Loading...
HomeMy WebLinkAbout04-17 Carbaugh Business Center - Back Creek PINs 74-A-68 & 69 RA to M1 with Proffer - BackfileREZONING TRACKING SHEET rhi-ek Lief - Application Form Proffer Statement Impact Analysis Adjoiner List File opened Fee & Sign Deposit Deed Plat/Survey Taxes Paid Statement Reference manual updated/number assigned D-base updated Copy of adjoiner list given to staff member for verification Color location maps ordered from Mapping Application Action Summary updated Planning Commission Meeting Board of Supervisors Meeting ACTION: t' ACTION: Signed copy of Resolution received from County Administrator and placed in Proffers Notebook together with proffers Approval (or denial) letter mailed to applicant/copy to file and cc's Reference manual updated D-base updated Application Action Summary updated File given to Mapping to update zoning map Zoning map amended Proffers recorded QC-Q-naod NOTES RECEIPT RECEIVED FROM ADDRESS DATE —No. 379193 A �3 FOR C ZC U L 1 0 0 Cuki tiq -A - 6,9 ACCOUNT HOW 7q -P Alml. OF CASH ACCOUNT AA'T' 7A 1 CHECK ,A,, 9Q, BALANCE I MONEY DUE 1 ORDER )0 d02001 " p,8006 i 0 December 14, 2017 Mr. Timothy Stowe Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 RE: REZONING #04-17 Carbaugh Business Center PINS: 74-A-68 and 74-A-69 Dear Tim: COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Pax: 540/665-6395 This letter serves to confirm action taken by the Frederick County Board of Supervisors at their meeting on December 13, 2017. The above -referenced application was approved to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M l (Light Industrial) District with proffers. The property is located on the southeastern side of Shady Elm Road, approximately L I 1 miles southwest of the intersection of Shade Llm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad in the Back Creek Magisterial District. The parcels are identified as Property Identification Numbers 74-A-68 and 74-A-69. The proffer statement, originally dated October 6, 2017 and revised on October 19, 2017, that was approved as a part of this rezoning application is unique to the above referenced property and is binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your records. Pursuant to §165.102.06E, the County Attorney will present the written proffer to the Frederick County, Clerk of Circuit Court for recordation. Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning application. Sincerely, Candice Perkins, AICP Assistant Director CEP/pd Attachment cc: Gary A. Lofton, Back Creek Supervisor Greg L. Unger and J. Rhodes Marston, Back Creek District Planning Commissioners Jane Anderson, Real Estate Ellen Murphy, Commissioner of Revenue Rod Williams, County Attorney w/Proffer and Resolution Bank of Clarke County "Trust Dept., c/o Henry Carbaugh, 202 N. Loudoun St. Winchester, VA 22601 107 North Kent Strect, Suite 202 o Winchester, Virginia 22601-5000 U • Pam Deeter To: Gary Lofton; Greg Unger; Rhodes Marston Subject: Approval of Rezoning #04-17 Carbaugh Business Center Attachments: Carbaugh Business Center.doc Good morning, Please find attached the approval letter for the Rezoning 404-17 Carbaugh Business Center which is in your magisterial district. If you have any questions, please contact Ms. Perkins. Pam Deeter Planning and Development 107 N. Kent Street, Suite 202 Winchester, VA 22601 (540) 665-5651 0 C� Pam Deeter From: Microsoft Outlook To: Gary Lofton Sent: Friday, December 15, 2017 9:49 AM Subject: Delivered: Approval of Rezoning 404-17 Carbaugh Business Center Your message has been delivered to the following recipients: Gary Lofton (glofton@fcva.us) Subject: Approval of Rezoning #04-17 Carbaugh Business Center 9 i Pam Deeter From: Microsoft Outlook To: Rhodes Marston Sent: Friday, December 15, 2017 9:49 AM Subject: Relayed: Approval of Rezoning #04-17 Carbaugh Business Center Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: Rhodes Marston (irmmarston(@gmail.com) Subject: Approval of Rezoning #04-17 Carbaugh Business Center Pam Deeter From: Microsoft Outlook To: Greg Unger Sent: Friday, December 15, 2017 9:49 AM Subject: Relayed: Approval of Rezoning #04-17 Carbaugh Business Center Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: Greg Unger (greglunger(abyahoo,com) Subject: Approval of Rezoning #04-17 Carbaugh Business Center REZONING APPLICATION 904-17 CARBAUGH BUSINESS CENTER Staff Report for the Board of Supervisors Prepared: November 28, 2017 StafT Contact: Candice E. Perkins, AICP, CZA, Assistant Director John Bishop, AICP, Assistant Director —Transportation Reviewed Action Planning Commission: 1 1/01/17 Public I-Iearing Held; Recommended Approval Board of Supervisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21-1-/- acres fi-onl the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. LOCATION: The site has an address of 831 Shady Ehn Road (Route 651) and is located on the southeastern side of Shady Elm Road, approximately 1.1 1 miles southwest of the intersection of Shady Elfin Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/13/17 BOARD OF SUPERVISORS MEETING: This is an application to rezone two parcels of land that total 107.21+/- acres front the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the requested MI Zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation Improvements to Renaissance Drive (lip to a Inaxilllllnl of $1,080,OOO.00), right-of-way dedications for Renaissance Drive and Shady Ehn Road, limits on the number of access points for the site, and proffers for inter -parcel connections for all new parcels. The Applicant has also provided proffers for the screening of loading docks, landscaping, signage, documentation of the Carbaugh I-Iouse and monetary proffers for fire and rescue purposes. The Planning Commission recommended approval of the rezoning application at their November 1, 2017 meeting. Following the required Public hearing, a decision regarding this rezoning application by the Board of Supervisors ivould be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Board of Supervisors. Rezoning #03-17 Carbaugh Business Center November 28, 2017 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision ou this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 11/01/17 Public I-Iearing Held; Recommended Approval Board of Superwisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21-E-/- acres from the RA (Rural Areas) District to the M I (Light Industrial) District with proffers. LOCATION: The site has an address of 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately L I 1 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad. MAGISTERIAL DISTRICT: Back Creek PROPERTY Ill NUMBER: 74-A-68 and 74-A-69 PROPERTY ZONING: RA (Rural Areas) District PRESENT USE: Vacant/Agricultural ADJOINING PROPERTY ZONING & PRESENT USE: North: MI (Light Industrial) District Use: Vacant RA (Rural Areas) District Residential, Agriculture South: RA (Rural Areas) District Use: Residential, Agriculture East: B3 (Industrial Transition) District Use: Commercial RA (Rural Areas) District Railroad West: RA (Rural Areas) District Use: Residential, Agriculture • 0 Rezoning #03-17 Carbaugh Business Center November 28, 2017 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation (VDOT): Please see the attached email. from Mcilthen, Smith, P.E., dated September 7, 2017. Frederick County Fire Marshall: Approved Frederick Water: Please see the attached letter from Uric R. Laivl'ence, Execulive Direclol' dated August 18, 2017. Frederick Count}- Department of Public Works: A comprehensive review shall occur at time of site plan submission. We offer no additional comments at this time. Vir14inia Department of Health: This I lealth Department has reviewed the request for comments for the Rezoning of property located at 831 Shady Elm Road, in the Back Creek Magisterial District, Tax Map #74-A-68 & 74-A-69 from RA to M1. Based upon information provided by the Applicant, this Health Department has no objection to the rezoning of the subject property. However, it is the recommendation of this Health Department that any know or discovered sewage disposal systems or private water wells on the property be properly abandoned, per I-Iealth Department Regulations or best practice policies. In the event that it is determined that there are sewage disposal systems or private water wells on the property, please notify this Health Department immediately for proper abandonment procedures. Frederick County Planning Department: Please sec' the attached letterfi'oln Candice E. Perkins, Assistant Director dated Augusl 7, 2017. Frederick County Transportation Continents: Pleasesee the attached le'tle'1',1'oln John A. Bishop, Assistant Dll'eclol'-T7'c111Sl7o1'latloll dated Angus/ 7, 2017. Historic Resources Advison, Board: The Historic Resources Advisory Board (I-IRAB) recommended approval of the Rezoning with the condition that the Applicant perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34-1040) prior to its demolition. Planninjz & Zoniniz: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Winchester Quadrangle) depicts the subject properties as being zoned A-2 (Agricultural General) District. The County's agricultural zoning districts were subsequently Combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. 0 0 Rezoning #03-17 Carbaugh Business Center November 28, 2017 Page 4 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It Is In essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, arc the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Kernstown Area Plan identifies these properties with an industrial land use designation as outlined in the Shady Elin Economic Development Area, which is generally consistent with the requested M1 zoning designation. The Shady Elm Economic Development Area is designed to be a significant area of industrial and commercial opportunity that is fully supportive of the County Economic Development Authority's targeted goals and strategies. The intent of the industrial designation is to further enhance the County's commercial and industrial areas and to provide focus to the County's fixture regional employment centers. Transportalion and Site Access The Eastern Road Plan of the 2035 Comprehensive Plan and the Kernstown Area Plan both call for the extension of a new major collector roadway though parcel 74-A-68, which is adjacent to the Artillery Business Center Development which was rezoned in 2007 and revised in 2015. This new major collector roadway, Renaissance Drive, has been constructed from Valley Pike (Route 11) to the limits of the CXS Railroad. The Comprehensive Plan calls for this roadway to be extended to Shady Elm Road. The plan also calls for Shady Elm Road to be improved four lane divided collector roadway. Site access to the subject property will be provided via two entrances on Renaissance Drive. 3) Site Suitability/Environment: The site is not located within or near any 100-year floodplains. The site has some wetlands in the form of two small farm ponds and a spring. The spring feeds one of the ponds and drains via a culvert under the CSX railroad; the Applicant intends on preserving the spring and lower pond while removing the upper pond. There are no areas of mature woodlands. The site does contain 46 acres of prime agricultural farmland and 59 acres of farmland of statewide importance. Rezoning 403-17 Carbaugh Business Center November 28, 2017 Page 5 4) Potential Impacts: E.visting Residential Uses: This application recognizes the existing residential land uses that are zoned RA (Rural Areas) District that are located adjacent to and across Shady Elm Road from the Carbaugh Property by providing buffering and landscape screening (full screen) consistent with the Zoning Ordinance to screen the development and loading docks from Shady Elm Road. "Phis buffer consists of 100' of distance (75' active/25' inactive), a 6' berm and 3 plants per 10 linear feet. Historic Resources: The Study of Civil War Sites in the Shenandoah Valley published by National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify a core battlefield on the site. The battle maps for the 1" and 2"`1 Battles of Kernstown show that troops might have marched across the subject property on their way to the battles, no fighting is recorded on the property. The Historic Resources Advisory Board recommended that the Applicant conduct an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34- 1040) prior to its demolition; the Applicant included this in their proffer statement. Frederick County Transportation Comments: The Applicant's Transportation Impact Analysis assumes 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. This results in average weekday vehicle trips totaling 4,820 which the Applicant proposes to address via transportation proffers of right-of-way and funding toward the Renaissance Drive project. The proffered funding amount allows the County to fully match revenue sharing funds that have been awarded to the project. 5) Proffer Statement — Dated October 6, 2017, Revised October 19, 2017 Site Improvements: 1. The owner agrees to participate in the cost of transportation improvements in the nearby area, up to a maximum of $1,080,000.00. Such payment shall be made either within 30 calendar days after the start of the Renaissance Drive extension or prior to the issuance of the certificate of occupancy for all buildings developed on the Property, whichever comes first. 2. The owner agrees to dedicate 60' of right-of-way along Shady Elm Road, 10' of which shall be used for construction of a pedestrian trail. 3. The owner agrees to dedicate 20' of right-of-way along its northeast boundary for the extension of Renaissance Drive from Valley Pike to Shady Elm Road. 4. The owner agrees to grant to Frederick County an 80' grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the Renaissance Drive. 5. The owner agrees to limit the number of commercial entrances for the property to a maximum of two along Renaissance Drive. a. In the event that the property is developed prior to the completion of Renaissance Drive, the owner may build a portion of the road from Shady Elm Road to the first entrance to the site to enable use of the site. 0 0 Rezoning #03-17 Carbaugh Business Center November 28, 2017 Page 6 b. In the event that Frederick County requests that the owner not build a portion of the extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance will be permanently closed immediately after Renaissance Drive is available for use by the applicant. 6. The owner proffers to provide for inter -parcel connections for all new lots to provide access to the access points on Renaissance Drive. Building Restrictions: The development of the subject Property shall include the following building restrictions: 1. All loading docks shall be screened from view From all adjacent properties in the RA (Rural Areas) Zoning District that are located west of Shady Elm Road. The owner will utilize a 100' Category C (full Screen) buffer. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the Henry Carbaugh House prior to its demolition. Landscape Design Features 1. The owner shall provide street trees planted 50' on center adjacent to the Renaissance Drive road extension. Monetary Contributions to Offset Impact of Development: The owner proffers to pay $30,000.00 prior to the issuance of the Certificate of Occupancy for the first structure constructed on the property for fire and rescue purposes. PLANNING COMMISSION SUMMARY AND ACTION FROM THE I1/1/17 MEETING: Staff reported this is an application to rezone two (2) parcels of land that total 107.21 +/- acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. Staff further stated that the properties are located within the limits of the Sewcr and Water Service Area (S WSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. Ms. Perkins noted the plan identifies these properties with an industrial land use designation as outlined in the Shady Elm Economic Development Area and the Comprehensive Plan calls for the extension of a new major collector roadway, Renaissance Drive. A Commission Member inquired about the monetary transportation proffer and what it would provide and about improvements to Shady Elm Road. Staff stated that the monetary proffer would be for the construction of Renaissance Drive and noted that the application proffers right-of-way for future widening of Shady Elm Road. Mr. Tim Stowe of Stowe Engineering, P.L.C. representing the Applicant came forward. Mr. Stowe reported there are benefits of this project that he feels should be highlighted and are: the project builds on the work the Planning Commission has done over the past two years when the Comprehensive Plan and the Kernstown Area Plan were updated, the transportation improvements will be critical to that local area, the property is rail accessible, will provide an additional 60' right-of-way on Shady Elm 0 0 Rezoning 903-17 Carbaugh Business Center November 28, 2017 Page 7 Road to satisfy requirements Of the Comprehensive Plan and a multi -use trail along Shady Elm Road and proffered inter -parcel connectors. The Applicant also stated they have taken steps to protect neighbors with buffers and screening and that there will be no signs placed on Shady Elm Road. During the public hearing three citizens came forward to speak. Concerns were expressed about traffic safety, the potential for large trucks along Shady Elm Road, and Springdale Road and the proffered monetary contribution to Fire and Rescue. Mr. Stowe addressed the concerns pertaining to truck traffic; he empathizes with the citizens that canine forward regarding Springdale Road. He continued it's his Understanding that the railroad crossing oil Springdale Road may eventually be closed with the bridge crossing at Renaissance Drive taking shape. Regarding the Fire and Rescue proffer, Mr. Stowe reported over a million dollars is being invested in Renaissance Drive to make emergency access to this area much easier and faster for emergency vehicles to be able to get to the residences, businesses, and the surrounding area. Mr. Stowe concluded, they feel that is a significant contribution to help with the needs of Fire and Rescue. A motion was made, seconded, and Una11imollSly recommended approval ofREZ 1/04-17 for Carbaugh Business Center. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/13/17 130ARD OF SUPERVISORS MEETING: This is an application to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the requested M 1 zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation improvements to Renaissance Drive (up to a maxinnunl of$1,080,000.00), right-of-way dedications for Renaissance Drive and Shady Elm Road, linnits On the number Of access points for the site, and proffers for inter -parcel connections for all new parcels. The Applicant has also provided proffers for the screening of loading clocks, landscaping, signage, documentation ofthe Carbaugh I-IOuse and monetary proffers for fire and rescue purposes. The Planning Commission recommended approval of the rezoning application at their November 1, 2017 meeting. Following the required public hearing, a lleciyion regarllin;; this rezoning, application by the Board of Supervisors would he appropriate The Applicant should be prepared to a(lequatell) lldlh•evs all concerns raised by the Board of Supervisors. REZ#04-17 Carbaugh Business Center -a PINS: 4-A-68,74-A-69 Rezoning from RA to M1 Zoning Map wo _ HOCRAUUAN Fi � �+ 1 HOCKRRAN Ci 6 ` NOCKMAN CT 130 - HOCKIN NCT / •, .; ,; p DEVELOPMENTLN ® STVALOR� - -s,• rr, - — 553 VAL �180 1 * PROSPERTY DR PROSPEE=Ra ,'Y DR 1_ PRO SPE v F"�;cf a,•. DR � I61 ,201 PROSPER PROSPERITY DRVA • �12d �46 /ROS/ER11 VA UEY :PI fPROSIERR_Y R 4006 f VALLEY PIKE •' � f C� 1016 r • t VALLEY "- IIKE 4050 VALLEY •e>,` PIKE CY.1'RV �IWO� '4184 aE -•o. '- � SHADY s VAUEY • MARARAiI ELM RD VALLEY ' a 4141 4 PIKE IIKE• • J1� '�•-" • �.� VALLEY 1013 S/RINGDALE PD SIRINGDALE RD III PIKE tNADY ' MUSKET ' EUNRD MUSKETI`R 1 222 4i00 �M MUSKET DF 3l� S►RINGDALERD -eV_�LLEYj, SPRING INGDAIE RD • 'IIKE SPRINGDALE RL)' is • 8 v� 385 ' �. 140 Applications SPRINGDALE RD r —L GOALE RD r Sewer and Water Service Area f Parcels Building Footprints • t 371 ' 12 B1 (Neighborhood Business District)SPRINGDALE'DR S PRIN G D 02 (General Business District) 4324 4330 VALLEY r Transition83 (industrial VALLEY PIKE e1 EM (Extractive Manufacturing - District) PIKE - N. , REZ # 04 - 17 Carbaugh Business Center PINS: I - A - 68,74 - A - 69 -Rezoning from RA to Ml Location Map O!W 957 SHADY FUN RD 983 SPRINGDALE NADY ElM RD ILE RD 400/RINGDALERD SIRINGOALE•RD' 385 21 SPRING ' LE S RINGDALE RD Ate �03838 .4RI010 .,�GDALE RD 4 7 rRIAL:DP J�c F N 4 #.4168 VALLEY VALL. Y WE PIKE SPRINGDALE RD .222 4200, SPRINGDALE RD VAIKE LLEY P � � A 140 SPRINGDALE DA IF R,, 12 '4324 4330 'VALLEY VALLEY PIKE " 46 PIKE 3 VAL Mcc) CKMANC I HCCi r t;a,• �1 N CCK N''''C1��I i NGFKM sNADr ELM�RD SKrJESTW 5SKyj;'ES 1� SKYIES LN PAY". Sewer and Water Service Area Parcels 0{! Building Footprints Long Range Land Use Residential Neighborhood Village Urban Center • Mobile Home Community Business Highway Commercial Mixed -Use 0 Mixed Use Commercial/Office 0 Mixed Use Industrial/Office - Industrial ® Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center ® Fire & Rescue • Sensitive Natural Areas ® Institutional • Planned Unit Development Ar Park Recreation School Employment Airport Support Area 0 B2/B3 O Residential. 4 u/a �O High -Density Residential, 6 u/a O High -Density Residential. 12-16 u/a ORural Area Interstate Buffer Landoll Support Area Natural Resources 8 Recreation • Environmental & Recreational Resources M C OQ Qor I i. 0016 • VALLE1 PIKE I V IILLEEY V ►IKE� ••• �� ,�PII 224 IGDALE RD S/RINGDALE RD +• IKEi D �' �i 110 1200 I�iN SK 61�� � SIRINGDALE RD yA�y 222 /IKE • R S/RINGDALE RD M ' 136 �j MUSKET DF 4�jj4 _ SIRI'�LE RD .. ® Oq t �p0 l Note: REZ It04 - 17 Frederick County Dept of Carbaugh Business Center Planning a Development PINS: 107 N Kent St e 74-A-68.74-A-69 Suife202 Rezoning from RA to MI Winchester, VA 22601 Long Range Land Use Map 540 - 665 - 5651 Map Created: October 10. 2017 Staff: cperkins 0 4625 925 1,850 Feet ,�I 1� • 0 REZONING REQUEST PROFFER Property Identification Number 74 - ((A)) - 68 and 74 - ((A)) - 69 Back Creek Magisterial District Carbaugh Business Center Record Owner: The Henry J. Carbaugh Trust Applicant: Timothy Stowe Original Date of Proffers: 10/6/17 Revisions Date of Proffers: 10/19/17 Preliminary Matters Pursuant to Section 15.2-2296 et.seq of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application t# for the rezoning of Tax Map Parcel 74-A-68, a 89.8719-acre parcel, and Tax Map Parcel 74-A-69, a 17.3391-acre parcel, to establish 107.21 +/- acres of Light Industrial (M-1) Zoning District, development of the 107.21 +/- acre Light Industrial (M-1) Zoning District, hereinafter referred to as the "Property", shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the owner and such be approved by the Frederick County Board of Supervisors in accordance with Virginia Law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the owner and their legal successors or assigns. Site Improvements The owner agrees to participate in the cost of transportation improvements in the nearby area. The owner will contribute to Frederick County, Virginia, a maximum of one million and eighty thousand dollars ($1,080,000.00). Such payment shall be made either within 30 calendar days after the start of construction on the extension of Renaissance Drive that will connect with Shady Elm Road or prior to the issuance Proffer Statement Page 1 of 4 • 0 of the certificate of occupancy permit for the first building structure developed on the Property, whichever event occurs first. Such funds can be used by the Board of Supervisors in its discretion for transportation improvements related to the extension of Renaissance Drive, an East-West Collector Road, to Shady Elm Road and can be used as local match funding for County Revenue Sharing Program projects related to the aforementioned extension. The owner agrees to dedicate 60' (sixty feet) of right-of-way along Shady Elm Road to Frederick County as depicted on the Generalized Development Plan (GDP), which is attached and incorporated as part of the Proffer Statement. 10' (ten feet) of which is to be used for the construction of a pedestrian trail adjacent to the Property. This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. The owner agrees to dedicate 20' (twenty feet) of right-of-way along its northeast boundary to Fredrick County for the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road. This right-of-way is depicted on the GDP. This dedication is to be made within 90 (ninety) days of a written request by Frederick County. 4. The owner agrees to grant to Frederick County an 80' (80 feet) grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road if needed. The final length of the easement will be determined during the design phase of the extension of the East- West Collector Road. The length shall not exceed the distance from the CSX rail line to the start of the bridge ramp. This grant is to be made within 90 (ninety) days of a written request by Frederick County. 5. The owner agrees to limit the number of commercial entrances for the Property to be rezoned to a maximum of two (2) entrances along the new collector road to be constructed as an extension of Renaissance Drive and intersecting with Shady Elm Road. In the event the property is developed prior to the completion of Renaissance Drive collector road extension, the owner may build a portion of Renaissance Drive collector road extension from Shady Elm Road to the first entrance to the site to enable use of the site. The portion of the collector road to be built in this event will meet with both VDOT and Frederick County approval. In the event that Frederick County request that the owner not build a portion of the Renaissance Drive collector road extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance on Shady Elm Road will be permanently closed Proffer Statement Page 2 of 4 • • immediately after the Renaissance Drive collector road extension is available for use by the owner. 6. The owner herby proffers to provide for inter -parcel connections for all new lots to provide access to the two new access points on Renaissance Drive. Building Restrictions The development of the subject Property shall include the following building restrictions: 1. All loading docks shall be screened from view from all adjacent properties in the Rural Area (RA) Zoning Districts that are located west of Shady Elm Road. The Owner will utilize a Class C — Full Screen (As defined by Frederick County at the date of this rezoning) 100' (one hundred feet) buffer adjacent to Rural Area (RA) Zoning Districts west of Shady Elm Road. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - 434-1040) prior to its demolition. Landscape Design Features The development of the subject Property, and the submission of any Master Development Plan, shall include the following landscape design features: The owner shall provide street trees planted 50 (fifty) feet on center adjacent to the Renaissance Drive collector road extension. The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County. Monetary Contributions to Offset Impact of Development The owner, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning for the 107.21 +/- acre property to the Light Industrial (M-1) Zoning District, the undersigned will pay Frederick County, prior to the issuance of the Proffer Statement Page 3 of 4 0 Certificate of Occupancy Permit for the first structure constructed on the Light Industrial (M-1) Zoning District portion of the parcel, the sum of thirty thousand dollars ($30,000.00), for use by the Board in its discretion for fire and rescue purposes. Additionally, the owner shall contribute five thousand dollars ($5,000.00) to the Kernstown Battlefield Association prior to the issuance of the Certificate of Occupancy Permit for the first structure constructed on the property. Escalator In the event the monetary contributions set forth in the Proffer Statement are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by the owner, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of 4 percent (4%) per year, non -compounded. Respectfully Submitted, The Henry J. Carbaugh Trust OWNER: HC✓l ^y 'J, CG<b<«,F/ I J/�rs,i �{vic(.�•' Date: ! f�' 7�� , A r f- STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -Wit: e X0,-i —7 S�c�Ce,SSF 'j ✓'USIeN The foregoing instrument was acknowledged before me this day of 2017, by CPrr\ LSaer 1 My Commission expires 9 Zo • 10 Notary Public Proffer Statement Page 4 of 4 • 0 AMENDMENT Action: PLANNING COMMISSION: November 1, 2017 - Recommended Approval BOARD OF SUPERVISORS: December 13, 2017 - ❑ APPROVED F] DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING 804-17 CARBAUGI-I BUSINESS CENTER WHEREAS, REZONING #04-17 Carbaugh Business Center, submitted by Stowe Engineering, PLC to rezone two parcels of land that total 107.21 f acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers with a final revision date of October 19, 2017 was considered. The site has an address of 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately 1.1 1 miles southwest ofthe intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad, in the Back Creek Magisterial District and is identified by Property Identification Nos. 74-A-68 and 74-A-69; and WHEREAS, the Planning Commission held a public hearing on this rezoning on November I, 2017 and recommended approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on December 13, 2017; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors, that Chapter 165 of the Frederick County Code, Zoning, is amended to rezone two parcels of land that total 107.21f acres from the RA (Rural Areas) District to the M I (Light Industrial) District with proffers with a final revision date of October 19, 2017. The conditions voluntarily proffered in writing by the Applicant and the Property Owner are attached. PDRes #45-17 0 9A This ordinance shall be in effect on the date of adoption. Passed this 13th day Of December, 2017 by the following recorded vote: Charles S. DeHaven, Jr., Chairman Gary A. Lotion J. Douglas McCarthy Robert W. Wells Gene E. Fisher Blaine P. Dunn PDRes 945-17 Judith McCann -Slaughter A COPY ATTEST Kris C. Tierney Frederick COLrnty Administrator 0 • Candice Perkins From: Funkhouser, Rhonda (VDOT) <Rhonda.Fun khouser@VDOT.Virginia.gov> on behalf of Smith, Matthew, P.E. (VDOT) <Mattliew.Smith@vdot.virginia.gov> Sent: Thursday, September 7, 2017 9:37 AM To: John Bishop; 'mcheran@fcva.us Cc: Tim Stowe; Short, Terry (VDOT); Campbell, Adam (VDOT); Smith, Matthew, P.E. (VDOT) Subject: Carbaugh Rezoning - Tax Map 74-A-68,69 - VDOT Comments A VDOT review has been completed on the Carbaugh Rezoning. We offer the following comments: Following discussions with Frederick County, it is VDOT's understanding that if an agreeable proffer regarding the monetary participation for the completion of Renaissance Drive can be reached between Frederick County and the developer, the county will consider the transportation mitigation responsibilities of the subject property resolved. While VDOT agrees that the completion of Renaissance Drive is an important and significant transportation improvement to the area, there remains future concerns over the operation of US 11 and the interchange with Route 37 given the extent of planned developments in the region. Should the County determine a revised submission of the TIA is not warranted, the following comments are for the County's knowledge and understanding of potential operational issues related to the TIA's study limits along the US 11 corridor. 1. The primary mitigation proposed in the study to address transportation impacts of the development is monetary participation by the developer in the extension of Renaissance Drive to Shady Elm Road. While this transportation improvement is critical for the subject development, as well as other developments in the vicinity • of Shady Elm Road and Apple Valley Road, the current trigger of said participation in both the draft proffers and study report conveys the risk of potential impacts to the existing transportation network in the event that the subject development proceeds prior to the completion of Renaissance Drive. The study states that access to the development will be from Shady Elm Road prior to the completion of Renaissance Drive and the conclusion section states that "the traffic that is forecasted from this development can be accommodated on the existing road network". However, this assumption is unfounded as the TIA does not include Build and Design Year scenarios where Renaissance Drive does not connect US 11 and Shady Elm Road. It is VDOT Staunton District Planning's recommendation that Frederick County consider requesting modifications to the proffers that requires the monetary participation of the developer and start of construction on the extension of Renaissance Drive, prior to the issuance of the initial occupancy permit on the subject property. Without such changes to the proffer, it is recommended that the TIA be revised to evaluate the build and design year impacts without Renaissance Drive in place and detail improvements needed to mitigate impacts. The traffic models and analysis outputs presented in the study are currently inadequate in identifying the future operational performance of the US 11 corridor between Renaissance Drive and the Route 37 interchange. As a result, the potential impacts of the full build out of the subject property on US 11 are unclear. The following is a summary of deficiencies within the current traffic models: • In all models, the traffic signal at US 11 and the Route 37 eastbound ramps is coded with signal timings, vehicle extension, and clearance intervals that do not match VDOT supplied data (the signal timing sheet is included in Appendix F of the report). • In the existing year models at the US 11 and Route 37 eastbound ramp signal, the left turn movements for • the off -ramp and Kernstown Commons Boulevard approach need to be revised to protective / permissive phasing with leading lefts. Ll • • The percentage of heavy vehicles within the models seems to be based on the number of heavy vehicles counted during the entire traffic data collection window instead of the peak hour window, and therefore • may not represent accurate conditions. Additionally, it seems future year heavy vehicle percentages at the US 11 and Route 37 eastbound ramp intersection were not adjusted for development traffic. • No trips were assigned to the various side streets accessing US 11 between Renaissance Drive and Route 37 and as a result, there are considerable vehicle balancing discrepancies in the models. While these side streets were not scoped as study intersections, assumptions should have been made for these side street movements to achieve vehicle balancing in the network and provide a more accurate analysis of the operational performance of US 11. • The analysis does not consider trip diversion or potential impacts from existing developments along Shady Elm Road and Apple Valley Road to the US 11 corridor via routing along Renaissance Drive. 3. Even with the deficiencies listed above, based on the potential trip generation associated with the subject property and other potential developments within the vicinity, it is likely that additional improvements will be necessary within the study area to mitigate future impacts. These may include access management / alternative intersection consideration along US 11 between Renaissance Drive and Route 37 and a potential second lane on the Route 37 eastbound on -ramp to accommodate simultaneous receipt of heavy northbound left turns and southbound right turns from US 11. 4. In the Build and Design Year models, the US 11 and Route 37 eastbound ramp signal is modified from the current protected only left turn phasing on US 11 to protected / permissive phasing in the form of flashing yellow arrows. However, this left turn phasing modification is not discussed in the report from either a safety or operational perspective or listed as an improvement recommendation. If a modification from protected only to protected / permissive left turn phasing is being considered as a future year improvement, VDOT recommends • that the protected only left turn phasing also be analyzed in the future year to identify operation impacts if left turn phasing must be converted back from protective / permissive should a safety concern arise. Additionally, VDOT intends to upgrade the Route 37 eastbound ramp and Kernstown Commons Boulevard left turn phasing to protective / permissive via flashing yellow arrows in the next few years. 5. When Frederick County's Revenue Sharing project advances for the extension of Renaissance Drive, improvements should be considered along the existing section of the roadway to improve future operations of the facility as developments begin to come online. Improvements to be considered include modifying the traffic signal at US 11 to provide flashing yellow arrow left turn phasing and the consolidation of the two eastern most entrances currently serving vacant properties in order to reduce potential turning movement conflicts and increase available storage of the eastbound left turn lane onto northbound US 11. 6. The study includes two trip generation scenarios for the subject property, consisting of ITE rates and custom rates with supporting documentation as proposed by the preparer of the study. This approach was agreed to during study scoping to evaluate the differences in transportation impacts between to two trip generation scenarios. Please be advised that the utilization of ITE rates will still be the accepted process for all studies moving forward per the Chapter 527 TIA Administrative Guidelines. Any use of custom trip rates, if requested, will be discussed on a case by case basis during the study scoping process. Should you have any questions or wish to discuss this information, do not hesitate to let me know. Matthew B. Smith, P.E. I Area Land Use Engineer Virginia Department of Transportation Clarke, Frederick, Shenandoah & Warren Counties • ] 4031. Old Valley Pike Edinburg, VA 22824 voice: 540/984-561.5 11 • Matthew.Smith@vdot.virginia.gov • FREDERICK WAFER 315 Tasker Road PH (540) 868-1061 Eric R. Lawrence Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director www.FrederickWater.coni August 18, 2017 Tim Stowe Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 RE: Rezoning Application Comment Carbaugh Rezoning Application Tax Map Number: 74-A-68 and 74-A-69 • 107.21 acres Dear Mr. Stowe: Thank you for the opportunity to offer review comments on the Carbaugh rezoning application package, with an undated draft proffer statement and the Impact Statement dated October 21, 2016. Frederick Water offers comments limited to the anticipated impact/effect upon Frederick Water's public water and sanitary sewer system and the demands thereon. The project parcels were recently added to the sewer and water service area (SWSA) and in an area not presently served by FCSA. SWSA enables access to public water and sewer service by county policy. Location within the SWSA does not guarantee that sanitary sewer and water capacities are available to serve the property. The rezoning application is silent on the potential use, square footage, and water and sewer demands. The Impact Analysis suggests a 1,000,000 square foot user for calculating solid waste production, while the Traffic Impact Analysis proposes 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. In order to analyze water and sewer usage, Frederick Water will analyze demands based on a light industrial user which consumes 500 gpd/a (gallons per day, per acre). Based on the 107 acre site, water and sewer demands are projected to each be 53,500 gpd. It ANNIVERSARY Water At Your Service iris Page 2 Carbaugh rezoning application Tim Stowe, Stowe Engineering • August 18, 2017 Water and sanitary sewer treatment facilities are presently available to meet the projected demand of 53,500 gpd. Facilities for conveyance of water to, and sanitary sewer from, the subject properties does not presently exist. From previous discussions with the applicant, Frederick Water understands the applicant's intent is to construct a water line which will tap into an existing 20-inch water main along Route 11, and traverse westward within to be established easements. Sanitary sewer would be addressed through the construction of a new sanitary sewer pump station located along the CSX railroad tracks, and a sanitary sewer force main northward following the CSX railroad tracks to a point at which the force main would discharge into the Hoge Run Interceptor, The interceptor would then convey flows to Parkins Mill Wastewater Treatment Plant. An optional sanitary sewer route would be the construction of the Opequon Interceptor which will facilitate flows directly from the subject properties to the Parkins Mill Wastewater Treatment Plant. Regardless of the route for water and sanitary sewer conveyance, the construction of the infrastructure will be the responsibility of the applicant. The proffer statement is silent on improvements that would be constructed by the applicant to meet water and sanitary sewer demands. Accordingly, the comments offered herein are general in nature. The ultimate decision regarding the ability to serve the property with adequate water and sanitary sewer will be determined at the time the site's use is determined, • conveyance facilities are constructed, and water and sewer connection fees are paid to Frederick Water. Sanitary sewer system capacity is not reserved until the sewer connection fee is paid to Frederick Water, and physical connection to the system is made. Water and sanitary sewers are to be constructed in accordance with the FCSA standards specifications. Dedicated easements may be required and based on the layout vehicular access will need to be incorporated into the final design. Please be aware that the FCSA is offering these review comments without benefit of knowledge of the specific use of the site. Additionally, we would welcome an opportunity to review any proffers which may serve to mitigate any sanitary sewer deficiencies. Thank you for the opportunity to offer review comments. Sincerely, Eric R. Lawrence Executive Director Cc: Michael T. Ruddy, AICP, County Planning Department 0 • • • August 7. 2017 Mr. Tim Stowe, PE, LS Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 COUNTY of FREDERICK Department of'Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 RE: Proposed Rezoning for Carbaugh Business Center Property Identification Numbers (PINs): 74-A-68 and 74-A-69 Dear Tim: I have had the opportunity to review the draft rezoning application for the Carbaugh Business Center. This application seeks to rezone two properties totaling 107.21 acres • from the RA (Rural Areas) Districts to the M 1 (Light Industrial) District with proffers. The review is generally based upon the proffer statement submitted on July 13, 2017. Prior to formal submission to the County, please ensure that these comments and all review agency comments are adequately addressed. At a minimum, a letter describing how each of the agencies and their comments have been addressed should be included as part of the submission. Kernstown Area Plan — Land Use. The 2035 Comprehensive Plan and the Kernstown Area Plan provide guidance on the future development of the property. The property is located within the SWSA. The 2035 Comprehensive Plan identifies these properties with an industrial land use designation. The proposed M 1 Zoning is generally consistent with the Kernstown Area Plan as it relates to this area The land use plan depicts access to this site through a new major collector road, Renaissance Drive. Proffer — Site Improvements. a. Shady Elm Road is a rural roadway that is not set up to accommodate new industrial entrances at this point. This roadway should not be utilized for new industrial entrances which would place heavy industrial traffic in close proximity to existing rural residential land uses, even on a temporary basis. Staff recommends that the proffer be revised to state that Renaissance Drive must be completed prior to any occupancy permits granted for any proposed structures. 0 • Page 2 Mr. Tim Stowe RE: Carbaueh Business Center August 7, 2617 b. A proffer should be included that restricts the location of temporary construction entrances. Construction entrances should not be placed near existing residential land uses along Shady Elm Road. Any temporary entrances (including temporary construction entrances) should be provided adjacent to Renaissance Drive. c. Proffer 2 and 3 from this section should be expanded to state "to Frederick County for Dedication to VDOT". J. Proffer 7 from this section should be modified to state that the owner will provide interparcel connections for all new lots to provide access to the two new access points on Renaissance Drive to ensure future lots have access to an improved collector road and do not impact Shady Elin Road. Proffer — Building Restrictions. a. Proffer 2 under this section is a requirement of the Subdivision Ordinance and should be removed. b. Staff suggests providing a proffer for building facades facing Shady Elm Road and Renaissance Drive (cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco — similar to the Artillery proffer statement). • c. A proffer for a multi -tenant complex sign is suggested along Shady Elm Road and Renaissance Drive, with prohibitions for individual business signs along Shady Elm Road. d. Flashing loading bay lighting should be addressed with this proffer statement in addition to the proffer for screening. Industrial facilities on similar properties contain flashing loading bay lights. 4. Proffer — Landscape Design Features. a. Proffer I under this section is proffering less than the buffer section of the Zoning Ordinance. The land uses across Shady Elm Road consist of single family residential — therefore a full distance buffer would be required (three trees per ten linear feet — evergreen, shrub, deciduous and a 6' berm). Staff suggests depicting the three trees per ten linear feet along Shady Elm Road and providing street trees along Renaissance Drive on the GDP. b. Proffer 2 from this section is proffering less than the buffer section of the Zoning Ordinance. The southwestern portion of the property is adjacent to RA residential land uses and therefore the minimum required is a Category C — full screen 100' buffer. 5. Proffer — Monetary Proffer. Recent rezonings have included a 50.05-50.10 per building square foot proffer to Fire and Rescue, staff recommends keeping within this range. The Fire and Rescue proffer provided with this rezoning equates to • E • Page 3 Mr. Tim Sto",e RE: Carbaugh Business Center August 7, 20) 7 S0.02 per building square foot based on the 1.000.000 square foot assumptions provided in the application. 6. Impact Analysis. Expand the parameters of the impact analysis section pertaining to surrounding properties. This development will impact a number of existing rural residential land uses along Shad, Elm Road and adjacent to the southwestern property line of the proposed rezoning. Consideration of the topography and viewshed fi•om the residential properties and the existing agricultural operation along Shady Elm Road should be addressed in this section. Transportation Comments. Please note that the transportation comments on the rezoning application from John Bishop, Assistant Director - Transportation, are being provided to you in a separate letter. Staff may also provide additional comments related to the proposed changes if warranted subject to adjustments requested by VDOT. 8. Agency Comments. Please provide appropriate agency comments fi-om the following agencies: Virginia Department of Transportation, Frederick County Department of Public Works, Frederick County Fire Marshal, Frederick County Sanitation Authority, Health Department, the local Fire and Rescue Company, the County Attorney, the Historic Resources Advisory Board (HRAB) and the Frederick -Winchester Service Authority. Fees. Based on the fees adopted by the Board of Supervisors on April 23, 2008, the rezoning fee for this application would be 520.721.00 based upon acreage of 107.21 acres. All of the above comments and reviewing agency comments should be appropriately addressed before staff can accept this rezoning application. Please feel free to contact me with questions regarding this application. Sincerely, Candice E. Perkins, AICP, CZA Assistant Director CEP/pd is CJ 0 0 August 7, 2017 Mr. Tim Stowe. PE. LS Stowe Engineering. PLC 103 Heath Court Winchester, Virginia 22602 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 RE: Transportation Comment for Proposed Rezoning for Carbaugh Business Center Property Identification Numbers (PINs): 74-A-68 and 74-A-69 Dear Tim: Thank you for the opportunity to review the drafl rezoning application for the Carbaugh Business Center to rezone two properties totaling 107.21 acres from the RA (Rural Areas) Districts to the MI (Light Industrial) District with proffers. The review is based upon the undated proffer statement submitted on July 13. 2017. Transportation Comments Renaissance Drive Proffer 1 notes that the applicant is willing to provide S820,000.00 toward the completion of Renaissance Drive. As noted in the TIA, Renaissance Drive is important in offsetting the impact of the proposed development and will comprise a significant portion of traffic on the roadway. The current proffer is insufficient to move the project to bid. Based upon that, though the TIA notes the need of Renaissance Drive to offset the traffic impact, the current proffer does not offset the transportation impact of the proposed development. Entrances Proffer 5 notes that the owner may use two temporary entrances on Shady Elm until such time as Renaissance Drive is in place for construction and commercial purposes. Extreme care should be taken to minimize the impact of this traffic on the residential neighborhood on the west side of Shady Elm Drive and staff would suggest that the applicant coordinate with County Staff and VDOT to keep any access as close to the final intended location on future Renaissance Drive as possible. Particularly in the case of actual commercial 0 0 i Page 2 Mr. Tim Stowe RE; Carbaugh Business Center August 7, 2017 entrances, staff believes it would be difficult to relocate a commercial entrance once established. 3. Bicycle and Pedestrian Accommodation In keeping with the Comprehensive plan and due to the significant number of potential future employees as well as existing residents, please Nvork to mirror the trail that has been proffered along Shady Elm Drive by previous rezonings. All of the above comments and reviewing agency comments should be appropriately addressed before staff can accept this rezoning application. Please feel fi-ee to contact me with questions regarding this application. S incerel John A. Bishop, AICP Assistant Director -Transportation JAB/pd • 40 0 • October 4, 2017 Mr. Michael Ruddy County of Frederick Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, VA 22602 RE: Rezoning Application Comments Dear Mr. Ruddy, The following summary outlines agency responses to our rezoning application: (Please see attached documents for verification) 1) Frederick County Fire and Rescue Department — Office of the Fire Marshall • a. Plan approval was recommended 2) Winchester Regional Airport a. Proposed rezoning of M1 is compatible with airport Operations. 3) Frederick County Sanitation Authority a. The parcels to be rezoned have been added to the sewer and water service area. b. Water and sanitary sewer treatment facilities are presently available to meet the projected demand of 53,000 gpd. c. The applicant is in agreement that construction of adequate infrastructure will be the responsibility of the applicant. d. Water and sanitary sewers are to be constructed in accordance with the FCSA (Frederick Water) standard specifications. 4) Frederick -Winchester Service Authority a. Comments deferred to FCSA 5) Frederick County Department of Public Works a. Only comment, "A comprehensive review shall occur at time of site plan submission". 6) Virginia Department of Transportation (VDOT) a. VDOT's comment, "Following discussions with Frederick County, it is VDOT's understanding that if an agreeable proffer regarding the monetary participation for the completion of Renaissance Drive can be reached between Frederick County and the • developer, the county will consider the transportation mitigation responsibilities of the subject property resolved." It is the applicant's understanding that the revised Proffer Statement's monetary participation is agreeable to Fredrick County. 7) Frederick County Attorney a. "Applicant" has been changed to "owner" in the Proffer Statement b. The sentences have been combined in the Proffer Statement c. The GDP has been incorporated as part of the Proffer Statements d. The Proffer Statement was revised to indicate "whichever event occurs first" e. See the current revised Proffer Statement: Item 2 — "This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. Item 3 — "This dedication is to be made with 90 (ninety) days of a written request by Frederick County." Item 4 — "This grant is to be made with 90 (ninety) days of a written request by Frederick County." f. The Proffer Statement has been revised to "grading/slope" easement. g. See the revised Proffer Statement, Site Improvements, Item 5. h. The Proffer Statement was been revised to "west of Shady Elm Road" i. The Proffer Statement was revised to "The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County." 8) Historic Resources Advisory Board a. Approval was recommend with the condition that the Applicant preform an intensive level survey on the Henry Carbaugh House #34-1040. b. The Proffer Statement was revised to require the intensive level survey request prior to demolition of the Henry Carbaugh House. 9) Virginia Department of Health, Lord Fairfax Health District a. No objections noted. b. The applicant will properly abandon any discovered sewer disposal systems or private wells per Health Department Regulations. 10) Department of Planning and Development Proffer —Site Improvements a. The Proffer Statement has been revised to limit the impact on Shady Elm Road. See Site Improvement— Item 5. b. On the Proffer Statement. See Site Improvements — Item 5. c. The suggested change has been incorporated into the Proffer Statements. d. The suggested change has been incorporated into the Proffer Statements. Proffer - Building Restrictions a. The item has been removed from the Proffer Statement b. The applicant feels that a facade restriction would place an undo burden on the marketability of the land for future developments. Those restrictions are not prevalent on other M1 zoned properties, c. Signage has been restricted on Shady Elm Road in the Proffer Statement. 0 • 0 • d. The flashing lights cannot be restricted on the buildings as it has become a loading dock safety requirement. The applicant has added the use of a Category — C full screen 100' buffer to the Proffer Statement to mitigate the impact of the loading dock lights. Proffer —Landscape Design Features. a. See the revised GDP and Proffer Statement. Street tress have been provided for along Renaissance Drive. b. The item has been removed. Proffer — MonetarV Proffer a. The applicant has increased the proffered amount by $20,000 dollars. Impact Analysis: TBD 11) Frederick County Transportation a. To be discussed Please feel free to contact me with any questions or concerns. • Thank you, Tim Stowe 1�1 - I i Impact Analysis Statement { Ca rba ugh Rezoning Back Creek Magisterial District Parcel ID 74-(A)-68 and 69 Total Area: 105.74 acres October 21, 2016 Owner: Henry J. Carbaugh Trust Winchester, VA 22603 R 1 Prepared by I{ I Stowe Engineering, PLC I 103 Heath Court I Winchester, VA 22602 I I Carb7"'gh Property Location Map W-Onchester Va. ��_. �C, 4" .. -`�' :�• ' tom•, s;� .� • ti4fi�. f f �- • ugh f P roi?:erty "6 J Google,earth • IMPACT ANALYSIS STATEMENT Henry J. Carbaugh Trust Introduction The Henry J. Carbaugh Trust is requesting a rezoning of a 105.75-acre parcel in Frederick County. The property is owned by the Trust and is located east of Shady Elm Road, west of the CSX railroad, and south of the planned extension of Renaissance Drive. The site has previously been leased for agricultural use and the abandoned home on the property has been vacant in recent years. The applicants are seeking a change in zoning from RA to M-1. The property is currently open fields with an abandoned home and farm buildings. Multiple utilities run along the perimeter of the property adjacent to the railroad and Shady Elm Road. Stormwater drains generally south east to a 3' x 5' stone box culvert that pass under the CSX railroad. The Frederick County Comprehensive Plan's 2035 Long Range Land Use map shows this property 0 is planned for industrial use. The requested M-1 zoning is consistent with this planned use. Light manufacturing and warehousing businesses are planned for the site. The site will be graded, landscaped, and roads will be installed that will meet current County specifications. The main entrance will connect to Renaissance Drive when Renaissance Drive is extended Shady Elm Road. Inter -parcel connectors will be utilized within the parcel to direct all traffic to this main entrance. Site Suitability 100 Year Flood Plains - The site is not located within or near any 100-year flood plains per FEMA Flood Map Nos. 51069CO330D and 51187C0050C. Wetlands — Based on field studies performed by Virginia Waters and Wetlands and a site visit by the US Army Corps of Engineers, Warrenton field office representative, the Corps of Engineers is taking jurisdiction of wetland areas on the property, which includes two farm ponds and a small spring. Steep Slopes — This site is fairly flat, without any steep slopes. is Mature Woodlands —There are no areas of mature woodlands on the site. Prime Agricultural Soils — Based on data from the USDA Web Soil Survey there are 46.3 acres of Prime Farmland on the site and 59.45 acres of farmland of statewide importance. Efforts will be made to preserve these lands in the wetlands and inactive buffer areas. Soil or Bedrock Conditions which would create Construction Difficulties or Hazards —A review of the USDA Web Soil Survey indicates that the depth to bedrock is over 80 inches for 80+ acres of the site, and for the remainder of the site it is 20 to 40 inches. Where rock is encountered in excavation areas it will be removed by mechanical means or blasting. Surrounding Properties The subject property is surrounded by: • The CSX railroad to the east. On the opposite side of CSX is undeveloped land and the Mountain View Church. • The proposed American Woodmark headquarters lies to the north. • To the south and adjoining the property are four homes. 0 • To the west is Shady Elm Road and on the opposite side of the road is the Shady Elms Farm subdivision. The distance from the property line to the homes on the west side of Shady Elm Road is 130 feet or more. Due to existing utilities, the VDOT right of way dedication requirements, and the Frederick County zoning buffer requirements, noise and glare impacts on the neighbors is expected to be minimal, if any. The planned uses will are not generators of loud noises, fumes or pollution. Traffic A Traffic Impact Study has been prepared by Stowe Engineering. The study shows that Renaissance Drive, when completed, will serve as the primary road between Route 11 and the site. Until Renaissance Drive is completed, Shady Elm Road will be used for access. Route 11 currently operates at a good level of service south of Route 37. However, it is recognized that this proposed development will add traffic to the roadways. Therefore, the developer is proffering to participate financially to improve mobility to the area. 2 • 0 f�J CJ Seivage Conveyance and Treatment The site is located inside of the Frederick County Sewer and Water Service Area. Wastewater from the site will be collected and pumped into the existing FCSA gravity sewer system. Improvements to the Battlefield pumping station will be implemented as needed to convey the wastewater to the Parkins Mill Wastewater Treatment Plant which is sized to treat 5 million gallons a day. Water Suppl}, The site is located inside of the Frederick County Sewer and Water Service Area. An existing 20" water main in Valley Pike will be tapped to provide water to the site. A new line will be run perpendicular to Valley Pike and under the CSX railroad to the serve the site. The line will be constructed so it can be looped back into the water system. Drainage Drainage from the site flows to the southeast. A spring feeds a small stream which fills a farm pond in the southeast area of the property, which ultimately drains through a 3' x 5' stone box culvert under the CSX Railroad. An upper farm pond does not collect water and has little development value. Preliminary plans call for the spring and lower pond to be preserved, while the upper pond will be removed. Post -development drainage from the developed areas will be routed through stormwater management facilities to control the quantity and quality of stormwater leaving the site. Solid Waste Collection of solid waste will occur through the use of on -site dumpsters and private haulers. The Civil Engineering Reference Manual, 4`h edition, uses a solid waste generation rate of 5.4 cubic yards per 1,000 square feet of floor area. Applying this rate, 1,000,000 sf development will 3 • generate 5,400 cubic yards of solid waste per year. The solid waste will be transferred to the Frederick County Landfill Facility by private licensed commercial carriers. Historical Site and Structures A review of battle maps for the 151 and 2nd Battles of Kernstown showed that troops marched across the subject property on their way to the battles, but no fighting is recorded on the property. A review of the VA Department of Historic Resources record 034-1040 for the Henry Carbaugh House (formerly the Hockman House) provided the following statements: 1112006: The Hackman House has aluminum replacement windows, and an interior that was destroyed by fire and rebuilt. Research did not indicate that it was associated with historical events, persons of historical significance, nor is it an outstanding example of an architectural style or type or the work of a master craftsman. Impact on Community Facilities 0 Educational Facilities — This project will add no children to the school system. Emergency Services — Police protection will be provided by the Frederic County Sheriff Department. The property is located in the first response area for the Stephens City Fire and Rescue station. Response times from the station to the site are reasonable. Parks and Recreation —This project will not add to the population of Frederick County and therefore will not increase the demand for Parks and Recreational services. Libraries - This project will not add to the population of Frederick County and therefore will not increase the demand for library services. Local Government — The Frederick County Impact Model will be used to determine the level of impact this project will have on the local government. 0 4 y Executive Summary • This Traffic Impact Study was prepared to support the rezoning request for the land owned by the Henry J. Carbaugh Trust, and is located south of Kernstown in Frederick County, VA. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed project area is 107.21 acres. The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Access to the site will be through a new entrance onto Renaissance Drive. Development traffic will be directed east on Renaissance Drive towards Route 11 for access to Route 37 and 1-81. During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. The Proposed Trip Generation rates presented in this report were offered to VDOT as a more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using the Proposed Trip Generation and ITE Trip Generation rates. These are included in this report and are identified with labeling of either "Proposed" or "ITE trip generation rates. While the traffic that is forecasted to result from this development can be accommodated on the existing roadway network, the completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line extending 600 ft. west from the CSX right of way, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady Elm Road, totaling approximately 2.7 acres. • Participation financially in the development of Renaissance Drive. With these improvements proffered by this developer combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. • 0 LJ Table of Contents ExecutiveSummary .....................................................................................................................................1 Introduction.................................................................................................................................................. 4 Purpose.....................................................................................................................................................4 StudyObjectives....................................................................................................................................... 4 BackgroundInformation...............................................................................................................................4 Transportation Improvements Assumed to be in Place...........................................................................4 Transportation Improvements Planned....................................................................................................4 DevelopmentDescription.............................................................................................................................4 SiteLocation..............................................................................................................................................4 Descriptionof the Parcel...........................................................................................................................5 GeneralTerrain Features..........................................................................................................................5 Location within Jurisdiction and Region...................................................................................................5 Comprehensive Plan Recommendations......................................................................................................6 CurrentZoning..................................................................1..........................................................I................7 StudyArea Description.................................................................................................................................7 • Study Area.................................................................................................................................................7 Proposedand Existing Uses..........................................................................................................................8 ExistingUse...............................................................................................................................................8 ProposedUses & Access...........................................................................................................................8 NearbyUses.............................................................................................................................................. 9 ExistingRoadways.....................................................................................................................................9 FutureTransportation Improvements......................................................................................................9 2016 Existing Traffic Conditions..................................................................................................................10 DataCollection........................................................................................................................................10 Analysis..................................... ..............................................................................................................11 2018 Background (No -Build) Traffic Conditions.........................................................................................16 Analysis...................................................................................................................................................16 Methodsof Forecasting Trips.....................................................................................................................19 Proposed Method for Trip Generation and Trip Distribution.....................................................................20 TripGeneration — Proposed Method......................................................................................................20 Trip Distribution — Proposed Method.....................................................................................................20 2018 Build -Out Conditions — Proposed Method.........................................................................................24 11 0 . Analysis...................................................................................................................................................24 2024 Design Year Conditions — Proposed Method.....................................................................................30 Analysis...................................................................................................................................................30 ITE Trip Generation and Distribution..........................................................................................................36 TripGeneration — ITE Method................................................................................................................36 TripDistribution......................................................................................................................................36 2018 Build -out Conditions with ITE Rates...................................................................................................39 Analysis................................................................................................................................... ...39 Design Year (2024) with ITE Rates..............................................................................................................46 Analysis...................................................................................................................................................47 Recommended Roadway Improvements....................................................................................................52 QueueAnalysis............................................................................................................................................53 Pedestrian and Bicycle Traffic.....................................................................................................................54 Conclusions................................................................................................................................................. 55 Appendices . Appendix A Pre -Scope of Work Meeting Form Appendix B Traffic Count Data Appendix C Synchro LOS and Queue Reports Appendix D Cost Estimate Appendix E Generalized Development Plan Appendix F Traffic Signal Timing Plan • 0 • Introduction Purpose This Traffic Impact Study has been prepared to support a rezoning request for the land located south of Kernstown in Frederick County, VA that is owned by the Henry J. Carbaugh Trust. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed rezoning is 107.21 acres, which includes the entire parcel. Study Objectives The objectives of this study are to identify: 1. Impacts on traffic operations that may result from the project. 2. Future connectivity to pedestrian and bicycle facilities. Background Information Transportation Improvements Assumed to be in Place For the purposes of this study Renaissance Drive is assumed to completed from its current terminus to Shady Elm Road prior to the build out year of this proposed project. Transportation Improvements Planned A review of the VDOT Six Year Improvement Plan shows that VDOT has one planned construction project near this proposed rezoning, the extension of Renaissance Drive, UPC 91847. Schedule information for the project is not provided in the VDOT online database. • According to the Frederick County 2016-2017 Secondary Road Improvement Plan and the 2016-2017 Primary Road Improvement Plan, two planned roadway improvement projects are near the Carbaugh property. These are: Improve Valley Pike (Route 11) to establish an Urban Divided Four Lane System from the southern limits of the City of Winchester to 0.4 miles south of intersection of the Route 37 EB ramps. It is assumed that this improvement will not be in place before 2018, the build out year for this rezoning project. The extension of Renaissance Drive from 0.24 miles west of Route 11 to Shady Elm Road. It is assumed that this improvement will be in place before 2018. Development Description Site Location The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Figure throul 0 Figure 1 Project Location Map (n.t.s.) Description of the Parcel The subject property for which this rezoning is requested encompasses 107.21 acres with frontage along Shady Elm Road and future frontage along Renaissance Drive. The terrain is gently rolling and the land is currently farmed. The property lies within the Frederick County Sewer and Water Service Area. General Terrain Features The site and its surrounding areas have gently rolling terrain with gentle slopes draining to the east. The CSX railroad runs north -south on the east side of the property and runoff collects along the railroad until it reaches a stone culvert near the south end of the property where drainage flows under the railroad and ultimately to Opequon Creek. Shady Elm Road runs north -south along the western side of the property and the future Renaissance Drive will run east -west along the north side of the property. Location within Jurisdiction and Region The subject property is in the Back Creek Magisterial District of Frederick County, VA. • is 0 • Comprehensive Plan Recommendations The 2035 Frederick County Comprehensive Plan — Kernstown Plan, identifies the future land use on the site to be industrial. Surrounding properties are designated as industrial to the north, business to the east and rural/agricultural to the south and west. Figure 2 shows the Future Land Use Plan near the rezoning area. I11 ' 1 Figure 2 Future Land Use map (n.t.s.) 0 n L »y Riir ..•tl V W �j C� Current Zoning • The current zoning on the property is RA (Rural Agriculture) and the property is being used for agricultural purposes. The current land uses and zoning for the surrounding properties are: Table I Surrounding zoning and land use North _ �—_— East MI Light Industrial --agricultural CSX railroad w/ RA beyond agricultural — South_ u� _ RA, lame lot residential—,----- housing_ Housing and agricultural West RA, large lot residential The current zoning map is shown in figure 3. PROJECT / LOCATION ",y ,�j / Zoning r Figure 3 Existing Zoning Map (n.t.s.) Study Area Description Study Area For the purposes of this Traffic Impact Study the study extends from Route 37 on the north to Springdale Road on the south, and from Valley Pike on the east to Shady Elm Road on the west. There are no additional major intersections within 2000 feet of the site that are not being studied. Figure 4 shows the locations of the intersections that have been studied and the existing roadways near the site. • 0 • 0 • • Figure 4 Location of Study Intersections Proposed and Existing Uses Existing Use The property is currently used for agricultural purposes. Proposed Uses & Access The proposed uses for the property are light manufacturing and warehousing (ITE land uses 110 and 150) which will include a mix of manufacturing, service and warehouse facilities. A plan of the proposed development at an engineering scale is included in Appendix F of this report. Access to the property will be through a proposed commercial entrance on Renaissance Drive. This will be the only access to the site for normal traffic. A connection to Shady Elm Road is also proposed and will be used for site access until Renaissance Drive is open to traffic. After the opening of Renaissance Drive the Shady Elm access will be closed to normal traffic and reserved for emergency and maintenance access. 0 0 • Nearby Uses The existing land uses near the proposed site are: • North —agricultural land that is zoned Light Industrial. • West — agricultural land and large lot residential that is zoned Rural/Agricultural. • South — agricultural land and large lot residential that is zoned Rural/Agricultural. • East - CSX railroad and a mixture of Rural/Agricultural and commercial entities beyond CSX. Existing Roadways Figure 4 shows the location of the existing roadways near the subject property. The typical section attributes for these roadways is as follows: Table 2 Existing Roadway Attributes Shady Elm Road 2 11 Gravel, variable width Major Collector Renaissance Drive 2 12 Curb & Gutter Major Collector Route 11 - Valley Pike 2 NB and 2 SB thru 12 Curb & Gutter in Major Arterial lanes w/ left and right some sections. Gravel turn lanes at Route 37 shoulders with EB ramps and variable width in commercial some sections entrances. Narrows to one thru lane with left • and right turn lanes at Renaissance Drive Route 37 EB Ramps 3 EB, 1 WB 12 - 18 Gravel, variable width n/a The intersection of Route 11 and the eastbound ramp for Route 37 is signalized. A traffic signal was constructed at the intersection of Route 11 and Renaissance Drive when phase 1 of Renaissance Drive was constructed. Since that time the signal has been "bagged" and is not in service. For the purpose of this study it is assumed that the signal will be placed into service by VDOT in the project buildout year of 2018. Future Transportation Improvements The subject property is in the Virginia Department of Transportation's Staunton District, and Edinburg Residency area of responsibility. A review of the VDOT Six Year Improvement Plan shows that VDOT has one planned construction project near this proposed rezoning, the extension of Renaissance Drive, UPC 91847. Schedule information for the project is not provided in the VDOT online database. According to the Frederick County 2016-2017 Secondary Road Improvement Plan and the 2016-2017 Primary Road Improvement Plan, two planned roadway improvement projects are near the Carbaugh property. These are: • Improve Valley Pike (Route 11) to establish an Urban Divided Four Lane System from the southern limits of the City of Winchester to 0.4 miles south of intersection of the Route 37 EB 0 0 ramps. It is assumed that this improvement will not be in place before the build out year of 2018. • The extension of Renaissance Drive from 0.24 miles west of Route 11 to Shady Elm Road. It is assumed that this improvement will not be in place before the build out year of 2018. 2016 Existing Traffic Conditions Data Collection To analyze the existing traffic conditions, peak hour turning movement counts were performed in late August and early September following the opening of Frederick County Public Schools. Count data at the following locations was collected using a video recording device that was later reviewed and tabulated: The intersection of Shady Elm Road where Renaissance Drive will connect (vol. on Shady Elm Rd. only). • The intersection of Route 11 and Renaissance Drive. • The intersection of Route 11 and the Route 37 EB ramps. The intersection count data was classified into cars and heavy vehicles thus providing a percentage of heavy vehicles in the traffic. A minimal number of pedestrian movements (5) were also counted in the intersection of Route 11 and Route 37 EB ramps. Some construction was underway north of the Route 11— Route 37 EB ramp intersection at the time of Is the count. After waiting over 4 weeks for the work area to clear, it became apparent the work area was going to remain in place from 8:00 AM to 4:00 PM each week day for the foreseeable future. Based on visual observations it was determined that the work area did not affect the flow of traffic in the intersection and the count proceeded. In addition to the intersection counts, 24 hour tube counts were also performed on Route 11 between Renaissance Drive and Route 37 EB ramps. Count data was collected independently for the northbound and southbound directions over a two -week period, but due to equipment problems only one week of data was reported as having a high quality. Data from Tuesday through Thursday is used in this reporting. This data is summarized in table 3 below and the count reports are included in Appendix B of this report. Table 3 Summary of Tube Count Data for Route 11 For the purposes of this report a 'K factor' of 0.086 was computed based on the PM peak hour volumes from the tube counts. Since the VDOT Traffic Volume reports only include a 'k' Factor for Route 11, this computed 'k' factor was applied to all other study locations to compute the AADT for those roadways. 0 A count of the vehicles that did not clear the queue at the intersection of Route 11 and Route 37 EB ramps was also performed in the peak AM and PM hours. The data was collected to more accurately model the actual conditions during saturated flows, although in almost every cycle the queue cleared, there was a minimal number of vehicles that did not clear the signal queue on every cycle. Visual observations indicate that inattentive drivers using their phones was the cause of most vehicles not clearing the queue. This data is also included in Appendix B. Analysis The existing AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. The location of the intersections studied is shown in figure 4, and the existing AM and PM peak hour traffic volumes are shown in figure 5. For the AM peak hour, the existing lane geometry, levels of service, and delays are shown in figure 6 and the resulting 951h percentile queues are shown in figure 7. For the PM peak hour, the existing lane geometry, levels of service, and delays are shown in figure 8 and the resulting 95th percentile queues are shown in figure 9. The modeling results (levels of service and delays) are shown in tabular form in Tables 3 through 6. Route 11 is a major north -south corridor that parallels 1-81 through Frederick County. In the study area, patrons are attracted to local restaurants, shops, and a large theater. Two intersections that are not being studied were modeled to evaluate the impact of traffic in the NB Route 11 queue that could block these intersections. These intersections are at Kernstown Commons Blvd (150' wide) and Kavanaugh Drive (95' wide). While there are other commercial and residential entrances within the study area on Route 11, these two each have a break in the raised median and therefore require additional consideration. Through visual observations during the PM peak hour it was determined that drivers on Route 11 have no reservation about blocking the intersection with Kavanaugh Drive. Under existing conditions, the NB Route 11 queue does not extend to the intersection with Kernstown Commons Blvd, so it was not possible to evaluate driver's willingness to also block that intersection. However, for modeling purposes, it was assumed that if drivers are willing to block one intersection, they are willing to at least partially block another. In this case it was assumed that 2 vehicles will partially block the intersection with Kernstown Commons Blvd south. The model was coded to reflect this situation. rl - tip rl J C a v � � 51 (70) , •— 34 (40) — 17 (22) A•- k/ Kerns rown Rte 37 EB Ramps Commons Blvd 110 (114) 10 (29) --i I 196 (171) in w rn Legend: AM Peak Hr, (PM P ak HR) W= I "v M L d A, v 4 (11) •— 1 (0) 0 (6) Renaissance Or Volvo Dealer Entrance 3 (3) • • I 0 (i) - ► 0 (2) N n .N... rl M 'i Figure 5 Existing Year 2016 AM and PM Peak Hour Volumes • 0 • 0 v ,r > � p m o, LL N N > 22.0 (C) • 21.9 (C) r ♦ ► 23.2 (C) Kernstown Rte 37 EB Ramps Commons Blvo 30.9 (C) 20.9 (C) + 28.4 (C) u m Y a Q m o W , — 12.5 (B) Renaissance Dr Volvo Deoler $ Entrance 19.2 (C) = tl 4. ♦ D. 19.2 (C) —� Q OD Figure 6 AM Peak Hour Existing Year 2016 AM Lone Geometry, Lane Delay and LOS N � � Y ` v 4 � v LL Ln ♦ 0 (150) '� ► r i 20 (300) t Kernstown Rte 37 EB Romps I r Commons Blvd 95 (165) • . • * I ► 21 (175) o c v c V O t` Legend: 95th Percentile Que je (Available Storage) Figure 7 AM Peak Hour Existing Year 2016 AM Queue Length (ft) co a O m m , • — 3 (35) Renaissance Dr Volvo Dealer F �, L Entrance 3 (200) • ► 0 Ln rn o o O O 0 • � U U Y Q. 23.8 (C) �— 23.5 (C) 4- ♦ + 29.1 (C) i Kernstown Rte 37 EB Ramps i Commons Blva 28.7 (C) 19.2 (B) - a 6.8 (A) u v m + a� 00 Lf� ai o 00 N N ti Legend: Delay in sec., (LOS) I j 4 Q � V j 00 ♦ 4 17A (C) 4 Renaissance Dr Volvo Dealer 0 Entrance 25.1 (D) 15.4 (C) Figure 8 PM Peak Hour Existing Year 2016 PM Lane Geometry, Lone Delay and LOS f L � M G a v � " > a • 0 0 50) i + -► i 31 (300) _ t ' Kernstown Rte 37 EB Romps k A Commons Blvd • 125 (165) r ♦ • • 8 (175) — o v %a Is 0 Legend: 951h Percentile Que a (Available Storage) Figure 9 PM Peak Hour Existing Year 2016 PM Queue Length (ft) a 00 �1 Y a 00 o v v 8 (35) Renaissance Dry Volvo Dealer Entrance • 3 (200) • I LA 0 0 0 rq 0 0 • • 0 0 • Table 4 Level of Service and Delays at Route 11 and Route 37 EB Ramps Route 11, Route 37 EB Ramps, and Kernstown Commons Blvd Level of Service per Movement by Approach (delay In sec/veh) Overall Scenario LOS Eastbound Westbound Northbound Southbound LT TH RT LT I TH I RT LT TH I RT LT I TH RT AM Peak Hour C C C C C C C B A C C 2016 C 30.9 20.9 28.4 23.2 21.9 22.0 27.2 19.7 5.9 26.3 23.0 C(29.2) C(22.4) C(21.5) C(23.4) Existing (24.1) C B A C C C. C C B B B C 2018 B 24.7 15.9 6.4 27.9 20.3 20.1 19.7 17.2 14.6 21.8 No Build (19.1) 6(14.6) C (22,0) 8(19.7) C (20.9) C C I B C C B B B A 8 C 2018 0 30.0 24.0 11.9 25.3 24.9 12.2 14.9 17.3 4.9 12.7 21.6 Build -out (19.5) C(22.8) C(20.6) 8(16.4) C(20.9) C C B C C B B B A a C 2024 B 29.6 23.4 12.8 24.7 24.3 11.6 15.6 ]B.0 5.1 13.2 20.9 C(2Z.5) 8(19.9) B(17.1) C(20.3) Design Yr (19.4) PM Peak Hour C 8 A C C C C C B C C 2016 C 28.7 19.2 6.8 29.1 23.5 23.8 29.9 70.8 18.5 27.5 23.2 Existing (23.2) C(Z0.2) C(24.6) C(23.3) C(24.0) C B A C C A C C 8 B C 2018 C 27.1 18.5 6.7 29.0 22.6 9.5 21.5 20.6 18.1) (24.41 122.11 No Build (20.3) B(19.3) B(18.3) C(20.8) C(20.7) C C A C C C C B 8 B C 2018 C 33.7 23.4 7.9 33.8 27.G 28.7 25.0 1B.7 15.9 12.6 24.9 Build -out (22.6) C (23.4) C (29.1) C (21.2) C (23.0) D C A C C B C B 8 B C C 36.1 24.6 8.5 34.7 28.6 14.7 25.5 18.5 15.7 12.7 25.5 2024 OesynYr C(24.6) C(23.9) C(Z3.3) C(23.4) is Table 5 Level of Service and De(ays at Route 11 and Renaissance Drive Route 11, Renaissance Drive, and Volvo Dealer Ent. Level of Service per Movement by Approach (delay In sec)veh) Overall Eastbound Westbound Northbound Southbound Scenario LOS LT TH RT I LT I TH j RT I LT I TH I RT I LT I TH I RT AM Peak Hour C A 8 A A 2016 21.7 0.0 14.0 8.3 8.3 C (21.7) 8(14.0) Existing 2018 19.2 0.0 12.5 8.1 8.3 C (19.2) 8(12.5) - - No Build C B C B B A A B B Zola 8 29.5 14.0 24.4 10.0 13.5 9.3 9.9 14.3 13.6 C(279) C(24.4) B(13.3) 8(13.9) Bulldvul C B C B B A A 8 B 2024 B 33.5 14.6 25.0 10.0 13.8 9.2 9.9 14.3 13.2 C(31.6) C(2S.0) B(13.5) B(13.8) Design Yr (15.1) PM Peak ]fax 0 C C A A 2016 25.1 15.3 17.4 B.5 ll.4 Existing C (19.2) 8(12.5) - C - 2018 24 2 15.3 16.4 C(19.7) C(16.4) - - NoBuild C B C B C B C C A C 2018 31.3 14.8 33.4 16.8 25.G 16.1 27.4 23.7 2.4 (23.9) 8uild-0ut C (29.6) C (33.4) C (25.2) B (19.6) C B C 8 C B C C A 2024 C 32.9 15.8 35.0 17.1 26.1 16.1 28.5 24.2 2.3 C(31.1) C(35.0) C(25.8) C(20.1)i� Des t<nYr 0 Table 6 Level of Service and Delays at Renaissance Drive and Site Entrance 0 Renaissance Drive and Site Entrance Scenario Overall LOS Level of Service per Movement by Approach (delay in sec/veh) Eastbound Westbound Northeast Northwest LT TH RT I LT I TH I RT LT I TH I RT LT TH RT AM Peak Hour 2016 Existing 2018 No Build 2018 Build -out (7 9) - A 7 9 - _ C 16.6 A B.8 - - - - - A (9.2) 2024 Design Yr ( 9) - - - A 7.5 B 11.9 B 30.2 - - - - B(10.21 PM Peak Hour 2016 Existing 2018 No Build 2019 Build -out 23 7.5 11.1 30.2 - - - B (70.2) 2024 Des n Yr 1 A (9.2) - - - A 7.5 B 10.9 B 10.2 - - - B (10.2) Table 7 Level of Service and Delays at Renaissance Drive and Shady Elm Road Is Shady Elm Road and Renaissance Drive Scenario overall LOS Level of Service per Movement by Approach (delay in sec/veh) Southeast -bound Northwest -bound Northeast -bound Southwest -bound LT TH RT LT I TH I RT LT TH RT LT TH RT AM Peak Hour 2016 Existing 2018 No Build 2018 Build -out ( �) A 8.9 A 8.6 A 7.3 A (8.8) A (3.3) 2024 Design Yr ( 6) A 8.9 A 8.6 A 7.3 A (8.8) PM Peak Hour 2016 Existing 2018 No Build 2028 Build -out ( 3) A 9.0 A 8.4 A 7.3 A (8.7) 2024 Design Yr ( 3) A 9.0 A 8.4 A 73 A (8.7) 0 • • 0 2018 Background (No -Build) Traffic Conditions Background traffic conditions are those that are expected to occur without the proposed rezoning. These traffic conditions were established by increasing the existing 2016 traffic volume by 1.0% per year to the build -out year of 2018. The growth factor of 1.0% was determined by VDOT Staunton District Planning staff and is based on the historical and anticipated growth in traffic volumes in the project area. The 2018 Background AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 10. The lane geometry, AM peak hour delay and level of service are shown in Figure 11 and the 9511 percentile queue for the AM peak hour is shown in figure 12. The lane geometry, PM peak hour delay and level of service are shown in Figure 13 and the 95`h percentile queue for the PM peak hour is shown in figure 14. The modeling results (levels of service and delay) are tabulated in Tables 4 through 7. Analysis The traffic modeling shows that traffic continues to operate smoothly with acceptable levels of service under the no -build conditions. N > v a, > � n ^� m 52 (71) 35 (41) ' ► 17 (22) Kernstown Rte 37 EB Romps Commons Blvd 112(116) . • -i 10 (30) 200 (174) V M .... 00 M M Legend: AM Peak Hr, (PM P ak HR) Figure 10 No -Build Year 2018 AM and PM Peak Hour Volumes � acL o Ln v rn oo Ln 4 (11) 1(0) F . - 0 (6) ® Renolssonce Dr Volvo Deoler ® f Entronce 3 (3) '' t i r OW -` ul v • 0 as \ U m d y pp ID W N f 20.3 (C) �— 20.3 (C) • • + 27.9 (C) i Kernst own Rte 37 EB Romps r Commons Blvc • 24.7 (C) r A 4 ► 15.9 (B) --� 6.4 (A) v m m • e-f t` N O G� r\ Delay in sec., (LOS) j 4 Q � O - 12.5 (B) • RenoissoncP Dr Volvo Dealer Entrance • 19.2(C) •l • • 19.2 (C) ► I • Q N 00 Figure 11 AM Peak Hour No -Build 2018 Lone Geometry, Deloy lsec) and LOS v � m a u � N 0 (150) 27 (300) • Kernstown Rte 37 EB Ramps • 102 (165) 25 (175) Legend: 9S" Percentile Commons Blv . • • ► i Ln w v v so 0 r e (Available Storage) Figure 11 AM Peak Hour No -Build 1018 95th Percentile Queue (ft) h CO o Q v O v O • 0 (3S) Renaissance Dr Volvo Dealer Entrance 0 (200) • ' I • ► i � o 0 N "g 0 0 • • 0 r� I* • • 0 h a � * - 9.5 (A) — 22.6 (C) �— 29.0 (C) Kemstown Rte 37 FB Ramps e I Commons • 27.1 (C) • • ► 18.5 (B) - + 6.7 (A) i i m 6 o6 N fV Legend: Delay in sec., (LOS) J C Q o6 00 •L 16.4 (C) Renaissonce Dr Volvo Dealer Entrance 24.2 (C) - f ' ► 15.3 (C) �+ a N 00 Figure 13 PM Peak Hour No -Build 2018 Lone Geometry, Delay (sec), and LOS a � � ` M Y C � 07 d Ln LL > O(ISO) ++ + 34 (300) i Rte 3 7 EB Romps 107 (165) • 33 (175) + Kernstown Commons '. • * I► v 0000 o Legend: 951" Percentile Que�e (Available Storage) Figure 14 PM Peak Hour No -Build 2018 95th Percentile Queue (ft) � 4 � a O O 1 • L- 6 (35) : Renaissance Dr Volvo Dealer ® Entrance • 3 (200) ' I ! ► LA o 0 0 Methods of Forecasting Trips • During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. A report was prepared by Stowe Engineering that analyzes three locations where traffic counts were performed to compare the actual trip rates for warehouses and light industrial land uses with those published in the ITE Trip Generation Manual. The report was undertaken as part of the traffic study scoping for the development of the Carbaugh Business Center, a 107.4-acre parcel in Frederick County, VA and is included in Appendix A as a part of the scoping document for this project. There is a strong indication that the trip generation rates published by ITE overestimate the trips that will result for warehouse and light manufacturing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. Warehouse and light manufacturing facilities have evolved rapidly in recent years and have significantly improved the management of transporting their products. This must be accounted for in the planning of modern facilities. While the data and findings presented in this report may not be representative of these same land uses in other areas, it does represent local conditions as is demonstrated in the Stowe Engineering Report. The trip generation rates presented in table 8 were presented to VDOT as more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using both scenarios. Subsequent sections of this report first present the more appropriate Is generation rates identified as "Proposed", followed by the ITE trip generation rates. A summary of these rates is presented in table 8. Trips for both scenarios were distributed according to the distribution agreed upon in the project scoping and discussed later in this report. Table 8 Proposed and ITE Trip Generation Rates Proposed Trip Land Use Time Period Gen. Rate per Acre ITE Trip Gen. Rate per Acre ITE % Increase 110 Ught Manufacturing + ADT 20.5 I 47.$ - 1336.2% AM Peak 4.1 7.5 82.9% PM Peak , 4.4 6.1 ' ' 38.6% 150 Warehousing ADT 23.6 54.9 1 132.6% AM Peak 4.7 8.6 83.0% PM Peak —5.7 7.8 J 36.8% 0 • Proposed Method for Trip Generation and Trip Distribution Trip Generation -- Proposed Method The developer of this project has performed traffic analyses at three locations where they have developed similar projects to determine the appropriateness of the ITE trip generation rates for the light manufacturing and warehousing land uses. Through these studies, it has been found that the ITE trip generation rates greatly overestimate the amount of traffic that is associated with these uses. A copy of the analyses performed resulting in this determination is included in the appendix C of this report. The trip generation rates provided on the following page are proposed as an alternative to the ITE trip generation rates. These proposed rates are consistent with actual traffic counts taken at similar nearby facilities where modern warehousing and production methods are in use as well as late model trucks. Eight percent of the new traffic associated with the development is assumed to be heavy trucks based on information presented in the ITE Trip Generation Handbook data for industrial parks. There were no pass -by trip reductions applied to the forecasted traffic volumes. Trip Distribution - Proposed Method Trips generated by the development using the proposed trip generation rates were assigned to the roadway network based on proximity to logical transportation corridors, access to 1-81, and commuter patterns. The trip distribution percentages are shown in figure 15-A and the assignment of the new AM and PM peak hour trips are shown in figure 15-B. 0 Trip Generation Summary Alternative: Full Build Out with Proposed Trip Generation Rates Phase: Open Date: 7/7/2016 Project: Carbaugh Business Center Analysis Date: 7/7/2016 Weekday Average Daily Trips Weekday AM Peak Hour of Weekday PM Peak Hour of Adjacent Street Traffic Adjacent Street Traffic ITE Land Use * Enter Exit Total ,r Enter Exit Total ,t Enter Exit Total 110 Light Industrial Use ✓ 481 480 961 ✓ 159 33 192 ✓ 45 161 206 46.9 Acres 150 Warehousing Use ✓ 554 553 1107 46.9 Acres ✓ 158 62 220 ✓ 93 174 267 • Unadjusted Volume 1035 1033 2068 317 95 412 138 335 473 Internal Capture Trips 0 0 0 0 0 0 0 0 0 Pass -By Trips 0 0 0 0 0 0 0 0 0 Volume Added to Adjacent Streets 1035 1033 2068 317 95 412 138 335 473 Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent * - Custom rate used for selected time period. Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 TRIP GENERATION 2014, TRAFFICWARE, LLC P. 1 • 0 0 Kern t wn r Y ;•4b Project ,�• :�• �'�d Location y 4 ^ . �':•tip •� 4 rn m a � N N N • Kernstown 37 EB Romps _ Commons, 63 (28) • o 0 n a, Ln N Figure 16-8 New Tips - Proposed Method Legend: AM Peak Hr, (PM Peak HR),® F Y7! Y d � 1 I j • Re issance Dr to Volvo Dealer Entrance 86 (302) ' • ' 10 (34) • v N ' T • r: 0 0 is • 2018 Build -Out Conditions - Proposed Method The 2018 build -out condition combines the background traffic for the year 2018, and the new trips that are forecasted to result from the development of this property. This is the "Proposed Build Condition" which is forecasted to occur in the year 2018. The Proposed Build Condition anticipates the completion of Renaissance Drive from its current terminus to Shady Elm Road and the activation of the traffic signal at Renaissance Drive and Route 11. The entrance to the development will connect to Renaissance Drive west of the CSX crossing. It is assumed that Renaissance Drive will cross the CSX with a bridge over the railroad. Analysis The 2018 Build Condition AM and PM peak hour turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 16. The lane geometry, AM peak hour delays, and level of service are shown in Figure 17. The AM peak hour 95" percentile queue length is shown in figure 18. The lane geometry, PM peak hour delays, and level of service are shown in Figure 19. The PM peak hour 9S' percentile queue length is shown in figure 20. The modeling results (levels of service and delay) are tabulated in Tables 3 through 6. • 0 . N al H Y v�i o 52 (71) �— 35 (41) ' ► 17 (22) Kernstown 37 EB Romps Commons 112 016) . • 10 (30) - ► 263 (202) v Y N r-I a N In O1 M Ln f 4 (11) • + 0 (6) Renoissonce Dr �� Volvo Dealer Entrance • 0(1) ► 10 (36) Ln + � v rmn c — E W Ln C Ln ul N �1 I� 5 (5) i 4 5 (5) Renaissance Dr n Ln v figure 17 Swid-Our Yr ioj8 lane Geometry and Peck Hour iruffic Volumes —Proposed Methud Legend: AM Peak Hr, (PM Peak HR), • • 0 • 0 ry VI • 12.2 (B) — 24.9 (C) F • r + + 25.3 (C) �} Kemsfown Rre 37 EB Romps Commons Blvc 30.0 (C) t • -► 24.0 (C) - ► 11.9 (B) m m a v � m • • 7.9 (A) Renaissance Or `ease`, �6 CO ao c 0 `c W U h Renoissance Dr • 24.4 (C) 29.5 (C) — • ► 14.0 (B) ► r m m G Volvo Deoler cc E W Q O en V • 8.6 (A) + ► + 8.9 (A) Renaissance Dr Figure 187 Ruild-Out Yr 2013 AM Peak Hour Lon Geometry, Delay (sec) and Leve! of Service. — proposed Method 0 • a ry rl j a ^ � n m d ? y � � v lL 0 (150) ' + • -► 27 (300) • Kernstown 37 £B Ramps , t Commons 103 (165) . ♦ ♦ ► 62 (175) + o a o ip O t\ ( Renaissance Dr 0(150) + Ln d O F # ► Renorssonce Dr a v + 10 (35) Volvo Dealer Entrancr 99 (200) • ♦tn h 0 00 N O O z E W ,n a N 0 O � • ► 0 (225) 0 + Renaissance Dr ♦In ► 0 O Figure 19 Build -Out Yi 2013l dr) Peak Hour 95(h Pe,rentile Queue Ili) - Proposed Method C, • 0 r: is • W v W 28.1 (C) • 27.6 (C) • • • ► 33.8 (C) i Kernstown Rte 97 EB Romps Commons Blva 33.7 (C) .. 23.4 (C) ► 7.9 (A) iJ m m Vi 00 in N rl f-1 TS (A) i Renaissance Dr +t • 01 N O O 01 V C C W d h _ _ Y h � W V (yj r` j N N N 33.4 (C) f i ► Renaissance Or Volvo Dealer Entrance 31.3 (C) 14.8 (B) j► m V m W �p Ln la W _ a Q C L M � ^ ♦ 8.4 (A) + ► 9.0 (A) • Renaissance Dr ♦ P. 9 Bui!A Dut Yr 2 i1 E PM Peak Hour Lune Geometry, Delay (sec) and Level of Service - Proposed A41hod • • � N Y \ V C 6l � N ^ � 0 (150) ' • + ► 33 (300) • Kernstown Rte 37 FB Romps a Commons Blvd 131 (165) .. ♦ ♦ ► 57 (175) O v v 14 O N f-- 8 (575) Renaissonce Or 0 (150) u, o c O c W w Y 00 O 4 W O � j 0 (35) Renaissance Dr Volvo Dealer !0 Entrance 309 (200) ♦ ! i o M O 6 ti E W o N � H O � ' + 0 (225) Renaissance Or 0 O Figure 200 Build Out Yr 2018 PM Peak Noun 95th Percentile Queue (ft) - Proposed Method L�z • 0 • 2024 Design Year Conditions - Proposed Method The design year for the project is six years beyond the Build Conditions of the project, which in this case is the year 2024. Analysis The 2024 Design Year AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. AM and PM peak hour traffic volumes are shown in Figure 21. The lane geometry, AM peak hour delay and LOS are shown in Figure 22 and the AM peak hour 95`h percentile queue length is shown in figure 23. The lane geometry, PM peak hour delay and LOS are shown in Figure 24 and the PM peak hour 95"' percentile queue length is shown in figure 25. The modeling results (levels of service and delay) are tabulated in Tables 3 through 6. • LJ • 0 H N N v v ! r4 va', > * 55 (76) j 4 37 (43) 'J * ► 18 (24) Kernstown Rte 37 EB Ramps Commons Blvd 119 (123) —t-� A ► 11 (31) — -► 275 (213} o ,� • m O m N ltll:�la m F. 5 (5) 317 (139) Renaissance Or �I ► II 5 (5) ! 5 (5) � m �n v N a�1 c b C� w v Figure 21 De q,, c .. . ..,our , Legend: AM Peak Hr, (PM Peak HR), b T� N a CL CL V W • V �° 4 (11) ' 1 (0) ' • • 0 (6) Renaissance Or Volvo Dealer Entrance 89 (305) f ' • • 1 0 (1) 10 (36) _ `a v O m V 9tCr E W a � � H �o v� • S (S) + 5 (5) Renaissance Dr • —s M O • • (b • C� • cu N y pi N 1 11.6 (B) 24.3 (C) '- r ♦ ► 24.7 (C) `-' Kernsfown Rfe 37 E8 Romps , Commons Blvc 29.6 (C) .- ♦ ♦ ,1 23.4 (C) + 12.8 (B) m m Q • o o ui o6 • • 7.9 (A) Renaissance Or _ v 116 � a Oq V ~ 00 C O c w d cur Design Year 2026 i.c,^z Li y, AM Fran dill.! L'c'i;.y t:, • F- • ► nce Or y! 1J 33.5 (C) 1 14.6 (B) ► • 2S.0 (C) i Volvo Dealer ® ' E W a a M y . 8.6 (A) r ► 8.9 (A) i Renaissance or cc) and Level of Service - Pruposed h.t;:r ., � i v �+ \ CL v � N N M , r `L 0 (150) ♦ • 29 (300) Kerns t own Rte 37 EB Romps ! f Commons I 108 (165) . A ♦ . i 64 (175) + o v a m O 18 (575) Renaissance Or 0 (150) Z n ♦ n r. M M V M 00 C O G W d H O^ O^ Y Do N O j 10 (35) e Or + Volvo Dealer 110 (200) ! r' i 0 0 o z ZE N t O • ' 0 (225) Renaissance Or O '-1 O Figure 23 Oe>rgn Year 2024 AM Peak Hc:ur 95th Percentile Queue (fl) - Proposed Conditions • do 0 is • LJ d >� m a a wLn n ry 14.7 (B) 28.8 (C) 34.7 (C) Kernstown Rte 37 EB Ramps tv Commons Blvo 36.1 (D) . • 24.6 (C) I 8.5 (A) u m m • �n n n ui C6 Ui N N r1 • + 7.5 (A) Renaissance Or m p 0 0 V rl rl C O C W W H ry Q m C 00' p t`— 35.0 (C) Renaissance Or f ' Volvo Dealer Entrance * 32.9 (C) • 15.8(B) �► m u m la ,D E w a c s m ,n r` 8.4 (A) + 9.0 (A) Renaissance Or i Figure 244 Design Year 2014 Lnn,: Geometry, PM Peak Hour Delay (sec) and Level of Service - Proposed Conditions 0 `J 6! U) N n c v � LL N L - 0 (150) f i • -s j - 49 (300) _ Kernstown Rte 37 EB Romps a Commons 161 (165) • . • 70 (175) a � Mi N O 12 (575) I Renaissance Dr I f 0 (150) O M C b W A M 0- a � v in v n 0(35) f i �• Renaissance Dr-' Volvo Dealer Entrance } 348 (200) • O ry W O Figure 25 Design Year 2024 Ptii Peak Hour 95th Percentile Queue (ft) - Proposed Method • 17J 0 • ITE Trip Generation and Distribution Trip Generation -- IT1 Method The ITE Method of trip generation for the project uses was developed using Trip Gen 2014 software based on the 9`h edition of the ITE Trip Generation Manual. The peak traffic volumes on the adjacent streets for the AM and PM periods were used for forecasting the new traffic. Land uses and trips generated using the ITE rates are summarized in table on the following page. Eight percent of the new traffic associated with the development is assumed to be heavy trucks based on information presented in the ITE Trip Generation Handbook data for industrial parks. There were no pass -by trip reductions applied to the forecasted traffic volumes. Trip Distribution Trips generated by the development were distributed on the roadway network based on proximity to logical transportation corridors, access to 1-81, and commuter patterns. The trip distribution percentages are shown in figure 15-A and the assignment of the new peak hour trips are shown in figure 26. • Trip Generation Summary Alternative: Full Build Out using ITE Trip Generation method Phase: Project: Carbaugh Business Center Open Date: 7/7/2016 Analysis Date: 7/7/2016 Weekday Average Daily Trips Weekday AM Peak Hour of Weekday PM Peak Hour of Adjacent Street Traffic Adjacent Street Traffic ITE Land Use * Enter Exit Total * Enter Exit Total * Enter Exit Total 110 Light Industrial Use 1122 1121 2243 292 60 352 64 225 289 46.9 Acres 150 Warehousing Use 1289 1288 2577 291 113 404 128 237 365 46.9 Acres Unadjusted Volume 2411 2409 4820 583 173 756 192 462 654 Internal Capture Trips 0 0 0 0 0 0 0 0 0 Pass -By Trips 0 0 0 0 0 0 0 0 0 Volume Added to Adjacent Streets 2411 2409 4820 583 173 756 192 462 654 Total Weekday Average. Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent * - Custom rate used for selected time period. Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 TRIP GENERATION 2014, TRAFFICWARE, LLC P. 1 0 • Ljr1 M a p O � � F— • Kernstown Rte 37 EB Romps Commons i AL �r 117 (38) r� r, M O ^� • j— 583(191) Renaissance Or N — y lD Q M t` W ~ N M •'1 N � „ti 4 N O � t • i i Renaissance Or e ) Volvo Dealer 1r Entrance 156 (416) I � 17 (46) oo Figure 26 New Trip Assignments based on ITE Trip Generation Method Legend: AM Peak Hr, (PM Peak HR), • -t' E { h • i Renaissance Or rr 2018 Build -out Conditions with ITE Rates The 2018 build -out conditions combine the background traffic for the year 2018, and the new traffic that is forecasted to result from the development of this property. This is commonly referred to as the "Build Condition" which is forecasted to occur in the year 2018. The Build Condition takes into account the completion of Renaissance Drive from its current terminus to Shady Elm Road and the activation of the traffic signal at Renaissance Drive and Route 11. The entrance to the development will connect to Renaissance Drive west of the CSX crossing. It is assumed that Renaissance Drive will cross the CSX with a bridge over the railroad. It is also assumed that the signal at the intersection of valley Pike and Renaissance Drive will be activated. Analysis The 2018 Build Condition AM and PM peak hour turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 27. The lane geometry, AM peak hour delays, and level of service are shown in Figure 28. The AM peak hour 951h percentile queue length is shown in figure 29. The lane geometry, PM peak hour delays, and level of service are shown in Figure 30. The PM peak hour 95" percentile queue length is shown in figure 31. The modeling results (levels of service and delay) are tabulated in Tables 10 through 13. :7 • 0 • 0 • 1 ( j Ln a Ln ^� r, a >° 7 - 52 (71) • 35 (41) •' t-+ 17 (22) Kemstown Rte 37 EB Romps Commons ' 112 (116) . • i 10 (30) — 317 (212) N T v v m M0) Ln 60 M Figure 27 Build Condition 2018 Peak Hour Traffic Volumes Legend: AM Peak Hr, (PM Peak HR;, t!1 C y r- CL M `4 * 4(11) Lrn n •- - 1 (0) .1 • P. 0 (6) • Renaissance Dr Volvo Dealer Entrance 1 159 (419) • ' • ' 0(1) -� 17 (48) o N LnN b A K �( 1 a 0 to Ln • 5 (5) i l L + 5 (5) Renaissance Dr n � 1 � 11 v d m a v � N 1 13.6 (B) �— 26.6 (C) + + • 34.2 (C) i Kernstown Rte 37 E8 Romps Commons Blvd 33.5 (C) * . • 21.8 (C) — —• I • 10.7 (B) m m • m oo h N N r-1 8.8 (A) Renaissance Or c 0 c W Y h o m v n a oN • 31.7 (C) • Renaissance Or Volvo Dealer Entrance • 30.5 (C) 17.9 (B) i • m � m 00 'D h �D Figure 18 AM Peak Hour Build Condition 1018 Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) 1, E W Q O • `< 8.6 (A) i • 8.9 (A) Renaissance Or Cl E 0 0 v r,� T ^, n v � 0 (150) . • • ► 28 (300) r Kernstown Rte 37 EB Ramps Commons Bivc 106 (165) .- ♦ ♦ . I 71 (175) a M o r, T- 1 • 50 (575) Renaissance Or 0 (150) 00 O d fl— 10 (35) . v D. ,nce Or a 137 (200) J I • • ► Figure 19 AM Peak Hour 2018 Build Condition 95th Percentile Queue Length (ft) Legend: 951^ Percentile Queue (Available Storage) • Volvo Deafer Entrance E W C O� N = h o i ► 0 (225) i Renaissance Or O O 0 • rl .K � U m CL Mm f 14.8 (B) 29.0 (C) ' i + ► 35.1 (D) Kernstown Rte 37 E6 Romps ; Commons Blvc 38.2 (D) i 24.7 (C) -- 26.4 (C) m m + N v c 0) 00 ln1 N .-1 eti f- 7.6 (A) Renaissance Dr — m m 14 .y V � � C L W v • Y �a N n N rn j m .r '+ 37.9 (D) Renaissance Or Volvo Dealer Entrance 46.3 (D) — } 14.4(8) - �+ � U m � Q1 W '.D � b a o r m 8.4 (A) • ' 9.0 (A) Renaissance Dr Figure 250 PM Peak Hour 2018 Build Condition Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) �M • 0 CJ • I n M Y 0 y > e tt v (� � 0 (150) ♦ . 0 (35) F • + • 32 (300) • Kernstown Renoissonce Or Volvo Denier to 37 EB Ramps Commons Blvd Entrance 126 (165) 443 (200) �-i • m. 33 (175) � v o 0 O Ln 0 M ry O • • 12 (575) Renaissance Dr 0 (150) • _ m N O c W V H Figure 261 PM Peak Hour 2018 Build Conditions 95th Percentile Queue length (ft) 0 E w N = Ln O � • 0. 0 (225) a Renaissance or O O 0 • Table 9 Level of Service and Delays at Route it and Route 37 EB Ramps - ITE Trip Generation Method 0 Route 11, Route 37 EB Ramps, and Kernstown Commons Blvd Level of Service per Movement by Approach (delay in sec/veh) Scenario overall LOS Eastbound Westbound Northbound Southbound LT TH RT LT TH I RT LT TH RT LT TH RT C C B C C B C B B B c 2018 C (33.5) (21.8) (]0.7) (34.2) (26.6) (13.6) (27.3) (16.8) (14.7) (12.3) (24.7) Build -out (22.3) C (21.3) C (23.7) C (20.2) C (23.9) D C B C C C C B 8 B C 2024 C (35.8) (22.1) (11.4) (34.1) (27.0) (27.0) (28.2) (17.0) (14.8) (12.3) (25.2) Design Yr (23.0) C (22.5) C (28.6) C (20.6) C (24.4) PM Peak Hour D C C D C B C B B B C 2018 C (38.2) (24.7) (26.4) (35.1) (29.0) (14.8) (29.2) (18.4) (15.9) Build -out (25.9) C(23.4) C (29.1) C (21.2) C(23.0) D C B C C C C C C C D 2024 c (41.4) (28.9) (12.1) (29.3) (29.3) (30.0) (31.1) (26.9) (21.7) (20.6) (35.9) Design Yr (30.3) C (28.5) C (29.6) C (28.6) C (33.6) Table 10 Level of Service and Delays at Route 11 and Renaissance Drive - ITE Trip Generation Method Route 11, Renaissance Drive, and Volvo Dealer Ent. Level of Service per Movement by Approach (delay in sec/veh) Overall Eastbound Westbound Northbound Southbound scenario LOS LT TH RT LT I TH I RT LT TH I RT LT I TH RT AM Peak Hour 2018 C C 8 C B e B C B p Build -out (31.9) (30.5) (17.9) (31.7) (19.8) (29.6) (16.7) (20.0) (17.0) (47.2) C (29.3) C (31.7) B (28.4) C (34.2) 2024 C D B C B C B B B C (38.4) (18.3) (31.4) (19.3) (26.8) (15.3) (19.5) (15.6) (35.0) Design Yr (27.3) D (36.5) C (31.4) C (25.9) C (26.4) PM Peak Hour D B D D C B B D q 2018 C (46.3) (14.4) (37.9) (36.7) (28.5) (16.9) (19.2) (39.6) (2.7) Build -out (33.5) D (43.0) D (37.9) C (28.8) C (30.3) D B D C C B B D C 2024 C (49.0) (16.6) (42.3) (21.4) (28.01 (16.9) Design Yr (34.9) D (45.7) D (42.3) C (27.7) C (32.8) • E 0 0 Table 11 Level of Service and Delays at Renaissance Drive and Site Entrance - ITE Trip Generation Method Renaissance Drive and Site Entrance Level of Service per Movement by Approach (delay in sec/veh) all overall Scenario Eastbound Westbound Northeast Northwest LT TH RT LT I TH I RT LT I TH RT LT TH RT AM Peak Hour A E A 2018 A (8.8) (39.8) (9.18) Build -out (8.9) - - - 8(10.0) A E A 2024 A (8.8) (39.8) (9.1) Design Yr (8.9) - - - B (10.0) PM Peak Hour A 8 B 2018 B (7.6) (12.2) (11.4) BuNd-out (10.1) - - - B (11.4) A B B 2024 B (7.6) (12.2) (11.4) Design Yr (10.1) B (11.4) Table 11 Leve! of Service and Delays at Renaissance Drive and Shady Elm Rd - ITE Trip Generation Method Shady Elm Road and Renaissance Drive Level of Service per Movement by Approach (delay in sec/veh) Overall Scenario LOS Eastbound Westbound =Northbound Southbound LT TH RT LT I TH I RT LT TH RT LT I TH RT AM Peak Hour A A A 2018 A (8 9) (8.6) (7.3) Build -out (1.7) A(8.8) A(3.3) I A A A 2024 A (8.9) (8.6) Design Yr (1.6) A (8.8) PM Peak Hour A A A 2018 A (9.0) (8.4) (7.3) Build -out (1.3) A (9.7) A A A 2024 A (9.0) (8.4) (7.3) 7 1 Design Yr (1.2) A (8 7) Design Year (2024) with ITE Rates The design year for the project is six years beyond the Build Conditions of the project, which in this case is the year 2024. is Analysis The 2024 Design Year AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. AM and PM peak hour traffic volumes are shown in Figure 32. The lane geometry, AM peak hour delay and LOS are shown in Figure 33 and the AM peak hour 95th percentile queue length is shown in figure 34. The lane geometry, PM peak hour delay and LOS are shown in Figure 35 and the PM peak hour 9S" percentile queue length is shown in figure 36. The modeling results (levels of service and delay) are tabulated in Tables 10 through 13. N V C Lnn Ln Ln N '/ f, L p 55 (76) I �— 37 (43) ` • • 18 (24) _ t+ Kernstown 37 EB Romps s Commons 119 (123) 4 11 (31) s i 329 (223)oo m • a rn rrnn a1 L n � N t 5 (5) 583 (191) rNn I Figure 17 Design Year 1014 Peak Hour Volumes Legend: AM Peak Hr, (PM Peak HR), o CLrn Ln m v a Ln :° 4 (11) f— 1 (0) T ♦ 0 (6) • Renaissance Dr Volvo Dealer Entrance f159 (419) ♦ i 0 (I) - + 17 (48) + .. v O N 01 M Ln V I 'I E�W a U O Ln h �D al • 5 (5) 5 (5) Renaissance Dr m N � O � • 0 0 • • Rte 37 EB Romps 35.8 (D) 22.1 (C) ► 11.4 (8)- • • 27.0 (C) 27.0 (C) + 34.2 (C) Kernstown Commons Blva • * ,► I V m ra N O 00 06 r� v 8.8 (A) Renaissance Or .t. sir+ ai M O c 0 c w a r Q a u! Ln u 0 rn 'r a Renaissance Dr 38.4 (D) 18.3(8) + I Volvo Dealer WI a W Q O M � • 8.6 (A) + ► 8.9 (A) i =1' Renaissonce Dr Figure 28 AM Peak Hour 2014 Design Year Lane Geometry, Velay and LU.5 Legend: Delay in sec., (LOS) 41 • 0 U F, H G ` ^ d v a M � u > 0 (150) 4 • • -+ • 30 (300) Kernstown Rte 37 EB Romps Commons 140 (165) • 72 (175) o Lnko • v c o r-1 Renaissance Dr 0(150) — • M H m O N ry a u ID N ; • r— 11 (35) • Renaissance Dr i_+ Volvo Dealer Entrance YI 165(200) - ' ! �• • � o N � r fy1 O .t b a F W ui b N � .N.. V1 • "• - 0 (225) Renaissance Dr Ln 0 '-I 0 Figure 29 AM Feak Haut- 2U.'4 Design Year 9S'" Perccntle Queue Length (/tj Legend: 95", Percentile Queue (Available Storage) Cl C] 0 i� U - - v v � � t m > 30.0 (C) • 29.3 (C) • i + 29.3 (C) v Kernstown Rte 37 Fe Ramps 41.4 D 28.9 (C) - ► • Commons Blv, r • • L► V V V M M N N 7.6 (A) Renaissance Dr i� _ m m � N � N r1 U ~ N C dO C W d Figure 30 PM Peak Hour 2024 Design Year Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) CJ A V Y (] rii d Oi ,a o o "a a) once Dr tf 42.3 (D) • 49.0(D) 4 ► 16.6 (B) —3+ (> V m V O m - 06 'D ry N r Volvo Dealer cc W Q O M H 8.4 (A) t ► 9.1 (A) i Renaissance Dr • P. 0 v Ln m � a v � 1 > 0 (150) f • + + f- + 34 (300) k ° Kernstown 37 EB Romps Commons, 134 (165) 39 (175) o • v � m o 12 (575) Renoissonce Or Aft 0 (150) - Ln n • n en m ry � o kD e O c W W o 00 0 a ��— 0 (35) nce Or Volvo Deafer R t Entrance • 467 (200) — ' • i 0 0 rMy O Figure 31 PM Peak Hour 2024 Design Year 95th Percentile Queue length (fr) Legend: 951" Percentile Queue (Available Storage) + 0 (225) Renaissance Or P. • • r] • Recommended Roadway Improvements The speedy completion of Renaissance Drive is a necessary component of this project. The completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. Additionally, planning for future roadway improvements, as depicted in the Frederick County Comprehensive Plan, is necessary. Since the studied intersections operate at an acceptable level of service, the focus for roadway improvements has directed towards the roadways surrounding the site. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line from the CSX right of way, 600 ft. to the west, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady (lm Road, totaling approximately 2.7 acres. • Financial participation in the development of Renaissance Drive. • With these improvements proffered.by this developer, combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. C7 • Is Queue Analysis At signalized intersection and stop signs a queue forms while vehicles wait to advance. An analysis was performed to evaluate the back of the queue for the 50th and 95th percentile of the queue. The 50th percentile maximum queue is the maximum back of queue on a typical traffic signal cycle and has a probability of happening 50% of the time. The 95th percentile maximum queue is the maximum back of queue with 95th percentile traffic volumes when traffic does not move for two signal cycles and has the probability of happening 5% of the time. The queues associated with the 50th and 951 percentile maximum queues using the Proposed Trip Generation method are shown in Table 14. The same queues for the ITE Trip Generation method are shown in Table 15. Table 13 50th and 95th Percentile Queue Lengths — Proposed E 0 0 • • i able 14 50th and 95,ii Percen'*Life Queue 'Leilgth - ITL Trip Generation k ietilod Pedestrian and Bicycle Traffic To identify any previously planned pedestrian and/or bicycle facilities in the project area, the Frederick County Comprehensive Plan Future Land Use map was reviewed. There are no pedestrian or bicycle facilities planned in this area. However, In discussions with the County Transportation Planner it was learned that a multi -use trail was proffered/is planned along Shady Elm Road on the Venture 1 property. It was felt that this trail should be extended south on this property as well. Therefore the developer is proposing to construct a 10' wide multi -use trail along the east side of Shady Elm Road for the length of its fry....., - -- ....,a .,,tea 0 conclusions This Traffic Impact Study was prepared to support the rezoning request for the land owned by the Henry J. Carbaugh Trust, and is located south of Kernstown in Frederick County, VA. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed project area is 107.21 acres. The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Access to the site will be through a new entrance onto Renaissance Drive. Development traffic will be directed east on Renaissance Drive towards Route 11 for access to Route 37 and 1-81. During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. The Proposed Trip Generation rates presented in this report were offered to VDOT as a more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using the Proposed Trip Generation and ITE Trip Generation rates. These are included in this report and are identified with labeliri'g of either "Proposed" or "ITE trip generation rates. • While the traffic that is forecasted to result from this development can be accommodated on the is existing roadway network, the completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line extending 600 ft. west from the CSX right of way, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady Elm Road, totaling approximately 2.7 acres. • Participation financially in the development of Renaissance Drive. With these improvements proffered by this developer combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. 0 • 11 DACI 0- 0 V Igo lop 41, f "N N L TAX MAP 74-440 -ACRF-fi-, --V.3" - I ACRES FQJK7 ROSY ..#ATWO� S7 INV T. V'4 y r, cr L crid tic 1-CLOCUN Z-KV - OWMIML VW4V4A 22W J0,11arT Awwd '4"V': V-01 If"046 - -4X (sue 647-346 - fMAIL OF THE LAND OF� THE,HENRY CARSAUGH TRUST SU CT r- -I TM. 75-A-1 VENIURE I OF WNCHESTER, LLC INST. #OB0005960 INST #160001418 45.1035 ACRES PROPERLY LINE S 51'23'4_1" E BY BOUNDARY _ B? 1 25-= F C1 RF LINE ADJUSTMENT INST. #160001418 °F rn -T C2 527.15' S 45'04'39" E 7 S 42'06'49" W J 169.64' 'r N 11 `1 y Q s N TAX MAP 74-A-68 99.9719 ACRES N N\ �' INST.1116000141B N a 1 ° INST. 11070000157 POND WpQ,Z FRAME N 1 -o DWELLING N 1 1 0 o 11 GRAVEL ;n �� DRIVEWAY � o V) ca ADJOINING OWNERS (I)TAX MAP 74-A-57A VERNON E. HEAVNER, II & LISA IA. HEAVNER INST. §110005301 F 02 TAX MAP 74-A-59 ROBERT J. DIAZ & DONNA L. DIAZ INST. #060014496 (3)TAX MAP 74-A-61 ROBERT D. PATTON & ANITA K. RUKAMNA-PATTON INST. #070005130 QTAX MAP 74-A-62 DAVID H. CARBAUGH INST. #150001374 TAX MAP 74-A-63 DMAD fi. CARBAUGH INST. #150001375 �A. p�FRAME BARN & S 40'06'12` W 120.12' SHEDS POND -bb Vl TAX MAP 74-A-69 17.3391 ACRES PF INST.11070000157 0A J �1 0 V-5 RF PF /RF �. \2 RF RF - REBAR FOUND RS - REBAR SET PF - PIPE FOUND —� 01�2(_IiEAU UTILITY IIIJ CIL CD 00 GRAPHIC SCALE 400' BOO' SCALE : 1" = 400' 'SEE SHEET 2 FOR NOTES, LINE TABLE & CURVE TABLE BOUNDARY SURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAVM BY: JTG DWG NAIIE:10205-PLAT-4-17 SHEET 1 OF 2 0� Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 EMAIL office4norshandicgge.co. m ��ATH OF V�c� �i U � Narsh Lic. No. 001843 glallo DATE: 08/12/ 2016 6 0 9 • L J NOTES 1. NO TITLE REPORT FURNISHED, THEREFORE, EASEMENTS OR ENCUMBRANCES AFFECTING THE PROPERTY REPRESENTED BY THIS SURVEY MAY EXIST THAT ARE NOT SHOWN ON THIS PLAT, 2. THE LOCATIONS OF UNDERGROUND UTILITIES OR OTHER SUBSURFACE IMPROVEIA ITS, IF ANY, '6ERE NOT ASCERTAINED; THEREFORE. ARE NOT SHOM4. 3. THE INFORMATION SHOWN ON THIS PLAT IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED U14DER MY SUPERVISION AV 10 AUGUST 2016. 4 REFERE14CE IS MADE TO RAILROAD VALUATION MAP ENTITLED RIGHT OF WAY AND TRACK N,AP THE WINCHESTER AND STRASaURG RAILROAD COMPANY OPERATEO BY THE BALTIMORE AND OHIO RAILROAD COMPANY V32.1/3. LINE TABLE LINE _!BEARING _ Ll IS 61'26'49' W _ DISTANCE 57.20' L2 jS 30'29'58" W 94.93' _ 176.80' LL3 I V 7T56'191" W L4 LS L6—IN IN 07'34'36" E IN 75'57124" W 08'35'35" E 153.22' 34.09' 304.46' L7 IN 76'47'38" W 214.35' CURVC R_AO.US ARC LENGTH ICHORD LENGTH CHORD BEARING DELTA ANGLE _ 960.00' 436.53' 432.77' S 38'22'06" E 23'03'12" �C1 C2 C3 _L570.40' 1540.00 530.46' 191.31' 527.84' i90 -1 S 35'12'34" E IN 18'2932" E 19'44'09" 191SOO" BOUNDARYSURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAIN BY: JTG I DYIG NAME: 10205-PLAT ! SHEET 2 OF 2 Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET VHNCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0-169 =L� EMAIL offlcedinorehondlegge.corn T H OFji "p cj Y o r Marsh Lic. No. 001843 DATE: 03/12/2016 • • • REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA To be completed by Planning Staff. Fee Amowlt Paid $_jll*vi.m Zoning Amendment Number-0 '-1 - 1 �� Date Received t e to ` t 'N PC Hearing Date I t , � t " .�BOS Hearing Date The following information shall be provided by the applicant. - All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester. 1. Applicant: Name: Timothy Stowe Address: Stowe Engineering, PLC 103 Heath Court, Winchester VA 22602 2. Property Owner (if different than above): Name: The Henry J. Carbaugh Trust Address: C/O Bank of Clarke County Trust Department 202 N. Loudoun St. Winchester VA 22601 3. Contact person if other than above: Name: Timothy Stowe Telephone: 540-336-0656 Telephone: Telephone: 540-336-0656 4. Property Information: a. Property Identification Number(s): 74 - A - 68 and 74 - A - 69 b. Total acreage to be rezoned: 107.21 acres C. Total acreage of the parcel(s) to be rezoned (if the entirety of the parcel(s) is not being rezoned): d. Current zoning designation(s) and acreage(s) in each designation: 107.21 acres zoned RA C. Proposed zoning designation(s) and acreage(s) in each designation: 107.21 acres to be rezoned M1 f. Magisterial District(s): Back Creek Magisterial District 0 12 0 0 5. Checklist: Check the following items that have been included with this application. Location map ✓ Agency Comments Plat _ ✓ _ Fees _ Deed to property _ ✓ _ Impact Analysis Statement _ ✓ _ Verification of taxes paid _ ✓ _ Proffer Statement Plat depicting exact meets and bounds for the proposed zoning district _ ✓ _ Digital copies (pdf s) of all submitted documents, maps and exhibits ✓ _ 6. The Code of ViLginia allows us to request full disclosure of ownership in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: The Henry J. Carbaugh Trust 7. Adjoining Property: • PARCEL ID NUMBER USE ZONING See attached List S. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road natrles and route numbers): The property is located at 831 Shady Elm Road. From the intersection of Apple Valley Road and Shady Elm Road, the property is located approximately 1.11 miles heading southwest on Shady Elm Road. The southeast portion of the property in bound by the CSX Railroad. 13 0 9. The following information should be provided according to the type of rezoning proposed: Number of Units Proposed Single Family homes: Townhome: Multi -Family: Non -Residential Lots: Mobile I-lome: Hotel Rooms: Square Footage of Proposed Uses Office: Service Station: Retail: Manufacturing: 500,000 Restaurant: Warehouse: 500,000 Commercial: Other: 10, Signature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. 1 (we) authorize Frederick County officials to enter the property for site inspection purposes. • I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. C Applicant(s): _ _ � Date: _ /V 17 Date: Owner(s): 0 14 Date: Date: U 40 Adjoining Pr ?rty Owners # PIN IOwner Address Zoning 1 75 A 1 Venture I of Winchester LLC 54 Merriman's Lane, Winchester, VA 22601 Ml 2 74 A 71 Stephen D. Brim, ETALS 254 Queen Street, Strasburg, VA 22657 RA 3 74 A 70 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 4 74 A 72 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 5 74 A 57A Vernon E., II and Lisa M. Heavner 1043 Shady Elm Road, Winchester, VA 22602 RA 61 74 A 59 Robert J. and Donna L. Diaz 1006 Shady Elm Road, Winchester, VA 22602 RA 7 74 A 61 Robert D. Patton and Anita K. Rukavina-Patton 983 Shady Elm Road, Winchester, VA 22602 RA 8 74 A 62 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 9 74 A 63 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 10 74 A 64 Ronald L. Brown 970 Shady Elm Road, Winchester, VA 22602 RA 11 74 612 30ON LLC P. 0. Box 179, Moorefield, WV 26836 RA 12 74611 Daniel J. and Sandra M. Lyons 121 Skyjes Lane, Winchester, VA 22602 RA 13 7462 30ON LLC P. 0. Box 179, Moorefield, WV 26836 RA 14 7461 Matthew and Mary Ann Kremer 138 Skyjes Lane, Winchester, VA 22602 RA 15 74314 Kevin and Tina Anderson 113 Hockman Ct., Winchester, VA 22602 RA 16 7435 Gregory R. and Johanna A. Brown 114 Hockman Ct., Winchester, VA 22602 RA 17 7434 Jacob T., III and Heather R. Rudolph 750 Shady Elm Road, Winchester, VA 22602 RA 18 74 A 67 Kitty Hockman Nicholas 690 Shady Elm Road, Winchester, VA 22602 RA 19 7433 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 20 7432 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 21 22 23 24 25 26 27 28 29 30 31 32 33 34 is • C 11 • 4,c� cpL� Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.feva.us wu r Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) Henry J. Carbaugh Trust Under Agreement (Name) Dated December 18, 2006 (Phone) _ 540/665-2400 (Address) 202 North Loudoun Street, Winchester, VA 22601 the owners) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by SEE EXHIBIT "A" ATTACHED HERETO FOR DESCRIPTION OF PROPERTY. Instrument No. on Page , and is described as Parcel: Lot: Block: Section: Subdivision: do hereby make, constitute and appoint: • I (Name) Timothy Sto,o (Phone) 540:336-0656 (Address) 103 Heath Court, Winchester, VA 22602 To act as my true and lawful attorney- in- fact for and in my (our) name, place and stead with frill power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: X Rezoning (including proffers) Conditional Use Permit X Master Development Plan (Preliminary and Final) X Subdivision Site Plan Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I (we) have hereto set my (our) hand and seal this day of , 20 , Signature(s) SEE ATTACHED SIGNATURE PACE State of Virginia, City/County of , To -wit: 1 , a Notary Public in and for the jurisdiction aforesaid, certify that the person(s) who signed to the foregoing instrument personally appeared before me and has • acknowledged the same before me in the jurisdiction aforesaid this day of _, 20 I My Commission Expires: Notary Public 0 • • HENRY J. CARBAUGH TRUST UNDER AGIZEEMENT DATED DECEMBER 18, 2006 By: Bank of Clat•Ice County, Successor Trustee By: �^ c�r�ti (SEAL) Carl A. Esterhay, Senior Vic;,", sident STATE OF VIRGfNIA, AT LARGE, CITY OF WINCHESTER, to -wit: The foregoing instrument was acknowledged before me, a Notary Public in and for the State and Jurisdiction aforesaid, this 19*N day of_J 0ML , 2017, by Carl A. Esterhay, Senior Vice President of Bank of Clarke County, Successor'I'rustec of the Heiuy J. Carbaugh Trust Under Agreement Dated December 18, 2006. My commission expires y i t,`1�,11- lnrwi� r. � ���- . �I-�I.o � ry Puj� 'c 0 i EXHIBIT "A" PARCEL ONE: That certain parcel of land containing 89.8719 acres, more or less, located on the eastern side of Shady Elm Road, in Back Creek Magisterial District, Frederick County, Virginia, designated as ... I'ax Map 74-A-68 89.8719 Acres" on that certain plat titled "Boundary Survey Of The Land Of The Hciuy J. Carbaugh Trust" dated August 12, 2016, drawn by S. W. Marsh, L.S., a copy of which is attached hereto and incorporated herein by reference as if set out in full; and being a portion of the lands designated as Parcel One acquired by that certain Dced dated January 3, 2007, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia as Instrument No. 070000157. Tax Map No. 74-A-68. PARCEL TWO: That certain parcel of land containing 17.3391 acres, more or less (according to Frederick County Tax Records), located on Shady EIm Road, in Back Creck Magisterial District, Frederick County, Virginia, designated as "Tax Map 74-A-69 17.3391 Acres" on that certain plat titled "Boundary Survey Of The Land Of The Hc1uy J. Carbaugh Trust" dated August 12, 2016, drawn by S. W. Marsh, L.S., a copy of which is attached hereto and incorporated herein by reference as if set out in full; and being the remainder of the lands designated as Parcel Two acquired by that certain Dced dated January 3, 2007, of record in the • Clerk's Office of the Circuit Court of Frederick County, Virginia as Instrument No. 070000157. Tax Map No. 74-A-69. MLB/porn c:\Misc\Carbaugh Exhibit A 6/16/17 C7 REZONING APPLICATION #04-17 CARBAUGH BUSINESS CENTER Staff Report for the Planning Commission Prepared: October 23, 2017 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director John Bishop, AICP, Assistant Directoi—Transportation Reviewed Action Planning Commission: 1 1/01/17 Pending Board of Supervisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21-+-/- acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. LOCATION: The site has an address of' 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately 1.1 1 miles southwest of'tlle intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is hounded by the CSX Railroad. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 11/01/17 PLANNING COMMISSION MEETING: Tliis is an application to rezone t\vo parcels of land that total 107.2l d-/- acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Scrvicc Area (SWSA) and are within the limits of the Kernstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the reduested M 1 zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation improvements to Renaissance Drive (up to a maxlllll1111 of $1,080,000.00), right-of=way dedications for Renaissance Drive and Shady Elm Road, limits on the number of access points for the site, and proffers for inter -parcel connections for all new parcels. The Applicant has also provided proffers for the screening of loading docks, landscaping, signage, clOCUmcntation of the Carbaugh House and monetary proffers for fire and rescue purposes. Following the required public hearing, 11 recol) mellllll%/on re�,,ardi g this rezoning application to the Board of Supervisors would be appropriate. The Applicant Shollld be prepared to pllequatelV llllllress all concerns raised bl, the Planning Commission. on. Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 2 This report is prepared k}, the Frederick Coimtp Planning Staff to provide in1brination to the Planning Commission and the Board of'Supernisors to assist there in making a decision on this application. It nug also he useful to others interested in this zoning matter. Unresolved issues concerning this application are noted I)), staff Where relevant throughout this staff'report. Reviewed Action Planning Commission: 1 1/01/17 Pending Board of Supervisors: 12/13/17 Pending PROPOSAL: To rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers. LOCATION: The site has an address of' 831 Shady Elm Road (Route 651) and are located on the southeastern side of Sllady Elm Road, approximately 1.1 1 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad. MAGISTERIAL DISTRICT: Back Creek PROPERTY ID NUMBER: 74-A-68 and 74-A-69 PROPERTY ZONING: RA (Rural Areas) District PRESENT USE: Vacant/Agricultural ADJOINING PROPERTY ZONING & PRESENT USE: Nortli: M I (Light Industrial) District Use: Vacant RA (Rural Areas) District Residential, Agriculture South: RA (Rural Areas) District Use: Residential, Agriculture East: B3 (Industrial Transition) District Use: Commercial RA (Rural Areas) District Railroad West: RA (Rural Areas) District Use: Residential, Agriculture 0 0 Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 3 REVIE\V EVALUATIONS: Virginia Dept. of Transportation (VDOT): Please .see the ciitaclnecl enictil fi•otn Allaltfreil, Smith, P.D., elated September 7, 2017. Frederick County Fire Marshall: Approved Frederick Water: Please sec the attached letter from Eric R. Lawrence, ExeculNe Director clatccl August 18, 2017. Frederick County Department of Public Works: A C0I11prChenS1VC 1-CVICNV Shall OCCUr at time Of site plan submission. We offer no additional comments at this time. Viraiiiia Depai-tmemt of I-Iealtli: This Health Dcpartlncnt has reviewed the request for comments for the Rezoning of property located at 831 Shady Elm Road, in the Back Creek Magisterial District, Tax Map #74-A-68 & 74-A-69 from RA to MI. Based upon information provided by the Applicant, this Health Department has no objection to the rezoning Of' the subject properly. However, it is the recommendation of this Health Department that any know or discovered Sewage disposal systems or private water wells on the property be properly abandoned, per Health Department Regulations or best practice policies. In the event that it is determined that there are sewage disposal systems or private water wells on the property, please notify this Health Department immediately for proper abandonment procedures. Frederick County Planning Department: Please .see the attached letter from Candice E. Perkins, Assistant Director dates! August 7, 2017. Frederick County Transportation Comments: Plectse sec the attached letter from John A. Bishop, Assistant Director-7i-crnspotvatioii dated August 7, 2017. Historic Resources Advisory Board: The I-listoriC Rcsourccs Advisory Board (HRAB) recommended approval of the Rezoning with the condition that the Applicant perform an intensive level survey on the i1iStO1-iC structure located on -site (1-Ienry Carbaugh House - #34-1040) prior to its demolition. Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Winchester Quadrangle) depicts the subject properties as being zoned A-2 (Agricultural General) District. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. 0 • Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 4 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the COmIII Lill ity's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment \vlthln FrCdCl-iCk COLlllty. It is ill CSSCllCC a CO1111)OSlti011 Of�I)OliCiCS Used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are tllc primary implementation tool and will be instrumental to the future planning efforts Of the County. Ladd Use The subject properties are located within the limits Of the Sewer and Water Service Area (SWSA) and are within the limits of the Kernstown Area Plan ofthe 2035 Comprehensive Plan. The Kernstown Area Plan identifies these properties with an industrial land use designation as outlined in the Shady Elm Economic Development Area, which is generally consistent with the requested M 1 zoning designation. The Shady Elm Economic Development Area is designed to be a significant area Of industrial and commercial OppOl-tllnity that is fully supportive Of the County Economic Development Authority's targeted goals and strategies. "bile intent Of'tllC industrial designation is to further enhance the COLulty's commercial and il1dLIStl-ial areas and to provide imis to the COLlllty's future regional employment centers. Transportation and Site Access The Eastern Road Plan Of the 2035 Comprehensive Plan and the Kernstown Area Plan both call for the extension of a new major collector roadway though parcel 74-A-68, which is adjacent to the Artillery Business Center Development which was rezoned in 2007 and revised in 2015. This new major collector roadway, Renaissance Drive, has been constructed front Valley Pike (Route 1 1) to the limits of the CXS railroad. The Comprehensive Plan calls for this roadway to be extended to Shady Elm Road. The plan also Calls for Shady Elm Road to be improved four lane divided collector roadway. Site access to the subject property will be provided via two entrances on Renaissance Drive. 3) Site Suitability/Environment: The site is not located within or near any 100-year floodplains. The site has some wetlands in the form of two small farm ponds and a spring. The spring feeds one of the ponds and chains via a Culvert under the CSX railroad; the Applicant intends on preserving the spring and lower pond while removing the upper pond. There arc no areas Of mature woodlands. The site does contain 46 acres Of prime agl-iCllltllral farmland and 59 acres of farmland of statewide importance. 0 0 Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 5 4) Potential Impacts: E.visting Residential Uses: This application recognizes the existing residential land uses that are zoned RA (Rural Areas) District that are located adjacent to and across Shady Elm Road from the Carbaugh Property by providing bUffering and landscape screening (full screen) consistent \vlth the Zoning Ordinance to screen the development and loading clocks from Shady Elm Road. This buffer consists of 100' of distance (75' active/25' inactive), a 6' berm and 3 plants per 10 linear feet. Hivoric Resources: The Study Of Civil War Sites in the Shenandoah Valley published by National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify a core battlefield on the site. The battle maps for the I" and 2" `1 Battles of Kernstown show that troops alight have marched across the subject property on their way to the battles, no fighting is recorded on the property. The Historic Resources Advisory Board recommended that the Applicant conduct an intensive level survey on the historic structLlrc located on -site (I-Ienry Carbaugh House - #34- 1040) prior to its demolition; the Applicant included this in their proffer statement. Frederick County Transportation Comments: The Applicant's Transportation Impact Analysis assumes 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. This results in average weekday vehicle trips totaling 4,820 which the Applicant proposes to address via transportation proffers of right -of -Way and funcling toward the Renaissance Drive project. The proffered funding amount allows the County to frilly match revenue sharing funds that have been awarded to the project. 5) Proffer Statement — Dated October 6, 2017 Site Improvements: 1. The owner agrees to participate in the cost of transportation improvements in the nearby area, up to a rllaxinluni of 4 1,080,000.00. Such payment shall be nlacle either within 30 calendar days after the start of the Renaissance Drive extension or prior to the issuance of the certificate of occupancy for all buildings developed on the Property, whichever comes first. 2. The owner agrees to dedicate 60' ofright-of-way along Shady Elm Road, 10' ofwhich shall be used for construction of a pedestrian trail. 3. The owner agrees to dedicate 20' ofright-of-way along its northeast boundary for the extension of Renaissance Drive fi•om Valley Pike to Shady Elm Road. 4. The owner agrees to grant to Frederick County an 80' grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the Renaissance Drive. 5. The owner agrees to limit the I1LIIllbel' of commercial entrances for the property to a maximum of two along Renaissance Drive. a. In the event that the property is developed prior to the completion of Renaissance Drive, the owner may build a portion of the road fi-om Shady Ehn Road to the first entrance to the site to enable use of the site. 0 0 Rezoning #03-17 Carbaugh Business Center October 23, 2017 Page 6 b. In the event that Frederick County rcducsts that the owner not build a portion of the extension, the owner may build a temporary entrance onto Shady Elm Road I'm commercial use. The temporary entrance will be permanently closed immediately after Renaissance Drive is available fol' Use by the applicant. 6. The owner proffers to provide for inter -parcel connections for all new lots to provide access to the access points on Renaissance Drive. Building Restrictions: The development of the subject Property shall include the tollowing building restrictions: 1. All loading docks shall be screened from view from all adjacent properties in the RA (Rural Areas) Zoning District that are located west of Shacly Elm Road. The owner will utilize a I00' Category C (full Screen) buffer. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive ICvel survey on the Henry Carbaugh House prior to its demolition. Landscape Design Features 1. The owner shall provide street trees planted 50' on center acl.jacent to the Renaissance Drive road extension. ionetary Contributions to Offset Impact of Development: The owner proffers to pay S30,000.00 prior to the issuance ofthe Certificate of Occupancy for the first structure constructed on the property for fire and rescue purposes. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 11/01/17 PLANNING COINIAIISSiON MEETING: This is an application to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the M I (Light Industrial) District with proffers. The subject properties are located within the limits of the Sewer and Water Service Area (SWSA) and are within the limits of the KCrnstown Area Plan of the 2035 Comprehensive Plan. The Comprehensive Plan identifies these properties with an industrial land use designation which is generally consistent with the reducsted M 1 zoning. With this rezoning, the Applicant has proffered that this project will contribute to transportation improvements in the vicinity of the site that have been identified as important to the overall transportation solution for this general area. The Applicant has proffered to participate in the cost of transportation improvements to Renaissance Drivc (up to a maximum of$1,080,000.00), right-of-way dedications for Renaissance Drive and Shady Elm Road, limits on the number of access points for the site, and proffers for inter -parcel connections for all new parcels. The Applicant has also provicled proffers for the screening of loading docks, landscaping, signage, documentation of the Carbaugh House and monetary proffers for fire and rescue purposes. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Superyi.yor's would be appropriate. The Applicant should be prepared to adegulrtell� addr'e.y all concerns rai.ved by the Plarrrring C'omnds.yion. / _ INDUSIRIAI DR DEVELOPMENT LN REZ#04 - 17 Carbaugh Business Center! PINS: 74 - A - 68,74 - A - 69 Rezoning from RA to M1 Zoning Map 16, f 553 NOC9R4ANC SHADYO M' 130 750 ELM RD 3 NOCKMAMCi SHADY VAL M ELM RD i 180 I 171 111 PROSPERITY DR MOCKMAN CT NOCKMAN Ci ^ 10r__��'.r v/ROSIERI►Y�DR' NOCKMANCi SPE 220 PRO 1 1 7t3 PRITY DR NOCKMANFi NOCKMA�b .��OSPER`6= w NO 201 PROSPER SKYJES W I33 ,l 7Q(J PROSPERRY DR /ROSPERRY DR 1 A NOCKMAN Ci - 046 r R�pS•►EyRJf► Ii1 VALLEY 15I ,W IM PIKE, '• (PROSPERITY DR 1006 SKYJES W VALLEY PIKE SILYJES LN VALLEY 161 w /WE SKYJES W �I2t •• III SKYJES W ,"� SKYJES W 1050 VALLEY 957 SHADY VAIIEr AL 97b ELMiRO v PIKE • Ill SHADY 71 A N ELM RD' SHADY ELM RD 1006 168 Tl� ' n 1 SHADY VAIBEY VALLEY - M,AARA ELM RD 4 224� PIKE PIKE:~ v4 1 1013 3I6 S/RINGDALE RD tSNADY ' S►RINGDALE RD - # „ ; . III PIKE\ EUN RO MUSK%D 131 RIN631 SIGDALE RD VALLEY 222 00�MUSKEFDi ►RINGDALE RO 100 �S/RINGDALE RD v PIKE! S%RINGDALE RDT • R � '� J85 � R . ♦ 140 • RD - SPRINGDAIE ��� 1I7 S85`����� S/RINGDALERO � � � GOALE RD 371 12 • • S►RINGDALE DR SPRING 4314 J33B VALLEY ✓ALLEY P,KF 6t PIKE Cl REZ#04- 17 Carbaugh Business Center PINS: 74-A-68,74-A-69 Rezoning from RA to M1 h M. 4 location Map r ..NOCKMAANhTWOU, � n LNDUSTR_la'�O INODU I�ALrD • t INDUSTRIAUDR S61 SHADY ELM RD • � r r a 553 SHADY ELM RD ✓ I.. ROS PER11 404�, VALLEY PIKE / �11e SHADYA' �• ELM RD 1006 i 1168 - SNADY 419E - V • VALLEY ALLEY ELM RD �.. J1� 421� PIKE MA 10Q SIRINGDAtF RD SPRINGDAIE RD SHADY' Km RD 222 JN r 400 SPRINGDALE RDPRINGAIE RD VALLf • �fNJ °` y� PIKE SIRINGDZWRDY • R '�' • 421 SPRING DALE.PD 2 SPRINGDALE S/RING ` 385 - SPRINGDALE RD I SPRINGDALE RD L' • IND 4 J71 li SIRINGDALELM SPRING 4324 4330 VAILEY VALLEY PIKE ` PIKE I I I �!IKe 1J� K�D_7 1 WMUSKET,DI i Jk . R E Z # 04 - 17 DEVE ° AI t10 Carbaugh Business Center ' ,"DUSM IAVDR PINS: 74 - A - 68,74 - A - 69 MA Rezoning from RA to M1 "I&E 1N0 L0R Long Range Land Use Map SHADY ELM RD N ;DEVELO/MENiIN HOCKIN190 N Ci • fee. HOCKMAN Ci A HOCKARAN Ci SHAD � 7S0 ELM RD -130w7 SMAL1v 180) HOCKMAN LI 11LAII RD pROSPEI HOCKMAN CT 111 HOCKMAN Ci PROSPERRY D N220 OCKMANCT A /ROS/ERrivDR NOCKMAN�Ci IJJ f737 1 , 0 R PE RJI 11+0 �N �KMAN Ci WSJ IROSIERY/DR PROSPE SKY1�13 PROSPE ELM RD HOCKMANrC1 71 A 6d �,,:► � VALLEY 251 161 IJR ►IKE 'NOS PERm DR SKY1lY•LN SKYJES�LN 101 VALLI /II 4016 1 161 VALLEY 11111 PIKE �21 VALLEY ►IKE so 95 SHAD ♦ ♦ ♦ ♦ � VALLEI �♦♦♦♦♦♦ PIKE • ELM RD r ♦♦♦♦1.� -J►���♦♦ ♦♦♦♦♦ ,�RJ♦♦ ♦ ♦ I♦♦♦♦♦♦♦♦♦ ♦�i -SHAD Y - ♦♦♦♦♦♦♦♦♦ ELM RD ♦♦�♦�♦� ® ' 006 I I RI L6R ♦♦♦�♦ v _ SnAD_f,�a.� _ VALLEY ♦♦�♦♦ ELM RD" /� J41 V IIKEY IIKE ♦♦�♦ I�� SHADY J' j IN RD /r `LM RD �RINGDALE In 200 SMNGDALERD J61 S/RINGDALE RD VALLEY i 'PRINGDALERD 1 2222 PIKE 1 6 S/RINGDALERD ` 421 a - SPRINGDALE RD' SPRINGDAIE RD-'.� *% ' . I 17, RS _ NGDALE RD �'- 'SPRINGDALE�RD R J71 IJJO t Recreation Schoo Employment G� Airport Support Area O y D. High -Density Landfill Support Area Rural Areainterstate Buffer Natural Resources 8. Recreation (Z), Environmental & Recreational Resources H. REZ # 04 - 17 Note: Frederick County Dept of Carbaugh Business Center Planning a Development 107 N Kent St PINS: 74 - A - 68. 74 - A - 69 Suite 202 e Rezoning from RA to MI Winchester. VA 2260' Long Range Land Use Mop 540 - 665 - 5651 Map Created: October 10, 2017 Staff: cperkins 0 4625 925 1,850Feet 0 0 REZONING REQUEST PROFFER Property Identification Number 74 - ((A)) - 68 and 74 - ((A)) - 69 Back Creek Magisterial District Carbaugh Business Center Record Owner: The Henry J. Carbaugh Trust Applicant: Timothy Stowe Original Date of Proffers: 10/6/17 Revisions Date of Proffers: TBD Preliminary Matters Pursuant to Section 15.2-2296 et.seq., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # for the rezoning of Tax Map Parcel 74-A-68, a 89.8719-acre parcel, and Tax Map Parcel 74-A-69, a 17.3391-acre parcel, to establish 107.21 +/- acres of Light Industrial (M-1) Zoning District, development of the 107.21 +/- acre Light Industrial (M-1) Zoning District, hereinafter referred to as the "Property", shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with Virginia Law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the owner and their legal successors or assigns. Site Improvements The owner agrees to participate in the cost of transportation improvements in the nearby area. The owner will contribute to Frederick County, Virginia, a maximum of one million and eighty thousand dollars ($1,080,000.00). Such payment shall be made either within 30 calendar days after the start of construction on the extension of Renaissance Drive that will connect with Shady Elm Road or prior to the issuance Proffer Statement Page 1 of 5 of the certificate of occupancy permit for all building structures developed on the Property, whichever event occurs first. Such funds can be used by the Board of Supervisors in its discretion for transportation improvements related to the extension of Renaissance Drive, an East-West Collector Road, to Shady Elm Road and can be used as local match funding for County Revenue Sharing Program projects related to the aforementioned extension. 2. The owner agrees to dedicate 60' (sixty feet) of right-of-way along Shady Elm Road to Frederick County for future dedication to VDOT as depicted on the Generalized Development Plan (GDP), which is attached and incorporated as part of the Proffer Statement. 10' (ten feet) of which is to be used for the construction of a pedestrian trail adjacent to the Property. This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. 3. The owner agrees to dedicate 20' (twenty feet) of right-of-way along its northeast boundary to Fredrick County and eventual dedication to VDOT for the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road. This right-of-way is depicted on the GDP. This dedication is to be made within 90 (ninety) days of a written request by Frederick County. 4. The owner agrees to grant to Frederick County an 80' (80 feet) grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road if needed. The final length of the easement will be determined during the design phase of the extension of the East- West Collector Road. The length shall not exceed the distance from the CSX rail line to the start of the bridge ramp. This grant is to be made within 90 (ninety) days of a written request by Frederick County. 5. The owner agrees to limit the number of commercial entrances for the Property to be rezoned to a maximum of two (2) entrances along the new collector road to be constructed as an extension of Renaissance Drive and intersecting with Shady Elm Road. In the event the property is developed prior to the completion of Renaissance Drive collector road extension, the owner may build a portion of Renaissance Drive collector road extension from Shady Elm Road to the first entrance to the site to enable use of the site. The portion of the collector road to be built in this event will meet with both VDOT and Frederick County approval. In the event that Frederick County request that the owner not build a portion of the Renaissance Drive collector road extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance on Shady Elm Road will be permanently closed Proffer Statement Page 2 of 5 �J 0 immediately after the Renaissance Drive collector road extension is available for use by the applicant. 6. The owner herby proffers to provide for inter -parcel connections for all new lots to provide access to the two new access points on Renaissance Drive. Building Restrictions The development of the subject Property shall include the following building restrictions: All loading docks shall be screened from view from all adjacent properties in the Rural Area (RA) Zoning Districts that are located west of Shady Elm Road. The Owner will utilize a Class C — Full Screen (As defined by Frederick County at the date of this rezoning) 100' (one hundred feet) buffer adjacent to Rural Area (RA) Zoning Districts west of Shady Elm Road. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34-1040) prior to its demolition. Landscape Design Features The development of the subject Property, and the submission of any Master Development Plan, shall include the following landscape design features: The owner shall provide street trees planted 50 (fifty) feet on center adjacent to the Renaissance Drive collector road extension. The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County. Monetary Contributions to Offset Impact of Development The owner, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning for the 107.21 +/- acre property to the Light Industrial (M-1) Zoning District, the undersigned will pay Frederick County, prior to the issuance of the Proffer Statement Page 3 of 5 0 Certificate of Occupancy Permit for the first structure constructed on the Light Industrial (M-1) Zoning District portion of the parcel, the sum of thirty thousand dollars ($30,000.00), for use by the Board in its discretion for fire and rescue purposes. Additionally, the owner shall contribute five thousand dollars ($5,000.00) to the Kernstown Battlefield Association prior to the issuance of the Certificate of Occupancy Permit for the first structure constructed on the property. Escalator In the event the monetary contributions set forth in the Proffer Statement are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by the Applicant, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of 4 percent (4%) per year, non -compounded. Respectfully Submitted, The Henry J. Carbaugh Trust OWNER: Hcn'-% 'J. C[t 0e4c'- Arrr✓ne '7'r J"-Ae'l Qfcr -7,v6rr / yC)v6, ' b y 6c�•,� �yt✓C-- Ca;l� C"n«��7� 5����ss��; `T�usiz'f By: Date:yc �ahy l] / % STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -Wit: The foregoing instrument was acknowI dg d before me this [o�� day of OcAl-) er 2 017, b y a dA C<, My Commission expires CI •30 -201 g Proffer Statement Page 4 of 5 Notary Public/M-�,Mutj 11 Proffer Statement Page 5 of 5 • C� Candice Perkins From: Funkhouser, Rhonda (VDOT) <Rhonda.Funkhouser@VDOT.Virginia.gov> on behalf of Smith, Matthew, P.E. (VDOT) <Mattliew.Smith@vdot.virginia.gov> Sent: Thursday, September 7, 2017 9:37 AM To: John Bishop; 'mcheran@fcva.us Cc: Tim Stowe; Short, Terry (VDOT); Campbell, Adam (VDOT); Smith, Matthew, P.E. (VDOT) Subject: Carbaugh Rezoning - Tax Map 74-A-68,69 - VDOT Comments A VDOT review has been completed on the Carbaugh Rezoning. We offer the following comments: Following discussions with Frederick County, it is VDOT's understanding that if an agreeable proffer regarding the monetary participation for the completion of Renaissance Drive can be reached between Frederick County and the developer, the county will consider the transportation mitigation responsibilities of the subject property resolved. While VDOT agrees that the completion of Renaissance Drive is an important and significant transportation improvement to the area, there remains future concerns over the operation of US 11 and the interchange with Route 37 given the extent of planned developments in the region. Should the County determine a revised submission of the TIA is not warranted, the following comments are for the County's knowledge and understanding of potential operational issues related to the TIA's study limits along the US 11 corridor. The primary mitigation proposed in the study to address transportation impacts of the development is monetary participation by the developer in the extension of Renaissance Drive to Shady Elm Road. While this transportation improvement is critical for the subject development, as well as other developments in the vicinity of Shady Elm Road and Apple Valley Road, the current trigger of said participation in both the draft proffers and study report conveys the risk of potential impacts to the existing transportation network in the event that the subject development proceeds prior to the completion of Renaissance Drive. The study states that access to the development will be from Shady Elm Road prior to the completion of Renaissance Drive and the conclusion section states that "the traffic that is forecasted from this development can be accommodated on the existing road network". However, this assumption is unfounded as the TIA does not include Build and Design Year scenarios where Renaissance Drive does not connect US 11 and Shady Elm Road. It is VDOT Staunton District Planning's recommendation that Frederick County consider requesting modifications to the proffers that requires the monetary participation of the developer and start of construction on the extension of Renaissance Drive, prior to the issuance of the initial occupancy permit on the subject property. Without such changes to the proffer, it is recommended that the TIA be revised to evaluate the build and design year impacts without Renaissance Drive in place and detail improvements needed to mitigate impacts. The traffic models and analysis outputs presented in the study are currently inadequate in identifying the future operational performance of the US 11 corridor between Renaissance Drive and the Route 37 interchange. As a result, the potential impacts of the full build out of the subject property on US 11 are unclear. The following is a summary of deficiencies within the current traffic models: • In all models, the traffic signal at US 11 and the Route 37 eastbound ramps is coded with signal timings, vehicle extension, and clearance intervals that do not match VDOT supplied data (the signal timing sheet is included in Appendix F of the report). • In the existing year models at the US 11 and Route 37 eastbound ramp signal, the left turn movements for the off -ramp and Kernstown Commons Boulevard approach need to be revised to protective / permissive phasing with leading lefts. • The percentage of heavy vehicles within the models seems to be based on the number of heavy vehicles counted during the entire traffic data collection window instead of the peak hour window, and therefore may not represent accurate conditions. Additionally, it seems future year heavy vehicle percentages at the US 11 and Route 37 eastbound ramp intersection were not adjusted for development traffic. • No trips were assigned to the various side streets accessing US 11 between Renaissance Drive and Route 37 and as a result, there are considerable vehicle balancing discrepancies in the models. While these side streets were not scoped as study intersections, assumptions should have been made for these side street movements to achieve vehicle balancing in the network and provide a more accurate analysis of the operational performance of US 11. • The analysis does not consider trip diversion or potential impacts from existing developments along Shady Elm Road and Apple Valley Road to the US 11 corridor via routing along Renaissance Drive. 3. Even with the deficiencies listed above, based on the potential trip generation associated with the subject property and other potential developments within the vicinity, it is likely that additional improvements will be necessary within the study area to mitigate future impacts. These may include access management / alternative intersection consideration along US 11 between Renaissance Drive and Route 37 and a potential second lane on the Route 37 eastbound on -ramp to accommodate simultaneous receipt of heavy northbound left turns and southbound right turns from US 11. 4. In the Build and Design Year models, the US 11 and Route 37 eastbound ramp signal is modified from the current protected only left turn phasing on US 11 to protected / permissive phasing in the form of flashing yellow arrows. However, this left turn phasing modification is not discussed in the report from either a safety or operational perspective or listed as an improvement recommendation. If a modification from protected only to protected / permissive left turn phasing is being considered as a future year improvement, VDOT recommends that the protected only left turn phasing also be analyzed in the future year to identify operation impacts if left turn phasing must be converted back from protective / permissive should a safety concern arise. Additionally, VDOT intends to upgrade the Route 37 eastbound ramp and Kernstown Commons Boulevard left turn phasing to protective / permissive via flashing yellow arrows in the next few years. 5. When Frederick County's Revenue Sharing project advances for the extension of Renaissance Drive, improvements should be considered along the existing section of the roadway to improve future operations of the facility as developments begin to come online. Improvements to be considered include modifying the traffic signal at US 11 to provide flashing yellow arrow left turn phasing and the consolidation of the two eastern most entrances currently serving vacant properties in order to reduce potential turning movement conflicts and increase available storage of the eastbound left turn lane onto northbound US 11. 6. The study includes two trip generation scenarios for the subject property, consisting of ITE rates and custom rates with supporting documentation as proposed by the preparer of the study. This approach was agreed to during study scoping to evaluate the differences in transportation impacts between to two trip generation scenarios. Please be advised that the utilization of ITE rates will still be the accepted process for all studies moving forward per the Chapter 527 TIA Administrative Guidelines. Any use of custom trip rates, if requested, will be discussed on a case by case basis during the study scoping process. Should you have any questions or wish to discuss this information, do not hesitate to let me know. Matthew B. Smith, P.E. I Area Land Use Engineer Virginia Department of Transportation Clarke, Frederick, Shenandoah & Warren Counties 11031 Old Valley Pike Edinburg, VA 22824 voice: 540/984-5615 fax: 540/98"'1-5607 e-mail: Matthew.Smith@vdot.virginia.gov • 315 Tasker Road Stephens City, Virginia 22655 August 18, 2017 Tim Stowe Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 FREDERICK WATER PH (540) 868-1061 Fax (540) 868-1429 www.FrederickWater.com RE: Rezoning Application Comment Carbaugh Rezoning Application Tax Map Number: 74-A-68 and 74-A-69 107.21 acres Dear Mr. Stowe: Eric R. Lawrence Executive Director Thank you for the opportunity to offer review comments on the Carbaugh rezoning application package, with an undated draft proffer statement and the Impact Statement dated October 21, 2016. Frederick Water offers comments limited to the anticipated impact/effect upon Frederick Water's public water and sanitary sewer system and the demands thereon. The project parcels were recently added to the sewer and water service area (SWSA) and in an area not presently served by FCSA. SWSA enables access to public water and sewer service by county policy. Location within the SWSA does not guarantee that sanitary sewer and water capacities are available to serve the property. The rezoning application is silent on the potential use, square footage, and water and sewer demands. The Impact Analysis suggests a 1,000,000 square foot user for calculating solid waste production, while the Traffic Impact Analysis proposes 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. In order to analyze water and sewer usage, Frederick Water will analyze demands based on a light industrial user which consumes 500 gpd/a (gallons per day, per acre). Based on the 107 acre site, water and sewer demands are projected to each be 53,500 gpd. 5,o�s�t `�h ANNIVERSARY Water At Your Service ]AMMAX 0 0 Page 2 Carbaugh rezoning application Tim Stowe, Stowe Engineering August 18, 2017 Water and sanitary sewer treatment facilities are presently available to meet the projected demand of 53,500 gpd. Facilities for conveyance of water to, and sanitary sewer from, the subject properties does not presently exist. From previous discussions with the applicant, Frederick Water understands the applicant's intent is to construct a water line which will tap into an existing 20-inch water main along Route 11, and traverse westward within to be established easements. Sanitary sewer would be addressed through the construction of a new sanitary sewer pump station located along the CSX railroad tracks, and a sanitary sewer force main northward following the CSX railroad tracks to a point at which the force main would discharge into the Hoge Run Interceptor. The interceptor would then convey flows to Parkins Mill Wastewater Treatment Plant. An optional sanitary sewer route would be the construction of the Opequon Interceptor which will facilitate flows directly from the subject properties to the Parkins Mill Wastewater Treatment Plant. Regardless of the route for water and sanitary sewer conveyance, the construction of the infrastructure will be the responsibility of the applicant. The proffer statement is silent on improvements that would be constructed by the applicant to meet water and sanitary sewer demands. Accordingly, the comments offered herein are general in nature. The ultimate decision regarding the ability to serve the property with adequate water and sanitary sewer will be determined at the time the site's use is determined, conveyance facilities are constructed, and water and sewer connection fees are paid to Frederick Water. Sanitary sewer system capacity is not reserved until the sewer connection fee is paid to Frederick Water, and physical connection to the system is made. Water and sanitary sewers are to be constructed in accordance with the FCSA standards specifications. Dedicated easements may be required and based on the layout vehicular access will need to be incorporated into the final design. Please be aware that the FCSA is offering these review comments without benefit of knowledge of the specific use of the site. Additionally, we would welcome an opportunity to review any proffers which may serve to mitigate any sanitary sewer deficiencies. Thank you for the opportunity to offer review comments. Sincerely, s Eric R. Lawrence Executive Director Cc: Michael T. Ruddy, AICP, County Planning Department 0 Fj August 7, 2017 Mr. Tim Stowe, PE, LS Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 RE: Proposed Rezoning for Carbaugh Business Center Property Identification Numbers (PINs): 74-A-68 and 74-A-69 Dear Tim: I have had the opportunity to review the draft rezoning application for the Carbaugh Business Center. This application seeks to rezone two properties totaling 107.21 acres from the RA (Rural Areas) Districts to the M I (Light Industrial) District with proffers. The review is generally based upon the proffer statement submitted on July 13, 2017. Prior to formal submission to the County, please ensue that these comments and all review agency comments are adequately addressed. At a minimum, a letter describing how each of the agencies and their comments have been addressed should be included as part of the submission. 1. Kernstown Area Plan — Land Use. The 2035 Comprehensive Plan and the Kernstown Area Plan provide guidance on the future development of the property. The property is located within the SWSA. The 2035 Comprehensive Plan identifies these properties with an industrial land use designation. The proposed M l Zoning is generally consistent with the Kernstown Area Plan as it relates to this area. The land use plan depicts access to this site through a new major collector road, Renaissance Drive. 2. Proffer — Site Improvements. a. Shady Elm Road is a rural roadway that is not set up to accommodate new industrial entrances at this point. This roadway should not be utilized for new industrial entrances which would place heavy industrial traffic in close proximity to existing rural residential land uses, even on a temporary basis. Staff recommends that the proffer be revised to state that Renaissance Drive must be completed prior to any occupancy permits granted for any proposed structures. • 0 Page 2 Mr. Tim Stowe RE: Carbaugh Business Center August 7, 2017 b. A proffer should be included that restricts the location of temporary construction entrances. Construction entrances should not be placed near existing residential land uses along Shady Elm Road. Any temporary entrances (including temporary construction entrances) should be provided adjacent to Renaissance Drive. c. Proffer 2 and 3 from this section should be expanded to state "to Frederick County for Dedication to VDOT". d. Proffer 7 from this section should be modified to state that the owner will provide inteiparcel connections for all new lots to provide access to the two new access points on Renaissance Drive to ensure future lots have access to an improved collector road and do not impact Shady Elm Road. 3. Proffer — Building Restrictions. a. Proffer 2 under this section is a requirement of the Subdivision Ordinance and should be removed. b. Staff suggests providing a proffer for building facades facing Shady Elm Road and Renaissance Drive (cast stone, stone, brick, architectural block, glass, wood, dry vit or stucco — similar to the Artillery proffer statement). c. A proffer for a multi -tenant complex sign is suggested along Shady Elm Road and Renaissance Drive, with prohibitions for individual business signs along Shady Elm Road. d. Flashing loading bay lighting should be addressed with this proffer statement in addition to the proffer for screening. Industrial facilities on similar properties contain flashing loading bay lights. 4. Proffer — Landscape Design Features. a. Proffer 1 under this section is proffering less than the buffer section of the Zoning Ordinance. The land uses across Shady Elm Road consist of single family residential — therefore a full distance buffer would be required (three trees per ten linear feet — evergreen, shrub, deciduous and a 6' berm). Staff suggests depicting the three trees per ten linear feet along Shady Elm Road and providing street trees along Renaissance Drive on the GDP. b. Proffer 2 from this section is proffering less than the buffer section of the Zoning Ordinance. The southwestern portion of the property is adjacent to RA residential land uses and therefore the minimum required is a Category C — full screen 100' buffer. 5. Proffer — Monetary Proffer. Recent rezonings have included a 50.05-$0.10 per building square foot proffer to Fire and Rescue, staff recommends keeping within this range. The Fire and Rescue proffer provided with this rezoning equates to 0 0 Page 3 Mr. Tim Stowe RE: Carbaugh Business Center August 7, 2017 S0.02 per building square foot based on the 1,000,000 square foot assumptions provided in the application. 6. Impact Analysis. Expand the parameters of tine impact analysis section pertaining to surrounding properties. This development will impact a number of existing rural residential land uses along Shady Elm Road and adjacent to the southwestern property line of the proposed rezoning. Consideration of the topography and viewshed fi•om the residential properties and the existing agricultural operation along Shady Elm Road should be addressed in this section. 7. Transportation Comments. Please note that the transportation comments on the rezoning application from John Bishop, Assistant Director - Transportation, are being provided to you in a separate letter. Staff may also provide additional comments related to the proposed changes if warranted subject to adjustments requested by VDOT. S. Agency Comments. Please provide appropriate agency continents from the following agencies: Virginia Department of Transportation, Frederick County Department of Public Works, Frederick County Fire Marshal, Frederick County Sanitation Authority, Health Department, the local Fire and Rescue Company, the County Attorney, the Historic Resources Advisory Board (HRAB) and the Frederick -Winchester Service Authority. 9. Fees. Based on the fees adopted by the Board of Supervisors on April 23, 2008, the rezoning fee for this application would be S20,721.00 based upon acreage of 107.21 acres. All of the above comments and reviewing agency comments should be appropriately addressed before staff can accept this rezoning application. Please feel free to contact me with questions regarding this application. Sincerely, Candice E. Perkins, AICP, CZA Assistant Director CEP/pd • 0 August 7, 2017 Mr. Tim Stowe, PE, LS Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 RE: Transportation CoIUI11e11t for Proposed Rezoning for Carbaugh Business Center Property Identification Numbers (PINS): 74-A-68 and 74-A-69 Dear Tim: Thank you for the opportunity to review the draft rezoning application for the Carbaugh Business Center to rezone two properties totaling 107.21 acres from t11e RA (Rural Areas) Districts to the M 1 (Light Industrial) District Nvith proffers. The review is based upon the undated proffer statement submitted on July 13, 2017. TraIsportation COI11I1101ts Renaissance Drive Proffer I notes that the applicant is willing to provide S820,000.00 toward the completion of Renaissance Drive. As noted in the T1A, Renaissance Drive is important in offsetting the impact of t11e proposed development and will comprise a significant portion of traffic on the roadway. The current proffer is insufficient to move the project to bid. Based upon that, though the TIA notes the need of Renaissance Drive to offset the traffic impact, the current proffer does not offset the transportation impact of the proposed development. 2. Entrances Proffer 5 notes that the owner may use two temporary entrances on Shady Elm until such time as Renaissance Drive is in place for construction and commercial purposes. Extreme care should be taken to minimize the impact of this traffic on the residential neighborhood on the west side of Shady Elm Drive and staff would suggest that the applicant coordinate with County Staff and VDOT to keep any access as close to the final intended location on future Renaissance Drive as possible. Particularly in the case of actual commercial 0 • Page 2 Mr. Tim Stowe RE: Carbaugh Business Center August 7, 2017 entrances, staff believes it would be difficult to relocate a commercial entrance once established. 3. Bicycle and Pedestrian Accommodation In keeping with the Comprehensive plan and due to the significant number of potential future employees as well as existing residents, please work to minor the trail that has been proffered along Shady Elm Drive by previous rezonings. All of the above comments and reviewing agency comments should be appropriately addressed before staff can accept this rezoning application. Please feel free to contact me with questions regarding this application. Sincerel John A. Bishop, AICP Assistant Director -Transportation JAB/pd t • October 4, 2017 Mr. Michael Ruddy County of Frederick Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, VA 22602 RE: Rezoning Application Comments Dear Mr. Ruddy, The following summary outlines agency responses to our rezoning application: (Please see attached documents for verification) 1) Frederick County Fire and Rescue Department — Office of the Fire Marshall a. Plan approval was recommended 2) Winchester Regional Airport a. Proposed rezoning of M1 is compatible with airport Operations. 3) Frederick County Sanitation Authority a. The parcels to be rezoned have been added to the sewer and water service area. b. Water and sanitary sewer treatment facilities are presently available to meet the projected demand of 53,000 gpd. c. The applicant is in agreement that construction of adequate infrastructure will be the responsibility of the applicant. d. Water and sanitary sewers are to be constructed in accordance with the FCSA (Frederick Water) standard specifications. 4) Frederick -Winchester Service Authority a. Comments deferred to FCSA 5) Frederick County Department of Public Works a. Only comment, "A comprehensive review shall occur at time of site plan submission". 6) Virginia Department of Transportation (VDOT) a. VDOT's comment, "Following discussions with Frederick County, it is VDOT's understanding that if an agreeable proffer regarding the monetary participation for the completion of Renaissance Drive can be reached between Frederick County and the developer, the county will consider the transportation mitigation responsibilities of the r subject property resolved." It is the applicant's understanding that the revised Proffer Statement's monetary participation is agreeable to Fredrick County. 7) Frederick County Attorney a. "Applicant" has been changed to "owner" in the Proffer Statement b. The sentences have been combined in the Proffer Statement c. The GDP has been incorporated as part of the Proffer Statements d. The Proffer Statement was revised to indicate "whichever event occurs first" e. See the current revised Proffer Statement: Item 2 — "This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. Item 3 — "This dedication is to be made with 90 (ninety) days of a written request by Frederick County." Item 4 — "This grant is to be made with 90 (ninety) days of a written request by Frederick County." f. The Proffer Statement has been revised to "grading/slope" easement. g. See the revised Proffer Statement, Site Improvements, Item 5. h. The Proffer Statement was been revised to "west of Shady Elm Road" i. The Proffer Statement was revised to "The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County." 8) Historic Resources Advisory Board a. Approval was recommend with the condition that the Applicant preform an intensive level survey on the Henry Carbaugh House #34-1040. b. The Proffer Statement was revised to require the intensive level survey request prior to demolition of the Henry Carbaugh House. 9) Virginia Department of Health, Lord Fairfax Health District a. No objections noted. b. The applicant will properly abandon any discovered sewer disposal systems or private wells per Health Department Regulations. 10) Department of Planning and Development Proffer —Site Improvements a. The Proffer Statement has been revised to limit the impact on Shady Elm Road. See Site Improvement — Item 5. b. On the Proffer Statement. See Site Improvements — Item 5. c. The suggested change has been incorporated into the Proffer Statements. d. The suggested change has been incorporated into the Proffer Statements. Proffer - Building Restrictions a. The item has been removed from the Proffer Statement b. The applicant feels that a fagade restriction would place an undo burden on the marketability of the land for future developments. Those restrictions are not prevalent on other M1 zoned properties. c. Signage has been restricted on Shady Elm Road in the Proffer Statement. O d. The flashing lights cannot be restricted on the buildings as it has become a loading dock safety requirement. The applicant has added the use of a Category — C full screen 100' buffer to the Proffer Statement to mitigate the impact of the loading dock lights. Proffer —Landscape Design Features. a. See the revised GDP and Proffer Statement. Street tress have been provided for along Renaissance Drive. b. The item has been removed. Proffer — Monetary Proffer a. The applicant has increased the proffered amount by $20,000 dollars. Impact Analysis: TBD 11) Frederick County Transportation a. To be discussed Please feel free to contact me with any questions or concerns. Thank you, Tim Stowe 0 0 • REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA To be completed by Planning Staff. G� _ Fee AmoLmt Paid $ Zoning Amendment Number O Ll - I Date Received I o �n't �I PC Hearing Date t I l i I t'1 BOS Hearing Date t-)_ t 3 1 1 The following informalion shall be provided by the applicant. - All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester. 1. Applicant: Name: Timothy Stowe Telephone: 540-336-0656 Address: Stowe Engineering, PLC 103 Heath Court, Winchester VA 22602 • 2. Property Owner (if different than above): Name: The Henry J. Carbaugh Trust Telephone: Address: C/O Bank of Clarke County Trust Department 202 N. Loudoun St. Winchester VA 22601 3. Contact person if other than above: Name: Timothy Stowe Telephone: 540-336-0656 4. Property Information: a. Property Identification Number(s): 74 - A - 68 and 74 - A - 69 b. Total acreage to be rezoned: 107.21 acres C. Total acreage of the parcel(s) to be rezoned (if the entirety of the parcel(s) is not being rezoned): d. Current zoning designation(s) and acreage(s) in each designation: 107.21 acres zoned RA e. Proposed zoning designation(s) and acreage(s) in each designation: 107.21 acres to be rezoned M 1 f. • Magisterial District(s): Back Creek Magisterial District 12 11 0 &- 1 � rv\- rx), & 0 E i • S. Checklist: Check the following items that have been included with this application. Location map ✓ Agency Comments Plat _ ✓ _ Fees _ Deed to property _ ✓ _ Impact Analysis Statcnic It _ ✓ _ Verification of taxes paid _ ✓ _ Proffer Statement Plat depicting exact meets and bounds for the proposed zoning district _ ✓ _ Digital copies (pdrs) of all submitted documents, maps and exhibits ✓ 6. The Code of Virginia allows us to request full disclosure of owne►•ship in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: The Henry J. Carbaugh Trust • 7. Adjoining Property: PARCEL ID NUMBER USE ZONING See attached List 8. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers): The property is located at 831 Shady Elm Road. From the intersection of Apple Valley Road and Shady Elm Road, the property is located approximately 1.11 miles heading southwest on Shady Elm Road. The southeast portion of the property in bound by the CSX Railroad. • 13 a 0 • 9. The following information should be provided according to the type of rezoning proposed: Single Family homes: Non -Residential Lots; Office: Retail: RestaUrant: Commercial: 10. Signature: Number of Units Proposed Townhome: Mobile Home: Square Footage of Proposed Uses Multi -Family: Hotel Rooms: Service Station: MallllfaCtLII'Ing: 500,000 Warehouse: 500,000 Other: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. • I (we) understand that the sign issuecl when this application is submitted must be placed at the fi•ont property line at least seven days prior to the Planning COIIIIIIISSIOIn public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and Its accompanying materials are trlle and accurate to the best of my (our) knowledge. Z Applicant(s): _ Date: /�7 Date: Owner(s): • 14 Date: Date: Adjoining Pdk�rty Owners IRW • # PIN Owner Address Zoning 1 75 A 1 Venture I of Winchester LLC 54 Merriman's Lane, Winchester, VA 22601 M1 2 74 A 71 Stephen D. Brim, ETALS 254 Queen Street, Strasburg, VA 22657 RA 3 74 A 70 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 4 74 A 72 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 5 74 A 57A Vernon E., II and Lisa M. Heavner 1043 Shady Elm Road, Winchester, VA 22602 RA 6 74 A 59 Robert J. and Donna L. Diaz 1006 Shady Elm Road, Winchester, VA 22602 RA 7 74 A 61 Robert D. Patton and Anita K. Rukavina-Patton 983 Shady Elm Road, Winchester, VA 22602 RA 8 74 A 62 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 9 74 A 63 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 10 74 A 64 Ronald L. Brown 970 Shady Elm Road, Winchester, VA 22602 RA 11 74612 300N LLC P. 0. Box 179, Moorefield, WV 26836 RA 12 74611 Daniel J. and Sandra M. Lyons 121 Skyjes Lane, Winchester, VA 22602 RA 13 7462 BOON LLC P. 0. Box 179, Moorefield, WV 26836 RA 14 7461 Matthew and Mary Ann Kremer 138 Skyjes Lane, Winchester, VA 22602 RA 15 74314 Kevin and Tina Anderson 113 Hockman Ct., Winchester, VA 22602 RA 16 7435 Gregory R. and Johanna A. Brown 114 Hockman Ct., Winchester, VA 22602 RA 17 7434 Jacob T., III and Heather R. Rudolph 750 Shady Elm Road, Winchester, VA 22602 RA 18 74 A 67 Kitty Hockman Nicholas 690 Shady Elm Road, Winchester, VA 22602 RA 19 7433 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 20 7432 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 21 22 23 24 25 26 27 28 29 30 31 32 33 34 • 40 • • 00 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.feva.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents: That I (We) Henry J. Carbaugh Trust Under Agreement (Name) Dated December 18, 2006 (Phone) 540/665-2400 (Address) 202 North Loudoun Street, Winchester, VA 22601 the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by SEE EXHIBIT "A" ATTACHED HERETO FOR DESCRIPTION OF PROPERTY. Instrument No. on Page , and is described as Parcel: Lot: Block: Section: Subdivision: do hereby make, constitute and appoint: (Name) Timothy Stowe (Phone) 540:336-0656 (Address) 103 Heath Court, Winchester, VA 22602 To act as my true and lawful attorney -in -fact for and in my (our) name, place and stead with fiill power and authority I (we) would have if acting personally to file planning applications for my (our) above described Property, including: X Rezoning (including proffers) Conditional Use Permit X Master Development Plan (Preliminary and Final) X Subdivision Site Plan Variance or Appeal My attorney -in -fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or modified. In witness thereof, I (we) have hereto set my (our) hand and seal this day of , 20 , Signature(s) SEE ATTACHED SIGNATURE PAGE State of Virginia, City/County of I, To -wit: Notary Public in and for the jurisdiction certify that the person(s) who signed to the foregoing instrument personally appeared before m acknowledged the same before me in the jurisdiction aforesaid this day of , 20 Notary Public My Commission Expires: aforesaid, and has • • • 0 r • HENRY J. CARI3AUGH TRUST UNDER AGREEMENT DATED DECEMBER 18, 2006 By: Bank of Clarke County, Successor Trustee B y:� / �� �c�l� i{ (SEAL) Carl A. Esterhay, Senior Vice P esident STATE OF VIRGINIA, AT LARGE, CITY OF WINCI-IESTER, to -wit: The foregoing instrument was acknowledged before me, a Notary Public in and for the State and .Jurisdiction aforesaid, this JY" day of j om- , 2017, by Carl A. Esterhay, Senior Vice President of Bank of Clarke County, Successor Trustee of the Henry J. Carbaugh Trust Under Agreement Dated December 18, 2006. My commission expires H o -'-w1 A,lli1b11- � i�Lot'ry Pu�ic 00 66 • EXHIBIT "A" PARCEL ONE: That certain parcel of land containing 89.8719 acres, more or less, located on the eastern side of Shady Elm Road, in Back Creek Magisterial District, Frederick County, Virginia, designated as "Tax Map 74-A-68 89.8719 Acres" on that certain plat titled "Boundary Survey Of The Land Of The Henry J. Carbaugh Trust" dated August 12, 2016, drawn by S. W. Marsh, L.S., a copy of which is attached hereto and incorporated licrein by reference as if set out in full; and being a portion of the lands designated as Parcel One acquired by that certain Deed dated January 3, 2007, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia as Instrument No. 070000157. Tax Map No. 74-A-68. PARCEL TWO: That certain parcel of land containing 17.3391 acres, more or less (according to Frederick County Tax Records), located on Shady Elm Road, in Back Creek Magisterial District, Frederick County, Virginia, designated as "Tax Map 74-A-69 17.3391 Acres" on that certain plat titled "Boundary Survey Of The Land Of The Henry J. Carbaugh Trust" dated August 12, 2016, drawn by S. W. Marsh, L.S., a copy of which is attached hereto and incorporated herein by reference as if set out in full; and being the remainder of the lands designated as Parcel Two acquired by that certain Decd dated .January 3, 2007, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia as InStrunlent No. 070000157. Tax Map No. 74-A-69. MLB/porn cAMisc\Carbaugh Exhibit A 6/16/17 r SHOCKEY THE PARTNER OF C H O I C E To: Kernstown Battlefield Association P.O. Box 1327 Winchester, VA 22604 The Shockey Companies P. O. Box 2530 Winchester, Virginia 22604 540-723-4162 / 540.665-3211 (FAX) Date: November 29.2021 Project: Graystone Corporation Attn: Charlie Hagan, Secretary Subject: Check We are forwarding: FX Herewith The following: = Drawing(s) Sample(s) Under separate cover Shop Drawing(s) Color Chart(s) Via: rn UPS / FED EX Specification(s) FX ] Other Copies Drawing Number Company Description oi- Title 1 Check 4672182 The Shockey Companies $5,000.00 - Carbau h Property Proffer Which are: Submitted for your approval F_� Submission 0 Returned for correction and resubmission Approved with corrections noted 0 For your use ❑ Approved for construction Proceed with fabrication a�f��o�w,"rd to us __prints for our file and field use For your use in pro i'�1i g, return to HSS by [—X ] Receive_— ` ,/—�` L-- `t-` -- -- Dated: `- ' tfi �/ r � 1 � 1.__L. Remarks: Very 'rutty Yours, i Sign: `'.1.� 1 J(.ril'C f t ,,t/. L) tt�_ Name: Gray Fattind Title: Vice President of Corporate Development Phone M 540-723-4162 JOB S - U - |wvoxTc o.-S,mpnow GROSS AMOUNT cxxcoowT NET AMOUNT 11/29/21 RBAUQH'PROFFER 5.000.0.0 5,000.01. /, a.:a. r TOTAL S | 5.000.00 / / | 0Q 7�` �� o��n�� Companies P�.amzO0 ^ Winchester, Virginia 22604 PAY Five Thousand Dollars and 00 Cents TO Komubown Battlefield THE AuonoiuUon ORDER P.O. Box 1327 OF Winchester VA 22604 TRUIST 69-426 CHECK DATE CHECK NO 11/28/2021 672182 ' (-- ------ -----— °------ � 5.O0O.0OV010 o"G?2L82ill /:05I 1,0�260/: SI �9O9Y259lim 10 SHOCKEY THE PARTNER OF CHOICE* To: Frederick County, Virginia 107 North Kent Street Winchester, VA 22601 Attn: John Bishop is The Shockey Companies P. 0. Box 2530 C *� Winchester, Virginia 22604 540-723-4162 / 540-665-3211 (FAX) Date: November 29, 2021 Project: Graystone Corporation _ Subject: Checks We are forwarding: FX Herewith The following:= Drawing(s) Sample(s) Under separate cover Shop Drawing(s) Color Chart(s) Via: UPS /FED EX Specification(s) Other X I Delivery copies Drawing Number Company Description or Title $30,000.00 - For your use - Fire & Rescue - per I Check #672180 The Shockey Companies Carbau h Property Proffer 1 lCheck #672181 IThe Shockey Companies Which are: Remarks: 1.141.128.00 - Road Submitted for your approval �1 Submission Returned for correction and resubmission Approved with corrections noted For your use Approved for construction Proceed with fabrication and forward to us prints for our file and field use For your use in providing quotation, return to HSS by Received bv: Dated: - I;ECENEp Q, a FREDERICK COLIN1y PLANNING AND DEVELOPMENT Very Truly Yours, Sign: .&I-11, Name: Gray Fand Title: Vice President of Corporate Development Phone #: 540-723-4162 THE SHOCKEY COMPANIE� JOB/ SUB JOB NO. C IV VENDOR REFERENCE CHECK NO. 672181 P O sox 2530 1 13471 Winchester, Virginia 22604 INV NUMBER INV DATE DESCRIPTION GROSS AMOUNT DISCOUNT NET AMOUNT 11292021 11/29/21 OAD 1,141,128. 1,141,128.0 Q j � I DETACH AND RETAIN THIS STATEMENT THE ATTACHED CHECK IS IN PAYMENT OF ITEM' DESCRIBED ABOVE TOTALS 1,141,128.00 ' 1,141,128.0 IF NOT CORRECT PLEASE NOTIFY US PROMPTLY. NO RECEIPT DESIRED The Shockey Companies P.O. Box 2530 Winchcster, Virginia 22604 PAY One Million One Hundred Forty -One Thousand One Hundred Twenty -Eight Dollars and 00 Cents TO Frederick County THE ORDER OF TRUIST WINCHESTER, VIRGINIA CHECK DATE 11 /29/2021 68-426 514 CHECK NO 672181 CHECK AMOUNT �___-1,141,128.00 VOID AFTER 90 DAYS 00 1166?21BL11' I:OSL401,2P301: S L 3 ?0 9 7 2 S 9118 THE SHOCKEY COMPANI • P.O. Box 2530 JOB/ SUB JOB NO. V I VENDOR I REFERENCE 3471 CHECK NO. 72180 Winchester, Virginia 22604 AMOUNTDISCOUNT NET AMOUNT INV NUMBER INV DATE DESCRIPTIONGROSS 30,000.0 11/29/21 CARBAUGH-PROFFER 30,000.0 .0 112921 I I , DETACH AND a=-n:t: THIS STATEMENT TOTALS 30,000.00 .0 30,000.0 '8E F.7.AC!i-: 7HEc9 :S IN :A'C!E::T OF ITEP:5 DESCRIBED i.nOVE Ir KC7 =: Rr.EC7 PLEASE 1.071 US PROXPTLY. NO RECEIPT DES:PED The Shockey Companies P.O. Box 2530 Winchester, Virginia 22604 PAY Thirty Thousand Dollars and 00 Cents TO Frederick County THE ORDER OF TRUIST 68-426 WINCHESTER. VIRGINIA 514 CHECK DATE CHECK NO 11 /29/2021 672180 CHECK AMOUNT **30 000.00 VOID AFTER 90 DAYS ]I'67216001 1:0S14042601: S1370972S9111 THE SHOCKEY COMPANTEA P.O Box 2530 Winchesler, Virginia 22604 JOB/ SUB JOB NO. iNVNUMBER INV DATE DESCRIPTION 11292021 11/29/21 ROAD TOTALS �ocQ r CO VENDOR REFERENCE CHECK NO, 1 0 13471 "72181 GROSS AMOUNT DISCOUNT - NET AMOUNT 1,141,128.00 Oa 1,141,128.00 1,141,128.00 .00 TRUIST k The Shockey Companies WINCHESTER, VIRGINIA P.O S.qx 21130 Winchextar, Virginia :226,04 PAY One Million One Hundred Forty -One Thousand One Hundred Twenty -Eight Dollars and 00 Cents �i TO Frederick County THE ORDER OF 1,141,128.00 68-426 514 CHECK DATE CHECK NO 11 /29/2021 672181 CHECK AMOUNT *"1,141,128.00 VOID AFTER 90 DAYS 0 , /' � /X - C' D 1116? 2 18 1111 1:05 L4042601: 5 L3?097 25911' ID r}LE SHOCKEY COMPANIES i JOB/ SUB JOB NO. CO I VENDOR REFERENCE CHECK NO. P.0 Box 2530 1 13471 672180 Winchester, Virginia 22604 INV NITMBER INV DATE DESCRIPTION GROSS AMOUNT � DISCOUNT NET AMOUNT _ I112921 11/29/21 CARBAUGH-PROFFER 30,000.00� .Od 30,000.0 --.. i TOTALS 30,000.00 .00 30,000.00 0II I ) 0-caq -� dam" T"A6� ;: iPCn `f4 L'S`!iC tY17k "J' d •;O .t'77:?m O@^.S@R :;7�i IaACtiQ?1..313a) I�l";� !: ;Ci�7•t?[: i-'riC:".ar�'ai�C � G " :7A: [3R(:�!r.Ei !iY 'TNT 3rCC{ C:0)i.9 ri4 t.:;' � r j�f re�,y TRU I ST 68426 The Shockey Companies WINCHESTER, VIRGINIA 514 P 0 Box 2530 Winchester, Virgima 22'604 PAY Thirty f poaand Dollars and 00 Cents TO Frederick County THE ORDER OF CHECK DATE CHECK NO 11/29/2021 672180 CHECK AMOUNT _ ""30,000.00 VOID AFTER 90 DAYS 11867218011, 1:0S11,042601: S13709?2S91I' • w AMENDMENT o co Action: PLANNING COMMISSION: November 1, 2017 - Recommended Approval BOARD OF SUPERVISORS: December 13, 2017 - n APPROVED Ll DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #04-17 CARBAUGH BUSINESS CENTER WHEREAS, REZONING #04-17 Carbaugh Business Center, submitted by Stowe Engineering, PLC to rezone two parcels of land that total 107.21f acres from the RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers with a final revision date of October 19, 2017 was considered. The site has an address of 831 Shady Elm Road (Route 651) and are located on the southeastern side of Shady Elm Road, approximately 1.11 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The southeastern portion of the site is bounded by the CSX Railroad, in the Back Creek Magisterial District and is identified by Property Identification Nos. 74-A-68 and 74-A-69; and WHEREAS, the Planning Commission held a public hearing on this rezoning on November 1, 2017 and recommended approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on December 13, 2017; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors, that Chapter 165 of the Frederick County Code, Zoning, is amended to rezone two parcels of land that total 107.21± acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers with a final revision date of October 19, 2017. The conditions voluntarily proffered in writing by the Applicant and the Property Owner are attached. PDRes #45-17 0 • -2- This ordinance shall be in effect on the date of adoption. o 0 Passed this 13th day of December, 2017 by the following recorded vote: Charles S. DeHaven, Jr., Chairman Aye J. Douglas McCarthy Aye Gene E. Fisher Aye Blaine P. Dunn Aye PDRes #45-17 BOS Res. #044-17 Gary A. Lofton Aye Robert W. Wells Aye Judith McCann -Slaughter Aye A COPY ATTEST Kris C-,Ti Frederick County Administrator / v i ocut NIA: F1,.--;DLtC1 Ch COU NTY.SM . This instruumen/t of writing was produced to me of and with certificate acknowledgement thereto annexed was admitted to record. '1-ax imposed by Sec. 58.1-802 of and 58.1-801 have been paid, if assessablr 0 0 1700/3253 REZONING REQUEST PROFFER Property Identification Number 74 - ((A)) - 68 and 74 - ((A)) - 69 Back Creek Magisterial District Carbaugh Business Center Record Owner: The Henry J. Carbaugh Trust Applicant: Timothy Stowe Original Date of Proffers: 10/6/17 Revisions Date of Proffers: 10/19/17 Preliminary Matters Pursuant to Section 15.2-2296 et.seg., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # 0`I- 17 for the rezoning of Tax Map Parcel 74-A-68, a 89.8719-acre parcel, and Tax Map Parcel 74-A-69, a 17.3391-acre parcel, to establish 107.21 +/- acres of Light Industrial (M-1) Zoning District, development of the 107.21 +/- acre Light Industrial (M-1) Zoning District, hereinafter referred to as the "Property", shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the owner and such be approved by the Frederick County Board of Supervisors in accordance with Virginia Law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the owner and their legal successors or assigns. Site Improvements The owner agrees to participate in the cost of transportation improvements in the nearby area. The owner will contribute to Frederick County, Virginia, a maximum of one million and eighty thousand dollars ($1,080,000.00). Such payment shall be made either within 30 calendar days after the start of construction on the extension of Renaissance Drive that will connect with Shady Elm Road or prior to the issuance 0 0 C, Proffer Statement Page 1 of 4 0 E c=� c of the certificate of occupancy permit for the first building structure developed on o the Property, whichever event occurs first. Such funds can be used by the Board of o Supervisors in its discretion for transportation improvements related to the ry extension of Renaissance Drive, an East-West Collector Road, to Shady Elm Road and can be used as local match funding for County Revenue Sharing Program projects related to the aforementioned extension. The owner agrees to dedicate 60' (sixty feet) of right-of-way along Shady Elm Road to Frederick County as depicted on the Generalized Development Plan (GDP), which is attached and incorporated as part of the Proffer Statement. 10' (ten feet) of which is to be used for the construction of a pedestrian trail adjacent to the Property. This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. 3. The owner agrees to dedicate 20' (twenty feet) of right-of-way along its northeast boundary to Fredrick County for the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road. This right-of-way is depicted on the GDP. This dedication is to be made within 90 (ninety) days of a written request by Frederick County. 4. The owner agrees to grant to Frederick County an 80' (80 feet) grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road if needed. The final length of the easement will be determined during the design phase of the extension of the East- West Collector Road. The length shall not exceed the distance from the CSX rail line to the start of the bridge ramp. This grant is to be made within 90 (ninety) days of a written request by Frederick County. The owner agrees to limit the number of commercial entrances for the Property to be rezoned to a maximum of two (2) entrances along the new collector road to be constructed as an extension of Renaissance Drive and intersecting with Shady Elm Road. In the event the property is developed prior to the completion of Renaissance Drive collector road extension, the owner may build a portion of Renaissance Drive collector road extension from Shady Elm Road to the first entrance to the site to enable use of the site. The portion of the collector road to be built in this event will meet with both VDOT and Frederick County approval. In the event that Frederick County request that the owner not build a portion of the Renaissance Drive collector road extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance on Shady Elm Road will be permanently closed Proffer Statement Page 2 of 4 • --c C O O immediately after the Renaissance Drive collector road extension is available W for use by the owner. 6. The owner herby proffers to provide for inter -parcel connections for all new lots to provide access to the two new access points on Renaissance Drive. Building Restrictions The development of the subject Property shall include the following building restrictions: 1. All loading docks shall be screened from view from all adjacent properties in the Rural Area (RA) Zoning Districts that are located west of Shady Elm Road. The Owner will utilize a Class C — Full Screen (As defined by Frederick County at the date of this rezoning) 100' (one hundred feet) buffer adjacent to Rural Area (RA) Zoning Districts west of Shady Elm Road. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34-1040) prior to its demolition. Landscape Design Features The development of the subject Property, and the submission of any Master Development Plan, shall include the following landscape design features: 1. The owner shall provide street trees planted 50 (fifty) feet on center adjacent to the Renaissance Drive collector road extension. The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County. Monetary Contributions to Offset Impact of Development The owner, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning for the 107.21 +/- acre property to the Light Industrial (M-1) Zoning District, the undersigned will pay Frederick County, prior to the issuance of the Proffer Statement Page 3 of 4 CD GO O Certificate of Occupancy Permit for the first structure constructed on the Light Industrial (M-1) Zoning District portion of the parcel, the sum of thirty thousand dollars ($30,000.00), for use by the Board in its discretion for fire and rescue purposes. Additionally, the owner shall contribute five thousand dollars ($5,000.00) to the Kernstown Battlefield Association prior to the issuance of the Certificate of Occupancy Permit for the first structure constructed on the property. Escalator In the event the monetary contributions set forth in the Proffer Statement are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by the owner, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of 4 percent (4%) per year, non -compounded. Respectfully Submitted, The Henry J. Carbaugh Trust OWNER: ��C✓1 "y J. Gek�b«�f� !/i.rs� ����C/�G'✓Zc�I�ICC•v3 G) �� I)ee,C' �� s .2v0� b., /'� C«�1<.� Jc��17 stc«r.Ss��:� Date: W C ✓w 1-7 rf y C� STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -Wit: The foregoing instrument was acknowledged before me this �day of 2017, by R 'LsAer \,,­,,,.1 rT mr�gt)on expires etY>=?�tsr�?tub Page 4 of 4 n LJ s00()9d 9 • REZONING REQUEST PROFFER Property Identification Number 74 - ((A)) - 68 and 74 - ((A)) - 69 Back Creek Magisterial District Carbaugh Business Center Record Owner: The Henry J. Carbaugh Trust Applicant: Timothy Stowe Original Date of Proffers: 10/6/17 Revisions Date of Proffers: 10/19/17 Preliminary Matters Pursuant to Section 15.2-2296 et.seg., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # for the rezoning of Tax Map Parcel 74-A-68, a 89.8719-acre parcel, and Tax Map Parcel 74-A-69, a 17.3391-acre parcel, to establish 107.21 +/- acres of Light Industrial (M-1) Zoning District, development of the 107.21 +/- acre Light Industrial (M-1) Zoning District, hereinafter referred to as the "Property", shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the owner and such be approved by the Frederick County Board of Supervisors in accordance with Virginia Law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the owner and their legal successors or assigns. Site Improvements The owner agrees to participate in the cost of transportation improvements in the nearby area. The owner will contribute to Frederick County, Virginia, a maximum of one million and eighty thousand dollars ($1,080,000.00). Such payment shall be made either within 30 calendar days after the start of construction on the extension of Renaissance Drive that will connect with Shady Elm Road or prior to the issuance Proffer Statement Page 1 of 5 ____--_-- -'_--- \\U------- ----- ' ` I ` ' || 0 • of the certificate of occupancy permit for the first building structure developed on the Property, whichever event occurs first. Such funds can be used by the Board of Supervisors in its discretion for transportation improvements related to the extension of Renaissance Drive, an East-West Collector Road, to Shady Elm Road and can be used as local match funding for County Revenue Sharing Program projects related to the aforementioned extension. The owner agrees to dedicate 60' (sixty feet) of right-of-way along Shady Elm Road to Frederick County as depicted on the Generalized Development Plan (GDP), which is attached and incorporated as part of the Proffer Statement. 10' (ten feet) of which is to be used for the construction of a pedestrian trail adjacent to the Property. This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. 3. The owner agrees to dedicate 20' (twenty feet) of right-of-way along its northeast boundary to Fredrick County for the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road. This right-of-way is depicted on the GDP. This dedication is to be made within 90 (ninety) days of a written request by Frederick County. 4. The owner agrees to grant to Frederick County an 80' (80 feet) grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road if needed. The final length of the easement will be determined during the design phase of the extension of the East- West Collector Road. The length shall not exceed the distance from the CSX rail line to the start of the bridge ramp. This grant is to be made within 90 (ninety) days of a written request by Frederick County. 5. The owner agrees to limit the number of commercial entrances for the Property to be rezoned to a maximum of two (2) entrances along the new collector road to be constructed as an extension of Renaissance Drive and intersecting with Shady Elm Road. In the event the property is developed prior to the completion of Renaissance Drive collector road extension, the owner may build a portion of Renaissance Drive collector road extension from Shady Elm Road to the first entrance to the site to enable use of the site. The portion of the collector road to be built in this event will meet with both VDOT and Frederick County approval. In the event that Frederick County request that the owner not build a portion of the Renaissance Drive collector road extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance on Shady Elm Road will be permanently closed Proffer Statement Page 2 of 5 • immediately after the Renaissance Drive collector road extension is available for use by the owner. The owner herby proffers to provide for inter -parcel connections for all new lots to provide access to the two new access points on Renaissance Drive. Building Restrictions The development of the subject Property shall include the following building restrictions: 1. All loading docks shall be screened from view from all adjacent properties in the Rural Area (RA) Zoning Districts that are located west of Shady Elm Road. The Owner will utilize a Class C — Full Screen (As defined by Frederick County at the date of this rezoning) 100' (one hundred feet) buffer adjacent to Rural Area (RA) Zoning Districts west of Shady Elm Road. 2. Individual business signs will be prohibited along Shady Elm Road. 3. The owner will perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34-1040) prior to its demolition. Landscape Design Features The development of the subject Property, and the submission of any Master Development Plan, shall include the following landscape design features: The owner shall provide street trees planted 50 (fifty) feet on center adjacent to the Renaissance Drive collector road extension. The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County. Monetary Contributions to Offset Impact of Development The owner, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning for the 107.21 +/- acre property to the Light Industrial (M-1) Zoning District, the undersigned will pay Frederick County, prior to the issuance of the Proffer Statement Page 3 of 5 Certificate of Occupancy Permit for the first structure constructed on the Light Industrial (M-1) Zoning District portion of the parcel, the sum of thirty thousand dollars ($30,000.00), for use by the Board in its discretion for fire and rescue purposes. Additionally, the owner shall contribute five thousand dollars ($5,000.00) to the Kernstown Battlefield Association prior to the issuance of the Certificate of Occupancy Permit for the first structure constructed on the property. Escalator In the event the monetary contributions set forth in the Proffer Statement are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by the owner, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of 4 percent (4%) per year, non -compounded. Respectfully Submitted, The Henry J. Carbaugh Trust OWNER:�livl?re' h�J �rc' ' 0 �Gl }J.2-0� Ur By: Date: (i/ 'c, (r -2 LY /10/ 2 STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -Wit: r►� The foregoing instrument was acknowledged before me this day of cr 2017, by Or 1 R sac ti�A�l My Commission expires cA -_1L,0• 'LoN% Proffer Statement Page 4 of 5 • 0 Notary Public � Lur^ -� ' ' L Proffer Statement Page 5 of 5 • 0 � 0 i v 0 1 d OIL- ayli . Carbaugh Property fir Location Map Winchester —i — - �k 1 Iri IVO 4•a- Carbaugh Property I 61d�- Oil Google,earth - ��:05 REZONING REQUEST PROFFER Property Identification Number 74 - ((A)) - 68 and 74 - ((A)) - 69 Back Creek Magisterial District Carbaugh Business Center Record Owner: The Henry J. Carbaugh Trust Applicant: Timothy Stowe Original Date of Proffers: 10/6/17 Revisions Date of Proffers: 10/19/17 Preliminary Matters Pursuant to Section 15.2-2296 et.seq., of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application 4 for the rezoning of Tax Map Parcel 74-A-68, a 89.8719-acre parcel, and Tax Map Parcel 74-A-69, a 17.3391-acre parcel, to establish 107.21 +/- acres of Light Industrial (M-1) Zoning District, development of the 107.21 +/- acre Light Industrial (M-1) Zoning District, hereinafter referred to as the "Property", shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the owner and such be approved by the Frederick County Board of Supervisors in accordance with Virginia Law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the owner and their legal successors or assigns. Site Improvements 1. The owner agrees to participate in the cost of transportation improvements in the nearby area. The owner will contribute to Frederick County, Virginia, a maximum of one million and eighty thousand dollars ($1,080,000.00). Such payment shall be made either within 30 calendar days after the start of construction on the extension of Renaissance Drive that will connect with Shady Elm Road or prior to the issuance Proffer Statement Page 1 of 4 0 0 of the certificate of occupancy permit for the first building structure developed on the Property, whichever event occurs first. Such funds can be used by the Board of Supervisors in its discretion for transportation improvements related to the extension of Renaissance Drive, an East-West Collector Road, to Shady Elm Road and can be used as local match funding for County Revenue Sharing Program projects related to the aforementioned extension. 2. The owner agrees to dedicate 60' (sixty feet) of right-of-way along Shady Elm Road to Frederick County as depicted on the Generalized Development Plan (GDP), which is attached and incorporated as part of the Proffer Statement. 10' (ten feet) of which is to be used for the construction of a pedestrian trail adjacent to the Property. This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application. 3. The owner agrees to dedicate 20' (twenty feet) of right-of-way along its northeast boundary to Fredrick County for the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road. This right-of-way is depicted on the GDP. This dedication is to be made within 90 (ninety) days of a written request by Frederick County. 4. The owner agrees to grant to Frederick County an 80' (80 feet) grading/slope easement for the construction and maintenance of a bridge over the CSX rail line that will be part of the extension of the East-West Collector Road (Renaissance Drive) from Valley Pike (Rt. 11) to Shady Elm Road if needed. The final length of the easement will be determined during the design phase of the extension of the East- West Collector Road. The length shall not exceed the distance from the CSX rail line to the start of the bridge ramp. This grant is to be made within 90 (ninety) days of a written request by Frederick County. 5. The owner agrees to limit the number of commercial entrances for the Property to be rezoned to a maximum of two (2) entrances along the new collector road to be constructed as an extension of Renaissance Drive and intersecting with Shady Elm Road. a. In the event the property is developed prior to the completion of Renaissance Drive collector road extension, the owner may build a portion of Renaissance Drive collector road extension from Shady Elm Road to the first entrance to the site to enable use of the site. The portion of the collector road to be built in this event will meet with both VDOT and Frederick County approval. b. In the event that Frederick County request that the owner not build a portion of the Renaissance Drive collector road extension, the owner may build a temporary entrance onto Shady Elm Road for commercial use. The temporary entrance on Shady Elm Road will be permanently closed Proffer Statement Page 2 of 4 E immediately after the Renaissance Drive collector road extension is available for use by the owner. 6. The owner herby proffers to provide for inter -parcel connections for all new lots to provide access to the two new access points on Renaissance Drive. Building Restrictions The development of the subject Property shall include the following building restrictions: All loading docks shall be screened from view from all adjacent properties in the Rural Area (RA) Zoning Districts that are located west of Shady Elm Road. The Owner will utilize a Class C — Full Screen (As defined by Frederick County at the date of this rezoning) 100' (one hundred feet) buffer adjacent to Rural Area (RA) Zoning Districts west of Shady Elm Road. 2. Individual business signs will be prohibited along Shady Elm Road, 3. The owner will perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - 434-1040) prior to its demolition. Landscape Design Features The development of the subject Property, and the submission of any Master Development Plan, shall include the following landscape design features: 1. The owner shall provide street trees planted 50 (fifty) feet on center adjacent to the Renaissance Drive collector road extension. The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County. Monetary Contributions to Offset Impact of Development The owner, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning for the 107.21 +/- acre property to the Light Industrial (M-1) Zoning District, the undersigned will pay Frederick County, prior to the issuance of the Proffer Statement Page 3 of 4 • u Certificate of Occupancy Permit for the first structure constructed on the Light Industrial (M-1) Zoning District portion of the parcel, the sum of thirty thousand dollars ($30,000.00), for use by the Board in its discretion for fire and rescue purposes. Additionally, the owner shall contribute five thousand dollars ($5,000.00) to the Kernstown Battlefield Association prior to the issuance of the Certificate of Occupancy Permit for the first structure constructed on the property. Escalator In the event the monetary contributions set forth in the Proffer Statement are paid to Frederick County within eighteen (18) months of the approval of this rezoning, as applied for by the owner, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following the approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index ("CPI-U") published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI-U from that date eighteen (18) months after the approval of this rezoning to the most recently available CPI-U to the date the contributions are paid, subject to a cap of 4 percent (4%) per year, non -compounded. Respectfully Submitted, The Henry J. Carbaugh Trust OWNER: �!C ✓1,„h C /' / �'`1 c;� l4� s,E(� CC��c � f�✓C�� �-VI�� S��`����. Date: STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -Wit: The foregoing instrument was acknowledged before me this day of -0a . 2017, by �� , \ � \ , �- f V I My Commission expires `1I Notary PubiiC Proffer statement Page 4 of 4 Frederick County Department of'Fire and Rescue Office of'the Fire Marshal 1080 Coverstnne Drive N inchester, VA 22602 (540) 665-6350 Fax: (540) 6 78-4 739 Entail: fiiio i eva. its Plan Review & Comments Date Received 7/19/2017 Plan/Permit Type Rezoning Application 07-19-17 Name Henry J. Carbaugh Trust Address 831 Shady Elm RD Winchester Project Name Rezoning Applicant Name & Number Stowe Engineering 540-686-7373 RE# Permit Number Emergency Vehicle Access: Adequate Inadequate N1� Hydrant Location: Adequate Inadequate NIA Siamese Location: Adequate Inadequate Df1A Fire Lanes Required: Yes No f Plan Approval Status Approve Comments i�Signature:' Reviewed By: Kenneth Scott, Jr. Title: G� Date Reviewed 8/1 /2017 VA 22602 9 Rezoning Comments Frederick County Fire Marshal RECEIVED JUL 19 2017 Mail to: Hand deliver to: Frederick County Fire Marshal Frederick County Fire & Rescue Dept. 1800 Coverstone Drive Attn: Fire Marshal Winchester, Virginia 22602 Public Safety Building (540) 665-6350 1800 Coverstone Drive Winchester, Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Frederick County Fire Marshal with his review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: Timothy Stowe Mailing Address: Stowe Engineering, PLC 103 Heath Court, Winchester VA 22602 Telephone: 540-336-0656 Location of property: The property is located at 831 Shady Elm Road in the Back Creek Magisterial District. Current zoning: RA Zoning requested: M1 Acreage: 107.21 Fire Marshal's Comments: Fire Marshal's Signature & Date: caz7 Notice to Fire Marshal - Please Return This Form to the Applicant 22 Rezoning Comillents Frederick County Department of Public Works Mail to: Frederick County Dept. elf Public• Works Attu: Director of Enhineering 107 North Kent Street Winchester, Virginia 22601 (540) 665-56)43 Band deliNrer to: Frederick County Dept. of Puhlie Works Attn: Director of Fnginecring County Administration Bldg., Suite 202 107 North KeW Street Winchester, Virginia Applicant: Please fill Out file illfolnintion ns accllratelV as possible in order to assist the Department of Public Works, with their rovicw. Attach a copy, of your application form, location mail, proffer . statement; impact analysis, and,any other, pertinent -information. Applicant's N£lnle: Timothy Stowe Mailim, Address: StowA FnginP.ering, PLC Telephone: 540-336-00 5r I .nentioll nf' I)jy)l)crty: The property is located at B31 Shady Elm Road In the Back Creek Magisterial District. CUITeIll 7011111g: HA Zoning requested: I'M Acrl'A��..',e: 107.21 Department of Public Work's Comments: A coft..poehr>,s;vet /'e,1ie4,/ 4e o f i � H'7 s'✓ % ,,-, rs `�LL1_�r . (fie G T tr i' Yl o .t crl i �-�'�^+�. 1'llblic Works Signaturc & Date: Y- 7JZ7// -7 Notice to Dept. of Pub �cWorks - Please Return This Norm to the Applicant 21 LjILOR,D FAIRFAX HEALTH DISTRICT July 18, 2017 Lord Fairfax Health District Frederick / Ninchester Environmental Health 107 North Kent Street - Suite # 201 Winchester, Virginia 22601 Tel. (540) 722-3480 - Fax (540) 722-3479 www.ydh.yirginia.gov Agency Comments: VIRGINIA V1 D DEPARTMENT HOF HEALTH Protecting You and Your Environment This Health Department has reviewed the request for comments for the Rezoning of property located at 831 Shady Elm Rd in the Back Creek Magisterial District. Tax Map #74-A-68 & 74-A-69. from RA to M I. Based upon information provided by the annlicant. this Health Department has no obiections to the rezoninp- of the subiect property. However, it is the recommendation of this Health Department that any known or discovered sewage disposal systems or private water wells on the propertyproperly abandoned, per Health Department Regulations or best practice policies. In the event that it is determined that there are sewage disposal systems or private water wells on the property. please notify this Health Department immediately for proper abandonment procedures. Agency Signature: �-� o _-,, st. Date: 77 11 ? ( 1 % Title: �,3 ks0 v- (NOTICE TO AGENCY —PLEASE RETURN THIS FORM TO THE APPLICANT) Candice Perkins From: Tim Stowe <tiinstowe@stowecompanies.com> Sent: Thursday, October S, 2017 10:25 AM To: Rod Williams Cc: Candice Perkins; John Bishop; Gray Farland (gfarland@howardshockey.com) Subject: Carbaugh Rezoning - Review Comment Responses Attachments: GDP 10042017.docx; Carbaugh Rezoning Proffers Draft Six.docx Rod, In response to your review comments on the proffers and GDP for the subject rezoning, the documents have been revised and are attached for your approval. Specifically, the following changes have been made: a. "Applicant" has been changed to "owner" in the Proffer Statement b. Preliminary Matters - The sentences have been combined in the Proffer Statement c. Generalized Development Plan - The GDP has been incorporated as part of the Proffer Statements d. The Proffer Statement was revised to indicate "whichever event occurs first" e. The current revised Proffer Statement reflects the following: Item 1— The statement has been revised to impose the obligation when the first of the two options occurs. Item 2 —Text has been revised to read "This dedication is to be made within 90 (ninety) days after the date of the approved Rezoning Application." Item 3 —Text has been revised to read "This dedication is to be made with 90 (ninety) days of a written request by Frederick County." Item 4 —Text has been revised to read "This grant is to be made with 90 (ninety) days of a written request by Frederick County." Site Improvements, Item 4 - The Proffer Statement has been revised to "grading/slope" easement. g. Site Improvements, Item 5 - See the revised Proffer Statement, Site Improvements, Item 5. h. Building restrictions, Item 1- The Proffer Statement was been revised to "west of Shady Elm Road" i. Landscape Design Features, Item 1- The Proffer Statement was revised to "The trees are to be planted within 120 (one hundred and twenty) days of written request by Frederick County." Should you require any additional information, please feel free to contact me. Thank you Tim Stowe Stowe Engineering 540.686.7373 v 1540.336.0656 m 1 540.301.1100 f • COUNTY of FREDERICK Department of'Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 August 17, 2017 Mr. Tim Stowe, PE, LS Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 RE: Request for Historic Resources Advisory Board (HRAB) Comments - Carbaugh Business Center Property Identification Numbers (PINS): 74-A-68 and 74-A-69 Zoning: RA (Rural Areas) District Dear Tim: The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced Rezoning application during their meeting on August 15, 2017. The HRAB reviewed information from the Virginia Department of Historic Resources (VDHR), the Study of Civil War Sites in the Shenandoah Valley Maps and information provided by the Applicant. This site is identified by Property Identification Numbers 74-A-68 and 74-A-69, in the Back Creek Magisterial District. The Carbaugh rezoning seeks to rezone 107.21 acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. Historic Resources Advisory Board Comments: The Study of Civil War Sites in the Shenandoah Valley published by National Park Service Study of Civil War Sites in the Shenandoah Valley does not identify a core battlefield on the site; however it is located within close proximity to the Kernstown Battlefield. The Virginia Department of Historic Resources identifies seven mapped properties within the immediate area of the subject property, one of which is located on site. After reviewing this information and the Applicant's materials and proposals, the Historic Resources Advisory Board (HRAB) recommended approval of the Rezoning with the condition that the Applicant perform an intensive level survey on the historic structure located on -site (Henry Carbaugh House - #34-1040) prior to its demolition. Thank you for the chance to comment on this application. Please call if you have any questions or concerns. Sincerely, Candice E. Perkins, AICP, CZA Assistant Director CEP/pd 107 North Kent Street, Suite 202 9 Winchester, Virginia 22601-5000 ,�. -�'=ram:=.�I=" �S"�,�; •�i�.. -- �; _Winch_este'r�Va n; ow- m / ` •► Carbaugh Property - Ail -6 Oil Google,earth -- �k ' ' G� 2017 GoWle "\d aki , IMPACT ANALYSIS STATEMENT Henry J. Carbaugh Trust Introduction The Henry J. Carbaugh Trust is requesting a rezoning of a 105.75-acre parcel in Frederick County. The property is owned by the Trust and is located east of Shady Elm Road, west of the CSX railroad, and south of the planned extension of Renaissance Drive. The site has previously been leased for agricultural use and the abandoned home on the property has been vacant in recent years. The applicants are seeking a change in zoning from RA to M-1. The property is currently open fields with an abandoned home and farm buildings. Multiple utilities run along the perimeter of the property adjacent to the railroad and Shady Elm Road. Stormwater drains generally south east to a 3' x 5' stone box culvert that pass under the CSX railroad. The Frederick County Comprehensive Plan's 2035 Long Range Land Use map shows this property • is planned for industrial use. The requested M-1 zoning is consistent with this planned use. Light manufacturing and warehousing businesses are planned for the site. The site will be graded, landscaped, and roads will be installed that will meet current County specifications. The main entrance will connect to Renaissance Drive when Renaissance Drive is extended Shady Elm Road. Inter -parcel connectors will be utilized within the parcel to direct all traffic to this main entrance. Site Suitability 100 Year Flood Plains - The site is not located within or near any 100-year flood plains per FEMA Flood Map Nos. 51069CO330D and 51187C0050C. Wetlands — Based on field studies performed by Virginia Waters and Wetlands and a site visit by the US Army Corps of Engineers, Warrenton field office representative, the Corps of Engineers is taking jurisdiction of wetland areas on the property, which includes two farm ponds and a small spring. Steep Slopes —This site is fairly flat, without any steep slopes. • Mature Woodlands —There are no areas of mature woodlands on the site. Prime Agricultural Soils — Based on data from the USDA Web Soil Survey there are 46.3 acres of Prime Farmland on the site and 59.45 acres of farmland of statewide importance. Efforts will be made to preserve these lands in the wetlands and inactive buffer areas. Soil or Bedrock Conditions which would create Construction Difficulties or Hazards — A review of the USDA Web Soil Survey indicates that the depth to bedrock is over 80 inches for 80+ acres of the site, and for the remainder of the site it is 20 to 40 inches. Where rock is encountered in excavation areas it will be removed by mechanical means or blasting. Surrounding Properties The subject property is surrounded by: • The CSX railroad to the east. On the opposite side of CSX is undeveloped land and the Mountain View Church. • • The proposed American Woodmark headquarters lies to the north. • To the south and adjoining the property are four homes. • To the west is Shady Elm Road and on the opposite side of the road is the Shady Elms Farm subdivision. The distance from the property line to the homes on the west side of Shady Elm Road is 130 feet or more. Due to existing utilities, the VDOT right of way dedication requirements, and the Frederick County zoning buffer requirements, noise and glare impacts on the neighbors is expected to be minimal, if any. The planned uses will are not generators of loud noises, fumes or pollution. Traffic A Traffic Impact Study has been prepared by Stowe Engineering. The study shows that Renaissance Drive, when completed, will serve as the primary road between Route 11 and the site. Until Renaissance Drive is completed, Shady Elm Road will be used for access. Route 11 currently operates at a good level of service south of Route 37. However, it is recognized that this proposed development will add traffic to the roadways. Therefore, the developer is • proffering to participate financially to improve mobility to the area. 2 • Seivage Conveyance and Treatment The site is located inside of the Frederick County Sewer and Water Service Area. Wastewater from the site will be collected and pumped into the existing FCSA gravity sewer system. Improvements to the Battlefield pumping station will be implemented as needed to convey the wastewater to the Parkins Mill Wastewater Treatment Plant which is sized to treat 5 million gallons a day. Water Supply The site is located inside of the Frederick County Sewer and Water Service Area. An existing 20" water main in Valley Pike will be tapped to provide water to the site. A new line will be run perpendicular to Valley Pike and under the CSX railroad to the serve the site. The line will be constructed so it can be looped back into the water system. Drainage Drainage from the site flows to the southeast. A spring feeds a small stream which fills a farm pond in the southeast area of the property, which ultimately drains through a 3' x 5' stone box culvert under the CSX Railroad. An upper farm pond does not collect water and has little development value. Preliminary plans call for the spring and lower pond to be preserved, while the upper pond will be removed. Post -development drainage from the developed areas will be routed through stormwater management facilities to control the quantity and quality of stormwater leaving the site. Solid Waste Collection of solid waste will occur through the use of on -site dumpsters and private haulers. The Civil Engineering Reference Manual, 4`h edition, uses a solid waste generation rate of 5.4 cubic yards per 1,000 square feet of floor area. Applying this rate, 1,000,000 sf development will 11 .7 generate S,400 cubic yards of solid waste per year. The solid waste will be transferred to the Frederick County Landfill Facility by private licensed commercial carriers. Historical Site and Structures A review of battle maps for the 151 and 2nd Battles of Kernstown showed that troops marched across the subject property on their way to the battles, but no fighting is recorded on the property. A review of the VA Department of Historic Resources record 034-1040 for the Henry Carbaugh House (formerly the Hockman House) provided the following statements: 1112006: The Hockman House has aluminum replacement windows, and an interior that was destroyed by fire and rebuilt. Research did not indicate that it was associated with historical events, persons of historical significance, nor is it an outstanding example of an architectural style or type or the work of a master craftsman. Impact on Community Facilities Educational Facilities — This project will add no children to the school system. Emergency Services — Police protection will be provided by the Frederic County Sheriff Department. The property is located in the first response area for the Stephens City Fire and Rescue station. Response times from the station to the site are reasonable. Parks and Recreation —This project will not add to the population of Frederick County and therefore will not increase the demand for Parks and Recreational services. Libraries - This project will not add to the population of Frederick County and therefore will not increase the demand for library services. Local Government —The Frederick County Impact Model will be used to determine the level of impact this project will have on the local government. M 0 Executive Summary This Traffic Impact Study was prepared to support the rezoning request for the land owned by the Henry J. Carbaugh Trust, and is located south of Kernstown in Frederick County, VA. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed project area is 107.21 acres. The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Access to the site will be through a new entrance onto Renaissance Drive. Development traffic will be directed east on Renaissance Drive towards Route 11 for access to Route 37 and 1-81. During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. The Proposed Trip Generation rates presented in this report were offered to VDOT as a more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using the Proposed Trip Generation and ITE Trip Generation rates. These are included in this report and are identified with labeling of either "Proposed" or "ITE trip generation rates. • While the traffic that is forecasted to result from this development can be accommodated on the • existing roadway network, the completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line extending 600 ft. west from the CSX right of way, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady Elm Road, totaling approximately 2.7 acres. • Participation financially in the development of Renaissance Drive. With these improvements proffered by this developer combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. • 0 0 MTable of Contents ExecutiveSummaiy.....................................................................................................................................1 Introduction..................................................................................................................................................4 Purpose..................................................................................................................................................... 4 StudyObjectives.......................................................................................................................................4 BackgroundInformation...............................................................................................................................4 Transportation Improvements Assumed to be in Place...........................................................................4 Transportation Improvements Planned....................................................................................................4 DevelopmentDescription.............................................................................................................................4 SiteLocation..............................................................................................................................................4 Descriptionof the Parcel...........................................................................................................................5 GeneralTerrain Features.......................................................................................................................... 5 Location within Jurisdiction and Region...................................................................................................5 Comprehensive Plan Recommendations......................................................................................................6 CurrentZoning.............................................................................................................................................. 7 StudyArea Description.................................................................................................................................7 StudyArea................................................................................................................................................. 7 Proposedand Existing Uses..........................................................................................................................8 ExistingUse...............................................................................................................................................8 ProposedUses & Access........................................................................................................................... 8 NearbyUses..............................................................................................................................................9 ExistingRoadways.....................................................................................................................................9 Future Transportation Improvements......................................................................................................9 2016 Existing Traffic Conditions..................................................................................................................10 DataCollection........................................................................................................................................10 Analysis...................................................................................................................................................11 2018 Background (No -Build) Traffic Conditions.........................................................................................16 Analysis...................................................................................................................................................16 Methodsof Forecasting Trips.....................................................................................................................19 Proposed Method for Trip Generation and Trip Distribution..................................................................... 20 Trip Generation — Proposed Method...................................................................................................... 20 Trip Distribution — Proposed Method.....................................................................................................20 2018 Build -Out Conditions — Proposed Method......................................................................................... 24 Analysis................................................................................................................................................... 24 2024 Design Year Conditions — Proposed Method.....................................................................................30 Analysis...................................................................................................................................................30 ITE Trip Generation and Distribution..........................................................................................................36 TripGeneration — ITE Method................................................................................................................36 TripDistribution......................................................................................................................................36 2018 Build -out Conditions with ITE Rates...................................................................................................39 Analysis...................................................................................................................................................39 Design Year (2024) with ITE Rates..............................................................................................................46 Analysis...................................................................................................................................................47 Recommended Roadway Improvements....................................................................................................52 QueueAnalysis............................................................................................................................................53 Pedestrian and Bicycle Traffic.....................................................................................................................54 Conclusions.................................................................................................................................................55 Appendices Appendix A Pre -Scope of Work Meeting Form Appendix B Traffic Count Data Appendix C Synchro LOS and Queue Reports Appendix D Cost Estimate Appendix E Generalized Development Plan Appendix F Traffic Signal Timing Plan L • Introduction Purpose This Traffic Impact Study has been prepared to support a rezoning request for the land located south of Kernstown in Frederick County, VA that is owned by the Henry J. Carbaugh Trust. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed rezoning is 107.21 acres, which includes the entire parcel. Study Objectives The objectives of this study are to identify: 1. Impacts on traffic operations that may result from the project. 2. Future connectivity to pedestrian and bicycle facilities. Background Information Transportation Improvements Assumed to be in Place For the purposes of this study Renaissance Drive is assumed to completed from its current terminus to Shady Elm Road prior to the build out year of this proposed project. Transportation Improvements Planned A review of the VDOT Six Year Improvement Plan shows that VDOT has one planned construction project near this proposed rezoning, the extension of Renaissance Drive, UPC 91847. Schedule information for the project is not provided in the VDOT online database. According to the Frederick County 2016-2017 Secondary Road Improvement Plan and the 2016-2017 Primary Road Improvement Plan, two planned roadway improvement projects are near the Carbaugh property. These are: Improve Valley Pike (Route 11) to establish an Urban Divided Four Lane System from the southern limits of the City of Winchester to 0.4 miles south of intersection of the Route 37 EB ramps. It is assumed that this improvement will not be in place before 2018, the build out year for this rezoning project. The extension of Renaissance Drive from 0.24 miles west of Route 11 to Shady Elm Road. It is assumed that this improvement will be in place before 2018. Development Description Site Location The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Figure 1 shows the location of the property and its surrounding land uses. Access to the site will be through a new entrance onto Renaissance Drive. • Figure 1 Project Location Map (n.t.s.) Description of the Parcel The subject property for which this rezoning is requested encompasses 107.21 acres with frontage along Shady Elm Road and future frontage along Renaissance Drive. The terrain is gently rolling and the land is currently farmed. The property lies within the Frederick County Sewer and Water Service Area. General Terrain Features The site and its surrounding areas have gently rolling terrain with gentle slopes draining to the east. The CSX railroad runs north -south on the east side of the property and runoff collects along the railroad until it reaches a stone culvert near the south end of the property where drainage flows under the railroad and ultimately to Opequon Creek. Shady Elm Road runs north -south along the western side of the property and the future Renaissance Drive will run east -west along the north side of the property. Location within Jurisdiction and Region The subject property is in the Back Creek Magisterial District of Frederick County, VA. E 0 0 • • Comprehensive Plan Recommendations The 2035 Frederick County Comprehensive Plan — Kernstown Plan, identifies the future land use on the site to be industrial. Surrounding properties are designated as industrial to the north, business to the east and rural/agricultural to the south and west. Figure 2 shows the Future Land Use Plan near the rezoning area. • Figure 2 Future Land Use map (n.t.s.) 0 Lo" Range L& W Vat O1;— -1 gnu . A-1 Q u roams 4& May Vw 0 M.to Ur C W%I� 1OY- Q HV/Ma COMMOC4a V%we-t— +.awr HNvy iMsra M.tO U" hO.W.- • P� Unt'1atek,• M tog Uw AQt Httt—. aC• Ubv C~ •�• Nvglb 'wog Vaapt Ravew- OC�- • P--A— O ow'%P" NOIO RatO� L 4t:,..• PM HWOM , CAA ® I... a Htaa.a CO vwkr ml • Current Zoning 0 The current zoning on the property is RA (Rural Agriculture) and the property is being used for agricultural purposes. The current land uses and zoning for the surrounding properties are: Table 1 Surrounding zoning and land use Direction Zoning Use North M1 Light Industrial agricultural East CSX railroad w/ RA beyond agricultural South RA, large lot residential housing West RA, large lot residential Housing and agricultural The current zoning map is shown in figure 3. PROJECT LOCATION Figure 3 Existing Zoning Map (n.t.s.) Study Area Description Zomny kawneaa Neighborhood CkW c 921Ruaareaa Ce al Dab" BJ (Buaeaaa w4 amm irw"- Dao—, - EM (EW&CO" VAMAW." DW O) - ME IMWO Edr.AW 0"iN) - Mt Itw-mm. lqM Dom) M; i Indlalrial. Ge 81 DiaMc4 _Wi(IMeble Ha Camay Dabld) — MS (Medical &wW Dakkr) - OM 100ke - MaaAW WMq Park) - Rl (ReW*rAW PWa A CW—Vty DmMd) _ R5 (ReWW" ReaSAWM Cormkakly poo, RA(Rraal Area Umbra) RP (ReW"W PMamance Drs►) l) Study Area For the purposes of this Traffic Impact Study the study extends from Route 37 on the north to Springdale Road on the south, and from Valley Pike on the east to Shady Elm Road on the west. There are no additional major intersections within 2000 feet of the site that are not being studied. Figure 4 shows the locations of the intersections that have been studied and the existing roadways near the site. • C • :7 Figure 4 Location of Study Intersections Proposed and Existing Uses Existing Use The property is currently used for agricultural purposes. Proposed Uses & Access The proposed uses for the property are light manufacturing and warehousing (ITE land uses 110 and 150) which will include a mix of manufacturing, service and warehouse facilities. A plan of the proposed development at an engineering scale is included in Appendix E of this report. Access to the property will be through a proposed commercial entrance on Renaissance Drive. This will be the only access to the site for normal traffic. A connection to Shady Elm Road is also proposed and will be used for site access until Renaissance Drive is open to traffic. After the opening of Renaissance Drive the Shady Elm access will be closed to normal traffic and reserved for emergency and maintenance access. 0 Nearby Uses The existing land uses near the proposed site are: • North —agricultural land that is zoned Light Industrial. • West — agricultural land and large lot residential that is zoned Rural/Agricultural. • South — agricultural land and large lot residential that is zoned Rural/Agricultural. • East - CSX railroad and a mixture of Rural/Agricultural and commercial entities beyond CSX. Existing Roadways Figure 4 shows the location of the existing roadways near the subject property. The typical section attributes for these roadways is as follows: Shady Elm Road Renaissance Drive Route 11 - Valley Pike Route 37 EB Ramps Table 2 Existing Roadway Attributes 2 2 2 NB and 2 SB thru lanes w/ left and right turn lanes at Route 37 EB ramps and commercial entrances. Narrows to one thru lane with left and right turn lanes at Renaissance Drive 3EB, 1WB 11 Gravel, variable width Major Collector 12 Curb & Gutter Major Collector 12 Curb & Gutter in Major Arterial some sections. Gravel shoulders with variable width in some sections 12 - 18 Gravel, variable width n/a The intersection of Route 11 and the eastbound ramp for Route 37 is signalized. A traffic signal was constructed at the intersection of Route 11 and Renaissance Drive when phase 1 of Renaissance Drive was constructed. Since that time the signal has been "bagged" and is not in service. For the purpose of this study it is assumed that the signal will be placed into service by VDOT in the project buildout year of 2018. Future Transportation Improvements The subject property is in the Virginia Department of Transportation's Staunton District, and Edinburg Residency area of responsibility. A review of the VDOT Six Year Improvement Plan shows that VDOT has one planned construction project near this proposed rezoning, the extension of Renaissance Drive, UPC 91847. Schedule information for the project is not provided in the VDOT online database. According to the Frederick County 2016-2017 Secondary Road Improvement Plan and the 2016-2017 Primary Road Improvement Plan, two planned roadway improvement projects are near the Carbaugh property. These are: • Improve Valley Pike (Route 11) to establish an Urban Divided Four Lane System from the southern limits of the City of Winchester to 0.4 miles south of intersection of the Route 37 EB • 11 0 • ramps. It is assumed that this improvement will not be in place before the build out year of 2018. • The extension of Renaissance Drive from 0.24 miles west of Route 11 to Shady Elm Road. It is assumed that this improvement will not be in place before the build out year of 2018. 2016 Existing Traffic Conditions Data Collection. To analyze the existing traffic conditions, peak hour turning movement counts were performed in late August and early September following the opening of Frederick County Public Schools. Count data at the following locations was collected using a video recording device that was later reviewed and tabulated: The intersection of Shady Elm Road where Renaissance Drive will connect (vol. on Shady Elm Rd. only). • The intersection of Route 11 and Renaissance Drive. • The intersection of Route 11 and the Route 37 EB ramps. The intersection count data was classified into cars and heavy vehicles thus providing a percentage of heavy vehicles in the traffic. A minimal number of pedestrian movements (S) were also counted in the intersection of Route 11 and Route 37 EB ramps. Some construction was underway north of the Route 11— Route 37 EB ramp intersection at the time of the count. After waiting over 4 weeks for the work area to clear, it became apparent the work area was going to remain in place from 8:00 AM to 4:00 PM each week day for the foreseeable future. Based on visual observations it was determined that the work area did not affect the flow of traffic in the intersection and the count proceeded. In addition to the intersection counts, 24 hour tube counts were also performed on Route 11 between Renaissance Drive and Route 37 EB ramps. Count data was collected independently for the northbound and southbound directions over a two -week period, but due to equipment problems only one week of data was reported as having a high quality. Data from Tuesday through Thursday is used in this reporting. This data is summarized in table 3 below and the count reports are included in Appendix B of this report. Table 3 Summary of Tube Count Data for Route 11 For the purposes of this report a 'K factor' of 0.086 was computed based on the PM peak hour volumes from the tube counts. Since the VDOT Traffic Volume reports only include a 'k' Factor for Route 11, this computed 'k' factor was applied to all other study locations to compute the AADT for those roadways. A count of the vehicles that did not clear the queue at the intersection of Route 11 and Route 37 EB ramps was also performed in the peak AM and PM hours. The data was collected to more accurately model the actual conditions during saturated flows, although in almost every cycle the queue cleared, there was a minimal number of vehicles that did not clear the signal queue on every cycle. Visual observations indicate that inattentive drivers using their phones was the cause of most vehicles not clearing the queue. This data is also included in Appendix B. Analysis The existing AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. The location of the intersections studied is shown in figure 4, and the existing AM and PM peak hour traffic volumes are shown in figure S. For the AM peak hour, the existing lane geometry, levels of service, and delays are shown in figure 6 and the resulting 951h percentile queues are shown in figure 7. For the PM peak hour, the existing lane geometry, levels of service, and delays are shown in figure 8 and the resulting 951h percentile queues are shown in figure 9. The modeling results (levels of service and delays) are shown in tabular form in Tables 3 through 6. Route 11 is a major north -south corridor that parallels 1-81 through Frederick County. In the study area, patrons are attracted to local restaurants, shops, and a large theater. Two intersections that are not being studied were modeled to evaluate the impact of traffic in the NB Route 11 queue that could block these intersections. These intersections are at Kernstown Commons Blvd (150' wide) and Kavanaugh Drive (95' wide). While there are other commercial and residential entrances within the study area on Route 11, these two each have a break in the raised median and therefore require additional consideration. Through visual observations during the PM peak hour it was determined that drivers on Route 11 have no reservation about blocking the intersection with Kavanaugh Drive. Under existing conditions, the NB Route 11 queue does not extend to the intersection with Kernstown Commons Blvd, so it was not possible to evaluate driver's willingness to also block that intersection. However, for modeling purposes, it was assumed that if drivers are willing to block one intersection, they are willing to at least partially block another. In this case it was assumed that 2 vehicles will partially block the intersection with Kernstown Commons Blvd south. The model was coded to reflect this situation. t0 � rn > • m v 51 (70) �— 34 (40) • ' 17 (22) • V Kernstown Rte 37 EB Ramps jl Commons Blvd 110 (114) • 10 (29) ► I I 196 (171) r r`rn n °i 0o r,4 m Legend: AM Peak Hr, (PM Peak HR), Figure 5 Existing Year 2016 AM and PM Peak Hour Volumes ui o a n mI .Iv'-� > • 4 (11) 1 (0) 0 (6) qq [� Renaissance Or Volvo Dealer Entrance 3 (3) — ♦ ► 0 (1) 0 (2) i n a m 0 0 E • • 11 v, 61 Y ' v y o m c, L N N > 22.0 (C) 21.9 (C) i L� 23.2 (C) ♦ V Kernstown Rte 37 ES Ramps yl Commons 30.9 (C) • �,,11 r 1 r 20.9 (C) ► 28.4 (C) m Q ♦ N n n ai 01 rh � _ Y C, Q � m c f— 12.5(B) 0 Renaissance Dr Volvo Dealer 0 Entrance • 19.2 (C) ► Q r-1 06 Figure 6 AM Peak Hour Existing Year 2015 AM Lane Geometry, Lane Delay and LOS 'i N Ln M 4. 61 v ' Ln a 0(150) • t� • `► 20 (300) Kernstown Rte 37 EB Ramps U, Commons Blvd 95 (165) • � * II • r ► 21 (175) -T o a v o Legend: 951h Percentile Que a (Available Storage) Figure 7 AM Peak Hour Existing Year 2016 AM Queue Length (ft) ry H 00 N o Y a w m m 3 (35) � i L► Renaissance Dr Volvo Dealer Entrance 3 (200) • -- f • ► 0 0 Un O O • E N � u v N Uf Y a (U 1 'Yl n O L N N > 23.8 (C) �— 23.5 (C) • • -► 29.1 (C) Kernstown Rte 37 EB Romps Commons 28.7 (C) ♦ �I f _► 19.2 (B) - ► f 6.8 (A) v v m • m oo u� ai 6 o6 N ry ' Legend: Delay in sec., (LOS) Q 4 � v a' j �+ 17.4 (C) . i 4 0 Renaissance Dr Volvo Dealer 0 Entrance 25.1 (D) --A t f 15.4 (C) +► Q Ln CD Figure 8 PM Peak Hour Existing Year 2016 PM Lane Geometry, Lane Delay and LOS I v > v 5 n a v U > 0 (150) • • ► 31 (300) • Kernstown 37 EB Ramps i, Commons 125 (165) s 8 (175) o v d, v o Legend: 951" Percentile Quee (Available Storage) Figure 9 PM Peak Hour Existing Year 2015 PM Queue Length (ft) 00 a o N M M 4— 8 (35) ® Renaissance Dr Volvo Dealer A E� Entrance 3 (200) • 41 ♦ ► r► 0 � o O O • 0 • • Table 4 Level of Service and Delays at Route 11 and Route 37 EB Ramps Route 11, Route 37 EB Ramps, and Kernstown Commons Blvd Level of Service per Movement by Approach (delay In sec/veh) Overall Scenario LOS Eastbound Westbound Northbound Southbound LT TH I RT LT I TH I FIT LT TH I RT LT TH RT AM Peak Hour C C C C C C C 0 A C C 2016 30.9 20.9 28.4 23.2 21.9 22.0 27.2 19.7 5.9 26.3 23.0 Existing (241) C(29.2) C(22.4) C(21.5) C(23.4) C B A C C C C 0 B B C 2018 24.7 15.9 6.4 27.9 20.3 20.3 20.1 19.7 17.2 14.6 21.8 No Build (191) B (14.6) C (22.0) B (19.7) C (20.9) C C B C C 0 B B A B C 2018 30.0 24.0 11.9 25.3 24.9 12.2 14.9 17.3 4.9 12.7 21.6 Build -out (19.5) C(22.8) C(20.6) 8(16.4) C(20.9) C C B C C B 0 B A B C 2024 29.6 23.4 12.8 24.7 24.3 11.6 15.6 18.0 5.1 13.2 20.9 DesignYr (19 4) C(22.5) B(19.9) B(17.1) C(20.3) PM Peak Hour C B A C C C C C B C C 2016 28.7 19.2 6.8 29.1 23.5 23.8 29.9 20.8 18.5 27.5 23.2 Existing (23 2) C (20.2) C (24.6) C (23.3) C (24.0) C B A C C A C C B B C 2018 27.1 18.5 6.7 29.0 22.6 9.5 21.5 20.G 18.1 14.4 22.1 No Build (20 3) B(19.3) B(18.3) C(20.8) C(20.7) C C A C C C C B B B C 2018 33.7 23.4 7.9 33.8 27.6 28.1 25.0 18.7 15.9 12.8 24.9 Build -out (22 6) C(23.4) C(29.1) C(21.2) C(23.0) D C A C C B C 0 B B C C 36.1 24.6 8.5 34.7 28.6 14.7 25.5 18.5 15.7 12.7 25.5 C(24.6) C(23.9) C(21.3) C(23.4) 2024(22.6) De 0 Table 5 Level of Service and Delays at Route 11 and Renaissance Drive Route 11, Renaissance Drive, and Volvo Dealer Ent. Level of Service per Movement by Approach (delay In sec/veh) overall Scenario LOS Eastbound Westbound Northbound Southbound LT TH I RT LT I TH I RT LT TH RT LT TH RT AM Peak Hour C A B A 2016 21.7 _ 0.0 14.0 _ _ 8.3 6.3 C (21.7) 8(14.0) Existing C A B A A 2018 19.2 0.0 12.5 8.1 8.3 No Build C (19.2) B (12.5) - - C 0 C 0 B A A B 0 2018 B 29.5 14.0 24.4 10.0 13.5 9.3 9.9 14.3 13.6 Build -out (14.8) C(27.9) C(24.4) 0(13.3) B(13.9) C B C B B A A 0 B 2024 33.5 14.6 25.0 10.0 13.8 9.2 9.9 14.3 13.2 Design Yr (15.1) C (31.6) C (25.0) B (13.5) B (13.8) PM Peak Hour D C C A A 2016 25.1 15.3 17.4 8.5 8.4 Existing C (19.2) B (12.5) - C - - 2018 24.2 15.3 16.4 8.5 8.4 C (19.7) C (16.4) No Build C 0 C B C B C C A 2018 31.3 14.8 33.4 16.8 25.6 16.1 27.4 23.7 2.4 Build -out (23 9) C (29.6) C (33.4) C (25.2) B (19.6) C B C B C B C C A 2024 C 32.9 15.8 35.0 17.1 26.1 16.1 28.5 24.2 2.3 Desl nYr (24.6) C(31.1) C(35.0) C(25.8) C(20.1) 0 • 0 Table 6 Level of Service and Delays at Renaissance Drive and Site Entrance Renaissance Drive and Site Entrance Scenario Overall LOS Level of Service per Movement by Approach (delay in sec/veh) Eastbound Westbound Northeast Northwest LT TH RT I LT I TH I RT LT TH RT LT TH RT AM Peak Hour 2016 Existing 2018 No Build 2018 Build -out (9) A 7.9 C 16.6 A 8.8 - - A (9.2) 2024 Design Yr ( 9) - - - A 7.5 _ _ B 10.9 _ B - - - B (10.2) PM Peak Hour 2016 Existing 2018 No Build 2018 A - - - A 7.5 - - B 11.1 - B 10.2 - - - Build -out (9 2) - - - B (10.2) 2024 Design Yr ( 2) 7.5 10.9 10.2 - - - B (10.2) • Table 7 Level of Service and Delays at Renaissance Drive and Shady Elm Road 0 Shady Elm Road and Renaissance Drive Scenario Overall LOS Level of Service per Movement by Approach (delay in sec/veh) Southeast -bound Northwest -bound Northeast -bound Southwest -bound LT TH RT LT I TH I RT LT TH RT LT TH RT AM Peak Hour 2016 Existing 2018 No Build 2018 Build -out A (1.7) A 8.9 A 8.6 A 7.3 A (8.8) A (3.3) 2024 A A 8.9 A 8.6 A 7.3 Design Yr (1.6)P==. A (8.8) PM Peak Hour 2016 Existing 2018 No Build 2018 A 9.0 A 8.4 A 7.3 Build -out ( 9) A (8.7) 2024 Design Yr A (1.2) A 9.0 A 8.4 A 7.3 A (8.7) • • 2018 Background (No -Build) Traffic Conditions Background traffic conditions are those that are expected to occur without the proposed rezoning. These traffic conditions were established by increasing the existing 2016 traffic volume by 1.0% per year to the build -out year of 2018. The growth factor of 1.0% was determined by VDOT Staunton District Planning staff and is based on the historical and anticipated growth in traffic volumes in the project area. The 2018 Background AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 10. The lane geometry, AM peak hour delay and level of service are shown in Figure 11 and the 95`h percentile queue for the AM peak hour is shown in figure 12. The lane geometry, PM peak hour delay and level of service are shown in Figure 13 and the 95`h percentile queue for the PM peak hour is shown in figure 14. The modeling results (levels of service and delay) are tabulated in Tables 4 through 7. Analysis The traffic modeling shows that traffic continues to operate smoothly with acceptable levels of service under the no -build conditions. nrq fV y rn `4 v m 52 (71) - 35 (41) 17 (22) �l Kernstown Rte 37 EB Ramps Commons Blvd 112 (116) 10 (30) • 200(174)---� EF ^ � m Q1 M � W rn Legend: AM Peak Hr, (PM P ak HR),� __J Figure 10 No -Build Year 2018 AM and PM Peak Hour Volumes .K cL °�°Ln4(11) v ` 1 (0) 4.. ♦ b. 0 (6) 0 Renaissance Dr Volvo Dealer 40 Entrance 3 (3) •- ♦ -+ 0 (1) ► 0 (2) N 111 N a '" • 9 ry H H N _ Y v v 00 N > T 20.3 (C) �— 20.3 (C) 27.9 (C) Kernstown Rte 37 EB Ramps Commons 24.7 (C) • �1 � t f I r 15.9 (B) ► I 6.4 (A) O cn n Legend: Delay in sec., (LOS) h H X Q. v m 'a 00 y 12.5 (B) ® Renaissance Or Volvo Dealer ® Entrance 19.2 (C) * -4 * ► 19.2 (C) —; ► • Q oo Figure 11 AM Peak Hour No -Build 2018 Lane Geometry, Delay (sec) and LOS 4 i+ ► Rte 37 EB Ramps 102 (165) 25 (175) * 0 (150) 27 (300) t� Kernstown U Commons I t �► � o Legend: 951h Percentile Queue (Available Storage) Figure 11 AM Peak Hour No -Build 2018 95th Percentile Queue (ft) J O ry � Q I i Q 4— 0 (35) ® Renaissance Or Volvo Dealer ® Entrance 0 (200) * r► t f r� I 0 o a O O • • 11 0 H H _a N _ GJ Y � 9.5 (A) a— 22.6 (C) a �• 29.0(C) t) Kernstown Rte 37 EB Ramps ' Commons 27.1 (C) 18.5 (B) - ► 6.7 (A) u u m r+ 6 06 (V N ­4 Legend: Delay in sec., (LOS) H 'y Q Q t, Q 00 j 16.4 (C) 0 Renaissance Dr Volvo Dealer ® Entrance 24.2 (C) • 15.3 (C) Zi Q U1 Figure 13 PM Peak Hour No -Build 2018 Lane Geometry, Delay (sec), and LOS ® r- H H a j U m 2 Gl � v � O � L I > 0 (150) •J i i I-► • 34 (300) U Kernstown Rte 37 EB Ramps Commons 107 (165) 4 ♦ ► 33 (175) o c v o o 0 Legend: 95th Percentile Que�e (Available Storage) Figure 14 PM Peak Hour No -Build 2018 95th Percentile Queue (ft) is H 00 a o O O > Fr-6(35) • 0 Renaissance Dr Volvo Dealer 0 Entrance 3 (200) ? f r i o 0 O o O 0 Methods of Forecasting Trips During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. A report was prepared by Stowe Engineering that analyzes three locations where traffic counts were performed to compare the actual trip rates for warehouses and light industrial land uses with those published in the ITE Trip Generation Manual. The report was undertaken as part of the traffic study scoping for the development of the Carbaugh Business Center, a 107.4-acre parcel in Frederick County, VA and is included in Appendix A as a part of the scoping document for this project. There is a strong indication that the trip generation rates published by ITE overestimate the trips that will result for warehouse and light manufacturing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. Warehouse and light manufacturing facilities have evolved rapidly in recent years and have significantly improved the management of transporting their products. This must be accounted for in the planning of modern facilities. • While the data and findings presented in this report may not be representative of these same land uses in other areas, it does represent local conditions as is demonstrated in the Stowe Engineering Report. The trip generation rates presented in table 8 were presented to VDOT as more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using both scenarios. Subsequent sections of this report first present the more appropriate trip generation rates identified as "Proposed", followed by the ITE trip generation rates. A summary of these rates is presented in table 8. 01 Trips for both scenarios were distributed according to the distribution agreed upon in the project scoping and discussed later in this report. Tahip R PrnnncPrl antl ITF Trin r:nnnrnfi— Dn+— Land Use 110 Light Manufacturing Time Period ADT Proposed Trip Gen. Rate per Acre 20.5 ITE Trip Gen. Rate per Acre 47.8 ITE % Increase 1336.2% AM Peak 4.1 7.5 82.9% PM Peak 4.4 6.1 38.6% 150 Warehousing ADT 23.6 54.9 132.6% — -- AM Peak 4.7 8.6 83.0% PM Peak 5.7 7.8 36.8% 0 0 Proposed Method for Trip Generation and Trip Distribution Trip Generation - Proposed Method The developer of this project has performed traffic analyses at three locations where they have developed similar projects to determine the appropriateness of the ITE trip generation rates for the light manufacturing and warehousing land uses. Through these studies, it has been found that the ITE trip generation rates greatly overestimate the amount of traffic that is associated with these uses. A copy of the analyses performed resulting in this determination is included in the appendix C of this report. The trip generation rates provided on the following page are proposed as an alternative to the ITE trip generation rates. These proposed rates are consistent with actual traffic counts taken at similar nearby facilities where modern warehousing and production methods are in use as well as late model trucks. Eight percent of the new traffic associated with the development is assumed to be heavy trucks based on information presented in the ITE Trip Generation Handbook data for industrial parks. There were no pass -by trip reductions applied to the forecasted traffic volumes. Trip Distribution - Proposed Method Trips generated by the development using the proposed trip generation rates were assigned to the roadway,network based on proximity to logical transportation corridors, access to 1-81, and commuter patterns. • The trip distribution percentages are shown in figure 15-A and the assignment of the new AM and PM peak hour trips are shown in figure 15-13. 0 Alternative: Full Build Out with Proposed Trip Generation Rates Phase: Project: Carbaugh Business Center ITE Land Use 110 Light Industrial Use 46.9 Acres 150 Warehousing Use 46.9 Acres Trip Generation Summary Open Date: 7/7/2016 Analysis Date: 7/7/2016 Weekday Average Daily Trips Weekday AM Peak Hour of Weekday PM Peak Hour of Adjacent Street Traffic Adjacent Street Traffic * Enter Exit Total * Enter Exit Total * Enter Exit Total ✓ 481 480 961 ✓ 159 33 192 ✓ 45 161 206 ✓ 554 553 1107 ✓ 158 62 220 1/ 93 174 267 Unadjusted Volume 1035 1033 2068 317 95 412 138 335 473 Internal Capture Trips 0 0 0 0 0 0 0 0 0 Pass -By Trips 0 0 0 0 0 0 0 0 0 Volume Added to Adjacent Streets 1035 1033 2068 317 95 412 138 335 473 Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent t - Custom rate used for selected time period. Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 TRIP GENERATION 2014, TRAFFICWARE, LLC P. 1 0 0 0 0 • 0 • Figure 15-A Trip Distribution Percentages • i d a1 N N ♦ N j ♦ Kernstown Rte 37 EB Rompsq Commons ..r► 63 (28) ♦ 0 0 r. Ln m (V ♦ 317 (139) Renaissance Dr ♦ m v e iD c W N H Figure 16-8 New Trips - Proposed Method Legend: AM Peak Hr, (PM Peak HR),® J _ l!1 y N p Lf100 N O rHcnaissanre Ur ♦ 86 (302) - ' • ► 10 (31) ♦ v OMMEWM Volvo Dealer a cc E W O H ® Renaissance Dr • • 40 • 2018 Build -Out Conditions - Proposed Method The 2018 build -out condition combines the background traffic for the year 2018, and the new trips that are forecasted to result from the development of this property. This is the "Proposed Build Condition" which is forecasted to occur in the year 2018. The Proposed Build Condition anticipates the completion of Renaissance Drive from its current terminus to Shady Elm Road and the activation of the traffic signal at Renaissance Drive and Route 11. The entrance to the development will connect to Renaissance Drive west of the CSX crossing. It is assumed that Renaissance Drive will cross the CSX with a bridge over the railroad. Analysis The 2018 Build Condition AM and PM peak hour turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 16. The lane geometry, AM peak hour delays, and level of service are shown in Figure 17. The AM peak hour 951h percentile queue length is shown in figure 18. The lane geometry, PM peak hour delays, and level of service are shown in Figure 19. The PM peak hour 95`h percentile queue length is shown in figure 20. The modeling results (levels of service and delay) are tabulated in Tables 3 through 6. • • 0 s v U-) 00 a rn ? t Ln v - 52 (71) f 35 (41) �- • L► 17 (22) VKernstown Rte 37 EB Ramps Commons 112(116) • ► 10 (30) —► 263 (202) v u, • M r` M v mar, a v` 0) - m • - 5 (5) 317 (139) Renaissance Dr 5 (5) - ► 5 (5) m CU o u, m c W +: 1 a r'4 Ln a c' • N M > 4 (11) '- 1 (0) ' • -► i 0 (6) sonce Dr d Volvo Dealer Entrance 89 (305) ' • ► 0 (1) ► 10 (36) • � v N M O � I CC E• W a a Ln Ln In 7,D Ln * 5 (5) • ► y 5 (5) Renaissance Dr n Ln v r-igure 1 / Build -Out Yr 2018 Lane Geometry and Peak Hour Traffic Volumes - Proposed Method Legend: AM Peak Hr, (PM Peak HR), • • U • • • n N v �0 n Y v y LL ry > L 12.2 (B) �— 24.9 (C) ~ • — 25.3 (C) V, Kernstown Rte 37 EB Ramps e.� Commons • J 24.0 (C) - ► 11.9 (B) m m Q • m m -- rn 4 �A v 7.9 (A) Renaissance Or � v � Q 00 c a `c W N H Q Ia m a > '"m ,� of • ' — 24.4 (C) Renaissance Or tj Volvo Dealer Entrance • 29.5 (C) ' • ► 14.0 (B) ► m m Q o un m o ni of cc 4 W Q O t ^ 8.6 (A) • `+ 8.9 (A) Renaissance Or Figure 187 Build -Out Yr 1018 AM Peak Hour Lane Geometry, Delay (sec) and Level of Service — Proposed Method • 0 v � d a v � 0 (150) ► i 27 (300) Kernstown Rte 37 ES Ramps Commons 103 (165) 62 (175) o c �n v �o g � n o 18 (575) Renaissance Dr --► f Ii 0 (150) ;nLn rrnn fn u rr1 O e 0 c W N h 00 o a � o tL 10 (35) � 1 .► i Renaissance Dr Volvo Dealer Entrance 99 (200) } ♦ ► � o 00 N O '4 O G C - W a N h IO A 0 (225) Renaissance Dr • ► o' eti O Figure 19 Build -Out Yr 2018 AM Peak Hour 95th Percentile Queue (ft) - Proposed Method • • 10 • ti ry v -0 m v oo a a v a, "i N 28.1 (C) 27.6 (C) ' + ► 33.8 (C) U Kernstown 37 EB Ramps tj I Commons 33.7 (C) 1 t 23.4 (C) ► 7.9 (A) u m m u'f a0 un N e -i 7.5 (A) Renaissance Dr — m m � � N V O O G O G W v H ry •`i 2 V eri 1� N N 33.4 (C) Renaissance Dr Volvo Dealer Entrance 31.3 (C) ♦ f 14.8 (B) ► Cp V m ,6 Lri a K E w a Q o m �+ 8.4 (A) 1 �► 9.0 (A) !� Renaissance Dr f► I Figure 19 Build -Out Yr 2018 PM Peak Hour Lane Geometry, Delay (sec) and Level of Service - Proposed Method 0 • T ^ � M 2 U Li u'f W � > 0 (150) ' • i ► • 33 (300) Kernstown Rte 37 EB Romps Commons 131 (165) fI + • 57 (175) o a m N o f- 8 (575) Renaissance Dr f ► Q (150) Ln1 • ^ M � o m c 0 c w v 00 o C �'y N N � > 0 (35) Renaissance Dr U Volvo Dealer U Entrance A 309 (200) 41 ♦ -+ Ln 0 0 ,My O U C W O N t IO ♦ _ • +' 0 (225) ® Renaissance Dr O n 0 Figure 200 Build -Out Vr 2018 PM Peak Hour 95th Percentile Queue (ft) - Proposed Method Fj • • 2024 Design Year Conditions - Proposed Method The design year for the project is six years beyond the Build Conditions of the project, which in this case is the year 2024. Analysis The 2024 Design Year AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. AM and PM peak hour traffic volumes are shown in Figure 21. The lane geometry, AM peak hour delay and LOS are shown in Figure 22 and the AM peak hour 95th percentile queue length is shown in figure 23. The lane geometry, PM peak hour delay and LOS are shown in Figure 24 and the PM peak hour 95th percentile queue length is shown in figure 25. The modeling results (levels of service and delay) are tabulated in Tables 3 through 6. • • ry H h Ln Ln a ^N' Ln n * 55 (76) f- 37 (43) t • ► i 18 (24) 1ri Kernstown 37 EB Ramps Commons 119 (123) 11 (31) -► 275 (213) Ln m m p vi v` W N m 5 (5) 317 (139) Renaissance Dr 5 (5) • 5 (5) i m e Ln rn O W W H ry H J L a v °� M oo N v L 4 (11) -4-4 �-- 1(0) • • • 0 (6) Renaissance Dr �I Volvo Dealer _ Entrance 89(305) 0 (1) 10 (36) m M rrnn Tr r cc 7.9 cc E W O N N H 5 (5) + 5 (5) ® Renaissance Dr I - Ln M _ U1 O r-igure 21 Vesign Year 2014 Peak Hour Traffic Volumes - Proposed Method Legend: AM Peak Hr, (PM Peak HR), • • • 0 C] v a�i T N v 11.6 (B) — 24.3 (C) • • ► j — 24.7 (C) Kernstown Rte 37 EB Ramps Commons BlvC 29.6 (C) 23.4 (C) 12.8 (B) m m Q u' 1-1 ao r Lri • 7.9 (A) Renaissance Dr — V • � a 00 00 a W h ry ry D.CL Ca m 25.0 (C) Renaissance Dr Volvo Dealer Entrance • 33.5 (C) ' • ► 14.6 (B) +► m m Q 0 00 O ni ry E 'W Q a 8.6 (A) • + pp 8.9 (A) l� Renaissance Dr rr Figure 22 Design Year 2026 Lane Geometry, AM Peak Hour Delay (sec) and Level of Service — Proposed Method 0 • CI ry v � rn m a N CN ? N 0 (150) 29 (300) � Kernstown 37 EB Ramps U Commons 108 (165) � t, I 64 (175) • o c Ln is Q1 n � 18 (575) Renaissance Dr , 0 (150) n ;� m m 4U m ap c 0 C c W W H • 10 (35) nce Dr J Volvo Dealer Entrance 110 (200) f • —' b. o N O O / a cc W Tj N In h lIO ♦ • `� 0 (225) ® Renaissance Dr 0 0 Figure 23 Design Year 2024 AM Peak Hour 95th Percentile Queue (t) - Proposed Conditions • is 11 • • 0 v V m y a v " n-i -4 L 14.7 (B) 34.7 (C) ti Kernstown Rte 37 E8 Ramps 1 ►, Commons 36.1 (D) t t 24.6 (C) ► I r 8.5 (A) u m m U� u, Ln 00 a; fV 'I 7.5 (A) Renaissance Or — m m � � o V O O C O C W 6� H Renaissance Or 32.9 (C) 15.8 (B) , ► d �* 35.0 (C) Volvo Dealer t) Entrance err m � m r; �6 N f4 cc - W Q O In m In 8.4 (A) 9.0 (A) ® Renaissance Or rr Figure 244 Design Year 2024 Lane Geometry, PM Peak Hour Delay (sec) and Level of Service - Proposed Conditions � ry H J Gj 6J N � U N O > 0 (150) - l49(300) V Kernstown Rte 37 LB Ramps Commons, 161 (165) 70 (175)Ln • c v �o rn Nr-4 o U- 12(575) Renaissance Dr Iz ► 0 (150) + ^ M r\ o rrnn c 0 c w 2 �n +- 0 (35) rnce Dr Volvo Dealer uEntrance • 348 (200) 7 • ► 0 0 N O c O I a E 'w N O .N. h l IO- ♦ • 0 (225) • Renaissance Dr • ► 0 Ln 0 Figure 15 Design Year 2024 PM Peak Hour 95th Percentile Queue (ft) - Proposed Method • r: 0 O • ITE Trip Generation and Distribution Trip Generation - ITE Method The ITE Method of trip generation for the project uses was developed using Trip Gen 2014 software based on the 9`h edition of the ITE Trip Generation Manual. The peak traffic volumes on the adjacent streets for the AM and PM periods were used for forecasting the new traffic. Land uses and trips generated using the ITE rates are summarized in table on the following page. Eight percent of the new traffic associated with the development is assumed to be heavy trucks based on information presented in the ITE Trip Generation Handbook data for industrial parks. There were no pass -by trip reductions applied to the forecasted traffic volumes. Trip Distribution Trips generated by the development were distributed on the roadway network based on proximity to logical transportation corridors, access to 1-81, and commuter patterns. The trip distribution percentages are shown in figure 15-A and the assignment of the new peak hour trips are shown in figure 26. Alternative: Full Build Out using ITE Trip Generation method Phase: Project: Carbaugh Business Center ITE Land Use 110 Light Industrial Use 46.9 Acres 150 Warehousing Use 46.9 Acres Trip Generation Summary Weekday Average Daily Trips * Enter Exit Total 1122 1121 2243 1289 1288 2577 Weekday AM Peak Hour of Adjacent Street Traffic * Enter Exit Total 292 60 352 291 113 404 Open Date: 7/7/2016 Analysis Date: 7/7/2016 Weekday PM Peak Hour of Adjacent Street Traffic * Enter Exit Total 64 225 289 128 237 365 Unadjusted Volume 2411 2409 4820 583 173 756 192 462 654 Internal Capture Trips 0 0 0 0 0 0 0 0 0 Pass -By Trips 0 0 0 0 0 0 0 0 0 Volume Added to Adjacent Streets 2411 2409 4820 583 173 756 192 462 654 Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 0 Percent 0 yc - Custom rate used for selected time period. Source: Institute of Transportation Engineers, Trip Generation Manual 9th Edition, 2012 TRIP GENERATION 2014, TRAFFICWARE, LLC P. 1 0 0 is • � M Y C 00 a j Kernstown Rte 37 EB Ramps J Commons 117 (38) ^ • � m N M V � O N 71 i — 583 (191) Renaissance Or _ y N D O c M t` v 1.1 N -k r d NLn- j • Renaissance Or Volvo Dealer Entrance 156(416) ! ' 17 (46) r � CO Ln Figure 26 New Trip Assignments based on ITE Trip Generation Method Legend: AM Peak Hr, (PM Peak HR), 0 / cc E W a 0 ® Renaissance Or �r 2018 Build -out Conditions with ITE Rates The 2018 build -out conditions combine the background traffic for the year 2018, and the new traffic that is forecasted to result from the development of this property. This is commonly referred to as the "Build Condition" which is forecasted to occur in the year 2018. The Build Condition takes into account the completion of Renaissance Drive from its current terminus to Shady Elm Road and the activation of the traffic signal at Renaissance Drive and Route 11. The entrance to the development will connect to Renaissance Drive west of the CSX crossing. It is assumed that Renaissance Drive will cross the CSX with a bridge over the railroad. It is also assumed that the signal at the intersection of Valley Pike and Renaissance Drive will be activated. Analysis The 2018 Build Condition AM and PM peak hour turning movements were analyzed using the Synchro 9.1 traffic modeling software. The AM and PM peak hour traffic volumes are shown in Figure 27. The lane geometry, AM peak hour delays, and level of service are shown in Figure 28. The AM peak hour 951h percentile queue length is shown in figure 29. The lane geometry, PM peak hour delays, and level of service are shown in Figure 30. The PM peak hour 951h percentile queue length is shown in figure 31. The modeling results (levels of service and delay) are tabulated in Tables 10 through 13. 0 lJ 0 0 • • • 0 ul � C7 � 2 . m v ^' a > * 52 (71) 35 (41) i ► 17 (22) Kernstown Rte 37 EB Ramps Commons Blvd 112(116) —? * ► 10 (30) ► 317 (212)Ln N u, ♦ v .n V 00 r, M 5 (5) 583 (191) • Renaissance Dr z 5 (5) ► 5 (5) N v u M � � c o r Ln w o, • 1 Figure 27 Build Condition 2018 Peak Hour Traffic Volumes Legend: AM Peak Hr, (PM Peak HR), D Lll y n � 4 v ¢' Ln vMi enr > • 4 (11) • _ 1(0) . j- 0 (6) Renaissance Dr r Volvo Dealer Entrance 159 (419) ' • ► 0 (1) -► 17 (48) Ln ® N V a - E � w a 0 m t � v � �n Ln 5 (5) • ' AA 5 (5) F Renaissance Dr v • I� L 6! � v r, m m Y a Qj w y "N �13.6(B) f— 26.6 (C) 34.2 (C) 1J Kernstown 37 EB Ramps J Commons, 33.5 (C) • f f r 21.8 (C) ► 10.7 (B) u m m • m o0 � N '-7 8.8 (A) Renaissance Dr — - w � � Q N c 0 c w v i 31.7 (C) Renaissance Or Volvo Dealer Entrance • 30.5 (C) 1 • ► I 17.9 (B) +► t0 V m 00 �O a1 ai -1 N I � W Q L I� 8.6 (A) 1 `► r— 8.9 (A) ® Renaissance Dr • ► figure Zd AM Peak Hour Build Condition 2018 Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) • • 0 • v Lr) r, a N G O a • 0 (150) ' r r ► 28 (300) • U Kernstown 37 EB Romps J. Commons • 106 (165) � * � �► 71 (175) . a v m o • 50 (575) Renaissance Dr 0 (150) . m m u � � c 0 c W W h +� 10 (35) Renaissance DrI Volvo Dealer Entrance tj 137 (200) ' 0 0 m O Figure 29 AM Peak Hour 2018 Build Condition 95th Percentile Queue Length (ftJ Legend: 9511 Percentile Queue (Available Storage) 1-1 z E w � o N r N IO • • `► 0 (225) F� Renaissance Dr ♦ ► 0 0 ry � m Y a " mo 14.8 (B) — 29.0 (C) ' • ♦ ' �- 35.1 (D) V Kernstown Rte 37 E8 Ramps Commons ♦ 24.7 (C) 26.4 (C) u m m • N v � D N 06 U' .--1 •-i 7.6 (A) Renaissance Dr ► — m m c 0 c w v �n m a a v � N N M M L 37.9 M Renaissance Dr Volvo Dealer Entrance ♦ 46.3 (D) ♦ ► I 14.4 (B) ► � U m � � m LO W M N e.i I Qc W Q o t M In I^ L 8.4 (A) • `► r— 9.0 (A) Renaissance Dr ♦ ► Figure 250 PM Peak Hour 2018 Build Condition Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) • 0 17J 40 • d Ln N � oo v j 0 (150) F- • + -► 32 (300) • U Kernstown Rte 37 EB Ramps d Commons 126 (165) 4- ♦ �► 33 (175) • o `^ a v m O M • • 12 (575) Renaissance Dr 0 (150) n F • m O rq c O c W N h ZZ W -X CL V n 4 --- • 0 (35) Renaissance Dr V Volvo Dealer Entrance 443 (200) - 4 ♦ I. i 0 Ln N 0 O .--i N O Figure 261 PM Peak Hour 2018 Build Conditions 95th Percentile Queue Length (ft) 0 W a � O N � O ♦ `► 0 (225) �f Renaissance Dr rr N O i Table 9 Level of Service and Delays at Route 11 and Route 37 EB Ramps - ITE Trip Generation Method 0 Route 11, Route 37 EB Ramps, and Kernstown Commons Blvd Level of Service per Movement by Approach (delay in sec/veh) Overall Eastbound Westbound Northbound Southbound Scenario LOS LT TH RT LT TH RT LT TH RT LT TH RT C C B C C B C B B B C 2018 C (33.5) (21.8) (10.7) (34.2) (26.6) (13.6) (27.3) (16.8) (14.7) (12.3) (24.7) Build -out (22.3) C (21.3) C (23.7) C (20.2) C (23.9) 0 C B C C C C B B B C 2024 C (35.8) (22.1) (11.4) (34.2) (7.0 ) (27.0) (28.2) (17.0) (14.8) (12.3) (25.2) Design Yr (23.0) C (22.5) C( 28.6) C (20.6) C (24.4) PM Peak Hour D C C D C B C B B B C 2018 C (38.2) (24.7) (26.4) (35.1) (29.0) (14.8) (Z9.2) (18.4) (15.9) (12.8) (24.9) Build -out (25.9) C (23.4) C (29.1) C (21.2) C (23.0) D C B C C C C C C C D 2024 C (41.4) (28.9) (12.1) (29.3) (29.3) (30.0) (31.1) (26.9) (21.7) Design Yr (30.3) C (28.5) C (29.6) C (28.6) C (33.6) Table 10 Level of Service and Delays at Route 11 and Renaissance Drive - ITE Trip Generation Method Route 11, Renaissance Drive, and Volvo Dealer Ent. Level of Service per Movement by Approach (delay in sec/veh) Scenario ver Overall Eastbound Westbound Northbound Southbound LT TH I RT LT I TH I RT I LT I TH I RT I LT I TH I RT AM Peak Hour 2018 C C B C B B 1 8 C B D Build -out (31.9) (30.5) (17.9) (31.7) (19.8) (29.6) (16.7) (20.0) (17.0) (47.2) C (29.3) C (31.7) B (28.4) C (34.2) 2024 C D B C B C B B B C Design Yr (27-3) (38.4) (18.3) (31.4) (19.3) (26.8) (15.3) (19.5) (15.6) (35.0) D (36.S) C (31.4) C (25.9) C (26.4) PM Peak Hour 2018 C D B D D C B B D A Build -out (33.5) (46.3) (14.4) (37.9) (36.7) (28.5) (16.9) (19.2) (39.6) (2.7) D (43.0) D (37.9) C (28.8) C (30.3) 2024 C D B D C C B TB D C (49.0) (16.6) (42.3) (21.4) (28.0) (16.9) ) (36.6) (20.9) Design Yr (34.9) D (45.7) D (42.3) C (27.7) C (32.8) • 0 0 • • Table 11 Level of Service and Delays at Renaissance Drive and Site Entrance - 0 Renaissance Drive and Site Entrance Level of Service per Movement by Approach (delz Overall Eastbound Westbound Northea! Scenario LOS LT TH RT LT I TH I RT LT I TH AM Peak Hour A E 2018 A (8.8) (39.8) Build -out (8.9) B (10.0) A E 2024 A (8.8) (39.8) Design Yr (8.9) B (10.0) PM Peak Hour A B 2018 B (7.6) (12.2) Build -out (10.1) A B 2024 B (7.6) (12.2) Design Yr (10.1) B (11.4) Table 12 Level of Service and Delays at Renaissance Drive and Shady Elm Rd - I Shady Elm Road and Renaissance Drive Level of Service per Movement by Approach (delay in sec/veh) Overall Eastbound Westbound Northbound Southbound Scenario LOS LT TH RT LT I TH I RT LT TH RT I LT TH RT AM Peak Hour A A A 2018 A (8.9) (8.6) Build -out (1.7) A (8.8) A (3.3) A A A 2024 A (8.9) (8.6) Design Yr (1.6) A (8 8) PM Peak Hour A A A 2018 A (9.0) (8.4) (7.3) Build -out (1.3) A (8.7) A A A 2024 A (9.0) (8.4) (7.3) Design Yr (1.2) A (8.7) Design Year (2024) with ITE Rates The design year for the project is six years beyond the Build Conditions of the project, which in this case is the year 2024. • i Analysis The 2024 Design Year AM and PM peak hour intersection turning movements were analyzed using the Synchro 9.1 traffic modeling software. AM and PM peak hour traffic volumes are shown in Figure 32. The lane geometry, AM peak hour delay and LOS are shown in Figure 33 and the AM peak hour 9S`h percentile queue length is shown in figure 34. The lane geometry, PM peak hour delay and LOS are shown in Figure 35 and the PM peak hour 9S`h percentile queue length is shown in figure 36. The modeling results (levels of service and delay) are tabulated in Tables 10 through 13. 0 O ry Y Ln '0 o a U1 55 (76) �— 37 (43) ' • ► • 18 (24) Kernstown Rte 37 EB Ramps U Commons 119(123) 11 (31) ► 329 (223)00 m • V M a Ln n Q1 6 N F 5 (5) i 583 (191) Renaissance Di 5 (5) ► r N 5 (5) • v v rn c o UI) W Figure 27 Design Year 2024 Peak Hour Volumes Legend: AM Peak Hr, (PM Peak HR), Ln � n Y N Ln en v �— 4 Ln .4 (11) 1 (0) 0 (6) >once Dr 159(419) ' A I. 0 (1) ► 17 (48) • y V' 0) ro ro N 1 Ln V Volvo Dealer I ac w 1' a n t Ln Ln In �o Un 5 (5) 5 (5) 0 Renaissance or m o ul 1: u) • • 0 • Qj 5 Y � m a a ' � ry M W " N > 2 7. 0 (C) 27.0 (C) �� ► �— 34.2(C) Kernstown Rte 37 EB Ramps Commons • 35.8 (D) 22.1 (C) ► 11.4 (B) u m m oo r` v N . . 8.8 (A) Renaissance Or z — w � � Q ai rn a C C c W W H Y o U) N o — 31.4 (C) Renaissance Or Volvo Dealer Entrance 38.4 (D) ♦ . • ► 18.3 (B) m oo r^ Q1 la Ln Figure 28 AM Peak Hour 2024 Design Year Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) E w Q a m �n ♦ 8.6 (A) i �► 8.9 (A) Renaissance Or • M ry v r- 6! � 0 (150) 30 (300) Kernstown Rte37ESRamps tjI Commons 140(165) ♦ ♦ ► 72 (175) °n' o v o 50 (575) Renaissance Or z 0 (150) Lnn n M m Ln c 0 c W v H m O 2 N N -4 t0 N 'y j • -- 11 (35) nce Or Volvo Dealer y Entrance 165 (200) ' I • ► • 0 `^ N 0 o ti rn 1 � W a N � O 0 (225) Renaissance Or I li 0 0 Figure 29 AM Peak Hour 2024 Design Year 9511 Percentile Queue Length fftf Legend: 951^ Percentile Queue (Available Storage) • • 0 0 • • 11 G1 Y p u a a v m 30.0 (C) 29.3 (C) ♦ ► j— 29.3 (C) Kernstown Rte 37 EB Ramps Commons Blvc 41.4 (D) 28.9 (C) ► 12.1 (B) v u v r D M N N np 7.6 (A) Renaissance Or • N a V � � C O C W v ^1 G N M rl f t 42.3 (D) Renaissance Dr Volvo Dealer U Entrance 49.0 (D) ♦ ► 16.6 (B) ► Oa la N N ti Figure 30 PM Peak Hour 2024 Design Year Lane Geometry, Delay and LOS Legend: Delay in sec., (LOS) a W Q O t M �n I^ t- 8.4 (A) + 9.1(A) [� Renaissance Dr ♦ ► > M a � v v � = 0 (150) '— 34 (300) mil Kernstown Rte 37 EB Ramps �l( Commons 134 (165) ♦ . * II • 39 (175) ♦ 0 0 Ln � M o • 12 (575) Renaissance Dr f- ► 0 (150)rn • rn M � O N tr � G O W v h Figure 31 PM Peak Hour 2024 Design Year 95th Percentile Queue Length (ftJ Legend: 951h Percentile Queue (Available Storage) 0 (35) nice Dr J Volvo Dealer Entrance 467 (200) t t i► I 0Ln 0 N O ti Nr-4 cc cc N O v � O ♦ i `► 0 (225) • Renaissance Dr O O 0 0 0 • Recommended Roadway Improvements The speedy completion of Renaissance Drive is a necessary component of this project. The completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. Additionally, planning for future roadway improvements, as depicted in the Frederick County Comprehensive Plan, is necessary. Since the studied intersections operate at an acceptable level of service, the focus for roadway improvements has directed towards the roadways surrounding the site. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line from the CSX right of way, 600 ft. to the west, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady elm Road, totaling approximately 2.7 acres. • Financial participation in the development of Renaissance Drive. • With these improvements proffered by this developer, combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. 0 Queue Analysis • At signalized intersection and stop signs a queue forms while vehicles wait to advance. An analysis was performed to evaluate the back of the queue for the 50th and 95th percentile of the queue. The 50th percentile maximum queue is the maximum back of queue on a typical traffic signal cycle and has a probability of happening 50% of the time. The 95th percentile maximum queue is the maximum back of queue with 95th percentile traffic volumes when traffic does not move for two signal cycles and has the probability of happening 5% of the time. The queues associated with the 50th and 95th percentile maximum queues using the Proposed Trip Generation method are shown in Table 14. The same queues for the ITE Trip Generation method are shown in Table 15. Table 13 50th and 95th Percentile Queue Lengths — Proposed • 0 0 • Table 14 50th and 95th Percentile Queue Length - ITE Trip Generation Method • Pedestrian and Bicycle Traffic To identify any previously planned pedestrian and/or bicycle facilities in the project area, the Frederick County Comprehensive Plan Future Land Use map was reviewed. There are no pedestrian or bicycle facilities planned in this area. However, in discussions with the County Transportation Planner it was learned that a multi -use trail was proffered/is planned along Shady Elm Road on the Venture 1 property. It was felt that this trail should be extended south on this property as well. Therefore the developer is proposing to construct a 10' wide multi -use trail along the east side of Shady Elm Road for the length of its frontage on said road. Conclusions • This Traffic Impact Study was prepared to support the rezoning request for the land owned by the Henry J. Carbaugh Trust, and is located south of Kernstown in Frederick County, VA. The rezoning, if approved, will lead to development that will create 46.9 acres of light manufacturing and 46.9 acres of warehousing uses. The total area of the proposed project area is 107.21 acres. The subject property is located south of the unincorporated area of Kernstown in Frederick County, VA. More specifically the site is west of Route 11, east of Shady Elm Road, and north of Springdale Road. Access to the site will be through a new entrance onto Renaissance Drive. Development traffic will be directed east on Renaissance Drive towards Route 11 for access to Route 37 and 1-81. During the scoping for this project it was brought to the attention of the VDOT staff that the ITE trip generation method was found to overestimate the traffic associated with light manufacturing and warehousing land uses. Some ITE data for these land uses dates to the 1960s and does not reflect efficiencies gained with current technologies and automation systems. The old data also does not account for the increased capacity of modern day trucks. The Proposed Trip Generation rates presented in this report were offered to VDOT as a more appropriate trip generation rates for this project. VDOT asked that the 2018 Build and 2026 Design Year analyses be performed using the Proposed Trip Generation and ITE Trip Generation rates. These are included in this report and are identified with labeling of either "Proposed" or "ITE trip generation rates. While the traffic that is forecasted to result from this development can be accommodated on the • existing roadway network, the completion of Renaissance Drive will bring with it benefits beyond those recognized by this project by providing traffic relief to other local roadways in the region, including Route 11 on the north side of Route 37. The recommended roadway improvements are: • 20 feet of right of way should be dedicated along the northern property line towards the Renaissance Drive project, totaling approximately one acre. Note: the remainder of the needed right of way for Renaissance Drive and the Shady Elm Road intersection improvements was proffered with the rezoning of the Venture 1 property. • An 80' wide permanent grading/slope easement should be dedicated along the aforementioned right of way line extending 600 ft. west from the CSX right of way, totaling approximately 1.1 acres. • 40' of additional right of way should be dedicated for future roadway improvement along the western property line adjacent to Shady Elm Road, totaling approximately 2.7 acres. • Participation financially in the development of Renaissance Drive. With these improvements proffered by this developer combined with the improvements planned and proffered by other developers in the vicinity, it is the opinion of this engineer that the transportation impacts of this rezoning and its resulting development are both manageable and acceptable for this project setting. • a s � y � � _ TAX 1AAP 74,A 3391 ACRES `. • I. \ N 700001p \ 3 o ,N :r ,h+& Legge L rid urvevors C 10205-EE I � � LOUDOUN STREET . ONCNESTER. 'AR(,NIA 22601 _ DMw By JiG PHONE (540) e671�048 « FAX (540) 66�T- 0460 — EMAIL offceOmoreaanoiegge can .1 � �1 SEG f SHApY E 324p'1 �a do S �M•-/� �.. - MAP -%4-A-68 ' j 9:d719rACRES _ - I . #160001418PROPERTY UNE ' ST. itQ70000157 t'J V 81 BOUNDARY �! LINE ADJUST4ENT i INST./160001418 Ir y' �J 's i V \ EXHIBIT DRAWING 400 r OF THE LAND OF ~ THE HENRY J CARBAUGH TRUST 2W a r • s E T.M. 15- A--1 14 VENTURE I OF WINCHESTER, LLC INST. #080005980 INST. #160001418 45.1035 ACRES PROPERTY LINE S 51'23'41" E 874.29 - BY 6F Cl BOUNDARY RF LINE ADJUSTMENT RF , r INST. #160001418 CZ �'' R`�-- RF `� - - 327.15' rN S 45'04'39" E S 42'06'49" W 169.64' 1 1 Q TAX MAP 74-A-68 o 89.8719 ACRES W O a ' INST. #160001418 V r 4 CA INST. #070000157 dID �ol►D.� Iti O POND FRAME `c-4 DWELLING o .np N O GRAVEL 1 in N DRIVEWAY ADJOINING OWNERS @TAX MAP 74-A-57A VERNON E. HEAVNER, II & LISA M. HEAVNER INST. N110005301 Q2 TAX MAP 74-A-59 ROBERT J. DIAZ & DONNA L. DIAZ INST. #060014496 (3)TAX MAP 74-A-61 ROBERT D. PATTON & ANITA K. RUKAVINA-PATTON INST. #070005130 @TAX MAP 74-A-62 DAVID H. CARBAUGH INST. #150001374 (5 TAX MAP 74-A-63 DAVID H. CARBAUGH INST. #150001375 Z �\ _ 1 o S 40'08'12" WFRAMBARNS& 120.12'_ \ SHEDS PONDC„� �q02`'�PS 695l rAv u A M -sue w 17.3391 ACRES N PF INST. #070000157 � F U �� @ �`' RF /RF EL. c� RF - REBAR FOUND IRS - REBAR SET PF - PIP FOD OVEUNRHEAD UTILITY LINE_ Er d 0 00 N � w cn w X O U z U w w cn Lt GRAPHIC SCALE 0' 400' 800, SCALE : 1" = 400' 'SEE SHEET 2 FOR NOTES, LINE TABLE & CURVE TABLE BOUNDARY SURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAWN BY: JTG I DWG NAME: 10205- PLAT- 4-17 1 SHEET 1 OF 2 1 Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 EMAIL of(iceGmarshandlegge.com U Marsh Lic. No. 001843 � 1 �0 s u Roj ,f.X"/ DATE: 08/12/2016 0 0 • • NOTES 1. NO TITLE REPORT FURNISHED; THEREFORE, EASEMENTS OR ENCUMBRANCES AFFECTING THE PROPERTY REPRESENTED BY THIS SURVEY MAY EXIST THAT ARE NOT SHOWN ON THIS PLAT. 2. THE LOCATIONS OF UNDERGROUND UTILITIES OR OTHER SUBSURFACE IMPROVEMENTS, IF ANY, WERE NOT ASCERTAINED; THEREFORE, ARE NOT SHOWN. 3. THE INFORMATION SHOWN ON THIS PLAT IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED UNDER MY SUPERVISION ON 10 AUGUST 2016. 4. REFERENCE IS MADE TO RAILROAD VALUATION MAP ENTITLED RIGHT OF WAY AND TRACK MAP THE WINCHESTER AND STRASBURG RAILROAD COMPANY OPERATED BY THE BALTIMORE AND OHIO RAILROAD COMPANY V32.1/3 LINE TABLE LINE BEARING DISTANCE L1 S 61'26'49" W 57.20' L2 S 30'29'58" W 94.93' L3 N 77'56'19" W 176.80' L4 N 07'34'36" E 153.22' L5 N 75'57'24" W 34.09' L6 N 08'35'35" E 304.46' L7 N 76'47'38" W 214.35' CURVE TABLE CURVE RADIUS ARC LENGTH CHORD LENGTH ICHORD BEARING DELTA ANGLE Cl 960.00' 436.53' 432.77' IS 38'22'06" E 23'03'12" C2 1540.00' 530,46' 527.84' S 35'1234 E 19'44'09" C3 570.40' 191.31' _ 190.41' IN 18'29'32" E 19,13,00" BOUNDARY SURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAWN BY: JTG I DWG NAME: 10205-PLAT I SHEET 2 OF 2 Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 EMAIL office@marshandlegge.com H OF' 1 Os 2, D Marsh Lic. No. 001843 .�� SURNE1b�N DATE: 08/12/2016 II ` a • 0 170005GJ CM w. m ThIIS CONF1101ATION OF PLAT, made and dated this 31'1 day of Tana 201Z, by the HENRY J. CARBAUGII TRUST UNDER AGREEMFN'r DATED DECEtMBFR 18, 2006 (the "Ca rbaugh 'Trust"). RE,CiT'AL,S: A. By Deed And Deed Of Boundary Line Adjustment dated February 5, 2016, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia as Instrument No. 160001418, the common boundary between the lands of the Carbaugh Trust and Venture I Of Winchester, LLC ("Venture I") was adjusted so as to create that certain tract or parcel of land containing 86.25 acres, more or less (by subtraction) owned by the Carbaugh '£rust (the "Carbaugh Tract") and that certain tract or parcel of land containing 45,1035 acres, more or less, owned by Venture I (the "Venture I Parcel"). B. Upon subsequent actual field survey, it has been determined that the Carbaugh L f Tract contains 89.8719 acres, more or less, as more particularly described on that certain plat 0 titled "Boundary Survey Of The Land Of The Henry J. Carbaugh Trust" dated August 12, T M16, drawn by S. W. ivfarsh, L.S. (the "Field Survey Plat"), a copy cff which is attached hereto and incorporated by reference as if set forth hereinafter. C. The Carbaugh Trust hereby confirms the boundaries of the Carbaugh Tract in ry u ' accordance with the Field Survey Plat, as more fully set forth hereinafter. L L NOW, TIIERFFORE, WITNESSETN: That for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Carbaugh Trust hereby confirms the boundaries of the Carbaugh Tract, as more Billy set forth on (lie attached Field Survey Plat, as L Follows: 1. Recitals: The Recitals are incorporated herein and made a material part hereof as if set out in full. 2. Contirmation of Fiela] Sui-i ey flat; The Carbaugh Trust hereby confirms Michael L. nrt'nn VSa #15737 the boundaHcs of the Carbaugh Tract as set forth on the attached Field Survey Plat, The 116 S. Braddock St. Winchester, VA Carbaugh Tract contains 89.8719 acres, more or less, as more fully set forth on the attached Dlidmel L. Brynit 1•SB 015737 116 S. Brnddock St. Winchester, VA is 2� c: � c.,) Field Survey Plat. Tax Map No. 74-A-68. ey —J WITNESS the following signature and seal: HENRY J. CARBAUGH TRUST UNDER AGREEMENT DATh:D DECEMBFIZ 18, 2006 By: Bank of Clarke County, Successor Trustee By:_Al,)(SL; Carl A. Esterhay, Senior Vic 'resident STATE OF VIRGINIA, AT LARGE, CITY/COLJNTY OF L„�tt�j ,:et , to -wit: The foregoing instrument was acknowledged before me, a Notary Public in and for the State and .furisdiction aforesaid, this 3rel day of % nNEfr7, 201_Z , by Carl A. Esterhay, Senior Vice President of Bank of Clarke County, Successor Trustee of the Henry y J. Carbaugll Trust Under Agreement Dated December 18, 2006. Nly commission expires J— �MIP4 THIS INSTRUMENT PRf?PARFD BY: Michael L. Bryan, Esquire Bryan & Coleman, P.L.C. 116 South Braddock Street Winchester, Virginia 22601 1k,&'C.,b.,ug h T-1 Confirmation of P1,t I242216 2 i • • • T.M. 75- A- I VENTURE I OF WNCHESTER, LLC INST. #080005980 INST. (/160001418 45.1035 ACRES PROPERTY LINE E 874.29' BY BOUNDARY RF C1 S 51'23'41" s RF L114E ADJUSTMENT RF , INST. #160001418 -- — r�i a, r C2 _ - - 327.15' N S 45'04'39" E S 42'06'49" WY 169.64' r-. n TAX MAP 74-A-68 o y 89.8719 ACRES N O INST. #160001418 tir r 0 INST. #070000157 �� awo���.� N 0POND 1 W N 7 U' FRAME `c + 0 DWELLING n o 1 1( � GRAVEL �o CD N DRIVEWAY ADJOINING OWNERS (I)TAX MAP 74-A-57A VERNON E. HEAVNER, II & LISA M. HEAVNER INST. #110005301 (2) TAX MAP 74-A-59 ROBERT J. DIAZ & DONNA L. DIAZ INST. n060014496 (a)TAX MAP 74-A-61 ROBERT D. PATTON & ANITA K. RUKAVINA-PATTON INST. #070005130 ®TAX MAP 74-A-62 DAV1D H. CARBAUGH INST. #150001374 ( TAX MAP 74-A-63 DAVID H. CARBAUGH INST. #150001375 `J a I �p FRAME S 40'08' 12" W 120.12' BARN & RS \ SHEDS POND y. o � sRS am N 501� �� J t1 b9 r _ RS TAX MAP 74-A-69; cs. u 17.3391 ACRES PF INST. #070000157 y J0 F O <� \ t ' �`� RF PF RF <rr j \ RIF LEGEND RF - REBAR FOUND RS - REBAR SET PF - PIPE FOUND —14 1 OVERHEAD UTILITY LINE e, L1 jr coo 4� GRAPHIC SCALE 0' 400' 800' SCALE : 1" = 400' *SEE SHEET 2 FOR NOTES, LINE TABLE & CURVE TABLE BOUNDARYSURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAWN BY: JTG I DWG NAME: 10205- PLAT- 4-17 I SHEET 1 OF 2 -� Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 t EMAIL off icealmorshandlegge.com 0" -T H OF 1 2' C D Marsh Lic. No. 001843 104?1D S u?10- ,,3ulll DATE: 08/12/2016 F 10 n LJ • 0 NOTES 1. NO TITLE REPORT FURNISHED; THEREFORE, EASEMENTS OR ENCUMBRANCES AFFECTING THE PROPERTY REPRESENTED BY THIS SURVEY MAY EXIST 114AT ARE NOT SHOWN ON THIS PLAT. 2. THE LOCATIONS OF UNDERGROUND UTILITIES OR OTHER SUBSURFACE IMPROVEMENTS, IF ANY, I'iERE NOT ASCERTAINED; THEREFORE, ARE NOT SHOWN. 3. THE INFORMATION SHOWN ON THIS PLAT IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED UNDER MY SUPERVISION ON 10 AUGUST 2016. 4. REFERENCE IS MADE TO RAILROAD VALUATION MAP ENTITLED RIGHT OF WAY AND TRACK MAP THE MNCHESTER AND STRASBURG RAILROAD COMPANY OPERATED BY THE BALTIMORE AND OHIO RAILROAD COMPANY V32.1/3. LINE TABLE LIME BEARING _ DISTANCE L1 S 61'26'49" W 57.20' L2 S 30'29'58" W 94.93' L3 N 77'56'19" W 176.80' L4 N 07'34'36" E 153.22' L5 N 75'57'24" W 34.09' L6 N 08'35'35" E 304.46' L7 N 76'47'38" W 214.35' CURVE TABLE CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 960.00' 436.53' 432.77' S 38'22'06" E 23'03'12" C2 1540.00' 530,46' 527.84' S 35'12'34" E 19'44'09" C3 570.40' 191.31' 190.41' N 18'29'32" E 19'13'00" BOUNDARY SURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAWN BY: JTG I DWG NAME: 10205-PLAT I SHEET 2 OF 2 Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 EMAIL office@Pmarshandlegge.com H 0!' i.'Sl� Z7 Marsh Lic. No. 001843 5U06���r DATE: 08/12/2016 -rs 0 W O • • vIMANIA: Ffk,pF:RICKCOUNTY.SL1. This instrument of writing was produced to me on endv+itircerti c;ric:ril:nuulc(Igemen�annexed < wasadm'tteltorecord. faaingxzsedbySec. 58.1-802of and 58.1-801 have been paid, if asses ahlr .4 " /)4=� , Clerk 0 cA CD CZ C7 0 io ti- T V� ? Y Ch Michncl L. Bryan V813#15737 6 S. Braddock St Viodiester, VA 160001418 THIS DEED AND DEED OF BOUNDARY LINE ADJUSTMENT, made and dated this 5th day of February, 2016, by and between the HENRY J. CARBAUGH TRUST UNDER AGREEMENT DATED DECEMBER 18, 2006 (the "Carbaugh Trust") and VENTURE I OF WINCHESTER, LL.C, a.Virginia Limited Liability Company ("Venture 111), RECITALS: A. The Carbaugh Trust is vested with fee simple title to that certain parcel of land containing 90 acres, 3 roods and 12 square poles, more or less, situate about six miles South of the City of Winchester, Virginia, near Bartonsville, fronting cn the Eastern side of Shady Elm Road (Virginia.Rbute 651), in Back Creek [Magisterial District, Frederick County, Virginia; and being a portion of lands (Parcel One) acquired by the Carbaugh Trust by that certain Deed dated January 3, 2007, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia a,5 Instrument No. 070000157, Tax. Map No. 74-A-68 (the "Carbaugh _Parcel.") . B. Venture I is vested with fee simple title to that certain tract of land containing 40.6035 acres,.more or less, situate about five (5) miles Southwest of the City of Winchester, Virginia, in Back Creek Magisterial District, Frederick County, Virginia, fronting on the Eastern side of Shady Elm Road (Virginia Route 651), designated as "Remainder Of 75-A-1 40.6035 Ac" on that certain plat titled "Final. Plat Shady Elm Subdivision" dated April 18, 2008, revised I•lay 9, 2008, drawn by Kirk W. Norton, L.S., which plat is attached to that certain Deed of Dedication And Declaration dated May 16, 2008, of record in the aforesaid Clerk's Office as Instrument. No. 080005980, and being the remainder of the lands acTaired by Venture I by that certain Deed dated December 27, 2006, of • Michael L. Brynn VSB H15737 #V6 S. Braddock St. incheMer, VA record in the aforesaid Clerk's Office as Instrument No. 060024270, Tax Map No. 75-A-1 (the "Venture I Parcel"). D. The Carbaugh Trust has agreed to convey a portion of the Carbaugh Parcel containing 4.5000 acres, more or less, to Venture I (the "BLA Parcel"), which BLA Parcel will be merged into and become a part of the Venture 3. Parcel, as more particularly described on that certain plat titled "Boundary Line Adjustment Of The Lands Of Venture I Of Winchester, LLC And The Henry J. Carbaugh Trust" dated January 11, 2016, drawn by P. Duane Brown, L.S., a copy of which is attached hereto and incorporated herein by reference as if: set out in full (the "BLA Plat"), as more fully set forth hereinafter. NOW, THEREFORE, WITNESSETH: That for and in consideration of the premises conveyed, and other good and valuable consideration deemed adequate at law, the receipt and sufficiency of which is hereby acknowledged, the parties do agree as follows: 1. RECTZASS: The Recitals are incorporated herein and made a material part hereof as if set: out in full. 2. CONVEYANCE OV BLA PARCEL: (a) The Carbaugh Trust hereby grants and conveys unto Venture I, in fee simple, with special warranty of title, the BLA Parcel. After conveyance of the BLA Parcel to Venture I, the Carbaugh Parcel shall contain 86.25 acres, more or less, (by subtraction) and the Venture I Parcel shall contain 45.1035 acres, more or less, as more particularly described on the attached BLA Plat. (b) The conveyance of the BLA Parcel is made subject to all easements, rights of way and restrictions of record 2 • affecting the BLA Parcel; provided, however, that the foregoi.nc shall not be deemed in any way to reinstitute or republish any irestrict-ions of record that may have expired or lapsed. 3. MERGER OF BLA PARCEL: Venture I hereby merges the BLF Parcel into the Venture I Parcel, thereby creating that certair tract of land containing 45.1033 acres, more or less, as referenced on the attached BLA Plat. 4. FREDERICK COUNTY CONSENT: Frederick County consents tc the terms of this Deed of Boundary Line Adjustment and Deed of Easement as evidenced by its execution of the BLA Plat. C;ITNESS the following signatures and seals: HENRY J. CARBAUGH TRUST UNDER AGREL'I,NT DATED DECEM13ER 18, 2006 By: Bank of Clarke County, Successor Trustee By:_zn' 't c V _(SEAL) Carl A. Esterhay, SPlior Vice President STATE OE' VIRGINIA, CITY/COUNTY OF �a. i—, to -wit: The foregoing instrument was acknowledged before me this day of t�ebruskr�, 2016, by Car]. A. Esterhay, Senior Vice President of Bank of Clarke County, Successor Trustee of: the Henry J. Carbaugh Trust Under Agreement dated December 18, 2006. My commission expires q-5 D•2D1 �nvt S ew---- Not ry P i-c tYY11liY ti�.4 d L • ., hlichoel L. Brpnn V0 1115737 IG S. Braddock St. 3ud.ftr, VA 3 7MV:.rURE I OF WIMIUSTBR, LLCBy:L _(SRAL) STATE OF VIRGIPiIA, AT 12MR, c-1--.,/Coth,TY of Fiedyick , to -wit: The foregoing instrument was acknowledged before me on the _ !£} day of JOPUN 201G, by Je who is of Venture I of Wincheotor, LLC, a Virginia limited l-iiabbiil`it'y Company. ray commission ewpires 1a131/o)61Q ARY LIC &flZ/.mb Da 1Snmb.q+Dcod of no=duy lice Mjirini^p. e,`o�rrurir,rr, NOTARY �'•,� REG # 71552' g o t.,YCWM1SSi0Nj Q ooEXPIR �?.% 121310:0 ,e 4 N C1 M i �y9 �1 ! SITE AV SCALEI1MAP 1"=4000' i APPROVED BY B IVISION ADMINISTRATOR DATE OWNFR'S CERTIFICATE THE ABOVE AND FOREGOING BOUNDARY LINE ADJUSTMENT OF THE LAND OF VENTURE I OF WNCHESTER, LLC [PIN 75—A-1] AND THE LAND OF THE HENRY J. CARBAUGH TRUST [PIN 74—A-681 AS APPEARS IN THE ACCOMPANYING PLATS, IS VATH 111E FREE CONSENT AND IN ACCORDANCE THE DESIRES OF THE UNDERSIGNED OMIERS, PROPRIETORS, AND TRUSTEES, IF ANY. . /C °Me, ON BEHALF OF VE14E I OF VAI¢,hESTER, LLC j � P DATE ��° jt r %\ ,....., , ijTARY SLlC ON BEHALF OF THE HENRY J. CARBAUGH 111UST DATt REGJ1715525B A F VIr )Ill NOTARY PUBLIC-=�-��...s,��.�.. ��D.•'�EXp�--9••QC� STATE O &�'/COUNTY OF" 1CK ,•���e,q�m4p,�0°° jj}}iiE fppRREp > INSTRUMENT WAS ACKNOV,'LEDGED BEFORE ME THIS IGt DAY OF'_kn 1 20 1100 BY (+PJlA1U I.QPJ_aI ON BEHALF O114 F VENTURE I OF WNCHESTER, LLC. s ZJ NOTARY PUBLIC MY COMMISSION EXPIRES NQTARY PUBLIC CITY DUN inChc 4eY` gARYp.,j .0••• G .• T}1 ORE�OIN IN 1RUMENT WAS ACIQJ YitT%YA 0 '? �j1HlS hh DAY OF E4 bC1 1 2D BY (1 nc�t� Ofisj F'� I - BENRY, J ARBAUGH.IR[1Sl D ` T. %c 1 7C1/�L TARY PUBUC �,�Jy•.., .•• ��` ` !AY COIdMIS510N EXPIRES 5-31-z( r� �1 CERTIFICATE I HEREBY CERTIFY THAT THE PROPERTIES CONTAINED IN THIS BOUNDARY LINE ADJUSTMENT ARE (1) THE REMAINDER [PIN 75-A-1] OF THE PROPERTY YMICH WAS CONVEYED TO VENTURE I OF RINCNESTER, LLC BY DEED DATED DECE14BER 27, 2006 AND (2) THE PROPERTY [PIN 74-A-681 THAT WAS CONVEYED TO THE HENRY J. CARBAUGH TRUST BY DEED DATED JANUARY 3, 2007, SAID DEEDS RECORDED IN THE OFFICE Of THE CLERK OF THE CIRCUIT COURT OF FREDERICK COUNTY, VIRCINIA AS (1) INSTRUMENT 060024270 AND (2) INSTRUMENT 070000157, RESPECTIVELY. BOUNDARY LINE: ADJUSTMENT to101♦I}s.. F LANDS OF VENTURE IOFE WINCHESTER, LLC �o�TH of Pr��� AND o �, THE HENRY J. CARBAUGH TRUST U P: Duane ' Duane rown ' Bm BACK CREEK MAGISTERIAL DISTRICT Lic, No. 001285 FREDERICK COUNTY, VIRGINIA ,�Eri.l1,207&il DATE: 01/11/16 COVER SHEET_ SHEET 1 OF 2 r� soHN0'►0 k? harsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET •- WINCHESTER, VIRGINIA 22601 DRAWN BY: HHK PHONE (540) 667-0468 - FAX (540) 667-0469 - EMAIL ohIccG nor0ondIcgge.wn I09103—OLA 11 0 0 .�.• 1 � I z 1 �N E i fug I I 75-A-1B I PIN 75--A-IC RC PROPERTIES INC.CORRUGATED CONTAINER CORP. ?� DB 896 PG. 1�26 DB 729 PG. 929 U:7• -- -- --- F 25' BRL PIN 75-A-1F NW' WOW, INC. PIN 75-A-1 INST. 080005981 I I r I m VENTURE I OF YNNCHESTER, LLC N INST. 060024270 INST. 080OD5980 ZONED: IAI 40.6035 ACRES (ORIGINAL) 45.1035 ACRES (ADJUSTED) 21 BRL �_ 25' BRL EX, 20' INGRESS -EGRESS ESM'T (IJJST. 080005980) 25' BRL _ S 51`23'41" E 1270.93' IRS C2 PR TY LINE HEREBY VACATE — — — — - - —PROPERTY UNESR 4.5000 ACRES — 10' BRL HEREBY CREATED PIN 74-A-68 Cr THE HENRY J, CARBAUGH TRUST FUTURE R/1W C IRS N4; INST. 070000157 1.9760 ACRES -- .____ 3, ZONED: RA ±90.75 ACRES (ORIGINAL) ±86.25 ACRES (ADJUSTED) NIRVF TAHI E CURVE I RADIUS ARC CH. BEARING CHORD Dnm!.10' C1 1540.00' 530.46' N 35'12'34' W 527.64 19 C2 960.00' 436.53' N 3872Q6 W 432,77 26 NOTES: 1. NO TITLE REPORT FURNISHED. EASEMENTS MAY EXIST THAT ARE NOT SHOµ4 ON THIS PLAT. 2 PROPERTY IDENTIFICATION NUMBER 74-A-68 AND 75-A-1. 3. NO BOUNDARY SURVEY HAS BEEN CO!dPLETED OR IS IMPLIED. ALL INFOWdAT10N SHOYN HEREON IS EITHER TAKEN FROM OR BASED UPON THE FINAL PLAT OF SHADY EW SUBDIVISION PREPARED BY PATTON HARRIS RUST & ASSOCIATES, SAID PLAT ATTACHED TO INSTRUMENT 080005980. s I z Nct� I m 0 a LOT 7 ckf o m C5 04 _ 1 1 II Vi LOT 8 I LOT 9 LOT 10 LI GEK IRS - IRON ROD SET BRL - BUILDING RESTRICTION LINE PIN 75-A-1 PIN 74-A-68 09IGLNAL AREA 40.6035 ACRES t 90.75 ACRES ADJUSTMENT 4 4.500D ACRES - 4.50D0 ACRES ADJUSTED AREA 45.1035 ACRES 1 86.25 ACRES 300, 0 300' Scele: 1" 300' BOUNDARY LINE ADJUSTMENT OF THE LANDS OF VENTURE r OF WINCHESTER, LLC AND THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DATE: 01/11/16 SCALE: 1" = 30D' SHEET 2 OF 2 A Marsh & Legge Land Surveyors,. P.L.C. I / 560 NORTH LOUDOUN STREET N WINCHESTER, VIRGINIA 22601 PHDkE (540) 667-0468 - FAX (540) 667-0469 - EMAIL ofOceCmmhcndinggc crnn P. Duane Brown Lic, No. 001285 Jan. 11, 2al4 ' r Nb Surr4S_o1 DRAWN BY: HBK ID9103-BLA • VIKUIN1A: FR3llBR1CK COUN"I""U `'his instrument of vvritino "'as produced to me on at andvrit r to record. i ax im v� ad- tted po by Sec 58.1-802 of r. and 58.1-801 have been paid, if assessable, Clery U r� 0 N b-) • -o o rn �. 6 U 0 4 14 17 HE, J. CARBAUGIi TRUST N CERTMCATE OF TR 1J'AGREEA�fEI'+iT THIS CERTIFICATE OF TRUST AGREEAH;NT is made and entered 'into as of the 19`h day of September, 2014, by BANK OF CLARKE COUNTY,, sole acting Tnistee of the Henry J. Carbaugh Trust, following the death of Wayne W. Carbaugh, Trustee, on September 19, 2014. This Certificate ofTrust acknowledges aird certifies the existence ofthe above -named frust and the authority of the above -named trustee following the death of Henry J. Carbaugh on May 14, 2014. This Certificate of Trust is not intended to alter in any way the provisions of the revocable trust agreement established by the Grantor, but is intended as evidence of the existence of such trust and the authority of the Trustee to act under the trust. The, undersigned acknow- ledges and agrees that the Trustee has full power and authority, without the joinder of any person whatsoever, to sell, exchange, lease, encumber, or otherwise dispose of the property interest in the trust; or any part thereof, at one time or from time to time, and no person dealing with the Trustee shall be required to make further inquiry as to the right. of tlne'l'rustcc so to act, nor shall such person be required to inquire as to the disposition of any proceeds. This authority shall be construed in accordance with the authorizations provided under Sections 55-17.1, 64.2-105 and 26-5.2 of the Code of Virginia. Investments under this trust will be titled as follows: Henry J. Carbaugh Trust Bank of Clarke County, Trustee 202 North Loudoun Street Winchester, Virginia 22601 • Federal Identification Number: 46-7524703 IN WITNESS WHEREOF, the undersigned has executed this instrument as of the day and year first above written. TRUSTEE: B,tkN`IC OF CLARKE COUNTY ByPa 6✓� (SEAL) Carl A. Esterhay, T►up Officer COMMONWEALTH OF VIRGINIA CITY OF WINCHESTER, TO -WIT: The foregoing instrument was acknowledged before me this 17th day of February, 2016, by Carl A. Esterhay, Trust Officer, Bank of Clarke County, Trustee. VIRGINW PREDDUCK t 0UM'1', SCT, Tidy jmUVmentt of NTiting %vm prod uccd tome on at —LL—Ii— and Nitb certificate of admMiedgement thereto annexed , was edmitted to record. Tiix Imposed by Seq 58.1.802 of S , and 58.1.801 have tx en paid, if asussable �J� Clerk � • C) 0 J 070000157 THIS DEED made and dated this _?nl day of January, 2007, by and between HENRY J. CARBAUGIi. Widower, hereinafter Grantor, and HENRY J. CARBAUGH, TRUSTEE 09 THE IIENRY ,1. CARIIAUGH TRUST UNDER AGREEMENT DATED DECEMBER 18, 2006, hereinafter Grantee. The Grantor desires to convey the hereinafter described property to the Trustee of a e a the above -referenced Trust, which the Grantor has established for his benefit. There is no consideration for this conveyance, and this conveyance is exempt from the recording F N tax in accordance with Virginia Code § 58.1-81 1.A.12. o-F In consideration of the foregoing, Grantor grants and conveys, with General o m a v Warranty and English coventmts of title, unto the Grantee, all of his right, title and a d a N a W interest in and to the following property: �0Q PARCEL ONE: All of that certain tract or parcel of land containing 90 acres, 3 roods and 12 • c square poles, more or less, together with all improvements and appurtenances a g thercunto belonging, lying and being situate about six miles South of Winchester w near Bartonsville, in Shawnee District, Frederick County, Virginia; and being the e n same property acquired by Henry J. Carbaugh and Nora W, Carbaugh, his wife, in 9 C % fee simple as tenants by the entireties with right of survivorship between them as S H at common law, by Deed from Melvin A. Carbaugh and Jane M. Carbaugh, his wife, Kenneth R. Carbaugh and Elizabeth S. Carbaugh, his wife, and Stewart M. Carbaugh and Elizabeth C. Carbaugh, his wife, dated August 9, 1958, and recorded in the Office of the Clerk of the Circuit Court of Frederick County, Virginia, in Deed Book 254 at Page 427, The said Nora W. Carbaugh died on October 7, 2002, thereby vesting all of her right, title and interest in the subject property in the Grantor herein. Tax Map Parcel No. 74-A-68 • ' i • o PARCEL TWO: All of that certain tract of land, together with all appurtenances and privileges thereto belonging, located in Shawnee District, Frederick County, Virginia, near Bartonsville, about one-half mile west of U.S. Highway No. 11, on the east side of Road No. 651 just north of its intersection with Road No. 649, containing nineteen (19) acres, more or less; LESS AND EXCEPT a parcel of land conveyed to Ida May Bennington and Waldo W. Bennington, her husband, by Deed dated April 25, 1962, and recorded May 8, 1962, in the aforesaid Clerk's Office in Deed Book 278 at Page 339; and further LESS AND EXCEPT a parcel of land conveyed to Clayton J. Bennington and L. Lenora Bemtington, his wife, by Deed dated April 25, 1962, and recorded June 9, 1962, in the aforesaid Clerk's Office in Deed Book 279 at Page 188; and being a portion of the same property acquired by Henry J. Carbaugh and Nora Warier Carbaugh, his wife, as tenants by the entirety with common law right of survivorship, by Deed from Henry J. Carbaugh and Nora Winter Carbaugh, his wife, by Deed dated July 28, 1960, and recorded in the aforesaid Clerk's Office in Deed Book 269 at Page 174. The said Nora Winter Carbaugh died on October 7, 2002, thereby vesting all of her right, title and interest in the subject property in the Grantor herein. Tax Map Parcel No. 74-A-69 Reference is here made to the aforesaid instruments and (lie attachments and the references therein contained for a further and more particular description of the property • hereby conveyed. This conveyance is made subject to all duly recorded and enforceable restrictions, easements and rights -of -way; provided, however, that the foregoing shall not be deemed in any way to reinstitute or republish any restrictions of record that may have expired or lapsed. Asset forth in Virginia Code §55-17.1, the Trust referenced herein shall not fail, nor shall any use relating to the above -described property be defeated because no 2 • 0 0 0 beneficiaries are specified by name herein or because no duties are imposed upon the �i Trustees. G -.1 (y) The parties agree, and this conveyance is made upon the express condition, that the Trustee shall have, and is by this Deed grunted, full power and authority, without the joinder of any person whatsoever, to sell, exchange, lease, encumber, or otherwise dispose of the property interests transferred and conveyed herein, or any part thereof, at one time, or from time to time, and no person dealing with the Trustee shall be required to snake further inquiry as to the right of the Trustee so to act, nor shall such person be required to inquire as to the disposition of any proceeds. The Trustee shall have no individual liability or obligation whatsoever arising from its ownership, as Trustee, of the legal title to said property, or with respect to any act done or contract entered into or indebtedness incurred by him in dealing with said property or in otherwise acting as such Trustee, except only so far as said Trust property and any Trust fimds in the actual possession of the Trustee shall be applicable to the payment and discharge thereof. This instrument is a deed of gift and is not to secure a debt or to indemnify a surety. The terms "Trustee" or "'Trustees" as used in this instrument include the singular and the plural, as the case may be, and any successor Trustee or Trustees. WITNESS the following signatures and seals; \`^�^ (SEAL) Henry I Ca ba h, IndividuallyW 3 TIfE HENRY J. CARBAUGH TRUST UNDER AGREEMENT DATED 1D1ECEMBER 19, 2006 By: gOr ci(SEAL) Iicnry Cn�augel_i,Ti-nste COMMONWEALTH OF VIRGINIA CITY OF WINCHESTEIZ, To -wit: —wet � The foregoing instrument as acknowledged before me this �rt day Beemi�er, JS-by Henry J. Carbaugh, Individually, and in his capacity as Trustee of the Henry J. Carbaugh Trust Under Agreement Dated December 18, 2006. 9AA /1f l41pYt� �►y ��tt�`- rs�kbo�-�- My commission expires: ntx a,2, 31, 2-52 M T H Ji j V � � This instrument prepared (without the benefit by: of a title examination) tl. Edmunds Coleman, III, Esquire Bryan & Coleman, IIi.C. VIRGINiA: FREDERICK COUNTY.SCf. The Feltneruild Building, 3 r Floor Court Square lThis il nt of writing was produced to rue on Winchester, VA 22601 I q ^ b 1 (540) 545-4172 03 and with cei tificate acknowledgement thereto auntxed was admitte to record. Tax imposed by See. 58.1-802 of b and 58.1-801 have been paid, if tataxAbW, CJPA i • is 0 T.M. nNCHE q V VENTURE I OF dNCHESTER, LLC \�\ INST. #080005980 INST, (/160001418 45.1035 ACRES , PROPERLY LINE S 51'23'41" E 874.29' RF By BOUNDARY RF _ ~ ~ RF LINE ADJUSTMENT INST. N160001418 C2RF 327.15' z S 45'04'39" E "' S 42'06'49" 4/ RS 1 ,,- A 169.64" 1f�. z 7/�� n7/��j yq /� �+ TAX 11fIA ! �i-A-68 y 4 89.8719 ACRES ' N) N I 0 �? a N "� INST. #160001418 04 I a "' La -i' INST. #0700001570-1 1 c-� POND 0 N B RS aNp � T W FRAME - I o 11 DWELLING ,N o bp GRAVEL n o C' DRIVD. r " 1 Z o cn ADJOINING Qn RS QTAX MAP 74-A-57A VERNON E. HEAVNER, II & USA M. HEAVNER INST. #110005301 (2)TAX MAP 74-A-59 ROBERT J. DIAZ & DONNA L. DIAZ INST. #060014496 QQ TAX MAP 74-A-61 ROBERT D. PATTON & ANITA K. RUKAVINA-PATTON INST. #070005130 ®TAX MAP 74-A-62 DAVID H. CARBAUGH INST. #150001374 (3)TAX MAP 74-A-63 DAVID H. CARBAUGH INST. #150001375 d FRAME S 40'08'12" W BARN & 120.1 - RS R�SI SHEDS PONDNSI t L1 r " �./ "b osp o' V1 5 RS L2 RS TAX MAP 74-A-69 wn 17.3391 ACRES col i. PF INST. #070000157 yJ J 0 F �6 ® \5 RF RF <v �\ F LEGEND RF - RFBA_ R FOUND RS - R BAR SF1 P - PIPE FOUND OVERHEAD UTILITY LINE GRAPHIC SCALE 0' _ 400' 800' SCALE : 1" = 400' *SEE SHEET 2 FOR NOTES, LINE TABLE & CURVE TABLE BOUNDARY SURVEY ki4'0'%4f OF THE LAND OFE�� TH OF���c}r THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICTS Z FREDERICK COUNTY, VIRGINIA v DWG `"' DRAPdJ BY: JTG NAME:10205-PLAT-4-17 4HE 1 OF 2 . N Marsh eL LicNo. 001843 Marsh _.& Legge Land Surveyors, P.L.C. �1< 4 560 NORTH LOUDOUN STREET VANCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 ' -" "'D SURD ; �`...d.... EMAIL officc@marshondlegge.com DATE: 08/12/2016 0 NOTES 1, NO TITLE REPORT FURNISHED; THEREFORE, EASEMENTS OR ENCUMBRANCES AFFECTING THE 2R THE RLOCATIONS OTY FEUNDERGROUND D By NIS RUTILITI SVEY Y OR I OTI EST -I SUBAT SURFACE NOT HMPROVEfdTNYN ON I IMPROVEMENTS, F ANY, VERE NOT ASCERTAINED; THEREFORE, ARE NOT SHOWN. 3. T14E INFORMATION SHOR,ti ON THIS PLAT IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED UNDER MY SUPERVISION ON 10 AUGUST 2016. 4. REFERENCE IS FADE TO RAILROAD VALUATION MAP ENTITLED RIGHT OF 1VAY AND TRACK MAP THE WNCHESTER AND STRASBURG RAILROAD COMPANY OPERATED BY THE BALTIMORE AND OHIO RAILROAD COMPANY V32.1/3. LINE TABLE LINE BEARING DISTANC L1 S 61'26'49" W W 57.2( L2 S 30'29'5g 94oR L3 N 77'56'19" W 153,22 L4 N 07'34'36" E 5 N 75,57'24" 41 —" 09 34.46 -6 N 08'35'35" E 7 N 76'47'38" W 9oe zs BOUNDARY SURVEY OF THE LAND OF THE HENRY J. CARBAUGH TRUST BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA DRAWN BY: JTG I DWG NAME: 10205—PLAT ~SH� SHEET 2 OF 2 Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET SVINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 FAX (540) 667-0469 EMAIL Off ic @mcirshandlegge.com 0. r `�O G) D:b S.W. Marsh Lic. No. 001843 AID SURg�y���° t1td-'W4" DATE: 08/12/2016 Untitled Page • El Page l of l 0 CJ Frederick County Virginia c,ri 47, Tji1 r01' PaY/Lookup Taxes Real Estate Ticket Detail 2017 REAL ESTATE Depr'I'icket# Re2oii/-! ss000, --1 rrequenc� Supplement#[_] Name CARBAJ� Gi I1CNR� J TRUSTEE Ac ount# W23/10 Name 2 c4) BANK OF CLARK COUNTY TRul Rill Date A 28- , - Acreage Address .. Due Datc orsrosao r Improvements Land Value v,5 Zip Penalty Paid Original Bill i Date 4ns.r2017 6✓S/2017 Land Use Minerals soot ww Interest Paid so.00 Last Transaction Date 0d0612617 Current Pa-ment Status 1'atments Principal Balance Penalty Interest Balance Due Dee — -- Transaction llistor.N Type Tran%acliontt Amount Balance Charge 0 S693.92 S693.92 Principal Paid 5413 ($693.92) $0.00 F YNUU1 https://taxes.co.frederick. va. us/applications/TR_payTaxes/RF,Deta... 6/6/2017 Untitled Page • • Page l of 1 Frederick County Virginia Litt 1-W RIP 11'.Iv/Lookup T.lxes Real Estate Ticket Detail Prevla,s 2017 REAL ESTATE Dept!'ricket# f tL 7: %56woi I rcqucnL% ldanle'CARBAUGH HENRY: TRUSTEE Mal)4 J7. A 69 'dame 2 co BANK Or CLARK COUNTY TRU5 hill Date (asnon0n Address 202 N i OU:)r,.iN ST Due Date onfn"017 Dc�c Zip z.vus S52 Penalty Paid s :y Interest Paid w W Current Pa%mcnl Statue Principal Balancc Ori final Bill Payment. Due I'i•nalt� • Transaction History Date Type Transaction# 4/28/2017 Charge 0 6/5/2017 Principal Paid 5413 Frn.irv,t is Supplement-4 jo Account* �eo234„ Acreage Improvements land Value 1_and Use Mineralssoon I.ast Transaction Date o6ro6 zo,Jl Interest Balance Due Amount Balance $17.07 S17.07 ($17.07) S0.00 . https://taxes.co.frederick.va.us/applications/TR_payTaxes/REDeta... 6/6/2017 0 L� 0C? 6 2017 FRtD'R!CK COUNTY Document Approval Form PLEASE REVIEW THE ATTACHED DOCUMENT, IF THIS DOCUMENT ]MEETS YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF YOUR APPROVAL. IFrffISDOCUAfENTDOESNor,wEEr-yo,URAPPROII,X4, PLEISEPROVIDE COMMENTSAS TO WHAT YOU WOULD LIKE TO NAVE COMPLETED: Initials Date S, Time Candice Mari Dave Tyler Mike John COMMENTS: Received by Clerical Staff (Date & Time): (S:Ofrce on BlackboxTormslDocumen( Approval Form 4/7/2016 ) • 0 COUNTY of FREDERICK Department o1'Planning and Development 540/ 665-5651 Tax: 540/ 665-6395 NOTIFICATION OF PUBLIC HEARING November 29, 2017 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE: REZONING APPLICATION #04-17 FOR CARBAUGI-I BUSINESS CENTER On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public hearing being held on Wednesday, December 13, 2017, at 7:00 pm in the Board Room of the Frederick County Administration Building at 107 North Kcnt Street, Winchester, Virginia to consider the following application: Rezoning #04-17 for Carbaugh Business Center, submitted by Stowe Engineering, PLC, to rezone two parcels of land that total 107.21 +/- acres from the RA (Rural Areas) District to the MI (Light Industrial) District Nvith proffers. The site has an address of 831 Shady Elm Road (Route 651) and is located on the eastern side of Shady Elm Road, approximately 1.1 1 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The eastern portion of the site is bounded by the CSX Railroad. The properties are identified by Property Identification Numbers 74-A-68 and 74-A-69 and are located within the Back Creek Magisterial District. Any interested parties having questions or wishing to speak may do so at the public hearing. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia, or by calling (540) 665-5651. You can also visit us on the web at: www.feva.us. Sincerely, Candice E. Perkins, AICP, CZA Assistant Director CEP/pd 107 North Kent Strect, Suitc 202 • Winchester, Virginia 22601-5000 ! 0 4 This is t certify that the attached correspondence was mailed to the following on 0 'Z 11 from the Department of Planning and Development, Frederick Counly, Virginia: J 75 . A• • 1• 74-A-69 VENTURE I OF WINCHESTER LLC The H^nr-- C�:rb�:ut> Trust CIO GERALD F SMITH JR Mank of Clarke Court J 549 MERRIMANS LN 202 N. Loudoun St W-nchester, VA 22601 WINCHESTER VA 22601.6207 74 -A- - 71• 74-A-68 BRIM STEPHEN D ETALS The Henry Curbaugh Trust 254 W QUEEN ST %Bank of C.iarke County STRASBURG VA 202 N. Loudoun St 22657.2223 Winchester, VA 22601 74 • A• • 70- 74 - A• • 61- HAYMAKER ELIZABETH ANN PATTON ROBERT D 316 SPRINGDALE RD RUKAVINA-PATTON ANITA K WINCHESTER VA 22602.2540 983 SHADY ELM RD 74 - A• • 72• WINCHESTER VA 22602.2535 HAYMAKER ELIZABETH ANN 14 • A- • 62- 316 SPRINGDALE RD CARBAUGH DAVID H WINCHESTER VA 22602.2540 957 SHADY ELM RD WINCHESTER VA 22602.2535 74 . A• . 57-A HEAVNER VERNON E II 74 - A. - 63. HEAVNER LISA M CARBAUGH DAVID H 1043 SHADY ELM RD 957 SHADY ELM RD WINCHESTER VA 22602.2536 WINCHESTER VA 22602.2535 74 • A• - 59- DIAZ ROBERT J DIAZ DONNA L 1006 SHADY ELM RD WINCHESTER VA 22602.2529 Candice E. Perkins, AI , Assistant Director Frederick County Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK I, �� ti �� ) G (]��y , a Notary Public in and for the State and County aforesaid, do hereby certify that Candice E. Perkins, Assistant Director for the Department of PI i g� and Development, whose name is signed to the foregoing, dated has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this °� day of L-u �� 1 My commission expires on y,e 1 Q-0 a G PA DE UBLIC NOT Y Pd T TION # 354474 COMMONWEALTH OF VIRGINIA MY COMMISSION EXPIRES DECEMBER 31, 2017 74 - A BROWN RONALD L 970 SHADY ELM RD WINCHESTER VA 22602.2528 74 -6- - 12- 30ON LLC ATTN DEBT MANAGEMENT PO BOX 179 MOOREFIELD WV 26836.0179 74 -6- - 11- LYONS DANIEL J LYONS SANDRA M 121 SKYJES LN WINCHESTER VA 22602.2589 74 -6- - 2• 30ON LLC ATTN DEBT MANAGEMENT PO BOX 179 MOOREFIELD WV 26836.0179 74 -3- - 3• NICHOLAS KITTY HOCKMAN EDDY ROBIN H 690 SHADY ELM RD WINCHESTER VA 22602.2525 74 -3- - 2- NICHOLAS KITTY HOCKMAN EDDY ROBIN H 690 SHADY ELM RD WINCHESTER VA 22602.2525 sP n U n LJ COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 NOTIFICATION OF PUBLIC HEARING October 18, 2017 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE: REZONING APPLICATION #04-17 FOR CARBAUGH BUSINESS CENTER On behalf of the Frederick County Planning Commission, you are hereby notified of a public hearing being held on Wednesday, November 1, 2017, at 7:00 pm in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following application: Rezoning #04-17 for Carbaugh Business Center, submitted by Stowe Engineering, PLC, to rezone two parcels of land that total 107.21+/- acres from the RA (Rural Areas) District to the MI (Light Industrial) District with proffers. The site has an address of 831 Shady Elm Road (Route 651) and is located on the eastern side of Shady Elm Road, approximately 1.1 1 miles southwest of the intersection of Shady Elm Road and Apple Valley Road (Route 652). The eastern portion of the site is bounded by the CSX Railroad. The properties are identified by Property Identification Numbers 74-A-68 and 74-A-69 and are located within the Back Creek Magisterial District. Any interested parties having questions or wishing to speak may do so at the public hearing. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia, or by calling (540) 665-5651. You can also visit us on the web at: www.feva.us. Sincerely, Candice E. Perkins, AICP, CZA Assistant Director CEP/pd 107 North Kcnt Street, Suite 202 • Wlncllcstcr, Virginia 22601-5000 • This is to certiq that the attached correspondence was mailed to the following on t 0 I V i 1 from the Department of Planning and Development, Frederick County, Vir inia: 74 - A- - 62- 75 -A- - 1- CARBAUGH DAVID H VENTURE I OF WINCHESTER LLC 957 SHADY ELM RD CIO GERALD F SMITH JR WINCHESTER VA 22602-2535 549 MERRIMANS LN WINCHESTER VA 22601.6207 74-A--71- BRIM STEPHEN D ETALS 254 W QUEEN ST STRASBURG VA 22657.2223 74 - A- - 70- HAYMAKER ELIZABETH ANN 316 SPRINGDALE RD WINCHESTER VA 22602-2540 74 - A- - 72- HAYMAKER ELIZABETH ANN 316 SPRINGDALE RD WINCHESTER VA 22602-2540 74 - A- - 57-A HEAVNER VERNON E it HEAVNER LISA M 1043 SHADY ELM RD WINCHESTER VA 74 - A. - 59- DIAZ ROBERT J 74 - A- - 63. CARBAUGH DAVID H 957 SHADY ELM RD WINCHESTER VA 74 - A- - 64- BROWN RONALD L 970 SHADY ELM RD WINCHESTER VA 74 - 6- - 12- 300N LLC 22602-2535 22602-2528 ATTN DEBT MANAGEMENT PO BOX 179 MOOREFIELD WV 26836-0179 74 -6- - 11- LYONS DANIEL J LYONS SANDRA M 121 SKYJES LN WINr.HFSTFR VA 22602-2509 74 - 6- - 2- 300N LLC ATTN DEBT MANA :E ;-,ENT 22602-2536 PO BOX 179 MOOREFIELD WV 26836.0179 DIAZ DONNA L 1006 SHADY ELM RD WINCHESTER VA 22602-2529 74 -A- - 61- PATTON ROBERT D RUKAVINA-PATTON ANITA K 983 SHADY ELM RD WINCHESTER VA 22602-2535 Candice E. Perkins, AICP, CZA Assistant Director Frederick County Plamiing Dept. li vl • 11\V 11\1!'1 COUNTY OF FRE1DERICK I> y '11 a�� ��'v� , a Notary Public in and for the State and County aforesaid, do hereby certify that Candice E. Perkins, Assistant Director for the Department of Pipiling and Development, whose name is signed to the foregoing, dated / U / �' I --) , has personally appeared before me and acknowledged the same in my Sta e an6 County aforesaid. Given under my hand this day of Qd-c�" M commission expires on L -/ �1 �� Y P ��7 �-. i. NOTARY PUBLIC 74 -6 KREMER MATTHEW • KREMER MARY ANN 138 SKYJES LN WINCHESTER VA 22602.2593 74 - 3- - 14- ANDERSON KEVIN ANDERSON TINA 113 HOCKMAN CT WINCHESTER VA 22602-2551 74 -3- - 5- BROWN GREGORY R BROWN JOHANNA A 114 HOCKMAN CT WINCHESTER VA 22602-2551 74 -3- - 4- RUDOLPH JACOB T III RUDOLPH HEATHER R 750 SHADY ELM RD WINCHESTER VA 22602-2561 , - A- - 67- NICHOLAS KITTY HOCKMAN 690 SHADY ELM RD WINCHESTER VA 22602.2525 74 - 6- - 1- KREMER MATTHEW KREMER MARY ANN 138 SKYJES LN WINCHESTER VA 22602.2593 74 -3. - 14- ANDERSON KEVIN ANDERSON TINA 113 HOCKMAN CT WINCHESTER VA 22602-2551 74 -3- - 5- BROWN GREGORY R BROWN JOHANNA A 114 HOCKMAN CT WINCHESTER VA 22602.2551 74 -3- - 4- RUDOLPH JACOB T III RUDOLPH HEATHER R 750 SHADY ELM RD WINCHESTER VA 22602-2561 74 - A- - 67- NICHOLAS KITTY HOCKMAN 690 SHADY ELM RD WINCHESTER VA 22602.2525 74 - 3- - 3- NICHOLAS KITTY HOCKMAN EDDY ROBIN H 690 SHADY ELM RD WINCHESTER VA 22602-2525 74 -3- - 2- NICHOLAS KITTY HOCKMAN EDDY ROBIN H 690 SHADY ELM RD WINCHESTER VA 22602.2525 74-A-68 The Henr, Carbaugh Trust %Bank of Clarke County 202 N. Loudoun St. Winchester, VA 22601 74-A-69 The Henry Car*6h Trust %Bank of Clarke County 202 N. Loudoun St. Winchester, VA 22601 KQ Z-%3 -f\ ; -ft 0 � � Car �av,o, h 6 U S I C i C �,ni�c r Adjoining PI arty Owners # PIN Owner Address Zoning 1 75 A 1 Venture I of Winchester LLC 54 Merriman's Lane, Winchester, VA 22601 M1 2 74 A 71 Stephen D. Brim, ETALS 254 Queen Street, Strasburg, VA 22657 RA 3 74 A 70 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 4 74 A 72 Elizabeth Ann Haymaker 316 Springdale Road, Winchester, VA 22602 RA 5 74 A 57A Vernon E., II and Lisa M. Heavner 1043 Shady Elm Road, Winchester, VA 22602 RA 6 74 A 59 Robert J. and Donna L. Diaz 1006 Shady Elm Road, Winchester, VA 22602 RA 7 74 A 61 Robert D. Patton and Anita K. Rukavina-Patton 983 Shady Elm Road, Winchester, VA 22602 RA 8 74 A 62 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 9 74 A 63 David H. Carbaugh 957 Shady Elm Road, Winchester, VA 22602 RA 10 74 A 64 Ronald L. Brown 970 Shady Elm Road, Winchester, VA 22602 RA 11 74612 30ON LLC P. 0. Box 179, Moorefield, WV 26836 RA 12 74611 Daniel J. and Sandra M. Lyons 121 Skyjes Lane, Winchester, VA 22602 RA 13 7462 30ON LLC P. 0. Box 179, Moorefield, WV 26836 RA 14 7461 Matthew and Mary Ann Kremer 138 Skyjes Lane, Winchester, VA 22602 RA 15 74314 Kevin and Tina Anderson 113 Hockman Ct., Winchester, VA 22602 RA 16 7435 Gregory R. and Johanna A. Brown 114 Hockman Ct., Winchester, VA 22602 RA 17 7434 Jacob T., III and Heather R. Rudolph 750 Shady Elm Road, Winchester, VA 22602 RA 18 74 A 67 Kitty Hockman Nicholas 690 Shady Elm Road, Winchester, VA 22602 RA 19 7433 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 20 7432 Kitty Hockman Nicholas and Robin H. Eddy 690 Shady Elm Road, Winchester, VA 22602 RA 21 22 23 TO:LANCE-DATA PROCESSING FROM: PAM - Planning Dept. P1 se print _ sets of labels by �'Cf 1, z.C,' 1 THANKSI 24 25 26 27 28 29 30 31 32 33 34 • FREDERICK COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT MAP REQUEST DATE RECEIVED: 10/10/17 REQUESTED COMPLETION DATE: 10/19/17 REQUESTING AGENT: Pam STAFF MEMBER: Candice TYPE OF MAP: Comp Plan "Transportation Locator ✓ TDR Ag & Forest District CIP Other PIN: 74-A-68 & 69 DESCRIPTION OF REQUEST: Rezoning 04-17 Carbaugh Business Center RA to M1 Submit