Loading...
HomeMy WebLinkAbout022-89 Creek Side Village - Bk Crk. Dist. (formerly Hoge's Extraordinary) - Backfile (2)Air \ 6. W., SITE PLAN CHECKLIST The application is not complete if the following are not present: I-1 1. Two sets of comment sheets from the followi g ge c'es Ir along with any marked copies of the plan; �I27 VDOT �I��_V&City of Winc R� Co. San. Auth. `,� � Co. Hlth. Dept, ff Inspections Dept. —Ae�wParks & Rec. Fire Marshall b�- Airport Authority 2. 2 copies of the Site Plan application 3. 5 copies of the plan on a single sheet 4. 1 reproducible copy of the plan (if required) 5. a 35mm. slide of the plan (if required) * One copy of the application and comment sheets, two copies of the plan and the marked plans from the review agencies should be enclosed in a package which will be forwarded to the County Engineer. TRACKING DiATE Application Received z- 'Isite Plan forwarded to Consulting ,Engineer Review/Invoice received from Engineer 1 Fee Paid (amount $ ) Site Plan heard by Planning Commission (if required) Final Site Plan submitted with review agency, Planning Commission, and staff comments addressed. COUNTY OF FREDERICK, VIRGINIA DEPARTMENT OF INSPECTIONS / 2h Caller Gm �A��c- Time Called Date Called ( 7 0 Phone No. Time Requested I1 , OU Date Requested 8( 29I50 Received By �VA►J W y I Date of Inspection b 1 z4 lqo PERMIT HOLDER NAME RT. NO. Lot No. SEC. No. SUBDIVISION-RkZKSI DL V I L(-A G E STREET NAME DIRECTIONS KLe- QS-r0, — #,C BOSS F24jM1 RL)MtC-Z-04A l D BUILDING NO. PLUMBING NO. ELECTRICAL NO. MECHANICAL NO SIGN NO. DISTRICT PERMIT FOR: Type of Inspection / Residential Commercial V Footers Setbacks: FR BK L R Slab Draintile Gas Fire -up Final Electrical Water Service Framing Final Mechanical Sewer Rough Electric Final V Site Plan \,, Rough Plumbing Rough Mechanical Final Building Fire Marshall Groundworks Gas Piping/Test Final Plumbing Special/Complaint Other: Time In: I C) I S Temperature k �� 1- Cut in No. Time Out: 0 '45 Weather 5000)J Results: Approved v 1 NXO Cnim UaT'S� Rejected Comments: n A '' Si e 1 1 a L I I /I� Signature Lc_44 U Date Z i l g O • n U COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 FAX 703 / 667-0370 MEMORANDUM To: Chairman of the Planning Commission Chairman of the Board Back Creek Planning Commissioners Back Creek Supervisor From: Robert W. Watkins, Director Subject: Zoning Review Committee Meeting on March 1 Date: February 22, 1990 There will be an ad hoc Zoning Review Committee meeting on March 1 at 1:00 PM in the conference room of the Old County Courthouse. We will discuss the proposed Creekside Village rezoning. We are having the meeting on an ad hoc basis because the application was begun before the current requirements were adopted. Normally we will only have Zoning Review meetings on the second Thursday. Materials on the rezoning are attached. We will go over the proposal 'and informally discuss. The goal of the meeting is to make recommendations to the applicant on the information and proposals in the application. Please let me know if you have any questions. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 • z is APPLICATION FOR REZONING FREDERICK COUNTY, VIRGINIA Zoning Amendment No. Submittal Deadline is CApplication Date �% - P/C Meeting: A Fee Pai �jgI.(pl% B/O/S Meeting: 350.L1D (4a��) t 1. APPLICANT (The applicant is the ( owner other (check one) NAME: /7/CH/]RA A• 6RAh�6e ADDRESS: /-//Z A ,4 41/E. - ►,/pVf 1br 11A• 2-Z,6of TELEPHONE: 7D3 667- ///` 2. Please list all owners of the property or parties in interest: 3. The property sought to be rezoned is located at (please give exact directions) APr' 390' au7F// o•/ �/o siaE c� 04 /Qwj E 4 06 VA, 4. The property has a frontage of .0181 feet and a depth of 3'i4.i/ feet and consists of A 4 L7 acres. (Please be exact) 5. The property to be rezoned is owned by 2/l/mwe 4. -4,z b as evidenced by deed from recorded in deed book no. %Z$ on page 76 7 , registry of the County of :L-ZR 40ev,p-A4S - Gb00 ^ QODO� QOZOO 6. 21-Digit Property Indentification No: lo-So te-Aoo- OddO-ODOd-OCZ/o Magisterial District: FQ4!2tR �' 7. It is requested that the property be rezoned from 100 to 8Z 8. It is proposed that the pro erty will be put to the following use: �O(/S7J7L/CT/O,l Of Ze-wL�C of ..<,%n-- A-5 PA,PT OF «EKSme- ✓/1LAC-- AM'EzT V4,!Fu--V77-y (/(/DES' 4,AAf7XtlLJ/GX/ - -- 9. It is proposed that the following buildings will be constructed: RETl:/L�LIr{ LE S,dd tE c4C//LA/.VS S i 10. The following are all of the individuals, firms, or corporations owning property adjacent to both sides and rear and in front of (across street from) C the property sought to be rezoned. (Use additional pages if necessary). These people will be notified by mail of this application. [PLEASE LIST COMPLETE 21-DIGIT NUMBER] to A rav 1, Or°E6c/�/ H�7'/dam P,� CF. y7�I441 elotlXeff P02Scu/A 14z elo Wi[uAii (r[4vmQ Address: .3//9 VA&&Y 4ti6 - AllAle. V4. 22601 Pro erty ID#: - DO/9A 2. ��Hq,Qv A. Address: /9/1 s1AA1A AvE - k/ive. ✓A. 224o/ Pro erty ID#: dYoe-.4a,- o`ado- ooz3o ,� 3'�liiARZ A• Ev.PA/ 7Q Address: /'7/Z 11,0144V_r- - W/MC. ✓d • 2260 / Property ID# , �66 -A06- 0,W -Ddao - 062¢A 4.E301✓H�4/Ul��/W4 Address: roperty ID#: r630Cb -4 - DDOD ^ ODOo - pO3 f0 • C r" Page Two Rezoning NAMF r 5. {d/�ii/Q�1 /7/�it'EFC1?5� Address Pro erty ID#: Aco -e" - ooco - noz7o 6. Address: Property ID#: 7. Address: Property ID#: B. Address: Property ID# : 9. Address: Property ID#: 10. Address: Property ID# : C11. Additional comments, if any &ZrO/11511, 12M&2E ai /s i3EJit/!r SU6%L/T2 /L/ �`iU.icrh.�/' I✓�/ H. eEv� ,oia� ,A,r 2t�dfsrm �, he k/.arxuis • I (we), the undersigned, do hereby respectfully make application and petition the governing body to amend the zoning ordinance and to change the zoning map of the Frederick County, Virginia, with the above facts as support of this application. Signature of Applicant(��w4�14—zl,� Signature of Owner: Owners' Mailing Address: 171Z /�/iQ(�DL 1K — IVWk ✓q• Z24o/ Owners' Telephone No: 703 6 i-111 For Office Use Only r PLANNING COMMISSION PUBLIC HEARING RECOMMENDATION OF (date) I� Approval I ] Denial SECRETARY (signed) BOARD OF SUPERVISORS PUBLIC HEARING ACTION OF (date) I� Approval I� Denial COUNTY ADMIN. (signed) • • 0 C Ll S Z5'48'00' Z/.ZO CA?EEK /. 6 G 7-46R6.5 ZONED QO ( r0 BE REZOA/EO B Z J \ \ 3A. �0 '�Ot y0 E 0 8� "fo- 6 la 5 jp / A?EZON/NC vtar CAB 0ER C,QEEK L ,v � SCALE / " 50K " DATE r ✓4AIIIARY 3, /900 No. 1628 Cjreenway Engineering &Surveying Co., Inc. ;�•b�s �o�� 1104 Baker Lane* Winchester. Virginia• 22601.703-662-4185 URVE H. Bruce Edens* President SHEET of psi W.C.PL.~.746/ • 19A,, 21 3 20 AW Rt. 706' (� / > 39B 3 s ?1D 32 104 A 38 33 9 �� Boa, •. 34 09 O 110C j 2 I 35 6 %" 211 • 37 36 2Ta— �• 5 B-3 110 115 �` 6 118 4, 3 Vzse—tee INSERT 63� 90 315 - 119 • e9 2 pts. �• � tRF-(if -1.- Rt. , 87 578 322 —34 s U B.M.756 87A 4� � 6 g— 386-339) 2A Q~0 = IZ 116 B 9 �� 277 c 26 i rr, �� 68 � ix � s � �� `'c IA BmB.,,fmcl 6189 ( DK728PG767 10-02-89 11 �g s z r4 J o•• 0 0 oU) a) W o �4 o •o Z °t Lr, ra � N t a� +J 1• THIS DEED made and dated this 13th day of October, 1989, by and between Z & S PROPERTIES, a Virginia Partnership, party of the first part, hereinafter called the Grantor, and RICHARD A. GRABER and MARY JOLEEN GRABER, his wife, parties of the second part, hereinafter called the Grantees. WITNESSETH: That for and in consideration of the sum of Ten ($10.00) Dollars, cash in hand paid, and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantor does hereby grant and convey with general warranty of title unto the Grantees, in fee simple, as tenants by the entirety with common law right of survivorship, the following described real estate, to -wit: TRACT ONE: All of that certain tract or parcel of land, lying and being situate in Back Creek Magisterial District, Frederick County, Virginia, containing 0.371 Acres, and more particularly described by survey drawn by Douglas C. Legge, C.L.S., dated February 2, 1987, of record in the Clerk's Office of the Circuit Court of Frederick County, Virginia in Deed Book 643 at Page 180; and TRACT TWO: All of that certain tract or parcel of land lying and being situate in Back Creek Magisterial District, Frederick County, Virginia, containing 1.296 Acres, and more particularly described by survey drawn by Douglas C. Legge, C.L.S., dated February 2, 1987, of record in the aforesaid Clerk's Office in Deed Book 643 at Page 176; Tracts One and Two being the same property conveyed to the Grantor herein by deed dated December 8, 1987, from Mendle S. Zickefoose, et ux, of record in the aforesaid Clerk's Office in Deed Book 667 at Page 190. Reference is made to the aforesaid surveys and deed for a more particular description of the property herein conveyed. This conveyance is made subject to all rights of way 2E 768 and restrictions of record affecting the subject property. The Grantor hereby covenants that it has the right to convey to the Grantees; that the Grantees shall have quiet and peaceable possession of the said property, free from all liens and encumbrances; and it will grant such further assurances of title as may be requisite. WITNESS the following signatures and seals: Z & S PROPERTIES BY ENDL `S. CK, OOSE, Partner BY /G `�" G �I'�" (SEAL) RALPH SHOCKEY, Vartner STATE OF VIRGINIA, City OF Winchester TO -WIT: I, M. F. McLaughlin a Notary Public in and for the State and jurisdiction aforesaid, do hereby certify that MENDLE S. ZICKEFOOSE and RALPH D. SHOCKEY, Partners of Z & S PROPERTIES, whose names are signed to the foregoing Deed, dated the 13th day of October, 1989, have personally appeared before me and acknowledged the same in my State and Jurisdiction aforesaid. Given under my hand this 17th day of October 1989. My commission expires- September 30, ,-1993 y 0 UBLI 2 II ° COUNTY of FREDERICK Ii. C. William Orndof, f, Jr. ;) ( Treasurer 703/ 662 - 6611 I(* I �9 TO WHOM IT MAY CONCERN: ALL REAL ESTATE TAXES ON THE FOLLOWING PARCELS ARE PAID IN FULL THROUGH THE YEAR OF 1,989. Z & S PROPERTIES .37 acres located at Kernstown 1.30 acres located at Kernstown Richard Graber 1.82 acres located at Kernstown Kneeland, Mark :c 1.84 acres located at Kernstown C. William Orndoff, Jr Treasurer P.O. Box 225 - Winchester - Virginia - 22601 U (0 REQUEST FOR REZONING COMMENTS Frederick County Commonwealth Attorney Winchester -Frederick County,Judicial Center 5 N. Kent Street, Winchester, Virginia 22601 (703) 667-5770 The Commonwealths Attorney offices are"located in the Winchester - Frederick Judicial Center at 5 North Kent in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: Name of development and/or description of the request: Location: Attorney Comments: Language used appears to be legally -binding upon the applicant. If it fully and accurately sets out what staff desires from applicant, proffer appears all right. 42 Attorney Signature and Dat (NOTICE TO ATTORNEY - PLEASE R URN THIS FORM TO HE APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please also attach a copy of your application form, proffer statement, location map, and all other pertinent information. Sri M { Mr. Richard A. Graber 1712 Handley . Winchester, Va. 22601 January 15, 1990 LAO, Mr. Lew-'r's Ambrogi Frederick County Commonwealth Attorney Judicial Center 5 N. Kent Street Winchester, Va. 22601 Dear Mr. Ambrogi: Mr. Robert Watkins asked that I provide you with a cover letter regarding our project in Kernstown and a description of our request, Proffering Statement, location map and Master Development Plan plat. The request covers a three phase commercial project on three parcels of land with a combined area of 4.7 acres. Phase I of the project was purchased in 1988 and rezoned from RP to B-2. A site plan was submitted and approved and construction of approximately 14,000 sq. ft. of retail/office space is presently underway. In an agreement with the City of Winchester and The Frederick County Sanitation Authority, city sewer and water lines have been extended to the property. We have worked with the VDOT and obtained approval for a relocated commercial entrance which is now completed and the installation of a revamped traffic signal light at the entrance intersecting Valley Avenue and Shawnee Drive in Frederick County. The light will be operational by February 28th according to VDOT. Phase II (B-2 zoning) and Phase III (RP zoning) were purchased during 1989. With the inclusion of these two additional parcels, a Master Development Plan is required since the project size has increased. Phase III also necessitates the submission of a rezoning application and proffering statement. The total project will eventually contain approximately 45,000 square feet of leasable retail/office space. Phase I should be completed by late spring in 1990 and complete project buildout should occur in 1991. January 15, Page 2 Attached for your review are the following: Commonwealth Attorney Comment Sheet (For rezoning) Proffering Statement Impact Statement Master Development Application Form Rezoning application request form (Phase III only) Master Development Plan Plat Your earliest possible review and comments regarding this request will be appreciated since we hope to have the master development and rezoning requests reviewed during February by the Planning Department and the Board of Supervisors. ( W14Z�- � Richard A. Graber Applicant/Owner Bob Watkins REQUEST FOR REZONING COMMENTS Virginia Department of Transportation ATTN: William H. Bushman, Resident Engineer P.O. Boa 278, Edinburg, Virginia 22824-0278 (703) 984-4133 The local office of the Transportation Department is located at 1550 Commerce Street, if you prefer to hand deliver this review form. Applicant's name, address and phone number: ZA-VAQ4 �% ��� /31JZ - /;/Z 1.1XN0 LEy .4 /c= r ��c%iJEs , V4 224ol Name of development and/or description of the request: 5/Dr= l//LC<46E — R,--4e1EST a /'?) , A20.f�T 7-WO,-/ kIP An A -2. ,4yA.sE -T /S AA°MoYi5ZI AAf/ ZAIV-5 7l - is --- Location: J-W- o% A 7AW-e Oft z' �4 Z S/ 7,— 114. 86r:v[/ 419 A4Y;Z:-7 // A 14 DAv XW 11zzW171 A RT' 7o� /Av Tij���}<<C�/ZE �Sis7>Z�T A�,C?elC< Qx&AIU , ✓4. Transportation Department Comments: No objection to rezoning of this property. before deveiopment, triis office win require a complete set or construction plans detailing entrance designs, drainage features and traffic flow data from trie rip Ceneration vf.Muurtrii ion for review. Any worR per ormed on the State s right-of-way must be covered under a land use permit. This permit is issued by this ortice mires an inspection tee anti surety bona coverage. VDOT Signature and Date: A-) %/, (,-O �_ayc gG 117,4170 (NOTICE TO VDOT - PLEASE RETURN THIS FORM TO THE APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map, and all other pertinent information. C.' REQUEST FOR REZONING COMMENTS Frederick County Sanitation Authority ATTN: Wellington Jones, Engineer/Director P.O. Boa 618, Winchester, Virginia 22601 (703) 665-5690 The Frederick County Sanitation Authority is located on the second floor of the Old Frederick County Courthouse in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: �/ llw o 4. c!,eAAfK —1-7i.2 Sys 4LAE - k/Av -- 04, z26 o / - (170.3) 64 7 ///6 Name of development and/or description of the request: 606z C'-s/DF 11/LA6E -Z61Vr-- Td A .2aT�T RWO.-41 2,d 775 B -2. .4 -Z .5✓ f/e S 8� / do��11ii6-A fi /'nA1srx . is ii AbV" JZ • Location: A�i�/1Ot�/.y�AT�y 9� 1✓L-sT Ac &C. R77- // A-41.0 eN 7,%Y` /fI61,0 / ✓A ervl 7b4 /,f/ 7 edeKe;CE� .c_s ill C �r1��sQl 16< L w�" , V,4 Sanitation Authority Comments: 7'Y of Wc'�,E'ST- Zff V,CS Tiy�/s •S��,E�9 wl Tll 4Eh'E, ,1A9,yTS W/711 T/�� G/Ti' �lG ST •�9f �.�.��A�D TO. Sanit. Signature & Date: E RETURN THIS FORM T9d (NOTICE TO SANITATION EASO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map, and all other pertinent information. C C REQUEST FOR REZONING COMMENTS Frederick County Fire Marshall P.O. Boa 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Fire Marshall is -located at 21 Court Square in Winchester, if you prefer to hand deliver this review form. Applicant's name`, address and phone number: /l/af)/1 D i1 Cp/ rZ /'%/Z /14AIA/ E 4 t/E- — 40,1/G A4, Z 2b o/ Name of development and/or description of the request: �� Cd�X �s iA/.��.�-� --. ,aH.z� zz� /s • At.2�,dy 3�/E4 B -z. Location: N Ai, of � e Marshall Comments: WI P tots,L-- �S A)C q � �A tic: ✓A . A roo Fire Marshall Signature & Date: L ALSO, PLEASE(NOTICE TO IRE NOTEAIFRFIRE COMPANY RASURN BEENHIS CONTACTED.)TO APPLICANT. NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as 140 possible in order to assist the agency with their review. Also, tiplease attach a copy of your application form, location map, and -all other pertinent information. COUNTY of FREDERICK Departments of Planning and Building REQUEST FOR MASTER DEVELOPMENT PLAN COMMENTS 703/665-5650 /�Zae_ , Frederick County Fire Marshall `�T�.c/c-TTE P.O. Box 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Fire Marshall is located at 21 Court Square in Winchester, if yqu prefer to hand deliver this review form. Applicant's name, address and phone number: /'7/ZAvc-- Name of development and/or description of the request: 116 Location: Ii SAS S</Jft/N ati TNT' A7T,1Cr��tAi_ �stes� L tt/,AS P.42t7//6Z/S1- y A4 -eoaM d JY - -/ (, -2;z !�I/�i/UE — �`72� Al�i< fot/�/T� - .c�d/Z Dt�li✓Es Ttt� Wi.+/e . �'iTy L.6'11 r---?, . z xls zS : OF AAW,!EZ.S ZO, Z/ , Z3 "A Z90-' aN T� 'IA J 466.3 /A/ Fire Marshall Comments: /Uri / �,��Win. c "' A -7— %�r v�/�>>� j l �x� � '%S �'�'nT•�'� i F7j, Fire Marshall Signature & Date: A// (NOTICE: TO FIRE MARSHALL - PLEASE RETURN THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach TWO copies of your plans and/or application form. REQUEST FOR REZONING COMMENTS C_ Frederick County Inspections Department ATTN: Kenneth L. Coffelt, Director P.O. Boa 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Inspections Department is located at 9 Court Square in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: ,E�i<FlA2o 4. 171E At/E - kIlAle. ✓A, ZZl o � Name of development and/or description of the request: Tb IIr OF s! 7Wi0�E Af. y ,� B-2- - ,Nd.s_ r C• Location: f/, A� �/ S Rcell-t- // A� OA %/lam it/D,VV �dE D,C 1/x- _ *,4 141 7I� .eAIKe­,66� ,�li16115- Z _.dc ,,Xj_S1W1lJ" 41�c ✓A. IInspections Department Comments: /�1', 5 -g r I�Fu 11 I 1 (10" . 1i, 7 ct 9- .7 Inspect. Signature & Date: (NOTICE TO INSPECTIONS - F E RETURN THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your application form, location map, and all other pertinent information. REQUEST FOR REZONING COMMENTS City of Winchester, Virginia ATI'N: Tim Youmans, Planning Director Rouss City Hall 15 N. Cameron Street, Winchester, Virginia 22601 (703) 667-1815 The City of Winchester offices are located in Rouss City Hall at 15 North Cameron Street in Winchester, if you prefer to hand deliver this review form. App;;��licant's name, address and phone number: ,&11,4,W �- 444,96t - /'!/Z Alf / d c% - A//,f 1/4 . 2-2,66/ 03) 667- ////, Name of development and/or description of the request: �LLA6f- - fE�, /A% Aj OF ?WkE .� ��{,QI�L Gam" �t/d .4S A/ /r/UX/ /9S9 77tiS e6c tel - /S ?an " RO.v.A-Ay 77/F f V 4SE -W� AVeer- jrto y .ep 7a Az Location: A,�Pr�x/,y�ir�zy �90 ' w�- o,�y s. ,�.�- /� �vd a� r� .c%�t s✓.d�o�- '/a . Pr'e 794- 141 � .B4611- C2Eb(-,J AlsVIc7- DOC ��.r �cYr.✓� . !/� . 465-6�MK- TdCIfHE-S ZME- fuo127,71A%v ;;zd OF TN,— fie« 4x1d ,cs 7,3�F- WlAle . C17ZI ZIA117S Bte,'A -•ey hl/ A4e-19dN A %� Z f,5AI City of Winchester Comments: / / I City Signature and Dat�� _ ///'j", (NOTICE TO CITY - PLEASE RETURN THIS OIM TO THE APPLICANT.)/ NOTICE TO APPLICANV---' It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please also attach a copy of your application form, location map, and all other pertinent information. , C6 REZONING APPLICATION - IMPACT STATEMENT APPLICANT # I the undersigned, owner and rezoning applicant hereby submit the required Impact Statement covering those topics applicable to my rezoning request for Phase III of my property located in Kernstown, Back Creek Magisterial District, Frederick County, Virginia. Impacts are as follows: I. Transportation Impact o A traffic analysis using the publication "Trip Generation" published by The Institute of Traffic Engineers and rates based upon our expected land use and building types were used to anticipate traffic flows in and out of the subject property. The rates are weighted averages from a U.S. Study. General C� office rates are for suburban office space outside of the downtown core. Shopping center rates were used for the retail space as no rates were available for small specialty shops. Rates are shown as number of round trips (in/out) per 1,000 sq. ft. of leased space. Assuming a complete build out, Phases I, II, and III would be 43,000 sq. ft. of leased space and the occupancy mix would be 45% retail and 55% office. TRIP GENERATION SOURCE MATERIAL CHART AVERAGE ROUND TRIPS TYPE PER SQ. FT. OF OF LEASED SPACE BUSINESS MIN MAX AVG ** GENERAL OFFICE Weekdays 3.6 43.5 12.3 Saturdays 1.0 8.9 3.3 SHOPPING CENTER Weekdays 21.5 270.9 115.8 sq. ft +) Saturdays N/A N/A 156.3 C0 Rezoning Application - Impact Statement January 15, 1990 Page 2 I. Transportation Impact Continued Project Space: Office Space: 43,000 X 55%= Retail: 43,000 X 45% _ Sq. Trips Per Total Max Ft. 1,000 Sq. Ft. Daily Trips 23,650 Wkdy 12.3 291 Sat 3.3 78 19,350 Wkdy 115.8 2241 Sat 156.3 3024 "NOTE: These estimates are thought to be considerably overstated as the retail space will consist of small specialty shops rather than typical high volume "shopping center" business. The "average" column was used for computing both office and retail calculations even though the "minimum" column would probably be more applicable. However, we felt it best to show the highest volume scenario. o A traffic signal is being installed at the entrance to the project by VDOT. The signal change is being done at the owners expense as agreed to with VDOT, II. Water & Sewer Impact In accordance with agreements previously reached between the applicant, The City of Winchester, and The Frederick County Sanitation Authority for Phase I of the project, the property is serviced by the City of Winchester to satisfy water and sewer needs. V o An approved six inch water main extension has been extended onto the property from the twenty four inch main water line paralleling Valley Avenue on the eastern side of the subject project. This line will be extended to Phases II and III and a second fire hydrant will be installed on Phase III in accordance with the Fire Marshall Regulations. s!o An eight inch on -site sewer network has been installed during Phase I and will be extended to service Phases II and III. The gravity sewer system ties into The City of Winchester's twelve inch line on the East side of Valley Avenue. In agreement with The City of Winchester the tie-in to the city's existing system is being completed by the applicant and is a cost sharing project which will enable the city to subsequently extend their twelve inch line West on Snyder Lane to complete a pending project for properties lying to the North and West of the applicant's property. NOTE: The above mentioned projects are being funded by the applicant or shared as in the case of a specific section of the sewer tie-in. Rezoning Application - Impact Statement January 15, 1990 Page 3 III. Historic -Structures Impact o There is a large 2 story house on the property that was built in the 1790's. It has been preserved and remodeled by the owner. The colonial style of this main building has been retained and used as an architectural guideline for designing the proposed additional new structures on the property. o The existing brick garage has been remodeled and expanded to create a 2,100 sq. ft. free standing art gallery. IV. Storm Water Impact o Phase I of the project has been designed and altered in accordance with the recommendation of the Fairfax Engineering Firm that services the Frederick County Planning Department. As a portion of Phase I lies within the 100 year floodway, two buildings have been specially engineered to meet new specifications and two others have been relocated to Phase II and Phase III properties. o The Hoge Creek channel which intersects with Phase I has been dredged, widened and rip rapped to carry water through the property in high water situations. The area designated as floodway has been graded as specified by the Fairfax Consulting Engineer and parking lot elevations have been established to carry Hoge Creek overflow through the applicants property without forcing water onto adjoining properties. V. Screening and Landscaping Impact o All existing trees and vegetation in Phase I has been preserved except in building and parking area construction. Unsightly vegetation has been removed and is being replaced with fencing and new plantings as part of the overall landscape plan. VI. Surrounding Properties Impact The subject property is bordered by the below listed properties: o North - Residential rental property zoned B-2 o South - Undeveloped land - zoned R-P and a single family home zoned B-2 o East - applicant/owner's property - Phase II of this project - zoned B-2 o West - Opequon Presbyterian parsonage - single family home �� zoned R-P C.1 � Rezoning Application - Impact Statement January 15, 1990 Page 4 VII. Incremental Revenues - Frederick County o The completed project will include approximately 43,000 sq. ft of leased space (19,500 retail and 23,500 office) Frederick County will receive incremental, tax revenues from inventories, furniture/fixtures, equipment, improved real estate and retail sales. These, to the best of my knowledge are the impacts applicable to the rezoning of the Phase III section of my property. Applicant and Property Owner: Richard A. Graber BY&4� : DATE: C» MASTER DEVELOPMENT PLAN AND REZONING - PROFFERS APPLICANT # We the undersigned, sole owners of land to be rezoned under rezoning request number referred to as the rezoning, and the applicant for said rezoning, hereby voluntarily proffer the following conditions. The conditions proffered shall be binding upon the heirs, executors, administrators, assigns and successors in interest of both the applicant and owners. In the event the Frederick County Board of Supervisors grants said rezoning and accepts these conditions, the following proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County code: Transportation: A. The sole entrance/exit on the subject property will be the commercial entrance onto Route 11 at the front of the property. Traffic will be controlled by the traffic signal installed at the owners expense at the intersection of Route (16 11 and Shawnee Drive (Route 652). B. The only entrance/exit to Route 706 on the southern boundary of the property will be an emergency vehicle entrance. Water & Sewer A. The water service to Phases II and III will be extended from Phase I by the owner and a second fire hydrant will be installed in accordance with the Fire Marshall Regulation. B. The sewer line to Phase II and III will be extended form Phase I by the owner. Aesthetics: The project will be designed to create a village type shopping and office complex unlike the typical "strip mall" look that is prevalent in most new commercial projects either recently completed or presently under construction in the Winchester/Frederick County area. wIII h� o The existing main building built in the 1790's i---b�g preserved and remodeled. This structure fronts on Valley Avenue at the entrance to the project. o All new buildings that will be constructed during the three phases will complement the existing main building and colonial brick and siding architectural standards will be followed. o All non paved open areas and parking islands will be landscaped with a mixture of trees, shrubs, flowers and grass. An underground irrigation system will be installed to assure all plantings are properly maintained. i 1, C Master Development Plan and Rezoning Proffers January 15, 1990 Page 2 Aesthetics: Continued (46 co o All signage will be in accordance with established standards set by the architect and the owner and must be approved prior to installation. No business sign shall exceed 100 sq. ft. in size. o All outside lighting will be of Colonial or Victorian design and perimeter lighting will be directed on site and will be non -glare so as to minimize the impact of adjoining properties. o Curb and guttering will be used in•wmsA_ paved areas for aesthetic appeal and water run-off control. All traffic areas will be asphalt covered. o The property line between the applicants project and the 7-Eleven Store on the Southeast of applicant's property will be fenced with open fencing. The southern property line bordering VA Route 9706 will be a combination of parking and landscaped islands on the applicant's property. The parking area within the Winchester City limits will be landscaped as previously agreed to with the Winchester Planning Director for Phase I site plan approval. Storm Water Manaqement: A underground storm water collection and drainage system will be installed as a part of Phase II and Phase III site work to facilitate rainwater run-off and drainage from the project property to Hoge Creek. Underground Utilities: All electrical, telephone and cable lines on the property will be installed underground for aesthetics and anticipated new county regulations. Master Development Plan: The owner is proffering the Master Development Plan covering proposed uses of property and applicable drawings as submitted to the Frederick County Planning Commission for Phases I, II and III of the subject project. Master Development Plan and Rezoning Proffers January 15, 1990 C . Page 3 Continuity: It is the intent of the owner/applicant to maintain the property under individual ownership and to maintain the standards outlined in these proffers. If the property is sold at a future date, deed covenants, where possible, will apply to future ownership to protect the original aesthetic and historic preservation intentions as stated above. These proffers shall be binding upon the heirs, executors, administrators, assigns and successors in interest of the applicant and property owner. This document shall set forth the total obligation of the applicant and property owner to The County of Frederick in connection with the rezoning of the site. Consequently, the applicant's and property owner's obligation shall not be subject to future modification or enlargement without the express written concurrence or consent of the current property owner(s), applicant or their �• successors and assigns. Applicant & P per Owne . �R' and A. Gr ber BY: (. DATE: --�,O oc/ % 4 11KO ss: Subscribed and sworn to before me on this 7 day of 19�0 Notary Public: C-ate Cca.c�, h My commission expires: My Cr-mmission Expires October 11, 1992. e.X �YA':JSyN to ` COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/667-0370 December 14, 1989 Mr. Richard A. Graber 1712 Handley Avenue Winchester, VA 22601 Dear Mr. Graber: The Frederick County Planning Department administratively approved Site Plan #022-89 for Creekside Village on December 14, 1989. This site plan calls for the construction of six (6) new buildings for retail and office space. Enclosed is a copy of the approved site plan for your records. If I may answer any questions regarding this letter, please contact me. Sincerely, Evan A. Wyatt Planner I EAW/slk cc: Mr. Harrington Smith, Shawnee District Supervisor 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 1. • APPLICATION AND CHECKLIST FOR SITE PLANIN ,1-�28?9��0 THE �,� COUNTY OF FREDERICK, VIRGINIA c�D�h�6 �1 d 1989 ,�/J' DATE: IIA%I�f/ Z�� /�-JSL/ APPLICATION NUMBER: o �P O pt4 �`' ANp NING APPLICANT/AGENT: R/6/AZ,4 A. 4,eAae5P4 NT ll/ ADDRESS: /1/2 11A NaLEy .B VE Jr//it/GyE S/29Z ✓4, 2Z6o/ PHONE: �0b) t4�-7-///� The following checklist serves solely to aid the staff, Planning Commission, and Board of Supervisors in reviewing your application. Please complete this checklist and submit it with your proposal. BACKGROUND INFORMATION 1. Location of property: IIAZZEY-dt/�t/dE-/5�25 W< &W 2. Property tax map and identification number: A4Q1 Z #Z3--7AY"A,P ..Z:D. # 63000 -Aoo _cam- oo _ po23o 3. Property zoning and present use: k/4,C&ET^p,(!� 7a ,B-Z IN /988 4. Adjoining propert zoning and present use:Ae741L l/s� ; ��� B -z ���si,�Fss �i�.a�) AW RP ,per S . Proposed uses : 1e&-1A&- Z f1SF N 6. M a g i s t e r i a 1 D i s t r i c t: 4,dN.6 7 . N o t e s : /`M 0 i &-7- k//T1�/ VAC %ZF6 A IZ4/4/y .fit/T l/!E/ /T /ate//T A4,0 .S�/B/7/7lF4 S/1� 044*-/ AAh& D7h�.,2 /ZcGpt/E.S7��tS �lTA. � 7>�"'% Aj%x/ IlAtIEFF' Her Wll V 7W W/A/4,�S78t-' AZIAZle 4177Z./77-0M �o•�/Ni/� � AeeF/V-,s4 Tb e-eweAe7- 72> k/lr?l 4 eOl-e `rT/QX1 TAit/� / bRIM4Ea2 r0/.1/ .4722(6y�5D ) / W.,& - AAE-54W'r 7frls ZA729P2 /Jilt/ A &VA �F r ///ezl �/.B/�.csS/Dx/ 7 S/7� A�Ad WE Age!F �2E FST� j .B� k•Li'EfXla'�ylil��l�/�V' .sires �I2�p a�,a�io n/ 4 y Z=Z 1W Tt/� Z Aelll! ZI I 7� �v=001mo' 7W EEj-/47" 1 E1Dli-/ &STD /iVlXj!D /,d bt/cce:I-S� 2 •A) Cod-JPG� �Pt�c.or�o-�/ �j/zK!-�sr )a/2-y �) �Uk (4) e; IVMs Cr TlfE- A44,J b✓/17-1 Thy e64t4.16c:!-.- z�/�/%vy SEoi�avr �d�io2S r 4elA) r or„�r,✓ y Ti1� eW77'1.4AJ1E1AeV'i T 4WD -SEAT owl ay V.4v r ,a) B 1�✓O �,v =- Sf�oGt�/.v y 7� ,Bi✓T���.�ar�� .�-�, y� IE A1201asEZ Ti/�SE BU/c1�i.J� s 1V1� ciZRsS /1 EF724=-A/4 7,/E 4/7ZE I'le 44-It. Tb TW AV AIai t/ ,6&&ALAI fc .I Jillu- L 9,t�6x/T J iZ73 AVA .517-3r-- P"AJ S /b �I) lr/ElU�cI6Tac/ .✓�0.�/3 - �U•vr� <S,c�i�zlr��1 �Tf/o✓rI-% �F �DSS/� � G�.�DuLd �//lam /� /`fE�T !C%//� tz/ d•�rc� y f%/z 1.�/a>�x/ /1Qy'.d/1.07�1'y .APB/?rJG�c_ o� .%X/,�.oi�� ��►2yir� 4o'J.4 r4Lc;:- ,ee����v�vy grid' AM171-DZ1s 44 RM7 Tt. O A1- 4AJ .4//4. 1At S ae.2eede' /sr�.try ew 7 (*A, E 1) /.�'kk1/ems 2 �SS�-S1��krc /J iafis ,ya,r�_ <S/NL 46t" -<!�L g4 / 7/Z 174�k/.eAeil ,dvO- A6I-///�. 1] W F CPUSrs�J 10it/E BASE 7"Y,,0/C,1 C yQ L `" SEC 7/OA/ 7y,PIU 67A17Te,4 Al/C E 1-711O G 6- �x T,e4 O,P U/Iv,4ley SCALE: DATE /v14 ec_.s� z8 . i9g9 GREENWAY ENGINEERING AND SURVEYING CO.. INC TFI i PHONE 1�6; 4195 �EpLTN O,c, .� r • O Z' • c� H. BRUCE EDENS No. 1628 , •,'•�Oa.,4URVF��� SHEET of gyp, &tIlLmm.r. STY LE Flgl-%14FIJ S ft cF MIX REMIL DFFICE TbTnL A Z ST69Y Ff1A ME 1320 1370 Q Z $Toz y BR I cK 13,zo 1320 C Z STaR%/ FizdME' LLo t&0 13Za p Z STORY FRA/KE 440 6Co l3-zx> E 1 STbRy SRIc-K 40o 400 F Z STo2L-1 F-9414& ( 370 132.0 I S Te Ry s 1 dmc boo 4.00 l.j Z 5Torcy goe-K, 9.60 660 ! 3Zo SUOTTL.-MEW � 567.6 3300 B�Zo App CKIsrlu6t aLb&s M P.,T-- 2E►�IOVF�-a MAIW Z Sro2y &ZICr-1FPAHr- Z710 ze-0 Z4 ►o 2ncd Z s rO2Y 132i cr- 14e�o 6 0o 20ao SLI&.TfL•-6y4ST XLD& 4110 boo 4c110 �'D t. q? 3o 41 co 1383�D PAIZKIM6 ftb4c! I R�ho.1'T3 = P�11s1 N ES Say �T foli i Pp S R�tA IL 9730 �+ 49 C� FFI cE 41 oo 4cso l o TorALS: 1 13.83o 1 1 s9 S*Az,dt/ llowAorloxl atA114bAZ--SrsX � 7-///6 ) RECEIVED 80 EDIN13URG RESIDENCY MAR 291989 REQUEST FOR COMMENTS �&a ❑ RE ❑ JAC (� F ElKJushman ❑ ARE O KDW RBC O R TO: PIES Resident Engineer VA. Dept. of Transportation P.O. Box 278 Edinburg, Virginia 22824-0278 (703) 984-4133 COUNTY of FREDERICK Departments of Planning and Building 703/665-5650 Local Office: 1550 Commerce Street Winchester, VA. 22601 (703) 662-8876 FROM: Robert W. Watkins, Planning Director DATE: SUBJECT: Review Comments for Conditional Use Permit Rezoning Subdivision fr Site Pjan Master Development Plan Please review this request for ary �/1/Ti�A/«/�C/%/ J/2- 1 o c a t e d at /S/ V,,GLl--y ZVE - COVAl Proposed building and improvements: e/rz L./iy/J, 10 AAL 41Z(4-0 l/i° W11-& y.4}✓i(AZ�- 40I/E (Ar* 6S2) 112106 HF7- WiT7/ ,ea6r c///4D/Z6Xs .A-r 7 7h�--AA&V.,7 This comment sheet must be returned to the Frederick County Department of Planning and Development, or the applicant, by for the meeting of VDOT Comments: Site plans have been reviewed and approved by this office. Before work is allowed to start on t e entrance, a land use permit must be applie'd for and issued by this office. The permit requires a fee and surety bon coverage. VDH&T Signature: 51t/. )Ze Date• / q8 Applicant's Name: /6/iF.Q11 A. e!r-iQABEx�L Address: 'i/Z A6 Ay ,A. ZZ6oi Phone Number: 403) 661Y-1116 NOTICE TO APPLICANT: It is your responsibility to �(�/7 Virginia Department of Transportation for commentsr,3y project and to return all comments as part of your tion before or on the submittal deadline date. ,, ag I� 9 C'nnrt Smiare - P.O. Box 601 Winchester. Vireinia 22601 w � • "/z RegE./zr a L01//46R, SS ~elq zz /969 /-1/,4iIUTA-1 Aoqz,-firt-, S�emLjsr 11/2b/N/A .64'7.- Di 7;eAA4s Pa,e 7Z T/A� ,160. ,BOY Z78 ,O 11/,B&X4 , i/A. ZZBZ¢ oV/A/,4 �U/z MtWW14 D,v pia A�e 3/z�1- / •4,Y 4SArcLPs I.vy 1-27',Fr A,6 /J 171- e /-4t- /NF��M•d -/Dx/ Wf/iLy / /w o246�wl- 72� /L / ou2 ,SATE ACAA1 �, 145V-"fIr lIc'a0+r/c� 4A' £vmAvcE/ &lr .4T 26/.5/ v4ud7 d ✓e7 krE /A/ OF fl*!7 k//s/Z-Ws749'L ea S�PE 4oc- rhtF- /bZA V /r /.s AA'VUEE56 1b Z6mjo,Dtz 72�0 7.3r=7WO -0*-6/4QA(-, Sn2clUL//1c3 Dec/ T1� P.Qor� � �i!) •� 1l% STfi�y ��� hbc,CtE (B) ,A )2�b 5T1,AZy SR�fK 9A2.4rE/.ol4rQrsyFY/r: TYA3E Ttvo .:�Wsr/,c/y Brim rv�s wig �,,vis� .Ar •�Ao���iyar�y ,OPof ,eon /�/os�� �o,4�E. /� o'ei ri vv DzoE ,fir,/ra/Nys WI= i.✓rc� � lo•�/s�dcTi•Uy F../6c�r •�iEu/ .srzUfTU�E3 y/^/y ,N S,�E O� �So &4 fT .tea fir. , �/,�eai Ga�lP�rieyv wE �sr��,er� r/e✓%�y ,a r�ra �-- OF o00 — /f, c� sQ r=r of ,rlac��- s oecE Gc� 72> a� r1S.,;t6 AIM, o/L. -:�OSr/.dzl�, R�7ri�L SP•dtE. 0 2 &-Z4MAT/rU6/ J74/ /^/11EP-/o,4- .AlfEs.sG2/E� S/oP 7lzd*Pe- ✓oz. .4D k/ C) 02/ � �2v6r Bus/n/Es s boa d /DW 1� ) �j J) 17 LEd SAS - 411e/T/�i'/•oL E3 IVA ✓E Be&, / •eKFN�O 17Gv'f DI'�'l��2 S,�zi�c�l+-f AX1S✓A/E".SSE� �SCC�h✓S �i/I�Pc4�E BdSAAFS_S ,moo k d -L- CoV72FX� densr AOV"q-/,Iy Ze1s/A19;Ss _5e �: "srne -- -�-- s — A/A!! De/e- .otzae. k) AMW IOW- a «SIOVAFs - AF-enAl3C r H/tea c s,QV/,lf S ice-SAACE- f0. ' yi✓ 72) IXYo scQ� rarx� � 'OVO y/ 6f/ ✓D/[/i`lE 6�/S/�/E�S t'3 N//lG l3E .�GY/�'� �b /e- j V14o&'a • G�o2eTii� y�c//zs : ►.�- aN J7c/�A/� o�e�r/�y ,yodel �,Ji« �x/T L r o v %b ✓� ` .D vE ,r/a�2n,� �Rr'�`//) , Z! % wig �,eCISS My F rifllb'ZS�7/O�l E6Js ?' &IVe- �0 4521) 0 3. AND IS 7o W&L R16177' • 77ZAFfi� .�✓c��vo�.• /�/ f�.P�l/ovS �O�+vc52.Sor��s 1.��>� i'/z �X1�f/9Ar/ noc ✓.6or /,f/ /gg8, f� `JwGE SOf1E/D/f�(/E i e4� ke-6A"IW y / YA Vlx)y Tt'E .3 -W47, 7;940r c-51AA14 4 .d•��s�.rzy lrxor� ,AT e�'i2 1O1WAZUE;o ���2.4,�/cE/ iT Q�.t/cldll�b 7b 4 14-F h14 s 7ZY-4 77Yf r 7rf� s yN� 7cly 7Z,y .ec'��,--e /7 e~/ j . Al .44,0,4�11MW7- 6S7- Of �O 11/4s 0-S77,VA 1t--,p 72b &V&-22 ecUIS oc �OGIyGG T/o7� / S �l' ,PEJ�/Io�/z•0�itJ� 4� T/f� �o/vinocc.� ,eA,t/,D hlEA4s . • TS/P/ode L'/1�5.5 JIB �2os s /o�vs �u� rrf� �vrnat/c�/�x� r e4A9-,-lc-- �c%r s�fok/�1 ew 777� sip- /^/ Xf/.S • ,�b4W 14 el AAA f IA W = 72�11s 4,P70,A/ yr S 1,Ve ciao sHakJlAor9 �,ea4C—� . 7,1015- AAAIll jy A,vv T� �NT�2.4n.►CE wrc� � L'c%eBEb � .A s�cT �i� G-Yc� 8E else IAJ 7AIF /Nfo W-& - .5174E au • ¢ 0 T�?AFFic CrGY/•c/T- THE tle sr 2eteklr Tf AOS is Cg[!NT 16[//2Em ?r 2014/ I /AOr •AC Z s To U-OWIS : • O,v /zr-e/i patllelc 11v F,,2owrnc 7W s/E T1/,e ,cad ley C'ta[/4/T / S /3740 ic47o,. D+c/ SNA W�t/�t 4 iQl Mc)'Y RT '0// R) ,0 ,/ O "t N/tL /ZO! 6, 11! e &1OzWr 1s 6,3/4 tA6W1cc8Z 4-"4y. Irroeds, • 5 1-5.14/ 711,�p BGbK �'7TI/•d 6�n�1dT/Oc/ �ti6t/r�� ,ay % /.vsT7n/TE aa ROES f asp/ MAOXI oV2 /avloe z1s�5-- y hU&41AI-; A41F3 zee �Hy/�r�e ,ticrEr�AyC-3 7ira�y U s . S7zl4 y , C)t-rjLE S/�C Q'/77Zido'EG}c T� .�Dl-✓�c/7Z�/�t/ Q�i2E . ��E- �15� "-�Ho��/.� y C�ci1s2 /20� ir�� ,QETXJ/L ��dylt3 . R,6�3 .42E SHowAJ .A s Alth Yea OF 2crl,(/.0 7n/14S ice% /060 Sq OF Lc4So' . .Qssu�/ivcJ a �1�;rirki�y OF /y, or-o .9 & fT' (7S% iCE V 4 = 16, 0'bo -10 iY ) (Bd c.- office- 3 -Go s4 4`7-) ,?ATF3 rn� DI-"fi« �o oe�c- BS 7;rneLCQS /y or /-Sf// S A4�v low S A AF H,4V q,4 it 4116 t 07-�: l&zddyl A& WI;.r /z. 3 -%dTt/"A7cc Ao k. 4 3. 3 M,/� .d.ssc�ti�- 1i iibtaycs WUli�,o .yam rt�n� tovG,2 mug AMeAA4MI 7/2APP" f ?EOYJ ,Sr/fS . SPEC/dcTt7 l/�r hti�h` • ��Vzuf1E . So, aeo -<o Ar —,.4RI scys N14 N1,4 /14.3 �4��/ocb %� �•ld�r . �t Fl rDd/Ly �CE etc.: 3 50o so Fr Wogs /Z. 3 �3.i 1416Wa4yS /IS-8 /Z/S. 9 - 1dm ZyS /54.3 16V/. o W4TLZ:': /7�-74 /C /24 rE3-S;Y&YZ4 /° ,G agcy �25cz- -450h*FWh rE- �/ A V6 --Yi v 8t17 cisvv 4 vg. 7D XWeJ iJ)rt 116WSr 84SE • 6 0 7;fW Oz/ /1C'&_iESAE�0 . rkeasF y .a,JO 77%w,CS Yap 744) Ll— S 6g2 I'LP �1 ti 118 4' '//117 3 .C� zee —zee INSERT 65 9i ; 9� 315 - 119 O 52A � • • �Q� 116 8 2 pts. • 87 t btoZ 322-3t F t 578 46A ^ B.M. 756 87A9 £ d �g �� �� �2A 3 t OB �P 38 / 3 = ? Q` 116 B yam"' \ o U ? N• '° '2 � 6rn �� — IA E Entrance Permit Check List August 8, 1988 1. Detailed sketch or plans. M H"? eid11IOe:;S-C '1L¢ 2. Location map (prefer print from quadrangle map showing location). 4)7ZN-e� 3. Sketch should show flow arrows of proposed and existing drainage ot/ T1Ytl- -5112' pipes and sizes. Also flow arrows along the existing road. P4 ^1 4. Master plan of future development, if available. dK/ hW Sit t6MAJ 5. Commercial entrance plan assemblies should include grading and OU/ ThyI drainage contours with computations to support the drainage design. 6. Type of development - number of town houses, square foot of business, E-1eZOS4!Ga etc. Number units of development. Days of operation, hours of operation. 7. Trip generation traffic volume and source. Traffic volume of existing intersecting road. Anticipated left and right turn volumes. 8. Grades and profiles of entrance roads including vertical and horizontal sight distance. Also sight distance at entrances. W ey/La4ers 1N/i7 9. Proposed typical sections of entrance road and turn lanes off of existing state route. t-A/f[AI;)St� 10. Pavement design proposed construction. JCH/ct PLAN NUMBER: SITE ADDRESS: PROJECT: APPLICANT: DATE RECEIVED: DATE CIRCULATED: CIRCULATED BY: PRIORITY: RETURN BY: TYPE OF REVIEW: SITE PLAN xx NEW xx ADMINISTRATIVE REVISION CORRECTIONS STAFF REVIEW SHEET SP-89-37A 3151 Valley Avenue Hoge's Extraordinary Richard_Graher_-_ 5-8-89 5-8-89 Shana Routine 5-15-89 SUBDIVISION _ MAJOR _ MINOR _ REVISION CORRECTIONS PREVIOUS PLAN ATTACHED (Y/N) N REF PLAN: SIGN OFFS: DATE Y/ C (MDY) INITIALS ENGINEERING (442): ylC so-Z L PUBLIC WORKS (414) : Y//c 5 -L 3 G PUBLIC UTILITIES (452): C, S Z 5 FIRE DEPARTMENT (662-2298): PLANNING (419): OTHER: RETURNED TO APPLICANT: COMMENT NAs vao i APP,-4o v& J TA'tf Ewr&4rvice,;7 U 1Z / 7-1E5 +�il%eea� /�7Z`c� �o �r �Z �� t%��-ram PLEASE RETURN ALL PLANS TO SHANA ASAP. CIRCULATION PROCESS SHOULD NOT TAKE MORE THAN ONE WEEK. THANK YOU.ze bN doPP�.� �A� l� i�10 � get July 6, 1989 Al Graber Dear Mr. Graber: COUNTY of FREDERICK John R. Riley, Jr. County Administrator 703/665-5666 FAX: 703 / 667-0370 Please be advised that the Frederick County Board of Supervisors has no objection to the extension of the water main currently located at 3151 Valley Avenue to the proper- ty known as the Hoge's. If you need additional information, please do not hesitate to contact me. JRR/tjp John R. Riley, Jr. County Administrator Virginia - 22601 y COMMONWEALTH of VIRQINJA DEPARTMENT OF TRANSPORTATION P. O. BOX 278 REDINBURG, 22824 AY D. PETHTEL COMMISSIONER (703) 984-4133 May 8, 1989 0 WILLIAM H. BUSHMAN RESIDENT ENGINEER Mr. H. Bruce Edens Ref: Proposed Commercial Entrance C/O Greenway Engr. & Surveying Co., Inc. Hoge's Extraordinary (, 1104 Baker Lane Route 11 South Winchester, VA 22601 Frederick County Dear Bruce: As requested we have reviewed the above referenced plans dated April 11, 1989. Our recommendations may be found on the attached b/w print and as follows: 1. A 12' wide turn lane 50' long and 100' taper will be required on the south bound lane of Route 11. 2. The entrance must be shifted south for better intersection alignment. 3. Cc-6 curb and gutter is required. 4. Estimated cost for traffic signal modification to accommodate existing traffic is $9,000. The developer will be responsible for this cost which can be handled on an accounts receivable basis. This work can be coordinated with the Route 11 and Route 652 inprovement project. A letter of agreement for the traffic signal modification and cost must accompany the land use permit assembly. To expedite planning and design of the signal modification, the agreement letter should be sent to my office as soon as possible. Please revise and resubmit for review. My office will require four (4) copies of the revised plans to process a land use permit. Should you have any questions, please call. RBC/rh Attach. xc: Mr. K. B. Downs Mr. L. S. Sheets Mr. R. W. Watkins Mr. R. A. Graber Sincerely, W. H. Bushman Resident Engineer (Pn4a !X?. a I �, � By: Robert B. Childress Hwy. Permits & Subd. Spec. Senior TRANSPORTATION FOR THE 21 ST CENTURY VIRGIN=A DE1=�Z�RZ3�l'r QF TRANSL�OI�T�T=ON I ►iY: s �3s\:71u1�1► m5*153O)ORWIN�I ul TO Mr. J. B. Diamond Attn: Mr. K. B. Downs FROM W. H. Bushman SUBJECT: Plan Review Edinburg, Virginia April 14, 1989 Ref: Proposed Commercial Entrance Hoge's Extraordinary Route 11 South Frederick County Attached are two (2) sets of plans dated April 11, 1989 and traffic flow data for the above referenced development for your review and comments. My recommendations are marked in red. Mr. Al Graber has been informed by me any costs associated with modification to the existing traffic signal at the intersection of Route 11 and Route 652 will be 100% his responsibility. After review, please forward to Mr. J. C. Heatwole for any comments he may have on proposed drainage. Should you have any questions, please call. W. H. Bushman Resident Engineer By: Robert B. Childress Hwy. Permits & Subd. Spec. Senior RBC / rh Attachments sc: Mr. R. L. Moore Mr. J. C. Heatwole Mr. R. W. Watkins AP, I I op,:4 V9 1 4--M- � Rf?- COUNTY of FREDER CK Departments of Planning and Building Ikkk ZZ�-MMQQUEST FOR COMMENTS 703/665-5650 TOQ" Ve ington Jones, Engineer/Director [L� F ederick County Sanitation Authority he Old Frederick County Courthouse Located on the �Y P.O. Box 618 second floor of Winchester, Virginia 22601 the Old Frederick (703) 665-5690 County Courthouse FROM: Robert W. Watkins, Planning Director DATE: 1peew Z¢, /,5F$y SUBJECT: Review Comments for Conditional Use Permit Rezoning Subdivision Site Plan Master Development Plan Please review this request for a .S,�j�Ol�/�Q,U/�,Qpy�L fit' i2�/j�/pe 77e-IAI k/lA/C/fL�M7W- .s C ! Y� k//r� lacRr/uc/ rV.vr. c 6VAM& AeIA60 s74714 /,ara,✓,c�E located at -4/5/ V/ &L-y AY,6A t/F - _ e zVM C-M&7z/ - 40124V21AW /c//,ve- e/Tz/ L!`1/73 Proposed building and improvements This comment sheet must be returned to the Frederick County Department of Planning and Development, or the applicant, by for the meeting of Sanitation Authority Comments: The Sanitation Authority has no objections to the City of Winchester serving this property in accordance with the agreement with the amity ot Winchester's letter to John Riley, dated August 7, 1989 (copy attached). Sanitation Signature: Date: August 28, 1989 Applicant's Name: /CNsi2D A. e5�2ASSC Address: /'r/z NDLEZj .d!/E.1/UE {�+►//�t/ , ✓/,ed✓N/.fit-• Zoo/ Phone Number: 70W A67-///4. NOTICE TO APPLICANT: It is your responsibility to contact the Frederick County Sanitation Authority for comments on your project and to return all comments as part of your application before or on the submittal deadline date. T n "-.. rnl 11Ani l J 9 CITY OF WINCHESTER, VIRGINIA August 7, 1989 Rouss City Hall 15 North Cameron Street Winchester, VA 22601 703-667-1815 Mr. John R. Riley, Jr. County Administrator 9 Court Square Winchester, Virginia 22601 Dear John: Enclosed is a revised Gravity Flow Agreement for your consideration. All added language is underlined. Most of the situations requiring this type of agree- ment will be resolved when the new Hogue Run interceptor is constructed. The City needs to know when you anticipate having this line available. Several developers working in Frederick County have indicated a desire to extend City utilities for their pro- jects. They have previously been approved by the City sub- ject to an allocation from the Frederick County Sanitation Authority at the Opequon Regional Wastewater Treatment Plant. The allocation has been denied. The City proposes that these and other properties be approved by the City and the County under the following circumstances: A. As an interim measure, the hook-ups would be to the City system as it presently exists. All associated costs would be borne by the developer. B. When the gravity flow agreement is approved, all areas eligible under the agreement pro- visions would be transferred from the City to the County and master meters installed in compliance with the agreement. "THE APPLE CAPITAL" C. When the Hogue Run interceptor is constructed properties in Frederick County would be trans- ferred from the City to the County. Mr. Stiles indicated his willingness to negotiate the whole- sale water rate to the level of the City's cost, including capital improvements. The City and the County could then consider the trans of utility customers in the County that are served by the City to the County. Most of these customers are in the Senseny Road area. Please evaluate the feasibility of extending all County residents in the area. This would free capacity in the City's line to serve the new customers in the Kernstown area. The Fay Springs water system is not available for transfers to the County. It is used as part of the City system. Thank you for your interest in these projects. Please contact City Attorney Mark Flynn or me if we can be of assistance . ECD/b Sincerely yours, Ed 0: City Manager cc: Mr. Mark K. Flynn City Attorney Utilities Committee 04 wlNch'�s CITY OF WINCHESTER, VIRGINIA Rows City Hall 16 North Cameron Street Winchester, VA 22601 G1c��P 703-667-1816 March 7, 1989 Mr. Richard Graber 1712 Handley Ave. Winchester, VA 22601 RE: SANITARY SEWER AWMABnJTY Dear Mr. Graber: The Winchester City Utilities Committee, meeting in regular session on February 28, 1989► considered your request of. February 20, sanitary sewer service to serve approximately 1.84 acres of 1989, fora 198 zone property in Frederick County. This property is located at 3151 valley Avenue, and will eventually serve retail/office space ridhY• an anticipated maximum th sewage discharge of 5,000-10,000 g per The Utilities Committee has approved your request for a sanitary sewer connection, in accord with your sketched development plan. Said connection will be to an existing City sewer located on a e north side of Hogue Run, with said discharge being accomplished by grinder sewage pump, through a discharge line located in the Route 11 South right-of-way. Said pump will be located in such a manner that the service will eventually connect to a Proposed sewer line, which will serve Snyder Lane and other areas within the drainage area. The is subject to the County agreeing to the beforementioned approvala eeing connection, and to the Frederick County Sanitation Authority the that sewage flows from the complex will be chargedagainst e allocation at the ppequon Water Sanitation Authority's sewage Reclamation Facility. City water service is already available to the property. It is hoped the above responds to your inquiry. If this office can provide additional information, please advise. Sincerely, James W. Givens, P.E. Public Utilities Director pc: Ed Daley, City Manager John Riley, County Administrator W. H. Jones, P.E., FCSA "THE APPLE CAPITAL" 41 7'1 !f' f 1 ,y i .P. 'c . �, ,.� = JJ� �. • 747. 3 �. Vx ;�- ,tr�'`�y7 it •.t4M ` ; -.n O� '�''• r 1Y. ` '� .xo� � . � - • J ` f •z. 6 "• �.z ins ;Al s}� f. y fit: r..n �•� 1' J + `y( , J: /�`/� fOsC Cry ' �r • •' `.. •Mr•r.i . j� � s �'� . 0614 ����.t �'R *�� � -fit, •x a I f fI 1 735. o� 0 ♦h• pjc� �:.�. 1 7b 746. 2���� t`. BAN FF746 4 .. 10 7C t 745.0 K t• • l 0 COUNTY of FREDERICK Departments of Planning and Building REQUEST FOR SITE PLANS 703/665-5650 Doug Kiracofe, Frederick County Fire Marshall P.O. Boa 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Fire Marshall is located at 21 Court Square in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: X (5!k4,96z - /viz .yQ.vzkE-tf Av-r- - u/.kl&A7c Name of development and/or description of the request: /'5-/ 1�l�Cl�1 d Al Pirz� /.hYA73 ,fir �� � - RE1�c,�s n.•fy sip .d�.av �P,�.�� � �U�arlr�r�vrJ /� f�N�T7lc��T' .�.tilL/4'�� -s�'4� O.c/ S✓TF --� Tl>T� .E1�Y.l�Y, /.�saV� Location : ���,� �.e k.,/,ez /o, oQp /L, Gtao i7 Fire Marshall Comments: c/ Fire Marshall Signature & Date, (NOTICE TO FIRE MARSHALL - PLEME RETURN THTt FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in orde o assist the agency with their review. Also, please attach TF+IO�opies of your plans and/or application form. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 COUNTY of FREDERICK Departments of Planning and Building REQUEST FOR ;-3TX, PLANS 703/665-5650 City of Winchester, Virginia ATTN: Tim Youmans, Planning Director Rouss City Hall 15 N. Cameron Street, Winchester, Virginia 22601 (703) 667-1815 The City of Winchester offices are located in Rouss City Hall at 15 North Cameron Street in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: �lfl�3RQ 4RARE� - /-//z fIAWO .dVg�rl ✓,e . 2-3 4-1 703) L67'- //ice Name of development and/or description of the request: 2ikAeZ 8 z IIW/!L T/E 1AIM JVIVO72F �z SeW,122 sL/ r ,Gs .aur ei .8� A'ry 40-:- W/A/6H6 4"17r& /A/ SEjs ion/ 6Y ZB, 11?51 Location: 4 � � .duTtld�2r�4rr� L� is 4�� . City of Winchester Comments: City Signature and Date: (NOTICE TO CITY - PLEASE RETURN THIS FORD TO THE APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please also attach a copy of your plans and/or application form. h44 Aj:�1 40V 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 .18 • � 4 �� wlNc� s CITY OF WINCHESTER, VIRGINIA March 7, 1989 Mr. Richard Graber 1712 Handley Ave. Winchester, VA 22601 RE: SANITARY SEWER AVAILABILITY Dear Mr. Graber: Roues City Hall 16 North Cameron Street Winchester, VA 22601 703-667-1815 meeting in regular The Winchester City Utilities Committee, meetest of February 20, session on February 28, 1989, considered your requ 1989, for a sanitary sewer service to serve approximately 1.84 acres of B-2 zone property in Frederick County. This property is located at 3151 Valley Avenue, and will eventually serve retail/office space with an anticipated maximum sewage discharge of 5,000-10,000 gallons per day. The Utilities Committee has approved your request for a sanitary sewer connection, in accord with your sketched development plan. Said connection will be to an existing City sewer located on the north side of Hogue Run, with said discharge being accomplished by a grinder sewage pungp, through a discharge line located in the Route 11 South right-of-way. Said pump will be located in such a manner that the service will eventually connect to a proposed sewer line, which will serve Snyder Lane and other areas within the drainage area. The beforementioned approval is subject to the County agreeing to the connection, and to the Frederick County Sanitation Authority agreeing that sewage flows from the complex will be charged against the Sanitation Authority's sewage allocation at the ppequon Water Reclamation Facility. City water service is already available to the property. It is hoped the above responds to your inquiry. If this office can provide additional information, please advise. SincerelJy, James W. Givens, P.E. Public Utilities Director pc: Ed Daley, City Manager John Riley, County Administrator W. H. Jones, P.E•, FCSA "THE APPLE CAPITAL" i , COUNTY of FREDERI( .c Departments of Planning and Build. REQUEST FOR COMMENTS 703/665-5 TO: Mr. Herbert L. Sluder Sanitation Engineer Frederick -Winchester Health Department Located at the P.O. Box 2056 intersection of Winchester, Virginia 22601 Smithfield Ave. 6 (703) 667-9747 Brick Kiln Road FROM: Robert W. Watkins, Planning Director DATE: /�1d.?�1/Zr�, Ife r� SUBJECT: Review Comments for Conditional Use Permit Rezoning Subdivision Site Plan Master Development Plan Please review this request for a 440WOV4L l o c a t e d a t 3/S/ I/ 11 - /GC daU _40AW& wweh/G / Proposed building aifd improvements: ,4; eoQgy. &74/4-lE _SPzCE -- /E IAI C/Ty Sc"k/BZ S �1-SlF /&Qr, a y 60er W141,C AvAgeve- UTivTlg ry/77AZ7 /X/ Aiig Z8, /1789 S' 4X) ar 4,9a,, v✓.IZ zewmie IS 4/74f rc4 i5A Ve ie- �PeYi�r✓, This Xomment sheet must be returned to rife Frederick County Department of Planning and Development, or the applicant, by for the meeting of Health Comments: Health Signature: r O Applicant's Name: Address: Phone Number: Date. y— �__ NOTICE TO APPLICANT: It is your responsibility to contact the Frederick -Winchester Health Department for comments on your project and to return all comments as part of your application before or on the submittal deadline date. • E Engineers Land Planners Surveyors Gilbert W. Clifford & Associates Inc. 20 South Cameron Street P.O. Box 2104 Winchester,Virginia 22601 703-667-2139 HOGE RUN 100 YEAR FLOOD EVALUATION at Creek Side Village Frederick County, Virginia 13 September 1989 The firm of Gilbert W. Clifford and Associates, Inc. has been commissioned by the Mr. Al Graber to evaluate the effect of his development at Kernstown on the Hoge Run one hundred year flood elevation. The scope of the study was to include: - A determination of the existing flood elevations and quantities. - Determination of the elevations resulting from development, and the ef- fect of the increase on surrounding properties. - Suggest design variations as appropriate. The Engineer has employed topographic mapping provided by Mr. Bruce Edens of Greenway Engineering, USGS topography, and site visits to determine existing conditions. The computation of flow quantities, and pipe capacities are in accordance with methods promulgated by the Virginia Department of Transportation. The Hoge Creek drainage area to the development consists of approximately 1.6 square miles, situated generally south of The City of Winchester, and west of Valley Avenue (US Route 11). The 100 year flood was computed using the Snyder, Anderson, USGS, and Rational Methods. Analysis of the results provid- ed a flow of 1150 cfs. This flow was used in both the pre development and post development conditions. The Hoge Run profile, and the proposed site plan were studied to determine the critical section. The finished floors of homes believed to be affected by the flood plain were also considered. A section approximately 250 ft upstream of the Valley Ave. Bridge was selected. The section is Section B on the plan. sEP 1 51989 1; ; • u Gilbert W. Clifford & Associates Inc. 20 South Cameron Street P.O. Box 2104 WInchester,VIrginia 22601 703-667-2139 This selection was based on the following factors: - the Valley Ave bridge was determined to be capable of passing the 100 year storm without creating a headwater condition. - the culvert crossing under Snyder Lane would be inundated, and the flow would crest the roadway. As the centerline elevations of the road are close to the existing stream elevation, this area was not consider as a restriction to flow. - the section containing the three 48" concrete culverts is a significant restriction. This is Section A on the site plan. The parking lot to the north of the stream has been graded to allow passage of any flow outside the capabilities of the culverts. The headwa- ter created would therefore be minimal as compared to the resulting 100 year flood ele- vation. Routing of the 100 year flood flow of 1150 cfs through the Section B at the pre development contours resulted in a flood elevation of 747.0 ft. Routing of the flow though the developed section utilizing the proposed grading shown on the plan resulted in a flood height increase of over one foot, and a potential impact on the dwelling to the north of the stream. It was recommended to the developer that the buildings as established along the Hoge Run bank be constructed with crawl spaces, leaving the existing grades beneath these buildings undisturbed. This cross section was evaluated and provided an elevation of 747.5 ft, or an increase of 1/2 ft. It was also determined that flow though this section would not violate the generally accepted one foot rule for storm channel modifications, and the effect on adjacent properties should be minimal. A copy of the recommended cross section, the flood quantity calculations, and a site plan, marked to show the sections of concern, have been attached. The developer has been advised of our recommendation concerning the construction of the two buildings affected. He has no objection to this requirement. The foundation wall will need to meet BOCA Code specifications for structures in the floodway (Article 21). Should you have any questions concerning our finding or methods please do not hesitate to call. Mr. Graber, Mr Bruce Edens, or myself would be happy to meet with the County, or its engineer- ing consultants to discuss this project at any time. Charles E. Maddox, Jr. P.E. Vice President i -- r A B C D E A B C D E F 100 Year Flood Level Determination Graber Site (Valley Ave) 100 Year Flood Evaluation 100 year Q = 1 150.00 cfs SECTION "B" vert diff length n slope Q ( 1 0 0 ) 1.20 260 0.04 0.0046 1150.00 WATER w(1) w(2) A(sqft) H.R.(ft) v(fps) Q(cfs) 742.50 Elv. 1.50 0.00 9.00 7 0.71 2.02 13.61 744.00 1.00 9.00 58.00 40 0.69 1.98 79.80 745.00 1.00 58.00 154.00 146 0.95 2.44 357.55 746.00 1.00 154.00 205.00 326 1.59 3.45 1122.40 747.00 1.00 205.00 280.00 568 2.03 4.06 2304.96 748.00 747.02 FLOOD HEIGHT = 4.52 SECTION "B" vert diff length n slope Q ( 1 0 0 ) 1.20 260 0.04 0.0046 1150.00 WATER w(1) w(2) A(sqft) H.R.(ft) v(fps) O(cfs) 742.50 Elv. 1.50 0.00 9.00 7 0.71 2.02 13.61 744.00 1.00 9.00 54.00 38 0.71 2.01 76.87 745.00 1.00 54.00 80.00 105 1.31 3.04 319.59 746.00 1.00 80.00 91.00 191 2.09 4.14 789.59 747.00 1.00 91.00 108.00 290 2.68 4.89 1418.80 748.00 747.57 0.30 108.00 110.00 323 2.93 5.19 1674.80 748.30 FLOOD HEIGHT = 5.07 Increase in Flood Elev due to Development = 0.55 ft SEP { Hoge Run Flood Study 100 Year Flood at the Grabber Property Sep-89 Abram's Creek Drainage Area Data Drainage Area = 1.6 sq.mi. Hi Elv = 810 Length = 1.46 mi. Lo Elv = 742 Slope= 46.58 ft/mi Slope = 45.66 ft/mi ADJUSTED(10-85%) Impervious = 5 % n= 0.04 Anderson Method Q = R ' 230 ' K-(AA.82) ' (TA-.48) R = Factor = 5.1 K = Impery Coef = 1.075 A = Area(sgmi) T = 4.64 ' (1/sgrt(s))A.42 T = 2.44 Q(100) = 1208.66 cfs Snyder Method = T(c) = C(t) ' L' ^ .6 L' _ (10 ' L ' n)/sgrt(S) S = ((Hi Elv - Lo Elv)/2)/(U2) S = 46.58 L' = 0.86 T(c) = 1.55 From VDOT Charts Rainfall = 4 % Dir Rainfall = 42 % Adj. Rainfall 44 Runoff = 1.76 I(r) = Runoff/T(c) I(r) = 1.14 Q(100) = 500 ' A ' I(r) Q(100) = 909.40 USGS Method Q = 269 ' (A ^ .73) ' (S ^ .21) Q= 849.32 C(t)= 1.7 Se 1 5 1989 Rational Method Q= C'i"A T(c) = 31.5 m i i = 4.3 in/hr. c = 0.35 Q(100) = 1541.12 cfs SUMMARY 100 Year Flood Anderson = 1208.66 cfs Snyder = 909.40 cfs USGS= 849.32 cfs Rational = 1541.12 cfs Strict Average = 1127.13 cfs Average(minus hi, lo) = 1059.03 cfs Use 1 1 5 0 CFS r�'gum so -,.. !tl ss site 1; +! I;;v It so Ills Ilia live Mom. !ti ll MRilkamill awn sUK soon w s@M Dallis IMS MEN alga t'!ts pores sass I-"A'Nsz19 5151211111114 i on ■■ an ass 19b ■s A sysss z zsuuuu■ rssssmassumes ssssi�s& �■ss�i�,r '!i*Igp �ln�a►� smeov •ras■s ■MMsks swoon sal/s■ wilsss ■as/i ■■raarsM■■■■■■■■■a�>ldc�s� ■■i1134s�11w1■//■■a1M�alcsc�� ■■iil�Nal■■■ ■■■■As■�dli/ ■■i■salalisi■■■■n■aa■� ■■�i /tii la/s■i ■■i■■�■M/i i//a�taiat//alga■■■■■■■/ ■itll/;ii/a1a�s■iili�aiti■■17i/� i■ii� //!ii■lllfa:■i�/®i ■iss��scs_■■�a■■ �rtia now 6,wmi�/&r!B■■■ M■N■ an we • • we AI"Y Fie -7S2_1- f i A. Jim- 1Ji= L' V" - r-, AAZ 9 he -C>-W- 1 0 0 0 0 0 0 1� , • . G. W. CLIFFORD & ASSOCIATES, INC. 20 South Cameron Street P.O. Box 2104 Winchester, Virginia 703-667-2139 September 28, 1989 Mr. Ai Graber 1712 Handley Avenue Winchester, Va. 22601 Re: Your Project at Kernstown 22601 Storm Water Management Analysis Dear Al, We have completed our assessment of storm related impacts at your project. We have performed this work per your request and as directly required by the County in their review of your site development plan. We will attach numerous items of supporting data and information to this letter which will be a benefit to the County and the County's consultant in final review of the work. The scope of our work involves simply the assessment of impacts as they may be created by the construction of your facility within the flood plain and recommendations as to how to minimize these impacts. These recommendations include specific design changes which you and your engineer, if you elect, will implement in your planning. Our concerns cover several areas: 1. Effects on adjacent properties and buildings. 2. Effects on upstream properties and buildings. 3. Effects on the proposed structures made as a part of this site plan. 4. Effects on all of the above with present and with future conditions in upstream drainage considered. 5. Effect on safety and health. To estimate future as well as existing flood elevations we have have employed a method frequently used for this type of work involving Mannings flow equation and storm water quantities estimated from a variety of methods which are described in the attached information. We have also consulted the City of Winchester and the County flood mapping and those associated calculations. Significant agreement was observed in flow quantity prediction. This site is predominately within the 100 year flood plain as described in the Frederick County Flood Insurance maps. The flood insurance maps show no floodway on the property. The County zoning ordinance for flood plain districts allows the type of construction proposed on this project, in our opinion. It requires the owner to meet all BOCA code requirements for structures and we recommend that you closely review your structural requirements with this document in mind. The scope of our services will not include evaluation of structural elements of the buildings, this is not something that we routinely do as a part of our service. We recommend a qualified engineer specializing in this work, perhaps Foundation Engineering of Virginia, evaluate structures in that regard. Our findings indicate that there are impacts associated with the plan as proposed. We believe you will able to mitigate most impacts, however you must understand that any construction within a flood plain area such as you propose will cause a proportionate increase in the flood height passing that point and therefore will have impacts. You also have the issue of acceptable losses in a flood event on buildings and property within your site. There will undoubtedly be damage resulting from a flood occurrence and although certain of our recommendations speak to elimination of certain risks such as building foundations; maintenance and associated costs will be required after major storm events. The mitigating factors which we recommend are as follows: 1. Revise the grading to allow for a split floodway area flowing on either side of the major culvert installation in the western part of your site. This area is shown on the attached mapping as section A. 2. Relocate certain buildings to the locations shown. This will eliminate the buildings from causing increased flood height and perhaps eliminate unnecessary damage to the structure during flood events. Blocking a floodway can have problems other than flood height, namely certain items can float down stream and lodge on structures creating increased stress and damage. By eliminating the structures as shown we believe the chances of such happening will be much reduced. 3. Elevate the floor of the northern structures above the flood plain, leaving the flood plain at its natural location and providing a structural support slab with columns to adequately sized footings. The underneath of the building would be equipped with breakaway walls which would allow the flood flow to cross underneath the buildings and not be impeded by the structure. This alternative also eliminates fill within the floodway and the zone of maximum velocity of the stream during flood stage, which should additionally eliminate damage. 4. During the passage of a design storm, the increased flood height for the water shed as it exists should be less than 0.6 feet. With the increased flood potential of future development runoff upstream, which is likely to occur and, if such development is allowed without storm water detention, then the flood height could be significantly higher. Our calculations show that with a 50% impervious area upstream the difference in flood height between the existing and proposed would be .61 feet but more importantly the stage height of flow would be the 748.64 elevation which could cause inundation of your existing buildings. As best as we can determine the flood elevations which are pertinent to the County flood ordinances are to be determined from existing flood flows. So the future flood height estimates based on 50% impervious area upstream is not an issue for regulatory agency concern, but should be noticed by you in setting the finished floor elevations of your building. We recommend that a storm evacuation plan be prepared so that people and property can be protected during extreme events. Finally, in closing, we trust that we have given you the information you required and needed in order to obtain necessary approval in the County. Building and construction can and has occurred throughout flood plains in Frederick County and can be performed for commercial and industrial uses with good result so long as impact are accessed and the risks known. We trust you understand that there are risks and that we cannot by any means insulate you and your project from damage potential. We believe the attached analysis has given an accurate portrayal of the impacts and if we can be of any additional service please call. Sincerely yours, C. E. Maddox, Jr., P.E., V. G. W. Clifford & Associates, Inc. cc: Mr. Paul Bernard, P.E. Mr. Bob Watkins, County Planner • • 100 Year Flood Level Determination 100 year Q = 1150.00 cfs SECTION "A" W(1) w(2) A 1.20 0.00 1 1 .00 B 1.40 1 1 .00 112.00 C 1.00 112.00 167.00 D 0.50 167.00 214.00 E 0.50 214.00 240.00 Graber Site (Valley Ave) 100 Year Flood Evaluation vert diff length n slope 1.20 260 0.04 0.0046 WATER A(sqft) H.R.(ft) v(fps) Q(cfs) 743.40 7 0.59 1.77 11.70 744.60 93 0.83 2.23 206.75 746.00 232 1.39 3.15 731.91 747.00 327 1.53 3.36 1100.31 747.50 441 1.84 3.80 1673.84 748.00 FLOOD HEIGHT = Post Development 100 year flood elevation = 747.69 Increase in Flood Elev due to Development = 0.15 f t Q(100) 1150.00 Elv. 747.54 4.14 r- (�e7. E SEP 2 9 • 100 Year Flood Level Determination • Graber Site (Valley Ave) 100 Year Flood Evaluation 100 year Q = 2400.00 cfs SECTION "A" W(1) w(2) A 1.20 0.00 1 1 .00 B 1.40 1 1 .00 112.00 C 1.00 112.00 167.00 D 0.50 167.00 214.00 D 0.50 214.00 240.00 D 0.50 240.00 270.00 D 0.50 270.00 290.00 Impervious area in Basin = 50% vert diff length n slope Q (1 0 0 ) 1.20 260 0.04 0.0046 2400.00 WATER A(sqft) H.R.(ft) v(fps) Q(cfs) 743.40 Elv. 7 0.59 1.77 11.70 744.60 93 0.83 2.23 206.75 746.00 232 1.39 3.15 731.91 747.00 327 1.53 3.36 1100.31 747.50 441 1.84 3.80 1673.84 748.00 568 2.11 4.16 2362.96 748.50 708 2.44 4.59 3251.79 749.00 748.52 FLOOD HEIGHT = 5.12 Post Development 100 year flood elevation = 748.47 Increase in Flood Elev due to Development = - 0.0 5 f t • 0 FLOOD ELEVATION CALCULATIONS Hoge Run Flood Data GRABER FLOOD ADJUSTED 100 YEAR FLOOD LEVEL Impervious Area in Basin = 500/6 SECTION "A -A" 100 year Q = 2400 cfs Flood elevation determined from analysis of Snyder, Anderson, Rational, USGS Methods vert diff length n slope 0(100) 1.50 1 1 3 0.03 0.0133 2115.00 South Lot North Lot WATER 100 FLOOD ADDITIONAL CHANNEL AREA w(1) w(2) A(sgft)H.R.(ft) v(fps) 0(cfs) 745.80 Elv. D W1 W2 A WP Elv. A 0.20 0.00 42.00 4 0.10 1.23 5.18 746.00 0.5 0 0 0 0.00 746.00 B 0.50 42.00 55.00 28 0.52 3.69 104.86 746.50 0.5 0 0 0 0.00 746.50 C 0.50 55.00 95.00 66 0.69 4.49 295.85 747.00 0.5 0 0 0 0.00 747.00 D 0.50 95.00 116.00 119 1.02 5.81 689.64 747.50 0.5 0 0 0 0.00 747.50 D 0.50 116.00 130.00 203 1.13 6.21 1262.74 748.00 0.5 43 50 23 50.07 748.00 D 0.20 130.00 134.00 240 1.28 6.74 1618.74 748.20 0.2 50 54 10 54.02 748.20 D 0.30 143.00 192.00 291 1.51 7.54 2190.83 748.50 748.46 0.5 0 0 0 0.00 748.70 D 0.50 192.00 199.00 388 1.95 8.93 3468.05 749.00 0.5 0 0 0 0.00 749.20 FLOOD HEIGHT = 2.66 Hoge Run 100 yr flow - 2400 cfs Proposed RCP Culverts At 3 - 48" RCP Diameter(ft) 4 Inv In 743.63 n(RCP) = 0.013 Inv Out 743.20 Slope(%) - 1.23 Length 35.00 Q(full)cfs = 478.69 at HW Elv = 748.48 hw/d = 1.21 Q(Passed)= 95.00 cfs Flow to pass thru parking area = 21 1 5 cfs Resulting HW Elv = 748.46 Resulting hw/d = 1.21 OX 100 year flood elevation = 748.47 100 Year Flood Level Determination Graber Site (Valley Ave) 100 Year Flood Evaluation 100 year 0 = 2400.00 cfs with 50% developed basin SECTION "B" vert diff length n slope 0(100) 1.20 260 0.04 0.0046 2400.00 WATER w(1) w(2) A(sgft)H.R.(ft) v(fps) O(cfs) 742.50 Elv. A 1.50 0.00 9.00 7 0.71 2.02 13.61 744.00 B 1.00 9.00 58.00 40 0.69 1.98 79.80 745.00 C 1.00 58.00 154.00 146 0.95 2.44 357.55 746.00 D 1.00 154.00 205.00 326 1.59 3.45 1122.40 747.00 E 1.00 205.00 265.00 561 2.12 4.17 2338.72 748.00 F 0.50 265.00 280.00 697 2.49 4.65 3239.50 748.50 748.03 G 0.50 280.00 300.00 842 2.81 5.04 4239.48 749.00 FLOOD HEIGHT = 5.53 SECTION "B" vert diff length n slope 0(100) 1,20 260 0.04 0.0046 2400.00 South Lot WATER ADDITIONALC OMIELAREA w(1) w(2) A(sgft)H.R.(ft) v(fps) O(cfs) 742.50 Elv. D W1 W2 A WP Elv. A 1.50 0.00 9.00 7 0.71 2.02 13.61 744.00 1.5 0 0 0 0.00 744.00 B 1.00 9.00 54.00 38 0.71 2.01 76.87 745.00 1.0 0 0 0 0.00 745.00 C 1.00 54.00 80.00 105 1.31 3.04 319.59 746.00 1.0 0 0 0 0.00 746.00 D 0.80 80.00 94.00 175 1.86 3.83 668.82 746.80 0.8 0 0 0 0.00 746.80 E 0.20 94.00 97.00 199 1.32 3.05 607.04 747.00 0.2 0 54 5 54.00 747.00 F 1.00 97.00 108.00 383 1.77 3.70 1418.03 748.00 1.0 54 108 81 108.04 748.00 G 0.20 108.00 108.00 426 1.95 3.95 1684.42 748.20 0.2 108 110 22 110.04 748.20 H 1.00 88.00 94.00 631 2.98 5.24 3306.05 749.20 748.64 1.0 110 117 114 117.28 749.20 FLOOD HEIGHT = 6.14 Increase in Flood Elev due to Development = 0.61 t t r SEP 2 1989 • FLOOD ELEVATION CALCULATIONS • Hoge Run Flood Data GRABER FLOOD ADJUSTED 100 YEAR FLOOD LEVEL SECTION "A -A" 100 year Q = 1150 cfs Flood elevation determined from analysis of Snyder, Anderson, Rational, USGS Methods North Lot w(1) w(2) A 0.20 0.00 42.00 B 0.50 42.00 55.00 C 0.50 55.00 95.00 D 0.50 95.00 116.00 E 0.50 116.00 130.00 vent diff length 1.50 113 A(sqft) H.R.(ft) v(fps) 4 0.10 1.23 28 0.52 3.69 66 0.69 4.49 1 1 9 1.02 5.81 203 1.13 6.22 Hoge Run 100 yr flow - 11 50 cfs At3-48"RCP Inv In 743.63 Inv Out 743.20 Length 35.00 n slope Q(100) 0.03 0.0133 910.00 WATER 100 FLOOD O(cfs) 745.80 Elv. 5.18 746.00 104.86 746.50 295.85 747.00 689.64 747.50 1264.79 748.00 747.69 FLOOD HEIGHT = 1.89 Proposed RCP Culverts Diameter(ft) 4 n(RCP) = 0.013 Slope(%) 1.23 Q(full)cfs = 478.69 at HW Elv = 747.68 hw/d = 1.01 Q(Passed)= 80.00 cfs Flow to pass thru parking area = 910 Resulting HW Elv = 747.69 Resulting hw/d = 1.02 100 year flood elevation = 747.69 CIS OX South Lot ADDITIONAL CHANNEL AREA D W 1 W 2 A WP Elv. 0.5 0 0 0 0.00 746.00 0.5 0 0 0 0.00 746.50 0.5 0 0 0 0.00 747.00 0.5 0 0 0 0.00 747.50 0.5 43 49 23 49.08 748.00 i SEP _1989 ' • • Hoge Run Flood Study 100 Year Flood at the Grabber Property Impervious area = 50% Sep-89 Hoge Run Drainage Area Data Drainage Area = 1.6 sq.mi. Hi Elv = 810 Length = 1.46 m i. Lo Elv = 742 Slope = 46.58 ft/mi Slope = 45.66 ft/mi ADJUSTED(10-85%) Impervious = 50 % n= 0.04 Anderson Method Q= R " 230 K *(AA.82) " (TA-.48) R = Factor = 3.1 K = Impery Coef = 1.75 A = Area(sgmi) T = .9 " (1/sgrt(s))A.5 for developed basins, partly channeled T = 0.42 Q(100) = 2787.22 cfs Snyder Method = T(c) = C(t) " L' ^ .6 L' _ (10 L " n)/sgrt(S) S = ((Hi Elv - Lo Elv)/2)/(L/2) S = 46.58 L' = 0.86 T(c) = 1.08 From VDOT Charts Rainfall = 4.6 % Dir Rainfall = 43 % Adj. Rainfall 72 Runoff = 3.31 1(r) = Runoff/T(c) I(r) = 3.06 Q(100) = 500 " A " I(r) Q(100) = 2448.85 USGS Method Q = 269 " (A ^ .73) " (S ^ .21) Q= 849.32 C(t)= 1.19 • �J Rational Method Q= C*i`A T(c) = 31.5 m i i = 4.3 in/hr. c = 0.5 Q(100) = 2201.60 cfs SUMMARY 100 Year Flood Anderson = 2787.22 cfs Snyder = 2448.85 cfs USGS= 849.32 cfs Rational = 2201.60 cfs Strict Average = 2071.75 cfs Average(minus hi, lo) = 2325.23 cfs Use 2400 CFS r� SEP 2 9 �ggg u . -- C� W. CLIFFORD Mr. Evan Wyatt Frederick County Planning Commission 9 Court Square Winchester, VA 22601 Dear Evan, & ASSOCIATES, 20 South Cameron Street P.O. Box 2104 Winchester, Virginia 7 0 3 - 6 6 7 - 2 1 3 9 October 4, 1989 Re: Creek Side Village Frederick County, VA INC. 22601 Thank you for your call concerning Mr. Bernard's letter of 2 October 1989. The information Mr. Bernard requires was sent to him last Friday. Apparently, this letter and our study, which was also sent to Mr. Graber and the Planning Commission Staff, crossed in the mail. At this time, we believe we have satisfied all of the concerns cited by Mr. Bernard, and have not been made aware of any other problems. Therefore we see no reason to hold approval of this development. Should you have any further questions please call. cc: Mr. Al Graber Mr. Paul Bernard RAM/klf Regards, 4on Mislowsky / nnau�a., Inc. Planners/Engineers/Surveyors Fair Center/11240 Waples Mill Road/Suite 100/Fairfax, VA 22030 (703) 385-3566,Manassas, VA (703) 368-3124 Kris Tierney, Deputy Director Frederick County Dept of Planning 9 Court Square P.O. Box 601 Winchester, VA 22601 RE: Creek Side Village S.P. # 022-89 HSO 72106-6-0021 Dear Kris, (Hoge Extraordinary) AUG I have conducted a review for the site plan for the above project. With the project being located within the flood plain limits as indicated in the Flood Plain Study prepared by C.H.2M. Hill, drainage is a critical consideration for this site. Also important is the impact this plan would have on the flood plain and adjacent properties. Drainage calculations were not submitted with the review package. In order to review this plan, we will need drainage calculations. These calculations must include the 10 and 100 years storm event. Also, a flood plain evaluation will need to be conducted by a registered engineer to determine the effects of this development on the flood plain. Also, Frederick County Sanitation Authority comments were not included in the review package. It is my opinion that additional input from the Sanitation Authority would be required regarding the pump station, and profile of the sewer lines prior to County approval. This information may be on sheet 2 of 2 which we did not receive a copy of. Other comments are: * A more detailed erosion control plan must be submitted. * Outlet protection such as rip -rap must be included at the curb opening. Hanis, Snnariga &Associates, hx. Frederick, MD/(301) 662-4488 I Iuri�&nangj ,Manz,hw_ Baltimore, MD/(301) 486-1511 rj At this point, the flood plain and drain design criteria are my greatest concern. I can not recommend approval until these issues have been satisfied. cc: Bruce Edens, L.S. ncer ly, Paul A. Bernard, P.E. ffarris Smari a Orsflko Inc. 10 Surveyors • Engineers • Landscape Ar:hitects • Planners FAIR CENTER-11240 WAPLES MILL ROAD FAIRFAX, VIRGINIA 22030 (703) 368-3124 Kris Tierney Frederick County Dept. of Planning 9 Court Square P.O. Box 601 Winchester, Va. 22601 19 (�"Mow_ ��UG�0 w ii I August 8, 1989 INVOICE # PROJECT# 72106-6-0021 PROJECT: Creek Side Village (Hodge Extraordinary) FOR PROFESSIONAL SERVICES RENDERED THRU: PROFESSIONAL SERVICES HRS. RATE AMOUNT Principal .2 hrs 48.00 9.60 Sr. Project Manager 2.5 hrs 33.25 83.13 Admin. Assist. .5 hrs 14.50 7.25 Total Direct 99.98 Indirect 149.97 TOTAL THIS INVOICE $249.94 �)- 10/ QA'� Please Return Yellow Copy With Remittance A Finance Charge Will Be Applied On Unpaid Invoices • ���rris, Sn�;�ri�a, C�rsillg Inc. Planners/Engineers/Surveyors Fair Center/ 11240Waples Mill Road/Suite 100/Fairfax, VA 22030 (703) 385-3566,Manassas, VA (703) 368-3124 October 2,1989 Ron Mislowsky Gilbert w. Clifford & Assoc.,Inc. 20 South Cameron Street P.O. Box 2104 Winchester, VA. 22601 Re: Huge Creek (Creekside Village) HSO Job # 72106-6-0021 Dear Ron, D i, OCT-4 Following our meeting of last Monday night regarding the above flood plain study, I wanted to firm up what we agreed you would look into. I appreciate your efforts to keep the study simple on behalf of your client, however, I must receive verification of the effects of this development on the upstream and adjacent properties. It is my opinion that the proposed culverts and stream crossing will raise the headwater and subsequently raise the flood level on the upstream property by more than one (1) foot. This needs to be confirmed. After a site visit, I feel that something could be done in the proposed remote parking lot to channel the storm water through it to eleviate the impacts both on site and off. In addition, I feel that your client needs to be made aware that his buildings that are in the flood plain may very well be flooded during the 100 year storm. His floor elevations could perhaps be set to reduce this probability by careful study and evaluation of the impacts on the flood plain. Now is the time to accomplish this. You indicated that you would provide cross sections upstream to verify the flood elevation. This can be done with the parameters you have already selected. I suggest when it comes time to evaluate the impacts of the flood waters on the proposed floor elevations, that consideration be given to runoff coefficients or impervious ratios that represent reasonable future developed conditions. This would allow your client some factor of saftey should future development upstream not provide onsite storm water management just as not being provided on this site. Frederick. MD/(301) 662-4488 Baltimore. MD/)301) 486-1511 Page 2 Hugh Creek (Creekside Village) HSO Job # 72106-6-0021 Let me know when you have completed your study so that we can go over it. Sin re , Paul A. Bernard, P.E. For Harris,Smariga,Orsillo,Inc. cc: Kris Tierney, Frederick Co. Planning PAB/mam FP Oct 1 8 NO S O1S� hw- U �, ���s, nna�a� illo, Planners/Engineers/Surveyors Fair Center/11240 Waples Mill Road/Suite 100/Fairfax, VA 22030 (703) 385-3566,Manassas, VA (703) 368-3124 October 9, 1989 Evan Wyatt Site Plan Coordinator Frederick Co. Va. Re: Crestside Village HSO 72106-6-0021 Dear Evan, We received and reviewed the information provided by Gilbert Clifford. I feel that the concepts that they are expressing have merit. The applicant now needs to reflect those concepts and the proposed cross sections for diverting the stream flood waters. Once the grading plan incorporates and indicates these items as suggested by Gilbert Clifford then I feel the plan can be approved. Sincerely, Paul A. Bernard, P.E. Vice President PAB/TLC cc: Ron Mislowky-Gilbert Clifford & Associates Bruce Edens-Greenway Engineering Harris,SmAliga&Aw) ates,Inc. Harris,Siwa a,Matz,In- Frederick, MD/(301) 662-4488 Baltimore. MD/(301) 486-1511 9 0 Tis, 01Qn�(,h1G Planners/ Engineers/Surveyors Fair Center/ 11240Waples Mill Road/Suite 100/Fairfax, VA 22030 (703) 385-3566,Manassas, VA (703) 368-3124 December 4, 1989 Evan A. Wyatt, Planner I Frederick County Dept. of Planning and Development 9 Court Square P.O. Box 601 Winchester, VA 22601 Re: Creekside Village HSO #72106-6-0021 Dear Evan, 0�J I5 nFr -- 81969 ' I _._10 As requested, I have reviewed the site plan submission dated October 2, 1989. My comments are directed only at that portion identified as Phase I consisting of the area previously submitted. The other phase will be reviewed separately when the submission drawings and drainage calculations are complete. My comments are as follows: Drainage/Grading 1. Gilbert Clifford and Associates prepared a report with recommendations for this site. The report indicates that special grading and building foundation plans are needed for those buildings adjacent to the creek which would allow for water to flow under portions of the buildings. In other words, the buildings should be designed on special piers to allow for fairly unobstructed flow. The 100 year flow elevation for developed conditions upstream is projected by Gilbert Clifford and Associates to be approximately 748.60. a) The plans as submitted do not clearly indicate that the buildings and grading will accommodate "flow through" potential under the northern buildings. b) The northern buildings are subject to flooding under the projected 100 year storm. A note to clearly indicate this should be added to the plans to warn future building owners and/or tenants. Hans, Snxui a&Asxx tes, hoc. Hams,Srriai Lou, Mate, Inc Frederick, MD/(301) 662-4488 Baltimore, MD/(301) 486-1511 c) It does appear that the northern parking lot will allow for water to overflow to relieve some of the flooding in the areas of the buildings. This parking lot could be lowered further in the center of the western edge and northeast corner to allow greater relief. These parking areas should be marked as "subject to flooding" with signage at the time of construction. 2. The slope from the 2' curb opening near "MH-1" to the ditch at Route 11 is very flat. Positive drainage is unlikely. 3. It is unclear where the drainage is proposed to go at the main entrance from Route 11. 4. It appears that the existing dwellings to the north will not be negatively impacted based on the finish floor elevations as provided by Greenway Engineering. Therefore, this is no longer a concern. 5. Since this property is immediately in the flood plain area, it is my opinion that it would be best to get drainage away from this site undetained. Therefore, I concur that an on site stormwater retention facility is not appropriate for this project. Erosion and Sedimentation Control 1. The proposed straw bail barrier is not adequate for the drainage acres flowing to it. A combination of silt fences, diversion berms and silt/sediment traps would be preferred. 2. A construction entrance is required. 3. Erosion control measures and specifications need to be adequately included on the plan. Miscellaneous 1. Please verify if this use does not require any buffers from the adjacent residential uses. This concludes the comments for the Phase I portion of this plan. I have a few suggestions for the proposed Phase II. On site storm water management is recommended to mitigate the effects of runoff on the downstream properties. The stormwater discharge should be located further downstream. Erosion and sedimentation plans need to be outlined and indicated on the plans. Profiles and drainage calculations need to be submitted with the plans. This includes drainage area calculations. These items need to be incorporated with the construction plans and design review documents in order to review the plans. I would be happy to meet with the owner and his design representative to discuss the planning of this phase. Also, if there are any questions pertaining to my comments for Phase I, I will also make myself available. Please let me know if you have any questions. Si ely, Paul A. Bernard Vice President PAB/sls cc: Bruce Edens, Greenway Engineering Harris, Smariga, Orsi o, Inc. Surveyors • Engineers • Landscape Architects • Planners FAIR CENTER-11240 WAPLES MILL ROAD FAIRFAX, VIRGINIA 22030 (703) 368-3124 Kris Tierney, Deputy Director Frederick County Planning Department 9 Court Square, P.O. Box 601 Winchester, Va. 22601 PROJECT: Creekside Village FOR PROFESSIONAL SERVICES RENDERED THRU: 61 EC"CEOM!E ! ! nF_113 — 8 M December 4, 1989 INVOICE # PROJECT#72106-6-0021 PROFESSIONAL SERVICES HRS. RATE AMOUNT Project Manager Admion Assistant 9 hrs. @ 33.25 1 hr. @ 14.50 Total Direct Total Indirect TOTAL DUE THIS INVOICE 299.25 14.50 313.75 470.63 $784.38 Please Return Yellow Copy With Remittance A Finance Charge Will Be Applied On Unpaid Invoices