HomeMy WebLinkAbout02-13 Fairfax Pk-VDOT Ln - Opequon 3.61 acres from B1 to B2 - BackfileREZONING TRACKING SHEET
Check List:
✓ Fee & Sign De
Application Form Deposit
g P
Proffer Statement t/ Deed
Impact Analysis ✓ Plat/Survey
Adjoiner List Taxes Paid Statement C/
File opened
yReference manual updated/number assigned
D-base updated
�a 3 Copy of adjoiner list given to staff member for verification
_ Color location maps ordered from Mapping
/ Application Action Summary updated
�i Planning Commission Meeting ACTION:
/ g
Board of Supervisors Meeting ACTION: C `-e
/3 Signed copy of Resolution received from County Administrator and
placed in Proffers Notebook together with proffers
Approval (or denial) letter mailed to applicant/copy to file and cc's
& I j ---3 Reference manual updated
!p D-base updated
(� f Application Action Summary updated
7 �' 13 r File given to Mapping to update zoning map
Zoning map amended
Sys ID #
RECEIPT DATE_ Z_— _ NO. J u J `t
RECEIVED FROM _13 J% InS)I
•U
(-)FOR RENT
RFOR _kylti
ACCOUNT
Q ASH
—
CHECK
MONEY
Q ORDER
PAYMENT
BAl DUE
I
QCREDIT
CARD
)l V-} �2 ;-Li�*S5
,t.G`rvi 5clmv. DOLLARS
r ► �
all "M
BY
RECEIPT DATE 4111 1 a, No. 5)L,
RECEIVED FROM
�FOR� RENT 'R�
ACCOUNT O CASHCAT
VCHECK
PAYMENT t�� n�,l� MONEY
ORDER
BAL DUE OCREDIT
CARD
BY
Rem
(o '51�1
RS
Nc0 ,oft&ICK
Department of Planning and Development
S40/66S-S6S1
FAX: S40/66S-639S
) 2013
Mr. Evan Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE: REZONING 902-13 FAIRFAX PIKE/VDOT LANE
PINS: 86-A-1=1 AND 86-A-15
Dear Evan:
This letter serves to confirm action taken by the Frederick County Board of Supervisors at their
meeting on June 12, 2013. The above -referenced application was approved to rezone 3.61 acres
from the B1 (Nei(hborhood Business) District to the B2 (General Business) District with proffers.
The properties are located on the north side of Fairfax Pike (Route 277), adjacent to VDOT Lane
(Route 1018), approximately '/ mile east of hnterstate 81 Exit 307. in the Opcquon Magisterial
District.
The proffer statement, originally dated January 25, 2013, with Final revision date of May 17, 2013,
that was approved as a part of this rezoning application is unique to the above referenced properties
and is binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your
records. Pursuant to §165.102.06E, the County Attorney will present the written proffer to the
Frederick County Clerk of Circuit Court for recordation.
Please do not hesitate to contact this office if you have any questions regarding the approval of this
rezoning application.
Sincerely,
Michael T. Ruddy, AICP
Deputy Director
\4TPJpd
Attachment
cc: Roger Thomas and Brian Madagan, Opequon District Planning Commissioners
Jane Anderson, Real Estate
Commissioner of Revenue
Rod Williams, County Attorney w/Proffer and Resolution
Bowman -Shoemaker Cos., Inc.. PO Box 480. Stephens City, VA 22655
107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000
0
REZONING APPLICATION #02-13
FAIRFAX PIKE/VDOT LANE COMMERCIAL
Staff Report for the Board of Supervisors
Prepared: June 3, 2013
Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director
Reviewed Action
Planning Commission: 05/15/13 Recommended Approval
Board of Supervisors: 06/12/13 Pencling
PROPOSAL: To rezone 3.61 acres from B I (Neighborhood Business) District to B2 (General
Business) District with proffers.
LOCATION: The properties are located on the north side of Fairfax Pike (Route 277) adjacent to
VDOT Lane (Route 1018), approximately %2 mile east of Interstate 81 Exit 307.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 06/12/13 BOARD OF
SUPERVISORS MEETING:
This is an application to rezone a total of 3.61 acres of land from the B 1 (Neighborhood Commercial)
District to the B2 (Business General) with proffers, to accommodate commercial Uses.
The B2 (Business General) land use proposed in this rezoning is generally consistent witli the Route
277 Urban Center Plan and the 2030 Comprehensive Plan. The impacts associated with this request
leave generally been addressed by the Applicant and the adjacent properties have been considered in this
rezoning application. Witll this rezoning, the applicant has proffered to dedicate the necessary riglit-of-
way to enable the Route 277 improvement project to occur and has coordinated the access to this
development to further implement the Route 277 plan. In addition, the Applicant has proffered a
monetary contribution in the amount of $35,000 to assist in other transportation improvements. The
Applicant made a minor rcvlslon to the proffer statement (Revision Date; May 17, 2013) to open this
contribution up to any approved Rcvenue sharing projects in Frederick County. Previously, this had
been specifically for the Renaissance Drive Phase 2 project.
The Frederick County Planning Commission recommended approval of this request with the above
noted minor modification to the proffer statement.
Following the required public hearing, a decision regarding this rezoning application by the
Board ofSitperi,isois woiild be appropriate. The crpplicatit shoitld be prepared to adequately
address all concerns raised by the Board of'Superi,isors.
L--1
•
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
Junc 3. 2013
Page 2
This report is prepared by the Frederick Countti, Planning Staff to provide information to the
Planning Commission and the Board of'Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff Where relevant throughout this staff report.
Reviewed Action
Planning Commission: 05/15/13 Recommended Approval
Board of Supervisors: 06/12/13 Pending
PROPOSAL: To rezone 3.61 acres from B 1 (Neighborhood Business) District to B2 (General
Business) District with proffers.
LOCATION: The properties are located on the north side of Fairfax Pike (Route 277) adjacent to
VDOT Lane (Route 1018), approximately % mile cast of Interstate 81 Exit 307.
MAGISTERIAL DISTRICT: Opequon
PROPERTY ID NUMBERS: 86-A-14 and 86-A-15
PROPERTY ZONING: B I (Neighborhood Business)
PRESENT USE: Vacant
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RP (Residential Performance)
B 1 (Neiglborhood Business)
South: B2 (Business General)
East: B 1 (Neighborhood Business)
West: B2 (Business General)
B 1 (Neighborhood Business)
Use: Residential
Residential
Use: Commercial
Use: Commercial
Use: Residential
VDOT Headquarters
0 •
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
June 3. 2013
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: We have reviewed the revised rezoning application for the Fairfax
Pike/VDOT Lane Commercial Properties as received by this office on April 11, 2013, for impacts to the
local transportation system. VDOT supports this rezoning in its current format.
Fire and Rescue: Plan approved.
Public NVorks Department: We have completed our review of the rezoning application for the
proposed commercial development at the intersection of Fairfax Pike and VDOT Lane. Based on this
review, we offer the following minor comments: 1. Rcier to Site Drainage on Page 8. Change east to
west of the Food Lion Plaza development. 2. At the site plan design phase, include an analysis of the
downstream stormwater conveyance systelll Lllltll tile 111110ff 1'caclics the drainage channel Oil tile SOLIth
side of Fairfax Pike. Alternative stormwater management Systems Should be considered ill future site
plan designs.
Department of Inspections: N/A
Frederick County Sanitation Authority: Per your request, a review ol�thc proposed rezoning has
been performed. The Frederick County Sanitation Authority Offers conlnlCntS limited to the anticipated
impact/effect ul)on the Authority's public water and sanitary sewer system and the demands thereon.
The parcel is in the water and sanitary sewer area served by the Authority. Based on the anticipated
usage, water capacity is presently available. Sanitary sewer treatment Capacity at the waste water
treatment plant is also presently available. Conveyance capacity and layout will be contingent on the
applicant performing a technical analysis the existing sanitary sewer system within the area to be served
and the existing collection maul. Both water and sanitary sewer facilities are located within a
reasonable distance fi'onl this site. Please be aware that the Authority does not review or comment upon
proffers and/or conditions proposed Or Subinitted by the applicant ill SLII)I)01't Of 01' Ill COI1jL111CtiOn with
this application for rezoning, nor does the Authority assume or undertake any responsibility to review or
comment upon any amended proffers and/or conditions which the Applicant may liercafter provide to
Frederick County.
Service Authority: N/A
Frederick -Winchester Health Department: N/A
Parks & Recreation: N/A
Winchester Regional Airport: Proposed rezoning should not have an impact on operations at the
Winchester Regional Airport.
Frederick Count, Attorney: Pleu,ve .vee attached letter clalecl Mcirch 12, 2013, from Roderick B.
I,Villi(rnls, Counl1) illlorney.
0 0
Rezoning 02-13 Fairfax Pike/VDOT Lane Commercial
June 3, 2013
Page 4
Piannina. Department: Pleasesee attached memo dated Allarch 22, 2013, ftom Michael 7: Rirchly,
AICP, Deputy Planning Director.
PlaI nill(,j & ZOl hg,:
1) site History
The original Frederick County zoning ]flap (U.S.G.S. StCI)IICIiS City QUadrangle) Identlf cs the
subject parcels as being zoned 13-1 (Ncighborhood Business). The intent of this district is to
provide small business areas to serve the daily IIOLISC110Id needs Of' siu-roundillg residential
neighborhoods. Uses allowed primarily consist of limited retailing and personal Service uses.
Business uses in this district Should be small in size and should not produce Substantial vellicle
traffic in excess Of what IS usual in the residential neighborhoods.
2) Comprehensive Police Plan
The 2030 Comprehensive Plan is the guide for the future growth of Frederick County.
Tile 2030 Comprellcnslve Plan is all official public CIOCIIIIiCIIt that sci*vcs as the C011lnlllillty'S
guide for making decisions regarding (development, preservation, public facilities and other key
components of community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence a composition Of policies LISCd to
plan for the future physical development of Frederick County.
Land Use.
The 2030 Comprehensive Plan and the Route 277 Triangle and Urban Center Land Use Plan
provide guidance on the future development of the property. The property is located within the
UDA and SWSA. The 2030 Comprehensive Plan identifies the general area surrounding this
property with all Urban Ccntcr land use dCSlgnation. Ill general, the proposed commercial land
use designation for this property is consistent with this land use designation of the
Comprehensive Plan as the urban center designation promotes both commercial and residential
land uses ill a IlliXCd use Cl1VIl'011llient. This general area contains both uses.
Site Access and Transportation.
Route 277 is identified as a minor arterial road. Transportation improvements to Route 277,
Fairfax Pike, are planned on the VDOT Six -Year hnprovcnlent Plan. Therefore, it is not
anticipated that this project constructs inlprovcnlcnts to Route 277, rather, dedicates appropriate
right-of-way, designs access to this site that is consistent with those improvements anticipated
with the VDOT Six -Year Plan Project, and provides some contribution to transportation
improvements resulting from the impacts of this new development; further, that the value of any
contribution has a nexus to the project and its impacts.
0 •
Rezoning ft02-13 Fairfax PikeNDOT Lane Commercial
June 3, 2013
Page 5
The provision of a shared right-in-►-ight-out entrance is proposed. Given the anticipated
separated median design for Route 277, such an approach may work in this location. In general
additional entrances on Route 277 are to be avoided. hmtcr parcel connectivity has been provided
between the two properties.
The proposed relocation of VDOT Lane to the west to align with the existing entrance to the
shopping center will not have an impact to the entrance proposed on VDOT Lane. The
Applicant has worked with VDOT and Mr. Bishop, Frederick County Transportation Planner, to
ensure that the proposal fits in with the preliminary engineering and design work for the Route
277 improvement project.
3) Site Stiitability/Environment
The site does not contain any environmental fcatures that would either constrain or preclude site
development. There are no identified areas of steep slopes, floodplains or woodlands. The
Frederick County Engineer has requested that an analysis of the downstream stormwater
conveyance system until the runoff rcaclics the drainage channel on the south side of Fairfax
Pike will be needed as part of the detailed site plan design.
4) Potential Impacts
The subject properties are currently zoned B 1 (Neighborhood Business). Therefore, the
rezoning of these properties to the B2 (Business General) district will have the potential to
generate additional impacts. However, it is recognized that the impacts associated may not be
as significant as if this property was zoned RA (Rural Areas). The Applicant has made
commitments to address the additional impacts associated with this request.
3) Proffer Statement— Dated January 25, 2013 and revised on April 11, 2013
(Final Revision date May 17, 2013)
A) Generalized Development Plan
The Applicant has proffered a Generalized Development Plan. The Plan identifies the
properties to be developed and recognizes the transportation and access related
commitments made with this rezoning application; including the Route 277 right-of-
way dedication area, access to and from the site via a right -in -right -out entrance on
Route 277 and a full entrance on VDOT Lane, and the inter parcel ingress/egress
casement.
B) Land Use
The application's proffer statement does not place any limitation on the amount of
commercial development that may occur on this property.
Rezoning 02-13 Fairfax PIkeNDOT Lane Commercial
.tune 3. 2013
Page 6
C) Access Mana 7en� kilt.
Access to the property will be via a I'Igllt-ill-t'Igllt-OLIt entrance on ROLIte 277 and a full
commercial cntrancc O11 VDOT Lane. A 50 foot ingress/egress casement will be
locatc(I at this full commercial clltraIICC aII(I will CIISLII'C inter parcel access to the
eastern parcel, Parcel 86-A-14
D) Transportation
The proffer statement provides for 20 foot of'right-of-way dedication along Route 277
III support of the Route 277 Improvement Project.
As noted previously, transportation improvements to Route 277, Fairfax Pike, are
plannecl on the VDOT Six -Year Improvement Plan. Therefor(, it is important that the
access to this site reflects the design of the improvements anticipated with the VDOT
Six -Year Plan Project. The above proficrecl access improvcments are consistent with
this project.
The application adch'csscs the relocation of VDOT Lane in the fixture by ensuring the
entrance to this property is located so as to fit in with the clesign for the realignment.
In addition, this application has proffered a monetary contribution in the anlOLult of
$35,000.00 to transportation IlmproVCIIICIItS CISCWIICI'C in the County. More specifically,
for the off -site transportation improvcments associated with the Renaissance Drive —
Pllase 2 Revenuc Sharing Project. The Applicant believes that the value Of this
contribution has a nexus to the project and its impacts.
The Applicant made a minor rel,rsvon to the proffer statement (Revision Date; May
17, 2013) to open this contribution up to ally approved Revenue sharing protects 111
Frederick County. Prevlous1j,, this had been specy cal% j, for the Renaissance Drive
Phase 2 project.
C) Community Facilities
This application proffers a monetary contribution in an amount Of $0.05 per bLIiIC11IIg
square foot for Fire and Rescue SCI'V1CCS.
STAFF CONCLUSIONS FOR THE 05/15/13 PLANNING COMMISSION MEETING:
This is an application to rezone a total of 3.61 acres Of land From the B I (NClghborhoocl Commercial)
District to the B2 (Business General) wit}l proffers, to acc011 moclatc commercial uses.
The B2 (Business Gcneral) lancl use proposed in this rezoning is generally consistent with the Route
277 Urban Centcr Plan and the 2030 Comprehensive Plan. The impacts associated with this request
leave generally been adcl'essec] by the Applicant and the acijaecnt properties have been considered in this
rczoning application. Wltll tllls I'ezolllilg, the applicant has proffered to dedicate the necessary right-of-
way to enable the Route 277 improvcnICllt pI'OjCCt to OCCLII' alld has coor(f mated the access to this
0 •
Rezoning 02-13 Fairfax I'IkeNDOT Lane C'ommcrcial
June 3, 2013
Pase 7
development to further implement the ROLItc 277 plan. In addition, the Applicant has proffered a
monetary contribution ill the amount of S35,000 to assist in other transportation improvements.
Following the required public hearing, (( r'ecorr mend((tion regarding this rezoning application to
the Board of'Supervisors )mrrld be appropriate. The applicant should be prepared to adeguatell,
a(lllr'e.v.4 all concerns r'ar3ed bh the Plarrrrrng Cori mi.ys on.
PLANNING COMMISSION SUMMARY & ACTION Or THE 5/15/13 MEETING:
The applicant's representative, Mr. Evan Wyatt with Greenway I_ngineering, stated considerable time
was spent working with VDOT and the County's Transportation Planner. The applicant was
encouraged not to seek a full access entrance on Routc 277 Ior the internal parcel; instead they
developed a full access off VDOT Lanc which would serve both properties. In retLII-n, VDOT gave the
applicant an exception for the spacing requirement for the right -in, right -out entrance. Tile second issue
was the relocation of VDOT Lanc when the widening of Route 277 occurs. The applicant wanted to
make sure the siding of his entrance was done so that it woLlld not have to be ripped out when the
improvement occurred; therefore, the entrance was moved a little further back from the corner Clearance
1'egLlll'elllellt. Mr. Wyatt commented the applicant was the local matell for the Renaissance Drive, Phase
1 improvements. Phase 2 was targeted by the applicant because it is a priority project for the County.
1-fe suggested the possibility of'having the applicant's monetary prof lei' available for a local ]hatch for a
qualifying revenue sharing project; therefore, if for any reason, Renaissance Drive does not materialize,
the
$35,000 is still available to the County for a local match for another qualifying revenue -sharing project.
Mr. Wyatt said the applicant would be agreeable with amending this section of the proffer before it
goes to the Board, if the Planning Commission believes it would be appropriate.
Members of the Commission asked the applicant if the project site was anticipated to be developed
before Fairfax Pike (Rt. 277) is improved. Mr. Wyatt believed there would be the opportLulity for one
of the two lots to develop and Nvould most likely be some type of retail or food service. A Commission
member inquired if the relocation of V DOT Lane would occur regardless of the proposed rezoning; Mr.
Wyatt replied yes, the widening will II1CILlde two travel lanes cast and two travel lanes west with a
center median. Ill addition, VDOT Lane will tic Into a cross intersection with the entrance into the Food
Lion Plaza.
One adjoining property owner spoke and wanted to know how the rezoning would impact his property.
He also had questions on the scope of the project and why the parcel deeded to be rezoned for this
particular project.
A motion was made, seconded, and passed by a majority vote fora recommendation of approval of the
rezoning with the understanding that before going to the Board of Supervisors, the language for the
monetary proffered contribution of S35,000 will be amended from being specific to Renaissance Drive
to being generalized for a qualifying revenue project elsewhere in the County.
(Note: Commissioners Thomas, Crockett, and Croscll werc absent from the meeting.)
i
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
,tune 3, 2013
Page S
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 06/12/13 BOARD OF
SUPERVISORS MEETING:
This is an application to rezone a total of 3.61 acres of land from the B 1 (Neighborhood Commercial)
District to the 132 (Business Gcneral) with proffers, to accommodate commercial uses.
The B2 (Business General) land use proposed in this rezoning is generally consistent with the Route
277 Urban Center Plan and the 2030 Comprehensive Plan. The impacts associated with this request
have generally been addressed by the Applicant and the adjacent properties have been considered in this
rczoning apphCatlon. With tllis i-czolllilg, the ap])llcallt has ])l'of1C1'CCl to CIecllcatc t11C IIecessal'y i'Igllt-Of=
way to enable the Route 277 improvc111C11t ])I'OjCCt to OCCUr and has Coordinated the access to this
development to further implement the Route 277 plan. In addition, the Applicant has proffered a
illonetary contribution ill the amount Of S35,000 to assist Ill other transportation improveillents. The
Applicant made a minor revision to the proffer statement (Revision Date; May 17, 2013) to open this
contribution up to any approved Revenue sharing projects in Freclerick County. Previously, this had
been specifically for the Renaissance Drive Phase 2 project.
The Frederick County Planning Commission reconi cndcd approval of this request with the above
noted minor modification to the proffer statement.
Followin the requiredpublic hearing, a decision regarding this rezoning application b31 the
Board ofSuperhisors would be appropriate. The applicant should be prepared to a(lequatel3,
address all concerns raised 151, the Board of'Superl,isors.
R Applications
Parcels
Building Footprints
B1 (Business. Neighborhood District)
B2 (Business, General Distrist)
B3 (Business, Industrial Transition District)
EM (Extractive Manufacturing District)
�f! HE (Higher Education District)
Mt (Industrial, Light District)
M2 (Industrial, General District)
MH1 (Mobile Home Community District)
4� MS (Medical Support District)
OM (Office • Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Area District)
RP (Residential Performance District)
• r ag
po
e
:+ TT ■ r Al VME 5
�� awl'•" ^ � . o `
REZ#02-13
Fairfax Pike / VDOT
Lane Commercial
PINS:
86 A 14.86 A 15
3.61 Acres B 1 to B 2
Note:
Frederick County Dept of
Planning Developments
107 N Kent
St
Suite 202
Winchester. VA 22601
540 665 5651
reap Created: April 24, 2013
Staff: mruddy
0 80 160 320 Feet
0 0
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
To be completed by Planning Staff.-
Fee Amount Paid $ o0
Zoning Amendment Number Date Received
PC Hearing Date BOS Hearing Date
The following information shall be provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the Office of the
Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Wincliester.
1. Applicant:
Name: Greenway Engineering
Address: 151 Windy Hill Lane
Winchester, VA 22602
2. Property Owner (if different than above):
Name: Bowman -Shoemaker Companies
Address: P.O. Box 480
Stephens City, VA 22602
3. Contact peison if other than above:
Name: Evan Wyatt
4. Property Information:
Telephone: 540-662-4185
Telephone: 540-869-1800
Telephone: 540-662-4185
Property Identification Number(s): 86-A-14 & 86-A-15
Total acreage to be rezoned: 3.61 +/- Acres
Total acreage of the parcel(s) to be rezoned (if the entirety of the parcel(s) is not being
rezoned): N/A
Current zoning designation(s) and acreage(s) in each designation: B-1 District
1.65 +/- Acres (Parcel 14) & 1.96 +/- Acres (Parcel 15)
Proposed zoning dcsignation(s) and acreage(s) in each designation: B-2 District
1.65 +/- Acres (Parcel 14) & 1.96 +/- Acres (Parcel 15)
Magisterial District(s): Opequon Magisterial District
12
I�
0
5. Checklist: Check the following items that have been included with this application.
Location map ✓ Agency Comments ✓ I
Plat ✓ Fees ✓
Deed to property ✓ Impact Analysis Statement _; ✓ j_
Verification of taxes paid ✓ !_ Proffer Statement
Plat depicting exact meets and bounds for the proposed zoning district
Digital copies (pelf's) of all submitted documents, maps and exhibits I ✓ i_
6. The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Bowman -Shoemaker Companies, Inc. - Beverley B. Shoemaker, President
Elizabeth Properties, Inc. - Beverley B. Shoemaker, Manager
7. Adjoining Property:
PARCEL ID NUMBER
I:1ld
86-A-14A
86-A-15A
86-A-16
86-A-18
86D-4-18A
USE
VDOT Yard/Office
Commercial
Residential Apartment
Residential
Commercial
Townhouse Open Space
ZONING
B-1 District
B-1 District
B-1 District
B-2 District
B-2 District
RP District
8. Location: The property is located at (give exact location based on nearest road and distance from
nearest intersection, using road names and route numbers):
North side of Fairfax Pike (Route 277); Adjacent to VDOT Lane (Route 1018); approximately 1/2-mile east of Interstate 81 Exit 307
13
•
•
9. The following information should be provided according to the type of rezoning
proposed:
Single Family homes: N/A
Non -Residential Lots: N/A
Office:
Retail:
Restaurant:
Commercial:
10. Signature:
Number of Units Proposed
TownhoIlle: N/A Multi -Family: N/A
Mobile Home: N/A Hotel Rooms:
Sauare Footan of Proposed Uses
Service Station:
ManUIaCLU611g:
Warehouse:
Other: Undetermined
I (we), the undersigned, do hereby respectfully make application and petition the Frederick
County Board of Supervisors to amend the zoning ordinance and to change the zoning map
of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the
property for site inspection purposes.
I (we) understand that the sign issued when this application is submitted must be placed at
the front property line at least seven clays prior to the Planning Commission public hearing
and the Board of Supervisors public hearing and maintained so as to be visible from the road
right-of-way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and
accurate to the best of my (our) knowledge.
Applicant(s): t Date: -III 13
Date:
Owner(s): t U t 'ilur Z,i �, /i Date:
Date:
14
Q AUZED DEVELgPME►{T PLM z n
l�
t EXISTING DATA SHOWN HAS BAN CO&P1LIED
FROM FREDERICK 00. NO DATA. LE�111S
2. TOPO(BiAPHY 18 FROM YEAR 200S. L S S. TAX MAP WORMATIO N 0 FROM YEAR 2010. W FtLL
♦. ORTHOPHOT08 ARE FROM YEAR 2006-
Bpl�
L THIS EXHBIT HAS BEEN DEVELOPED FOR R1ROI 333
iiEF6E4CE AND M NOT NTIEDED FOR S 1
GONBTRUCTION OR P9i/TTINo 118E /
J
S. LEA
ae
1 - ROW DGMATION AREA Is
2 - F104T N/RIONT OUT ENTRANCE
a - CORNER CLEARANCE. FULL ACCESS C
ENTRANCE `J s
. A � BrfT i
- FULL ACCESS ENTRANCE OM N 6D'
SPACNKI) - -
T. ROW NARRATIVE - THE ROW DEDICATION Z
AREA PROVDED ON THIS EXHISTT 16 TO z
ENSURE APPROPRIATE AREA FOR THE J
SECOND WESTBOUND TRAVEL LANE MM N Tv �s A t6 TM so-"0-
STRIP T9 SIDEWALK EWALK AA P MAPMMANCE
ST1aP. THE ROW DEDICATION TO BE F..
PROVDED AT TINT TM OF FIRST SITE PLAN Z
UNLESS tEOUI ED BY VDOT PRIOR TO W
DEVELOPMENT. 2a i >
of
J
W aI
LU
�. N
c
z
-_ - o
IIOUTE 2" - FAMAI
60 30 O 60 120 ■a re a
a s
5GA1E, V - 60'
•
P14TE8•
L EXt8TM DATA SHOWN HAS BMN COMPILED
FROM FREDERICK CO. 098 DATA-
2. TOPOGRAPHY IB FROM YEAR 2008.
i. TAX MAP WORMATTON IS FROM YEAR 201a
4. P1/ ORTH100T08 A,= FROM YEAR YOOQ
a. THIS EXHBT HAS BEEN DEVELOPED FOR
REFSIEIICE AND W NOT INTENDED FOR
CONSTRUCTION OR PERM"M USE.
IL Llwml? Iwo
- ROW DEDICATION AREA
Q - RXifT N/RKifT OUT ENTRANCE
9 - CORNET; CLEARANCE. FULL ACCESS
ENTRANCE
O- NITER -PARCEL ACCESS ESMT
T. ROW NARRATTVE - THE ROW DEDICATION
AIiA PROVIDED ON THIS EXHWT tS TO
ENSUE APPROPRIATE AREA FOR THE r
SECOND WESTBOIED TRAVEL LANE, GREEN
STRIP, IV SIDEWALK AND A T MAEfT@IANCE 1 1
STRIP. THE ROW DEDICATION TO i
PROVIDED AT THE TOF FRET BETE PLAN
tMtSS REOIi,ED BY VDOT PROR TO
DEVELOPMWT.
S. VDOT LANE RELOCATION IS BASED ON
VDOrS MIAL SKETCHES THEN TAKES WTO
ACCOUNT THE DEVELOPMENT OF THE
OLO E0T PARCEL& DESIM SPEED OF 20
MPH ON VDOT LACE HAS BEEN USED FOR
THIS EXHIR.
. klom s
i
• r
0%
J
Q
U
cw
F
o*
w 3�
� a-
.
0
X w
Q a
LL O
U-
_� T
a►a �s�u
we KE
wl
•
u
-YrLG VVVIV lflf ^DOImm i1f
0
0
N
+.a+ .sLlrts/• �.s M �
r
/04po.v
s��,�s-spN%wrt
y.so-s �cvar�-�
OI :���•rwtF
t 9�? ►- c�res
CC K, 1,5
L Il29 O i.l''4�j
I092
LAND 54��
,..
c�,o,�'4�C/G.v oc�T, �.PEoE.Qicr
%-.sVt•*s • ioo •
--VA~.M+/i .adr si iP p a
v AR .t/decE.0 Y
' iw•vc.�vrr r�.4� i.•i.
owt,,,j
I i CPS
aaoz,-)eca 1p 4 C, a, I CC)
lK
el
imam
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Website: www.co.frederick.va.us
Department of Planning & Development, County of Frederick, Virginia
107 No►•th Kent Street, Winchester, Virginia 22601
Phone (540) 665-5651 Facsimile (540) 665-6395
Know All Men By These Presents: That I (we)
(Name) Bowman -Shoemaker Companies, Inc.
(PllollC) (540) 869-1800
(Address) PO Box 480 Stephens City, VA 22655
the owner(s) of all those tracts or parcels of' land ("Property") conveyed to tile (us), by cfeed recorcled in the
Clerk's Office of the Circuit Court of the County of 1'rccierick, Virginia, by
Illstrliillcilt No. Deed Book 634
Oil Page 499 , and is described as
Parcel: S6 Lot: 14 Block: A Section
do hereby make, constitute and appoint:
(Nallle) Greenway Engineering
Subdivision:
(PllO11C) (540) 662-4185
(Address) 151 Windy Hill Lane Winchester, VA 22602
To act as Illy true and lawful attorney -in -fact for and in Illy (Our) name, place and stead with full power and
authority I (we) would have if acting personally to file planning applications for Illy (our) above described
Property, including:
X Rezoning (including proffers)
Conditional Use Permit
Master Development Plan (Preliminary and Final)
Subdivision
Site Plan
Variance oi- Appeal
My attorney -in -fact shall have the authority to ofTer proflerecl conditions and to make amendments to previously
approved proffered conditions except as follows:
This authorization shall expire one year from the clay it is signed, or until it is otherwise reseincled or nlociified.
In witness thereof, I (we) have hereto set Illy (our) hand and seal this J — clay of 04AL 20 13 ,
Signature(s)
0i
State of Virginia, City/County Of ���� C�\� , To -wit:
I, i ���tlh'-� \� , `h 19s1 , a Notary Public in and for the jurisdiction aforesaid,
certify that the person(s) who signed to the foregoing insti'linicnt I)Ci-sonally nappeared before me and has
as�alowleciged the same before ale in the jurisdiction aforesaid this A day of N- (X4l , 20 1 '3 .
1 I I
emission Cxpires:
Notary Public SAUNDRA M. MURPH
Notary Public
7r14181
Mar A^ a1 2016
.��. ... ..•L, .
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Website: www.co.frederick.vams
Department of Planning & Development, County of Frederick, Virginia
107 North Kent Street, Winchester, Virginia 22601
Phone (540) 665-5651 Facsimile (540) 665-6395
Know All Men By These Presents: That I (NVe)
(Nallle) Elizabeth Properties, L.C.
(Phone) (540) 869-1800
(Address) PO Box 480 Stephens City, VA 22655
the owncr(s) of all those tracts or parcels of land ("Properly") conveyed to nlc (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County Of Frederick, Virginia, by
I1lStl•il1llcllt NO. 070002101
on Page 0411 , and is described as
Parcel: 86 Lot: 15 Block: A Section
do hereby make, constitute and appoint:
(Name) Greenway Engineering
Subdivision:
(P11011C) (540) 662-4185
(Address) 151 Windy Hill Lane Winchester, VA 22602
TO act as my true and lawful attonicy-ill-fact for and ill Illy (om-) Rattle, place and stead with full power and
authority I (we) wotdd have if acting personally to file planning applications for Illy (our) above described
Property, including:
X Rezoning (inchiding proffers)
Conditional Use Permit
Master Development Plan (Preliminary and Final)
Subdivision
Site Plan
Variance or Appeal
My attorney -in -fact shall have the authority to offer proffered conditions and to make anlen(in1CntS to previously
approved proffered conditions except as follows:
This authorization shall expire one year from the (lay it is signed, or Lill 11 1 is otherwise rescinded or modified.
In witness thereof, I (we) have hereto set my (our) haled alld scat this i�-� (lay of A , 20 3 ,
Signaturc(s)
v
State of Virginia, City/COtinty Of C_� < , To -wit:
I, -k - , a Notary Public in and for the jurisdiction aforesaid,
certi y that the person(s) who signed to t le foregoing instrunlCnl personally appeared before me and has
Psnowledgcd the same before me in the jurisdiction aforesaidthis JV—day of , 20L�.
11 v S \ M Commission Expires:
Notary Pilblic SAUNDRA M. MURPH
Notary Public
7514181
M., ��..,•, . �,. NA; 31. 2016
NOTES-
1. EXISTING DATA SHOWN HAS BEEN COMPILED
FROM FREDERICK CO. GIS DATA.
2. TOPOGRAPHY IS FROM YEAR 2008.
3. TAX MAP INFORMATION IS FROM YEAR 2010.
4. ORTHOPHOTOS ARE FROM YEAR 2006.
5. THIS EXHIBIT HAS BEEN DEVELOPED FOR
REFERENCE AND IS NOT INTENDED FOR
CONSTRUCTION OR PERMITTING USE.
6. LEGEND
t ROW DEDICATION AREA
2 - RIGHT IN/RIGHT OUT ENTRANCE
3 - CORNER CLEARANCE, FULL ACCESS
ENTRANCE
- INTER -PARCEL ACCESS ESMT
7. ROW NARRATIVE - THE ROW DEDICATION
AREA PROVIDED ON THIS EXHIBIT IS TO
ENSURE APPROPRIATE AREA FOR THE
SECOND WESTBOUND TRAVEL LANE, GREEN
STRIP, 5' SIDEWALK AND A 1' MAINTENANCE
STRIP. THE ROW DEDICATION TO BE
PROVIDED AT THE TIME OF FIRST SITE PLAN
UNLESS REQUIRED BY VDOT PRIOR TO
DEVELOPMENT.
8. VDOT LANE RELOCATION IS BASED ON
VDOT'S INITIAL SKETCHES THEN TAKES INTO
ACCOUNT THE DEVELOPMENT OF THE
SUBJECT PARCELS. DESIGN SPEED OF 20
MPH ON VDOT LANE HAS BEEN USED FOR
THIS EXHIBIT.
�1
,a
Z
Lu N h u
Z
t\
• � 9
W�o~i�'np�
UA
lil
rya
♦
v
♦
4Ir
�O
•
�. c
Q
E" cc F
W L)
La
w V)>
~ � d
z
Q U v rx a
o cc FU
w W^
W Ym
AL00 z Q
LB
0 a
H X c
LL
t
_
REVISED 04/09/13
i7w"w lum
DATE: 3-28-13
SCALE I' - 60'
60 30 0 60 120
DESIGNED BY: Rix
`;IL
JOB NO. 6510
#
15GAI E: 1 " = 60'
9HEET I OF I
Map Data Source Frederick County. Va GIS Department. November 2012 Data. Aerial Photo from 2010
- ---
low
( \
Admk
�� Fairfax Pike & Adjoining Roads 4
B1 & B2 District FAR Data Map and Tahle Exhibit
�
_ 2y
74B
81
O / 0 57
2652
OC! 0 57 74B 5 1 Bi O O O
Q� 1
3696 B
74B 51 D FPO
�'
y B 1 ,Z! \
Qr 647 098 U y'9i� oO m
2 O ,
C/R O �65668
3120',
86 A
B 0:3a 19 o n Bz
\ 85 4 3 O °
0.878
85 4 5A 0.41 O O O O G FTy.�R
B. 0 O (/�/� 2 01 /
51 O o V 86 A
08
O 85 BO ' 498 ; 4250 B2 7 Q
0 es q 1 es A 15
O ` O O � � O B7 Bt \✓ /�
Q 235 178
4588 - 2352
85 A 149 /' - 746--72jD` / r 1.96 0 86 A 13 11
59 B2 B2 / 1 09t 0.87 Z 0 88 A 14 B1 7254--__�
1541 5 \� / 11 / 15 !' 1 045 + 5000 88 A 15 81 0.71 1.04 86 A 10B t
82 74B 7 2 C 74B 7 2 D2 B2 0 0 75 56 12322 82.. i ° Q
2810 6859 5 1 P'
\851 Ar 149C 0 748 7 2 D1/ f 74B 7 2 D3 B1 61
748 i7 2 B !r c _- 86 .. A 14 88 �A 12 r 1
81 B2 B2 B2 t;5 A 152 3742 B1 r�I o
B2 86 A 16 Q n
- — B2. U Q!,
Ap-
FAIRFAX-PIKE - 77 -- F
019 -- o.a3 , za
133 _ --
y
85 A1 1 0.57 11 ---, a Q 0 8 B12 B .,. A 86 1 A 8 82AJ
91 85 A 148D '_ .I O 0 ❑ 3396 82 2
--- — s58 1 A B
1 e 297 O L-INWOOD-C_T.1 s2 1 L
5120 3000 0
85 A 148E ' ;' 85 3 1 O ❑ Q I 0 57 88 A 17 Bt Legend
21 ❑ 85B 1 B1 1814
Yi5 85 A=�14170,6�21 O �1 I 82 Building Footprint
24308 B2 0 U w o 86 A 18 Parcel Boundary
85 A 148c 8 A 1488 o a > I.Li LJ 62
B o ❑ Q °
W
2 02 W
1.52. 85 A 14 O� w
❑
5530 i� 1
A 146A B2 �,• Zs7 O d C] ❑ M1900 0 ,�GO
B2 �� 0 o W ❑ rV - -
8 - L of — rr
S .. w 2 O v OODSID B2 E-ClR ❑_❑ o O gRK
Q a L
GREENWAY ENGINEERING _ C1
. Feet
O a 300 150 0 300
New a N►rwrr f.ww.wW 1 ee.rm � ( \ G � O / J �� �'� � � I
Fairfax Pike Adjoining Roads B1 B2 District FAR Data Map and Table Exhibit Greenway File 5510
Tax Map
Acreage
Zoning
Building Square Ft
Parcel Square Feet
FAR
86 A 1
8.13
B1
720
354142.8
0.00
85 A 149C
1.059
B1
1541.5
46130.04
0.03
86 A 13
2.22
B1
3462
96703.2
0.04
85 A 148A
0.91
B1
2912
39204
0.07
74B 51 B
0.57
B1
2652
24829.2
0.11
85 4 1
0.61
B1
3120
26571.6
0.12
86 A 15A
0.8
B1
4250
34848
0.12
85 4 5A
0.878
B1
5470
38245.68
0.14
74B 51 D
0.571
B1
3696
24829.2
0.15
86 A 14
0.71
B1
6156
30927.6
0.20
85 3 1
2.97
B2
3000
129373.2
0.02
74B 7 2 D
1.78
B2
2352
77536.8
0.03
85 A 149
2.35
B2
4588
102366
0.04
86 A 18A
1.241
B2
2861
54014.4
0.05
74B 72 B
1
B2
2810
43560
0.06
85 A 148D
0.57
B2
1776
24829.2
0.07
74B 7 2 D1
1.091
B2
3588
47523.96
0.08
85B 1 A
0.98
B2
3396
42688.8
0.08
86 A 10
16.08
B2
65668
700444.8
0.09
86 A 18
18.14
B2
88084
790178.4
0.11
86 A 16
0.75
B2
3742
32670
0.11
85 A 148F
1
B2
5120
43560
0.12
74B 7 2 D3
0.87
B2
5000
37897.2
0.13
74B 72 D2
1.0451
B2
6859.5
45520.2
0.15
86 A 10B
1.11
B2
7254
47916
0.15
85 A 148E
2.821
B2
21322
122839.2
0.17
86 A 82A
1.33
B2
11180
57934.8
0.19
85B 1 B
0.43
B2
4092
18730.8
0.22
85 A 148C
2.5
B2
24308
108900
0.22
86 A 12
1.04
B2
12322
45302.4
0.27
85 A 146A
1.521
B2
35530
66211.2
0.54
Source: Frederick County GIS, 2012 Data Data Sorted by Zoning/FAR
Of low
New
z
�o FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES eGt^
G� o� UDA AND SWSA MAP WITH WATER AND SEWER LINES �F14,A uU
= a E
�Jv Wt Z� LL w
\ W •
>EL
\S \ q s:AQ
WC
Z v •
Z CLLI
v o
R LLI
cc
ZqeFTy
5 Jo OF,CT\
\ C
c.�
all
w
�;- w w z
ih Q z J
�3 Jw Qw
v, p Op 0 Qw
�181 Z o� z U)
0
EXIT 307 Z ss A 14 Y / JQ 0 Q z 86 A 15 d 5 W Z
9 Xci QLu
L ui
0 Q
Z
FAIRFAX•PIKE $ a.. O
�NX $
LINWDOD CT o
W
W W O
0 to
Z w Z m
Legend a o J w
Q z
Fairfax PikeNDOT Lane Commercial Properties c=7 w F- z_
= Q w w
Parcel Boundary j \ X cn o
X JUj
� Urban Development Area (UDA) Boundary J MFgOQ Z Q 0 LO
rr@ Sewer Water Service Area (SWSA) Boundary WOODsil) C'R LL h�glQk \ m o w U) Uj o 0
Water Line N n Z w Q Q U w
0
x Q o g x o
— Sewer Line Of pit Q zp a u-
n w
�p 2 w N Q cv r
Feet oo- X Q o `�
300 0 300 600 �``P `� W W
a = o
Map Data Source Frederick County, Va GIs Department, November 2012 Data
730
735 740
----LINWOOD CT
740
745
I I 16� I 760
Map Data S01FLU F re(]unck County, Va GIS Department, November 2012 Data
1- 760
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
ENVIRONMENTAL FEATURES MAP
U
MFq�o�Cq
v
760
O
r'
z
760 i
FAIRFAX-PIKE
$ Feet
200 0 200 400
0
•
Z
N
_
N
C
N
O
O r
'
� N
O
V q
C
c J
Z G LL
U
Lu 0
�
W E
E
'• o
�+ o
m 5
C C
Q J O
� W
_ � 3
3
a
c y
c a
Z °
a
• �
y N
W f
°
m
W
;�
w
P
Lli
2
w
Cf)
<
J �
w
�
� W
00
�
0
U
<
Z�
Z
z
w
LL
LLJJ
Y_ <
NN
J
Q
Cl. U
w
(2f
Z
X cr-
w
< w
L.L
2
z
of
0
QO
U
�
z
W
I
I
i
J
<
cLJ
J
<
<
w
�
O
r
in
o
W
Q
}
p
Z
LWL
W
Z
O
1 O
0
0
0
W
Z
<
w
W
Y
U
O
a
LL
N
>
p
w
0
N
j
i
V
W
W
X
p
N
ii
L
-
Z
W
a-LL
O
(D
N
u
C
C
LIJ
Q
t
o
J)
FAIRFAX PIKE/VDOT LANE COMMERCIAi_ PROPERTIES ���Z
SOILS MAP
LU m z
a
N C °
-- Z y pOp C
J
Z0LL C f0
C �
W.2 E
8 2
°
a-
J O T 0 w
:: n - • ,. _
2 N i
a
y y m
7 L rn
U1 °
�PT1''
W z�
3113
v
O s m
w
Z •
r
w w
z�
86 A 14 O a0 C7 a
i 0 a Z Q
Z a Z
1C YQ ON
86 A 15 44B a U w O
X Q�
L w
L O
n
. _
Feet
100 0 100 200 71
-- FAIRFAX- PIKE
wLU
�
W
r
m
11
F—
o
°
a
g
z
Z
w
Legend
W
?
Q
J
Q
w
>
p
Fairfax PikeNDOT Lane Con-mercial Properties
U
O
J
to
z
O
o
X
OU)
CD
U
Parcel Boundary
Q
2
Y
o
Solis
o
o
U
w
a
- 1C, BERKS CHANNERY SILL LOAM, 7 TO 15 PERCENT SLOPES
,
a
uw
o
- 3B, BLAIRTON SILT LOAM, 2 TO 7 PERCENT SLOPES
Y
X
w
p
X
`L
N
N
L
- 44B, ZOAR SILT LOAM, 2 TO 7 PERCENT SLOPES
f
w
J'
aQ
rn
ap Data Source F reoenek County, Va GIs Department, November 2012 Data
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
HISTORIC FEATURES MAP Z� ?'O cc N
LI
r
p e�0,9,� Q-I=PJ Z > E
$
Oo
,Q v' N m a ;
wm
=cc
�� µ �C Z to
N O
�°cGseGc �
e
s 'i- G �
iti #
cy�titi
�q R� X �� y
04,A m 'Q ti� `= w
tiST < Z
2 VO
s2 70
A,
Ryas
O V V
yYOF T a
CQ. � �� \P?
V o O �� w w
J4.
4(b F/ Q� v m �Q ?� i Q w (n
j q'�'ST tie v A0,
0 0 ap o w
tti Z D
86 A 14 2 ? l� Z CL Z f-
/�86 A 15 0 / Y Q O w
ST 4(1 a U w U
Lt Oy X of IY
c O�O� � O W O
�2 U)
Q �
LINWOOD CO
T AIRFgX pI,?
w
� U =
O� Z 77 Q
4 = O� 1
yo WOOD =\M�'400 �� w a
J� SIDE.CIR �CARK�N O � a � m
O U Q z
O� O� m a CL z 0
', O O�� _ Legend U <o�o
VF/�V O c Fairfax Pikeh/DOT Lane Commercial Properties w w Q> o
Cr 01,�Q- = Parcel Boundary o z W z Lo
I Z Q D 0
�QO v rt; Cemetery w ON W O
RIDGEFIELD AVE—U DRIFTW'JOD DR z W U w
w Rural Landmark g v o
J O Q O w a o
cr
p0 eR�'1'O y W = O w o
Feet Y W LL W L
I—M
7
MAE L � 6500 0 500 1,000 DOLLIE \ <LX
QL.L
Map Data Source: Fredenck County. Va. GIS Department, November 2012 Data
86D 4 18A • • \F<�ZggFl Z N
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES \ "by
ADJOINING PROPERTIES MAP La N
La d
FQ Z > E
86D 4 18A y o
\ ZG LL w
C C
W q s '
\\ ` o
\/
. 3
L `
HD 4 18A � W �
•r
v W Z06
oIM
co (o p
00
86 A 15A 00 � E
Siw W
86 A 1
L
v
0
z 0
w Cf)w Q
C,yG,p Q w w
y�4 0� Z �
86 A 14 w J Z O
Y_ Q Oa
N CL
Q d U w
X Ii Of U
86 A 15 Q W Z
LL 2 z2i
_
-
O
<O
U 0
Q
86 A 16
w w
Z_
� r
w m
� � o
- - 77
FAIRFAX•PIKE (I. Q z
Q U) �—� U)
U cn p
LegenCi w
w � Q >
o
U IY � >:
Fairfax PikeNDOT Lane Commercial Properties 0 z o
Adjoining Property Q < w
Parcel Boundary 86 A 18 0 0 0 w a L
> 0 0 ('4o
w w o
Feet a Q 0 N C
X
100 0 100 200 Q w w
Cr F
Q
Q
Q U)
M.ip Oala SourceFrederick County, Va GIS Department. November 2012 Data
FAIRFAX PIKE/VDOT LANE COORCIAL PROPERTIES 0
0
Tax Map Number
Owner
Mailing Address
City
State
ZIP
Zoning
Land Use
Improvements
Land
Tota
86 A 1
COMMONWEALTH OF VIRGINIA
PO BOX 2249
STAUNTON
VA
24402
B1
72
$165,900
$782,700
86 A 14
BOWMAN -SHOEMAKER - COMPANIES INC
PO BOX 480
STEPHENS CITY
VA
22655
B1
4
$0
$618,100
86 A 14A
CHU'S STEPHENS CITY LLC
5851 SADDLE DOWNS PL
CENTREVILLE
VA
20120
B1
4
$381,400
$397,100
86 A 15
ELIZABETH PROPERTIES LC
PO BOX 480
STEPHENS CITY
VA
22655
B1
4
$2,000
$677,000
86 A 15A
YATES WILLOWS APARTMENTS LLC
111 DEVILS BACKBONE OVERLOOK
STEPHENSON
VA
22656
B1
4
$168,700
$125,500
86 A 16
ORNDORFF THOMAS D
1015 OLD GRADE RD
STRASBURG
VA
22657
B2
4
$67,400
$204,400
86 A 18
WINCITY REALTY ASSOCIATES -DE LLC - C/O WIN PROPERTIES INC
10 RYE RIDGE PLZ STE 200
RYE BROOK
NY
10573
B2
4
$6,270,100
$3,058,000
86D 4 5
RIDINGS BRIAN D
208 FREETON CT
STEPHENS CITY
VA
22655
RP
2
$72,100
$29,500
86D 4 6
CHAMBERS JOSHUA - CHAMBERS KATE
206 FREETON CT
STEPHENS CITY
VA
22655
RP
2
$62,800
$29,500
86D 4 7
SLAUGHTER DONALD G - SLAUGHTER VICKY S
1049 LAUREL GROVE RD
WINCHESTER
VA
22602
RP
2
$66,400
$29,500
86D 4 8
ANDERSON JON E
2130 SCARLET OAK CT
HARRISONBURG
VA
22801
RP
2
$62,800
$29,500
86D 4 9
LARKIN SHANE
119 SEDGWICK AVE APT 3B
YONKERS
NY
10705
RP
2
$71,300
$29,500
86D 4 18A
BOWMAN -SHOEMAKER - COMPANIES INC
PO BOX 480
ISTEPHENS CITY
VA
22655
RP
77
$0
$1,500
Sorted by Tax Map Number Source: Frederick County GIS, November 2012
i
• \�
FAIRFAX PIKENDOT LANE COMMERCIAL PROPERTIES �Gtis BG Z
LU N LOCATION AND ZONING MAP� C+ ,�a
Q- /�� cy WZ_
\ N
S 0 Z fr LL W W
> W m
T C WOA z a= a m
2 y A� Z n o >A
W
LY
�d
a U
HyoF cT
677
z
r a U a
z
° o w z
\l z p OD O z
EXIT 307 2 Z CL z ON
/ 8 A 14 Y Q O
86 A 15N z
a U w Q
X w Of z
Qw O
FAIRFAX-PIKE UO
J
WI HEST R 2 ID CT Legend
o
® Fairfax PikeNDOT Lane Commercial Properties
w Parcel Boundary L o
I r
7 a Frederick County Zoning a o
J
B1 (Business, Neighborhood District) w a Q z
Q�-z-
w = B2 (Business, General Distrist) Q o ( o
> \ U Z
o MF M1 (Industrial, Ligtit District) w z Q
q0 2c�Z >�
W pt'►�(gRkCH M2 (Industrial, General District) U O Q Q
C RA (Rural Area District) w r.� z 0 0
STEPHENS CITY Q'/ z w z Q YLU
SITE �O RP (Residential, Performance District) g O U °�
O� o Q O W a o
11 O p o
oFAwAX.pEKE Oa
Feet
o LL N U
4 77
300 0 300 600 Lij
�U)
Map Uata Source hredenck County, Va GIS Department, November 2012 Data
REZONING APPLICATION #02-13
FAIRFAX PIKE/VDOT LANE COMMERCIAL
Staff Report for the Planning Commission
Prepared: April 29, 2013
Staff Contact: Michael T. Ruddy, AlCP, Deputy Planning Director
Reviewed Action
Planning Commission: 05/15/13 Pending
Board of Supervisors: 06/12/13 Pending
PROPOSAL: To rezone 3.61 acres from B 1 (Neighborhood Business) District to B2 (General
Business) District with proffers.
LOCATION: The properties are located on the north side of'Fairfax Pike (Route 277) adjacent to
VDOT Lane (Route 1018), approximately'/2 mile east of Interstate 81 Lxit 307.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 05/15/13 PLANNING
COMMISSION MEETING:
This is an application to rezone a total of 3.61 acres of land from the B 1 (Neighborhood Commercial)
District to the B2 (Business General) with proffers, to accommodate commercial Uses.
The B2 (Business General) land use proposed in this rezoning is generally consistent with the Route
277 Urban Center Plan and the 2030 Comprehensive Plan. The impacts associated with this request
have generally been addressed by the Applicant and the adjacent properties have been considered in this
rezoning application. With this rezoning, the applicant has proffered to dedicate the necessary right-of-
way to enable the Route 277 improvement project to occur and has coordinated the access to this
development to further implement the Route 277 plan. In addition, the Applicant has proffered a
monetary contribution in the amount of $35,000 to assist in other transportation improvements.
J'ollolying the iequil'ed public heai'in , a Pecoif men(latiofl this mzoning application to
the Boal'd of Supervisors would be appropriate. The applicaiit shoiilrl be prepared to ailequately
address all conceivis raised by the Planning Co/mfii.ssion.
•
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
April 29, 2013
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors 10 assist thein in making a llecisioil oil this
application. It may also be useful to others interested In this zoning matter. Unresolved issues
concerning this application are doted by staff where relevant throti-hoat this staff report.
Reviewed Action
Planning Commission: 05/15/13 Pending
Board of Supervisors: 06/12/13 Pending
PROPOSAL: To rezone 3.61 acres from 131 (Neighborhood Business) District to 132 (General
Business) District with proffers.
LOCATION: The properties are located on the north side of Fairfax Pike (Route 277) adjacent to
VDOT Lane (Route 1018), approximately''/2 mile cast of Interstate 81 Exit 307.
MAGISTERIAL DISTRICT: Opcquon
PROPERTY Ill NUMBERS: 86-A-14 and 86-A-15
PROPERTY ZONING: B 1 (Neighborhood BLISIIIeSS)
PRESENT USE: Vacant
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RP (Residential Performance)
131 (Neighborhood Business)
South: 132 (Business General)
East: Bl (Neighborhood Business)
West: 132 (Business General)
131 (Neighborhood Business)
Use: Residential
Residential
Use: Commercial
Use: Commercial
Use: Residential
VDOT I-Ieadquarters
• •
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
April 29, 2013
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: We have reviewed the revised rc-r_oning application for the Fairfax
Pike/VDOT Lane Commercial Properties as received by this office on April 1 1, 2013, for impacts to the
local transportation system. VDOT supports this rezoning in its current format.
Fire and Rescue: Plan approved.
Public Woi-ks Deparhnent: We have completed our review of the rezoning application for the
proposed commercial development at the intersection of Fairfax Pike and VDOT Lane. Based on this
review, we offer the following minor comments: 1. Refer to Site Drainage on Page 8. Change east to
west Of the Food Lion Plaza development. 2. At the site plan design phase, include an analysis of the
downstream stormwater conveyance SyStC111 L111t11 the rL1110f1 I'CaChCS the drainage Channel on the south
side of Fairfax Pike. Alternative stormwater management systems should be considered in future site
plan designs.
Department of Inspections: N/A
Frederick Counth, Sanitation Authority: Per your request, a review of the proposed rezoning has
been performed. The Frederick County Sanitation Authority offers comments limited to the anticipated
impact/effect upon the Authority's public water and sanitary sewer system and the demands thereon.
The parcel is in the water and sanitary sewer area served by the Authority. Based on the anticipated
usage, water capacity is presently available. Sanitary sewer treatment capacity at the waste water
treatment plant is also presently available. Conveyance capacity and layout will be contingent on the
applicant performing a technical analysis the existing sanitary sewer system within the area to be served
and the existing collection main. Both water and sanitary sewer facilities are located within a
reasonable distance from this Site. Please be aware that the AuthOrity does not review or comment upon
proffers and/or conditions proposed or submitted by the applicant in support of or in conjunction with
this application for rezoning, nor does the Authority assume or undertake any responsibility to review Or
comment upon any amended proffers and/or conditions which the Applicant may hereafter provide to
Frederick County.
Service Authority: N/A
Frederick -Winchester Health Department: N/A
Parks & Recreation: N/A
Winchester- Regional AII'port: Proposed I'C'!_011111g ShOUld not have all impact on Operations at the
Winchester Regional Airport.
Frederick Couny, Attorney: Please see allcichecl leper clulecl Mcirch 12, 2013, fi'ona Roclerick B.
Williams, Coimly Allor»ey.
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
April 29, 2013
Page d
Planning Department: Please see attached memo clatecl March 22, 2013, from Allichael T. Rucicly,
AICP, Deputy Planning Director.
Planning & Zoning:
1) Site Histoi-v
The original Frederick County Zoning map (U.S.G.S. Stephens City Quadrangle) identifies the
subject parcels as being zoned B-1 (Neighborhood Business). The intent of this district is to
provide small business areas to ScrvC the daily household necdS of surrounding residential
neighborhoods. Uses allowed primarily consist of'linlited retailing and personal Service uses.
Business uses in this district should be small in SiZC and Should not produce substantial vehicle
traffic in excess of'what is usual in the residential neighborhoods.
2) Comprehensive Policy Plan
The 2030 Comprehensive Plan is the guide for the future growth of Frederick County.
The 2030 Comprehensive Plan is all Official pLlblle CIOCunlCllt that SCrVCS as the C011111111111ty's
guide for making decisions regarding development, preservation, public facilities and other key
components of community life. The primary goal of this plan is to protect and improve the
living envii-orilellt within Frederick County. It is ill essence a composition of policies used to
plan for the future physical development of Frederick County.
Land Use.
The 2030 Comprehensive Plan and the Route 277 Triangle and Urban Center Land Use Plan
provide guiclance on the future development of the property. The property is located within the
UDA and SWSA. The 2030 Comprehensive Plan identifies the general area surrounding this
property with an Urban Center land use designation. In general, the proposed commercial land
use designation for this property is consistent with this land use designation of the
Comprehensive Plan as the urban center designation promotes both commercial and residential
land uses in a mixed use environment. This general area contains both uses.
Site Access and Ti•ansportation-
Route 277 is identified as a minor arterial road. Transportation improvements t0 ROLItc 277,
Fairfax Pike, are planned on the VDOT Six -Year Improvement Plan. Therefore, it is not
anticipated that this project constructs improvements to Route 277, rather, dedicates appropriate
right-of-way, designs access to this site that is consistent with those improvements anticipated
with the VDOT Six -Year Plan Project, and provides some contribution to transportation
improvements resulting from the impacts of this new development; further, that the value Of ally
contribution has a nexus to the project and its impacts.
0 •
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
April 29, 2013
Page 5
The provisioIl of a shared right -in -right -out entrance is proposed. Given the anticipated
separated median design for Route 277, such an approach may work in this location. In general
additional entrances on Route 277 are to be avoided. Inter parcel connectivity has been provided
between the two properties.
The proposed relocation of VDOT Lane to the west to align with the existing entrance to the
shoppino center will not have an impact to the entrance proposed on VDOT Lane. The
Applicant has worked with VDOT and Mr. Bishop, Frederick COL111ty I ransportation Planner, to
ensure that the proposal fits in with the preliminary engineering and design work for the Route
277 improvement project.
3) Site Suitability/Environment
The site does not contain any environmental featLll'CS that WOUld either constrain or preclude Site
development. There are no identified areas Of steep slopes, floodplalns or woodlands. The
Frederick County Engineer has requested that an analysis Of the downstream stormwater
conveyance System until the runoff reaches the drainage channel on the south side of Fairfax
Pike will be needed as part of the detailed site plan design.
4) Potential Impacts
The subject properties are currently zoned B1 (Neighborhood Business). Therefore, the
rezoning of these properties to the B2 (Business General) district will have the potential to
generate additional impacts. However, it is recognized that the impacts associated may not be
as significant as if this property was zoned RA (Rural Areas). The Applicant has made
commitments to address the additional impacts associated with this request.
5) Proffer Statement — Dated January 25, 2013 and revised on April 11, 2013
A) Generalized Development Plan
The Applicant has proffered a Generalized Development Plan. The Plan identifies the
properties to be developed and recognizes the transportation and access related
co11 mitmcnts Made \vith this rezoning application; including the Route 277 right -of -
Way dedication area, access to and from the site via a right -in -right -out entrance on
Route 277 and a full entrance on VDOT Lane, and the inter parcel ingress/egress
easement.
B) Land Use
The application's proffer statement does not place any limitation on the amOL111t Of
commercial development that may occur 011 this property.
Rezoning 1102-13 Fairfax Pike/VDOT Lane Commercial
April 29, 2013
Page 6
C) Access Management.
Access to the property will be via a fight-in-fight-ollt ClltrarICC Oil Rollie 277 and a full
commercial entrance Oil VDOT Lane. A 50 foot ingress/Cgl'cSs casement will be
located at this full commercial entrance and will ensure inter parcel access to the
eastern parcel, Parcel 86-A-14.
D) Transportation
The proffer statement provides for 20 foot ofright-of-way dedication along Route 277
in support of the ROLIte 277 Improvement Project.
As noted previously, transportation improvements to ROLIte 277, Fairfax Pike, are
planned On the VDOT Six -Year Iillprovement Plan. Therefore, it is important that the
access to this site reflects the design of the improvements anticipated with the VDOT
Six -Year Plan Project. The above proffered access improvements are consistent with
this project.
The application addresses the relocation of VDOT Lane in the future by ensuring the
entrance to this property is located so as to fit in with the design for the realignment.
In addition, this application has proffered a monetary contribllti011 ill the amOLlllt Of'
$35,000.00 to transportation improvements elsewhere in the County. More
specifically, for the off -site transportation improvements associated with the
Renaissance Drive — Phase 2 RCVCIILIC Sharing Project. 'file Applicant believes that the
value of this contribution has a nexus to the project alld its impacts.
C) Community facilities
This application proffers a monetary contribution ill all a111ount Of $0.05 peI' building
square foot for Fire and Rescue Services.
STAFF CONCLUSIONS FOR THE 05/15/13 PLANNING COMMISSION MEETING:
This is an application to rezone a total of 3.61 acres Of land from the B 1 (Neighborhood Commercial)
District to the B2 (Business General) with proffers, to accommodate commercial LISCS.
The B2 (Business General) land use proposed in this rezoning is generally consistent with the ROLAC
277 Urban Center Plan and the 2030 Comprehensive Plan. 'file impacts associated with this I'equest
have generally been addressed by the Applicant and the adjacent properties have been considered in this
rezoning application. With this rezoning, the applicant has proffered to dedicate the necessary right-of-
way to enable the Route 277 improvement project to occur and has coordinated the access to this
development to further implement the Route 277 plan. In addition, the Applicant has proffered a
monetary contribUtiOIl Ill the aillOLIllt of $35,000 to assist ill Other transportation improvements.
1'ollon,ing the required public / em-inh, a recommen(lation i'e ai'ding this rezoning- application to
the Board of Supervisors would be appropriate. 7/le applicant shoillll be prepai-ed to adequately
address all concerns raised by the Planning Commission.
ts
0
NOTES RECEIPT DATE 2-Up-ILl- _NO. 855
VAT) 988
RECEIVED FROM
Al2DRESS_%_]s_ T:_,fo,8�Far�r4d v;llt, ms xoe
IS
FOR
I// —M
ACCOUNT
HOW
PAID
/ .10
autx f—
AML OF
ACCOUNT
CASH
A
PAIMT.D
Ll lm
B YAM,(4o�
BALANCr
DUE
tiIONEY
(02001 ranEcm. @ BLBI 8
VADG LLC
9815 J SAM FURR ROAD
SUITE 259
HUNTERSVILLE, NC 28078
Ila to tile
Order of—
Fv lj/
A Q U E S T A
A N
- I'A CORNEMS, NCB (mq uw4W K
L,-
1:0 S 3 11 27 1 24 1000 4 GO 3 ?it
10L, 2
_1111 _te
Ls
1042
66.1271/531
GFIFENSPEFFIRD-
'Co CD
cl
wq�' *• RE,SOLUTION co
IGIA,
173% -
Action:
PLANNING COMMISSION: May 15, 2013 - Recommended Approval
BOARD OF SUPERVISORS: .tune 12, 2013 KI APPROVED ❑ DENIED
AN ORDINANCE AMENDING
TI-IE ZONING DIS"fRICT MAP
REZONING 402-13 FAIRFAX PIKE/VDO I' LANE COMMERCIAL,
WHEREAS, Rezoning 902-13 Of Fairfax Pilce/VDOT Lane Commercial, submitted by Greenway
Engineering. to rezone 3.61 acres from B 1 (Neighborhood Business) District to B2 (General Business)
District with proffers dated January 25, 2013 and final revision May 17, 2013 was considered. The
properties are located on the north side of Fairfax Pike (Route 277) adjacent to VDOT Lane (Route 1018),
approximately'/2 mile east of Interstate 81 Exit 307, and are identified by Property Identification Numbers
86-A-14 and 86-A-15 in the Opeduon Magisterial District.
WHEREAS, the Planning Commission held a public hearing on this rezoning on May 15, 2013
and forwarded a recommendation of approval; and
WHEREAS, the Board of' Supervisors held a public hearing on this rezoning on June 12, 2013; and
WHEREAS, the Frederick County Board of Supervisors f inds the approval ofthis rezoning to be in the
best interest of the public health, safety, welfare, and in conirnnjance with the Comprehensive" olicv
Plan:
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors to rezone
3.61 acres from BI (Neighborhood Business') District to B2 (General Business) District with proffers
subject to the attached conditions voluntarily proffered in writing by the applicant and the property
owner.
PDRes l4-13
•
•
This ordinance shall be in effect on the date of adoption.
Passed this 12th day of June 12, 2013 by the following recorded vote:
Richard C. Shickle, Chairman Aye Gary A. Lofton Aye
Robert A. Hess Aye Gene E. Fisher Aye
Christopher E. Collins Aye Charles S. DeI-Iaven, Jr. Aye
Opequon Magisterial District Vacant
A COPY ATTEST
Iohn R.,Rile�t, 9r.
Frederick County Administrator
VIRGINIA: FREDERICI< COUIM.SCT.
This instrument of writing was produced to me oi.
at
and with certificate ackii:o.
was admitted to by Sec. 01
$. ° Ll_—, and .58.1 „11 have been paid, if as5cs,,:iN.
PDRest 14-13
Greemvay Engineering • D' -
Janua 25, 2013 • Fairfax YikeNDOT Lane Rezoning O
Revised April 11, 2013
0 f, tRevised May 17. 2013 Ul
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ# U.Z, - 1.3
Neighborhood Business (B 1) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in after the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: May 17, 2013
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application # 02, -/ for the
rezoning of 3.61±-acres of Neighborhood Business (B1) District to 3.61±-acres of
Business General (132) District with proffers; development of the subject properties
("Property") shall be done in conformity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be subsequent]), amended of -
revised by the Owner and such be approved by the Frederick County Board of
SUpel"viSOI-S in accordance with the Said Code and Zoning Ordinance. In the event that
such i'ezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bown-lan-Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File 45510/EA\1V
Grcenw ay L=ngineering • January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
Revised May 17. 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
A. Generalized Development Plan
1) The Owner hereby proffers to develop the Property in substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-irdright-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full screen buffer adjacent to the Freeton
Townhouse Subdivision. Tile filial locations of the commercial entrances and the
Miter -parcel collllectlon can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-irdrlght-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. The Owner
will ensure that a reciprocal ingress/egress easement and maintenance agreement
is established for the right-in/right-out commercial entrance servlllg the Property.
O
U-1
fV
File n5;1WEAw 2
•
Greenway Engineering 0
January 25, 2013 Fairfax Pike/VIDOT Lane Rezonine
Revised April 11. 2013
Revised May 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
will ensure that the full access commercial entrance is located a minimum of 225'
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress easement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
Owner will ensure that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress easement serving the Property.
C. Monetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick County to be
utilized as part of the local share match for qualifying off -site transportation
improvements associated with an approved Revenue Sharing project. The Owner
shall provide the $35,000.00 to Frederick County at the time that Frederick
County provides written request for this monetary contribution.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet Of structural development on the Property for general fire and rescue
services. The Owner- shall provide the appropriate monetary contribution amount
for each structure prior to the issuance of the Certificate Of Occupancy Permit for
each structure developed on the Property.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
O
U-1
C-"-)
File :;5510/EAw 3
•
Greemvay Engineering 0
Si,gnature
January 25. 2013 Fairfax 1'il:e/VDo"r Lane Rezoning
Revised April 11. 2013
Revised May 17. 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other- requirements set forth in the Frederick County Code.
Respectfully Submitted:
Bo\�,man-Shoemaker Companies, Inc. Date
Commonwealth of Virginia,
City/ ounty of FV-e'_CAe-�' e-k_ To Wit:
The foregoing instrument was acknowledged before me this —i kday of JyCI<�-
20 13 by
eve -'de i
My Commission Expires Fe b. 2cl 2-01
X. " 1L Vim/ 6
Notary Public
O
(J]
File ,':5510/C-A\\'
M
C�
Greenwav Engineering •
Signature
January 25. 2013 Fairfax Pil:e/\'DOT Lane Rezoning
Revised April 11. 2013
Revised May 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board Of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
r
Eliz, both Properties, L.C. Date
Commonwealth of Virginia,
City ounty f
R,-e,Ie✓lCL
To Wit:
The foregoing instrument was acknowledged before me this`A--�4� day of 30v-v�
20 by }-eVe,; if U FU • ShUc,c`v1��t�C' �'�C� lT1CtC��.f
Notary Public
My Commission Expires -�e-
Zci W l
File r 5510/L-AW
GENERALIZED DEVELOPMENT PLAN
NOTES-
1. EXISTING DATA SHOWN HAS BEEN COMPILED
FROM FREDERICK CO. GIS DATA.
2. TOPOGRAPHY IS FROM YEAR 2008.
3. TAX MAP INFORMATION IS FROM YEAR 2010.
4. ORTHOPHOTOS ARE FROM YEAR 2006.
5. THIS EXHIBIT HAS BEEN DEVELOPED FOR
REFERENCE AND IS NOT INTENDED FOR
CONSTRUCTION OR PERMITTING USE.
8. LEGEND
1 -ROW DEDICATION AREA
2 - RIGHT IN/RIGHT OUT ENTRANCE
3 - CORNER CLEARANCE, FULL ACCESS
ENTRANCE
O - FULL ACCESS ENTRANCE (MIN 50'
SPACING)
7. ROW NARRATIVE - THE ROW DEDICATION
AREA PROVIDED ON THIS EXHIBIT IS TO
ENSURE APPROPRIATE AREA FOR THE
SECOND WESTBOUND TRAVEL LANE, GREEN
STRIP, 5' SIDEWALK AND A 1' MAINTENANCE
STRIP. THE ROW DEDICATION TO BE
PROVIDED AT THE TIME OF FIRST SITE PLAN
UNLESS REQUIRED BY VDOT PRIOR TO
DEVELOPMENT.
r
i
m
188-A-18
IOUTE 277 - FAIRFAX PIKE
50' FULL
SCREEN
BUFFER
�J
TM 89-A-14
120
moniiii
ec:�ALE:
w
N �
W01�� �o IO
W
CNN iN a4
Z
W !
�a
�
Qhvq��
3~�A`�
Z � h
W
um
o "v'
Ww�
z
a
J
a.
H
Cz
'I �2
a. d Q
_j o z
wx� W w o
w >
W �' x
0 o z Q
W oa
N_ F CV w
J a
a
or:
W
z
0
DATE: 04-10-13
SCALP: I' - 60'
DESIGNED BY: RLK
JOB NO. 6610
3HM 1 OFi
Greenway Engineering • January 25, 2013 [oil fix PikeNDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ#
Neighborhood Business (B l) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in after the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: Api-il 11, 2�'-3, May 17, 2013
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, sliall approve Rezoning Application # for the
rezoning of 3.61±-acres of Neighborhood Business (B 1) District to 3.61±-acres of
Business General (132) District with proffers; development of the subject properties
("Property") shall be doI1e III coIlformity with the terms and conditions set forth herein,
except to the extent that such terms and coIditions may be subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bowman -Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File N551o/EAw
•
Greenway Engineering
0
January 25, 2013 Pairliix Pike/VD0'r lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
A.
la
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
Generalized Development Plan
1) The Owner hereby proffers to develop the Property in substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-in/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A- 15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full screen buffer adjacent to the Freetorl
Townhouse Subdivision. The final locations of the commercial entrances and the
inter -parcel connection can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur- in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-in/right-out commercial entrance, which meets all applicable VDOT
requirements. The light-ln/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. Tile Owner
will ensure that a reciprocal ingress/egress easement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
File N5510; EA\V 2
Greenway Engineering • January 25, 2013 Qflix I'IkeNDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
Will ensure that the full access commercial entrance is located a minimum ol'225'
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress easement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
Owner will ensure that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress casement serving the Property.
C. Monetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick County to be
utilized as part of the local share match for qualifying off -site transportation
improvements associated with the erlaissanee—Di-ive Phase 2 an approved
Revenue Sharing project. The Owner to ^"^„ e
project. The Owner shall provide the $35,000.00 to Frederick County at the time
that Frederick County provides written request for this monetary contribution.
2) The Owner- hereby proffers to provide a monetary contribution of $0.05 per -
square feet of structural development on the Property for general fire and rescue
services. The Owner shall provide the appropriate monetary contribution amount
for each structure prior to the issuance of the Certificate of Occupancy Permit for
each structure developed on the Property.
File #5510/EAW
Greenway Engineering •
Sip,nature
January 25, 2013 pa"fax IlikeNDOT laic Rezoning
Revised April 11, 2013
Revised Nlay 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
RIA
Bowman -Shoemaker Companies, Inc.
Commonwealth of Virginia,
City/County of
To Wit:
The foregoing instrument was acknowledged before me this day of
20 by
My Commission Exp1I-es
Date
Notary Public
File U5510/EAW 4
Date
To Wit:
clay of
Notary Public
Greenway Engineering •
SiViiature
hummy 25, 2013 t iirlax PikeNDOI' Line Rezoning
Revised April 11, 2013
Rcviscd May 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
Elizabeth Properties, L.C.
Commonwealth of Virginia,
City/County of
The foregoing instrument was acknowledged before me this
20 by
My Commission Expires
Untitled Stationery Page I of 1
Evan Wyatt
From: Rod Williams [rwillia@co.frederick.va.us]
Sent: Friday, May 24, 2013 2:40 PM
To: Evan Wyatt
Cc: Mike Ruddy
Subject: RE: Fairfax PikeNDOT Lane Proffer Revision
Evan,
The revision looks fine to me.
Roderick B. Williams
County Attorney
County of Frederick, Virginia
107 North Kent Street, 3rd Floor
Winchester, Virginia 22601
Telephone: (540) 722-8383
Facsimile: (540) 667-0370
E-mail: rwiIlia@co.frederick.va.us
From: Evan Wyatt [mailto:ewyatt@greenwayeng.com]
Sent: Tuesday, May 21, 2013 11:46 AM
To: Rod Williams; Mike Ruddy
Subject: Fairfax Pike/VDOT Lane Proffer Revision
Hi Rod and Mike,
I have attached the proposed revision to the Proffer Statement to reflect what was discussed at the 5-15
Planning Commission meeting. Please advise me if this new language works and I will get Bev to sign
the final proffer for the 6-12 Board meeting.
Thanks, Evan
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
Phone: 540-662-4185
Fax: 540-722-9528
Visit us on the web at www.greenwayen�_lr.com to learn about exciting new services offered by
Greenway Engineering: Laboratory Services, Water Sewer, Maintenance / Monitoring, ESA
Phase I, Wetlands and more.
A Please consider the environment before printing this
CONFIDENTIALITY NOTICE: This email may contain confidential and privileged material
for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others
is strictly prohibited. If you have rcccived this conununication in error, please notify the sender
immediately by email and delete the message and any file lttachmcnls I'rom your computer.
Thank you.
6/4/2013
•
6reenway Engineering • January 25, 2013 Fairfax PikeNUOT Lane Rezoning
Revised April 11, 2013
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ#o1z-13
Neighborhood Business (B 1) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in alter the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: April 11, 2013
Preliminary Matters
Pursuant to Section 1.5.2-2296 Et. Seq, of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application # O ' /3 for the
rezoning of 3.61 ±-acres of Neighborhood Business (B I) District to 3.61 ±-acres of
Business General (132) District with profl'ers; development of the Subject properties
("Property") Shall be done in conformity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
SLICII rezoning is not granted, then these proffers Shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the lane( owned by Bowman -Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File 115510/1?Aw
•
Greenway Engineering • January 25, 2013 17airfax I'ike/VDOT lane Rezoning
Revised April 11, 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, iLll'ther as shown oil the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
A. Generalized Development Plan
1) The Owner hereby proffers to develop the Property in substantial coil forillance
with the Generalized Development Plan (GDP) prepared by Greellway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-in/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement oil Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full Screen buffer adjacent to the Freetoil
Townhouse Subdivision. The final locations of the commercial entrances and the
litter -parcel connection can be adjusted to accommodate filial engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area oil the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such lime that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-in/right-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. The Owner
Will ensure that a reciprocal ingress/egress easement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
Pile H5510/FAW
2
Oreenway Engineering • January 25, 2013 • Fairfax I'ike/v1)o,r lane Rezoning
Revised April 11, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
Will eI1SL11'e that the 171111 access Commercial entrance is located a minimU111 of 225'
from the intersection of' Fairfax Pike and VDOT Lane to provide for appropriate
corner Clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress casement across Tax
Mal) 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
OW11C1- Will C11SLII-e that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress easement serving the Property.
C. Monetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick County for off -Site
transportation improvements associated with the Renaissance Drive Phase 2
Revenue Sharing project. The Owner agrees to allow the $35,000.00 to be
Utilized as part of the local share match for this transportation improvement
project. The Owner shall provide the $35,000.00 to Frederick County at the time
that Frederick County provides Written reCIIICSt 101- this monetary contrlbi,16011.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet 01StrllCtUral development on the Property for general fire and rescue
Services. The Owner shall provide the appropriate monetary contrlbUtlon a1110L111t
for each structure prior to the issuance 0f the Certificate of Occupancy Permit for
each structure developed on the Property.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
File #15510/HAW 3
49
Greenway Iingineering •
Sigiiature
January 25, 2013 Fairfax I'ike/ DOT lane Rezoning
Revised April 11, 2013
The conditions pi -of lei-ed above shall be bind11Ig Lll)011 the SLICCCSSOI-S and assigns Of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions Shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By: 4-tj)-1 I d Loj--d . 4-19-15
Bow-nan-Shoemaker Companies, Inc. Date
Commonwealth of' Virginia,
C-ity/COLIIIty Of T.� C� ��,t C✓\L To Wit:
The 101'CgOLIIg II1Stl-Lllllent was acknowledged befoi-e me this _day Of NOA
20 6 by
My COn1I111Sslon EXl)li'eS (:�5 A O o
Notary ublic
FMyCommlsslon
UNDRA M. MURPH
Notary Public
monwealth of Virgini]2016
7514181
Expires May 31
File #5510/FAW
Oreenway 1?nginecring •
0
January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick COUnty Board Of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By:La�t�
Elikabeth Properties, L.C.
Commonwealth of Virginia,
-Erty/County 01' CA — To Wit:
Date
The foregoing instrument was acknowledged before me this 1 d6 Iay of' (ti
20 13 byI�YIG�►Uq
_ t
Notary Public
My Commission Expires C31 1 L
SAUNDRA M. MURPH
Notary Public
Commonwealth of Virgini]2016
7514181
My Commission Expires May 31
Idle #5510/Iv1W
i
GREENWAY ENGINEERING,
I51 Windy I fill lane
Winchester, Virginia 22602
Founded in 1971
April 19, 2013
Frederick County Planning Department
Attn: Mike Ruddy, Deputy Director
107 North Kent Street
Winchester, VA 22601
RE: Fairfax Pike/VDOT Lane Commercial ProDerties Rezolling — Review Agency
Information and Comment Response Letlei'
Dear Mike:
The purpose of this letter is to advise the Planning Commission and Board Ol' Supervisors
of information regarding the property owner's mitigation of Impacts for the referenced
rezoning application. Please note the following:
VDOT Comments — April 18, 2013
The property owner has received VDOT approval of an Access Management
Exception Request to allow for a shared right-ul/right-out entrance on Fairfax
Pike.
VDOT has approved the conceptual plan for access management that utilizes a
shared full access commercial entrance on VDOT Lane. VDOT has determined
that the location Of the full access commercial entrance will be appropriate when
VDOT relocates VDOT Lane to align with the existing commercial entrance
serving the Food Lion Plaza.
i VDOT has determined that the Fairfax I -like frontage dedication is appropriate for
the fLltul'e widening plans for this corridor.
FCSA Comments — February 26, 2013
FCSA has stated that public water and sewer capacity is available for the
development Of the subject properties.
COLlnly Attorney Comments — March 12, 2013
The regLICSt to change the name "Applicant" to "Owner" was made to the final
proffer statement.
Engineers surveyors Planners hwhonmental Scientists
Telephone 540-662-4185 FAX 540-722-9528
Project 551WFAW www.greenwayeng.com
0 a
> The Special Limited Power of Attorney documents for I3ownlan-Shoemaker
CompaIlies and Elizabeth Properties have been eXCCllted and ai-C submitted as
inf'ornlation with the Rezoning Application.
Public Works Comments — March 1, 2013
i The information in the Site Drainage section of the Impact Analysis Statement has
been revised accordingly.
The first site plan developed on the subject properties will include an analysis of
the downstream stormwater conveyance system, which will be designed for
review and approval by the County Engineer.
File Marshal Comments — Febl'llary 25, 2013
i No comments.
Winchester Regional Airport Comments — April 4, 2013
No Comments.
Planning Comments — March 22, 2013
The required application fee has been submitted with the Rezoning Application.
We agree that the proposed commercial land use designation for the subject
properties is consistent with the Comprehensive Plan.
We agree that the subject properties are not able to support an urban center design
and that there will heed to be a greater mix of commercial and residential land use
in the future to support an urban center concept.
COLInty Transportation Comments — March 22, 2013
VDOT has advised that the anticipated fight -of -Way needed along the fl'011tage oil
the subject properties ranges from 12.5 feet to 19 feet. The property owner has
proffered a right-ol'-way dedication strip that is 20 feet in width along the frontage
Of the subject properties.
> The shared right-in/right-Out entrance has been approved by VDOT, which
regUll-Cd the review and approval Of all Access Management Exception RegUeSt.
> Inter -parcel connectivity has been provided between the subject properties
through a proffered ingress/egress casement. DiSCLISSiOl1S With the COLlllty
Transportation Planning Director indicate that connectivity t0 the east is not
necessary.
Project 551(VEAW
i VDOT has reviewed a conceptual design for the potential relocation of VDOT
Lane, which aligns with the existing shopping center entrance and has determined
that this will not impact the proposed full access commercial entrance on VDOT
Lane that will seine the subject properties.
VDOT reviewed a conceptual design for the potential relocation of' VDOT Lane
and did not determine that additional right-of-way would be required for future
improvements, as this will occur on their property.
The frontage improvements to the subject properties will include pedestrian
sidewalks. The Zoning Ordinance requires the development of a full buffer and
screen along the Freeton Townhouse Open Space; therefore, pedestrian
connectivity is not permitted by code.
The subject properties will be developed for commercial land use, consist with
other adjoining commercial properties and commercial properties within close
proximity of the site. The proffered Generalized Development Plan provides for
enhanced access management for the subject properties through the restriction of
left turn movements on Fairfax Pike, which is not the case with other commercial
properties along the corridor.
Please contact me il' you have any questions regarding this information, or if you need
anything else at this time.
Sincerely,
II
I
Evan Wyatt, AIC
Greenway Engineering
Cc: Beverley B. Shoemaker
Rachel Shoemaker
Mike Bryan, P.L.C.
Project 55 10/lIAW
3
0 0 Page I of I
Evan Wyatt
From: Funkhouser, Rhonda (VDOT) [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Smith, Matthew, P.E. (VDOT)
[Matthew.Smith Q vdot.virginia.gov]
Sent: Thursday, April 18, 2013 9:01 AM
To: Bishop, John. (VDOT); Evan Wyatt
Cc: Ingram, Lloyd (VDOT)
Subject: Fairfax Pike/VDOT Lane Commercial Properties - VDOT Comments to Rezoning
We have reviewed the Revised Rezoning Application for the Fairfax Pike/VDOT Lane
Commercial Properties as received by this office on April 11, 2013 for impacts to the local
transportation system.
VDOT supports this rezoning in its current format. Thank you for allowing Lis the
opportunity to comment. Should you have any questions, feel free to contact me.
Matthew B. Smith, P.E.
Area Land Use Engineer
VDOT - Land Development
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA 22824
Phone # (540) 984-5615
Fax # (540) 984-5607
4/ 19/2013
i '� � `5 N 3
GREEENWAY
ENGihJEEIRING
TO: Evan Wyatt
Greenway Engineering
FROM: Michael T. Ruddy, AICP '4,k,�7
Deputy Director
•
COUNTY of FREDERICK
Department of Planning and Development
S40/665-5651
FAX: 540/665-6395
RE: Rezoning Comments: Fairfax Pike/VDOT Lane Commercial Rezoning.
DATE: March 22, 2013
The following comments are offered regarding the Fairfax Pike/VDO"f Lane Commercial
Rezoning Application. This is a request to rezone 3.61 acres from B I (Neighborhood
Business) to B2 (Business General) with Profilers. The review is generally based upon
the proffer statement dated January 25, 2013, and the Impact Analysis Statement of the
same date.
Prior to formal submission to the County, please ensure that these comments and all
review agency comments are adequately addressed. At a minimum, a letter describing
]low each of the agencies and their comments have been addressed should be included as
part of the submission.
General
The submission � c for this application would total $10,3 61.00, based upon
acreage of 3.61 acres, pIl1S the appropriate amount for public hearing signs.
Land Use
1) The 2030 Comprehensive Plan and the Route 277 Triangle and Urban Center
Land Use Plan provide guidance on the future develolnnent of the property. The
property is located within the UDA and SWSA. The 2030 Comprehensive Plan
identifies the general area surrounding this property with an Urban Center land
use designation. In general, the proposed commercial land use designation for
this property is consistent with this land use designation of the Comprehensive
Plan as the urban center designation promotes both commercial and residential
land uses in a mixed use environment. This general area contains both uses.
107 North Kent Street, Suite 202 - Winchester, Virginia 22601-5000
0 0
Fairfax Pike/VDOT Lane Commercial Rezoning Comments
March 22, 2013
Page 2
2) The subject properties, regardless of their location, size and dimension, are an
integral part of the identified Urban Center. While they individually may not be
able to support an entire urban center, they certainly have the ability to fit into the
overall Urban Center design. A greater mix and integration of the commercial
and residential land uses should occur in the future as this area continues to
develop.
Impact Analysis and Proffer Statements.
Please address the following items from the Impact Analysis and Proflcr Statements
prepared for this Application. The following comments have been provided in
conjunction with John Bishop, County Transportation Planner.
1) Transportation improvements to Route 277, I'airlax Pike, are planned on the
VDOT Six -Year Improvement Plan. Therefore, it is not anticipated that this
project constructs improvements to Route 277, rather, dedicates appropriate right-
of-way, designs access to this site that is consistent with those improvements
anticipated with the VDOT Six -Year Plan Project, and provides some
contribution to transportation improvements resulting from the impacts of this
new development; further, that the value of any contribution has a nexus to the
project and its impacts.
2) The provision of a shared right-in/right-out entrance may work given the
anticipated separated median design for Route 277. In general, additional
entrances on Route 277 are to be avoided.
3) Potential interparcel connectivity could be provided to the commercial property to
the east.
4) Please ensure that the proposed relocation o1' VDOT Lane to the west to align
with the existing entrance to the shopping center will not have an impact to the
entrances proposed on VDOT Lane.
5) Please evaluate if any additional right-ol •way dedication is necessary along
VDOT Lane for future improvements.
6) Please ensure that pedestrian accessibility and circulation is provided to the
adjacent properties where appropriate to ensure this project is well integrated into
the surrounding community.
7) The commercial and residential land uses of the Route 277 Urban Center are
expected to have a strong street presence and relate to existing Fairfax Pike.
Please explain what site planning and design elements will be implemented to
achieve this goal of the Route 277 Triangle and Urban Center Plan.
In conclusion, please ensure that the above comments, and those offered by the reviewing
agency are addressed.
MTR/bad
•
0
March 12, 2013
VIA E-MAIL AND REGULAR MAIL
Mr. Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester VA 22602
COUNTY of FREDERICK
Roderick B. Williams
County Attorney
540/722-8383
Fax 540/667-0370
E-mail:
rwillia@co.frederick.va.us
Re: Rezoning Application — Fairfax Pike/VDOT Lane Commercial Properties
Proffer Statement dated January 25, 2013
Dear Evan:
You have submitted to Frederick County for review the above -referenced proffer
statement (the "Proffer Statement") for the proposed rezoning of Tax Parcel Numbers 86-
A-14 and 86-A-15 (collectively, the "Property"), in the Opequon Magisterial District,
from the B 1 Neighborhood Business District to the B2 General Business District, with
proffers. I have now reviewed the Proffer Statement and it is my opinion that the Proffer
Statement would be in a form to meet the requirements of the Frederick County Zoning
Ordinance and the Code of Virginia, and would be legally sufficient as a proffer
statement, subject to the following comments:
• In the third line under "Preliminary Matters", "Applicant" should be changed to
"Owner", consistent with the view that the obligations are ultimately those of the
owner(s) (and any successors -in -interest) and not of any applicant(s).
• Prior to final submission of the rezoning application, as I assume that you will be
acting for the owner(s)/applicant(s), you will of course need to submit executed
powers of attorney for Bowman -Shoemaker Companies and Elizabeth Properties,
L.C.
GREENWAY
01
107 North Kent Street Winchester, Virginia 22 �E�_,� :[_t,:i�1� tt A--
Mr. Evan Wyatt
March 12, 2013
Page 2
I have not reviewed the substance of the proffers as to whether the proffers are
suitable and appropriate for this specific development, as my understanding is that that
review will be done by staff and the Planning Commission.
A
. Wil iams
County Attorney
cc: Michael T. Ruddy, Deputy Director of Planning & Development, Frederick
County (via e-mail)
0 0 Page 1 of I
Evan Wyatt
From: Funkhouser, Rhonda (VDOT) [Rhonda.Funkhouser@VDOT.Virginia.gov] on behalf of Smith, Matthew, P.E. (VDOT)
[Matthew.Smith@vdot.virginia.gov]
Sent: Tuesday, March 19, 2013 11:33 AM
To: Bishop, John. (VDOT); Evan Wyatt
Cc: Ingram, Lloyd (VDOT); Smith, Matthew, P.E. (VDOT)
Subject: Fairfax PikeNDOT Lane Commercial Properties - VDOT Comments to Rezoning
We have reviewed the Rezoning Application for the Fair fax Pike/VDOT Lane Commercial
Properties as received by this office on February 25, 2013 for impacts to the local
transportation system. Our comments for your consideration are as follows:
Remove all dimensions associated with the entrances on the Generalized
Development Plan, as final design and location will be determined at time of site
plan review in accordance with current regulations and standards.
. At this time, VDOT does not support two full -access entrances off of VDOT Lane. The
50' ingress/egress easement should provide access to both parcels.
Access locations to these properties will be determined at the time of site plan
review. This office will require a complete set of construction plans detailing
entrance designs, drainage features, and traffic flow data from the I.T.E. Trip
Generation Manual, Eighth Edition for review. VDOT reserves the right to comment
on all right-of-way needs, including turn lanes, right-of-way dedications, traffic
signalization, and drainage.
VDOT supports this rezoning after satisfactorily addressing the above comments. Thank
You for allowing us the opportunity to comment.
Matthew B. Smith, P.E.
Area Land Use Engineer
VDOT - Land Development
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA 22824
Phone # (540) 984-5615
Fax # (540) 984-5607
3/22/2013
Untitled Stationery • Page I of 3
Evan Wyatt
From: Colson, Chris, P.E. (VDOT)[Chris.Colson@vdot.virginia.gov]
Sent: Friday, January 25, 2013 11:57 AM
To: Evan Wyatt
Cc: Bishop, John. (VDOT); Thomason, Kirk (VDOT)
Subject: RE: Fairfax Pike Preliminary Design
Hi Evan, that sounds reasonable to us at this point in time based on the current design. I just want to
reiterate the design is still preliminary and is subject to change, but as design continues we will keep the
future development of the parcels in mind. If you can share site plan design files we would appreciate it.
Chris Colson, P.E.
VDOT - Staunton District
Location & Design
540-332-7746 (tel)
From: Evan Wyatt [mailto:ewyatt@greenwayeng.com]
Sent: Friday, January 25, 2013 9:05 AM
To: Colson, Chris, P.E. (VDOT)
Cc: Bishop, John. (VDOT)
Subject: RE: Fairfax Pike Preliminary Design
Hi Chris,
I appreciate the return call and the follow up message below. I have had a chance to discuss
this information with John Bishop and the property owner. In order to accommodate the
preliminary design at this point in time, we will plan to provide a 20' right-of-way dedication
along the property frontage of Elizabeth Properties and Bowman -Shoemaker Properties, as well
as a 10' temporary construction easement. The County's parking lot setback requirements are
10' from the right-of-way; therefore, we will also identify the ability to extend the dedicated
right-of-way into the 10' temporary construction easement if necessary to accommodate the
final design. I do not see this being an issue except in the area of the western property line of
the Elizabeth Property and would not anticipate the additional encroachment to be more than
a couple of feet; therefore, there will not be an impact to the parking lot that will most likely be
developed in advance of the Route 277 widening improvements. We will identify the right-of-
way dedication area on the site plan for the project and will plan to provide the dedication plat
to VDOT at the time it is requested by VDOT, which would most likely occur after the final
design of the Route 277 widening.
I would ask that both John and you review this suggestion and advise me if this makes sense or
if there are other ideas.
Thanks, Evan
From: Colson, Chris, P.E. (VDOT)[mailto:Chris.Colson@vdot.virginia.gov]
Sent: Thursday, January 17, 2013 1:50 PM
To: Evan Wyatt
4/ 19/2013
Untitled Stationery is • Page 2 of 3
Cc: Bishop, John. (VDOT)
Subject: RE: Fairfax Pike Preliminary Design
Hi Evan, I wanted to make sure I got back to you today regarding your questions on Route 277. We are currently still in the
preliminary engineering stage; while I feel confident with the horizontal layout through this section, we are still developing
the vertical, so I am hesitant to provide CAD files at this stage; and we have not began to set the right-of-way. With that
caveat, the following are approximate back of walk offsets from the existing right of way lines at the property corners:
Offset Location
19-ft north Western property line of Elizabeth Properties
13-ft north Eastern property line of Elizabeth Properties /
Western property line of Bowman -Shoemaker
12.S-ft north Eastern property line of Bowman -Shoemaker
The right-of-way will at a minimum be a foot behind the back of walk or greater depending upon the grading; this does not
account for any easements (utility, etc.) that may be needed.
Let me know if you need additional information.
Chris Colson, P.E.
VDCT - Staunton District
Location & Design
811 Commerce Road
Staunton, VA
540-332-7746 (tel)
From: Evan Wyatt [mailto:ewyatt@greenwayeng.com]
Sent: Wednesday, January 16, 2013 2:26 PM
To: Colson, Chris, P.E. (VDOT)
Cc: Bishop, John. (VDOT)
Subject: Fairfax Pike Preliminary Design
Hi Chris,
I met with John Bishop yesterday to discuss one of our projects located at the intersection of Fairfax Pike and VDOT Lane.
John advised me of the information discussed between VDOT and Frederick County to establish the typical section in this part
of the corridor, which we will be following in our project. I obtained a copy of the preliminary design layout on the aerial base
(see attached), which was not to scale; therefore, I need to know what the proposed right-of-way width so we can plan
accordingly. It would be great if I could obtain the digital file for the attached document or dimensional information from the
road centerline to the north at your earliest possible convenience. I am available should you need to contact me regarding
this matter.
Thank you, Evan
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
Phone: 540-662-4185
Fax: 540-722-9528
Visit us on the web at www.greenwa eng.com to learn about exciting new services offered by Greenway
Engineering: Laboratory Services, Water Sewer, Maintenance / Monitoring, ESA Phase I, Wetlands and more.
4/ 19/2013
0
•
tip\ /E)®T Virginia Department
of Transportation August 2012
ACCESS MANAGEMENT EXCEPTION REQUEST: AM-2
MINOR ARTERIAL, COLLECTOR, & LOCAL STREET REGULATIONS 24 VAC 30-73
SECTION 120
Submitted by: Greenway Engineering
Date: February 22, 2013
Email Address: ewyatt@greenwayeng.com
Phone: 540-622-4185
Address:151 Windy Hill Lane Winchester, VA 22602
Project Name: VDOT Lane, Route 277
Rte 277
Locality: Frederick County
Description of Project:
Rezoning of two commercial properties on the corner
of VDOT Lane and Route 277,
VDOT District: Staunton/Edinburg Residency
Area Land Use Engineer:
Matthew B. Smith, P.E.
NOTES:
(1). Submit this form and any attachments to one of the District's Area Land Use Engineers.
(2). See Section 120 of the Regulations for details on the requirements, exceptions, and exception request review process.
(3). Attach additional information as necessary to justify the exception request(s).
(4). If a traffic engineering study is required, the decision on the request will be based on VDOT engineering judgment.
(5). Use the LD-440 Design Exception or the LD-448 Design Waiver forms for engineering related standards, e,g. sight
distance. See IIM-LD-227 for additional Instructions.
Select the Exception(s) Being Requested
❑ Exception to the shared entrance requirement. (Access M. Regulations Section 120 C.2)
Reason for exception:
❑ A. An agreement to share the entrance could not be reached with adjoining property owner.
❑ Attached: Written evidence that adjoining property owner will not share the entrance.
❑ B. Physical constraints: topography, adjacent hazardous land use, stream, wetland, other.
❑ Specify constraint:
❑ Attached: Documentation of constraint such as aerial photo or topographic map.
❑ Exception to the vehicular connection to adjoining undeveloped property requirement. (Section 120 C.4)
Reason for exception:
[] A. Physical constraints: topography, adjacent hazardous land use, stream, wetland, other.
❑ Specify constraint:
❑ Attached: Documentation of constraint such as aerial photo or topographic map.
❑ B. Other reason:
❑ Exception to the requirement that an entrance shall not be located within the functional area of an
intersection or roundabout. (See Regulation Section 120 C. 1; Appendix F, Rd Design Manual)
❑ Attached: A traffic engineering study documenting that the operation of the intersection and
publlc safety will not be adversely impacted.
AM-2
9 •
August 2012
❑ EXCEPTION TO THE SPACING STANDARDS FOR:
• Entrances, Intersections, crossovers (Table 2-2);
• Entrances, Intersections near interchange ramps (Tables 2-3, 2-4); or
• Corner clearance (Figure 4-4). Appendix F, Road Design Manual
Provide the following Information on the Exception Request
0 ON A MINOR ARTERIAL OR COLLECTOR
❑ NEAR AN INTERCHANGE RAMP (Submittal of a traffic engineering study required)
❑ CORNER CLEARANCE (Submittal of a traffic engineering study required)
Type of entrance/intersection/crossover: Signalized ❑ Unsignalized/Full Access ❑ Partial Access no
Posted speed limit: 35 mph Minor Arterial: Collector: ❑ Local: ❑
Required spacing distance 250 ft
Proposed spacing dlstanc(?12+/-ft
Requested exception: Reduction in required spacing38 +/-ft
REASON FOR EXCEPTION:
A. To be located on an older, established business section of a highway corridor where existing
spacing did not meet the spacing standards prior to October 14, 2009. (Regulation Section 120 C.3.c)
NAttached: Dated aerial photo of corridor identifying proposed entrance/intersectlon location.
❑ B. Not enough property frontage to meet spacing standard, but the applicant does not want a
partial access right-In/right-out entrance. (Section 120 C.3.f)
❑ Attached: A traffic engineering study documenting that left turn movements at the entrance will not
have a negative impact on highway operation or safety.
❑ C. To be located within a new urbanism mixed use type development. (Section 120 C.3.d)
0 Attached: The design of the development and compliance with intersection sight distance.
D. The proposed entrance meets the signal warrants but does not meet the signalized
Intersection spacing standard. The applicant requests an exception to the spacing standard.
❑ Attached: A traffic engineering study that (1) evaluates the location's suitability for a roundabout and (11)
contains specific/documented reasons showing that the proximity of the proposed signal to an adjacent
signal will not adversely impact a safe and efficient flow of traffic on the highway. (Section 120 C.5)
❑ E. The development's 2"d (or additional) entrance does not meet the spacing standards but is
necessary for the streets to be accepted Into the secondary system. (Section 120 C.3.e)
0 Attached: Information on the development that identifies the location of entrances.
❑ F. To be located within the limits of a VDOT and locality approved access management corridor plan.
[] Attached: Aerial photo of corridor Identifying proposed entrance/intersection location. (Sect 120 C.3.b)
2
AM-2
August 2012
FOR VDOT USE ONL
Recommendation on Exception Request: Approve ■0 Deny ❑ Date -April 11, 2013
Area Land Use Engineer or : Name Matthew B. Smith, P.E., Area Land Use Engineer
Remarks: The Edinburg Residency supports the exception request, as this is within an older .
established business section of an Urban Highway Corridor. The proposal is providing
a shared right in/right out access with the adjacent lot. In addition, proposed roadway
improvements on Route 277 will shift VDOT Lane further west once completed and will
then meet spacing requirements to the west.
Exception Request Action: Approve Denied ❑ Date: q _ ( -1.. 13
District Administrator or s gnee• Wk-1 Qk
Name (and position if Designee) J-ePf�ry A , L4ne6erry V5e— O i re c+b t-
Remarks:
Con cur
wr+k
+1 e Propo5ed
anal fki
ex ce
Ue54-
15
capprovej
District Staff: Please email copy to Paul. Grasewicz@VDOT.Virginia.Gov
3
AM-2
•
0
August 2012
MINOR ARTERIAL & COLLECTOR REGULATIONS Section 120. Commercial entrance access management.
A. As commercial entrance locations and designs are prepared and reviewed, appropriate access management
regulations and standards shall be utilized to ensure the safety, integrity and operational characteristics of the
transportation system are maintained. The proposed commercial entrance shall meet the access management
standards contained in Appendix F of the Road Design Manual and the regulations in this chapter to provide the
users of such entrance with a safe means of ingress and egress wtule minimizing the impact of such ingress and
egress on the operation of the highway.
B. A proposed development's compliance with the access management requirements specified below should be
considered during the local government and VDOT's review of any rezoning, site plan, or subdivision plat for the
development. VDOT's review of a rezoning traffic impact statement and a site plan/subdivision plat supplemental
traffic analysis submitted for a development in accordance with the Traffic Impact Analysis Regulations shall include
comments on the development's compliance with the access management requirements specified below.
C. Access management requirements, in addition to other regulations in this chapter, include but are not limited to:
1. Restricting commercial entrance locations. To prevent undue interference with free traffic movement
and to preserve safety, entrances to the highways shall not be permitted within the functional areas of
intersections, roundabouts, railroad grade crossings, interchanges or similar areas with sensitive traffic
operations. A request for an exception to this requirement submitted according to 24VAC30-73-120 D shall
include a traffic engineering investigation report that contains specific and documented reasons showing that
highway operation and safety will not be adversely impacted.
2. Entrances shared with adjoining properties on minor arterials and collectors. To reduce the number of
entrances to state highways, a condition of entrance permit issuance shall be that entrances serve two or more
parcels. A street that meets the Secondary Street Acceptance Requirements will be publicly maintained and
shall be the preferred method for shared entrances as such entrances will allow for the future development of a
network of publicly maintained streets. Otherwise a shared commercial entrance shall be created and designed
to serve adjoining properties. A copy of the property owners' recorded agreement to share use of and maintain
the entrance shall be included with the entrance permit application submitted to the district administrator's
designee. The shared entrance shall be identified on any site plan or subdivision plat of the property. The
district administrator's designee is authorized to approve an exception to this requirement upon submittal of a
request according to 24VAC30-73-120 D that includes the following:
a. Written evidence that a reasonable agreement to share an entrance cannot be reached with adjoining
property owners, or
b. Documentation that there are physical constraints, including but not limited to topography,
environmentally sensitive areas, and hazardous uses, to creating a shared entrance.
3. Spacing of entrances and intersections. The spacing of proposed entrances and intersections shall
comply with the spacing standards for entrances and intersections in Appendix F except as specified below.
a. Where a plan of development or a condition of development that identifies the specific location of an
entrance or entrances was proffered pursuant to §15.2-2297, 15.2-2298, or 15.2-2303 of the Code of
Virginia as part of a rezoning approved by the locality prior to October 14, 2009, such entrances shall be
exempt from the applicable spacing standards for entrances and intersections, provided the requirements of
§ 15.2-2307 of the Code of Virginia have been met. Entrances shall be exempt from the applicable spacing
standards for entrances and intersections when the location of such entrances are shown on a subdivision
plat, site plan, preliminary subdivision plat, or a Secondary Street Acceptance Requirements conceptual
sketch that was submitted by the locality to VDOT for review and received by VDOT prior to October 14,
2009 or is valid pursuant to §§15.2-2260 and 15.2-2261 and was approved in accordance with §§15.2-2286
and 15.2-2241 through 15.2-2245 prior to October 14, 2009. The district administrator's designee is
authorized to exempt such entrances from the spacing standards upon submittal of a request according to
24VAC30-73-120 D that includes documentation of the above criteria.
4 AM-2
August 2012
b. VDOT may work with a locality or localities on access management corridor plans. Such plans
may allow for spacing standards that differ from and supersede the applicable spacing standards for
entrances and intersections, subject to approval by the district administrator. Such plans may also
identify the locations of any physical constraints to creating shared entrances or vehicular/pedestrian
connections between adjoining properties. If the permit applicant submits a request according to
24VAC30-73-120 D for an exception to the spacing standards and provides documentation that the
location of the proposed commercial entrance is within the limits of an access management plan
approved by the local government and by VDOT, the plan should guide the district administrator's
designee in approving the exception request and in determining the appropriate location of the entrance.
c. On older, established business corridors of a locality within an urban area where existing entrances
and intersections did not meet the spacing standards prior to October 14, 2009, spacing for new entrances
and intersections may be allowed by the district administrator's designee that is consistent with the
established spacing along the highway, provided that the permit applicant submits a request according to
24VAC30-73-120 D for an exception to the spacing standards that includes evidence that reasonable efforts
were made to comply with the other access management requirements of this section including restricting
entrances within the functional areas of intersections, sharing entrances with and providing vehicular and
pedestrian connections between adjoining properties, and physically restricting entrances to right -in or
right -out or both movements.
d. Where a developer proposes a development within a designated urban development area as defined in
§15.2-2223.1 of the Code of Virginia or an area designated in the local comprehensive plan for higher
density development that incorporates principles of new urbanism and traditional neighborhood
development, which may include but need not be limited to (i) pedestrian -friendly road design, (ii)
interconnection of new local streets with existing local streets and roads, (iii) connectivity of road and
pedestrian networks, (iv) preservation of natural areas, (v) satisfaction of requirements for stormwater
management, (vi) mixed -use neighborhoods, including mixed housing types, (vii) reduction of front and
side yard building setbacks, and (viii) reduction of subdivision street widths and turning radii at subdivision
street intersections, the district administrator's designee may approve spacing standards for public street
intersections internal to the development that differ from the otherwise applicable spacing standards,
provided that the developer submits a request according to 24VAC30-73-120 D for an exception to the
spacing standards that includes information on the design of the development and on the conformance of
such entrances and intersections with the intersection sight distance standards specified in Appendix F.
e. Where a development's second or additional commercial entrances are necessary for the streets in
the development to be eligible for acceptance into the secondary system of state highways in accordance
with the Secondary Street Acceptance Requirements and such commercial entrances cannot meet the
spacing standards for highways, the developer may submit a request according to 24VAC30-73-120 D
for an exception to the spacing standards that includes information on the design of the development.
The following shall apply to the exception request:
1) For highways with a functional classification as a collector or local street, the district
administrator's designee may approve spacing standards that differ from the otherwise applicable
spacing standards to allow the approval of the entrance or entrances. Such commercial entrances
shall be required to meet the intersection sight distance standards specified in Appendix F of the
Road Design Manual.
2) For highways with a functional classification as a minor arterial, the district administrator's
designee shall, in consultation with the developer and the locality within which the development is
proposed, either approve spacing standards that differ from the otherwise applicable spacing
standards to allow the approval of the entrance or entrances, or waive such state requirements that
necessitate second or additional commercial entrances. If approved, such commercial entrances shall
be required to meet the intersection sight distance standards specified in Appendix F.
5 AM-2
August 2012
f. Where a parcel of record has insufficient frontage on a highway to meet the spacing standards
because of the dimensions of the parcel or a physical constraint such as topography or an environmentally
sensitive area, the entrance shall be physically restricted to right -in or right -out movements or both or
similar restrictions such that the public interests in a safe and efficient flow of traffic on the systems of state
highways are protected and preserved. A request for an exception to this requirement submitted according
to 24VAC30-73-120 D shall include a traffic engineering investigation report that contains specific and
documented reasons showing that highway operation and safety will not be adversely impacted.
4. Vehicular/pedestrian circulation between adjoining properties. To facilitate traffic circulation between
adjacent properties, reduce the number of entrances to the highway, and maximize use of new signalized
intersections, the permit applicant shall be required on a highway with a functional classification as a minor
arterial highway, and may be required by the district administrator's designee on a highway with a functional
classification as a collector, as a condition of permit issuance to record access easements and to construct
vehicular connections to the boundaries of the property (which may include frontage roads or reverse
frontage roads) in such a manner that affords safe and efficient future access between the permit applicant's
property and adjoining undeveloped properties. Where appropriate, the permit applicant also shall construct
pedestrian connections to the boundary lines of adjoining undeveloped properties and adjoining developed
properties with sidewalks that abut the property. At such time that a commercial entrance permit application
is submitted for the adjoining property, a condition of permit issuance shall be to extend such
vehicular/pedestrian connections into the proposed development. Development sites under the same
ownership or consolidated for the purposes of development and comprised of more than one building site
shall provide a unified vehicular and pedestrian access connection and circulation system between the sites.
a. Such connections shall not be required if the permit applicant submits a request for an exception
according to 24VAC30-73-120 D and provides documentation that there are physical constraints to
making such connections between properties, including but not limited to topography, environmentally
sensitive areas, and hazardous uses.
b. If a permit applicant does not wish to comply with this requirement, the permit applicant's entrance shall
be physically restricted to right -in or right -out movements or both or similar restrictions such that the public
interests in a safe and efficient flow of traffic on the systems of state highways are protected.
5. Traffic signal spacing. To promote the efficient progression of traffic on highways, commercial entrances
that are expected to serve sufficient traffic volumes and movements to require signalization shall not be
permitted if the spacing between the entrance and at least one adjacent signalized intersection is below
signalized intersection spacing standards in Appendix F of the Road Design Manual. If sufficient spacing
between adjacent traffic signals is not available, the entrance shall be physically restricted to right -in or right -
out movements or both or similar restrictions such that the public interests in a safe and efficient flow of
traffic on the systems of state highways are protected and preserved. A request for an exception to this
requirement submitted according to 24VAC30-73-120 D shall include a traffic engineering investigation
report that (i) evaluates the suitability of the entrance location for design as a roundabout, (ii) contains
specific and documented reasons showing that highway operation and safety will not be adversely impacted.
6. Limiting entrance movements. To preserve the safety and function of certain highways, the district
administrator's designee may require an entrance to be designed and constructed in such a manner as to
physically prohibit certain traffic movements.
D. A request for an exception from the access management requirements in 24VAC30-73-120 C shall be
submitted in writing to the district administrator's designee. The request shall identify the type of exception, describe
the reasons for the request, and include all documentation specified in 24VAC30-73-120 C for the type of exception.
After considering all pertinent information including any improvements that will be needed to the entrance or
intersection to protect the operational characteristics of the highway, the district administrator's designee will advise
the applicant in writing regarding the decision on the exception request within 30 calendar days of receipt of the
written exception request, with a copy to the district administrator. The applicant may appeal the decision of the
district administrator's designee to the district administrator in accordance with the procedures for an appeal.
AM-2
• 0
151 Ws* �ha line
Vx:7�V` %rMd M Vitrnia 22602
lbund�d Nt 1971
February 22, 2013
Virginia Department of Transportation
Attn: Matthew B. Smith, PE
14031 Old Valley Pike
Edinburg, Virginia 22824
R Fair_fIc keJVTXIT r•oan*nercUL Proppdcs AMA gMt Exceovon
Dear Matt:
Cownway Engineering is processing a rezoning application for two small commercial
properties to change the zoning designation from the B1 District to the B2 District.
These properties are designated as tax parcels 86-A-14 and 8&A-15 and are Iocated on
the north side of Fairfax Piim between VDOT Lane and Double Church Road. Parcel 15
has frontage on Fairfax Pike and VDOT LAne and Parcel 14 has frpntage solely on
Fairfax Pike. The combined frontage for these parcels is approximately 365 feet (Parcel
14 has approximately 175 feet of frontage and Parcel 15 has approximately 190 feet of
frontage). The commercial property irnme diately east of these parcels is developed;
therefore, there is approximately 425 feet between VDOT Lane and the adjoining
commercial property entrance. Fairfax Pike is clauffied as a minor arterial road with a
posted speed limit of 35 mph; therefore, VDOT currently requires 470 feet for AM access
commercial entrances for this type of road system.
Greenway Engineering has had discussions with VDOT and the Frederick County
Director of Transportation regarding the planned widening of the Fairfax Pike and access
design for the two commercial properties. Specifically, the County has requested that hill
aoc ess commercial entrances be avoided on Fairfax Pike for these parcels; that access
onto Fairfax Pike is limited to a shared right•inhight-out entrance; that Rill access
commercial entrances are located on VDOT Lane; and that Lot 14 is provided with an
access easement across Lot 15 to avoid a landlocked situation that would dictate a hull
access commercial entrance on Fairfax Pike. These discussions have provided guidance
as to an appropriate 800 M management plan for the two parcels, which is being
proffered by the property owner.
In order to accomplish this access management plan. VDOT will need to provide the
allowance for looting a shared right-idright>•out access that is less than 250 feet.
Greenway Engineering has prepared an exhibit that is proffered with the rezoning
application that locates the shared right inhight-out access approximately 212 feet from
kngineers 5urveyon Planners Environmental Soenttsm
'telephone 540.662.4185 FAX 540.722-9528
Pmra 05Sl0/HAW Www.greenwayeng com
• •
the Wdsting entrances on Fairfax Pipe. This location can be easily constructed and has
appropriate sight distance for westbound traffic on Fairfax Pike. Greenway Engineering
has included the VDOT Access management Exception Request: AM-2 Form that
identifies the applicable exception request along with the proffered Generalized
Development Plan extu'bit dated January 25, 2013 for your review. It is requested that
VDOT provide a favorable won for this request, which will be incorporated
as a component of the VDOT review comments during the rezoning application process.
Please contact nee if you have any questions regarding this information, or if you need
anything else at this time.
Sincerely,
Q_.
Evsn yatt, AI
Greenway Engineering
Cc: John A. Bishop, Jr., Frederick County Director of Transportation
ATJM #5s1NHAw
2
% ffi.� I
AWAIUM
f
Fax from : 540 678 4739
0
t94—G5-1j 11:4(
Yy
G
Rezoning Comments
Frederick County Fire Marshal
Mail to: Hand deliver to:
Frederick County File Marshal Frederick County Fire & Rescue Dept.
1800 Coverstone Drive Attn: Fire Marshal
Winchester, Virginia 22602 Public Safety Building
(540) 665-6350 1800 Coverstone Drive
Winchester, Virginia
Applicant: Please fill out the information as accurately,as,possible in order to assist the Frederick County
Fire Marshal with his review. 'Attach a copy of your: application forms, location.mtap, prof 1e)r,staieilnep t,
impact analysis, and any. other pez 0 nt;infolr atxo
Applicant's Name: Greenway Engineering
Mailing Address:
151 Windy Hill Lane
Winchester, VA 22602
Telephone: 540-662-4185
Location of property: North side of Fairfax Pike (Route 277) adjacent to VOO7 Lane (Route 1018);
approximately''/2-mile east of Interstate 81 Exit 307
Current zoning: B-1 District Zoning requested: B-2 District Acreage. 3.61+/- Ac.
Fire Marshal's Comments:
Fire Marshal's Signature & Date:
Notice to Fire Marshal - Please Return This Form to the Applicant
22
Fax from : 940 678 4739
02-25-13 11:47 Pg: 1
Control number uate receiveo - - --
Rz12-0004 2/22/2013 2/25/2013
Project Name Applicant
Fairfax Pike / VDOT Lane Commercial Rezoning Greenway Engineering
City State Zip Applicant Phone
Address 540-662-4185
151 Windy Hill LWinchester VA 22602
ane
Type Application Tax ID Number Fire District
Rezoning 86-A-14 & 86-A-1 11
Current Zoning
61 Recommendations
Automatic Sprinkler System
Yes
Other recommendation
Emergency Vehicle Access
Not Identified
Siamese Location
Not Identified
Emergency Vehicle Access Comments
Access Comments
Additional Comments
(plan Approved
Plan Approval Recommended
Yes
Automatic Fire Alarm System
Yes
R-equ96"erneids
Hydrant Location
Not Identified
Roadway/Aisleway Width
Adequate
Rescue District
11
Election District
Opequon
Residential Sprinkler System
No
Fire Lane Required
No
Special Hazards
No
Reviewed By Signature _
Kenneth Scott Title'�'�s__L_
•
•
I
Mr. Evan Wyatt, AICP
Grcenway Engineering
1 S 1 Windy Hill Lane
Winchester, Virginia 22602
March 1, 2013
COUNTY of FREDERICK
Department of Public Works
540/665-5643
FAX: 540/ 678-0682
RE: Rezoning Rcquest for Proposed Commercial Properties at Intersection of Fairfax Pike
and VDOT Lane
Frederick County, Virginia
Dear Evan:
We have completed our review of the rezoning application for the proposed commercial
development at the intersection of Fairfax Pike and VDOT Lane. Based on this review, we offer
the following minor comments:
Refer to Site Drainage on Page 8. Change cast to west of the Food Lion Plaza
development.
2. At the site plan design phase, include an allalysls of the dowllstrealll storlllwater
collveyallce systelll ulltll the runoff Peaches the drainage chaimel oil the south side of
Fairfax Pike. Alternative stormwater nlanagenlcnt systems should be considered in
fiitu re site plan designs.
I can be reached at 722-8214 if you should have any questions regarding the above
colllnlellts.
SI11cerely,
MAMI.i
I-Iarve L* Strawsn cler, P.E.
Y Y Jr.,
Director of Public Works
HES/rls
cc: Planning and Development
file
t:\Rhonda\TEiN1PC0\1MGN'I'S\IN'I' Il-AIRPAx PK & VUO'1' LN RGZ COM.doc
0 •
Rezoning Comments
Frederick County Sanitation Authority
Mail to:
Frederick County Sanitation Authority
Attn: Engineer
P.O. Box 1877
Winchester, Virginia 22604
(540) 868-1061
Hanel deliver to:
Frederick County Sanitation Authority
Attn: Engineer
315 Taslcer Road
Stephens City, Virginia
- -- - - ----- - -------------
Applicant: Please fill out the information as accurately as possible in order to assist the Sanitation Authority
with their review. Attach a copy of ,your application form, location map, proffer statement, impact
analysis, and any other pertinent information
Applicants Na►11C: Greenway Engineering
Mailing Address: 151 Windy Hill Lane
TC ] Cp lloll e: 540-662-4185
Winchester, VA 22602
Location of property: North side of Fairfax Pike (Route 277) adjacent to VDOT Lane (Route 1018);
approximately 1/2-mile east of Interstate 81 Exit 307
CurreIlt Zolllllg: B-1 District Zoning requested: B-2 District
Acreage: 3.61+/- Ac.
Sanitation Authority Comments:
stc atickcInca cioa-L"nca.
Sanitation Authority Signature & bate:
Notice to Sanitation Authority - Please Return This Form to the Applicant
25
GREENWAY
ENGINEERING
•
Post Office Box 1877
N1'inchcsicr Virginia 22604-8377
February 26, 2013
Mr. Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
�J
FREDER RCK COUNTY
S MTATM114 AUTHOG�F-Y
P11. -- (540)868-1061
(5411)808-1.129
Ref.: Rezoning Comments
Fairfax Pike/VDOT Lane Properties Rezoning
Tax Map # 86-A-14 & 86-A-15
Dear Mr. Wyatt:
l\cc 1•1. Weindel, P.E.
E'lig nccr-Dircclor
Per your request, a review of the proposed rezoning has been performed. The Frederick County Sanitation
Authority offers comments limited to the anticipated impact/effect upon the Authority's public water and sanitary
sewer system and the demands thereon.
The parcel is in the water and sanitary sewer area served by the Authority. Based on the anticipated usage, water
capacity is presently available. Sanitary sewer treatment capacity at the waste water treatment plant is also
presently available. Conveyance capacity and layout will be contingent on the applicant performing a technical
analysis of the existing sanitary sewer system within the area to be served and the existing collection main. Both
water and sanitary sewer facilities are located within a reasonable distance from this site.
Please be aware that the Authority does not review or comment upon proffers and/or conditions proposed or
submitted by the applicant in support of or in conjunction with this application for rezoning, nor does the
Authority assume or undertake any responsibility to review or comment upon any amended proffers and/or
conditions which the Applicant may hereafter provide to Frederick County.
Thank you-,
Uwe E. Weindel, PE
Engineer -Director
I-T r 2 f �2 1
i-I-l.� 1.!
GREENWAY
ENGINEER HNIG
„IATI:R'S WORTH IT
Rezoning Comments
Winchester Regional Airport
Mail W • Hand delver to:
Winehiiter Regiarial Airport Winchester Regional Airport
Attn- Executive:Directcir Attn: Executive Director
491 Airport Road 491 Airport Rood
Winchester,"Vi;ginia 22602 (Rt. 645, off of Rt. 522 South)
(540) ¢62-2422 ' : Winchester, Vtinia
t1�� i�'(armation as accurately as po blq, ,or*4 j*ssist the Winchester
R.eoo -AU-0 -with ;eir-Tevicw,. Attach a copy of your appli.; it forttri, location map, proffer
sateni: ilia
s any otlier�Pe ►a !� f! 4 A
Applicant's Name: Greenway Engineering
Mailing Address: 151 windy Hit Lane
Winchester, VA 22602
Telephone: 540-6624185
Location of property: Norm &I" of Fairfax Pke (Route 277) adjacent to VOOT Lane (Routs 1018);
approximately frmile east of Interstate 81 Exit 307
Current zoning: B-1 District Zoning requested: B-2 District Acreage: 3.61+/ Ac.
Winchester Regional Airport's Comments:
Proposed rezoning should not have an impact on operations at the Winchester Regional Airport.
Winchester Regional Airport's
Signature & Date: _ April 4, 2013
Notice to Winchester Regional Airport - Please Return Form to Applicant
30
0
a
IMPACT ANALYSIS STATEMENT
FAIRFAX PIKENDOT LANE
COMMERCIAL PROPERTIES
REZONING
Frederick County, Virginia
Opequon Magisterial District
Tax Parcel # 86-A-14 and 86-A-15
Aggregate Area of 3.61± acres
January 25, 2013
Revised April 11, 2013
Current Owner: Bowman -Shoemaker Companies, Inc.
Elizabeth Properties, LC
Contact Person: Evan A. Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
(540)-662-4185
9
0
Greenway Engineering January 25, 2013 Fairfax PikeNDOT Lane Rezoning
Revised April 11, 2013
FAIRFAX PIKE NDOT LANE COMMERCIAL
PROPERTIES REZONING
INTRODUCTION
This report has been prepared for the pUrpose Of assessing the impact t0 Frederick COuilty
by the rezoning of 3.61± acres owned by Bowman -Shoemaker Companies, Inc., and
Elizabeth Properties, LC, identified as Tax Map Parcels 86-A-14 and 86-A-15. Tax Map
86-A-15 is a 1.96± acre parcel Owned by Bowman-Shocnlaker Companies, which is
curfently zoned 13-1, Neighborhood Business District. Tax Map 86-A-14 is a 1.65± acre
parcel owned by Elizabeth Properties, LC, which is currently zoned B-1, Neighborhood
Business District. Both properties are currently undeveloped. The Owner desires to
rezone both parcels from the B-1, Neighborhood Business District to B-2, Business
General District with proffers.
Bask Information:
Location: North side of Fairfax Pike (Route 277) adjacent to VDOT
Lane (Route 1018); approximately'/2-mile east of Interstate
81 Exit 307.
Magisterial District:
Properly ID Numbers:
Current Zoning
CUrreIll Use:
Proposed Zoning:
Total Rezoning Area:
Proposed Development:
Opecqu011 District
86-A-14 and 86-A-15
86-A-14: 131 District (1.65± acres)
86-A-15: B 1 District (1.96± acres)
Undeveloped
86-A-14: B-2 District (1.65± acres) with proffers
86-A-15: I3-2 District (1.96± acres) with proffers
3.61± acres 13-2 Business General District
Commercial Retail; Commercial Service; and/Or Office
Pile #5510/FAW 2
0 0
Greenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
COMPREHENSIVE POLICY PLAN
Sewer and Water Service Area
Tax Map Parcels 86-A-14 and 86-A-15 are Currently located within the Sewer and Water
Service Area (SWSA). Therefore, the rezoning of this properly for commercial land use
is appropriate based on Current policy. The 3.61± acre subject properties are Currently
zoned for neighborhood Commercial land use, and have access to public water and public
sewer service. Therefore, the request to rezone the subject properties from B-1,
Neighborhood Commercial District to 13-2, Business General District will not require the
expansion of the SWSA or the extension of public water and sewer infrastructure to serve
the Subject properties. (Please refer to the UDA and SWSA Map Exhibit.)
Southern Frederick Land Use Plan
Tax Map Parcels 86-A-14 and 86-A-15 are a component of the Route 277 Triangle and
Urban Center Land Use Plan. This land use plan recommends the development of
business and Urban center land uses along the north Side or Fairfax Pike (Route 277),
between the Interstate 81 Exit 307 interchange area and Double Church Road (Route
641). The land use plan identifies the Subject properties within a future urban center land
use designation. The land use plan stales that the urban Center is larger than the
neighborhood commercial Center with a larger commercial core, higher residential
densities, and is designed around some form Of public space or focal point. The 3.61±
acre subject properties have approximately 425' of frontage along Fairfax Pike and will
have their primary point of access along VDOT Lane. The location, size, and dimension
Of the subject properties are not Conducive to urban center clesign; therefore, the Owner
intends to maintain a business land use designation for the property. The Owner's
proposal provides right-of-way dedication for the planned widening of Fairfax Pike, the
provision of inter -parcel access to direct traffic to VDOT Lane, and the provision of
right-in/right-OUt access on Fairfax Pike to facilitate access management control.
Therefore, the Owner's request is consistent with the transportation goals of the Route
277 Triangle and Urban Center Land Use Plan and provides for economic development
land use to further support the goals of the plan.
SUITABILITY OF THE SITE
Floodplains
Tax Map Parcels 86-A-14 and 86-A-15 are located on FEMA NFIP Map #510063-0200
B. This map, as well as the Frederick County CIS database delineates the subject
properties as being outside or the 100-year floodplaul. Both mapping SOLICCCS identify
Stephens RLIn as the Closest floodplaill area, which is approximately 3/4-mile southwest
of' the subject properties. Therefore, there will be no impacts to this environmental
File #5510/I:AW 3
Greenway Engineering January 25, 2013 Fairfax Pike/VDO'1' Lane Rezoning
Revised April 11, 2013
Feature by the development of' the proposed commercial land uses On these properties.
(Please refer to the Environmental Features Map Exhibit.)
WmI-Inrlc
Tax Map Parcels 86-A-14 and 86-A-15 do not contain wetland areas as demonstrated on
the National Wetlands Inventory (NWI) Map, as well as information from the Frederick
County GIS Database. No evidence of wetlands features and vcgCtation is present On the
property; therefore, the subject site is not impacted by wetland areas. (Please refer to the
Environmental Features Map Exhibit.)
Steep Slopes
Tax Map Parcels 86-A-14 and 86-A-15 are both gently rolling sites with slopes ranging
from 2 to 7 percent. The greatest topographic relict 1S within the northern portion O1 Lax
map parcel 86-A-14, which will be required to be set aside as a butler and Screening area
for the benefit ol' the Frecton Townhouse Subdivision. There are no areas of sleep slope as
defined; therefore, there are no impacts to this environmental featLF1'e. (Please refer LO the
Environmental FeatLlreS Map Exhibit.)
Woodlands
Tax Map Parcels 86-A-14 and 86-A-15 contain areas of matUrC VCgClat1011 tlII'OLIghOUt the
northern and central portions of the site. The development Of both properties for
commercial land Use and for the collStRIC6011 Of the internal access drive will necessitate
the clearing Of all i11atLII'C vegetation on both properties. However, commercial parcels
will be required to Comply with the landscaping regLlll'Cl11CnlS OI the Zoning Ordinance,
which will mitigate this impact. The Owner will attempt to LltlliZC matUl'C vegetation
along the rear property line of tax map parcel 86-A-14 1'Or required buffer and screening
for the benefit of the Freeton Townhouse subdivision. (Please refer to the Aerial
Overview Exhibit).
Soil Types
The Soil Survey of Frederick County, published by the USDA Soil Conservation Service
was COIiSLIILCd to CletCl'1111nC SOIL types contained in Tax Map Parcels 86-A-14 and 86-A-
15. The Subject properties contain the following Soil types:
1 C — Berks Channery Silt Loams: 7-15% slope
3B — Blairton Silt Loams: 2-7% slope
44B — Zoar Silt Loams: 2-7% slope
The Blairton Silt Loam and Zoar Silt Loam soil types are is classil'ied as prime farmland
soil. The primary soil types on Tax Map Parcels 86-A-14 and 86-A-15 are identified as
moderate to severe due to wetness and shrink -swell for Small commercial bUildingS;
File #5510/1iAw 4
0
Greenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
therefore, geotechnical analysis will be needed to determine it existing soils are
appropriate for construction or if select materials will be needed. However, it is noted
that the Soil characteristics 1dentiried above are similar to the soil types Follnd Oil
roadways and developed commercial properties along this portion of the Fairfax Pike
corridor. (Please refer to the Soils Map Exhibit.)
Other Environmental Features
Tax Map Parcels 86-A-14 and 86-A-15 do not contain areas of lakes, ponds or natural
storm water retention areas as defined by the Frederick County Zoning Ordinance. There
are no environmental featUl'CS present that create development constraints For the
proposed commercial land uses on these properties. (Please refer to the Aerial Overview
Exhibit and the Environmental Features Map Exhibit.)
SURROUNDING PROPERTIES
Adjoining property zoning and present use:
North: Zoned B 1, Neighborhood Business District Use: Apartment
Zoned RP, Residential Performance District Use: TOwnhomes
South: Zoned 132, Business General District Use: Commercial
East: Zoned: B1, Neighborhood Business District Use: Commercial
West: Zoned: B 1, Neighborhood Business District Use: VDOT Yard
Zoned: B2, Business General District Use: Residential
(Please refer to the Location and Zoning Map Exhibit)
TRANSPORTATION
Tax Map Parcels 86-A-14 and 86-A-15 have approximately 365± feel of' frontage along
the north side of Fairfax Pike (Route 277), and tax map parcel 86-A-15 has
approximately 360± feet of' frontage along the cast side of' VDOT Lane (Route 1018).
Fairfax Pike is classified as a minor arterial road, while VDOT Lane is classified as a
local street. The Virginia Department of Transportation Six Year Improvement Plan
(SYIP) identifies funding for the widening of Fairfax Pike during FY14-18. VDOT and
County officials have met to discuss an appropriate typical section for Fairfax Pike.
VDOT representatives have provided a preliminary geometric road section for the portion
of Fairfax Pike located along the subject property frontage. The typical section proposed
along the frontage of the subject properties 1nCILKICS C011UIlllollS pavement to provide for
File 115510/FAw 5
0 0
Greenway Iinginecring January 25. 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
two eastbol111d tl',1VC1 1,111CS, two wCStbOl111d tl'aVCI lanes, a shared CClltCl' tl11'11 lane, CIII'b
and gutter, and sidewalks. Additionally, this information depicts the VDOT Lane
intersection shifting to the west to align with the western -most commercial entrance that
serves the Food Lion Plaza commercial development.
Fairfax Pike is classified as a minor arterial road and the speed limit is between 35-45
mph. Therefore, the VDOT illinin111111 spacing standards of 470 feet for full access
commercial entrances cannot be achieved for the subject properties duC to distance
.constraints (tax parcel 86-A-14 has approximately 175± feet of frontage and tax parcel
86-A-15 has approximately 190± feet of frontage). Greenway Engineering has met with
the Collnty's Director of Transportation Planning and VDOT representatives to discuss
this and other access management matters, as well as traffic analysis information
associated with commercial developmCllt On the Subject properties. These discussions
SllppOrt the pl'OV1S10i1 Of a shared right-I11/I'Ight-011t COI11111C1'Clal entrance on Fairfax Pike,
a fulI access Commercial entrance serving tax parcel 86-A-14 and tax parcel 86-A-15, and
a 50' ingress/egress easement across tax parcel 86-A-15 that provides inter -parcel
connectivity to tax parcel 85-A-14. The property owner has prepared a Generalized
DevelopIllent Plan (GDP) that is incorporated as part of the proffer statement for the
Subject properties. The GDP depicts the general location of commercial access along
VDOT Lane, the general location of the inter -parcel connectivity, the general location of
the shared right-illhight-out commercial access on Fairfax Pike, and the general location
of the proposed Fairfax Pike right-of-way dedication area.
Greenway Engineering met with the Frederick County Transportation Planner to diSCIISS
the proposed rezoning application and it was determined that a Traffic Impact Analysis
(TIA) study would not be required fOr this process. VDOT has analyzed the Fairfax Pike
corridor and determined the appropriate lane geometry, which has been funded for
prelims Lary engineering design, fight -Of -way acgUlSlt1011, and construction. Additionally,
the proposed rezoning request is for a change in commercial zoning from the 13-1 District
to the B-2 District, which is projected to create a modest increase in peak hour traffic
volumes.
Greenway Engineering has prepared information from the Frederick County GIS
database that provides Floor -to -Area (FAR) calculations for properties that are zoned 13-1
District and B-2 District within the immediate area of the subject properties. (Please
refer to the Fairfax Pike & Adjoining Roads 131 & 132 District FAR Data Map and Table
Exhibit.) Analysis of this information suggests that the 13-1 District property would yield
approximately a 0.12 FAR, while the B-2 District property would yield approximately a
0.20 FAR. Therefore, the change in zoning would result in an increase of approximately
12,500 square meet of development on the 3.61± acre Subject propertieS. It is anticipated
that a freestanding discount store will be initially developed as a result of this rezoning
application. The ITE Manual, 7°i Edition, provides traffic projections for this type of land
use. The ITE Manual projects that the additional development potential would increase
peak flour volumes by 68 VPD during the weekdays, by 96 VPD on Saturdays, and by 92
VPD on Sundays. Therefore, it Is not anticipated that the change ill zoning from the B-I
Pile #55 VVEAw 6
Greenway Fnginccring January 25, 2013 Fairfax Pike/VUOT Lane Rezoning
Revised April 11, 2013
District t0 the 13-2 District Will have a negative impact On the corridor improvements that
are planned by VDOT.
SEWAGE CONVEYANCE AND TREATMENT
The subject properties are located within the Sewer and Water Service Area (SWSA).
The Frederick County Sanitation Authority (FCSA) provides public sewer service to this
geographic area of the c0n1111unity, Which provides treatment at the Parkins Mill
Wastewater Treatment Facility. The existing site conditions include a sanitary sewer
easement, which contains all 8-inch gravity sewer line and an 8-inch sewer force illain.
The site infrastructure directs effluent from the 8-inch sewer line to the Stephens Run
Lagoon pump station, which connects to a 15-inch sewer transmission line t0 the Parkins
Mill Wastewater Treatment Facility. FCSA has developed a SeWcl' Usage calculation for
planning purposes, Which provides for residential, commercial, and industrial land Uses.
A conceptual land plan has not been prepared for the subject properties; therefore, the
Collnty's rezoning application package suggests that the 3.61± acres has a maxiML1111
potential yield of 21,361 square feet of retail development per acre, resulting in a
maximum of 77,113 square feet (0.49 FAR). Therefore, the FCSA calculations for
projected sewer demands For the max111111111 (level opmen t potential retail development are
as follows:
Q = 7.5 gpd/1,000 Square beet
Q = 77,113 square feet/ 1,000 square feet = 77.11
Q = 77.11 x 75 gpd = 5,783 gpd
A conservative sewer demand projection for file subject properties is estimated to direct
5,783 gallons per day to the public sewage conveyance system and treatment demand at
the Parkins Mill Wastewater Treatment Facility. The design capacity of' the Parkins Mill
Wastewater Treatment Facility is 5.0 million gallons per clay (MGD), with current usage
averaging 1.97 MGD. Therefore, the projected land use development Will produce 5,783
gpd Of efflUellt for treatment, utilizing approximately 0.002% Of the available capacity at
this facility. This information demonstrates that the SUbject property can be developed
With adequate sewer service With available capacity for ti'eatillent. (Please refer t0 the
SWSA Map Exhibit.)
WATER SUPPLY
The subject properties are located within the Sewer and Water Service Area (SWSA).
The Frederick County Sanitation Authority (FCSA) has developed water infrastructure
Within the proximity Of the subiect properties, which provides potable water to the
commercial and residential land Uses located to the 1101'th, south, and cast of the proposed
development. An 8-inch water line exists On the south side of Fairfax Pike (Route 277)
File #5510/IiAW 7
•
0
(ireenway linginccring January 25, 2013 Fairfax Pike/VUOT Lane Rezoning
Reviscd April 11, 2013
across from the subject properties, and a water line crossing is in place that serves the
commercially zoned properties along VDOT Lane. A connection will be made to the fl-
inch water line to provide service to the subject properties to ensure that adequate water
flow and preSSUre are available for development. Land uses in this area of the County
receive potable water from the James H. Diehl Water Filtration Plant located by the
Stephens City quarries. The James 1-I. Diehl Water Filtration Plant provicles an average
of 3.4 Million Gallons per clay (MGD), and can provicle Up to 4 MPG of potable water
based on available pumping capacity. FCSA has developed a watei' Usage calculation for
planning purposes, which provides for residential, commercial, and illdustrial land uses.
A conceptual land plan has not been prepared 101- the subject properties; therefore, the
County's rezoning application package Suggests that the 3.61± acres has a maxlll111111
potential yield of 21,361 square feet of retail development per acre, resulting in a
maxl111L1111 of 77,1 13 square Feet (0.49 FAIZ). Therefore, the FCSA CalCLllatiOnS for
projected water clemandS for the maxIn1Ut11 development potential retail development are
as I011ows:
Q = 7.5 gpd/1,000 square feet
Q = 77,113 square feet/ 1,000 scluare feet = 77.11
Q = 77.11 x 75 gpd = 5,783 gpd
A conservative water clemand projection for the Subject properties is estimated to require
5,783 gallons per day of potable water from the FCSA water transmission system.
Greenway Engineering obtained fire hydrant test data From FCSA at the Food Lion Plaza
commercial project, which demonstrates water flow it 1,187 gpm and a residual pressure
of 50 psi; therefore, there is adequate water flow and pressure for development purposes.
Future Site plans for the Subject properties will demonstrate appropriate water pressure
based on their project demands; however, the inlormatlon in this Section demonstrates
that the subject property can be developed with adequate water service with available
capacity. (Please refer to the SWSA Map Exhibit.)
SITE DRAINAGE
Tax Map Parcels 86-A-14 and 86-A-15 are both gently rolling sites with slopes ranging
from 2 to 7 percent. The sites generally drain northeast to Southwest towards VDOT
Lane where stormwater is directed to a drainage area located north of' the Ornclorfl'
property to a cesigned storm water management area within the CB Ventures, LLC
development. It is envisioned that the Subject properties will be designed to provide
storm water management with appropriate capacities and treatment that will be directed
to the existing storm water management area. The County Engineer will be Consulted
during this process, and plans will be prepared and submitted for review and approval by
the County Engineer prior to any new development activity on the subject properties to
e11SL11'e that there are no negative impacts to the existing project site and SUITOUnding
properties resulting from storm water management activities. (Please refer to the
Environmental Features Map Exhibit.)
File #5510/IiAW 8
(ireenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
SOLID WASTE DISPOSAL
The impact oil solid Waste disposal facilities call be projected froill all average amlLlal
cominei'cial consumption Of 5A cubic yards per 1,000 square feet of Structural area (Civil
Engineering Reference Manual, 4t11 Edition). The follOWlllg I1gLI1'CS show the increase in
the average annual volume based on a conservative development projection of 77,113
square feet (0.49 FAR) of commercial land use for the entire acreage:
AVV = 5.4 cu. Yd. Per 1,000 sq. ft. commercial
AAV = 5.4 CLl. Yd. x 77.11
AAV = 416.4 cu. Yd. at build out, or 291.5 tons at build Out
The Municipal Solid Waste area Of the regional Landfill has a CLII'I'Cllt remaining Capacity
of 13,100,000 cubic yards of air Space. Tile potential development of 77,110 square feet
of commercial land use will generate approximately 291.5 tons of'solid waste annually on
average. This represents a 0.19% increase in the annual solid waste received by the
Municipal Solid Waste area of the Regional Landfill, Which currently average 150,000
tons per year; therefore, this information demonstrates that the Regional Landfill has
adegUate Capacity to accommodate the solid Waste impacts associated With this proposal.
Solid waste produced by the commercial land uses will be routed to the Regional Landfill
by a commercial waste hauler; tllefefore, the COLlilty Will receive tipping lees associated
with this land use to mitigate this impact.
HISTORICAL SITES AND STRUCTURES
Tile SUbject properties do not contain Stl'LiCtUl-CS (ICC111Cd to be historically significant, nor
are there potentially significant structures adjacent to the Subject property. Additionally,
the subject properties are not located within defined battlefield areas or potential historic
districts as demonstrated in the National Park Service Study Of Civil War Sites in the
Shenandoah Valley and the Frederick County C011lpfehenSive Policy Plan. Therefore, the
developmeit of the commercial laird uses On the subject propefticS Will not negatively
impact historic resources Or ViewshedS. (Please refer to the I-listoric Features Map
Exhibit.)
CONCLUSIONS
The rezoning of the 3.61± acre subject properties owned by Bowman-Shoenlakel'
Companies, Inc., and Elizabeth Properties, LC, is not anticipated to negatively impact
public services and Will provide economic development revenue that will benefit the
COLulty. The Subject properties are currently zones( 13-1 District; therefore, rezoning the
Subject properties to the B-2 District will provide the Opportunity to create commercial
File 115510/1:AW 9
Greenway Engincering January 25, 2013 Fairfax I'ike/VUOT Lane Rezoning
Revised April 11, 2013
land use that is compatible with other land uses along the Fairfax Pike (Route 277)
corridor. The Applicant has agreed to dedicate right-ol-way that is Sufficient in width to
accommodate the IUtIII'e Wi(lCIIillg of Fairfax Pike, and has prepared a proffered access
management plan that Is Consistent with improvements diSCUSSC(I With VDOT and the
County's Dircctor of Transportation Planning. Additionally, the Owner has ollered to
provide a monetary contribution to Frederick County for general fire and rescue services
to further mitigate impacts associated with this project. Therefore, this rezoning proposal
will provide for positive economic and transportation benefits to Frederick County
Without impacting capital facilities or services provided by the County.
Pile #5510/I:AN 10
Greenway Engineering January 25, 2013 Fairfax PikeNDOT lane Rezoning
Revised April 11. 2013
Revised May 17, 2013
FAIRFAX PIKENDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ#
Neighborhood Business (B 1) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in after the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: May 17, 2013
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application # for the
rezoning of 3.61 t-acres of Neighborhood Business (B 1) District to 3.61 t-acres of
Business General (132) District with proffers; development of the subject properties
("Property") shall be done in conformity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bowman -Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File N551WFAW
Greenway Engineering January 25, 2013 Fairfax l'IkeNDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
A. Generalized Development Plan
I ) The Owner hereby proffers to develop tile PI'Operty 111 substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-ill/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full screen buffer adjacent to the Freetoll
Townhouse Subdivision. The final locations of the commercial entrances and the
inter -parcel connection can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that It Is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-in/right-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. The Owner
will ensure that a reciprocal ingress/egress casement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
File I15510/I:Aw 2
(ireenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
Will ensure that the full access commercial entrance is located a minimum of 225'
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress easement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
Owner will ensure that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress easement serving the Property.
C. Monetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick County to be
Utilized as part of the local share match for qualifying off -site transportation
improvements associated with an approved Revenue Sharing project. The Owner
shall provide the $35,000.00 to Frederick County at the time that Frederick
County provides written request for this monetary contribution.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet of structural development on the Property for general fire and rescue
services. The Owner shall provide the appropriate monetary contribution amount
for each structure prior to the issuance of the Certificate of Occupancy Permit for
each structure developed on the Property.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
File #551(YEAw 3
Greenway Engineering
Signature
January 25, 2013 Fairfax PiKeNDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of' Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By: IL6-4-0
Boy man -Shoemaker Companies, Inc. Date
Commonwealth of Virginia,
City/ ounty of Ft-C(Je-V1C-L To Wit:
The foregoing instrument was acknowledged before me this -[ iclay of Jync—
20 i 3 by
eueY,
S
Notary Public
My Commission Expires Fe o, 2-q 20 i c,
File #5510/EAW 4
Greenway Engineering
Sij4iiature
January 25, 2013 Fairfax Pike/VDO'r Lane Rezoning
Revised April I I, 2013
Revisal May 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
r
B y:a"'Im"�-zet)
Eliz beth Properties, L.C.
Commonwealth of Virginia,
City ounty f Fy-e-de-V l L
To Wit:
The foregoing instrument was acknowledged before me this mil' day of
20 by )f-\J(Y if U a - S hoc cN10,ke'- "anacje.V1
My Commission Expires -F2 U • yq, 201 �
lOIV;�•, �.
t : v OF
� --1-/3
Date
Notary Public
File #5510/GAw
Greenway Engineering hammy 25, 2013 Fairlax like/VDOT Line Rezoning
Revised April 11, 2013
Revised May 17, 2013
FAIRFAX PIKE/VDOT LAND COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ#
Neighborhood Business (B 1) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in after the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: Apr-il 1-1, 24�3 May 17, 2013
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application # for the
rezoning of 3.61±-acres of Neighborhood Business (B 1) District to 3.61±-acres of
Business General (132) District with proffers; development of the subject properties
("Property") shall be done in conformity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bowman -Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File #5510/EA\\'
Grcenway Engineering January 25, 2013 Fairfax PikeJVDOT Lame Rezoning
Revised April 11, 2013
Revised May 17, 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
A. Generalized Development Plan
I ) The Owner hereby proffers to develop the Property in substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-in/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' fill] screen buffer adjacent to the Freeton
Townhouse Subdivision. The final locations of the commercial entrances and the
inter -parcel connection can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depleted oil the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the fi•ontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. Tile Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-in/right-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. The Owner
will ensure that a reciprocal ingress/egress casement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
rilc #5510;EAW 2
Greemvay Engineering January 25, 2013 Fairlhx Pike/VDOT lane Rezoning
Revised April I I, 2013
Revised iNlay 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner -
will ensure that the full access commercial entrance is located a minimum of 225'
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress casement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
Owner will ensure that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress casement serving the Property.
C. Monetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick Comity to be
utilized as part of the local share match for qualifying off -site transportation
improvements associated with the n ^hiss^ • ce—Drive—Phase2 an approved
Revenue Sharing project. The —O per--agrees—te allow the $35,00"0—te—be
pf-E)jee-t. The Owner shall provide the $35,000.00 to Frederick County at the time
that Frederick County provides written request for this monetary contribution.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet of structural development on the Property for general fire and rescue
services. The Owner shall provide the appropriate monetary contribution amount
for each structure prior to the issuance of the Certificate of Occupancy Permit for
each structure developed on the Property.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
File H5510/EA\V 3
Greenway Engineering January 25, 2013 Fairfax Pike/VDOT lane Rezoning
Revised April 11, 2013
Ro,ised Nlay 17, 2013
Signature
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of' Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
Bowman -Shoemaker Companies, Inc. Date
Commonwealth of Virginia,
City/County of
To Wit:
The foregoing instrument was acknowledged before me this day of
20 by
Notary Public
My Commission Expires
File 115510/EA\V 4
Greenway Engineering
Sll4nature
January 25, 2013 PairRax r'ikewnoT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By:
Elizabeth Properties, L.C.
Commonwealth of Virginia,
City/County of
To Wit:
The foregoing instrument was acknowledged before me this clay of
20 by
My Commission Expires
Date
Notary Public
File 1I5510/EAW
5
Greenway Engineering himm , 25, 2013 Pairkax PikdVDO'l' Line Rezoning
Revised April 11, 2013
Revised May 17, 2013
FAIRFAX PIKEAIDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ#
Neighborhood Business (B 1) District to Business Gcneral (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bo\wnian-Shoemaker Companies, file., & Elizabeth Properties,
L.C. (here -in after the "Owner")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: Apt-il '��=�-1 243 May 17, 2013
Preliminary Matters
Pill"SUant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application 11 for the
rezoning of 3.61±-acres of Neighborhood Business (B 1) District to 3.61 f-acres of
Business General (132) District with proffers; development of the subject properties
(111roperty") shall be done In collf rmity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be Subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors In accorclance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be deemed withdrawn and have no
effect \whatsoever. These proffers shall be bincling upon the Owner and any successors,
or assigns of the Owner.
The Property, identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bowman -Shoemaker Companies, Inc., being all of Tax
Map Parcel 86-A-14, fin-ther as shown on the plat titled Plat Showing Property of James
L. Bowman, by J.R. Nicely dated April 27, 1972, and the land owned by Elizabeth
File 10510/EAw
Greenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April I I, 2013
Revised May 17, 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled
Plat of the Division of the Land of Pine Investment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975.
FAIRFAX PIKE/VDOT LANE COMMERCIAL PROPERTIES
PROFFER STATEMENT
A. Generalized Development Plan
1) The Owner hereby proffers to develop the Property in substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-in/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entrance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full screen buffer adjacent to the Freeton
Townhouse Subdivision. The final locations of the commercial entrances and the
inter -parcel connection can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
right-in/right-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-out commercial entrance shall be designed,
approved, and constructed with the first Site Plan for the Property. The Owner
will ensure that a reciprocal ingress/egress easement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
File #5510/EAW 2
Greenway Engineering January 25, 2013 Pairkax I'IkeNDOT lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
will ellSure that the lull access commercial entrance is located a 1111111111L1111 Of 225'
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby profilers to provide a 50' ingress/egress easement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
Owner will ensure that a reciprocal ingress/egress casement and maintenance
agreement is established for the 50' ingress/egress casement serving the Property.
C. I\Ionetary Contributions
1) The Owner hereby proffers to provide $35,000.00 to Frederick County to be
utilized as part of' the local share match for qualifying off -site transportation
improvements associated with the —z enaissane Drive Phase 2 an approved
Revenue Sharing project. •eej to allow the5,089 80 to be
prejeet. The Owner shall provide the $35,000.00 to Frederick County at the time
that Frederick County provides written request IOr this monetary contributi011.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet of structural development on the Property for general fire and rescue
services. The Owner shall provide the appropriate monetary contriblitioll amount
for each structure prior to the issuance of the Certificate Of Occupancy Permit for
each Structure developed on the Property.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
File 0510/EAW 3
Greenway Engineering January 25, 2013 Fairfax Pike/VDOT Lane Rezoning
Revised April 11, 2013
Revised May 17, 2013
Sil4nature
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
Bowman -Shoemaker Companies, Inc. Date
Commonwealth of Virginia,
City/County of
To Wit:
The foregoing instrument was acknowledged before me this day of
20 by
Notary Public
My Commission Expires
File 45510/EAW �}
Greenway Gigineering
Siu,nature
January 25, 2013 Pairlhx Pike/VDOT lane Rezoning
Revised April 11, 2013
Revised \gay 17, 2013
The conditions proffered above shall be binding upon the successors and assigns of the
Owner. In the event the Frederick County Board of' Supervisors grants this rezoning and
accepts the conditions, the proffered conditions shall apply to the land rezoned in addition
to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By:
Elizabeth Properties, L.C.
Conunonwcalth of Virginia,
City/County of
The foregoing instrument was acknowledged before me this
20 by
My Commission Expires
Date
To Wit:
day of
Notary Public
File t15510-EAW S
Untitled Page 9 https://taxes.Co. fre ick.va.us/Applications/tr_paytaxes/YearlyTaxesP...
I'redcrick I ]cone Frederick County Virginia Ltl-T.4%rtlF 7O'
Pay/Lookup Taxes
Note: Use the print key 1'01- your browser to print a copy of the screen at any time.
Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Other Payments
ShoppingCart(0) Pin Options Change Email
COUNTY OF FREDERICK Real Estate Taxes Paid for Tax
Year 2012
Map Number: 86 A 14 Name: BOWMAN -SHOEMAKER
Dept#
Ticket# Seq#
Account#
Bill Date
Description
IZE2012
3850
1
25488
5/9/2012
1.65 ACRE
RE2012
3850
2
25488
5/9/2012
1.6.5 ACRE
Tax AMount Paid Due
$1,807.9.5
$1,807.94
%fiis ar�otirrtrepreaeirts payrrrer��.� app/i0d durir'g ca/end8rye91-2092.7nd
do059 clot` ir7c/ude Pena/fy, /merest` or 01edW Ward Fees
Retum to Search
Printer Friendly Page
Total Paid: $3,615.89
1 of 1 4/ 19/2013 10:02 AM
Untitled Page • https://(axes.co.l*rc rick.Va.us/Applications/u-_paytaxes/YearlyTaxesP...
Frederick 1-lonv
Frederick County Virginia Lrt�.rrmr 70�
Pay/Lookup Taxes I
Note: Use the print key for your browser to print a copy o1' the screen at any time.
Payment Home Personal Property Real Estate Dog Tags Pay Parking Violation Other Payments
ShoppingCart(0) Pin Options Change Email
COUNTY OF FREDERICK Real Estate Taxes Paid for Tax
Year 2012
Map Number: 86 A 15 Name: ELIZABETH PROPERTIES LC
Dept#
Ticket# Seq#
Accouiit#
Bill Date
Description
Tax AMourit Paid Due
IZE2012
11134
1
25489
5/9/2012
1.96 ACRES
$1,986.08
RE2012
11134
2
25489
5/9/2012
1.96 ACRES
$1,986.07
7171S 91n0u171repre9017,(S payrn-91715 app/ied diirir77q 0a/e17da1yea)2072,917d
dOOS 1701117011lde Fe1781,11, 117te1-091 or O'redW
Retum to Search
Printer Friendly Page
Total Paid: $3,972.15
I of 1 4/ 19/2013 10:00 AM
BMB:fmcI
12/16/86
41
Ba
om
No
W N
41a
o. a..,
KoIf
v •r, -4
N ICI
•a x ,1
>.43 m
41 V)
Na
0 U n
a•.+ o
O,•d41
U
w o to
AW0
F N i-)
499
#7801 �
JAMES L. BOWMAN ET. UX.
TO DEED
JASBO, INC.
BK63ItPG499
THIS DEED made and dated this 16th day of December,
1986, by and between JAMES L. BOWMAN and MARY JANE BOWMAN,
his wife, By JAMES L. BOWMAN, her attorney in fact under
Power of Attorney dated March 25, 1983 , hereinafter
called the Grantors, and JASBO, Inc., a Virginia Corporation,
party of the second part, hereinafter called the Grantee.
WITNESSETHt That for and in consideration of the
sum of Ten ($10.00) Dollars, cash in hand paid, and other
good and valuable consideration, the receipt of which is
hereby acknowledged, the Grantors do hereby grant and convey
with general warranty of title unto the Grantee, in fee
simple, all those certain tracts or parcels of land, lying
mostly in Frederick County, Virginia, and partially in Clarke
County, Virginia, described as follows:
PARCEL ONE: All those certain lots lying
and being situate in Opequon Magisterial
District, Frederick County, Virginia,
being designated lots 1 through 137,
inclusive, of Nottoway Subdivision,
Section Two, as the same appears on the
plat of said subdivision of record in
the Office of the Clark of the Circuit
Court of Frederick County, Virginia in
Deed Book 632, at Page 510, and being a
portion of the same land conveyed to
James L. Bowman by deeds dated December 5,
1949 from Joseph A. Massie, Jr., at al,
Special Commissioners, of record in the
aforesaid Clerk's Office in Deed Book 213
at Page 73 and by deed dated March 8, 1972,
from Robert K. Woltz,et ux, of record in
the aforesaid Clerk's Office in Deed Book
387 at Page 497.
PARCEL TWO: All that certain tract of
land, located Northeast of Stephens City,
in Opequon Magisterial District, Frederick
County, Virginia, containing 93 acres, more
or less, and being a portion of the same
land conveyed to James L. Bowman by deed
dated March 21, 1968, from Edward Nicholson,
at ux, of record in the aforesaid Clerk's
Office in Deed Book 340 at Page 205.
500
PARCEL THREEt All that �g 1—�5at HroU
parcel of land, lying an 11 tit
the North side of Senseny Road, Shawnee
Magisterial District, Frederick County,
Virginia, containing 7.312 acres, more or
less, and being the same property conveyed
to James L..Bowman by deed dated June 29,
1992, from Fredericktowne Company, of
record in the aforesaid Clerk's Office
in Deed Book 550 at Page 799.
PARCEL FOUR: All that certain tract of
land lying and being situate in Opequon
Magisterial District, just west of U. S.
Highway No. 522, containing 139.9 acres,
more or less, and being a portion of the
same land conveyed to James L. Bowman from
David S. Whitacre, at al, Special Commis-
sioners, by deed dated March 25, 1983, of
record in the aforesaid Clerk's Office in
Deed Book 557 at Page 712.
PARCEL FIVE: All that certain tract or
parcel of land lying and being situate in
the Town of Stephens City, Opequon Magis-
terial District, Frederick County, Virginia,
designated as Lot No. 45 on the plan of
the Town of Stephens City and more par-
ticularly described as fronting on the East
side of Main Street for a distance of 82.5
feet, more or less, and extending back in
an easternly direction for a distance of
250 feet, more or less, with an even width,
and having a width in the rear of 82.5 feet
on Mulberry Street, and being the same land
conveyed to James L. Bowman by deed dated
March 16, 1984, from the Commercial and
Savings Bank, of record in the aforesaid
Clerk's Office in Deed Book 572 at Page 881.
PARCEL SIX: All those certain parcels of land
lying and being situate in the Town of Stephens
City, Opequon Magisterial District, Frederick
County, Virginia, and further described in
the hereinafter mentioned deed as followst
" Parcel Bt That certain other parcel of land
mprove'd by two-story storeroom building,
and other buildings, located on a lot 48
feet x 125 feet, and located on the West
side of Main Street, in Stephens City,
Virginia, and being a part of the original
Bucher property.
Parcel Ft That certain other lot of land
oca ed on the East side of Green Street,
in Stephens City, Virginia, which lot fronts
70 feet on Green Street, and extends East
for a depth of 90 feet, and being also a
part of the original Robertson property."i
and being a portion of the same property con-
veyed to James L. Bowman by deed dated May 11,
1981, from John E. Lemley, divorced, at al, of
record in the aforesaid Clerk's Office in Deed
Book 536 at Page 371.
-2-
r
501
�66�(,rs501
PARCEL SEVEN: BA�l'of that parcel of land
located on the North side of State High-
way No. 277, about one-half (1/2) mile
East of Stephens City, in Opequon Magis-
terial District, Frederick County, Vir-
ginia, containing 1.553 acres, more or
lessi and being the same property conveyed
to James L. Bowman by deed dated May 13, 1977,
from Simone J. Gates, et vir, of record in
the aforesaid Clerk's Office in Deed Book
473 at Page 575.
PARCEL EIGHT: An undivided one-half interest
in that certain tract of land on the South
side of Virginia Secondary Highway No. 277,
approximately four (4) miles East of Stephens
City, in Opequon Magisterial District, Frederick
County, Virginia, containing 143 acres, more or
less, bounded by Apperson on the West, Rust
on the South, Sandy on the East and the lots
known as the "Clark Survey" on the North, now
owned by Emma Beryl Walker, Bertie Clark,
Gladys Cornwell and Ruby Madigan, and being
the same property a one-half interest in which
was conveyed to James L. Bowman by deed dated
October 30, 1973, from William A. Johnston,
et al, Trustees, of record in the aforesaid
Clerk's Office in Deed Book 421 at Page 606.
PARCEL NINE: All of that certain lot or
parcel of land, lying and being situate in
the Town of Stephens City, Virginia, on the
Northwest corner of Main Street and Martin
Street, and more particularly described by
plat and survey of J. R. Nicely, C.L.S.,
dated March 9, 19721 and being the same
land conveyed to James L. Bowman by (Iced
dated December 19, 1984, of record in the
aforesaid Clerk's Office in Deed Book 587
at Pago 19.
PARCEL TEN: All those two certain lots of
land in Back Creek Magisterial District,
more particularly designated as Lot 6, Block
it, Section 5, and Lot 8, Block H, Section 5,
Wilde Acres Subdivision, as the same is duly
dedicated and recorded among the land records
of Frederick County, Virginia, in Deed Book
250 at Page 127, and the Plat of which is
recorded at Page 10, in Wilde Acres Plat
Book No. It and being the same property con-
veyed to James L. Bowman by deed dated May 1,
1982, from Ruby T. Smith, widow, of record
in the aforesaid Clerk's Office in Deed Book
547 at Page 265.
-3-
502
H631,Pc502
PARCEL LLEVENi An Undivided ono -half
interest in that certain tract of land
lying and being situate mostly in Opequon
Magisterial District, Frederick County,
Virginia, and partially in Greenway
Magisterial District, Clarke County,
Virginia, fronting on the West side of
Route 522 South of Double Toll Gate and
North of Ninevah, known as "Wheatland",
bounded on the North by the Will Chamblin
Estate property, Raymond Sandy, Donald
Patton and Milton Apperson, on the West
by Clarence Campbell and others and on
the South by Norman Tolkan and others,
and containing 817 acres, more or leas,
and being a portion of the same property
a one-half undivided interest in which
was conveyed to James L. Bowman by deeds
dated September 3, 1971 from Frances C.
Jett, widow, et al, of record in the
aforesaid Clerk's Office in Deed Book
392 at Page 231 and by deed dated
November 30, 1971 from Helen C. Rust,
at vir, of record in the aforesaid
Clerk's Office in Deed Book 385 at
Page 302.
PARCEL TWELVE: All that certain lot of
land lying and being situate in Opequon
Magisterial District, Frederick County,
Virginia, containing 10,704 square feet,
designated Parcel B on plat drawn by
H. Bruce Edens dated November 19, 1986,
of record in the aforesaid Clerk's Office
in Deed Book 633 at Page 110; and being
the remaining portion of land conveyed
to James L. Bowman by deed dated November 1,
1982, from Robert F. Braithwaite, at ux, of
record in the aforesaid Clerk's Office in
Deed Book 553 at Page 717.
PARCEL THIRTEEN: A one-half undivided
interest in all those certain tracts or
parcels of land, lying and being situate
in the Town of Stephens City, Opequon
and Back Creek Magisterial Districts,
Frederick County, Virginia, together with
the rights, rights of way and appurtenances
thereunto belonging containing 252.413
acres in the aggregate and being the
remainder of the tracts of land conveyed
to James L. Bowman and Shen --Valley Limo
Corporation by deed dated September 30,
1983, from The Flintkote Company, a
Delaware Corporation, of record in the
aforesaid Clerk's Office in Deed Book
566 at Page 517.
-4-
I
i
003
mi
H634rr,503
This conveyance is made subject to all rights of
way And restrictions of record affecting the subject property.
The Grantors do hereby covenant that they have the
right to convey to the Granteel that the Grantee shall have
quiet and peaceable possession of the said property, free from
All liens and encumbrancest and they will grant such further
assurances of title as may be requisite.
This Deed is exempt from taxation pursuant to
Section 58.1-ell(6), Code of Virginia, the Grantor being the
sole stockholder of the Grantee Corporation, and this con-
veyance is made in the organization of JASSO, Inc, and
qualifies for non -recognition of gain pursuant to Section
351 of the internal Revenue Code of 1954.
WITNESS the following signatures and sealsi
(SEAL)
JAM�� Iy. 80WMAfj�
/)VT cry,ccA_
` , (SEAL)
RY UANE BOWMAN, by JAMES
L. BOWMAN, her attorney in fact
STATE OF VIRGINIA,
City OF Winchester , TO -WIT:
I, M. F. McLaughlin , a Notary Public in
and for the State and jurisdiction aforesaid, do hereby
certify that JAMES L. BOWMAN, individually and as attorney
in fact for MARY JANE BOWMAN, his wife, whose signatures
are signed to the foregoing Deed dated December 16, 1986,
has personally appeared before me and acknowledged the same
in my state and jurisdiction aforesaid.
Given under my hand this 18 day of December
19 86 .
'C My Commission expires August 4, 1989
r' mm-
1�5'ai•••Cf• i ��tl h. W�(w taH1N7+. Sra t
[ 1 fral•1•.•.1 10 m•, o-i or �Y"--'4,y of /
• , %'I '0�r`,'ti.?� i%1..,. uA vMh t* flfiCula or rr.YroMcdprtfnnt lherNo 6,.Od W, &dno4e
9
0
cu- v e---.
r...........
..rill
YN!
C, � (o Vg , I Oc
Q
1;;r4
--'- el
0
c
V,
00
u
f)
ov
o
N
ao
'n
4J
Michael L. Bryan
9 Court Square
2" Floor
Winchester, VA
I,
O
070002101.
THIS DEED, made and dated this S 46 day of { V , 2007, by and between
(tile
Grantor"); and ELIZABETH PROPERTIES, L,C., a Virginia limited liability company
"Grantee").
NOW, THEREFORE WITNESSETH: That for and in consideration of the
and the sum of Tcn Dollars ($10.00), cash in hand paid, receipt of which is hereby
acknowledged, the Grantor does hereby grant, bargain, sell and convey, with special warranty
of title, unto the Grantee, in fee simple, the following described property, to -wit:
All of that certain lot or parcel of land, together with all improvements
thereon and all rights, rights of way and appurtenances thereunto belonging,
lying and being situate in Opequon Magisterial District, Frederick County,
Virginia, at the intersection of VDOT Lane and Fairfax Pike (State Route
277), containing 1.958 acres, more or less, designated as Parcel "B" on that
certain plat titled "Plat Showing Property of James L. Bowman" dated April
27, 1972, drawn by J. R. Knicely, C.L.S., which plat is attached to and made a
part of that certain Deed dated August 31, 1982, which Deed is of record in
the Clerk's Office of the Circuit Court of Frederick County, Virginia in Deed
Book 553, at Page 108; and being a portion of the lands conveyed to James L.
Bowman and Mary Jane Bowman (a/k/a Jane Huff Bowman), his wife, with
common law right of survivorship, by that certain Deed dated August 22, 1958
from Evelyn Lemley, which Deed is of record in the aforesaid Clerk's Office
in Deed Book 254, at Page 49. Subsequent thereto, Mary Jane Bowman died
on November 17, 1991, thereby vesting fee simple title in her surviving
husband, James L. Bowman. James L. Bowman died testate on December 21,
2001, and by the terms of his Last Will and Testament dated March 7, 1997,
of record in the aforesaid Clerk's Office as Will File 11020000002, devised the
aforesaid real estate to the James L. Bowman Trust. Beverley B. Shoemaker
is the Trustee of The James L. Bowman Trust. Reference is hereby made to
the aforesaid instruments and the references therein contained for a more
particular description of the property conveyed hereby.
Tax Map No.: 86-A-15
This conveyance is made subject to all casements, rights of way and restrictions of
affecting the subject property provided, however, that the foregoing shall not be
in any way to reinstitute or republish any restrictions of record that may have expired
orlapsed.
,r.11
WITNESS the following signature and seal:
THE JAMES L. BOWMAN TRUST U/A
ORIGINALLY DATED MAY 31, 1994,
AMENDED AND RESTATED EFFECTIVE
MARCH 27, 1997 WITH SUCH
AGREEMENT BEING SUBSEQUENTLY
AMENDED ON OCTOBER 15, 1999
By: (SEAL)
Beverle . Shoemaker, Trustee
STATE OF VIRGINIA,II AT LARGE,
:ITY/C'6bWRY OF Wto-wit:
The foregoing instrument was acknowledged before me on the S WA- day of
f e1rv0j!4 , 2007, by Beverley B. Shoemaker, Trustee of The James L. Bowman Trust
U/a Originally Dated May 31, 1994, Amended and Restated Effective March 27, 1997 with
Such Agreement Being Subsequently Amended on October 15, 1999.
My commission expires `7 31 Q
NOTARY PUBLIC
ITHIS INSTRUMENT PREPARED BY:
Michael L. Bryan, Esquire
Bryan & Coleman, P.L.C.
9 Court Square, 2nd Floor
Winchester, Virginia 22601
IA9D.'�mn
c.lDtediVbwman Io Jubo
VIRGINIA: FREDERICK COUN7Y.SCf.
This instrument of writing was produced to me on
a S 2 tJ O `1 at -//• J .2 P.
and with certificate acknowledgement thereto annexed
was admitted to record. Tax imposed by Sec. 58.1-802 of
and 58.1-801 have been paid, if assessable.
M19L Bryan
9 Court S
2'' Flooroor �a ,Clerk
Winchester, VA
O) I�rK VVVI� I/� r NOJ I I�AV I VRJ
•
idw�qr. a+000
j �� � i.• ram••✓
`J-
�o • T �%`E � Tr�n r�
't
Pr- r y t, /
9(c kkc ve5
o!! j?,L'TH 0
1092
Ile4f'n' f �LANfl S�
PL/q rss�o�iv�
f�.riOF�E.Q TY OF
Ilp Y
C�.w rif'��'o ��+.✓O �-�'v�Prd ►moo �4
.(o77.ix
{ �✓�.vc.v�.r - t.4, I�.I — 1
COUNTY of FREDER>! CK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
1\1EIYI0RANDUIVI
TO: Finance Department
FROM: Pam Decter, Office Assistant I1
SUBJECT: Return Of Sign Deposit
DATE: June 17, 2013
The amount of S25.00 was deposited in line item #3-010-0191 10-0008 for Fairfax Pike/VDOT
Lane. They had a deposit for one sign for a Rezoning 402-13. The sign was returned and
therefore entitled to the return of the deposit. You may pay this through the regular bill cycle.
Please send a check in the amount of S25.00 to:
RSA/pd
Q�-
(,.1-7• ID
Elizabeth Properties
P.O. Box 480
Stephens City, VA 22655
107 North Dent Street, Suite 202 o Winchester, Virginia 22601-5000
COUNTY of FREDERICK
w W -
w
Department of Planning and Development
540/665-5651
R�1•V/ FAX: 540/665-6395
17JB
1\1E1\10RANDU1\1
TO: Finance Department
FROM: Pam Deeter, Office Assistant 11
SUBJECT: Return Of Sign Deposit
DATE: .tune 17, 2013
The amount of $25.00 was deposited in line item #3-010-0191 10-0008 for Fairfax Pike/VDOT
Lane. They had a deposit for one sign for a Rezoning #02-13. The sign was returned and
therefore entitled to the return of the deposit. You may pay this through the regular bill cycle.
Please send a check in the amount of S25.00 to:
Bowman -Shoemaker Company
P.O. Box 480
Stephens City, VA 22655
RSA/pd
i
107 North Kent Street, Suite 202 0 Winchester, Virginia 22601-5000
w 41
0 GREENWAY ENGINEERING
151 Windy Hill Lane
Founded in 1971 Winchester, Virginia 22602
/',PR 1 q 201
TRANSMITTAL Y
Project Name: Fairfax Pike/VDOT Lane Commercial Properties Rezoning
File No: 5510
Date: Fri, Apr 19, 2013
To: FC Planning
Attn:
Copied
Mike Ruddv
From: Evan Wyatt
GREENWAY ENGINEERING
Phone: 540-662-4185
Fax: 540-722-9528
Delivery: ❑ Fed Ex ❑ U.S. Mail F./ Courier ❑ Pick Up
❑ Other
❑ Urgent ® For Your Review ❑ As YOU Requested [Z Please Comment
Message
Hi Mike,
Please find attached all regUired information, fees, owner signed/notarized CIOCLIMents, and 30 color
copies of all exhibits for the Fairfax Pike/VDOT Lane Commercial Properties 1Ze%omng. This
information is being filed for inclL]SlOil Oil the Planning Commission Agenda for May 15, 2013.
Please review this information and advise me if there is anything else that you need at this time.
Thank you, Evan
Hand Delivery and Pick Ups Only:
Received by: Date:
Please Print Name:
40 (r,'r.Zrnc�f'�plei _ (�'IJa;�1 n�Cr
APPLICATION FOR REZONING
FREDERICK COUNTY, VIRGINIA
In order to rezone a parcel of land in Frederick County, an application for rezoning must be
submitted to the Department of Planning and Development. It is the responsibility of the applicant
to gather all information and materials that make up the application. Rczonings are ultimately
approved or denied by the County Board of Supervisors. This package contains instructions which
must be must be followed in order to complete an application. It is important to read these
instructions carefully. If you have questions or need assistance, please contact the Department of
Planning and Development at (540) 665-5651.
APPLICATION MATERIALS
The following materials must be submitted to the Department of Planning and Development.
/
•! 1. A completed application form (the form is attached).
vl 2. A survey or plat of the entire parcel with the location of all proposed zoning boundary lines.
/3. A copy of the deed to the property verifying current ownership. This may be obtained from the
Frederick County Clerk of the Circuit Court at the Joint Judicial Center, 5 North Kent Street,
Winchester.
4. A statement verifying that taxes have been paid. This may be obtained from the Treasurer's
Office at 107 North Kent Street, Winchester.
5. A complete listing of adjoining property owners, including addresses and property
identification numbers. These can be obtained from the Office of the Commissioner of Revenue,
Real Estate Division, 107 North Kent Street, Winchester.
6. Impact analysis statement. Information concerning the projected impacts of the proposed
rezoning following the specifications beginning on Page 4.
7. Proffer Statement. Specific conditions to be volunteered as part of the application. See
explanation and instructions on Page 8.
8. Completed agency comment slieets. Comments sheets are attached. It may trot be requh-ed that
all coutntent sheets be contlVeted. Check with the Department of Planning and Development to
determine which continent sheets are applicable.
,i 9. Fees. There is a fee of $5,000.00 base plus $100.00 per acre for two acres or less; $10,000.00 base
plus $100,00 per acre for more than two acres but less than 150 acres; $10,000.00 base plus $100.00
per acres for the first 150 acres plus $50.00 per acre for each acre over 150 acres; and, a $50.00
k
<<;Ir
o
C-t
RESOLUTION a
PLANNING COMMISSION: May 15, 2013 - Reconunended Approval
BOARD OF SUPERVISORS: June 12, 2013 K) APPROVED 0 DENIED
AN ORDINANCE AMENDING
THE ZONING DISTRICT MAP
REZONING #02-13 FAIRFAX PIKE/VDOT LANE COMMERCIAL
WHEREAS. Rezoning #02-13 Of Fairfax Pike/VDOT Lane Commercial, submitted by Greenway
Engineering, to rezone 3.61 acres from B I (Neighborhood Business) District to B2 (General Business)
District with proffers dated Januar5, 2013 and final revision May 17, 2013 was consider
y 2ed. The
properties are located on the north side. of Fairfax Pike (Route 277) adjacent to VDOT Lane (Route 1018),
approximately'/z mile east of Interstate 81 Exit 307, and are identified by Property Identification Numbers
86-A-14 and 86-A-15 in the Opequon Magisterial District.
WHEREAS, the Planning Commission held a public hearing on this rezoning on May 15, 2013
and forwarded a recommendation of approval; and
WHEREAS.. the Board of Supervisors held a public hearing on this rezoning on June 12, 2013; and
WHEREAS, the Frederick County Board of Supervisors finds the approval ofthis rezoning to he in the
best interest of the public health, safety, welfare, and in con onriance with the Comprehensive Policy
Plan;
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors to rezone
3.61 acres from BI (Nieighborhood Business) District to B2 (General Business) District with proffers
subject to the attached conditions voluntarily proffered in writing by the applicant and the property
owner.
PDRes# l 4-1.3
9
0
This ordinance shall be in effect on the date of adoption.
Passed this 12th day of June 12, 2013 by the following recorded vote:
Richard C. Shicklc, Chairman
Robert A. Hess
Christopher E. Collins
Opequon Magisterial District Vacant
PDRes# 14-13
Gary A. Lofton
Gene E. Fisher
Charles S. DeHaven, Jr.
A COPY ATTEST
John R. lj i. ey" fir.
Fred&r--i&k County Administrator
VIRGINIA- FREDERICK COUNTY.SCT.
This instrument of writing was produced to me oi.
60 - I q- 13
at I
and with certificate ackj-j--,),k
was admitted to record. by Sec. 56'. 1-802 of
$--!�L- and 58.1-801 nave been paid, if
Clert
Grecmti'a)' cneine rine • January 25. 2013 irrax Pike/VDOT Lane Rczoninu
Revised April 11. 2013
Revised May 17. 2013
FAIRFAX PIKEAVDOT LANE CONIKERCIAL PROPERTIES
PROFFER STATEMENT
REZONING: RZ# G-), - 13
Neighborhood Business (B 1) District to Business General (132)
District with Proffers
PROPERTY: 3.61-acres +/-;
Tax Parcels 86-A-14 & 86-A-15
RECORD OWNER: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C.
APPLICANT: Bowman -Shoemaker Companies, Inc., & Elizabeth Properties,
L.C. (here -in after the "Owner-")
PROJECT NAME: Fairfax Pike/VDOT Lane Commercial
ORIGINAL DATE
OF PROFFERS: January 25, 2013
REVISION DATE: May 17, 2013
Preliminary iVlatters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve Rezoning Application # 0;� -/; for the
rezoning of 3.61±-acres of Neighborhood Business (B 1) District to 3.61±-acres of
Business General (132) District with proffers; development of the subject properties
("Property") shall be done in conformity with the terms and conditions set forth herein,
except to the extent that such terms and conditions may be subsequently amended or
revised by the Owner and such be approved by the Frederick County Board of
Supervisors in accordance with the said Code and Zoning Ordinance. In the event that
such rezoning is not granted, then these proffers shall be dee.ined withdrawn and have no
effect \whatsoever. These proffers shall be binding upon the Owner and any successors,
or assigns of the Owner.
The Property. identified as Fairfax Pike/VDOT Lane Commercial, and more particularly
described as the land owned by Bowman -Shoemaker Companies, Inc., being all of Tax
lvlap Parcel 86-A-14, further as shown on the plat titled Plat Showing Property of James
L. Bowman. by J.R. l,,ricely dated April 2T 1972: and the land owned by Elizabeth
O
Ul
File=5510/EAW
Greenkvay engineering January 25, 2013 0airfax i'i1:eJVDO'r Lane Rezoning
Revised April 11. 20) 3 Q
Revised May 17. 2013
Properties, L.C., being all of Tax Map Parcel 86-A-15, further as shown on the plat titled r n
Plat of the Division of the Land of Pine hlvestment Corp, by J.R. Nicely dated July 28,
1975, revised September 9, 1975,
FAIRFAX PIKE/N1DOT LANE COMIWERCIAL PROPERTIES
PROFFER STATENIENT
A. Generalized Development Plan
1) The Owner hereby proffers to develop the Property in substantial conformance
with the Generalized Development Plan (GDP) prepared by Greenway
Engineering, dated April 10, 2013, and approved as part of this rezoning
application. The GDP is intended to delineate the general location of the Fairfax
Pike (Route 277) right-of-way dedication area, the general location of the shared
right-in/right-out commercial entrance on Fairfax Pike, the general location of the
full access commercial entl-ance along VDOT Lane (Route 1018), the general
location of the 50' ingress/egress easement on Tax Map 86-A-15 that is intended
to provide inter -parcel connection and access to VDOT Lane for Tax Map 86-A-
14, and the general location of the 50' full screen buffer adjacent to the Freeton
Townhouse Subdivision. The final locations of the commercial entrances and the
inter -parcel connection can be adjusted to accommodate final engineering design
requirements without the need to revise the GDP provided that the final
engineering design is consistent with the overall layout depicted on the GDP.
B. Transportation
1) The Owner hereby proffers to dedicate a right-of-way area along the frontage of
Tax Map 86-A-14 and Tax Map 86-A-15 that is 20' in width for the future
widening of Fairfax Pike. The Owner will delineate the 20' right-of-way
dedication area on the Site Development Plans for these properties if development
activities occur in advance of the Fairfax Pike widening project. The Owner will
dedicate the 20'-wide right-of-way to VDOT at such time that it is requested for
the Fairfax Pike widening project.
2) The Owner hereby proffers to limit access to the Property along Fairfax Pike to a
I"lgllt-lIl/I-lght-out commercial entrance, which meets all applicable VDOT
requirements. The right-in/right-Out commercial entrance shall be designed.
approved, and constructed \vith the first Site Plan for the Property. The Owner
\a-i11 ensure that a reciprocal ingress/egress easement and maintenance agreement
is established for the right-in/right-out commercial entrance serving the Property.
1-de gi510/EAW
2
Greenway Engineerine S January 25, 2013 War, 1'il:c/\7DOT Lane Rezonine
Revised April 1 ]. 2013
Revised May 17, 2013
3) The Owner hereby proffers to develop one full access commercial entrance along
VDOT Lane that will serve Tax Map 86-A-14 and Tax Map 86-A-15. The Owner
will ensure that the full access commercial entrance is located a minimum of 225,
from the intersection of Fairfax Pike and VDOT Lane to provide for appropriate
corner clearance.
4) The Owner hereby proffers to provide a 50' ingress/egress easement across Tax
Map 86-A-15 in the general location depicted on the proffered GDP to provide for
inter -parcel access and connectivity to VDOT Lane for Tax Map 86-A-14. The
O\vner will ensure that a reciprocal ingress/egress easement and maintenance
agreement is established for the 50' ingress/egress easement serving the Property.
C. -Monetary Contributions
l ) The Owner hereby proffers to provide $35,000.00 to Frederick County to be
utilized as part of the local share match for qualifying off -site transportation
improvements associated with an approved Revenue Sharing project. The Owner
shall provide the $35,000.00 to Frederick County at the time that Frederick
County provides written request for this monetary contribution.
2) The Owner hereby proffers to provide a monetary contribution of $0.05 per
square feet of structural development on the Property for general fire and rescue
services. The Owner shall provide the appropriate monetary contribution amount
�C_ ��\ for each structure prior to the issuance of the Certificate of Occupancy Permit for
,N k each structure developed on the Property.
GS
�� 1�A
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
O
rT 1
C.J
File -5510/EAR\ 3
Norrs� ,�988
-R,' G ' / �1 DATE �! U. / NO. 8 5
RECEIVED FROM 7-V (ANY 1`� L /J�,
A DRESSS-��—�Ju-6� f/ (cri l�C(. {� p1+Svl N(s x6 e [—
' O tM' J1 [�1� �.ca- a k-,t r'T7� — hp / (e. �� S� � IS
FOR Q11L_rll RC1Z Zi� I�Ld (J(c-4-1 Se WrM
n
Wou'"_ Iyy-
ACCOUNT HOW PAID
Gf -
A.'.11. Of
CASHACCOLINT
c
AS
CK
RALANcr
(02001 r-m-FOAM. ® BL818
UUl
ORDCR
lr3ir •iai�a-31i5a�ta+�.�+-�i+io1++ __-_ ir.ridk � +4yt'�_fe. �.._�.,._`"�ai$- t: k.��e. :�;a..os 'slki�f ti _..
VADG LLC
9815 J SAM FURR ROAD
SUITE 259
HUNTERSVILLE, NC 28078
)- / Y-/
Date
Pdto tile t rOrof
7-7
�AQUESTA
A,]
).- BANK
GORHn=, HC CM4) 4W-
For
1:0531127121:
`-lCSIrC C} �{yr�
1000L,60371042
rS
1042
66.1271/531
r;nrm snrrnno��
9 0
COUNTY of FREDRRICK
Department of Planning and Development
540/ 665-5651
FAX: 540/ 665-6395
NOTIFICATION OF PUBLIC HEARING
May 29, 2013
TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNER(S)
RE: REZONING APPLICATION #02-13 FOR FAIRFAX PIKE/VDOT LANE COMMERCIAL,
On behalf of the Frederick County Board Of Supervisors, you are hereby notified Of a public hearing
being held on Wednesday, June 12, 2013, at 7:00 p.m. in the Board Room Of the Frederick County
Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following
application:
Rezoning 902-13 of Fairfax Pike/VDOT Lane Commercial, submitted by Greenway Engineering, to
rezone 3.61 acres from B1 (Neighborhood Business) District to 132 (General Business) District with
proffers. The properties are located on the north side of Fairfax Pike (Route 277) adjacent to VDOT
Lane (Route 1018), approximately''/2 mile east of Interstate 81 Exit 307, and are identified by Property
Identification Numbers 86-A-14 and 86-A-15 in the Opequon Magisterial District.
Any interested parties having questions Or wishing to speak may attend the public hearing. A copy of
the application will be available for review at the Handley Library and the Bowman Library the week of
the meeting, or at the Department of Planning and Development located at 107 North Kent Street in
Winchester, Virginia, or by calling (540) 665-5651. YOU can also Visit US On the web at:
www. co. frederi ck. va. a s.
Sincerely,
Michael T. Ruddy, AICP
Deputy Planning Director
MTR/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
t �Es is to certify�at the at�ached coiTespondence vAsinai.led to the follow,-inc, on
from the Department ofP1ammg and Development, Frederick
County, Virginia: 86 - A- 18-
WINCITY REALTY ASSOCIATES -DE LLC
86 - A- - 14- CIO WIN PROPERTIES INC
BOWMAN -SHOEMAKER 10 RYE RIDGE PLZ STE 200
COMPANIES INC RYE BROOK NY 10573.2828
PO BOX 480
STEPHENS CITY VA 22655.0480 860 -4- - 5-
RIDINGS BRIAN D
208 FREETON CT
Greenway Engineering
1 5 1 Windy I-lill Lane
Winchester, VA 22602
86 - A- - 15-
ELIZABETH PROPERTIES LC
PO BOX 480
STEPHENS CITY VA 22655.0480
86 - A- - 14-A
CHU'S STEPHENS CITY LLC
5851 SADDLE DOWNS PL
CENTREVILLE VA 20120.4916
STEPHENS CITY VA 22655.3111
86D - 4- - 6-
CHAMBERS JOSHUA
CHAMBERS KATE
206 FREETON CT
STEPHENS CITY VA 22655.3111
86D - 4- - 7-
SLAUGHTER DONALD G
SLAUGHTER VICKY S
1049 LAUREL GROVE RD
WINCHESTER VA 22602
86 - A- - 15-A
YATES WILLOWS APARTMENTS LLC
111 DEVILS BACKBONE OVERLOOK
STEPHENSON VA 22656.1905
86 - A- - 16-
ORNDORFF THOMAS D
1015 OLD GRADE RD
STRASBURG VA 22657.4452 Michael T. Ruddy, Deputy Planning Director
Frederick County Planning Department
STATE OF VIRGIN"IA
COUNTY OF FREDERICK f
I, > a Notary Public in and for the State and County
aforesaid, hereby certify that 1\/ri ael T. Ruddy, Deputy Planning Director for the Department of
Plannin d Development, whose name is signed to the foregoing, dated
has personally appeared before me and acknowledged the same in my
State and County aforesaid.
L1(, da of 61
Given under my hand this y
My commission expires on , Z. -
BEVERLY H. DELLINGER
NOTARY PUBLIC
REGISTRATION N 331878
COMMONWEALTH OF VIRGINIA
MY COMMISSION EXPIRES
JULY 31, 2015
i
NOTARY UBL C
UVrI
86D - 4- - 8-
ANDERSON JON E
2130 SCARLET OAK CT
HARRISONBURG VA 22801-8747
86D - 4- - 9-
LARKIN SHANE
119 SEDGWICK AVE APT 313
YONKERS NY 10705-2528
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
NOTIFICATION OF PUBLIC HEARING
May 2, 2013
TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S)
RE: REZONING APPLICATION 402-13 FOR FAIRFAX PIKE/VDOT LANE COMMERCIAL
On behalf of the Frederick County Planning Commission, you are hereby notified of a public hearing
being held on Wednesday, May 15, 2013, at 7:00 p.m. in the Board Room of the Frederick County
Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following
application:
Rezoning #02-13 of Fairfax Pike/VDOT Lane Commercial, submitted by Greenway Engineering, to
rezone 3.61 acres from B 1 (Neighborhood Business) District to 132 (General Business) District with
proffers. The properties are located on the north side of Fairfax Pike (Route 277) adjacent to VDOT
Lane (Route 1018), approximately''/2 mile east of Interstate 81 Exit 307, and are identified by Property
Identification Numbers 86-A-14 and 86-A-15 in the Opequon Magisterial District.
Any interested parties having questions or wishing to speak may attend the public hearing. A copy of
the application will be available for review at the Handley Library and the Bowman Library the week of
the meeting, or at the Department of Planning and Development located at 107 North Kent Street in
Winchester, Virginia, or by calling (540) 665-5651. You can also visit us on the web at:
www.co.frederick.va.us.
Sincerely,
7---
Michael T. Ruddy, AICP
Deputy Planning Director
MTR/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
This is o ceriii t e, attached correspondence v'10malle-d to the iollovvulcy on
7 �T %
Z/� li om the Depai-isneni of Planning and Development Frederick
County, Virg=
86 - A- - 14-
BOWMAN-SHOEMAKER
COMPANIES INC
PO BOX 480
STEPHENS CITY VA
Greenway 1 iigineenlig
151 Windy Hill Lane
Winchester, VA 22602
86 - A- - 15-
ELIZABETH PROPERTIES LC
PO BOX 480
STEPHENS CITY VA
86 • A• - 1 d-
ORNDORFF THOMAS D
1015 OLD GRADE RD
STRASBURG VA 22657.4452
22655.0480
86 • A• 18-
WINCITY REALTY ASSOCIATES -DE LLC
CIO WIN PROPERTIES INC
10 RYE RIDGE PLZ STE 200
RYE BROOK NY 10573.2828
860 - 4- . 5-
RIDINGS BRIAN D
208 FREETON CT
22655.0480
86 -A- - 1-
COMMONWEALTH OF VIRGINIA
PO BOX 2249
STAUNTON VA 24402.2249
86 - A- - 14-A
CHU'S STEPHENS CITY LLC
5851 SADDLE DOWNS PL
CENTREVILLE VA 20120.4916
86 . A• . 15-A
YATES WILLOWS APARTMENTS LLC
111 DEVILS BACKBONE OVERLOOK
STEPHENSON VA 22656.1905
5 !'A 1 Li• Uky11(u MLlk
COUNTY OF 1{REDEMCK
STEPHENS CITY VA 22655.3111
861) - 4- - 6-
CHAMBERS JOSHUA
CHAMBERS KATE
206 FREETON CT
STEPHENS CITY VA 22655.3111
Michael T. Ruddy, Deputy Planning Director
Frederick County Planning Department
I, , a Notary Public in and for the State and County
aforesaid, do ereby certify, that Mi hael T. Ruddy, Deputy Planning Director for the Department of
Planning an Development, whose name is signed to the foregoing, dated
has personally appeared before me and acknowledged the same in my
State d Co ty aforesaid.
Given under my hand this day of
My commission expires on
NOTARY P LIC
S3H1dX3 NOISSINN00 AN
VINIDUTA 30 H11V3MN0NN00
8L8LE£ k N01iVd1S1EJ3d
onend A»V10N
»39NI1134 'H Ald3A38
86D - 4- - 7-
SLAUGHTER DONALD G
SLAUGHTER VICKY S
1049 LAUREL GROVE RD
WINCHESTER VA 22602
86D - 4- - 8-
ANDERSON JON E
2130 SCARLET OAK CT
HARRISONBURG VA 22801-8747
860 -4- - 9-
LARKIN SHANE
119 SEDGWICK AVE APT 3B
YONKERS NY 10705.2528
16F-z6N / KJ,�,' -44' 6 -- i
,FAIRFAX PIKE/VDOT LANE ERCIAL PROPERTIES
�iNs F4—A-i6_,4
0
Tax Map Num4er
Owner
Mailing Address
86
A
1
COMMONWEALTH OF VIRGINIA
PO BOX 2249
86
A
14
BOWMAN -SHOEMAKER - COMPANIES INC
PO BOX 480
86
A
14A
CHU'S STEPHENS CITY LLC
5851 SADDLE DOWNS PL
86
A
15
ELIZABETH PROPERTIES LC
PO BOX 480
86
A
15A
YATES WILLOWS APARTMENTS LLC
111 DEVILS BACKBONE OVERLOOK
86
A
16
ORNDORFF THOMAS D
1015 OLD GRADE RD
86
A
18
WINCITY REALTY ASSOCIATES -DE LLC - C/O WIN PROPERTIES INC
10 RYE RIDGE PLZ STE 200
86D
4
5
RIDINGS BRIAN D
208 FREETON CT
86D
4
6
CHAMBERS JOSHUA - CHAMBERS KATE
206 FREETON CT
86D
4
7
SLAUGHTER DONALD G - SLAUGHTER VICKY S
1049 LAUREL GROVE RD
86D
4
8
ANDERSON JON E
2130 SCARLET OAK CT
86D
4
9
LARKIN SHANE
119 SEDGWICK AVE APT 38
86D
4
18A
BOWMAN -SHOEMAKER - COMPANIES INC jPO
BOX 480
TO:BARBARA-DATA PROCESSING
FROM:BEV - Planning Dept.
Please print sets of labels by
/THANKSI
Cit
ST.
ST,
CE
ST'
ST1
ST,
RY
STI
STi
WI
HA
YO
STI
Sorted by Tax Map Number
0 0
Document Approval Form
....15.._�
APR 1 9 2013
F'' it :,_il,6n COUNTY
PLEASE REVIEW THE ATTACHED DOCUMENT. IF THIS DOCUMENT MEETS
YOUR APPROVAL PLEASE INITIAL AND PROVIDE THE DATE AND TIME OF
YOUR APPROVAL.
IF THIS DOCUMENT DOES NOT MEET )'OUR APPROVAL, PLEASE PROVIDE
COAIiYIENTSAS TO Ff1HAT )'OU WOULD LIKE 7'0 HAVE COMPLETED.
Initials Date & Time
Candice
Mark
Dana
Eric
Mike
Jolul
COI\,IN,IENTS: 2—
Received by Clerical Staff (Date & Time): 5 5 vL
(S:Oflice on Blackbos\Forms\llocument Approval Form — 08/15/12)
0 !
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
NOTIFICATION OF PUBLIC HEARING
May 2, 2013
TO: THE APPLICANTS) AND/OR ADJOINING PROPERTY OWNER(S)
RE: REZONING APPLICATION 902-13 FOR FAIRFAX PIKE/VDOT LANE COMMERCIAL
On behalf of the Frederick County Planning Colllnllsslon, you are hereby notified of a public hearing
being held on Wednesday, May 15, 2013, at 7:00 p.m. in the Board Room of the Frederick County
Administration Building at 107 North Kent Street, Winchester, Virginia to consider the following
application:
Rezoning 902-13 of Fairfax Pike/VDOT Lane Commercial, submitted by Greenway Engineering, to
rezone 3.61 acres from Bl (Neighborhood Business) District to B2 (General Business) District with
proffers. The properties are located on the north side of Fairfax Pike (Route 277) adjacent to VDOT
Lane (Route 1018). approximately'/ mile east of Interstate 81 Exit 307, and are identified by Property
Identification Numbers 86-A-14 and 86-A-15 in the Opequon Magisterial District.
Any interested parties having questions or wishing to speak may attend the public hearing. A copy of
the application Nvill be available for review at the Handley Library and the Bowman Library the week of
the meeting, or at the Department of Plan -ring and Development located at 107 North Kent Street in
Winchester. Virginia. or by calling (540) 665-5651. You can also visit us on the web at:
-,N,N�,,A7.co.frederick.va.us.
Sincerely.
Michael T. Ruddy, AICP
Deputy Plaruling Director
MTR/bad
107 North Dent Street, Suite 202 - �N'illchester, Virginia 22601-5000
COUNTY of FREDERICK
Department of Planning & Development
107 North Kent Street, Suite 202
Winchester, Virginia 22601
2u'l')
T
86 A I
COMMONWEALTH OF VIRGINIA
PO BOX 2249
$00.460
ld
h1j''en pro -
Al US POSTAGE
o
STAUNTON VA 24402 2249
1) 0 i
D F' R
I t7I v �N il 1 A D U S -
ONAii- , 10 ORWARP
0 t 5 0 0 0 0'4 1 1 0 4 0