SITE PLAN CHECKLIST
The application is not complete if the following are not present:
I-1 1.
Two sets
of comment sheets
from the followi g ge c'es
Ir
along with
any marked copies
of the plan;
�I27
VDOT
�I��_V&City of Winc
R� Co.
San. Auth.
`,� � Co. Hlth. Dept,
ff
Inspections
Dept.
—Ae�wParks & Rec.
Fire
Marshall b�-
Airport Authority
2.
2 copies
of the Site Plan
application
3. 5 copies of the plan on a single sheet
4. 1 reproducible copy of the plan (if required)
5. a 35mm. slide of the plan (if required)
* One copy of the application and comment sheets, two
copies of the plan and the marked plans from the review
agencies should be enclosed in a package which will be
forwarded to the County Engineer.
TRACKING
DiATE
Application Received
z- 'Isite Plan forwarded to Consulting ,Engineer
Review/Invoice received from Engineer
1
Fee Paid (amount $ )
Site Plan heard by Planning Commission
(if required)
Final Site Plan submitted with review agency, Planning
Commission, and staff comments addressed.
COUNTY OF FREDERICK, VIRGINIA
DEPARTMENT OF INSPECTIONS / 2h Caller Gm �A��c- Time Called Date Called (
7 0
Phone No. Time Requested I1 , OU Date Requested 8( 29I50
Received By �VA►J W y I Date of Inspection b 1 z4 lqo
PERMIT HOLDER NAME
RT. NO. Lot No. SEC. No. SUBDIVISION-RkZKSI DL V I L(-A G E
STREET NAME
DIRECTIONS KLe- QS-r0, — #,C BOSS F24jM1 RL)MtC-Z-04A l D BUILDING NO.
PLUMBING NO.
ELECTRICAL NO.
MECHANICAL NO
SIGN NO.
DISTRICT
PERMIT FOR:
Type of Inspection /
Residential Commercial V
Footers Setbacks: FR BK L R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final V
Site Plan \,,
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: I C) I S Temperature k �� 1- Cut in No.
Time Out: 0 '45 Weather 5000)J
Results: Approved v 1 NXO Cnim UaT'S� Rejected
Comments:
n A '' Si e 1 1 a L I I
/I�
Signature Lc_44 U Date Z i l g O
•
n
U
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
FAX 703 / 667-0370
MEMORANDUM
To: Chairman of the Planning Commission
Chairman of the Board
Back Creek Planning Commissioners
Back Creek Supervisor
From: Robert W. Watkins, Director
Subject: Zoning Review Committee Meeting on March 1
Date: February 22, 1990
There will be an ad hoc Zoning Review Committee meeting on March
1 at 1:00 PM in the conference room of the Old County Courthouse.
We will discuss the proposed Creekside Village rezoning. We are
having the meeting on an ad hoc basis because the application was
begun before the current requirements were adopted. Normally we
will only have Zoning Review meetings on the second Thursday.
Materials on the rezoning are attached. We will go over the
proposal 'and informally discuss. The goal of the meeting is to
make recommendations to the applicant on the information and
proposals in the application.
Please let me know if you have any questions.
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
•
z
is
APPLICATION FOR REZONING
FREDERICK COUNTY, VIRGINIA
Zoning Amendment No. Submittal Deadline is
CApplication Date �% - P/C Meeting: A
Fee Pai �jgI.(pl% B/O/S Meeting:
350.L1D (4a��) t
1. APPLICANT (The applicant is the ( owner other (check one)
NAME: /7/CH/]RA A• 6RAh�6e
ADDRESS: /-//Z A ,4 41/E. - ►,/pVf 1br 11A• 2-Z,6of
TELEPHONE: 7D3 667- ///`
2. Please list all owners of the property or parties in interest:
3. The property sought to be rezoned is located at (please give exact directions)
APr' 390' au7F// o•/ �/o siaE c�
04 /Qwj E 4 06 VA,
4. The property has a frontage of .0181 feet and a depth of 3'i4.i/ feet and
consists of A 4 L7 acres. (Please be exact)
5. The property to be rezoned is owned by 2/l/mwe 4. -4,z b as evidenced
by deed from recorded in deed book no. %Z$ on page
76 7 , registry of the County of :L-ZR
40ev,p-A4S - Gb00 ^ QODO� QOZOO
6. 21-Digit Property Indentification No: lo-So te-Aoo- OddO-ODOd-OCZ/o
Magisterial District: FQ4!2tR �'
7. It is requested that the property be rezoned from 100 to 8Z
8. It is proposed that the pro erty will be put to the following use:
�O(/S7J7L/CT/O,l Of Ze-wL�C of ..<,%n-- A-5 PA,PT OF «EKSme- ✓/1LAC--
AM'EzT V4,!Fu--V77-y (/(/DES' 4,AAf7XtlLJ/GX/ - --
9. It is proposed that the following buildings will be constructed:
RETl:/L�LIr{ LE S,dd tE c4C//LA/.VS S
i
10. The following are all of the individuals, firms, or corporations owning
property adjacent to both sides and rear and in front of (across street from)
C the property sought to be rezoned. (Use additional pages if necessary).
These people will be notified by mail of this application. [PLEASE LIST
COMPLETE 21-DIGIT NUMBER]
to A rav
1, Or°E6c/�/ H�7'/dam
P,� CF. y7�I441 elotlXeff
P02Scu/A 14z
elo Wi[uAii (r[4vmQ
Address:
.3//9 VA&&Y 4ti6 - AllAle. V4. 22601
Pro erty ID#:
- DO/9A
2.
��Hq,Qv A.
Address:
/9/1 s1AA1A AvE - k/ive. ✓A. 224o/
Pro erty ID#:
dYoe-.4a,- o`ado- ooz3o
,�
3'�liiARZ A• Ev.PA/ 7Q
Address:
/'7/Z 11,0144V_r- - W/MC. ✓d • 2260 /
Property ID#
, �66 -A06- 0,W -Ddao - 062¢A
4.E301✓H�4/Ul��/W4
Address:
roperty ID#:
r630Cb -4 - DDOD ^ ODOo - pO3 f0
•
C
r"
Page Two
Rezoning
NAMF
r
5. {d/�ii/Q�1 /7/�it'EFC1?5�
Address
Pro erty ID#:
Aco -e" - ooco - noz7o
6.
Address:
Property ID#:
7.
Address:
Property ID#:
B.
Address:
Property ID# :
9.
Address:
Property ID#:
10.
Address:
Property ID# :
C11. Additional comments, if any &ZrO/11511, 12M&2E ai /s i3EJit/!r SU6%L/T2 /L/
�`iU.icrh.�/' I✓�/ H. eEv� ,oia� ,A,r 2t�dfsrm �, he k/.arxuis
• I (we), the undersigned, do hereby respectfully make application and petition the
governing body to amend the zoning ordinance and to change the zoning map of the
Frederick County, Virginia, with the above facts as support of this application.
Signature of Applicant(��w4�14—zl,�
Signature of Owner:
Owners' Mailing Address: 171Z /�/iQ(�DL 1K — IVWk ✓q• Z24o/
Owners' Telephone No: 703 6 i-111
For Office Use Only
r PLANNING COMMISSION PUBLIC HEARING RECOMMENDATION OF (date)
I� Approval I ] Denial SECRETARY (signed)
BOARD OF SUPERVISORS PUBLIC HEARING ACTION OF (date)
I� Approval I� Denial COUNTY ADMIN. (signed)
•
•
0
C
Ll
S Z5'48'00'
Z/.ZO
CA?EEK
/. 6 G 7-46R6.5
ZONED QO
( r0 BE REZOA/EO B Z J
\
\
3A.
�0 '�Ot y0
E 0
8� "fo-
6 la 5
jp / A?EZON/NC vtar CAB
0ER C,QEEK L ,v �
SCALE / " 50K " DATE r ✓4AIIIARY 3, /900
No. 1628
Cjreenway Engineering &Surveying Co., Inc. ;�•b�s �o��
1104 Baker Lane* Winchester. Virginia• 22601.703-662-4185 URVE
H. Bruce Edens* President SHEET of
psi W.C.PL.~.746/
•
19A,, 21 3
20
AW
Rt. 706' (� /
> 39B 3
s
?1D
32 104 A
38 33 9 �� Boa, •.
34 09 O 110C j 2
I 35 6 %" 211 •
37 36 2Ta— �•
5
B-3 110 115
�` 6
118
4,
3
Vzse—tee
INSERT 63� 90 315 - 119 •
e9 2 pts.
�• � tRF-(if
-1.- Rt. , 87
578
322 —34 s
U B.M.756
87A 4�
� 6
g— 386-339) 2A
Q~0 = IZ 116 B
9 �� 277
c
26
i rr,
�� 68 � ix � s � �� `'c IA
BmB.,,fmcl
6189 ( DK728PG767
10-02-89 11
�g s
z r4
J
o••
0 0
oU)
a) W
o �4
o •o Z °t
Lr, ra
� N t
a�
+J
1•
THIS DEED made and dated this 13th day of October,
1989, by and between Z & S PROPERTIES, a Virginia Partnership,
party of the first part, hereinafter called the Grantor, and
RICHARD A. GRABER and MARY JOLEEN GRABER, his wife, parties of
the second part, hereinafter called the Grantees.
WITNESSETH: That for and in consideration of the sum
of Ten ($10.00) Dollars, cash in hand paid, and other good and
valuable consideration, the receipt of which is hereby
acknowledged, the Grantor does hereby grant and convey with
general warranty of title unto the Grantees, in fee simple, as
tenants by the entirety with common law right of survivorship,
the following described real estate, to -wit:
TRACT ONE: All of that certain tract or parcel
of land, lying and being situate in Back Creek
Magisterial District, Frederick County,
Virginia, containing 0.371 Acres, and more
particularly described by survey drawn by
Douglas C. Legge, C.L.S., dated February 2,
1987, of record in the Clerk's Office of the
Circuit Court of Frederick County, Virginia in
Deed Book 643 at Page 180; and
TRACT TWO: All of that certain tract or parcel
of land lying and being situate in Back Creek
Magisterial District, Frederick County,
Virginia, containing 1.296 Acres, and more
particularly described by survey drawn by
Douglas C. Legge, C.L.S., dated February 2,
1987, of record in the aforesaid Clerk's Office
in Deed Book 643 at Page 176;
Tracts One and Two being the same property
conveyed to the Grantor herein by deed dated
December 8, 1987, from Mendle S. Zickefoose, et
ux, of record in the aforesaid Clerk's Office in
Deed Book 667 at Page 190.
Reference is made to the aforesaid surveys and
deed for a more particular description of the
property herein conveyed.
This conveyance is made subject to all rights of way
2E 768
and restrictions of record affecting the subject property.
The Grantor hereby covenants that it has the right to
convey to the Grantees; that the Grantees shall have quiet and
peaceable possession of the said property, free from all liens
and encumbrances; and it will grant such further assurances of
title as may be requisite.
WITNESS the following signatures and seals:
Z & S PROPERTIES
BY
ENDL `S. CK, OOSE, Partner
BY /G `�" G �I'�" (SEAL)
RALPH SHOCKEY, Vartner
STATE OF VIRGINIA,
City OF Winchester TO -WIT:
I, M. F. McLaughlin a Notary Public in and for
the State and jurisdiction aforesaid, do hereby certify that
MENDLE S. ZICKEFOOSE and RALPH D. SHOCKEY, Partners of Z & S
PROPERTIES, whose names are signed to the foregoing Deed,
dated the 13th day of October, 1989, have personally appeared
before me and acknowledged the same in my State and
Jurisdiction aforesaid.
Given under my hand this 17th day of October 1989.
My commission expires- September 30, ,-1993
y
0 UBLI
2
II
°
COUNTY of FREDERICK
Ii.
C. William Orndof, f, Jr.
;) ( Treasurer
703/ 662 - 6611
I(*
I �9
TO WHOM IT MAY CONCERN:
ALL REAL ESTATE TAXES ON THE FOLLOWING PARCELS ARE PAID IN FULL THROUGH THE YEAR
OF 1,989.
Z & S PROPERTIES .37 acres located at Kernstown
1.30 acres located at Kernstown
Richard Graber 1.82 acres located at Kernstown
Kneeland, Mark :c 1.84 acres located at Kernstown
C. William Orndoff, Jr
Treasurer
P.O. Box 225 - Winchester - Virginia - 22601
U
(0
REQUEST FOR REZONING COMMENTS
Frederick County Commonwealth Attorney
Winchester -Frederick County,Judicial Center
5 N. Kent Street, Winchester, Virginia 22601
(703) 667-5770
The Commonwealths Attorney offices are"located in the Winchester -
Frederick Judicial Center at 5 North Kent in Winchester, if you
prefer to hand deliver this review form.
Applicant's name, address and phone number:
Name of development and/or description of the request:
Location:
Attorney Comments:
Language used appears to be legally -binding upon the applicant. If it fully
and accurately sets out what staff desires from applicant, proffer appears
all right.
42
Attorney Signature and Dat
(NOTICE TO ATTORNEY - PLEASE R URN THIS FORM TO HE APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Please
also attach a copy of your application form, proffer statement,
location map, and all other pertinent information.
Sri
M
{
Mr. Richard A. Graber
1712 Handley .
Winchester, Va. 22601
January 15, 1990
LAO,
Mr. Lew-'r's Ambrogi
Frederick County Commonwealth Attorney
Judicial Center
5 N. Kent Street
Winchester, Va. 22601
Dear Mr. Ambrogi:
Mr. Robert Watkins asked that I provide you with a cover letter
regarding our project in Kernstown and a description of our request,
Proffering Statement, location map and Master Development Plan plat.
The request covers a three phase commercial project on three parcels
of land with a combined area of 4.7 acres.
Phase I of the project was purchased in 1988 and rezoned from RP to
B-2. A site plan was submitted and approved and construction of
approximately 14,000 sq. ft. of retail/office space is presently
underway. In an agreement with the City of Winchester and The
Frederick County Sanitation Authority, city sewer and water lines
have been extended to the property. We have worked with the VDOT and
obtained approval for a relocated commercial entrance which is now
completed and the installation of a revamped traffic signal light at
the entrance intersecting Valley Avenue and Shawnee Drive in
Frederick County. The light will be operational by February 28th
according to VDOT.
Phase II (B-2 zoning) and Phase III (RP zoning) were purchased during
1989. With the inclusion of these two additional parcels, a Master
Development Plan is required since the project size has increased.
Phase III also necessitates the submission of a rezoning application
and proffering statement.
The total project will eventually contain approximately 45,000 square
feet of leasable retail/office space. Phase I should be completed by
late spring in 1990 and complete project buildout should occur in
1991.
January 15,
Page 2
Attached for your review are the following:
Commonwealth Attorney Comment Sheet (For rezoning)
Proffering Statement
Impact Statement
Master Development Application Form
Rezoning application request form (Phase III only)
Master Development Plan Plat
Your earliest possible review and comments regarding this request
will be appreciated since we hope to have the master development and
rezoning requests reviewed during February by the Planning Department
and the Board of Supervisors.
( W14Z�- �
Richard A. Graber
Applicant/Owner
Bob Watkins
REQUEST FOR REZONING COMMENTS
Virginia Department of Transportation
ATTN: William H. Bushman, Resident Engineer
P.O. Boa 278, Edinburg, Virginia 22824-0278
(703) 984-4133
The local office of the Transportation Department is located at
1550 Commerce Street, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
ZA-VAQ4 �% ��� /31JZ - /;/Z 1.1XN0 LEy .4 /c= r ��c%iJEs , V4 224ol
Name of development and/or description of the request:
5/Dr= l//LC<46E — R,--4e1EST a /'?) ,
A20.f�T 7-WO,-/ kIP An A -2. ,4yA.sE -T /S
AA°MoYi5ZI AAf/ ZAIV-5 7l - is ---
Location:
J-W- o% A 7AW-e Oft
z' �4 Z S/ 7,— 114. 86r:v[/
419 A4Y;Z:-7 // A 14 DAv XW 11zzW171
A RT' 7o� /Av Tij���}<<C�/ZE �Sis7>Z�T A�,C?elC< Qx&AIU , ✓4.
Transportation Department Comments:
No objection to rezoning of this property.
before deveiopment, triis office win require a complete set or construction
plans detailing entrance designs, drainage features and traffic flow data from
trie rip Ceneration vf.Muurtrii ion for review. Any worR per ormed
on the State s right-of-way must be covered under a land use permit. This permit
is issued by this ortice mires an inspection tee anti surety bona coverage.
VDOT Signature and Date: A-) %/, (,-O �_ayc gG 117,4170
(NOTICE TO VDOT - PLEASE RETURN THIS FORM TO THE APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach a copy of your application form, location map, and
all other pertinent information.
C.'
REQUEST FOR REZONING COMMENTS
Frederick County Sanitation Authority
ATTN: Wellington Jones, Engineer/Director
P.O. Boa 618, Winchester, Virginia 22601
(703) 665-5690
The Frederick County Sanitation Authority is located on the
second floor of the Old Frederick County Courthouse in
Winchester, if you prefer to hand deliver this review form.
Applicant's name, address and phone number:
�/ llw o 4. c!,eAAfK —1-7i.2 Sys 4LAE - k/Av -- 04, z26 o / -
(170.3) 64 7 ///6
Name of development and/or description of the request:
606z C'-s/DF 11/LA6E -Z61Vr-- Td A
.2aT�T RWO.-41 2,d 775 B -2. .4 -Z .5✓ f/e S 8� /
do��11ii6-A fi /'nA1srx . is ii AbV" JZ
• Location:
A�i�/1Ot�/.y�AT�y 9� 1✓L-sT Ac &C. R77- // A-41.0 eN 7,%Y` /fI61,0 /
✓A ervl 7b4 /,f/ 7 edeKe;CE� .c_s ill C �r1��sQl 16< L w�" , V,4
Sanitation Authority Comments:
7'Y of Wc'�,E'ST- Zff V,CS Tiy�/s •S��,E�9
wl Tll
4Eh'E, ,1A9,yTS W/711 T/�� G/Ti' �lG ST •�9f �.�.��A�D TO.
Sanit. Signature & Date: E RETURN THIS FORM T9d
(NOTICE TO SANITATION EASO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach a copy of your application form, location map, and
all other pertinent information.
C
C
REQUEST FOR REZONING COMMENTS
Frederick County Fire Marshall
P.O. Boa 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Fire Marshall is -located at 21 Court Square
in Winchester, if you prefer to hand deliver this review form.
Applicant's name`, address and phone number:
/l/af)/1 D i1 Cp/ rZ /'%/Z /14AIA/ E 4 t/E- — 40,1/G A4, Z 2b o/
Name of development and/or description of the request:
�� Cd�X �s iA/.��.�-� --. ,aH.z� zz� /s • At.2�,dy 3�/E4 B -z.
Location:
N Ai, of � e Marshall Comments:
WI P
tots,L--
�S A)C q �
�A tic:
✓A .
A roo
Fire Marshall Signature & Date: L
ALSO, PLEASE(NOTICE TO IRE NOTEAIFRFIRE COMPANY RASURN BEENHIS CONTACTED.)TO APPLICANT.
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
140 possible in order to assist the agency with their review. Also,
tiplease attach a copy of your application form, location map, and
-all other pertinent information.
COUNTY of FREDERICK
Departments of Planning and Building
REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS 703/665-5650
/�Zae_ , Frederick County Fire Marshall
`�T�.c/c-TTE P.O. Box 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Fire Marshall is located at 21 Court Square
in Winchester, if yqu prefer to hand deliver this review form.
Applicant's name, address and phone number:
/'7/ZAvc--
Name of development and/or description of the request:
116 Location:
Ii
SAS S</Jft/N ati TNT' A7T,1Cr��tAi_ �stes� L tt/,AS
P.42t7//6Z/S1- y A4 -eoaM d JY
- -/ (,
-2;z !�I/�i/UE — �`72�
Al�i<
fot/�/T� -
.c�d/Z Dt�li✓Es
Ttt� Wi.+/e . �'iTy L.6'11 r---?, .
z xls zS
: OF AAW,!EZ.S ZO,
Z/ , Z3
"A Z90-'
aN T� 'IA J
466.3 /A/
Fire Marshall Comments:
/Uri / �,��Win. c "' A -7— %�r v�/�>>� j l �x� � '%S �'�'nT•�'� i F7j,
Fire Marshall Signature & Date: A//
(NOTICE: TO FIRE MARSHALL - PLEASE RETURN THIS FORM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach TWO copies of your plans and/or application form.
REQUEST FOR REZONING COMMENTS
C_
Frederick County Inspections Department
ATTN: Kenneth L. Coffelt, Director
P.O. Boa 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Inspections Department is located at 9 Court
Square in Winchester, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
,E�i<FlA2o 4. 171E At/E - kIlAle. ✓A, ZZl o �
Name of development and/or description of the request:
Tb IIr OF s! 7Wi0�E Af.
y ,� B-2- - ,Nd.s_ r
C• Location:
f/, A� �/ S Rcell-t- // A� OA %/lam it/D,VV �dE D,C 1/x- _ *,4
141 7I� .eAIKe,66� ,�li16115- Z _.dc ,,Xj_S1W1lJ" 41�c ✓A.
IInspections Department Comments:
/�1', 5 -g r
I�Fu 11 I 1 (10" . 1i, 7 ct
9- .7
Inspect. Signature & Date:
(NOTICE TO INSPECTIONS - F
E RETURN THIS FORM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach a copy of your application form, location map, and
all other pertinent information.
REQUEST FOR REZONING COMMENTS
City of Winchester, Virginia
ATI'N: Tim Youmans, Planning Director
Rouss City Hall
15 N. Cameron Street, Winchester, Virginia 22601
(703) 667-1815
The City of Winchester offices are located in Rouss City Hall at
15 North Cameron Street in Winchester, if you prefer to hand
deliver this review form.
App;;��licant's name, address and phone number:
,&11,4,W �- 444,96t - /'!/Z Alf / d c% - A//,f 1/4 . 2-2,66/
03) 667- ////,
Name of development and/or description of the request:
�LLA6f- - fE�, /A% Aj OF ?WkE .� ��{,QI�L Gam" �t/d .4S A/
/r/UX/
/9S9
77tiS e6c tel - /S ?an " RO.v.A-Ay 77/F f V 4SE -W� AVeer- jrto y .ep 7a Az
Location:
A,�Pr�x/,y�ir�zy �90 ' w�- o,�y s. ,�.�- /� �vd a� r� .c%�t s✓.d�o�-
'/a . Pr'e 794- 141 � .B4611- C2Eb(-,J AlsVIc7- DOC ��.r �cYr.✓� . !/� .
465-6�MK- TdCIfHE-S ZME- fuo127,71A%v ;;zd OF TN,— fie« 4x1d ,cs 7,3�F- WlAle .
C17ZI ZIA117S Bte,'A -•ey hl/ A4e-19dN A %� Z f,5AI
City of Winchester Comments: / /
I
City Signature and Dat�� _ ///'j",
(NOTICE TO CITY - PLEASE RETURN THIS OIM TO THE APPLICANT.)/
NOTICE TO APPLICANV---'
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Please
also attach a copy of your application form, location map, and
all other pertinent information. ,
C6
REZONING APPLICATION - IMPACT STATEMENT
APPLICANT #
I the undersigned, owner and rezoning applicant hereby submit the
required Impact Statement covering those topics applicable to my
rezoning request for Phase III of my property located in Kernstown,
Back Creek Magisterial District, Frederick County, Virginia.
Impacts are as follows:
I. Transportation Impact
o A traffic analysis using the publication "Trip Generation"
published by The Institute of Traffic Engineers and rates
based upon our expected land use and building types were used
to anticipate traffic flows in and out of the subject
property.
The rates are weighted averages from a U.S. Study. General
C� office rates are for suburban office space outside of the
downtown core. Shopping center rates were used for the retail
space as no rates were available for small specialty shops.
Rates are shown as number of round trips (in/out) per 1,000
sq. ft. of leased space. Assuming a complete build out,
Phases I, II, and III would be 43,000 sq. ft. of leased space
and the occupancy mix would be 45% retail and 55% office.
TRIP GENERATION
SOURCE MATERIAL CHART
AVERAGE ROUND TRIPS
TYPE
PER SQ. FT. OF
OF
LEASED
SPACE
BUSINESS
MIN
MAX
AVG **
GENERAL OFFICE
Weekdays
3.6
43.5
12.3
Saturdays
1.0
8.9
3.3
SHOPPING CENTER
Weekdays
21.5
270.9
115.8
sq. ft
+) Saturdays
N/A
N/A
156.3
C0
Rezoning Application - Impact Statement
January 15, 1990
Page 2
I. Transportation Impact Continued
Project Space:
Office Space: 43,000 X 55%=
Retail: 43,000 X 45% _
Sq.
Trips Per
Total Max
Ft.
1,000 Sq. Ft.
Daily Trips
23,650
Wkdy
12.3
291
Sat
3.3
78
19,350
Wkdy
115.8
2241
Sat
156.3
3024
"NOTE: These estimates are thought to be considerably overstated as
the retail space will consist of small specialty shops
rather than typical high volume "shopping center" business.
The "average" column was used for computing both office and
retail calculations even though the "minimum" column would
probably be more applicable. However, we felt it best to
show the highest volume scenario.
o A traffic signal is being installed at the entrance to the
project by VDOT. The signal change is being done at the
owners expense as agreed to with VDOT,
II. Water & Sewer Impact
In accordance with agreements previously reached between the
applicant, The City of Winchester, and The Frederick County
Sanitation Authority for Phase I of the project, the property is
serviced by the City of Winchester to satisfy water and sewer needs.
V o An approved six inch water main extension has been extended onto
the property from the twenty four inch main water line
paralleling Valley Avenue on the eastern side of the subject
project. This line will be extended to Phases II and III and a
second fire hydrant will be installed on Phase III in accordance
with the Fire Marshall Regulations.
s!o An eight inch on -site sewer network has been installed during
Phase I and will be extended to service Phases II and III. The
gravity sewer system ties into The City of Winchester's twelve
inch line on the East side of Valley Avenue. In agreement with
The City of Winchester the tie-in to the city's existing system
is being completed by the applicant and is a cost sharing
project which will enable the city to subsequently extend their
twelve inch line West on Snyder Lane to complete a pending
project for properties lying to the North and West of the
applicant's property.
NOTE: The above mentioned projects are being funded by the
applicant or shared as in the case of a specific section
of the sewer tie-in.
Rezoning Application - Impact Statement
January 15, 1990
Page 3
III. Historic -Structures Impact
o There is a large 2 story house on the property that was built in
the 1790's. It has been preserved and remodeled by the owner.
The colonial style of this main building has been retained and
used as an architectural guideline for designing the proposed
additional new structures on the property.
o The existing brick garage has been remodeled and expanded to
create a 2,100 sq. ft. free standing art gallery.
IV. Storm Water Impact
o Phase I of the project has been designed and altered in
accordance with the recommendation of the Fairfax Engineering
Firm that services the Frederick County Planning Department. As
a portion of Phase I lies within the 100 year floodway, two
buildings have been specially engineered to meet new
specifications and two others have been relocated to Phase II
and Phase III properties.
o The Hoge Creek channel which intersects with Phase I has been
dredged, widened and rip rapped to carry water through the
property in high water situations. The area designated as
floodway has been graded as specified by the Fairfax Consulting
Engineer and parking lot elevations have been established to
carry Hoge Creek overflow through the applicants property
without forcing water onto adjoining properties.
V. Screening and Landscaping Impact
o All existing trees and vegetation in Phase I has been preserved
except in building and parking area construction. Unsightly
vegetation has been removed and is being replaced with fencing
and new plantings as part of the overall landscape plan.
VI. Surrounding Properties Impact
The subject property is bordered by the below listed properties:
o North - Residential rental property zoned B-2
o South - Undeveloped land - zoned R-P and a single family
home zoned B-2
o East - applicant/owner's property - Phase II of this project
- zoned B-2
o West - Opequon Presbyterian parsonage - single family home
�� zoned R-P
C.1 �
Rezoning Application - Impact Statement
January 15, 1990
Page 4
VII. Incremental Revenues - Frederick County
o The completed project will include approximately 43,000 sq. ft
of leased space (19,500 retail and 23,500 office) Frederick
County will receive incremental, tax revenues from inventories,
furniture/fixtures, equipment, improved real estate and retail
sales.
These, to the best of my knowledge are the impacts applicable to the
rezoning of the Phase III section of my property.
Applicant and Property Owner: Richard A. Graber
BY&4�
:
DATE:
C»
MASTER DEVELOPMENT PLAN AND REZONING - PROFFERS
APPLICANT #
We the undersigned, sole owners of land to be rezoned under
rezoning request number referred to as the
rezoning, and the applicant for said rezoning,
hereby voluntarily proffer the following conditions. The
conditions proffered shall be binding upon the heirs, executors,
administrators, assigns and successors in interest of both the
applicant and owners. In the event the Frederick County Board of
Supervisors grants said rezoning and accepts these conditions, the
following proffered conditions shall apply to the land rezoned in
addition to other requirements set forth in the Frederick County
code:
Transportation:
A. The sole entrance/exit on the subject property will be the
commercial entrance onto Route 11 at the front of the
property. Traffic will be controlled by the traffic signal
installed at the owners expense at the intersection of Route
(16 11 and Shawnee Drive (Route 652).
B. The only entrance/exit to Route 706 on the southern boundary
of the property will be an emergency vehicle entrance.
Water & Sewer
A. The water service to Phases II and III will be extended from
Phase I by the owner and a second fire hydrant will be
installed in accordance with the Fire Marshall Regulation.
B. The sewer line to Phase II and III will be extended form Phase
I by the owner.
Aesthetics: The project will be designed to create a village type
shopping and office complex unlike the typical "strip
mall" look that is prevalent in most new commercial
projects either recently completed or presently under
construction in the Winchester/Frederick County area.
wIII h�
o The existing main building built in the 1790's i---b�g
preserved and remodeled. This structure fronts on Valley
Avenue at the entrance to the project.
o All new buildings that will be constructed during the three
phases will complement the existing main building and colonial
brick and siding architectural standards will be followed.
o All non paved open areas and parking islands will be
landscaped with a mixture of trees, shrubs, flowers and grass.
An underground irrigation system will be installed to assure
all plantings are properly maintained.
i
1,
C Master Development Plan and Rezoning Proffers
January 15, 1990
Page 2
Aesthetics: Continued
(46
co
o All signage will be in accordance with established standards
set by the architect and the owner and must be approved prior
to installation. No business sign shall exceed 100 sq. ft. in
size.
o All outside lighting will be of Colonial or Victorian design
and perimeter lighting will be directed on site and will be
non -glare so as to minimize the impact of adjoining
properties.
o Curb and guttering will be used in•wmsA_ paved areas for
aesthetic appeal and water run-off control. All traffic areas
will be asphalt covered.
o The property line between the applicants project and the
7-Eleven Store on the Southeast of applicant's property will
be fenced with open fencing. The southern property line
bordering VA Route 9706 will be a combination of parking and
landscaped islands on the applicant's property. The parking
area within the Winchester City limits will be landscaped as
previously agreed to with the Winchester Planning Director for
Phase I site plan approval.
Storm Water Manaqement:
A underground storm water collection and drainage system will be
installed as a part of Phase II and Phase III site work to
facilitate rainwater run-off and drainage from the project property
to Hoge Creek.
Underground Utilities:
All electrical, telephone and cable lines on the property will be
installed underground for aesthetics and anticipated new county
regulations.
Master Development Plan:
The owner is proffering the Master Development Plan covering
proposed uses of property and applicable drawings as submitted to
the Frederick County Planning Commission for Phases I, II and III
of the subject project.
Master Development Plan and Rezoning Proffers
January 15, 1990
C . Page 3
Continuity:
It is the intent of the owner/applicant to maintain the property
under individual ownership and to maintain the standards outlined
in these proffers.
If the property is sold at a future date, deed covenants, where
possible, will apply to future ownership to protect the original
aesthetic and historic preservation intentions as stated above.
These proffers shall be binding upon the heirs, executors,
administrators, assigns and successors in interest of the applicant
and property owner.
This document shall set forth the total obligation of the applicant
and property owner to The County of Frederick in connection with
the rezoning of the site. Consequently, the applicant's and
property owner's obligation shall not be subject to future
modification or enlargement without the express written concurrence
or consent of the current property owner(s), applicant or their
�• successors and assigns.
Applicant & P per Owne . �R' and A. Gr ber
BY:
(.
DATE: --�,O oc/ % 4 11KO
ss:
Subscribed and sworn to before me on this 7 day of
19�0
Notary Public: C-ate Cca.c�, h
My commission expires: My Cr-mmission Expires October 11, 1992.
e.X �YA':JSyN to `
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703/667-0370
December 14, 1989
Mr. Richard A. Graber
1712 Handley Avenue
Winchester, VA 22601
Dear Mr. Graber:
The Frederick County Planning Department administratively approved
Site Plan #022-89 for Creekside Village on December 14, 1989. This
site plan calls for the construction of six (6) new buildings for
retail and office space. Enclosed is a copy of the approved site
plan for your records.
If I may answer any questions regarding this letter, please contact
me.
Sincerely,
Evan A. Wyatt
Planner I
EAW/slk
cc: Mr. Harrington Smith, Shawnee District Supervisor
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
1.
•
APPLICATION AND CHECKLIST
FOR
SITE PLANIN
,1-�28?9��0
THE
�,�
COUNTY
OF FREDERICK,
VIRGINIA
c�D�h�6
�1 d 1989
,�/J'
DATE: IIA%I�f/ Z�� /�-JSL/
APPLICATION
NUMBER:
o �P O pt4
�`' ANp NING
APPLICANT/AGENT:
R/6/AZ,4
A. 4,eAae5P4
NT
ll/
ADDRESS: /1/2
11A NaLEy .B VE
Jr//it/GyE
S/29Z ✓4,
2Z6o/
PHONE: �0b)
t4�-7-///�
The following checklist serves solely to aid the staff, Planning
Commission, and Board of Supervisors in reviewing your application.
Please complete this checklist and submit it with your proposal.
BACKGROUND INFORMATION
1. Location of property: IIAZZEY-dt/�t/dE-/5�25 W< &W
2. Property tax map and identification number: A4Q1 Z #Z3--7AY"A,P
..Z:D. # 63000 -Aoo _cam- oo _ po23o
3. Property zoning and present use: k/4,C&ET^p,(!� 7a ,B-Z IN /988
4. Adjoining propert zoning and present use:Ae741L
l/s� ; ��� B -z ���si,�Fss �i�.a�) AW RP ,per
S . Proposed uses : 1e&-1A&- Z f1SF
N
6. M a g i s t e r i a 1 D i s t r i c t:
4,dN.6
7 . N o t e s : /`M 0 i &-7- k//T1�/ VAC %ZF6 A IZ4/4/y .fit/T l/!E/ /T /ate//T A4,0
.S�/B/7/7lF4 S/1� 044*-/ AAh& D7h�.,2 /ZcGpt/E.S7��tS �lTA. � 7>�"'% Aj%x/
IlAtIEFF' Her Wll V 7W W/A/4,�S78t-' AZIAZle 4177Z./77-0M �o•�/Ni/� �
AeeF/V-,s4 Tb e-eweAe7- 72>
k/lr?l 4 eOl-e `rT/QX1 TAit/� / bRIM4Ea2 r0/.1/
.4722(6y�5D ) / W.,& - AAE-54W'r 7frls ZA729P2 /Jilt/ A &VA �F
r
///ezl �/.B/�.csS/Dx/ 7 S/7� A�Ad WE Age!F �2E FST� j
.B� k•Li'EfXla'�ylil��l�/�V' .sires �I2�p a�,a�io n/ 4 y
Z=Z
1W Tt/� Z Aelll! ZI I 7�
�v=001mo' 7W EEj-/47"
1 E1Dli-/ &STD /iVlXj!D /,d bt/cce:I-S� 2
•A) Cod-JPG� �Pt�c.or�o-�/ �j/zK!-�sr )a/2-y
�) �Uk (4) e; IVMs Cr TlfE- A44,J b✓/17-1 Thy
e64t4.16c:!-.- z�/�/%vy SEoi�avr �d�io2S r
4elA) r or„�r,✓ y Ti1� eW77'1.4AJ1E1AeV'i T 4WD -SEAT owl
ay V.4v r
,a) B 1�✓O �,v =- Sf�oGt�/.v y 7� ,Bi✓T���.�ar�� .�-�, y�
IE
A1201asEZ
Ti/�SE BU/c1�i.J� s 1V1� ciZRsS /1 EF724=-A/4 7,/E 4/7ZE I'le 44-It.
Tb TW AV AIai t/ ,6&&ALAI fc
.I Jillu- L 9,t�6x/T J iZ73 AVA .517-3r-- P"AJ S /b
�I) lr/ElU�cI6Tac/ .✓�0.�/3 - �U•vr� <S,c�i�zlr��1 �Tf/o✓rI-%
�F �DSS/� � G�.�DuLd �//lam /� /`fE�T !C%//� tz/ d•�rc�
y
f%/z 1.�/a>�x/ /1Qy'.d/1.07�1'y .APB/?rJG�c_ o� .%X/,�.oi�� ��►2yir�
4o'J.4 r4Lc;:- ,ee����v�vy grid'
AM171-DZ1s 44 RM7 Tt. O A1- 4AJ .4//4. 1At S ae.2eede'
/sr�.try ew 7 (*A, E 1)
/.�'kk1/ems 2 �SS�-S1��krc /J iafis ,ya,r�_
<S/NL 46t"
-<!�L g4
/ 7/Z 174�k/.eAeil ,dvO-
A6I-///�.
1]
W
F CPUSrs�J 10it/E BASE
7"Y,,0/C,1 C yQ L `" SEC 7/OA/
7y,PIU 67A17Te,4 Al/C E
1-711O G 6- �x T,e4 O,P U/Iv,4ley
SCALE: DATE /v14 ec_.s� z8 . i9g9
GREENWAY ENGINEERING AND SURVEYING CO.. INC
TFI i PHONE 1�6; 4195
�EpLTN O,c,
.� r •
O Z' •
c� H. BRUCE EDENS
No. 1628
,
•,'•�Oa.,4URVF���
SHEET of
gyp,
&tIlLmm.r. STY LE
Flgl-%14FIJ S ft cF MIX
REMIL
DFFICE
TbTnL
A
Z ST69Y Ff1A ME
1320
1370
Q
Z $Toz y BR I cK
13,zo
1320
C
Z STaR%/ FizdME'
LLo
t&0
13Za
p
Z STORY FRA/KE
440
6Co
l3-zx>
E
1 STbRy SRIc-K
40o
400
F
Z STo2L-1 F-9414&
( 370
132.0
I S Te Ry s 1 dmc
boo
4.00
l.j
Z 5Torcy goe-K,
9.60
660
! 3Zo
SUOTTL.-MEW � 567.6 3300 B�Zo
App CKIsrlu6t aLb&s M P.,T-- 2E►�IOVF�-a
MAIW
Z Sro2y &ZICr-1FPAHr-
Z710
ze-0
Z4 ►o
2ncd
Z s rO2Y 132i cr-
14e�o
6 0o
20ao
SLI&.TfL•-6y4ST XLD&
4110
boo
4c110
�'D t.
q? 3o
41 co
1383�D
PAIZKIM6 ftb4c! I R�ho.1'T3 =
P�11s1 N ES Say �T foli i Pp S
R�tA IL 9730 �+ 49
C� FFI cE 41 oo 4cso l o
TorALS: 1 13.83o 1 1 s9
S*Az,dt/ llowAorloxl
atA114bAZ--SrsX � 7-///6 )
RECEIVED
80 EDIN13URG RESIDENCY
MAR 291989
REQUEST FOR COMMENTS
�&a
❑ RE ❑ JAC (� F ElKJushman
❑ ARE O KDW RBC O R
TO: PIES
Resident Engineer
VA. Dept. of Transportation
P.O. Box 278
Edinburg, Virginia 22824-0278
(703) 984-4133
COUNTY of FREDERICK
Departments of Planning and Building
703/665-5650
Local Office:
1550 Commerce Street
Winchester, VA. 22601
(703) 662-8876
FROM: Robert W. Watkins, Planning Director DATE:
SUBJECT: Review Comments for Conditional Use Permit Rezoning
Subdivision fr Site Pjan
Master Development Plan
Please review this request for ary �/1/Ti�A/«/�C/%/ J/2-
1 o c a t e d at /S/ V,,GLl--y ZVE - COVAl
Proposed building and improvements: e/rz L./iy/J,
10 AAL 41Z(4-0 l/i° W11-& y.4}✓i(AZ�- 40I/E (Ar* 6S2)
112106 HF7- WiT7/ ,ea6r c///4D/Z6Xs .A-r 7 7h�--AA&V.,7
This comment sheet must be returned to the Frederick County Department
of Planning and Development, or the applicant, by
for the meeting of
VDOT Comments:
Site plans have been reviewed and approved by this office.
Before work is allowed to start on t e entrance, a land use
permit must be applie'd for and issued by this office. The
permit requires a fee and surety bon coverage.
VDH&T Signature: 51t/. )Ze Date• / q8
Applicant's Name: /6/iF.Q11 A. e!r-iQABEx�L
Address: 'i/Z A6 Ay
,A. ZZ6oi
Phone Number: 403) 661Y-1116
NOTICE TO APPLICANT: It is your responsibility to �(�/7
Virginia Department of Transportation for commentsr,3y project and to return all comments as part of your tion
before or on the submittal deadline date. ,, ag
I�
9 C'nnrt Smiare - P.O. Box 601
Winchester. Vireinia
22601
w � •
"/z RegE./zr a L01//46R, SS ~elq zz /969
/-1/,4iIUTA-1 Aoqz,-firt-, S�emLjsr
11/2b/N/A .64'7.- Di 7;eAA4s Pa,e 7Z T/A�
,160. ,BOY Z78
,O 11/,B&X4 , i/A. ZZBZ¢
oV/A/,4 �U/z MtWW14 D,v pia A�e 3/z�1- / •4,Y 4SArcLPs I.vy
1-27',Fr A,6 /J 171- e /-4t- /NF��M•d -/Dx/ Wf/iLy / /w o246�wl-
72� /L / ou2 ,SATE ACAA1 �, 145V-"fIr lIc'a0+r/c� 4A' £vmAvcE/
&lr .4T 26/.5/ v4ud7 d ✓e7 krE /A/
OF fl*!7 k//s/Z-Ws749'L ea
S�PE 4oc- rhtF- /bZA V
/r /.s AA'VUEE56 1b Z6mjo,Dtz 72�0 7.3r=7WO -0*-6/4QA(-,
Sn2clUL//1c3 Dec/ T1� P.Qor� � �i!) •� 1l% STfi�y ��� hbc,CtE
(B) ,A )2�b 5T1,AZy SR�fK 9A2.4rE/.ol4rQrsyFY/r: TYA3E Ttvo
.:�Wsr/,c/y Brim rv�s wig �,,vis� .Ar •�Ao���iyar�y
,OPof ,eon /�/os�� �o,4�E. /� o'ei ri vv DzoE
,fir,/ra/Nys WI= i.✓rc� � lo•�/s�dcTi•Uy F../6c�r •�iEu/
.srzUfTU�E3 y/^/y ,N S,�E O� �So &4 fT
.tea fir. , �/,�eai Ga�lP�rieyv wE �sr��,er� r/e✓%�y ,a r�ra �--
OF o00 — /f, c� sQ r=r of ,rlac��- s oecE Gc� 72> a�
r1S.,;t6 AIM, o/L. -:�OSr/.dzl�, R�7ri�L SP•dtE.
0 2
&-Z4MAT/rU6/ J74/ /^/11EP-/o,4-
.AlfEs.sG2/E� S/oP
7lzd*Pe- ✓oz.
.4D k/
C) 02/ � �2v6r Bus/n/Es s boa d /DW
1� )
�j
J)
17 LEd SAS -
411e/T/�i'/•oL E3 IVA ✓E Be&, / •eKFN�O 17Gv'f
DI'�'l��2 S,�zi�c�l+-f AX1S✓A/E".SSE� �SCC�h✓S
�i/I�Pc4�E BdSAAFS_S
,moo k d -L- CoV72FX�
densr
AOV"q-/,Iy Ze1s/A19;Ss
_5e �: "srne -- -�-- s — A/A!! De/e- .otzae.
k) AMW IOW- a «SIOVAFs - AF-enAl3C
r H/tea c s,QV/,lf S
ice-SAACE-
f0. ' yi✓ 72)
IXYo
scQ�
rarx� �
'OVO y/ 6f/ ✓D/[/i`lE 6�/S/�/E�S t'3 N//lG l3E .�GY/�'� �b /e- j
V14o&'a
• G�o2eTii�
y�c//zs :
►.�- aN J7c/�A/�
o�e�r/�y ,yodel �,Ji«
�x/T L r o v %b ✓� ` .D vE ,r/a�2n,� �Rr'�`//) , Z! % wig
�,eCISS My F rifllb'ZS�7/O�l E6Js ?' &IVe- �0 4521)
0 3.
AND IS 7o W&L R16177'
• 77ZAFfi� .�✓c��vo�.• /�/ f�.P�l/ovS �O�+vc52.Sor��s 1.��>�
i'/z �X1�f/9Ar/ noc ✓.6or /,f/ /gg8, f� `JwGE SOf1E/D/f�(/E
i
e4� ke-6A"IW y
/ YA Vlx)y Tt'E .3 -W47, 7;940r c-51AA14 4 .d•��s�.rzy lrxor�
,AT e�'i2 1O1WAZUE;o ���2.4,�/cE/ iT Q�.t/cldll�b 7b 4
14-F h14 s 7ZY-4 77Yf r 7rf� s yN� 7cly
7Z,y .ec'��,--e /7
e~/ j . Al .44,0,4�11MW7-
6S7- Of �O 11/4s 0-S77,VA 1t--,p 72b &V&-22 ecUIS oc
�OGIyGG T/o7� / S �l' ,PEJ�/Io�/z•0�itJ� 4� T/f� �o/vinocc.�
,eA,t/,D hlEA4s .
• TS/P/ode L'/1�5.5
JIB �2os s /o�vs �u� rrf� �vrnat/c�/�x� r e4A9-,-lc--
�c%r s�fok/�1 ew 777� sip-
/^/ Xf/.S
• ,�b4W 14 el AAA f IA W = 72�11s 4,P70,A/ yr S 1,Ve ciao
sHakJlAor9 �,ea4C—� . 7,1015- AAAIll jy A,vv
T� �NT�2.4n.►CE wrc� � L'c%eBEb � .A s�cT �i� G-Yc�
8E else IAJ 7AIF
/Nfo W-&
- .5174E au
• ¢ 0
T�?AFFic CrGY/•c/T- THE tle sr 2eteklr Tf AOS is Cg[!NT 16[//2Em
?r 2014/ I /AOr •AC Z s To U-OWIS :
• O,v /zr-e/i patllelc 11v F,,2owrnc 7W s/E
T1/,e ,cad ley C'ta[/4/T / S /3740 ic47o,.
D+c/ SNA W�t/�t 4 iQl Mc)'Y RT '0// R) ,0 ,/ O "t N/tL /ZO!
6, 11! e &1OzWr 1s 6,3/4 tA6W1cc8Z 4-"4y.
Irroeds,
• 5
1-5.14/ 711,�p BGbK �'7TI/•d 6�n�1dT/Oc/ �ti6t/r��
,ay % /.vsT7n/TE aa
ROES f asp/ MAOXI oV2 /avloe z1s�5-- y hU&41AI-;
A41F3 zee �Hy/�r�e ,ticrEr�AyC-3 7ira�y U s . S7zl4 y ,
C)t-rjLE S/�C Q'/77Zido'EG}c T�
.�Dl-✓�c/7Z�/�t/ Q�i2E . ��E- �15� "-�Ho��/.� y C�ci1s2 /20� ir��
,QETXJ/L
��dylt3 .
R,6�3 .42E SHowAJ .A s Alth Yea OF 2crl,(/.0 7n/14S
ice%
/060
Sq OF Lc4So' .
.Qssu�/ivcJ a �1�;rirki�y
OF
/y, or-o
.9 & fT' (7S% iCE V 4 = 16, 0'bo
-10 iY ) (Bd c.- office- 3 -Go s4 4`7-)
,?ATF3 rn� DI-"fi« �o oe�c- BS 7;rneLCQS
/y or /-Sf// S A4�v low S A AF
H,4V q,4 it 4116
t 07-�: l&zddyl A& WI;.r /z. 3
-%dTt/"A7cc Ao k. 4 3. 3
M,/� .d.ssc�ti�- 1i iibtaycs
WUli�,o .yam rt�n�
tovG,2 mug AMeAA4MI
7/2APP" f ?EOYJ
,Sr/fS . SPEC/dcTt7
l/�r hti�h` • ��Vzuf1E .
So, aeo -<o Ar —,.4RI scys N14 N1,4 /14.3
�4��/ocb %� �•ld�r .
�t Fl rDd/Ly
�CE etc.: 3 50o so Fr Wogs /Z. 3 �3.i
1416Wa4yS /IS-8 /Z/S. 9
- 1dm ZyS /54.3 16V/. o
W4TLZ:': /7�-74 /C /24 rE3-S;Y&YZ4 /° ,G agcy �25cz- -450h*FWh rE-
�/ A V6 --Yi v 8t17 cisvv 4 vg. 7D XWeJ
iJ)rt 116WSr 84SE
• 6 0
7;fW Oz/ /1C'&_iESAE�0 . rkeasF
y
.a,JO
77%w,CS Yap
744)
Ll—
S
6g2
I'LP �1
ti
118
4'
'//117
3
.C� zee —zee
INSERT 65 9i ;
9� 315 - 119 O
52A � • • �Q� 116
8 2 pts.
• 87
t
btoZ 322-3t F t
578
46A ^
B.M. 756
87A9 £ d �g �� �� �2A 3 t
OB �P 38 /
3 = ? Q` 116 B
yam"'
\ o U ? N• '° '2
�
6rn
�� — IA
E
Entrance Permit Check List
August 8, 1988
1. Detailed sketch or plans. M H"? eid11IOe:;S-C '1L¢
2. Location map (prefer print from quadrangle map showing location). 4)7ZN-e�
3. Sketch should show flow arrows of proposed and existing drainage ot/ T1Ytl- -5112'
pipes and sizes. Also flow arrows along the existing road. P4 ^1
4. Master plan of future development, if available. dK/ hW Sit t6MAJ
5. Commercial entrance plan assemblies should include grading and OU/ ThyI
drainage contours with computations to support the drainage design.
6. Type of development - number of town houses, square foot of business, E-1eZOS4!Ga
etc. Number units of development. Days of operation, hours of operation.
7. Trip generation traffic volume and source. Traffic volume of existing
intersecting road. Anticipated left and right turn volumes.
8. Grades and profiles of entrance roads including vertical and horizontal
sight distance. Also sight distance at entrances. W ey/La4ers 1N/i7
9. Proposed typical sections of entrance road and turn lanes off of
existing state route. t-A/f[AI;)St�
10. Pavement design proposed construction.
JCH/ct
PLAN NUMBER:
SITE ADDRESS:
PROJECT:
APPLICANT:
DATE RECEIVED:
DATE CIRCULATED:
CIRCULATED BY:
PRIORITY:
RETURN BY:
TYPE OF REVIEW:
SITE PLAN
xx NEW
xx ADMINISTRATIVE
REVISION
CORRECTIONS
STAFF REVIEW SHEET
SP-89-37A
3151 Valley Avenue
Hoge's Extraordinary
Richard_Graher_-_
5-8-89
5-8-89
Shana
Routine
5-15-89
SUBDIVISION
_ MAJOR
_ MINOR
_ REVISION
CORRECTIONS
PREVIOUS PLAN ATTACHED (Y/N) N
REF
PLAN:
SIGN OFFS:
DATE
Y/ C
(MDY)
INITIALS
ENGINEERING (442):
ylC
so-Z L
PUBLIC WORKS (414) :
Y//c
5 -L 3
G
PUBLIC UTILITIES (452):
C,
S Z 5
FIRE DEPARTMENT (662-2298):
PLANNING (419):
OTHER:
RETURNED TO APPLICANT:
COMMENT
NAs vao i APP,-4o v& J TA'tf Ewr&4rvice,;7
U 1Z / 7-1E5 +�il%eea� /�7Z`c� �o �r �Z �� t%��-ram
PLEASE RETURN ALL PLANS TO SHANA ASAP. CIRCULATION PROCESS SHOULD
NOT TAKE MORE THAN ONE WEEK. THANK YOU.ze
bN
doPP�.�
�A� l� i�10 � get
July 6, 1989
Al Graber
Dear Mr. Graber:
COUNTY of FREDERICK
John R. Riley, Jr.
County Administrator
703/665-5666
FAX: 703 / 667-0370
Please be advised that the Frederick County Board of
Supervisors has no objection to the extension of the water
main currently located at 3151 Valley Avenue to the proper-
ty known as the Hoge's.
If you need additional information, please do not
hesitate to contact me.
JRR/tjp
John R. Riley, Jr.
County Administrator
Virginia - 22601
y
COMMONWEALTH of VIRQINJA
DEPARTMENT OF TRANSPORTATION
P. O. BOX 278
REDINBURG, 22824
AY D. PETHTEL
COMMISSIONER (703) 984-4133
May 8, 1989
0
WILLIAM H. BUSHMAN
RESIDENT ENGINEER
Mr. H. Bruce Edens Ref: Proposed Commercial Entrance
C/O Greenway Engr. & Surveying Co., Inc. Hoge's Extraordinary (,
1104 Baker Lane Route 11 South
Winchester, VA 22601 Frederick County
Dear Bruce:
As requested we have reviewed the above referenced plans dated
April 11, 1989. Our recommendations may be found on the attached b/w print
and as follows:
1. A 12' wide turn lane 50' long and 100' taper will be required on the south
bound lane of Route 11.
2. The entrance must be shifted south for better intersection alignment.
3. Cc-6 curb and gutter is required.
4. Estimated cost for traffic signal modification to accommodate existing
traffic is $9,000. The developer will be responsible for this cost which
can be handled on an accounts receivable basis. This work can be
coordinated with the Route 11 and Route 652 inprovement project. A letter
of agreement for the traffic signal modification and cost must accompany
the land use permit assembly. To expedite planning and design of the
signal modification, the agreement letter should be sent to my office as
soon as possible.
Please revise and resubmit for review. My office will require four (4) copies
of the revised plans to process a land use permit.
Should you have any questions, please call.
RBC/rh
Attach.
xc: Mr. K. B. Downs
Mr. L. S. Sheets
Mr. R. W. Watkins
Mr. R. A. Graber
Sincerely,
W. H. Bushman
Resident Engineer
(Pn4a !X?. a I �, �
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
TRANSPORTATION FOR THE 21 ST CENTURY
VIRGIN=A DE1=�Z�RZ3�l'r QF TRANSL�OI�T�T=ON
I ►iY: s �3s\:71u1�1► m5*153O)ORWIN�I ul
TO Mr. J. B. Diamond
Attn: Mr. K. B. Downs
FROM W. H. Bushman
SUBJECT: Plan Review
Edinburg, Virginia
April 14, 1989
Ref: Proposed Commercial Entrance
Hoge's Extraordinary
Route 11 South
Frederick County
Attached are two (2) sets of plans dated April 11, 1989 and traffic flow data
for the above referenced development for your review and comments.
My recommendations are marked in red.
Mr. Al Graber has been informed by me any costs associated with modification
to the existing traffic signal at the intersection of Route 11 and Route 652
will be 100% his responsibility.
After review, please forward to Mr. J. C. Heatwole for any comments he may
have on proposed drainage.
Should you have any questions, please call.
W. H. Bushman
Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
RBC / rh
Attachments
sc: Mr. R. L. Moore
Mr. J. C. Heatwole
Mr. R. W. Watkins
AP,
I I
op,:4 V9
1 4--M- � Rf?-
COUNTY of FREDER CK
Departments of Planning and Building
Ikkk ZZ�-MMQQUEST FOR COMMENTS 703/665-5650
TOQ" Ve ington Jones, Engineer/Director
[L� F ederick County Sanitation Authority
he Old Frederick County Courthouse Located on the
�Y P.O. Box 618 second floor of
Winchester, Virginia 22601 the Old Frederick
(703) 665-5690 County Courthouse
FROM: Robert W. Watkins, Planning Director DATE: 1peew Z¢, /,5F$y
SUBJECT: Review Comments for Conditional Use Permit Rezoning
Subdivision Site Plan
Master Development Plan
Please review this request for a .S,�j�Ol�/�Q,U/�,Qpy�L fit' i2�/j�/pe 77e-IAI
k/lA/C/fL�M7W- .s C ! Y� k//r� lacRr/uc/ rV.vr. c 6VAM& AeIA60 s74714 /,ara,✓,c�E
located at -4/5/ V/ &L-y AY,6A t/F - _ e zVM C-M&7z/ - 40124V21AW /c//,ve- e/Tz/ L!`1/73
Proposed building and improvements
This comment sheet must be returned to the Frederick County Department
of Planning and Development, or the applicant, by
for the meeting of
Sanitation Authority Comments:
The Sanitation Authority has no objections to the City of Winchester serving this
property in accordance with the agreement with the amity ot Winchester's letter to
John Riley, dated August 7, 1989 (copy attached).
Sanitation Signature: Date: August 28, 1989
Applicant's Name: /CNsi2D A. e5�2ASSC
Address: /'r/z NDLEZj .d!/E.1/UE
{�+►//�t/ , ✓/,ed✓N/.fit-• Zoo/
Phone Number: 70W A67-///4.
NOTICE TO APPLICANT: It is your responsibility to contact the
Frederick County Sanitation Authority for comments on your
project and to return all comments as part of your application
before or on the submittal deadline date.
T n "-.. rnl
11Ani
l J
9
CITY OF WINCHESTER, VIRGINIA
August 7, 1989
Rouss City Hall
15 North Cameron Street
Winchester, VA 22601
703-667-1815
Mr. John R. Riley, Jr.
County Administrator
9 Court Square
Winchester, Virginia 22601
Dear John:
Enclosed is a revised Gravity Flow Agreement for your
consideration. All added language is underlined.
Most of the situations requiring this type of agree-
ment will be resolved when the new Hogue Run interceptor
is constructed. The City needs to know when you anticipate
having this line available.
Several developers working in Frederick County have
indicated a desire to extend City utilities for their pro-
jects. They have previously been approved by the City sub-
ject to an allocation from the Frederick County Sanitation
Authority at the Opequon Regional Wastewater Treatment
Plant. The allocation has been denied.
The City proposes that these and other properties be
approved by the City and the County under the following
circumstances:
A. As an interim measure, the hook-ups would
be to the City system as it presently exists.
All associated costs would be borne by the
developer.
B. When the gravity flow agreement is approved,
all areas eligible under the agreement pro-
visions would be transferred from the City
to the County and master meters installed
in compliance with the agreement.
"THE APPLE CAPITAL"
C. When the Hogue Run interceptor is constructed
properties in Frederick County would be trans-
ferred from the City to the County.
Mr. Stiles indicated his willingness to negotiate the whole-
sale water rate to the level of the City's cost, including capital
improvements. The City and the County could then consider the trans
of utility customers in the County that are served by the City to
the County. Most of these customers are in the Senseny Road area.
Please evaluate the feasibility of extending all County residents
in the area. This would free capacity in the City's line to serve
the new customers in the Kernstown area.
The Fay Springs water system is not available for transfers
to the County. It is used as part of the City system.
Thank you for your interest in these projects. Please
contact City Attorney Mark Flynn or me if we can be of assistance .
ECD/b
Sincerely yours,
Ed 0:
City Manager
cc: Mr. Mark K. Flynn
City Attorney
Utilities Committee
04 wlNch'�s CITY OF WINCHESTER, VIRGINIA
Rows City Hall
16 North Cameron Street
Winchester, VA 22601
G1c��P 703-667-1816
March 7, 1989
Mr. Richard Graber
1712 Handley Ave.
Winchester, VA 22601
RE: SANITARY SEWER AWMABnJTY
Dear Mr. Graber:
The Winchester City Utilities Committee, meeting in regular
session on February 28, 1989► considered your request of. February 20,
sanitary sewer service to serve approximately 1.84 acres of
1989, fora
198 zone property in Frederick County. This property is located at
3151 valley Avenue, and will eventually serve retail/office space ridhY•
an anticipated maximum th
sewage discharge of 5,000-10,000 g per
The Utilities Committee has approved your request for a sanitary
sewer connection, in accord with your sketched development plan. Said
connection will be to an existing City sewer located on a e north side
of Hogue Run, with said discharge being accomplished by grinder
sewage pump, through a discharge line located in the Route 11 South
right-of-way. Said pump will be located in such a manner that the
service will eventually connect to a Proposed sewer line, which will
serve Snyder Lane and other areas within the drainage area. The
is subject to the County agreeing to the
beforementioned approvala eeing
connection, and to the Frederick County Sanitation Authority
the
that sewage flows from the complex will be chargedagainst
e allocation at the ppequon Water
Sanitation Authority's sewage Reclamation Facility. City water service is already available to the
property.
It is hoped the above responds to your inquiry. If this office
can provide additional information, please advise.
Sincerely,
James W. Givens, P.E.
Public Utilities Director
pc: Ed Daley, City Manager
John Riley, County Administrator
W. H. Jones, P.E., FCSA
"THE APPLE CAPITAL"
41
7'1 !f' f 1 ,y i .P. 'c . �, ,.� = JJ� �. • 747. 3 �.
Vx
;�- ,tr�'`�y7 it •.t4M ` ; -.n O� '�''• r 1Y. ` '� .xo�
� . � - • J ` f •z. 6 "• �.z ins
;Al
s}� f. y fit: r..n �•� 1' J + `y( , J:
/�`/� fOsC Cry ' �r • •' `.. •Mr•r.i . j� � s �'� .
0614
����.t �'R *�� � -fit, •x a I f fI 1
735. o�
0
♦h• pjc� �:.�. 1 7b
746. 2����
t`. BAN
FF746 4
..
10
7C
t
745.0
K
t•
• l
0
COUNTY of FREDERICK
Departments of Planning and Building
REQUEST FOR SITE PLANS 703/665-5650
Doug Kiracofe, Frederick County Fire Marshall
P.O. Boa 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Fire Marshall is located at 21 Court Square
in Winchester, if you prefer to hand deliver this review form.
Applicant's name, address and phone number:
X (5!k4,96z - /viz .yQ.vzkE-tf Av-r- - u/.kl&A7c
Name of development and/or description of the request:
/'5-/ 1�l�Cl�1 d Al
Pirz� /.hYA73
,fir �� � - RE1�c,�s n.•fy sip .d�.av �P,�.�� � �U�arlr�r�vrJ
/� f�N�T7lc��T' .�.tilL/4'�� -s�'4� O.c/ S✓TF --� Tl>T� .E1�Y.l�Y, /.�saV�
Location : ���,� �.e k.,/,ez /o, oQp /L, Gtao i7
Fire Marshall Comments:
c/
Fire Marshall Signature &
Date,
(NOTICE TO
FIRE MARSHALL -
PLEME RETURN THTt
FORM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in orde o assist the agency with their review. Also,
please attach TF+IO�opies of your plans and/or application form.
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
COUNTY of FREDERICK
Departments of Planning and Building
REQUEST FOR ;-3TX, PLANS 703/665-5650
City of Winchester, Virginia
ATTN: Tim Youmans, Planning Director
Rouss City Hall
15 N. Cameron Street, Winchester, Virginia 22601
(703) 667-1815
The City of Winchester offices are located in Rouss City Hall at
15 North Cameron Street in Winchester, if you prefer to hand
deliver this review form.
Applicant's name, address and phone number:
�lfl�3RQ 4RARE� - /-//z fIAWO .dVg�rl ✓,e . 2-3 4-1
703) L67'- //ice
Name of development and/or description of the request:
2ikAeZ 8 z IIW/!L T/E 1AIM JVIVO72F �z SeW,122 sL/ r ,Gs .aur ei .8�
A'ry 40-:- W/A/6H6 4"17r& /A/ SEjs ion/ 6Y ZB, 11?51
Location:
4 � � .duTtld�2r�4rr� L� is 4�� .
City of Winchester Comments:
City Signature and Date:
(NOTICE TO CITY - PLEASE RETURN THIS FORD TO THE APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Please
also attach a copy of your plans and/or application form.
h44 Aj:�1 40V
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
.18
•
� 4 �� wlNc�
s
CITY OF WINCHESTER, VIRGINIA
March 7, 1989
Mr. Richard Graber
1712 Handley Ave.
Winchester, VA 22601
RE: SANITARY SEWER AVAILABILITY
Dear Mr. Graber:
Roues City Hall
16 North Cameron Street
Winchester, VA 22601
703-667-1815
meeting in regular
The Winchester City Utilities Committee, meetest of February 20,
session on February 28, 1989, considered your requ
1989, for a sanitary sewer service to serve approximately 1.84 acres of
B-2 zone property in Frederick County. This property is located at
3151 Valley Avenue, and will eventually serve retail/office space with
an anticipated maximum sewage discharge of 5,000-10,000 gallons per day.
The Utilities Committee has approved your request for a sanitary
sewer connection, in accord with your sketched development plan. Said
connection will be to an existing City sewer located on the north side
of Hogue Run, with said discharge being accomplished by a grinder
sewage pungp, through a discharge line located in the Route 11 South
right-of-way. Said pump will be located in such a manner that the
service will eventually connect to a proposed sewer line, which will
serve Snyder Lane and other areas within the drainage area. The
beforementioned approval is subject to the County agreeing to the
connection, and to the Frederick County Sanitation Authority agreeing
that sewage flows from the complex will be charged against the
Sanitation Authority's sewage allocation at the ppequon Water
Reclamation Facility. City water service is already available to the
property.
It is hoped the above responds to your inquiry. If this office
can provide additional information, please advise.
SincerelJy,
James W. Givens, P.E.
Public Utilities Director
pc: Ed Daley, City Manager
John Riley, County Administrator
W. H. Jones, P.E•, FCSA
"THE APPLE CAPITAL"
i , COUNTY of FREDERI(
.c
Departments of Planning and Build.
REQUEST FOR COMMENTS 703/665-5
TO: Mr. Herbert L. Sluder
Sanitation Engineer
Frederick -Winchester Health Department Located at the
P.O. Box 2056 intersection of
Winchester, Virginia 22601 Smithfield Ave. 6
(703) 667-9747 Brick Kiln Road
FROM: Robert W. Watkins, Planning Director DATE: /�1d.?�1/Zr�, Ife r�
SUBJECT: Review Comments for Conditional Use Permit Rezoning
Subdivision Site Plan
Master Development Plan
Please review this request for a 440WOV4L
l o c a t e d a t 3/S/ I/ 11 - /GC daU _40AW& wweh/G /
Proposed building aifd improvements: ,4; eoQgy.
&74/4-lE _SPzCE -- /E IAI C/Ty Sc"k/BZ S �1-SlF /&Qr,
a y 60er W141,C AvAgeve- UTivTlg ry/77AZ7 /X/ Aiig Z8, /1789 S' 4X)
ar 4,9a,, v✓.IZ zewmie IS 4/74f rc4 i5A Ve ie-
�PeYi�r✓,
This Xomment sheet must be returned to rife Frederick County Department
of Planning and Development, or the applicant, by
for the meeting of
Health Comments:
Health Signature: r O
Applicant's Name:
Address:
Phone Number:
Date. y— �__
NOTICE TO APPLICANT: It is your responsibility to contact the
Frederick -Winchester Health Department for comments on your
project and to return all comments as part of your application
before or on the submittal deadline date.
•
E
Engineers
Land Planners
Surveyors
Gilbert W. Clifford & Associates Inc.
20 South Cameron Street
P.O. Box 2104
Winchester,Virginia 22601
703-667-2139
HOGE RUN 100 YEAR FLOOD EVALUATION
at Creek Side Village
Frederick County, Virginia
13 September 1989
The firm of Gilbert W. Clifford and Associates, Inc. has been commissioned
by the Mr. Al Graber to evaluate the effect of his development at Kernstown on
the Hoge Run one hundred year flood elevation. The scope of the study was to
include:
- A determination of the existing flood elevations and quantities.
- Determination of the elevations resulting from development, and the ef-
fect of the increase on surrounding properties.
- Suggest design variations as appropriate.
The Engineer has employed topographic mapping provided by Mr. Bruce
Edens of Greenway Engineering, USGS topography, and site visits to determine
existing conditions. The computation of flow quantities, and pipe capacities are
in accordance with methods promulgated by the Virginia Department of
Transportation.
The Hoge Creek drainage area to the development consists of approximately
1.6 square miles, situated generally south of The City of Winchester, and west
of Valley Avenue (US Route 11). The 100 year flood was computed using the
Snyder, Anderson, USGS, and Rational Methods. Analysis of the results provid-
ed a flow of 1150 cfs. This flow was used in both the pre development and post
development conditions.
The Hoge Run profile, and the proposed site plan were studied to determine
the critical section. The finished floors of homes believed to be affected by the
flood plain were also considered. A section approximately 250 ft upstream of
the Valley Ave. Bridge was selected. The section is Section B on the plan.
sEP 1 51989 1; ;
•
u
Gilbert W. Clifford & Associates Inc.
20 South Cameron Street
P.O. Box 2104
WInchester,VIrginia 22601
703-667-2139
This selection was based on the following factors:
- the Valley Ave bridge was determined to be capable of passing the 100 year storm
without creating a headwater condition.
- the culvert crossing under Snyder Lane would be inundated, and the flow would
crest the roadway. As the centerline elevations of the road are close to the existing
stream elevation, this area was not consider as a restriction to flow.
- the section containing the three 48" concrete culverts is a significant restriction.
This is Section A on the site plan. The parking lot to the north of the stream has been
graded to allow passage of any flow outside the capabilities of the culverts. The headwa-
ter created would therefore be minimal as compared to the resulting 100 year flood ele-
vation.
Routing of the 100 year flood flow of 1150 cfs through the Section B at the pre development
contours resulted in a flood elevation of 747.0 ft. Routing of the flow though the developed section
utilizing the proposed grading shown on the plan resulted in a flood height increase of over one
foot, and a potential impact on the dwelling to the north of the stream. It was recommended to the
developer that the buildings as established along the Hoge Run bank be constructed with crawl
spaces, leaving the existing grades beneath these buildings undisturbed. This cross section was
evaluated and provided an elevation of 747.5 ft, or an increase of 1/2 ft. It was also determined
that flow though this section would not violate the generally accepted one foot rule for storm
channel modifications, and the effect on adjacent properties should be minimal.
A copy of the recommended cross section, the flood quantity calculations, and a site plan,
marked to show the sections of concern, have been attached.
The developer has been advised of our recommendation concerning the construction of the two
buildings affected. He has no objection to this requirement. The foundation wall will need to meet
BOCA Code specifications for structures in the floodway (Article 21).
Should you have any questions concerning our finding or methods please do not hesitate to call.
Mr. Graber, Mr Bruce Edens, or myself would be happy to meet with the County, or its engineer-
ing consultants to discuss this project at any time.
Charles E. Maddox, Jr. P.E.
Vice President
i
-- r
A
B
C
D
E
A
B
C
D
E
F
100 Year Flood Level Determination
Graber Site (Valley Ave)
100 Year Flood Evaluation
100 year Q = 1 150.00 cfs
SECTION "B"
vert diff
length
n
slope
Q ( 1 0 0 )
1.20
260
0.04
0.0046
1150.00
WATER
w(1)
w(2)
A(sqft)
H.R.(ft)
v(fps)
Q(cfs)
742.50
Elv.
1.50
0.00
9.00
7
0.71
2.02
13.61
744.00
1.00
9.00
58.00
40
0.69
1.98
79.80
745.00
1.00
58.00
154.00
146
0.95
2.44
357.55
746.00
1.00
154.00
205.00
326
1.59
3.45
1122.40
747.00
1.00
205.00
280.00
568
2.03
4.06
2304.96
748.00
747.02
FLOOD HEIGHT =
4.52
SECTION "B"
vert diff
length
n
slope
Q ( 1 0 0 )
1.20
260
0.04
0.0046
1150.00
WATER
w(1)
w(2)
A(sqft)
H.R.(ft)
v(fps)
O(cfs)
742.50
Elv.
1.50
0.00
9.00
7
0.71
2.02
13.61
744.00
1.00
9.00
54.00
38
0.71
2.01
76.87
745.00
1.00
54.00
80.00
105
1.31
3.04
319.59
746.00
1.00
80.00
91.00
191
2.09
4.14
789.59
747.00
1.00
91.00
108.00
290
2.68
4.89
1418.80
748.00
747.57
0.30
108.00
110.00
323
2.93
5.19
1674.80
748.30
FLOOD HEIGHT =
5.07
Increase in Flood Elev due to Development = 0.55 ft
SEP {
Hoge Run Flood Study
100 Year Flood
at the
Grabber Property
Sep-89
Abram's Creek Drainage Area Data
Drainage Area =
1.6
sq.mi. Hi Elv = 810
Length =
1.46
mi. Lo Elv = 742
Slope=
46.58
ft/mi
Slope =
45.66
ft/mi ADJUSTED(10-85%)
Impervious =
5
%
n=
0.04
Anderson Method
Q = R ' 230 ' K-(AA.82) ' (TA-.48)
R = Factor = 5.1
K = Impery Coef = 1.075
A = Area(sgmi)
T = 4.64 ' (1/sgrt(s))A.42
T = 2.44
Q(100) = 1208.66 cfs
Snyder Method =
T(c) = C(t) ' L' ^ .6
L' _ (10 ' L ' n)/sgrt(S)
S = ((Hi Elv - Lo Elv)/2)/(U2)
S = 46.58
L' = 0.86
T(c) = 1.55
From VDOT Charts
Rainfall =
4
% Dir Rainfall =
42
% Adj. Rainfall
44
Runoff =
1.76
I(r) =
Runoff/T(c)
I(r) =
1.14
Q(100) = 500 ' A ' I(r)
Q(100) = 909.40
USGS Method
Q = 269 ' (A ^ .73) ' (S ^ .21)
Q= 849.32
C(t)= 1.7
Se 1 5 1989
Rational Method
Q= C'i"A
T(c) = 31.5 m i
i = 4.3 in/hr.
c = 0.35
Q(100) = 1541.12 cfs
SUMMARY 100 Year Flood
Anderson =
1208.66
cfs
Snyder =
909.40
cfs
USGS=
849.32
cfs
Rational =
1541.12
cfs
Strict Average =
1127.13
cfs
Average(minus hi, lo) =
1059.03
cfs
Use
1 1 5 0
CFS
r�'gum
so
-,..
!tl ss
site
1; +!
I;;v
It so
Ills
Ilia
live
Mom. !ti ll
MRilkamill
awn
sUK
soon
w
s@M
Dallis
IMS
MEN
alga
t'!ts
pores
sass
I-"A'Nsz19
5151211111114
i
on
■■
an
ass
19b
■s
A
sysss z zsuuuu■
rssssmassumes
ssssi�s& �■ss�i�,r
'!i*Igp
�ln�a►�
smeov
•ras■s
■MMsks
swoon
sal/s■
wilsss
■as/i
■■raarsM■■■■■■■■■a�>ldc�s�
■■i1134s�11w1■//■■a1M�alcsc��
■■iil�Nal■■■ ■■■■As■�dli/
■■i■salalisi■■■■n■aa■�
■■�i /tii la/s■i ■■i■■�■M/i
i//a�taiat//alga■■■■■■■/
■itll/;ii/a1a�s■iili�aiti■■17i/�
i■ii� //!ii■lllfa:■i�/®i
■iss��scs_■■�a■■ �rtia
now 6,wmi�/&r!B■■■ M■N■
an
we
•
•
we AI"Y
Fie
-7S2_1-
f
i
A.
Jim-
1Ji= L' V"
- r-,
AAZ
9 he
-C>-W- 1
0 0
0
0
0
0
1� ,
• .
G. W. CLIFFORD & ASSOCIATES, INC.
20 South Cameron Street
P.O. Box 2104
Winchester, Virginia
703-667-2139
September 28, 1989
Mr. Ai Graber
1712 Handley Avenue
Winchester, Va. 22601
Re: Your Project at Kernstown
22601
Storm Water Management Analysis
Dear Al,
We have completed our assessment of storm related impacts at your project. We
have performed this work per your request and as directly required by the County in their
review of your site development plan. We will attach numerous items of supporting data and
information to this letter which will be a benefit to the County and the County's consultant in
final review of the work.
The scope of our work involves simply the assessment of impacts as they may be
created by the construction of your facility within the flood plain and recommendations as to
how to minimize these impacts. These recommendations include specific design changes
which you and your engineer, if you elect, will implement in your planning. Our concerns
cover several areas:
1. Effects on adjacent properties and buildings.
2. Effects on upstream properties and buildings.
3. Effects on the proposed structures made as a part of this site plan.
4. Effects on all of the above with present and with future conditions in
upstream drainage considered.
5. Effect on safety and health.
To estimate future as well as existing flood elevations we have have employed a
method frequently used for this type of work involving Mannings flow equation and storm
water quantities estimated from a variety of methods which are described in the attached
information. We have also consulted the City of Winchester and the County flood mapping
and those associated calculations. Significant agreement was observed in flow quantity
prediction.
This site is predominately within the 100 year flood plain as described in the
Frederick County Flood Insurance maps. The flood insurance maps show no floodway on
the property. The County zoning ordinance for flood plain districts allows the type of
construction proposed on this project, in our opinion. It requires the owner to meet all
BOCA code requirements for structures and we recommend that you closely review your
structural requirements with this document in mind. The scope of our services will not
include evaluation of structural elements of the buildings, this is not something that we
routinely do as a part of our service. We recommend a qualified engineer specializing in
this work, perhaps Foundation Engineering of Virginia, evaluate structures in that
regard.
Our findings indicate that there are impacts associated with the plan as proposed.
We believe you will able to mitigate most impacts, however you must understand that
any construction within a flood plain area such as you propose will cause a proportionate
increase in the flood height passing that point and therefore will have impacts. You also
have the issue of acceptable losses in a flood event on buildings and property within your
site. There will undoubtedly be damage resulting from a flood occurrence and although
certain of our recommendations speak to elimination of certain risks such as building
foundations; maintenance and associated costs will be required after major storm events.
The mitigating factors which we recommend are as follows:
1. Revise the grading to allow for a split floodway area flowing on either
side of the major culvert installation in the western part of your site.
This area is shown on the attached mapping as section A.
2. Relocate certain buildings to the locations shown. This will eliminate
the buildings from causing increased flood height and perhaps eliminate
unnecessary damage to the structure during flood events. Blocking a
floodway can have problems other than flood height, namely certain items
can float down stream and lodge on structures creating increased stress
and damage. By eliminating the structures as shown we believe the
chances of such happening will be much reduced.
3. Elevate the floor of the northern structures above the flood plain,
leaving the flood plain at its natural location and providing a structural
support slab with columns to adequately sized footings. The underneath of
the building would be equipped with breakaway walls which would allow
the flood flow to cross underneath the buildings and not be impeded by the
structure. This alternative also eliminates fill within the floodway and
the zone of maximum velocity of the stream during flood stage, which
should additionally eliminate damage.
4. During the passage of a design storm, the increased flood height for the
water shed as it exists should be less than 0.6 feet. With the increased
flood potential of future development runoff upstream, which is likely to
occur and, if such development is allowed without storm water detention,
then the flood height could be significantly higher. Our calculations show
that with a 50% impervious area upstream the difference in flood height
between the existing and proposed would be .61 feet but more importantly
the stage height of flow would be the 748.64 elevation which could cause
inundation of your existing buildings.
As best as we can determine the flood elevations which are pertinent to the County flood
ordinances are to be determined from existing flood flows. So the future flood height
estimates based on 50% impervious area upstream is not an issue for regulatory agency
concern, but should be noticed by you in setting the finished floor elevations of your
building.
We recommend that a storm evacuation plan be prepared so that people and property can
be protected during extreme events.
Finally, in closing, we trust that we have given you the information you required and
needed in order to obtain necessary approval in the County. Building and construction
can and has occurred throughout flood plains in Frederick County and can be performed
for commercial and industrial uses with good result so long as impact are accessed and
the risks known. We trust you understand that there are risks and that we cannot by any
means insulate you and your project from damage potential. We believe the attached
analysis has given an accurate portrayal of the impacts and if we can be of any additional
service please call.
Sincerely yours,
C. E. Maddox, Jr., P.E., V.
G. W. Clifford & Associates, Inc.
cc: Mr. Paul Bernard, P.E.
Mr. Bob Watkins, County Planner
• •
100 Year Flood Level Determination
100 year Q = 1150.00 cfs
SECTION "A"
W(1)
w(2)
A 1.20
0.00
1 1 .00
B 1.40
1 1 .00
112.00
C 1.00
112.00
167.00
D 0.50
167.00
214.00
E 0.50
214.00
240.00
Graber Site (Valley Ave)
100 Year Flood Evaluation
vert diff
length
n
slope
1.20
260
0.04
0.0046
WATER
A(sqft)
H.R.(ft)
v(fps)
Q(cfs)
743.40
7
0.59
1.77
11.70
744.60
93
0.83
2.23
206.75
746.00
232
1.39
3.15
731.91
747.00
327
1.53
3.36
1100.31
747.50
441
1.84
3.80
1673.84
748.00
FLOOD HEIGHT =
Post Development 100 year flood elevation = 747.69
Increase in Flood Elev due to Development = 0.15 f t
Q(100)
1150.00
Elv.
747.54
4.14
r- (�e7. E
SEP 2 9
•
100 Year Flood Level Determination
•
Graber Site (Valley Ave)
100 Year Flood Evaluation
100 year Q = 2400.00 cfs
SECTION "A"
W(1)
w(2)
A 1.20
0.00
1 1 .00
B 1.40
1 1 .00
112.00
C 1.00
112.00
167.00
D 0.50
167.00
214.00
D 0.50
214.00
240.00
D 0.50
240.00
270.00
D 0.50
270.00
290.00
Impervious area in Basin = 50%
vert diff
length
n
slope
Q (1 0 0 )
1.20
260
0.04
0.0046
2400.00
WATER
A(sqft)
H.R.(ft)
v(fps)
Q(cfs)
743.40
Elv.
7
0.59
1.77
11.70
744.60
93
0.83
2.23
206.75
746.00
232
1.39
3.15
731.91
747.00
327
1.53
3.36
1100.31
747.50
441
1.84
3.80
1673.84
748.00
568
2.11
4.16
2362.96
748.50
708
2.44
4.59
3251.79
749.00
748.52
FLOOD HEIGHT =
5.12
Post Development 100 year flood elevation = 748.47
Increase in Flood Elev due to Development = - 0.0 5 f t
• 0
FLOOD ELEVATION CALCULATIONS
Hoge Run Flood Data
GRABER FLOOD
ADJUSTED 100 YEAR FLOOD LEVEL
Impervious Area in Basin = 500/6
SECTION
"A -A"
100
year Q =
2400 cfs
Flood elevation determined from analysis of
Snyder, Anderson, Rational, USGS
Methods
vert diff
length n
slope
0(100)
1.50
1 1 3 0.03
0.0133
2115.00
South
Lot
North Lot
WATER
100 FLOOD
ADDITIONAL CHANNEL AREA
w(1)
w(2) A(sgft)H.R.(ft)
v(fps) 0(cfs)
745.80
Elv.
D
W1
W2
A
WP
Elv.
A 0.20
0.00
42.00 4 0.10
1.23 5.18
746.00
0.5
0
0
0
0.00
746.00
B 0.50
42.00
55.00 28 0.52
3.69 104.86
746.50
0.5
0
0
0
0.00
746.50
C 0.50
55.00
95.00 66 0.69
4.49 295.85
747.00
0.5
0
0
0
0.00
747.00
D 0.50
95.00
116.00 119 1.02
5.81 689.64
747.50
0.5
0
0
0
0.00
747.50
D 0.50
116.00
130.00 203 1.13
6.21 1262.74
748.00
0.5
43
50
23
50.07
748.00
D 0.20
130.00
134.00 240 1.28
6.74 1618.74
748.20
0.2
50
54
10
54.02
748.20
D 0.30
143.00
192.00 291 1.51
7.54 2190.83
748.50
748.46
0.5
0
0
0
0.00
748.70
D 0.50
192.00
199.00 388 1.95
8.93 3468.05
749.00
0.5
0
0
0
0.00
749.20
FLOOD HEIGHT
=
2.66
Hoge Run
100
yr flow - 2400 cfs
Proposed RCP
Culverts
At 3 - 48" RCP
Diameter(ft)
4
Inv In 743.63
n(RCP) =
0.013
Inv Out 743.20
Slope(%) -
1.23
Length 35.00
Q(full)cfs =
478.69
at HW Elv =
748.48
hw/d =
1.21
Q(Passed)=
95.00
cfs
Flow to pass thru parking area =
21 1 5
cfs
Resulting HW Elv =
748.46
Resulting hw/d =
1.21
OX
100 year flood elevation = 748.47
100 Year Flood Level Determination
Graber Site (Valley Ave)
100 Year Flood Evaluation
100 year 0 =
2400.00
cfs
with 50% developed basin
SECTION "B"
vert diff
length n slope
0(100)
1.20
260 0.04 0.0046
2400.00
WATER
w(1)
w(2)
A(sgft)H.R.(ft)
v(fps) O(cfs) 742.50
Elv.
A 1.50
0.00
9.00
7
0.71
2.02 13.61 744.00
B 1.00
9.00
58.00
40
0.69
1.98 79.80 745.00
C 1.00
58.00
154.00
146
0.95
2.44 357.55 746.00
D 1.00
154.00
205.00
326
1.59
3.45 1122.40 747.00
E 1.00
205.00
265.00
561
2.12
4.17 2338.72 748.00
F 0.50
265.00
280.00
697
2.49
4.65 3239.50 748.50
748.03
G 0.50
280.00
300.00
842
2.81
5.04 4239.48 749.00
FLOOD HEIGHT =
5.53
SECTION "B"
vert diff
length
n
slope
0(100)
1,20
260
0.04
0.0046
2400.00
South Lot
WATER
ADDITIONALC OMIELAREA
w(1)
w(2)
A(sgft)H.R.(ft)
v(fps)
O(cfs)
742.50
Elv.
D
W1
W2
A
WP
Elv.
A 1.50
0.00
9.00
7
0.71
2.02
13.61
744.00
1.5
0
0
0
0.00
744.00
B 1.00
9.00
54.00
38
0.71
2.01
76.87
745.00
1.0
0
0
0
0.00
745.00
C 1.00
54.00
80.00
105
1.31
3.04
319.59
746.00
1.0
0
0
0
0.00
746.00
D 0.80
80.00
94.00
175
1.86
3.83
668.82
746.80
0.8
0
0
0
0.00
746.80
E 0.20
94.00
97.00
199
1.32
3.05
607.04
747.00
0.2
0
54
5
54.00
747.00
F 1.00
97.00
108.00
383
1.77
3.70
1418.03
748.00
1.0
54
108
81
108.04
748.00
G 0.20
108.00
108.00
426
1.95
3.95
1684.42
748.20
0.2
108
110
22
110.04
748.20
H 1.00
88.00
94.00
631
2.98
5.24
3306.05
749.20
748.64
1.0
110
117
114
117.28
749.20
FLOOD HEIGHT =
6.14
Increase in Flood Elev due to Development = 0.61 t t
r
SEP 2 1989
•
FLOOD ELEVATION CALCULATIONS
•
Hoge Run Flood Data
GRABER FLOOD
ADJUSTED 100 YEAR FLOOD LEVEL
SECTION "A -A"
100 year Q = 1150 cfs
Flood elevation determined from analysis of
Snyder, Anderson, Rational, USGS Methods
North Lot
w(1)
w(2)
A 0.20
0.00
42.00
B 0.50
42.00
55.00
C 0.50
55.00
95.00
D 0.50
95.00
116.00
E 0.50
116.00
130.00
vent diff length
1.50 113
A(sqft) H.R.(ft) v(fps)
4
0.10
1.23
28
0.52
3.69
66
0.69
4.49
1 1 9
1.02
5.81
203
1.13
6.22
Hoge Run
100 yr flow - 11 50 cfs
At3-48"RCP
Inv In 743.63
Inv Out 743.20
Length 35.00
n
slope
Q(100)
0.03
0.0133
910.00
WATER
100 FLOOD
O(cfs)
745.80
Elv.
5.18
746.00
104.86
746.50
295.85
747.00
689.64
747.50
1264.79
748.00
747.69
FLOOD HEIGHT =
1.89
Proposed RCP Culverts
Diameter(ft) 4
n(RCP) = 0.013
Slope(%) 1.23
Q(full)cfs = 478.69
at HW Elv = 747.68
hw/d = 1.01
Q(Passed)= 80.00 cfs
Flow to pass thru parking area = 910
Resulting HW Elv = 747.69
Resulting hw/d = 1.02
100 year flood elevation = 747.69
CIS
OX
South Lot
ADDITIONAL
CHANNEL AREA
D
W 1
W 2
A
WP
Elv.
0.5
0
0
0
0.00
746.00
0.5
0
0
0
0.00
746.50
0.5
0
0
0
0.00
747.00
0.5
0
0
0
0.00
747.50
0.5
43
49
23
49.08
748.00
i
SEP _1989 '
•
•
Hoge Run Flood Study
100 Year Flood
at the
Grabber Property
Impervious area = 50%
Sep-89
Hoge Run Drainage Area Data
Drainage Area = 1.6 sq.mi. Hi Elv = 810
Length = 1.46 m i. Lo Elv = 742
Slope = 46.58 ft/mi
Slope = 45.66 ft/mi ADJUSTED(10-85%)
Impervious = 50 %
n= 0.04
Anderson Method
Q= R " 230 K *(AA.82) " (TA-.48)
R = Factor = 3.1
K = Impery Coef = 1.75
A = Area(sgmi)
T = .9 " (1/sgrt(s))A.5 for developed basins, partly channeled
T = 0.42
Q(100) = 2787.22 cfs
Snyder Method =
T(c) =
C(t) " L' ^ .6
L' _
(10 L " n)/sgrt(S)
S =
((Hi Elv - Lo Elv)/2)/(L/2)
S =
46.58
L' =
0.86
T(c) =
1.08
From VDOT Charts
Rainfall =
4.6
% Dir Rainfall =
43
% Adj. Rainfall
72
Runoff =
3.31
1(r) =
Runoff/T(c)
I(r) =
3.06
Q(100) =
500 " A " I(r)
Q(100) =
2448.85
USGS Method
Q = 269 " (A ^ .73) " (S ^ .21)
Q= 849.32
C(t)= 1.19
•
�J
Rational Method
Q= C*i`A
T(c) = 31.5 m i
i = 4.3 in/hr.
c = 0.5
Q(100) = 2201.60 cfs
SUMMARY 100 Year Flood
Anderson =
2787.22
cfs
Snyder =
2448.85
cfs
USGS=
849.32
cfs
Rational =
2201.60
cfs
Strict Average =
2071.75
cfs
Average(minus hi, lo) =
2325.23
cfs
Use
2400
CFS
r�
SEP 2 9 �ggg
u . --
C�
W. CLIFFORD
Mr. Evan Wyatt
Frederick County Planning Commission
9 Court Square
Winchester, VA 22601
Dear Evan,
& ASSOCIATES,
20 South Cameron Street
P.O. Box 2104
Winchester, Virginia
7 0 3 - 6 6 7 - 2 1 3 9
October 4, 1989
Re: Creek Side Village
Frederick County, VA
INC.
22601
Thank you for your call concerning Mr. Bernard's letter of 2 October 1989. The
information Mr. Bernard requires was sent to him last Friday. Apparently, this letter and
our study, which was also sent to Mr. Graber and the Planning Commission Staff, crossed in
the mail. At this time, we believe we have satisfied all of the concerns cited by Mr. Bernard,
and have not been made aware of any other problems. Therefore we see no reason to hold
approval of this development.
Should you have any further questions please call.
cc: Mr. Al Graber
Mr. Paul Bernard
RAM/klf
Regards,
4on Mislowsky /
nnau�a., Inc.
Planners/Engineers/Surveyors
Fair Center/11240 Waples Mill Road/Suite 100/Fairfax, VA 22030
(703) 385-3566,Manassas, VA (703) 368-3124
Kris Tierney, Deputy Director
Frederick County Dept of Planning
9 Court Square
P.O. Box 601
Winchester, VA 22601
RE: Creek Side Village
S.P. # 022-89
HSO 72106-6-0021
Dear Kris,
(Hoge Extraordinary)
AUG
I have conducted a review for the site plan for the above
project. With the project being located within the flood plain
limits as indicated in the Flood Plain Study prepared by C.H.2M.
Hill, drainage is a critical consideration for this site. Also
important is the impact this plan would have on the flood plain
and adjacent properties.
Drainage calculations were not submitted with the review
package. In order to review this plan, we will need drainage
calculations. These calculations must include the 10 and 100
years storm event. Also, a flood plain evaluation will need to
be conducted by a registered engineer to determine the effects of
this development on the flood plain.
Also, Frederick County Sanitation Authority comments were
not included in the review package. It is my opinion that
additional input from the Sanitation Authority would be required
regarding the pump station, and profile of the sewer lines prior
to County approval. This information may be on sheet 2 of 2
which we did not receive a copy of.
Other comments are:
* A more detailed erosion control plan must be submitted.
* Outlet protection such as rip -rap must be included at the
curb opening.
Hanis, Snnariga &Associates, hx.
Frederick, MD/(301) 662-4488
I Iuri�&nangj ,Manz,hw_
Baltimore, MD/(301) 486-1511
rj
At this point, the flood plain and drain design criteria are
my greatest concern. I can not recommend approval until these
issues have been satisfied.
cc: Bruce Edens, L.S.
ncer ly,
Paul A. Bernard, P.E.
ffarris Smari a Orsflko Inc. 10
Surveyors • Engineers • Landscape Ar:hitects • Planners
FAIR CENTER-11240 WAPLES MILL ROAD
FAIRFAX, VIRGINIA 22030
(703) 368-3124
Kris Tierney
Frederick County Dept. of Planning
9 Court Square
P.O. Box 601
Winchester, Va. 22601
19 (�"Mow_
��UG�0
w ii I
August 8, 1989
INVOICE #
PROJECT# 72106-6-0021
PROJECT: Creek Side Village (Hodge Extraordinary)
FOR PROFESSIONAL SERVICES RENDERED THRU:
PROFESSIONAL SERVICES
HRS.
RATE
AMOUNT
Principal
.2 hrs
48.00
9.60
Sr. Project Manager
2.5 hrs
33.25
83.13
Admin. Assist.
.5 hrs
14.50
7.25
Total Direct
99.98
Indirect
149.97
TOTAL THIS INVOICE
$249.94
�)- 10/
QA'�
Please Return Yellow Copy With Remittance
A Finance Charge Will Be Applied On Unpaid Invoices
•
���rris, Sn�;�ri�a, C�rsillg Inc.
Planners/Engineers/Surveyors
Fair Center/ 11240Waples Mill Road/Suite 100/Fairfax, VA 22030
(703) 385-3566,Manassas, VA (703) 368-3124
October 2,1989
Ron Mislowsky
Gilbert w. Clifford & Assoc.,Inc.
20 South Cameron Street
P.O. Box 2104
Winchester, VA. 22601
Re: Huge Creek (Creekside Village)
HSO Job # 72106-6-0021
Dear Ron,
D
i, OCT-4
Following our meeting of last Monday night regarding the
above flood plain study, I wanted to firm up what we agreed you
would look into. I appreciate your efforts to keep the study
simple on behalf of your client, however, I must receive
verification of the effects of this development on the upstream
and adjacent properties. It is my opinion that the proposed
culverts and stream crossing will raise the headwater and
subsequently raise the flood level on the upstream property by
more than one (1) foot. This needs to be confirmed. After a
site visit, I feel that something could be done in the proposed
remote parking lot to channel the storm water through it to
eleviate the impacts both on site and off.
In addition, I feel that your client needs to be made aware
that his buildings that are in the flood plain may very well be
flooded during the 100 year storm. His floor elevations could
perhaps be set to reduce this probability by careful study and
evaluation of the impacts on the flood plain. Now is the time to
accomplish this.
You indicated that you would provide cross sections upstream
to verify the flood elevation. This can be done with the
parameters you have already selected. I suggest when it comes
time to evaluate the impacts of the flood waters on the proposed
floor elevations, that consideration be given to runoff
coefficients or impervious ratios that represent reasonable
future developed conditions. This would allow your client some
factor of saftey should future development upstream not provide
onsite storm water management just as not being provided on this
site.
Frederick. MD/(301) 662-4488 Baltimore. MD/)301) 486-1511
Page 2
Hugh Creek (Creekside Village)
HSO Job # 72106-6-0021
Let me know when you have completed your study so that we
can go over it.
Sin re ,
Paul A. Bernard, P.E.
For Harris,Smariga,Orsillo,Inc.
cc: Kris Tierney,
Frederick Co. Planning
PAB/mam
FP
Oct 1 8 NO
S O1S� hw- U �,
���s, nna�a� illo,
Planners/Engineers/Surveyors
Fair Center/11240 Waples Mill Road/Suite 100/Fairfax, VA 22030
(703) 385-3566,Manassas, VA (703) 368-3124
October 9, 1989
Evan Wyatt
Site Plan Coordinator
Frederick Co. Va.
Re: Crestside Village
HSO 72106-6-0021
Dear Evan,
We received and reviewed the information provided by Gilbert
Clifford. I feel that the concepts that they are expressing have
merit. The applicant now needs to reflect those concepts and the
proposed cross sections for diverting the stream flood waters.
Once the grading plan incorporates and indicates these
items as suggested by Gilbert Clifford then I feel the plan can
be approved.
Sincerely,
Paul A. Bernard, P.E.
Vice President
PAB/TLC
cc: Ron Mislowky-Gilbert Clifford & Associates
Bruce Edens-Greenway Engineering
Harris,SmAliga&Aw) ates,Inc. Harris,Siwa a,Matz,In-
Frederick, MD/(301) 662-4488 Baltimore. MD/(301) 486-1511
9 0
Tis, 01Qn�(,h1G
Planners/ Engineers/Surveyors
Fair Center/ 11240Waples Mill Road/Suite 100/Fairfax, VA 22030
(703) 385-3566,Manassas, VA (703) 368-3124
December 4, 1989
Evan A. Wyatt, Planner I
Frederick County Dept. of Planning and Development
9 Court Square
P.O. Box 601
Winchester, VA 22601
Re: Creekside Village
HSO #72106-6-0021
Dear Evan,
0�J I5
nFr -- 81969 ' I
_._10
As requested, I have reviewed the site plan submission dated
October 2, 1989. My comments are directed only at that portion
identified as Phase I consisting of the area previously
submitted. The other phase will be reviewed separately when the
submission drawings and drainage calculations are complete.
My comments are as follows:
Drainage/Grading
1. Gilbert Clifford and Associates prepared a report with
recommendations for this site. The report indicates
that special grading and building foundation plans are
needed for those buildings adjacent to the creek which
would allow for water to flow under portions of the
buildings. In other words, the buildings should be
designed on special piers to allow for fairly
unobstructed flow. The 100 year flow elevation for
developed conditions upstream is projected by Gilbert
Clifford and Associates to be approximately 748.60.
a) The plans as submitted do not clearly indicate
that the buildings and grading will accommodate
"flow through" potential under the northern
buildings.
b) The northern buildings are subject to flooding
under the projected 100 year storm. A note to
clearly indicate this should be added to the plans
to warn future building owners and/or tenants.
Hans, Snxui a&Asxx tes, hoc. Hams,Srriai Lou, Mate, Inc
Frederick, MD/(301) 662-4488 Baltimore, MD/(301) 486-1511
c) It does appear that the northern parking lot will
allow for water to overflow to relieve some of the
flooding in the areas of the buildings. This
parking lot could be lowered further in the center
of the western edge and northeast corner to allow
greater relief. These parking areas should be
marked as "subject to flooding" with signage at
the time of construction.
2. The slope from the 2' curb opening near "MH-1" to the
ditch at Route 11 is very flat. Positive drainage is
unlikely.
3. It is unclear where the drainage is proposed to go at
the main entrance from Route 11.
4. It appears that the existing dwellings to the north
will not be negatively impacted based on the finish
floor elevations as provided by Greenway Engineering.
Therefore, this is no longer a concern.
5. Since this property is immediately in the flood plain
area, it is my opinion that it would be best to get
drainage away from this site undetained. Therefore,
I concur that an on site stormwater retention facility
is not appropriate for this project.
Erosion and Sedimentation Control
1. The proposed straw bail barrier is not adequate for the
drainage acres flowing to it. A combination of silt
fences, diversion berms and silt/sediment traps would
be preferred.
2. A construction entrance is required.
3. Erosion control measures and specifications need to be
adequately included on the plan.
Miscellaneous
1. Please verify if this use does not require any buffers
from the adjacent residential uses.
This concludes the comments for the Phase I portion of this
plan.
I have a few suggestions for the proposed Phase II. On site
storm water management is recommended to mitigate the effects of
runoff on the downstream properties.
The stormwater discharge should be located further downstream.
Erosion and sedimentation plans need to be outlined and indicated
on the plans. Profiles and drainage calculations need to be
submitted with the plans. This includes drainage area
calculations. These items need to be incorporated with the
construction plans and design review documents in order to review
the plans.
I would be happy to meet with the owner and his design
representative to discuss the planning of this phase.
Also, if there are any questions pertaining to my comments
for Phase I, I will also make myself available. Please let me
know if you have any questions.
Si ely,
Paul A. Bernard
Vice President
PAB/sls
cc: Bruce Edens, Greenway Engineering
Harris, Smariga, Orsi o, Inc.
Surveyors • Engineers • Landscape Architects • Planners
FAIR CENTER-11240 WAPLES MILL ROAD
FAIRFAX, VIRGINIA 22030
(703) 368-3124
Kris Tierney, Deputy Director
Frederick County Planning Department
9 Court Square, P.O. Box 601
Winchester, Va. 22601
PROJECT: Creekside Village
FOR PROFESSIONAL SERVICES RENDERED THRU:
61
EC"CEOM!E !
! nF_113 — 8 M
December 4, 1989
INVOICE #
PROJECT#72106-6-0021
PROFESSIONAL SERVICES HRS. RATE AMOUNT
Project Manager
Admion Assistant
9 hrs. @ 33.25
1 hr. @ 14.50
Total Direct
Total Indirect
TOTAL DUE THIS INVOICE
299.25
14.50
313.75
470.63
$784.38
Please Return Yellow Copy With Remittance