Loading...
HomeMy WebLinkAbout002-97 Eastgate Commerce Center - Shawnee - BackfileCASH Date 19 RECEI Received From Address Dollars $ For � ACCOUNT• AMT OF ACCOUNT CASH BY AMT. PAID CHECK BALANCE DUE MONEY ORDER e e,"N �r 61 REZONING CHECKLIST A complete application will include the following: SUBMISSION PACKAGE 1. Application Form ✓ 2. Sign received 3. Fees paid 4. Proffer statement 5. Comment sheets from the following agencies along with any marked copies of the plan: VDOT tzz City of Winchester Frederick Co. Sanitation Authority Health Department Inspections Dept. ✓ Parks & Recreation ✓ Fire Marshal Airport Authority County Attorney ✓ County Engineer 6. Plat(s) ✓ Fred, Co. f"I'C Sc-km 15 7. Location map " 8. Deed 9. Impact statement v 10. Taxes paid statement V-1, TRACKING SHEET Date /4. ; �• Application received/file opened Reference manual updated/number assigned D-base updated 6991d as File given to office manager to update bi-monthly report R51k jr,3 �' `�'`lT • Z Four sets of adjoiner labels ordered from data processing 40 color location maps ordered from GIS Z�R PC public hearing date ACTION: h2!jwv e Qgar-pila - 3 - BOS public hearing date ACTION: M V I �✓ Signed copy of resolution for amendment of ordinance, with conditions proffered, received from County Administrator's office and placed in Proffers notebook. (Note: if no proffers, resolution goes in amendments without proffers notebook.) ��� ��• (b tl7 l� Other notes: File given to office manager to update bi-monthly report (final action) ,,�L File given to Mapping & Graphics to update zoning map Zoning map amended I'M ��C(l COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 August 14, 1997 G. W. Clifford & Associates, Inc. 200 N. Cameron Street Winchester, Virginia 22601 RE: REZONING APPLICATION #002-97 OF EASTGATE COMMERCE CENTER; PIN 76-A-53 Dear Mr. Gyurisin: The Frederick County Board of Supervisors approved your request to rezone land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and MI (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 2 1. 10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of MI (Industrial Light) zoned land identified as PIN 76-A-53, during their meeting of August 13, 1997. The proffers that were approved as a part of this rezoning application are unique to this property and are binding regardless of ownership. Enclosed is a copy of the adopted proffer statement for your records. Please do not hesitate to contact this office if you have any questions regarding the approval of this rezoning application. Sincerely, � ll Evan A. Wyatt r Deputy Director EAW/cc Enclosure cc: W. Harrington Smith, Jr.; Shawnee Supervisor Ellen Murphy, Commissioner of Revenue 107 North Kent Street • Winchester, Virginia 22601-5000 REZONING REQUEST PROFFER Property Identification Number 76-((A))-53 Shawnee Magisterial District EASTGATE COMMERCE CENTER WRIGHTS RUN, LP Preliminary Matters Pursuant to Section 15.1 - 49.1 et. seq.. of the code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned hereby proffers that in the event the Board of Supervisors of Frederick County, VnZinia, shall approve Rezoning Application #002-97 for the rezoning of approximately 235.75 acres from the present RA - 112.20 acres, B-2 - 25.00 acres, B-3 - 23.86 acres and M-1 - 74.69 acres to RA - 79.00 acres, B-2 - 51.96 acres, b-3 - 21.10 acres and M-1 - 51.38 zoning now consisting of 203.89 acres (see attached zoning map; sheet 1 of 2), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with Virginia law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the applicant (the undersigned) and their legal successors or assigns. Request to Amend Original Proffers The undersigned request to amend the outstanding proffers of August 14, 1991 adopted for the rezoning approved by the Frederick County Board of Supervisors for the Eastgate Commerce Center. Voluntarily proffered are the following amended proffers for the Eastgate Commerce Center: Street intersection connections to Tasker Road will be limited to five streets that create three intersections with Taster Road. These streets are shown on the attached Master Development Plan and labeled as Eastgate Drive, Rams Head Road, Armel Circle, Bearcat Circle and Wrights Run Road. 2. All streets in the Eastgate Commerce Center will be constructed to VDOT standards. Right turn lane entering Sunrise Drive from southbound Front Royal Pike (US Route 522) and road improvements required to exit onto southbound Front Royal Pike at Sunrise Drive. if required by VDOT, will be built by the undersigned to VDOT standards. The undersigned will pay to Frederick County, at the time of the next lot transfer or issuance of the next grading permit, the sum of five thousand dollars ($5,000.00) for Fire and Rescue Emergency Services costs. REZONING REQUEST PROFFER EASTGATE COMMERCE CENTER PAGE 2 General Development Plan The development of the subject property will provide for a street layout connecting with the relocated VA State Route 642, known as Tasker Road and US Route 522 known as Front Royal Pdce as shown on the attached Master Development Plan, Sheet 2 of 2 - Master Development Plan for Eastgate Commerce Center, dated January 27, 1997. Voluntarily proffered is the attached Master Development Plan and as shown on the Master Development Plan for Eastgate Commerce Center the following improvements: L A thirty foot (3 f') wide road efficiency buffer along both sides of Tasker Road landscaped with a double row of evergreen plants four feet (4') minimum in height will be installed by the undersigned. The road efficiency buffer may be used for right-of- way expansion of Tasker Road. 2. A traffic signal at the intersection of Tasker Road and Front Royal Pike (US Route 522) and the exansion of the left turn lane from northbound Front Royal Pike (US Route 522) west onto Tasker Road will be constructed by the undersigned within nine (9) months of an official notification by VDOT. 3. Additional right-of-way for the construction of turn lanes and/or travel lanes along Tasker Road will be provided by the undersigned to VDOTat subdivision stage. 4. A traffic impact study will be conducted using VDOT procedures for each site development use proposed within the Eastgate Commerce Center at the time of site plan review. Improvements to Tasker Road will be constructed by the undersigned as required by VDOT regulations for the predicted traffic impacts based upon the specific proposed use. Notification of the existence of this proffer shall be provided to each lot purchaser prior to or at the time of each lot sale. Monetary Contribution to Offset Impact of Development The undersigned, who owns the above described property, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick. Virginia approves the rezoning `; of 85.78 acres of the 203.86 acre tract, lying on the west side of US Route 522 south along Tastier Road in the Shawnee Magisterial District of Frederick County, Virginia from existing RA, B-?. B-3 and M-1 to RA, B-27 B-3 and M-1 zoning district, the undersigned will pay to Frederick County, at the time of time of the next lot transfer or issuance of the next grading pernut, the sum of six thousand one hundred sixty-six dollars and twenty-three cents (S6,166.23) for Fire and Rescue Emergency Services costs. The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in interest of the Applicant and Owner. In the event the Frederick County Board of Supervisors grant said rezoning and accepts these conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. REZONING REQUEST PROFFER Property Identification Number 76-((A))-53 Shawnee Magisterial District EASTGATE COMMERCE CENTER WRIGHTS RUN, LP PAGE 3 Respectfully submitted, PROPERTY OWNERS: LIM Date: 710' 7 STATE OF VIRGINIA, AT LARGE CITY OF WINCHESTER, To -wit: The finstrument was acknowledged before me this p"7 day of �2� 1997, by My Commission expires dI 7 Notary Public 'a 0 PC REVIEW DATE: 7/2/97 BOS REVIEW DATE: 8/13/97 REZONING APPLICATION #002-97 EASTGATE COMMERCE CENTER To rezone land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and MI (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 2 1. 10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of MI (Industrial Light) zoned land. LOCATION: This property is located on the west side of Route 522 South (Front Royal Pike) at the intersection of Route 522 South and Route 642 (Tasker Road) MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 76-A-53 PROPERTY ZONING & PRESENT USE: Zoned: RA, Rural Areas District; B-2, Business General District; B-3, Industrial Transition District; and M-1, Light Industrial District Land Use: Manufacturing and Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: Zoned: RA, Rural Areas Use: Vacant South: Zoned: RA, Rural Areas Use: Residential East: Zoned: RA, Rural Areas Use: Residential; Church; Vacant West: Zoned: RA, Rural Areas Use: Vacant PROPOSED USE: Industrial and Business Park Eastgate Commerce Center, REZ #002-97 Page 2 August 6, 1997 REVIEW EVALUATIONS: Virginia Dept. of Transportation: See attached letter from Robert Childress dated April 9, 1997. Frederick Co. Sanitation Authority: No comment. Public Works: We have no additional comments regarding the rezoning. Fire and Rescue: Recommend approval. Stephens City Fire and Rescue Company: The Stephens City Volunteer Fire and Rescue Company has no objection to the rezoning request and accepts the proffers as stated herein. County Attorney: Proffers appear to be in proper form. Planning & Zoning: 1) Project History The Board of Supervisors approved Rezoning Application #006-91 for Wrights Run L.P. on August 14, 1991 with proffers. This approved application rezoned 115 acres of a 235 acre parcel from RA, Rural Areas District to create 25 acres of B-2, Business General District, 20 acres of B-3, Industrial Transition District, and 70 acres of M-1, Light Industrial District. An additional five acres was dedicated for the relocation of Route 642. Two subdivisions totaling 30.76 acres were approved by the Board of Supervisors within the M-1, (Light Industrial) District acreage subsequent to the rezoning approval. To date, one of those parcels is currently under development by Jouan, Inc. The relocation of Route 642 (Tasker Road) has been recently completed and is open for public use. The final design of this road required additional dedication by the property owner, totaling 11.1 acres. 2) Location The property is located within the Sewer and Water Service Area and is designated as an industrial area on the Frederick County Comprehensive Plan Land Use Map. Eastgate Commerce Center, REZ #002-97 Page 3 August 6, 1997 3) Site Suitability Environmental & Historical: The portion of the 235 acre site that is proposed to be rezoned contains no steep slopes or floodplain areas and some woodlands. No historical features exist on the property. Water & Sewer: Public water and sewer service is currently provided to the Eastgate Commerce Center. Transportation: The Eastgate Commerce Center property is located on the west side of Front Royal Pike (Route 522 ) and Tasker Road. Front Royal Pike has been improved to a four -lane condition, and Tasker Road has been improved as a two-lane major collector road. 4) Potential Impacts Adjoining Properties: Two adjoining properties whose primary use is residential will be directly impacted by this rezoning application as a result of the proposal to rezone land currently located on the north side of Tasker Road from RA to B-2. The residential properties are situated along the northern and western property lines of this parcel. Transportation Issues: The applicant submitted a transportation impact statement which has been reviewed by staff but not by the Virginia Department of Transportation. The information within this traffic impact statement includes actual traffic counts and turning movements taken on the recently opened Tasker Road at the intersection with Front Royal Pike, peak hour totals, and traffic projections based on trip generations at full development of Eastgate Commerce Center. The traffic impact statement concludes that there will be a 16% increase in traffic utilizing Tasker Road and Front Royal Pike as a result of this rezoning application. This percentage includes an increase of 591 trips per day on Tasker Road and 5,399 trips per day on Front Royal Pike. The letter from Robert B. Childress, of the Virginia Department of Transportation dated April 9, 1997, describes several transportation issues that may be of concern to Frederick County. These potential impacts are described as follows: A) Comment #1 recommends that the applicant provide a detailed traffic analysis for this rezoning request. Staff met with Mr. Childress on June 18, 1997 to discuss transportation issues associated with this rezoning application. Mr. Childress had not received a traffic analysis as of that date; therefore, staff provided him with the copy that is in your agenda package. Mr. Childress indicated that VDOT would not be able to complete this analysis prior to the Planning Commission meeting of July 2, 1997. • Eastgate Commerce Center, REZ #002-97 Page 4 August 6, 1997 B) Comment #2 reflects a concern that traffic exiting Eastgate Commerce Center via Sunrise Drive will proceed south on Front Royal Pike and then make a U-turn to travel north on Front Royal Pike. A concern was also expressed during the VDOT meeting with staff that the recently improved northbound lane of Front Royal Pike is at a much higher elevation than the southbound lane. This may create a situation where a vehicle turns left when exiting Eastgate Commerce Center. Mr. Childress indicated that VDOT would be willing to allow improvements to the northbound lane of Front Royal Pike to lower the elevation and provide a crossover to align with Sunrise Drive at the cost of others. C) Comment #3 reflects a concern with additional entrances into Eastgate Commerce Center along Front Royal Pike. Staff shares this concern and has asked the applicant to restrict access off of Front Royal Pike to Tasker Road and Sunrise Drive. The applicant has stated that they do not wish to limit access to those two roads. D) Comment #5 reflects a concern that the expansion of the left turn lane that provides access fiom northbound Front Royal Pike to the intersection with Tasker Road may need to occur as a result of this rezoning application. The funding of this improvement would be taken from the County's primary road improvement fund unless it was improved by others. E) Comment #6 reflects a concern that additional travel and turn lanes may be required along Tasker Road as a result of this rezoning application. Mr. Childress has indicated that it could be difficult to have Tasker Road widened by individual owners as site plans are reviewed and approved in the future. The funding for additional travel lanes along Tasker Road would be taken from the County's secondary road improvement fund unless it was improved by others. Emergency Services: The application of the Frederick County Capital Facilities Impact Model demonstrates a fiscal impact to emergency services. The model run assumed a rezoning of RA acreage to create 24 acres of B-2, Business General, 9 acres of B-3, Industrial Transition, and one acre of M-1, Light Industrial. 5) Impact Statement/Proffer Statement The applicant has submitted a proffer that accounts for outstanding proffered requirements from the 1991 rezoning approval, as well as new proffered conditions. The applicant has proffered to offset the fiscal impacts to emergency services through two financial contributions that are consistent with the previous rezoning approval and the results of the Frederick County Capital Facilities Impact Model. The applicant has proffered transportation improvements including the 0 • Eastgate Commerce Center, REZ #002-97 Page 5 August 7, 1997 installation of traffic signalization at the intersection of Front Royal Pike and Tasker Road, and the provision of right turn lanes at Sunrise Drive. The applicant has also proffered to provide a 30 foot wide road efficiency buffer along the north and south sides of Tasker Drive. The County Attorney has stated that the proffers appear to be in appropriate form; however, it has also been recommended that minor editorial revisions occur to this statement prior to Board action to ensure that the undersigned is the responsible party for future proffered improvements and that monetary proffers are received at the time of lot transfer or first grading in lieu of building permit application. STAFF RECOMMENDATION FOR 07/02/97 PLANNING COMMISSION MEETING: The proposed rezoning application is consistent with development policies set forth in the Comprehensive Plan and the applicant has mitigated some of the potential impacts through the proffer statement. Several concerns raised by VDOT should be addressed following their analysis of the applicant's traffic impact statement. This analysis may also result in the need for additional transportation improvements; therefore, it may be prudent to ensure that the transportation issues are resolved prior to the approval of this rezoning application. PLANNING COMMISSION SUMMARY & ACTION OF 07/02/97: Commission members were concerned that a substantial portion of the site remained RA and they felt the applicant should have petitioned to rezone the entire site, rather than coming back at a later time to rezone the remaining portion. Commissioners would have preferred the transportation issues to be studied for the whole site, rather than piecemeal, and also to let everyone know up front what to expect for the site. A second area of concern was the applicant's intention of pursuing additional entrances on Route 522. Some Commission members were not in favor of additional entrances on Route 522 and believed access should be taken care of internally; in this case, via Sunrise Drive and Tasker Road. Other Commission members felt that although additional entrances on a primary arterial highway was not desirable, it would reduce the amount of automotive and truck traffic on Tasker Road. Other than these two concerns, Commission members felt the application with proffers was consistent with the policies set forth in the Comprehensive Plan and they approved the rezoning by majority vote. There were no citizen comments. 0 0 Eastgate Commerce Center, REZ #002-97 Page 6 August 6, 1997 YES (TO APPROVE): Miller, Thomas, Wilson, Marker, Light, Morris NO: DeHaven (Mr. Romine, Mrs. Copenhaver, Mr. Stone, Mr. Ours were absent.) N 89 M O 1038 31 88 103 w E 31 A jg 87 86 31813JY 80 SS 78 S Q° 49D 3`j � 83 103D 75 77 103A R 4 34 ci 84 Armd Rood 1 'b JS �0 0 10 A n .0� 49B �� �2 y 106 108B 49 3n, u 49C 68 49A 0 104 48 336 104A 9 105 108 ° k �� v 48A 51 Y 104E s1 104C 42 265-374 48A Fr i ° a? Loop 51C Rood e4� 53C O� 57@ 61 60A 59N 47 y 53 �° 53 59K 59 118 361-W 60B 598 59A 538 \ c�A 59F 119 55 59D 53A 0 56 59J 59 51p 59C 59G \1 bi 3, 53 35 28&-331 1 73 53 0 17 34 � ,y 72 1 31 016, 32 p 9 48 63 10 1 8 11 50 �o 5 ez 7 332122 3 59 51 52 5B 56 6 75 o o, 4 53 54 54A A 5lp 75A Rea § fir 1 2 80 a pP 77 12C �. L� ti� 18 �D 168 81 85 82 12D REZONING #002-97 PIN: 76—A-53 Eastgate Commerce Center Ct 4,7VI 01, � i L."�L�'I i of 1�'IRGIi� i.? DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 1.10.11 OLD VALLEY PIKE Cq' Mi:: ;Io;JLfi P O BOX 278 EDINBURG. VA 22824-0278 April9, 1997 Mr. Stephen M. Gyurisin C/O G. W. Clifford & Associates, Inc. 200 North Cameron Street Winchester, VA 22601 ✓ear Steve: JERRY A. COPP RFLNGINEER TELE ,540, 984-55G3 I Ax �54O1984-5GO7 Ref: Eastgate Commerce Center Route 522 South/642 Frederick County As requested, we have reviewed your revised zoning and master development plan for the referenced project. We realize approved proffers are in place, based on current zoning, to address impacts on existing VDOT facilities. However, since the original rezoning our Route 522 project has been completed and the Route 642 project is nearing completion. As you have indicated, the completion of these projects has necessitated the redesign of your internal roadway network and need for different zoning. We therefore offer the following comments: 1) As indicated in your March 13, 1997 letter, you intend to prepare a revised impact statement along with this rezoning request. This statement should include a complete traffic impact analysis to determine new project impacts on the current roadway system. The analysis results could address/answer some of our additional comments below. 2) If permitted, the proposed Sunrise Drive connection to Route 522 will need to meet our minimum sight distance requirements. At the location proposed a median crossover does not exist between the north and south bound lanes. The current grade differential between the lanes does not appear conducive to construct a crossover. Therefore, we see the potential for a real problem to result for exiting north bound traffic, especially truck traffic. Vehicles Arrn„ lei hmre to tra�rel south bound for a short distance in order to u-turn at the next crossover to begin north bound flow. This could lead to serious safety hazards for the development's traffic and north & south bound motorists. It appears from our files the earlier rezoning plans and analysis for this project assumed a crossover would be provided on Route 522 at this connection. 3) Based on the proposed B-2 zoning for the parcels along Route 522 it appears a full length right turn lane along the proposed frontage will be necessary. Considering the possible varied uses, primary access to these parcels may want to be made from Tasker Drive or Sunrise Drive. 4) As originally proffered, two traffic signals were to be provided - one at the Route 522/Route 642 intersection and another at the access roadway connection with Route 642. The previously mentioned traffic impact analysis should address necessary signalization. However, at the very least, we feel safe to say based on this preliminary information the Route 522/642 intersection will need to be controlled. WE KEEP VIRGINIA MOVING Mr. Stephen M. Gyunsin Ref• Eastgate Commerce Center April 9, 1997 Paae 2 5) The existing Route 522 north bound left turn lane onto west bound Route 642 may need to be expanded. 6) The recently constructed Route 642 as you are aware, was constructed with a 24' wide paved surface with the ability to expand by two additional 12' lanes on either side of the existing pavement. These additional lanes may be necessary as a result of your development. However, in addition, right and left turn lanes along Route 642 may need to be considered which might necessitate the need for additional right-of-way. 7) Any entrances constructed into the property whether from Route .522, 642 or internal streets will need to meet minimum sight distance requirements. Additionally any work performed on the State's right-of-way must be in accordance with our land use permit policies. In summary, we have no overall objections to the rezoning or subsequent development of this property. However, in consideration of the aforementioned comments/concerns, we feel a traffic impact analysis should be completed in order to determine specific impacts prior to proceeding further with the project. We appreciate the opportunity to comment on this significant project and ask you give us a call if there are any questions or you would like to discuss our comments in more detail. Sincerely, 6�� /3. A-z� Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor RBC/rf Attach. xc: Mr. J. B. Diamond, Attn: Mr. K. B. Downs Mr. T. L. Jackson, Attn: Mr. G. C. Tudor Mr. S. A. Melnikoff Mr. B. J. Sweitzer Mr. Kris Tierney REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA To be completed by Planning Staff. - RE. 2-®N IN &��a� Date Received `� q Zoning, Amendment Number _ I- PC Hearing Date BOS Hearing Date The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be 23 tCoud from the Office of the Commissioner of Revenue, Real Estate Division,Square, Winchester. 1. Applicant: Name: G.W• Clifford & Associates Telephone: 540-667-2139 Address: 200 N. Cameron Street Winchester Vir inia 22601 2. Property Owner (if different than above) Name: Wriahts Run L.P. Telephone: 703-820-2500 Address: 2800 Shirlin ton Road Suite 803 Arlin ton Vir inia 22206 3. Contact person if other than above Name: Stephen M Gyurisin Telephone: 540-667-2130 4. Checklist: Check the following items . that have been included with this application. Location map X Plat. X Deed to property X Verifying taxes paid X Agency Comments X — Fees X— Impact Analysis Statement X Proffer Statement X— Vir ini allows us to request full disclosure of ownership in . 5. The od of a relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: Allan Huson Richard Peterson Frank Maranto Ond Miller Sidne r Lesowitz 6. Current Use of the Property: East ate Commerce Centre Proposed Use of the Property: same 7. Adjoining Property: PARCEL ID NUMBER USE ZONING 76-A-48A & 5 • K & 52 76-A-57 57A 56 55 54 60B 87 A 1, 87(4)-9, 10,11 76-A-42 76-A-47 Vacant (AG Resident Resident Resident Vacant (AG) Vacant (AG) RA RA RA RA RA � The roperty is located at (give exact location based on nearest road g, Location: P an d distance from nearest intersection, using road names and route number): E t Drive . e is located at a. U 0 4 • 1'.*OINING PROPERTY OWNERS This is to certify that the attached correspondence was mailed to the following on from the Department of Planning and Development, Vjkd—erick County, Virginia: 76 . A• . 52- 76 • A• • 53• HOUGH, EARL E. EST. & ANNA B. WRIGHTS RUN L.P. CIO ANNA B. HOUGH PAINTER 2800 SHIRLINGTON RD #803 2776 FRONT ROYAL PIKE ARLINGTON, VA 22206 WINCHESTER, VA 22602 76 • A- - 47. 76 • A- • 55- HEFLIN, WILLIAM J. & LORETTA LADD, BETH C10 BETH SIMPKINS 113 TADPOLE LANE 4479 CONICVILLE RD WHITE POST, VA. 22663 MT JACKSON, VA 22842 76 • A• • 48-A 76 - A• • 57•A JENI COMPANY COMER, ORVILLE LEE 2903 FRONT ROYAL PIKE P 0 BOX 2598 WINCHESTER, VA. 22602 WINCHESTER, VA 22604 76 -A. - 60-A 76 • A• • 51 •B RITTER, RICHARD E SR FLETCHER, DOUGLAS R. 141 GEMSTONE LANE 301 VINE LANE WINCHESTER, VA 22602 WINCHESTER, VA. 22602 76 - A• . 60-B 76 • A- - 51-C KING, ELIZABETH A RITTER STROSNIDER, CLIFTON R. 2805 FRONT ROYAL PIKE WINCHESTER, VA 22602 173 ARMEL RD WINCHESTER, VA. 22602 Gilbert W. Clifford & Assoc. Attn: Steve Gyurisin 200 N. Cameron Street Winchester. VA 22601 STATE OF VIRGINIA COUNTY OF FREDERICK CoHfrHu�d ok oQ•cK Evan A. . yatt, Dep ty Director Frederick Co. Planning Dept. I,_P) �A�) � I , a Notary Public in and for the State and County aforesaid, do hereby certify that Evan A. Wyatt, Deputy Director, for the Department of Planning and Development, whose name is signed to the foregoing, dated __S'k 1fle I-- lcl�, has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this Nth day of My commission expires on 3I q C{ NtaARY PUBLIC . • ADTWG PROPERTY OWNERS Pal 87 - A- - 1- SCHEULEN, EDWIN EDWARD & ETALS CIO TERRY SCHEULEN P 0 BOX 361 STEPHENS CITY, VA 22655 87 - A- - 16-B GIBSON, MONTIE W 155 CASTLEBRIDGE COURT WINCHESTER,VA 22602 87 -A- - 31- LESKO, HELEN RILEY 2982 FRONT ROYAL PIKE WINCHESTER, VA. 22602 '7 G-A- 5+ Timber Ridge Ridge Ministries, Inc. P.O. Box 3438 Stephens City, VA 22655 g7 -4-? Francis & Eleanor Bascue 319 Wrights Run Lane White Post, VA 22663 g1- 1—!O Vincent Fertig 325 Wrights Run Lane White Post, VA 22663 87`¢-I William & Joyce Tucker 353 Wrights Run Lane White Post, VA 22663 • Information to be Submitted for Capital Facilities Impact Model In order for the Planning Staff to use its capital facilities impact model, it is necessary for the applicant to provide information concerning the specifics of the proposed use. Otherwise, the planning staff will use the maximum possible density or intensity scenario for the proposed Zoning District as described on Page 9 of the application package. 9. Parcel Identification[Location: Parcel Identification # : 76-((A)) - 53 Districts Magisterial District: Shawnee High School: Sherando g Middle School: �4ei �•K• M►°a.E Fire Service: Stephe�uCity Elementary School: ARMc`- Rescue Service: SteyhemCity Y 10. Zoning Change: requested. 11. The List the acreage included in each new zoning category being rezoning proposed: Number of Units Proposed N/A Single Family Homes: Townhomes: Multi -Family: Non -Residential Lots: Mobile Home: Hotel Rooms: Square Footage of Proposed Uses N/A Office: Service Station: Retail: Manufacturing: Restaurant: Warehouse: _ Other: f 0 40 12. Signature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors, public Meaning and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its .accompanying materials are true and accurate to the best of my (our) knowledge. p p �t �Daw i i ar 1 Owner(s): i 14 Date PDate: gi1b e t w. ciiff'Ord & associat�a,.: in ' Eastgate Commerce Centre Adjoining Property Owners May 30,1997 Tax # Name and Address Zonin Use 76-A-47 William J. & Loretta Heflin RA Vacant 113 Tadpole Lane White Post, Virginia 22663 76-A-48 Betty J. Tinsman RA Residential 1804 Macedonia Church Road White Post, Virginia 22663 76-A-48A Jeni Company RA Vacant P.O. Box 2598 Winchester, Virginia 22604 76-A-51B Douglas R. Fletcher RA Residential 301 Vine Lane Winchester, Virginia 22602 76-A-51C Clifton R. Strosnider RA Residential 173 Armel Road Winchester, Virginia 22602 76-A-52 Earl E. Hough Est. & Anna B. RA Residential 2776 Front Royal Pike Winchester, Virginia 22602 76-A-53 Wrights Run L.P. RA Vacant 2800 Shirlington Road, Suite 803 Arlington, Virginia 22206 76-A-53A • Donald D. Rainville RA Residential P.O. Drawer X Woodbridge, Virginia 22194 76-A-53 Timber Ridge Ministries, Inc. R A Church P.O. Box 3438 Stephens City, Virginia 29655 Tax # 76-A-55 76-A-56 76-A-56A 76-A-60A 76-A-60B 76-A-61 87-A-1 87-A-9 87-A-10 87-A-16B 87-A-31 87-A-32 Name and Address Beth Ladd - c/o Beth Simpkins 4479 Conicville Road Mt. Jackson, Virginia 22842 Orville Lee Comer 2903 Front Royal Pike Winchester, Virginia 22602 Richard E. Ritter, Sr. 141 Gemstone Lane Winchester, Virginia 22602 Elizabeth A. Ritter King 2805 Front Royal Pike Winchester, Virginia 22602 Galen E. & Sandra B. Snider 2751 Front Royal Pike Winchester, Virginia 22602 George D. Schuelen et als 7232 Hunton Street Warrenton, Virginia 20187 Elwood L. Fletcher, Jr. 1445 Fairfax Pike White Post, Virginia 22663 Samuel F. & Gloria H. Baker Box 1415 Fairfax Pike White Post, Virginia 22663 Montie W. Gibson 716 Front Royal Pike Winchester, Virginia 22602 Helen Riley Lesko 2982 Front Royal Pike Winchester, Virginia 22602 87-A-35 Commonwealth of Virginia 87-A-36 87-A-37 •Eaate Commerce Centre Adjstgoining Property Owners May 30,1997 • Page 2 Zoning Use RA Residential RA Residential RA Residential RA Residential RA Residential RA Vacant RA Residential RA Residential RA Vacant RA Residential RA Governmental 9 0- AMENDMENT Action: PLANNING COMMISSION: Recommended Approval on July 2, 1997 BOARD OF SUPERVISORS: Approved on August 13, 1997 AN ORDINANCE AMENDING THE ZONING DISTRICT MAP #002-97 of EASTGATE COMMERCE CENTER WHEREAS, Rezoning Application #002-97 of Eastgate Commerce Center requested the rezoning of land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and MI (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 21.10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of MI (Industrial Light) zoned land and identified with P.I.N. 76-A-53. The property is located on the west side of Route 522 South (Front Royal Pike) at the intersection of Route 522 South and Route 642 (Tasker Road). WHEREAS, the Planning Commission held a public hearing on this rezoning on July 2, 1997; and WHEREAS, the Board of Supervisors held a public hearing on this ordinance adoption on August 13, 1997; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to change land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and MI (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business 9 General) zoned land; 21.10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of Ml (Industrial Light) zoned land as described by the application and plat submitted, subject to the attached conditions voluntarily proffered in writing by the applicant and the property owner. This ordinance shall be in effect on the date of adoption. Passed this 13th day of August, 1997 by the following recorded vote: James L. Longerbeam, Chairman Ave W. Harrington Smith, Jr. Aye Charles W. Orndoff, Sr. Aye O'.UGEN DAS\REZONE\EASfGATE.RES PDRes N015.97 Richard C. Shickle Margaret B. Douglas Robert M. Sager A COPY ATTEST Joh Riley, Jr. Frederick County Administrator Aye Aye Aye REZONING REQUEST PROFFER Property Identification Number 76-((A))-53 Shawnee Magisterial District EASTGATE COMMERCE CENTER WRIGHTS RUN, LP Preliminary Matters Pursuant to Section 15.1 - 49.1 et. sea., of the code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #002-97 for the rezoning of approximately 235.75 acres from the present RA - 112.20 acres, B-2 - 25.00 acres, B-3 - 23.86 acres and M-1 - 74.69 acres to RA - 79.00 acres, B-2 - 51.96 acres, b-3 - 21.10 acres and M-1 - 51.38 zoning now consisting of 203.89 acres (see attached zoning map; sheet 1 of 2), development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such be approved by the Frederick County Board of Supervisors in accordance with Virginia law. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and of no effect whatsoever. These proffers shall be binding upon the applicant (the undersigned) and their legal successors or assigns. Request to Amend Original Proffers The undersigned request to amend the outstanding proffers of August 14, 1991 adopted for the rezoning approved by the Frederick County Board of Supervisors for the Eastgate Commerce Center. Voluntarily proffered are the following amended proffers for the Eastgate Commerce Center: Street intersection connections to Tasker Road will be limited to five streets that create three intersections with Taster Road. These streets are shown on the attached Master Development Plan and labeled as Eastgate Drive, Rams Head Road, Armel Circle, Bearcat Circle and Wrights Run Road. 2. All streets in the Eastgate Commerce Center will be constructed to VDOT standards. Right turn lane entering Sunrise Drive from southbound Front Royal Pike (US Route 522) and road improvements required to exit onto southbound Front Royal Pike at Sunrise Drive, if required by VDOT, will be built by the undersigned to VDOT standards. 3. The undersigned will pay to Frederick County, at the time of the next lot transfer or issuance of the next grading permit, the sum of five thousand dollars ($5,000.00) for Fire and Rescue Emergency Services costs. REZONING REQUEST PROFFER EASTGATE COMMERCE CENTER PAGE 2 General Development Plan The development of the subject property will provide for a street layout connecting with the relocated VA State Route 642, known as Tasker Road and US Route 522 known as Front Royal Pike as shown on the attached Master Development Plan, Sheet 2 of 2 - Master Development Plan for Eastgate Commerce Center, dated January 27, 1997. Voluntarily proffered is the attached Master Development Plan and as shown on the Master Development Plan for Eastgate Commerce Center the following improvements: 1. A thirty foot (30') wide road efficiency buffer along both sides of Tasker Road landscaped with a double row of evergreen plants four feet (4') minimum in height will be installed by the undersigned. The road efficiency buffer may be used for right-of- way expansion of Tasker Road. 2. A traffic signal at the intersection of Tasker Road and Front Royal Pike (US Route 522) and the exansion of the left turn lane from northbound Front Royal Pike (US Route 522) west onto Tasker Road will be constructed by the undersigned within nine (9) months of an official notification by VDOT. 3. Additional right-of-way for the construction of turn lanes and/or travel lanes along Tasker Road will be provided by the undersigned to VDOTat subdivision stage. 4. A traffic impact study will be conducted using VDOT procedures for each site development use proposed within the Eastgate Commerce Center at the time of site plan review. Improvements to Tasker Road will be constructed by the undersigned as required by VDOT regulations for the predicted traffic impacts based upon the specific proposed use. Notification of the existence of this proffer shall be provided to each lot purchaser prior to or at the time of each lot sale. Monetary Contribution to Offset Impact of Development The undersigned, who owns the above described property, hereby voluntarily proffers that if the Board of Supervisors for the County of Frederick, Virginia approves the rezoning of 85.78 acres of the 203.89 acre tract, lying on the west side of US Route 522 south along Tasker Road in the Shawnee Magisterial District of Frederick County, Virginia from existing RA, B-2, B-3 and M-1 to RA, B-2, B-3 and M-1 zoning district, the undersigned will pay to Frederick County, at the time of time of the next lot transfer or issuance of the next grading permit, the sum of six thousand one hundred sixty-six dollars and twenty-three cents ($6,166.23) for Fire and Rescue Emergency Services costs. The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in interest of the Applicant and Owner. In the event the Frederick County Board of Supervisors grant said rezoning and accepts these conditions, the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. 0 REZONING REQUEST PROFFER Property Identification Number 76-((A))-53 Shawnee Magisterial District EASTGATE COMMERCE CENTER WRIGHTS RUN, LP PAGE 3 Respectfully submitted, PROPERTY OWNERS: I: I STATE OF VIRGINIA, AT LARGE G. e CITY OF WINCHESTER, To -wit: eA The f eg mg instrument was acknowledged before me this day of 1997, by My Commission expires -%/d® 7 2i�� e7e — Notary Public it i gilbert w. clifford & associates, inc INCORPORATED 1972 Engineers — Surveyors — Land Planners — Water Quality 15 May 1998 Board or Directors- Mr. Eric Lawrence, Zoning Administrator Preddent Frederick County Planning Department Thomas J. O'Toole, P.E. 107 N. Kent Street `'ice President" Charles E. Maddox Jr., P.E. Winchester, Virginia 22601 Earl R. Sutherland, P.E. Ronald A Nfislowsky, P.E. RE: Eastgate Commerce Center David J. Saunders, P.E. Directors: Zoning Proffer Payment P. Duane; Brown, LS. William L Wright Michael A Hammer ear Eric: Thomas W. Price Attached you will find a check number 1033 for the amount of $21,166.23 from Wrights Run, L.P. C/o Ominex, Inc. for payment associated with the rezoning proffers #002-97 and #001-98. This amount represents full payment of the monetary amounts proffered for Fire and Rescue Emergency Services as follows: Rainville Lot Proffered $5,000.00 Amount Paid $5,000.00 Jouan Lot $5,000.00 $5,000.00 SpecialMade Lot $5,000.00 $5,000.00 White Properties Lot $5,000.00 $5,000.00 White Properties Lot $6,166.23 $6,166.23 $26,166.23 $26,166.23 Less Previous Amount Paid for Jouan Lot -$5,000.00 $21,166.23 Less Amount Attached -$21,166.23 Balance Due 0 We believe that this payment now satisfies your April 22, 1998 letter requesting that proffers be paid prior to any further subdivision activity. Although the White Properties lot (5.00 acres of Wrights Run, L.P. property) is not final approved for subdivision, we have submitted application and fees to your office to subdivide the White Property lot. Sincerely, gilbe clifford & associates, inc. MpY ti Steph . Gyurisin ND SM Enclosure cc: Allan Hudson 200 North Cameron Street, Winchester, Virginia 22601 gh S l0) 667-2139 Fax (510) 665-0493 a -mail gwcliff(a�mnsinc.com inMember American Consulting Engineers Council Rezoning Comments Frederick County Commonwealth's Attorney Mail to: County Commonwealth's Attorney Winchester -Frederick Co. Juidicial Center 5 N. Kent Street Winchester, Virginia 22601 (540) 665-6383 Hand Deliver to: County Commonwealth's Attorney Winc.-Frederick Co. Juidicial Center 5 N. Kent Street Winchester, Virginia Applicant: Please fill out the information as accurantely as possible in order to assist the Commonwealth's Attorney's Office with their review. Attach a copy of your application form, location map, proffer statement, impact analysis, and any other pertinent information. Applicant's Name: G. W. Clifford & Assoc., Inc. Telephone: (540) 667-2139 Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester, Virginia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 (See Sheet 1 of 2 enclosed) Current zoning: RA, B2, B3 & M1 Zoning requested: B2, B3 & M1 Acreage: RA - 79 Acres, B2 - 51.96 Acres B3 - 21.10 Acres, M1 - 51.83 Acres �A�tn�/ "y's Comments: zz, i* /h-- c— C/I-A--- Notice to Commonwealth's Attorney - Please heturn Form to Applicant �I - QF � JI • • Frederick Countv, Virginia Master Development Plan Application Package Reguest For Master Development Plan Comments Virginia Department of Transportation Mail toe Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-5600 Hand deliver to: Virginia Department of Transportation 1550 Commerce Street Winchester, VA (540) 722-3460 Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Please attach JjU (5) copies of the MDP with the sheet. Applicant's Name: Gilbert W. Clifford & Associates, Inc. Address: 200 N. Cameron Street Winchester, Va. 22601 c/o Stephen M. Gyurisin Phone number: 540-667-2139 3/13/97 Name of development and/or description of the request: Eastgate Commerce Center Location of Property: Intersection of US/Route 522 South & Relocated Va. Route 642 Virginia Department of Transportation's Comme See attached letter dated April 9, 1997 to G. W. Clifford & Associates. VDOT use only Date received 97 Date reviewed and Date from R. B. Childress Review Number: 10 2 3 4 5 (please circle one) Date approved Revision required X 4UL-., 7117 Rezoning Comments Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer P.O. Box 278 Edinburg, Virginia 22824-0278 (540) 984-5600 Hand Deliver to: Virginia Dept of Transportation Attn: Resident Engineer 1550 Commerce Street Winchester, Virginia Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester, Vireinia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 (See Sheet 1 of 2 enclosed). Current zoning: RA, B2, B3 & M1 Zoning requested: B2, B3 & M1 Acreage: RA - 79 Acres B2 - 51.96 Acres B3 - 21.10 Acres M1 - 51.83 Acres Virginia Department of Transportation Comments: See attached letter dated April 9, 1997 from R. B. Childress to G. W. Clifford & Associates. ri Notice to VDOT- Please Return Form to Avvlicant Rezoning Comments Frederick County Department of Public Works Mail to: Frederick County Dept of Public Works Attn: Director of Engineering 107 N. Kent Street Winchester, Virginia 22601 (540) 665-5643 Hand Deliver to: Frederick Co. Dept of Public Works Attn: Director of Engineering 107 N. Kent Street Winchester, Virginia Applicant's Name: G. W. Clifford & Assoc., Inc.. Telephone: (540) 667-2139 Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester, Virginia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 (See Sheet 1 of 2 enclosed). Current zoning: RA, B2, B3 & M1 Zoning requested: B2, B3 & M1 Acreage: RA - 79 Acres, B2 - 51.96 Acres, B3 - 21.10 Acres, M1 - 51.83 Acres Department of Public Works' Commen SA�Mw-& wtaw-(4 wk_)� 1�6� IP1CUc C cSu� J'e c cl - r •, Notice to Department of Public Works - Please Return Form to Applicant COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No.RZ97-0003 Date Received 3/14/97 Date Reviewed 4/20/97 Applicant G.W. Clifford And Associates Address 200 N. Cameron St. Winchester, Virginia 22601 Project Name Eastgate Commerce Center Phone No. 540-667-2139 Type of ApplicationRe-Zoning Current Zoning RA,13-2,13-3 1st Due Fire Co. 11 1st Due Rescue Co. 11 Election DistrictShawnee Tax I.D. No. 76-((A))-53 RECOMMENDATIONS Automatic Sprinkler SystemXX Residential Sprinkler System Automatic Fire Alarm SystenKX Other "Knox" Fire Dept. Entry Systems REQUIREMENTS Emergency Vehicle Access Adequate Inadequate Not IdentifiedXX Fire Lanes Required Yes XX No Comments Will address Fire Lanes on Site Plan Roadway/Aisleway Widths Adequate Inadequate Not IdentifiedXX Special Hazards Noted Yes No XX Comments Hydrant Locations Adequate Inadequate Not IdentifiedXX Siamese Location Adequate Inadequate Not Identified XX Additional Comments Attached? Yes No XX Plan Approval Recommended? Yes XX No Signature _ Title 0 0 Rezoning Comments Frederick County Department of Parks & Recreation Mail to: Hand Deliver to: Frederick County Frederick County Department of Parks & Recreation Department of Parks & Recreation 107 N. Kent Street County Admin. Bldg.,2nd Floor Winchester, Virginia 22601 107 N. Kent Street (540) 665-5678 Winchester, Virginia Applicant's Name: G. W. Clifford & Assoc., Inc. Telephone: (540) 667-2139 Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester, Virginia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 (See Sheet 1 of 2 enclosed) Current zoning: RA, B2, B3 & M1 Zoning requested: B2, B3 & M1 Acreage: RA - 79 Acres B2 - 51.96 Acres B3 - 21.10 Acres M1 - 51.83 Acres Department of Parks & Recreation Comments: No comment 1, j dames M. Doran, Director Parks and Recreation Department 11 Notice to Department of Parks & Recreation - Please Return Form to Applicant Count Public Scools P:redericky 1415 Amherst Street Post Office Box 3508 Winchester, Virginia 22604-2546 Telephone: (540) 662-3888 — FAX (540) 722-2788 Administrative Assistant to the Superintendent March 26, 1997 Mr. Stephen M. Gyurisin G. W. Clifford & Associates, Inc. 200 N. Cameron Street Winchester, Virginia 22601 REF: Rezoning Comments Dear Steve: I am in receipt of your request for rezoning comments concerning several parcels of land to be rezoned from RA, B2, B3, and M1 to B2, B3, and Ml. It is my understanding the land to be rezoned (the Eastgate Commerce Center) is approximately 235.75 acres in size and is at the following location: Intersection of US/Route 522 South and Relocated VA Route 42 We do not believe the proposed rezoning of the property listed above will have an adverse impact on current or future school needs. If you should have any questions, please do not hesitate in contacting me at your earliest convenience. Sincerely, T'odas Sullivan Administrative Assistant to the Superintendent cc: R. Thomas Malcolm, FCPS Rezoning Comments Frederick County Sanitation Authority Mail to: Hand Deliver to: Frederick County Sanitation Authority Frederick Co. Sanitation Authority Attn: Engineer/Director Attn: Engineer/Director P.O. Box 1877 315 Macedonia Church Road Winchester, Virginia 22604 (540) 868-1061 Applicant's Name: G. W. Clifford & Assoc., Inc. Telephone: (540) 667-2139 Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester, Virginia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 See Sheet 1 of 2 enclosed). Current zoning: RA, B2, B3 & M1 Zoning requested: B2, B3 & M1 Acreage: RA - 79 Acres B2 - 51.96 Acres B3 - 21.10 Acres M1 - 51.83 Acres Sanitation Authority Comments: Notice to Sanitation Authority- Please Return Form to Applicant 00 do Rezoning Comments Fire and Rescue Company Name of Fire & Rescue Company: Address & Phone: S40 Applicant's Name: G. W. Clifford & Assoc., Inc. Telephone: (540) 667-2139 Mailing Address: c/o Stephen M. Gyurisin (3/13/97) 200 N. Cameron Street Winchester Virginia 22601 Location of property: Intersection of US/Route 522 South & Relocated Va. Route 642 (See Sheet 1 of 2 enclosed) Current zoning: RA, B2, B3 & M1 Zoning requested: B2 B3 & M1 Acreage: RA - 79 Acres B2 - 51.96 Acres B3 - 21.10 Acres M1 - 51.83 Acres Fire and Rescue Company's Comments: The Stephens City Volunteer Fire & Rescue Company has no objection to the rezoning request and accepts the proffers as stated herein. Fire & Rescue Company's Signature & Date: Jack Notice to Advise A e, �Kkef June 09, 1997 Board - Please Return Form to A FREDERICK COUNTY, VIRGINIA IMPACT ANALYSIS STATEMENT AND REZONING APPLICATION MATERIALS FOR REZONING REVIEW AND APPROVAL OF THE Wrights Run Limited Partnership, LP PROPERTY Opequon Magisterial District March,1997 EASTGATE COMMERCE CENTER gilbert w. clif ford & associates, inc. 200 North Cameron Street • Winchester, Virginia 22601 Phone:540-667-2139 • Fax:540-665-0493 • gwcliff@mnsinc.com 150C Olde Greenwich Drive • Fredericksburg, Virginia 22401 Phone:540-898-2115 • Fax:540-898-2115 • clifford@lbigred.com Eastgate Commerce Center Eastgate Commerce Center Table of Contents Summary Project Background Introduction Location and Access Zoning and Land use Site Suitability Development Plan Impact Analysis Introduction Planning Analysis • Site Suitability/Soils Traffic Sewage Water Drainage Solid Waste Historic Sites Community facilities • Education • Emergency Services • Parks and Recreation Environment Fiscal Impact/Proffer Fiscal Impact Impact Model Report Appendix Impact Analysis Statement Summary E 4 Eastgate Commerce Center SUMMARY Impact Analysis Statement The following Impact Analysis Statement has been prepared for the property known as Eastgate Commerce Center. The property consists of 235.75 acres, of which, 31.86 acres have been sold or dedicated for road right-of-way. The total remaining acreage for this property is 203.89 acres and consists of four types of zoning. The property is currently zoned Rural Area (RA), 12.20 acres: Business General (B-2), 25.00 acres: Industrial Transition (B-3), 23.86 acres; and, Light Industrial (M-1), 74.69 acres. The requested change of zoning comes as a result of the final design and construction of relocated VA Route 642 now known as Tasker Drive; and, the completion of US Route 522 South known as the Front Royal Pike. The location of these right-of-ways and crossovers changed since the initial design of Eastgate was proposed and zoned. The area to be rezoned consists of 31.86 acres. The Impact Analysis Statement for Eastgate Commerce Center is prepared as required by the Frederick County Board of Supervisors for rezoning approval of the property. A positive fiscal impact is projected. There are no residential units proposed as part of this rezoning. The property is planned as a business and industrial park with a mix of B-2, B-3 and M-1 zoning to accommodate a variety of uses. No specific uses are proposed at this time. However, Jouan, Inc. is currently under construction. The development is divided by relocated VA Route 642 (Tasker Drive) that traverses the site it's entire length connecting with US Route 522. This primary access route is to be controlled by a traffic signal located at the intersection of US Route 522 and VA Route 642. A network of cul-de-sac roads and interparcel connecting roads are proposed to provide access via VA Route 642. US Route 522 and VA Route 642 are constructed to the latest VDOT standards as will all proposed improvements planned for the Eastgate project. Eastgate Commerce Center is located outside the Urban Development Area (UDA) and within the Sewer and Water Service Area (SWSA). Community and county- wide planning and planning policies recognize this area as suitable for development. The property is zoned and currently the site of Jouan, Inc. Eastgate Commerce Center Impact Analysis Statement Analysis of environmental and physical characteristics of this property to be rezoned indicate that there is opportunity for development as envisioned. There are no known environmental features that limit development of the property. Assuming full development of the 203.89 acres rezoned to B-2, B-3 and M-1, and assuming an average development factor of 5,000 to 15,000 square feet per acre, approximately 2,038,900 square feet of office/commercial/industrial space may be developed using an average of 10,000 square feet per acre. For example, the Jouan, Inc. facility currently under construction has approximately 5,100 square feet per acre. Revenues in the form of real property taxes, the local share of retail sales taxes, personal property taxes and business license fees are accounted for in the Development Impact Model provided by the Frederick County Planning Office. Impacts to fire and rescue capital costs are projected at $6,166.23 and mitigated with a like payment. Public water and sewer are available to the property. Currently a 12" water line serves the property. Sewer service is available via a 6" force main and an on site sewage pump station. Natural gas and electrical service are available to the property. The rezoning and master development plan fit within the guidelines of present planning policy for this currently zoned and developing commerce center. In summary: • The property is within the Sewer and Water Service Area (SWSA) shown in the Comprehensive Plan. • The property has all service utilities including sewer and water. • The property is zoned and designated for development. • The property is located on an important transportation corridor, US Route 522. • There are no environmental or historic impacts. • There are positive fiscal impacts. • Major transportation improvements are proposed as part of the development plan. • Landscaped greenways are proposed. Project Background Eastgate Commerce Center PROJECT BACKGROUND Impact Analysis Statement Introduction Eastgate Commerce Center consists of 235+/- acres. Since it's inception US Route 522 was reconstructed from two lanes to four lanes and VA Route 642 has been designed and relocated. This rezoning is in response primarily to the major road improvements completed. Since the initial rezoning for Eastgate, 31.86 acres have been sold or dedicated for right-of-ways. 20.86 acres have been sold to Jouan, Inc and 11.01 acres have been given for right-of-ways. Of the remaining 203 +/- acres, 31+/- acres are evaluated herein for B-2, B-3 and M-1 zoning. Eastgate Commerce Center is located at the northwest corner of the intersection of US Route 522 South and VA Route 642. The parcel is identified as tax parcel 76-((A))-53, 53A-D in the Opequon Magisterial District and is currently zoned Rural Areas (RA), Business General (B-2), Industrial Transition (B-3) and Industrial (M-1). Additional areas of B-2 and revised areas of B-3 and M-1 are planned for the property and summarized below: ZONING CATEGORY ACTUAL EXISTING PROPOSED CHANGE RA 112.20 acres 97.18 acres B-2 25.00 acres 33.78 acres B-3 23.86 acres 21.10 acres M-1 74.69 acres 51.83 acres The change of zoning reduces the RA zoning by 15.02 acres. It increases the B-2 zoning category by 8.78 acres and reduces the B-3 and M-1 zoning categories by 2.76 acres and 22.86 acres respectively. The total areas changed The property is located in the Sewer and Water Service Area designated in the adopted Frederick County Comprehensive Plan. The property is currently zoned and is the site of one major industry. A master site development plan and site evaluation indicates that this site can support business and industrial uses. Eastgate Commerce Center Location and Access Impact Analysis Statement Eastgate Commerce Center is located in the Opequon Magisterial District of Frederick County. The Center has frontage on US Route 522 and VA Route 642. See the attached location map. The 31 acres to be zoned B-2, B-3 and M-1 is located throughout the property made in adjustment with the relocated VA Route 642 and US Route 522 construction project. Site Suitability The property to be rezoned has no site specific development limiting factors. The property to be rezoned appears well suited for all categories of zoning proposed and development based on site evaluation of soils, slopes, wetlands, ponds and lakes, flood plains and other site suitability and environmental factors. Development impacts are slight on adjacent properties. The primary impact concern on adjoining properties is the change of use from open, rural land to an business/industrial setting. The impacts of the allowed and industrial uses on the surrounding uses is reduced through distance setbacks, buffers, landscaping and screening regulations. The adjoining property is primarily vacant, agricultural with residences along US Route 522. DEVELOPMENT PLAN The Eastgate Commerce Center development proposes a new commercial and industrial center in the southeastern part of Frederick County. US Route 522 is an important corridor connecting with US Route 50/17 and I-81 in Frederick County Additionally, newly relocated VA Route 642 that traverses the site is an important east -west connector linking I-81 and US Route 522. Eastgate Commerce Center is proposed as an industrial, commercial and office center. This industrial, commercial and office center is designed to provide near term industrial sites along this important corridor while providing for future commercial growth in the same planned setting. The site is bisected by a major road that connects to US Route 522. The road replaces the old Macedonia Church Road and provides for a east -west connecting link with the Urban Development Area to the west. Two cul-de-sac roads are planned intersecting with Tasker .�/` � O / 1 \�. a •.• f�°e � I�V ` J61 Mae \ .. tom-_ / Gh / �.: s ■ \ a\ �;-� Ir �—• 14 p--- \�' •.°. ♦fit � � •.� �. 'I � vl� •� 10 am er AW ri` %� '' ,-�` `: •S" ;fir' s ` - i '� / ���� • .•dh �`•'�J EASTGATE _ Location Map COMMERCE CENTER gilbert w. clifford & associates, inc. Eastgate Commerce Center Impact Analysis Statement Drive to provide access to portions of the site not suitable for interparcel connections. A parallel road connects with US Route 522 serving the southeastern portion of the site providing a secondary access. These roads create different development sections which are defined by and follow the natural form and flow of the land connecting with relocated VA Route 642. A Master Development Plan is attached illustrating the major design features proposed for the Eastgate Commerce Center. IMPACT ANALYSIS Gilbert W. Clifford & Associates, Inc. is commissioned to evaluate the rezoning of the Wrights Run, LP property project known as "Eastgate Commerce Center" in light of several major planning issues, as outlined and required by the Frederick County Board of Supervisors. This document is prepared to rezone a 31 +/- acre tract within a 203+/- acre property from present Rural Areas (RA) to Business General (B-2), Industrial Transition (B-3) and Industrial (M-1). The property is well suited for B-2, B-3 and M-1 zoning considering all factors required for analysis of a site. There is a positive fiscal impact. Introduction The 203 +/- acre property, of which 31+/- acres are evaluated herein for B-2, B-3 and M-1 zoning, is identified as tax parcel 53-((A))-68 in the Opequon Magisterial District and is currently zoned RA, B-2, B-3 and M-1. Business General (B-2) zoning is the primary zone that accounts for the revisions planned for the property. The property is located in the Sewer and Water Service Areas designated in the adopted Frederick County Comprehensive Plan. The property is located on a major transportation corridor, US Route 522 South. A preliminary site development master plan and site evaluation indicates that this site can support business and associated uses of the B-2, B-3 and M-1 zones. Planning Analysis Site Suitability - The property to be rezoned has no site specific development limiting factors. The property appears well suited for B-2, B-3 and M-1 zoning uses and development based on site evaluation of soils, slopes, wetlands, ponds and lakes, flood plains and other site suitability and environmental factors. Eastgate Commerce Center Impact Analysis Statement Soils - The soils are suitable for site development purposes. The USDA Soil Conservation Soil Survey for Frederick County identifies the soils of the property on map sheet 48 as Weikert Berks channery silt loams and Clearbrook channery loams. Prime Agricultural Soils.- The property does not contain prime agricultural soils as identified by the Frederick County Comprehensive Plan. Slopes - There are few identified steep slopes on this property and no steep slopes on the area to be rezoned. The topography is ideally suited for business/industrial type development. Slopes generally range from 2% to 7% on the areas to be rezoned as part of this application for zoning revisions. Wetlands - There are no wetlands on this property to be rezoned. The property is generally well drained and has no low lying wet areas or wetland vegetation that indicates the presence of a wetland area. Ponds and Lakes - There are no ponds or lakes on the property that impact planned development or impact the areas considered for rezoning. Flood Plain - The property is not located within the 100 year HUD designated flood plain as identified in the Frederick County Comprehensive Plan and panel map number 510063- 00115B of the United States Department of Housing and Urban Development Flood Boundary map. Adjoining Properties - Development impacts are slight on adjacent properties. The primary impact concern on adjoining properties is the change of use from open, rural land to an business and industrial setting. The impacts of the allowed business uses on the surrounding uses is reduced through existing zoning, master planning, distance, setback, buffer, landscaping and screening regulations. Traffic Impacts Recent traffic counts and traffic study analysis are contained herein for the relocated VA Route 642 and recently reconstructed US Route 522. The traffic volume impact resulting from the proposed rezoning is estimated. The proposed development and full development of the land would result in an increase of 591 trips on Route 642 and 5,399 trips on Route 522. This is a 16 percent increase over traffic that would have occurred if the land was developed under the existing zoning arrangement. This increase in traffic is due primarily to the increase of the B-2 zoned area from 25 acres to approximately 52 acres. Trip generation counts and evaluations follow: TRUCKS+CARS Traffic From West Traffic From South Traffic FrO1104orth on VA Rte 642 on US Rte 522 on US Rte 522 Left Right Total Left Thru Total Thru Right Total Total Time Period Time Period 7:00 - 7:15 5 19 24 15 46 61 47 9 56 141 7:00 - 7:15 7:15 - 7:30 3 23 26 9 _ 53 62 59 3 62 150 7:15 - 7:30 7:30 - 7:45 9 22 31 12 71 83 54 12 66 180 7:30 - 7:45 7:45 - 8:00 8 15 23 10 61 71 52 7 59 153 7:45 - 8:00 8:00 - 8:15 10 10 20 3 67 70 44 7 51 141 8:00 - 8:15 8:16 - 8:30 2 9 11 2 52 54 38 0 38 103 8:15 - 8:30 8:30 - 8:45 4 12 16 1 41 42 29 2 31 89 8:30 - 8:45 8:45 - 9:00 6 7 13 4 76 80 40 2 42 135 8:45 - 9:00 9:00 - 9:15 5 10 15 6 51 57 45 10 55 127 9:00 - 9:15 9:15 - 9:30 5 7 12 5 61 66 32 2 34 112 9:15 - 9:30 9:30 - 9:45 7 2 9 4 58 62 32 2 34 105 9:30 - 9:45 9:45 - 10:00 4 4 8 3 41 44 25 4 29 81 9:45 - 10:00 10:00 - 10:15 6 11 17 6 59 65 59 2 61 143 10:00 - 10:15 10:15 - 10:30 2 3 5 6 36 42 17 3 20 67 10:15 - 10:30 10:30 - 10:45 2 6 8 8 72 80 37 5 42 130 10:30 - 10:45 10:46 - 11:00 3 5 8 2 47 49 42 3 45 102 10:45 - 11:00 11:00 - 11:15 4 3 7 6 49 55 46 2 48 110 11:00 - 11:15 11:15 - 11:30 3 1 4 4 53 57 38 4 42 103 11:15 - 11:30 11:30 - 11:45 2 8 10 9 34 43 51 3 54 107 11:30 - 11:45 11:45 - 12:00 5 9 14 8 58 66 49 2 51 131 11:45 - 12:00 12:00 - 12:15 7 9 16 12 46 58 45 1 46 120 12:00 - 12:15 12:15 - 12:30 3 7 10 4 57 61 55 5 60 131 12:15 - 12:30 12:30 - 12:45 0 5 5 8 55 63 45 7 52 120 12:30 - 12:45 12:45 - 13:00 1 2 3 2 38 40 55 0 55 98 12:45 - 13:00 13:00 - 13:15 2 4 6 5 61 66 50 3 53 125 13:00 - 13:15 13:15 - 13:30 3 4 7 12 49 61 65 3 68 136 13:15 - 13:30 13:30 - 13:45 3 3 6 1 60 61 46 4 50 117 13:30 - 13:45 13:45 - 14:00 6 4 10 4 40 44 67 1 68 122 13:45 - 14:00 14:00 - 14:15 5 4 9 7 61 68 51 1 52 129 14:00 - 14:15 14:15 - 14:30 4 8 12 9 61 70 74 2 76 158 14:15 - 14:30 14:30 - 14:45 5 4 9 7 62 69 59 7 66 144 14:30 - 14:45 14:45 - 15:00 5 4 9 3 58 61 65 6 71 141 14:45 - 15:00 15:00 - 15:15 5 4 9 4 66 70 52 5 1 57 136 15:00 - 15:15 15:15 - 15:30 2 5 7 8 52 60 71 7 78 145 15:15 - 15:30 15:30 - 15:45 4 1 5 7 49 56 72 7 79 140 15:30 - 15:45 15:45 - 16:00 7 8 15 14 57 71 78 5 83 169 15:45 - 16:00 16:00 - 16:15 14 4 18 17 46 63 83 9 92 173 16:00 - 16:15 16:15 - 16:30 4 6 10 7 52 59 81 10 91 160 16:15 - 16:30 16:30 - 16:45 7 8 15 14 58 72 92 5 97 184 16:30 - 16:45 16:45 - 17:00 5 5 10 10 45 55 90 9 99 164 16:45 - 17:00 17:00 - 17:15 1 15 16 28 136 164 85 9 94 274 17:00 - 17:15 17:15 - 17:30 5 17 22 51 151 202 119 10 129 353 17:15 - 17:30 17:30 - 17:45 9 39 48 60 132 192 89 9 98 338 17:30 - 17:45 17:45 - 18:00 2 38 40 57 172 229 69 7 76 345 17:45 - 18:00 f 9 h j k I n o p r 204 394 598 474 2750 3224 2494 216 2710 6532 gilbert w. clifford and associates Revision 1.0 - 1 June 1997 VA Rte 642/ US Rte 522 Intersection Current Weekday Volumes (Total) Attachment #1C Counted totals adjusted*burly volumes North Traffic From West Traffic From South Traffic Fro' on VA Rte 642 on US Rte 522 on US Rte 522 Total Left Right Total Left Thru Total Thru Right Total N,S,E,W Time Period Time Period 7:00 - 8:00 25 79 104 46 231 277 212 31 243 624 7:00 - 8:00 7:15 - 8:15 30 70 100 34 252 286 209 29 238 624 7:15 - 8:15 7:30 - 8:30 29 56 85 27 251 278 188 26 214 577 7:30 - 8:30 7:45 - 8:45 24 46 70 16 221 237 163 16 179 486 7:45 - 8:45 8:00 - 9:00 22 38 60 10 236 246 151 11 162 468 8:00 - 9:00 8:15 - 9:15 17 38 55 13 220 233 152 14 166 454 8:15 - 9:15 8:30 - 9:30 20 36 56 16 229 245 146 16 162 463 8:30 - 9:30 8:45 - 9:45 23 26 49 19 246 265 149 16 165 479 8:45 - 9:45 9:00 - 10:00 21 23 44 18 211 229 134 18 152 425 9:00 - 10:00 9:15 - 10:15 22 24 46 18 219 237 148 10 158 441 9:15 - 10:15 9:30 - 10:30 19 20 39 19 194 213 133 11 144 396 9:30 - 10:30 9:45 - 10:45 14 24 38 23 208 231 138 14 152 421 9:45 - 10:45 10:00 - 11:00 13 25 38 22 214 236 155 13 168 442 10:00 - 11:00 10:15 - 11:15 11 17 28 22 204 226 142 13 155 409 10:15 - 11:15 10:30 - 11:30 12 15 27 20 221 241 163 14 177 445 10:30 - 11:30 10:45 - 11:45 12 17 29 21 183 204 177 12 189 422 10:45 - 11:45 11:00 - 12:00 14 21 35 27 194 221 184 11 195• 461 11:00 - 12:00 11:15 - 12:15 17 27 44 33 191 224 183 10 193 461 11:15 - 12:15 11:30 - 12:30 17 33 50 33 195 228 200 11 211 489 11:30 - 12:30 11:45 - 12:45 15 30 45 32 216 248 194 15 209 502 11:45 - 12:45 12:00 - 13:00 11 23 34 26 196 222 200 13 213 469 12:00 - 13:00 12:15 - 13:15 6 18 24 19 211 230 205 15 220 474 12:15 - 13:15 12:30 - 13:30 6 15 21 27 203 230 215 13 228 479 12:30 - 13:30 12:45 - 13:45 9 13 22 20 208 228 216 10 226 476 12:45 - 13:45 13:00 - 14:00 14 15 29 22 210 232 228 11 239 500 13:00 - 14:00 13:15 - 14:15 17 15 32 24 210 234 229 9 238 504 13:15 - 14:15 13:30 - 14:30 18 19 37 21 222 243 238 8 246 526 13:30 - 14:30 13:45 - 14:45 20 20 40 27 224 251 251 11 262 553 13:45 - 14:45 14:00 - 15:00 19 20 39 26 242 268 249 16 265 572 14:00 - 15:00 14:15 - 15:15 19 20 39 23 247 270 250 20 270 579 14:15 - 15:15 14:30 - 15:30 17 17 34 22 238 260 247 25 272 566 14:30 - 15:30 14:45 - 15:45 16 14 30 22 225 247 260 25 285 562 14:45 15:45 15:00 - 16:00 18 18 36 33 224 257 273 24 297 590 15:00 - 16:00 15:15 - 16:15 27 18 45 46 204 250 304 28 332 627 15:15 - 16:15 15:30 - 16:30 29 19 48 45 204 249 314 31 345 642 15:30 - 16:30 15:45 - 16:45 32 26 58 52 213 265 334 29 363 686 15:45 - 16:45 16:00 - 17:00 30 23 53 48 201 249 346 33 379 681 16:00 - 17:00 16:15 - 17:16 17 34 51 59 291 350 348 33 381 782 16:15 17:15 16:30 - 17:30 18 45 63 103 390 493 386 33 419 975 16:30 - 17:30 16:45 - 17:45 20 76 96 149 464 613 383 37 420 1129 16:46 - 17:45 17:00 - 18:00 17 109 126 196 591 787 362 35 397 1310 17:00 - 18:00 gilbert w. clifford and associates Revision 1.0 - 1 June 1997 VA Rte 642/ US Rte 522 Intersection Peak Hour Determination Attachment #2C Full Development Under Existing Zoning Trips Generated UnAF evelopment oposed Zoning Trips Generated Proposed Increase Trips Generated Development Type Industrial Park (M-1,6-3) Trip Rate Average Daily Trips 62.9 P.M. Peak Hour Adj. Street 10.48 Retail (B-2) At FAR = 25% Trip Rate Average Daily Trips 48.54 P.M. Peak Hour Adj. Street 4.56 Area 98.6 6199 1033 Area 25 G.L.F.A. - 272250 13215 1241 Residential (RA) Area 112.2 Lot Size(ac) = 5 Lots - 22.4 Trip Rate Average Daily Trips 9.55 214 P.M. Peak Hour Adj. Street 1.01 23 TOTALS: Average Daily Trips 19628 P.M. Peak Hour Adj. Street 2297 Area 72.9 4587 764 Area 52.0 G.L.F.A. - 566844 Trip Rate 36.9 20880 3.5 1980 Area 79 Lots - 15.8 151 16 25618 2761 -1611 -268 7665 739 -63 -7 5990 464 Average Daily Volume Summary Trips Per Day at Trips Per Day at Full Development Full Development Increase Trips Existing Trips Per Day Existing Zoning Proposed Zoning Due to Rezoning VA Rte 642 1717 3652 4243 691 U.S. Rte 522 7552 Northside 16062 18659 2597 U.S. Rte 522 8149 Southside 17332 20135 2802 Total - 17419 37047 43037 Assuming traffic occurring between 7:00 a.m. and 6:00 p.m. accounts for 75% of daily trips Assume future trips arrive site relative to current trip distribution at the 522/642 intersection The change in zoning from the current layout increases the retail area by 27 acres while losing industrial area. This change will result'in a 16 percent increase in trips generated over what could have occurred under the existing zoning. gilbert w. clifford and associates Eastgate Rezoning Revision 1.0 - 1 June 1997 Traffic Impact Analysis Attachment #3 Eastgate Rezoning Traffic Impact Analysis Attachment #4 Trip Generation Calculation Existing Zoning Patterns gilbert w. clifford and associates Revision 1.0 - 1 June 1997 A Eastgate Ex Retail SUMMARY OF TRIP GENERATION CALCULATION FOR 272.25 T.G.L.A. OF SHOPPING CENTER 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 48.54 0.00 1.00 13216 7-9 AM PK HR ENTER 0.68 0.00 1.00 185 7-9 AM PK HR EXIT 0.40 0.00 1.00 108 7-9 AM PK HR TOTAL 1.08 0.00 1.00 293 4-6 PM PK HR ENTER 2.28 0.00 1.00 621 4-6 PM PK HR EXIT 2.28 0.00 1.00 621 4-6 PM PK HR TOTAL 4.56 0.00 1.00 1242 AM GEN PK HR ENTER 0.00 0.00 1.00 0 AM GEN PK HR EXIT 0.00 0.00 1.00 0 AM GEN PK HR TOTAL 0.00 0.00 1.00 0 PM GEN PK HR ENTER 0.00 0.00 1.00 0 PM GEN PK HR EXIT 0.00 0.00 1.00 0 PM GEN PK HR TOTAL 0.00 0.00 1.00 0 SATURDAY 2-WAY VOL 63.01 0.00 1.00 17155 PK HR ENTER 3.09 0.00 1.00 841 PK HR EXIT 3.09 0.00 1.00 841 PK HR TOTAL 6.18 0.00 1.00 1681 SUNDAY 2-WAY VOL 29.89 0.00 1.00 8137 PK HR ENTER 1.52 0.00 1.00 413 PK HR EXIT 1.58 0.00 1.00 430 PK HR TOTAL 3.10 0.00 1.00 843 Note: A zero rate indicates no rate data available The above rates were calculated from the following equations: AWD 2-Way Vol (=<570 TGLA): Ln(T) = 0.625Ln(A) + 5.985, R^2 = 0.78 AWD 2-Way Vol (>570 TGLA): Ln(T) = 0.756Ln(A) + 5.154, R^2 = 0.42 7-9 AM Pk Hr Total: Ln(T) = 0.589Ln(A) + 2.378 R^2 = 0.49, 63% Enter, 37% Exit 4-6 PM Pk Hr Total (=<600 TGLA): Ln(T) = 0.637Ln(A) + 3.553 R^2 = 0.81, 50% Enter, 509. Exit 4-6 PM Pk Hr Total (>600 TGLA): Ln(T) = 0.725Ln(A) + 2.987 R^2 = 0.55, 50% Enter, 50% Exit Saturday 2-Way Vol.: Ln(T) = 0.628Ln(A) + 6.229, R^2 = 0.83 Saturday Pk Hr Total: Ln(T) = 0.635Ln(A) + 3.867 R^2 = 0.83, 50% Enter, 50% Exit Sunday 2-Way Vol.: Ln(T) = 0.498Ln(A) + 6.212, R^2 = 0.44 Sunday Pk Hr Total: Ln(T) = 0.437Ln(A) + 4.287 R-2 = 0.33, 49% Enter, 51% Exit Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. Eastgate Ex Ind Pk SUMMARY OF TRIP GENERATION CALCULATION FOR 98.55 ACRE OF INDUSTRIAL PARK 2 June 1997 AVERAGE RATE STANDARD DEVIATION ADJUSTMENT FACTOR DRIVE WAY VOLUME AVG WKDY 2-WAY VOL 62.90 62.21 1.00 6199 7-9 AM PK HR ENTER 8.27 0.00 1.00 815 7-9 AM PK HR EXIT 1.82 0.00 1.00 179 7-9 AM PK HR TOTAL 10.09 6.57 1.00 994 4-6 PM PK HR ENTER 2.20 0.00 1.00 217 4-6 PM PK HR EXIT 8.28 0.00 1.00 816 4-6 PM PK HR TOTAL 10.48 7.38 1.00 1033 AM GEN PK HR ENTER 7.21 0.00 1.00 711 AM GEN PK HR EXIT 1.08 0.00 1.00 106 AM GEN PK HR TOTAL 8.29 6.12 1.00 817 PM GEN PK HR ENTER 1.82 0.00 1.00 179 PM GEN PK HR EXIT 6.85 0.00 1.00 675 PM GEN PK HR TOTAL 8.67 7.16 1.00 854 SATURDAY 2-WAY VOL 34.23 41.91 1.00 3373 PK HR ENTER 1.51 0.00 1.00 149 PK HR EXIT 3.20 0.00 1.00 316 PK HR TOTAL 4.71 2.23 1.00 464 SUNDAY 2-WAY VOL 10.11 9.02 1.00 996 PK HR ENTER 0.46 0.00 1.00 45 PK HR EXIT 0.53 0.00 1.00 53 PK HR TOTAL 0.99 1.22 1.00 98 Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. TRIP GENERATION BY MICROTRANS Eastgate Ex Residential SUMMARY OF TRIP GENERATION CALCULATION FOR 23 DWELLING UNITS OF SINGLE FAMILY DWELLINGS 2 June 1997 STANDARD ADJUSTMENT DEVIATION FACTOR AVG WKDY 2-WAY VOL 7-9 AM PK HR ENTER 7-9 AM PK HR EXIT 7-9 AM PK HR TOTAL 4-6 PM PK HR ENTER 4-6 PM PK HR EXIT 4-6 PM PK HR TOTAL AM GEN PK HR ENTER AM GEN PK HR EXIT AM GEN PK HR TOTAL PM GEN PK HR ENTER PM GEN PK HR EXIT PM GEN PK HR TOTAL SATURDAY 2-WAY VOL PK HR ENTER PK HR EXIT PK HR TOTAL SUNRAY 2-WAY VOL PK HR ENTER PK HR EXIT PK HR TOTAL Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. TRIP GENERATION BY MICROTRANS • to Eastgate Rezoning Traffic Impact Analysis Attachment #5 Trip Generation Calculation Proposed Zoning Patterns gilbert w. clifford and associates Revision 1.0 - 1 June 1997 EASTGATE Prop Retail SUMMARY OF TRIP GENERATION CALCULATION FOR 565.844 T.G.L.A. OF SHOPPING CENTER 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION- FACTOR VOLUME AVG WKDY 2-WAY VOL 36.90 62.21 1.00 20878 7-9 AM PK HR ENTER 0.50 0.00 1.00 284 7-9 AM PK HR EXIT 0.29 0.00 1.00 167 7-9 AM PK HR TOTAL 0.80 6.57 1.00 451 4-6 PM PK HR ENTER 1.75 0.00 1.00 990 4-6 PM PK HR EXIT 1.75 0.00 1.00 990 4-6 PM PK HR TOTAL 3.50 7.38 1.00 1979 AM GEN PK HR ENTER 0.00 0.00 1.00 0 AM GEN PK HR EXIT 0.00 0.00 1.00 0 AM GEN PK HR TOTAL 0.00 6.12 1.00 0 PM GEN PK HR ENTER 0.00 0.00 1.00 0 PM GEN PK HR EXIT 0.00 0.00 1.00 0 PM GEN PK HR TOTAL 0.00 7.16 1.00 0 SATURDAY 2-WAY VOL 48.00 41.91 1.00 27159 PK HR ENTER 2.36 0.00 1.00 1338 PK HR EXIT 2.36 0.00 1.00 1338 PK HR TOTAL 4.73 2.23 1.00 2675 SUNDAY 2-WAY VOL 20.70 9.02 1.00 11713 PK HR ENTER 1.01 0.00 1.00 569 PK HR EXIT 1.05 0.00 1.00 592 PK HR TOTAL 2.05 1.22 1.00 1161 Note: A zero rate indicates no rate data available The above rates were calculated from the following equations: AWD 2-Way Vol (=<570 TGLA): Ln(T) = 0.625Ln(A) + 5.985, R^2 = 0.78 AWD 2-Way Vol (>570 TGLA): Ln(T) = 0.756Ln(A) + 5.154, R^2 = 0.42 7-9 AM Pk Hr Total: Ln(T) = 0.589Ln(A) + 2.378 R^2 = 0.49, 6396 Enter, 379. Exit 4-6 PM Pk Hr Total (=<600 TGLA): Ln(T) = 0.637Ln(A) + 3.553 R^2 = 0.81, 50% Enter, 50% Exit 4-6 PM Pk Hr Total (>600 TGLA): Ln(T) = 0.725Ln(A) + 2.987 R-2 = 0.55, 5096 Enter, 50%- Exit Saturday 2-Way Vol.: Ln(T) = 0.628Ln(A) + 6.229, R^2 = 0.83 Saturday Pk Hr Total: Ln(T) = 0.635Ln(A) + 3.867 R^2 = 0.83, 509.- Enter, 50% Exit Sunday 2-Way Vol.: Ln(T) = 0.498Ln(A) + 6.212, R"2 = 0.44 Sunday Pk Hr Total: Ln(T) = 0.437Ln(A) + 4.287 R^2 = 0.33, 499.- Enter, 5196 Exit Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. EASTGATE Prop Ind Pk SUMMARY OF TRIP GENERATION CALCULATION FOR 72.93 ACRE OF INDUSTRIAL PARK 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 62.90 62.21 1.00 4587 7-9 AM PK HR ENTER 8.27 0.00 1.00 603 7-9 AM PK HR EXIT 1.82 0.00 1.00 132 7-9 AM PK HR TOTAL 10.09 6.57 1.00 736 4-6 PM PK HR ENTER 2.20 0.00 1.00 161 4-6 PM PK HR EXIT 8.28 0.00 1.00 604 4-6 PM PK HR TOTAL 10.48 7.38 1.00 764 AM GEN PK HR ENTER 7.21 0.00 1.00 526 AM GEN PK HR EXIT 1.08 0.00 1.00 79 AM GEN PK HR TOTAL 8.29 6.12 1.00 605 PM GEN PK HR ENTER 1.82 0.00 1.00 133 PM GEN PK HR EXIT 6.85 0.00 1.00 500 PM GEN PK HR TOTAL 8.67 7.16 1.00 632 SATURDAY 2-WAY VOL 34.23 41.91 1.00 2496 PK HR ENTER 1.51 0.00 1.00 110 PK HR EXIT 3.20 0.00 1.00 234 PK HR TOTAL 4.71 2.23 1.00 344 SUNDAY 2-WAY VOL 10.11 9.02 1.00 737 PK HR ENTER 0.46 0.00 1.00 33 PK HR EXIT 0.53 0.00 1.00 39 PK HR TOTAL 0.99 1.22 1.00 72 Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. TRIP GENERATION BY MICROTRANS EASTGATE Prop Residential SUMMARY OF TRIP GENERATION CALCULATION FOR 16 DWELLING UNITS OF SINGLE FAMILY DWELLINGS 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 9.55 3.66 1.00 153 7-9 AM PK HR ENTER 0.19 0.00 1.00 3 7-9 AM PK HR EXIT 0.55 0.00 1.00 9 7-9 AM PK HR TOTAL 0.74 0.90 1.00 12 4-6 PM PK HR ENTER 0.66 0.00 1.00 11 4-6 PM PK HR EXIT 0.35 0.00 1.00 6 4-6 PM PK HR TOTAL 1.01 1.05 1.00 16 AM GEN PK HR ENTER 0.20 0.00 1.00 3 AM GEN PK HR EXIT 0.56 0.00 1.00 9 AM GEN PK HR TOTAL 0.76 0.91 1.00 12 PM GEN PK HR ENTER 0.66 0.00 1.00 11 PM GEN PK HR EXIT 0.36 0.00 1.00 6 PM GEN PK HR TOTAL 1.02 1.05 1.00 16 SATURDAY 2-WAY VOL 10.19 3.65 1.00 163 PK HR ENTER 0.52 0.00 1.00 8 PK HR EXIT 0.44 0.00 1.00 7 PK HR TOTAL 0.96 1.00 1.00 15 SUNDAY 2-WAY VOL 8.78 3.36 1.00 140 PK HR ENTER 0.44 0.00 1.00 7 PK HR EXIT 0.44 0.00 1.00 7 PK HR TOTAL 0.89 0.96 1.00 14 Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. TRIP GENERATION BY MICROTRANS Eastgate Commerce Center Impact Analysis Statement Sewage Conveyance and Treatment Impacts There are no sewage conveyance or treatment problems associated with this project. The property is located within the area identified in the Frederick County Comprehensive Plan covering future sewer service. Currently this property is served by public sewer service. Sewage service to this site is provided by Frederick County Sanitation Authority via a 6" force main. Water Supply Impacts There are no water supply or transmission problems with this property. The property is located within the area identified in the Frederick County Comprehensive Plan covering future water service. Currently this property is served by public water service via an 12" water line. Water service is under the Frederick County Sanitation Authority. Fire protections measures such as the installation of fire hydrants will be addressed at the site development stage. The installation of fire protection hydrants poses no problems. The installation of fire hydrants on the property will improve the fire protection means of the surrounding properties as well as the enhancing the protection of the property. The fire fighting capabilities of the fire company covering this area will be enhanced with additional fire hydrants. Drainage Facility Impacts Proper storm water management planning will result in minimal or no site drainage impacts. The development of business in lieu of rural residential/agricultural will increase stormwater run off. It is recommended that the increased run off would be reduced prior to discharge from the site. In lieu of the above, additional storm water detention calculations should be presented with final design which would show no adverse impacts created by the imposition of this increase storm water on the existing downstream water course. Drainage flows generally south toward Wrights Run drainage area to the south of the property. Predevelopment runoff rates will be maintained using recognized storm water management standards. Eastgate Commerce Center Impact Analysis Statement Solid Waste Cost There are no solid waste collection and disposal impacts. Solid waste will be exported by contract hauler at no cost to the County. No additional solid waste facilities will be required to handle the waste from this property. Historic Impacts This project area through past development of adjoining property has no known significance. The area has been significantly developed to the east and south. There are no structures currently located on the area to be rezoned that are of historic significance. A review of the National Register, the Virginia Landmarks Register and The Frederick County Comprehensive Plan indicates that there are no known historic structures on this property. Community Facilities Education - This project will generate no school children and therefore have no effect on educational cost in Frederick County. Capital cost impacts for school age children will be reduced since no school children will result with B-2, B-3 and M-1 zoning. Parks and Recreation - This project would result in no capital impact on Parks and Recreational facilities. Emergency Services Cost - There are minimal additional fire, rescue or sheriff capital facilities anticipated with the zoning of the property. Additional capital costs have been mitigated with a like proffer contribution to the County. Fire protection is available from the Stephens City Volunteer Fire and Rescue Company. The planned B-2, B-3 and M-1 rezoning will have all required site development standards required by the fire code, building code and zoning codes. There are no fire protection problems associated with this property. All hydrants and fire protection measures will be installed when the property is developed. Rescue services are provided by the Stephens City Volunteer Fire and Rescue Squad. Sheriff Department services protection will be required by this facility. Generally, routine patrols of the area should suffice for the majority of time and materials necessary to cover this property. Eastgate Commerce Center Impact Analysis Statement Environmental Impacts There are no known major environmental impacts associated with the rezoning of this property . There will be certain minor negative impacts due to the construction activity including run off sediment, noise and traffic movements. These are to be minimized by proper compliance with local and state laws for environmental protection. The effects on the down -stream impoundment and stream are minimal. There is no known loss of irretrievable resources involved with this project. There are no known endangered species of fauna, flora or wildlife which will be effected by this project. Ground water and air quality should be unaffected. A minor impact of a negative nature is associated with lighting for security and business use. These should be closely controlled during planning stage to minimize the adverse impacts on adjacent residential structures and impacts on the traveling public. Other This planned zoning change would create a positive fiscal impact as compared to the existing zoning. There are no known other impacts. E E Fiscal Impact 0 0 Eastgate Commerce Center FISCAL IMPACT Impact Analysis Statement The fiscal impacts of the Eastgate Commerce Center rezoning are measured for capital costs that relate to the improvements necessary for the County to increase the capacity of public facilities. The amount of the impact for any rezoning and subsequent land development such as Eastgate Commerce Center depends upon location and land uses. Using the rezoning impact model provided by Frederick County, the total capital cost of required new facilities generated by the Eastgate Commerce Center rezoning is considered for each local governmental department for it's respective service area. In this case these departmental areas include: • Schools • Parks and Recreation • Fire and Rescue As evidenced by the model forecast, the only capital cost is new capital costs calculated for Fire and Rescue for costs not covered by county contributions boosts the amount for Fire and Rescue to $6,166.23. The Eastgate Commerce Center development when rezoned warrants a credit based upon it's overall net fiscal impact due to taxes that will be paid by the project in future years. Eastgate Commerce Center generates a net positive fiscal impact. Future credits that go toward funding existing debt service are determined by the model and applies to school, fire and rescue and parks and recreation departments only. The rezoning impact model for Frederick County does not calculate positive fiscal impacts associated with non-residential land uses such as this rezoning for Eastgate Commerce Center, B-2 zoning. Instead, only impacts associated with residential uses are actually shown. In the case of non-residential uses a zero ($0) value impact amount or value is shown due to the large amount of fiscal impact associated with such commercial or office (non-residential) land uses. 13 Eastgate Commerce Center Impact Analysis Statement The Frederick County impact model shows that there is no net impacts for the Eastgate Commerce Center rezoning. There is a fiscal impact credit since the impact of all land uses is positive and a credit for contribution to capital costs is shown through future taxes paid to the County. The net fiscal impact credit result from the new project against capital costs that are generated by the project. The credit over a ten year period is the amount of development fees, as well as permit fees, plus, project revenues. Revenues are the sum of the following taxes and fees associated with B-2, B-3 and M-1 type zoning land uses: • Real property tax • Personal property tax (estimated at $93.00 per employee) • Business license tax • Utility tax • Retail sales tax (estimated at $2.83 per square foot) • Transient tax (Motel tax) (estimated at $172.00 per room) • Meals tax ( estimated at $5.91 per square foot) Although the actual zoning change is an increase in B-2 and a reduction of B-3 and M-1 zoning the model impacts reflect a change of RA to B-2, B-3 and M-1 for purposes of calculating impacts. 14 OUTPUT MODULE Net Credit for Fiscal Taxes to Capital Impact Capital Net Q5t.5 Credit QD6t 1131f Q.1 Fire Department $19 $194 $0 Rescue Department Elementary Schools Middle Schools Nigh Schools Parks and Recreatlon TOTAL FIRE AND RESCUE ADDENDUM $125 $0 $0 $27,585 $0 ` $O $144 $390,472 $29,419 New Capital Costs Not $305 78 Covered by County Contributions NOTES: Model Run Date 5/14/97 EAW Eastgate Rezoning: Assumes 24,750 sq ftof office use on 1 acre rezoned from RA to M1 $0 $Q r $0 OUTPUT MODULE Fire Department Rescue Department Elementary Schools Middle Schools High Schools Parks and Recreation TOTAL_ FIRE AND RESCUE ADDENDUM New Capital Costs Not Covered by County Contributions Capital Impact Capital Net I C a.9IS D.i t+dA c asis tn=cl $131 $830 $536 $0 $0 $302,734 $0 $668 $4,530,927 $321.558 -------------------------------------------------------------------- $1,457.02 NOTES: Model Run Date 5/14/97 EAW Eastgate Rezoning- Assumes169,632 sq.ft. of retail use on 9 acres rezoned from RA to 83. $0 ---------------------------------- OUTPUT MODULE Fire Department Rescue Department Elementary Schools Middle Schools Nigh Schools Parks and Recreation Net Credit for Fiscal Taxes to Capital Impact Capital Net COW Qmdil CD.515 trop-ad $397 $2,507 $0 TOTAL FIRE AND RESCUE ADDENDUM $1,620 $0 $0 �4 $2,018 $13,688,366 $914,925 $0 $5.4.3.8.5 $0 $971,818 r ----------------------------------------- $0 New Capital Costs Not $4,403.43 Covered by County Contributions NOTES: Model Run pate 5/14/97 EAW Eastgate Rezoning Assumes 512,664 sq,ft. of retail use on 24 acres rezoned from RA to B2. L_J • OUTPUT MODULE Fire Department Rescue Department Elementary Schools Middle Schools High Schools Parks and Recreation TOTAL ------------------------------------------------------ FIRE= AND RESCUE ADDENDUM New Capital Costs Not Covered by County Contributions ----------------------------- Net Fiscal Capital Impact s Gmw $994 $6,487 $0 $0 $0 $0 $7,481 $20,580,671 Credit for Taxes to Capital QUI$ $10.038 Net 1"a-a $0 $1,429,744 $0 HAMI N $1.524:769 ---------------------------------------------- $0 $15,848.79 NOTES: Modal Run Date 5/30/97 EAW Eastgate Rezoning' ASSllmes 1.282,793 sq.ft. of office on 51.83 acres zoned M1 OUTPUT MODULE Fire Department Rescue Department Elementary Schools Middle Schools High Schools Parks and Recreation TOTAL FIRE AND RESCUE ADDENDUM Not Credit for Fiscal Taxes to Capital Impact Capital Net Credit Q-Qa� Impact $308 $1, 945 $0 $1,257 $0 $0 $709, 742 $0 $0 B 5A2-16.2 $.Q $1,565 $10.619.280 $753,876 - $0 New Capital Costs Not $3,415.91 Covered by County Contributions ----------------------------------------------- NOTES' Model Run Date 5/30/97 EAW Eastgate Rezoning. Assumes 397,693 sq ft of retail on 21.10 acres zoned B3 OUTPUT MODULE Net Fiscal Capital Impact Costs CAP& Fire Department $860 Rescue Department $3,508 Elementary Schools $0 Middle Schools $0 High Schools $0 Barks and Recreation SD TOTAL $4,368 $29,632,510 FIRE AND RESCUE ADDENDUM • Credit for Taxes to Capital Net MI5 I.t1:1put $5.428 $0 $1,980,814 $0 $11.7..7.44 IQ $2,103,986 50 New Capital Costs Not $9,533,44 Covered by County Contributions NOTES. Model Run Date 5i30i97 EAW Eastgate Rezoning: Assumes 1,109,918 sq ft of retail on 51.96 acres zoned 62, Eastgate Commerce Center Frederick County, Traffic Impact Analysis An application is filed for rezoning of a 24 acre tract of land from RA (Rural Area) to B2 (Business General) on the north side of relocated VA Route 642, 450 ft. west of U.S. Route 522. The site has frontage on approximately 3,200 ft. along relocated VA Route 642. The site is envisioned to be fully developed with a variety of commercial land uses. Though the northeast corner of the Eastgate site is currently zoned B2, the surrounding lands are undeveloped. A rezoning of areas south of this site in August 1991 resulted in M1 (industrial), B3 (industrial transition), and B2 areas south of VA Route 642, across from the area currently under consideration for rezoning to B2. As part of the current application a small portion of formerly B3 land will be rezoned to B2 and areas currently zoned either B2, B3 and M1 will be slightly revised to accommodate the relocated VA Route 642 right-of-way. Since that 1991 action, VA Route 642 has been relocated to its current location and U.S. Route 522 has been widened to four lanes. This entire site of 236 acres is known as the Eastgate Commerce Center and is master planned as a business and industrial park. If the rezoning is approved, 52 acres of B2, 21 acres of B3, and 52 acres of M1 and 79 acres of RA would result. The main access to the Eastgate Development will be from the relocated VA Route 642 right- of-way. Limited access will be available from U.S. Route 522 due to the existing median. The major traffic impact will occur at the U.S. Route 522/VA Route 642 intersection. The current configuration, a "T," with two lanes both north and south bound on U.S. Route 522, and two lanes, one east and one west bound on relocated VA Route 642 under current loading, operates satisfactorily. Turn lanes are provided on U.S. Route 522 for northbound left turns and southbound rights. The generalized development plan calls for two additional intersections on relocated VA Route 642 to be created. Wrights Run Road, 1,000 ft. west of U.S. Route 522 and Rams Head Road, 840 ft. west of Wrights Run Road will allow access to lots not fronting on relocated VA Route 642. The development of Eastgate will increase the vehicle trips at the U.S. Route 522/VA Route 642 intersection and along relocated VA Route 642. In order to determine the consequence of these trips, the developer has commissioned Gilbert W. Clifford & Associates, Inc. to examine the existing and proposed conditions at the intersection with regard to the Eastgate development by examining the following: Determine the existing traffic volumes at each of the affected intersections; Estimate the trips generated by the full development Apply these trips to the proposed intersection geometries; and Determine proposed level of service. Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Vehicle count information was taken by Clifford in May 1997 at the VA Route 642/U.S. ' Route 522 intersection. These volumes were analyzed and determination made that the peak hour traffic is from 5:00 to 6:00 p.m. A copy of the counted traffic data at the intersection is shown on Attachment #1. The hourly summation is shown on Attachment #2. ' The impact of the development is estimated by determining the peak hour trips generated by the new development (Eastgate), and adding these trips to the existing volumes. It was assumed that the B2 areas achieve 25% area coverage of retail uses. The M-1/13-3 areas were ' treated as an industrial park. Trip rates provided by the Institute of Traffic Engineers (ITE) Trip Generation Manual were ' also employed. Attachment #3 provides a summation of the daily and peak hour generated trips. It also calculates the actual traffic increase due to the proposed rezoning. The detailed breakdown of the new trip volumes from the ITE calculations is provided in Attachment #4. ' 2,744 trips are generated during the p.m. peak hour; 1,150 entering and 1,594 exiting the site. These volumes can be related to the two zoning classifications as follows: ' PM Peak Volume Enter Exit B2 (retail uses) 1,980 990 990 M1/B3 (industrial park uses) 764 160 604 The estimated peak hour trips were then assigned to turn movements at each of the three ' intersection based on the directional distribution percentages. A conservative assumption was made that 40% of the trips to the development are to and from the west on relocated VA Route 642, 45% are to and from Front Royal to the south on U.S. Route 522, and 15% from ' the north on U.S. Route 522. These assumed percentages are based on a breakdown of the most current vehicle count data. See Attachment 95. The calculations distributing the trips, and calculating the resulting intersection movement ' volumes at the U.S. Route 522/VA Route 642 intersection are provided on Attachment 96. The ultimate hourly volume through the VA Route 642/U.S. Route 522 intersection is 2,741. This is an increase of 1,430 trips. Attachment #7 provides the distribution and ' resulting volumes at the Wrights Run Road and Rams Head Road intersection. The volume through the VA Route 642/Wrights Run Road intersection is 1,954 and through the VA Route 642/Rams Head Road is 1,732. ' The Highway Capacity Manual Special Report 209 Methodology was employed to determine the level of service available at each intersection. Initially, all three intersections were evaluated as unsignalized. For various reasons all fail to provide adequate levels of service. All traffic from U.S. Route 522 must enter Eastgate from relocated VA Route 642, relocated VA Route 642 must carry a large portion of the generated trips. This increased volume makes turn movements to enter VA Route 642 difficult. Signalization at all intersections is ' required. The unsignalized evaluation for Wrights Run Road and Rams Head Road are provided for information purposes as Attachment #8. ' The SP209 signalized intersection analysis was then used to evaluate levels of service. The Peak Hour Factor was assumed to be .09. Permitted and protected left turns were only provided at the U.S. Route 522 and Wrights Run Road signals. The calculations indicate that: Gilbert If' Clifford & Associates, Inc. 200 .North Cameron Street ' ff"inchester, 1 it inia 22601 Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia ' 1. The U.S. Route 522/VA Route 642 intersection will operate at a level of service C. a. The existing northbound left turn lane must be expanded to provide two lanes. ' The minimum lane length shall be 220 ft. b. The southbound right turn lane required length is 100 ft. ' 2. The Wrights Run Road intersection will operate at level of service B. a. Relocated VA Route 642 must be expanded to include a left turn lane, thru lane, and right turn lane for both directions. b. North and south bound Wrights Run Road shall provide a left turn and thru lanes. ' 3. The Rams Head Road intersection will operate level of service B. ' a. Relocated VA Route 642 must be expanded to include a left turn lane, thru lane, and right turn lane for both directions. b. North and south bound Rams Head Road shall provide a left turn and thru lanes. The length of stacking lanes required at each movement has been determined. The SP 209 Supplemental Uniform Delay Worksheet was used. The analysis confirms that the stacking ' lane lengths offered by the proffers and described previously are adequate. These sheets along with the entire signalized analyses for each intersection are provided in Attachment #'s 9A, 9B, and 9C. A summary of the required left turn lane lengths is provided in Attachment #10. ' Development of retail and industrial park uses at the Eastgate Commerce Center will increase traffic on U.S. Route 522 and relocated VA Route 642. While improvements cannot make the traffic disappear, they can mitigate traffic impacts somewhat. Signalization and stacking ' lane improvements proposed will allow the current and full development volumes to move at a reasonable rate of speed, and allow for signal designs which operate at an acceptable level of service. ' As mentioned, the Generalized Development Plan or Concept Plan is currently under review as part of the rezoning application and indicates that the owners of the Eastgate Commerce ' Center Development have attempted to address the needs of the expected traffic volumes. The street improvements detailed in the proffers are as follows: 1. On U.S. Route 522, a 200 ft. dual left turn lane for northbound traffic will be ' provided; 2. Relocated VA Route 642 will be widened to an ultimate five lane section to include ' left turn, thru, and right turn lanes for each direction; 3. Left turn lanes will be provided for northbound Wrights Run Road. 4. The Rams Head Road and Wrights Run Road intersections will be signalized. Gilberl 11'. Clifford &Associates, Inc. 200 ,Forth Cameron Street Winchesler, Firi;inia 22601 Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia 5. This analysis assumes a "worst case" buildout scenario. That is, it was assumed that all of the B2 land is developed retail. The actual uses could vary significantly, reducing the amount of traffic. VDOT has agreed, and the owner has proffered, to check the traffic inputs at site plan stage for each development to determine what improvements are necessary at that time. At full buildout, the aggregate improvements maybe less than what is described here. Additional proffers included: 1. Route 522 and relocated VA Route 642 will be signalized. 2. Right turn lanes will be constructed at Sunrise Drive entering and exiting U.S. Route 522. 3. total) road efficiency buffer will be installed along both sides of relocated VA Route 642 that may be used for right-of-way expansion. 'L Gilbert !f: Clifford &Associates, Inc. 200 North Cameron Street ' Winchester, Firginia 22601 Lastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 1 Traffic Counts Gilbert W Cliffoni c- Associates, Ine. 200 ,North Cameron Street Winchester, Firginia 22601 TRUCKS+CARS Time Period 7:00 - 7:15 7:15 - 7:30 7:30 - 7:45 7:45 - 8:00 8:00 - 8:15 8:15 - 8:30 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:30 - 9:45 9:46 - 10:00 10:00 - 10:15 10:15 - 10:30 10:30 - 10:45 10:45 - 11:00 11:00 - 11:15 11:15 - 11:30 11:30 - 11:45 11:45 - 12:00 12:00 - 12:15 12:15 - 12:30 12:30 - 12:45 12:45 - 13:00 13:00 - 13:15 13:15 - 13:30 13:30 - 13:45 13:45 - 14:00 14:00 - 14:15 14:15 - 14:30 14:30 - 14:45 14:45 - 15:00 15:00 - 15:15 15:15 - 15:30 15:30 - 15:45 15:45 - 16:00 16:00 - 16:15 16:15 - 16:30 16:30 - 16:45 16:45 - 17:00 17:00 - 17:15 17:15 - 17:30 17:30 - 17:45 17:45 - 18:00 Traffic From on VA Rte Left 5 3 9 8 10 2 4 6 5 5 7 4 6 2 2 3 4 3 2 5 7 3 0 1 2 3 3 6 5 4 5 5 5 2 4 7 14 4 7 5 1 5 9 2 f 204 West 642 Right 19 Total 24 Traffic From on US Rte Left 15 South 522 Thru 46 Total 61 Traffic From on US Rte Thru 47 North 522 Right 9 3 12 7 Total 56 62 66 59 51 38 31 42 55 34 34 29 61 20 42 45 48 42 54 51 1 46 60 52 55 53 68 50 68 52 1 76 66 71 57 78 79 83 92 91 97 99 94 129 98 76 p 2710 Total 141 150 180 153 141 103 89 135 127 112 105 81 143 67 130 102 110 103 107 131 120 131 120 98 125 136 117 122 129 158 144 141 136 145 140 169 173 160 184 164 274 353 338 345 r 6532 Time Period 7:00 - 7:15 7:15 - 7:30 7:30 - 7:46 7:45 - 8:00 8:00 - 8:15 8:15 - 8:30 8:30 - 8:45 8:45 - 9:00 9:00 - 9:15 9:15 - 9:30 9:30 - 9:45 9:45 - 10:00 10:00 - 10:15 10:15 - 10:30 10:30 - 10:45 10:45 - 11:00 11:00 - 11:15 11:15 - 11:30 11:30 - 11:45 11:45 - 12:00 12:00 - 12:15 12:15 - 12:30 12:30 - 12:45 12:45 - 13:00 13:00 - 13:15 13:15 - 13:30 13:30 - 13:45 13:45 - 14:00 14:00 - 14:15 14:15 - 14:30 14:30 - 14:45 14:45 - 15:00 15:00 - 15:15 15:15 - 15:30 15:30 - 15:45 15:45 - 16:00 16:00 - 16:15 16:15 - 16:30 16:30 - 16:45 16:45 - 17:00 17:00 - 17:15 17:15 - 17:30 17:30 - 17:45 17:45 - 18:00 23 26 9 53 62 59 22 31 12 71 83 54 15 23 10 61 71 52 10 20 3 67 70 44 7 0 2 9 11 2 52 54 38 12 16 1 41 42 29 7 13 4 76 80 40 2 10 2 10 15 6 51 57 45 7 12 5 61 66 32 2 9 4 58 62 32 2 4 8 3 41 44 25 4 11 17 6 59 65 59 2 3 5 6 36 42 17 3 6 8 8 72 80 37 5 3 5 8 2 47 49 42 3 7 6 49 55 46 2 1 4 4 53 57 38 4 8 10 9 34 43 51 3 9 14 8 58 66 49 2 9 16 12 46 58 45 1 7 10 4 57 61 55 5 5 5 8 55 63 45 7 2 3 2 38 40 55 0 4 6 5 61 66 50 3 4 7 12 49 1 61 65 3 3 6 1 60 61 46 4 4 10 4 40 44 67 1 4 9 7 61 68 51 1 8 12 9 61 70 74 2 4 9 7 62 69 59 7 4 9 3 58 61 65 6 4 9 4 66 70 52 5 5 7 8 52 60 71 7 1 5 7 49 56 72 7 8 15 14 57 71 78 5 4 18 17 46 63 83 9 6 10 7 52 59 81 10 8 15 14 58 72 92 5 5 10 10 45 55 90 9 15 16 28 136 164 85 9 17 22 51 151 202 119 10 39 48 60 132 192 89 9 38 40 57 172 229 69 7 g 394 h j 598 474 k 2750 I n 3224 2494 o 216 gilbert w. clifford and associates Revision 1.0 - 1 July 1997 VA Rte 642/ US Rte 522 Intersection Current Weekday Volumes (Total) Attachment #1 Eastgate Rezoning Traffic Impact Studv County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 2 Hourly Volume Summary Gilbert [V Clifford &—Associates, Inc. 200 Vorth Cameron Street ft incliester, 1 itghda 22601 F Li �II Counted totals adjusted to hourly volumes Traffic From West Traffic From South Traffic From North on VA Rte 642 on US Rte 522 on US Rte 522 Total Left Right Total Left Thru Total Thru Right Total N,S,E,W Time Period Time Period 7:00 - 8:00 25 79 104 46 231 277 212 31 243 624 7:00 - 8:00 7:15 - 8:15 30 70 100 34 252 286 209 29 238 624 7:15 - 8:15 7:30 - 8:30 29 56 85 27 251 278 188 26 214 577 7:30 - 8:30 7:45 - 8:45 24 46 70 16 221 237 163 16 179 486 7:45 - 8:45 8:00 - 9:00 22 38 60 10 236 246 151 11 162 468 8:00 - 9:00 8:15 - 9:15 17 38 55 13 220 233 152 14 166 454 8:15 - 9:15 8:30 - 9:30 20 36 56 16 229 245 146 16 162 463 8:30 - 9:30 8:45 - 9:45 23 26 49 19 246 265 149 16 165 479 8:45 - 9:45 9:00 - 10:00 21 23 44 18 211 229 134 18 152 425 9:00 - 10:00 9:15 - 10:15 22 24 46 18 219 237 148 10 158 441 9:15 - 10:15 9:30 - 10:30 19 20 39 19 194 213 133 11 144 396 9:30 - 10:30 9:45 - 10:45 14 24 38 23 208 231 138 14 152 421 9:45 - 10:45 10:00 - 11:00 13 25 38 22 214 236 155 13 168 442 10:00 - 11:00 10:15 - 11:15 11 17 28 22 204 226 142 13 155 409 10:15 - 11:15 10:30 - 11:30 12 15 27 20 221 241 163 14 177 445 10:30 - 11:30 10:45 - 11:45 12 17 29 21 183 204 177 12 189 422 10:45 11:45 11:00 - 12:00 14 21 35 27 194 221 184 11 195 451 11:00 - 12:00 11:15 - 12:15 17 27 44 33 191 224 183 10 193 461 11:15 - 12:15 11:30 - 12:30 17 33 50 33 195 228 200 11 211 489 11:30 - 12:30 11:45 - 12:45 15 30 45 32 216 248 194 15 209 502 11:45 - 12:45 12:00 - 13:00 11 23 34 26 196 222 200 13 213 469 12:00 - 13:00 12:15 - 13:15 6 18 24 19 211 230 205 15 220 474 12:15 - 13:15 12:30 - 13:30 6 15 21 27 203 230 215 13 228 479 12:30 - 13:30 12:45 - 13:45 9 13 22 20 208 228 216 10 226 476 12:45 - 13:46 13:00 - 14:00 14 15 29 22 210 232 228 11 239 500 13:00 - 14:00 13:15 - 14:15 17 15 32 24 210 234 229 9 238 504 13:15 - 14:16 13:30 - 14:30 18 19 37 21 222 243 238 8 246 526 13:30 - 14:30 13:45 - 14:45 20 20 40 27 224 251 251 11 262 553 13:46 - 14:45 14:00 - 15:00 19 20 39 26 242 268 249 16 265 572 14:00 - 15:00 14:15 - 15:16 19 20 39 23 247 270 250 20 270 579 14:15 - 15:15 14:30 - 15:30 17 17 34 22 238 260 247 25 272 566 14:30 - 15:30 14:45 - 16:45 16 14 30 22 225 247 260 25 286 562 14:45 - 15:45 15:00 - 16:00 18 18 36 33 224 257 273 24 297 590 15:00 - 16:00 15:15 - 16:15 27 18 45 46 204 250 304 28 332 627 15:15 - 16:15 15:30 - 16:30 29 19 48 45 204 249 314 31 345 642 15:30 - 16:30 15:46 - 16:45 32 26 58 52 213 265 334 29 363 686 15:45 - 16:45 16:00 - 17:00 30 23 53 48 201 249 346 33 379 681 16:00 - 17:00 16:15 - 17:15 17 34 51 59 291 350 348 33 381 782 16:15 - 17:15 16:30 - 17:30 18 45 63 103 390 493 386 33 419 975 16:30 - 17:30 16:45 - 17:45 20 76 96 149 464 613 383 37 420 1129 16:45 - 17:45 17:00 - 18:00 17 109 126 196 591 787 362 35 397 1310 17:00 - 18:00 ' gilbert w. clitford and associates Revision 1.0 - 1 July 1997 VA Rte 642/ US Rte 522 Intersection Peak Hour Determination Attachment #2 Eastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 3 Increase Traffic Volume Summary Gilben9 {i'. Clifford & Associates, Inc. 200 North Cameron Street Winchester, Firghiia 22601 1 ' Development Type ' Industrial Park (M-1,13-3) Trip Rate Average Daily Trips 62.9 ' P.M. Peak Hour Adj. Street 10.48 Retail (B-2) At FAR = 25% ' Trip Rate Average Daily Trips 48.54 P.M. Peak Hour Adj. Street 4.56 Full Development Under Existing Zoning Trips Generated Area 98.6 6199 1033 Area 25 G.L.F.A. - 272250 13215 1241 1 ' Residential (RA) Area 112.2 Lot Size(ac) = 5 Lots - 22.4 Trip Rate ' P.M. Peak Hour Adj. Street 1.01 23 TOTALS: Average Daily Trips 19628 ' P.M. Peak Hour Adj. Street 2297 Full Development Proposed Increase Under Proposed Zoning Trips Generated Trips Generated Area 72.9 4587 -1611 764 -268 Area 52.0 G.L.F.A. - 565844 Trip Rate 36.9 20880 7665 3.5 1980 739 Area 79 Lots - 15.8 16 -7 25618 5990 2761 464 Average Daily Volume Summary Trips Per Day at Trips Per Day at ' Full Development Full Development Increase Trips Existing Trips Per Day Existing Zoning Proposed Zoning Due to Rezoning VA Rte 642 1717 3652 4243 591 1 U.S. Rte 522 7552 Northside 16062 18659 2597 ' U.S. Rte 522 8149 Southside 17332 20135 2802 Total - 17419 37047 43037 ' Assuming traffic occurring between 7:00 a.m. and 6:00 p.m. accounts for 75% of daily trips Assume future trips arrive site relative to current trip distribution at the 522/642 intersection ' The change in zoning from the current layout increases the retail area by 27 acres while losing industrial area. This change will result in a 16 percent increase in trips generated over what could have occurred under the existing zoning. ' gilbert w. clifford and associates Revision 1.0 - 1 June 1997 Eastgate Rezoning Traffic Impact Analysis Attachment #3 Gasigate Rezoning Traffic Impact Study County ofErederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 4 ITE Trip Generation Gilbert ft Clifford &.-Issociates, Inc. 200 North Cameron Street Winchester, Fhginia 22601 EASTGATE Prop Residential SUMMARY OF TRIP GENERATION CALCULATION FOR 16 DWELLING UNITS OF SINGLE FAMILY DWELLINGS 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 9.55 3.66 1.00 153 7-9 AM PK HR ENTER 0.19 0.00 1.00 3 7-9 AM PK HR EXIT 0.55 0.00 1.00 9 7-9 AM PK HR TOTAL 0.74 0.90 1.00 12 4-6 PM PK HR ENTER 0.66 0.00 1.00 11 4-6 PM PK HR EXIT 0.35 0.00 1.00 6 4-6 PM PK HR TOTAL 1.01 1.05 1.00 16 AM GEN PK HR ENTER 0.20 0.00 1.00 3 AM GEN PK HR EXIT 0.56 0.00 1.00 9 AM GEN PK HR TOTAL 0.76 0.91 1.00 12 PM GEN PK HR ENTER 0.66 0.00 1.00 11 PM GEN PK HR EXIT 0.36 0.00 1.00 6 PM GEN PK HR TOTAL 1.02 1.05 1.00 16 SATURDAY 2-WAY VOL 10.19 3.65 1.00 163 PK HR ENTER 0.52 0.00 1.00 8 PK HR EXIT 0.44 0.00 1.00 7 PK HR TOTAL 0.96 1.00 1.00 15 SUNDAY 2-WAY VOL 8.78 3.36 1.00 140 PK HR ENTER 0.44 0.00 1.00 7 PK HR EXIT 0.44 0.00 1.00 7 PK HR TOTAL 0.89 0.96 1.00 14 Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. Dy EASTGATE Prop Ind Pk SUMMARY OF TRIP GENERATION CALCULATION FOR 72.93 ACRE OF INDUSTRIAL PARK 2 June 1997 DRIVE AVERAGE STANDARD ADJUSTMENT WAY RATE DEVIATION FACTOR VOLUME AVG WKDY 2-WAY VOL 62.90 62.21 1.00 4587 7-9 AM PK HR ENTER 8.27 0.00 1.00 603 7-9 AM PK HR EXIT 1.82 0.00 1.00 132 7-9 AM PK HR TOTAL 10.09 6.57 1.00 736 4-6 PM PK HR ENTER 2.20 0.00 1.00 161 4-6 PM PK HR EXIT 8.28 0.00 1.00 604 4-6 PM PK HR TOTAL 10.48 7.38 1.00 764 AM GEN PK HR ENTER 7.21 0.00 1.00 526 AM GEN PK HR EXIT 1.08 0.00 1.00 79 AM GEN PK HR TOTAL 8.29 6.12 1.00 605 PM GEN PK HR ENTER 1.82 0.00 1.00 133 PM GEN PK HR EXIT 6.85 0.00 1.00 500 PM GEN PK HR TOTAL 8.67 7.16 1.00 632 SATURDAY 2-WAY VOL 34.23 41.91 1.00 2496 PK HR ENTER 1.51 0.00 1.00 110 PK HR EXIT 3.20 0.00 1.00 234 PK HR TOTAL 4.71 2.23 1.00 344 SUNDAY 2-WAY VOL 10.11 9.02 1.00 737 PK HR ENTER 0.46 0.00 1.00 33 PK HR EXIT 0.53 0.00 1.00 39 PK HR TOTAL 0.99 1.22 1.00 77 Note: A zero rate indicates no rate data available Source: Institute of Transportation Engineers Trip Generation, 5th Edition, With Feb. 1995 Update. Gastgate Rezoning Traffic Impact Studv County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 5 Determination of Traffic Distribution Gilbert IV. Clifford & Associates, Inc. 200 North Cameron Street Winchester, Virginia 22601 Determination of current traffic distribution Project Name: Eastgate Intersection: US Rte 522/VA Rte 642 Traffic From North on Us Rte 522 Thru Right Total Time Period 7:00-9:00 337 40 377 1600-1800 690 68 758 7:00-9:00 From Rte 642 to 522 Turn Movement Ratio 7:00-9:00 From Rte 522 to 642 Movement Ratio of trips entering 642 7:00-9:00 Thru Traffic on US Rte 522 16:00-18:00 Thru Traffic on US Rte 522 To 522 Northbound 47 29% From 522 Northbound Turning Left 55 58% Total % Northbound 787 57% Total %Northbound 1449 52% Location: Frederick County Traffic From the South on US Rte 522 Left Thru Total 55 450 505 239 759 998 To 522 Southbound 117 71% From 522 Southbound Turning Right 40 42% %Southbound 43 % %Southbound 48% Traffic From West on VA Rte 642 Left Right Total 47 117 164 46 123 169 1600-1800 To 522 Northbound To 522 Southbound From Rte 642 to 522 46 123 Turn Movement Ratio 27% 73% 1600-1800 From 522 Northbound From 522 Southbound From Rte 522 to 642 Turning Left Turning Right Movement Ratio 239 68 of trips entering 642 78% 22% Turn Ratio Assumptions % Distribution of VA Rte 642 US Rte 522 North US Rte 522 South Vehicles Per Road 40% 15% 45% For 63/M1 Areas to/from 522 south Percentage to 642 40% Percentage to Access Road 60% gilbert w clifford and associates Distribution of Traffic Revision 1.0-1 July 1997 Attachment 5 i o D co v CT cn -P w ru �- ro � ro P o b W ro U1 U Ln 4 � C:) CT 00 4, (� R) rc �D Lil rI rC r C7J 4P Cn Cn CT � CA ru �D CO o W 4CO (= rV r-) T o v W (IN --J CT roo ru A u .D w °` �D CT ru I'D w ry � `� m m a � O w Cn C Qll :D R) := C.J rp CJl Q` , rU ru W ? -1J ON rT X C7G -P Ul C1l CT %,D I'O C J CO o W 41 CO o ru ul %,D pp (O v W ON ON Iv --1 o CO -;- ul �-D W �D CT Iv %D ao Ul ru z - ru ru � ru w ru ul ul w � Cl-, 'D -+ S W Cn cn m ru CT "D ­l � w ro cn as ry w - � ao o ul In h Eastgate Commerce Center Traffic Impact Study Dis ribujinn Map �'<,�'Irdy (,f (re�lerick, V11 rjii li-i Eastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 6 VA Route 642/U.S. Route 522 Peak Hour Traffic Volumes Gilbert If' Clifford cX : lssociates, Inc. 200 North Cameron Street Whichever, Uilginia 22601 M Current US Rte 522/ Va Rte 642 Intersection Volumes Traffic From West Traffic From South Traffic From North on VA Rte 642 on US Rte 522 on US Rte 522 Total Left Right Total Left Thru Total Thru Right Total N,S,E,W Time Period 17 109 126 196 591 787 362 35 397 1310 17:00 18:00 NEW ZONING Trips Generated by B3/M1 Enter Exit Total During P.M. Peak Hour 161 604 765 Trips Generated By B-2 Enter Exit Total During P.M Peak hour 990 990 1980 Increase Traffic Volume Traffic From West Traffic From South Traffic From North on VA Rte 642 on US Rte 522 on US Rte 522 Added Left Turns 239.1 517.95 - Added Right turns 538.56 - 134.856 Added Thru Traffic 37.8 Impact of Development Based on Existing Zoning Total Traffic From West Traffic From South Traffic From North on Va Rte 642 on US Rte 522 on US Rte 522 N,S,E,W Time Period Left Right Total Left Thru Total Thru 362 Right 169.856 Total 531.9 2740.5 17:00 18:00 256.1 647.6 903.7 714.0 591 1305.0 gilbert w. clifford and associates VA Rte 642/ US Rte 522 Intersection P.M. Peak Hour Revision 1.0-3 July 1997 Intersection Traffic Volumes Attachment-6 Eastgate Rezoning Traffic Impact Studv County ofFreder7ck, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 7 Wrights Run Road/VA Route 642 Rams Head Road/VA Route 642 Peak Hour Traffic Volumes Gilbert W. Clifford ri,lssociates, Inc. 200 .Vorth Cameron Street Winchester, Virginia 22601 M M M M M M M M M M M M M M M M M M M j Intersection of 642/Wrights Run Road Current Traffic 6421Wrights Run Road Traffic From West on VA Rte 642 Time Period Left Right Thru 1700 1500 0 0 126 Increase Traffic Volume Due to Development Traffic From West on VA Rte 642 Added Left Turns 61.8 Added Right Turns 120.3 Added Thru Traffic 487 Impact of Development Based on New Zoning Traffic From West on Va Rte 642 Time Period Left Right Thru 1700 1800 61.8 120.3 613 Intersection of 642/Rams Rd Current Traffic 6421Rams Rd Traffic From West on Va Rte 642 Time Period Left Right Thru 1700 1800 0 0 126 Increase Traffic Volume Due To Development Traffic From West on VA Rte 642 Added Left Turns 62.8 Added Right Turns 10.6 Added Thru Traffic 530.2 Impact of Development Based on New Zoning Traffic From West on VA Rte 642 Time Period Left Right Thru 1700 1800 62.8 10.6 656.E Traffic From East on VA Rte 642 Left Right 0 0 Traffic From East on VA Rte 642 139.8 92.6 278.7 Traffic From North on Wrights Run 87.6 61.8 5 Traffic From East on VA Rte 642 Left Right 139.8 92.6 Traffic From East on Va Rte 642 Left Right 0 0 Traffic From East on VA Rte 642 15.8 76.8 435.6 Traffic From North on Rams Rd 71.8 62.4 5 Traffic From East on Va Rte 642 Left Right 15.8 76.8 Traffic From North Thru 231 0 Traffic From South on Wrights Run 174.4 82.9 5 Traffic From North on Wrights Run Thru Left Right 509.7 87.6 61.8 Traffic From North Thru 231 0 Traffic From South on Rams Run 39.6 59.6 5 Traffis From North on Rams Rd Thru Left Right 666.6 71.8 62.4 Traffic From South 0 Traffic From South on Wrights Run Thru Left Right 5 174.4 82.9 Traffic From South 0 Traffic From South on Rams Rd Thru Left Right 5 39.6 59.6 gilbert w. clifford and associates Wrights Run Road NA Rte 642 and Revision 1.0- 1 July 1997 Rams Head RoadNA Rte 642 Intersection Increase Volumes Due to Development Attachment-7 Thru 5 Thru 5 Total N,S,E,W 1948.9 Total N,S,E,W 1732.2 Eastgate Rezoning Traffic Impact Stuciv County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 8 Rams Head Road/VA Route 642 Wrights Run Road/VA Route 642 Unsignalized Intersections Gilbert {i: Clifford &Assoeiates, Inc. 200 .Vorth Cameron Street Winchester, Virginia 22601 EB L 77 686 5.9 0.4 B 0.5 WB L 20 696 5.3 0.0 B 0.1 Intersection Delay = 19.3 sec/veh HCS: Unsignalized Intersections Release 2.1c PREG-RRUS.HCO Page 1 Gilbert W. Clifford And Associates 200 North Cameron Street Winchester, VA 22601- Ph: (540) 667-2139 Streets: (N-S) Rams RD (E-W) VA Rte 642 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... HCS Date of Analysis.......... 7/1/97 Other Information ......... Eastgate Traffic Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound -L-- T R -L-- T R -L-- T R -L-- T R No. Lanes Stop/Yield Volumes PHF Grade MC's (o) SU/RVIs (o) CV,s (o) PCEIs ------------ H 1 2 < 0 Y 63 656 11 .9 .9 .9 0 1.10 --------------- 1 2 < 0 Y 16 667 77 .9 .9 .9 0 1_10 1 1 < 0 40 5 60 .9 .9 .9 0 1�- 101�- 101�10 Adjustment Factors 1 1 < 0 72 5 62 .9 .9 .9 0 1�10-1�10-1�10 Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 J 7 HCS: Unsignalized Intersections Release 2.1c PREG-RRUS.HCO Page 2 ----------------------------------------------------------------------- C L Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 364 370 Potential Capacity: (pcph) 906 899 Movement Capacity: (pcph) 906 899 Prob. of Queue -Free State: 0.92 0.92 -------------------------------------------------------- Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 729 741 Potential Capacity: (pcph) 696 686 Movement Capacity: (pcph) 696 686 Prob. of Queue -Free State: 0.97 0.89 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 1558 1558 Potential Capacity: (pcph) 134 134 Capacity Adjustment Factor due to Impeding Movements 0.86 0.86 Movement Capacity: (pcph) 116 116 Prob. of Queue -Free State: 0.94 0.94 -------------------------------------------------------- Step 4: LT from Minor StreetNB ------------------------ Conflicting Flows: ------------- (vph) -----------SB 1560 1562 Potential Capacity: (pcph) 107 106 Major LT, Minor TH Impedance Factor: 0.81 0.81 Adjusted Impedance Factor: 0.85 0.85 Capacity Adjustment Factor due to Impeding Movements 0.78 0.78 Movement Capacity: -------------------------------------------------------- (pcph) 84 83 Flow Rate Movement (pcph) NB L 48 NB T 7 NB R 74 ' SB L SB T SB R 1 Intersection Performance Summary Move Cap (pcph) 84 116 > 906 > 83 116 > 899 > Avg. 95. Shared Total Queue Cap Delay Length (pcph) (sec/veh) (veh) - - 96.3 3.2 Approach LOS Delay ----- (sec/veh) F 41.2 570 7.4 0.5 B 390.4 11.4 F 573 7.3 0.5 B 205.7 EB L 76 851 4.6 0.2 A 0.4 WB L 172 739 6.3 1.0 B 1.2 Intersection Delay = 303.5 sec/veh * The calculated value was greater than 999.9. f' 11 U H HCS: Unsignalized Intersections Release 2.1c PREG-WRUS.HCO Page 2 Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 340 284 Potential Capacity: (pcph) 931 994 Movement Capacity: (pcph) 931 994 Prob. of Queue -Free -------------------------------------------------------- State: 0.89 0.92 Step 2: LT from Major Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 681 567 Potential Capacity: (pcph) 739 851 Movement Capacity: (pcph) 739 851 Prob. of Queue -Free State: 0.77 0.91 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 1473 1473 Potential Capacity: (pcph) 150 150 Capacity Adjustment Factor due to Impeding Movements 0.70 0.70 Movement Capacity: (pcph) 105 105 Prob. of Queue -Free State: 0.93 0.93 -------------------------------------------------------- Step 4: LT from Minor StreetNB ---------------------------- Conflicting Flows: ------------- (vph) -----------SB 1476 1476 Potential Capacity: (pcph) 121 121 Maj or LT, Minor TH Impedance Factor: 0.65 0.65 Adjusted Impedance Factor: 0.73 0.73 Capacity Adjustment Factor due to Impeding Movements 0.67 0.65 Movement Capacity: -------------------------------------------------------- (pcph) 82 79 Intersection Performance Summary Avg. 95% Flow Move Shared Total Queue Rate Cap Cap Delay Length LOS Movement (pcph) (pcph) (pcph)(sec/veh) (veh) -------- ------ NB L 212 ------ 82 ------ ------- * ------- ----- 66.8 F NB T 7 105 > NB R 101 931 > 617 7.1 0.7 B ' SB L SB T SB R 108 79 7 105 > 76 994 > 580 846.4 19.8 F 7.2 0.5 B Approach Delay (sec/veh) * 483.E HCS: Unsignalized Intersections Release 2.1c PREG-WRUS.HCO Page 1 0 J L �I J Gilbert W. Clifford And Associates 200 North Cameron Street Winchester, VA 22601- Ph: (540) 667-2139 Streets: (N-S) Wrights Run (E-W) VA Rte 642 Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... HCS Date of Analysis.......... 7/1/97 Other Information ......... Eastgate Traffic Two-way Stop -controlled Intersection ----------------------------------------------------------------------- ----------------------------------------------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Stop/Yield volumes PHF Grade MC,s (o) SU/RV's (o) CV's (�) PCE's ------------ 1 2 < 0 Y 62 613 120 .9 .9 .9 0 1.10 --------------- 1 2 < 0 Y 140 510 92 .9 .9 .9 0 1.10 ---------------- 1 1 < 0 174 5 83 .9 .9 .9 0 1.10 1.10 1.10 ---------------- Adjustment Factors 1 1 < 0 88 5 62 .9 .9 .9 0 1.10 1.10 1.10 --------------- Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Eastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 9A VA Route 642/U.S. Route 522 Planning Analysis Gilbert {i! Clifford &-Associates, Inc. 200 Aloth Cameron Sheet Winchester, Virginia 22601 Path: ' File: PREG-642.OR9 18,176 a.. 7-01-97 7:21:22 am Page 1 %•) I C � I HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4c 07-01-1997 Gilbert W. Clifford And Associates -------------------------- Streets: (E-W) Va Rte 642 (N-S) Us Rte 522 Analyst: Ram File Name: EXEG-642.HC9 Area Type: Other 6-27-97 pm pk Comment: -Intersection -of-Rte -642/522----------------------------------- Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes Volumes PHF or PK15 Lane W (ft) Grade 9. Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Prop. Share Prop. Prot. Phase Combi 256 648 0.90 0.90 12.0 0 2 2 (Y/N) N 0 0 (Y/N) N 6 350 3.00 3.00 ---------------- nation 1 2 0 ---------------- Signal Operatioi 3 4 2 2 714 591 0.90 0.90 12.0 12.0 0 2 2 (Y/N) N 0 0 (Y/N) N 3 3 100 3.00 3.00 ---------------- is 5 2 1 362 170 0.90 0.90 12.0 12.0 0 2 2 (Y/N) N 0 0 (Y/N) N 3 3 150 3.00 3.00 --------------- 6 7 8 EB Left * NB Left Thru Thru Right * Right Peds Peds WB Left SB Left Thru Thru Right Right Peds Peds NB Right EB Right SB Right WB Right Green 40.OA Green 24.OP 17.OA Yellow/AR 3.0 Yellow/AR 3.0 3.0 Cycle Length: 90 secs Phase combination order: #1 #5 #6 ----------------------------------------------------------------------- Intersection Performance Summary Lane Group: Adj Sat V/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS EB LR 669 1506 0.919 0.444 22.0 C 22.0 C NB L 1079 3539 0.757 0.444 22.0 C 22.9 C T 993 3725 0.695 0.267 24.1 C SB T 993 3725 0.425 0.267 20.9 C 20.8 C R 422 1583 0.052 0.267 18.7 C HCS: Signalized Intersection Version 2.4c 07-01-1997 2 Streets: (E-W) Va Rte 642 (N-S) Us Rte 522 Analyst: Ram File Name: EXEG-642.HC9 Area Type: Other 6-27-97 pm pk Comment: Intersection of Rte 642/522 Volume Adjustment Worksheet Direc- Lane Lane Adj tion/ Mvt Adj Lane Grp No. Util Growth Grp Prop Prop Mvt ----- Vol PHF Vol Grp Vol Ln Fact Fact Vol LT RT EB ---- ---- ---- ---- ---- -- ----- ------ ---- ---- ---- Left 256 0.90 284 Thru 0 0.90 0 LR 615 1 1.000 1.000 615 0.46 0.54 Right 648 0.90 331 WB NB Left 714 0.90 793 L 793 2 1.030 1.000 817 1.00 0.00 Thru 591 0.90 657 T 657 2 1.050 1.000 690 0.00 0.00 SB Thru 362 0.90 402 T 402 2 1.050 1.000 422 0.00 0.00 Right ----------------------------------------------------------------------- 170 0.90 22 R 22 1 1.000 1.000 22 0.00 1.00 Saturation Flow Adjustment Worksheet Ideal Adj Direction Sat No. f f f f f f f f Sat /LnGrp Flow Lns W HV G p BB A RT LT Flow EB LR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 0.83 0.98 1506 WB NB 0.29 1097 L 1900 2 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.95 3539 T 1900 2 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 3725 SB T 1900 2 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 3725 R 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 0.85 1.00 1583 L u J 1 IHCS: Signalized Intersection Version 2.4c 07-01-1997 3 ' Streets: (E-W) Va Rte 642 (N-S) Us Rte 522 Analyst: Ram File Name: EXEG-642.HC9 Area Type: Other 6-27-97 pm pk Comment: Intersection of Rte 642/522 Worksheet Supplemental Permitted LT APPROACH NB Cycle Length, C 90 Actual Green Time for Lane Group, G 44 Effective Green Time for Lane Group, g Opposing Effective Green Time, go 24 24 Number of Opposing Lanes, No 2 Number of Lanes in Lane Group, N 2 Adjusted Left -Turn Flow Rate, Vlt 793 Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 19.83 Adjusted Opposing Flow Rate, Vo 422 ' Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 5.28 Opposing Platoon Ratio, Rpo 1 ' Lost time per phase, tl gf=Gexp(-0.882*LTC^0.717)-tl 3 0.00 Opposing Queue Ratio: qro=l-Rpo(go/C) 0.73 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 5.76 gu=g-gq (or g-gf) 18.24 fs=(875-0.625Vo)/1000 0.61 P1=Plt [1+{ (N-1) g/ (fsgu+4.5) }] 2.53 Ell 2.53 fmin 0.29 fm,(min=fmin;max=1.00) 0.29 ' flt= [fm+0 . 91 (N-1) ] /N 0.29 L L L HCS: Signalized Intersection Version 2.4c 07-01-1997 4 Streets: (E-W) Va Rte 642 (N-S) Us Rte 522 Analyst: Ram File Name: EXEG-642.HC9 Area Type: Other 6-27-97 pm pk Comment: Intersection of Rte 642/522 ----------------------------------------------------------------------- ----------------------------------------------------------------------- Capacity Analysis Worksheet Adj Adj Sat Flow Lane Group Direction Flow Rate Flow Rate Ratio Green Ratio Capacity v/c /LnGrp --------- (v) --------- (s) --------- (v/s) ---------------- (g/C) (c) ---------- Ratio ----- EB LR 615 1506 0.408 0.444 669 0.919 * WB NB Lsec. 293 1097 0.267 0.267 293 1.000 * Lpri. 524 3539 0.148 0.222 786 0.667 * Ltot. 817 1079 0.757 T 690 3725 0.185 0.267 993 0.695 SB T 422 3725 0.113 0.267 993 0.425 R 22 1583 0.014 0.267 422 0.052 Sum (v/s) critical = 0.824 Lost Time/Cycle, L = ----------------------------------------------------------------------- 6.0 sec Critical v/c(x) = 0.882 Level of Service Worksheet ' Delay Del Lane Calib Delay Lane Lane Delay LOS Direction v/c g/C d Adj Group d d Grp Grp By By /LnGrp Ratio Ratio 1 Fact Cap 2 2 Del LOS App App --------- ----- ----- ----- ----- ----- ----- ----- ---- ---- ----- --- EB LR 0.919 0.444 17.8 1.000 669 4 4.2 22.0 C 22.0 C WB ' NB L 0.757 0.444 19.8 1.000 1079 16 2.2 22.0 C 22.9 C T SB 0.695 0.267 22.6 1.000 993 16 1.5 24.1 C T 0.425 0.267 20.7 1.000 993 16 0.2 20.9 C 20.8 C R 0.052 0.267 18.7 1.000 422 16 0.0 18.7 C ' --------------------------- Intersection ------ Delay -- = 22.4 ------ sec/veh Intersection --------------------- LOS = ---- -- C --- J IHCS: Signalized Intersection Version 2.4c 07-01-1997 5 Streets: (E-W) Va Rte 642 (N-S) Us Rte 522 ' Analyst: Ram File Name: EXEG-642.HC9 Area Type: Other 6-27-97 pm pk Comment: Intersection of Rte 642/522 ' Supplemental Uniform Delay Worksheet Approach Northbound ' Adj. LT Vol (v) 793 v/c ratio (x) 0.76 Primary phase effective green 20.00 ' gq from Supplemental LT Worksheet 5.76 gu from Supplemental LT Worksheet 18.24 Red time (r) 46.00 Arrivals qa = v/(3600(max(x,1) 0.22 ' Primary Ph. Departures Sp=s/3600 0.98 Secondary Ph. Departures Ss=S(Gq+Gu)/(Gu*3600) 0.40 Xperm 2.11 ' XProt N/A Case 5 Queue at begining of green arrow (Qa) 8.11 ' Queue at beginning of unsaturated green (Qu) 11.40 Residual queue (Qr) 0.00 Uniform Delay 19.78 INTERSECTION DIAGRAM Intersection: Va Rte 642 and Us Rte 522 Time period: pm pk volumes SB Total 532 < v > 170 362 0 Legend [X] = Level of Service #—� = No. of Lanes D-J = De facto Turn 1 v EB Total 904 1 2 v [C] [C] [C] Us Rte 522 Intersection [C] [C] [C] 2 2 0 i 0 WB Total < 0 0 v 714 Va Rte 642 591 1305 NB Total 0 Eastgate Rezoning Traffic Impact Stu(ly Coun4, of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 9B Wrights Run Road/VA Route 642 Planning Analysis Gilbert JK Clifford cX Associates, Ine. 200 North Cameron Street Winchester, !lrginia 22601 L I HCS: Signalized Intersection Version 2.4c 07-03-1997 1 Gilbert W. Clifford And Associates 200 North Cameron Street Winchester, VA 22601 (540) 667-2139 Streets (E-W) Va Rte 642 (N-S) wrights run road Analyst: HCS File Name: EGWR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed intersection with full development No. Lanes Volumes PHF or PK15 Lane W (ft) Grade 96 Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Traf f is --------------- Eastbound L R --- T --- 1 1 1 62 613 120 0.90 0.90 0.90 12.0 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 3 120 3.00 3.00 3.00 :andRoadwayCc - - - Westbound L T R --- --- 1 1 1 140 510 93 0.90 0.90 0.90 12.0 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 3 93 3.00 3.00 3.00 --------------- inditions --------------- Northbound L --- -T R -- 1 1 < 174 5 83 0.90 0.90 0.90 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 83 3.00 3.00 3.00 --------------- Signal Operations -------------- Southbound L --- -T R -- 1 1 < 88 5 62 0.90 0.90 0.90 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 62 3.00 3.00 3.00 --------------- Phase Combination 1 2 3 4 5 6 7 8 EB Left * * NB Left Thru * Thru Right * Right Peds Peds WB Left ' Thru Right Peds ' NB Right SB Right I Green Yellow/AR I Cycle Length: 4.OP 26.OP 3.0 3.0 SB Left Thru Right Peds EB Right WB Right (Green 18.OP Yellow/AR 3.0 57 secs Phase combination order: #1 #2 #5 1 HCS: Signalized Intersection Version 2.4c 07-03-1997 2 Streets: (E-W) Va Rte 642 (N-S) wrights run road Analyst: HCS File Name: EGWR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed intersection with full development ----------------------------------------------------------------------- ----------------------------------------------------------------------- Volume Adjustment Worksheet Direc- Lane Lane Adj tion/ Mvt Adj Lane Grp No. Util Growth Grp Prop Prop Mvt Vol PHF Vol Grp Vol Ln Fact Fact Vol LT RT ----- EB ---- ---- ---- ---- ---- -- ----- ------ ---- ---- ---- Left 62 0.90 69 L 69 1 1.000 1.000 69 1.00 0.00 Thru 613 0.90 681 T 681 1 1.000 1.000 681 0.00 0.00 Right 120 0.90 0 R 0 1 1.000 1.000 0 0.00 1.00 WB Left 140 0.90 156 L 156 1 1.000 1.000 156 1.00 0.00 Thru 510 0.90 567 T 567 1 1.000 1.000 567 0.00 0.00 Right 93 0.90 0 R 0 1 1.000 1.000 0 0.00 1.00 NB Left 174 0.90 193 L 193 1 1.000 1.000 193 1.00 0.00 Thru 5 0.90 6 TR 6 1 1.000 1.000 6 0.00 0.00 Right 83 0.90 0 SB Left 88 0.90 98 L 98 1 1.000 1.000 98 1.00 0.00 Thru 5 0.90 6 TR 6 1 1.000 1.000 6 0.00 0.00 Right ----------------------------------------------------------------------- 62 0.90 0 Saturation Flow Adjustment Worksheet Ideal Adj Direction Sat No. f f f f f f f f Sat /LnGrp Flow Lns W HV G ----- p ----- BB ----- A ----- RT ----- LT ----- Flow ---- ------ EB ---- --- ----- ----- 0.14 257 L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.95 1770 T 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 R 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 WB 0.14 257 L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.95 1770 T 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 R 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 NB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.93 1737 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 SB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.93 1737 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1863 HCS: Signalized Intersection Version 2.4c 07-03-1997 3 ' Streets (E-W) Va Rte 642 (N-S) wrights run road Analyst: HCS File Name: EGWR-SIG.HC9 Area Type: Other 7-1-97 PK HR ' Comment: Eastgate Traffic proposed intersection with full development Supplemental Permitted LT Worksheet --- ---- -- - ' APPROACH EB Cycle Length, C 57 ' Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g 33 29 Opposing Effective Green Time, go 26 Number of Opposing Lanes, No 1 ' Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 69 Proportion of Left Turns in Lane Group, Plt 1.00 ' Left Turns per Cycle: LTC=Vlt*C/3600 1.09 Adjusted Opposing Flow Rate, Vo 567 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 8.98 Opposing Platoon Ratio, Rpo 1 ' Lost time per phase, tl 0 gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.54 ' gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 14.26 gu=g-gq (or g-gf) 14.74 fs=(875-0.625Vo)/1000 0.52 P1=Plt [l+{ (N-1) g/ (fsgu+4.5) )] 1.00 ' Ell 7.39 fmin 0.14 fm,(min=fmin;max=1.00) 0.14 ' flt= [fm+0 . 91 (N-1) ] /N 0.14 ' APPROACH Cycle Length, C WB 57 Actual Green Time for Lane Group, G 33 Effective Green Time for Lane Group, g 29 ' Opposing Effective Green Time, go 26 Number of Opposing Lanes, No 1 Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 156 ' Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 2.47 ' Adjusted Opposing Flow Rate, Vo Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 681 10.78 Opposing Platoon Ratio, Rpo 1 Lost time per phase, tl 0 ' gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.54 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 18.87 gu=g-gq (or g-gf) 10.13 ' fs=(875-0.625Vo)/1000 0.45 Pl=Plt [1+{ (N-1)g/ (fsgu+4.5) }] 1.00 ' Ell fmin 8.20 0.14 fm,(min=fmin;max=1.00) 0.14 I I flt= [fm+0 .91 (N-1) ] /N 0.14 APPROACH NB Cycle Length, C 57 Actual Green Time for Lane Group, G 18 Effective Green Time for Lane Group, g 18 Opposing Effective Green Time, go 18 Number of Opposing Lanes, No 1 Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 193 Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 3.06 Adjusted Opposing Flow Rate, Vo 6 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 0.09 Opposing Platoon Ratio, Rpo 1 Lost time per phase, tl 3 gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.68 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 0.00 gu=g-gq (or g-gf) 18.00 fs=(875-0.625Vo)/1000 0.87 Pl=Plt [1+{ (N-1) g/ (fsgu+4.5) )] 1.00 Ell 1.07 fmin 0.22 fm,(min=fmin;max=1.00) 0.93 flt= [fm+0 . 91 (N-1) ] /N 0.93 APPROACH SB Cycle Length, C 57 Actual Green Time for Lane Group, G 18 Effective Green Time for Lane Group, g 18 Opposing Effective Green Time, go 18 Number of Opposing Lanes, No 1 Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 98 Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 1.55 Adjusted Opposing Flow Rate, Vo 6 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 0.09 Opposing Platoon Ratio, Rpo 1 Lost time per phase, tl 3 gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.68 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 0.00 gu=g-gq (or g-gf) 18.00 fs=(875-0.625Vo)/1000 0.87 Pl=Plt [1+{ (N-1) g/ (fsgu+4.5) )] 1.00 Ell 1.07 fmin 0.22 fm,(min=fmin;max=1.00) 0.93 flt= [fm+0 . 91 (N-1) ] /N 0.93 HCS: Signalized Intersection Version 2.4c 07-03-1997 4 Streets: (E-W) Va Rte 642 (N-S) wrights run road Analyst: HCS File Name: EGWR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed intersection with full development ----------------------------------------------------------------------- ----------------------------------------------------------------------- Capacity Analysis Worksheet Adj Adj Sat Flow Lane Group Direction Flow Rate Flow Rate Ratio Green Ratio Capacity v/c /LnGrp --------- (v) --------- (s) --------- (v/s) (g/C) (c) Ratio EB Lsec. 0 257 ---------------- 0.000 ---------- 0.509 131 ----- 0.000 Lpri. 69 1770 0.039 0.070 124 0.556 Ltot. 69 255 0.271 T 681 1863 0.366 0.456 850 0.801 * R 0 1863 0.000 0.456 850 0.000 WB Lsec. 32 257 0.125 0.509 131 0.244 Lpri. 124 1770 0.070 0.070 124 1.000 * Ltot. 156 255 0.612 T 567 1863 0.304 0.456 850 0.667 R 0 1863 0.000 0.456 850 0.000 NB L 193 1737 0.111 0.316 549 0.352 TR 6 1863 0.003 0.316 588 0.010 SB L 98 1737 0.056 0.316 549 0.179 TR 6 1863 0.003 0.316 588 0.010 Sum (v/s) critical = 0.547 Lost Time/Cycle, L = ----------------------------------------------------------------------- 9.0 sec Critical v/c(x) = 0.649 Level of Service Worksheet Delay Del Lane Calib Delay Lane Lane Delay LOS Direction v/c g/C d Adj Group d d Grp Grp By By /LnGrp Ratio Ratio 1 Fact Cap 2 2 Del LOS App ----- App --- --------- EB ----- ----- ----- ----- ----- ----- ----- ---- ---- L 0.271 0.193 5.6 1.000 255 16 0.1 5.7 B 13.2 B T 0.801 0.456 10.1 1.000 850 16 3.9 14.0 B R 0.000 0.456 0.0 1.000 850 0 0.0 0.0 A WB L 0.612 0.193 7.2 1.000 255 16 3.0 10.2 B 10.5 B T 0.667 0.456 9.2 1.000 850 16 1.4 10.6 B R 0.000 0.456 0.0 1.000 850 0 0.0 0.0 A NB L 0.352 0.316 11.4 1.000 549 16 0.2 11.6 B 11.5 B TR 0.010 0.316 10.2 1.000 588 16 0.0 10.2 B SB L 0.179 0.316 10.7 1.000 549 16 0.0 10.8 B 10.7 B TR 0.010 0.316 10.2 1.000 588 16 0.0 10.2 B ----------------------------------------------------------------------- Intersection Delay = 11.8 sec/veh Intersection LOS = B 1 HCS: Signalized Intersection Version 2.4c 07-03-1997 5 ' Streets (E-W) Va Rte 642 (N-S) wrights run road Analyst: HCS File Name: EGWR-SIG.HC9 Area Type: Other 7-1-97 PK HR ' Comment: Eastgate Traffic proposed intersection with full development Supplemental Uniform Delay Worksheet Lproach Eastbound Adj. LT Vol (v) 69 /c ratio (x) 0.27 rimary phase effective green 4.00 q from Supplemental LT Worksheet 14.26 from Supplemental LT Worksheet 14.74 d time (r) fr 24.00 rivals qa = v/(3600(max(x,l) 0.02 Primary Ph. Departures Sp=s/3600 0.49 econdary Ph. Departures Ss=S(Gq+Gu)/(Gu*3600) 0.14 perm 0.27 Xprot 0.27 1 fase ueue at begining of green arrow (Qa) 0.46 ueue at beginning of unsaturated green (Qu) 0.27 queue (Qr) 0.00 iesidual niform Delay 5.56 Approach Westbound dj . LT Vol (v) 156 /c ratio (x) 0.61 Primary phase effective green 4.00 q from Supplemental LT Worksheet 18.87 from Supplemental LT Worksheet 10.13 ed time (r) 24.00 ,krrivals qa = v/(3600(max(x,l) 0.04 rimary Ph. Departures Sp=s/3600 0.49 Q-econdary Ph. Departures Ss=S(Gq+Gu)/(Gu*3600) 0.20 Xperm 0.61 prot 0.62 ase 1 Queue at begining of green arrow (Qa) 1.04 Ce eue at beginning of unsaturated green (Qu) 0.82 sidual queue (Qr) 0.00 iform Delay 7.22 Eastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 9C Rams Head Road/VA Route 642 Planning Analysis Gilber9 1G' Clifforzl &Associates, Inc. 200 North Cameron Street 11?11chester, Virginia 22601 1 I HCS: Signalized Intersection Version 2.4c 07-03-1997 1 Gilbert W. Clifford And Associates 200 North Cameron Street Winchester, VA 22601 (540) 667-2139 ----------------------- Streets: (E-W) Va Rte 642 (N-S) rams head road Analyst: HCS File Name: EGRR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed signalized int with full development No. Lanes Volumes PHF.or PK15 Lane W ( f t ) Grade %- Heavy Veh Parking Bus Stops Con. Peds Ped Button Arr Type RTOR Vols Lost Time Traffic ----- Eastbound L --- -T R -- 1 1 < 63 656 11 0.90 0.90 0.90. 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 and Roadway Cc - Westbound ---- -T-- R 1 1 < 16 667 77 0.90 0.90 0.90 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 --------------- inditions --------------- Northbound L T R --- --- 1 1 < 40 5 60 0.90 0.90 0.90 12.0 12.0 0 2 2 2 (Y/N) N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 --------------- Signal Operations -------------- Southbound L --- -T R -- 1 1 < 72 5 62 0.90 0.90 0.90 12.0 12.0 0 2 2 2 (Y/N) .N 0 0 (Y/N) N 3 3 0 3.00 3.00 3.00 --------------- Phase Combination 1 2 3 4 5 6 7 8 EB Left * NB Left Thru * Thru Right * Right Peds Peds WB Left Thru Right Peds NB Right SB Right Green Yellow/AR Cycle Length: 33.OP 3.0 SD Left Thru Right Peds EB Right WB Right Green 18.OP Yellow/AR 3.0 57 secs Phase combination order: #1 #5 HCS: Signalized Intersection Version 2.4c 07-03-1997 2 Streets: (E-W) Va Rte 642 (N-S) rams head road Analyst: HCS File Name: EGRR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed signalized int with full development ----------------------------------------------------------------------- ----------------------------------------------------------------------- Volume Adjustment Worksheet Direc- Lane Lane Adj tion/ Mvt Adj Lane Grp No. Util Growth Grp Prop Prop Mvt Vol PHF Vol Grp Vol Ln Fact Fact Vol LT RT ----- EB ---- ---- ---- ---- ---- -- ----- ------ ---- ---- ---- Left 63 0.90 70 L 70 1 1.000 1.000 70 1.00 0.00 Thru 656 0.90 729 TR 741 1 1.000 1.000 741 0.00 0.02 Right 11 0.90 12 WB Left 16 0.90 18 L 18 1 1.000 1.000 18 1.00 0.00 Thru 667 0.90 741 TR 827 1 1.000 1.000 827 0.00 0.10 Right 77 0.90 86 NB Left 40 0.90 44 L 44 1 1.000 1.000 44 1.00 0.00 Thru 5 0.90 6 TR 73 1 1.000 1.000 73 0.00 0.92 Right 60 0.90 67 SB Left 72 0.90 80 L 80 1 1.000 1.000 80 1.00 0.00 Thru 5 0.90 6 TR 75 1 1.000 1.000 75 0.00 0.92 Right ----------------------------------------------------------------------- 62 0.90 69 Saturation Flow Adjustment Worksheet Ideal Adj Direction Sat No. f f f f f f f f Sat /LnGrp Flow Lns W HV G p BB A RT LT Flow EB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.12 226 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1858 WB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.12 226 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 0.98 1.00 1834 NB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.77 1440 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 0.86 1.00 1606 SB L 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.78 1447 TR 1900 1 1.00 0.98 1.00 1.00 1.00 1.00 0.86 1.00 1606 �I HCS: Signalized Intersection Version 2.4c 07-03-1997 3 Streets: (E-W) Va Rte 642 (N-S) rams head road Analyst: HCS File Name: EGRR-SIG.HC9 Area Type: Other 7-1-97 PK HR Comment: Eastgate Traffic proposed signalized int with full development Supplemental Permitted LT Worksheet APPROACH Cycle Length, C Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g Opposing Effective Green Time, go Number of Opposing Lanes, No Number of Lanes in Lane Group, N Adjusted Left -Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Left Turns per Cycle: LTC=Vlt*C/3600 Adjusted Opposing Flow Rate, Vo Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No ' Opposing Platoon Ratio, Rpo Lost time per phase, tl gf=Gexp(-0.882*LTC^0.717)-tl Opposing Queue Ratio: qro=1-Rpo(go/C) ' gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl gu=g-gq (or g-gf) fs=(875-0.625Vo)/1000 ' Pl=Plt [l+{ (N-1) g/ (fsgu+4.5) }] Ell fmin ' fm, (min=fmin; max=1. 00 ) flt= [fm+0 . 91 (N-1) ] /N ' APPROACH Cycle Length, C Actual Green Time for Lane Group, G Effective Green Time for Lane Group, g ' Opposing Effective Green Time, go Number of Opposing Lanes, No Number of Lanes in Lane Group, N ' Adjusted Left -Turn Flow Rate, Vlt Proportion of Left Turns in Lane Group, Plt Left Turns per Cycle: LTC=Vlt*C/3600 Adjusted Opposing Flow Rate, Vo Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No Opposing Platoon Ratio, Rpo Lost time per phase, tl gf=Gexp(-0.882*LTC^0.717)-tl Opposing Queue Ratio: qro=1-Rpo(go/C) gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl gu=g-gq (or g-gf) fs=(875-0.625Vo)/1000 Pl=Plt [1+{ (N-1)g/ (fsgu+4.5) }] ' Ell fmin fm, (min=fmin;inax=1.00) EB 57 33 33 33 1 1 70 1.00 1.11 827 13.09 1 3 0.00 0.42 17.40 15.60 0.36 1.00 10.40 0.12 0.12 0.12 WB 57 33 33 33 1 1 18 1.00 0.28 741 11.73 1 3 0.00 0.42 13.79 19.21 0.41 1.00 8.72 0.12 0.12 L I I F flt= [fm+0 .91 (N-1) ] /N 0.12 APPROACH NB Cycle Length, C 57 Actual Green Time for Lane Group, G 18 Effective Green Time for Lane Group, g 18 Opposing Effective Green Time, go 18 Number of Opposing Lanes, No 1 Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 44 Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 0.70 Adjusted Opposing Flow Rate, Vo 75 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 1.19 Opposing Platoon Ratio, Rpo 1 Lost time per phase, tl 3 gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.68 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 0.00 gu=g-gq (or g-gf) 18.00 fs=(875-0.625Vo)/1000 0.83 Pl=Plt [l+{ (N-1) g/ (fsgu+4 .5) } ] 1.00 Ell 1.29 fmin 0.22 fm,(min=fmin;max=1.00) 0.77 flt= [fm+0 . 91 (N-1) ] /N 0.77 APPROACH SB Cycle Length, C 57 Actual Green Time for Lane Group, G 18 Effective Green Time for Lane Group, g 18 Opposing Effective Green Time, go 18 Number of Opposing Lanes, No 1 Number of Lanes in Lane Group, N 1 Adjusted Left -Turn Flow Rate, Vlt 80 Proportion of Left Turns in Lane Group, Plt 1.00 Left Turns per Cycle: LTC=Vlt*C/3600 1.27 Adjusted Opposing Flow Rate, Vo 73 Opposing Flow per Lane, Per Cycle: Volc=VoC/3600No 1.16 Opposing Platoon Ratio, Rpo 1 Lost time per phase, tl 3 gf=Gexp(-0.882*LTC^0.717)-tl 0.00 Opposing Queue Ratio: qro=1-Rpo(go/C) 0.68 gq = Volc * qro / (.5 - Volc * (1 - qro) / go)-tl 0.00 gu=g-gq (or g-gf) 18.00 fs=(875-0.625Vo)/1000 0.83 Pl=Plt [l+{ (N-1) g/ (fsgu+4.5) }] 1.00 Ell 1.29 fmin 0.22 fm,(min=fmin;max=1.00) 0.78 flt= [fm+0 . 91 (N-1) ] /N 0.78 7 1 HCS: Signalized Intersection Version 2.4c 07-03-1997 4 ' Streets (E-W) Va Rte 642 (N-S) rams head road Analyst: HCS File Name: EGRR-SIG.HC9 Area Type: OtherPK __ _- _7-1_HR Comment_EastgateTrafficproposedsignalizedint- with -full development evelopment Capacity Analysis Worksheet Adj Adj Sat Flow Lane Group Direction Flow Rate Flow Rate Ratio Green Ratio Capacity v/c ' /LnGrp --------- (v) --------- (s) --------- (v/s) ---------------- (g/C) ---------- (c) Ratio ----- EB ' L 70 226 0.310 0.579 131 0.535 TR 741 1858 0.399 0.579 1076 0.689 WB L 18 226 0.080 0.579 131 0.138 ' TR 827 1834 0.451 0.579 1062 0.779 NB L 44 1440 0.031 0.316 455 0.097 ' TR 73 1606 0.045 0.316 507 0.144 SB L 80 1447 0.055 0.316 457 0.175 ' TR 75 1606 0.047 0.316 507 0.148 Sum (v/s) critical = 0.506 Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.566 ----------------------------------------------------------------------- Level of Service Worksheet Delay Del Lane Calib Delay Lane Lane Delay LOS Direction v/c g/C d Adj Group d d Grp Grp By By /LnGrp Ratio Ratio 1 Fact Cap 2 2 Del LOS App App --------- ----- ----- ----- ----- ----- ----- ----- ---- ---- ----- --- EB L 0.535 0.579 5.6 1.000 131 16 3.3 8.8 B 7.8 B ' TR 0.689 0.579 6.4 1.000 1076 16 1.3 7.7 B WB L 0.138 0.579 4.2 1.000 131 16 0.0 4.2 A 9.5 B TR 0.779 0.579 7.0 1.000 1062 16 2.6 9.6 B ' NB L 0.097 0.316 10.5 1.000 455 16 0.0 10.5 B 10.6 B ' TR SB 0.144 0.316 10.6 1.000 507 16 0.0 10.6 B L 0.175 0.316 10.7 1.000 457 16 0.0 10.8 B 10.7 B TR 0.148 0.316 10.6 1.000 507 16 0.0 10.6 B ' -------- -- Intersection Delay-=- 9_0 ------- sec/veh Intersection LOS = ------------------------- -- B -- Eastgate Rezoning Traffic Impact Study County of Frederick, Virginia Eastgate Commerce Center Traffic Impact Study County of Frederick, Virginia Attachment 10 Stacking Length Summary Gilbert IV. Clifford & Associates, Inc. 200 North Cameron Street Winchester, Firginia 22601 Left Turn Lane Stacking Length Summary Number of Lanes Length (ft.) 522 Northbound 2 220 642 At 522 1 200 642 at W rights Run Road Westbound 1 100 Eastbound 1 100 642 At Rams Head Road Westbound 1 100 East bound 1 100 Right Turn Lane 522 Southbound 1 100 gilbert w. clifford and associates Lane Length Revision 1.0-1 July 1997 Attachment-10 A X R E C E I P T - UNTY OF FRErF WT LIAM ORNDOFF, JR 0• DX 225 .NCHESTER VA 22604 96 REAL ESTATE .7.02 ACRES Y E A R 1 9 g 6 Ticket #:00343840001 @@ Date : 6/10/96 Register: COS/WA Trans. #: 48069 Dept # RE9601 ACCT# 24287 76 A 53 Previous Principal Acres: 227.02 Balance $ 5034.60 na: 1602100 Principal Being Paid $ 5034.60 Imp: 76100 Penalty $ .00 IGHTS RUN L.P. Interest $ .00 Amount Paid $ 5034.60 { 00 SHIRLINGTON RD #1200 LINGTON, VA *Balance Due {. 206 as of 6/10/96$ .00 CK WASH FED 315 d by WRIGHTS RUN LIMITED PARTNERSHIP BALANCE DUE DOES NOT INCLUDE PENALTY AND INTEREST. A X R E C E I P T _ OUNTY OF FREDERICK • LLIAM ORNDOFF, JR •0. BOX 225 INCHESTER VA 22604 996 REAL ESTATE 17.01 ACRES (DUPLICATE) Y E A R 1 9 9 6 Ticket #:00343840002 @@ Date : 12/12/96 Register: DMS/WA Trans. #: 59052 Dept # RE9602 ACCT# 24287 76 A 53 Previous Principal Acres: 227.02 Balance $ 5034.60 and: 1602100 Principal Being Paid $ 5034.60 Imp: 76100 Penalty $ .00 RIGHTS RUN L.P. Interest $ .00 Amount Paid $ 5034.60 800 SHIRLINGTON RD #1200 LINGTON, VA *Balance Due 206 as of12/12/96$ .00 CK FNB 1012 Pd by OMINEX INC Y BALANCE DUE DOES NOT INCLUDE PENALTY AND INTEREST. n U (DUPLICATE) C. �•%. /��. % 0 • :�b r, o • : CAHDaSH N OOO u719PG642 THIS DEED made and dated this J14 day of `) , 1989, from R. J. TURNER and MARY M. TURNER, his wife, parties of the first part, hereinafter referred to as the Grantors, to WRIGHT'S RUN L. P n Virginia limited partnership, party of the second part, hereinafter referred to as the Grantee. WITNESSETH: That in consideration of the sum of Ten Dollars, ($10.00), and other valuable considerations paid the Grantors by the Grantee on or before the delivery of this Deed, the receipt of all of which is hereby acknowledged, the Grantors hereby grant, sell and convey, with general warranty and with English covenants of title, unto the Grantee in fee simple, the following real estate, together with all improvements and appurtenances thereto belonging but subject to all easements and legally enforceable restrictions and reservations of record affecting such realty: All that certain parcel of land, located in the Opequon Magisterial District, Frederick County, Virginia, located on U. S. Route 522, 5.4 miles south of U. S. Route 50 at Winchester, Virginia, containing 240.8940 acres, more or less, as described in that certain plat and survey of Louis J. Motacia, C.L.S., dated June 16, 1989, attached hereto for a more '•.particular description of the property herein conveyed; and being the same property which was conveyed to the Grantors herein by deed of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia, in Deed Book 700, Page 922; and further the some property which was conveyed to the Grantors herein by deed from Margie S. Cornwell intended to be recorded immediately prior hereto in the some Clerk's Office, LESS AND EXCEPT HOWEVER, that certain lot or parcel designated as Lot 17 on said survey and shown thereon as containing 5.1451 acres, which was conveyed to Rockland A. See, et ux, by deed from George A. Cornwell, et ux, of record in Deed Book 490, Page 25, among the same land records. WITNESS the following signatures and seals: �l 0 • DIc719�c643 #..{NER MARY TURNER STATE OF VIRGINIA OF _ k!_)trty��9�7" , to —wit: The foregoing instrument was acknowledged before me this I�III, day of _IIIa16 1989. by R. J. Turner and Mary M. Turner, his wife, Grantors. My commission expires o n 1p�.,%Ip� Qri l 1`'I`l:l Notary Public c�•!�- $MAAA. M(CANDUSK II DOCXW00D 1 All0ult� .I u• ��� u.cnou. nuuu fY7 3'• i 1 9KT 19PG644 IL ry E �..M a av 7G r /. „ 14 l N el a•c ti to = 35 5 34 •I Z V i > 1 ,I 32 33 `o y y c 3 Y = 4 • 50 al Z as o a , l a A 53 s+ a2 ti' a 17 P w Ise � 80UNDAR Y, S U VEY Docrlp.loa: Lot ................. dlocf Nt W itYlStot+.................................................................. S.cue., ........,.. ►tne. a Dov�de .Y.Rs. .... ..... 1�i«OER/.C/r....... ................................ lWi.�a►.0fZi.t..O..�O•.bwC�Ci. G�.fU�r�R///1.��.�QR�►++"W.Dt(+./uYkutQf, ' fiqN............ .....................�,...1•. .........:.....•............. ............. ..:�,.•.. ..O njLDP..............A7rORN•Y:......................... . ................................ ON t Data D4vww rti .R..lt. .urtN� T ►ww.:..7.G-A�S��-/�1..... �r.•..G. �.Rx.. .................. ......... I o... 1 A! (kid LM offla .wi �a t+SSW saiver" y ��A NNr W phys a "Us""a or Like land bo,Wula ted hamrym t`� T6. ��^•ro. F"Md TN 4. her L or even our a.d laad oou.darin aaa We t=he WAry ve Dereitaa. ttt.. tr p►T.ky muatas. as tr Land Yd gene. wnr7« -.us. the'... la.o.0 .y�._ . tr aur.eror ltae carried otrt the L%N t.nl0.e ltw for t1w Wrv" ead r 4 .ao.e«utr.Llrvepor•.pVt00t.uaa. ' U reaprtT. zz' .7. 10 (us) Kan front Lae due e.""L moved h .0 psrtSe. involved vrU the Pon tee of tAtg u+-s fee x Iranri.r N W Ydro. meet r ti.o+. (or . re.`iii�, ser,.adw w�payebriie `^� rr...r and w ..1..e.u.�,. Ir rn+e.. It... �. tdatada, .ftl,la a da" of tkk O •a b- tdmv r oa1T to r .eed for the .f matrwiv Title la. � •T. ►ar aJta.e .be relet y n ennrx. A s ml HOUSE LOCATION SURVEY' r .a µ� r or W ph7unl wvclw, to tAe aaLtly r.t raw a1 Like Una of the M' area os owy. a. oo A- 0 n W` t1111V—P-lq for vnlfkatloa of lonU of ItadR w�eT. e4. �rouad etu d" Won dl{Slaj am " Opel Thu ben preyrred .it", tLe b mnl of a Lfik upon and dor eat tbarefore --1611107 ladkale aG me .W L.. on 0 T1L� pUa nano, M d (c fv a.T I of Tin. eon.trvcdoa .tuuaever Ixludlnr. but not Led to, addttlood to boom, .LILa, e.l1A• PO R , PUMSE WKAnor to tr a atlon for Y loDU a for LWA4 WPow ANY AL TSOlVPR IS SiRICiLY f�RRIDDPII ORATION OF T}{L3 FLAT � U1dITATION of S . CrdfluUoe n 1i'' ° . n'al` a and/or tran.rn tan la„d e r Ann . of �' 1e or p"na"`r's r.rw4e1 it a« r.r.t to to ►7' MILaeta for 0 .0 �y► y ..ru"W" a. a►o.. .rce1 of 6" .4 a. 3a .. DD n.e1. cIa , Ufk.Lle. to" aw LXT¢ND to •ar.aa.a.N • • •'d•r: and rLrta.rmon tLa tin CD lo. 32" a twang O`a• and r.ogeor void Irae.dy0y171i YT au. L1« ir air to I" �� Of 1L1..ur"T Y. No. 17 LI ►T YT P..... A NO Tu COWWWAn a. ra •a+noanu and ralr4Ctlra v A NO, fl a le. � rt oar ano.e, .ee Lael. j. M Let. CaU1L I Land Sur i . NO. Sd0 �1 P.O.IoDot "S6. Duna lµ IM.0 (7c�1) 7T3011! i0`!? ANN. NO. I1.17 • Use FLOOD ttAIN NOTl: 71.. Mrtaf.f toed tr lot{LW W Zoe. �•��rQ 0 -1 BK119PG64 Ali ' ..)J\ -- - -- ••-- - ._... 1NL/ T wrn •f `as e--r-�a- fi.a ° 8 ,.ty�xir'/ 9+d aeR 3-6 J.w..( � VA NW.. icwNr wswa•rs r,a,7 VI , Ar sts .olaltcr �wr ti AL O/*'AA'-i 377W-i Ata3l-0s Jr- �I� � 2G31•/O ' ��•�••/ - rr• Or 0 T/ff s-/�•S6 ti 7'M• 87• A 3l ILLM R. 4& IKO /O AC. ' ' D. 74, Pa. /lo , Mt " -A.iN R. LssnCo • :U 9. 7e, Pa. /so • . 0 r 1 /l Arr age • (; 91 /y. r C,,..r � •VA. P.wi• � ('..O.O•ti3� %%% 47- A: 4 B� */A W. so s ' 1 � d<- � - y WUIS 1 MIATXC O Teo lt,ttD �� MMMME& 5 + 3 2 SN6ST LAYOUT 9'0R .PaCoRo/wG /N TSVL LANO AwXC0ROS. r D*&Wp& I Mach d .... t1tD ri Dua as y T M1+os. AM now if w-I`tNproper"` -XV am Of C, •'TTL .am a ►ou"M ® HAnw.a. Lay am of This ur TLre7 the pro" - rol� Atli i �.7 WD NO. n" KY. NO. 1711 ' N0.TU M. - NO. 61 TS". N0. 760 r N0.1N r 1 /l Arr age • (; 91 /y. r C,,..r � •VA. P.wi• � ('..O.O•ti3� %%% 47- A: 4 B� */A W. so s ' 1 � d<- � - y WUIS 1 MIATXC O Teo lt,ttD �� MMMME& 5 + 3 2 SN6ST LAYOUT 9'0R .PaCoRo/wG /N TSVL LANO AwXC0ROS. D*&Wp& I Mach d .... t1tD ri Dua as y T M1+os. AM now if w-I`tNproper"` -XV am Of C, •'TTL .am a ►ou"M ® HAnw.a. Lay am of This ur TLre7 the pro" - rol� Atli i �.7 WD NO. n" KY. NO. 1711 ' N0.TU M. - NO. 61 TS". N0. 760 r N0.1N -t OW7I9PG646 Wet, •f fence Nx Nil Its 14 !) '•• N� • Z�� Ro«irvs K.vo«s Esr�r is`e.s o°i LOT � V, � `�`-� .•..�-� Nlrt � Het �f r \`,\,,` t \ \ .�iCArr �i' ao..si , tea. t3 y Ap • 1.3O.aQ•. fh•■r�'ai Se " to `\%\ /• iti 7*• vo �t� 6 A,I I • I �r��ro, 3 �J C S ��il �\� \ Pit 3#6 we •��. •Q u1J �IR�ISO.Z \\� ,\ �. er'1%C �r��� 'j �. 0 T.M. 497- A- •'rQ a'4"'r � .0 �� C / ��~ `�. •�...At• Mo.vri/ W. � Pti 49 so 41 se r�.Q. •ae� 2'IjIr1 fen.•, 3 J.W..' V • IA flwt• Axe. vl. t im �•1 v :Av. d TAx M^r 87- A- K% lob, s/ Ae. %7 1 S?G6 4 7 s BK7I9PC648 R�c¢•eo.wa A►ArcN L/,Yc ivxa r s hIM 430 nu 25 Q h �^ �• IVr/t ua . 140, it ACPO V top Lr f. f.•Ir to • tO/ 0 1. it i If '•wr.• �•.� . AM M. lOI 10 .. •r •.r' • .A Y �i •..rr � •1WIr W •�.: � .Yr ' top •� w i• � J.1• r �r.. .i Q it \\� • N.I. �.= r•r��t \ ' LO1 I N1.1 !w�'r I�aw' • m.r•� . ►' 1 V tO/ /I � u1 f •• al. A. � i � 1 ur .fIs 14 tT i 7 LOP to •• top st I/ J • 01 •�\ at A. &or f Lop t Z •� N.IIr µ•Or �\1� 95 •V•Iti1Y • �.• . J bi r • .! :r si. ' sr tdt i PWJA= !r r ' 1 L tLu►ati w S tt• •'t• t&.A9 •'�• RMUhC KAOLLS ESiAW cri*&WAA It IMIS 'J6 Opp �••r l r/: Tf�/1u w�.•�•1• r. .ice. 4 • • I• SKI I9PGS49 I 1 7-INSMAH TAX MAP 74- A-46 3!5AC. O.Q. 52a. PG. SGS Q O. EL S, "G. 37-1 b h v ZI A r-AA MA/ 76- A--A-f C .37. 36 Ac. G O. 26/, IG. s•i0 'T � .le A �E,4 2 t W Loy- /7 �z3 . _„- o/ats ar.. f'eC ,e iv �J 3 �+ TAT M A/ 7G• A' -OL ti f /22 AC. ✓o�I.v N. SAR6LvT nor. .rI Co 111^16 MArcw L,wt Jvxxr a �" --- .tIC •�.wS A.Arcw .CAVAr J.YLArr a iMA/J +v -76- A -'fs T2d, PG• 3sS 2L fi, A•G. 373 ocsc �a.a�. s AREA LOT /7 IOTA L OX7I9Pc650 I Su Frio^ TA); -)OAP 7`-A- o•0• 325�6,Ps-74 1 9L S r, 8' \ \ 040- 8 9 4-0 Ac. -6- / 4 51' Ac. 23 5. 7.4 8 9 X �i[S�/.•� /K� I G..Par iwliwca /'ws . It r,4% AAAe e7- A-t — MAIQr Lim >tv`LT f 98 'v•3- �c7 f� w t• ce�dK a 11 • • • oKl19Pc651 I / 9. B A C • �+y \ Nh fJ 700 I 110 •I �nct C,R • h YAr MA/7� A'Sld •, Qi 04. CNN z 74 hl I aRtop, .At C t ll9 -rA}MA/ 7G A3 0 Z 7 Ac- a NQA.3aRT pA�NraK 6y'4.G'47 E 590. 47 77 sat.$,4 01'�.R v I (`.fM/ •w �11 1� R/.V I,Z N; u A � r.wJ ✓A•NrK �• • TI :\ iSfefes �` ,C3ovnds Dex• ! ��� ��FI� t•`• �.,\ � is �PO/NT Of B�6'rNN/NG~•�•........�................. I g rA Arc • 346.29Z' 4�,A do 3. Ch wat 3 4 6. 74 Z5 C.Q. • • S /3 •SS'L0 •E �� t s.vc r r d Ys `f _ \ \ ` MArCIV t/N.r Si✓A,L r3 i.P. 'KIr BK7I9?GG52 A ell 44 oo 0; r 19 a • i a •DATA " b° •�1 \s• //` •� 5 R' 3 es • 55',t ,� � �'j h�.c , 3 .r't ■ • t2.t� • � wrti' � •d. w�'r•fk•••� ;��++' rAt e7-A•37 00 ra2J' as -i3 c ,•' , r.,, 67• A- 36 o.e. »*. Pc.+se .947Aa. 957 15 S t9•l3 t7 E...• ' �. •C q o .' �a�C. P•nLt Ifwlr♦ � ZD/. SG M 07 -A • 33 r O. Q Pi. MArCN 70 . rva�r � PArRrCK MArc�j �/.vc i31 sva�ra � - � 't / $t [C. 47" • • 6 W. i ♦_ 14 1t, V no BK719FG653 ex719rc654 M!(BIP'I'ION OF TAX MAP pARMZ 76-A-53 and 67-5-0 -16), Op.vuon Magisterial Dlotrict, irederick County, Ylrglnls, located on U. 3. Rt. 522, 5.4 miles south of U. S. Rt. 50 at Winchester, Ylrginla. "HD3M nM at a found (Deck center cone. men.) Virginia Hwy. Mon. POINT NO. 76 on the westerly right-of-way of U. 3. Route No. 522, P. T. Station 540 • 67.99 as per Ye. Hwy. Plan Project (Old Ar-1, 377 11-2, 2634-02. 2634-10, right-of-way 4-17-56, Sheet 6 of 18, said right-of-way being 95 feet at this hwy. station) T1f1:yCE with the arc of a curve to the left on the we3terly right-of-way of U.3. Route No. 522,36G.292 feet, having a radlvs of 1965.585 feet, a delta of 10' 40' 38', a chord distance of 365.7623 feet, a chord bearing of 5 13* 55' 24" E, to an Iron pipe set (POINT NO. 73) 3.1 feet southwest of an existing fence line and 0.3 feet North of Paskel's property feace•llns; T MCE leaving the 95 foot right -of -ray of U. S. Rt. No. 522 and with the northerly line of Daskel 3 69' 52' 13" W 198.40 lest 'i an Iron pipe set 3.2 feet west of an existing fence corer, POINT NO. 57; THENCE with the southwest line of Paskel 3 19' 23' 27" E 145.00 feet to an Iron pipe sat at& fence post corner, said pipe being In the northerly line of Patrick, POINT NO. 58; THENM WITH the northerly line of Patrick 3 62' 43' 13" W 201.56 feet to an lrm pipe west of an ullitlag fence corner, POINT 110. 70; TIUKE with the westerly Ile of Patrick 3 25' 22' 44" E 300.00 fast to an Iron pipe, a corm= corner to Patrick, POINT NO. 69; MUNCE with the westerly line of Patrick and Lesko 3 36' 21' 13" W 1209.20 fast to a found force post, a coon corner of Lesko and Gibson, POINT 190. 91; MaNCE with the northerly lie of Gi.0 on 3 77' 42' 38" W 850.26 feet to an Iron pipe set 3 feet southwest of an 8" cedar tree on the fence line, POINT NO. 56; T1Mid VIM the northerly line of Glb3on and Tuckor (Lot 11). lertig (Lot 10). Bsac" (Lot 9) as per subdivision plat recorded in the land records In Deed book 480 at page 204, It 41' 00' 59" W 1345.04 feet to a found re -bar, the northerly corner of; Lot 9, POINT NO. Mr; TMF = N 73e 19' 45" W 594.77 fact to an Iron pipe, Point No. 58; THENCE H 43e 31' 18" W 363.21 feet to a found Iron pin, a coomon corner to Schouten, POIXT NO. 95; 71MVZ with the easterly line of Scheulen N 550 51' 48" E 1925.10 fast to a found split planted stons at a fence corner, POINT No. 124; TiMCE WITH the northerly line of 3choulen N 57' 44' 03" W 608.75 feet to a 20" red ask tree In the fence line, POINT NO. 98; LOUIS J. MATAGIA CwUflod land Sury ror P.O. Box 436 Oum lorry VA 22027 1 (703) 573-0135 F C i' i Pis 2 dKT 19rc655 T1iEKS with the northerly line of Snheulan and Sargent -is estate it 58' 48' 02" T 1536.20 feet to an Iron pipe set at a fence corner, a common corner of Sargent and Heflin, POINT NO. 123; 7hiF2iCE with the easterly line of Heflin N 34' 55' 47" L 1422.40 feet to a found square Iron rod beside a planted stone at a fence corner, ■ corner to Tinsman, POINT NO. 125; TMC3 with the southerly line of Tinsman 3 89' 18' 48" Y 1551.94 fast to I a fence post In concrete, A cocoon corner of Tlnaman and Susptlon, POINT NO. 92; TMICE with the southern line of Sumptlon 3 68' 18' 57" Y 944.41 feet to a found Iron rod at a fence corner In the westerly line of Pletcher, POINT NO. 120; Ti02)CT with the westerly line of Pletcher 3 14' 5402" T 239.31 feet to an Iron pipe set at a found fence post corner, a caasaon corner of Pletcher and painter, POINT NO. 119; ITMia with the Westerly line of Painter 3 15e 11' 53" R 223.92 feet to as i Iron pipe set at a fence corner, POINT N0, ill; THEXX with the southerly line of Painter 3 67e 45, 47" I 530.47 feet to tt an Iron pipe at A fence corner In the Westerly right -of -Amy of U. S. Route No. 522 j with a right-of-way of 80 feet, POINT )i0, 77;1 , T1OliCY with the Westerly right-of-way (60 feet wide) Of U- 3. Route No. 522, to 6' 58' 54" i 668.43 feet to the back center of a found broken Virginia Hwy. Yon,, POINT NO. 80; '1i02)CY with said right-of-way 3 8' 27' 48" ! 250.03 feet to the back canter of a found Va- kr7.'Mon. (right-of-way 80 fast wide), POINT NO. 79; TIFF = 3 81" 32' 08" T 13.00 fast to an Iron pipe set on the northerly edge of a gravel drlvawe y, the right-of-way being 95 feet wide, POINT 110. 78; TIil2)CT NI7U Bald right -of -ray 3 Be 25' 43" E 273.44 feet to the found Ya. (, ltry. Yon., center of t G back or West side of the even., POINT N0, 75, the point of F beginning, containing 240.8940 Acres as per boundary survey by Louis J. Yatacla, C.L.3., dated June 16, 1989, the plat to his recorded with the written descrlpt ¢ State of Virginia, County of Fairfax. Louie J. ticla�Date r, TO MIT: 34scribe and sworn to me and In the State and County, Thla W� Day cf im. 1989. Yy c0=13alon Expires Yy0�a1p1aoEaplrmalt�rNtO lYmt ........................................ ' VIRGINIA. FREDERICK COUNTY, SCT. This insUumont of riti was produced to me on the i II� � 3y0�m 10-M It S:O, aosary wDllo �/ and with certificate ck i0smont thcrato annexcd was admitted to record. Tax impo'.ed by See. 5&ti4.1 of ind 5&54 have been paid , it aucssabM. Q CLERK LOUIS J. MATAMA CerUfbd lend SwMaa P.O. Box 436 Dam Lorne, VA 22027 (703) 573-0135 COMMONWE - LTH of 'y'1RQIN1A DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY DAVID R. GEHR 14031 OLD VALLEY PIKE COMMISSIONER P.O. BOX 278 EDINpUPr, VA 22824.0278 June 23, 1997 Mr. Charles E. Maddox, Jr., P.E., V.P. G. W. Clifford & Associates, Inc. 200 North Cameron Street Winchester, VA 22601 Dear Chuck: .TERRY A. COPP RESIDENT ENGINEER TELE (540) 984-5600 FAX (540) 984.5607 Ref: Eastgate Commerce Center Routes 522 & 642 Frederick County On last Wednesday, June 18, 1997 I met with Mr. Evan Wyatt and Mr. Mike Ruddy of the Frederick County Planning Department to discuss the rezoning of the referenced development. They shared an impact analysis statement with me which included traffic data. In our April 9,1997 letter to Mr. Steve Gyurisin of your office we indicated we felt a trip generation analysis should be completed in order to determine specific impacts. If this analysis is available, we would appreciate you providing us with a copy for review. If you have any questions, please let me know. Sincerely, (: I/ i. 4ZZ �' Robert B. Childress Trans. Permits & Subdivision Specialist Supervisor RBC/ rf xc: Mr. S. A. Melnikoff Mr. Kris Tierney, Attn: Mr. Evan Wyatt ': �'� Q ` c; v wt,, av WE KEEP VIRGINIA MOVING COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 April 21, 1997 Gilbert W. Clifford & Associates Attn: Stephen M. Gyurisin 200 North Cameron Street Winchester, Virginia 22601 Dear Steve: I have reviewed the information provided by your firm for the referenced review applications. In order to determine the appropriate review fees, the following items need to be addressed: 1) Your cover letter states that 34.19 acres of land will be rezoned from RA to B2, B3 and M1; however, the plan indicates that 33.20 acres will be rezoned. Please provide the correct acreage. 2) The rezoning review fee is calculated using a total of 34.19 acres. This is appropriate for the RA portion (unless the acreage is modified based on the first item); however, it does not account for acreage that is currently zoned B2, B3 and M1 that is being rezoned. Please provide information that depicts the total amount of acreage that is being rezoned regardless of the current zoning classification. 3) Your cover letter states that the master development plan review fee is based on a total of 124.89 acres. The plan indicates that Eastgate Commerce Center totals 235.75 acres. Our department would not require a fee for the portion zoned RA which totals 79 acres or for the Jouan Inc., tract which totals 20.76 acres; therefore, the review fee should be based on the remaining area of 135.99 acres. The Capital Facilities Impact Model will be only applied to the acreage that is being rezoned from RA to another classification and the monetary proffers from the original rezoning will be applied to the remaining area. Metes and bounds descriptions will need to be provided for all zoning lines within Eastgate Commerce Center to allow our department to accurately update the count} s database and mapping files. Please contact me if you have any questions regarding this letter. Sincerely, Evan A. Wyatt, Deputy Director 107 North Kent Street • Winchester. Virginia 22601-5000 0 0 gilbert w. clif ford & associates, inc. 200 North Cameron Street • Winchester, Virginia 22601 540-667-2139 9 Fax: 540-665-0493 MEMORANDUM To: Kris Tierney, Frederick County Planning Director From: Stephen M. Gyurisin Re: Eastgate Commerce Center Rezoning and Master Development Plan Date: March 18, 1997 Attached are two sets of rezoning plans and a copy of the Rezoning Request Proffers for the Eastgate Commerce Center. Please review these plans and proffers and call me with any comments you may have. Rezoning The Eastgate rezoning consists of the following changes calculated for your to run fiscal impacts: RA to B2 23.68 Acres RA to B3 9.28 Acres RA to M1 1.23 Acres 34.19 Acres Please let me know what your model determines for fiscal impact. Based on the 34.19 acre change I have calculated the rezoning application fee at $1,771.65. A base fee of $550.00 plus $1,196.65 ($35.00 X 34.19 acres) plus $25.00 for rezoning sign. If these fees are correct please let me know. Master Development Plan The master development plan fees are calculated as follows: $1,300.00 Base Fee $2,000.00 ($40.00 X 50 Acres) 2 246.70 ($30.00 X 74.89 Acres) $5,546.70 Total MDP Fees This is based upon a master planned area of 124.89 acres. Please let me know if this amount is correct. SMG:cls attachments COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 April 17, 1997 Mr. Steve Gyurisin G. W. Clifford and Associates, Inc. 200 North Cameron Street Winchester, Virginia 22601 RE: Eastgate Commerce Center Dear Steve: In response to your request for written comments on the above project, I will attempt to recall the main points of our numerous conversations regarding the same. As you and I know, there has been no formal review of the project and it has been a number of weeks since we last spoke about it; therefore, the following comments should in no way be considered a complete list of issues or items that may need to be addressed on this site. First and foremost, a new traffic impact analysis will need to be conducted. The last version of the proposed plan I saw had a number of significant variations from the plan which was approved. The traffic flows resulting from these changes could potentially be significantly different than those previously anticipated. The frontage of both Routes 642 and 522 will need to address visual concerns through buffering, landscaping and sign control. Also, entrances onto Route 522 from the proposed B-2 area should be kept to a minimum. It might even be preferable to have all entrances to the site come off of either Route 642 or the southern east/west road. I am uncertain if your client has decided whether to submit a rezoning and Master Development Plan simultaneously, or do the rezoning first. If the rezoning is submitted first, it would be advisable to have a generalized development plan proffered in order to address the many road layout issues. The Master Development Plan, as well as the rezoning, will need to somehow address the remaining property to the south which is under the same ownership. The manner in which this property develops will have an impact on the road system proposed, in particular the southern connection to Route 522. Items which were proffered as part of the original rezoning will need to somehow be addressed as part of the revised proposal. It may be best to make it clear that the existing proffers stand, and address only issues relating to acreage which will be rezoned as part of the pending submission. t07 North Kent Street • Winchester, Virginia 22601-5000 Mr. Steve Gyurisin Page 2 April 17, 1997 I hope these comments are of some use to you and your client in preparing your application(s). I would be happy to discuss any of these items if you so desire. Sincerely, Kris C. Tierney, AICP Planning and Development Director KCT/cc cc: Robert M. Sager COUNTY of FREDE#K Department of Planning and Development, 107 North Kent Street • Winchester, Virginia 22601-5000 Telephone: 540/665-5651 FAX:540/678-0682 FAX TO: STtvE G'/vRxSl rl COMPANY: G A -I • r Assoa. . FAX #: L5±�) L S - b" 3 Remarks: S-Mve: . Date: - S / 11-' 9 -% Number of Pages (including cover sheet)_ a- TZAN ErNC j4 )Nb£P1 RDEY- `ro Rev o l D C o rJ �s o,til . I H-E Om L->r i M P ►'� CT' Z 3 fi i-c�t s c Go _T�'� -'T ►") E l y o U Tl on I A-t---- From the desk of: EV4N A . \„ IvATF— OUTPUT MODULE Fire Department Rescue Department Elementary Schools Middle Schools High Schools Parks and Recreation TOTAL FIRE AND RESCUE ADDENDUM New Capital Costs Not Covered by County Contributions • Net C*for Fiscal T s to Capital Impact Capital Net Q-Qst5 Q10jit -Q.Q,5h l.mant $397 $2,507 $0 $1,620 $0 $0 $914,925 $0 $0 ,$Q $2,018 $13,688,366 $971,818 $0 $4,403.43 NOTES: Model Run Date 5/14/97 EAW Eastgate Rezoning: Assumes 512,664 sq.ft. of retail use on 24 acres rezoned from RA to B2. OUTPUT MODULE • Net COfor Fiscal T s to Capital Impact Capital Net G t Credit QOA15 I MP -act Fire Department $131 $830 $0 Rescue Department $536 Elementary Schools $0 Middle Schools $0 $302,734 $0 High Schools $0 Parks and Recreation $Q $17 995 $O TOTAL $668 $4,530,927 $321,558 $0 FIRE AND RESCUE ADDENDUM New Capital Costs Not Covered by County Contributions $1,457.02 NOTES: Model Run Date 5/14/97 EAVV Eastgate Rezoning: Assumes169,632 sq.ft. of retail use on 9 acres rezoned from RA to B3. OUTPUT MODULE Net Afor Fiscal to Capital Impact Capital Net Fire Department $19 $194 $0 Rescue Department $125 Elementary Schools $0 Middle Schools $0 $27,585 $0 High Schools $0 Parks and Recreation IQ I&N $Q TOTAL $144 $399,472 $29,419 $0 FIRE AND RESCUE ADDENDUM New Capital Costs Not Covered by County Contributions $305.78 NOTES: Model Run Date 5/14/97 EAW Eastgate Rezoning: Assumes 24,750 sq.ft. of office use on 1 acre rezoned from RA to M1. 0 gilbert w. clifford & associates, inc INCORPORATED 1972 Engineers — Surveyors — Land Planners — Water Quality June 6, 1997 Mr. Evan Wyatt, Planner Frederick County Planning Department 107 N. Kent Street Winchester, Virginia 22601 Re: Eastgate Commerce Center Rezoning and Master Plan Dear Evan: Thanks for meeting with me on Wednesday, June 4, 1996 to go over the application packages submitted for the above project. Based upon our meeting you indicated that the following items are needed to complete the applications for your review. Master Development Plan Application 1. Master Development Plan comment sheets from the Fire Marshal. 2. Twenty-five prints of sheet 1 of 2 showing existing and proposed zoning to be attached to sheets 2 of 2 showing the Master Plan. 3. A slide of the Master Plan. Zoning Application 1. Check for the amount of $3,577.30. 2. Signed proffer statement. 3. Revised page 10 of the rezoning application. 4. County Attorney comment sheet. 5. Stephens City Fire Chief comment sheet. You also indicated that the slide for the master plan and the Fire Chief's comment sheet will be accepted after the submittal deadline dates if not immediately available. Also, that the project would be scheduled for the July 2, 1997 planning commission meeting. Sin e y; Ste en M. Gyurisin S G:c 200 North Cameron Street, Winchester, Virginia 22601 Phone: (540) 667-2139 Fax: (540) 665-0493 Member American Consulting Engineers Council `V - 199 �,`��=��=+•�.��jf flee; DEPr, OF PLAtYll�lt�i�,: AND RE6'kLOP�EfU�� . c • • Lawyers Title Insurance Grporation ISSUED AT RICHMOND, VIRGINIA WARNING IS UNLESS YOUOCAON S E THE WORD "SAFE" N 2 000321 IN THE BACKGROUND. HOLD AT AN ANGLE TO VERIFY. 68-677/510 FILE Re: NAME Jouan, Inc./Wrights Run rMM-�0%02 MBER DATE CENTS FO5/22/97 f��: 7.30 PAY***** **********TH RE E THOUSAND, FIVE HUNDRED SEVENTY-SEVEN'& 30/100 **********DOLLARS r TO THE ORDER Treasurer of Frederick County, Va. ESCROWACCOUNT 01-4501-00 OF SIGNET BANK AUTHORIZED SIGNATURE RICHMOND, VIRGINIA - AU411,- -IGNA7URE �.__.-..---_...-_.._._...__.. II■00032Ins i:05loop.? 78,: 10553111057560311' COUNTY of FREDERICK Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 Timber Ridge Ridge Ministries, Inc. P.O. Box 3438 S Stephens City, VA 22655 NIXIE 30P-5 I 20 07/31/C?7 RETURN TO SENDER NO SUCH NUMBER UNABLE VO FORWARD .Gr.r��=rC\1 ! �r•?T_�fa �J� �?iiiltl�fl!t?[fl't[!li itP�lil3fP.i?Itt lF!!I i?i li iI?1ii 7tl l!F [� 10 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 NOTIFICATION OF PUBLIC HEARING July 30, 1997 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE: APPLICATIONS OF EASTGATE COMMERCE CENTER - REZONING #002-97 AND MASTER DEVELOPMENT PLAN #005-97 PUBLIC HEARING On behalf of the Frederick County Board of Supervisors, you are hereby notified of a public hearing being held on August 13, 1997, at 7:15 p.m., in the board room of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia. This meeting is to consider Rezoning #002-97 of Eastgate Commerce Center by Wrights Run L.P. to rezone land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and M1 (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 2 1. 10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of M1 (Industrial Light) zoned land. The property is located on the west side of the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Number 76-A-53 in the Shawnee Magisterial District. Any interested parties having questions or wishing to speak may attend this hearing. A copy of the application is available for review at the Handley Library, or the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. PUBLIC MEETING Master Development Plan #005-97 of Eastgate Commerce Center by Wrights Run L.P. to master plan 51.96 acres of B2 (Business General) zoned land; 2 1. 10 acres of B3 (Industrial Transition) zoned land; and 72.59 acres of M1 (Industrial Light) zoned land for proposed commercial and industrial use. The property is located on the west side of the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Numbers 76-A-53, 76-A-53A, 76-A-53B, and 76-A-53C in the Shawnee Magisterial District. Any interested party may attend this meeting. A copy of the application is available for review at the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. Sincerely, Evan A. Wyatt Deputy Director EAW/cc 107 North Kent Street • Winchester, Vir-inia 22601-5000 . r CO , 46 41 �� COUNTY of FREDERICK ®� w Department of Planning and Development 540/665-5651 ]738 FAX: 540/ 678-0682 NOTIFICATION OF PUBLIC HEARING July 30, 1997 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE: APPLICATIONS OF EASTGATE COMMERCE CENTER - REZONING #002-97 AND MASTER DEVELOPMENT PLAN #005-97 PUBLIC HEARING On behalf of the Frederick County Board of Supervisors, you are hereby notified of a'public hearing being held on August 13, 1997, at 7:15 p.m., in the board room of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia. This meeting is to consider Rezoning 9002-97 of Eastgate Commerce Center by Wrights Run L.P. to rezone land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and M1 (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 21.10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of M1 (Industrial Light) zoned land. The property is located on the west side of the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Number 76-A-5.3 in the Shawnee Magisterial District. Any interested parties having questions or wishing to speak may attend this hearing. A copy of the application is available for review at the Handley Library, or the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. PUBLIC MEETING Master Development Plan #005-97 of Eastgate Commerce Center by Wrights Run L.P. to master plan 51.96 acres of B2 (Business General) zoned land; 21.10 acres of B3 (Industrial Transition) zoned land; and 72.59 acres of M1 (Industrial Light) zoned land for proposed commercial and industrial use. The property is located on the west side of the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Numbers 76-A-53, 76-A-53A, 76-A-53B, and 76-A-53C in the Shawnee Magisterial District. Any interested party may attend this meeting. A copy of the application is available for review at the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. Sincerely, Evan A. Wyatt Deputy Director EAW/cc 107 North Kent Street • Winchester, Virginia 22601-5000 'Al This is to certify that the attached correspondence was mailed to the following on �cn -j from the Department of Planning and Development, Fred County, Virginia: 76 - A- - 53- WRIGHTS RUN L.P. 2800 SHIRLINGTON RD #803 ARLINGTON, VA 22206 76 - A- - 47- HEFLIN, WILLIAM J. & LORETTA 113 TADPOLE LANE WHITE POST, VA. 76 - A- - 48-A JENI COMPANY P 0 BOX 2598 WINCHESTER, VA 76 -A- - 51-B FLETCHER, DOUGLAS R. 301 VINE LANE WINCHESTER, VA. 76 -A- - 51-C STROSNIDER, CLIFTON R. 173 ARMEL RD WINCHESTER, VA 22663 76 - A- - 55- LADD,BETH CIO BETH SIMPKINS 4479 CONICVILLE RD MT JACKSON, VA 22842 76 - A- - 57-A COMER, ORVILLE LEE 2903 FRONT ROYAL PIKE WINCHESTER, VA. 22602 76 - A- - 60-A RITTER, RICHARD E SR 141 GEMSTONE LANE WINCHESTER,VA 22602 22604 76 - A- - 60-B KING, ELIZABETH A RITTER 2005 FRONT ROYAL PIKE WINCHESTER,VA 22602 22602 87 -A. - 1. SCHEULEN, EDWIN EDWARD & ETALS C/O TERRY SCHEULEN P 0 BOX 351 STEPHENS CITY, VA 22655 22602 76 - A- - 52. HOUGH, EARL E. EST. & ANNA B. C/O ANNA B. HOUGH PAINTER 2776 FRONT ROYAL PIKE WINCHESTER,VA 22602 Evan A.'Wyatt, DepitDirector Frederick Co. PlanninDept. STATE OF VIRGINIA COUNTY OF FREDERICK I, 1,2 Ih Anq �1a" , a Notary Public in and for the State and County aforesaid, do hereby certify that Evan A. Wyatt, Deputy Director, for the De art of Planning and Development, whose name is signed to the foregoing, dated G , has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this day of Q lAil I M l My commission expires onyeLm n \4 @9 . 1999 '-NOT" RY PUBLIC 87 - A- - 16-B GIBSON, MONTIE W 155 CASTLEBRIDGE COURT WINCHESTER,VA 22602 87 -A- - 31- LESKO, HELEN RILEY 2982 FRONT ROYAL PIKE WINCHESTER,VA. 22602 Timber Ridge Ridge Ministries, Inc. P.O. Box 3438 Stephens City, VA 22655 To. A -5y Francis & Eleanor Bascue 319 Wrights Run Lane White Post, VA 22663 ��-q.9 Vincent Fertig 325 Wrights Run Lane White Post, VA 22663 g].Ll- to William & Joyce Tucker 353 Wrights Run Lane White Post, VA 22663 v-LA- II Gilbert W. Clifford & Assoc. Attn: Steve Gyurisin 200 N. Cameron Street Winchester, VA 22601 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/ 678-0682 NOTIFICATION OF PUBLIC HEARING June 18, 1997 TO: THE APPLICANT(S) AND/OR ADJOINING PROPERTY OWNER(S) RE: APPLICATION OF EASTGATE COMMERCE CENTER - REZONING #002-97 PUBLIC HEARING On behalf of the Frederick County Planning Commission, you are hereby notified of a public hearing being held on July 2, 1997, at 7:00 p.m., in the board room of the Frederick County Administration Building at 107 N. Kent Street, Winchester, Virginia. This meeting is to consider Rezoning #002-97 of Eastgate Commerce Center by Wrights Run L.P. to rezone land currently zoned RA (Rural Areas), B2 (Business General), B3 (Industrial Transition), and M1 (Industrial Light) within the Eastgate Commerce Center, to create 51.96 acres of B2 (Business General) zoned land; 21.10 acres of B3 (Industrial Transition) zoned land; and 51.83 acres of M1 (Industrial Light) zoned land. The property is located at the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Number 76-A-53 in the Shawnee Magisterial District. Any interested parties having questions or wishing to speak may attend this hearing. A copy of the application is available for review at the Handley Library, or the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. PUBLIC MEETING Master Development Plan 11005-97 of Eastgate Commerce Center by Wrights Run L.P. to master plan 51.96 acres of B2 (Business General) zoned land; 2 1. 10 acres of B3 (Industrial Transition) zoned land; and 72.59 acres of M1 (Industrial Light) zoned land for proposed commercial and industrial use. The property is located at the intersection of Route 522 South (Front Royal Pike) and Route 642 (Tasker Road), and is identified with Property Identification Numbers 76-A-53, 76-A-53A, 76-A-53B, and 76-A-53C in the Shawnee Magisterial District. Any interested party may attend this meeting. A copy of the application is available for review at the Department of Planning and Development located at 107 North Kent Street in Winchester, VA. Sincerely, T �{ r Evan A, yatt Deputy Director EAW/cc 107 North Dent Street • Winchester, Virginia 22601-5000 IV This is to certify that the attached correspondence was mailed to the following on from the Department of Planning and Development, r ederick County, Virginia: 76 - A- - 52- 76 -A- - 53- HOUGH, EARL E. EST. & ANNA B. WRIGHTS RUN L.P. C10 ANNA B. HOUGH PAINTER 2000 SHIRLINGTON RD #803 2776 FRONT ROYAL PIKE ARLINGTON, VA 22206 WINCHESTER, VA 22602 76 - A- - 47- 76 - A- - 55- HEFLIN, WILLIAM J. & LORETTA LADD, BETH C10 BETH SIMPKINS 113 TADPOLE LANE 4479 CONICVILLE RD WHITE POST, VA. 22663 MT JACKSON, VA 22842 76 - A- - 48-A 76 - A- - 57-A JENI COMPANY COMER, ORVILLE LEE 2903 FRONT ROYAL PIKE P 0 BOX 2598 WINCHESTER, VA. 22602 WINCHESTER, VA 22604 76 -A- - 60-A RITTER, RICHARD E SR 76 -A- - 51-B FLETCHER, DOUGLAS R. 141 GEMSTONE LANE 301 VINE LANE WINCHESTER, VA 22602 WINCHESTER,VA. 22602 76 - A- - 60-B 76 -A- - 51-C KING, ELIZABETH A RITTER STROSNIDER, CLIFTON R. 2805 FRONT ROYAL PIKE WINCHESTER,VA 22602 173 ARMEL RD WINCHESTER, VA. 22602 Gilbert W. Clifford & Assoc. Attn: Steve Gyurisin 200 N. Cameron Street Evan A.. yattDeb6 ty Director Winchester, VA 22601 Frederick Co. Planning Dept. STATE OF VIRGINIA COUNTY OF FREDERICK I, R(::'M' 1—nf) om1 , a Notary Public in and for the State and County aforesaid, do hereby certify that Evan A. Wyatt, Deputy Director, for the Department of Planning and Development, whose name is signed to the foregoing, dated IOP 11, 19q j , has personally appeared before me and acknowledged the same in my State and County aforesaid. Given under my hand this 1Sth day of (Inp �I p My commission expires on q �� NaARY PUBLIC 87 -A- - 1- SCHEULEN, EDWIN EDWARD & ETALS CIO TERRY SCHEULEN P 0 BOX 351 STEPHENS CITY, VA 22655 87 - A- - 16-B GIBSON, MONTIE W 155 CASTLEBRIDGE COURT WINCHESTER,VA 22602 87 -A- - 31- LESKO, HELEN RILEY 2982 FRONT ROYAL PIKE WINCHESTER,VA. 22602 -7 G-f1- 5+ Timber Ridge Ridge Ministries, Inc. P.O. Box 3438 Stephens City, VA 22655 P7 '4- ? Francis & Eleanor Bascue 319 Wrights Run Lane White Post, VA 22663 91- 9--1O Vincent Fertig 325 Wrights Run Lane White Post, VA 22663 g'7-4- 11 William & Joyce Tucker 353 Wrights Run Lane White Post, VA 22663