Loading...
HomeMy WebLinkAbout055-87 Stephens City Shopping Center - BackfileJAMESWAY SHOPPING CENTER STORM WATER MANAGEMENT PLAN Prepared For *' jjeV11t1 i���� �74� First Washington Development 5530 Wisconsin Avenue, Suite 1600 Chevy Chase, MD 20815 March 1991 Revised 2 April 1991 Prepared By G. W. Clifford & Associates, Inc. 200 N. Cameron Street Winchester, VA 22601 703-667-2139 G. W. CLIFFORD & ASSOCIATES, INC. 200 North Cameron Street P.O. Box 2104 Winchester, Virginia 22601 703-667-2139 Fax: 703-665-0493 memorandum To: Mr. Wayne Miller, Frederick County Zoning Administrator From: Ron Mislowsky, P.E. Re: Jamesway Shopping Center Detention Stephens City, VA Date: March 15,1991 Revised April 2, 1991 The firm of G. W. Clifford & Associates, Inc. has, at the request of Mr. Marvin Fabrikant of First Washington Development, developed a storm water management model and a recommendation for detention for the Jamesway Shopping Center. The limited scope of our study was to determine what changes to the ' existing detention pond would be necessary to meet the requirements of the Frederick County Ordinance. This would include estimating pre development and existing runoff values, and sizing of a pond to mitigate any affect that the ' shopping center development might have on downstream properties. We would also prepare construction sketch plans for the pond rehabilitation. Those drawings are attached. ' The United States Department of Agriculture, Soil Conversation Service Technical Release No. 55, Urban H, d�gy for Small Watersheds method of ' hydrology is used herein to estimate the peak run-off of a 2-year, 25-year, and 100-year Type II storm distribution after development, and the 2-year and 10-year ' Type II storm distribution prior to development. The site has been evaluated on a 10 and 25 year pre and post development basis. We intend to release the 25 year post development storm at a rate less than or equal to the 10 year storm flow rate. t This design will meet the detention requirements as stated in Frederick County Ordinance, paragraph 3-7-4.. ' Existing Conditions ' The shopping center is located on the southwest corner of the intersection of VA Rte. 277 and VA Rte. 641. It is .4± miles east of Interstate 81 in a commercial area. The site area is 20.3 acres which includes 92,362 sq. ft. of building area, and ' 431,000 sq. ft. of paved parking and roadway. The rational method was used to estimate individual region peak flows. These were used to approximate the velocity of flow in the storm sewers which is required for the TR-55 program. The TR-55 program was used to determine the actual post development hydrograph routing to the detention pond. Those calculations are attachment #3. The peak 25 year post development flow to the pond is 157 cfs. The pre development drainage area boundaries are essentially the same as the post development limits. Two areas are used to describe the site. One is the 15± undeveloped acres south of VA Rte. 277. The other is the 4.7 acres north of Rte. 277. Again the TR-55 program was used to estimate runoff rates. Those calculations are attachment #4. The pre development peak ten year storm flow rate to the pond area is 45 cfs. In the post development state, the increase in peak runoff will be controlled by the rehabilitated detention basin. A structure consisting of a concrete riser pipe with an orifice at the invert is proposed. An earth spillway will be used as the emergency overflow. Post development storms of 25 year frequency or more will pass through the orifice. Storms less frequent than 25 years will crest the riser pipe. The 100 year storm is contained within the pond without overtopping. Storms less frequent than 100 years will flow over the weir spillway at an uncontrolled but predictable rate. Sheet 2 of 2 of the attached plan shows the existing contours and also the proposed grading plan. Also detailed on sheet 2 is the proposed cross section of the new dam. A detention pond routing program was used to estimate the water levels to ' be achieved in the new pond by the two, 25 and 100 year storms. The program also provides the out flow hydrograph of each event. Those calculations are attachment #5. 1 ISuinmary ' The mission was to capture the post development 25 year storm from the famesway Shopping Center in the detention pond then release that stormwater at a rate equal to or less than the pre development 10 year storm. As we stated previously, the pre development 10 year storm peak flow equalled 45 cfs. The 25 ' Five (5) undeveloped outlots lie between the parking area and VA Rte. 277. p p g ' There is an additional 31,350 sq. ft. of commercial floor space planned on the west end of the center and a small 8000 sq. ft. addition possible on the east end. A copy of the existing site layout is sheet 1 of 2 of the attached plan. The surrounding ' land uses include, commercial, residential, and vacant land which is zoned commercial. A failed detention pond is located on the west end of the site. The pond drains to a well defined channel flowing to the west, and along the south side of VA Rte. 277. Almost all of the site and a portion of the commercial land north of VA Rte. 277 drain, by enclosed storm sewer, to the pond. A relatively small portion at the east end of the site drains to Rte. 641 and is not addressed by this ' study. Pre -development Conditions Prior to development the site was gently sloped with a sparse natural ' growth of weeds and grasses. The property was grass covered and unused. Run-off from the site traveled west to an existing pond and thence to a natural drainage way that continued west. A small portion of the site drained to the east. The site ' was well drained, suitable for commercial use and zoned for that purpose. ' The site is in the Weiker t-Berks- Blair ton Soil Association. The area is characterized by gently sloping to steep, poorly drained soils that have a medium textured subsoil, formed in material weathered from shale. ' For purposes of design runoff conditions, antecedent moisture condition II (normal consideration for the mid -Atlantic region) is assumed. Soils are of the ' Blairton (3B), Clearbrook (9B) and Zoar (44B) Series. These soils have a moderate rate of water transmission, therefore, SCS Soil group "C" is adopted. A copy of the soils map is enclosed as attachment #1 Stormwater Management ' The post development site has been divided into ten drainage areas, and three regions. Each region is served by a separate storm sewer main. Main A picks ' up areas B, C, and D; Main B, areas E, F, and G, and Main C, areas H, I, and J. Area A belongs to no region. It drains directly to the pond. The post development areas are delineated on the site plan, sheet 1 of 2 on the plans. All calculations assume full development of the property. The post development drainage areas and associated runoff volumes are summarized in attachment #2. F7 L year post development peak flow from the pond is 45 cfs. The elevations of the ' two, 25, and 100 year storms are shown on the embankment detail on sheet 2 of 2 of the plan, relative to the dam itself. I' The seeding plan for the pond, as well as erosion control measures required during construction are shown on the plans. This plan meets all of the applicable requirements of the Frederick County Ordinance. Any questions concerning the findings presented here can be addressed to Mr. Charles Maddox, Jr., P.E. or the writer. 11 11 n 11 11 �I� l ball Al .•! • , Vie.' � t •\� o"s . r, o f � �/� V� �K' ••'. ` ,�. 1, t7 i . Al or WK of .f1` i/' •mot ,•'�- � ���•• jr ��.., ~c��f••s 1�' .,r �9f1 �� �{'.+. '�r� \`� •tom s - t'�► If j1-�;�,�c i-F` � /• �L��•a�;�j', T1!'- .�' � ,7� ��'8 •'r. 7? i. -;. s;` '+a_-�i ..J_} •` J /�, j, .6` �' � is ..i"1" � ,1��.ar +. 1 r c _ ... - G+R.. `� ��`' ,;. • 1-.;P.�ryFra,..I' t }�-�i'�,;..• -1w:3..+1`EEli•..s i : ►i _ '� /•lam'' e.�`�c�'. It—` 7i'' .`!r, 1 ` r- • �3'.•.-"��T r.V. `' c •'� �,e' y/ 1: �,] f „�- _ter.•_-.'•e• G � T•' _ 9' jy,, r.. iSj `::. JAMESWAY SHOPPING CENTER Drainage Area/Runoff Summary Drainage Curve Two Year C Factor Area CA Sum CA Sheet Tc Two Year Q(2)peak Lenght of Hi Elv Lo Elv Average Vel (fps) Pipe Flow Area(ac) Number 24 Hr Inches (Ac.) Intensity (cfs) Pipe(ft) Slope(%) Time (min) A 91 3.10 0.75 4.82 3.62 3.62 5 5.8 20.97 B 98 3.10 0.90 1.31 1.18 4.03 5 5.8 23.39 1070 760.80 754.00 0.64 7.3 2.4 C 98 3.10 0.90 1.17 1.05 D 98 3.10 0.90 2.00 1.80 E 98 3.10 0.90 1.80 1.62 6.58 5 5.8 38.16 840 761.71 753.00 1.04 9.9 1.4 F 98 3.10 0.90 1.50 1.35 G 98 3.10 0.90 4.01 3.61 H 98 3.10 0.80 0.11 0.09 5.14 10 5.8 29.79 870 760.00 0.00 87.36 8.3 1.7 I 98 3.10 0.80 2.78 2.22 J 94 3.10 0.80 3.53 2.82 Attachment #2 Jamesway Shopping Center Stormwater Management Plan Post Development Calculations Attachment # 3 Two Year Post Development Hydrograph 25 Year Post Development Hydrograph 100 Year Post Development Hydrograph Post Development Area Data Post Development Time of Concentration Calculations I Two Year Post Development Hydrograph �J L� AR-55 TWiLAR DISCHARGE MlMD VERSION 1.V Project : Jamesway Detention User: rm Date: 03-12-91 County : Frederick State: VA Checked: Date: Subtitle: Post Development Flow to Pond Total watershed area: 0.036 sq mi Rainfall type: IJ Frequency: 2 years -------------------------- Subareas -------------------------- a b c d e Area(sq mi) 0.01* 0.00* 0.00* 0.00* 0.00* Rainfall(in) 3.1 3.j 3.1 3.1 3.1 Curve number 91* 98* 98* 98* 98* Runoff(in) 2.16 2.87 2.87 2.87 2.87 Tc Mrs) 0.10* 0.05* 0.05* 0.05* 0.06* (Used) 0.10 0.10 0.10 0.10 0.10 TimeToOutlet 0.00 0.00 0.02* 0.03* 0.00 (Used) 0.00 0.00 0.00 0.00 0.00 Ia/P 0.06 0.01 0.01 0.01 0.01 (Used) 0.10 0.10 0.10 0.10 0.10 Time Total ------------- Subarea Contribution to Total Flow (cfs) ----------- (hr) Flow a b c d e 0 0 0 11.3 2 1 0 0 0 0 11.6 3 1 0 0 0 0 11.9 25 5 2 2 3 3 12.0 49 11 4 3 6 5 12.1 78P 16P 6P 5P 9P 8P 12.2 58 10 4 3 6 5 12.3 32 4 1 1 2 2 12.4 23 12.5 17 l 12.6 14 2 12.7 J1 1 12.8 8 1 13.0 13.2 5 13.4 13.6 4 L 0 0 0 13.8 3 1 0 0 0 0 14.0 3 1 0 14.3 14.6 2 1 15.0 1 0 C 0 0 0 15.5 0 16.0 16.5 0 17.5 0 0 0 0 0 0 i9.0 20.0 22.0 0 0 0 0 0 0 26.0 0 0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-55 system routines | TR-55 TABULAR JISCHARGE ME7HClf! WRS}9N Project : Jamesway Detention User: rm Date: 03-12-9J County : Frederick State: VA Checked: Date: Subtitle: Post Development Flow to Pond Continuation of subarea information -------------------------- Subareas -------------------------- f g h i j Area(sq mi) 0.00* 0.01* 0^00* 0.00* 0.01* Rainfall(in) 3.1 3.1 3.1 3.1 3'1 Curve number 98* 98* 94* 94* 94* Runoff(in) 2.87 2.87 2.45 2.45 2.45 Tc Mrs) 0.06* 0.07* 0.10* 0.26* 0.25* (Used) 0.10 0.10 0.10 0.30 O.20 TimeToOutlet 0.01* 0.02* 0.00 0.01* 0.01* (Used) 0.00 0.00 0.00 0.00 0.10 Ia/P 0.01 0.01 0.04 0.04 0.04 (Used) 0.10 0.10 0.10 0.10 0.10 |ime ------------- Subarea Contribution to Total Flow (cfs) ---------- (hr) f g h i j 11.0 0 0 OF; 0 0 11.3 0 1 0 0 0 11.6 0 1 0 0 1 11.9 2 1 1 12.0 4 12 0 2 2 12.1 7P 18P 0 5 � 12.2 4 11 0 7P 6 12.3 1 4 0 7 1�P 12.4 1 3 0 5 � 12.5 12.6 12.7 � 12.8 l 1 0 1 2 13.0 13.2 0 1 0 1 1 13.4 0 0 1 1 0 0 1 1 1 1 13.6 13.8 0 0 1 1 0 0 1 0 1 1 14.0 0 1 0 0 � 14.3 0 1 0 0 0 14.6 0 1 0 0 0 15.0 15.5 0 0 0 C 0 16.0 0 0 0 o 0 i6.5 17.0 0 0 0 0 C 17.5 0 0 0 0 0 19.0 20.0 22.0 0 ' 0 0 0 0 26.0 0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-55 system routines 25 Year Post Development Hydrograph I I TH-55 TABULAR DISCHARCL METHY� ;K?S|OH 1.T Project : Jamesway Detention User: rm Date: 03-12-9� County n Frederick State: VA ChecKed: Date' Subtitle: Post Development Flow to Pond Total watershed area: 0.036 sq mi Rainfall type: lI Frequency: 25 years -------------------------- Subareas ------------------------- a Area(sq mi) 0.01* 0.00* 0.00* 0'00* 0.00* Rainfall(in) 5.7 5.7 5.7 5.7 5.7 Curve number 91* 98* 981".. 98* 98* Runoff(in) 4.66 5.46 5.46 5.46 5.46 Tc Mrs) 0.10* 0.05* 0.05* 0.05* 0.06* (Used) 0.10 0.10 0.10 0.10 0.10 TimeToOutlet 0.00 0.00 0.02* 0.03* 0.00 (Used) 0.00 0.00 0.00 0.00 0.00 I/P 0.03 0.01 0.01 0.01 0.01 (Used) 0.10 0.10 0.10 0.10 0.10 Time Total ------------- Subarea Contribution to Total Flow (cfs) ----------' (hr) Flow a b c d e 11.0 3 1 0 11.3 6 1 0 0 1 1 11.6 11 2 1 1 1 1 11.9 50 12 4 3 6 5 12.0 98 23 7 6 11 10 12.1 157P 35P 11P 10F 17P 16P 12.2 118 22 7 6 11 10 12.3 64 12.4 46 8 5 2 2 2 4 3 12.5 M 12.6 25 12.7 18 12.8 16 4 2 2 13.0 13.2 12 2 1 1 � 1 13.4 12 2 1 13.6 jo 2 13.8 7 1 0 0 1 1 14.0 6 1 0 0 1 1 14.3 6 A4.6 5 15.0 4 15.5 4 ^6.5 3 1 0 o 0 0 `7,� ±7.5 3 18'0 1 2 2 1 0 0 [ 0 22.0 0 0 0 0 0 0 26.0 0 0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-55 system routines TA-55 TABMAR DISCHAREE W'MD VOMM 1.� Project : Jamesway Detention User: rm Cate: 03-12-9. County : Frederick State: VA CheckeM Date: Subtitle: Post Development Flow to Pond ____ _______ Continuation of subarea information -------------------------- Subareas -------------------------- f g h i j Area(sq mi) 0.00* 0.01* 0.00* 0.00* 0.01* Rainfall(in) 5.7 5.7 5.7 5.7 5.7 Curve number 98* 98* 94* 94* 94* Runoff(in) 5.46 5.46 5.00 5.00 5.00 Tc (hrs) 0.06* 0.07* 0.10* 0.26* 0.25* (Used) 0.10 0.10 0.10 0.30 0.20 FimeToOutlet 0.01* 0.02* 0.00 0.01* 0.01* (Used) 0.00 0.00 0.00 0.00 0.10 Ia/P 0.01 0.01 0.02 0.02 0.02 (Used) 0.10 0.10 0.10 0.10 0.10 Time ------------- Subarea Contribution to Total Flow (cfs) ---------- (hr) f g h 11.3 0 1 0 l 1 11.6 l 2 0 1 1 L1.9 4 11 0 3 2 12.0 8 22 1P 5 5 12.1 13P 35P 1 10 9 12.2 8 21 1 1 5P 17 12.3 3 7 0 �5 20F 12.4 5 12.5 Z 4 12.6 i 4 12.8 1 3 0 2 3 13.0 13.2 /3.4 1 1 � 2 2 2 13.8 1 1 0 1 1 14'0 0 1 0 1 1 14.3 0 15.5 16.0 17.0 17.5 19.0 20.0 0 0 0 0 0 22.0 0 0 0 0 0 � 26.0 0 0 0 0 V P - Peak Flow * - value(s) provided from TR-55 system routines 100 Year Post Development Hydrograph TR-55 TABULAR DISCHARGE MEWOD VER3I6N 1.1. Project : Jamesway Detention User: rm Date: 03-12-M County : Frederick State: VA Checked: Date: Subtitle: Post Development Flow to Pond _______ iotal watershed area: 0.036 sq mi Rainfall types 11 Frequency: 100 years -------------------------- Subareas -------------------------- a Area(sq mi) 0.01* 0.00* 0.00* 0.00* 0.00* Rainfall(in) 6.5 6'5 6.5 6.5 6.5 Lurve number 91* 98* 98* 98* 98* Runoff(in) 5.45 6.26 6.26 6.26 6.26 Tc Mrs) 0.10* 0.05* 0.05* 0.05* 0.06* (Used) 0.10 0.10 0.10 0.10 0.10 TimeToOutlet 0.00 0.00 0.02* 0.03* 0.00 (Used) 0.00 0.00 0.00 0.00 0.00 Ia/P 0.03 0.01 0.01 0.01 0.01 . (Used) 0.10 0.10 0.10 0.10 0.10 Time Total ------------- Subarea Contribution to Total Flow (cfs) ---------- (hr) Flow a b c d e 11.0 4 1 0 0 0 0 11.3 6 1 0 0 1 1 11.6 11 2 1 1 1 1 11.9 59 14 4 4 7 6 12.0 112 27 8 7 13 11 12.1 181P 41P 13P 12P 20P 18P 12.2 135 26 8 7 12 11 12.3 74 9 3 2 4 4 12.4 54 12.5 3/ 12.6 28 6 5 2 2 3 2 2 l 2 2 12.7 23 4 12.8 18 13.0 16 3 3 1 1 1 � 13.2 13 2 1 1 2 1 1 1 1 1 Mn 12 2 1 1 1 1 13.6 12 13.8 11 2 14.0 8 2 0 0 1 1 14.3 6 �4.6 6 1 0 0 l 1 15.0 6 1 15.b 5 16'0 4 1 1 V o 0 0 16'5 4 17.0 4 1 0 0 0 0 17.5 3 18.0 3 1 J. 0 0 0 0 0 0 0 0 0 0 0 0 22.� 0 0 0 0 0 0 26.0 0 0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-55 system routines TR-55 TABULAR DISCHARGE METHWD VERSION Project : Jamesway Detention User: rm Date: 03-12-9' County : Frederick State: VA Checked: _.. Date: _______ Subtitle: Post Development Flow to Pond Continuation of subarea information -------------------------- Subareas --- 7---------------------- f g h i j Area(sq mi) 0.00* 0.01* 0.00* 0.001 0.01* Rainfall(in) 6.5 6.5 6.5 6.5 6.5 Curve number 98* 98* 94* 94* 94* Runoff(in) 6.26 6.26 5.79 5.79 5.7? Tc Mrs) 0.06* 0.07* 0.10* 0.26* 0.25* (Used) 0.10 0.10 0.10 0.30 0.20 TimeToOutlet 0.01* 0.02* 0.00 0.01* 0.01* (Used) 0.00 0.00 0.00 0.00 0.10 Ia/P 0.01 0.01 0.02 0.02 0.02 (Used) 0.10 0.10 0.10 0.10 0.l0 Time ------------- Subarea Contribution to Total Flow (cfs) ---------- (hr) f g h 11.0 0 1 0 1 1 11.3 0 1 0 1 1 11'6 1 2 0 1 1 11.9 5 13 0 3 3 12.0 9 25 1P 6 5 12'1 151F' 40p 1 11 1� 12.2 9 25 1 17P 19 12.3 3 9 0 17 23P 12.4 2 6 0 12 1� 12.5 2 5 0 7 5 11 � 12.6 12.7 2 1 4 3 0 0 4 � 13.0 1 3 0 2 7 13.2 1 2 0 2 2 13.4 1 2 0 1 � 13.6 1 13.8 1 2 0 1 2 i4.0 1 l 0 1 l 14.3 0 1 0 1 l 14.6 0 1 0 1 1 15.0 l5.5 16,0 16.5 17.0 0 1 17.5 19.0 20.0 0 22.0 0 0 0 0 0 � 26.0 0 0 O 0 3 � P - Peak Flow * - value(s) provided from TR-55 system routines ` Development rR-55 CURVE NUMBEP CO�P�TATlON Project : Jamesway Detention County : Frederick State: VA Subtitle: Post Development Flow to Pond | N� Subarea : a User: rm Checked: Date: 03-12-91 Date: .... .... __ ~~ ..... ... ________-__ Hydrologic Soil Group COVER DESCRIPTION A B C D W� Acres (CN) _________ FULLi bEVELOPED URBAN AREAS (Veg Estab.) N� Urban Districts Avg % impery | Industrial 72 - - 4.82(91) - Total Area (by Hydrologic Soil Group) 4.82 �=== U �� SUBAREA: a TOTAL DRAINAGE AREA: 4.82 Acres WEIGHTED CURVE 4UMBER:91 UN� ______----__________------------------------------------------------------- Project : Jamesway Detention User: rm Date: C�.... -9.. County : Frederick State: �A Checked: ____ Date: _______ Subtitle: Post Development Flow to Pond Subarea : b ... _..... ... _..... ..... ..... .... ..... __________________... ..... ..... ... ___..... ..... ..... __________ _..... ... __.... ____________________ Hydrologic Soil Gro�.p COVER DESCRIPTION A B C D Acres (CN) ... .... __ FULLY DEVELOPED URBAN AREAS (�eg Estab.) Impervious Areas Paved parking lots, roofs, driveways - - 1.31(98) - Total Area (by Hydrologic Soil Group) 1.31 ==== '----------------------------------------'--------------------------------'--- SUBAREA: b TOTAL DRAINAGE AREA: 1.31 Acres WEIGHTED CURVE NUMBER:98 ___..... .... ..... ..... ..... __________________________________..... _______________________ TR-55 CURVE N�MBER C��F��A/�OK Project : Jamesway Detention User: rm D�te: 03-12-9� County : Frederick State: VA Cherked: Date: ____ Subtitle: Post Development Flow to Pond ---- Subarea : c -----------..... .... ..... .... ... -..... ... ---------------------------... ..... ----------------------.... .... ------ �ydrologic Soil Group COVER DESCRIPTION A B C D Acres (C�) ..... .... _....... ..... .... .... __..... ..... _________________________ FULLY DEVELOPED U8AN AREAS (Veg Impervious Areas Paved parking lots, roofs, driveways - - 1.17(98) Total Area (by Hydrologic Soil Group) 1.17 ==== SUBAREA: c TOTAL DRAINAGE AREA: 1.17 Acres WEIGHTED CURVE NUMBER:98 ..... ... ... ____..... .... _..... _ TR-55 CURVE NUMBER COMPUTATlO!i VE7STON 1.1: Project : Jamesway Detention User: rm Date: 03-12-9' County : Frederick State: VA Checked: Date: ............... ........ __ Subtitle: Post Development Flow to Pond Subarea : d ___________________________________________________________________________ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (ON) _____________________________________________________________________________ FULLY DEVELOPED URBAN AREAS (Veg Estab.) Impervious Areas Paved parking lots, roofs, driveways - - 2.00(98) - Total Area (by Hydrologic Soil Group) 2 ==== ________--- --------- ______________------ --------- ____ _____--- _________--- --- _ SUBAREA: d TOTAL DRAINAGE AREA: 2 Acres WEIGHTED CURVE NUMBER:98 -------------------- -------------------------------------------------------- l�: ! �\!'E NUMB�U!ATIO1"i VMS IC Tj 1.I . Project : Jamesway Detention User: rm Date: County : Frederick State: VA Checked-. Date: Subtitle: Post Development Flow to Pond Subarea : e Hydrologic Soil Oroup COVER DESCRIPTION A B C D Acres (CN) _____________________________________________________________________________ FULLY DEVELOPED URBAN AREAS (Vag Estab.) Impsrvious Areas Paved parking lots, roofs, driveways Total Area (by Hydrologic Soil Group) 1.8 ==== ------------------------------'---------------------------------------------- SUBAREA: e TOTAL DRAINAGE AREA; 1.8 Acres WEIGHTED CURVE NUMBER:98 Pro3ect ; Jamesway Dets5tior` ! I-ats: 07-17-9.,� County : FredericL State: VA Checkeo, Dots, ....... ......... ........ ........... Subtitle: Post Development Flow to Pond Subarea : f ��yirologic S�i� G,��p COVER DESCRIPTI0N A B C D ocves (CN�' _... ..... ... _.... ..... ..... ... ... ..... .... .... _____..... ... ..... ... ___________________.... ... .... FULLY DEVELOPED URBAN AREAS (Vsg Estab.) Impervious Areas Paved parking lots, roofs, driveways Total Area (by Hydrologic Soil Group) -------------------- `------- ------ ----------------- - --'------- - --- ------- SUBAREA: f TOTAL DRAINAGE AREA: 1.5 Acres WEIGHTED CURVE NUMBER:98 U U TR-[5 CURVE NCP8Bi COMPUTATIM Project : Jamesway Detention User: rm Date, 03-12-0 County : Frederick State: VA Checked: Data; Subtitle: Post Development Flow to Poni Subarea : g -_-________________-_- -__--_____- Hydrologi.SoiI Ern.... COVER DESCRIPTIUN A Acrss (M. ` ' '--------------------------------------------- -------------'----- -- -- -Ui'LY DEVELOPED MEAN AREAS (Vag Estas'> Tmpervious Areas Paved parking lots, roofs, driveways Total Area (by Hydrologic Soil 3roup) 4.01 ==== ------------------------------------------------------------------------------ SUBAREA: g TOTAL DRAINAGE AREA: 4.01 Acres WEIGHTED CURVE NUMBER:9G ___________________________________________________________________________ T�-��..|R'/�::. N�.,!M3EP CO!{F:'�/`lVEM3I913 \ .� Project : Jamesway Detentic� User: rm Dato; County : Frederick State: VA Checked: _....... ... _ Datp: Subtitle: Post Development Flow to Pond Subarea : h � . ..... .... ..... .... ... ..... ������� / Hydrologic Scil Srnuli� COVER DESCRIPTION B C � Acres (CM. _..... _------------------------------ ____________________________________ FULLY DEVELOPED URBAN AREAS (Vey Estab.) Urban Districts Avg % impery Commercial & business 85 - - .11(94. Total Area (by Hydrologic Soil Broup) .11 ==== --- _--- _________--- --- ____________________ ________----- ____----- _ ____--- ___ SUBAREA: h TOTAL DRAINAGE AREA: .11 Acres WEIGHTED CURVE NUMBER:94 -------------------------------------- ------------------------------'- 14-55 CiEVE NUM8ER CCMPUTPT[M Project : Jamesway Detention User: r:,, � Datst 03-12-4:, County : Frederick State: VA Checked: ____ Date:: Subtitle: Post Development Flow to Pond Subarea : i __________________________________ Hydrologic Soii Group COVER DESCRIPTION A B C � ___________________________________________________________________________ Acres (CN) FOLLY DEVELOPED URBAN AREAS (Veg Estab.) _ Urban Districts Avg % impery Commercial & business 85 - - 2.78(94) - Total Area (by Hydrologic Soil Group) 2.78 ` ����������������������������������������������������������� SUBAREA: i TOTAL DRAINAGE AREA: 2.78 Acres WEIGHTED CURVE NUMBER:94 --------------------------------------------------'------------------------- Project N Jamesway Detentio� User: rr Date: 33-12-91 County : Frederick State: VA Chscked: Date: Subtitle: Post Development Flow to Pond Subarea : j __________ Hydroiogic Soil Group COVER DESCRIPTION B C D __.... ..... .... ..... .......... ..... ________________________________________________________________ Acres (CN) FULLY DEVEL2PED URBAN AREAS (Veg Estab.) _ Urban Districts Avg % impery Commercial & business 85 - - 3.53(94) Total Area (by Hydrologic Soil Group) 3.53 ==== ------ __________--- _--- __----- __--- ------ ____________________________________ SUBAREA: j TOTAL DRAINAGE AREA: 3.53 Acres WEIGHTED CURVE NUMBER:94 _... ..... .... _.... __.... ..... .... ______________________________ I Post Development Time of Concentration Calculations F I lR-� it �n c�`," �i THRi/ SMAKI 11 &TVPUTA -IEW .E1 2 : 1� ; 1., — -'-------------------------- Subarea #2 - b ---------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Ti� rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (|, ____________________ ------ ___________________________________________ 3.1 300 .0208 a 0.Q� Time of Concentratiu� = 0'0N ====' Open Channel 400 7.3 C.C: Travel Time = 0.02:: ==== Open Channel 1 - Generated for use by |ABULAK nethod TR-55 In and TL VHRU SUBPHFA COMPUTAllOn VERSION 1.1:, Project : Jamesw*y Detention User: rm Date: 03-12-W County : Frederick State: VA Choc ked: Date: _______ Subtitle: Post Development Flow to Pond -------------------------------- Subarea 44 - d ------- ---------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Ti', rain _______________________________________________________ (ft) (ft/ft) cobe (sq/ft) (ft) (ft/sec) ______ (h' __ Sheet 3.1 260 10708 a 0.01 Open Channel 230 7.3 0.0( Time of Concentration = 0.05^� ====` Open Channei. 225 7.3 0.0C Travel lime = 0.01^ ===== ------------------------------- Subarea #5 - e ---- ------------------------- Flow Type 2 yea, Length Slope Surface n Area Wp Velocity Tin rain -----------'-----`—`---------------------------------------------------------- (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr Sheet 3.1 300 .0208 a 0.0 Shallow Concent'd 140 .0208 p 0.0� Time of Concentration = 0.06* Open Channel 240 8.3 0.0. Travel Time = 0.00 ==== ipen Channel 205 G.3 0.0 Travel lime = 0.0�^ ==== * - Generated for use by TABULAR method ��-55 lc an� T'THRi> Si����E� COHPJT � I � I I I Projec� � Jamesway ��tention County : Frederick State: VA Subtit�e: Post Developmen� Flow to Pond --... ..... ... .... ..... —... ..... .... ----... ..... ... .... '------.... .... ... --' Flow lype Z year Length Slope Surfa,e rain (ft. ) (ft/ft) co .... e --------'----------------------------------..... Sheet �c'en Channel 170 Open Channel 240 Us Checked. 8.3 0.0C Travel Time ------------------------------- Subarea �� - i ----------------------------- Flow Type 2 year Length SIope Surface n Area Wp Vel�city Tiv' rain _..... ..... _________ (ft> (ft/ft) code (sq/fIt: > (ft) (ft/sec) (hr Sheet 3.1 300 ... ..... ____..... _ _________ .01 b .... ..... .... ______________________ 0.2� Shallow Concent'd 220 .01 u �.0� Open Channel 75 9.9 0.0C Time of Concentration ====~ 0� --- Sh�et A Smooth Surface Flow Surface Codes --- F G,a�s` �e`se - �i�a�lnw Conr� C Cultivated < 20 % Res. H Woous, Li�ht P Pays� N N� E Erass-Rang�, Short * - ,�nerated for use by TABULAR methoo Jamesway Shopping Center Stormwater Management Plan Pre Development Calculations Attachment # 4 Two Year Pre Development Hydrograph Ten Year Pre Development Hydrograph Post Development Area Data Post Development Time of Concentration Calculations I i I � I 11 11 u L J Two Year Pre Development Hydrograph C, j:) 1,*-, ............ . ...... u b t i t 1. '13" IUC. 11 c-, ta ;,4 --A 5 F*.'-'--`.'::; iR A ..... ..... ..... .. - . ..... . ... .. . ..... ... ....... . . ... ..... ... ... ..... ..... -'j. .:D o, -:z-1 1-4 ',11 R i. i f --a -i. i v !::ZL.:'.-!Of f 1.1-1, 0, 7 Tc h s A.,Z A.- Ut-sed T i in e To Ou t I -e t I a /P C' C-4 10 'T I - (Y, e . D +-;:4 - - - - ' Ltbarc��a C',xi.t!;,--j-I---;�t-; c.1 'I-,:j ... . ..... . . .. - f I h r LF I vj A tj 12 k.2 2: 6 F, X', v;n, u e 7, p r o d c in R 1r; , ::: , t en.; ri e, - � I � I n 11 11 J Ten Year Pre Development Hydrograph TH-55 TABULAR DISCHARGE METHOD VERSION 1.1,� Project : Jamesway Shopping Center User: rm Date: 03-12-9� County : Frederick States VA Checked� Date� Subtitle: Pre Development Ten Year Storm Flow Total watershed area: 0.031 sq mi Rainfall type: II Frequency: 10 years -------------------------- Subareas -------------------------- A B Area(so mi) 0.02A 0.01* Rainfall(in) 4.9 4.9 Curve number 74* 94* Runoff(in) 2.28 4.21 Tc (hrs) 0.46* 0.29* (Used) 0.50 0.30 TimeToOutlet 0.00 0.00 Ia/P 0.14 0.03 (Used) 0.14 0.10 Time Total ------------- Subarea Contribution to Total Flow (cfs) ----------- (hr) Flow A B 11.0 2 1 1 11.3 2 1 1 11.6 2 1 J. 11.9 6 2 4 12.0 11 4 7 12.1 22 8 14 12.2 36 15 21P 12.3 45P 24 21 12.4 4281 12.5 36 27 14 9 12.6 28 22 12.7 21 16 12.8 16 12 6 5 4 13.0 11 8 A. 3 2 2 2 14.6 3 2 J. 15.5 3 2 1 ^ 18'0 2 i 1 � 26.0 0 0 0 P - Peak Flow * - value(s) from TR-55 provided system routines I Post Development Area Data 1�-�� C���E ���M��R COMPUTATIOM VER�`�� �.� Project : Jamesway Shoppi�g Center User: rm Date� 0� 12-9� County : Frederick State: VA Checked: ___ Date: _____ Subtitle: Pre Development Two Year Storm Flow Su�area : A ..... ..... ... ............ _______..... ... ..... ..... _____.... .... ........ .... _... __.... ..... .... _... ..... _..... ___..... ..... _.... _________________ Hy�rol�gic S�il Grc�p COVER DESCRIPTiON A B C D Acres (CN) _..... ..... ..... __________________________________________ OTHER AGRICULTURAL LA�DS Pasture, grassland or ran;je good ��tal Area (by Hydrologic Soil Gro�p� 15.2 ==== SUBAREA: A TOTAL DRAINAGE ARE4, 15.2 Acres WE�GHT�� CURVE Ni��8ER�/4 Project : Jamesway ShoPp�/,� Center User: rm County : Frederick State: V� Checked: ____ Date: ..... .......... .............. __ Subtitle: Pre Development Two Year Storm Fl�� Subarea � B ����� ����� ..... ..... .... �..... ..� Hydrologic Soiup COVER DESCRIPTi�� A B [ D Acres �CN) _..... ..... ... ___________.... ..... ________________... .... ____..... _____.... _____ FULLY DEVELOPED URBAN AREAS (Veg Estab.) Urban Districts Avg % impery Commercial & business 85 Total A,rea (by Hydrologic Soil Group) 4.76 ==== _..... .... ... ________ SUBAREA: P. TOTAL DRAINAGE AREA: 4.76 Acres WEIGHTED CUPk IMBER:9� _.... ..... _______________.....______ 1 Post Development Time of Concentration Calculations ./|RU SL8AHE'� Project a damesway Shopping CeMrr County : Frederick State: VA Checked: �a|s� ________ Subtitle: Pre Development Two Year Storm Flow ----------------'--------- Flow Type 2 Length --- Subarea 41 - A ----------------------------- Slope Surface n Area Wp V&ocity Tin year rain (ft/ft) code (s4/ft) (ft> (K/spc) _______ (&- Sheet 3.1 300 .018 e 0.3� Shallow Concent'd 300 .02 0.6� Open Channel 500 5.5 0.0� Time of Concentration = 0.46* -------------------------------- Subarea #2 - B ------------------------------ Flow Type 2 Length Slope Surface n Area Wp Velocity Tin year rain (ft) (ft/ft) code (sq/"t) NO (ft/sec) (hr -------------------------- _-___________________________.______'_____________- Sheet 3.1 30; .01 b 0.21 Shallow Concent'd 380 .01 u 0.0� Open Channel 240 7.5 0.0C Tim� of Concertration = 0.29, ===== Open Channel 400 5.5 0.0I Travel Time = 0.02� --- Sheet Flow 5urfice Codes --- A Smooth surface 7 Gras+, Donse - ip.,,low �Incemtrzteq -- G Fallow (%o Ras.) O Grass, Burmuda --- Surf-ce bodev --- C Cultivatsd < 20 � HS+. H Woods, Light Pave''; D Cultivated > 20 X Res. I Woods, Dense � Unpaved E Grass -Range, Short � * - Generated for use by TAB:LAR method Jamesway Shopping Center Stormwater Management Plan Detention Pond Calculations Attachment # 5 Two Year Detention Pond Data 25 Year Detention Pond Data 100 Year Detention Pond Data i � I � I 1 Two Year Detention Pond Data *************�***�*�***�*�***********�*�:*�-�***�**��*****��� * ROUT VERSION 5.3b ** PROJECT: Jamesway Det P�nd *��* (T�pes: 1:Weir; 2:Pipe; 3�Riser> Structure ct�r� 2 .... .... .... ____.... 1: Type 1� Weir 3� Riser �eir: 2: Elevation (ft) 758.00 0.00 3: Length (ft) 20.00 0.00 4: Coefficiest 3.33 0.00 Riser: 5: Elevation (ft) 0.00 757.25 6: Diameter 48.00 7: Orifice Elevation (ft) 0.00 748.50 8: Orifice Diameter (in> Co 24.00 9: Orifice Elevation (ft) 0.00 0.00 10: Orifice Diameter (in) 0.00 0.... 0 11: Orifice Elevation (ft> 0.00 0.00 12: Orifice Diameter (in) 0.00 0.00 Invert Elevation748.50 14: Diameter (ix) 0.00 36.00 15: Orifice Diameter (in) 0.00 36.00 16: Length (ft) 0.00 65.00 17: Manning's n 0.000 0.013 18: Slope (ft/ft) 0.000 0.012 19: Entrance Loss Coefficient 0.0 0.6 Surface: 20: Initial Elevation 748.50 Storage Pond Characteristics: RW = Riser ac�ing as a wei~ RO = Riser acting as ar u'i��ce PI = Horiz'»�tal p�pe i� i/ l�i control PO = Horizuntal pi�e �'' o�'t�et control Time Inflow Weir Riser /utal Elev (�r) (cfs> (cfs) (cfs) (cfs) (ft) _..... .... ________________.... ..... _ ..... __.... .... ... _ 748.50 749.00 i'.9 25.O0 0.� 14.0 14.02 750.60 ?.0 49.O0 �.� 20'5 20'53 751.44 12.1 78.00 0.� 25.8 25.82 752.65 12.2 58.00 0.0 29.4 2=.45 753.55 12,3 32.00 0.0 30.6 30.59 753.84 12.4 23.00 0'0 30.4 3�.35 753.78 12.5 17.00 0.0 29.6 29.58 753.58 12.6 14.00 0'0 28.5 28.47 753.30 12.7 11.00 0.0 27.1 27.09 752.96 8.00 0.0 25.4 25.39 752.54 13.0 6.00 0.021.13 751.57 13.2 5.00 0.0 13.7 13.73 750.57 0.00 350.47 G20.I6 6.916.98 28,5�9.13 42,9�3.94 �8.307.8� 43,533.01 38,651'64 33,134.40 27,086.55 15,329.56 6,727.00 � I � I � I � I I I 25 Year Detention Pond Data 4 a'. 's 74,9. 6 8.67. 7 .5 C) . C) 5 68" . 22 7 1511 62 1. 7 5: 7 ? 2 Z1. 49 46 4 9 �q7 9 21 7 1.3 2 2, 7 4V 17 0 tj 8 1.8(.) 749C)6 I 100 Year Detention Pond Data 752. j- 75-. 21 p i 1 C1 ZJ 2 C 0 n r c' et i5er Total Elev Storage LIW Ofyj cfs! (cfs) Vu W; 00 748.50 0. OG 1b.. :o7 5.90 749M 2.246.4,', 8.38 750.04 ,07.1, 2 -4 24. '--.2 752.29 7(-)():: 9 . f:� 1 29.35 753.65 44.746.1f,1 76 100, 5. 5 755 AN 74 77 .6.--.., AP.55 2 9 4. D.I. ill �7 4. 1 4.15 / 419. i,'. 8 1 k V . 95 749.45 .1 ? () 4.tilJ 749,46 1 .3 56 .. 4 6 7. 7; J., 057.7i) C: Ij 74 9 . �t —2 2.17 749.15 612. 50, pG cc Mr. Patch For your informati 7� 6/28/91 COUNTY of FREDERICK Department of' Planning and Development % 703/ 665-565 l b FAX 703 / 678-0682 une 26, 1991 J� Mr. H. Edmunds Coleman III 208 South Loudoun Street Winchester, VA 22601 RE: Jamesway Plaza Shopping Center (Your letter. June 19 1991) Dear Mr. Coleman: In response to your questions concerning this property, the following is provided: 1. The parcel of land that includes the Jamesway Plaza Shopping Center is an approved parcel under the ordinances of Frederick County. 2. The zoning of the subject property is B-2, Neighborhood Business District, and the businesses located therein are permitted uses in this district. 3. The shopping center was approved under site plan #055-87 and is in technical compliance with the requirements of the zoning ordinance. Variance application (#013-87) for a 50 foot front setback variance along Routes 277 and 641 was approved by the Board of Zoning Appeals on 15 December 1987. During a significant flooding event in the Stephens City area on 13 October 1990, a considerable amount of damage was done to the storm water detention facility on this property. It was also determined that the detention facility was inadequate for the amount of runoff. I subsequently required an engineering study be done and that this facility be modified based on the recommendations of the study. A storm water management plan was prepared by G. W. Clifford & Associates, Inc. in March, 1991 and submitted to this department. This plan requires S0-'iiicant expansion of the storm wafer detention facility and repair of dhe pCe'vious damage. There is also a continuing ponding of water in the area of what is identified as out parcel "E". This area needs to be graded to eliminate this condition. Should you have additional questions, please do not hesitate to give me a call. Sincerely, of W. Wayne Miller Zoning Administrator THE COURTHOUSE COMMONS 9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601 COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/678-0682 November 25, 1991 Mr. H. Edmunds Coleman, III 208 South Loudoun Street Winchester, VA 22601 RE: Jamesway Plaza Shopping_ Center (Your letter, November 25, 1991 Dear Mr. Coleman: The statements I made concerning the Jamesway Plaza Shopping Center property in my letter to you dated June 26, 1991 are still valid with one exception. The exception is the information in the last paragraph concerning the storm water detention facility and the ponding of water on the out parcel "E". The storm water detention facility has been reconstructed and inspected. The parcel where the ponding was occurring has also been regraded and inspected. Both of these facilities are considered to be satisfactory at this time. Should you have additional questions, please do not hesitate to contact me. Sincerel , W. Wayne iller Zoning Administrator WWM/dc THE COURTHOUSE COMMONS 9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601 COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/678-0682 November 25, 1991 Mr. H. Edmunds Coleman, III 208 South Loudoun Street Winchester, VA 22601 RE: Jamesway Plaza Shopping Center (Your letter, November 25, 1991 Dear Mr. Coleman: The statements I made concerning the Jamesway Plaza Shopping Center property in my letter to you dated June 26, 1991 are still valid with one exception. The exception is the information in the last paragraph concerning the storm water detention facility and the ponding of water on the out parcel "E". The storm water detention facility has been reconstructed and inspected. The parcel where the ponding was occurring has also been regraded and inspected. Both of these facilities are considered to be satisfactory at this time. Should you have additional questions, please do not hesitate to contact me. Sincerel , W. Wayne iller Zoning Administrator WWM/dc THE COURTHOUSE COMMONS 9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601 LAW OFFICES KUYKENDALL, JOHNSTON, COLEMAN & KuYKENDALL, P. C. 208 SOUTH LOUDOUN STREET POST OFFICE BOX 2760 WINCHESTER, VIRGINIA 22601-1960 1. SLOAN KUYKENDALL TELEPHONE (703) 667-4644 GEORGE W. JOHNSTON, III FAX (703) 667-2769 H. EDMUNDS COLEMAN, III J. SLOAN KUYKENDALL, III PLEASE REPLY TO. P. O. BOX 2760 HAND -DELIVERED Mr. W. Wayne Miller Zoning Administrator, Department of Planning Development P.O. Box 601 Winchester, Virginia November 25, 1991 County of Frederick and 22601 Re: Owner: Fourteenth Commerce Properties Corporation, a Virginia corporation Property Description: Jamesway Plaza Shopping Center, 19.04 Acres + Located at the Intersection of State Routes 277 and 641 in Frederick County, Virginia Tax Map No. 86-A-0018 Our File No. 30432 Dear Mr. Miller: On June 19, 1991, I wrote to you regarding the above -referenced property, and you responded through your letter of June 26, 1991; enclosed please find copies of both letters. I would appreciate your updating the statements made in your June 26, 1991 letter and advising if there has been any change in such information or in the property; specifically, I understand that since June 26, work has been performed relative to the storm water drainage facility and grading. Please address your response to me, and should you have any questions concerning this matter, please do not hesitate to contact me. I appreciate your continuing assistance in this matter. Sincerely, �•1. �Cl 1')� LL'I-IGC.� � ���P�1�1Ct 1l. ,7-C/ � L H. Edmunds Coleman, III HECIII/lt Enclosures cc: Richard L. Patch, II w/o encl. f:miller.ltr I.A\vOII1(I, KUYKENDALL, JOHNSTON, COLEMAN & KUYKENDALL, P. C. 208 SOUI 1-1 LOUDOUN S'I RI.I'I POST OITICf BO\ W60 WINCHESI ER, VIRGINIA 22601-1960 L SLOAN KUYKENDALL 1'1 1.1 111 JONI (/0 1) GEORGE W, JOHNSTON, III I AK (/0 a (,n/ .'/L') H. EDMUNDS COLEMAN, III June 19, 1991 1. SLOAN KUYKENDALL, III I'I I A',I RI N Y 10 P 0 B,A .'/60 Mr. Wayne Miller Zoning Administrator County of Frederick P. O. Box 601 Winchester, VA 22601 Re: Owner: Fourteenth Commerce Properties Corporation, a Virginia Corporation Property Description: Jamesway Plaza Shopping Center, 19.04 Acres + Located at the Intersection of State Routes 277 and 641 in Frederick County, Virginia Tax Map No. 86-A-0018 - Our File No 30432 Dear Mr. Miller: I have been retained to represent Richard R. Walter and Susie Mae Walter, prospective purchasers of the Jamesway Plaza Shopping Center. Incident to this transaction, their lender has requested that it receive a letter from the Zoning Administrator of Frederick County certifying that the above -captioned parcel (1) is a duly existing lot under the subdivision ordinance of Frederick County; (2) that the operation of the shopping center is a permitted use within the B-2 (general retail) zoning district in which the shopping center is situate; and (3) that the shopping center, as shown by site plan, has been constructed in technical conformity with the requirements of the zoning ordinance. You may address your letter to me. If you have any questions concerning this matter, please call me. Thank you for your anticipated cooperation. Sincerely, H. Edmunds Coleman III /jr cc: Mr. Richard L. Patch II COMNIONWEALTE of vIRQJNJA DEPARTMENT OF TRANSPORTATION P. O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER (703) 984-4133 January 3, 1991 Mr. Winston Jones C/O Davidson & Jones Development Co. 1201 Front Street P. O. Box 19067 Raleigh, NC 27619 Dear Mr. Jones: WILLIAM H. BUSHMAN RESIDENT ENGINEER Ref: Stephens City Shopping Center Routes 277 & 641 Frederick Count-, VA In closing out our files on the above referenced project we could not seem to locate a deed of dedication for the strip of land fronting your property which you conveyed for public street purposes. Upon research at the Frederick County Land Records we could not seers to find a copy of the deed at this location either. Therefore, we would appreciate you supplying us with a copy of the recorded instrument as soon as practicable. For your use I have enclosed a copy of the SCV Associates plat which details the said dedication. Should you have any questions concerning the above, please give us a call. Sincerely, William H. Bushman Trans. Resident Engineer By: Robert B. Childress Hwy. Permits & Subd. Spec. Senior RBC / rf Enclosure xc: Mr. F. L. Lovegrove Hr. R. W. Watkins (w/ enclosure) -1?A_'2130�WZ;'=r•1Yal�.�o->:- zzr.�-s.: �s¢a.-_......_,.—.__��.,... v-�r ..:rs- a1.Qta�a: ri ,.. •.�=.:..+�• sarr-�-•�--asz� T ` �� -=,7: ' •. APPROVED: �yFREDERICK COUNTY BOARD OF SUPI_:RVISOP.S�, DATE Nc �. :� •'!•= . ;� -� ,' i `'—,t_ ;� FREDERI COUNT PLANNING COIV MISSION �J � �--� DATE SUBDIVISI0N ADMINISTRATOR ��✓ j�/��G-ems DATE VIF.G111IA DEPARTMENT OF TRANSPORTATION DATE -z-ZI-C: rNTE Nc� Sl i E 713 VICINITY MAP Sca1c:1"=2,000' 0, 1 iER' S CEP,T I F I CATS : T't,1:.J a� 1 �r n I;OVE AND FOREGOING SUBDIVISIOII OF T: E LAND OF 11 SCV ASSOCIATLS AS IT APPEARS ON THIS PLAT IS WITH FREE CONSENT AND IN ACCORDANCE WITH THE DESIRES AND }y;:;u ` OF TIIE UNDERSIGNED O1','NERS, PROPRIETORS AND, O1L 7' '.U=TEES, IF ANY. SC. .-S:0-_'ATES,,A, Virginia General Partnership • Uai'idson Ail Jones Development-Lbnpany Vice President DATE TTEST: W./ f ,�•—Sec retaty_-- DATE STATE OF A),71� Cc nf,)InG) (Corporate Notary) COUN-Y OF }.� 71;J•J 1 I' f SURVEYORS CERTIFICATE: IOTT RITCHIE, JR., A DULY AUTHORIZED LAND SURVEYOR IN THE STATE I, ELL OF VIRGINIA DO HEREBY CERTIFY' THAT THE LAND L 4BRACED IN THIS SUBDIVISION IS A PORUIPION OF THE PROPERTY CONVEYED BY BOI':'MAN TRUCKING COIIPA.NY, INC. TO SCV ASSOCIATES, A NORTH CAROLINA JOINT VENTURE BY A DEED D�_ATED NOVEIIBI•II 23, 1987_ AND RECORDED IN DEED BOOK 665, PAGE 277. +i •+'jl. l 0,JN :n Ei!iott Ritchie, Jr LI�.,E!JSE 1318 \+ SUR1ilr_ /���-!-.ice /� •�.�..� El LIOTT PLITCHlE, JR. �/.L.S. RES.' 1318 FINAL PLAT OF A SUBDIVISION OF THE PPOPERTY OF SCV ASSOCLATES �✓ 4 �. �r t s,. _, a Notary Public, in and for said County and State cert'fy _ that personally care before re this day and a; ;,nc�r,l edyc: that he/she i s `:ecr �ary"of LY r;,��� f'ti. n,1,' ! r„ ���,�� %;�,, �k„� a Corporation, and that by authority duly Ui gel: agd as t1 e act of the Corporation, the r.oreing instruments was signed in its name by President, sealed Ori ', its corpor3'E seal, and attested by i f as i ts;(<<! r.n-' �— Secretary. c ;� rhirr,/tiErse A 1 -':EcS Ty hard and notarial seal t;;i s � � day of ? 1 ��_;,(' 19 ;�`"� • F'y Expires: r I 5ry Public: (t���-l{�c—�.r�•`.'�.J _ OPEQUON DISTRICT FREDERICK COUNTY, VIF.GIINIA SCALE:1"=50' NOVEMBER 11, 1918 RITCHIE SURVEYS STE-H-NS CITY, V'LRGINIA STATE 83° 29' 51" E - 55.30 A=284.82' R=5,759.58' 62.14' s U INOTES 1. The property shown on this plat is a Portion or the same property conveyed by Bowman Trucking Company, Inc. to SCY Associates by a deed dated November 23, 1987 and recorded in D.B.665, Pg.277. 2. The property shown on this plat is a portion of the property shown on Frederick County Tax Assessment Map No. 86-((A))-Parcel 86. 3. No Title Report Furnished. 4. The property shown on this plat is to be conveyed to the Virginia Department of Transportation for Public Street Purposes. 5. This plat corrects the bearings erroneously stated as N 5.11 56' 52" W and N 890 19' 50" IV and are corrected to N 840 56' 52" W and N 861 19' 50" IV respectively. R O U T E 277 � FE 9.59'S SG° 19' 50" E z 56' 52" W — 435.12' c o >> - 1 c N 86 19 50 1ti — .,09_.3 s 0.2547 Acres to Dedicated D=890 16' 56" For Public Street Purposes P'=38.50' r A=59.99' T=38.02' C=54.11' ` SCY ASSOCIATES CB=N41041'22"tiV D.B.665, PG.277 (Shopping Center Site) 250' S 870 02' 54r' E 5_Q0' Cr K ' REVISED 7:501 z PLAT SHOWING �� �4 A PORTION OF cam �j� THE PROPERTY OF ,CV ASSOCIATES il _� Jr1 � EiiiCii RiiC r)ieJi r.' � '` 1. OPEQUON DISTRICT L I C NSc No FREDERICK COUNTY, VIRGINIA Os 131 n � i lY LS 4 " SCALE:1"=50' MARCH 14, 1989 RITCHIE SURVEYS STEPHENS CITY, VIRGINA 11 COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/667-0370 August 9, 1989 Mr. N. Wayne Stainback C/O Crossroads Development Co. P.O. Box 1714 Henderson, North Carolina 27536 RE: Site Plan # 055-87 Dear Mr. Stainback: This letter is to confirm action taken by the Frederick County Planning Department on August 3, 1989. Final site plan approval of Site Plan # 055-87 of Stephens City Shopping Center for Jamesway Plaza located at the southwest intersection of State Route 277 and State Route 641, east of Stephens City in the Opequon District. The shopping center, consisting of'95,000 square feet and situated on 20.537 acres, is zoned B-4. If you have any questions regarding this action, do not hesitate to call this office. Sincerely, Robert W. Watkins Planning Director . ' RWW/s1k 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 SITE PLAN #055-87 Stephens City Shopping Center 20.537 Acres, Zoned B-4 (Shopping Center) LOCATION: The southwest intersection of State Route 277 and State Route 641, a short distance east of Stephens City. MAGISTERIAL DISTRICT: Opequon ADJACENT LAND USE AND ZONING: Residential, commercial, and vacant land uses with RP (Residential Performance), B-1 (Business Neighborhood) and A-2 (Agricultural General) Zoning. PROPOSED USE AND IMPROVEMENTS: A shopping center consisting of 95,000 square feet which includes a 43,000 (plus or minus) square foot department store, a 25,000 (plus or minus) square foot food store, and a 7,000 square foot drug store, as well as four additional retail store areas. Improvements also include parking, highway and access changes, storm water protection, landscaping, and off-street loading and service improvements. REVIEW EVALUATIONS: Dept. of Transportation - See attached letter. Sanitation Authority - Site plan received and reviewed on January 5, 1988. Plans have been corrected and sent to the developer for revisions. Stephens City Fire Company - Shall comply with Chapter 10 of the Frederick County Code as a minimum with the following additions: 1) Minimum of four hydrants --two in rear and two in front of complex. Hydrant located at the intersection of Routes 277 and 641 doesn't meet the standard for one of the hydrants. 2) All areas within the complex shall be sprinkled with standpipe connections in the rear. 3) A fire lane shall be designated in front of the complex. 4) Request that contact be made with me prior to installing the hydrants. 5) Poor set of specs to view for comments. Page 2 Stephens City Shopping Center Inspections Department - Must comply with VUSBC. Building plans have been submitted for review. No objection to a footer/foundation permit. Planning and Zoning - All corrections to the site plan as suggested by the staff have been made. All proposed uses in this shopping center are permitted uses in the B-4 Shopping Center District. All planning, zoning, site planning and parking standards have been met. The Planning staff has no objection to the approval of this site plan for the Stephens City Shopping Center. All VDOT comments have been incorporated into the site plan, as required. STAFF RECOMMENDATIONS: Approval. �� 4 5 y �= Off. 670 1�6a7 �•C::. ••. .it.'• � l - 1 606 37 620 6,6 6t9 0o.a.m r.r �..�'.656 622 22 671 lt, , y 615 6,2 !0 S7 �•:: ' S22 s s 628 lk 6sa Vu �N t _ 629 625 F 4" d' 947 1 �A 79 9 6ay op 27 �. f pe 6a9 QVO� ci 629 623 .. t Cr 67s i. baxr'E .....•...v 642 6a2 TtKINS t -8 677 .CRY. �7 l k 63, i�p 63t •e eaG � 616 Dist� T•67 I� 760 6''2 ba t 675 L . '+e 636 \ p a P \•�' •�� �'-, \ 643 671 627 �r 638 61 277 ( .X- ,527 / 7tt7s 59 61S t ba7 7 / �� v7^1 636 \ Q\ V.do.• Bag v 735 5a0. � 3h 70 Soya 522 6 77 675 �� 673 \ 7 �• ' t �b� 731 '\I • 710 6777- �o' �» 67a �\ 4 2 f—1 i LOCATION MAP n.;t t' scale Stepl►txs C�+r SkoPPtM� C�v►+er `Vs�1iI.- tiFEB 108C DEPARTMENT OF TRANSPORTATION �n P.O.BOX 2249 RAY D. PETHT jz�ECE'6�jo � STAUNTON, 24401 COMMISSIONER c.n DEPT. Of PLANNING January 21, 1988 An BUILDING � PAUL F. CECCHINI DISTRICT ENGINEER Telephone: (703) 332-9144 Ref: Routes 277 and 641 Proposed Shopping Center Frederick County Mr. Wilson T. Currin, Jr., Project Manager Crossroad Development Company P 0 Box 1714 820 South Garnett Street Henderson, NC 27536 Dear Mr. Currin: As requested, we have reviewed the plans for the proposed shopping center at the intersection of Routes 277 and 641 in Frederick County. We offer the following comments and recommendations: (1) The eastern approach to the Route 277 and 641 intersection on Route 277 should only be 36' wide with an eastbound thru lane, a westbound left turn lane, and a westbound thru lane. (2) The right turn lane on Route 641 should be extended to the southern boundary of property and ended with a 36' uncurbed taper section. (3) After- further- consideration, we recommend that the center entrance on Route 641 be 36' wide, with one (1) lane in and two (2) lanes out. The above recommendations have been shown in red on the attached site plan. if we can be of further assistance, do not hesitate to contact us. RWH/ct. Attachment xc: Mr. W. H. Bushman Sincerely, % K. B. Downs Transportation Engineer TRANSPORTATION FOR THE 21ST CENTURY JAMES H. DIEHL, CHAIRMAN R. 8. CARPER, VICE CHAIRMAN G. W. BORDEN. S[C.-TR[Af. DONALD R. HODGSON C. A. MOLD[N E. 0. RUDOLPH, III "6 _0 FREDERICK COUNTY SANITATION AUTHORITY POST OFFICE ■ox 618 WINCHESTER, VIRGINIA 22601 PHONE 703 - 666-6600 January 31, 1989 WELLINGTON H. JONES. P.E. ENGINEER • DIRECTOR Mr. Gregory Edge Levan-Hepler Building Co. P. 0. Box 406 Statesville, Nc 28677 REFERENCE: Stephens City Shopping Center SUBJECT: Final Acceptance Dear Mr. Edge: The water and sewer system for the above noted project was accepted into our system on January 31, 1989. Respectfully, John G. itacre Engineer the cf: R. C. Wood - FCSA COUNTY of FREDERICK Departments of Planning and Building 703/665-5650 December 22, 1983 Mr. Wayne Stainback Crossroads Development Company P.O. Box 1714 Henderson, North Carolina 27536 Dear Wayne: This is to confirm our conversation of December 21, 1988 regarding the oversight in review of the site plan for Jamesway Plaza. As we discussed, the Frederick County Zoning Ordinance requires a 25 foot setback in the B-4 Zone between any parking access and service areas and a side or rear property line which adjoins agricultural or residential property. As you know, this effects the rear of the plaza which has service access to within six feet of the rear property line. In order to resolve this matter, a variance will be necessary. The Board of Zoning Appeals is empowered to grant variances and has a meeting scheduled for February 21, 1989. In order to assure you are placed on the agenda for this meeting, we would need your completed application no later than January 30, 1989. Given the circumstances involved, I feel confident that the Board will be willing to grant a variance. I have enclosed a variance application. If I can be of any further assistance, please feel free to contact me. Sincerely, n� Kris C. Tierney Deputy Planning Director KCT/rsa Enc: variance application 9 Court Square P.O. Box 601 Winchester, Virginia 22601 COUNTY of FREDERICK Departments of Planning and Building 703/665-5650 October 31, 1988 Mr. Andrew Boninti Caleb Stowe Associates 1100 Dryden Lane Charlottesville, VA 22901 RE: Jamesway Shopping Center, Route 277, Stephens City, Virginia Dear Mr. Boninti: I have been asked to drop you this letter as an item of information on the status of sewer services at the above project. As you have been informed, the Stephens Run service area of the Frederick County Sanitation Authority Sewer District is presently under a moratorium for new connections by agreement with the Virginia State Water Control Board. The reasons for this involve the lack of ability of the Stephens Run Wastewater Plant to handle present flows from the service area. That plant has violated its three month rolling average effluent discharge limits established by permit, which has caused the State Water Control Board to reach this agreement with the County. Basically the Sanitation Authority agrees not to connect additional users, above a certain set limit of connections, until certain actions on the Authority's part have been performed. In response to this problem, the Sanitation Authority immediately began planning for the new interim Regional Wastewater Treatment Facility to be located at Parkins Mill on US Route 522 near the Stephens Run service area. This plant will accept sewage flows from the existing Stephens Run service area, the Wright's Run service, and the Lakeside Estates or Opequon service area. The portion of flows that will be eliminated from the Stephens Run service area by the Parkins Mill Plant will release the stress on the Stephens Run Plant, thereby allowing future new connections in the area in which the Jamesway Shopping Center is located. The design of the Parkins Mill Plant and transmission system has been completed, approved by the regulatory agencies, bid by contractors and a contract awarded by the Authority. The completion date for the new facility is June 1, 1989 and work at this point is on schedule. By recent action, the local Planning Commission has agreed to review development proposals in this water shed subject to an understanding that no actual use of the sewage system can be made until after completion and start up of the Parkins Mill facility. The risk for proceeding under guidelines is solely on the owners' part. This action, if it continues to be exercised, will allow for planning, issuing permits, and even construction to proceed in advance of the June 1 date. While we do not advise as to the appropriateness of this activity, nevertheless, it is an available option to development planning of your vacant lot within the shopping center area. 9 Court Square - P.O. Box 601 Winchester, Virginia - 22601 Mr. Andrew Boninti October 31, 1988 Page 2 I trust that this letter answers certain questions you have had as to the status of the wastewater planning in the Stephens Run area. If you have additional questions or require additional information, please do not hesitate to call. Sincerely, 11"S-17e 4Z �/' Stephen M. Gyurisin Deputy Director SMG/dkg !JW. CLIFFORD & ASSOCIATES, INC. 20 South Cameron Street P.O. Box 2104,-, Winchester, Virginia 22601 703-667-2139. Andrew Boninti Caleb Stowe Associates 1100 Dryden Lane Charlottesville, VA. 22901 Dear Mr. Boninti, August 17, 1988 Re: Jamesway Shopping Center Route 277, Stephens City, VA ,- (- -L .� have tasked )1� to drop you this letter as an item of information on the status of sewer services at the above project. As you have been informed, the Stephen's Run service area of the Frederick County Sanitation Authority Sewer District is presently under a moritorum for new connections by agreement with the Virginia State Water Control Board. The reasons for this involve the lack of ability of the Stephen's Run Wastewater Plant to handle present flows from the service area. That plant has violated its 3 month rolling average effluent discharge limits established by permit, which has caused the State Water Control Board to reach this agreement with the County. Basically the Sanitation Authority agrees not to connect additional users, above a certain set limit of connections, until certain actions on the Authority's part have been performed. In response to this problem, the Sanitation Authority immediately began planning for a new enterim Regional Wastewater Treatment Facility to be located at Parkin's Mills on US Route 522 near the Stephen's Run service area. This plant will accept sewage flows from the existing Stephen's Run service area, the Wright's Run service area, and the Lakeside Estates or Opequon service area. The portion of flows that will be eliminated from the Stephen's Run service area by the Parkin's Mills Plant will release the stress on the Stephen's Run Plant, thereby allowing future new connections in the area in which the Jamesway Shopping Center is located. The design of the Parkin's Mills Plant and transmission system has been completed, approved by regulatory agencies, bid by contractors and a contract awarded by the Authority. The completion date for the new facility is June 1, 1989 and work at this point is on schedule. By recent action, the local Planning Commission has agreed to review development proposals in this water shed subject to an understanding that no actual use of the sewage system can be made until after completion and start up of the Parkin's Mills facility. The risk for proceeding under these guidelines is solely on the owners part. This action, if it continues to be exercised, will allow for planning, issuing permits, and even construction to proceed in advance of the June 1 date. While we do not advise as to the appropriateness of this activity, it nevertheless, is an available option to development planning of your vacant lot within the Shopping Center area. We trust that this letter answers certain questions you have had as to the status of wastewater planning in the Stephen's Run area. If you have additional questions or require additional information please do not hesitate to call. Sincerely yours, E-k4od G. W es, Inc. CEM/ckd «joh • ' 0 ���a�516171Il e JUN 1988 RECEIVED �p DEPT. OF PLANNING COMMONWEALTH of VIRGINIA �i9_ AND BUILDING DEPARTMENT OF TRANSPORTATION P. 0. BOX 278 RAY D. PETHTEL EDINBURG, 22824 W. H. BUSHMAN COMMISSIONER (703) 984-4133 RESIDENT ENGINEER June 13, 1988 Mr. N. Wayne Stainback, President Ref.: Route 277 Crossroad Development Company Frederick County P. O. Box 1714 820 South Garnett Street Henderson, ivC 27b36 Dear Mr. Stainback: I am writing in response to your letter of June 6, 1988. You requested permission to allow Jamesway to open their store on July 28, 1988 even though the proposed entrances for the entire development may not be completed. We have no objection to this request with the understanding the entrances are under j,�rrst and under construction and proceeai ng in accordance with the permitted design Any county requirements over. and above the entrance permit must be addressed through their offices. If you have any questions, please call me. WHB/sl xc: Mr. J. B. Dia,7lond Mr. C. W. Lam, Jr. Mr. Robert Watkins Sincerely your, William H. Bushman, P.E. Resident Engineer TRANSPORTATION r OR I:+, 21 Sl- CENTURY COMMONWEALTH of VIRQINJA DEPARTMENT OF TRANSPORTATION R O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER (703) 984-4133 June 13, 1988 Mr. N. Wayne Stainback, President Crossroad Development Company P. O. Box 1714 820 South Garnett Street Henderson, NC 27536 Dear Mr. Stainback: I am writing in response to your letter of June 6, 1988. W. H. BUSHMAN RESIDENT ENGINEER Ref.: Route 277 Frederick County You requested permission to allow Jamesway to open their store on July 28, 1988 even though the proposed entrances for the entire development may not be completed. We have no objection to this request with the understanding the entrances are under permit and under construction and proceeding in accordance with the permitted design. Any county requirements over and above the entrance permit must be addressed through their offices. If you have any questions, please call me. WHB/sl xc: Mr. J. B. Diamond Mr. C. W. Lam, Jr. Mr. Robert Watkins Sincerely your, William H. Bushman, P.E. Resident Engineer JUN 1988 RECEIVED DEPT. DF PLANNING AND BUILDING TRANSPORTATION FOR THE 21ST CENTURY 0 Mr. William Bushman Virginia Dept. of Highways Box 278 Edinburg, Va. 22824 Dear Bill: June 6, 1988 • Per your conversation with Tommy, the following is a brief explanation of what we are requesting: Jamesway is pushing to open their store on July 28th. No other store will be opening this early. We should have most of the road improvements complete by this time, but probably not all. We will be asking Frederick County for a conditional certificate of occupancy, which they have agreed to do if the Virginia Department of Transportation has no objection, and if we post a bond or letter of credit for the balance of the incomplete items. I would appreciate a letter from you stating that it will be acceptable to the Virginia Department of Transportation for Jamesway to open even if we have not totally completed all the road improvements. The purpose of this is to satisfy Jamesway and the Frederick County Planning Department. I would appreciate your earliest attention to this as we are being harassed daily by Jamesway. Thanks. NWS/kv SI,I SOUTI I C. \I:\! cLt --) J,?o r- 1115�11- 0 CROSSROAD DEVELOPMENT COMPANY P. O. Box 1714 820 South Garnett Street Henderson, NC 27536 (919) 438-8079 TO: l GENTLEMEN: WE ARE SENDING YOU ❑ Drawings ❑ Copy of Letter ❑ Attached [Z f rints • LETTER OF TRANSMITTAL DATE. JOB NO. ATTENTION: -- ,ii--�� RE: ` ❑ Under separate cover via _ the following items: ❑ Plans E] Contracts ❑ Specifications ❑ Change Order ❑ COPIES DATE NUMBER DESCRIPTION .(0�39IOj%f THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies ❑ For review and comment ❑ For bids due 19 a • May 3, 1988 N. Wayne Stainback, President c/o Crossroad Development Company P.O. Box 1714 820 South Garnett Street Henderson, North Carolina 27536 COUNTY of FREDERICK Departments of Planning and Building 703/665-5650 RE: Site Plan #055-87 of Stephens City Shopping Center Dear Mr. SUC nback.� i While reviewing our files, we realized that we had not received a final revised site plan showing all Virginia Department of Transportation comments on the Stephens City Shopping Center. Would you please send us several copies as soon as possible for our files? Thank you for your assistance. Sincerely, Steph Gyurisin DeputtDirector SMG/rsa 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 • CROSSROAD DEVELOPMENT COMPANY P. 0. Box 1714 820 South Garnett Street Henderson, NC 27536 (919) 438-8079 TO: GENTLEMEN: WE ARE SENDING YOU ❑ Drawings Copy of Letter ❑ Attached V'Orints ❑ Change Order LETTER OF TRANSMITTAL DATE: ---2 ?-- ele JOB NO.: ATTENTION: R E' ❑ Under separate ❑ Plans n n yia � the following items: ❑ Spe6fications ,r COPIES DATE NUMBER DESCRIPTION THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit _ copies ❑ For review and comment ❑ For bids due 19 0 • COUNTY of FREDERICK IDepartment of Planning and Development 703/665-565A FAX 703/667-0370 February 18, 1988 Mr. N. Wayne Stainback, President c/o Crossroad Development Company P. 0. Box 1714 820 South Garnett Street Henderson, NC 27536 Dear Mr. Stainback: This letter is to confirm the Frederick County Planning Commission's action at their meeting of February 17, 1988: Approval of Site Plan #055-87 of Stephens City Shopping Center, zoned B-4, 20.537 acres, for a shopping center consisting of 95,000 square feet which includes a 43,000 (+) square foot department store, a 25,000 (+) square foot food store, and a 7,000 square foot drug store, as well as four additional retail store areas. Improvements also include parking, highway and access changes, storm water protection, landscaping, and off—street loading and service improvements. This property is located at the southwest intersection of State Route 277 and State Route 641, a short distance east of Stephens City, in the Opequon Magisterial District. If you have any questions regarding your site plan, please do not hesitate to call this office. Sincerely, Robert W. Watkins Planning Director RWW/dkg 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 COMMONWEALTH of VIRGINJ JA N 1 SO 3 DEPARTMENT OF TRANSPORTATION r P. O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 1-firt-, ujual-I W. Ij - COMMISSIONER (703) 984-4133 January 20, 1988 PAS C) Mr. Keith Williams C/O Keith Williams & Associates 110 North Cameron Street Winchester, Virainia 22601 Dear Mr. Williams: Ref: Stephens City Plaza Site Plans Route 1006 Stephens City As requested, we have reviewed the above referenced site plans. We are returning one set of plans with our revisions and recommendations marked in red. Drainage computations for this development will also be necessary to study its affect on the drainage at the outlet end. If it will be necessary to replace existing pipes, it shall be the responsibility of the developer. Should you have any additional questions or concerns, please do not hesitate to contact my office. CWL/rh Enclosure xc: Mr. R. L. Moore Mr. J. B. Diamond Mr. D. E. Li--e Mr. R. W. Watkins Sincerely, C. William Lam Inspector For: W. H. Bushman Resident Engineer SHMAN ENGINEER TRANSPORTATION FOR THE 21 ST CENTURY �o 7 ��, COUNTY of FREDERICK Departments of Planning and Building ® 703/665-5650 a M E M O R A N D U M TO: Frederick County Planning Commission FROM: Stephen M. Gyurisin, Deputy Director SUBJECT: Agenda Addendum - Stephens City Shopping Center Site Plan for Footer/ Foundation Permit DATE: January 6, 1988 The staff would ask that the Planning Commission add the above site plan review to the agenda for approval of a footer/foundation permit only. A land disturbance (grading) permit has been issued, a site plan has been submitted and reviewed, and building plans have been submitted for approval. All plans have been reviewed and comments have been made except for VDOT comments. Final review is expected January 20, 1988 or February 3, 1988. SMG/rsa 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 Page 2 Stephens City Shopping Center Inspections Department - Must comply with VUSBC. Building plans have been submitted for reivew. No objection to a footer/foundation permit. Planning and Zoning - No objection. It is the staff's understanding that this plan and approval is only for the foundation work and continued site work. All applicable site plan and zoning standards appear satisfactory. A plan for this project has been reviewed and all review comments have been incorporated in a revised plan. VDOT final comments are still pending, but will not impact the building location for footer/foundation work. Prior to final site plan approval (for the structures), the following needs to be added: 1) detail as per VDOT 2) all revisions as per agency review comments. STAFF RECOMMENDATIONS: Approval for footer/foundation portion only. SITE PLAN # 055-87 (Footer/Foundation) Stephens City Shopping Center 20.537 Acres, Zoned B-4 (Shopping Center) LOCATION: The southwest intersection of State Route 277 and State Route 641, a short distance east of Stephens City. MAGISTERIAL DISTRICT: Opequon ADJACENT LAND USE AND ZONING: Residential, commercial, and vacant land uses with RP (Residential Performance), B-1 (Business Neighborhood) and A-2 (Agricultural General) Zoning. PROPOSED USE AND IMPROVEMENTS: A shopping center consisting of 95,000 square feet which includes a 43,000 plus or minus) square foot department store, a 25,000 (plus or minus) square foot food store, and a 7,000 square foot drug store, as well as four additional retail store areas. Improvements also include parking, highway and access changes, storm water protection, landscaping, and off-street loading and service improvements. REVIEW EVALUATIONS: Dept. of Transportation - See attached letter dated November 19, 1987 to Mr. N. Wayne Stainback. Sanitation Authority - Site plan received and reviewed on January 5, 1988. Plans have been corrected and sent to the developer for revisions. Stephens City Fire Company - Shall comply with Chapter 10 of the Frederick County Code as a minimum with the following additions: 1) Minimum of four hydrants --two in rear and two in front of complex. Hydrant located at the intersection of Routes 277 and 641 doesn't meet the standard for one of the hydrants. 2) All areas within the complex shall be sprinkled with standpipe connections in the rear. 3) A fire lane shall be designated in front of the complex. 4) Request that contact be made with me prior to installing the hydrants. 5) Poor set of specs to view for comments COMMONWEALTH of VJIRIGINIA DEPARTMENT OF TRANSPORTATION P. O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER (703) 984-4133 November 19, 1987 Mr. N. Wayne Stainback C/O Crossroad Development Company P. O. Box 1714 Henderson, N.C. 27536 Dear Mr. Stainback: W. H. BUSHMAN RESIDENT ENGINEER Ref: Routes 277 & 641 Proposed Shopping Center Entrance Design Frederick County As per our telephone conversation on November 18, 1987, this office has no overall objection to the concept of the proposed entrances to the above referenced. However, this office will be proposing some changes for turning lanes for egress and ingress traffic on Route 277 and at the Intersection of Routes 277 & 641. The proposed site plans have been forwarded to our Central Office for their review and comments; upon receipt of them we will forward to you. CWL/ks cc: Mr. R. L. Moore Mr. J. B. Diamond Sincerely, C. William Lan Inspector For: vl. H- E-ushr I- Resident Engineer T RAiNSPORTAHON FOR THE 21 ST CENTURY • 0 December 21, 1987 COUNTY of FREDERICK Departments of Planning and Building 703/665-5650 Mr. N. Wayne Stainback, President Crossroad Development Company P. 0. Box 1714 820 South Garnett Street Henderson, North Carolina 7536 Dear Mr. Stainac'k: / 4C� Here are some of the ite Atoa tothe Stephens City Shopping Center site plan for final approval: 1. The architects, engineer, or surveyor's seal. 2. The Virginia Department of Transportation's comments about the entrances to the shopping center and to the parking areas. 3. Show parking aisle widths. 4. Show handicapped parking spaces. 5. Show fire lanes. 6. Show fire hydrants as required in Chapter 10 of the County Code. 7. Show details for islands and curb stops. 8. Need drainage calculations and attested by a seal. 9. Lot area coverage by buildings and proposed buildings. 10. Architectual and landscaping details. 11. Screening of services areas. 12. Show setbacks. 13. Move parking away from Route 641 -- must be at least 25' from highway. 14. Lighting fixtures need to be shown. 15. Locate trash dumpsters. 9 Court Sauare P.O. Box 601 Winchester, Virginia 22601 16. Show proposed use of out parcels, etc. 17. Show detail of sidewalks with ramps. 18. Show sign locations. Please call if you have any questions. Happy Holidays! Sincerely, y Ste Vectour sin De ut D /dkg COMMONWEALTH of VIRGI1 DEPARTMENT OF TRANSPORTATION P. O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER (703) 984-4133 January 5, 1988 Mr. N. Wayne Stainback, President C/O Crossroad Development Company Post Office Box 1714 820 South Garnett Street Dear Mr. Stainback: Gllp�P"PO ..CZ\~� W. H. BUSHMAN RESIDENT ENGINEER Ref: Routes 277 8 641 Proposed Shopping Center Entrance Design Frederick County As requested, we have reviewed the plans for the proposed shopping center at the intersection of Route 277 and Route 641. We offer the following comments and recormmendations: 1. A right turn lane should be provided adjacent to Route 277 across the developed property. It should begin with a 150' taper and 200' full width before the westernmost entrance. 2. A left turn lane should be provided for westbound traffic on Route 277. 3. The north entrance on Route 641 should be 36' wide. 4. The southernmost entrance on Route 641 should be 50' wide due to the type of traffic utilizing this entrance. 5. A section of the right turn lane on Route 641 closest to the intersection R::xat� 12,7 should be eliminated to prevent i.ts use as er. ,ion lane. 6. A 100' right turn lane with 100' taper should be provided for northbound traffic on Route 641. 7. The minimum radii at the intersection of Route 277 and Route 641 should be 50.. 8. Entrances to out parcels off of Route 277 and Route 641 should be eliminated. Access to these parcels should be from the parking lot. TRANSPORTATION FOR THE 21 ST CENTURY 0 0 Mr. N. Wayne Stainback January 5, 1988 Page 2 - 9. Trip generation rates and distribution is needed to determine proper traffic control and pavement design. If signalization is warranted, you as the developer will be expected to participate in the cost as outlined in memorandum H&TS-185 dated February 19, 1986, which I am attaching. These recommendations have been noted on the attached site plans. If we can be of further assistance, please advise. Sincerely, C. William Lam Inspector For: W. H. Bushman Resident Engineer CWL/rh Attach. xc: Mr. R. L. Moore Mr. J. B. Diamond Mr. Robert W. Watkins ;,','' ,• VIRGINIA DE4ATMENTW HIGHWAYS'AND TRANSWAT10N - HIGI-JTWAY.AND TRAFFIC SAFETY DIVISION �..�� MEMORANDUM s `U GENERALSUBJECT: NUMBER: �.a °�"� beveTo �C'i a 'ibn. "ri°Tr'a" n,�•- S -185 DATE SPECIFIC SUBJECT: February 8 Method of Determining Developer Responsibility SUPERSEDES:_. for Participation in Traffic Signal Costs. DIRECTED T0: SIGNATE District Engineers Gi ;he foiiowing guidelines have been developed in an effort to obtain an uitable method of determining developer responsibility for participation in funding traffic signal work necessitated by land development: Condition # I. Where the proposed development will generate sufficient traffic to warrant signalization, the total cost for design, materials, timing plans, and installation shall be borne by the developer. Condition #2. Where development generated traffic and existing highway traffic must be combined to justify signalization, the developer shall bear 50% of the total cost for design, materials, timing plans, and installation. Condition #3. Where an existing traffic signal must be modified to accommodate traffic movements to or from the development, the developer shall bear the total cost for any design, materials, timing plans, Installation, and relocation required to accommodate the development traffic., For larger developments such as regional shopping centers and corporate complexes, the Department reserves the right to require that the developer design or have designed the traffic signal, including timing plans; and to install or have installed a complete working installation. Designs and installations shall be in accordance with the cu: rent Departrrieniai specifications and standards. TRV:dws cc: Mr. 0.. K. Mr. J' M. Mr. J. T. fir.. J. S. Ms. S. H. fir. J. G. Mr. A. W. Mr. J. W. Division Resident District Mabry Wray, Jr. Warren Hodge Cooper Ripley Coates, Jr. Atwell Administrators Engineers Highway and Traffic Safety Engineers COUNTY of FREDERICK IDepartment of Planning and Development EaLo� W. tAbiLE_ is - Planning Director Stephen M. Gyurisin - Deputy Director 703t. 5-SG6I LAND DISTURBING PERMIT For land disturbing activity at dog-ner DF A- JT/ % 40 ((2'11 . pp r ISSUED TO: ke-ooq- LJe)e,r r who has met all requirements of the Frederick County Erosion and Sedimentation Control Ordinance as certified by the Frederick County Department of Planning and Development. Approving Signature Date: NOTICE OF RIGHT TO INSPECT An agent of the Frederick County Department of Planning and Development shall be permitted entry to the site of the land - disturbing activity to inspect the control measures shown in the approved plan. Signature of Applicant Date: �l U '�z - / � k 7 NOTE: Issuance of this permit does not constitute approval of the site plan. This permit is for land disturbance only. 9 Court Sauare - P.O. Box 601 - Winchester, Virginia - 22601 AGREEMENT r 1 THIS AGREEMENT, made this (-%ylCL T day of �(l e9,1 ,IDe , 1 9A, by and between ��Ull)� /,Valet- i3ui%dt�iU (21yl <�Ll party (parties) of the first part; and the COUNTY OF FREDERICK, VIRGINIA, party of the second part; WHEREAS, in consideration of the approval by the party of the second part of this Virginia land disturbance plan and permit known as 5- he),)s C,`h 3hDopiac1 ( &-4-er and the party of the second part requiri.g thd fi-llowing work to be completed during the land disturbance construction & before final occupancy, the party (parties) of the first part, his or its heirs and assigns agree to do the following work. 1. Provide for the adequate control of erosion and sedimentation by temporary and permanent control practices and measures which will be implemented during all phases of clearing, grading, and construction, all conformity with the Virginia Erosion and Sediment Control Law, Title 21, Chapter 1, Article 6.1 of the Code of Virginia and local code laws. 2. To provide Erosion and Sediment Control as per site plan # Oss5 -(9`% In testimony whereof, the party of the first part has hereunto caused its corporate names and seals to be hereunto affixed, for and in its behalf, by AbAc Cride-r ,.; ,Job �wriAknel%y " duly attested by "AC: and caused this agreement to be acknowledged and delivered for and in its behalf. CORPORATION BY (SEAL) Z, Attest: � //� STATE OF VIRGINIA COUNTY OF FREDERICK I, )dlae- ' J'. (A'& , a Notary Public in and for the State and County aforesaid, do hereby certify that whose names are' signed to the foregoing agreement, this day personally appeared before me in my State and County aforesaid and acknowledged the same. Given under my hand this d day of D(,CI%/)L(.LP�C/ , 19,i NOTARY PUIBLIC My Commission Expires 0 0 Agreement Page 2 In testimony whereof, the party of caused its body corporate �ames and and in its behalf, by al'=- W, b the second part has hereunto seal to be hereunto affixed, for )rztbls . its Planning Director, duly attested by its Deputy Planning Director and caused t acknowledged and delivered for and in its and Deputy Director. WITNESS THE FOLLOWING SIGNATURE AND SEAL: (SEAL) Attest: it agreeme-ht to be behalf by its said Director COUNTY OF FREDERICK, VIRGINIA BY Z&�- -fLANNING DIRECTOR Frederick County Department of Planning and Development STATE OF VIRGINIA COUNTY OF FREDERICK I, puwe� oubzz;c—�' , a Notary Public in and for the State and County aforesaid, do hereby certify that this day e soa a_ AI appeared before me in my said County, ��,(,VPlanning Director of the Frederick C unty Depart ent of Planning and Development and I , j_vt� . 4 lJtGatll-1 , Deputy Director of the .Frederick County Deartment*ofcPlanning and Development, whose names are signed to the f rego ng d her unto annexed agreement dated � Yi jj j, f and each then and there personally and severally acknowledged the said agreement for and on behalf of the said County of Frederick, Virginia, and acknowledged that the seal thereto affixed is the true and genuine seal of the County of Frederick, Virginia. Given under my hand this �� day of �t �v 1 9 s//,. My commission expires day of �s/ _, , 1977—. NOTARY PUBLIC • • ff COUNTY of FREDERICK Departments of Planning and Building NOV 1987 703/665-5650 N' M E M 0 R A N D UM To: DF.PF. OF PLANNING ti AND BUILDING ti Ste hens Ci pFire Compa C' , ATTN: Mr. Frank W. Welch, Jr. 1C Virginia Depar- tmn Transportation , ATTN: Mr. William H. Bushman Sanitation Authority , ATTN: Mr. Wellington H. Jones , ATTN: Planning and Zoning Department , ATTN: Mr. Stephen M. Gyurisin FROM: Robert W. Watkins, Director DATE: November 17, 1987 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Master Plan Rezoning Subdivision We are reviewing the enclosed request by Stephens City Shopping Center , or their representative, Billy Tisinger 667-1266 Will you please review the attached and return your comments to me as soon as possible. --------------------------------------------------------------------------------- THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: Shall comply with chanter 10 of the Frederick County Code as a minimum with the following additions: 1. Minimum of 4 itvurents - 2 4 n rear and 2 front of complex. Hydrant located at _ the intersection of Rts 277 & 641 doesn't meet the standard for one of the hydrants 2. All areas within the complex shall be sprinkled with standpipe connections in the rear. 3 .A fire lane shall be designated in front of the complex. 5. Poor set of specs Signature f ox cam, installing of hvdrants Date 9 Court 4nnare - P.O. Box 601 Winchester, Virginia - 22601 M�ErC2 ,1�GvA N D U M TO: COUNTY of FREDERICK I ertt of -Planning and Building <� 703/665-5650 ti s Stephens City Fire Company Mr. Frank Welch, Jr. Virginia Department of Transportation , ATTN: Mr. William\ S�u4 �� Sanitation Authority , ATTN: Mr. Wellington H. Jones , ATTN: Planning and Zoning Department , ATTN: Mr. Stephen M. Gyurisin FROM: Robert W. Watkins, Director DATE: November 17, 1987 SUBJECT: Review Comments On: Master Plan Conditional Use Permit Rezoning X Site Plan Subdivision We are reviewing the enclosed request by Stephens City Shopping Center , or their representative, Billy Tisinger 667-1266 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: See attached letter dated November 19, 1987 to Mr. N. Wayne Stainback. Signature) Date 9 Cnnrt Sminre - P.O. Box 601 - Winchester. Virginia - 22601 0 0 M E M O R A N D U M WC619 COUNTY of FREDERICK of Planning and Building 703/665-5650 Stephens City Fire Company ATTN: Mr:, Frank W. Welch, Virginia Department of Transportation , ATTN: Mr. H. an Sanitation Authority , ATTN: Mr. Wellington H. Jones ATTN: Planning and Zoning Department , ATTN: Mr. Stephen M. Gyurisin FROM: Robert W. Watkins, Director DATE: November 17, 1987 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Master Plan Rezoning Subdivision We are reviewing the enclosed request by Stephens City Shopping Center , or their representative, Billy Tisinger 667-1266 Will you please review the attached and return your comments to me as soon as possible. --------------------------------------------------------------------------------- THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: ('0A Y /Y07 G-0 ,s1 015C v -vo W,4f X-6W <- Tr wfA 5"� 0 WV Signature Date /./ sv 9 Conrt Cnnare - P.O. Box 601 - Winchester. Virginia - 22601 Ir i � Site Drainage Calculations Stephens City Shopping Center Stephens City, Virginia ASSUME i = 6.6in/hr for 5 minutes duation 10 year worst storm (1) Area Calculations Total Site A = 500 2 860 (1220) A = 829,600 s.f. A = 19.05 acres Area not draining A = 400 (500) .5 Toward Proposed A = 100,000 Retention Pond A = 2.30 acres (2) Calculate Present Flow Toward Retention Pond Q = CiA Q = .3(6.6)(19.05 - 2.30) Q = 33.165 cf/s (3) Calculate Expected Run-off After Development Area = 220 + 140 C= .30 2 (1160) + (300 x 560) (240 x 120) 280,800 + 168,000 + 28,800 = 434,400 s.f. 9.97 acres Area C= .95 = 19.05 - 9.97 = 9.08 acres QTotal = CiA = (.30(6.6)9.97) + (.95(6.6)9.08) = 19.74 + 56.93 = 76.67 cf/s '. � .�a' ` 02 .i tip• �� ��n..tlP Cl. .:` L z 6i $ E L r 0 LJ Site'Drainage Calculations Page 2. (4) Calculate Required Storage Volume Volume Required = (76.67 - 33-165) 5 minutes x 60 sec/min = 13,051 c.f. (Controls) Check 30 minutes - i = 3.43 Q=(.3(3.43)9.97) + (.95(3.43)9.08) = 10.26 + 29.59 39.85 cf/s Volume Required = (39.85 - 33.165) 30 x 60 = 12,033 c.f. (5) Calculate Flow Through Typical Catch Basin (Front) .Front Q = .95 (6.6) 160 x 160 43,560 Q = 3.69 cf/s Rear Q = .95 (6_6)360 x 270 43,560 Q = 8.2 cf/s (6) Design Outlet Pipe to Allow for Maximun Outlet Flow of 33.165 cf/s Try 2 - 24" 0 RCP From nomograph culvert design - inlet control D = 24" diameter Q = .17 cfs Therefore HW = 1.3 D HW = 31.2" Pond is 4'0" deep okay. CULVERT DESK'0,N - INLET CtN TROL 180 10,000 168 8,000 (1) (2) (3) 6, 156 6,000 144 5,000 HW / D ENTRANCE q,000 SCALE TYPE 6• 132 (1) Square woe with 3 000 hoodwa I 4• (2) Groove end with I20 heod wo l l 2 0O0 (3) Groove end projedirV 4. r 108 96 1,000 3. 800 84 — — 600 500 / 72 400 / � 2. S LLj 300 Uv Z t!) Z 60 U) 200 / w 1.5 LL Q U EXAMPLE —54 Z / D r 42 inches (3.5 feet) Q log t] - 120 CFS Lj 48/ 80 HW/D' HW(Feet) Z J W (1) 2.5 8.8 = / U U 42 cc 60 ( z) 2.1 .4 a Q 50 (3) 2.2 7.7 Li1 O U 40 ' D in - I.0 LLj LLJ F- 30 Q .9 w 33 3- 0 30 , w _ .8 27 to � �.4- pa 8 . , f�T_ , ,3 7 — 6 v 21 5 ice) 4 3 \ 6 18 2 5. 4. .6 �— .6 Un 15F� l " v� 5 .5 .5 1.0 To use scale (2)or (3)draw a straight line through known HEADWATER SCALES 2 AND 3 REVISED MG1,1964 volws of sue and discharge to intersect scale (-N.From 12 Doi nt on score (1) Dro)ect horizontally to solution on either score (2) or (3). HEADWATER DEPTH FOR BUREAU OF PUBLIC ROADS JAN., 1963 CONCRETE PIPE CULVERTS WITH INLET CONTROL �f l R MR I l