107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
June 26, 2023
Mr. John C. Wright, PE
Bohler Engineering
28 Blackwell Park Lane
Suite 201
Warrenton, Virginia 20186
RE: Site Plan Comments – WaWa-Amoco Lane
Frederick County, Virginia
Dear Mr. Wright:
Upon review of the site plan dated March 7, 2022, we recommend approval of the subject
plan. Please be advised that a draft SWM/BMP maintenance agreement and receipt of nutrient
credit purchase (0.81 lbs) will be required with the land disturbance application (2.71 acres
disturbed).
Sincerely,
Joseph W. Johnson, P.E. Joe C. Wilder
Civil Engineer Director of Public Works
JCW/kco
cc: Planning and Development
file
FREDERICK WATER
SITE PLAN REVIEW COMMENTS
PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice
315 Tasker Road, Stephens City, VA 22655 540.868.1429 fax
Project ______________________________________________________________________________
Applicant ____________________________________________________________________________
REVIEW STATUS attention________________________________
review number ____________
correct & resubmit approved as noted number of items to be corrected _____________
approved
DRAWINGS
send me by_________________________________________:
1.print of sheets_____________________________________
2. one CD or flash drive containing all sheets as a combined, multi-page document in PDF format. The pages
shall be in landscape orientation.__________________________________
EASEMENTS
Y N A copy of the recorded onsite FW easement(s) is/are required.
A copy of the recorded offsite FW easement(s) is/are required.
o The easement document shall contain a plat and both shall be signed by the Frederick Water.
o The Frederick Water requires specific language in its deed of easement.
o Visit our website www.frederickwater.com to obtain a copy of the form.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
This project also requires DEQ - Valley Region Office approval.
This project also requires VDH – Lexington Field Office approval.
Date: _________________ ____________________________________________
Earl W. Wiley – Engineering Assistant FEB 22
Y N
Y N
Y N
Y N
Y N This project also requires VDH – Lexington Field Office – Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see website for form
This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ’s Certificate to Construct, (2) a
copy of DEQ’s Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These documents must be received before service will be authorized. (4) Work cannot
commence that wo uld connect to FW facilities or require FW inspections until the contract is returned
to this office.
From:Derek Reardon
To:Tara Kerr
Cc:v202185@nf.bohlereng.com
Subject:FW: Wawa Site Plan Review - Amoco Lane & Martinsburg Pike
Date:Friday, July 8, 2022 3:57:08 PM
Attachments:General Notes - June 2013.pdf
For filing, please. Comments from VDOT.
From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov>
Sent: Friday, July 8, 2022 1:56 PM
To: John Wright <jwright@bohlereng.com>
Cc: Derek Reardon <dreardon@bohlereng.com>; Rhonda Funkhouser
<Rhonda.Funkhouser@vdot.virginia.gov>; John Bishop <jbishop@fcva.us>; Tyler Klein
<tklein@fcva.us>
Subject: Wawa Site Plan Review - Amoco Lane & Martinsburg Pike
EXTERNAL: Use caution with attachments and links.
Mr. Wright,
A VDOT review has been finalized for the proposed Wawa site, located at the corner
of Amoco Lane and Martinsburg Pike, signature dated July 1, 2022 . We offer the
following comments:
You may remove the Auto-Turn exhibits for the WB-50 as WB-67 is the larger
vehicle and must be accommodated.
The WB-67 Auto-Turn exhibits demonstrate the vehicle driving into the opposing
lane of traffic and topping the curb to achieve the right turn into the site from
Amoco Lane. The entrance will need to designed to accommodate the truck
without impacting the adjacent travel lanes and without topping the curb. Our
experience has shown a minimum radius of 50’-75’ is needed to accommodate
the maneuver.
The VDOT General Notes that were included are not correct. I have provided
the appropriate VDOT General Notes to be in the plan set.
Please add a note to the pavement sections stating “Limits of full depth
pavement widening along Route 37/11 and Rte. 839 shall be determined by
excavation in the presence of a VDOT inspector and matching core samples
required per WP-2 detail.”
VDOT Staunton District has a memorandum for tree plantings on right-of-way,
which states tree plantings shall be a minimum of 15’ from underground utilities,
including stormwater pipes. Some plantings near the storm drain from Structure
B10 to Structure EX-1, which appear off-right-of-way, are still closer than 15’
from the storm structure and should be removed.
Please provide the existing cross slopes for Rte. 37/11 and Rte. 839 on the
entrance profiles. The allowable change in grade is shown on VDOT Standard
CG-11 Detail and is not to exceed 3%.
The plan advises the ADT for Rte. 37/11 is 18,285. Please revise to show the
correct ADT of 30,000.
VDOT Standard UD-4, Pavement Edgdrain is to be provided beneath the CG-6,
per the detail. Please include and show tying into storm drainage structure or
VDOT Standard EW-12.
For the right-in only entrance on Rte. 37/11, please add “Wrong Way” signage
with the “Do Not Enter.” These signs will need to be called out as R5-1 and R5-
1A from the current MUTCD. The sign size is also to be included.
Please provide storm and HGL computations for the existing inlets and storm
drains with the addition of CG-6. At a minimum, we need to be sure the spread
is within the allowable limits.
Sheet C-502 shows storm drain B-10 going to EX-4 on the 10 year storm
computation table. Should this be EX-1, not EX-4?
Please include all pages of VDOT Standard CG-12. VDOT Standard UD-4 and
PB-1 Details also are to be included.
The plan is still not including a TMP plan. You advised this is still being
prepared and will be submitted. Please be aware the site plan will not be
approved prior to the TMP plan being submitted and reviewed.
Please provide a resolution for the above comments by sending two sealed & signed
sets of revised drawings highlighted to show plan changes, a comment response
letter, as well as one digital copy of the plans. Should you have any questions,
please feel free to contact me.
Thank you,
Timothy Rhodes
VDOT~Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-534-3206
No further road names required at this time. Address will be issued upon the submission of a
building permit.
3/8/22
3/11/22No 3/11/22
Ethan R. Homesley