HomeMy WebLinkAbout063-90 Dominion Knolls - Stonewall District - Backfile (2)RECEIPT
022641
AMOUNT DUE
�''� _ J Q U(J• i
AMO NT'PA _
BALANCE DUE /
PAID BY
ID,,
�_^SM -
Q CHECK
OTHER
PLAN'N.NG AND DEVELOPMENT
P.O. B:.% bul • 9 uuUmi o;gUARE
WINCHESTM VIRGIIJIA ;L2601
THE SUM OF
DOLLARS $ �L zz 6 6
FOR
iJ
BY
t AV -TIMERS RE ORDER No 3221 — Pnnteo n USA
a
SITE PLAN CHECKLIST
The application is not complete_ if the followingr are not present:
► c�� 1.
Two sets of comment sheets
from the
following agencies
along with any marked copies
of the
plan;
oK
4(cl1
►_ VDOT
City of Winchester
11algl
l-:�LO Co. San. Auth.
Co. Hlth. Dept.
tl/IShO
/2/21 Inspections Dept.
2JAI__
Parks & Rec.
oK
I3o/Q
(_ Fire Marshall
Airport Authority
k,I AI
Cc,
2.
2 copies of the Site Plan
application
3. 5 copies of the plan on a single sheet
4. 1 reproducible copy of the plan (if required)
5. a 35mm. slide of the plan (if required)
* One copy of the application and comment sheets, two
copies of the plan and the marked plans from the review
agencies should be enclosed in a package which will be
forwarded to the County Engineer.
TRACKING
DATE
Application Received
Site Plan forwarded to Consulting Engineer
Review/Invoice received from Engineer: ioc,oej�'
�--
Fee Paid (amount
Site Plan heard by Planning Commission
(if required)
Final Site Plan submitted with review agency, Planning
Commission, and staff comments addressed.
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703 / 678-0682
May 23, 1991
Dove & Associates
ATTN: Mr. Tom Davis
P.O. Box 2033
Winchester, Virginia 22601
Dear Mr. Davis:
The Frederick County Planning Department administratively approved
Site Plan #063-90 of Dominion Knolls on May 22, 1991. This plan
calls for the construction of 180 townhouses with four (4) feet
concrete sidewalks, an asphalt parking/maneuvering area complete
with CG-6 curb and gutter, 418 parking spaces including 14
handicapped parking spaces with ramps and crosswalks, recreational
facilities including tot lots, picnic facilities, and an asphalt
court, pedestrian walkway connections to Baker Lane and Fort
Collier Road, an eight (8) foot high board on board opaque privacy
fence with full landscaping, stormwater management facilities,
required fire protection and all erosion and sediment control
measures. Enclosed is a copy of the approved site plan for your
records.
If I may answer any questions regarding this letter, please contact
me.
Sincerely,
Evan A. Wyatt
Planner II
EAW/dds
cc: Mr. Charles Orndoff, Sr., Stonewall District Supervisor
Mr. Pete Weidlein, Dominion Knolls Joint Venture
THE COURTHOUSE COMMONS
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
•
6.1
January 30, 1991
Dove & Associates
Attn:` Mr. Tom Davis
3078 Shawnee Drive
Winchester, VA 22601
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703/667-0370
RE: Preliminary Review Of Dominion Knolls Site Plan
Dear Tom:
This letter regards my review of Site Plan #063-90 for the Dominion
Knolls townhouse project. This project received Master Development
Plan approval on November 4, 1987 and Subdivision Plan approval
from the Planning Commission on February 1, 1989. The site plan
conforms with both of the approved plans. The site plan was
designed well and the overall concept of the plan is fine; however,
there are some minor revisions that need to be made in order to
receive final site plan approval. I offer the following comments:
1) A fifty (50) feet perimeter setback is required along the
eastern property boundary line. This affects units 95-103,
104-111 and 120-129.
2) The cover sheet needs to be changed to reflect current parking
requirements. Two bedroom units require 2.25 parking spaces.
This will not create a problem with this plan as you have
already provided the required amount of parking.
3) I have counted 418 parking spaces for this project. The note
on the cover sheet says there are 409. Is this number
correct?
4) All aisle widths need to be twenty-two (22) feet due to the
use of 90 degree parking.
5) The use and zoning of adjoining properties needs to be
provided.
6) The maximum site impervious ratio needs to be provided.
7) Does Baker Lane have a route number?
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
Page 2
Mr. Tom Davis
January 30, 1991
8) Your checklist indicates that numbers 7, 17, 23, 27, 39, 42
and 44 are included on the site plan. I can not locate them.
9) Although I have read the comments made by Donohue, I question
the placement of silt fencing for this project.
--Should silt fencing be installed along the western property
boundary during construction?
--Why does the silt fence end halfway along the City/County
border?
--Why is there a break in the silt fence at the southeastern
corner of this property?
I realize that this plan was intended for preliminary review only,
so I will briefly describe items that I will be looking for on the
final site plan:
1) Pedestrian access along Fort Collier Road to Hampton Chase as
well as along Baker Lane to the City limits.
2) Buffer details for full screening along the City/County
border.
3) Crosswalks across the parking area to the play areas to warn
motorists of children in the area.
4) The landscaping plan shows perimeter parking lot landscaping
I like it!
I hope this preliminary review is beneficial to your project.
Please remember that all details for dedication and bonding need
to be resolved in order to receive final plat approval. If I may
answer any questions regarding this letter or be of any assistance,
please contact me.
Sincerely,
Evan A. Waytt, Planner II
EAW
i
SITE PLAN APPLICATION
DATE (� S- 0C;T 17?6 APPLICATION # (0(" �6 -1 V
Complete the following application:
1. Development Name: Do m 1 N 1 o n) K Nd I k
2. Location of Property: M 10lt� R !�6 O'jZy V Q r BAKE IZ L-A /Jf -A rJ t'
(by street name)
60P-00►� s7oljf�k-r
3. Property Owner:,, P Qr l Q e W Q A �d eJQ
Address: 1 41 S O — A W ►1l oo-N koo� S c1 itt -ad 0
Gha.P'i((Y IVA Qd �J
Telephone: 1 - :2 63
4. Applicant/Agent : s cx n-a c,-n O'L w e
Address:
Telephone:
5. Designer:
Address:
D a v 4 A N J A s5 o c' l o.T'e .S
Sri% Dr► ✓-e.
0 ► ri CAN P-5 .'t t- , V
Telephone:
Contact: p m DC' y I S [ !D e) V P
5
6. Is this an original or revised Site Plan?
Original Revised
7. Total area of parcel to be developed:
8. Property Information:
a) Tax Map:
b) Parcel Nu
c) Tax ID # :
d)Current Zoning: R P
e) Present Use:
f ) Proposed Use: y3 Y�o �J�S l� 14S Oy r1 1
g) Adjoining Property Zoning: uW KP , 0 C K P
h) Adjoining Property Use: n9u5-V,ni�' Alt D�yp1�x S- V�"+connErCra�
i) Magisterial District: S-t- & (J 6y3 0.„
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submission of my site plan.
Applicant's Signature: �,� �� V,) t,1 \,1 rjQ
•
0.
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
✓' _ 1. Name of proposed development
-se _ 2. Name and address of owner
3. Name and address of developer
_ 4. Name, address, and phone number of designer
_ 5. Certificate of surveyor, engineer, or architect
_ 6. Date plan prepared and date of revisions
_ 7. A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval
8. A space labeled "approved by the Zoning
Administrator" for the approval signature and date
of approval
General Site Information
Y N
Z 9. Location map (scale 1:2000)
�1/ _ 10. Magisterial District of site
— 11. Scale of site plan (not to exceed 1:50)
�• 12. North Arrow
_ 13. Zoning of site
_ 14. use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Y N
_
15.
Surveyed boundaries for all lots and parcels
_
16.
Acreage of all lots included in the plan
pol _
17.
The location and dimensions of all required setbacks
and yard areas
18.
Location of all buildings, structures, and uses
_✓ _
19.
The proposed use of each building, structure, and
area
20.
The location and type of all dwelling units
_
21.
Ground floor area and total floor area of all
buildings With FAR calculations for commercial and
industrial zoning districts
22.
The height of all buildings and structures
=
23.
The location and dimension of all signs
7
0
0
Lots/Uses/Buildings & Structures (con't)
Y N
i✓M
24.
Location
of
outdoor lighting fixtures
Ar#j_
25.
Location
and
nature of outdoor storage areas
_
26.
Location
and
area of common open space
27.
Location
and
description of all recreation facilities
28.
Location
of
sidewalks and pedestrian ways
29. Location of outdoor trash receptacles
Roads
Y N
_ 30. Name and number of existing and planned streets on
and adjoining the site
y _ 31. Location of existing and planned streets on and
adjoining the site
_ 32. Dimensions, boundaries, width, pavement, and
construction of planned roads
r _ 33. Location and dimensions - of all proposed
entrances from public right-of-ways
Utilities
Y N
34. Location of all utilities, including sewer and water
lines with the size of lines, mains, and laterals
_ 35. Location and width of all easements, including
access, utility and drainage easements
36. Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Y N
37. Calculations describing the required number of
parking and loading spaces
_ 38. Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing, and
other features to be used
Y" _ 39. Location and dimension of all handicapped spaces
1.1
0
Natural Features
Y N
j5f_ 40. Existing and finished contour lines
L.LJ/{A _ 41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
Landscanin
Y N
_ 43. Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
Y N
✓ _ 45. A stormwater management plan with run off
calculations and location and description of
facilities to be used
46. Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
�9
w:.•�70UY6..S.��.. rtoiw��. ��.�-.,��..:..� uW�ttWY� -. ��. J�u, ���- .i44]Aemm :.�LVIQmiWY� -..t.i.'s.:..!riymiw
1020
DOMINION KNOLLS JOINT VENTURE
14150-A WILLARD ROAD, SUITE 200
CHANTILLY, VA. 22021
68-444
_1 s.1& 5w
PAY
TO THE
ORDER OF_ _� /Pcf'�� C� - $
�C ✓L'. o�.S-_�.'� -�.1 ✓ ��� -- ��`�=DOLLARS
FOR
rtle` E0'R,- '.
MASON KAIVK
FAIRFAX VIRGINIA 22AIA
�11� r-.e- -
116000010 2011' 1:056004445l: 003574 2110
�>P �k- 063-9 0
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
1. Name of proposed development
_ 2. Name and address of owner
7 _ 3. Name and address of developer
7 _ 4. Name, address, and phone number of designer
7 _ 5. Certificate of surveyor, engineer, or architect
7 6. Date plan prepared and date of revisions
RA 7/F A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval
_ 8. A space labeled "approved by the Zoning
Administrator" for the approval signature and date
of approval
General Site Information
Y N
9. Location map (scale 1:2000)
_ 10. Magisterial District of site
11. Scale of site plan (not to exceed 1:50)
✓ _ 12. North Arrow
_ 13. Zoning of site
14. Use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Y N
_AZ
_
15.
Surveyed boundaries for all lots and parcels
-V-
16.
Acreage of all lots included in the plan
17.
The location and dimensions of all required setbacks
and yard areas
_✓
_
18.
Location of all buildings, structures, and uses
✓
_
19.
The proposed use of each building, structure, and
area
_
20.
The location and type of all dwelling units
LA
21.
Ground floor area and total floor area of all
buildings with FAR calculations for commercial and
22.
industrial zoning districts
_
✓
The height of all buildings and structures
—
23
The location and dimension of all signs
7
Lots/Uses/Buildings & Structures (con't)
Y N
A 24. Location of outdoor lighting fixtures
_ 25. Location and nature of outdoor storage areas
26. Location and area of common open space
_ ✓ 07 Location and description of all recreation facilities
28. Location of sidewalks and pedestrian ways
�q 29. Location of outdoor trash receptacles
Roads
-tovap- Y
01
N /
30. Name and 5UP
of 'sting and planned streets on
and adjo the si
31. Location of existing and planned streets on and
adjoining the site
32. Dimensions, boundaries, width, pavement, and
construction of planned roads
33. Location and dimensions of all proposed
entrances from public right-of-ways
Utilities
34. Location of all utilities, including sewer and water
lines with the size of lines, mains, and laterals
35. Location and width of all easements, including
access, utility and drainage easements
36. Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Parking
Y N
►J.nxr�v '
37 Calculations describing the required number of
/ parking and loading spaces
✓ _ 38. Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing, and
other features to be used
39. Location and dimension of all handicapped spaces
Natural Features
Y N
_ 40. Existing and finished contour lines
41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
Landscaping
Y N
43. Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
rM
45. A stormwater management plan with run off
calculations and location and description of
facilities to be used
46. Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
9
SITE PLAN CHECKLIST
All required information must be obtained prior to the submission
of this application. If any of the required information is missing
or not complete, the site plan application will not be accepted by
the planning department. The applicant shall schedule a meeting
with the staff member in charge of. site plan review when the
application is ready for submission to insure that all required
information is complete.
SITE PLAN PACKAGE
1. One set of comment sheets from the following agencies
along with any marked copies of the plan:
✓ VDOT
Co. San. Auth.
Inspections Dept.
Fire Marshal
Town of Middletown
County Engineer
5*-tA 4-6
City of Winchester
Co. Hlth Dept.
Parks & Rec.
Airport Authority
Town of Stephens City
Soil & Water Conservation
District
X 2. One copy of the Site Plan application
_,K3. Five copies of the Site Plan
_LA 4. One reproducible copy of the Site Plan (if required)
wjA 5. A 35mm slide of the Site Plan (if required)
.5 P 4_1
6 a770
0�- PlAl 67 P. 01
.000 rV r FV G,
A3.
,CO3NjM0,NWEALTH of ViRCiINIA
DEPARTIVIFNT OF TRANSpuATA I -ION
P. U. /S SUSIqMAN
EWNSURG, 229' .4 MOAAM M.
RAY L) PETHTFL (703) 984-4133
nzirch 4, 1991-
Sr.. TWV:Rf!f prC, ._d C DmAnion Kwll,
"C' 3ates Route-, 1200 & 131
J,r i ve Frederick
w� 22601
I is to aakledgc of your revised plans Llat-991 to the
ed Jam%ary 4, 1 Please
ryow
tht, developer according Y.
Jrli- fU0W,1n9 commients:
A pee,001--;,"it-tation corifererc)e
by the
engineer a d 'or dev --lorper w i Lhe
o loxinty agemies and VWr steal I be conduCtP-d
attnndam,,,�,, f the� �:.-,xitractor, C
prior to f:;f work.
Materials used and method of cox)' Appiv to current obsL-,z-,,ed
Rid xdove lcypr►erai.
-
and Bridge Specifications aPPlIC-a _IUMUI, tion of this
Our rev L eW and comments are general in nib..,,,tjld conditions in the Lt
e.xi--:t n-)oh that. additional measures are such iit�sures shall be
c"->jfstPd to the satisfaction of the Departr-
The appropriate land use permits shall be oUtairx--d before any work is performed oiA
the, State's right-of-way. Said permits will require the de-veR4x-_r to pay t-he
galary and expenses of a state assigned Inspector whale work is being Performed on
the Stat.A-'s right -of -way Any charges will be billed monthly ork
The contractor shall notify %V)T when %,,*rk is to begin or ceaRre
undetermined lenqt.h of timtzt- vDoT will also require ( forty -eight) 48 tx)[UrS
for inwc-t ions.
Sbrn.ild yov need additional information, 10 ro.,t. tiesit ate to call.
sinti,erely,
wi 1. 1 iam H . DuA)vcAn
Trans. Rec;idexlt E1-10)inc�.
By- Robext B.
perruts d S-Ubd- Spec'. sx, VAR 1
j t-n- U�: FRUH fie
1, -1 71,74 1 W 2 � S L) C 4 =, t
TC1 10 6670370 P.02
COUNTY of FREDERICI
Department of Pianning? and Developmen,
/03 (165-56f BFQPT��T FOR SITE PLAN COMMENTS
Virginia Deoartme =t of ,T-an.f;portation
P.O. Box -718, Wl-nburg, v-irgirxia 22824-0276
(703) 964-4133
Tbo local office of thtn, Transportation Department is located at
1550 Commerce Street, if you prefer to hand deliver this review
Applicant's name, address and phone numix--r:
Name of development and/or description of the request:
Loca t i on t
(A K G(?ti j k t4 a -iNo
Transpox-tation Department Comments :
See attach!>d 1.ettl-er. from W. H. Bushman tco Dove
(JaL-LA Maxch 4,
VDOT Signature and Da
L_////♦♦♦♦
re-
NOTICE TO VDOT - PLFASF -.,T7j3 FOR.M. TO THE A,--rd L C A !!-
ri CYT I (--, 1; '1,f) -A .-, T---f
g
It L$ YQUr re5von3ibty r7o illcompletc.4 [
�11 Order tc)
ea a e j.)1a
v00 r Corte w
J
COMMONWEALTH ®f V1RQ1N1A
DEPARTMENT OF TRANSPORTATION
P. 0. BOX 278
RAY D. PETHTEL EDINBURG, 22824 WILLIAM H. BUSHMAN
COMMISSIONER ( 703 ) 984-4133 RESIDENT ENGINEER
February 22, 1991
Mr. Tom Davis Ref: Proposed Commercial Entrances
C;0 Dove & Associates Dominion Knolls
3078 Shawnee Drive Routes 1200 & 1322
Winchester, VA 22601 Frederick County
Dear Tom:
As requested we have reviewed the above referenced project's revised site
plans dated January 4, 1991. Our recommendations may be found on the attached
plans marked in red and as follows:
1. Overall the plans reflect the changes discussed at our on site meeting of
November 19, 1990. However, we feel a standard DI-3B drop inlet with 15"
pipe should be provided at Station 20+15, Baker Lane, to accommodate
surface drainage. Also, the proposed 24"x18" C.M.P. under the Baker Lane
entrance should be connected to the adjacent drop inlet.
2. Several of the old typical sections should be eliminated from the plans
and the proposed pavement design revised to reflect our new pavement
designations.
3. The proposed sanitary sewer encasement pipe under Route 1322 should be
extended as noted.
4. A standard VDOT stop sign will be required at the Baker Lane entrance.
Please revise and resubmit four (4) copies for final approval. Should any
changes be deemed necessary, please design them to meet or exceed the above
recommendations.
Should you have any questions concerning the above, please give me a call.
Sincerely,
William H. Bushman
Trans. Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
RBC 'rf
Attachment
xc: Mr. F. E. Wymer, Mr. R. W. WatkinslJ �
TRANSPORTATION FOR THE 21 ST CENTURY
•
V111-
COUNTY of FREDERICI
I Departments of Planning and Buildim
703/665-5654
REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS
Virginia Department of Transportation
AT1'N: William H. Bushman, Resident Engineer
P.O. Box 278, Edinburg, Virginia 22824-0278
(703) 984-4133
The local office of the Transportation Department is located at
1550 Commerce Street, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
C Y�SOC i PAC S ?�-O 1 B S f+Ayj Q93- 1¢, 0i
W 1 t-NC4-ESTGK-1 d1 A• ZZ (00 1 Z, ' - i 103
Name of development and/or description of the request:
`�1 V -1 i IJ 100 /� t c t�.S
Location:
--1NT>:tLS`Z�c'l O� of �ArkCR- �►.k=, � �y «mac c.� �-�J
Transportation Department Comments:
See attached letter from W. H. Bushman to Mr. Tom Davis
dated November 2, 1990.
VDOT Signature and Date: .-i Z
PnBG ❑KS; � V KDC, UHL
OPIES TO' __
NOTICE TO APPLIC T2
22 L� r
Please attach THRRE copies of your plans and/or a� L-f-orm
in order to assist this agency with their review. I n ou.
9 Court Square - P.O. Box 601 Winchester, Virgini
RAY D. PETHTEL
COMMISSIONER
Mr. Tom Davis
C/O Dove & Associates
3078 Shawnee Drive
Winchester, VA 22601
Dear Tom:
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
P. O. BOX 278
EDINBURG, 22824 WILLIAM H. BUSHMAN
(703) 984-4133 RESIDENT ENGINEER
November 2, 1990
Ref: Proposed Commercial Entrances
Dominion Knolls
Routes 1200 & 1322
Frederick County
As requested we have reviewed the above referenced project's revised site plans dated
October 19, 1990. Our recommendations may be found on the attached plans marked in
red and as follows:
1. Standard CG-6 curb and gutter should be extended along the property frontage with
Route 1200, Baker Lane, to provide a consistent 36' typical section from face to
face of curb as noted. Curb drop inlets are to be provided as necessary to
accommodate surface drainage.
2. The curb and gutter should be extended around the intersection with Route 1322 to
provide a 12'x100' right turn lane with 100' taper as noted. The existing double
line of 54"02" C.M.P.A. are to be extended as necessary in order to provide a
minimum 50' radius. This design should align properly with ongoing improvements
of the Baker -Knight Street Extended project opposite this intersection. For your
use I have enclosed a black and white copy of the approved design for tho-
Baker -Knight Street intersection.
3. Adjustment to the proposed utilities within the Route 1322 right-of-way will be
required as noted.
Please revise and resubmit four (4) copies for further review. Should any changes be
deemed necessary, please design them to meet or exceed the above recommendations.
Although site plans similar to these were reviewed and approved by this Department in
early January, 1989, we feel the above recommendations are warranted at this time due
to the increased amount of development and changing geometrics of the area surrounding
this intersection over the past two years.
Should you have any questions or would like to meet to discuss this matter, please do
not hesitate to contact me.
Sincerely,
W. H. ZTransp. Res. Engr.
By: R. B. Childress, Hwy. Permits & Subd.
Attachment Xc: Mr. F. E. Wymer, Mr. R. 'TRAW§ t�k�10NFORTHE21STCENTURY
l
COUNTY of FREDERICK
Department oC PlannM2 and Development
70 665-561
F/\\ 701 667-0370
REQUEST FOR SITE PLAN COMMENTS
Frederick County Sanitation Authority
P.O. Boa 618, Winchester, Virginia 22601
(703) 665-5690
The Frederick County Sanitation Authority is located on the
second floor of the Old Frederick County Courthouse in
Winchester, if you prefer to hand deliver this review form.
Applicant's name, address and phone number: iC
7D 3 �b3 aid U
Name of development and/or description of the request:
Location:
E'
Sanitation Authority Comments:
-ZN4 A V/F_ W - 4,,OAgo VEa 45 4/y-7",Ea - lel S --
/ �O�Y o f �L G,� Gliy/� S 6Y TGfl ✓ - �S ►'�'cn�
,c ON
Sanit. Signature & Date:
(NOTICE TO SANITATION y
NOTICE
It is your responsibility to
possible in order to assist
please attach TWO copies of
4 44r v 1 ,QiY 8 1/
E RETURN THIS FORM TO APPLICANT.)
TO APPLICANT
complete this form as accurately as
the agency with their review. Also,
your plans and/or application :orm.
o
P n
t1 1 COUNTY of FREDERICK
��Department oC Planning and Development
�/, S � i. 1.�e .• � .. ` 703 665-561
FAN 703 667-0370
EE UEST FOR SITE PLAN COMMENTS
Frederick County Sanitation Authority
P.O. Boa 618, Winchester, Virginia 22601
(703) 665-5690
The Frederick County Sanitation Authority is located on the
second floor of the Old Frederick County Courthouse in
Winchester, if you prefer to hand deliver this review form.
Applicant's name, address and phone.number:
Name of development and/or description of the request:
Location:
. �jEjL�c'r�-'l o�-, � r ��{�\��•3L '�iTt.E�'� �'1C� C�1�C;,,� t`'�;
Sanitation Authority Comments:
J PAW.& - Rf fPA&/TW
coR,q OCT. --ff Sz1,j"# zr - 99, 1.nsw s . / sr' RW y1..eW1.
as
Sanit. Signature & Date:
(NOTICE TO SANITATION 7!
E RETURN THIS FORM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this for
possible in order to assist the agency with th
please attach TWO copies of your plans and/or
lv as
n n n- ((II \\'ieC-6o,t"T- `r
t� �,
•
COUNTY of FREDERICE
Department of Planning anti De%elopmew
703 665-5651
REQUEST FOR SITE PLAN COMMENTS FAX 703 6674037t
Frederick County Inspections Department
P.O. Boa 601, Winchester, Virginia 22601
(703) 665-56� 54
The Frederick County Inspections Department is located at 9 Court
Square in Winchester, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
Name of development and/or description of the request:
Location:
Inspections Department
40
Comments:
l9d'7'
Inspect. Signature & Date
(NOTICE TO INSPECTIONS - P SE RETURN THIS VORM
ty zI "�5-7- 9 z)
TO APPLICANT.)
NOTICE TO APPLICANT -
It is your responsibility to complete this form a
possible in -rder to assist '.he agency with their
please attach a copy of your plans and/or applica
9 C��urt Square
P.O. Box 601
%%'inchester. V irvil
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 011491047 Date Received 011491 Date Reviewed
Applicant Name Dominion Knolls JV
Address 14150-4 Willard Road
Chantilly, VA 22021
Project Name Dominion Knolls
Phone No. 703-265-0600
Type of Application �irE f�'eA�� Current Zoning
1st Due Fire Co. / Ist Due Rescue Co. /f
Election District
RECOiMENDATIONS
Automatic Sprinkler System Residential Sprinkler System
Automatic Fire Alarm System _X Other
Emergency Vehicle Access;
Adequate _X Inadequate
Not Identified
Fire Lanes Required; Yes _ No
r
C o m m e n t s:
A/- .� zi.--,4i�%h
Roadway/Aisleway Widths;
Adequate_ Inadequate Not Identified _
Special Hazards {doted; Yes No l�
Comments:
- C:ont i nueo -
Hydrant Locations;
Adequate x Inadequate
Siamese Connection Location;
Approved Not Approved
Not Identified
Not Identified
Additional Comments:
D,c/Gr� /Dl� '' �f'l�,t°� o'`- �.A; ?c;,�'c•c�� of ��,v-
? �2/
/� FQuEST /%%C�� /G G'U �Ti/ /"XJ.C/E.cnS /,�i!/Gl7c`2'.✓ %D .l�/`-�CG:iS
_/fI/ALL/,dam ��/�7c=,riT/i�L ✓�"�,L'/�!/.C�LG�" �5%C�y/ /i,/ /j%vt�EZ
Review Time
Douglas A. Kiracofe
Fire Marshal
FIRE1` j� [��'!{i �'~7 r�: i=•;'� fi? f t
Y I1�1. j\��1 d�/t�iHi I��i LI-iL.i i\ll` � ,�R~P
1, U,* ! i
*OUNTY OF FREDERICK, VIRGAIA
` FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 101990518 Date Received 101990 Date Reviewed 102290
Applicant Name Dove and Associates
Address 3078 Shawnee Drive
Winchester, Virginia 22601
Project Name Dominion Knolls
Phone No. 703-667-1103
Type of Application Site Plan Current Zoning RP
___
1st Due Fire Co. 18 1st Due Rescue Co. 18/3
Election District Stonewall
RECOMMENDATIONS
Automatic Sprinkler System Residential Sprinkler System X
Automatic Fire Alarm System Other
Emergency Vehicle Access;
Adequate X Inadequate Not Identified
Fire Lanes Required; Yes X No
Comments: ''No parking - Fire Lane" signs required adjacent to all
hydrants.
Roadway/Aisleway Widths;
Adequate X Inadequate Not Identified
Special Hazards Noted; Yes X No
Comments: Access to structures for ambulance crews is poor, To make
access to most buildinos crews must carry eouioment & oatients between
parked cars' Recommend handicapped access ramps on isl
`
of each townhouse group to facilitate emergency access. ` } UCU I J IWAj
`
~
0
Hydrant Locations;
Adequate
Inadequate X
Siamese Connection Location;
Approved Not Approved
Not Identified
Not Identified X
Additional Comments: 1. Additional hydrant needed for proper coverage
'2"i 4%%1-J
of lots 1-7 & lots 172-180. 2. Additional hydrant needed for proper
coverage of lots 33-59. 3. Additional hydrant needed for proper coverage
to lots 68-74 and 76-103. 4. Temporary street signs and address signs
required during construction. 5. Access for emergency vehicles must be
maintained at all times during construction.
Review Time 1.25 hr
Douglas A. Ki acofe
Fire Marshal
I�
•
COUNTY of FREDERICI I
Department of Planning and Developmcr
7031665-56�
REQUEST FOR SITE PLAN COMMENTS FAX 7031667-1)3"
Frederick County Parks & Recreation Department
P.O. Box 601, winchester, virginia 22601
(703) 665-5678
The Frederick County Parks & Recreation Department is located on
the second floor of the Frederick County Administration Building,
9 Court Square, Winchester, if you prefer to hand deliver this
review form.
Applicant's name, address and phone number:
1 H 1 D AyJ t 1Ir r� Ra S �� as i)
Name of development and/or description of the request:
Parks & Recreation Department Comments:
Site plan meets open space and recreational area re uirements. Detailed
drawings and specifications of the half Basketball Court will need to be
reviewed and approved prior to development of this recreational unit-,
Parks Signature and Date:
(NOTICE TO PARKS - PLEASE URN THIS FORM TO THE a.PP C T.)
NOTift TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in ordr- to assist the agency With their review. Also,
please attach •i copy of your plans and/or application fort.
9 Court Square - P.O. Box 601 - Winchester, Virvi.iia - 22601
COUNTY of FREDERICk
IDepartment of Planning and Developmen
REQUEST FOR SITE PLAN COMMENTS 703/665-565i
FAX 703 / 667-03 7
Frederick County Parks & Recreation Department
P.O. Boa 601, Winchester, Virginia 22601
(703) 665-5678
The Frederick County Parks & Recreation Department is located on
the second floor of the Frederick County Administration Building,
9 Court Square, Winchester, if you prefer to hand deliver this
review form.
Applicant's name, address and phone number:
Name of development and/or description of the request:
Location:
Parks & Recreation Department CrMMv nts :
Adequate space -has not been provided for required recreational units.
Detailed specifications for proposed recreational amenities are needed
before this department can make a recommendation regarding recreational
requirements. Please indicate the percent of open space proposed that fall
within the following areas: lakes,& ponds, wetland or steep slop s%90
Parks Signature and Date: �1 ll�l
(NOTICE TO PARKS - PLEASE R URN THIS FORM TO THE APPLICANT.)
NOT i .. TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in or�ir-- to assist the agency with their review. Also,
please attach •i zopv of your plans and/or application f:or:n.
9 Court Square - P.O. Box 601 - Winchester, Virgi.lia - 22601
0 0 a
r
0
—9O
March 13, 1991
Evan Wyatt, Planner
Frederick County Planning Department
9 Court Square, P.O. Box 601
Winchester, VA. 22601
Re: Dominion Knolls, Second Submission
#17555.117
Dear Evan,
ENGINEERS
ARCHITECTS
SCIENTISTS
Following our first review, I had subsequent coordination meetings with Tom
Davis. He made a second submission which I have reviewed and my findings are
summarized below.
A. ACCESS ISSUES:
1. Traffic generation estimates have been provided and reviewed by VDOT.
2. I have been advised that neither the City or Frederick County have
plans for the extension of Battle Street into the County.
B. EROSION AND SEDIMENTATION:
E. & S. measures have been adequately addressed.
C. DRAINAGE DESIGN:
The majority of the comments have been addressed. During construction of
this project, grading controls and stake -out will be critical to ensure
positive drainage on -site since much of the drainage is conveyed in
surface gutters. Otherwise, pockets of standing water may develop during
and after rainfall. Thoughts or suggestions are listed below.
1. I would like to emphasize to the developer and designer that
deferential unbalanced fills against walls in excess of 7 feet
require special structural consideration. Also, the minimum spacing
between the top of ground and the bottom of the house framing is
8 inches. One example where this will need to be addressed by special
architectural design is behind units 98 thru 111. It is my
understanding that the developer has an architectural plan that will
meet these requirements.
FIE'
r� I
■ 11240 N&ples Mill Road, Suite 100, Fairfax, Virginia 22030 ■ 703.385.3566 ■ FYLC 703.$0., 319
r • •
ENGINEERS
ARCHITECTS
SCIENTISTS
2. I question the method for establishing the off -site drainage time of
concentration (Tc). It is my opinion that the "Tc" will be shorter
than the indicated 59 minutes and subsequently the peak flows would
be higher. In review of the channel behind Lot 40 to Lot 1 it appears
that the capacity will be adequate to handle the additional or
increased flows this would create. In further review of the four
large culverts under the entrance to the project, it appears that the
proposed culverts will pass the 100 year flow with a headwater
elevation of just less than 680.
3. The storm water runoff from the upstream areas within the City of
Winchester and proposed development in Frederick County is routed
through existing and proposed ponds for the respective local. This
will help mitigate (or justify) the long time of concentration
assumed in this design.
Based on the above reasoning established through meetings with the designer
and this final review of the plans, I can recommend approval.
If you have any questions, please let me know.
Sincerely,
DONOHUE & ASSOCIATES, INC.
la4u:c;'Bernard, P.E.
Project Manager
PAB/j la
cc: Torn Davis, Dove & Associates
R/F/AH7
0
11240 Waples Mill Road
ENGINEERS Suite 100
ARCHITECTS Fairfax, Virginia 22030
SCIENTISTS 703.385.3566
Evan Wyatt, Planner
Frederick County Planning Department
9 Court Square, Box 601
Winchwster, VA 22601
Your Authorization: Signed Agreement
Second Review Dominion Knolls
Project Manager
Sr. Engineer
Admin. Assist.
3.0 hrs @33.25
5.0 hrs @33.25
1.0 hrs @14.25
Total Direct
Total Indirect
TOTAL DUE THIS INVOICE
1]
Date: Mar. 13, 1991
Please Reference:
Project No. 17555 .//%
Invoice No. 9101056
Client No. 07534
99.75
166.25
14.50
280.50
420.75
$ 701.25
E-NGINFERS
ARCHITECTS
SCIENTISTS
December 13, 1990
Evan Wyatt, Planner
Frederick County Planning Department
9 Court Square, P.O. Box 601
Winchester, VA 22601
Re: Dominion Knoll Site Plan
17555.117
Dear Evan,
We have reviewed the site plan for the above referenced project and offer the
following comments:
A. ACCESS ISSUES:
1. The estimated traffic generation from this property to Cordor and
Baker Streets based on the ITE Manual will be required prior to final
plan approval.
2. This plan, which is consistent with the MOP does not include the
extension of Battle Avenue into the County. What is the ultimate
proposed status of this street?
B. EROSION AND SEDIMENTATION CONTROL
1. A complete E & S narrative describing construction phasing, soil
stability, maintenance, fuel removal measures and final stabilization
as required by the Virginia E & S handbook need to be included with
this plan.
2. Measures need to be referenced to the typical standards and/or
details. These can be referenced to the specifications in the
handbook or to details added to the plan.
3. The size of the temporary construction entrance is required.
4. Rip -rap outlet protection should be placed at the outlet ends of the
proposed drains to minimize the potential for down stream erosion
where velocities exceed 4 cfs or as otherwise specified.
�7
■ 11240 Nhpks Mill Road, Suite 100, Fairfax, Virginia 22030 ■ 703.385.3566 ■ Fax 703.
Pri�urJ nu av'c1r,l /ai/r� _ _--_
•
,D
7W
ENGINEERS
ARCHITECTS
SCIENTISTS
C. DRAINAGE AND STORMWATER MANAGEMENT
1. The drainage divide map and stormwater management design were
provided.
2. The design calculations for the proposed culvert pipes beneath the
proposed entrance from Cordor Street to the detention pond need to be
provided.
3. The drainage calculations need to be re-evaluated. The "C" factor
used for the offsite properties should be somewhere between 0.4 and
0.45 as a minimum. The 0.3 used is not conservative enough.
4. The pre-existing "C" for onsite should be 0.2 in establishing the
total allowable pre -development runoff rate.
5. The pre -development flow to the pond needs to take into consideration
the time of concentration from the furthest point where the offsite
concentrated flows enter the property and travel to the pond site.
The flow from the greatest drainage area enters from Battle Avenue
and travels around the end of the property to the existing pond. If
it takes 10 minutes to travel from the property line to the pond, the
total travel time or time of concentration will be 69 minutes. The
pre -developed flow should be based on the product of the IlOyr for Tc
of 69 minutes, weighted total area "C" factor and a drainage area of
25.7 + 51.88 + 105.82 acres.
6. Similarly, the post -development flow will need to be determined. This
should include a shorter total time of concentration, since the
channel will be a prepared channel.
7. The drainage channels will need to be designed so that the 100 year
design storm will not flood private property.
8. Additional elevations need to be provided at building corners, curb
and gutter returns, drainage inlets and parking areas to ensure
proper drainage and to provide control for construction.
9. The class of the proposed RCP is not stated in either the general
notes, plan, or profile sheets.
10. Most of the buildings at the east end of the property may not meet
the Building Code requirements for minimum clearance between the
finish floor elevsation and the proposed exterior grade if units will
include frame construction.
• 0
QEG 1 7 i990 I f
I
9 •
ENGINEERS
ARCHITECTS
SCIENTISTS
11. Some information on the storm sewer profiles do not depict what is on
the pipe capacity chart.
a) The slope of the 18" RCP pipe between B7 and B6 is not
consistent with calculation table or invert elevations.
b) The top elevation of B6, B3 and B2 inlets on the profile sheet
are not consistent. It appears they should be 692.00, 681.30 and
680.30 respectively.
12. I did not see any calculations or construction detailing for the
emergency spillway or embankment.
These comments will have to be addressed before I can recommend approval of
the plan. If you have any questions, please let me know.
Sincerely,
NOHU & ASSOC S, INC.
Pau A. Bernard, P.E.
Project Manager
PAB/ j 1 a
cc: Tom Davis, Dove & Associates
file: r/f/AD7
D(� -
i � i �' 1�90
Ft' : JPOKO A 64Ab S . P
0 11240 Waples Milt Road
ENGINEERS Suite 100
ARCHITECTS FairiaX, Virginia 22030
SCIENTISTS 703.385.3566
Evan Wyatt, Planner
Frederick County Planning Department
9 Court Square, Box 601
Winchwster, VA 22601
Your Authorization: Signed Agreement
Dominion Knolls Site Plan
0
Date: Dec. 13 ,1990
Please Reference:
Project No. 17555.117
Invoice No. 9009785
Client No. 07534
Principal
.5
hrs
@
48.00
24.00
Project Manager
4.0
hrs
@
33.25
133.00
Senior Engineer
5.0
hrs
@
33.25
166.25
Engineer
15.0
hrs
@
19.90
298.50
Admin Assist.
1.0
hrs
@
14.50
14.50
Total Direct
Total Indirect
TOTAL DUE THIS INVOICE
636.25
954.38
$ 1590.63
•
•
W
rS
COUNTY of FREDERICI;
Department of Planning and Developmen
70? 665-56=-,
REQUEST FOR SITE PLAN COMMENTS FAX 703 6E -0;
City of Winchester, Virginia
Rouss City Hall
15 N. Cameron Street, Winchester, Virginia 22601
(703) 667-1815
The City of Winchester offices are located in Rouss City Hall at
15 North Cameron Street in Winchester, if you prefer to hand
deliver this review form.
Applicant's name, address and phone number:
1 S "..is-- §TFFMMI- • 1
Name of development and/or description of the request:
Location:
rnrner of Raker Lane and Gordon S� trreet„
City of Winchester Comments: "
r 1 5 Cf
t i�! JCrlFrlrrl J /Ury v 3,-Vte-•r1r.,,,1 / /t Ir:L" UC��/� /i[�.17 Uj`•' S��/�1
v FC rn t v'. l�� C. c% rr;,d�S I7o
S<�S E5 + � c..� o. �J��'((E�u' �E Cc.�'e ✓ �Fv <*�d,�✓r rv� ILXI
C!1/ty Sign and Dte : .-•-� i� i �i " v J
(NOTICE TO CI - PLEASE jRE_T_URN HIS FCRM T T_H-APPLIC /
pkI <�/Iff f ��� r acLvCwr CCri ! ����J�� S Ic''I SySiCM
/ NOTICE TO J6PLICAN"r wti,� �a.� nF C7<5 �rs o je c/Sec► of*k �
It is your responsibility to complete this form as accurately as
_ a_ :ist t e eir review --'
/ also attach 1a copy of
y,jur plans and or app scat*/Con form-t
�Un.
.er �G•iF t
/s �Si/ �ioRl�O FU('
/ / �� near ro escN S�e� c�.��Ec �l
Pru�trSE C S' �E ����� '���"`^''u!' rh �� ry,�`' �• rt S� � � �
9 Cour; Square P.O. Box601 ✓ �[]' i �ya(1' y�r .ir,�_�nia , - �`501
2 J 1J
•
•
DRAINAGE
LONG
NIGHT
J
�oQ=�
1o1
4•
A
o E)GSTING
CO UNDERDRAIN
10
/0
0
XISTI �.D
Y
sl
cq-x1\0
-e STRUCTION
BFGIN CON' "r7p• —
\-DF 'E:Q,
AINAGE ESMT R
I
WIDENING
W
ES I GN - TO
PAVEMEtp - KNIGHr:ST-
-AS
XIS T i N G ct,
UNDERDRAIN % /
EX.
0 ��
DOT
-STOF' i i
:-REQ-'Dt
S'
Culvert Inv. 00 95,0 2-73-45—
A• 67100 67 79.0 36 2
674.00 67200 15 3
68550 6a3 00 70.0
30.0 15
cl 68883 68575 0 687 vu 15 2
68575 Goo 4
250 15 I 6B8 32 66725 15
D
E 687.50 68725 250 54 c
EX 2.54 674.44 673.96 600
To
ULU 2 1 1990 i
-------------
p(mo(��
r�/4 5SE
0 ,g 07,4 Cf�iL1Fr 3
Transition to 3'
Meter Setting I Face of Curb
as Required
/ -t— 1 "x 3/4" WYe
tO
1 1 " Type K Copper
3/4" Type K� U (3/4" Type K Copper for
Copper Single Meter Installation)
Curb do
Gutter
Typical Duel Meter Installation
Not to Scale
(Plan View)
�L5 � T. 0 l/
Ii D OkG 2
{{ Sam
I 7
w
ViG1N1TY MAP
SCALe r Illow,
FINAL PLAT
DOMINION KNOLLS
STONEWALL DISTRICT
FREDERICK COUNTY, VIRGINIA
SCALE: 1' = 50' DATE: JANUARY 5, 1989
A/OTFS
/) A/O T/TLE- PE190,eT FUPA1/SNED.
'I) T//F P,POPr,PTY DEL /it/�q TED OrV TI-//5 PLAT /S LOC q TE O
OA/ / PFDE P/CK 00UA/7Y ,455E50MeW 7 Wl - ` 54- 6 07
Pq,PCEL JJ
�,) PqPCEL 6 /0 4A./ OPEA/ SPACe- /-O.P PAP/V47E S 7PEE7,
/A/G PESO/EG PESO, C 01V5 T,PUC 710A/ 4A/0 AmlA/ TEA 4A-ICE
OF U7%(/ 7/E5 , S/DE W,4L K PXPk'/NG AND C00" T V OMEk-
C�ENC V I/EN/CCE- 4C'C'ES5 EgO,-Mf-A/75.
4� //OMEOWA/� PS W/L L 6E E'FSPOA/S/6L E /90,P 7,0E Af4lA/-
7E'AIAA/CF OF 54A//74,PY OEWf'e L47rk41-0 TO 7-4/F M,4/A/
!3) /-/00.f-OWA/F&F5 lVI/ L eE k:r5P0A/5/6L ,f- 1--V e MA/A17fN JA1r6-
OF X4 TE P LATF,PALS 1�,POM 7/-1t� till 7F,P 70 7N� 11005E
6) P4 PCEL A, C, 0 AA/O E q,PF OPEA/ 5/941 E5 DES/6A/Z-0 I-O,P
,Pc CAePf47/OA/gL PUPPOSFS.
APPROVED BY
FREDERICK COUNTY
SANITATION AUTHORITY DATE
PLANNING COMMISSION DATE
SUBDIVISION ADMINISTRATOR
VA DEPT OF TRANSPORTATION
DATE
DATE
P4&E / O/` , O
`5UIPVEYOIP6 CERTIFICATE
/, EDWARD W DOVE, A DOL Y CE-eTIFiED [.AND 5UPVEYOR
IN T14E COMMOK/WEALT14 OF VIPG/NIA DO L-/ERE.BY CE,PTIF f
THAT / NAVE CAPEFLCLY 5UPVEYED THE I-eOPC-PTY DEL/NEATE0
BY T14/5 PLAT AND THAT /T /5 COPPECT TO THE OEST OF
MY KNOWLEDGE AND ,BELIEF THAT IT I5 A SUBDIVI6I0N
OF THE LAND ACQUIRED BY J lP DAPLINGTON FPOM C
MELVII.I OUNLOP, ET AL 45 PECOPDED /N DEED BOOK 45Z
PAGE CoIZ IA/ THE LAND eECOPO(5 OF FPEDERICK COUNTY
I FUPT"EP CEPT/FY THAT TAIE LAN05 EMBRACED IA/
TH/5 5"IVl5/0N LIE5 ENTIA-E-LY AlITAI/Al TPE 504/AJ05 OF
THE OeIGIAIAL TeACT TPAT TN/j PLAT ieE1`eE5Ek1T5 AN
ACCU2ATE 50RVEY OF THE SAME.
GIVEN UNDEk" MY NAND T4/5 O T1 DAY OF ,/gNUAhPY /eBoJ
EDWARD W. DOVE
CERT. NO.
54-17-3 (a) 964
�A^� lA ND Su4�S. �
OwIac-,P6 DEDICATION
EDWA,PD W. DOVE
I-, THE UNDEkP5/GAIED, OWNER OF THE LAND 5POWA)
f-IEPEON AND GE5CkP/5ED /N THE 5UPVEY005 CE-PTIF/CATS
NE PEa Y ADOPT TNlB PLAN OF 5UE0/05/0N E5TA,BL /5H
NE MINIMUM BUILDIAIG PE5TRPICTICKJ L/NES, ,PESE,PVE
THE eIG14TJ OF WAY AS INDICATED FOR COMST,PUCT10A/
MA/NTENAAICE AND OPERATION OF 5TPEET5, 5TOkPM
SEWE+PS , SA"I TARY SEWE�FPO AND WATE-e LINES. AND
AGREE THAT Ik'OAI P/%E WILL �5E SET AT ALL LOT
COPNEk:::'5 UA/DEP T14E 5U1-EP V!5/ON OF AN EA/6/NEER
Ok' 5UPVEY0,P. THAT OUCH FINAL PLAT /5 DeAWN
IN ACCORDANCE PVITN AN Al P,POVEO %PELIMIAIAeY
PLAT
DOMINION KNOLLS
DOVE AND ASSOCIATES
WINCHESTERVWC*M
/—A" Z of
CupvE T4aLE
t/O
/(�A' D///5
DEL TA
ACPC
TA A./
C/-IO,PD
CI-0 ,5,PG
l
4Z0.00'
ACo'Z7OZ""
/Z050'
&0.7/'
/ZO. /6
545'/Z'57'E
Z
460. 00'
Zl 'Z8'S/"
/71n'DCo'
J/ 05'
/76 !O'
547'4d'5Z"E
0
Z5.00'
06'/O'/5"
4ZB4
ZD.00'
3776'
00J'Z5'0J'E
4
-370OZ'
ZT40"t3/"
/7070'
0/(o&"
/7704'
5Z5'47'Z4"Al
5
403 47'
Z5"40'OC
/616/'
'DZ.46'
/80. Z6'
S Z4'47'OZ"lV
Ca
/00.00'
Z5°57'06o"
4/60'
Z/ Z/'
4/-5�'
5fC 47'L5"W
7
/GOO 00'
30'3/'ZZ"
5J. Z7'
Z7 Z8'
52-7(v4'
555' JO' /5'"k/
(f3
/50.00,
Z0`44'ZO"
54.ZD'
Z745'
5400'
5CoL140'p54'E
0
Z0500'
40','s5'/4"
/45ZZ'
7580'
/4Z ZO'
S5Z45'07"E
/0
/6500'
/0'4/'5/"
(o0(a0'
3Z./Z'
(o0 Z0J'
54Z'Z7*3/"E
/l
/50.00,
(o75°J'
-54C6'
&7.0Z'
NZ4'47'0Z'E
l Z
Z5 00'
coo' /0 5Z"
Z6 00 "
/5 Cob '
ZCo.SCo'
Al Z0'/Z 'S6 "W
AREA TABULATION
TOTAL AREA.............................20.2772 ACRES
TOTAL LOTS ............................. 7.9224 ACRES
PARCEL "B" (PRIVATE STREETS)........... 6.1662 ACRES
PARCEL "A" ................. ........... 5:2770 ACRES
OPEN SPACE IN STREET AREAS ............. 0.9117 ACRES
TOTAL OPEN SPACE ....................... 6.1887 ACRES OR 30.52%
DOMINION KNOLLS
Dove AND ASSOCUTES
PAGE n OF
Ino. C
J5%443'Zli'E"-�
J
ZO' SAN. SEW
ESM'T
/Z5.00'
to
I�
-,
--- 153
of
0
-- I
--- 01N 1G4 1,7000 �, 1
�SO.dO'
�-t0' WATC-V-LIIJE- C-l-vN1'T
I-- - /------
0
N 51°45'ZGO
i
p
�✓1 2
o
i
22 �,70o m
L—�
21 1,7000
�-
- J
20 1,700 0
loy 1,700M
'
IS 1,700c�
s
1-7 1,7oor�
o
lki2
g
Ili z55o,�
--- �P H07 I,-7oouj N g i ; I
151 ° IGG 1,700� g
I I
i 50 0 I G-7 i, 700 N I W
148 0 1, 700 0 p �o
_I4-7 i N 1-70 L7000 o
14i/ g 1 -71
i�
- - 09.0 0'
L)
144 z -
--- <
1-74 1,770 i o
o o I
o N 1-79 1,7700 N o
N 177G
140 N 1-7-7 1.70014 o
N I
13� 0 1-78 1,7000
-----, �'�� 1-70 1,700� N' Z I
I I 1� NdJ'/4'�'E /
o7
I I 500,
PARCEL i �•�, � �
I I 5. 1-770 AC.
I I 2o'w/cE5�Wr �A 10`� o o w
11
�rl 85.00,
65.00'
g 15 2,550 �
F
1.700 ,rl
I
•J
8
Uo
u
N
13
1,7000
N
12
1, 70:7 0
N
I I
f,700 0
N
N
IO
1-700 0
o
W
1-�
N
¢ ,
o
N
Gj
1,740 ti
L
m
85.00'
�
I
�
o
0
o
N
6
-=
1,700 �
°
O
'-
o°
5
1.700 0
o
..
o
_ _
>y
1 N
4
1,700 0
°
�
ti
3
1,700 14
u
�
-L
�z
0
2
1,700 [:�
g
I
o
I
13500'
2,5✓O 0
9I
~l..
j
tt�
�
5TOeM SEWER
E45EMEN T
I I 4774'
R=400c� t z
� -4
DOMINION KNOLLS
DOVE AND ASSOCIATES
WWCHESTF-RVwG&"
PAGE 4 OF &-9
C
I
— — _- — —-�1,►M�3 �3M�G .l�b1INt1S ,O� L/ LQS�
oL_� N
00'Of.OL OL 02 OZ OZ OZ 102,
s o I g
g o 0 0 0 0 0 I.
r.
is
c
t^P � In 0
I ,000� ,02 ,02 ,02 .OZ ,OZ ,OL ,OZ .00xI i
if,
—
_-
00 04 02 02 02 02 OZ OZ
0 0 0 0 0 0 0
o 0 0 0 0 0
UN c- c r r r r- w
00 0� GZ 02 I 00 0% -- —
00C/2- �1,W�� �ann�7�—w�JQ�6 ,OLD
06 z JAI g
vk, 2�•,
/
i
U)
zi
O
Y
Q
Z
Q
x
3
W
�I
w
z
U
ti
3
•
a 8
FARCE
qj
hi 0 1IZ 2,550va o
0
Q6 N 114 1,-7000 N o
JIG
�� N II-7 1.-7000
1,-7000
1 �
co N
o !Z-
0
(4 �a \
AeIVATE STeEET
Z4'k/ oJSGY�" I .
-- - 8 _y2owATEr� utic ce
W-14"W-85.0(7' °'�i-j --- ; Nf)f•/b'Z4
--
Von
a'
'0 20'S/�NIT^rf ciEWER 6AFi�M�"
=ARCEL E
\�
0
,G , W , -
\20� opd.
� o
a�
"� . �TO�Pti1 5E11/EP E5M "T
O�
5 Z 7 70 AC
DOMINION KNOLLS
DOVE AND ASSOCIATES
,.y 1' , .. - � -I i
g0
m
�z
10
'O
gZ
niZ
0
U)
5345°/4'34"W t�5.00'
01 18 &7 t55o Cis
�► lg 8 I ' I Ua v
,0 � IN
zl __
7>7p� iIS &oO/700o p; v
N 1� G5 i7Qp p I I iQiCC�L ®v �o 1&&e AC r�7f9 S52 /D24"E 20. ADO_ -� fA.J7
.J m 1 nj Z r
�CO'W�17FP L/NE EASE;UFN7 b - N p e�'14'04"W d5.0
17'
_
„ rrU to.00' — — — —-,— - . 6 L5 18 47 r55o
1 p <i3 / 700 p i I I 2O" PP/V/] TL 3 Tk'tE I i - - --� 65.00 , �.
Z 4:0 / 7cx� �
Qb �i $ to GZ__ o, 1 � I •� I � -- � 1=
o f i I (// i700,0
1. I 1:>A PCFL i700 ¢ p�� 0 i
i
A
Z55Oyr i i ioa' /O, 4,9li / oOsr `� ' D
15o 7 o c�
N'38'I4'34"� 05Gb' I ' 00' I ry
LA 0 4z •/700 P(
--i�r----------------� ----7--�---� -J�. --
ZO' PP/VATt 9Tk t-t-T i o fro' e5 00'
1 � �✓5/ 45'Z!o'�
--10.00"
a _ oo _ ,o j t550# O b I T
ZO'13TOPM Ot tk' C9M'T
/4QOO "
1 io- 8�•l4"4"W /60.00•
ooao' zo' zo' zo, zo' M, zo'-'-.001 / " ' zo' zo Zo" zo" zo" zo' W, '50.00 I y
U
Un
O
1�
1
U
N
v
o
rn
D r
D
'A 1�
p 8 8 8 8 8 mo._.. i
to, zo' to' to' 00' L�'k
_A/56'14'54"E—/60.c�J'------ N'd9'1434"�"----Z0000=--- � ----
L_
/STWc- /0' 5AN/7-AAFY -- — — - — — - — — — - — - — -- --- - V1
- �G /Vao ✓L�%W `JE►vEK JM'T --- l�l �O'45'/7`E --*,C7 0!9'
95zl5' 5TOPM 5EW6P EOM'T
(0.0. 4-97 f /t5)
ell
ISO
I Ov 210?6?/"9 I I
� y; — -- L — — l���l s �.c vr►/mod , o� � — I -_ � ��� �
~
.00 ow,
_
Gb OF '02 0.7 02 .02
g g g
0
— .W O� •02 .OZ .OZ .02 .W O�
— Z
O
I
I
N
I
�
00 0l� .02 02 .02 .02 .00 0i ;
L� I o
�� or •. I I
OD"OE 02 .02 Ol Cr1 be C
I
gW 18 1
to
8 I o ti
o0 0� oz o2 oa oa cn o� ° '00 oz oa 07 oz I,Uvolo
.00.0E
8
.Ol
.Ol
.Oi
.GZ
.000E
00 Ol I -
si OO GL
►�OCZ/
.Ors Flo
ff001/
� 1 I I I ,•
OCo
X��aL
Goa jj�
,SG I I CEO
l�
JJ
5L
7
3
Q
ks,
J
J
�
I�
I
000.7,
f�10/.A frN
.off— 21L I
00 69
Q?' ----moo �' I g.00P// 1w"02a./-k.ZC s
g' 18 , I
Day'I t7L
I z_ I I�,� I - 11
i
_ s I �oDL_� INN �� d 1���d o' I�►�°- SL
g o ooL, i �� g z' o - El�
00LA8iaa�il5 QldniA�I ,DZ
o f 8 8 1 ti _� .00 GL.1
., ,.. .00 oil -
�`` ' p DODO W 02, .00'W Ad oZ ,00 OZ ,00'0a D602 ,00 az 00'0� cl 00 04 00'OZ , oo oa
Q p Q p o tjp� o
�l
1 �
—
&-. — • z oo� —ooaz — — —. —
1--- - - - - - 00
/t ,LG S
(Ml�!l , o�)
- N V -7
I
I
.I
I
��J j j 3
N I I N
00'0.X ,OOM ,00'QZ ,00'02 00'09, 1 �
gl NI ��o
b o 0 0 0 I 21 p
�r
�I
I�
tig
Nti
1
1�
�
(� cA til sz 5z
iYd01f�.Ol .ft,".62N
O
z
Y
z
O
0
>
DOVE & ASSOCIATES, INC.
Engineering/Survey
P.O. Box 2033
WINCHESTER, VIRGINIA 22601
(703) 667-1103
To E VAN Al Yh 7i
WE ARE SENDING YOU X" ttached ❑ Under separate cover via_
❑ Shop drawings R-1prints ❑ Plans
❑ Copy of letter ❑ Change order ❑
LIEU EIM OF TURZATUL
DATE
tac ` D
JOB NO.
ATTENTION'
RE
the following items:
❑ Samples ❑ Specifications
COPIES
DATE
NO.
DESCRIPTION
S / Tom'
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted
2r'For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
f-1 FOR RIDS DUE 19
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
n PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED: _ r-_ e
A�
If enclosures are not as noted, kindly notify us at once. If
F , UDC 21 Im
Ul U
DOVE & ASSOCIATES, INC.
Engineering/Survey
P.O. Box 2033
WINCHESTER, VIRGINIA 22601
(1/
7,03) 667-1103
TO 1/AN YVYk?[
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via_
❑ Shop drawings [X''�rints ❑ Plans
❑ Copy of letter ❑ Change order ❑
CICTTEM OF MUMADuuQL
DATE
r, c� cD
JOB NO.
ATTENTION
RE
the following items:
Samples Lj Specifications
COPIES
DATE
NO.
DESCRIPTION
Q
THESE ARE TRANSMITTED as checked below:
❑
For approval
❑
Approved as submitted
Q,'For
your use
❑
Approved as noted
❑
As requested
❑
Returned for corrections
❑
For review and comment
❑
❑
FOR BIDS DUE
19
REMARKS—_
r'
a 1,
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
PRINTS RETURNED AFTER LOAN TO US
COPY TO__
PRODUCT 240 3 � Inc., GrOW, Mm 01411
i,,..:. SIGNED: .}xr l s�, '`,LEL_�b
If enclosures are not as noted, kindly notify us at once. '
)Le 2 Es u ri i
Ftkc 2 1 rim
L'