Loading...
HomeMy WebLinkAbout013-87 Shamrock Truck Terminal - Stonewall District - BackfileCOUNTY of FREDERICK ;. Departments of Planning and Building 4 M E M O R A N D U M 703/666,-5650 Virginia Dept. of Highways ATTN: Mr. William Bushman Planning and Zoning , ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Inspections Department , ATTN: Mr. Kenneth Coffelt Sanitation Authority ATTN: Mr. Wellington Jones ATTN: FROM: Robert W. Watkins, Director DATE: February 25, 1957 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Doug Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: -��=9 ��---�---- �'--L.2i`.�Sf w_�L�-�_' � c=_�1���.TP o :-r to l _.-c11.�t� ����• ----- -------------------------- Signature_=sw�� -- Date__ --------- ------ 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 0 1 'r 144, SD � J V D COUNTY of FREDERICK Department of Planning and Development John T.P. Horne - Planning Director Stephen M. Gyurisin - Deputy Director 703/662-4532 LAND DISTURBING PERMIT For land disturbing activity att� It(C�)Iqp 0 L'. ISSUED TO: who has met all requirements of the Frederick County Erosion and Sedimentation Control Ordinance as certified by the Frederick County Department of Planning and Development. Approving Signature yx"Zz�) Date: ?-- / %— k NOTICE OF RIGHT TO INSPECT An agent of the Frederick County Department of Planning and Development shall be permitted entry to the site of the land - disturbing activity to inspect the control measures shown in the approved plan. Signature of Applicant Date: C7 NOTE: Issuance of this permit does not constitute approval of the site plan. This permit is for land disturbance only. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 AGREEMENT HIS AGREEMENT, m de this i%�/L day of a)'ll,�� , 19 'T► by and between party (parties) of the first part; and the COUNTY OF FREDERICK, VIRGINIA, party of the second part; WHEREAS, in consideration of the approval by the party of the second p rt of this Vir ini land isturbance plan and permit known as 3v�l , inGG -�( and the party of the second part requiring the following work to be completed during the land disturbance construction & before final occupancy, the party (parties) of the first part, his or its heirs and assigns agree to do the following work. 1. Provide for the adequate control of erosion and sedimentation by temporary and permanent control practices and measures which will be implemented during all phases of clearing, grading, and construction, all conformity with the Virginia Erosion and Sediment Control Law, Title 21, Chapter 1, Article 6.1 of the Code of Virginia and local code laws. 2. To providErosion and Sediment Control as per site plan #0/9-8 L, In testimony whereof, the party its corporatelames and seals to behalf, by �. TIle duly attested by this agreement to be ac behalf. ( SEAL) Attest: STATE OF VIRGINIA COUNTY OF FREDERICK ' of the first part has hereunto caused be hereunto affixed, for and in its ;/yam , and cause edged and delivered for and in its M I, . zi�, a Notary Public in and for the State and County of ressaid, Ado hereby certify that whose names are signed to the foregoing agreement, this day personally appeared before me in my State and County aforesaid and acknowledged the same. Given under my hand this ZZ day of ��f / ,. 19 A�� '-� NOTARY PUBLIC My Commission Expires /. / 9 6' Agreement Page 2 In testimony whereof, the party of the second part has hereunto caused its body corporate names and seal,to be hereunto affixed, for and in its behalf, by &44 0 w"4'a, its Planning Director, duly attested by ► »� and caused this ag ement to be acknowledged and delivered for and in its behalf by its said Director and Deputy Director. WITNESS THE FOLLOWING SIGNATURE AND SEAL: COUNTY OF FREDERICK, VIRGINIA BY PLANNING DIRECTOR Frederick County Department of Planning and Development (SEAL) Attest: 1Vff'AjMq kt,-A STATE OF VIRGINIA COUNTY OF FREDERICK I, L, a Notary Public in and for the State and County afore aid, do hereby certify that this day personally a. eared before me in my said County, �� �pn �) w , Planning Director of the Frederick County Departme t of Planning and Development and =fir of the Frederick County Departmen of Planning and Development, whose names are signed to the foregoing and hereunto annexed agreement dated QAs-,A/ S , and each then and there personAll and severally acknowledged the said agreement for and on behalf of the said County of Frederick, Virginia, and acknowledged that the seal thereto affixed is the true and genuine seal of the County of Frederick, Virginia. Given under my hand this 17 4 A./ day of ► 19 [• My commission expires �).— day of , 19. 3CNAAa� NOTARY PUBLIC COUNTY of FREDERICK Departments of Planning and Building u s- 703/6-5-5-5650 March 11, 1987 Mr. Doug Toan Construction Management, Inc. Siler Route, Box 613 Lenoir Drive Winchester, VA 22601 Re: Site Plan #013-87 of Shamrock Truck Terminal. Dear Mr . ot- _y This letter is to confirm the action taken by the Frederick County Planning Commission at their meeting of March 4, 1987: Approval of Site plan #013-87 of Shamrock Truck Terminal for a truck terminal with office and warehouse facilities. This prop- erty is located in the Stonewall Industrial Park, east side of McGhee Road in the Stonewall Magisterial District. If you have any questions, please call this office. Sincerely, Stephen Gyurisin Depu ,y irector attachment SMG/jls 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 SITE PLAN #013-87, Shamrock Truck Terminal 9.666 Acres, Zoned M-1 (Industrial Limited) LOCATION: Stonewall Industrial Park, east side of McGhee Road. MAGISTERIAL DISTRICT: Stonewall ADJACENT LAND USE AND ZONING: Vacant and Industrial Land Use and M-1 (Industrial Limited) Zoning. PROPOSED USE AND IMPROVEMENTS: Truck terminal with office and warehouse facilities. REVIEW EVALUATIONS: Highway Department - No objection. A commercial entrance permit must be applied for and approved prior to working on the State's right-of-way. Sanitation Authority - Water and sewer is approved. Relocate hydrant to avoid two hydrants served by one 6" water line. Clearbrook Fire Company - We recommend that the Fire Code be followed. Inspections Department - All proposed structures to meet requirements of the VUSBC and applicable referenced standards for the intended use. Specific comments to be made at time of permit application. Planning and Zoning - No objection. The proposed plan meets all zoning and site planning standards. STAFF RECOMMENDATIONS: Approval. P.O. Box 601 - 9 Court Square Winchester, Virginia 22601 Mr. Douglas Toan Construction Management, Inc. Siler Route, Box 613 Winchester, Virginia 22601 COUNTY of FREDERICK, VIRGINIA Department of Inspections Daily Inspections Log Date of Request Date for Inspection Phone Rt# LotP IL*q Contractor, Owner, Builder Permit #: Bldg._ —Plumbing Elect.—/ Mechanical J 1 i Type of Inspection _ 'J Directions — Set backs: — District r Time In Right Left Time Out F ront Back Weatl1pr Cut in Tea(p`erature_.____ Elect. card Approved Rejected Correction # Inspectors Comments 4A rl &LX 1�at. Inspectors Signature— Logged Yes---- No Date COUNTY of FREDERICK, VIRGINIA Department of Inspections Daily Inspections Log Rt# Lot# Contractor, Owner, Builder Permit #: Bldg._ Mechanical Directions Date of Request Date for Inspection P hone Plumbing Elect. >> Type of Inspection Set backs: District Time In Right Left Time Out Front Back Weath$r Elect. Cut in card #___ Temperature Approved Rejected Correction # Inspectors Comments ,'' '" ' '' •'' 51 Inspectors Signature L��' ���'` 1iV! /'bates~ - Logged Yes No -- Date Ci jiv �� AR COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION P. 0. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER Edinburg, Virginia 22824-0278 January 1.3, 1987. 14 W. H. BUSHMAN RESIDENT ENGINEER Ref: Shamrock Trucking Company Proposed Terminal. Routes 11 and F733 Mr. Robert Watkins Department of Punning and Development P. O. Box 608 9 Court Square Winchester, VA 22601 Dear Bob: This is in regard to the site plan for the proposed Shamrock Trucking Company to be located along Routes 11 and 37 across from Crown, Cork and Seal. As you know, the site plan has been submitted to our District Office for their review and comments. In the interim, this will serve as general commentary on the philosophy, if you will, of this proposal. The tract to be developed is not currently adjoining state right-of-way and is contiguous to two other businesses currently operating. The current and future users of the state service road enter onto Route 11 at a point which see an average daily traffic of 11,060 vpd as indicated on the attached copy of the traffic count data, 1985, the most recently published. The point of entry was constructed originally to serve the dwellings in this area as they fronted on Route 11 much as the houses do north of I-81 and south of Route 37. To draw this to a conclusion, and put it succinctly, the Department cannot deny access via this service road for this proposed terminal, but the ingress/egress problems of this location would seem to make it a very poor choice for a truck terminal operation. I would like to state further, the developers, and their clients have been very forthright and up -front about this situation and have cooperated fully from our point of view. I have every reason to believe they are willing to help mitigate the detracting features as much as possible. TRANSPORTATION FOR THE 21 ST CENTURY Mr. Robert Watkins -2- January 1.3, 1986 When the comments from our District Office are secured they will. be transmitted to al! concerned. In the meantime, we will try to answer any related question or comments. Sincerely, t W. H. Bushman Resident Engineer WHB/wk Attach. cc - Mr. Paul F. Cecchini, Attn: Mr. R. L. Moore Mr. J. B. Diamond R APT A Ti AOTCeiel AWn PRIMARY TRAFFIC TABULATIONS ___ _ t ry 1 C K J I m I c h n ...... .... _ AVERAGE ------ DAILY TRAFFIC VIRGINIA PASSENGER CARS OUTOFSINGLE STATE PASSENGER CARS UNIT TRUCKS TRAILER TRUCKS , BUS TOTAL �UCLES ROUTE NUMBER FRO M T O — 2 AXLE 4 TIRES - 1 AXLE 6 TIRES 3 AXLE 6-10 TIRES 35 290 151 3r320 1r650 530 650 15 0 35 T 622 WEST OF AT 95-301 T 156 L 301 200 340 BO 15 240 20 1.855 35 T 156 6 301 T 40 HOMEVILLE 960 130 290 70 30 270 10 1r5T 35 RT 40 HOMEVILLE T 653 NORTH OF SEBRELL 710 90 560 80 15 300 25 2070 35 RT 653 NORTH OF SEBRELL T 616 NORTH OF COURTLAND 10100 880 120 15 370 35 3,020 35 RT 616 NORTH OF COURTLAND T 58 BUS COURTLAND 19500 100 65 15 120 60 2rS10 35 d 58 BUS T 58 BUS COURTLAND T 58 WEST OF COURTLAND 1r500 160 590 760 90 15 360 40 3,195 35 T 58 WEST OF COURTLANU BOYKINS 1r650 280 470 60 15 130 15 2,080 35 OYKINS NORTH CAROLINA STATE LINE 10150 240 36 T 602 WEST OF MATOACA T 600 HATOACA 49200 20 65 19350 IrT00 150 160 30 40 90 10 20 30 5,660 8,625 36 T 600 MATOACA WCL PETERSBURG 6r600 39600 510 140 260 30 22,540 36 CL PETERSBURG AIN ENTRANCE TO FORT LEE 169300 1r700 39300 480 150 270 35 18,585 36 AIN ENTRANCE TO FORT LEE wCL HOPEwELL 139200 19150 37 T 81 S OF WINCHESTER T 50 WEST OF WINCHESTER 29800 520 1►050 160 420 45 220 280 500 40 90 4r895 9,030 37 T SD WEST OF WINCHESTER T 522 NW OF WINCHESTER 49250 19350 29200 420 220 650 85 8r575 3T T 522 Nw OF WINCHESTER T 11 NORTH OF WINCHESTER 39T50 1r400 29050 38 MELIA RT 153 SCOTTS FORK 19050 4 470 45 6 10 30 19615 39 WEST VIAGINIA STATE LINE RT 6B7 WEST OF WARM SPRINGS 510 85 250 25 2 4 4 880 b INTERSTATE, ARTERIAL AND PRIMARY TRAFFIC TABULATIONS ROUTE NUMBER 10 6 156 10 6 156 10 10 10 10 L 144 10 10 10 10 6 258 BUS 10 HUSII+ESS 11 11 11 11 11 11 11 I1 11 11 11 FROM T 156 EAST OF HOPEWELL T 156 BY-PASS WCL HOPEWELL T 95 T 1-301 T 144 EAST INT T 144 WEST INT T 145 CHESTERFIELD C H T 150 CHIPPENHAM PKWY T 258 SW OF SMITHFIELD USINESS 258 SMITHFIELD TEST VIRGINIA STATE LINE tT 761 NEAR STEPHENSON tT 81 NORTH OF WINCHESTER ;CL WINCHESTER IT 37 S OF WINCHESTER ;TEPHEIIS CITY 1IDDLETOWN IT 81 14OPTH OF STRASBURG ;TRASBIJRG +OODSTOCK 4T JACKSON TO T 156 BY-PASS ECL HOPEWELL T 95 T 1-301 T 144 EAST INT T 144 WEST INT T 145 CHESTERFIELD C H T 150 CHIPPENHAM PKWY CL RICHMOND USINESS 258 SMITHFIELD T 10 WEST OF SMITHFIELD T 761 NEAR STEPHENSON T 81 NORTH OF WINCHESTER CL WINCHESTER T 37 S OF WINCHESTER TEPHENS CITY IDDLETOWN T 81 NORTH OF STRASBURG TRA58URG OOUSTOCK T JACKSON T T67 NORTH OF NEW MARKET AVERAGE DAILY TRAFFIC VIRGINIA OUT OF SINGLE UNIT TRUCKS TRAILER rAL ;y PASSENGER STATE PASSENGERF29ZUO TRUCKS LES XLE 2 AXLE 3 AXLE CARS CARS RES 6 TIRES 6 10 TIRES J 5r500 31050 210 110 350 25 89255 60800 330 220 80 380 20 10r030 149900 350 4r0",0 450 150 11000 20 20,870' 179400 500 4r7j0 S70 270 650 35 24r175 139500 270 392n0 390 200 290 SS 17,905 169100 190 39500 500 420 350 70 21,130 149200 240 39000 460 380 320 SO 18,650 120000 180 2000 410 180 120 55 15,645 7,100 80 19200 1TO 40 50 10 81650 7r400 370 2r300 300 70 220 85 109745 2r550 120 1r000 90 30 65 60 3,915 3r350 850 19750 3r650 860 19850 59900 19450 29650 8r300 940 2r050 49450 220 1r450 39450 190 10250 3r200 200 19200 3,500 390 1r200 49000 100 19400 39200 100 19100 19R00 95 T60 180 50 120 15 69315 190 50 120 15 6,735 370 160 520 10 11,060 280 90 380 25 120065 170 80 ♦ 10 40 69820 ISO 75 340 35 5,490 140 50 260 20 5,070 160 55 180 10 5,495 170 20 60 50 5,800 180 25 95 35 4,735 120 30 40 20 2,865 �coP1.ANN� S pEPjv��pPM t,ND OE M E M O R A N D U M COUNTY of FREDERICK Departments of Planning and Building &&!S 703/65-5-5650 Inspections , ATTN: Mrs. Donna Ritter Planning and 2oning ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Sanitation Authority ATTN: Mr. Wellington Jones Virginia Dept, of Highways , ATTN: Mr. William Bushman ---------------------------------------- ATTN: -------------------------- FROM: Robert W. Watkins, Director DATE: December 23, 1986 SUBJECT: Review Comments On: --_- Conditional Use Permit X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Douglas R. Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: -1�-RLOAD.&12-A/,C-? 1-E11Y-0O2)L-8L f-aLZ,0-WYJ2}-2-LUS-SIL-L26.Q�1-A2 YaZ? ,1 N l Zll INlC2SCCTION Of Sff�MWCIC ?OB 110 2%. F733, E02 SERVICEl0 ---------------------------------------------------------------------------- OWE? l CCff, rl Nl7 �lI L L C2 % OOL CO --------------------------------------- Signature_ to 116187 ------------------------- 0 C'nnrt Crninre P.O. Box 601 Winchester. Virginia 22601 COUNTY of FREDERICK Departments of Planning and Building �9�9J 703/63.5-5650 M E M O R A N D U M Inspections ATTN: Mrs. Donna Ritter Planninq and Zonina ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Sanitation Authority ATTN: Mr. Wellington Jones Virginia Dept, of Hiqhways ATTN: Mr. William Bushman ------------------------------------------ ATTN: -------------------------- FROM: Robert W. Watkins, Director DATE: December 23, 1986 SUBJECT: Review Comments On: ____ Conditional Use Permit X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Douglas R. Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: LIL ,n �� � "C'f-a? si-"-�- ------------------------------------ Signature--- / _�---- Date 0 ('niirt gniinre - P.O. Box 601 - Winchester, Virginia - 22601 Detention Basin Calculations Shamrock Trucking March 2, 1987 BEFORE A = 10 Ac. tc = 10 min. c = 0.15 a = 197.8 b = 25.2 i = a = 197.8 = 5.6 u - LAI- _) j . I- qo = ciA = 0.15 x 5.6 x 10 qo = 8.4 cfs Te =`V 2CAa (b - tc) _ b 4 qo Tc =N/ 2 x 0.5 x 10 x 197.8 x 22.7 - 25.2 8.4 Tc = 73.11 - 25.2 = 47.9 min. i = a = 197.8 = 2.7 b + Tc 25.2 + 47.9 Qo = CzA. = 0.5 x 2.7 x 10 = 13.5 cfs V = No Tc + Qo4tc _ go2Tc - 3 qo tc] 60 AFTER A = 10 Ac. to = 10 min. C = 0.50 a = 197.8 b = 25.2 i = 5.6 V = [13.5 x 47.9 + 13.54x 10 _ 8.4 2 47.9 _ 3 x 8.4 x 101 60 V = [646.65 + 33.75 - 201.18 - 631 60 = 24,973 cu. ft. (storage required) 25,578 cu. ft. (storage provided) Use two 12" P.V.C. or CONC. outlet pipes @ 1.4% -. 9f S,' MAR1987' �� LIE �•� ll'' [[cc p} m i Ga CERTIFICATE No. 54.17.3 W965 54.17-3 (b)162 LAND ' rn ���VYVYul�i.1� MORANDUM COUNTY of FREDERICI Departments of Planning and Buildin; 703/ -565, ATTN: Mr. William Bushman Planning and Zoning , ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company , ATTN: Mr. Ralph Robinson Inspections Department , ATTN: Mr. Kenneth Coffelt Sanitation Authority , ATTN: Mr. Wellington Jones ATTN: FROM: Robert W. Watkins, Director DATE: February 25, 1987 SUBJECT: Review Comments On: Conditional Use Permit X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Doug Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: Authority_ design standards to not permit_ two fire hydrants_ to be served by -------- ------------- ----------------- a dead-end six (6)-inch line. Also recommend two (2) inch laterals be ---------------------------------------------------------------------------- installed instead of 3/4"inch, especially if flush valve fixtures ---------------------------------------------------------------------------- are to be used. ---------------------------------------------------------------------------- Signature --------- 9 Court Square - P.O. Box 601 Winchester, Virginia - 22601 56,E'" COUNTY of FREDERICK v RECEIVED_ o w n� Departments of Planning and Building DEFT. OF PLANNINQ iV dV M E M 0 R AWN D U M 703/5-b.50 s" �n AND BUILDINQ 0 FF ,96 Virginia Dept. of Highways ATTNI Mr. 198? William B s�man Planning and Zoning P,XfTAl: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Inspections Department ATTN: Mr. Kenneth Coffelt Sanitation Authority ATTN: Mr. Wellington Jones ATTN: FROM: Robert W. Watkins, Director DATE: February 25, 1987 SUBJECT: Review Comments On: ____ Conditional Use Permit X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Doug Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: The proposed commercial entrance appears to be within our minimum commercial ---------------------------------------------------------------------------- --entrance standards and would be acceptable when the street is added to the ---------- --------- ---------------------------------- Secondary System. ---------------------------------------------------------------------------- ------------------------------------------- ------------------------------------------- Signature_ �,"may_ ii/ ----------------------------- 7------------ 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 2-3 4 S6 COUNTY of FREDERICK RECENF-0 Departments of Planning and Building DEPT. OF PLANNINR ti ma's_ 703/S5650 11ND gWLDINQ \�; M E M 0 R A N D U M Virginia Dept. of Highways ATTN: Mr. William Bushman Planning and Zoning ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Inspections Department , ATTN: Mr. Kenneth Coffelt Sanitation Authority ATTN: Mr. Wellington Jones ATTN: FROM: Robert W. Watkins, Director DATE: February 25, 1987 SUBJECT: Review Comments On: ____ Conditional Use Permit X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Doug Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. ---------------------------------------------------------------------------- THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: �'WE REQUEST YOU FOL- OQ NFPA CODE ----------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- ------------------------77--------- 7---------------------------------- Signature`s ; _��__-/�=1-` "---------- Date-------�/26/87---------- - - 7 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 APPLICATION AND CHECKLIST FOR SITE PLAN IN THE COUNTY OF FREDERICK, VIRGINIA DATE: Lv APPLICANT/AGENT: ADDRESS: PHONE: �06--O6q 3 APPLICATION NUMBER: The following checklist serves solely to aid the staff, Planning Commission, and Board of Supervisors in reviewing your application. Please complete this checklist and submit it with your proposal. BACKGROUND INFORMATION 1. Location of property: 2. Property tax map and identification number: 3. Property zoning and present use: 4. Adjoining property zoning and present use: 5. Proposed uses: 6. Magisterial District: 7. Notes: L1 pE� • p gU1p0�N�I COUNTY of FREDERK Departments of Planning and Buildii 0 R A N D U M 703/WS5h Virginia Dept of Highways ATTN: Mr. William Bushman Planning and 2onina , ATTN: Mr. Stephen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Inspections Department ATTN: Mr. Kenneth Coffelt Sanitation Authorit , ATTN: Mr. Wellington Jones . ATTN: FROM: Robert W. Watkins Director DATE: February 25, 1987 SUBJECT: Review Comments On: Conditional Use Permit __X _ Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal or their representative, Doug Toan. 665-0693 • Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: Autho-�y_Slg��is�pilards to not permit_two_fire hydrants_to_be served by ---------- a dead-end six (6)-inch line. Also recommend two (2) inch laterals be ---------------------------------------------------- installed instead of 3/4"inch, especially if flush valve fixtures ------------------------------------------------------ are to be used. Signature - --- Date- -- ----------------- - - ---A - 9 Court Sauare - P.O. Box 601 - Winchester, Virginia - 22601 COUNTY of FREDERICK Departments of Planning and Building <'Os 703/65-5-5650 M E M O R A N D U M a1 Insoections ATTN: Mrs. Donna Ritter Planning and Zonina ATTN: Mr. Steohen M. Gyurisin Clearbrook Fire Company ATTN: Mr. Ralph Robinson Sanitation Authority ATTN: Mr. Wellington Jones Virainia Dept. of Highways ATTN: Mr. William Bushman ---------------------------------------- ATTN:-------------- FROM: Robert W. Watkins, Director DATE: December 23, 1986 SUBJECT: Review Comments On: Conditional Use Permit X Site Plan Preliminary Master Plan Subdivision Rezoning We are reviewing the enclosed request by Shamrock Truck Terminal , or their representative, Douglas R. Toan, 665-0693 Will you please review the attached and return your comments to me as soon as possible. THIS SPACE SHOULD BE USED FOR REVIEW COMMENTS: Water service for proposed development will be from City of Winchester. ---------------------------------------------------------------------------- Sewer service will be from Authority. Existing sewer easement is not shown ---------------------------------------------------------------------------- on plan. Fire protection is not shown on plan. ---------------------------------------------------------------------------- Signature--- -------------------------- Date-- /------------ 0 rn„rt CrninrP - P.O. Box 601 - Winchester. Virginia - 22601