PC 09-06-23 Work Session Agenda6:00 PM Work Session Call to Order
Discussion Item(s)
Planning Commission Application Briefing for Rezoning #03-23 of O-N Minerals
(Chemstone) d/b/a Carmeuse Americas
Submitted to rezone 391.87 +/- acres from RA (Rural Areas) District to EM (Extractive
Manufacturing) District with proffers. The properties are located east of the Winchester & Western
Railroad, north of Brucetown Road (Route 672) and Turkey Run, and south of Woodbine Road
(Route 669) and are identified by Property Identification Numbers (PINs): 34-A-8A (portion), 34-A-
129E (portion), 34-A-10, 34-A-10A, 34-A-10B, 34-A-10D, 34-A-10E, 34-A-10F, 34-8-1-1, 34-8-1-2,
34-8-1-3, 34-8-1-4, 34-8-1-5, 34-8-1-6, 34-8-1-7, 34-8-1-8, 34-8-1-9, 34-8-1-17, 34-1-A, 34-A-7, 34-
A-129A, and 34-A-129G in the Stonewall Magisterial District.
In recognition of open meeting notification procedures, please be advised that the Board of
Supervisors has been invited to attend the Work Session.
Adjourn to Regular Meeting
AGENDA
PLANNING COMMISSION
WEDNESDAY, SEPTEMBER 6, 2023
6:00 PM
THE BOARD ROOM
FREDERICK COUNTY ADMINISTRATION BUILDING
WINCHESTER, VIRGINIA
PC09-06-23ApplicationBriefingREZ03-23_Redacted.pdf
1
Planning Commission
Agenda Item Detail
Meeting Date: September 6, 2023
Agenda Section: Discussion Item(s)
Title: Planning Commission Application Briefing for Rezoning #03-23 of O-N Minerals
(Chemstone) d/b/a Carmeuse Americas
Attachments:
PC09-06-23ApplicationBriefingREZ03-23_Redacted.pdf
2
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
TO: Frederick County Planning Commission
FROM: John A. Bishop, AICP, Assistant Planning Director
RE: Rezoning #03-23 for O-N Minerals (Chemstone) d/b/a Carmeuse
Americas
DATE: August 30, 2023
Project Summary
The subject project seeks to rezone 391.87 acres from RA (Rural Areas) District to EM
(Extractive Mining) District. The properties are located east of the Winchester &
Western (Omnitracks) Railroad, north of Brucetown Road (Rt 672) and Turkey Run, and
south of Woodbine Road (Rt 669).
According to the applicant’s impact statement the project seeks to expand their existing
limestone surface mining activities. The new proposed activity would be taking place
north of Brucetown Road and South of Woodbine Road and the property would have no
public access with access for Carmeuse mining vehicles being provided via an existing
tunnel under Brucetown Road from the existing mining operation area.
Proffers are attached to the agenda, however, to briefly summarize:
1. Land Use and Phasing proffers note that the application will be developed in
substantial conformance with the GDP, but notes areas of the GDP which will
need some level of flexibility subject to design or permitting requirements.
The proffer also notes the extractive mining area will be limited to the area
delineated on the GDP.
MEMORANDUM
3
2. Existing Stockpile proffers note a commitment to reduce the height of the
existing stockpile from 150 to 100 feet with permits for this activity to be
submitted within 6 months of rezoning approval and to be completed within
30 months of receiving VDOE permits for lowering the stockpile.
3. New Stockpiles and berms. New stockpiles on the rezoned property would be
not to exceed 75 feet in height and not be permanent in nature. The proffers
also allow for reclamation of stockpile areas following cessation of all mining
activities and also include 20 feet tall berms around any new quarry areas.
4. Transportation. The transportation section includes cash proffers of
$1,000,000 as well as donation of land and aggregate for upgrades to, or in the
vicinity of the Brucetown Road/Hopewell Road intersections with Route 11.
The transportation section also includes proffers related to guarantees and
cash penalty for not placing additional quarry related truck volumes on
Brucetown Road. In addition, the applicant is proffering significant road
network modification in the form of relocated roadways and abandonments.
5. Blasting activities. The applicant is placing a number of limitations on
blasting activities in the proffers to include hours of operations as well as days
of operation, limitations on total blasting activity, pre blast notifications and
activity monitoring as well as damage remediation.
6. Finally, the applicant has a number of proffers related to noise and light
emissions, dust remediation, groundwater monitoring and remediation when
necessary. In addition, the applicant has provided cash proffers for Stonewall
Elementary School, county parks and recreation and new regional trails.
Agency Comments
The entirety of staff preliminary comments as well as all agency comments and County
Attorney comments are included in this packet.
At the work session staff will be presenting the applicant’s proposal and go through the
Comprehensive Plan conformity and the current proffer package and note staff concerns
or issues.
4
£¤11
§¨¦81
§¨¦81
§¨¦81
§¨¦81
34 A 10F34 8 1 17
34 A 10
34 A 10A
34 A10D 34 A10E
34 8 1 9 34 A10B
34 8 1 8
34 81 2 34 8 1 1
34 A 129E
34 8 1 7
34 8 1 5 34 81 4 34 81 3
34 8 1 6
34 1 A
34 A 8A 34 A 129G
34 A 7
34 A129A
2140WOODSIDE RD2140WOODSIDE RD
1435BRUCETOWN RD
1435BRUCETOWN RD
1383BRUCETOWN RD
203WELCOMEHOME LN 1761BRUCETOWN RD
570GRACECHURCH RD
180JOHN DEERE CT
160JOHNDEERE CT
111JOHNDEERE CT
663GRACECHURCH RD
603GRACECHURCH RD
643GRACECHURCH RD
471GRACECHURCH RD527GRACECHURCH RD
569SIRJOHNS RD167ABRILSRUN LN
543SIRJOHNS RD
571GRACECHURCH RD 181ABRILSRUN LN 567SIR JOHNS RD
445GRACECHURCH RD
311ABRILS RUN LN
311ABRILSRUN LN
2619WOODSIDE RD2619WOODSIDE RD
3900MARTINSBURGPIKE
461GRACECHURCH RD
3915MARTINSBURGPIKE
451GRACECHURCH RD
4027MARTINSBURGPIKE
305ABRILSRUN LN
4030MARTINSBURGPIKE
271BRANSONSPRING RD
4123MARTINSBURGPIKE
4150MARTINSBURG PIKE
4170MARTINSBURGPIKE
4230MARTINSBURGPIKE
2066GILLIE LN
4273MARTINSBURGPIKE
4231MARTINSBURGPIKE
4268MARTINSBURGPIKE
280WOODBINE RD
351ZACHARYANN LN
4282MARTINSBURG PIKE
3026WOODSIDE RD4317MARTINSBURGPIKE4332MARTINSBURGPIKE
4364MARTINSBURG PIKE
276WOODBINE RD
3150WOODSIDE RD
1420REST CHURCH RD
4407MARTINSBURGPIKE 4374MARTINSBURG PIKE
4442MARTINSBURG PIKE
4412MARTINSBURGPIKE
321ZACHARYANN LN
4455MARTINSBURGPIKE
331WOODBINE RD
3121WOODSIDE RD
4481MARTINSBURG PIKE 4478MARTINSBURG PIKE
4504MARTINSBURGPIKE
166WOODBINE RD174WOODBINE RD
3201WOODSIDE RD 3220WOODSIDE RD
4535MARTINSBURG PIKE
165BUSINESSBLVD
281WOODBINE RD
3191WOODSIDE RD
3276WOODSIDE RD
1530RESTCHURCH RD
4547MARTINSBURG PIKE
4578MARTINSBURGPIKE
4600MARTINSBURGPIKE
4622MARTINSBURG PIKE
4663MARTINSBURGPIKE120BUSINESS BLVD
W O O DSIDE RDJOHN DEERE CTREST CHURCHENTER RAMP SGILLIE LNRESTCHURCHEXIT RAMP NABRILSRUN LNBUSINESS BLVDZACHARY ANN LNBRANSONSPRING RD
WOODBINERD
MARTINSBURGPIKEApplication
Sewer and Water Service A rea
Parcels
B2 (General Business District)
B3 (Industr ial Transition District)
EM (Ex tractive Manufacturing District)
M1 (Light Industrial District)
M2 (Industr ial General Distr ict)µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: July 25, 202 3
£¤11
§¨¦81
CEDARHILL RD CHRISTOREY DRR
U
E
B
U
C
K
L
N
JEFFSWAY
WOODBINE RD
GRACE CHURCH RDMARTINSBURG PIKES I R J O H N S R D
JOHNDEERE CTWOODSIDE RDBRANSONSPRING RD
SHADYCREEK RDClearBrookClear Brook
0 1,400 2,800700 Feet
BERKELEY
COUNTY
WEST VIRGINIA
REZ # 03 - 23: O-N Minera ls (Che mstone) db a C armeuse AmericasPINs: 34 - 1 - A, 34 - A - 7, 34 - A - 8A, 34 - A - 10, 34 - A - 10A, 34 - A - 10B, 34 - A - 10D, 34 - A - 10E, 34 - A - 10F, 34 - A - 129A, 34 - A - 129E, 34 - A - 129G, 34 - 8 - 1 - 1, 34 - 8 - 1 - 2, 34 - 8 - 1 - 3, 34 - 8 - 1 - 4, 34 - 8 - 1 - 5, 34 - 8 - 1 - 6, 34 - 8 - 1 - 7, 34 - 8 - 1 - 8, 34 - 8 - 1 - 9, 34 - 8 - 1 - 17Rezoning from RA to EMZoning Map
BERKELEY
COUNTY
WEST VIRGINIA
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23REZ #03-23
REZ #03-23
5
£¤11
§¨¦81
§¨¦81
§¨¦81
§¨¦81
34 A 10F34 8 1 17
34 A 10
34 A 10A
34 A10D 34 A10E
34 8 1 9 34 A10B
34 8 1 8
34 81 2 34 8 1 1
34 A 129E
34 8 1 7
34 8 1 5 34 81 4 34 81 3
34 8 1 6
34 1 A
34 A 8A 34 A 129G
34 A 7
34 A129A
1435BRUCETOWN RD
1435BRUCETOWN RD
2140WOODSIDE RD2140WOODSIDE RD 1383BRUCETOWN RD
203WELCOMEHOME LN 1761BRUCETOWN RD
570GRACECHURCH RD
180JOHN DEERE CT
160JOHNDEERE CT
111JOHNDEERE CT
663GRACECHURCH RD
603GRACECHURCH RD
643GRACECHURCH RD
471GRACECHURCH RD527GRACECHURCH RD
569SIRJOHNS RD167ABRILSRUN LN
543SIRJOHNS RD
571GRACECHURCH RD 181ABRILSRUN LN 567SIR JOHNS RD
445GRACECHURCH RD
311ABRILS RUN LN
311ABRILSRUN LN
2619WOODSIDE RD2619WOODSIDE RD
3900MARTINSBURGPIKE
461GRACECHURCH RD
3915MARTINSBURGPIKE
451GRACECHURCH RD
4027MARTINSBURGPIKE
305ABRILSRUN LN
4030MARTINSBURGPIKE
271BRANSONSPRING RD
4123MARTINSBURGPIKE
4150MARTINSBURG PIKE
4170MARTINSBURGPIKE
4230MARTINSBURGPIKE
2066GILLIE LN
4273MARTINSBURGPIKE
4231MARTINSBURGPIKE
4268MARTINSBURGPIKE
280WOODBINE RD
351ZACHARYANN LN
4282MARTINSBURG PIKE
3026WOODSIDE RD4317MARTINSBURGPIKE4332MARTINSBURGPIKE
4364MARTINSBURG PIKE
276WOODBINE RD
3150WOODSIDE RD
1420REST CHURCH RD
4407MARTINSBURGPIKE 4374MARTINSBURG PIKE
4442MARTINSBURG PIKE
4412MARTINSBURGPIKE
321ZACHARYANN LN
4455MARTINSBURGPIKE
331WOODBINE RD
3121WOODSIDE RD
4481MARTINSBURG PIKE 4478MARTINSBURG PIKE
4504MARTINSBURGPIKE
166WOODBINE RD174WOODBINE RD
3201WOODSIDE RD 3220WOODSIDE RD
4535MARTINSBURG PIKE
165BUSINESSBLVD
281WOODBINE RD
3191WOODSIDE RD
3276WOODSIDE RD
1530RESTCHURCH RD
4547MARTINSBURG PIKE
4578MARTINSBURGPIKE
4600MARTINSBURGPIKE
4622MARTINSBURG PIKE
4663MARTINSBURGPIKE120BUSINESS BLVD
W O O DSIDE RDJOHN DEERE CTREST CHURCHENTER RAMP SGILLIE LNRESTCHURCHEXIT RAMP NABRILSRUN LNBUSINESS BLVDZACHARY ANN LNBRANSONSPRING RD
WOODBINERD
MARTINSBURGPIKEApplication
Sewer and Water Service A rea
Parcels µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: July 25, 202 3
£¤11
§¨¦81
CEDARHILL RD CHRISTOREY DRR
U
E
B
U
C
K
L
N
JEFFSWAY
WOODBINE RD
GRACE CHURCH RDMARTINSBURG PIKES I R J O H N S R D
JOHNDEERE CTWOODSIDE RDBRANSONSPRING RD
SHADYCREEK RDClearBrookClear Brook
0 1,400 2,800700 Feet
BERKELEY
COUNTY
WEST VIRGINIA
REZ # 03 - 23: O-N Minera ls (Che mstone) db a C armeuse AmericasPINs: 34 - 1 - A, 34 - A - 7, 34 - A - 8A, 34 - A - 10, 34 - A - 10A, 34 - A - 10B, 34 - A - 10D, 34 - A - 10E, 34 - A - 10F, 34 - A - 129A, 34 - A - 129E, 34 - A - 129G, 34 - 8 - 1 - 1, 34 - 8 - 1 - 2, 34 - 8 - 1 - 3, 34 - 8 - 1 - 4, 34 - 8 - 1 - 5, 34 - 8 - 1 - 6, 34 - 8 - 1 - 7, 34 - 8 - 1 - 8, 34 - 8 - 1 - 9, 34 - 8 - 1 - 17Rezoning from RA to EMLocation Map
BERKELEY
COUNTY
WEST VIRGINIA
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23REZ #03-23
REZ #03-23
6
£¤11
§¨¦81
§¨¦81
§¨¦81
§¨¦81
34 A 10F34 8 1 17
34 A 10
34 A 10A
34 A10D 34 A10E
34 8 1 9 34 A10B
34 8 1 8
34 81 2 34 8 1 1
34 A 129E
34 8 1 7
34 8 1 5 34 81 4 34 81 3
34 8 1 6
34 1 A
34 A 8A 34 A 129G
34 A 7
34 A129A
1435BRUCETOWN RD
1435BRUCETOWN RD
2140WOODSIDE RD2140WOODSIDE RD 1383BRUCETOWN RD
203WELCOMEHOME LN 1761BRUCETOWN RD
570GRACECHURCH RD
180JOHN DEERE CT
160JOHNDEERE CT
111JOHNDEERE CT
663GRACECHURCH RD
603GRACECHURCH RD
643GRACECHURCH RD
471GRACECHURCH RD527GRACECHURCH RD
569SIRJOHNS RD167ABRILSRUN LN
543SIRJOHNS RD
571GRACECHURCH RD 181ABRILSRUN LN 567SIR JOHNS RD
445GRACECHURCH RD
311ABRILS RUN LN
311ABRILSRUN LN
2619WOODSIDE RD2619WOODSIDE RD
3900MARTINSBURGPIKE
461GRACECHURCH RD
3915MARTINSBURGPIKE
451GRACECHURCH RD
4027MARTINSBURGPIKE
305ABRILSRUN LN
4030MARTINSBURGPIKE
271BRANSONSPRING RD
4123MARTINSBURGPIKE
4150MARTINSBURG PIKE
4170MARTINSBURGPIKE
4230MARTINSBURGPIKE
2066GILLIE LN
4273MARTINSBURGPIKE
4231MARTINSBURGPIKE
4268MARTINSBURGPIKE
280WOODBINE RD
351ZACHARYANN LN
4282MARTINSBURG PIKE
3026WOODSIDE RD4317MARTINSBURGPIKE4332MARTINSBURGPIKE
4364MARTINSBURG PIKE
276WOODBINE RD
3150WOODSIDE RD
1420REST CHURCH RD
4407MARTINSBURGPIKE 4374MARTINSBURG PIKE
4442MARTINSBURG PIKE
4412MARTINSBURGPIKE
321ZACHARYANN LN
4455MARTINSBURGPIKE
331WOODBINE RD
3121WOODSIDE RD
4481MARTINSBURG PIKE 4478MARTINSBURG PIKE
4504MARTINSBURGPIKE
166WOODBINE RD174WOODBINE RD
3201WOODSIDE RD 3220WOODSIDE RD
4535MARTINSBURG PIKE
165BUSINESSBLVD
281WOODBINE RD
3191WOODSIDE RD
3276WOODSIDE RD
1530RESTCHURCH RD
4547MARTINSBURG PIKE
4578MARTINSBURGPIKE
4600MARTINSBURGPIKE
4622MARTINSBURG PIKE
4663MARTINSBURGPIKE120BUSINESS BLVD
W O O DSIDE RDJOHN DEERE CTREST CHURCHENTER RAMP SGILLIE LNRESTCHURCHEXIT RAMP NABRILSRUN LNBUSINESS BLVDZACHARY ANN LNBRANSONSPRING RD
WOODBINERD
MARTINSBURGPIKEApplication
Sewer and Water Service A rea
Parcels
Long R ange Land Use
Business
Mixed Use Industrial/O ffice
Industrial
Warehouse
Heavy Industrial
Extractive Mining
Rural Community Center
Sensitive Natural Areas µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: July 25, 202 3
£¤11
§¨¦81
CEDARHILL RD CHRISTOREY DRR
U
E
B
U
C
K
L
N
JEFFSWAY
WOODBINE RD
GRACE CHURCH RDMARTINSBURG PIKES I R J O H N S R D
JOHNDEERE CTWOODSIDE RDBRANSONSPRING RD
SHADYCREEK RDClearBrookClear Brook
0 1,400 2,800700 Feet
BERKELEY
COUNTY
WEST VIRGINIA
REZ # 03 - 23: O-N Minera ls (Che mstone) db a C armeuse AmericasPINs: 34 - 1 - A, 34 - A - 7, 34 - A - 8A, 34 - A - 10, 34 - A - 10A, 34 - A - 10B, 34 - A - 10D, 34 - A - 10E, 34 - A - 10F, 34 - A - 129A, 34 - A - 129E, 34 - A - 129G, 34 - 8 - 1 - 1, 34 - 8 - 1 - 2, 34 - 8 - 1 - 3, 34 - 8 - 1 - 4, 34 - 8 - 1 - 5, 34 - 8 - 1 - 6, 34 - 8 - 1 - 7, 34 - 8 - 1 - 8, 34 - 8 - 1 - 9, 34 - 8 - 1 - 17Rezoning from RA to EMLong Range Land Use Map
BERKELEY
COUNTY
WEST VIRGINIA
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23
REZ #03-23REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23
REZ #03-23 REZ #03-23REZ #03-23
REZ #03-23
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
05000 1000005001000LOCATION MAPSCALE: 1" = 5000'GENERALIZED DEVELOPMENT PLAN CARMEUSE LIME AND STONEDecember 19, 2022rev July 5, 2023103 Heath CourtWinchester VA 22602540.686.7373ADJACENT PROPERTIESREZONING PROPERTIESNOTES:1. INTERSECTION ALIGNMENTS, ROADWAY LOCATION, BERM, AND LANDSCAPELOCATIONS ARE SUBJECT TO CHANGE AT FINAL SITE PLAN PROVIDED THAT THEMODIFICATIONS MEET THE INTENT OF THE PROFFERS.2.08%5%5%4:12.08%5%5%CONST. B/LSOUTH BOUND LANE NORTH BOUND LANE2:1 max2:1 max2'1321. 2" ASPHALT CONCRETE SURFACE COURSE, TYPE SM-12.5A2. 4" ASPHALT BASE COURSE, TYPE BM-25.0A3. 8" AGGREGATE BASE MATERIAL, TYPE 1, No. 21-BREALIGNED WOODSIDE ROAD SECTIONROAD LOCATIONS1. THE LOCATION OF THE REALIGNED WOODSIDE ROADWILL BE DETERMINED AT THE SITE PLAN STAGE.6/12/23|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||W&
W
R
A
I
L
R
O
A
D
VAR.
R
/
W
W&
W
R
A
I
L
R
O
A
D
VAR.
R
/
W
W&
W
R
A
I
L
R
O
A
DWOODBINE RD.RT.66930'PRESCRIPTIVE R/WWOODBINE RD. RT.66930'PRESCRIPTIVE R/WW
O
O
D
S
I
D
E
R
D
.
R
T
.
6
7
1
3
0
'
P
R
E
S
C
R
I
P
T
I
V
E
R
/
W
W
O
O
D
S
I
D
E
R
D
.
R
T
.
6
7
1
3
0
'
P
R
E
S
C
R
I
P
T
I
V
E
R
/
WWOODSIDE RD.RT.67130'PRESCR
IPT
IVE R
/WGRACE CHURCH RD.RT.66830'PRESCRIPTIVE R/WGRACE CHURCH RD. RT.66830'PRESCRIPTIVE R/WBRANSON SPRING RD.RT.66830'PRESCRIPTIVE R/WW
O
O
D
S
I
D
E
R
D
.
R
T
.
6
7
1
3
0
'
P
R
E
S
C
R
I
P
T
I
V
E
R
/
W
WO
O
D
S
I
D
E
R
D
.
RT.6
7
1
30'P
R
E
S
C
R
I
P
T
I
V
E
R
/
W
GRACE CHURCH RD.RT.66830'PRESCRIPTIVE R/WFEMA FLOODHAZARD LIMITSPR
O
P
O
S
E
D
Z
O
N
I
N
G
L
I
N
E
-
E
M
PR
O
P
O
S
E
D
Z
O
N
I
N
G
L
I
N
E
-
R
A
MARTINS
B
U
R
G
P
I
K
E
-
U
S
R
T
.
1
1
W&
W
R
A
I
L
R
O
A
D
VAR.
R
/
W
R
O
A
D
T
O
B
E
A
B
A
N
D
O
N
E
D
(T
Y
P
.
)ROAD TO BEABANDONED(TYP.)PROFFER 4.4 - CUL DESAC AT END OFABANDONED ROADPROFFER 4.4 - CUL DESAC AT END OFABANDONED ROADROAD TO
BE ABANDONED(TYP.)
EX.
Z
O
N
I
N
G
L
I
N
E
-
M
2
EX.
Z
O
N
I
N
G
L
I
N
E
-
R
A
FEMA FLOODHAZARD LIMITSFEMA FLOODHAZARD LIMITSWOODSIDE RD.RT.67130'PRECRIPTIVER/W64.67 AC OF PARCEL34-A-129E NOT INCLUDEDIN REZONING AREAI-81
391.87 ACERS TO BEREZONED TO EMPROFFER 4.4 - REALIGNEDWOODSIDE RD50' ROWEEEEEEEEEEEEEEEEEEE
EEEEEEEEEEEE
E
EEEEEEEEEEEE
E
E
E
E
E
E
E
E
E
13
8
k
V
P
O
W
E
R
L
I
N
E
138
k
V
P
O
W
E
R
L
I
N
E
500 kV POWER LINE500 kV POWER LINE20.0 AC OF PARCEL34-A-8A NOT INCLUDEDIN REZONING AREAAPPROXIMATELIMITSOFMINING||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||WEST VIRGINIA - BERKELEY COUNTYVIRGINIA - FREDERICK COUNTYINTERSTATE 81MARTINSBURG PIKEUS RT.11W&W RAILROAD REZONINGAREAEXIT 323EXIT 321BRUCETOWN RD.SIR JOHNS RD.GRACECHURCH RD.WOODBINE RD.||||||||||||||||||
33
Brucetown RdBranson Spring RdWoodbine RdGrace Church RdTemporaryStockpileMiningAreaBermCul-de-sacCul-de-sacN
e
w
R
o
a
d
A
b
a
n
d
o
n
e
d
R
o
a
dBerm
BermBe
r
m
Ber
m
34
35
36
Impact Analysis Statement
Carmeuse Lime and Stone
Clear Brook, VA
Stonewall Magisterial District
Frederick County, VA
December 19, 2022
Rev June 12, 2023
Prepared for:
Carmeuse Lime and Stone
508 Quarry Lane
Clear Brook, VA 22624
Prepared by:
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
37
Carmeuse Lime & Stone
Clear Brook, VA
1
IMPACT ANALYSIS STATEMENT Carmeuse Lime and Stone, Clear Brook, VA Introduction
This project involves the expansion of an existing limestone surface mine near Clear Brook,
Frederick County, VA. The project is east of the Winchester & Western Railroad, north of
Brucetown Road, and south of Woodbine Road. The site will not be open to the public, and
access for Carmeuse mining vehicles will be through an existing tunnel under Brucetown Road.
Figure 1 shows the location of the project.
The tax parcels included in the project area are listed in Table 1 and comprise 391.87 acres.
Table 1 Parcels within the Project Area
KEY Tax Map OWNER USE ZONING ACREAGE NOTE
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
RA
AGRICULTURAL RA
R11 34-((8))-1-5 AGRICULTURAL
AGRICULTURAL RA
R10 34-((8))-1-4
R9 34-((8))-1-3
RA
R8 34-((8))-1-2 AGRICULTURAL RA
AGRICULTURAL RA
R7 34-((8))-1-1 AGRICULTURAL
AGRICULTURAL RA
R6 34-((A))--10F
R5 34-((A))--10E
RA
R4 34-((A))--10D AGRICULTURAL RA
AGRICULTURAL RA
R3 34-((A))--10B AGRICULTURAL
R2 34-((A))--10A
AGRICULTURAL RAR134-((A))--10 23.027
5.000
5.647
5.539
5.000
26.694
2.853
2.749
2.005
2.000
2.000
KEY Tax Map OWNER USE ZONING ACREAGE NOTE
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301 1
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301 1
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
TOTAL 391.87
Notes: 1. acerage is a portion of the entire parcel
RESIDENTIAL RA
R22 33-((A))--129G
R21 34-((A))--129A
RA
R20 34-((A))--7 RESIDENTIAL RA
RESIDENTIAL RA
RESIDENTIAL RA
R19 34-((A))--129E RESIDENTIAL
AGRICULTURAL RA
R18 34-((1))--A
R17 34-((A))--8A
RA
R16 34-((8))-1-17 RESIDENTIAL RA
AGRICULTURAL RA
R15 34-((8))-1-9 AGRICULTURAL
AGRICULTURAL RA
R14 34-((8))-1-8
R13 34-((8))-1-7
R12 34-((8))-1-6 AGRICULTURAL RA
51.887
8.854
5.003
18.228
2.000
3.295
3.142
3.037
33.906
137.612
42.388
38
Carmeuse Lime & Stone
Clear Brook, VA
2
Figure 1 Project Location Map (nts)
The rezoning site is currently agricultural with farm buildings and one house. The site is bounded
by the Winchester & Western Railroad on the west, undeveloped land to the east, Woodbine
Road to the north and Turkey Run to the south.
PROJECT AREA
39
Carmeuse Lime & Stone
Clear Brook, VA
3
Site Suitability
100 Year Flood Plains – The project area has a floodplain on the south. Turkey Run parallels the
southern boundary of the project area and its floodplain also extends into the project area.
Figure 2 shows the FEMA flood hazard mapping with this floodplain area. About 10 acres of the
Turkey Run floodplain extend towards the mining area. Current plans call for impacts to this
stream and wetland to be avoided.
Figure 2 Floodplain Map
PROJECT
AREA
40
Carmeuse Lime & Stone
Clear Brook, VA
4
Wetlands – A desktop review of the US Fish and Wildlife Service's National Wetland Inventory
mapping shows there are wetlands on the site. Figure 3 shows the location of wetlands mapped
by the agency.
41
Carmeuse Lime & Stone
Clear Brook, VA
5
Figure 3 National Wetland Inventory Map Project Location 42
Carmeuse Lime & Stone
Clear Brook, VA
6
There are two freshwater ponds shown as wetland areas on the NWI map. Prior to any site work
activity the entire site will be reviewed to confirm the presence of these and other wetlands.
Any permits required for the wetland areas will be obtained from the appropriate agency.
Steep Slopes – Based on field observations and 5 ft contour mapping provided by the Frederick
County GIS, the site has been found to be generally flat, without any steep slopes.
Mature Woodlands – There are no areas of mature woodlands on the site.
Prime Agricultural Soils – Based on data from the USDA Web Soil Survey, the soils are classified
as shown in Table 2. Of the soils listed, 3B Blairton silt loam, 14B Frederick Poplimento, 29
Massanetta loam, and 32B Oaklet silt loam are recognized by the USDA as prime farmland soils.
Figure 4 shows the soils map.
Table 2 Soil Units in Project Area
43
Carmeuse Lime & Stone
Clear Brook, VA
7
44
Carmeuse Lime & Stone
Clear Brook, VA
8
Figure 4 USDA Soils Map
Soil or Bedrock Conditions which would create Construction Difficulties or Hazards – A review of
the USDA Web Soil Survey indicates that the depth restrictive features in some areas is over 80
inches, while in others it is 20 to 40 inches. Given that a surface mine is the proposed use,
blasting is expected to remove the surface rock and ore. Surrounding Properties
The proposed rezoning area is bordered by properties zoned RA on the north, east and south. To
the west is the Winchester and Western Railroad with properties zoned M1 to the west of it.
Table 3 lists the adjoining owners, their property’s zoning, and use.
Table 3 Adjoining Owners, Zoning and Land Use
Traffic
Stowe Engineering has prepared a Traffic Diversion Study for the project. The study shows that
the proposed mine expansion will not generate new traffic, but local roadways will be affected.
Woodside Road will be relocated to the east side of the rezoning area, which moves it from the
KEY Tax Map OWNER USE ZONING
SEMPLES, CAROL THARPE, TRUSTEE
331 WOODBINE RD.
CLEAR BROOK, VA 22624
WHITE HALL INVESTMENTS, LLC
331 WOODBINE RD.
CLEAR BROOK, VA 22624
BODEN, MCHAEL, ET.AL
3026 WOODBSIDE RD.
CLEAR BROOK, VA 22624
BODEN, MCHAEL, ET.AL
3026 WOODBSIDE RD.
CLEAR BROOK, VA 22624
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
AY, CARL C. JR. TRUSTEE
PO BOX 295
CLEAR BROOK, VA 22624
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
WILSON, ROBERT E. ET.AL.
570 GRACE CHURCH RD.
CLEAR BROOK, VA 22624
HOTTLE, CHRISTOPHER M., ET.AL.
1761 BRUCETOWN RD.
CLEAR BROOK, VA 22624
BUTLER, KEVIN WARREN, ET.AL.
PO BOX 58
CLEAR BROOK, VA 22624
A9 34-((A))--120
RESIDENTIAL RA
A11 34-((2))--24E RESIDENTIAL RA
RESIDENTIAL RA
A10 34-((2))--A
RAA734-((A))--10C AGRICULTURAL
A6 34-((A))--126
A5 34-((A))--129I
RA
A4 34-((A))--129H AGRICULTURAL RA
RESIDENTIAL RA
RESIDENTIAL RAA134-((A))--5A
AGRICULTURAL RA
AGRICULTURAL RA
A3 34-((A))--129 RESIDENTIAL
A2 34-((A))--5C
KEY Tax Map OWNER USE ZONING
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
O-N MINERALS (CHEMSTONE) COMPANY
6920 POINTE INVERNESS WAY SUITE 301
FORT WAYNE, IN 46804
RUSSEL, GLEN E. TRUSTEE, ET.AL.
2619 WOODSIDE RD.
CLEAR BROOK, VA 22624
RUSSEL, GLEN E. TRUSTEE, ET.AL.
2619 WOODSIDE RD.
CLEAR BROOK, VA 22624
BROWN, JEFFERY D.
271 BRANSON SPRING RD.
CLEAR BROOK, VA 22624
DICKERSON, LINDSAY NICOLE
271 BRANSON SPRING RD.
CLEAR BROOK, VA 22624
BRANSON SPRINGS, LLC.
800 LAKE WINDERMERE CT.
GREAT FALLS, VA 22066
OJAUSMANI, INC.
653 NESTING LN.
MIDDLETOWN, DE 19709
FREDERICK COUNTY SCHOOL BOARD
PO BOX 3508
WINCHESTER, VA 22604
LESTER PROPERTIES - VA
1111 2ND AVE S.
LESTER PRAIRIE, MN 55354
GPT BTS BUSINESS BLVD. OWNER, LLC
PO BOX 1232
HICKSVILLE, NY 11802
A20 33-((A))--6C STORAGE M1
RAA2334-((A))--4 LOGISTICS
STORAGE M1A2133-((A))--6A
A19 33-((A))--105 VACANT RA
A16 34-((A))--8 RESIDENTIAL RA
AGRICULTURAL RA
A18 33-((A))--105D
A17 34-((A))--8B
VACANT M1
RA
AGRICULTURAL EM
A14 34-((1))--B
A13 34-((A))--11A
AGRICULTURAL RA
A15 34-((A))--87 RESIDENTIAL
A12 34-((A))--11 AGRICULTURAL EM
45
Carmeuse Lime & Stone
Clear Brook, VA
9
proposed mine area. The relocated portion of the road will be constructed as a two-lane paved
roadway from Grace Church Road to its intersection with Woodbine Road.
Also, Branson Springs Road will terminate in a cul de sac east of the W&W Railroad crossing,
and Woodside Road will also terminate in a cul de sac just east of the W&W Railroad crossing
near the Titan concrete plant. Figure 5 shows the location of these roadway features.
Mining equipment will cross Brucetown Road through an existing tunnel under the road.
Carmeuse customers will continue to use the existing entrance on Brucetown Road.
46
Carmeuse Lime & Stone
Clear Brook, VA
10
Figure 5 Proposed Roadway Modifications Sewage Conveyance and Treatment
Wastewater generated on the site will be in Port-a-Pottys which will be maintained by private
haulers. Wastewater will be transported to the Opequon Creek Water Reclamation facility
where it will be treated.
47
Carmeuse Lime & Stone
Clear Brook, VA
11
Water Supply
There will not be a need for potable water in the mine area. Excess water from the mine could
potentially be used to supply drinking water to Frederick County citizens and businesses. Drainage
Drainage from the area flows east via Turkey Run and Duncan Run. Surface runoff from the
mining area will be routed through stormwater management facilities to control the quantity
and quality of stormwater leaving the site. Solid Waste Disposal Facilities
There is no planned solid waste stream associated with this project. If solid waste should occur,
it will be collected and disposed of by private haulers. The solid waste generated in the mine, if
any, will be transferred to the Frederick County Landfill Facility by private licensed commercial
carriers. Historical Site and Structures
A review of the online Virginia Dept. of Historic Resources records shows several historic
architectural or archeological sites in the proposed project area. Figure 6 shows the Dept of
Historic Resources map showing the location of the features. The following brief descriptions
correlate to the feature ID number.
Site 034-5138. A review of the VA Department of Historic Resources records showed this
resource as a barn on Woodside Road, constructed between 1946 and 1991 with no discernable
style.
Site 034-0730. The VA Department of Historic Resources records showed this resource as the
Dangerfield-Phelps-Robinson, House, currently known as Mt Prospect. It was constructed in
1810Ca during the Early National Period (1790-1829). Mt Prospect is unusual in that is a stone
house which burned and was partially rebuilt using brick.
Site 034-0731. The VA Department of Historic Resources records identified this site as the
Branson-Stephenson-Huyett-Light House, currently known as Woodside. The house was
constructed in the 1840Ca Antebellum Period (1839-1860).
Site 034-1053. The VA Department of Historic Resources records also showed this resource as
the David Shaull house, currently known as the - Anderson – Reese House. The house was
constructed in 1845Ca Antebellum Period (1830-1860).
Site 44FK0697. The VA Department of Historic Resources records also showed this site as a small
trash scatter near the Mt. pleasant house.
48
Carmeuse Lime & Stone
Clear Brook, VA
12
Figure 6 VA Department of Historic Resources Map
49
Carmeuse Lime & Stone
Clear Brook, VA
13
Impact on Community Facilities
Educational Facilities – This project will not add children to the school system.
Emergency Services – the Frederick County Sheriff Department will provide Police protection.
The property is in the first response area for the Clear Brook Fire and Rescue station. Therefore,
response times from the station to the site are reasonable.
Parks and Recreation – This project will not add to the population of Frederick County and,
therefore, will not increase the demand for Parks and Recreational services.
Solid Waste – As previously stated, solid waste is not expected to be generated on the site, but if
any occurs it will be collected and transported by private haulers to the Frederick County land
fill.
50
October 31, 2022
TRAFFIC
DIVERSION
STUDY Carmeuse Lime and Stone Clear Brook, VA 12/19/22
Prepared for:
Carmeuse Lime & Stone
508 Quarry Lane
Clear Brook, VA 22642
Prepared by:
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
12/20/22
51
Table of Contents
Executive Summary ....................................................................................................................................... 2
Introduction and Background Information ................................................................................................... 1
Project Location and Description .............................................................................................................. 1
Non-existent Transportation Improvements ............................................................................................ 2
TIA Scoping ................................................................................................................................................ 2
Study Area ................................................................................................................................................. 2
Existing Roadway Descriptions ................................................................................................................. 3
Nearby Land Uses ..................................................................................................................................... 4
Comprehensive Plan ............................................................................................................................. 4
Zoning ................................................................................................................................................... 6
VDOT Functional Classification ................................................................................................................. 7
Multi-Modal Access .................................................................................................................................. 7
Future Transportation Improvements ...................................................................................................... 7
Existing Conditions ........................................................................................................................................ 8
Existing Traffic Operations ........................................................................................................................ 8
Assessment of the Existing Conditions: .................................................................................................... 8
Planned Quarry Development .................................................................................................................... 10
Overview ................................................................................................................................................. 10
Roadways Impacted ............................................................................................................................ 10
Travel Times ............................................................................................................................................ 12
Diverted Travel Times ......................................................................................................................... 14
Delays ...................................................................................................................................................... 16
Conclusions and Recommendations ........................................................................................................... 17
52
Executive Summary This Traffic Diversion Study has been performed to quantify the changes in travel times resulting from the relocation and vacation of public roadways that pass through the mining area proposed by Carmeuse. The Virginia Department of Energy regulations prohibits the traveling public from entering a permitted mine area due to the potential dangers of mining activity. Therefore, Carmeuse proposes to reroute the traveling public around the proposed mining area by vacating portions of the following public roads:
• Branson Springs Road (Route 668) to be terminated with a cul de sac near the W&W railroad crossing.
• Woodside Road (Route 671) to be terminated with a cul de sac near the W&W railroad crossing.
• Woodside Road (Route 671) to be relocated to the east of the proposed mine area.
• Grace Church Road (Route 668) to be routed into the relocated Woodside Road. Travel times were collected in five runs between 11:00AM and 2:00PM along three primary travel routes between Point A, the intersection of Grace Church Rd and John Deere Ct, and US Route 11 and I-81. Travel times were also computed on a new route between Point A and US Route 11 and I-81 at Rest Church Road. The collected travel times were averaged to arrive at a travel time for each route. Variations in travel times are attributed to the distance, roadway surface, speed limits, and signal phasing. The speed limits on Grace Church, Woodside, and Branson Spring Roads are 35MPH by statute, but due to the narrow roadway width, short site distances, and gravel surface, most drivers will not feel safe at that speed. The higher speed limit and hard surface on Sir John and Brucetown Roads permit motorists to travel at higher speeds, reducing their overall travel times. In addition, the traffic signals at Route 11 randomly affected travel times to I-81. Existing travel on Grace Church, Woodside, and Branson Spring Roads is limited by driver comfort, which results in slower speeds due to the narrow roadway width, short site distances, and gravel surface. The relocated woodside Rd will be paved, which will enable motorists to travel at 45MPH. The traffic signal at Route 11 and Rest Church Road randomly affected travel times to I-81. The following table summarizes the anticipated changes in travel times resulting from the proposed diversions.
53
From To
Travel Time
increase/decrease
(min:sec)
Diverted
travel time
(min:sec)
Int of John Deere Ct & Grace
Ch Rd Int of Route 11 & Brucetown
Rd via Brucetown Rd instead
of Grace Ch + Branson Sp +
Rte 11
-0:36 3:40
Int of I-81 SB ramp @
Hopewell Rd via Brucetown
Rd instead of Grace Ch +
Branson Sp + Rte 11*
Int of John Deere Ct &
Grace Ch Rd -0:57 5:26
Int of John Deere Ct & Grace
Ch Rd Int. of Route 11 & Rest
Church Rd -0:09 6:45
Int of John Deere Ct & Grace
Ch Rd Int of I-81 NB ramp and Rest
Church Rd -0:11 7:35
While the travel time savings associated with the proposed diversions are minor, they do allow
the traveling public to reach their destinations efficiently and safely.
This engineer believes that the changes in travel times resulting from this rezoning are both
manageable and acceptable for this project setting.
54
Introduction and Background Information
Page | 1
Introduction and Background Information Project Location and Description
This project involves rezoning 391.87 +/- acres in Frederick County, VA, for surface ore mining.
The project is north of Clear Brook, VA, and east of Route 11. Figure 1 shows the location of
the site.
Figure 1 Project location map
The project site consists of rolling fields currently being used for farming. Route 11 and I-81 are
to the west of the site, Woodbine Road is to the north, and the W&W railroad is along the
western property boundary. Grace Church Road (Route 668), Branson Springs Rd (Route 668),
and Woodside Road (Route 671) are gravel roads that pass through the project area. Two single-
family residences and some farm buildings are also present within the project boundary.
Exit
323
Exit
321
55
Introduction and Background Information
Page | 2
Non-existent Transportation Improvements
Based on a review of the online VDOT Six-Year Improvement plan, there are no VDOT
roadway improvement projects in the area.
The Frederick County 2022/23-2027/28 PRIMARY ROAD IMPROVEMENT PLAN calls for Route
11 to be widened to a 4-lane urban section between Cedar Hill Road and West Virginia and the
Frederick County NON-HARD SURFACE ROAD IMPROVEMENT PROJECTS 2022/2023 through
2027/2028 show the paving of Grace Church Road as unscheduled. Both projects are
dependent on VDOT funding.
TIA Scoping
A Traffic Study Pre-Scope of Work meeting was held with VDOT on January 25th, 2022, with a
follow-up meeting on March 30th, 2022. The study was determined to be a Diversion Study
rather than a routine Traffic Impact Analysis since the proposed rezoning generates no new
traffic. A copy of the final scoping document is included in Appendix A.
Study Area
The study area extends from Rest Church Road (Route 669) on the north to Hopewell and
Brucetown Roads (Route 672) on the south and from Sir Johns Road (Route 667) on the east to
I-81 on the west. Figure 2 shows the study area in this analysis.
56
Introduction and Background Information
Page | 3
Figure 2 Project Study Area
Existing Roadway Descriptions
The attributes of the existing road network in the study area are described in Table 1. The
Virginia Department of Transportation maintains these roads.
Study
Rezoning Area
57
Introduction and Background Information
Page | 4
Table 1 Existing streets attributes
Route
Number
Street Name Surface No. Lanes Speed Limit
(mph)
2021
AADT
11 Martinsburg
Pike
Pavement 2 with
TWLTL
45 posted 6800
667 Sir Johns Rd Pavement 2 55 (statutory) 620
668 Grace Church
Rd
Gravel 2 35 (statutory) 130
668 Branson Spring
Rd
Pavement 2 55 (statutory) 160
669 Rest Church Rd Pavement 2 to 4 plus
turn lanes
35 posted 9900
669 Woodbine Rd Pavement,
gravel
2 55 (statutory) 490
671 Woodside Rd Gravel 2 35 (statutory) 130
672 Brucetown/
Hopewell Rd
Pavement 2 Rte 11 to Quarry Ln – 35
Quarry Ln to Brucetown – 45
Brucetown to Sir Johns - 25
3500
2300
Nearby Land Uses
The W&W railroad, businesses, and the Frederick County Public Schools warehouse are to the
west of the project area, while agriculture is on the remaining three sides. Comprehensive Plan
The Frederick County Comprehensive Plan – 2005 to 2025 envisions the land use for the site to
be Heavy Industrial, Industrial, and Warehousing, as shown in figure 3.
58
Introduction and Background Information
Page | 5
Figure 3 Comprehensive Plan 2030 Land Use Map
Rezoning Area
59
Introduction and Background Information
Page | 6
Zoning
The current zoning on the site is Agriculture. See figure 4.
Figure 4 Frederick County Zoning Map
Rezoning Area
60
Introduction and Background Information
Page | 7
VDOT Functional Classification
The VDOT Functional Plan for this portion of Frederick County is shown in Figure 5, which
shows Route 11 (Martinsburg Pike) as a "Major Collector" in the vicinity of the study area, and
I-81 with a Functional Classification of "Interstate."
The functional designation establishes the VDOT Access Management requirements for median
crossovers and traffic control.
Figure 5 VDOT Approved Roadway Functional Classification Map Multi-Modal Access
The existing roadway network does not include continuous pedestrian access. Bike lanes are not
included in the existing roadway typical sections.
Future Transportation Improvements
Based on a review of the online VDOT Six-Year Improvement plan, there are no VDOT
roadway improvement projects in the area.
The Frederick County 2022/23-2027/28 PRIMARY ROAD IMPROVEMENT PLAN calls for
Route 11 to be widened to a 4-lane urban section between Cedar Hill Road and West Virginia
and the Frederick County NON-HARD SURFACE ROAD IMPROVEMENT PROJECTS
2022/2023 through 2027/2028 show the paving of Grace Church Road as unscheduled. Both
projects are dependent on VDOT funding.
61
Existing Conditions
Page | 8
Existing Conditions Existing Traffic Operations
For background and reference, turning movement traffic counts were collected on Tuesday,
November 16th, and Thursday, November 18th, 2021, from 6:00 AM to 9:00 AM and from 3:00
PM to 6:00 PM to identify the peak traffic volume hours. Upon reviewing the data, abnormally
high volumes were observed in the AM count around exit 321. Upon further investigation, it was
found that an accident in the southbound lanes of I-81 just south of exit 321 was causing traffic
to reroute onto Hopewell Road and south on Route 11. Therefore, this area was counted again on
May 17th, 2022. Pre-COVID AM traffic counts collected in 2019 were grown at 1%/year for
three years and were used as a comparison to the May 17th counts around exit 321. The AM peak
hour volumes used at exit 321, Hopewell Road and Brucetown Road are a blend and adjustment
of volumes representing the historical traffic growth.
The November 18th, 2021, PM peak hour volumes were unaffected.
In addition to the counts at Brucetown and Hopewell Roads, a combined count was assembled to
identify the peak hours for the combined traffic volume.
Following consultation with VDOT, a 24 hr video count was performed at the intersection of
Woodside Rd and Branson Springs Rd, and Woodside Rd Grace Church Rd on Tuesday, April
6th, 2022.
The traffic count data is included in Appendix B. The existing turning movement data for the
AM and PM peak hours are summarized in Figure 6. Assessment of the Existing Conditions:
• Very few vehicles are using Branson Springs Rd, Woodside Rd, and Grace Church Road. Eleven vehicles passed through the Branson Springs/Woodside intersection during the peak AM hour which includes two UPS size trucks. During the peak PM hour, a total of twenty-two vehicles passed through the Branson Springs/Woodside intersection with no trucks. These volumes are proposed to be rerouted.
• A large volume of southbound traffic moves from Route 11 to Rest Church Road to I-81 in the AM peak hour and goes opposite in the PM peak hour. This consumes much of the capacity on Rest Church Road, creating traffic congestion in the morning and evening peak hours. The other intersections in the vicinity of exit 323 functions without undue congestion.
• The east and west approaches of the signalized intersections of Hopewell and Brucetown Roads on Route 11 experience delays in the AM and PM peak hours. Heavy vehicles are going to and from various commercial and industrial facilities near the intersection. When heavy vehicles are present, they delay traffic because they accelerate slower than a car. In addition, the approaches from the east and west both have a single shared lane which restricts turning movements and causes further delays.
62
Existing Conditions
Page | 9
Figure 6 2021 Existing Traffic Volumes
63
Travel Times
Page | 10
Planned Quarry Development Overview
Carmeuse has acquired property north of Brucetown Road and intends to perform surface mining
there. The mining activity will extend northward from the existing quarries north side of
Brucetown Road, as shown in Figure 2. While the mining activity will take place over many
years, the initial berm construction and vegetative screening is expected to occur early in the
project development. This work will cause several roads in the project area to be rerouted or
closed, which will require motorists to travel on alternate routes. Impacted Roadways
The Virginia Department of Energy regulations prohibits the traveling public from entering an
active mine area due to the danger mining activity presents. Therefore, prior to work beginning
those roadways that pass through the mining area will be rerouted or closed. This includes:
• Branson Springs Road (Route 668) to be closed with a cul de sac east of the W&W railroad crossing
• Woodside Road (Route 671) to be rerouted
• Grace Church Road (Route 668) to be closed with a cul de sac east of the W&W railroad crossing
Woodside Road will be relocated to the east of the rezoning area. Figure 7 shows these planned
road changes.
64
Travel Times
Page | 11
Figure 7 Planned Roadway Changes
Rezoning Area
65
Travel Times
Page | 12
Travel Times
As previously mentioned, the purpose of this study is to determine the change in travel times
motorists will experience due to these roadways being relocated or closed. Methodology
To determine the difference in travel times, travel time runs along the roadways to be rerouted or
closed were measured, as were travel times along the logical alternative routes. A set of travel
times runs along each route was measured five times, and then averaged to get a travel time.
Appendix C shows the data from the travel time runs and the average time.
Travel times were measured between 11:00AM and 1:00 PM on Wednesday September 14 and
Thursday September 15, 2022. Performing the travel time runs mid-day provided a better
representation of the actual travel times without variable delays caused by external conditions,
such as variable traffic volumes and congestion in the peak hours.
For the purposes of this study, the intersection of Grace Church Road and John Deere Court was
selected as the origin-destination point for the motorist who the proposed road changes will
divert. This intersection is positioned to give the motorist a choice of routes to Route 11 and I-
81. Also, for the purposes of this study, it is assumed that motorists desiring to go south on I-81
will use Brucetown Road to Hopewell Road. Those wishing to go north on Route 11 or I-81 are
using any combination of routes, including Grace Church Road to Branson Springs Road to
Route 11, and Grace Church Road to Woodside Road to Woodbine Road to Route 11.
To develop a travel time as close as possible to that experienced by motorists currently using the
affected roadways, origin and destination points were identified as:
• Southbound I-81 ramps at exit 321
• Northbound I-81 ramps at exit 323
• Route 11 at the intersection of Brucetown Rd
• Route 11 at the intersection of Rest Church Rd
• The intersection of Grace Church Road and John Deere Ct
Tables 2 and 3 show the existing average inbound and outbound travel times between these
origins and destinations.
66
Travel Times
Page | 13
Table 2 Existing outbound travel times.
From To
Average
Travel Time
(min:sec)
John Deere Ct & Grace Ch Rd Route 11 and Brucetown Rd via
Brucetown Rd 3:40
John Deere Ct & Grace Ch Rd I-81 SB ramp @ Hopewell Rd via
Brucetown Rd 6:57
John Deere Ct & Grace Ch Rd Route 11 and Brucetown Rd via Grace
Ch Rd & Branson Sp Rd 4:16
John Deere Ct & Grace Ch Rd I-81 SB ramp @ Hopewell Rd via
Grace Ch Rd & Branson Sp Rd 7:33
John Deere Ct & Grace Ch Rd Route 11 & Rest Church Rd via
Woodside Rd & Woodbine Rd 6:54
John Deere Ct & Grace Ch Rd I-81 SB ramp @ Rest Church Rd via
Woodside Rd & Woodbine Rd
7:46
Table 3 Existing inbound travel times.
From To
Average
Travel Time
(min:sec)
Route 11 & Hopewell Rd John Deere Ct & Grace Ch Rd via
Brucetown Rd
4:39
I-81 SB ramps @ Hopewell Rd John Deere Ct & Grace Ch Rd via
Brucetown Rd
5:26
Route 11 & Hopewell Rd John Deere Ct & Grace Ch Rd via
Branson Sp Rd & Grace Ch Rd
5:36
I-81 SB ramps @ Hopewell Rd John Deere Ct & Grace Ch Rd via
Branson Sp Rd & Grace Ch Rd
6:23
Route 11 & Rest Church Rd John Deere Ct & Grace Ch Rd via
Woodbine Rd, Woodside Rd, & Grace
Ch Rd
7:11
I-81 SB ramp and Rest Church Rd John Deere Ct & Grace Ch Rd via
Woodbine Rd, Woodside Rd, & Grace
Ch Rd
7:55
67
Travel Times
Page | 14
Diverted Travel Times
The relocation and improvement of Woodside Road and the closure of Branson Springs and
Woodside Roads will require southbound traffic to use Brucetown Rd to get to southbound
Route 11 or I-81SB. Northbound motorists will use the relocated Woodside Road to get to Route
11 and I-81NB.
To get the travel time for routes using the relocated Woodside Road a speed of 45 MPH for the
2.3-mile length of new road was added to the proportional travel times on Grace church Road
and Woodbine Roads. Tables 4 through 7 provide the computation of the travel time for this
route.
Table 4 Travel Time from A to Route 11 via Relocated Woodside Rd
Segment Distance Average
Travel
Speed
Travel Time
Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:00:55
TOTAL 4.08 0:07:00
Table 5 travel Time from A to Exit 323 NB via Realigned Woodside Rd
Segment Distance Average
Travel
Speed
Travel Time
Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:01:25
Rest Church Road 0.16 35 0:00:45
TOTAL 4.24 0:08:15
Table 6 Travel Time from Route 11 to A via Relocated Woodside Rd.
Segment Distance Average
Travel
Speed
Travel Time
Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:00:40
TOTAL 4.08 0:06:45
68
Travel Times
Page | 15
Table 7 Travel Time from I-81NB to A via Relocated Woodside Rd.
Segment Distance Average
Travel
Speed
Travel Time
Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:01:45
Rest Church Road 0.16 35 0:00:05
TOTAL 4.24 0:07:55
Tables 8 and 9 show the travel times on the diversion routes. This assumes that southbound motorist will use
Brucetown Road, and northbound motorist will use relocated Woodside Rd.
Table 8 Diverted outbound travel times
From To
Average
Travel Time
(min:sec)
John Deere Ct & Grace Ch Rd Route 11 & Brucetown Rd via
Brucetown Rd
3:40
John Deere Ct & Grace Ch Rd I-81 SB ramp @ Hopewell Rd via
Brucetown Rd
6:57
John Deere Ct & Grace Ch Rd Route 11 & Rest Church Rd via
relocated Woodside Rd
7:00
John Deere Ct & Grace Ch Rd I-81 NB ramp and Rest Church Rd via
relocated Woodside Road
8:15
Table 9 Diverted inbound travel times
From To
Average
Travel Time
(min:sec)
Route 11 & Brucetown Rd John Deere Ct & Grace Ch Rd via
Brucetown Rd
4:39
I-81 SB ramps @ Hopewell Rd John Deere Ct & Grace Ch Rd via
Brucetown Rd
5:26
Route 11 & Rest Church Rd John Deere Ct & Grace Ch Rd via
relocated Woodside Rd
6:45
I-81 NB ramp and Rest Church Rd John Deere Ct & Grace Ch Rd via
Woodside Rd
7:55
69
Travel Times
Page | 16
Delays The difference in travel times between a diverted and a non-diverted travel route is delay. For motorists desiring to go south on Route 11 or I-81 from point A, the travel time using Brucetown Road is shorter than that of Grace Church and Branson Spring Roads. The travel times for motorists traveling north to Rest Church Road are longer. Table 6 provides a summary of the increase/decrease in travel times and the diverted travel times.
Table 10 Travel time delays
From To
Travel Time
increase/decrease
(min:sec)
Diverted
travel time
(min:sec)
Int of John Deere Ct & Grace
Ch Rd Int of Route 11 & Brucetown
Rd via Brucetown Rd instead
of Grace Ch + Branson Sp +
Rte 11
-0:36 3:40
Int of I-81 SB ramp @
Hopewell Rd via Brucetown
Rd instead of Grace Ch +
Branson Sp + Rte 11*
Int of John Deere Ct &
Grace Ch Rd -0:57 5:26
Int of John Deere Ct & Grace
Ch Rd Int. of Route 11 & Rest
Church Rd -0:09 6:45
Int of John Deere Ct & Grace
Ch Rd Int of I-81 NB ramp and Rest
Church Rd -0:11 7:35 While the travel time reductions are minor, the diversion routes do allow the traveling public to reach their destinations efficiently and safely. The variations in travel times are primarily attributed to the roadway surface, speed limits, and signal phasing. The speed limits on Grace Church, Woodside, and Branson Spring Roads are 35MPH by statute, but due to the narrow roadway width, short site distances, and gravel surface, a driver may not feel safe at that speed. While travel times were being collected, 25MPH was the maximum speed our drivers wanted to go. The higher speed limit and hard surface roads on Sir Johns and Brucetown Roads permit the motorist to travel at higher speeds, thereby reducing their overall travel times. The traffic signal at Route 11 and Brucetown Road randomly affected travel times to I-81. Travel to Rest Church Road is likewise affected by roadway surface, speed limits, and signal phasing. Travel on Grace Church, Woodside, and Branson Spring Roads is limited by driver comfort, and slower speeds are experienced due to the narrow roadway width, short site distances, and gravel surface. Even though the distance is longer, the ability to travel at 45MPH over those longer distances increased the travel times only modestly. The traffic signal at Route 11 and Rest Church Road randomly affected travel times to I-81.
70
Conclusions and Recommendations
Page | 17
Conclusions and Recommendations This Traffic Diversion Study has been performed to quantify the changes in travel times resulting from the relocation and vacation of public roadways that pass through the mining area proposed by Carmeuse. The Virginia Department of Energy regulations prohibits the traveling public from entering a permitted mine area due to the potential dangers of mining activity. Therefore, Carmeuse proposes to reroute the traveling public around the proposed mining area by vacating portions of the following public roads:
• Branson Springs Road (Route 668) to be terminated with a cul de sac near the W&W railroad crossing.
• Woodside Road (Route 671) to be terminated with a cul de sac near the W&W railroad crossing.
• Woodside Road (Route 671) to be relocated to the east of the proposed mine area.
• Grace Church Road (Route 668) to be routed into the relocated Woodside Road. Travel times were collected in five runs between 11:00AM and 2:00PM along three primary travel routes between Point A, the intersection of Grace Church Rd and John Deere Ct, and US Route 11 and I-81. Travel times were also computed on a new route between Point A and US Route 11 and I-81 at Rest Church Road. The collected travel times were averaged to arrive at a travel time for each route. Variations in travel times are attributed to the distance, roadway surface, speed limits, and signal phasing. The speed limits on Grace Church, Woodside, and Branson Spring Roads are 35MPH by statute, but due to the narrow roadway width, short site distances, and gravel surface, most drivers will not feel safe at that speed. The higher speed limit and hard surface on Sir John and Brucetown Roads permit motorists to travel at higher speeds, reducing their overall travel times. In addition, the traffic signals at Route 11 randomly affected travel times to I-81. Existing travel on Grace Church, Woodside, and Branson Spring Roads is limited by driver comfort, which results in slower speeds due to the narrow roadway width, short site distances, and gravel surface. The relocated woodside Rd will be paved, which will enable motorists to travel at 45MPH. The traffic signal at Route 11 and Rest Church Road randomly affected travel times to I-81. This engineer believes that this rezoning and its associated traffic diversions result in travel time changes that are both manageable and acceptable for this project setting.
71
Appendix A
Pre-Scope of Work Meeting Form
72
SCOPING INFORMATION
Traffic Impact Analysis
for
Carmeuse Rezoning
January 13, 2022
Rev 3/23/22
Prepared by
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
73
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
PRE-SCOPE OF WORK MEETING FORM
Information on the Project
Traffic Impact Analysis Base Assumptions
The applicant is responsible for entering the relevant information and submitting the form to VDOT and the
locality no less than three (3) business days prior to the meeting. If a form is not received by this deadline,
the scope of work meeting may be postponed.
Contact Information
Consultant Name:
Tele:
E-mail:
Stowe Engineering, PLC
540.686.7373
timstowe@stowecompanies.com
Developer/Owner Name:
Tele:
E-mail:
O N Minerals d.b.a Carmeuse Lime and Stone
540.662.3855 x4037
Logan.Thompson@carmeuse.com
Project Information
Project Name: Carmeuse Rezoning Locality/County: Frederick
Project Location:
(Attach regional and site
specific location map)
north of Brucetown Rd, east of Route 11, east of W&W railroad, wet of Woodside
Rd
Submission Type Comp Plan Rezoning Site Plan Subd Plat
Project Description:
(Including details on the land
use, acreage, phasing, access
location, etc. Attach additional
sheet if necessary)
Rezoning of 330+/- acres from RA to EM
Proposed Use(s):
(Check all that apply; attach
additional pages as necessary)
Residential Commercial Mixed Use Other
Residential Uses(s)
Number of Units:
ITE LU Code(s):
Commercial Use(s)
ITE LU Code(s):
Square Ft or Other Variable:
Other Use(s)
ITE LU Code(s):
Independent Variable(s):
see notes in
assumptions
Total Peak Hour Trip
Projection: Less than 100 100 – 499 500 – 999 1,000 or more
74
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Traffic Impact Analysis Assumptions
Study Period Existing Year: 2022 Build-out Year: 2035 Design Year: 2041
Study Area Boundaries
(Attach map)
North: Route 669 Rest Church
Rd South: Route 672 Hopewell Rd
East: Carmeuse Entrance West: I-81
External Factors That
Could Affect Project
(Planned road improvements,
other nearby developments)
none known
Consistency With
Comprehensive Plan
(Land use, transportation plan)
not currently
Available Traffic Data
(Historical, forecasts)
VDOT published traffic data and counts from previous studies
Trip Distribution
(Attach sketch)
Road Name: see attachment Road Name:
Road Name: Road Name:
Annual Vehicle Trip
Growth Rate: 1%
Peak Period for Study
(check all that apply) AM PM SAT
Peak Hour of the Generator
Study Intersections
and/or Road Segments
(Attach additional sheets as
necessary)
1.see attachment 6.
2. 7.
3. 8.
4. 9.
5. 10.
Trip Adjustment Factors Internal allowance: Yes No
Reduction: % trips
Pass-by allowance: Yes No
Reduction: % trips
Software Methodology Synchro HCS (v.2000/+) aaSIDRA CORSIM Other
Traffic Signal Proposed
or Affected
(Analysis software to be used,
progression speed, cycle length)
The traffic signals at Brucetown Rd/Hopewell Rd/Route 11 will continue to pass
Carmeuse traffic with no proposed Carmeuse traffic increase.
75
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Improvement(s)
Assumed or to be
Considered Traffic signals at I-81 ramps proffered by Blain-Cline rezoning.
Background Traffic
Studies Considered none
Plan Submission Master Development Plan (MDP) Generalized Development Plan (GDP)
Preliminary/Sketch Plan Other Plan type (Final Site, Subd. Plan)
Additional Issues to be
Addressed
Queuing analysis Actuation/Coordination Weaving analysis
Merge analysis Bike/Ped Accommodations Intersection(s)
TDM Measures Other
NOTES on ASSUMPTIONS:
1.This project is not planned to increase quarry related traffic; it expands access to reserves. Existing historical
traffic volumes are provided in this document.
2.Merge analysis will be performed on the I-81 ramps.
3.An Operational Analysis will be performed where roadways are proposed to be removed or rerouted, to
include:
+ Analysis of current routes, traffic volumes, and travel times
+Identification of proposed road closures and relocations
+Identification of routes receiving diverted trips
+Analysis of routes receiving diverted trips
+Identification of areas that will be impacted
+Quantify the current and rerouted travel times
+Evaluate each property for access to a public roadway or dedicated ingress/egress easement
SIGNED: _______________________ DATE: ______________
Applicant or Consultant
PRINT NAME: _____________________________
Applicant or Consultant
3/23/22
Tim Stowe
76
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
77
24 HR
Classified
Count
Study
Intersection
Study
Intersection
Study
Intersection
Quarry Ent
24 HR
Classified
Count
Study
Intersection
327.9 AC +/-
Exit 323
Exit 321
PROJECT
LOCATION
Study
Intersection
Quarry Ent
PROPOSED TRAFFIC COUNT LOCATIONSCARMEUSE REZONINGFREDERICK COUNTY, VArev. 3/23/22
78
40%
40%
10%
4%
4%
2%
327.9 AC +/-
Exit 323
Exit 321
PROJECT
LOCATION
PROPOSED TRIP DISTRIBUTIONCARMEUSE REZONINGFREDERICK COUNTY, VA79
Stowe Engineering, PLC
Tel 540.686.7373
Fax 540.301.1100
103 Heath Court
Winchester, VA 22602
01.17.2022 Memo
Background: Carmeuse Lime and Stone request the rezoning of 327.9 acres from RA to EM
zoning. The rezoning will allow Carmeuse to gain access to additional reserves to continue
operations at current levels. There is no plan to increase production, and therefore traffic is
expected to remain unchanged from present-day traffic volumes.
In recent years Carmeuse has relied heavily on rail to move large amounts of aggregate out of
the area. Locally, trucks transport aggregate, lime, and milled limestone. Almost all trucks
come from or head to the west on Brucetown Road. From there, the rips disburse on Route 11
or I-81.
The Institute for Transportation Engineer's Trip Generation Manual, the 11th edition, does not
have a land use category for surface mines. Therefore, historical count data and current
turning movement counts have been used to quantify the existing trips generated at the
Carmeuse plant in Clear Brook, VA.
Truck Design Hourly Volume: Carmeuse weighs all customer aggregate trucks when they
leave the property. All customer lime and milled limestone trucks cross the scales on arrival
and departure from the property. This action provides a historical record of the total number of
trucks leaving the property. Table 1 and Figure 1 on the following pages show the monthly and
daily average number of trucks crossing the scales in each of the last four years. The monthly
average number of trucks for each of the past 4 years was ordered from highest to lowest and
plotted from this data. See Table 2 and Figure 2. By evaluating the slope of the line, it
becomes easy to identify an overall daily design volume at 200 trucks/day based on the line's
upper break point.
Trip Generation: The daily design volume of trucks is 43% greater than the actual volume of
trucks that crossed the scales on November 16, 2021, the day the turning movement counts
were collected at the Carmeuse entrance. To calculate the average AM and PM peak hour
trips at the entrance, the peak hour turning movement volumes entering and leaving the site
was increased by 43%. The result is presented in Table 3, which also provides a breakdown of
non-customer trips, including 90 employees, 30 contractor employees (average), and 15 trips
for goods and services.
To
VDOT Land Use
Engineer, Edinburg, VA.
From
Tim Stowe
Stowe Engineering, PLC
CC
Transportation Planning,
Staunton Dist
Re
Traffic Study for
Carmeuse Rezoning,
Clear Brook, VA
80
01.17.2022 Memo Pg.02
Variations in the traffic volumes at Carmeuse are seasonal. And while the traffic data collected
for the Traffic Impact Analysis will include all Carmeuse related peak hour trips, the values
shown in Table 3 provide a conservative average of the daily and peak hour trips.
81
2018 2019 2020 2021 Notes
Jan 5006 2483 4101 2801
Feb 4451 1976 3146 2339
March 3788 3182 3468 3855
April 5155 3932 3825 3486
May 5181 4262 4096 3086
June 5223 4445 4308 4362
July 4699 4206 3950 3671
Aug 4106 4550 3140 3630
Sept 3652 6759 3553 3386
Oct 4380 6743 5082 3765
Nov 3733 3451 3281 3142 Nov 2021 Average = 126/day
Dec 3053 2711 2391 3389
Total 52427 48700 44341 40912
Month Truck Avg 4,369 4,058 3,695 3,656
Daily Truck Avg 175 162 148 146 Using 25 days per month(excluding Sat's)
TABLE 1. MONTHLY TRUCK VOLUMES CROSSING SCALES
Carmeuse Lime and Stone
Clear Brook, VA
82
0
1000
2000
3000
4000
5000
6000
7000
8000
Jan Feb March April May June July Aug Sept Oct Nov Dec
Figure 1. Monthly Truck Volumes Crossing Scales
2018 2019 2020 2021
83
2018
2018
Daily
Average
2019
2019
Daily
Average
2020
2020
Daily
Average
2021
2021
Daily
Average
Jan 5006 200 2483 99 4101 164 2801 112
Feb 4451 178 1976 79 3146 126 2339 94 = Max
March 3788 152 3182 127 3468 139 3855 154
April 5155 206 3932 157 3825 153 3486 139 = Min
May 5181 207 4262 170 4096 164 3086 123
June 5223 209 4445 178 4308 172 4362 174
July 4699 188 4206 168 3950 158 3671 147
Aug 4106 164 4550 182 3140 126 3630 145
Sept 3652 146 6759 270 3553 142 3386 135
Oct 4380 175 6743 270 5082 203 3765 151
Nov 3733 149 3451 138 3281 131 3142 126
Dec 3053 122 2711 108 2391 96 3389 136
Table 2. Average Daily Truck Volumes Crossing Scales
Carmeuse Lime and Stone
Clear Brook, Virginia
84
0
50
100
150
200
250
300
Figure 2. Average Daily Truck Volume Crossing Scales
January 2018 to December 2021
Design Point
=200
Max
Min
85
enter exit enter exit
Design Volume Daily Trucks @
scales (from graph)200 45 10 3 27 400
Employees (90+/-)90 20 5 1 12 180
Contractor Employees (30+/-)30 7 2 0 4 60
Goods and Services deliveries
(15+/-)15 3 1 0 2 30
Total Carmeuse Traffic 335 76 17 4 46 670
Note 1 11/16/21 peak hour turning movement volumes have been increased by 43% to align with the design hour daily
values
AM PM
Table 3. Peak Hour Traffic Volumes
Carmeuse Lime and Stone Quarry
Clear Brook, Frederick County, VA
14-Jan-22
Source: Carmeuse &11/16/21 Traffic Count Data
Peak Hour1
Traffic Generator One Way
Volume
ADT = One-Way
Volume * 2
86
87
88
89
enter exit enter exit
Design Volume Daily Trucks @
scales (from graph)200 45 10 3 27 400
Employees (90+/-)90 20 5 1 12 180
Contractor Employees (30+/-)30 7 2 0 4 60
Goods and Services deliveries
(15+/-)15 3 1 0 2 30
Total Carmeuse Traffic 335 76 17 4 46 670
Note 1 11/16/21 peak hour turning movement volumes have been increased by 43% to align with the design hour daily
values
AM PM
Table 3. Peak Hour Traffic Volumes
Carmeuse Lime and Stone Quarry
Clear Brook, Frederick County, VA
14-Jan-22
Source: Carmeuse &11/16/21 Traffic Count Data
Peak Hour1
Traffic Generator One Way
Volume
ADT = One-Way
Volume * 2
90
Appendix B
Traffic Count Data
91
CARS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 NB On Ramp - I-81 NB Off Ramp Date: November 16, 2021 Tuesday
and: Route 672 (Hopewell Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 3
TOTAL
on: I-81 NB On Ramp on: I-81 NB Off Ramp on:Route 672 (Hopewell Rd)on:Route 672 (Hopewell Rd)N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:1500000510061412002609301244
6:15 - 6:300000012100131620003609501463
6:30 - 6:450000020000208130021027102869
6:45 - 7:0000000190302213230036032103391
7:00 - 7:1500000150301814260040034503997
7:15 - 7:30000001603019133100440472049112
7:30 - 7:45000002125028253600610850186175
7:45 - 8:0000000170101892100300645069117
8:00 - 8:1500000160101710210031048305199
8:15 - 8:3000000100501592200310537060106
8:30 - 8:4500000130201510290140039404398
8:45 - 9:000000014040182330035030303386
3 Hr Totals 0000017842702091432870143104773915171157
1 Hr Totals
6:00 - 7:0000000562306151680011907710087267
6:15 - 7:150000066160735182001330102120114320
6:30 - 7:30000007009079489300141014090149369
6:45 - 7:4500000712140876511600181019881207475
7:00 - 8:00000006921208361114001750230121243501
7:15 - 8:15000007021008257109001660244101255503
7:30 - 8:30000006421207853100001530250151266497
7:45 - 8:450000056090653893011320204190223420
8:00 - 9:00000005301206531105011370170170187389
PEAK HOUR
7:00 - 8:00 000006921208361114001750230121243501
PM
3:00 - 3:150000024050299290038013501885
3:15 - 3:30000002215028243800620226028118
3:30 - 3:4500000220150371920003901611027103
3:45 - 4:00000001605021155400690287035125
4:00 - 4:150000014180231841005902014034116
4:15 - 4:30000002209031244200660328040137
4:30 - 4:450000017060232653007901826044146
4:45 - 5:00000002107028154300580228030116
5:00 - 5:1500000190130322436006002713040132
5:15 - 5:3000000190110301359007203915054156
5:30 - 5:450000017017034144400580209029121
5:45 - 6:00000001601102713280041023102492
3 Hr Totals 000002292112034321448700701028012304031447
1 Hr Totals
3:00 - 4:00000008413001156714100208079290108431
3:15 - 4:15000007423301097615300229086380124462
3:30 - 4:30000007413701127615700233096400136481
3:45 - 4:4500000691280988319000273098550153524
4:00 - 5:00000007413001058317900262092560148515
4:15 - 5:15000007903501148917400263099550154531
4:30 - 5:300000076037011378191002690106620168550
4:45 - 5:450000076048012466182002480108450153525
5:00 - 6:000000071052012364167002310109380147501
PEAK HOUR
4:30 - 5:30 0010176037011378191002690106620168551
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
92
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 SB Off Ramp - I-81 SB On Ramp Date: November 16, 2021 Tuesday
and: Route 672 (Hopewell Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: I-81 SB Off Ramp on: I-81 SB On Ramp on: Route 672 (Hopewell Rd) on: Route 672 (Hopewell Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15007070000001130143500829
6:15 - 6:30411001500000051902468001453
6:30 - 6:454020024000000412016811001959
6:45 - 7:00160250410000001119030714002192
7:00 - 7:1550270320000008240321022003296
7:15 - 7:302414106600000015200356180024125
7:30 - 7:458218401670010103650411170018227
7:45 - 8:0012026601880000001930223120015225
8:00 - 8:15532410960000001840221170018136
8:15 - 8:30205450700000002061274210126123
8:30 - 8:451432103800000016262448190027109
8:45 - 9:00321702200000016330498260034105
3 Hr Totals 345174040766001010169184335665190012561379
1 Hr Totals
6:00 - 7:0024162087000000216308424380062233
6:15 - 7:152918201120000002874010231550086300
6:30 - 7:3049111301630000003875011331650096372
6:45 - 7:45127217703060010107068013824710095540
7:00 - 8:00231421804530010107852013020690089673
7:15 - 8:15279623205170010108832012011640075713
7:30 - 8:30275102360521001010931811129670177711
7:45 - 8:452071217303920000007339311516690186593
8:00 - 9:009012124022600000070693142218301105473
PEAK HOUR
7:15 - 8:15 279623205170010108832012011640075713
PM
3:00 - 3:153090120000001918037114001564
3:15 - 3:303090120000001928047521002685
3:30 - 3:457070140000002317040524002983
3:45 - 4:00101401500000030390696260032116
4:00 - 4:15501502000000027280555230028103
4:15 - 4:30211601900000025280536250031103
4:30 - 4:45301101400000028320600360036110
4:45 - 5:0040150190000002429053819002799
5:00 - 5:15101201300000031260576330039109
5:15 - 5:30101902000000021480698370045134
5:30 - 5:45301301600000031330643200023103
5:45 - 6:0030130160000001526041113001471
3 Hr Totals 3611530190000000293352064554291003451180
1 Hr Totals
3:00 - 4:0014039053000000911020193178500102348
3:15 - 4:1516045061000000991120211219400115387
3:30 - 4:30151520680000001051120217229800120405
3:45 - 4:451115606800000011012702371711000127432
4:00 - 5:001415707200000010411702211910300122415
4:15 - 5:151015406500000010811502232011300133421
4:30 - 5:30905706600000010413502392212500147452
4:45 - 5:45905906800000010713602432510900134445
5:00 - 6:0080570650000009813302311810300121417
PEAK HOUR
4:30 - 5:30 905706600000010413502392212500147452
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
93
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: Quarry Rd - Quarry Entrance Date: November 16, 2021 Tuesday
and: Route 672 (Brucetown Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: Quarry Rd on: Quarry Entrance on: Route 672 (Brucetown Rd) on: Route 672 (Brucetown Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15000000080801620181300430
6:15 - 6:300000000202025002576001340
6:30 - 6:45000000020201700171413002746
6:45 - 7:00000000040402200221810002854
7:00 - 7:1500000002020250025168002451
7:15 - 7:30000000020203000301311002456
7:30 - 7:450000000404032003265001147
7:45 - 8:0000000005050220022413001744
8:00 - 8:1500000002020220022713002044
8:15 - 8:3000000003030240024810001845
8:30 - 8:450000000707036003665001154
8:45 - 9:0000000104050230023621002755
3 Hr Totals 00000104504602942029610611800224566
1 Hr Totals
6:00 - 7:00000000016016080208240320072170
6:15 - 7:15000000010010089008955370092191
6:30 - 7:300000000100100940094614200103207
6:45 - 7:4500000001201201090010953340087208
7:00 - 8:0000000001301301090010939370076198
7:15 - 8:1500000001301301060010630420072191
7:30 - 8:3000000001401401000010025410066180
7:45 - 8:4500000001701701040010425410066187
8:00 - 9:0000000101601701050010527490076198
PEAK HOUR
6:45 - 7:45 00000001201201090010953340087208
PM
3:00 - 3:1500000106070130013616002242
3:15 - 3:3000000008080210021223002554
3:30 - 3:4500000005160220022432003664
3:45 - 4:0000000006060290029127002863
4:00 - 4:150000000170170150015127002860
4:15 - 4:3000000006060290029030003065
4:30 - 4:4500000004040150015224002645
4:45 - 5:0000000004040250025129003059
5:00 - 5:150000000110110240024032003267
5:15 - 5:300000020160180350035234003689
5:30 - 5:4500000001010170017028002846
5:45 - 6:0000000000000140014535004054
3 Hr Totals 0000030841880259002592433700361708
1 Hr Totals
3:00 - 4:000000010251270850085139800111223
3:15 - 4:150000000361370870087810900117241
3:30 - 4:300000000341350950095611600122252
3:45 - 4:450000000330330880088410800112233
4:00 - 5:000000000310310840084411000114229
4:15 - 5:150000000250250930093311500118236
4:30 - 5:300000020350370990099511900124260
4:45 - 5:45000002032034010100101312300126261
5:00 - 6:000000020280300900090712900136256
PEAK HOUR
4:45 - 5:45 000002032034010100101312300126261
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
94
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 18, 2021 Thursday
and: Branson Spring Rd Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: US 11 on: US 11 on: Branson Spring Rd on: N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:1503300331240025000000000058
6:15 - 6:3006000601210022000000000082
6:30 - 6:4506210630330033100010000097
6:45 - 7:00080008023600382000200000120
7:00 - 7:1505310542330035001010000090
7:15 - 7:30061006114600471010200000110
7:30 - 7:45099009902700272000200000128
7:45 - 8:00088008803700370010100000126
8:00 - 8:1505400540270128001010000083
8:15 - 8:30060006004100410030300000104
8:30 - 8:45063306623200341000100000101
8:45 - 9:0004210431450046002020000091
3 Hr Totals 0755607611040201413709016000001190
1 Hr Totals
6:00 - 7:000235102364114001183000300000357
6:15 - 7:150255202575123001283010400000389
6:30 - 7:300256202585148001534020600000417
6:45 - 7:450293102945142001475020700000448
7:00 - 8:000301103023143001463030600000454
7:15 - 8:150302003021137011393030600000447
7:30 - 8:300301003010132011332050700000441
7:45 - 8:450265302682137011401050600000414
8:00 - 9:000219402233145011491060700000379
PEAK HOUR
7:00 - 8:00 0301103023143001463030600000454
PM
3:00 - 3:15042304508300832000200000130
3:15 - 3:30042004207600760000000000118
3:30 - 3:45050005029600981020300000151
3:45 - 4:0005610572108001101020300000170
4:00 - 4:1505500550115001151000100000171
4:15 - 4:3005510562102001040010100000161
4:30 - 4:4506710680102001020020200000172
4:45 - 5:0006500650112001120010100000178
5:00 - 5:1505310540120001202010300000177
5:15 - 5:3005300530102001021000100000156
5:30 - 5:4506100613119001220000000000183
5:45 - 6:0004200421105011070000000000149
3 Hr Totals 0 641 7 0 648 10 1240 0 1 1251 809017000001916
1 Hr Totals
3:00 - 4:000190401944363003674040800000569
3:15 - 4:150203102044395003993040700000610
3:30 - 4:300216202186421004273050800000653
3:45 - 4:450233302364427004312050700000674
4:00 - 5:000242202442431004331040500000682
4:15 - 5:150240302432436004382050700000688
4:30 - 5:300238202400436004363040700000683
4:45 - 5:450232102333453004563020500000694
5:00 - 6:000209102104446014513010400000665
PEAK HOUR
4:45 - 5:45 0232102333453004563020500000694
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
95
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 16, 2021 Tuesday
and: Route 672 (Brucetown Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: US 11 on: US 11 on: Route 672 (Brucetown Rd) on: N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15 0 49 0 0 49 6 20 0 0 26 4 0 23 0 27 0 0 0 0 0 102
6:15 - 6:30 0 71 1 0 72 12 29 0 0 41 4 0 18 0 22 0 0 0 0 0 135
6:30 - 6:45 0 57 3 0 60 30 30 0 0 60 1 0 19 0 20 0 0 0 0 0 140
6:45 - 7:00 0 70 6 0 76 29 33 0 0 62 5 0 26 0 31 0 0 0 0 0 169
7:00 - 7:15 0 63 8 0 71 26 36 0 0 62 3 0 30 0 33 0 0 0 0 0 166
7:15 - 7:30 0 74 7 0 81 18 43 0 0 61 4 0 37 0 41 0 0 0 0 0 183
7:30 - 7:45 0 89 0 0 89 14 43 0 0 57 2 0 32 0 34 0 0 0 0 0 180
7:45 - 8:00 0 94 5 0 99 28 36 0 0 64 6 0 27 0 33 0 0 0 0 0 196
8:00 - 8:15 0 80 5 0 85 19 43 0 0 62 2 0 27 0 29 0 0 0 0 0 176
8:15 - 8:30 0 98 1 0 99 16 25 0 0 41 3 0 22 0 25 0 0 0 0 0 165
8:30 - 8:45 0 91 2 0 93 14 30 0 0 44 1 0 44 0 45 0 0 0 0 0 182
8:45 - 9:00 0 93 5 0 98 25 43 0 0 68 6 0 30 0 36 0 0 0 0 0 202
3 Hr Totals 0 929 43 0 972 237 411 0 0 648 41 0 335 0 376 0 0 0 0 0 1996
1 Hr Totals
6:00 - 7:00 0 247 10 0 257 77 112 0 0 189 14 0 86 0 100 0 0 0 0 0 546
6:15 - 7:15 0 261 18 0 279 97 128 0 0 225 13 0 93 0 106 0 0 0 0 0 610
6:30 - 7:30 0 264 24 0 288 103 142 0 0 245 13 0 112 0 125 0 0 0 0 0 658
6:45 - 7:45 0 296 21 0 317 87 155 0 0 242 14 0 125 0 139 0 0 0 0 0 698
7:00 - 8:00 0 320 20 0 340 86 158 0 0 244 15 0 126 0 141 0 0 0 0 0 725
7:15 - 8:15 0 337 17 0 354 79 165 0 0 244 14 0 123 0 137 0 0 0 0 0 735
7:30 - 8:30 0 361 11 0 372 77 147 0 0 224 13 0 108 0 121 0 0 0 0 0 717
7:45 - 8:45 0 363 13 0 376 77 134 0 0 211 12 0 120 0 132 0 0 0 0 0 719
8:00 - 9:00 0 362 13 0 375 74 141 0 0 215 12 0 123 0 135 0 0 0 0 0 725
PEAK HOUR
7:15 - 8:15 0 337 17 0 354 79 165 0 0 244 14 0 123 0 137 0 0 0 0 0 735
PM
3:00 - 3:15 0 57 7 0 64 22 90 0 0 112 5 0 23 0 28 0 0 0 0 0 204
3:15 - 3:30 0 42 7 0 49 30 75 0 0 105 11 0 32 0 43 0 0 0 0 0 197
3:30 - 3:45 0 54 7 0 61 43 98 0 0 141 9 0 24 0 33 0 0 0 0 0 235
3:45 - 4:00 0 77 6 0 83 31 102 0 0 133 9 0 37 0 46 0 0 0 0 0 262
4:00 - 4:15 0 46 6 0 52 29 113 0 0 142 11 0 33 0 44 0 0 0 0 0 238
4:15 - 4:30 0 58 5 0 63 28 111 0 0 139 11 0 36 0 47 0 0 0 0 0 249
4:30 - 4:45 0 50 4 0 54 26 97 0 0 123 6 0 25 0 31 0 0 0 0 0 208
4:45 - 5:00 0 56 8 0 64 29 110 0 0 139 7 0 29 0 36 0 0 0 0 0 239
5:00 - 5:15 0 74 3 0 77 33 98 0 0 131 6 0 31 0 37 0 0 0 0 0 245
5:15 - 5:30 0 58 4 0 62 32 113 0 0 145 3 0 51 0 54 0 0 0 0 0 261
5:30 - 5:45 0 76 0 0 76 34 102 0 0 136 7 0 21 0 28 0 0 0 0 0 240
5:45 - 6:00 0 49 6 0 55 36 103 0 0 139 6 0 15 0 21 0 0 0 0 0 215
3 Hr Totals 0 697 63 0 760 373 1212 0 0 1585 91 0 357 0 448 0 0 0 0 0 2793
1 Hr Totals
3:00 - 4:00 0 230 27 0 257 126 365 0 0 491 34 0 116 0 150 0 0 0 0 0 898
3:15 - 4:15 0 219 26 0 245 133 388 0 0 521 40 0 126 0 166 0 0 0 0 0 932
3:30 - 4:30 0 235 24 0 259 131 424 0 0 555 40 0 130 0 170 0 0 0 0 0 984
PHF 0.76 0.86 0.76 0.94 0.91 0.88 0.97
%T 5.5% 4.2% 6.1% 4.7% 2.5% 6.9% 1.4%
3:45 - 4:45 0 231 21 0 252 114 423 0 0 537 37 0 131 0 168 0 0 0 0 0 957
4:00 - 5:00 0 210 23 0 233 112 431 0 0 543 35 0 123 0 158 0 0 0 0 0 934
4:15 - 5:15 0 238 20 0 258 116 416 0 0 532 30 0 121 0 151 0 0 0 0 0 941
4:30 - 5:30 0 238 19 0 257 120 418 0 0 538 22 0 136 0 158 0 0 0 0 0 953
4:45 - 5:45 0 264 15 0 279 128 423 0 0 551 23 0 132 0 155 0 0 0 0 0 985
5:00 - 6:00 0 257 13 0 270 135 416 0 0 551 22 0 118 0 140 0 0 0 0 0 961
PEAK HOUR
4:45 - 5:45 0 264 15 0 279 128 423 0 0 551 23 0 132 0 155 0 0 0 0 0 985
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
96
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 16, 2021 Tuesday
and: Route 672 (Brucetown Rd-Hopewell Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: US 11 on: US 11 on: Route 672 (Brucetown Rd) on: Route 672 (Hopewell Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15 8 39 0 0 47 3 16 11 0 30 4 11 12 0 27 7 3 4 0 14 118
6:15 - 6:30 9 63 1 0 73 5 23 16 0 44 4 8 10 0 22 5 7 6 0 18 157
6:30 - 6:4585030611221904219701714179040160
6:45 - 7:00 7 62 4 0 73 13 27 17 0 57 5 16 10 0 31 17 15 6 0 38 199
7:00 - 7:15 17 46 7 0 70 9 31 13 0 53 3 14 15 0 32 18 18 4 0 40 195
7:15 - 7:30 18 58 6 0 82 10 36 17 0 63 3 20 12 0 35 23 7 9 0 39 219
7:30 - 7:45 13 74 0 0 87 2 37 24 0 63 2 16 18 0 36 98 10 6 0 114 300
7:45 - 8:00 7 88 5 0 100 11 27 9 0 47 5 15 12 0 32 73 17 9 0 99 278
8:00 - 8:15 7 72 5 0 84 6 33 19 0 58 3 7 19 0 29 60 13 10 0 83 254
8:15 - 8:30 9 87 1 0 97 9 18 22 0 49 3 6 15 0 24 49 7 6 0 62 232
8:30 - 8:45 21 70 3 0 94 5 21 10 0 36 4 21 23 0 48 40 9 7 0 56 234
8:45 - 9:00 30 66 5 0 101 18 33 8 0 59 6 11 19 0 36 36 6 10 0 52 248
3 Hr Totals 154 775 40 0 969 103 323 175 0 601 43 154 172 0 369 440 129 86 0 655 2594
1 Hr Totals
6:00 - 7:00 32 214 8 0 254 33 87 53 0 173 14 44 39 0 97 43 42 25 0 110 634
6:15 - 7:15 41 221 15 0 277 39 102 55 0 196 13 47 42 0 102 54 57 25 0 136 711
6:30 - 7:30 50 216 20 0 286 44 115 56 0 215 12 59 44 0 115 72 57 28 0 157 773
6:45 - 7:45 55 240 17 0 312 34 131 71 0 236 13 66 55 0 134 156 50 25 0 231 913
7:00 - 8:00 55 266 18 0 339 32 131 63 0 226 13 65 57 0 135 212 52 28 0 292 992
7:15 - 8:15 45 292 16 0 353 29 133 69 0 231 13 58 61 0 132 254 47 34 0 335 1051
7:30 - 8:30 36 321 11 0 368 28 115 74 0 217 13 44 64 0 121 280 47 31 0 358 1064
7:45 - 8:45 44 317 14 0 375 31 99 60 0 190 15 49 69 0 133 222 46 32 0 300 998
8:00 - 9:00 67 295 14 0 376 38 105 59 0 202 16 45 76 0 137 185 35 33 0 253 968
PEAK HOUR
7:30 - 8:30 36 321 11 0 368 28 115 74 0 217 13 44 64 0 121 280 47 31 0 358 1064
PM
3:00 - 3:15 16 49 7 0 72 13 70 14 0 97 5 15 5 0 25 13 8 18 0 39 233
3:15 - 3:30 12 41 7 0 60 17 61 22 0 100 11 21 13 0 45 15 14 11 0 40 245
3:30 - 3:45 8 64 6 0 78 22 82 23 0 127 7 8 16 0 31 13 19 17 0 49 285
3:45 - 4:00 22 70 6 0 98 17 89 24 0 130 9 16 14 0 39 17 13 13 0 43 310
4:00 - 4:15 14 38 6 0 58 18 94 25 0 137 10 21 10 0 41 13 11 19 0 43 279
4:15 - 4:30 15 42 4 0 61 10 90 28 0 128 10 19 16 0 45 15 13 19 0 47 281
4:30 - 4:45 14 36 4 0 54 15 81 28 0 124 6 16 10 0 32 15 10 17 0 42 252
4:45 - 5:00 16 40 7 0 63 14 101 23 0 138 6 13 15 0 34 18 16 10 0 44 279
5:00 - 5:15 21 53 3 0 77 14 82 25 0 121 6 14 16 0 36 23 19 15 0 57 291
5:15 - 5:30 10 48 4 0 62 17 97 24 0 138 3 35 16 0 54 23 15 13 0 51 305
5:30 - 5:45 15 61 0 0 76 24 91 12 0 127 7 17 4 0 28 19 9 15 0 43 274
5:45 - 6:00104040541886190123687021111915045243
3 Hr Totals 173 582 58 0 813 199 1024 267 0 1490 86 203 142 0 431 195 166 182 0 543 3277
1 Hr Totals
3:00 - 4:00 58 224 26 0 308 69 302 83 0 454 32 60 48 0 140 58 54 59 0 171 1073
3:15 - 4:15 56 213 25 0 294 74 326 94 0 494 37 66 53 0 156 58 57 60 0 175 1119
3:30 - 4:30 59 214 22 0 295 67 355 100 0 522 36 64 56 0 156 58 56 68 0 182 1155
3:45 - 4:45 65 186 20 0 271 60 354 105 0 519 35 72 50 0 157 60 47 68 0 175 1122
4:00 - 5:00 59 156 21 0 236 57 366 104 0 527 32 69 51 0 152 61 50 65 0 176 1091
4:15 - 5:15 66 171 18 0 255 53 354 104 0 511 28 62 57 0 147 71 58 61 0 190 1103
4:30 - 5:30 61 177 18 0 256 60 361 100 0 521 21 78 57 0 156 79 60 55 0 194 1127
4:45 - 5:45 62 202 14 0 278 69 371 84 0 524 22 79 51 0 152 83 59 53 0 195 1149
5:00 - 6:00 56 202 11 0 269 73 356 80 0 509 22 74 43 0 139 76 62 58 0 196 1113
PEAK HOUR
3:30 - 4:30 59 214 22 0 295 67 355 100 0 522 36 64 56 0 156 58 56 68 0 182 1155
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
97
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 16, 2021 Tuesday
and: Route 672 (Hopewell Rd) Weather: Cool, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: US 11 on: US 11 on: on: Route 672 (Hopewell Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15195100700191103000000706013113
6:15 - 6:301773009002716043000005013018151
6:30 - 6:452057007703390420000014027041160
6:45 - 7:0024720096039170560000017021038190
7:00 - 7:1531610092040130530000018022040185
7:15 - 7:30387000108045170620000024016040210
7:30 - 7:452991001200392406300000980160114297
7:45 - 8:00221000012203490430000073026099264
8:00 - 8:15169000106036200560000061022083245
8:15 - 8:301610200118023220450000049014063226
8:30 - 8:45429300135026100360000039016055226
8:45 - 9:0040840012404980570000039017056237
3 Hr Totals 314 944 0 0 1258 0 410 176 0 586 00000444021606602504
1 Hr Totals
6:00 - 7:008025300333011853017100000430670110614
6:15 - 7:159226300355013955019400000540830137686
6:30 - 7:3011326000373015756021300000730860159745
6:45 - 7:45122294004160163710234000001570750232882
7:00 - 8:00120322004420158630221000002130800293956
7:15 - 8:151053510045601547002240000025608003361016
7:30 - 8:30833830046601327502070000028107803591032
7:45 - 8:4596385004810119610180000002220780300961
8:00 - 9:00114369004830134600194000001880690257934
PEAK HOUR
7:30 - 8:30 833830046601327502070000028107803591032
PM
3:00 - 3:1529480077083140970000012026038212
3:15 - 3:3032410073076210970000015021036206
3:30 - 3:451763008001042401280000013034047255
3:45 - 4:0042700011201042501290000017024041282
4:00 - 4:153548008301122401360000013030043262
4:15 - 4:303556009101012601270000014036050268
4:30 - 4:45304600760962901250000013027040241
4:45 - 5:003053008301152201370000017025042262
5:00 - 5:153870001080972501220000023034057287
5:15 - 5:3045640010901162401400000023030053302
5:30 - 5:453265009701111301240000018024042263
5:45 - 6:001847006501061801240000011033044233
3 Hr Totals 383 671 0 0 1054 0 1221 265 0 1486 00000189034405333073
1 Hr Totals
3:00 - 4:00120222003420367840451000005701050162955
3:15 - 4:151262220034803969404900000058010901671005
3:30 - 4:301292370036604219905200000057012401811067
PHF 0.77 0.85 0.94 0.95 0.84 0.86
%T 10% 3% 5% 8% 9% 5%
3:45 - 4:4514222000362041310405170000057011701741053
4:00 - 5:0013020300333042410105250000057011801751033
4:15 - 5:1513322500358040910205110000067012201891058
4:30 - 5:3014323300376042410005240000076011601921092
4:45 - 5:451492520040104398405230000081011301941118
5:00 - 6:001332460037904308005100000075012101961085
PEAK HOUR
4:45 - 5:45 1452520039704398405230000081011301941114
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
98
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 NB On-Off Ramp Date: May 17, 2022 Tuesday
and: Route 672 (Hopewell Rd) Weather: Warm, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: I-81 NB On-Off Ramp on: I-81 NB On-Off Ramp on: Route 672 (Hopewell Rd) on: Route 672 (Hopewell Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:150000080201012490061010301384
6:15 - 6:300000011010128570065015401996
6:30 - 6:4500000290103014210035023402792
6:45 - 7:00000001711019162600420318039100
7:00 - 7:1500000100201216290045030223491
7:15 - 7:30000001806024203900590317038121
7:30 - 7:45000001908027253300580314035120
7:45 - 8:0000000151301912370049020602694
8:00 - 8:1500000162402210230033028603489
8:15 - 8:30000001601017103400440355040101
8:30 - 8:450000016050219310040030003091
8:45 - 9:000000090201112350047025603189
3 Hr Totals 0000018443602241644140057803095523661168
1 Hr Totals
6:00 - 7:00000006515071501530020307919098372
6:15 - 7:150000067150735413300187099182119379
6:30 - 7:30000007411008566115001810115212138404
6:45 - 7:45000006411708277127002040123212146432
7:00 - 8:00000006211908273138002110112192133426
7:15 - 8:15000006832109267132001990110230133424
7:30 - 8:30000006631608557127001840114210135404
7:45 - 8:45000006331307941125001660113170130375
8:00 - 9:00000005721207141123001640118170135370
PEAK HOUR
6:45 - 7:45 000006411708277127002040123212146432
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
99
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 SB Off-On Ramp Date: May 17, 2022 Tuesday
and: Route 672 (Hopewell Rd) Weather: Warm, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: I-81 SB Off-On Ramp on: I-81 SB Off-On Ramp on: Route 672 (Hopewell Rd) on: Route 672 (Hopewell Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:150050500000064605278001572
6:15 - 6:30401311800000055305886001490
6:30 - 6:454116021000000913022612001861
6:45 - 7:0015023038000000223025914002386
7:00 - 7:158019027000000924033716002383
7:15 - 7:3050200250000001329042619002592
7:30 - 7:45100180280000001330043215001788
7:45 - 8:0090140230000001523038312001576
8:00 - 8:155018023000000619025716002371
8:15 - 8:304017021000000828036522002784
8:30 - 8:4530140170000001026036416002073
8:45 - 9:0000120120000001720037719002675
3 Hr Totals 671189125800000011333404477117500246951
1 Hr Totals
6:00 - 7:002315718200000022135015730400070309
6:15 - 7:1531171110400000025113013830480078320
6:30 - 7:303217801110000003389012228610089322
6:45 - 7:4538080011800000037106014324640088349
7:00 - 8:0032071010300000050106015618620080339
7:15 - 8:152907009900000047101014818620080327
7:30 - 8:302806709500000042100014217650082319
7:45 - 8:45210630840000003996013519660085304
8:00 - 9:00120610730000004193013423730096303
PEAK HOUR
6:45 - 7:45 38080011800000037106014324640088349
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
100
TOTALS TURNING MOVEMENT COUNT - SUMMARYCounted by: VCUIntersection of: US 11 Date: May 17, 2022 Tuesdayand: Brucetown Rd-Hopewell Rd Weather: Warm, ClearLocation: Frederick County, Virginia Entered by: CK Star Rating: 3TOTALon: US 11 on: US 11 on: Brucetown Rd-Hopewell Rd on: Brucetown Rd-Hopewell Rd N + STIME+RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTALE + WAM6:00 - 6:15419610138210902111070182850151926:15 - 6:3047817013582790441850146940192126:30 - 6:45 12 78 4 0 94 6 18 10 0 34 5 13 9 0 27 13 18 9 0 40 1956:45 - 7:00 8 60 3 0 71 11 29 17 0 57 3 17 16 0 36 21 19 5 0 45 2097:00 - 7:15 15 59 5 0 79 6 34 14 0 54 4 17 9 0 30 18 7 4 0 29 1927:15 - 7:30 18 62 4 0 84 9 29 20 0 58 3 17 11 0 31 16 11 13 0 40 2137:30 - 7:45 17 69 2 0 88 6 27 20 0 53 7 18 17 0 42 16 15 9 0 40 2237:45 - 8:00 15 71 5 0 91 10 35 11 0 56 5 13 11 0 29 12 10 8 0 30 2068:00 - 8:15 5 43 5 0 53 9 25 9 0 43 5 12 10 0 27 20 7 13 0 40 1638:15 - 8:30 14 58 0 0 72 3 35 7 0 45 4 21 20 0 45 19 15 7 0 41 2038:30 - 8:45 13 57 5 0 75 6 39 7 0 52 4 13 14 0 31 22 5 11 0 38 1968:45 - 9:00 16 58 8 0 82 12 46 18 0 76 4 7 13 0 24 15 8 11 0 34 2163 Hr Totals221 792 49 0 1062 88 354 151 0 593 46 166 142 0 354 180 132 99 0 411 24201 Hr Totals6:00 - 7:00 108 315 15 0 438 27 84 45 0 156 10 48 37 0 95 42 54 23 0 119 8086:15 - 7:15 82 278 19 0 379 31 108 50 0 189 13 55 39 0 107 58 53 22 0 133 8086:30 - 7:30 53 259 16 0 328 32 110 61 0 203 15 64 45 0 124 68 55 31 0 154 8096:45 - 7:45 58 250 14 0 322 32 119 71 0 222 17 69 53 0 139 71 52 31 0 154 8377:00 - 8:00 65 261 16 0 342 31 125 65 0 221 19 65 48 0 132 62 43 34 0 139 8347:15 - 8:15 55 245 16 0 316 34 116 60 0 210 20 60 49 0 129 64 43 43 0 150 8057:30 - 8:30 51 241 12 0 304 28 122 47 0 197 21 64 58 0 143 67 47 37 0 151 7957:45 - 8:45 47 229 15 0 291 28 134 34 0 196 18 59 55 0 132 73 37 39 0 149 7688:00 - 9:00 48 216 18 0 282 30 145 41 0 216 17 53 57 0 127 76 35 42 0 153 778PEAK HOUR6:45 - 7:4558 250 14 0 322 32 119 71 0 222 17 69 53 0 139 71 52 31 0 154 837TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
101
CARS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: May 17, 2022 Tuesday
and: Route 672 (Brucetown Rd) Weather: Warm, Clear
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: US 11 on: US 11 on: Route 672 (Brucetown Rd) on: N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15 132 1 0 133 10 15 0 25 1 14 0 15 0 173
6:15 - 6:30 127 3 0 130 18 29 0 47 0 12 0 12 0 189
6:30 - 6:45 85 2 0 87 18 25 0 43 4 19 0 23 0 153
6:45 - 7:00 66 2 0 68 24 30 0 54 2 28 0 30 0 152
7:00 - 7:15 67 5 0 72 11 36 0 47 4 23 0 27 0 146
7:15 - 7:30 77 4 0 81 17 37 0 54 3 26 0 29 0 164
7:30 - 7:45 80 2 0 82 13 34 0 47 7 31 0 38 0 167
7:45 - 8:00 81 5 0 86 17 36 0 53 5 20 0 25 0 164
8:00 - 8:15 45 3 0 48 12 33 0 45 6 21 0 27 0 120
8:15 - 8:30 70 0 0 70 13 33 0 46 5 38 0 43 0 159
8:30 - 8:45 68 5 0 73 8 46 0 54 4 21 0 25 0 152
8:45 - 9:00 66 7 0 73 18 52 0 70 4 17 0 21 0 164
3 Hr Totals 0 964 39 0 1003 179 406 0 0 585 45 0 270 0 315 0 0 0 0 0 1903
1 Hr Totals
6:00 - 7:00 0 410 8 0 418 70 99 0 0 169 7 0 73 0 80 0 0 0 0 0 667
6:15 - 7:15 0 345 12 0 357 71 120 0 0 191 10 0 82 0 92 0 0 0 0 0 640
6:30 - 7:30 0 295 13 0 308 70 128 0 0 198 13 0 96 0 109 0 0 0 0 0 615
6:45 - 7:45 0 290 13 0 303 65 137 0 0 202 16 0 108 0 124 0 0 0 0 0 629
7:00 - 8:00 0 305 16 0 321 58 143 0 0 201 19 0 100 0 119 0 0 0 0 0 641
7:15 - 8:15 0 283 14 0 297 59 140 0 0 199 21 0 98 0 119 0 0 0 0 0 615
7:30 - 8:30 0 276 10 0 286 55 136 0 0 191 23 0 110 0 133 0 0 0 0 0 610
7:45 - 8:45 0 264 13 0 277 50 148 0 0 198 20 0 100 0 120 0 0 0 0 0 595
8:00 - 9:00 0 249 15 0 264 51 164 0 0 215 19 0 97 0 116 0 0 0 0 0 595
PEAK HOUR
6:00 - 7:00 0 410 8 0 418 70 99 0 0 169 7 0 73 0 80 0 0 0 0 0 667
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
102
TOTALS TURNING MOVEMENT COUNT - SUMMARYCounted by: VCUIntersection of: US 11 Date: May 17, 2022 Tuesdayand: Route 672 (Hopewell Rd) Weather: Warm, ClearLocation: Frederick County, Virginia Entered by: CK Star Rating: 4TOTALon: US 11 on: US 11 on: on: Route 672 (Hopewell Rd) N + STIME+RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTALE + WAM6:00 - 6:15511030015401290210000020130151906:15 - 6:3055860014103690450000060140202066:30 - 6:452588001130231003300000130270401866:45 - 7:002576001010391705600000210240452027:00 - 7:153367001000401405400000190110301847:15 - 7:303573001080382005800000160240402067:30 - 7:453486001200332005300000160231402137:45 - 8:002882001100441105500000120170291948:00 - 8:1517530070034904300000200210411548:15 - 8:30347800112038704500000190210401978:30 - 8:4526710097046605200000220160381878:45 - 9:00237100940571807500000150190342033 Hr Totals386 934 0 0 1320 0 440 150 0 590000001810230141223221 Hr Totals6:00 - 7:00156353005090110450155000004207801207846:15 - 7:15138317004550138500188000005907601357786:30 - 7:30118304004220140610201000006908601557786:45 - 7:4512730200429015071022100000720821155805PHF 0.91 0.88 0.94 0.89 0.86 0.85%T 14.2% 6.0% 10.0% 9.9% 2.8% 23.2%7:00 - 8:00130308004380155650220000006307511397977:15 - 8:15114294004080149600209000006408511507677:30 - 8:30113299004120149470196000006708211507587:45 - 8:45105284003890162330195000007307501487328:00 - 9:0010027300373017540021500000760770153741PEAK HOUR6:45 - 7:4512730200429015071022100000720821155805TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
103
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Branson Spring Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: VA 671 on: VA 671 on: on: Branson Spring Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
12:00 - 12:15000000000000000000000
12:15 - 12:30000000000000000000000
12:30 - 12:45000000000000000000000
12:45 - 1:00000000000000000000000
1:00 - 1:15000000000000000000000
1:15 - 1:30000000000000000000000
1:30 - 1:45000000000000000000000
1:45 - 2:00000000000000000000000
2:00 - 2:15100010000000000000001
2:15 - 2:30000000000000000000000
2:30 - 2:45000000000000000000000
2:45 - 3:00000000000000000000000
3:00 - 3:15000000000000000000000
3:15 - 3:30000000000000000000000
3:30 - 3:45000000000000000000000
3:45 - 4:00000000000000000001011
4:00 - 4:15100010000000000000001
4:15 - 4:30000000000000000000000
4:30 - 4:45020020000000000000002
4:45 - 5:00000000000000000000000
5:00 - 5:15110020100100000000003
5:15 - 5:30010010100100000000002
5:30 - 5:45100010010100000000002
5:45 - 6:00000000000000000000000
6:00 - 6:15010010000000000000001
6:15 - 6:30000000000000000000000
6:30 - 6:45000000000000000200022
6:45 - 7:00000000000000000100011
7:00 - 7:15000000030300000100014
7:15 - 7:30000000020200000000002
7:30 - 7:45010010020200000000003
7:45 - 8:00010010000000000000001
8:00 - 8:15000000020200000000002
8:15 - 8:30010010000000000100012
8:30 - 8:45000000140500000000005
8:45 - 9:00010010000000000100012
9:00 - 9:15000000000000000100011
9:15 - 9:30100010200200000100014
9:30 - 9:45010010010100000000002
9:45 - 10:00000000100100000000001
10:00 - 10:15200020000000000100013
10:15 - 10:30010010000000000000001
10:30 - 10:45000000000000000001011
10:45 - 11:00100010000000000000001
11:00 - 11:15100010000000000002023
11:15 - 11:30020020000000000000002
11:30 - 11:45000000000000000000000
11:45 - 12:00000000000000000000000
12:00 - 12:15000000100100000000001
12:15 - 12:30000000120300000000003
12:30 - 12:45000000120300000100014
12:45 - 1:00010010010100000000002
1:00 - 1:15010010000000000100012
1:15 - 1:30000000010100000000001
1:30 - 1:45010010000000000200134
1:45 - 2:00000000200200000001013
2:00 - 2:15010010100100000000002
2:15 - 2:30000000010100000001012
2:30 - 2:45000000020200000000002
2:45 - 3:00000000100100000200023
3:00 - 3:15000000100100000000001
3:15 - 3:30010010000000000000001
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
104
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Branson Spring Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: VA 671 on: VA 671 on: on: Branson Spring Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
3:30 - 3:45000000110200000000002
3:45 - 4:00000000000000000200022
4:00 - 4:15010010230500000100017
4:15 - 4:30010010100100000100013
4:30 - 4:45110020100100000102147
4:45 - 5:00100010100100000000002
5:00 - 5:15010010000000000100012
5:15 - 5:30030030210300000000006
5:30 - 5:45020020120300000100016
5:45 - 6:00020020100100000100014
6:00 - 6:15010010030300000101026
6:15 - 6:30000000010100000001012
6:30 - 6:45010010010100000300035
6:45 - 7:00110020000000000000002
7:00 - 7:15000000110200000000002
7:15 - 7:30010010000000000001012
7:30 - 7:45110020000000000002024
7:45 - 8:00000000320500000000005
8:00 - 8:15010010100100000001013
8:15 - 8:30010010210300000100015
8:30 - 8:45000000010100000000001
8:45 - 9:00020020000000000100013
9:00 - 9:15000000000000000000000
9:15 - 9:30000000000000000000000
9:30 - 9:45100010300300000000004
9:45 - 10:00000000000000000000000
10:00 - 10:15000000000000000000000
10:15 - 10:30000000000000000000000
10:30 - 10:45010010000000000000001
10:45 - 11:00000000000000000001011
11:00 - 11:15000000000000000000000
11:15 - 11:30000000000000000000000
11:30 - 11:45000000000000000000000
11:45 - 12:00000000000000000000000
24 Hr Totals 9290053023370750000027010246174
105
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Branson Spring Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: VA 671 on: VA 671 on: on: Branson Spring Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
1 Hr Totals
12:00 - 1:00000000000000000000000
12:15 - 1:15000000000000000000000
12:30 - 1:30000000000000000000000
12:45 - 1:45000000000000000000000
1:00 - 2:00000000000000000000000
1:15 - 2:15100010000000000000001
1:30 - 2:30100010000000000000001
1:45 - 2:45100010000000000000001
2:00 - 3:00100010000000000000001
2:15 - 3:15000000000000000000000
2:30 - 3:30000000000000000000000
2:45 - 3:45000000000000000000000
3:00 - 4:00000000000000000001011
3:15 - 4:15100010000000000001012
3:30 - 4:30100010000000000001012
3:45 - 4:45120030000000000001014
4:00 - 5:00120030000000000000003
4:15 - 5:15130040100100000000005
4:30 - 5:30140050200200000000007
4:45 - 5:45220040210300000000007
5:00 - 6:00220040210300000000007
5:15 - 6:15120030110200000000005
5:30 - 6:30110020010100000000003
5:45 - 6:45010010000000000200023
6:00 - 7:00010010000000000300034
6:15 - 7:15000000030300000400047
6:30 - 7:30000000050500000400049
6:45 - 7:450100100707000002000210
7:00 - 8:000200200707000001000110
7:15 - 8:15020020060600000000008
7:30 - 8:30030030040400000100018
7:45 - 8:450200201607000001000110
8:00 - 9:000200201607000002000211
8:15 - 9:150200201405000003000310
8:30 - 9:301100203407000003000312
8:45 - 9:45120030210300000300039
9:00 - 10:00110020310400000200028
9:15 - 10:153100403104000002000210
9:30 - 10:30220040110200000100017
9:45 - 10:45210030100100000101026
10:00 - 11:00310040000000000101026
10:15 - 11:15210030000000000003036
10:30 - 11:30220040000000000003037
10:45 - 11:45220040000000000002026
11:00 - 12:00120030000000000002025
11:15 - 12:15020020100100000000003
11:30 - 12:30000000220400000000004
11:45 - 12:45000000340700000100018
12:00 - 1:000100103508000001000110
12:15 - 1:150200202507000002000211
12:30 - 1:30020020140500000200029
12:45 - 1:45030030020200000300149
1:00 - 2:000200202103000003011510
1:15 - 2:150200203104000002011410
1:30 - 2:300200203104000002021511
1:45 - 2:45010010330600000002029
2:00 - 3:00010010230500000201039
2:15 - 3:15000000230500000201038
2:30 - 3:30010010220400000200027
2:45 - 3:45010010310400000200027
3:00 - 4:00010010210300000200026
3:15 - 4:150200203407000003000312
3:30 - 4:300200204408000004000414
106
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Branson Spring Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: VA 671 on: VA 671 on: on: Branson Spring Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
3:45 - 4:451300404307000005021819
4:00 - 5:002300505308000003021619
4:15 - 5:152300503003000003021614
4:30 - 5:302500704105000002021517
4:45 - 5:451600704307000002000216
5:00 - 6:000800804307000003000318
5:15 - 6:1508008046010000003010422
5:30 - 6:300500502608000003020518
5:45 - 6:450400401506000005020717
6:00 - 7:001300400505000004020615
6:15 - 7:151200301304000003010411
6:30 - 7:301300401203000003010411
6:45 - 7:452300501102000000030310
7:00 - 8:001200304307000000030313
7:15 - 8:151300404206000000040414
7:30 - 8:301300406309000001030417
7:45 - 8:4502002064010000001010214
8:00 - 9:000400403205000002010312
8:15 - 9:15030030220400000200029
8:30 - 9:30020020010100000100014
8:45 - 9:45120030300300000100017
9:00 - 10:00100010300300000000004
9:15 - 10:15100010300300000000004
9:30 - 10:30100010300300000000004
9:45 - 10:45010010000000000000001
10:00 - 11:00010010000000000001012
10:15 - 11:15010010000000000001012
10:30 - 11:30010010000000000001012
10:45 - 11:45000000000000000001011
11:00 - 12:00000000000000000000000
PEAK HOUR
8:30 - 9:30 1100203407000003000312
5:15 - 6:15 08008046010000003010422
107
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Grace Church Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: on: VA 671 on: Grace Church Rd on: Grace Church Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
12:00 - 12:15000000000000000000000
12:15 - 12:30000000000000000000000
12:30 - 12:45000000000000000000000
12:45 - 1:00000000000000000000000
1:00 - 1:15000000000000000000000
1:15 - 1:30000000000000000000000
1:30 - 1:45000000000000000000000
1:45 - 2:00000000000000000000000
2:00 - 2:15000000000000000000000
2:15 - 2:30000000000000000000000
2:30 - 2:45000000000000000000000
2:45 - 3:00000000000000000000000
3:00 - 3:15000000000000000000000
3:15 - 3:30000000000000000000000
3:30 - 3:45000000000000000000000
3:45 - 4:00000000000000000000000
4:00 - 4:15000000000000000000000
4:15 - 4:30000000000000000000000
4:30 - 4:45000000000000000000000
4:45 - 5:00000000000000000000000
5:00 - 5:15000000000001001100012
5:15 - 5:30000000000001001000001
5:30 - 5:45000000000001001000001
5:45 - 6:00000000000000000000000
6:00 - 6:15000000000000000100011
6:15 - 6:30000000000000000000000
6:30 - 6:45000000000000000000000
6:45 - 7:00000000000000000000000
7:00 - 7:15000000000003003100014
7:15 - 7:30000000000002103000003
7:30 - 7:45000000000000101000001
7:45 - 8:00000000000000000000000
8:00 - 8:15000000000001001000001
8:15 - 8:30000000000000000000000
8:30 - 8:45000000000005005000005
8:45 - 9:00000000000000101000001
9:00 - 9:15000000000000000000000
9:15 - 9:30000000000002002000002
9:30 - 9:45000000000000000000000
9:45 - 10:00000000000001001000001
10:00 - 10:15000000000000000000000
10:15 - 10:30000000000000000000000
10:30 - 10:45000000000000000000000
10:45 - 11:00000000000000000000000
11:00 - 11:15000000000000000000000
11:15 - 11:30000000000000000000000
11:30 - 11:45000000000000000000000
11:45 - 12:00000000000000000000000
12:00 - 12:15000000010100000000001
12:15 - 12:30000000000003003000003
12:30 - 12:45000000010102002000003
12:45 - 1:00000000010100000000001
1:00 - 1:15000000000000000000000
1:15 - 1:30000000000001102000002
1:30 - 1:45000000000000000000000
1:45 - 2:00000000000002002000002
2:00 - 2:15000000000001001000001
2:15 - 2:30000000000001001000001
2:30 - 2:45000000000002103000003
2:45 - 3:00000000000001001000001
3:00 - 3:15000000000001102000002
3:15 - 3:30000000000000000000000
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
108
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Grace Church Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: on: VA 671 on: Grace Church Rd on: Grace Church Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
3:30 - 3:45000000010101001000002
3:45 - 4:00000000000000000000000
4:00 - 4:15000000010103003000004
4:15 - 4:30000000000001001100012
4:30 - 4:45000000000001001100012
4:45 - 5:00000000010100000000001
5:00 - 5:15000000000000000000000
5:15 - 5:30000000010102204000005
5:30 - 5:45000000010102002100014
5:45 - 6:00000000000001102000002
6:00 - 6:15000000000003003100014
6:15 - 6:30000000000001001000001
6:30 - 6:45000000000001001000001
6:45 - 7:00000000000000000000000
7:00 - 7:15000000000002002000002
7:15 - 7:30000000000000000100011
7:30 - 7:45000000000000000000000
7:45 - 8:00000000020203003000005
8:00 - 8:15000000000001001000001
8:15 - 8:30000000000003003000003
8:30 - 8:45000000010100000000001
8:45 - 9:00000000000000000000000
9:00 - 9:15000000000000101000001
9:15 - 9:30000000000000000000000
9:30 - 9:45000000000003003000003
9:45 - 10:00000000000000000000000
10:00 - 10:15000000000000000000000
10:15 - 10:30000000000000000000000
10:30 - 10:45000000000000000000000
10:45 - 11:00000000000000000000000
11:00 - 11:15000000000000000000000
11:15 - 11:30000000000000000000000
11:30 - 11:45000000000000000000000
11:45 - 12:00000000000000000000000
24 Hr Totals 0000000801104790697000888
109
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Grace Church Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: on: VA 671 on: Grace Church Rd on: Grace Church Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
1 Hr Totals
12:00 - 1:00000000000000000000000
12:15 - 1:15000000000000000000000
12:30 - 1:30000000000000000000000
12:45 - 1:45000000000000000000000
1:00 - 2:00000000000000000000000
1:15 - 2:15000000000000000000000
1:30 - 2:30000000000000000000000
1:45 - 2:45000000000000000000000
2:00 - 3:00000000000000000000000
2:15 - 3:15000000000000000000000
2:30 - 3:30000000000000000000000
2:45 - 3:45000000000000000000000
3:00 - 4:00000000000000000000000
3:15 - 4:15000000000000000000000
3:30 - 4:30000000000000000000000
3:45 - 4:45000000000000000000000
4:00 - 5:00000000000000000000000
4:15 - 5:15000000000001001100012
4:30 - 5:30000000000002002100013
4:45 - 5:45000000000003003100014
5:00 - 6:00000000000003003100014
5:15 - 6:15000000000002002100013
5:30 - 6:30000000000001001100012
5:45 - 6:45000000000000000100011
6:00 - 7:00000000000000000100011
6:15 - 7:15000000000003003100014
6:30 - 7:30000000000005106100017
6:45 - 7:45000000000005207100018
7:00 - 8:00000000000005207100018
7:15 - 8:15000000000003205000005
7:30 - 8:30000000000001102000002
7:45 - 8:45000000000006006000006
8:00 - 9:00000000000006107000007
8:15 - 9:15000000000005106000006
8:30 - 9:30000000000007108000008
8:45 - 9:45000000000002103000003
9:00 - 10:00000000000003003000003
9:15 - 10:15000000000003003000003
9:30 - 10:30000000000001001000001
9:45 - 10:45000000000001001000001
10:00 - 11:00000000000000000000000
10:15 - 11:15000000000000000000000
10:30 - 11:30000000000000000000000
10:45 - 11:45000000000000000000000
11:00 - 12:00000000000000000000000
11:15 - 12:15000000010100000000001
11:30 - 12:30000000010103003000004
11:45 - 12:45000000020205005000007
12:00 - 1:00000000030305005000008
12:15 - 1:15000000020205005000007
12:30 - 1:30000000020203104000006
12:45 - 1:45000000010101102000003
1:00 - 2:00000000000003104000004
1:15 - 2:15000000000004105000005
1:30 - 2:30000000000004004000004
1:45 - 2:45000000000006107000007
2:00 - 3:00000000000005106000006
2:15 - 3:15000000000005207000007
2:30 - 3:30000000000004206000006
2:45 - 3:45000000010103104000005
3:00 - 4:00000000010102103000004
3:15 - 4:15000000020204004000006
3:30 - 4:30000000020205005100018
110
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: VA 671 Date: 4/6/2022 Tuesday
and: Grace Church Rd Weather: Cool, Light Rain
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: on: VA 671 on: Grace Church Rd on: Grace Church Rd N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
3:45 - 4:45000000010105005200028
4:00 - 5:00000000020205005200029
4:15 - 5:15000000010102002200025
4:30 - 5:30000000020203205100018
4:45 - 5:450000000303042061000110
5:00 - 6:000000000202053081000111
5:15 - 6:1500000002020830112000215
5:30 - 6:300000000101071082000211
5:45 - 6:45000000000006107100018
6:00 - 7:00000000000005005100016
6:15 - 7:15000000000004004000004
6:30 - 7:30000000000003003100014
6:45 - 7:45000000000002002100013
7:00 - 8:00000000020205005100018
7:15 - 8:15000000020204004100017
7:30 - 8:30000000020207007000009
7:45 - 8:450000000303070070000010
8:00 - 9:00000000010104004000005
8:15 - 9:15000000010103104000005
8:30 - 9:30000000010100101000002
8:45 - 9:45000000000003104000004
9:00 - 10:00000000000003104000004
9:15 - 10:15000000000003003000003
9:30 - 10:30000000000003003000003
9:45 - 10:45000000000000000000000
10:00 - 11:00000000000000000000000
10:15 - 11:15000000000000000000000
10:30 - 11:30000000000000000000000
10:45 - 11:45000000000000000000000
11:00 - 12:00000000000000000000000
PEAK HOUR
8:30 - 9:30 000000000007108000008
5:15 - 6:15 00000002020830112000215
111
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 18, 2021 Thursday
and: Route 669 (Woodbine Rd) Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: US 11 on: US 11 on: Route 669 (Woodbine Rd) on: N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:1502910301210022302050000057
6:15 - 6:3004310445210026009090000079
6:30 - 6:4505620584300034007070000099
6:45 - 7:00 0 68 3 0 71 11 23 0 0 34 3 0 11 0 14 0 0 0 0 0 119
7:00 - 7:15047104842600304090130000091
7:15 - 7:300702072153700522070900000133
7:30 - 7:45 0 80 1 0 81 0 31 0 0 31 2 0 11 0 13 0 0 0 0 0 125
7:45 - 8:00073507823100330090900000120
8:00 - 8:15 0 52 2 0 54 2 24 0 0 26 4 0 11 0 15 0 0 0 0 0 95
8:15 - 8:300505055535004030701000000105
8:30 - 8:450612063129003030701000000103
8:45 - 9:0003720396370043207090000091
3 Hr Totals 0 666 27 0 693 56 345 0 0 401 26 0 97 0 123 0 0 0 0 0 1217
1 Hr Totals
6:00 - 7:00 0 196 7 0 203 21 95 0 0 116 6 0 29 0 35 0 0 0 0 0 354
6:15 - 7:15 0 214 7 0 221 24 100 0 0 124 7 0 36 0 43 0 0 0 0 0 388
6:30 - 7:30 0 241 8 0 249 34 116 0 0 150 9 0 34 0 43 0 0 0 0 0 442
6:45 - 7:45 0 265 7 0 272 30 117 0 0 147 11 0 38 0 49 0 0 0 0 0 468
7:00 - 8:00 0 270 9 0 279 21 125 0 0 146 8 0 36 0 44 0 0 0 0 0 469
7:15 - 8:15 0 275 10 0 285 19 123 0 0 142 8 0 38 0 46 0 0 0 0 0 473
7:30 - 8:30 0 255 13 0 268 9 121 0 0 130 9 0 38 0 47 0 0 0 0 0 445
7:45 - 8:45 0 236 14 0 250 10 119 0 0 129 10 0 34 0 44 0 0 0 0 0 423
8:00 - 9:00 0 200 11 0 211 14 125 0 0 139 12 0 32 0 44 0 0 0 0 0 394
PEAK HOUR
7:15 - 8:15 0 275 10 0 285 19 123 0 0 142 8 0 38 0 46 0 0 0 0 0 473
PM
3:00 - 3:1503640401174008560501100000136
3:15 - 3:30031303496600752040600000115
3:30 - 3:45 0 37 2 0 39 8 86 0 0 94 5 0 10 0 15 0 0 0 0 0 148
3:45 - 4:00047405141020010640801200000169
4:00 - 4:1505140558110001184040800000181
4:15 - 4:300554059698001042050700000170
4:30 - 4:4506030637106001131040500000181
4:45 - 5:0006240665106001111020300000180
5:00 - 5:1504610477106001131040500000165
5:15 - 5:3004630493101001043040700000160
5:30 - 5:450547061111160012740601000000198
5:45 - 6:0006050651487001015000500000171
3 Hr Totals 0 585 44 0 629 93 1158 0 0 1251 38 0 56 0 94 0 0 0 0 0 1974
1 Hr Totals
3:00 - 4:00 0 151 13 0 164 32 328 0 0 360 17 0 27 0 44 0 0 0 0 0 568
3:15 - 4:15 0 166 13 0 179 29 364 0 0 393 15 0 26 0 41 0 0 0 0 0 613
3:30 - 4:30 0 190 14 0 204 26 396 0 0 422 15 0 27 0 42 0 0 0 0 0 668
3:45 - 4:45 0 213 15 0 228 25 416 0 0 441 11 0 21 0 32 0 0 0 0 0 701
4:00 - 5:00 0 228 15 0 243 26 420 0 0 446 8 0 15 0 23 0 0 0 0 0 712
4:15 - 5:15 0 223 12 0 235 25 416 0 0 441 5 0 15 0 20 0 0 0 0 0 696
4:30 - 5:30 0 214 11 0 225 22 419 0 0 441 6 0 14 0 20 0 0 0 0 0 686
4:45 - 5:45 0 208 15 0 223 26 429 0 0 455 9 0 16 0 25 0 0 0 0 0 703
5:00 - 6:00 0 206 16 0 222 35 410 0 0 445 13 0 14 0 27 0 0 0 0 0 694
PEAK HOUR
4:00 - 5:00 0 228 15 0 243 26 420 0 0 446 8 0 15 0 23 0 0 0 0 0 712
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
112
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: US 11 Date: November 18, 2021 Thursday
and: Amazon Entrance - Route 669 (Rest Church Rd) Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: US 11 on: US 11 on: Amazon Entrance on: Route 669 (Rest Church Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:15 51 46 13 0 110 0 16 12 0 28 2 8 3 0 13 8 16 15 0 39 190
6:15 - 6:30 63 52 19 0 134 4 13 11 0 28 6 10 4 0 20 7 24 17 0 48 230
6:30 - 6:45 78 48 19 0 145 3 20 8 0 31 7 15 2 0 24 16 33 16 0 65 265
6:45 - 7:00 91 67 26 0 184 6 14 9 0 29 7 19 6 0 32 8 57 23 0 88 333
7:00 - 7:15 84 42 28 0 154 6 17 8 0 31 8 25 3 0 36 10 41 15 0 66 287
7:15 - 7:30 79 56 29 0 164 5 20 10 0 35 7 24 9 0 40 16 48 18 0 82 321
7:30 - 7:45 135 68 24 0 227 0 24 18 0 42 11 27 3 0 41 13 18 26 0 57 367
7:45 - 8:00 80 71 13 0 164 2 24 6 0 32 9 9 2 0 20 22 12 13 0 47 263
8:00 - 8:15 62 38 14 0 114 1 24 8 0 33 6 13 7 0 26 14 11 31 0 56 229
8:15 - 8:30 56 44 17 0 117 0 24 12 0 36 12 14 4 0 30 13 17 24 0 54 237
8:30 - 8:45 61 64 16 0 141 2 18 11 0 31 11 15 1 0 27 8 14 14 0 36 235
8:45 - 9:00 42 31 18 0 91 1 35 7 0 43 11 16 1 0 28 7 10 19 0 36 198
3 Hr Totals 882 627 236 0 1745 30 249 120 0 399 97 195 45 0 337 142 301 231 0 674 3155
1 Hr Totals
6:00 - 7:00 283 213 77 0 573 13 63 40 0 116 22 52 15 0 89 39 130 71 0 240 1018
6:15 - 7:15 316 209 92 0 617 19 64 36 0 119 28 69 15 0 112 41 155 71 0 267 1115
6:30 - 7:30 332 213 102 0 647 20 71 35 0 126 29 83 20 0 132 50 179 72 0 301 1206
6:45 - 7:45 389 233 107 0 729 17 75 45 0 137 33 95 21 0 149 47 164 82 0 293 1308
7:00 - 8:00 378 237 94 0 709 13 85 42 0 140 35 85 17 0 137 61 119 72 0 252 1238
7:15 - 8:15 356 233 80 0 669 8 92 42 0 142 33 73 21 0 127 65 89 88 0 242 1180
7:30 - 8:30 333 221 68 0 622 3 96 44 0 143 38 63 16 0 117 62 58 94 0 214 1096
7:45 - 8:45 259 217 60 0 536 5 90 37 0 132 38 51 14 0 103 57 54 82 0 193 964
8:00 - 9:00 221 177 65 0 463 4 101 38 0 143 40 58 13 0 111 42 52 88 0 182 899
PEAK HOUR
6:45 - 7:45 389 233 107 0 729 17 75 45 0 137 33 95 21 0 149 47 164 82 0 293 1308
PM
3:00 - 3:15 38 28 7 0 73 0 56 12 0 68 15 25 3 0 43 15 7 50 0 72 256
3:15 - 3:30 47 31 5 0 83 0 62 17 0 79 15 10 2 0 27 16 12 56 0 84 273
3:30 - 3:45 57 35 10 0 102 1 68 24 0 93 15 12 2 0 29 15 11 77 0 103 327
3:45 - 4:00 56 44 12 0 112 4 78 20 0 102 26 18 6 0 50 11 20 87 0 118 382
4:00 - 4:15 47 38 11 0 96 1 96 24 0 121 23 19 6 0 48 20 16 53 0 89 354
4:15 - 4:30 44 48 9 0 101 1 82 15 0 98 16 15 5 0 36 14 12 86 0 112 347
4:30 - 4:45 57 41 11 0 109 1 81 18 0 100 12 29 3 0 44 17 9 87 0 113 366
4:45 - 5:00 57 60 11 0 128 1 98 19 0 118 12 14 1 0 27 14 18 59 0 91 364
5:00 - 5:15 56 34 10 0 100 5 81 14 0 100 21 19 7 0 47 15 19 78 0 112 359
5:15 - 5:30 56 39 5 0 100 2 89 18 0 109 24 13 5 0 42 16 24 100 0 140 391
5:30 - 5:45 54 62 14 0 130 2 90 12 0 104 25 50 11 0 86 12 24 74 0 110 430
5:45 - 6:00 45 51 20 0 116 0 92 16 0 108 20 19 4 0 43 11 47 69 0 127 394
3 Hr Totals 614 511 125 0 1250 18 973 209 0 1200 224 243 55 0 522 176 219 876 0 1271 4243
1 Hr Totals
3:00 - 4:00 198 138 34 0 370 5 264 73 0 342 71 65 13 0 149 57 50 270 0 377 1238
3:15 - 4:15 207 148 38 0 393 6 304 85 0 395 79 59 16 0 154 62 59 273 0 394 1336
3:30 - 4:30 204 165 42 0 411 7 324 83 0 414 80 64 19 0 163 60 59 303 0 422 1410
3:45 - 4:45 204 171 43 0 418 7 337 77 0 421 77 81 20 0 178 62 57 313 0 432 1449
4:00 - 5:00 205 187 42 0 434 4 357 76 0 437 63 77 15 0 155 65 55 285 0 405 1431
4:15 - 5:15 214 183 41 0 438 8 342 66 0 416 61 77 16 0 154 60 58 310 0 428 1436
4:30 - 5:30 226 174 37 0 437 9 349 69 0 427 69 75 16 0 160 62 70 324 0 456 1480
4:45 - 5:45 223 195 40 0 458 10 358 63 0 431 82 96 24 0 202 57 85 311 0 453 1544
5:00 - 6:00 211 186 49 0 446 9 352 60 0 421 90 101 27 0 218 54 114 321 0 489 1574
PEAK HOUR
5:00 - 6:00 211 186 49 0 446 9 352 60 0 421 90 101 27 0 218 54 114 321 0 489 1574
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
113
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 SB Off-On Ramp - I-81 SB On Ramp Date: November 18, 2021 Thursday
and: Route 669 (Rest Church Rd) Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 4
TOTAL
on: I-81 SB Off-On Ramp on: I-81 SB On Ramp on: Route 669 (Rest Church Rd) on: Route 669 (Rest Church Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:151714022000000144806227160043127
6:15 - 6:3016011027000000206608624210045158
6:30 - 6:4515025040000000117408529260055180
6:45 - 7:00250280530000002686011222200042207
7:00 - 7:15240250490000002281010329290058210
7:15 - 7:30250230480000003378111241220063223
7:30 - 7:452201203400000033119015238280066252
7:45 - 8:00220130350000002683111034350069214
8:00 - 8:1515018033000000316409535220057185
8:15 - 8:301819028000000255818428360064176
8:30 - 8:4517014031000000295608533270060176
8:45 - 9:002619036000000344207623260049161
3 Hr Totals 2423191043600000030485531162 363 308 0 0 671 2269
1 Hr Totals
6:00 - 7:007316801420000007127403451028300185672
6:15 - 7:158008901690000007930703861049600200755
6:30 - 7:3089010101900000009231914121219700218820
6:45 - 7:4596088018400000011436414791309900229892
7:00 - 8:00930730166000000114361247714211400256899
7:15 - 8:15840660150000000123344246914810700255874
7:30 - 8:30771520130000000115324244113512100256827
7:45 - 8:45721540127000000111261237413012000250751
8:00 - 9:00762500128000000119220134011911100230698
PEAK HOUR
7:00 - 8:00 930730166000000114361247714211400256899
PM
3:00 - 3:1522017039000000384107928340062180
3:15 - 3:3034015049000000374318123360059189
3:30 - 3:4524019043000000444819328390067203
3:45 - 4:0029119049000000504209225350060201
4:00 - 4:1526014040000000474509240510091223
4:15 - 4:3015015030000000394808720360056173
4:30 - 4:4528119048000000365308923450068205
4:45 - 5:0022218042000000455109623490173211
5:00 - 5:1528015043000000464809425380063200
5:15 - 5:30290160450000004061010113520065211
5:30 - 5:45260190450000004164010528540082232
5:45 - 6:0029123053000000275608329340063199
3 Hr Totals 3125209052600000049060021092 305 503 0 1 809 2427
1 Hr Totals
3:00 - 4:001091700180000000169174234510414400248773
3:15 - 4:151131670181000000178178235811616100277816
3:30 - 4:30941670162000000180183136411316100274800
3:45 - 4:45982670167000000172188036010816700275802
4:00 - 5:00913660160000000167197036410618101288812
4:15 - 5:1593367016300000016620003669116801260789
4:30 - 5:30107368017800000016721303808418401269827
4:45 - 5:45105268017500000017222403968919301283854
5:00 - 6:00112173018600000015422903839517800273842
PEAK HOUR
4:45 - 5:45 105268017500000017222403968919301283854
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
114
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: I-81 NB On Ramp - I-81 NB Off Ramp Date: November 18, 2021 Thursday
and: Route 669 (Rest Church Rd) Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 3
TOTAL
on: I-81 NB On Ramp on: I-81 NB Off Ramp on: Route 669 (Rest Church Rd) on: Route 669 (Rest Church Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:150000027014041156300780114015134
6:15 - 6:30000003148043107800880204024155
6:30 - 6:450000040060461578009303115046185
6:45 - 7:00000004511426219980011703719056235
7:00 - 7:15000003701405130910012103714051223
7:15 - 7:30000004911827021940011502916045230
7:30 - 7:450000028012141301570018703212044272
7:45 - 8:00000002109030891009902919048177
8:00 - 8:150000026123050107500850308038173
8:15 - 8:3000000271132431070008003017047170
8:30 - 8:4500000100190292269009102516041161
8:45 - 9:0000000220301531252006402017037154
3 Hr Totals 00000363818085592021016 0 0 1218 0 331 161 0 492 2269
1 Hr Totals
6:00 - 7:000000014354221925931700376099420141709
6:15 - 7:1500000153542220274345004190125520177798
6:30 - 7:3000000171252422985361004460134640198873
6:45 - 7:45000001592585224100440005400135610196960
7:00 - 8:0000000135153319289433005220127610188902
7:15 - 8:1500000124262319169417004860120550175852
7:30 - 8:3000000102257316458393004510121560177792
7:45 - 8:450000084264215250305003550114600174681
8:00 - 9:000000085285317554266003200105580163658
PEAK HOUR
6:45 - 7:45 000001592585224100440005400135610196960
PM
3:00 - 3:1500000450260712155007602724051198
3:15 - 3:3000000511231761759007603319052204
3:30 - 3:4500000640250891965008403923062235
3:45 - 4:00000008512801142966009502725052261
4:00 - 4:1500000500320822767009403919058234
4:15 - 4:3000000730240971861007903819057233
4:30 - 4:45000007602701032573009804123165266
4:45 - 5:000000052126685167601930457052230
5:00 - 5:15000007412801032368009103219051245
5:15 - 5:30000009012601171772008904920069275
5:30 - 5:450000074027010131920012304232074298
5:45 - 6:00000008301801012160008104016056238
3 Hr Totals 00000817531071139 264 814 0 1 1079 0 452 246 1 699 2917
1 Hr Totals
3:00 - 4:00000002452102135086245003310126910217898
3:15 - 4:15000002502108136192257003490138860224934
3:30 - 4:30000002721109038293259003520143860229963
3:45 - 4:45000002841111039699267003660145861232994
4:00 - 5:00000002511109636786277013640163681232963
4:15 - 5:15000002752105638882278013610156681225974
4:30 - 5:300000029231076408812890137101676912371016
4:45 - 5:450000029031076406873080139601687802461048
5:00 - 6:00000003212990422922920038401638702501056
PEAK HOUR
5:00 - 6:00 000003212990422922920038401638702501056
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
115
TOTALS TURNING MOVEMENT COUNT - SUMMARY
Counted by: VCU
Intersection of: Amazon Entrance Date: November 18, 2021 Thursday
and: Route 669 (Woodbine Rd) Weather: Warm, Cloudy
Location: Frederick County, Virginia Entered by: CK Star Rating: 5
TOTAL
on: Amazon Entrance on: on: Route 669 (Woodbine Rd) on: Route 669 (Woodbine Rd) N + S
TIME +
RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL RIGHT THRU LEFT U-TN TOTAL E + W
AM
6:00 - 6:153030600000240060210315
6:15 - 6:304020600000070070430720
6:30 - 6:45101020000021000120120317
6:45 - 7:004020600000410001408601434
7:00 - 7:15200020000081000180320525
7:15 - 7:303000300000470011021501731
7:30 - 7:45402060000071000170000023
7:45 - 8:0060401000000350080330624
8:00 - 8:15502070000011000110310422
8:15 - 8:306020800000240170610722
8:30 - 8:454010500000130040320514
8:45 - 9:006000600000140050610718
3 Hr Totals 480190670000035840112004137078265
1 Hr Totals
6:00 - 7:0012080200000083100390151202786
6:15 - 7:15110501600000143700510161302996
6:30 - 7:301003013000001837005501425039107
6:45 - 7:451304017000002337006001323036113
7:00 - 8:00150602100000223200540820028103
7:15 - 8:15180802600000153200470819027100
7:30 - 8:30210100310000013290143012501791
7:45 - 8:452109030000007220130015702282
8:00 - 9:002105026000005210127018502376
PEAK HOUR
6:45 - 7:45 1304017000002337006001323036113
PM
3:00 - 3:15301040000015006010401424
3:15 - 3:3010405000002500709301224
3:30 - 3:45303060000021500170620831
3:45 - 4:0060208000004700110530827
4:00 - 4:1520204000002800100900923
4:15 - 4:3030104000001600708201021
4:30 - 4:4530407000003100409101021
4:45 - 5:0010203000003400706401020
5:00 - 5:1570501200000430070610726
5:15 - 5:304040800000630090600623
5:30 - 5:45701080000045009011501633
5:45 - 6:00205070000032005061201830
3 Hr Totals 420340760000035640099091370128303
1 Hr Totals
3:00 - 4:001301002300000932004103012042106
3:15 - 4:151201102300000103500450298037105
3:30 - 4:3014080220000093600450287035102
3:45 - 4:4514090230000010220032031603792
4:00 - 5:00909018000009190028032703985
4:15 - 5:15140120260000011140025029803788
4:30 - 5:30150150300000016110027027603390
4:45 - 5:4519012031000001715003202910039102
5:00 - 6:0020015035000001713003002918047112
PEAK HOUR
5:00 - 6:00 20015035000001713003002918047112
TRAFFIC FROM NORTH TRAFFIC FROM SOUTH TRAFFIC FROM EAST TRAFFIC FROM WEST
116
Appendix C
Travel Time Run Data
117
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 03:45 1 06:09
2 03:36 2 06:50
3 03:42 3 07:29
4 03:41 4 07:21
5 03:33 5 06:57
Average 03:39 Average 06:57
From: Int. John Deere Ct &
Grace Ch RD (Rte 668)
To: Int. Route 11 & Brucetown Rd
(Rte 672)
From: Int. John Deere Ct &
Grace Ch RD (Rte 668)
To: Int. I-81 SB & Hopewell Rd
(Rte 672)
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
Figure C-1
September 2022
118
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 04:17 1 04:57
2 04:20 2 04:57
3 04:30 3 05:48
4 04:57 4 05:39
5 05:13 5 05:50
Average 04:39 Average 05:26
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Brucetown Rd
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Brucetown Rd
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
From: Int Route 11 & Hopewell Rd
(Rte 672)
From: Int I-81 SB & Hopewell Rd
(Rte 672)
Figure C-2
September 2022
119
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 06:05 1 06:45
2 05:28 2 06:05
3 05:13 3 06:31
4 05:13 4 05:55
5 06:01 5 06:38
Average 05:36 Average 06:23
9/14/2022
From: Int Route 11 & Hopewell Rd
(Rte 672)
From: Int I-81 SB & Hopewell Rd
(Rte 672)
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Branson Sp & Grace
Ch RDs
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Branson Sp & Grace
Ch RDs
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
Figure C-3
September 2022
120
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 04:16 1 06:40
2 04:14 2 07:27
3 04:18 3 08:05
4 04:08 4 07:48
5 04:23 5 07:47
Average 04:16 Average 07:33
To: Int I-81 SB & Hopewell Rd
(Rte 672)
To: Int Route 11 & Brucetown Rd
(Rte 672)
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
From: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Branson Sp & Grace
Ch RDs
From: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Branson Sp & Grace
Ch RDs
Figure C-4
September 2022
121
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 07:13 1 08:08
2 07:43 2 08:40
3 07:06 3 07:41
4 07:15 4 07:41
5 06:39 5 07:23
Average 07:11 Average 07:55
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Woodbine and
Woodside RDs
To: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Woodbine and
Woodside RDs
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
From: Int Route 11 & Rest Ch Rd
(Rte 669)
From: Int I-81 NB & Rest Ch Rd
(Rte 669)
Figure C-5
September 2022
122
Run #Travel Time
(mm:ss)Run #Travel Time
(mm:ss)
1 07:05 1 08:04
2 07:09 2 08:00
3 06:52 3 07:14
4 06:46 4 08:05
5 06:40 5 07:25
Average 06:54 Average 07:46
9/14/2022
From: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Woodbine and
Woodside RDs
From: Int. John Deere Ct & Grace Ch RD
(Rte 668) via Woodbine and
Woodside RDs
To: Int I-81 NB & Rest Ch Rd
(Rte 669)
To: Int Route 11 & Rest Ch Rd
(Rte 669)
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
Figure C-6
September 2022
123
Segment Dist
Average
Travel
Speed
Travel
Time Segment Dist
Average
Travel
Speed
Travel
Time
Grace Church Rd 0.72 25 0:01:43 Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04 Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18 Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:00:40 Route 11 0.28 45 0:01:25
Total 4.08 0:06:45 Rest Church Road 0.05 35 0:00:05
TOTAL 4.13 0:07:35
To: Int Route 11 & Rest Ch Rd
(Rte 669)
To: Int I-81 NB & Rest Ch Rd
(Rte 669)
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
From: Int. John Deere Ct & Grace Ch RD (Rte
668)
From: Int. John Deere Ct & Grace Ch RD (Rte
668)
Figure C-7
September 2022
124
Segment Dist
Average
Travel
Speed
Travel
Time Segment Dist
Average
Travel
Speed
Travel
Time
Grace Church Rd 0.72 25 0:01:43 Grace Church Rd 0.72 25 0:01:43
Woodside Rd 2.3 45 0:03:04 Woodside Rd 2.3 45 0:03:04
Woodbine Rd 0.78 40 0:01:18 Woodbine Rd 0.78 40 0:01:18
Route 11 0.28 45 0:00:40 Route 11 0.28 45 0:01:45
Total 4.08 06:45 Rest Church Road 0.05 35 0:00:05
Total 4.13 07:55
From: Int. John Deere Ct & Grace Ch RD
(Rte 668)
From: Int. John Deere Ct & Grace Ch RD (Rte
668)
TRAVEL TIME COMPUTATION
Transportation Diversion Study
Frederick County, VA
9/14/2022
To: Int Route 11 & Rest Ch Rd
(Rte 669)
To: Int I-81 NB & Rest Ch Rd
(Rte 669)
Figure C-8
September 2022
125
Appendix D
Generalized Development Plan
126
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
Frederick Water 1/6/2023 No Comments
Winchester Regional Airport - Nick Sabo,
Executive Director 1/9/2023
Construction activity exceeding the maximum heights prescribed in
the EM zoning has not been evaluated by this request. Future
submissions will be reviewed for compliance with 14 CFR Park 77 -
Safe, Efficient Use and Preservation of Navigable Airspace
Noted.
Frederick County Department of Parks &
Recreation 1/13/2023 No Comments
Frederick-Winchester Service Authority 1/3/2023 No Comments
Frederick County Fire Marshal 1/20/2023 No Comments
Frederick County Historic Resource Advisory
Board - Kayla Peloquin, Planner 2/27/2023
Following their review of this application, the HRAB recommended a
Phase 2 architectural study and historical survey be conducted for all
structures on the subject parcels as well as Woodside (DHR #034-
0731) including but not limited to a chain of title including contextual
history of ownership, and an architectural analysis of the interior and
exteriors documenting any significant modifications or events related
to structures and associated resources/outbuildings.
We have agreed to perform this Phase 2 architectural study and historical survey. See
Proffer 13.2.
Frederick County Department of Public Works 1/31/2023 No Comments
Frederick County Public Schools 2/2/2023 No Comments
Frederick County Attorney's Office - Roderick
B. Williams, County Attorney 2/28/2023
To meet Clerk's Office recording standards, please have the names of
all owners in the heading section underlined and in bold type. As
well, all signature pages will need to comply with VA. Code § 55.1-621.
We have prepared the enclosed page with general information
regarding the form of signature pages.
Comment Noted. Proffer Statement has been revised to accommodate this comment.
127
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
I note that you have included with the materials a power of attorney
authorizing Logan Thompson to act for Carmeuse. We are unaware,
however, whether the Property owners intend to authorize your firm
to make binding commitments on their behalf as this matter
progresses. While attorneys at law may obviously appear before
County officials to present and advocate for a rezoning, in the
absence of powers of attorney from the owners, the County would of
course be unable to accept any changes to the Proffer Statement
without each of the owners then expressly acknowledging agreement
to the changes.
The person authorized to sign is Nicholas Bonarrigo, who is a duly empowered
corporate officer of O-N Minerals (Chemstone) Company. O-N Minerals (Chemstone)
now owns the entirety of parcel 34 A 129E. As such Carmeuse will be the only
signatory.
As the Rezoning proposes that two of the parcels - 34-A-8A and 34-A-
129E - would be split-zoned, we will need a metes and bounds plat of
the proposed zoning district boundaries, to prevent any ambiguities
as to exactly what areas are subject to which zoning. Also, per the
proposed Generalized Development Plan (the "GDP"), the right-of-
way for proposed relocated Woodside Road would be outside the
rezoned portion of parcel 34-A-129E, but in order to bind that portion
of parcel 34-A-129E to a commitment to provide right-of-way for the
relocation, that additional portion of parcel 34-A-129E would need to
be part of the Rezoning.
O-N Minerals (Chemstone) now owns the entirety of parcel 34 A 129E. The proposed
right of way for the relocated Woodside Road, which is outside of the rezoning area,
will be on lands owned by O-N Minerals (Chemstone). A metes and bounds plat for the
spilt parcels has been provided and is shown on the GDP.
As written, the obligations in the Proffer Statement are obligations
only of the "Applicant", which the Proffer Statement defines only as
Carmeuse. In order for the Proffer Statement to be fully enforceable,
all obligations should be those of the "Owners", as defined in the
Proffer Statement.
The Owner and the Applicant is now O-N Minerals (Chemestone) Company, and the
word Applicant has been removed from the proffers.
128
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
GDP - The materials are not entirely clear regarding what constitutes
the GDP, as the document labelled "Generalized Development Plan"
has multiple pages stapled to it and, as well, immediately following
the stapled pages were pages with various stockpile
photosimulations. I note, in particular, that the second of the pages
stapled together may be helpful for inclusion as part of the GDP.
Also, with respect to labeling, the label that the Proffer Statement
text indicates - "Generalized Development Plan - Carmeuse Lime &
Stone Clear Brook Quarry" - is not the same as that on the GDP, as the
latter does not reference "Clear Brook Quarry".
The GDP is a stand-alone 1-page document. All other documents are for illustrative
purposes only and are not proffered.
Proffer 1 - The proffer refers to the GDP delineating the general
location of the "quarry" but does not define what would constitute
the "quarry". This leaves unclear whether the "quarry" is, for
example, just the excavation pit or whether the "quarry" also includes
areas for the conduct of related activities.
This has been better defined in the Proffer Statement and the property shall be
developed in substantial conformance with the GDP, which shows the outline of the
quarry pit.
Proffer 2 - The proffer purports to obligate Carmeuse with respect to
Carmeuse's existing operations at its facility south of Brucetown
Road, which is not part of the Property. In this regard, the last
sentence of Proffer 2.1 refers to relocating "removed stockpile
elements" to "other" areas of the Property; there is no stockpile on
the Property now, so what constitutes the "other" areas of the
Property is unclear. Also, no binding documents appear to indicate
the location of any stockpiles on the Property (again, only the page
attached to the GDP, but not designated as part of the GDP, refers to
a stockpile).
We have provided Exhibit A in the proffer statement to show the area of the new
stockpile will be located. See Proffer 2.2.
Proffer 3.1 - The Proffer does not identify the time within which
removal of the stockpiles will take place, nor does it identify any
means for securing satisfaction of this obligation.
Future stockpiles in the newly rezoned area will be depleted as market conditions
dictate. See revised proffer statement 3.2 for further clarification.
129
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
Proffer 3.2 - Unless the second of the pages stapled together with the
GDP is specifically included as part of the GDP, the Proffer Statement
does not identify the locations of the berms.
Please refer to Exhibit A in the proffer statement for approximate berm locations.
Proffer 4.1 - The proffer is unclear, in that it discusses "public
roadways proposed for improvement", but the Proffer Statement
generally proposes only the relocation of existing roadways, as
opposed to improvement of any roadways.
The relocated road shall be designed and constructed as a rural 2 lane paved road
meeting the VDOT standards in a dedicated fee simple right-of-way.
Proffers 4.2 and 4.3 - The proffers do not state the time within which
Carmeuse would dedicate each parcel, following the respective
County request.
The revised proffer statement now contains the timing of the dedication of the
parcels. See Proffer 4.2.
Proffer 4.3 - Staff should be aware that the proffer represents a
contingent commitment that would only vest if Carmeuse is
successful in acquiring parcel 33-A-115B.
We now own this parcel of land and Proffer 4.2.iii has been updated accordingly.
Proffer 4.4 - The proffer does not specify a time for completion of the
construction. With general respect to the concept of the proposed
road abandonments, I acknowledge and appreciate the explanation in
your cover letter as to Carmeuse's proposed creative approach to
seeking removal of roads from, in particular, the Property's active
operations area as shown on the GDP. Having said that, I see two
issues, interconnected to some extent, to Carmeuse's proposed
approach. First, the process under Va. Code § 33.2-909 is a legislative
process, such that whether to act under that process is discretionary
for the local governing body. The related issue is one of timing - can
VDOT assign what would need to be a conditional effective date to an
abandonment under Va. Code § 33.2-912? If not, then Carmeuse
would have to proceed without having received definitive VDOT
action under § 33.2-912, as the Proffer Statement would still remain
in full force and effect.
We will build the road within 15 years of approval of the rezoning application and we
will do this in a phased approach. See Proffer Sections 4.3 and 4.4.
130
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
Proffer 4.5 - The proffer is not clear regarding if Carmeuse is unable to
obtain permission to construct a tunnel under Brucetown Road.
Would this nullify the commitment in the first sentence? If so, the
proffer should so state, in such a way that the proffer commitment is
conditioned on the occurrence. Also, the proffer may need to clarify
that "roadways and tunnels internal it" Carmeuse's property includes
other properties owned by Carmeuse and not part of the Rezoning.
Carmeuse is currently in the process of obtaining the permits, including a renewed
permit from VDOT and OmniTRAX. We will keep the county informed of our progress.
Proffer 4.6 - Staff should be aware that this proffer may represent a
limited commitment, as it would involve self-reporting by Carmeuse.
The revised proffer allows for a County audit of the number of ticketed customer
trucks leaving the property via the Brucetown road exit at any time.
Proffers 6, 7 and 8 (now covered in revised Proffers 9, 10, and 11) -
These proffers certainly represent a well-intended gesture by
Carmeuse, but I must question whether they are permissible under
applicable law. Virginia Code § 15.2-2298(A) allows for the voluntary
proffering of reasonable conditions, provided that, as would be
relevant here, (i) the rezoning itself gives rise to the need for the
conditions, and (ii) the conditions have a reasonable relation to the
rezoning. I recognize that § 15.2-2298 does not necessarily provide
an owner a remedy for a locality's acceptance of conditions that may
not comply with that section, but Va. Code § 15.2-2208 does. While
subsection B of § 15.2-2208.1 appears to offer a safe harbor for a
locality's acceptance of non-complying conditions - namely that the
applicant must object in writing to the conditions - upon closer
inspection of § 15.2-2208.1, that safe harbor does not appear to be
absolute. If an applicant objects in writing, yes, the section provides
that a court shall presume, absent clear and convincing evidence, the
conditions were "the controlling basis" for the locality's decision.
However, the absence of that presumption would not prevent an
applicant from still attempting to offer direct proof alleging a
"controlling basis".
See Revised Proffers 9, 10, and 11.
Proffer 8 (revised Proffer 12) - Also, notwithstanding the foregoing, I
also note that Proffer 8 is not sufficiently definite, as it provides no
details regarding the proffered trails.
We are not proffering a specific trail; we are proffering services to plan and locate the
trail in addition to funds for trail construction. See Revised Proffer 12.
131
O-N MINERALS (Chemstone) COMPANY
d/b/a CARMEUSE AMERICAS
REFERRAL AGENCY COMMENTS/RESPONSES
Revised 7/10/2023
REFERRAL AGENCY DATE REC'D.REFERRAL AGENCY COMMENT RESPONSE TO COMMENTS
Proffer 9.2 - Staff should be aware that this proffer may represent a
limited commitment, as the proffer would still permit the use of
temporary lighting units without any limits.
Temporary lighting units will not be used.
I also include by reference here comments from Planning staff's letter
dated February 24, 2023.Planning staff's comments are addressed in the cover letter dated July 10, 2023.
Virginia Department of Transportation 3/10/2023
VDOT has reviewed the latest Carmeuse rezoning application and
associated Traffic Diversion Study dated 12-19-2022 and we are in
agreement with the findings of the study.
Noted.
132
133
134
8/17/22, 9:24 AM Sra
https://risweb.courts.state.va.us/jsra/sra/#/search/recordSearch 1/4135
8/17/22, 9:24 AM Sra
https://risweb.courts.state.va.us/jsra/sra/#/search/recordSearch 2/4136
8/17/22, 9:24 AM Sra
https://risweb.courts.state.va.us/jsra/sra/#/search/recordSearch 3/4137
8/17/22, 9:24 AM Sra
https://risweb.courts.state.va.us/jsra/sra/#/search/recordSearch 4/4138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165