GENERAL NOTES
VDOT GENERAL NOTES
LEGEND
VICINITY MAP
1. Methods and materials used in the construction of the improvements herein shall conform to the current
County construction standards and specifications and/or current VDOT standards and specifications.
2. Measures to control erosion and siltation, including detention ponds serving as silt basins during
construction, must be provided prior to issuance of the site development permit. The approval of these plans in
no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment
Control Handbook.
3. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Transportation
Vl. All work on this project shall conform to the current editions of and latest revisions to the Virginia
Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and
Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a
discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall
govern.
V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health
Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. °
4
EXISTING INTERMEDIATE CONTOUR 330
EXISTING INDEX CONTOUR. 330
PROPOSED CONTOUR 400��
EXISTING EDGE OF PAVEMENT EX E/P
PROPOSED EDGE OF PAVEMENT PROP E/P
EX C&G
EXISTING CURB AND GUTTER
SCALE: 1" = 2000'
Z
W
LU
/�` .✓f� I� /� ��
`< ��
�'
SITE ~
(VDOT) and Frederick County prior to construction in existing State right-of-way.
4. Approval of this plan does not guarantee issuance of an entrance permit by VDOT when such permit is
required under State law.
5. The exact location of all guard rails will be determined by VDOT personnel. "A joint inspection will be held
e Developer, Count Representatives, and Representatives of the Virginia Department of Transportation
with the p y p p g P P
(VDOT) to determine if and where guard rail and/of paved ditches will be needed. The developer will be
responsible for providing guardrail and paved ditches as determined by this joint inspection." Refer to
Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications.
6. An approved set of plans and all applicable permits must be available at the construction site. Also, a
representative of the developer must be available at all times.
7. Warning signs, markers, barricades or flagmen should be in accordance with the Manual on Uniform Traffic
Control Devices (MUTCD).
8. All unsuitable material shall be removed from the construction limits of the roadway before placing
embankment.
V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in
accordance with the current edition of VDOT's Work Area Protection Manual. Furthermore, all traffic control
flaggers must be certified in accordance with Section 104.04(c) of the VDOT Road and Bridge Specifications.
V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic
signal poles, unction boxes, controllers, etc., owned b VDOT or private public utility companies. It is, the
g P 1 Y P / P Y P
sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict;
with the proposed construction activity. VDOT approval of these plans does not indemnify the developer; from
this responsibility.
I"
V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject
to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision
shall be the responsibility of the developer. !
V6. Prior to initiation of work, the contractor shall be responsible for acquiring all necessary VDOT land use
permits for an work within VDOT right-of-way.
P Y
V7. If required by the local VDOT Residency Office, a pre -construction conference shall be arranged and, held
by the engineer and/or developer with the attendance of the contractor, various County agencies, utility
PROP C&G
PROPOSED CURB AND GUTTER
CG-6 CG-6R
TRANSITION FROM CG-6 TO CG-6R
EXISTING TELEPHONE LINE
PROPOSED TELEPHONE LINE}
EXISTING STORM SEWER EX. 1.5" RCP-
PROP. 15RCP
PROPOSED STORM SEWER
EXISTING SANITARY SEWER - -�•�-�
PROPOSED SANITARY SEWER
EXISTING ELECTRIC SERVICE
PROPOSED ELECTRIC SERVICE
�I
T'
T ~
ly �� ��
/ / %
, /t
��, J % �J �� - -
l!�
i , ,-��- �t 1
W o1
� 00
�
d
o
a � N
co ►n
I rn
CIO
Z x
L 6 � Lo W
[�
SHEET INDEX
aa) o
o >,
W v�
w
9. All pavement sections on the approved plans are based on a minimum CBR value of 6. CBR values less
than 6 will require revised pavement section prepared by Greenway Engineering and approved by the owner.
10. All roadside ditches at grades of more than 5% shall be paved with cement concrete to the limits indicated
on the plans and as required at the field inspection.
11. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall
be minimum 6" diameter and conform to VDOT standard SB-1.
12. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than
one litter receptacle shall be provided at the construction site.
13. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to
entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take
whatever measures are necessary to insure that the streets are maintained in a clean, mud and dust free
condition at all times.
14. Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary
sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut sheets,
and connections to existing lines.
15. All sanitary sewers and water mains and appurtenances shall be constructed in accordance with the current
standards and specifications of the Frederick County Sanitation Authority.
companies and VDOT prior to initiation of work. 1
V8. The contractor shall notify the local VDOT Residency Office when work is to begin or cease for any
undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required
or requested inspection.
V9. The contractor shall be responsible for maintaining adequate access to the project from the adjacent
public roadway via a construction entrance that is constructed and maintained in accordance with Section
3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected
by this project shall be maintained through construction. The Developer shall have, within the limits of! the
project, an employee certified by the Virginia Department of Conservation and Recreation (VDCR) in Erosion
and Sediment Control who shall inspect erosion and siltation control devices and measures on a continuous
basis for proper installation and operation. Deficiencies shall be promptly rectified. I
V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end
of construction.
VI 1. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum
t o -six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict
p
?
V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered
during the course of construction shall be immediately brought to the attention of the engineer and VDOT.
Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved
EXISTING GAS LINE
PROPOSED GAS LINE
PROPERTY LINE
FLOW LINE -- ...- ... ... - ... -.- . "- "'-`
FENCELINE
EXISTING POWER POLE
EXISTING TELEPHONE PEDESTAL
EXISTING WATERLINE W/ TEE -- -
, �,
PROPOSED WATERLINE W/ TEE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED WATER METER
PROPOSED REDUCER
1.) COVER SHEET
2.) MINOR SITE PLAN
Z
,)
>
W
by VDOT.
16. The location of existing utilities shown in these plans are taken from existing records. It shall be the
contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed
prior to construction. The contractor shall inform the engineer of any conflicts arising from his existing
utility verification and the proposed construction.
VI 3. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT i
representative prior to placement and fill. Where CBR testing is required, a VDOT representative shall be
present to insure the sample obtained is representative of the location. When soil samples are submitted to
private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project
STOP SIGN
PARKING INDICATOR
INDICATES THE NUMBER OF TYPICAL PARING SPACES 12
17. The developer will be responsible for any damage to the existing streets and utilities which occurs as a
result of his construction project within or contiguous to the existing right-of-way.
to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards
and procedures.
HANDICAP PARKING ��-
W
E-
18. When grading is proposed within easements of utilities, letters of permission from all involved companies
must be provided to Frederick County Public Works Department prior to issuance of grading and/or site
development permits.
19. The developer will be responsible for the relocation of any utilities which is required as a result of his
project. The relocation should be done prior to construction.
20. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected
in accordance with state law. In the event gravesites are discovered during construction, the owner and
engineer must be notified immediately.
21. The contractor is to verify field conditions prior to and during construction and notify Greenway Engineering
at (540) 662-4185 immediately of any discrepancies between actual field conditions and the approved plan.
22. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per standard
proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified b a registered
p PP � Y Y g
professional engineer and results submitted to Frederick County prior to pavement construction. If a
geotechnical report has been prepared, it should supersede the requirements in this note.
23. Contractors shall notify operators who maintain underground utility lines in the area of proposed excavating
or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of
excavation or demolition. Names and telephone numbers of the and operators underground utility lines in
Frederick County appear below. These numbers shall also be used to serve in an emergency condition.
24. All utilities to be located underground.
25. All outdoor lighting must be shielded from adjoining properties and road right-of-ways.
Note: Any place within these plans stating Greenway Engineering, shall represent Greenway Engineering, Inc.
V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted
in six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within
plus or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the
direction of VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT
Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless
specified otherwise.
V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as:
specified by VDOT. ;
l
V16. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet
VDOT minimum design standards and is the responsibility of the developer.
�
V17. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be
installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the
Manual On Uniform Traffic Control Devices.
I
V18. The developer shall provide the VDOT Residency Office with a list of all material sources prior to the
start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way
must be provided to the local VDOT Residency Office prior to acceptance of the work. Unit and total prices
may be obscured.
V19. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader.
Density will be determined using the density control. strip in accordance with Section 304 of the VDOT Road
and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified
copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking
stone depths, a VDOT representative shall be notified and given the opportunity to be present during the
construction and testing of the density control strip. 1
}
V20. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge
Specifications. Density shall be determined using the density control strip as specified in Section 315 and
VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be
submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the
opportunity to be present during the construction and testing of the control strip.
#
V21. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger
shall be explored below the bottom of the excavation to determine the type and condition of the foundation.
The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to
placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding,
or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation
stabilization shall be determined by the engineer and approved by VDOT.
V22. Approval of these plans shall expire three (3) years from the date of the approval letter.
i
V23. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified
by VDOT.
V24. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in
accordance with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT� after
grading is mostly complete.
VEHICLES PER DAY COUNT 100
PROPOSED BUILDING ENTRANCE
PROPOSED STREET NAME SIGN
PROPOSED SANITARY LATERAL CLEANOUT /0
SANITARY MANHOLE IDENTIFIER 12
STORM DRAIN STRUCTURE IDENTIFIER
EASEMENT LINE
CENTERLINE
EXISTING SPOT ELEVATION X �'B�`4
PROPOSED SPOT ELEVATION X35
EXISTING TREE LINE
Q
THESE PLANS ARE IN CONFORMANCE WITH FREDERICK COUNTY STANDARDS AND ORDINANCES. ANY DEVIATION
OR CHANGE IN THESE PLANS SHALL BE APPROVED BY THE ZONING ADMINISTRATOR PRIOR TO CONSTRUCTION
TH OF
�f
U"
MARK D, SMITH
"d SIC. NO. 22837 �
'A- W
jONAL
PROJECT INFORMATION
STREET ADDRESS: 220 IMBODEN DRIVE
WINCHESTER, VA 22603 4091.
PARCEL ID NO.: 54-(( 7)) -7A
LOT AREA: 9.80 AC.
DISTURBED AREA: < 10,000 SF (NO LAND DISTURBANCE PERMIT REQUIRED)
CURRENT ZONING: Ml
CURRENT USE: BUS TERMINAL AND TRUCK REPAIR -
PROPOSED USE: BUS TERMINAL, TRUCK REPAIR �`"�UTDOOR DISPLAY
BUILDING HEIGHT: `MAXIMUM ALLOWED = 60' PRO OP SED NONE
SIGNS: ONE PROPOSED. ANY FUTURE SIGNS TO CONFORM
WITH THE STANDARDS OF SECTION 165-30 OF
THE FREDERICK COUNTY ZONING ORDINANCE.
OUTDOOR LIGHTING: ANY OUTDOOR LIGHTING MUST BE SHIELDED TO
PREVENT ILLUMINATION OF ADJACENT PROPERTIES
PARKING CALCULATION: THE PROPOSED REVISIONS WILL NOT INCREASE EMPL MENT;
THEREFORE NO ADDITIONAL PARKING IS REQUIRED.
SWM CALCULATION: THE PROPOSED REVISIONS WILL NOT INCREASE THE IMPERVIOUS
__
- AREA THEREFORE NO ADDITIONAL SWM IS REQUIRED.
_ _ _ _ ___-____ _
`--=--=-----
LANDSCAPE CALCULATION: THE PROPOSED REVISIONS WILL NOT INCREASE THE IMPERVIOUS -'-
AREA OR PARKING COUNT; THEREFORE NO ADDITIONAL LANDSCAPING
IS REQUIRED.
---- -
'J
�• �'
U
Z
o �
Q
,
E- O LU <� E
�1 Z
W
,�2,' � � �, O
l� U
a
W � �
W
Z Q
® 1.4
� W
®
0 W
J o
�,
00
SURVEY AND TOPOGRAPHIC INFORMATION
1. Boundary survey was performed by:
Dated:
2. Aerial, horizontal and vertical control surveys were
performed by:
(Year)
3. Aerial topographic mapping performed by:
Dated:
FCSA CONSTRUCTION NOTES
1. The Authority's Water and Sewer Standards and Specifications are available at www.fcsa-water.com
2. The water and sanitary sewer portion of these plans are valid for two years from date of FCSA approval.
3. The contractor shall adhere to the standards and specifications in effect at the time of construction.
4. The contractor shall coordinate with, and arrange for inspection by, the Authority.
5. The contractor shall tie-in a new sewer line to an existingmanhole b core drilling the manhole.
y g
6. When an existingwater or forced sewer main is tapped for the installation of a new line:
a) The Authority shall furnish all labor )and material.
b) The contractor must:
1. make application and pay deposit
2. mark the tap location.
3. coordinate installation with the engineering -assistant.
7. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's Inspector.
8. The Authority's maintenance department shall furnish and install all water meters through 2" in size..
It is the contractor's responsibility to have the meter box assemblyinstalled correctly.
Before a permanent meter is installed: Y
a) The meter box, with its frame and cover, must be properly aligned with the coppersetter.
b) The frame and cover shall be set to final grade.
c) The distance between the top of the cover and the coppersetter shall to be between 18 and 21 inches.
d) All components of the meter box assembly shall be in proper working order.
TT
APPR0 UAL
FREDERICK COUNTY ZONING ADMINISTRATOR DATE
*APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5)
YEARS FROM THE DATE OF PLANNING APPROVAL
FIRE MARSHALS NOTE
lane markings and signagee:ainted curb locations will be installed
Any No Parking" signs and yellow painted
,
by field inspection at the direction of the Fire Marshal's Office. i
TRIP GENERATION DATA 9
9. For water and sewer services that connect to existing lines:
a) The location of the service lateral is to be coordinated with the Authority's engineering assistant.
b) An Application for Service must be made and fees paid before work will begin.
-
Project Name:
ELLIOTIWILSON ��
�ITA -p- TRUCKS,LLC
Project Number:
2131 W
CLASS
USE
DWELLING UNITS
*TRIP RATE
TRIP RATE USE
� VPD
c) The Authority shall furnish and install all 5/8", 3/4" and 1' water services.
�a /
8
d) For all 1 1/2" and 2" water services, the Authority shall make the tap and bring the piping to the
property line. The contractor shall furnish and install the meter vault assembly. The Authority will install the
meter.UJ
e) The Authority will install all sewer laterals.
¢
Magisterial District:
STONEWALL MAGISTERIAL DISTRICT
Date of Plan: (Month, Day, Year)
OCTOBER 1, 2007
10. Any water service line must have a backflow prevention assembly (double check valve or RPZ,
as required). The assembly must meet ASSE standard No. 1015 or 1013.
* TA
EN FROM ITE TRIP GENERATIO
7TH EDITION
DATE: 10 1 07
/ /
Owner:
Address, Including Zip Code & Telephone No.
g P P
220 IMBODEN DRIVE
UTILITY CONTACTS
SCALE: N/A
11. All fire lines shall have a backflow prevention assembly (detector double check valve or RPZ, as required).
The assembly shall meet ASSE standard No. 1048 or 1047. Any exterior, privately owned fire line shall also have a
fire service meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read
remotes are required.
12. FCSA to review the mechanical plan(s) for design and material approval of: 1) the domestic water meter and
its backflow prevention device, and/or 2) the fire service line's backflow prevention device.
SCHROCK, LARRY R. & DOROTHY A
WINCHESTER, VA 22603
(540) 678-2871
Water/ Frederick County Sanitation Authority Phone: Verizon
Sewer: P.O. Box 1877 P.O. Box 17398
Winchester, VA. 22604 Baltimore, MD 21297
s54-s282 �
(540) 868-1061 (301 ) 9
Power: Allegheny Power Gas: Shenandoah Gas Co.
Developer:
ELLIOT/WILSON CAPITAL TRUCKS LLC
Address, Including Zip Code & Telephone No.
8300 ARDWICK ARDMORE ROAD
LANDOVER, MD 20785
(301) 341-5500
DESIGNED BY: EJG
FILE NO. 2131W
Engineer Certifying Plan:
GREENWAY ENGINEERING
Address, Including Zip Code & Telephone No.
151 WINDY HILL LANE
WINCHESTER, VA 22602
(540) 662-4185
P.O. Box 1458 P.O. Box 2400 �
Hagerstown, MD 21741 Winchester, VA 22604
1-800-654-3317 (540) 869-1111
Virginia Utility Protection Service 1-800-552-7001
HANDICAPPED PARKING NOTE
SHEET 1 OF 2
Handicapped parking spaces and aisles shall slope
no greater than 2% in all directions.
07-106
a
kD
N
r-I
n
O
O
N
N
O
1-4
V)
(N
O
7
1-4
r-I
N
a�
�o
a
0)
c
c
cn
W
M
N
aJ �
i O
. C7
X W
CURVE
DEL TA
RADIUS
ARC
TANGENT
CHORD
Cl
08°39' 14 "
5, 623.58'
849.38'
425.50'
S 00°00'24 " E 848.57'
C2
188°5546"
50.00'
164,87'
-
I N 36°4222" W 99.70'
C3
68.3332 "
1 25. 00'
29. 91 '
1 17. 04'
1 S 83°06'31 " W 28. 16'
a
z
W
W
Z
Z
W
o
Lo
co
W,
00
-
a
'
tcov
m,
z
C.\1
�"v
'o �',
w 'I
W
aL
.�-ir
ALo �G
HG4
W
V�J
z
0
H
H
W
IWH OF D
MARK D. SMITH
LicL
No22837
'o
�3L 'V
U
J
J
C
U
H
OC
�
~'
o
w
,-
z
cn
Q
Z
0
�
0�
Ci)
w
�'
.J
o
_
E--,
cn
J
J
W
DATE: 10/1/07
SCALE: 1"
= 50'
DESIGNED
BY:
EJG
FILE
NO.
2131 W
SHEET 2
OF
2
07-106