Loading...
HomeMy WebLinkAbout03-12 Graystone Corp. Proffer - Stonewall Proffer Revision - BackfileMike Ruddy From: Elizabeth Paradis Stern [epstern@svbf.net] Sent: Tuesday, November 03, 2009 5:45 PM To: Mike Ruddy Subject: SVBF letter to PC regarding Graystone Attachments: SVBF letter to FCPC re Graystone -- final.pdf I:fk"AT.-.' I chatted with June this evening about the Graystone proposal and gave her a heads -up about this letter and just emailed it off to her. I have been trying to get this done in some final fashion all day today so I could call you and it's been just so hard to get all of the pieces and parts together so quickly. So I apologize for the late notice about this. But your cover memo to the application was great and a huge help with this—] never would have been able to get this together in time had I not had that as a resource. I'll be on my cell tomorrow — 540-327-7097 — although I'll be in a Section 106 training session in Richmond (booked long ago). But I'll have breaks and would love to have a chat with you, if that's possible? (I also get emails on my PDA so that's an option, too.) Denman Zirkle, our new executive director, will be appearing at the public hearing tomorrow. I think you met him at the VCC Better Models for Development event earlier this year. He is a good guy and is getting up to speed with all of this as quickly as he can. Thanks, Mike! Beth Elizabeth Paradis Stern -- Director of Policy and Communications Shenandoah Valley Battlefields Foundation and the Shenandoah Valley Battlefields National Historic District PO Box 897, New Market, VA 22844 1 540.740.4545 1 epsternO)svbf.net I www.ShenandoahAtWar.org Working with public and private partners to protect, interpret, and promote the Shenandoah Valley's Civil War story for the region and the nation. -P(t (A, 5'e- a-vi VIA Mike Ruddy From: june wilmot [wilmot22@verizon.net] Sent: Wednesday, November 04, 2009 7:21 AM To: Eric Lawrence; Mike Ruddy Subject: FW: SVBF letter to PC regarding Graystone Attachments: SVBF letter to FCPC re Graystone -- final.pdf Got a call from Beth last evening. So here it is. Mr. Zirkle will be with us tonight. June From: Elizabeth Paradis Stern [mailto:epstern@svbf.net] Sent: Tuesday, November 03, 2009 5:39 PM To: june.wilmot@verizon.net Subject: SVBF letter to PC regarding Graystone Hi June — What a pleasure it was to chat with you this evening. I will talk with Denman about the notion of getting together for coffee sometime soon. We are way overdue in doing that! Attached as promised is the SVBF letter that Denman will have on hand tomorrow evening. Please feel free to let me know if you have any questions! My cell number is below in case you need it again. Thanks again! Beth Elizabeth Paradis Stern -- Director of Policy and Communications Shenandoah Valley Battlefields Foundation and the Shenandoah Valley Battlefields National Historic District PO Box 897, New Market, VA 22844 1 540.740.4545 office 1 540.327.7097 cell I epstern@svbf.net I www.ShenandoahAtWar.org Working with public and private partners to protect, interpret, and promote the Shenandoah Valley's Civil War story for the region and the nation. No virus found in this incoming message. Checked by AVG - www.avq.com Version: 8.5.424 / Virus Database: 270.14.45/2476 - Release Date: 11/03/09 07:36:00 3 November 2009 Ms. June Wilmot, Chairman Frederick County Planning Conlnlission 412 Westside Station Drive Winchester, VA 22601 RC: Rezoning Application #09-09 for Graystone Corporation of Virginia Dear Nis. Wilmot: The Shenandoah Valley Battlefields Foundation would like to submit comments regarding the above rezoning proposal to be considered at your meeting on 4 November 2009. As a neighboring landowner, the Battlefields Foundation received notice about this rezoning application on Tuesday, 27 October 27 2009, five business days before the public hearing for this application, which is quite lengthy and ponders a significant change in the use of the property, one that is also dramatically different front the surrounding land uses. The Foundation respectfully urges the Frederick County Planning Commission to table this proposal to allow further time for review of the application by the Foundation and others in the conlnnnlity. The above notwithstanding, in our initial review of the application the Battlefields Foundation has identified several concerns with its overall purpose as well as with specific elements of the proposed development. Shenandoah Valley Battlefields National Historic District and the Shenandoah Valley Battlefields Foundation The Shenandoah Valley Battlefields Foundation was established in 2000, pursuant to the Shenandoah Valley Battlefields National Historic District and Commission Act. The Act, passed by Congress in 1996, established the eight-C011nty Shenandoah Valley Battlefields National Historic District in order to preserve ten battlefields in the Shenandoah Valley, Including Second and Third Winchester. The Act also set in motion a three-year planning process overseen by a federal commission of Valley landowners and local, state, and federal government representatives. After more than 90 public meetings throughout the region, the federal commission published the Shenandoah Valley Battlefields National Historic District Management Plan in 2000, which was approved by the U.S. Secretary of the Interior; the Commonwealth of Virginia; Clarke, Frederick, Highland, Page, Rockingham, and Shenandoah counties; and rlunlerous municipalities. The management plan for the District recommended the creation of the Shenandoah Valley Battlefields Foundation, a Virginia non -stock corporation, to implement the plan and to preserve, interpret, and promote Civil War battlefields in the Shenandoah Valley Battlefields National Historic District. slice indooll B;lIllefichis I oitnrl:ilion Pont r_ ;(': c Ln., ?97 PJc�, T.1ot�-=t Vn�ir.ic 2"1F44 {�: ',4V,/.1U,4?r j i Sb8.6N9 ,I' 4 VIS. June Wilmot, Frederick County Planning COMI111SS1011 3 November 2009 Page 2 Si;llificallce Of the Shenandoah Valley's Civil War Battlefields ill the Shenandoah Valley Battlefields National Historic District and Commission Act, Congress determined that the Valley's Civil War battlefields and related historic sites "arc collectively Of national significance," and that their "preservation and interpretation ... \vill make a vital contribution to the understanding of the heritage of the United States." Of more than 300 engagements that tool: place in the Shenandoah Valley, the legislation authorized federal funding for the protection of ten battlefields, incluCing Second andd 'third Winchester (also known as the Battle of Opequon). The ten Civil War battlefields in the National Historic District —including Second and Third Winchester — are identified and documented in the Stlicly of Civil War Sites in the Shenandoah (alley of Virginia conductCd by the National Park Service in 1992 at the direction Of Congress.' The 1992 study noted that, "the scope, size, and casualties of the battles of Opequon and Cedar Creek would rank in any list of significant battlefields of the Civil War. A strong case can be made that either or both of these battlefields can be considered nationally significant in their own right..." and that "Opequon might qualify on its own for National Historic Landmark designation."Z Ill addition, the federal Civil War Sites Advisory Commission, created by Congress in 1991, identified the sites across the ilatlon of 10,500 armed conflicts that Occurred dLlrillg the CIVII War ill a Study released Ill 1993 and updated earlier this year..1 About Third Winchester (Opequon), the study said, "Because Of its Size, intensity, and result, many historians consider this the most important collflict of the Shenandoah Valley." The July 2009 update includes the entire Subject property within a Potential National Register BOL111dary, an area deemed to "retain (the) integrity and cohesion" required for listing in the National Register of Historic Places. Genel•al COncel•Ils In general, the Battlefields Foundation has strong concerns about this proposal. The subject property lies in core and Study area for the Secondand Third Winchester Civil War battlefields and, as noted above, retains the integrity and cohesion that are required for listing in the National Register of Historic Places. As part of a nationally significant battlefield, also as noted above, the property Itself and the SUI.1.OUllChllg landscape both have intrinsic historic value to the nation and the community. The conversion of this property from agricultural to commercial/light industrial use would be incompatible with its historic significance. Frederick County Planning Guidance As noted by Frederick County planning staff in its report to the Planning Commission, the proposed rezoning would allow for uses Of this land that are inconsistent with the couuty's own planning guidance I Snrrly ofCivil if'ar Sites in the Sltenanrloah Valle}' of Niginiu, Pursuant To Public Law 101-628, U.S. Department of the Interior, National Park Service (September 1992). Available online at htq?_�+��' nP Mgt'%I115tOr1'thpst_Ibpr/sjwnim(Ioahk v ti0_I Pub fill. lbid at http //�„+w n�covihrston/has/ahn�a/shenandoat scsa-3 hunt. 1 Civil IVar Sites Advisory Conunissiar 2epa7 oar the Nation's Civil H'ar l3rrltlefields•, prepared for the United States Senate Committee on 1?nergy and Natural Resources, the United States I louse of Representatives Conunittcc on Natural Resources, and the Secretary of the Interior by the Civil War Sites Advisory Commission, National Park Service (1993). Available online at http //tc ��q nps.g�!'hlston/hps ahpp/c csacfct _ 0-1_hnnl. Update to the Civil July 2009. http \1'ar Sites Advisory Conunission's Report on the Nation's Civil War 13atticliclds, Commonwealth of Virginia, Washington, DC, '/ �� nps �o'ihiston/hhstahpp_C'\1'S.II C\15115_tatcRcl orty '_hurl. Ms. June Wilmot, Frederick County Planning COI11Il11SS101i 3 November 2009 Page 3 found in the Frederick County -Winchester Battlefield Network Plan and the Northeast Frederick Land Use Plan, an element of the Frederick County Comprehensive Plan. Battlefield Network Plan (1997): The Battlefield Network Plan's recommendations \vere crafted by a steering committee comprised of local stakeholders and landowners. Among its recommendations were to, "(u)se Milburn Road as a primary travel connection between Stephensons Depot and Third Winchester. Work with land owners to preserve views along Milburn Road using buffers, vegetation, and easements." Northeast Frederick Land Use Plan and the Comprehensive Plan: Regarding the Subject property, the COurity'S Comprehensive plan envisions the following: The preservation and protection of significant historic resources, environmentally -sensitive areas, and open space areas is encouraged by this land use plan... Significant historic resources including the core area of Stephenson's Depot (2nd Battle of Winchester)... and the Milburn Road corridor (Route 662)...fall within the expanded SWSA and UDA boundaries. The land use plan incorporates a Developmentally Sensitive Areas (DSA) designation to ensure that these features... are protected from future development proposals. The DSA is a community and historical preservation area; therefore, adjacent uses which may be incompatible should provide adequate buffers and screening. The DSA is intended to discourage any development along the Milburn Road corridor... Significant portions Of the subject property are in the Developmentally Sensitive Area, targeted for protection fi-om future development proposals. Protecting the Preservation IIlvestment The work that the Shenandoah Valley Battlefields Fotlnclation and Others have done to preserve this area of the county is consistent with the county's planning guidance. The Battlefields Foundation, the National Park Service, the Commonwealth of Virginia, private donors ill the Winchester -Frederick area and beyond, the Civil War Preservation Trust, and Frederick County itself have together invested more than $6 million to preserve lands in this area, in accordance with the COunty's planning guidance. All of these stakeholders and investors made these commitments in the hope that such guidance would also be used in future decisions regarding surrounding land uses by others. The subject proposal would devalue the significant investment made by these private and public entities. Impacts to Preserved Battlefield Land More than 570 acres of preserved land lie immediately to the south Of the Subject property. The Shenandoah Valley Battlefields Foundation owns 345 acres, including the 209-acre Huntsberry Farm, recently preserved using $3.35 million in federal, state, county, and private funds. MuCll Of this landscape appears as it did to residents and soldiers at the time of the Second and 'third Battles Of Winchester —the land retains its historic, agricultural character and there are very few modern visual intrusions. (A slap of the preserved areas and photographs of the current viewshed front these areas are enclosed.) Ms. June Wilmot, Frederick COUllty Planning COi11mission 3 November 2009 Page 4 The application before you proposes the construction Of 90-foot (potentially nine -story) office buildings and 70-foot (potentially seven -story) parking garages on the subject property. In its 21 October 2009 letter to the applicant, the Frederick County I listoric Resources Advisory Board offered this comment: The proposed intensification of the project in terms of the request to increase the (floor area ratio) to 2.0, to increase the heiglit of Office Buildings to 90 feet, and to increase the height of parking stl•Uctures to 70 feet is undesirable as this would increase the potential impact on the adjacent historic resources. The Battlefields FOunclation concurs with this comment and others contained in the i-IRA13 letter. The visual impact on adjacent preserved historic areas and the Milburn Road corridor appears not to have been evaluated and is likely to be significant. While the Generalized Development Plan included with the application does not identify building locations, 70- to 90-foot stI'uctures will likely be prorllinent intrusions into the viewshed of preserved properties — including parcels owned by the Battlefields FOUndatlon — and Will dramatically alter the historic character of a landscape that so many have worked diligently to preserve. Proffered Buffers for Surrounding Preserved Lands Proffer C.8 of the application states the following: The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah Valley Battlefields Foundation property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation for this property and is conditioned upon a landscape easement being furnished by Shenandoah Valley Battlefields Foundation property owner. The applicant's proposed method for buffering its development front surrounding historic resources would likely not be allowable under federal law. The FOundation's land was protected USlllg dollars f-om the federal Land and Water Conservation Fund (LWCF) and per the Land and Water Conservation Fund Act, the granting of interest in LWCF-protected land to third parties Is not permitted. The Foundation appreciates the recognition of the sensitivity of the surrounding preserved resources that Proffer C.8 represents — this need exists not jList with regard to the Foundation's land but also to other resources along Redbud and Milburn Roads. Should this proposal or elements Of it go forward, the Foundation looks forward to working with the applicant, the county, and other surrounding landowners to seek an alternative to sleet this identified with buffers along the perimeter of the applicant's property. Conclusion Frederick County has a unique opportunity —one that many conlnlunities do not have. in this corridor lie nationally significant historic landscapes, Unmatched natUral resOLIMCS, and all actively engaged and successful preservation infrastructure that has been working to nlaxinlize these resources for the community and visitors. Here, within biking and walking distance of dense residential areas of the county, visitors and residents will be able to wander the county's historic and still -active farm fields and experience a quiet, contemplative setting where they can meaningfully understand the drama that tool: place on this landscape 150 years ago. INIs. June Wilmot, Frederick County Planning Commission 3 November 2009 Page 5 The Battlefields Foundation and many others have worked with the county to meet the community's interest and guidance and together Nve have made significant investments to that end. The Foundation hopes that the Planning Commission will continue to be guided by these interests. We look forward to continuing our work with the county and the community to maintain the value of this landscape today and for future generations. Thank you for the opportunity to provide comments on this proposal. We are available to answer any questions you may have and provide any fin-ther il,fol-nlatioll you might need as you consider this application. Sincerely, W. Del 1 Zlrlcle Executive Director dzirkle@svbf.net svbf.net Enclosures: • Ivlap of subject property and surrounding battlefield area with preserved areas • Photographs looking north toward subject property from I-Iuntsberry Farm CC: tMembers, Frederick County Planning COIIIIIIISSIOII 1%,lichael T. Ruddy, AICP, Frederick County Deputy Planning Director Greystone Development Plan on 3rd Winchester Battlefield JF- _ Detail, Battlefield of (Opeyt.x)n} Winchester, Va. Bvt. Lt. (A. G.L. Gillespie, 1873 1 Shenandoah Valley Battlefields Foundation 5 1.OVu 2.COO 4.000 6 X-0 8.000 Feet View looking north from SVBF's Huntsberry Farm property toward Milburn Road corridor. 11/04/2009 12:29 5406670370 FREDERICK COUNTY GOV PAGE 02/08 p 3 November 2009 Ms. June Wilmot, Chairman Frederick County Planing Commission 412 Westside Station Drive Winchester, VA 22601 R)✓: Rezoning Application #09-09 for Graystone Corporation of Virginia Dear Ms. Wilmot: The Shenandoah Valley .Battlefields Foundation would like to Submit comments regarding the above .rezoning proposal to be considered at your meeting on 4 November 2009. As a neighboring landowner, the Batileffelds Foundation received notice about this rezoning application on Tuesday, 27 October 27 2009, five business days before the public hearing:for this application, which is quite lengthy an.d ponders a significant changa in the use ofthe property, one that is also dramatically different from the surrounding land uses. The foundation respectfully urges the Frederick County Planning Commission to table this Proposal to allow further time for review of the application by the Foundation and others in the community. The above notwithstanding, in our initial review of the application the Battlefields Foundation .has identified several concerns with its overall purpose as well as witli specific elements of the proposed development. Shenandoah Valley Battlefield-1 National Historic District and the Shenandoah Valley Battlefields Foundation The Shenandoah Valley Battlefields Foundation was established in Mo, pursuant to the Shenandoah Valley Battlefields National Historic District and Commission Act. The Act, passed by Congress in 1996, established the eight -county Shenandoah Valley Battlefields National Historic District in. order to preserve ten battlefields in the Shenandoah Valley, including Second and Third Winchester, The Act also set in motion a three-year planning process overseen by a federal commission of Valley latidowners and local, state, and federal government representatives. After more than 90 public meetings throughout the region, the federal commission published the Shenandoah Valley Battlefields National Historie District Management Plan in 2000, which was approved by the U.S. Secretary of the Interior; the Commonwealth of Virginia; Clarke, Frederick, Highland, Page, Rockingham, and Shenandoab.'counties; anal numerous municipal ltles. The management plan for the District recommended the creation of the Slienandoalh Valley Battlefields Foundation, a Virginia non -stock corporation, to implement the plan and to preserve, interpret, and promote Civil War battlefields in the Shenandoah Valley Battlefields National Historic District, ,91irti tndoah Valley Ratilcfirlds rouund,ition POOOffite Bor. V7 New Markel, V,imin 228dd 1h; 540.70,e$a5 i OOU89,4645 'T '40.740.4509 11/04/2009 12:29 540G670370 FREDERICI< COUNTY GOV PAGE 03/08 Ms. June Wilmot, Frederick County Planning Commission 3 November 2009 Palle 2 Significance of the Shenandoah Valley's Civil, War B3ttleflelds In the Shenandoah Valley Battlefields Nation.al Historic District and Commission Act, Congress determined that the Valley's Civil War battlefields and related historic sites "are collectively of national significance," and that their "preservation and interpretation. „wi.l.l make a vital contribution, to the understanding of the heritage of the United States," Of more than 300 engagements that took place In the Shenandoah Valley, the legislation authorized federal funding .for the protection of ten battlefields, including Second and Third Winchester (also known as the Battle of Opeguon), The ten Civil War battlefields in the National Historic District —including Second and Third Winchester are identified and documented in the Study'of Civil War Srles in the Shenandoah Valley of Virgh7ia conducted by the National Park Service in 1992 at the direction of Congross, l The 1992 study noted that, ",lie scope, sire, and casualtiela of the battles of Opequon acid Cedar Creek would rank in any list of significant battlefields ofTbe Civil War. A strong case can be made that either or both of these battlefields can be considered nationally significant in their own right..." and that "Opequon might qualify on its own for National l:listoric Landmark designation.'2 In addition, the federal Civil War Sites Advisory Commission, created by Congress in 1991, identified the sites across the nation of 10,500 armed conflicts that occurred during the Civil War in a study released in 1993 and updated earlier this year.' About Third Winchester (Opequon), the study said, "Because of its size, intensity, and result, many historians consider this the most important conflict of the Shenandoah Valley." The July 2009 update includes the entire subject property within a Potential National register Boundary, an area deemed to "retain (the) integrity and cohesion" required Tor listing in the National Register of Historic Places. General Concerns In general, the Battlefields Foundation leas stroll$ concerns about this proposal. The subject property tics in core and study area for the Second and Third Winchester Civil War battlefields and, as noted above, retains the integrity and cohesion that are required for listing in the National Register of Historic places. As part of a nationally significant battlefield, also as noted above, the property itself and the surrounding landscape both have intrinsic historic value to the nation and the community. The conversion of Us property from agricultvrat to Commereial/light industrial use would be Incompatible with its historic significance. Frederick County P1anxling Guidance As noted by Frederiel< Count)' planning staff. in its report to the Planning Commission, the proposed rezoning would allow for uses of this land that are inconsistent with the county's own planning guidance ' Studl, ofCfvtl War Site? in the Shcriandoah Vallcy of 14tnitria, Pursruant To Public Low 1pt-628, U.S. Dcpartmmi tithe Interior, National Plark Service (September 1992). Available online at htt tm4y nos aovmistay bpi/Abymilicnapj(Q&L/sys0-1,hLml. 2 Ibid at httoa/vnvw.PpjTvminrxv/has ab o/shenund b/9ve4-3,htm1. Civil lf1or S+rar Advlsor3, C6--0slon Report on Or. NNW): Chill Mar Datrief)eidr, prepared fbr dto United Statoa Senate Committee tnt Energy and Nalluml R=urecs, the United States Howe of Rapwoontatives ComtniltAc on Natural Rcm: urcw, and the Sccrctary ot', the Interior by the Civil War Sites Advisory Commission, Notional Pnd( Service (1993). Available online at hip k�'+iv ps palfttpry/hoatebnn/aw,nc%we0•l.hlm), UpduG to the Civil %t Sites Advisory Commission's Report on the Nntiun'a Civil Woe Ilatticlields. Commonwealth of Virginia, Washington, DC, July 2009,11ttR,•lbvwvrnas gov/historvlltps/ab»nLCWStUCWSiI$tnfeRcnoriVA htffi, 11/04/2009 12:29 5406670370 FREDERICK CCUNTY GOV PAGE 04/08 Ms, ,Tune Wilmot, Frederick County Planning Commission 3 November 2009 Palle 3 found in. the Frederick County -Winchester Battlefield Network Plan and the Northeast Frederick Land Use Plan, an element of the Frederick County Comprehensivc pJ.an, Battlefield Network flan 1997) The Battlefield Network Plan's recommendations were crafted by a steering committee comprised of local stakeholders and landowners, Antong its recommendations were to, "(u)se Milburn Road as a primary travel connection between Stephensous Depot and Third Winchester. Work with land owners to preserve views along Milburn. Road using buffers, vegetation, and easements." Nortbie st_Frederlck );and Use Plan and the Cgoi ehqnslye flan: Regarding the subject property, the county's comprehensive plan envisions the following; The preservation and protection of significant historic resources, enviroiunentally-sensitive areas, and open space areas is encouraged by this land use plan... Significant historic resources including the core area of. Stephenson's Depot (2nd Battle of Winchester) —and the Milburn Road corridor (Route 662)..,fall within the expanded SWSA and ODA boundaries. The land use plan incorporates a Developmentally Sensitive Areas (DSA) designation to ensure that these features ... are protected from future development proposals. The DSA is a community and historical preservation area; therefore, adjacent uses which may be incompatible should provide adequate buffers and screening. The DSA is intended to discourage any development along the Milbum Road corridor... Significant portions of the subject property are in the Developmcntolly Sensitive Area; targeted for protection from future development proposals. Protecting the Preservation. Investment The work that the Shenatvdoah Valley Battlefields Foundation and others have done to preserve this area of the county is consiste»t with the Bounty's planning guidance, The Battlef olds Foundation, the National Park Service, the. Commonwealth of Virginia, private donors in the Winchester -Frederick area and beyond; the Civil War Preservation Trust, and Frederick County itself have together invested more than $6 million to preserve lands in this area, in accordance with the couuty's planning guidance. A]1 of these stakeholders and investors made these commitments in the hope that such guidance would also be used in future decisions regarding surrounding land uses by others. The subject proposal would devalue the signif.cant investment made by these private and public entities. Impacts to Preserved Battlefield Land More than 570 acres of preserved land lie immediately to the south of the subject property. The Shenandoali Valley Battlefields Foundation owns 345 acres, including the 209-acre Iluntsberry Fann, recently preserved using $3.35 million in federal, state, county, and private funds, Much of this landscape appears as it did to residents and soldiers at the time of the Second and Third Battles of Winchester —the land retains its historic, agricultural character and there are very few modern visual intrusions, (A. in.ap of the preserved areas and photographs of the current viowshed from these areas are enclosed,) 11/04/2009 12:29 5406670370 FREDERICK COUNTY GOV PAGE 05/08 Ms. June Wilmot, Frederick County Planning Commission 3 November 2009 Page 4. The application before you proposes the construction of90-foot (potentially nine -story) office buildings and 70-foot (potentially sevcn-story) parking garages on the subject property. In its 21 Oetobet 2009 letter to the applicant, the Frederick County Historic Resources Advisory Board offered this comment; The proposed intensification of the project i.n terms of the request to incteasethe (floor area ratio) to 2.0, to increase the height of Office Buildings to 90 feet, and to increase the height of parking structures to 70 feet is undesirable as this would increase the potential impact on the adjacent historic resources. The Battlefields Foundation. concurs with this comment and others contained in the RMB letter. The visual impact on adjacent preserved historic areas and il,e Milburn .Road corridor appears not to have been evaluated and is likely to be significant, While the Generalimd Development Plan. included with the application does not identify building locations, 70- to 90-foot structures will likely be prominent intrusions into flig viewshed of :preserved properties — including parcels owned by the Battlefields Foundation — and will dramatically alter the historic character of a landscape that so many have worked diligently to preserve, Proffered Ruf;.i'ers for Surrounding Preserved Lands Proffer C.8 of the application states the following, The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Shenandoah 'Valley Battlefields l:oundat on property identified as a green space buffer area on the proffered GDP. The provision of this evergreen laradscapung is to provide vicwshed mitigation forthis property and is conditioned upon a landscape easement bebag furnished by Shenandoah Valley BattleflOds Foundation property owner. The applicant's proposed method for buffering its development from surrounding historic resources would likely not be allowable under federal law. The Foundation's land was protected using dollars from, the federal .Lajid and Water Conservation Fund (I,WCF) and per the l,an.d and Water Conservation Fund Act, the granting of interest in LWCF-protected land to third parties is not permitted. The Foundation appreciates the recognition of the sensitivity of the surrounding preserved resources that Proffer C.8 represents — this need exists not just with regard to the Foundation's laud but also to other resources along Redbud and Milburn Roads. Should this proposal or elements of it go forward, the Foundation Iooks forward to working with the applicant, the county, and other surrounding landowners to seek an alternative to meet this identified with buffers along the perimeter of the applicant's property. Conclusion Frederick County has a unique opportunity —one that many communities do not have. In this corridor lie nationally significant lvstoric landscapes, unmatched natural resources, and an actively engaged and successful preservation infrastructure that has been. working to maximize these resources for the community and visitors. Here, within biking and walking distance of dense residential areas of the county, visitors and residenLs will be able to wander the county's historic and still -active farm fields and experience a quiet, contemplative setting where they can meaningfully understand the drama that took place on this landscape ISO years ago. 11/04/2009 12:29 5400070370 FREDERICI< COUNTY GOV PAGE 06/08 Ms, dune Wilmot, Frederick County Planning Commission 3 November 2009 PAze5 The Battlefields Foundation and matty others have worked with the county to meet the Community's interest and guidance and together we have made significant investments to that end, The Foundation hopes that the Planning Commission will continue to be guided by these interests, We look forward to continuing our work with the county and the community to maintain the value of this landscape today and for future generations. Thank you for the opportunity to provide comments on this proposal, We are available to answer any questions you may have and provide auy further information you might need as you consider this application, Sinccerely, VJ. De Zir{cle Executive Director dzirkle@svbf,not Enclosures: • Map of subject property and surrounding battlefield area with preserved areas • Photographs looking north toward subjcct'property from Nuntsbetty Farm CC' Members, Frederick County Planning Commission Michael T. Ruddy, AICP, Frederick County Deputy Planning Director A'Pin 154'. 1 • M&W 11/04/2009 12:29 5406670370 FREDERICK COUNTY GOV PAGE 08/08 View looking north from SVBF's Huntsberry Farm property toward Milburn Road corridor. NOTES Rl:GARDINC11 VISIBILITY & POTENTIAL MITIC'FATION MEASURES FOR 'fill: GMAYSTONE PARC;IZAL January G, 2009 Provided to Shenandoah Valley Battlefields Foundation HSPC Comm. 0957 Hill Studio Development Shenandoah Valley Battlefields Foundation 0 1.000 2.000 0.000 6.000 8.000 Feet Hill Studio GRAYSTONE PROPERTY _ i BATTLEFIELD PROPERTIES INTERSTATE 81 Hill Studio � R VALLIFY PRdmI T R1115G lei FORE�GR®UMD MEAD .... oar "oeA Valle, DRttIRIv10, F u d.twn It t I War P—Tat Trust P•ogrMS was 411 VALUE i' 1 v . .• ,.!,'�--. +.• _0-25 l 500000001 .5 + 000000001 ' 10 { 'J 00000001.:5 �• 1 v VALLEYAN P •PROMlNftT RIDGL=„�. YME& §D ME.&OW( r� Legend Viewshed of 70 ft buildings VALUE ' f: t _0 75 5 10 /��� '�1 •r/ I r 75. 101 �i ' IIIA 11IITS With heights raised 35' On the Graystone Property, Q this model shows that some 35' Fj structures would not be visible from most places on the Battlefield. Others, - • particularly on the prominent ridge and in the meadow, would be highly visible. M-... \*:.J�ylJ'RE (Note this sketch study was performed by raising the point grid on the battlefield site.) Hill Studio DESIGN GFUIDELINES Recommendation: Design Guidelines be established to guide development on the Graystone: 1. Site Planning Areas (priority 1,2,3) 2. Clustering Development 3. Grading and Landform Manipulation 4. Planting to Buffer Views 5. Architectural Character Hill Studio GRAYSTONE PROPERTY _ BATTLEFIELD PROPERTIES INTERSTATE 81 I . SITE PI.t NNING" PRIORITY AREAS Hill Studio This section illustrates the Graystone Property as seen from one of the ridges on the Battlefield. The prominent ridge in the Graystone serves to hide much of the valley to the north. This section is vertically exaggerated for legibility Hill studio 1. SITE PI.t NNINCO' PRIORITY AREAS This section illustrates a 90' building on the ridge of the Graystone Property as seen from one of the ridges on the Battlefield. Even with mature screening trees adjacent to the structure, the building would be visible from the Battlefield. This section is vertically exaggerated for legibility • Hill Studio 1. SITE PIANNINC11 PRIORITY A111"AS This alternative section illustrates a 90' building on the Graystone Property sited down in the valley, and other smaller structures sited along the slopes. The screening buffer on the prominent ridge hides the buildings in the valley. The ridge would be a first priority area for preservation, and should be open space, planted as a visual buffer. The foreground meadow would be a secondary priority. Smaller buildings could be clustered and screened in the foreground meadow. They will be visible, so should be designed with stringent guidelines. The valley behind the buffer can be a third priority, with less -stringent guidelines. This section is vertically exaggerated for legibility Hill studio L SITE PI.t NNI\TIi PRIOI1ITV AREAS Recommendation: This series of guidelines should address the advantages of clustering new construction with within the landscape. In the northern Shenandoah, there is precedent with the farm clusters, housing significant development. An emphasis should be placed on blending proposed development in with the host landscape, by studying historical compounds, and modeling new cluster developments on their patterns. Hill Studio Recommendation: This series of guidelines should address buffering new construction with landform to minimize visual impact from the battlefield, and other view -sensitive areas. An emphasis should be placed on blending proposed development in with the host landscape, by methods like slope rounding, berming, road blending, and other historically -compatible methods. k-.� Hill Studio Recommendation: This series of guidelines should address buffering new construction with plantings to minimize visual impact from the battlefield, and other view -sensitive areas. Plantings to screen buildings, utilities, and roadways should be addressed. An emphasis should be placed on plants native to or part of the cultural landscape of the Shenandoah Valley 4. 1'I.�INTING" TO liU l� l:l1111I 1'S Hill studio Recommendation: This series of guidelines should address the appearance of new construction to harmonize new construction with the historic landscape. An emphasis should be placed on !r Shenandoah Valley building form, materials, signage and even colors, to blend the new y!_ development with the -� surroundings. 7. Aloe:t lU3,lU+,9, mar S�aM.- _ 104.14R71b.. S q,dnal IOf•,45,uf. i. ABC, 1IITIA("1'I1IIAI. C'MAII.A(;'I IM Hill Studio REZONING TRACKING SHEET Check List: i Application Form 1/ Fee &-SigwDeposit i� Proffer Statement Deed Impact Analysis ✓ Plat/Survey I Adjoiner List Taxes Paid Statement-314 �� File opened Reference manual updated/number assigned 3 % D-base updated (. Copy of adjoiner list given to staff member for verification b Color location maps ordered from Mapping (o Application Action Summary updated %/, Planning Commission Meeting ACTION: Board of Supervisors Meeting ACTION: Signed copy of Resolution received from County Administrator and placed in Proffers Notebook together with proffers Approval (or denial) letter mailed to applicant/copy to file and cc's Reference manual updated D-base updated a7 Application Action Summary updated A) File given to Mapping to update zoning map &, %[ Zoning map amended Sys ID # I '12 RECEIVED ESS �T No. 4520 X a-53-(j-' vvly,-J� DOLLARS 5 FOR RENT LJFOR ORDER I By r COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 April 26, 2012 Mr. Gary McFarland Mr. Jolul Good Graystone Corporation of Virginia PO Box 2530 Winchester, VA 22604 RE: REZONING 1403-12, GRAYSTONE CORPORATION PINS: 43-A-158, 44-A-25 and 44-A-26 Dear Mr. McFarland and Mr. Good: This letter serves to confirm action taken by the Frederick County Board of Supervisors at their meeting of April 25, 2012. The above -referenced application was approved to revise proffers associated with Rezoning #09-09. This revision relates to the "Transportation Improvements" section of the proffers. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838), in the Stonewall Magisterial District. The proffer statement, originally dated August 24, 2009, with final revision date of February 3, 2012, that was approved as a part of this rezoning application is unique to the above referenced properties and is binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your records. Pursuant to §165.102.06E, the County Attorney will present the written proffer to the Frederick County Clerlc of Circuit Court for recordation. Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning application. Sincerely, r John A. Bishop, AICP---..-_ Deputy Director - Transportation JAB/bad Attachment cc: Charles S. DeHaven, Jr., Stonewall District Supervisor Gary Oates and Stan Crockett, Stonewall District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Rod Williams, County Attorney, w/original Proffers and Resolution 107 North Kent Street, Suite 202 e Winchester, Virginia 22601-5000 i a REZONING APPLICATION 803-12 GRAYSTONE CORPORATION Staff Report for the Board of Supervisors Prepared: April 19, 2012 Staff Contact: John A. Bishop, AICP, Deputy Director -Transportation Reviewed Planning Commission: 04/18/12 Board of Superwisors: 04/25/12 Action Recommended Approval Pending PROPOSAL: To revise proffers associated with Rezoning 1/09-09. This revision relates to the "Transportation Improvements" section of the proffers. LOCATION: The properties are located on the north side of Redbud Road (Route 661), the cast side of CSX Railroad, the west side of Milburn Road (ROutc 662) and the south side of McCanns Road (Route 838). EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 04/25/12 BOARD OF SUPERVISORS MEETING: The purpose of this application is to request a minor proffer revision to allow for greater flexibility in the roadway design for Snowden Bridge Boulevard. Specifically, the language revision would allow the option of removing the curb and gutter from the roadway design and allow greater flexibility in the form of the median for the four lane section of the roadway. Staff would note that VDOT is not in support of the proffer revision; however, if approved, the roadway could be designed to meet VDOT's published standards. It is important to note that Frederick County, on behalf of this applicant, has obtained $1.3 M in Economic Development Enhancement grants, and has closely partnered with the applicant thus far throughout the design process and will continue to cio so. Frederick County Staff will also be managing the construction of the roadway clue to the State funds involved. Following the required public hearing, a (lecisiou regarding this rezoning application by the Board of Supervisors would be appropriate. The applicant should be prepared to adequately address all concerns raised by the Board of Supervisors. 0 Rezoning 803-12 — Graystone Corporation April 19, 2012 Page 2 This report is pielm-ed by the Fi-edem-ick County Planning Staff to provide information to the Planning Commission and the Boal'd of Supel'visom to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter•. Unresolved issues concerning this application are noted by staff Whel'e 1'elevant thl-ollghout this staff repol't. Reviewed Planning Commission: 04/18/12 Board of Supervisors: 04/25/12 Action Recommended Approval Pending PROPOSAL: To revise proffers associated with Rezoning #09-09. This revision relates to the "Transportation Improvements" section of the proffers. LOCATION: The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838). MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 43-A-158, 44-A-25 and 44-A-26 PROPERTY ZONING: M 1 (Light Industrial) District PRESENT USE: Agricultural ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: South: RA (Rural Areas) Use: Red Burl Agricultural District East: RA (Rural Areas) Use: Red Bud Agricultm-al District R4 (Residential Planned Community) West: RA (Rural Areas) Use: M 1 (Light Industrial) Agricultural/Vacant Agricultural/Residential/Historic Agricultural Vacant (Snowden Bridge) Agricultural/Vacant 0 0 Rezoning 1103-12 — Graystone Corporation April 19, 2012 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation: Please see allciched enwil doled Alarch 6, 2012, from Lloyd Ingram. Public Works: We have no comments regarding the proposed changes to the proffer statement associated with the Graystone Corporation Office and Industrial Park. County Attorney: You have submitted proposed amendments to paragraphs 4 and 5 of part D (Transportation Improvements) of the Proffer Statement dated January 25, 2010, and approved by the Board of Supervisors on January 27, 2010, for Graystone Corporation. The project encompasses Tax Parcels 43-A-158, 44-A-25 and 44-A-26, comprised of 271.39 acres, located in the Stonewall Magisterial District (the "Property"). The Property is zoned M I with proffers. I have now reviewed the proposed amendments and it is my opinion that, subject to just one comment, the proffer statement containing the proposed amendments would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement. My one comment is that the proposed new/revised proffer statement will need to reflect a current revision date and not the final revision date of January 23, 2010, from the original rezoning. I have not reviewed the substance of the Proffers as to whether the Proffers are suitable and appropriate for this specific development, as it is my understanding that this review will be done by staff and the Planning Commission. Planning & Zoning: 1) Site Histoi-v The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A-2 (Agricultural General). The County's agricultural "zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject properties and all other A-1 and A-2 zoned land to the RA District. The subject property was rezoned to M 1 on 11 /9/2009. 2) Comprehensive Policy Plan The Frederick County Comprehensive Policy Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Comprehensive Policy Plan, p. 1-IJ Transportalion The Frederick County Eastern Road Plan provides the guidance regarding future arterial and collector road connections in the eastern portion of the County by identifying needed connections and locations. Plans for new development should provide for the right-of-ways necessary to implement planned road improvements and new roads shown on the road plan • 0 Rezoning 1103-12 — Graystone Corporation April 19, 2012 Page 4 should be constructed by the developer when warranted by the scale, intensity, or impacts of the development. Existing roads should be improved as necessary by adjacent development to implement the intentions of the plan (Comprehensive Plan 7-200). 3) Proffer Statement — Dated August 4, 2009, revised February 3, 2012 A) Generalized Development Plan No Change B) Land Use No Change C) Site Design No Change D) Transportation The applicant has made changes to sections 4 and 5 of the transportation section to allow greater flexibility in the design of the roadway as shown below. Removed language is stricken out and new language is shown in bold italics. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as a an m-luau four -lane, divided whel-e applicable, eelleetoi- road sect en-{-4D-) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two-lane road section, and shall be constructed as the ultimate folii'- lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8c000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with raised medians to provide for controlled left turn movement access to the Property. E) Community Facilities No Change Rezoning 1103-12 — Graystone Corporation April 19, 2012 Page 5 STAFF CONCLUSIONS FOR THE 04/25/12 BOARD OF SUPERVISORS MEETING: The purpose of this application is to request a minor proffer revision to allow for greater flexibility in the roadway design for Snowden Bridge Boulevard. Specifically, the language revision would allow the option of removing the curb and gutter from the roadway design and allow greater flexibility in the form of the median for the four lane section of the roadway. Staff would note that VDOT is not in support of the proffer revision; however, if' approved, the roadway could be designed to meet VDOT's published standards. It is important to note that Frederick County on behalf of this applicant has obtained $1.3 M in Economic Development Enhancement grants, and has closely partnered with the applicant thus far throughout the design process and will continue to do so. Frederick County Staff will also be managing the construction of the roadway due to the State funds involved. PLANNING COMMISSION SUMMARY & ACTION OF T1-IE 4/18/2012 MEETING: Some members of the Planning Commission were not supportive of modifying the transportation proffers. A Commissioner stated it was not the County taxpayers' responsibility to subsidize a developer's project because the applicant misestimated the original cost, when the proffers were originally presented. He believed if a precedent is started to change developers' proffers after a rezoning is approved to enable a contractor or developer to maximize their profit at the expense of Frederick County's taxpayers, it would not benefit anyone. I-Ie believed VDOT's comments made sense; particularly, that transitions are dangerous and are an impact to traffic flow. In addition, it was believed that infrastructure needed to be initially built to last; otherwise it would present a considerable future expense for taxpayers to maintain or rebuild. Other members of the Planning Commission had a different perspective and were supportive of the request under existing circumstances. A Commissioner noted that this project has been in progress a long time and these are not the same economic times as in earlier years. It was believed the applicant's request was reasonable; they were not in favor of unnecessary waste of resources, regardless of who is paying for them. It was noted there is a plan in place for accommodating future volume. Another Commissioner commented that this project will have a tremendously positive fixture economic impact. The Chairman noted that this road is more than a road to an industrial park; it was a connection to areas of the County that would also serve residential users. On a majority vote, the Planning Commission recommended approval of the transportation proffer modifications. The vote was as follows: YES (TO APPROVE): Unger, Crosen, Ambrogi, Manuel, Crockett, Wilmot, Kenney, Triplett NO: Thomas, Madagan, Lemieux, Mohn ABSTAIN: Oates ta, Z qrA'""•"�uA7o EL TT OV — 1 uMY2 u1A.71 2A u A•73 ,raystone Corp. IIALIS 13.AIIi 43 A 177 13 A 113 43�A•�t.2.4� I7•A II3 'offer Revision 43A1774!� zs u Ap7a '` Js: 47AI10 13A129 IIA74 -A-158,44-A-25, 03'A130 - A - 26 u•A 137 'e' u A �`• 13 A 174 \\ 47 A •\\ IOOA 47 A 106 17 A 1� 4J A 135 I1/! .\\ \ ; q A 105 IOI 17 A I76 � .\\ IL04J 43C .8 103 u A 17d 13C,t A 43A 1� u A 102 47 A 100 �� r q1A 4'77 I7A 140 IOOF 17C 7.2 17'A 141 2\ �'7�1A/117 a uAl9 uA 13rA ISO q�/Tp 47A 145 3.3 17 A t47 q A 116 `47C 72 uA Ist Zoo MILBURN L' SUBDIVISION , Subdivision _n SNOWDEN ix_BRIDGE Subdivision ?ter aCJtq • r - REZ0312 Cq C3C� I. Of Ilk OeG0�0 � Z � � • Applications CSTA Parcels 00 Building Footprints { B1 (Business. Neighborhood District) B2 (Business. General Distnst) Q E B3 (Business. Industrial Transition District) STER t EM (Extractive Manufacturing District) D HE (Higher Education District) Winchost M1 (Industrial. Light District) M2 (Industrial. General District) •440 MH1 (Mobile Home Community District) MS (Medical Support District) OM (Office - Manufacturing Park) R4 (Residential Planned Community District) R5 (Residential Recreational Community District) RA (Rural Area District) RP (Residential Performance District) REZ # 03 - 12 F Note: Frederick County Dept of Graystone Corp. Planning & Development 107 N Kent S Proffer Revision Suite 202 e PINS: Winchester, VA 22oi 43 - A - 158, 44 - A - 25. 540 - 665 - 5651 44 - A - 26 Map Created: March 27. 2012 Staff: jbishop 0 150 300 600 eet I1 i 1� • 0 REZONING APPLICATION #03-12 GRAYSTONE CORPORATION Staff Report for the Planning Commission Prepared: April 3, 2012 Staff Contact: John A. Bishop, AICP, Deputy Director -Transportation Reviewed Action Planning Commission: 04/18/12 Pending Board of Supei-visoi•s: 05/09/12 Pending PROPOSAL: To revise proffers associated with Rezoning 909-09. This revision relates to the "Transportation Improvements" section of the proffers. LOCATION: The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838). EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 04/18/12 PLANNING COMMISSION MEETING: The purpose of this application is to request a minor proffer revision to allow for greater flexibility in the roadway design for Snowden Bridge Boulevard. Specifically, the language revision would allow the option of removing the curb and gutter from the roadway design and allow greater flexibility in the form of the median for the four lane section of the roadway. Staff would note that VDOT is not in support of the proffer revision; however, if approved, the roadway could be designed to meet VDOT's published standards. It is important to note that Frederick County, on behalf of this applicant, has obtained $1.3 M in Economic Development Enhancement grants, and has closely partnered with the applicant thus far throughout the design process and will continue to do so. Frederick County Staff will also be managing the construction of the roadway due to the State funds Involved. A recommendation /'ega/'(ling this rezoning application to the Board of Supei-visom )voyl(l be at)propfiateThe applicant should be pi-epared to adeguately a&h-ess all coucewrs raised by the Planning Commission. Rezoning 03-12 — Graystone Corporation April 3, 2012 Page 2 This report is prepared by the Frederick County Planning Staff to provide infornnation to the Planning Commission and the Board of Supervisors to assist therm in making a decision o11 this application. It may also be useful to others interested in this zolnmg matter. Unresolved issues concerning this application are noted by staff jvhere relevant throughout this staff report. Reviewed Action Planning Commission: 04/18/12 Pending Board of Supervisors: 05/09/12 Pending PROPOSAL: To revise proffers associated with Rezoning #09-09. This revision relates to the "Transportation Improvements" section of the proffers. LOCATION: The properties are located on the north side of Rcdbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838). MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 43-A-158, 44-A-25 and 44-A-26 PROPERTY ZONING: M I (Light Industrial) District PRESENT USE: Agricultural ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: South: RA (Rural Areas) Use: Red Burl Agricultural District Bast: RA (Rural Areas) Use: Red Burl Agricultural District R4 (Residential Planned Community) West: RA (Rural Areas) Use: M1 (Light Industrial) Agricultural/Vacant Agricultural/Residential/I-Iistoric Agricultural Vacant (Snowden Bridge) Agricultural/Vacant Rezoning #03- l2 — Graystone Corporation April 3, 2012 Page 3 REVIEW EVALUATIONS: Vit-o,j is Dept. of Transportation: Please see allached email doled Allarch 6, 2012, fi-oni Lloyd Ingi-ain. Public Woi-ks: We have no comments regarding the proposed changes to the proffer statement associated with the Graystone Corporation Office and Industrial Park. County AttorIley: You have submitted proposed amendments to paragraphs 4 and 5 of part D (Transportation Improvements) of the Proffer Statement dated January 25, 2010, and approved by the Board of Supervisors on .January 27, 2010, for Graystone Corporation. The project encompasses Tax Parcels 43-A-158, 44-A-25 and 44-A-26, comprised of 271.39 acres, located in the Stonewall Magisterial District (the "Property"). The Property is zoned M 1 with proffers. I have now reviewed the proposed amendments and it is my opinion that, subject to Just one comment, the proffer statement containing the proposed amendments would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement. My one comment is that the proposed new/revised proffer statement will need to reflect a current revision date and not the final revision date of January 23, 2010, from the original rezoning. I have not reviewed the substance of the Proffers as to whether the Proffers are suitable and appropriate for this specific development, as it is illy understanding that this review will be done by staff and the Planning Commission. PlanninjZ & Zoning: 1) Site History The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the subject parcels as being zoned A-2 (Agricultural General). The County's agricultural zoning districts were combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re -mapping of the subject properties and all other A -I and A-2 zoned land to the RA District. The subject property was rezoned to MI on 11/9/2009. 2) Comprehensive Policy Plan The Frederick County Comprehensive Policy Plan is an official public document that selves as the Co11111111i11ty's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. [Conilnrehensive Policy Plan, h. I-11 Ti-cinsnoi-1 al ion The Frederick County Eastern Road Plan provides the guidance regarding future arterial and collector road connections in the eastern portion of the County by identifying needed connections and locations. Plans for new development should provide for the right-of-ways necessary to implement planned road improvements and new roads shown on the road plan Rezoning #03-12 — Graystone Corporation April 3, 2012 Page 4 should be constructed by the developer when warranted by the scale, intensity, or impacts of the development. Existing roads should be improved as necessary by adjacent development to implement the intentions of the plan (Coinj)rehensive Plan 7-206). 3) Proffer Statement — Dated August 4, 2009, revised February 3, 2012 A) Generalized Development Plan No Change B) Land Use No Change C) Site Design No Change D) Transportation The applicant has made changes to sections 4 and 5 of the transportation section to allow greater flexibility in the design of the roadway as shown below. Removed language is stricken out and new language is shown in bold italics. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as a an uFban four -lane, divided iMei•e trpplicahIe, colleeter road eetion ( II D) throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two- lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VPD or in the event that Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8c000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with fa-i-sed medians to provide for controlled left turn movement access to the Property. E) Community Facilities No Change 0 Rezoning 403-12 — Graystone Corporation April 3, 2012 Page 5 STAFF CONCLUSIONS FOR THE 04/18/12 PLANNING COMMISSION MELTING: The purpose of this application is to request a minor proffer revision to allow for greater flexibility in the roadway design for Snowden Bridge Boulevard. Specifically, the language revision would allow the option of removing the curb and gutter from the roadway design and allow greater flexibility in the form of the median for the four lane section of the roadway. Staff would note that VDOT is not in support of the proffer revision; however, if approved, the roadway could be designed to meet VDOT's published standards. It is important to note that Frederick County on behalf of' this applicant has obtained $1.3 M in Economic Development Enhancement grants, and has closely partnered with the applicant thus far throughout the design process and will continue to do so. Frederick County Staff will also be managing the construction of the roadway due to the State funds involved. A reconnnendation i-ehaiWing this rezoning application to the Board of Supervisors would be appropriate The applicant should be prepared to adequately address all concerns raised by the Planning Commission. REZ # 03 - 12 Graystone Corp. Proffer Revision PINS: 43 - A - 158, 44 - A - 25, 44 - A - 26 A -S3 A' 43 A 156 � 4 k 44 A.ISS Applications Parcels 00 Building Footprints B1 (Business. Neighborhood District) *; REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA To be completed by Planning Staff 00 Fee Amount Paid $ 1000 " Zoning Amendment Number Date Received 3 / PC Hearing Date Lb �z/a BOS Hearing Date_5' The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester. 1. Applicant: Name: Graystone Corporation of Virginia Telephone: (540) 665-3212 Address: P. 0. Box 2530, Winchester, VA 22604 2. Property Owner (if different than above) Name: Same as above Address: 3. Contact person if other than above Name: Gray Farland, John Good Telephone: Telephone:(540) 667-7700 4. Checklist: Check the following items that have been included with this application. Location map X Agency Comments A Plat X Fees X_ Deed to property _X Impact Analysis Statement X_ Verification of taxes paid X Proffer Statement -.X- 12 11 • EA. v E LIAR 2 3 2012 5. The Code of Vl➢'grinia allows us to request full d➢selosum of owne➢-ship ill ➢'elPaltloll to ➢•ezoning applications. Please list below all owners or parties in interest of the land to be rezoned: J. Donald Shockey, Jr. John P. Good, Jr. 6. A) Cup•➢•e➢lt Use of tlae P➢-ollel-ty: Agricultural, Residential & Unimproved B) P➢•oposed Use Of the PR-Opffty: Office & Industrial Park 7. Adjoining P➢'ope3ly: PARCEL ID NUMBER USE ZONING 8. Locution: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers): North side of Redbud Road (Route 661); East side of CSX Railroad; West side of Milburn Road (Route 662); and South side of IdcCanns Road (Route 838). Parcel Identification/Location: Parcel Identification Number 43-((A))-158, 44-((A))-25, and 44-((A))-26 13 0 • 9. The following infoi-mation should he pY"ovided a'tccw-dinjg to Qlle type of rezoning p2'oposed: Single Family homes: Non -Residential Lots: Office: Retail: Restaurant: 10. signature: Number of Units Prol used Townhome: Mobile Home: Multi -Family: Hotel Rooms: Square Footage of Proposed Uses 1,749,000 Service Station: _ Manufacturing: _ Warehouse: Other: 570,000 I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven clays prior to the Planning Commission public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Appllcant(s): Qi'A15-roo,� C CL �./��;PJq C(L�� 67- k&q,1111� Owner(s): <S7a�iG C�!ii��l dr' U�n,�-l�1ii 14 Date: -3 — 23 Date: Date: Date: O IS 14' L,O IRS TM 43-((A))-158 `EL IN \ 9 � O'er\£ NAIL FOUND 61 S� CENTER OF ROAD s \� O 16.91' POST FOf1ND 5 2727 J7- W S 27-17'43• W pOST 368.91, 400. FOUND KEY TO ADJOINING PROPERTY OWNERS ++ TM 4J-( Q JEFTREY C. ✓ INS. ET UX DO. BJ1 PC. 901 I 3 ® KIRBY ✓ANK:E MARE INSTRUMENT Na 010016716 h C8 mzs 2 3 LJHE DATA CANE BEARING ObTANLE L I S 25'20 50 W 9&74 IRS O 125 21-26 IJ W 16.61 j 19.74, DATE: 10/09/03 SCALE: 1 - 400' '• DRAM) BY: 3NR FILE N0. 2780SV SHEET 1 OF 1 C7� RS Csk R 1� �j qr• IRS I TM 44-((A))-26 2713968 ACRES (TOTAL) 14ILE11AN ROAD VA. ROUTE eel 30' PRESCRPTIVE EA8E1.ENr 7 j 6 0 9 f 0 O 1 1. NO 17TLE REPORT FURNISHED. E;t.SEUENTS OTHER THAN SHOWN MAY EXIST. 1 2. THE BOUNDARY INFOR9477ON SHOWN HEREON IS BASED ON A CURRENT �7 FIELD SURVEY BY THIS FIRM. '6 z CURRENT OWNER OF RECORD: H.K. BENHAM. !D. TRUSTEE (OF HARRY L MCCANN LAND TRUST) 10 INSTRUMENT NO. 010015746 '0 4. THE PROPERTY SHOWN HEREON LIES ENTIRELY WITHIN FLOOD ZONE C: AREAS OF W05 AL S. �6 FLOODING, PER FLOOD INSURANCE RATE MAP COMMUNITY PANEL NUMBER 3I006J 0103 S. DATED ✓ULY ]7, 1978. BOUNDARY SURVEY �pr�£NITfiIOI°'�� OF THE (ND OF o z RI(]1ARD A. EDENS > HARRY L. MCCANN LAND TRUST No.002580 STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIAA t� suRNE�o� F ro �" 1.ESzEf�Q IRS - 1/7 IRON REBAR W/GP SET PEa !RF - 1/?"IRON R£ENR FOUND -X- - WIRE FENCE - CENTERLINE OF ROADWAY IRS R. SPlxf f8.00 5£f RS O C77 IS.10' 1 l IRS L7T IRS �l Q IRS ; -0 T M Z d Z rM 44-l1NJ-25 � � U, I �.0 m m O 400 0 400 GRAPHIC SCALE (W FEET) CURVE RADIUS ARC LENGTH CFIORD LENGTH CHORD BEARING DELTA ANGLE CI 719.J< 159.J3 I39.02 S JI'41 JS W 1741 JI Q 1 1611.28-1 109.96 109.94 S 2J'2J JI W OJ'34 J5 CJ 6328.14 149.99 149.99 S 22'05 58 w 01'21 79 C4 4100.2j'l 149.98 149.97 S 13'50.15 w 02'05 43 CS 361.2J 119.55 119_1I S 16'47 20 W 1712 16 C6 765.59 IJ9.61 1J9.42 S 1754 J9 W 10'26 C7 34691.21 J50.00 J50.00 S 71'37 06 W 00'12 D0 CB 679.66 20220 201.46 5 Jl'11 IJ W 17'07 Al C-9 7Z4.54 125.54 12J.92 S 2X41 J2 W J702 O7 CIO I 162.&3 141.IZ 1J7.64 N 67'5J 01 W 44'1J 27 C11 6JOI.B3 506.70 506.56 N 48'0439 W 04'J711 C12 19J2.08 JI7.SB J17.19 N 42'41 IS E 09-415Z C1J 2842.9J JO.07 JO.07 N 3tl'0906 --J621 C14 2S44.9J 549.14 548.29 N 5J'S801 E II'OJ J4 C13 5745.65 5J1.78 5J1.59 N 36'31 42 E OS'18 I1 716 754 37}1O8164 J4IJ1 JO 1.27 N 5Z1J6 I, 0.'-- CI7 1476.54 H 4.3 11 E 14'4647 CI8 15B7.J3 IS.IS 15.)5 S 61*0911 E 01'J74B CI9 20064.J0 11 299.99: 299.99 S 672J 46 E 00'31 N QO 404.BJ 17916 176.89 5 69'11 I8 E 7745 40 Gil 291J.16 J9.94 39.94 S 165627 W 00'4708 C22 10071.34 150.W I30.00 S 26'54 23 W OD'31 17 QJ 591.80 119.39 119.J9 S JZ'I5 J5 11'JJ J1 GREENWAY ENGINEERING T 151 Rlnd7 }iene L 11lncAeater, VlVL rQlnln 22802 /N+Li M 1171 T414pb-. 646-M2-4166 -N Graystone Corporation Propertyic 1 LU W J�� ,,� Zoning and Location Map W Oct 4t �II'�eG JESSICA LN �P F S 838 , • ,�, ma °� 1�♦ LU 3 yo\`aati •� ` _ Goo Z44 A 25 m w Location Map d �a D_ z d� \ z IT661 o 0 Golds -Hill -Rd naoa Q IGee � c z U z0 OO 839 44 A 26 N ` W O rY Q O o� U 3 SITE L1.1 0o PACTIV yyq Y ti �a z z z x * �Pa p z 2 > c 43 A 158 qVq(/��<,y 37 N. pine Rd U .r 7 w � s6� ! WIN CH -ES T*ER altimore 8 Ohio RR l 1 REDBUD-R Miles } jQ -' a a_Q LU w Z J Q Z O Q > CD � Feet Zoning Legend < a � Z 0 900 450 0 900 O J 0 o B2 (Business, General Distrist) R4 (Residential Planned Community District) 0 Q v w LL IF OVQc�a�'' arm Legend B3 (Business, Industrial Transition District) RA (Rural Area District) Z z Q w —�- Z ui t� m �.J Graystone Corporation Property M1 (Industrial, Light District) RP (Residential Performance District) o Qf N L Q cn o Parcel Boundary M2 (Industrial, General District) w W. o U) rIL Map Data Source Fredenck County, Va GIS Department, May 2009 Data Ah • m ft O 2 0 Lu a rn �r 1h m rn CD O N n 3 g Lb z 0 N Lu C5 U O %D N N i ..O L X Lu 4_ 0 rn C O ci 01 O O N m c C C 10 d i U N i a� t� O T KEY TO ADJOINING PROPERTY OWNERS TM 43-( )-159 Q JEFFREY G to ET uX as am PG. 981 15AA uNx £ K1RBY INSTRUMENT NO. 010016716 ROAD VA. ROVE EA�i 11.. NO TULE REPORT FURNISHED. EASEMEN7S 07HLR THAN SHOWN MAY EXIST. 2. THE BOUNDARY INFORU477ON SHOWN HEREON IS BASED ON A CURRENT FIELD SURVEY BY THIS F7RM. J. CURRENT OWNER OF RECORD. H.K. BENHAM, 111, TRUSTEE (OF WRY L MCCANN LAID TRUS7) INSTRUMENT NO. 0100 15746 4. THE PROPERTY SHOWN HEREON LIES E7VTIRELY WITHIN FLOOD ZONE 'C , AREAS OF MINIMAL FLOODING, PER FLOOD INSURANCE RATE MAP COMMUNITY PANEL NUMBER 510063 0105 B, Q4TED JULY 17, 1978. 400 0 400 GRAPHIC SCALE (W FEET) L IRS = 1/2' IRON REBAR W/C4P SET IRF - 1/2" IRON REW FOUND -X- - WIRE FENCE q - CENTERLINE OF ROADWAY SPIKE SET t� CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 719.J4 159.J5 159.02 S J7 4135 W 12'41 31 C2 161128 109.96 109.94 S 2J'2J J2 W 0J'54 36 C3 6328.14 149.99 149.9 -9 22'06 58 W 012129 C4 41002J 149.98 149.9 -T 2J'50 J5 W 0705 45 C5 56123 119.55 R9.32 S 18'4720 W 12'1216 C6 765.59 1 J9.61 1J9.42 S 1 T54 J9 W 10'26 54 C7 5469124 J50.00 J50.00 S 22'57 06 W 00'22 00 C 679.6...6 20220 201.46 S J7'111 13 W 1T0244 CY 224.54 125.34 123.92 S 2341J2 W JT0207 CIO 182.8J IJ764 N 6T5301 W 44'1J27 Cll 630485 508.70 508.56 N 480459W 04J2 C12 19J208 3719 N4T41 15 E 09'4252 284 00 938'0806E 00J621C1J C14 2449J 54829 N 5J5802 E 1173 34141.12 7 5465 531.78 SJ1.59 42E OT 18 11C1 C16 5754.65 JO1.J1 J01.27 N5T4236E 050000 C17 5747.65 148264 478.5 -N4J4913 E 44647' 158735 515 5 15' 11 E O13748'C18 C19 20064.J0 99 299.99 S6T2346E 00S124.99 0 8048J 179.26 178.89 S69'1218E 2'4540 1 291J16 39. S26'562WDO4 08 10071. 5.00 26S4 25 W S112C2 00 5980 119J9C3 S315SW 11'33 J2 DATE: 10/09/09 REZONING PLAT EXHIBIT DATE REVISION GREENWAY ENGINEERING SCALE: N/A 151 wl.n J Sill I.sne OF THE LAND OF Wincherter, V1rginia 2M2 DRAWN ICY: EAW GRAYSTONE CORPORATION OF VIRGINIA FILE NO. 2760(;C STONEWALL MAGISTERIAL DISTRICT, FREDERICK COUNTY, VIRGINIA TiiiQbme UO-M-4105 SHEET 1 OF 1 TQ e/D-m-Ieie 0 CD CD RESOLUTION `-n Action: PLANNING COMMISSION: April 19, 2012 - Recommended Approval BOARD OF SUPERVISORS: April 25, 2012 0 APPROVED U DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING 403-12 PROFFER REVISION OF GRAYSTONE CORPORATION WHEREAS, Rezoning 403-1.2 Proffer Revision of Graystone Corporation, to revise the proffers associated with Rezoning 909-09 relating to the "Transportation Improvements" section of the proffers, was considered. The proffer revision, originally dated August 4, 2009 and revised February 3, 2012, is intended to allow greater flexibility in the design of the roadway. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838), in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43-A-158, 44-A-25 and 44-A-26. WHEREAS, the Plaiuung Conunission held a public hearing on this rezoning on April 18, 2012 and forwarded a reconunendation of approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on April 25, 2012; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the proffers concerning Rezoning #09-09. The proffer revision is intended to allow greater flexibility in the design of the roadway, as described by the application and attached conditions voluntarily proffered in writing by the applicant and the property owner. PDRes. rr 13-12 •CD -P— CD This ordinance shall be in effect on the date of adoption. Passed this 25th day of April, 2012 by the following recorded vote: Richard C. Shickle, Chairman Absent Gary A. Lofton Aye Aye - Nay Ross P. Spicer Bill M. ENving Gene E. Fisher Aye Charles S. DeHaven, Jr. Ave Cluistopher E. Collins Aye A COPY ATTEST Joh— n.:R•`RiIcy, }Jr. !/ Frederick County Administrator v1P.GINIIA: FREDERICK_ COUNTY.SCT. This instrument of writing was produced to me oi :5 Z- Z at / /" .3 p 0 / ./0 and with certificate acl;no,,vIedgemcnt therelo .,,ii, NCd was admitted to rcc-ord. Ta,\ imposed by Sec. .5ti.1-N)2 of 1, !jj_/L, and i;S.1-801 have been paid, if assess,,able. -. PDRes. �!13-12 0 0 O 4 r° 5 GRAYSTONE CORPORATION OF VIRGINIA �.D PROFFER STATEMENT 0-') REZONING: RZ#09-09 Rural Areas District (RA) to Light Manufacturing District (M1) PROPERTY: 271.39± acres; Tax Parcels #43-((A))-158, 44-((A))-25, and 44-((A))-26, (here -in after the "Property") RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant") PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: February 3, 2012 Preliminary 1\Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #09-09 for the rezoning of 271.39±-acres from the Rural Areas (RA) District to 271.39±-acres to the Light Industrial (M1) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider & Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43- ((A))-158, 44-((A))-25, and 44-((A))-26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). PROFFER STATEMENTr Revision Date: Februlp. s 3, 2012 • C=7 W.I. A. Generalized Development 1. The Applicant hereby proffers to submit a Generalized Development Plan (the "GDP") for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. M1, Liglit Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick Count), Board of Supervisors agrees to allow future office and industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. M1. Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the 1\41 District land bay areas identified in the proffered GDP. Proffer Statement CD is Revision Date: FebrLoy 3, 2012 W co 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100-foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm -McCann springhouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation between the Property and the Shenandoah Valley Battlefield Foundation property. Said buffer is in addition to the requirements of the Frederick County Code. D. Transportation Enhancements 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate aligrvment and right-of-way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if needed to assist Nvith this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 2. The Applicant hereby proffers to provide for a maximum 350-foot wide right-of-way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector -distributor lanes if necessary. It is agreed that any portion of the maximum 350-foot right-of-way that is Proffer Statement Revision Date: Februo.3, 2012 • C7 not required for the Route 37 mainline section within the Property will i1a be requested from the Applicant. The Applicant shall provide the required right-of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right-of-way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225-foot .vide right-of-way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right-of-way area, provided that this does not restrict use of the right-of-way. 3. The Applicant hereby proffers to provide for right-of-way dedication sufficient for the development of up to an 800-foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right-of-way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right- of-way needs for the new interchange will provide direct access to Snowden Bridge Boulevard. The Applicant shall provide the required right-of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the aligrunent and right-of-way width for the new Route 37 interchange within the Property. In the even the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225-foot wide right-of-way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right-of-way area, provided that this does not restrict use of the right-of- way. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as a four -lane, divided where applicable, road throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent xvith the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two-lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VDP or in the event that Proffer Statement Revision Date: Februa3, 2012 d Co 0 Snowden Bridge Boulevard is developed to allow access for additional traffic from outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor Study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCarni's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. Proffer Statement CD Revision Date: Febr* 3, 2012 4:" CD 11. The Applicant hereby proffers to provide for inter -parcel coiuiections where possible to mitigate transportation impacts to the full commercial intersections identified on the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportationdinfrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and/or any other transportatioi-/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements, 13. The Applicant hereby proffers to provide for a maximum 60-foot right-of-way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60-foot right-of-way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60-foot right-of-way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right-of-way dedication area. The Applicant shall provide the required right-of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60-foot right-of-way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right- of-way area, provided that this does not restrict use of the right-of-way. 14. The Applicant has agreed to provide Frederick County with right-of-way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the comiecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections D(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOT decides to not construct these road systems in whole or in part subsequent to right-of-way dedication, the recipient of the dedication agrees to convey the right-of-way dedication to the Applicant within 90 days from the date of this determination. Proffer Statement Revision Date: FebrA01 3, 2012 • CD .9:— 0 N E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures — Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: � Cv,/.��t�i.�}�� c�� �L 'b Date: --'>- f .1 Commonwealth of Virginian, / City/Count} of To Wit: The foregoing instrument was acknowledged before me this Z) day of 20I by SUS'+N D. STAHL Notary Public NOTARY PUBLIC f Commonwealth of Virginia My Commission Expires: Reg. 4290874 Registration No.: Proffer Statement ►a javl<smai" GENERALIZED DEVELOPMENT PLAN 3 3 GRAYSTONE CORPORATION OF VIRGIN i STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VA S m m m c m OO ON p mv O mnc. N O T rn z G m z m O Om m O o ^ m T p N O Z A F N ° C $ . A z o N z m ; In y» A D 1 N Q 6 yZ T m a V 4 GREENWAY ENGINEERING, w, /31 Windy /ldl Lane Winchester, Virginia 21602 EVnrrra..5'urwwn Telephone. (540) 662-4/85 Enwrnommm/.Srrnres F—drd m 197/ FAX- ( ) 540 722-9528 www.green wayeng. com O U (-J }� - .. .y Ii•, � �\`tom °J?\ f -, �" ''� �� a1 " \t . \..�.. .. �..t.r ' .�T'S -_-- + � % �Y, li��' '. 1 , t \�'\\ � rI =`f �1R , ` •. ^, �rl ) i _, - �,; -,Q� l�I � ; � - it �•�a� � CH r �I. , ',',fl I '! / r j:f !� 'f� '� ,ri �1• •.1' *`\�.. i,l ,� 1 .�_ 1 i� , / � � 1 I 1 I ) �•�\_ /,f,' ., ' 1 ' l a-rli\I �1r t a. ,.- o a/r'}`V�� I�), 1 ,' j •III + 1�1 Ax off 10 'IZ 1 ) g\ � �,;a~�•} •s 1 "� jl :, 11 FRI- \ ✓� �- �II - ) , 11 ' r f.x• "sr� xt ` t� Swig �� , -, 1, y,. "tag R ,rj. _ tr I `•ht_ i a J O TF PROPERTY EWBR .. �. - '• :. i 't' GRAYSTONE OFFICE AND INSDUSTRIAL PARK GREENWAY ENGINEERING,. sTORERAu uActsR�w. Disrxrcr COUNTY of F'REDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 665-6395 July 23, 2012 Mr. Gray Farland Graystone Coif)oration The Shockey Companies P.O. Box 2530 Winchester, VA 22604-1730 RE: Graystone Corporation Office and Industrial Park Property Identification Number(s) (PINs) 43-A-158, 25, & 26 Zoning District: M-1 (Industrial, Light) Dear Mr. Farland: This letter is in reference to your letter dated July 23, 2012, requesting a waiver of the sidewalk requirement for a collector road (Snowden Bridge Boulevard). 'this collector road will have a ten (10) foot asphalt pedestrian facility along the north side of the road; you are requesting a waiver of the sidewalk on the south side of the road. The Code of Frederick County, Subdivision of Land, Chapter 144-1 SA (2) allows the Subdivision Administrator to waive the sidewalk requirement. Frederick County will waive the sidewalk requirement for the south side of this road. Please note this waiver applies only to Snowden Bridge Boulevard. Frederick County will review any other waiver(s) on the above -referenced properties upon submission and review of a Master Development Plan (MDP) and subdivision(s). Call me at (540) 665-5651, if you have any questions on the matter. Sincerely, zc; zk Mark R. Cheran Zoning Administrator MRC/bad 107 North Kent Street, Suite 202 o Winchester, Virginia 22601-5000 • • 10 GRAYSTONE CORPORATION OF VIRGINIA PROFFER STATEMENT REZONING: RZ#09-09 Rural Areas District (RA) to Light Manufacturing District (M1) PROPERTY: 271.39± acres; Tax Parcels #43-((A))-158, 44-((A))-25, and 44-((A))-26, (here -in after the "Property") RECORD OWNER: Graystone Corporation of Virginia APPLICANT: Graystone Corporation of Virginia (here -in after the "Applicant') PROJECT NAME: Graystone Corporation Office and Industrial Park ORIGINAL DATE OF PROFFERS: August 24, 2009 REVISION DATE: February 3, 2012 Preliminary Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Applicant hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #09-09 for the rezoning of 271.39±-acres from the Rural Areas (RA) District to 271.39±-acres to the Light Industrial (MI) District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Applicant and such be approved by the Frederick County Board of Supervisors and their legal successors, heirs, or assigns in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this Applicant and their legal successors, heirs, or assigns. The Property, more particularly described as the lands owned by Graystone Corporation of Virginia (formerly Crider & Shockey, Inc. of West Virginia), being all of Tax Map Parcels 43- ((A))-158, 44-((A))-25, and 44-((A))-26, and further described by Instrument Number 030025588. (Please refer to Rezoning Application Deed Information). PROFFER STATEMENT Revision Date: Februa� y 3, 2012 A. Generalized Development 1. The Applicant hereby proffers to submit a Generalized ( Development Plan the • P "GDP") for the Property. The purpose of the GDP is to identify the general location of the M1 District office and industrial land bays, the general location of the future Route 37 corridor study area, the general location of the Snowden Bridge Boulevard urban four -lane divided collector road system with signalized intersection or roundabout design and limited entrance locations, the general location of on -site and off -site green space buffer areas, and the general location of the adjoining parcels that are within permanent protective easements. 2. The Applicant hereby proffers to develop the Property in substantial conformity with the proffered GDP, prepared by Greenway Engineering dated January 25, 2010. The GDP is recognized to be a conceptual plan and may be adjusted by the Applicant to accommodate final design and engineering constraints without the need of new conditional rezoning approval by the Frederick County Board of Supervisors, provided that the adjustments do not eliminate or substantially relocate the areas indicated on the proffered GDP. B. M1, Light Industrial District Land Uses 1. The Applicant intends to develop the Property to implement industrial and office land uses that are designed to coexist in an office park setting. 2. The Frederick County Board of Supervisors agrees to allow future office and is industrial land uses that are included within future amendments to the M1, Light Industrial District to be developed on the Property without the need for conditional zoning amendments. C. M1, Light Industrial District Design Standards 1. The Applicant hereby proffers to establish an Architectural Review Board (ARB) to oversee and approve all structural design exterior treatments for new construction and structural additions to ensure high quality development throughout the project. Additionally, the ARB will oversee and approve all monument signage and building mounted signage, to ensure consistency in the design of signage throughout the project. Notwithstanding what is stated herein, the ARB is intended to be in addition to and not intended to override or conflict with any provisions of the Frederick County Code. 2. The Applicant hereby proffers to establish requirements for outdoor green areas and/or outdoor plaza areas for the benefit of employees of the office and industrial park. These outdoor green areas and outdoor plaza areas will be located within each of the M1 District land bay areas identified in the proffered GDP. Proffer Statement 0 Revision Date: Februa., 3, 2012 • 3. The Applicant hereby proffers to establish internal asphalt trails for the benefit of employees of the office and industrial park. These asphalt trails will be a minimum of eight feet in width and will be designed to connect land uses throughout the M1 District land bay areas identified in the proffered GDP wherever possible. For each lot or parcel associated %with the construction of a building, the Applicant agrees to identify the location on said lot or parcel for trails (if applicable, to said lot or parcel) and to have the trail constructed (if applicable) prior to the issuance of the Certificate of Occupancy for the structure or building on said lot or parcel. 4. The Applicant hereby proffers to establish a 100-foot green space buffer area along the northern boundary of the Property as depicted on the proffered GDP. This green space buffer area will be left in its natural state to provide viewshed mitigation for the Milburn Cemetery and the Helm -McCann springliouse. Said buffer is in addition to the requirements of the Frederick County Code. 5. The Applicant hereby proffers to provide for evergreen landscaping along the Redbud Road frontage of the Property identified as a green space buffer area on the proffered GDP. The provision of this evergreen landscaping is to provide viewshed mitigation between the Property and the Shenandoah Valley Battlefield Foundation property. Said buffer is in addition to the requirements of the Frederick County Code. D. Transportation Enhancements • 1. The Applicant hereby proffers to provide a corridor study area within the Property as depicted on the proffered GDP that is a minimum of 350 feet in width. The purpose of this corridor study area is to provide Frederick County with an opportunity to determine a final alignment for Route 37 throughout the limits of the Property through the completion of engineering design sufficient for this purpose. The design within the corridor study area depicted on the proffered GDP will provide access to the Property to the proposed interchange and Snowden Bridge Boulevard. The corridor study area shall be available to Frederick County for a period of eight years from the date of rezoning approval to complete engineering design necessary to determine the appropriate alignment and right-of-way width for Route 37 within the Property. The Applicant agrees to cooperate with VDOT and Frederick County to provide engineering information and reports within the Applicant's possession if ID needed to assist with this design effort. The Board of Supervisors may allow encroachment into and or the definition of the corridor study area if necessary to accommodate site development proposals through the Site Plan approval process. 0 2. The Applicant hereby proffers to provide for a maximum 350-foot wide right-of-way dedication for the Route 37 mainline section within the Property. The mainline section is intended to include through travel lanes and collector -distributor lanes if necessary. It is agreed that any portion of the maximum 350-foot right-of-way that is Proffer Statement Revision Date: February 3, 2012 not required for the Route 37 mainline section within the Property will not be requested from the Applicant. The Applicant shall provide the required right-of-way • dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT for the alignment and right-of-way width for the Route 37 mainline section within the Property. In the event the aforesaid official decision has not been made for the Route 37 mainline section within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225-foot wide right-of-way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right-of-way area, provided that this does not restrict use of the right-of-way. 3. The Applicant hereby proffers to provide for right-of-way dedication sufficient for the development of up to an 800-foot wide diamond interchange or a single point urban interchange (SPUI) in the general location depicted on the proffered GDP. It is agreed that any portion of the right-of-way that is not required for the new interchange within the Property will not be requested from the Applicant. It is further agreed that the engineering design sufficient to determine the location, type and right- of-way needs for the new interchange will provide direct access to Snowden Bridge Boulevard. The Applicant shall provide the required right-of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and • VDOT for the alignment and right-of-way width for the new Route 37 interchange within the Property. In the even the aforesaid official decision has not been made for the new Route 37 interchange within the time period specified in Section D(1), the Applicant may either extend the time period for this decision, or may provide Frederick County with a 225-foot wide right-of-way dedication for Route 37 within the corridor study area depicted on the proffered GDP. The applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right-of-way area, provided that this does not restrict use of the right-of- way. 4. The Applicant hereby proffers to construct Snowden Bridge Boulevard between the Property and Martinsburg Pike (U.S. Route 11 North), including the CSX bridge crossing, prior to the issuance of an occupancy permit for the first office or industrial site plan approved on the Property. The Applicant shall design and construct Snowden Bridge Boulevard as a four -lane, divided where applicable, road throughout the limits of the Property, and shall develop the off -site segment of Snowden Bridge Boulevard consistent with the approved public improvement plan. Snowden Bridge Boulevard shall be initially constructed as a two-lane road section, and shall be constructed as the ultimate four -lane divided road section prior to the issuance of the occupancy permit for the site plan that exceeds 8,000 VDP or in the event that Proffer Statement 0 Revision Date: Februa,y 3, 2012 Snowden Bridge Boulevard is developed to allow access for additional traffic from • outside the Property, the construction of the ultimate four -lane divided road section shall be required when the total trip volume exceeds 8,000 VPD on the Property, which ever first occurs. 5. The Applicant hereby proffers to limit full commercial intersection access on Snowden Bridge Boulevard to establish up to three commercial intersections in the general location of intersections identified on the proffered GDP. An intersection has been identified on the proffered GDP that could potentially be developed as either a roundabout or as a signalized intersection if warranted by VDOT. All full commercial intersections identified on the proffered GDP will be developed with medians to provide for controlled left turn movement access to the Property. 6. The Applicant hereby proffers to allow for the full commercial intersection located on the east side of the Route 37 corridor study area to be closed entirely if necessary when Route 37 is developed by others throughout the limits of the Property. The closure of the full commercial intersection is conditioned upon the provision of street access to this portion of the Property that will be developed by others during the construction of Route 37. The Applicant agrees to cooperate with Frederick County to provide easements on the Property if necessary to facilitate new street access to this portion of the Property if this becomes necessary due to the construction of Route 37. 7. The Applicant hereby proffers to prohibit direct commercial access from the Property is access existing Milburn Road (Route 662). The County may determine that emergency access from to the Property from existing Milburn Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. is 8. The Applicant hereby proffers to prohibit direct commercial access from the Property to existing Redbud Road (Route 661). Frederick County may determine that emergency access from to the Property from existing Redbud Road is acceptable provided that it is designed to prohibit access for regular vehicular traffic. 9. The Applicant hereby proffers to prohibit direct commercial access from the Property to McCann's Road (Route 838). Emergency access to the Property from McCann's Road is prohibited as well to protect the integrity of the buffer identified along this road. 10. The Applicant shall develop Snowden Bridge Boulevard as a public street; however, the Applicant shall have the ability to develop all internal streets as private street systems. All private streets shall be constructed to meet or exceed VDOT vertical base section standards. Proffer Statement Revision Date: Februa,y 3, 2012 11. The Applicant hereby proffers to provide for inter -parcel connections where possible to mitigate transportation impacts to the full commercial intersections identified on • the proffered GDP. 12. The Applicant submits that it will apply for all such public assistance mechanisms that are available at the time of development to facilitate the installation of the aforementioned transportation/infrastructure improvements. Those mechanisms include, but are not limited to, matching funds, industrial access funds and/or any other transportation/infrastructure funding vehicles, such as CDAs. Without binding any future legislative act, the Applicant and the Frederick County Board of Supervisors agree that the use of said mechanisms are advantageous to the development of the Property and the use of same should be encouraged and that both parties should make all reasonable efforts to cooperate with one another to implement the appropriate mechanism or combination of mechanisms to ensure rapid installation of the aforementioned improvements. 13. The Applicant hereby proffers to provide for a maximum 60-foot right-of-way dedication to Frederick County to provide for the development of a street connection by others between the planned portion of Snowden Bridge Boulevard on the Property and existing Redbud Road (Route 661) immediately south of the Property. The general location of this 60-foot right-of-way shall be delineated on the final Master Development Plan, which shall connect to one of the proposed new full commercial intersections that are located to the west of the Route 37 corridor study area as depicted on the proffered GDP. It is agreed that the 60-foot right-of-way dedication can be located within buffer areas provided that the landscape screening and opaque elements are located between the adjoining properties owned by Applicant and the right-of-way dedication area. The Applicant shall provide the required right-of-way dedication to Frederick County within 90 days from the date of written notice by Frederick County, which shall occur after an official decision has been made by Frederick County and VDOT to construct this street connection. It is agreed that the Applicant can construct street access with entrances to land bays within the delineated 60-foot right-of-way area provided that the proposed street access meets or exceeds VDOT vertical base section standards. The Applicant shall be allowed to install utilities or other elements necessary for site development within the dedicated right- of-way area, provided that this does not restrict use of the right-of-way. 14. The Applicant has agreed to provide Frederick County with right-of-way dedications within the Property for the Route 37 mainline, the new Route 37 interchange, and the connecting street between Redbud Road and Snowden Bridge Boulevard as described in Sections 1)(2), D(3), and D(13) of the Proffer Statement. In the event that Frederick County or VDOT decides to not construct these road systems in whole or in part subsequent to right-of-way dedication, the recipient of the dedication agrees to convey the right-of-way dedication to the Applicant within 90 days from the date of this determination. Proffer Statement 0 Revision Date: Febl-Muy 3, 2012 • E. Fire and Rescue Monetary Contribution 1. The Graystone Office and Industrial Park has been demonstrated to provide a positive economic impact to Frederick County services by the Frederick County Development Impact Model. However, the Applicant intends to further support fire and rescue services through the provision of a monetary contribution in the amount of $0.05 per square foot of structural development for all land uses within the Property. This monetary contribution shall be provided to Frederick County for fire and rescue purposes prior to the issuance of a certificate of occupancy permit for each building permit issued within the Property. F. Signatures — Graystone Corporation of Virginia The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicants and owners. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Respectfully Submitted: • �.�'-v�� S � J�t� Cv �'.�c l�i.�-t� ��� GC= �} l �'�G t11 V} 3. c" X �/�-�3���� Date: - Commonwealth of Virginia, l City/County of ���U�` < < I J To Wit: The foregoing instrument was acknowledged before me this day of 20-0,Z by l;:lC��, , JL" My Commission Expires Registration No.: � 0 SUSAN D. STAHL NOTARY PUBLIC Commomveatfh of Virginia Reg. 290874 v ` �l Notary Public Proffer Statement • • • LEGEND TOTAL SITE: 271.39t AC. PROPOSED ZONE: M1 DISTRICT OFFICE - MANUFACTURING LAND BAYS ROUTE 37 CORRIDOR STUDY AREA `FUTURE ROUTE 371 SNOWDEN BRIDGE BLVD. INTERCHANGE GREEN SPACE BUFFER AREAS O URBAN 4 - LANE DIVIDED COLLECTOR ROAD PARCELS WITH PERMANENT EASEMENTS QUARRY hs' p, ®�TAOgD OLD CHARLfB RO.4 p D �? g� 4, rl gee Q.0 L p'10 o10 PP / )40Mt DISTRICT Mt DISTRICT * ag �o.FFn = BEGT%NI p0 L � FOP OETAIB F�T�RF srvpWOeN y �o o r+ AAA, BRID �g M1 DISTRICT 8�V0• +/M1 DISTRICT RFo ' SVBF PROPERTY 6�11016 Oq O RT• BB1 RT. 701 cs z c Z o� Lu eNd N O tlNNv u W.1a�aaeir Z^' CbN d Zve Lu C i2 W W ?ya y �.e C T+ [ij 1C 1L a CC I— > E. z w U a ILz s I ul a] > �ILI) W O Zx 0 d� p C a N 0 �w J W zw a z o ul F u DATE 01/25/10 SCALE NTS DESIGNED BY 1R S JOB NO. 278000 SIECI 1 OR I , Pv �o'Hr�t'j,,llr"��' I Ilk vJ F" J I r �. I � `' F '�`�• ` ' p '"tip +h, ' i H,l P C P � �. #. 0voALL PROPEM Mom ' } GRAYSTONE OFFICE AND INSDUSTRIAL PARK GREENWAYENGINEERING,.. C ` MNENALL MAGISTERIAL 019T = "EOERICE COUNTY, VA 0 C7 • RESOLUTION Action: PLANNING COMMISSION: April 18, 2012 - Recommended Approval BOARD OF SUPERVISORS: April 25, 2012 ❑ APPROVED ❑ DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #03-12 PROFFER REVISION OF GRAYSTONE CORPORATION WHEREAS, Rezoning 803-12 Proffer Revision of Graystone Corporation, to revise the proffers associated with Rezoning #09-09 relating to the "Transportation Improvements" section of the proffers, was considered. The proffer revision, originally dated August 4, 2009 and revised February 3, 2012, is intended to allow greater flexibility in the design of the roadway. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838), in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43-A-158, 44-A-25 and 44-A-26. WHEREAS, the Planning Commission held a public hearing on this rezoning on April 18, 2012 and forwarded a recommendation of approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on April 25, 2012; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the proffers concerning Rezoning #09-09. The proffer revision is intended to allow greater flexibility in the design of the roadway, as described by the application and attached conditions voluntarily proffered in writing by the applicant and the property owner. PDRes. #13-12 This ordinance shall be in effect on the date of adoption. Passed this 25th dayof April, 2012 b the following recorded vote: • P � Y g Richard C. Shickle, Chairman Ross P. Spicer Gene E. Fisher Christopher E. Collins Gary A. Lofton Bill M. Ewing Charles S. DeHaven, Jr. A COPY ATTEST John R. Riley, Jr. Frederick County Administrator • • PDRes. #13-12 l Rezoning CO2ninelnts Virginia Department off' ransportagion imail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 (540) 984-5600 Hand de➢iven• to: Virgitua Department of Transportation Attn: Resident Lngineer 2275 Northwestern Pike Winchester, Virginia 22603 Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Attach three copies of your application fornn, location neap, proffer, statement, impact analysis, and any other pertinent information. Applicant's Name:Graystone Corporation of Virginia Telephone: (540) 667-7700 Mailing Address: P. 0. Box 2530 Winchester, VA 22604 Location of property: Current zoning: Ml 271.39± acres: Tax Parcels #43_((A))-158, 44-((A))-25, and 44-((A))-26 Zoning requested: Amendment to Acreage: 271.39± Proffer Statement— apartment of Transportation Comments: attached email from Lloyd Ingram with VDOT to The Shockey Companies �Iarch 6, 2012.- ature & Date: ~l_ 03/06/�� ��`�_� �y-� l Notice to 'VDOT - Please Return Fox -in to Applicant 19 Grav Farland From: Funkhouser, Rhonda (VDOT) [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Ingram, Lloyd (VDOT)[Lloyd.ingram@VDOT.virginia.gov] Sent: Tuesday, March 06, 2012 8:36 AM To: Gray Farland Cc: John.Bishop; Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT) Subject: VDOT Comments to Proposed Graystone Proffer Amendment Attachments: Scanned from EDNXerox001.pdf VDOT has reviewed the submittal for an amendment to the existing proffers dated January 25, 2010 and provides the following comments: There was no accompanying documentation that supports the need for a change in the existing approved proffers. The question of eliminating the medians defies the research by both VDOT and AASHTO that identifies the medians as a critical part of building a safe 4-lane high volume roadway. Urban collector streets with four or more lanes should include width for an appropriate median treatment, where practical. In addition to restricting left turn movements, medians provide a recovery area for out -of -control vehicles, provide a stopping area in case,of emergencies, allow space for storage of left -turning and U-turning vehicles, diminish headlight glare and medians provide separation from opposing traffic which increase driver comfort and capacity. This criteria was a significant part of the proffers that convinced VDOT to support the original rezoning. At full build -out of both Graystone and Snowden Bridge, this portion of roadway will be mixing industrial/commercial traffic with residential traffic when Snowden Bridge Boulevard is completed in its entirety. The need for the median will become more critical as traffic increases. In addition to eliminating median, the proposed proffer change appears to eliminate curb and gutter as well. How will curb & gutter/median proffered (U4D design) in other sections along Snowden Bridge Boulevard tie- in with non -curb & gutter/median sections? Transitioning from a U4D Section to a non -curb & gutter and non - median section is unconventional and inconsistent and could affect driver performance and safety. VDOT advocates maintaining a consistent road section throughout the entire Snowden Bridge Boulevard, as originally proffered. Therefore, with the documentation provided with this request, VDOT cannot support the requested amendment in its current form. <<Scanned from EDNXerox001.pdf>> Lloyd A. Ingram, Land Development Engineer VA Department of Transportation — Land Development Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, Virginia 22824 Phone #(540) 984-5611 0 Fox # (540) 984-5607 Rezoning Commenit5 Frederick County Department of Public Works Mail to: Frederick County Dept. of Public Works Attn. -Director of Engineering 107 North Kent Street Winchester, Virginia 22601 (540) 665-5643 Hand deliver to: Frederick County Dept. of Public Works Atln. Director of Engineering County ilcliminisixation Bldg., Suite 202 107'North,�Kent Street Winchester, Virginia Applicant: Please fill out the information is accurately as possible' in order to assist the Department. of Public Works -with their review Attach. a, copy, of your ,application. form, location map, Proffea .stlt6ment Iiinpact analysis;,and' ariy�.othet= pertinen't�information: • y-y....'.71 _ •7+:�. - Lam- ,-rf: •.r. srr nr •', -. .yvY ..Nv;tt..l„/n•.V _ _ M 1" 1.^�^.. /-` �. �... 6. 3 Applicant's Name. Grayst ne Corporation. of Vir_ginialelephone: (540) 667-7700 Mailing Address: P 0 -Box 2530 Winchester, VA 22604 Location of property- 271 ,39±. acres Tax. Parcels #.43- ((A))-158, and 44-• (:(A)) -26 Current zoning: M1 Zoning requested. Amendment to Acreage: 271 39± Proffer StaL-emerit Department -of Public Work's Comments: v o YeC,(-;I-vt vb G VCk �� C. �. ec OY� (D 1Y7 (1 _ ca.VIA t Vtc�.l,L� TY l J Gt v Public Works Signature & Date: Notice to Dept. of Public Wo s -,Please Return This Form to the Applicant ►l 0 PJ COUNTY of FREDERICK �[1W�1 w n i I I., FED 1 hr 2012 HOWARD SHOCKEY & SONS, J[qG. i February 10, 2012 VIA FACSIMILE_ — 540-_665-_3211 — AND REGULAR MAIL Mr. Gray Farland l �� The Shockey Companies P.O. Box 2530 Winchester, Virginia 22604-1730 Roderick B. Williams County Attorney 540/722-8383 Fax 540/667-0370 E-mail: illia@coftederick.va.us Re: Graystone Corp. Office and Industrial Park — Proposed Proffer Amendments Dear Mr. Farland: You have submitted proposed amendments to paragraphs 4 and 5 of part D (Transportation Improvements) of the Proffer Statement, dated January 25, 2010, and approved by the Board of Supervisors on January 27, 2010, for the above -referenced project. The project encompasses Tax Parcels 43-A-158, 44-A-25 & 44-A-26, comprised of 271.39f acres, located in the Stonewall Magisterial District (the "Property"). The Property is zoned M1 (Light Manufacturing), with proffers. I have now reviewed the proposed amendments and it is my opinion that, subject to just one comment, the proffer statement containing the proposed amendments would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement. My one comment,is that the proposed riew/revised proffer statement will need to reflect a current revision date and not the final revision date of January 25, 2010, from the original rezoning. I have not reviewed the substance of the Proffers as to whether the Proffers are suitable and appropriate for this specific development, as it is my understanding that that review will be done by staff and the Planning Commission. /1�0c/lcrick yours, . i liams County Attorney cc: Michael T. Ruddy, Deputy Director of Plarniing and Development 107 North Kent Street • Winchester, Virginia 22601 0 0 IMPACT ANALYSIS STATEMENT GRAYSTONE CORPORATION OFFICE & INDUSTRIAL PARK REZONING Tax Map parcels 43-((A))-158, 44-((A))-25 & 44-((A))-26 Aggregate Area of 271.39t acres Stonewall Magisterial District Frederick County, Virginia October 9, 2009 Current Owners: Graystone Corporation of Virginia There are no changes to the previously submitted Impact Analysis Statement. G Gray Far and '3 12- -3Z— Dat 0 0 II CD II RS O 15.14' o• CT? IRS L 10 IRS l/ 1RS A' 3T4g f9' f 562,00• 0 `p T \oq KEY TO ADJOINING PROPERTY OWNERS TY 43-((A))-159 ® JEFFREY G. JENKINS, ET UX OB. 832 PG. 981 TM 43-((A))-159A ® JANICE MARIE KIRBY INSTRUMENT NO. 010016716 1 *JV n1T• UNE BEARING DISTANCE L 1 S 25'20 50 W 98.74 L2 S 21'26'13 W 26.61 L3 S 22'47 43 W 106.42 L4 S 24*60 2b W 34.32 L5 S 12741 12 W ___ 65.87 TM 43-((A))-158 1 I NAIL FOUND IN CENTER OF RAID \\ IRS O 16.91' POST FOUND 27'27'37' W S 2717'4 ' W P 568.91' 480. F *-flPn TA . Z M� IRS s� h�0 IRS O ,,,,?? 79.74'. SAL, W 0 0 ro { v TM 44-((A))-26 1 271.3968 ACRES (TOTAL) a 1 S 40 0 tl p F% joN RJP�►pN OR10 eo�pR 5 p85E JPER GP IRS S IRS R. SPIKE lv \�' ` 1 b.00 1 SET IRS O / IRS L21IRS n 4 IRS ; L20 p to w n � TM 44-((A))-25 col t -4 Cc mmm � 00 °D v N o � LEGEN IRS = 1/2" IRON REBAR W/CAP SET IRF a 1/2" IRON REBAR FOUND -X- = WIRE FENCE f = CENTERLINE OF ROADWAY C21 DATA 710 21' rcn ic• 1 .cn no• o vw. ® l t JEFFREY G. JENKINXINS,� ET UX DB. 832 PG. 981 O TM 43—((A))-159A ✓ANICE MARIE KIRBY INSTRUMENT NO. 010015716 LW DATA LINE BEARING D157ANCE L 1 S 25'20 50 W 98.74 L2 S 21'26 13 W 26.61 L3 S 22'47 43 W 106.42 L4 S 24753 28 W 34.32 L5 S 12'41 12 W 65.67 L6 S 23'08 03 W 32.67 L7 S 22'46'05 W 405.93 L8 N 45-46 18 W 158.73 L9 N 50'23 40' W 48.37 L 10 N 3749 49 E 169.00 L l l N 52' 10 11 W 4.00 L 12 S 52' 10 11 E 4.00 L 13 N 3749'49 E 307.70 L 14 N 44' 1 1.33A E 198.40' L 15 N 42'3J'O1 E 297.36 L 16 N 30'29 52' W 4.00' L 17 N 59'30 08 E 309.29 L 18 S 35*47 24 E 9.00 L 19 N 38'4724 W 7.00 L20 N 36'25 49 E 2.00 L21 N 39' 13 75' E 220.71 ' L22 N 36'2 135 E 213.71 L23 S 61'58'05 E 42.07 L24 S 62'4S28' E 171.96 L25 S 75'35 08 E 206.70 L26 S 2720 00' W 19.70 L27 S 38'02 21 W 37.36 Q �JO J IRS 2 3 IRS O 19.74'\ hV a93 2 NOTFS: 1. NO TITLE REPORT FURNISHED. EASEMENTS OTHER .2. THE BOUNDARY INFORMATION SHOWN HEREON /S FIELD SURVEY BY THIS FIRM. J. CURRENT OWNER OF RECORD: H.K. BENHAM, lll, I INSTRUMENT NO. 0.1 4. THE PROPERTY SHOWN HEREON LIES ENTIRELY Wl FLOODING, PER FLOOD INSURANCE RATE MAP COI ° DATE: 10/09/03 BOUNDARY SURVE SCALE: 1" = 400' OF THE LAND OF DRAWN BY: S" HARRY L. MCCANN LAN[ FTLE N0. 2780SV STONEWALL MAGISTERIAL DISTRICT, FREDERI SB= 1 OF 1 . TM 44-((A))-260 I v 271.3968 ACRES (TOTAL) I 1 o � I w CD I es � 7 93-C WLIWAN ROAD VA. ROUTE �BENIaY '0, PRE8CR1Pn )THER THAN SHOWN MAY EXIST. N IS BASED ON A CURRENT lll, TRUSTEE (OF HARRY L. MCCANN LAND TRUST) 10. 010015746 -LY WITHIN FLOOD ZONE "C , AREAS OF MINIMAL p COMMUNITY PANEL NUMBER 510063 0105 B, DATED JULY 17, 1978. VEY ,.41 LTH OFof A. EDENSAND TRUST (ORICHARD o.002550 COUNTY, VIRGINIAd 04OERICK svR�ti� 400 0 400 GRAPHIC SCALE (IN FEET) DATE I REvisic rm. 1O.UU • aci C1IRS 7 15.70' to �^-- IRS L27 IRS 4 IRS L?O M < A C7 I�, TM 44-((A))-25 `OI Z CA m m �O N O 400 I FEET) C?1 CURVE DATA CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C1 719.34 169.35 159.02 S 31'4135 W 1?'4131 C2 1611.28 709.96, 109.94 S 2.3'2332' W 03'5436 C3 632 5 114 149.99 749.99 S 22'06 58 W O1'21 29 C4 4100.23 149.98 149.97 S 23'50 35 W 02'05 45 C5 561.23 1 19.55 119.32' S 18'47 20' W 12' 12 16' C6 765.59 139.61 139.42 S 1 T54 39 W 10'26 54 C7 54691.24 350.00 350.00 S 22'57'06 W 00'2200" CB 679.66 202.20 201.46 S 31'11 13 W 17-0244 C9 224.54 125.54 123.92 S 23'41 32 W 32'02 07 CIO 162.83 141.12 137.64 N 67'53 O 1 W 44' 13 27 C11 6304.85 508.70 506.56 N 48'04 58 W 04'3722 C12 1932.08' 327.58 327.19 N 42-41'15' E 09'4252 C13 2642.93 30.67 30.07 N 38'08'06 E 00'3621 C74 2544.93' S49.1 5546.29 N 53'58'02' E 11'03'34" C 15 5745.65' 531.78 531.59 N 56'51 42 £ 05' 18'11 " C16 5754.65 301.31 301.27 N 52'42 36 E 03'00 00 C17 5747.65 74,52.64 1476.54 N 43'49'13' E 14'4647' C 18 1557.35 45.15 45,15 S 61 '09 11 E 013748 C19 20064.30 299.99' 299.99' S 62'2346 E 00*51'24" C20 6O4.83 179.2 1178.89 S 69'12 78 E 12'45 40 C21 2913.16 39.94 39.94 S 26'66 27 W 00'4 708 C22 10071.34 150.00 150.00' S 26'54 75' W 00.51 12 C23 592.80 1 19.59 1 19.39 S 32' 15 35 W 1 1.33 32 REVISION Founded in 1971 Lnaiw�n GRUTtMAY ENGINEERING 161 Windy Hill Lane Winchester, Virginia 22602 Telephone 640-662-4166 FAX 640-722-M CD W N VIR(31N1A: FREDERICK COUNTY, SCT. This instrument of writing was produced to me on at 0, 56 AyY1 :.nd wi u nifi tc of acJmowlcdgcmcnt thereto annexes ,as a mfited to record. T imposed by Sec. 58.1-802 of .o 'a'� 58.1-801 have been paid, if assessable l�L , Cicrk � 6i IN KkRRISON A JOHNSTON ATTORNEYS AT LAW µiNCHCSTEP, MAGMA 0 00025588 0 r� THIS DEED, made this day of 2003, between H. K. Benham III Trustee (of Harry L. McCann Land TrustL, a Memorandum of which is recorded in the Clerk's Office of the Circuit Court of Frederick County, Virginia in LR fiO10015745, of the one part, hereinafter called the Grantor; and Crider & Shockey, Inc of West Virginia, a West Virginia corporation authorized to do business in the Commonwealth of Virginia, of the other part, hereinafter called the Grantee. WITNESSETH: That for and in consideration of the sum of Ten Dollars ($10.00), cash in hand paid and other valuable consideration, receipt whereof is hereby acknowledged, the Grantor does grant and convey, with General Warranty and with English Covenants of Title, unto the Grantee, in fee simple, together with all rights, rights of way, privileges and appurtenances thereto belonging, all of those three (3) certain tracts of land, collectively containing 271.3969 Acres, more or less, lying on the West side of Milburn Lane and on the East side of the CSX Railroad in Stonewall Magisterial District of Frederick County, Virginia (TAX MAP NOS. 43-A-158, 44-A-25 and 44-A-26) and being more particularly described by plat dated October 9, 2003 and entitled "Boundary Survey of the Land of Harry L. McCann Land Trust" and recorded in the Clerk's Office of the Circuit Court of Frederick County, Virginia i:i� and being the same property conveyed to the Grantor herein by H. K. Benham, III and Judith McCann Slaughter, Executors of the Estate of Harry L. McCann by deed dated October 26, 20o0 and recorded in the aforesaid Clerk's Office in LR V010015746. GKTLCI "01C)Y P.o.i�ox as3o A, ucri���,�A zz( w 0 HARRISON A JOHNSTON ATTo"EY6 AT LAW YANCHEMP, MON A a N CJl This conveyance is made subject to all legally enforceable restrictive covenants and easements of record affecting the aforesaid realty. WITNESS the following signature and seal: (SEAL) H. K. Benham, III, Trustee (of Harry L. McCann Land Trust), a Memorandum of which is recorded in the Clerk's Office of the Circuit Court of Frederick County, Virginia in LR 9010015745 STATE OF VIRGINIA, AT LARGE, CITY OF WINCHESTER, To -wit: The foregoing instrument was acknowledged before me this 3 ' day of � Y.G�� , 2000, by H. K. Benham, III, Trustee (of Harry L. McCann Land Trust), a Memorandum of which is recorded in the Clerk's Office of the Circuit Court of Frederick County, Virginia in LR 90100157745). My commission expires ✓/ ��S (SEAL)a Notary Public .m - 2 - Frederick County Page 1 of 1 Frederick County, Virginia C. William Orndoff, Jr., Treasurer e-mail "Bill" Orndoff r F e-Treasurer Payment Options Payment Help Inquiry Options Inquiry Help --`Inquiry Options Real Estate Tax Personal Property Real Estate Paid Pers. Prop. Paid Return e-Treasurer Home e-Commissioner Home Frederick County Home Real Estate Public Inquiry Ticket Detail 2011 REAL ESTATE TAXES Department# : RE2011 Ticket #: 84580002 FRQ: 2 Sup#: 0 Name: CRIDER & SHOCKEY INC OF WV Account#: 8680 Name 2: Map#: 43 A 158 Address: PO BOX 2530 Description: 50.33 ACRES WINCHESTER VA 22604 Bill Date: 04/18/2011 Due Date: 12/05/2011 Land: $1,819,700 Improve: Use: Minerals: Original Bill: $4,958.68 Pavments: $4,958.68- Acres: 50.33 Penalty Paid: Int Paid: Amount Owed: Other: Last Date: 12/07/2011 Total Owed: Penaltv: Interest: Note that if payment has been received xvithin the last 10 business days, any returned items may not be posted at this time. Please check the website again. 11 Bate Type Transaction = :amount Balance 4/18/2011 Charge 0 S4.958.68 S4.958.68 12/7/2011 Payment 37115 (S4.958.68) S0.00 1 n U 0 https://taxes. co. frederick.va.us/Applications/TRApps/REIindex.htm 3/23/2012 Frederick County Page 1 of 1 Frederick County, Virginia'', C. William Orndoff, Jr., Treasurer e-mail "Bill" Orndoff r ; e-Treasurer Payment Options Payment Help Inquiry Options Inquiry Help --•Inquiry Options Real Estate Tax Personal Property Real Estate Paid Pers. Prop. Paid Return e-Treasurer Home e-Commissioner Home Frederick County Home Real Estate Public Inquiry Ticket Detail 2011 REAL ESTATE TAXES Department# : RE2011 Ticket #: 84590002 FRQ: 2 Sup#: 0 Name: CRIDER & SHOCKEY INC OF WV Account#: 8880 Name 2: Map#: 44 A 25 Address: PO BOX 2530 Description: 51.68 ACRES WINCHESTER VA 22604 Bill Date: 0411812011 Due Date: 12/05/2011 Land: S1,846,000 Improve: Use: Minerals: Original Bill: $5,030.35 Payments: $5,030.35- Acres: 51.68 Penalty Paid: Int Paid: Amount Owed: Other: Last Date: 12/07/2011 Total Owed: Penalty: Interest: Note that if payment has been received within the last 10 business days. any retumed items may not be posted at this time. Please check the website again. 11 Date Type Transaction » :amount Balance 4/18/2011 Charge 0 S5.030.35 S5.030.35 12/7/2011 Payment 37115 (S5.030.35) S0.00 1 h https://taxes. co. frederick.va.us/Applications/TRApps/REIindex.htm 3/23/2012 Frederick County Frederick County, Virginia C. William Orndoff, Jr., Treasurer e-mail "Bill" Orndoff e-Treasurer Real Estate Public Inquiry Ticket Detail Payment Options 2011 REAL ESTATE TAXES Payment Help Department# : RE2011 Ticket #: 84600002 FRQ: 2 Sup#: 0 Inquiry Options Inquiry Help CRIDER & SHOCKEY INC OF WV 8881 Name: Account#: —"Inquiry Options Name 2: Map#: 44 A 26 Real Estate Tax Address: PO BOX 2530 Description: 170.00 ACRES Personal Property WINCHESTER VA Real Estate Paid 22604 Pers. Prop. Paid Rm nnta• 0411812011 n„P nata• 12/05/2011 Return e-Treasurer Home Land: $1,866,100 Improve: $1,200 Use: Minerals: e-Commissioner Home Frederick County Home Original Bill: $5,088.39 Pavments: $5,088.39- Acres: 170.00 Penalty Paid: Int Paid: Amount Owed: Other: Last Date: 12/07/2011 Total Owed: Penalty: Interest: Note that if payment has been received within the last 10 business days. anv returned items may not be posted at this time. Please check the website a,ain. Date Type Transaction # Amount Balance 4/18/2011 Charcye 0 S5.088.39 S5.088.39 12/7/2011 Payment 37115 (S5.088.39) S0.00 1 https://taxes.co.frederick.va.us/Applications/TRApps/R-lindex.htm 0 0 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 NOTIFICATION OF PLANNING COMMISSION MELTING April 11, 2012 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RC: REZONING APPLICATION 403-12 FOR GRAYSTONE CORPORATION The Frederick County Board of Supervisors will be meeting on Wednesday, April 25, at 7:15 p.m. in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following application: Rezoning 903-12 of Graystone Corporation, to revise proffers associated with Rezoning #09-09, approved by the Board of Supervisors on January 27, 2010. This revision relates to the "Transportation Improvements" section of the proffers. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838), in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43-A-158, 44-A-25 and 44-A-26. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia, or by calling (540) 665-5651. You can also visit us on the web at: www.co. frederi ck.va. us. Sincerely, John A. Bishop, AICP Deputy Director of Transportation JAB/bad 107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000 0 This is to ert'fy that the attached correspondence was mailed to the following on J from the Department of Planning and Development, Frederick County. Virginia : 43 A 157 43 -A- • 158- ZINN PATRICIA A CRIDER & SHOCKEY INC OF WV RATCLIFF DOROTHY C PO BOX 2530 506 REDBUD RD WINCHESTER VA 22604.1729 WINCHESTER VA 22603.4736 43 - A- - 140- WEBER MICHAEL S 1912 MARTINSBURG PIKE WINCHESTER VA 22603.4708 43 • A• • 146- K & J INVESTMENTS LC 1800 MARTINSBURG PIKE WINCHESTER VA 22603.4707 43 - A- - 154- SHENANDOAH VALLEY BATTLEFIELDS FOUNDATION PO BOX 897 NEW MARKET VA 22844.0897 43 - A- - 155- BRAGG DAVID PO BOX 174 43 - A- - 159- R & J LAND DEVELOPMENT LLC 1631 REDBUD RD WINCHESTER VA 22603.4763 43 _ A• • 159-A KIRBY JANICE MARIE 541 REDBUD RD WINCHESTER VA 22603.4752 44 - A- - 25•B SLAUGHTER JUDITH MCCANN & MARSHALL ELLEN L TRUSTEES 562 MILBURN RD WINCHESTER VA 22603.4724 CLEAR BROOK VA 22624.0174 43 - A- - 156- J J J A ASSOCIATES CIO DRIGGS ASSOC 8700 ASHWOOD DR CAPITOL HEIGHTS MD 20743.3727 �Jo1in - Bishop, T• ry )ortat' n Planner Frederick C L1nty Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK a Notary Public in and for the State and County aforesaic, do 1 nvz, certify that John' Bishop, Transportation Planner For the Department of Planning c ld Development, whose name is signed to the foregoing, dated has personally appeared before me and acknowledged the same in my State a id ounty aforesaid. �9 Given under my hand this �1/l� clay of 'o �s�• Iv1y commission expires on BE�..E•B-'Ly H. DELLINGEi% NOTARY pUHLIC REGISTRATION COMMpN'EALT1-1 Of MY COMMISSION JULY 31..,2O ..� ._ .. NOTARY U1 LLIC 44 - A- - 27- • MBC LC 333 WOOD AVE WINCHESTER VA 22601-3052 44 - A- - 28-B UNGER KENNETH R 288 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-C BODEN ROBERT R JR BODEN MARSHA 210 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-G JOBE ALLEN B JOBE VELDA D 230 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-H HOLLIDAY MARTHA OMPS 130 MARQUIS CT WINCHESTER VA 22603.4723 44 -A- - 31-A STEPHENSON ASSOCIATES LC PO BOX 2530 WINCHESTER VA 22604.1729 44D - 3- - 8- BIG 0 PARTNERSHIP 1800 MARTINSBURG PIKE WINCHESTER VA 22603.4707 54 - A- - 88- ASSOCIATION FOR THE PRESERVATION OF CIVIL WAR SITES 1156 15TH ST NW STE 900 WASHINGTON DC 20005.1717 55 - A- - 3- SHENANDOAH VALLEY BATTLEFIELDS FOUNDATION PO BOX 897 NEW MARKET VA 22844-0897 0 COUNTY of I+REDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 NOTIFICATION OF PLANNING COMMISSION MEETING April 6, 2012 TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNER(S) RC: REZONING APPLICATION #03-12 FOR GRAYSTONE CORPORATION The Frederick County Planning Commission will be meeting on Wednesday, April 18, at 7:00 p.m. in the Board Room of the Frederick County Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following application: Rezoning #03-12 of Graystone Corporation, to revise proffers associated with Rezoning #09-09, approved by the Board of Supervisors on January 27, 2010. This revision relates to the "Transportation Improvements" section of the proffers. The properties are located on the north side of Redbud Road (Route 661), the east side of CSX Railroad, the west side of Milburn Road (Route 662) and the south side of McCanns Road (Route 838), in the Stonewall Magisterial District, and are identified by Property Identification Numbers 43-A-158, 44-A-25 and 44-A-26. A copy of the application will be available for review at the Handley Library and the Bowman Library the week of the meeting, or at the Department of Planning and Development located at 107 North Kent Street in Winchester, Virginia, or by calling (540) 665-5651. You can also visit us on the web at: www.co. fi•ecieriek.va.us. Sincerely, Li John A. Bishop, AICP Deputy Director of Transportation JAB/bad 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 This is to cer if), that the attached correspondence was nlalled to the following on {� from the Department of Planning and Development, Frederick County, Virginia: 43 • A• • 157• 43 • A- • 158• ZINN PATRICIA A CRIDER & SHOCKEY INC OF WV RATCLIFF DOROTHY C PO BOX 2530 506 REDBUD RD WINCHESTER VA 22604.1729 WINCHESTER VA 22603.4736 43 - A• - 140• 43 • A- - 159- WEBER MICHAEL S R & J LAND DEVELOPMENT LLC 1912 MARTINSBURG PIKE 1631 REDBUD RD WINCHESTER VA 22603.4708 WINCHESTER VA 22603.4763 43 . A- . 146- 43 - A• • 159-A K & J INVESTMENTS LC KIRBY JANICE MARIE 1800 MARTINSBURG PIKE 541 REDBUD RD WINCHESTER VA 22603.4707 43 . A- . 154- WINCHESTER VA 22603-4752 SHENANDOAH VALLEY BATTLEFIELDS 44 . A• . 25•B FOUNDATION SLAUGHTER JUDITH MCCANN PO BOX 897 & MARSHALL ELLEN L TRUSTEES NEW MARKET VA 22844.0897 562 MILBURN RD 43 • A• • 155• WINCHESTER VA 22603.4724 BRAGG DAVID PO BOX 174 CLEAR BROOK VA 22624-0174 43 . A• • 156- J J J A ASSOCIATES CIO DRIGGS ASSOC 8700 ASHWOOD DR CAPITOL HEIGHTS MD 20743.3727 /. c! ihn A. lshop, "fransp -t ion P ant r- -/ I'l-cdcl-ick County hlannii g ept. STATE OF VIRGINIA COUNTY OF FREDERICK 1, �lC�g�l� , a Notary Public in and for the State and County aforesaid, do ercby certify that .Iohishop, Transportation Planner for the Department of Planlllllg ail Dcvc1opmcnt, whose name is slgl7Cd to the foregoing, dated has personally appeared before me and acknowledged the same ill my State anc C unty aforesaid. Given under illy hand this —��� clay of NI}' Commission eSpll'CS Oil _ '3— gEVERL-Y H. D_ ELLINGER NOTARY PUBLIC REGISTRATION N 331878 COMMONWEALTHLA MY COMMISSION EXPIRES 1ULY 31,2015 % L!L NOT, IM P LIC 44 • A- • 27- MBC LC 333 WOOD AVE WINCHESTER VA 22601.3052 44 - A- - 28-B UNGER KENNETH R 288 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-C BODEN ROBERT R JR BODEN MARSHA 210 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-G JOBE ALLEN B JOBE VELDA D 230 MILBURN RD WINCHESTER VA 22603.4721 44 - A- - 28-H HOLLIDAY MARTHA OMPS 130 MARQUIS CT WINCHESTER VA 22603-4723 44 -A- - 31-A STEPHENSON ASSOCIATES LC PO BOX 2530 WINCHESTER VA 22604.1729 44D - 3- - 8- BIG 0 PARTNERSHIP 1800 MARTINSBURG PIKE WINCHESTER VA 22603.4707 54 - A- - 88- ASSOCIATION FOR THE PRESERVATION OF CIVIL WAR SITES 1156 15TH ST NW STE 900 WASHINGTON DC 20005.1717 55 - A- - 3- SHENANDOAH VALLEY BATTLEFIELDS FOUNDATION PO BOX 897 NEW MARKET VA 22844-0897 �Ys-?V AJ Graystone Corporation PrOWY V TO: BARBARA-DATA PROCESSING FROM:BEV - Pi Wing Dept. Please print sets of labels by ' l? H NKS! Ad Source: Fredenck County GIS. May 2009