Loading...
HomeMy WebLinkAbout018-90 Stephens Ridge - Opequon Dist. - Backfile (2)14 I June 5, 2001 Mr. Ronald A. Mislowsky, P.E. Vice President Gilbert W. Clifford & Associates, Inc. 117 East Piccadilly Street Winchester, Virginia 22601 RE: Stephens Ridge Subdivision Frederick County, Virginia Dear Ron: COUNTY of FREDERICK Department of Public Works 540/ 665-5643 FAX: 540/673-0632 We have completed our review of the revised grading and drainage plan for a portion of the Stephens Ridge subdivision and offer the following comments: 1. Provide a legible copy of the existing contours (pre -construction condition) adjacent to the proposed construction. Include all areas impacted by the proposed channel realignment and associated 100-year storm elevations. 2. Evaluate the impact of the proposed fill construction on the 100-year storm elevations adjacent to and immediately upstream. 3. Complete the channel improvements between the outfall of C5 and the three concrete culverts under Greenwich Drive. 4. Add a note to insure that the three culverts under Greenwich Drive are cleaned to remove accumulated silt. It appears that the channel downstream of the three culverts has not been graded properly and is causing the accumulation of silt in the pipes. This condition could_ be a continual maintenance problem which should not be delegated to the homeowners. We recommend that the channel improvements be extended to Stephens Run which would require an easement across property owned by the Town of Stephens City. 107 North Vent Street o Winchester, Virginia 22501-5000 Stephens Ridge Subdivision Letter Page 2 June 5, 2001 5. Provide grouted rip -rap at the outfall of all drainage pipes. It appears that the actual field construction has not achieved a smooth transition to the main channel. 6. Provide a legible plan delineating the drainage areas including the area associated with the existing 24 inch RCP. Please contact me if you have any questions regarding the above comments. Sincerely, Harvey F� trawsnyder, Jr., P.E. Director of Public Works HES/rls cc: Patrick Davenport, Frederick County Zoning Administrator file I wu.I�Iugc %,Ul-uc-oacj Subject: [Fwd: Stephens Ridge Cul-de-Sac] Date: Tue, 26 Jun 2001 15:00:56 -0400 From: "Evan A. Wyatt" <ewyatt@co.frederick.va.us> To: Jeremy Camp <jcamp@co.frederick.va.us> CC: Eric Lawrence <elawrenc@co.frederick.va.us>, Patrick Davenport <pdavenpo@co.frederick.va.us> Hi Jeremy, Please review this and advise me of the nature of this project. Thank you, Evan Subject: Stephens Ridge Cul-de-Sac Date: Tue, 26 Jun 2001 14:01:30 -0400 From: "Sweitzer, Barry" <BSweitzer@VDOT.STATE.VA.US> To: "G. W. Clifford & Associates (E-mail)" <gwcliff@mnsinc.com> CC: "Heironimus, David (Dave)" <DHeironimus@VDOT.STATE.VA.US>, 'Evan Wyatt' <ewyatt@co.frederick.va.us>, "Melnikoff, Steve"<SMelnikoff@VDOT.STATE.VA.US>, "Sweitzer, Barry"<BSweitzer@VDOT.STATE.VA.US> VIRGINIA DEPARTMENT OF TRANSPORTATION EDINBURG RESIDENCY 14031 Old Valley Pike Edinburg, VA 22824 June 26, 2001 Mr. Ronald A. Mislowsky, P.E., V.P. C/o G. W. Clifford & Associates, Inc. 117 E. Piccadilly Street, Suite 200 Winchester, VA 22601 Ref: Stephens Ridge Cul-de-Sac Ro to 10 idgefield Avenue eeckCounty Dear Ron: We have received your revised site plan dated 06/04/01 (received 06/18/01) for the referenced project. It appears all of our earlier review comments have been satisfactorily addressed. Please advise the owner of our approval. Also please provide six (6) sets of approved construction plans with signed seal for VDOT distribution. The appropriate land use permit may now be applied for to cover work within the Route 1065 right-of-way. The permit is issued by this office and will require a minimum processing fee, surety bond coverage, and the salary & expenses of a State assigned Inspector. A copy of any/all recorded plats of dedication for drainage easements or additional right-of-way required for implementation of this proposed project should be provided to VDOT prior to issuance of any land use permits. Dedication should be made to the Commonwealth of Virginia. Once satisfactory application has been made, a permit will normally take approximately thirty days to process and issue. Should you have any questions, do not hesitate to call. 1 of 2 6/26/2001 3:54 PM /G, Li wu.atcIjucua iuugc %,UI-uc-oa'j Barry J. Sweitzer Trans. Roadway Engineer VDOT - Edinburg Residency Permit & Subdivision Section 14031 Old Valley Pike Edinburg, VA 22824 (540) 984-5631 (540) 984-5607 (fax) 2 of 2 6/26/2001 3:54 PM LAW OFFICES OF EDWARD F. GRECO, R. C. A PROFESSIONAL CORPORATION PHILLIPS BUILDING 109 EAST MAIN STREET EDWARD F.GRECO FRONT ROYAL, VIRGINIA 22630-3393 KIMBERLY M.ATHEY (703) 636-8497 CARTER B. FOULDS FACSIMILE (703) 636-4408 CLIFFORD L. ATHEY. JR. September 7, 1994 County of Frederick Department of Planning & Development 9 North Loudon Street Winchester, Virginia 22601 NILS G. PETERSON OF COUNSEL Re: Dave Holliday - Continued Failure to Comply with Site Inspection of May 13, 1993 at Stephens Ridge Townhouse. Dear Sir: I am writing this letter as a follow-up to a letter dated July llth, 1994. I note for your purposes that Top of Virginia has still as of this date failed to comply with the Site Plan for Stephens Ridge Townhouse Development. I attach a copy of a letter which I have written to Mr. Holliday encouraging Top of Virginia to complete the amenities which is in the original Site Plan. V er1, ru s, L Clifford L. Athey, Jr.` CLA/clh Enclosure cc: M. Theresa Seitz 6 01b LAW OFFICES OF EDWARD F. GRECO, RC. A PROFESSIONAL CORPORATION PHILLIPS BUILDING 109 EAST MAIN STREET EDWARD F. GRECO FRONT ROYAL, VIRGINIA 22630-3393 NILS G. PETERSON KIMBERLY M• ATHEY OF COUNSEL (703) 636-8497 CARTER B. FOULDS FACSIMILE (703) 636-4408 CLIFFORD L. ATHEY. JR. September 7, 1994 Top of Virginia Attn: Dave Holliday P.O. Box 3276 Winchester, Virginia 22601 Re: Revocation of Class T Membership for Failure to Complete Conditional Improvements by August 31, 1994. Dear Mr. Holliday: As you are aware, our firm represents Stephens Ridge Homeowner's Association, and I am writing this letter on their behalf. According to a By -Law Amendment Agreement dated May 25th, 1994 between M. Theresa Seitz, in her capacity as President of the Stephens Ridge Homeowner's Association and David B. Holliday, President of Top of Virginia Development. Top of Virginia was granted a Class T membership in the Stephens Ridge Homeowner's Association. This new classification allowed Top of Virginia to pay $ 600.00 per quarter instead of the $ 1200.00 per quarter fee which is required of Class A owners. This period of Class T membership was to run for no less than six (6) months but not more than one (1) year. Top of Virginia was granted this status, and the following clause was a condition of the agreement, "Class T membership will immediately terminate and revert to Class A membership should any of the conditional improvements listed on Attachment A, remain incomplete after August 31, 1994. The following improvements remain incomplete according to the Homeowner's Association on September 1, 1994. 1. Additional pine trees behind Units 1-12. 2. Provide additional rip -rap for RCP between Units 20 and 21. 3. Provide pine trees on NE side of Unit 12. 4. Install required 1/2 basketball court. 5. Provide pine tress on the berm located on the South side of Greenwich Drive across from the tot lot. 6. Stabilize graded areas on both sides os Greenwich Drive between Units 47 and 48. 7. Provide pine trees on NE side of Unit 91. September 7, 1994 Page 2 Mr. Holliday, as I communicated in my letter dated July 11th, 1994, if these conditions were not completed by August 31, 1994, your membership status would revert by the terms of your agreement to a Class A membership. This letter is to inform you of the reversion of your Class T membership to Class A membership, and to inform you that your fees for the period beginning September 1, 1994 will be at Class A membership rates. It is my understanding from M. Theresa Seitz that you wish to renegotiate the amounts of your dues in the near future. I would suggest to you that good faith completion of the improvements required by Frederick County in the Site Plan and agreed to by you in the By -Law Amendment Agreement is a pre -requisite to any further negotiations along these lines. Stephens Ridge has acted in good faith in this matter, and extended the period of time for compliance on numerous occasions. In the Homeowners Association's judgement, it is time for you to complete these improvements, and then and only then will they be wiling to negotiate concerning concessions on dues. I have written a letter to the Department of Planning and Development, keeping them abreast of your continued non-compliance with the Site Plan. Very truly urs', Clifford L. Athey, Jr. CLA/clh cc: Department of Planning & Development M. Theresa Seitz Lim COUNTY of FREDERICK August 5, 1994 Mr. Dave Holliday Dave Holliday Construction, Inc. P.O. Box 2715 Winchester, Virginia 22604 RE: Stephens Ridge Frederick County, Virginia Dear Dave: Harvey E. Strawsnyder, Jr., P.E. Director of Public Works 9 North Loudoun St., 2nd Floor 703/665-5643 Per our recent conversation, I have attached a copy of a plan developed by Gilbert W. Clifford and Associates, Inc., for improvements to the existing triple concrete culverts. This plan was developed by Chuck Maddox to address our concerns related to the stability of the upstream and downstream slopes. Based on my recent site inspection, it appears that Jerry King has not completed the stabilization as indicated on the improvement plan. In fact, a portion of the stabilization rip -rap that was placed adjacent to the upstream inlet has failed and blocked the inlet of the eastern most pipe. The adjacent banks are continuing to erode and currently represent a potential safety problem for adjacent residents. As a consequence of Jerry King's failure to comply with the total scope of the improvements recommended by G. W. Clifford and Associates, Inc., I recommend that safety barricades be installed immediately to prevent a potential accident. Furthermore, the obstructions should be immediately removed from the inlet end of the pipes. To avoid further degradation of the slopes, I recommend that the banks be either regraded to achieve a stable slope or that wire baskets/mattresses be installed to stabilize the rip -rap. This action coupled with the installation of rip -rap in accordance with the G. W. Clifford and Associates, Inc. plan shall be completed on or before October 1, 1994. I suggest that a site meeting be scheduled prior to the commencement of these remedial improvements to ensure that all parties understand the intent and scope of the work to be performed. Fax: 703/678-0682 - P.O. Box 601 - Winchester, Virginia - 22604 r Stephens Ridge Page Two August 5, 1994 Please let me know when you or Jerry King plan to correct the deficiencies outlined above. Thank you in advance for your cooperation in resolving these issues. Sincerely, Harvey E Strawsnyder, Jr., P.E. Directo of Public Works HES:rls cc: Evan Wyatt, Planning and Zoning Chuck Maddox, G. W. Clifford and Associates, Inc. file Oli-cto __ _ _ COUNTY of FREDERICK Public Works Department Harvey E. Strawsnyder, Jr., P.E. Director September 26, 1995 Mr. Dave Holliday Dave Holliday Construction, Inc. P.O. Box 2715 Winchester, Virginia 22604 RE: Stephens Ridge Frederick County, Virginia Dear Dave: 5`�o 5f3/665-5643 Fax: - 65/678-0682 S40 Based on our recent site inspection, we conclude that you have addressed all of our site development concerns except the stabilization of the upstream slopes adjacent to the triple concrete culverts. This problem was highlighted in our letter dated August 24, 1994. I understand that intense storm flows in June 1995 caused a failure of the loose rip -rap that had been placed on the upstream slopes. I further understand that you propose to install a grouted rip -rap to insure long-term stability. The grouted rip -rap should, not only, be placed on the slopes above and adjacent to the pipes, but also, in front of the pipes to serve as an entrance apron. Please let us know when this work will be accomplished so that we can schedule a final inspection. Sincerely, 1Harvey E. Strawsnyder, Jr., P.E. Directo of Public Works HES:mlh 17 cc. Evan Wyatt, Planning and Zoning �✓�%G Chuck Maddox, G. W. Clifford and Associates, Inc. C\i��Q A �.��y .a file c., �G✓ oa 107 North Kent Street Winchester, Virginia 22601 w Off.AID LAW OFFICES OF EDWARD F. GRECO, PC. A PROFESSIONAL CORPORATION PHILLIPS BUILDING 109 EAST MAIN STREET EDWARD F.GRECO FRONT ROYAL, VIRGINIA 22630-3393 KIMBERLY M. ATHEY (703) 636-8497 CARTER 6. FOULDS FACSIMILE (703) 636-4408 CLIFFORD L. ATHEY, JR. September 18, 1995 Top of Virginia Attn: Dave Holliday P.O. Box 3276 Winchester, Virginia 22601 5 G-,PETERSON OF,- lQ�68� Re: Agreement to Continue Class T Membership in Exchange for Certain Repairs. Dear Mr. Holliday, As you are aware, our firm represents Stephens Ridge Homeowner's Association, and I am writing this letter on their behalf. As you remember, according to a By -Law Amendment Agreement dated September 30, 1994 between M. Theresa Seitz, in her capacity as President of the Stephens Ridge Homeowners Association, and David B. Holliday, President of Top of Virginia Development, Stephens Ridge, agreed to accept $ 744.00 per quarter instead of the $ 1,200.00 per quarter which a Class A membership requires you to pay for the lots which you own in the development. This agreement ends on September 30, 1995, and you revert back to Class A membership status requiring the $ 1,200.00 fees. The Association is willing to offer to continue your reduced fees for another 1 year period beginning October 1, 1995, if you complete the following necessary repairs in the Development by September 30th, 1995: 1. Because of the erosion created when you completed the basketball court, the adjacent landowners are concerned about diminution of the lateral support of their side yard adjacent to the court. We propose that you build a retaining wall along this boundary and back fill and landscape this area to prevent further erosion. Because of a concern about child safety, the Homeowner's Association also wants a 4 foot fence built along this retaining wall. Specifications and arrangements for this repair should be handled through Theresa Seitz. 2. Because of the erosion problems impacting upon the roadway entering Section 2 of Stephens Ridge, the Homeowner's Association would require that wire baskets (Gabions) filled with rocks and covered with wrap be placed along the slopes adjacent to the upstream end of the creek bed near the roadway. Specifications and arrangements to be made with Theresa Seitz. If these repairs are not made by this date, in order to make these repairs, the Homeowner's Association will need the additional September 18, 1995 Page 2 monies that a Class A membership provides, as well as a probable special assessment as provided in the covenants which you prepared for this subdivision. This proposal creates a win —win situation for both you and the Homeowner's Association, however, these required repairs need to be completed before September 30th to comply with this proposal. Please contact Ms. Seitz in order to facilitate completion of the repairs, or be prepared to relinquish your Class T membership on October 1, 1995. Sincer Cli ford L. Athey, r. CLA/clh cc: Evan Wyatt, Planning Department Ed Strawsnider, Engineering Department, Frederick County M. Theresa Seitz COUNTY of FREDERICK IParks and Recreation Department James M. Doran, Director 703/665-5678 - FAX: 703/665-9687 M E M O R A N D U M TO: Evan Wyatt FROM: Matthew G. Hott, Supt. of Parks; SUBJ: Recreational Amenities at Lakeside Condominiums DATE: March 22, 1995 On our March 20, 1995 site visit the following deficiencies were observed. The playground equipment at the Tot Lot between units #1 and #2 needs to be corrected. The protective areas for the equipment still overlap or protrude into adjoining structures. This equipment needs to be re -installed so that protective areas for the equipment can be established as called for by the manufacturer. It also appears that there is a lack of sufficient space to correctly install the equipment in this area unless the drainage to the west of the 4 seat swing is filled and leveled. In addition to the deficiencies at the Tot Lot, the picnic shelter has been constructed to a dimension of 10' x 20'. The developer had agreed to construct the shelter to a 16' x 20' dimension. If you should have any questions, please contact me at your convenience. MGH/kcd Attachment (Lakeside Condo Site Plan) cc: file 107 N. Kent Street P.O. Box 790 Winchester, VA 22601 Winchester, VA 22604