Loading...
HomeMy WebLinkAbout009-87 Project Hope - Shawnee District - BackfileCOUNTY of FREDERICK, VIRGINIA Department of Inspections Daily Inspections Log Rt# _ Lot# Contractor, Owner, Builder Permit #: Bldg— Plumbing Mechanical�'� ' Type of Inspection Directions Date of Request Date for Inspection Phone Elect. Set backs: District: Time In — Right Left Time Out Front Back Weather Elect. Cut in card #_ Approved Inspectors Comments—. Rejected Temperature Corr4 Inspectors Signature ` Date Logged Yes _ ___ Nc _ _ ____ _— Date inn it COUNTY of FREDERICK, VIRGINIA Department of Inspections Daily Inspections Log Rt# Lot# Contractor, Owner, Builder Permit #: Bldg.__ Mechanical -� Directions Plumbing — Type of Inspection Set backs: District Right Left Front Back Elect. Cut in card Approved Rejected_ Inspectors Comments�� Inspectors Signature— 469i4e� Logged Yes_- ____ No_._ __ __ Date Date of Request Date for Inspection Phone Elect. Time In — Time Out Weather Temperature._ --- Correction # Date BOS COUNTY of FREDERICK P.O. Box 601 - 9 Court Square Winchester, Virginia 22601 Mn. He/Lb eAt O' Gnad y Hawarcd Sh.ackey 6 Saws P.O. Box 2530 Winch.ezt eAl V.iAgimia 22601 COUNTY of FREDERICK Departments of Planning and Building 703/6-5-5-5650 February 19, 1987 Mr. Herbert O'Grady Howard Shockey & Sons P.O. Box 2530 Winchester, Virginia 22601 Re: Site Plan #009-87 of Project Hope Dear Mr. O'Grady: This letter is to confirm the action taken by the Frederick County Planning Commission on February 18, 1987. Approval of Site Plan #009-87 of Project Hope for a 12,500 square foot warehouse with parking and loading areas with the stipulation that adequate screening is provided. This property is located on the south side of Bufflick Road, approximately 3,500 feet east of Route 522, in the Shawnee Magisterial District. Before any construction, a building permit must be obtained. If you have any questions regarding this matter, please do not hesitate to call this office. Sincerely, zwav— WW6;�� Robert W. Watkins Planning Director RWW/rsa o 0,.,,rr Cniinra _ P C) Rox 601 - Winchester. Virginia - 22601 COUNTY of FREDERICK Departments of Planning and Building ((��5 703/,65'5-565C M E M 0_R A N D U M , ATTN: Mr. Bill Bushman Planning and Zoning ATTN: Mr. Stephen M. Gvurisin Greenwood Fire Company ATTN: Mr. Walt Cunningham Inspections Department ATTN: Ms. Donna Ritter Sanitation Authority ATTN: Mr. Wellinqton Jones Winchester Airport , ATTN: Mr. Ken Weigland FROM: Robert W.-Watkins, Director DATE: February 6. 1987 SUBJECT: Review Comments On: Conditional Use Permit __X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Project Hope 01 or their representative, Herb O'Grady, 665-3298 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: Water and sewer facilities that will provide service to this property and - - --------------------------------------------------------------------- the surrounding area are currentyly under design. The Aurhtority proposes to __ ----------------------------------------------------------------------- have consturction started by June. ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Signature __ Date__�� 4es,-E�nvinee ---- ---------------------- W.r-Direector 0 r-^11rt Cn,��rn _ P 0 Rny 601 - WincheCler. Virginia - 22601 It SITE PLAN # 009-87 Project Hope 4.6256 Acres, Zoned M-1 (Light Industrial) LOCATION: South side of Bufflick Road, approximately 3,500 feet east of Rt. 522. MAGISTERIAL DISTRICT: Shawnee ADJACENT LAND USE AND ZONING: Residential and vacant land zoned A-2 (Agricultural General) and vacant land zoned M-1 (Light Industrial) PROPOSED USE AND IMPROVEMENTS: 12,500 sq.ft. warehouse w/ parking & loading areas. REVIEW EVALUATIONS: VA Dept. of Highways & Transportation - A standard commercial entrance will be required prior to doing any work on the State's right-of-way and must be constructed to meet the minimum VDH&T minimum requirements. This is providing there is adequate sight distance in both directions at this location. Health Department - No objection. Pump and haul operation to be installed and approved as per Health Department requirements. Sanitation Authority - Water and sewer facilities to serve the area of the proposed development are under design. Service is proposed to be available in 1988. Inspections Department - The proposed structures to be built in accord with the Virginia Uniform Statewide Building Code. Greenwood Fire Company - Fire Codes should apply when water is provided to this site. Winchester Airport - No objection. Planning and Zoning - The proposed warehouse is an allowed use in the M-1 (Industrial Limited) District. The general layout of structures, parking, and loading areas must meet the requirements of the ordinance. This property abuts an existing residential property on the north. A 75' buffer area is Page 2 Project Hope Site Plan shown on this side of the parcel as required by the ordinance. It is the staff's recommendation that a landscaping plan be provided and approved describing how the residential property will be "protected from adverse effects" (Section 14-3-4 of the Zoning Ordinance) using vegetative screening or other methods. STAFF RECOMMENDATION: Approval, with the understanding that a landscaping plan will be submitted and approved by the staff prior to occupancy of the structure. (f) z 0 V) uj X CL (L u 4c ctirr Av- so� % /40' Aft. AV 0 COUNTY of FREDERICK Departments of Planning and Building 703�5650 M E M O R A N D U M VA Dept. of Highways & Transportation , ATTN: Mr. Bill Bushman Planning and Zoning , ATTN: Mr. Stephen M. Gyurisin Greenwood Fire Company ATTN: Mr. Walt Cunningham Inspections Department ATTN: Ms. Donna Ritter Sanitation Authority ATTN: Mr. Wellington Jones Winchester Airport , ATTN: Mr. Ken Weigland FROM: Robert W. Watkins, Director DATE: February 6, 1987 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Project Hope or their representative, Herb O'Grady, 665-3298 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: ---------I— -----= --------------- ------------- =----=---1-------------------------------------------- -�'----_-_---'------------- - - - - ------------------------ - - - - - - - - - - - - - - ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- Signature___L_-_=--____-; -', I Date__Z-__=_-jl=-------------- 0 PrNvirt QminrP P (l Roy 601 WinrhPeter. Virginia 22601 I M E M O R A N D U M COUNTY of FREDERICK Departments of Planning and Building 7037 -5650 VA Dept. of Highways & Transportation ATTN: Mr. Bill Bushman Planning and Zoning , ATTN: Mr. Stephen M. Gyurisin Greenwood Fire Company ATTN: Mr. Walt Cunningham Inspections Department ATTN: Ms. Donna Ritter Sanitation Authority ATTN: Mr. Wellington Jones Winchester Airport ATTN: Mr. Ken Weigland FROM: Robert W. Watkins, Director DATE: February 6, 1987 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Project Hope or their representative, Herb O'Grady, 665-3298 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: A standard commercial entrance will be required prior to doing any work ---------------------------------------------------------------------------- on the State's right-of-way, and must be constructed to meet the minimum ---------------------------------------------------------------------------- VHOT minimum requirements. This is providing there is adequate sight distance ---------------------------------------------------------------------------- in both directions at this location. ------------------------...--------------------------------------------------- Signature-Iz_i_-_------�!/-�-- 0 (- Ivrt cn,inTa _ P fl n y (.ni ----------------------------------- ----- Date--,- Y--Z---------------- - Winrheeter. Vireinia - 22601 August ?U, 1987 Dr. Paul vrunmeier Vice President of Administration Project Hope 11illwood, Virginia 222646 Dear Paul: We have watched the construction of your warehouse on Hufflick Road with great interest. we were pleased to see your trucks rolling in today - indicating that you have met the dealine necessary for moving your warehouse stock from Dulles. The building i.s indeed handsome. It sets a desired tone and is a hallmark of a class operation. As you near the final stages of construction and landscaping, we have a few questions: 1. Is the buffer between Project Hope and the immediate neighbor to the west adequate? Do you feel it meets the commitment made to the community? Would an additional lane of gretin staggered between the existing trees be wise? ?. The bay doors on the east side of the building are inordinately stark. Would it be possible to paint them to match the dark: brown door surround at the office entrance? This would blend them in well with the other earth tone colors you have chosen. 31, We assume there will be shrubbery and green areas included in your landscaping plan for the space in the front and at the base of the building. 4. Would you let us have your plans for any outdoor signage that you are proposing to use. (See article VI of the protective covenants if you have any questions). We look forward to hearing from you on these matters. It is a pleasure having you here in the Upper Valley Business Park. CDA/f 1 a Sincerely yours. C. Douglas Adams 2 7. s"Z '�✓�`'`�'�k'i �� N��ei Y(1 �{,�`/ 1 t?� a� e'?~•u:e 7�,,','3 r „ ��rCCD fi ."} THE PROJECT HOPE HEALTH SCIENCES EDUCATION CENTER, MILLWOOD, VIRGINIA 226461(703)837-2100 August 24, 1987 Mr. C. Douglas Adams 6930 Little River Turnpike Annandale, Va. 22003 Dear Doug: We too are pleased with the progress Shockey Bros. has made in the construction. The building is scheduled for completion by September 1, 1987 and we will have completed our move by that time. Concerning your questions: 1. The trees planted as a buffer on the west side of the building meet the Planning Commission requirement. The trees will grow and spread considerably over the next two to three seasons and an adequate but not dense buffer will be obtained. The resident of the house on that side is watering the trees for us and is pleased with the fact that we planted the trees. In our opinion the screening is adequate. 2. Approval to paint the bay doors has already been given to Shockey Bros. 3. The shrubbery plan for the front of the building has not yet been developed. When it is completed, we will send a copy for your review. Since, as you know, we are close to our maximum allowable spending, this shrubbery plan will be designed to screen the electric meter and the refrigerator condenser pad and soften the front exterior lines, it will not be a lavish rendering at this time. 4. No plans are completed for signage. The only direction I have at this time is that a) there will be no sign on the building property and b) signage will be small,unobtrusive and in good taste similar to the sign at HOPE Center. Once final plans are available they will be sent to you for review. I believe the last time we talked you indicated that with the sale of the property to the airport there were soine covenant restrictions which were waived. You indicated that you would be Board of Directors: W.N. Conzen, Chairman; Eugene R. Black, Herbert J. Bloom, D.D.S., Mrs. Edward N. Cole, J. Edward Day, W.L. Henry, Gene F. Jankowski, L.W. Lehr, Irwin Lerner, Edwin A. Locke, Jr., Fred W. Lyons, Jr., Mrs. Emil Mosbacher, Jr., John O'Neil, J. Donald Rauth, Mrs, John B. Rogan, Richard R. Shinn, Lester S. Sinn ess, C. Joseph Stetler, James Stewart, Randall L. Tobias, William B. Walsh, M.D., Richard J. Whalen, Foster B. Whitlock, Joseph D. Williams, Eugene M. Zuckert. Officers: William B. Walsh, M.D., President and Chief Executive Officer; Edwin A. Locke, Jr., Vice President; W.L. Henry, Treasurer; J. Edward Day, Secretary. e -2- sending these waivers to Project HOPE for our review. Is my recollection correct? If so, I have not seen these waivers to date. Once we have the interior of the facility organized, we will have you over to see the operation. Thank you also for the lovely plant. It immediately brightened the stack area in the Warehouse and made things friendlier. Sincerely, 6�� Paul W. Grunmeier, Ph.D. Vice President Administration PWG:ew cc: William B. Walsh, Jr. IR L\ Qv UPPER VALLEY BUSINESS PARK At The Airport Winchester, Virginia September 16, 1987 Dr. Paul W. Grunmeier Vice President, Administration Project Hope Mi11wood , VA 2'2�646 Dear Paul: Thank you for your letter of August 24 on the subject of your warehouse/office here in the Upper Valley business Park, and for your attention to our questions. 1. The bay doors are handsome. They were painted almost before we received your letter. Also, we notice the well - designed step-up entrance to the office which provides more green space around the side of the building. 2. Your shrubbery plans for the front of the building sound quite good and adequate. We will look forward to your signage plans when they become available. 4. One matter remains a serious concern, i.e., the green buffer on the west side of the building. Although your neighbor appears to be satisfied, in fact, the Frederick County Planning authority has indicated that it is lacking. Our understanding of "adequate" buffer betwen warehousing and residential is that, at ground level, the warehouse cannot be seen at all. However, if you would speak with Bob Watkins, Director of Planning (665-5651), this can be resolved to their satisfaction, without misunderstanding. I am sure you appreciate that this is a landmark situation and will set the tone and theme for all to follow. Therefore, it is important that the initial requirements be met, as was agreed at the Board of Supervisors meetings. Rt. I, Box 206A 0 Bufflick Rd. 0 Winchester, Va. 22601 0 703/662-7000 The waiver as to the airport purchase will be forthcpming shortly. Many thanks for your continued cooperation. FLA/jac cc: Bob Watkins Garth Adams Sincerely yours, C. Douglas A ams t, ae THE PROJECT HOPE HEALTH SCIENCES EDUCATION CENTER, MI Mr. Robert Watkins Frederick County Director of Planning 9 Court Square Winchester, VA 22601 Dear Bob: SEP 1987, P CLcn '. DEPT. OF PLAN NINa o !, I.i RU1�03) 100 September 21, 1987 In reference to our conversation on Friday afternoon, September 11, 1987, I am enclosing a copy of landscaping plan which we reviewed. It is my understanding that this plan will provide the necessary coverage to meet the requirements of "adequate screening". Thank you for meeting with me on quick notice and thank you for your consideration of the landscape plan. I believe we are making the effort to both screen and beautify the property and I think the approved plan will, in time, do just that. If you have any questions, please don't hesitate to call. We would like to have everything completed by early October but are, at this point, waiting review and approval by Upper Valley Business Park as required in the covenants. PWG:dsr Enclosure Sincerely, �V Paul W. Grunmeier, Ph.D. Vice President -Administration Board of Directors: W.H. Conzen, Chairman; Eugene R. Black, Herbert J. Bloom, D.D.S., Mrs. Edward N. Cole, J. Edward Day, W.L. Henry, Gene F. Jankowski, L.W. Lehr, Irwin Lerner, Edwin A. Locke, Jr., Fred W. Lyons, Jr., Mrs. Emil Mosbacher, Jr., John O'Neil, J. Donald Rauth, Mrs. John B. Rogan, Richard R. Shinn, Lester S. Sinness, C. Joseph Steller, James Stewart, Randall L. Tobias, William B. Walsh, M.D., Richard J. Whalen, Foster B. Whitlock, Joseph D. Williams, Eugene M. Zuckert. Officers: William B. Walsh, M.D., President and Chief Executive Officer; Edwin A. Locke, Jr., Vice President; W.L. Henry, Treasurer; J. Edward Day, Secretary. �Li%+le L f )_inter 6 Herz Junirek �II i Manhat4er Euonyr,.ut � `iens a 'tew I 2 Lacelca= I 1 19 Netn "o!�; I �'FO;ecFiore Y•d0er afPick A-W I i I� Li+fle esf Linden I Dank Ame ocan AR60,Yw ae 6 I � I '4% I 6 NefZ JunipeR �oJ E tiw i LAC* 5 Fos-ck Hol�