* STAFF SITE PLAN CHECKLIST *
This application is not complete if the following are not included:
One set of comment sheets from the following agencies along with any marked
/ copies of the plan;
VDOT City of Winchester
✓ Sanitation Authority Town of Stephens City
OYN - I-LIZ I97- ✓ Inspections Dept.
oK,- 3/i 193 / Fire Marshal
OK 1 / 19 N 3 County Engineer
Airport Authority
2. One copy of the Site Plan application.
3. Five copies of the Site Plan.
4. One reproducible copy of the Site Plan (if required).
5. One 35mm. slide of the Site Plan (if required).
TRACKING
Date
-1- 3 Application received.
✓ All necessary agency comments received.
3 - / - 9 3 Fee Paid (amount $ / "6.00 ).
Town of Middletown
Health Dept.
Parks & Recreation
Soil & Water Conservation Dist.
7403 Site Plan to Planning Commission via bi-monthly.
3 3 53 Site Plan heard by Planning Commission (if required).
Revisions received (if required).
93 Date of approval.
��--
Z
a Info added to annual report Bette. d&-�
•
SITE PLAN APPLICATION
Complete the following application:
DATE 1 December 1992 APPLICATION #
1. Development Green Bay Packaging Inc.
2. Location of Property: Park Center Center Drive
(by street name) Ft_ CnlliPr Tndustrial Park
3. Property Owner: —(-een Raj, Par-kaging, Tnc
Address: P n Rnx 19017
C.rPPn Rn3., Wisconsin 54307-9017
Telephone:
4. Applicant/Agent: Greenway, Inc.
Address: 1104 Baker Lane
_Winchester, Va. 22603
Telephone: _703-662-4185
5. Designer: GrPPnway, Tnc.
Address: _1104 Raker Lane
Winchesters Va. 22603
Telephone: 703-662-4185
Contact: _I3_ RriicP FdPns
6. Is this an original or revised site Plan?
Original X Revised
-5-
r
0
0
7. Total area of parcel to be developed: 18.218 Acres
8. Property Information:
a) Property ID #:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Zoning:
f) Adjoining Property Use:
g) Magisterial District:
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submission of my site plan.
Signature:��`�
Date:'2-
COUNTY OF FREDERICK, VIRGINIA
DEPARTMENT OF INSPECTIONS
Caller
o N -">
Time Called 9r"M
CAA-4OV Date Called S� f
Phone No.
Time Requested
A,5 -p Date Requested AsA-P
Received By
EVA-0
N/A-_,T_
Date of Inspection /2-r /9t-
PERMIT HOLDER NAME Plf 2I r-S 1 (1NtFrQ.LK_M OVS)
RT. NO. 1323 Lot No.SEC. No. E SUBDIVISION j�"f`. eo�u k IMP. pPH2'<-
STREET NAME PPIZK CEIQT Z` DR-19"
DIRECTIONS BUILDING NO. 1 164-6 — 9 2-
i3fi-rO PLUMBING NO.
ELECTRICAL NO.
MECHANICAL NO.
SIGN NO.
DISTRICT STON t= L3Pm -
PERMIT FOR: �3run9S R4V PRC K."" 1•� Ct'�
Type of Inspection /
Residential Commercial ✓/
Footers
Setbacks: FR
BK L
R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final
Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks v'
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: Zb "w Temperature
Time Out: I i JZ ^" Weather
L)t._)1'.)
Results: Approved vRejected
Comments: l )16"�
Cut in No.
i
Signature IS =M� � Date
COUNTY OF FREDERICK, VIRGINIA
DEPARTMENT OF INSPECTIONS
Caller YERIIQ� �d�r 1STf�uCTlonJ Time Called 1'"; Date Called Z /3I Q`}
Phone No. Time Requested Date Requested Z/7 /7+
Received By CVN°3 QDate of Inspection ��7/`t
PERMIT HOLDER NAME
RT. NO. Lot
No. SEC. No.
SUBDIVISION
FFT" �o�.a Wit;, 'r+[� • ?�2r1
y�
STREET NAME 1 A
I J
DIRECTIONS i (
TUKrJ 6n37C)
BUILDING NO.
D2lvE SITE
Or) C L�
PLUMBING NO.
ELECTRICAL NO.
MECHANICAL NO.
SIGN NO.
DISTRICT J7C;nl TWA-�l_
PERMIT FOR: E_
PA �!J PAC KC *-,. I JG—
Type of Inspection
Residential
Commercial
/
✓
Footers
Setbacks: FIR
BK
L R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final
✓ Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: A,^I
Temperature
^' 45
Cut in No.
Time Out: j c 3i�.
AA Weather
S000y
Results: Approv1ed, Rejected
Comments: VI[ IL.L Sir l — parr nnJ f"1 ti'qL. Q - 0. G1"T
/�= 0 S TA-B i L a ZC— D-
Signature Date z�'
COUNTY OF FREDERICK, VIRGINIA
DEPARTMENT OF INSPECTIONS
Caller -BoR Time Called Date Called (11'4 J93
(300 -79 7 - 16100 1 Phone No. er - :1 R - 21o00 Time Requested A nAp Date Requested 115193
Received By �_7YAO A . W 4 ATT_ Date of Inspection
PERMIT HOLDER NAME P[2101 kn, 00-s'ir.L clloN
RT. NO. Lot No. SEC. No. SUBDIVISION ,�g-r- (2+�Luel�� I t'3jb .YA
STREET NAME 1"AR.K cEwY" lQj-iE-
DIRECTIONS II N
BUILDING NO.
Pft-KrC l� TJ'is; DQ1 %1G ' PLUMBING NO,
- n..- 1 ( L
PERMIT FOR:
Type of Inspection
Residential
ELECTRICAL NO.
MECHANICAL NO.
SIGN NO.
DISTRICT vTOtJ�NL-L- -
Commercial
Footers
Setbacks: FIR
BK L
R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final •�
Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
t
Time In: 3 - US PM Temperature '�'� 1" Cut in No.
Time Out: Weather S�►J�JY
Results: A
Rejected
t�
� ar
Comments: OJIOE D'5ftLEQ .)TQIP< _ofty�.��• r1!`c�,T—
kkn'll Qc Cooc e_crt_ ---- I.J�L_ 5ni-_,-:- PAC L Z,
R1 P �i A I IN %A _vJ Y` 17—fr if O Crl�-k I kL• .ic .`.�� rZ �2 I— E l Q �i r ��i3'�SG
Signature
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
June 14, 1993
Green Bay Packaging, Inc.
Attn: Mr. Ed Havlow
P.O. Box 19017
Green Bay, WI 54307
RE: June 10, 1993 Site Inspection.
Dear Mr. Havlow:
This letter regards the above referenced site inspection. The
following items need to be complete prior to the issuance of a
Final Certificate of Occupancy Permit:
✓1) Stripe entire parking lot on east side of building.
2) Stripe all disabled parking spaces and provide required
sne_for all disabled spaces on east side of building.
3) Complete disabled ramp from parking lot to east side of
building.
4) Stripe pedestrian crossing areas from parking lot to east side
of building.
✓.5) Complete sidewalk along parking lot on east side of building.
6) Stripe all tractor trailer spaces in loading area on west side
of building.
7) Provide concrete .wheel stops and stripe all tractor trailer
parking spaces on west side of building.
8) Provide curb and gutter, asphalt, sidewalk, disabled signage,
and stripe all regular parking spaces and disabled parking
spaces beside office area.
9) Provide all outdoor lighting fixtures.
10) Pave entire maneuvering area around building.
11) Provide rip -rap around all RCP, CMP, and drainage ditch areas.
%12) Regrade and stabilize all disturbed areas.
Please contact me if I may answer any questions regarding this
letter.
Sincerely,
�.bl?Evan A. Wyat
Planner II
EAW
9 North Loudoun Street P.O. Box 601
Winchester, VA 22601 Winchester, VA 22604
COUNTY OF FREDERICK, VIRGINIA
DEPARTMENT OF INSPECTIONS
Caller M R . 31'i ► FFt__r--rT_ Time Called Date Called �" / 7 J
Phone No. Time Requested I . 00 Pwl Date Requested
Received By E-4A*3 A • Date of Inspection (o 1 �► 3
PERMIT HOLDER NAME BER►c.:►
RT. NO. Lot No. SEC. No. SUBDIVISION F&ZT' C�11_► E►� �rlbi,�T � a _ t'•�<:�:
STREET NAME f"R:F. C�,.iTG_C' 7) ,
DIRECTIONS Rr i r' -nR.BUILDING NO.
�DIZ \J SITU PLUMBING NO.
c'"J ELECTRICAL NO.
MECHANICAL NO.
SIGN NO.
DISTRICT�T-tE�JA
PERMIT FOR: c RED�t KrIC- I ►,� Cr
Type of Inspection
Residential Commercial
Footers Setbacks: FR BK L R
Slab Draintile Gas Fire -up Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final
/ Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: ' i
Temperature
'in 1=
Cut in No.
Time Out: --
Weather
`'
Results: Approved Fcrz
Tr,me_,aR&,w
Rejected
Comments: E A:rmc
EtQ Q
U" .
Signature X1a�J l l�� Date (oll4- 1 93
i COUNTY OF FREDERICK, VIRGINIA
Thomas W. Owens
Director
TO:
FROM:
FIRE AND RESCUE DEPARTMENT
9 N. Loudoun Street, 2nd Floor
Winchester, Virginia 22601
M E M O R A N D U M
John Trenary, Building Official
Douglas A. Kiracofe, Fire Marshal
SUBJECT: Green Bay Packaging
DATE: June 11, 1993
Douglas A. Kiracofe
Fire Marshal
As you are aware, I conducted an inspection of this site
today for a temporary occupancy of Zone #2. At this time I can
not sign off on temporary C.O. for the following:
1. Sprinkler heads in area are still taped up and covered with
aluminum foil from painting operations.
2. Flammable liquids (paint) is stored in the area being
discussed in 55 gallon drums. These must be removed.
3. Locks must be placed on all active P.I.V. valves.
4. Ceilings are required in the temporary office, truck drivers'
lounge, and restrooms. I would agree to sing off on a
temporary on this item provided the contractor agrees to
install by July 1, 1993.
5. Fire extinguishers must be hung by each exit.
Since the building is now occupied and production is
beginning with or without a temporary C.O., Green Bay Packaging
will be expected to adhere to all applicable sections of the
State Fire Prevention Code. This includes maintaining access to
all hydrants and siamese connections at all times.
If you have further questions on this matter please let me
know.
TWO:jlc
cc: Evan Wyatt
Pirini Construction Co.
Ed Havlo, Green Bay
File
DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682
CK �O P,
A l COUNTY OF FREDERICK, VIRGINIA
o FIRE AND RESCUE DEPARTMENT
FARE RESCUE 9 N. Loudoun Street, 2nd Floor
VIRGINIA Winchester, Virginia 22601
Thomas W. Owens Douglas A. Kiracofe
Director Fire Marshal
November 9, 1993
Mr. John H. Winters
Facilities Manager
Green Bay Packaging
285 Park Center Drive
Winchester, VA 22601
Dear Mr. Winters,
Today I visited your facility to do the final inspection
prior to your receiving an occupancy permit.
Most all of the items addressed prior to today have been
addressed however the following items are outstanding:
1. Fire lanes at the hydrants and Fire Department Connection
must be posted with signage reading "No Parking - Fire
Lane".
2. Numerical street address must be posted on the front of the
building using 8" numerals on a contrasting colored
background.
3. Sprinkler risers in the manufacturing areas must have design
density placards in place.
4. All spare sprinkler head cabinets must be fully supplied
with spare sprinkler heads.
5. 10# ABC fire extinguishers are needed at each exit from the
office area. (Exits to outdoors)
6. Light fixtures must be in place and all ceiling tiles in
place in meeting room and rest rooms.
I realize that many of these items are already being
addressed and as soon as everything is completed, please let me
know.
DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682
Mr. John H. Winters
November 9, 1993
Page 2
The only other area I'm concerned with is sprinkler coverage
for beneath the "coater" line. I'll be speaking with Factory
Mutual Insurance on that issue and will get back to you as soon
as I can.
Should you need anything further from me, please do not
hesitate to call me.
Thank you.
Sincerely,
Douglas A. Kiracofe
Fire Marshal
DAK:ilc
cc: John Trenary, Building Official
Evan Wyatt, Planning Department
File
COUNTY OF FREDERICK, VIRGINIA
FIRE AND RESCUE DEPARTMENT
9 N. Loudoun Street, 2nd Floor
Winchester, Virginia 22601
Thomas W. Owens
Director
November 9, 1993
Mr. John H. Winters
Facilities Manager
Green Bay Packaging
285 Park Center Drive
Winchester, VA 22601
Dear Mr. Winters,
Douglas A. Kiracofe
Fire Marshal
Today I visited your facility to do the final inspection
prior to your receiving an occupancy permit.
Most all of the items addressed prior to today have been
addressed however the following items are outstanding:
1. Fire lanes at the hydrants and Fire Department Connection
must be posted with signage reading "No Parking - Fire
Lane".
2. Numerical street address must be posted on the front of the
building using 8" numerals on a contrasting colored
background.
3. Sprinkler risers in the manufacturing areas must have design
density placards in place.
4. All spare sprinkler head cabinets must be fully supplied
with spare sprinkler heads.
5. 10# ABC fire extinguishers are needed at each exit from the
office area. (Exits to outdoors)
6. Light fixtures must be in place and all ceiling tiles in
place in meeting room and rest rooms.
I realize that many of these items are already being
addressed and as soon as everything is completed, please let me
know.
DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682
Mr. John H. Winters
November 9, 1993
Page 2
The only other area I'm concerned with is sprinkler coverage
for beneath the "coater" line. I'll be speaking with Factory
Mutual Insurance on that issue and will get back to you as soon
as I can.
Should you need anything further from me, please do not
hesitate to call me.
Thank you.
Sincerely
Douglas A. Kiracofe
Fire Marshal
DAK:ilc
cc: John Trenary, Building Official
Evan Wyatt, Planning Department
File
0
i
�L4 sr- N a, -
March 10, 1993
Green Nelson Weaver, Inc.
Attn: Mr. Gene Green
6465 Wayzata Boulevard
Minneapolis, MN 55426
RE: Site Plan Approval For Green Bay Packaging, Inc.
Dear Mr. Green:
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
The Frederick County Planning Department administratively approved Site Plan #005-93
of Green Bay Packaging on March 5, 1993. The approved site plan calls for the
construction a 96,196 square foot manufacturing and office facility, two (2) parking lots
complete with asphalt paving, 175 regular parking spaces, seven (7) disabled parking spaces,
curb and gutter, raised islands, and perimeter and interior landscaping, a concrete loading
area complete with 24 spaces and concrete curb blocks, pedestrian sidewalks, 11 outdoor
lighting fixtures, stormwater management facilities, a rail spur addition, and all appropriate
erosion and sediment control measures. Enclosed is a copy of the approved site plan for
your records.
Please contact our department to schedule an inspection of this site once all improvements
are complete. All improvements specified on the approved site plan must be finished prior
to the issuance of a Final Certificate of Occupancy Permit.
Sincerely,
LCL 01 �' . L?--
Evan A. Wyatt
Planner II
EAW
cc: Charles W. Orndoff, Sr., Stonewall District Supervisor
Michael A. Didawick, Director of General Assessments
H. Bruce Edens, Greenway, Inc.
9 North Loudoun Street P.O. Box 601
Winchester, VA 22601 Winchester, VA 22604
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
January 8, 1993
Greenway, Inc.
Attn: H. Bruce Edens
1104 Baker Lane
Winchester, VA 22601
RE: Green Bay Packaging Site Plan.
Dear Bruce:
This letter regards our January 7, 1993 meeting held in your office. The purpose of our
meeting was to review the above referenced site plan.
All items specified in my first review of this plan have been adequately addressed; therefore,
this plan meets all requirements of our department. I will recommend approval of this plan
once our department receives the site plan review fee, all approved review agency
comments, and four (4) copies of the final site plan. As requested, I will send a
memorandum to all review agencies asking that final comments be advanced to you
expeditiously.
I hope this letter is of assistance. Please contact me if I may answer any questions regarding
this letter.
Sincerely,
&01 T
J?-
Evan A. Wyatt
Planner II
EAW
cc: Mr. Tom Mecklenburg
Mr. Gene Green
1) Not-th L(HI(Joun Su-ect P.O. Box 601
\Vinchester, VA 22601 Winchester, VA 22604
Gq,e" t3s'y PAcK1441-30
L4,40 (bzw IT
i COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
November 25, 1992
Green Nelson Weaver, Inc.
Attn: Mr. Gene Green
6465 Wayzata Boulevard
Minneapolis, MN 55426
RE: Land Disturbance Permit For Green Bay Packaging Site.
Dear Mr. Green:
Mr. H. Edward Strawsnyder, Director of Engineering Services, has provided our department
with approval of the grading plan and erosion and sediment control plan for the above
referenced project. Our department will issue a land disturbance permit for this project
once application is made and the fee is paid. This fee includes a $200.00 base fee plus
$25.00 per acre of disturbed area.
I had an opportunity to meet with Mr. Bruce Edens of Greenway Engineering, to conduct
a preliminary site plan review for this project. It is my understanding that Mr. Edens is
submitting the site plan to all review agencies for comment. Once all review agencies have
responded, Mr. Edens should proceed with the site plan application. When this is
accomplished, our department will include this project on our Planning Commission's
Bimonthly report.
Please contact me if I may answer any questions regarding this letter, or if I may be of
further assistance.
Sincerely,
Evan A. Wyatt
Planner II
EAW
cc: H. E. Strawsnyder, Director of Engineering Services
H. Bruce Edens, Greenway Engineering, Inc.
9 North Loudoun Street P.O. Box 601
%Vinchester, VA 22601 Winchester, VA 22604
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
November 9, 1992
Greenway Engineering, Inc.
Attn: Mr. H. Bruce Edens
1104 Baker Lane
Winchester, VA 22601
RE: Green Bay Packaging Grading Plan.
Dear Bruce:
This letter regards our telephone conversation on Thursday, November 5, 1992. During that
conversation, we discussed requirements regarding land disturbance at the Green Bay
Packaging site.
It is my understanding that Green Bay Packaging would like to begin rough grading, fill, and
compaction on a portion of this site as soon as possible. In order to accomplish this, the
Frederick County Engineer will need to approve a grading plan and an erosion and
sedimentation control plan. The plans need to specify all required information and should
indicate phasing if the site is to be graded in this fashion.
I will be happy to issue a land disturbance permit for the Green Bay Packaging project once
the County Engineer has approved the grading plan and all appropriate fees are submitted.
Please contact me if you have any questions regarding this correspondence.
Sincerely,
Evan A. Wyatt
Planner II
EAW
cc: H.E. Strawsnvder, Director of Engineering Services
Gene Green, Green Nelson Weaver, Inc.
9 North Loudoun Street P.O. Box 601
Winchester, VA 22601 Winchester, VA 22604
•
0
March 11, 1992
Green Bay Packaging Inc.
Attn: Mr. Tom Mecklenburg
3250 South Ridge Road
P.O. Box 19017
Green Bay, Wisconsin 54307-9017
RE: Development Fees and Schedules.
Dear Mr. Mecklenburg:
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703 / 678-0682
This letter is in response to your request for information. In particular, you requested a listing
of potential fees related to manufacturing development. Enclosed is a booklet describing the
various fees associated with commercial and industrial development for your benefit. I wanted
to specifically address your request as well, in the event that certain items are not adequately
addressed by the booklet.
1) Site plans require a submittal fee. This fee includes all reviews, advertisement for
agendas, and site inspections.
2) Stormwater management is addressed as part of the site plan review. This plan is
reviewed by the County Engineer who provides our department with a comment sheet.
If the engineer's review is approved, our department will issue a land disturbance permit
to allow for grading work to commence. There is a fee for the land disturbance permit
if grading work begins prior to final site plan approval.
3) Zoning certificates are issued by the Frederick County Building Official (Mr. John
Trenary). A Temporary Certificate of Occupancy Permit will be issued to allow for the
setup of office and manufacturing equipment. There is a one time fee associated with a
Temporary C.O. A Final Certificate of Occupancy Permit will be issued once all
structural codes, fire protection codes, and required site work is complete.
4) Zoning amendments are considered as revisions to the site plan. As stated in number 1,
the fee for site plan submittal covers all reviews.
5) Plat fees are considered part of the subdivision review process. All required subdivision
plans and plats are reviewed by our department. There is a minimal fee
THE COURTHOUSE COMMONS
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
Page -2-
Mecklenburg Ltr.
March 11, 1992
associated with the recordation of all plats.
6) Our department does not have an improvement plan fee. Once the site plan is approved,
you may improve the site to reflect the plan.
7) Building permits are required prior to construction. Frederick County will grant footer
foundation permits prior to final site plan approval, provided that the footer plans are
reviewed and approved. Electrical, plumbing, mechanical, and structural permits require
review by the Building Inspections Department. The fee for the building permit covers
plans review, permitting, and inspections.
8) There are no administrative and overhead fees associated with reviews of permits. The
fees are based solely on the site plan submittal and the building permit fees.
9) There are no administrative and overhead fees associated with inspections. The Building
Inspections Department will charge for a reinspection if a scheduled inspection that is not
ready is not cancelled.
10) Water and sewer connections are very difficult to explain. Each user potentially falls into
a different category. This is based on the location of the property and the type of service
desired. I would suggest that the Frederick County Sanitation Authority provide you with
as much information as possible based on your site.
I hope this letter addresses your concerns regarding fee schedules. Please refer to the enclosed
booklet for specific questions. I will be happy to assist you with any questions regarding the
Local Development Fees booklet, Frederick County, or this letter.
Sincerely,
L1. 0,-. U �-
Evan A. Wyatt
Planner II
EAW
cc: John R. Riley, Jr., Frederick County Administrator
June M. Wilmot, Director of Economic Development
•
•
Winchester -Frederick County Economic Development Commission
12 Rouss Avenue, Winchester, VA, 22601, (703)665-0973, FAX - (703)722-0604
March 10, 1992
Mr. Tom Mecklenburg
Production Manager
Green Bay Packaging, Inc.
3250 S. Ridge Road
Green Bay, WI 54307-9017
Dear Tom:
We are pleased to provide in information you requested in order to
complete your assessment of our community as an expansion site for
Green Bay Packaging.
The first enclosure "Local Development Fees" summarizes local
development costs. A glance at the index will show that it includes
construction, building permits, water and sewer as well as taxes.
Evan Wyatt has provided a thorough transmittal letter to accompany
the data.
The second enclosure, "Virginia: A Guide to Establishing a
Business" comes from Rick McGeorge and provides an excellent
summary of State taxes. It is our understanding that an S
corporation does not affect the rates.
We've also enclosed a tax matrix which will indicates at what level
the taxes are levied which can guide you through the above data.
The State Department of Economic Development can prepare for you a
sample tax bill combining both State and Frederick County levies if
you can provide those values to Rick.
The fourth enclosure deals with business incentives in Virginia,
also provided by Rick McGeorge.
I have the site data on Ft. Collier ready for Gene Green. It and
the environmental data on the site for Brian will be forwarded
tomorrow. I will get to you copies of the transmittal letters.
COME TO THE TOP - NO BETTER PLACE.... NO BETTER TIME....
9
0
Green Bay Packaging
Page 2
We're on our way. Let us know what you need next. I'll call in
the next day or so.
Sincerely,
June M. Wilmot
Executive Director
cc: Rick McGeorge -
a/Evan Wyatt c--
" �N1AR 6 ' 92 9:13. GREEN 3•PCKG, COATED DIV, • P. 2/ 3.
'464
_..._�_. ., %jCfl4f,`I(. VC.y,
zg
. �e:../#N /J r,v ra /C}rv,t� . �U N r.0 L5 f'`a;Z �/,4S �'�•Lvkv .i � �[ � t �nrs .
� &r%C/,t aS S� C� r- T,QGrP.27'7 �.5�7's j'�4.�i J / �+•'/�/'..c� �JeIG � C'�d.� ..S ;��2 r c7 �i.,.r � rf'
%iNJ s4c7Vrz�G 7'T+1Cre—e7-7 r cti S,gr4��e.v 4 �j>41� r�f�Ct4 rT`y.
�/i N C.� / - i yV i rr�� / Xs
S' („!yr Vtsf '"'�/� ,.,�-•:'r
r
r"+
f,•�ze.t�s : .5.y-s Q•,,:'ut�l-,w�xc rY�r4•�,aGst-rr�� , ..�.,�,',.r�,��c,r-�s,
K,J•-S".0
(_J n,I r 7'• 4 j� �.�G � S f. 5 v r +,' w .5 v r 7`"�".�/�t t7'S C � /n r � t $ 7-� t¢• J`r�,� .� � �
rJIP-115Aa 7-r t; 6ef45�),u e_f � � e-l"'vrvS ;>.R-u I, e_.aS'Are
/"-'
. �` �,r7'1 r .J f 3 z•• T, �+ �• �}},^� �J d � •5�'7J•,ti ��� � 5 c /� f � C3 � „� r � � i `Sf�- .�4-v �
7�u S� C��rV'n.J Crru,v e, �5
e:tl 4. •w✓ca
4
rAllis
r% �C /�.✓ C3u�2
0
0
Winchester -Frederick County Economic Development Commission
12 Rouss Avenue, Winchester, VA, 22601, (703)665-0973, FAX - (703)722-0604
ITINERARY
Representatives of Green Bay Packaging
March 4, 1992
1:30 p.m. Arrival and Welcome (E.D.C. Conference Room, 2nd floor,
12 Rouss Avenue)
For the State of Virginia: Rick McGeorge, Marketing
Manager, Virginia Department of Economic
Development
For Winchester -Frederick County: Bill Shendow,
Executive Director, Winchester -Frederick County
Chamber of Commerce
Video: Why Winchester -Frederick County
2:00 p.m. Permitting and Regulatory Information
County Development Process: John R. Riley,
County Administrator
Construction Timetable: Evan Wyatt, Planner,
Frederick County Department of Planning and
Development
Sewage Treatment Requirements: John Whitacre,
Engineer, Frederick County Sanitation Authority
Air Pollution Control Requirements: David Taylor,
Senior Field Representative, Virginia Department
of Air Pollution Control
3:00 p.m. Tour of Sites and Community
IDC Site
Capital Records Facility
Stonewall Industrial Park
Ft. Collier Industrial Park
4:30 p.m. Meeting with Shockey Bros. Representatives
5:00 p.m. Conclude Day's Agenda
COME TO THE TOP - NO BETTER PLACE.... NO BETTER TIME....
ME
SI11E PLAN CHECKLIST
The site plan application is not complete if the required
information is not submitted. All required information must be
obtained prior to the submission of this application. If any part
of the required information is missing or not complete, the site
plan application will not be accepted by the planning department.
The applicant shall meet with the staff member in charge of site
plan review when the application is ready for submission to insure
that all required information is complete.
SITE PLAN PACKAGE
1. One set of comment sheets from the following agencies
along with any marked copies of the plan:
✓ VDOT City of Winchester
�- Co. San. Auth. Co. Health Dept.
k---- Inspections Dept.
✓/ Fire Marshal
Town of Middletown
_v-' County Engineer
Parks & Rec.
Airport Authority
Town of Stephens City
Soil & Water Conser. Dist.
2. One copy of the Site Plan application
3. Four copies of the Site Plan
4. One reproducible copy of the Site Plan (if required)
A 35mm slide of the Site Plan (if required)
v'
- 1-
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
✓ 1. Name of proposed development.
,i 2. Name and addr=--ss of owner.
✓ 3. Name and address of developer.
4. Name, address and phone number of designer.
.� 5. Certificate of surveyor, engineer or architect.
6. Date plan prE')ared and date of revisions.
_ 7. A listing of ill conditions placed on the site as
a result of a cc:iditional use permit or conditional
zoning approval.
✓ 8. A space labeled "approved by the Zoning
Administrator" for the approval signature and date of
approval.
General Site Information
Y N
F/ 9. Location map (scale 1:2000)
.� 10. Magisterial District of site
e/ 11. Scale of site plan (not to exceed 1:50)
✓ 12. North Arrow
.� 13. Zoning of sits
14. Use and zoning of adjoining properties
Lots/Uses/Buildings and Struct--ures
Y N
- 15.
Surveyed boundaries for all lots and p_Arcels
✓
16.
Acreage of al: lots included in the plan
17.
The location and dimensions of all required
setbacks and yard areas
✓
18.
Location of a,.l buildings, structures and uses
i
19.
The proposed use of each building, structure and
area
✓ 20.
The location -ind type of all dwelling units
✓
21.
Ground floor area and total floor area of all
buildings with F.,,-R calculations for commercial and
industrial zoning district
22.
The height of all buildings and structures
23.
The location and dimensions of all signs
a'
-7-
•
•
Lots/Uses/Buildings and Structures (con't)
Y N
_G
Roads
Y N
f
Utilities
Y N
Parking
Y N
24. Location of outdoor lighting fixtures
25. Location and nature of outdoor storage areas
26. Location and area of common open space
27. Location and description of all recreation
facilities
28. Location of sidewalks and pedestrian ways
29. Location of outdoor trash receptacles
30. Name and number of existing and planned streets on
and adjoining the site
31. Location of existing and planned streets on and
adjoining the site
32. Dimensions, boundaries, width, pavement and
construction of planned roads
33. Location and dimensions of all proposed entrances
from public right-of-ways
34. Location of all utilities, including sewer and
water lines with the size of lines, mains and laterals
35. Location and width of all easements, including
access, utility and drainage easements
36. Location and nature of fire lanes, fire hydrants
and all other facilities necessary to meet the Fire
Code requirements
37. Calculations describing the required number of
parking and loading spaces
38. Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing and other
features to be used
39. Location and dimension of all handicapped spaces
s'
0 0
Natural Features
Y N
.� 40. Existing and finished contour lines
41. Location of steep slopes, woodlands, floodplains
wetland, sinkholes and other environmental features
42. Location of streams and drainage ways
Landscaping
Y N
✓ 43. Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with
cross sections or profiles.
Erosion and Sediment Control
Y N
45. A stormwater management plan with run off
calculations and location and description of facilities
to be used
46. Soil erosion and sedimentation control plan with
location, types and examples of provisions to be used
i'
• 5.AOIAI1
12- 115Z.
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
1. Name of proposed development
_f 2. Name and address of owner
3. Name and address of developer
_ 4. Name, address, and phone number of designer
✓" 5. Certificate of surveyor, engineer, or architect
6. Date plan prepared and date of revisions
7. A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval
8. A space labeled "approved by the Zoning
Administrator" for the approval signature and date
of approval
General Site Information
Y N
9. Location map (scale 1:2000)
10. Magisterial District of site
11. Scale of site plan (not to exceed 1:50)
12. North Arrow
13. Zoning of site
14. Use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Y N
15. Surveyed boundaries for all lots and parcels
16. Acreage of all lots included in the plan
17. The location and dimensions of all required setbacks
and yard areas
18. Location of all buildings, structures, and uses
19. The proposed use of each building, structure, and
area
20. The location and type of all dwelling units
21. Ground floor area and total floor area of all
buildings with FAR calculations for commercial and
industrial zoning districts
22. The height of all buildings and structures
23. The location and dimension of all signs
7
t •
Lots/Uses/Buildings & Structures (con't)
Y N
24. Location of outdoor lighting fixtures
25. Location and nature of outdoor storage areas
26. Location and area of common open space
27. Location and description of all recreation facilities
28. Location of sidewalks and pedestrian ways
29. Location of outdoor trash receptacles
Roads
Y N
30. Name and number of existing and planned streets on
and adjoining the site
31. Location of existing and planned streets on and
adjoining the site
32. Dimensions, boundaries, width, pavement, and
construction of planned roads
33. Location and dimensions of all proposed
entrances from public right-of-ways
Utilities
Y N
34. Location of all utilities, including sewer and water
lines with the size of lines, mains, and laterals
35. Location and width of all easements, including
access, utility and drainage easements
36. Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Parkina
Y N
37. Calculations describing the required number of
parking and loading spaces
38. Location and dimensions of all parking and loading
spaces, driveways, parkin aisles, curbing, and
other features to be used F-,,�.,,4 i
39. Location and dimension of all handicapped spaces
D
Natural Features
Y N
40. Existing and finished contour lines
41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
Landscaping
Y N
43. Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
rM
45. A stormwater management plan with run off
calculations and location and description of
facilities to be used
46. Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
Q
9r11 1 1~�'
i t
COMMONWEAL"M-of VlRGI', IA
RAY D. PETHTEL
COMMISSIONER
Mr. Austin Spitler
C/O Greenway, Inc.
1104 Baker Lane
Winchester, VA 22601
Dear Austin:
DEPARTMENT OF TRANSPORTATION
P. O BOX 278
EDINBUHG. 22824
February 25, 1993
WILLIAM H. SUSHPO +
NtSIDENT ENGINEER
TELE(703)984.4133
FAX I /U31964-;)7E,1
Ref: Grccnbay Packaging, Inc.
Park Center Drier`
Ft. Collier Industrial Park
Frederick County
We have reviewed the referenced project's revised site plans dated January 21, 1993. All of our
earlier comments appear to have been satisfactorily addressed except for the proposed typical
ditch section A -A on Plan Sheet 1 of 4. This detail should specify a 6' shoulder at l" per foot
slope and a front ditch slope at 3:1 maximum.
Once revised please resubmit four (4) copies for our files. Should you have any questions,
please let me know.
Sincerely,
William H. Bushman
Trans. Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
RBC/rf
Enclosures
xc: Mr. T. L. Jackson
Mr. R. W. Watkins
Mr. H. E. Strawsnyder
Mr. Don Mcllvaine
1-1
THANSPORTATION FOR THE 21ST CENTURY
r\
COMMONWEALTH of VIRGINIA 6
DEPARTMENT OF TRANSPORTATION ---
P. O. BOX 278
RAY D. PETHTEL EDINBURG, 22824 WILLIAM H. BUSHMAN
COMMISSIONER RESDENT ENGINEER
January 4, 1993 Uo, / A , / / TELEI(703) 984-4133
' FAX (703) 984-9761
Mr. H. Bruce Edens Ref: Green Bay Packaging, Inc.
C/O Greenway, Inc. Park Center Drive
1104 Baker Lane Ft. Collier Industrial Park
Winchester, VA 22601 Frederick County
Dear Bruce:
As requested we have reviewed the above referenced site plan dated September 24, 1992. Our
recommendations may be found on the enclosed plans marked in red and as follows:
1. The two (2) northern entrances should be extended the full 50' width back 60' from
the edge of pavement as noted. This is to avoid truck entering/exiting conflicts.
2. The paved entrance tapers should terminate at the front edge of the gutter pan.
3. The northern entrance pipe needs to be moved back from the edge of pavement and
ditch flared back to the pipe ends.
4. All pipe ends should be mitered.
5. The proposed entrance pavement design should be revised as noted.
6. Drainage easements should be provided to enclose the entrance pipes. The easements
should extend 10' behind the pipes and 10' past the last one.
7. The right-of-way of Park Center Drive (present and future) should be clearly shop..:l.
If it is intended the road be extended later curving to the left as implied by the ra�'al
property line, there may be a conflict with the diversion berm shown.
8. It is unclear whether the detention basin is permanent or temporary. If permanent a
note is to be placed on the plans that the basin will be maintained by the property
owner and that the Virginia Department of Transportation will not be responsible for
any future maintenance or liability responsibilities due to its existence.
9. It appears the ditch along the east side of Park Center Drive is being lowered 2'±.
A typical section should be shown describing shoulder/ditch widths and slopes.
TRANSPORT AT : N FOR THE 21 ST CENTURY
0
Mr. H. Bruce Edens
January 4, 1993
Ref: Green Bay Packaging, Inc.
Page 2
10. The enclosed Xerox copy of the Park Center Drive typical section should be
incorporated into the plan. The lot developer should be made aware any damages to
the Park Center Drive right-of-way during construction of this project will need to be
corrected in accordance with the Park Center Drive typical section.
Once revised please resubmit four (4) copies for final approval. Should any changes be deemed
necessary, please design them to meet or exceed the above recommendations.
Should you have any questions, please let me know.
Sincerely,
William H. Bushman
Trans. Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
RBC/rf
Enclosures
xc: Mr. T. L. Jackson
Mr. J. B. Diamond
Mr. R. W. Watkins
Mr. H. E. Strawsnyder
Mr. Don McIlvaine
REQUEST FOR 61TE PLAN CQMXENT6 1993
Sraderick C�unty sanit"tion buthority--���
Attn: Enginuar Direactor
P.O. Box bits
wincho-iter, virgini,& 22601
(703) 665-6o90
The Frederick County Sanitation Authority is locatt:d on they 2rA
floor of the old r'rederick Co. Courthouse: in Winchester, l ,'
prefer to hand deliver this review.
Applicant's name, address and phone nuiunar:
I la &,tcEit tom- W LMt, VA. = 1
Name of development and/o-�: description of the rcqueat:
GREF.h►Myfta" lwo
Location:
Sanitation Authority cou",.;ats:
jrem4d .tie- rt Allw . lie 44 delwe t4"On
/ RL,,cxmr S0050/2' AAD-
�J,�
040
,k
Sanitation Authority Signature &Data:_!y'
(NOTICE TO SANITATION AUTHORITY * THIS FOAX TO APPLI +'
NOTICE TO APPLICANT
It is your responsibility to complete this form as accuraroly 44"1:
possible in order to assist the agency with their review. Also,
please attach two copies of your plans and/or application Coro;.
40
wW401C.0 f RjAdo
u�iLc I3� sir
0
REQUEST FOR SITE PLAN COMMENTS
Frederick County Sanitation Authority
Attn: Engineer Director
P.O. Box 618
Winchester, Virginia 22601
(703) 665-5690
The Frederick County Sanitation Authority is located on the 2nd
floor of the old Frederick Co. Courthouse in Winchester, if you
prefer to hand deliver this review.
Applicant's name, address and phone number:
7 0 3- 6 6 2 --
Name of development and/or description of the request:
Location: F- J-' C �.1- I �02 1 / DG ; r ' A J- J�
N- Sr D E- O-f A1< G;E- IR. -J)DQ( 4f AT
/,K T. 0f' tL,.C-5 I 9X0 a k Zr X D
Sanitation Authority Comments:
/ 3i' ojd9&/.o'W- 3/ /T��J - C'd 4 .6 CoP 1� Riffi/1
A/ 0#r A4 field .w & tom& wgo r /40 �� /*
,B ox ep e 1 eov ooIryr poor 4or r r4#* r 0* o v ra0Ao4
Sanitation Authority Signature & Date:
(NOTICE TO SANITATION AUTHORITY * RN THIS FORM TO APPLICANT.)
G/ NOTICE TO APPLICANT Mo`, /�/ at
It It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach two copies of your plans and/or application form.
9
;,=i 0 ,RCN
REQUEST FOR SITE PI';-N CO:-L'�1ENTS j
Frederick County Inspections Department
Attn: Building Official
P.O. Box 601
Winchester, Virginia 22601
(703) 665-5650
The Frederick County Inspections De=artment is located at 9 r+orzh
Loudcun St., 2nd :loot of the Hammon�Building in Winchester, if :cu
prefer to hand deliver this review.
Applicant's name, address and phone number:
C�0?F�av—//4j� TN
7
Name of development and/or description of the request:
5;,7-21- -7:�,4aN
Location:
ALL ,.�: R /N�S7"/4�A L- �/� � ,< -- r/ • S � � ,L c �
R ,< « -7Z7/f . /4 T / n/ l •. (.�J�S % l310�oI fZD
Inspection Depart=ent Comments:
Building shall com1v with the Virginia Uniform Statgaide Building Code and
Section 305, Use Group F (Factory & Industrial) of the BOCA National Building
Code/1990. Other codes that apply are title 28 Code of Federal Regulation, Part
36 Npndiscrimination on the Basis of Disabilitv by Public Accon n�dations and in
W'Rffercia Faci sties. NOTE: All handicap parking spaces grade shall not exceed
Code Administrator Signature & Date: a 1' to 50' or 2% within the unlnading area.
(NOTICE TO INSPECTIONS DEPT. *PLEASE Rzthis
7form
zaccurately
APPLICANT.)
NOTICE TO APP
It is your responsibility to completas
possible in order to assist the agency with their review. Also,
please attach a copy of your plans and/or application form.
0'NTY OF FREDERICK, VIRGIN
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 022393184
Date
Received 022393 Date Reviewed 022693
Applicant
Name
Greenway Inc.
____
Address
_
1104 Baker
Lane
Winchester,
VA
22601
Project Name
Greenbay Packaging
�............ . ........`�����������������`����`������������`�
Phone No.
703-662-4185
Type of Application
1st Due Fire Co. 13
Election Distric
Revised Site Plan Current Zoning
1st Due Rescue Co. 13
Stonewall
RECOMMENDATIONS
Automatic Sprinkler System X Residential Sprinkler System
Automatic Fire Alarm System X Other
Emeroencv Vehicle Access:
BMW
Adequate
X
Inadequate
Not Identified
Fire Lanes
Required5
Yes X
No
Comments:
Circumfrence Road and at
all hydrant locations must be
posted as
fire
lanes.
Roadway/Aisleway Widths;
Adequate X Inadequate
Special Hazards Noted; Yes
_
Comments:
Not Identified
0
Hydrant Locations;
Adequate X
Inadequate
Siamese Connection Location;
Approved X Not Approved
Not Identified
Not Identified
Additional Comments: Spoke to Austin Spitler on 2/26/93 about moving
one hydrant to Circumfrence Road. He will submit plans showing same
on Monday 3/1/93.
Plans approved subject to hydrant change 2/26/93.
Review Time
J. �e
Fire Marshal
9
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 022393184 Date Received 022393 Date Reviewed ,2zzd 3
Applicant Name Greenway Inc.
Address 1104 Baker Lane
Winchester, VA 22601
Project Name Greenbay Packaging
Phone No. 703-662-418S
Type of Application �l1/is�i� ��irr 1z'W'61 Current Zoning /%/
1st Due Fire Co. /3 1st Due Rescue Co. /9
Election District e
RECOMMENDATIONS
Automatic Sprinkler System X Residential Sprinkler System
Automatic Fire Alarm System X Other
Emergency Vehicle Access;
Adequate X Inadequate Not Identified _
Fire Lanes Required; Yes X_ No
Comments:
,Roadway/Aisleway Widths;
Adequate X Inadequate Not Identified _
Special Hazards Noted; Yes No X
Comments:
- Continued -
E
0
Hvdrant Locations;
Adequate X
Inadequate
Siamese Connection Location;
Approved . )(_ Not Approved
Not Identified
Not Identified
Additional Comments: ��04<e! �� _S���G� elzy
21,74- /3
1 J� e'2-1106
Review Time �� ,� 1� APP C _
RPIE
f R eat '-K ♦,ji„!UN i 'j
Douglas A. Kiracofe 'Z3�
Fire Marshal
NTY OF FREDERICK, VIRGINI-��
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 1120920922 Date Received 112092 Date Reviewed 113092
Applicant Name Greenway, Inc.
Address 1104 Baker Lane
Winchester, VA 22601
Project Name Green Bay Packaging
Phone No. 703-662-4185
Type of Application Site Plan Current Zoning M-1
1st Due Fire Co. 13 1st Due Rescue Co. 13
Election District Stonewall
RECOMMENDATIONS
Automatic Sprinkler System X Residential Sprinkler System
Automatic Fire Alarm System X Other
Emergency Vehicle Access;
Adequate X Inadequate Not Identified
Fire Lanes Required; Yes X No
Comments: Posted fire lanes required at all hydrant locations and
siamese location, Also Circumfrence Road must be desionated as a fire
Lane
Roadway/Aisleway Widths, -
Adequate X Inadequate Not Identified
Special Hazards Noted; Yes No X
Comments:
9
Hydrant Locations;
Adequate
Inadequate
Siamese Connection Location;
Approved X Not Approved
X Not Identified
Not Identified
Additional Comments: 1. Relocate hydrant on North corner of plant building
to circumfrence
road. Currently
it is located in
parking area.
Relocate
hydrant on South
corner of
plant
building to the
same side of the driveway
as the fire protection vault and siamese connection. 2. Add the following
to all construction notes: Burning of construction debris on site is
prohibited 3.
Access
for emergency
vehicles
must
be
maintained at
all
times during
construction.
4.
Post
temporary
street
address
sign.
Review Time .50 hr.
Douglas A. Kiracofe
Fire Marshal
COUNTY of FREDERICK
Harvey E. Strawsrtyder, Jr., P.L
Director of Engineering & Inspections
9 North L uudoua St., 2nd Flou
703/665-564:
January 19, 1993
Mr. Bruce Edens, C.L.S. �}
Greenway, Inc.
1104 Baker Lane
Winchester, Virginia 22601
RE: Site Plan Review
Green Bay Packaging, Inc.
Dear Bruce:
We have completed our final site plan review for Green Bay
Packaging, Inc. This review served as a supplementary review to our
prior approval of the erosion and sediment control plan as well as
the stormwater management plan.
Our final review of the site plan documents revealed that the
plans are basically complete i:nd satisfactory except for the
following comments:
1) Sheet 1: The pavement _section specified for the site road
network appears to be too light for the anticipated truck
traffic. It is suggested that the appropriate traffic
loading and intensity be obtained from Green Bay Packaging,
Inc. so that a pavement analysis can be performed to
accommodate the underlying soft clay soils.
2) sheet 1 and 3: Provide design calculations, hydrological as
well as structural, for the proposed triple box culvert.
The above comments will not deter our site plan approval.
However, these issues should be addressed before reaching that
particular phase of construction.
Please call if you have any questions regarding our comments.
d
HES:rls
Fax: 703/678-0682
Sincerely,
+Harve E. Strawsnyde
Director of Public Works
P.O. Box 601 - Winchester, Virginia - 22"
RECEIPT
N2 021610
AMOUNT DUE
$ -'175
AMOUNT PAID
BALANCE DUE
$ U
PAID BY
CASH
T"�yr
CHECK
❑ OTHER
F,'E4PICK COUNTY DEPT. 0 PLANNING AN40EVELOPMENT
P.O. OX 601, 9 COURT SQUARE
WINCHESTER, VIRGINIA 22601
RECEIVED FROM
DATE / N/' �_/ ! ✓ -----
n
ADDRESS��--
THE SUM OF L HL/t7��/(��Y ��UP�'"V DOLLARS S
FOR .4r' ; S /& , "9 n [ 't-
DAY -TIMERS REORDER No 3221—Pnnled m USA
w
9
•
LAND DISTURBING PERMIT
ISSUED TO: PERINI CONSTRUCTION, INC.
who has met all requirements of the Frederick County Erosion and
Sedimentation Control Ordinance as certified by the Frederick
County Department of Planning and Development.
AGREEMENT
This agreement, made this 2nd day of DECEMBER I
19 92, by and between PERTNT C ON,STRTIC ITnN, INC .
n
party(s) of the first part, and the County of Frederick , Virginia,
party of the second part.
Whereas, in consideration of the approval by the party of the
second part of this Virginia land disturbance plan and permit for
the GREEN RAY PAQKAaING N-Alfl-fELk Ti1RTNC. BU1TDINd
of 11 ACRES (actual disturbed acres)
and the party of the second part requiring the following work to
be completed during the land disturbance construction and before
final occupancy, the party(s) of the first part or his
heirs/assigns agree to do the following work:
1. Provide for the adequate control of erosion and sedimentation
by temporary and permanent control practices and measures
which will be implemented during all phases of clearing,
grading and construction and to provide for conformity with
the Virginia Erosion and Sediment Control Law, Title 21,
Chapter 1, Article 6.1 of the Code of Virginia and local code
laws.
2. To provide Erosion and Sediment Control as per the Erosion and
Sedimentation Control Plan.
•
•
-2-
The party (s) of the first part does further agree that an agent
of Frederick County shall be permitted entry to the site of the
land disturbing activity to inspect the control measures shown in
the approved plan.
In testimony whereof, the party of the first part has hereunto
caused its corporate names and seals to be hereunto affixed, for
and in its behalf, by ROBERT G. SHIFLET/PERINI CONSTRUCTION, INC.
and caused this agreement to be acknowledged and delivered for and
in its behalf.
PERINI CONSTRUCTION, INC.
CORPORATION
B Y :%
In testimony whereof, the party of the second part has hereunto
caused its body corporate names and seal to be hereunto affixed,
for and in its behalf by EVAN A. WYATT, PLANNER II
County of Frederick, Virginia
BY:
CC • ���
Frederic, Countfy Department of
Planning and Development
NOTE: Issuance of this permit does not constitute approval of
a site plan. This permit is for land disturbance only.
u
-3-
STATE OF VIRGINIA
COUNTY OF FREDERICK
I, W. WAYNE MILLER , a Notary Public in
and for the State and County aforesaid, do hereby certify that this
day personally appeared before me in my said County,
(name) ROBERT G. SHTELET of (company)
PFRTNT CONSTRU TTom, TNc
and F.VAN A. WYATT, PLANNER IT
of the Frederick County Department and Development, whose names are
signed to the foregoing agreement dated !1,12,192
did personally appear before me and acknowledged the same.
Given under my hand this 2nd day of DECE�IBER ,
19 92.
Notary Pu lic
My Commission expires on
LAND DISTURBING PERMIT
ISSUED TO: PERINI CONSTRUCTION INC
who has met all requirements of the Frederick County Erosion and
Sedimentation
Ordinance as certified by the Frederick
County Department of Planning and Development.
AGREEMENT
This agreement, made this 2nd day of DFC.FMRER
19 92, by and between PERTNT CONSTRUCTION INC
party(s) of the first part, and the County of Frederick , Virginia,
party of the second part.
in consideration of the approval by the party of the
second part of this Virginia land disturbance plan and permit for
the GRF.F.N RAY PACKAgI�G KA?*j-FA(.TiiR T1V(; nTjT r LLTNG
of 11 ACRES (actual disturbed acres)
and the party of the second part requiring the following work to
be completed during the land disturbance construction and before
occupancy,
heirs/assigns agree to do the following work:
Provide for the adequate control of erosion and sedimentation
by temporary and permanent control practices and measures
which will be implemented during all phases of clearing,
grading and construction and to provide for conformity with
the Virginia Erosion and Sediment Control Law, Title 21,
Chapter 1, Article 6.1 of the Code of Virginia and local code
laws.
To provide Erosion and Sediment Control as per the Erosion and
Sedimentation Control Plan.
0
0
-2-
The party (s) of the first part does further agree that an agent
of Frederick County shall be permitted entry to the site of the
land disturbing activity to inspect the control measures shown in
the approved plan.
In testimony whereof, the party of the first part has hereunto
caused its corporate names and seals to be hereunto affixed, for
and in its behalf, by ROBERT G. SHIFLET/PERINI CONSTRUCTION, INC.
and caused this agreement to be acknowledged and delivered for and
in its behalf.
PERINI CONSTRUCTION, INC.
CORPjORA,TTIION
BY: l%
In testimony whereof, the party of the second part has hereunto
caused its body corporate names and seal to be hereunto affixed,
for and in its behalf by EVAN A. WYATT, PLANNER II
County
�� of Frederick, Virginia
BY: u C 1vi CL Lj ic(-
Frederica Count
'y Department of
Planning and Development
NOTE: Issuance of this permit does not constitute approval of
a site plan. This permit is for land disturbance only.
0
0
-3-
STATE OF VIRGINIA
COUNTY OF FREDERICK
I, W. WAYNE MILLER , a Notary Public in
and for the State and County aforesaid, do hereby certify that this
day personally appeared before me in my said County,
(name) ROBERT G- SHTE ET of (company)
PE.RTNT CONSTRUCTION, INC
and EVAN A. WYATT, PLANNER IT
of the Frederick County Department and Development, whose names are
signed to the foregoing agreement dated !1,/21/9
a
did personally appear before me and acknowledged the same.
Given under my hand this 2nd day of DECEMBER ,
19 92.
Notary P&-7:2y'4�
c
My Commission expires on /'IiWleG/l . 1 / . / I /
t,
�lY
COMMONWEALTH, of'V1RQ1N1A
STATE WATER CONTROL. BOARD
Richard N. Burton
Executive Director
P. 0. Box 11143 Nov 3 U 1992
Richmond. Virginia 23230-1 1 43
(804) 527.5000
TDD (804) 527.42b1
Mr. H. Bruce Edens, President
Greenway, Incorporated
1104 Baker Lane
Winchester, Virginia 22601
RE: VWP Permit No. 92-6017
Dear Mr. Edens:
In accordance with your application, we have enclo6ed tho
original and 1 copy of the Permit for the proposed relocdtion of
1700 feet of Red Bud Run and the creation of a meandering low
flow channel with an associated flood channel near the Town of
Winchester in Frederick County, Virginia, pursuant to the
Virginia Water Protection Permit Regulations (VR 680-15-02) and
Section 401 of the Clean Water Act Amendments of 1977, Public Law
95-217.
The provisions and conditions contained therein according to
Section 401(a)(1) of the Clean Water Act requires that:
01any applicant fora -Federal license or permit to conduot
any activity including, but not limited to, the con.%truot.i an
or operation of facilities, which may result in any
discharge in.the navigable waters, shall provide the
licensing orpermitting agency a certification from the
State in which the discharge originates or will originate,
or, if appropriate, from the interstate water pollution
control agency having jurisdiction over the navigable waters
at the point where the discharge originates or will
originate, that any such discharge will comply with the
applicable provisions of sections 301, 302, 303, 306, and
307 of this Act."
As provided by Rule 2A:2 of the Supreme Court of Virginia,
you have thirty days from the date of service (the date you
actually received this decision or the date it was mailed to you,
whichever occurred first) within which to appeal this decision by
filing a notice of appeal in accordance with the Rules of the
Supreme Court of Virginia with the Executive Director, State
Mr. H. Bruce Edens
Page 2
Water Control Board. In the event that this decision is serval
on you by mail, three days are added to that period. Refer to
Part 2A of the Rules of the Supreme Court of Virginia for
additional requirements governing appealea from administrat:.ive:.
agencies.
Alternatively, any owner under §§ 62.1•-4.16, 62.1-44.17
and 62.1-44.19 of the State Water Control Law aggrieved by any
action of the Board taken without a formal hearing, or by
inaction of the Board, may demand in writing a formal hearing o
such owner's grievance, provided a petition requesting such
hearing is filed with the Board, Said petition must meet the
requirements set forth in § 1.23(b) of the Board's Procedural
Rule No. 1. In cases involving actions of the Board, such
petition must be filed within thirty days after notice of such
action is mailed to such owner by certified mail.
Please retain the copy and forward the original Permit to
the Norfolk District, Corps of Engineers, Fort Norfolk, 803 Front
Street, Norfolk, Virginia 23510, ATTN: Permits Section.
If you have any questions, please advise us.
Sincerely, )
Martin G. Ferguson, Jr.
Permits Program Manager
Office of Water Resources Management
Enclosures
cc: SWCB - OWRM VWPP File"
VMRC - Environmental Division
U.S. Army Corps of Engineers, Norfolk District
COMMONWEALTH of VIR(Q'INIA
STATE WATER CONTROL BOARD
Richard N. Burton
Executive Director
P. 0 Box 11143 '
Richmond. Virginia 23230-1 143
(804) 527-5000 VWP Permit No. 9�0�1�75 1992
TDD (804) 527-4261 Effective Date
Expiration Date: NOV 2 5 1997
AUTHORIZATION TO DISCHARGE UNDER THE
VIRGINIA WATER PROTECTION PERMIT
PURSUANT TO SECTION 401 OF THE CLEAN WATER ACT
AND STATE WATER CONTROL LAW
In compliance with Section 401 the Clean Water Act as amended (33
USC 1351 et seq) and pursuant to the State Water Control Law and
regulations adopted pursuant thereto, the following owner is
authorized to discharge in accordance with the conditions set
forth in this permit.
Owner: Whitney Wagner
Fort Collier Group, L.C.
6231 Leesburg Pike
Suite 600
County:
Falls Church, Virginia 22044
Frederick
Project Location: "North of the Town of Winchester,
Virginia adjacent to RedBud Run.
The authorized discharge shall be in accordance with this cover
page, Part I - Special Conditions, Part II - Monitoring and
Reporting Requirements, and Part III - Management Requirements,
as set forth herein.
i
Exe utivtr ire tqr, State Water Control Board
y 2-
Date
•
CONDITIONS
A. Special Conditions
VWP Permit No. 92-6017
Part I
Page 1 of 2
1. All construction of the relocated channel shall occur in
the dry, prior to conducting any activity in Red Bud Run.
2. The low water stream channel shall be no less than one
foot wide (bottom width) and no greater than two feet
deep, with side slopes of 1.5:1 and shall meander through
the constructed flood channel.
3. The flood channel shall be approximately forty feet wide,
and five feet deep, with side slopes of 3:1.
4. The low water and flood channels shall have a natural
bottom, the flood channel shall be stabilized with a seed
mix of Japanese millet, annual rye (Lolium temulentum)
and redtop (Aarostis alba). No less than eighty percent
of the area should be vegetated within the first growing
season.
5. To provide shade and riparian zone protection, trees
shall be planted on twenty foot centers, in two rows on
each side of the low flow channel (four rows total), for
a total of 340 trees. The channel -most row of trees
shall be planted approximately ten feet from channel
edge. A survival rate of no less than eighty percent of
the trees within the first three years is acceptable.
6. Riprap shall be -used at the upstream confluence to armour
areas of fill to prevent erosion.
B. General Conditions
1. That all work shall be done in such a manner as to
minimize sedimentation/siltation of State waters in
accordance with Virginia Erosion and Sedimentation
Regulations (VR 625-02-00).
2. That the applicant shall employ measures to prevent
spills of fuels or lubricants into State waters. The
State Water Control Board (SWCB) must be notified if
spills do occur (804/527-5200).
3. That appropriate erosion and sedimentation controls and
practices shall be utilized during construction and until
all disturbed areas have been stabilized.
VWP Permit No. 92-6017
Part I
Page 2 of 2
4. That the conditions and limitations as specified in the
application shall be adhered to during the life of this
proj-ect .
5. That all construction and installation associated with
the project shall be accomplished in such a manner that
construction material or waste material is not to be
discharged into State waters.
6. That the State Water Control Board's VWPP Program staff
shall be notified in writing 10 days prior to operations
authorized under this Permit are to begin so that staff
inspections of the project can be planned if deemed
necessary.
7. The permittee shall advise the Executive Director in
writing when unusual or potentially complex conditions
are encountered which require debris removal or involve
potentially toxic substances, and shall not take measures
to remove the obstruction, material, or toxic substance,
or change the location of the structure until written
approval by the Executive Director or his authorized
representative is received.
VWP Permit No. 92-6017
Part II
Page 1 of 1
MITIGATION, MONITORING AND REPORTING
A. Mitigation Requirement
1. The permittee shall take all reasonable steps to
a) avoid all adverse environmental impact which could
result from the activity,
b) where avoidance is impractical, minimize the adverse
environmental impact, and
c) where impacts cannot be avoided, provide mitigation of
the adverse impact on an in kind basis.
2. The conditions set out in Part I, Section A, 1-5
constitute mitigation for the conversion of stream
channel and riparian habitat to other uses.
B. Monitoring Method
1. Ten photographs shall be taken during the growing season
at representative points along the new channel.
2. Estimates of tree mortality at each photo station shall
be measured by counting the number of dead and live trees
within sixty feet of the photo station.
3. During the first growing season, visual estimates of the
extent of ground cover should be made within a thirty
foot radius of the"photo station.
C. Reporting of Results
1. A post-grading/planting report shall be submitted with
ten photos taken at representative points along the new
channel, along with photocopies of invoices for grass
seed and trees.
2. Brief reports concerning the success of the plantings
shall be submitted on an annual basis for the first three
growing seasons following planting.
•
VWP Permit No. 92-6017
Part III
Page 1 of 4
MANAGEMENT REQUIREMENTS
A. Duty to Comply
The permittee shall comply with all conditions of the permit.
Nothing in these regulations shall be construed to relieve
the VWPP holder of the duty of comply with all applicable
Federal and State statutes, regulations and toxic standards
and prohibitions. Any permit non-compliance is a violation
of the Act and law, and is grounds for enforcement action,
permit termination, revocation, modification, or denial of a
permit renewal application.
B. Change in Management of Pollutants
All discharges and other activities authorized by this permit
shall be made in accordance with the terms and conditions of
this permit. The permittee shall submit to the Board a new
application 180 days prior to all expansions or process
modifications that would result the discharge of any
pollutant at a level greater than that authorized by this
permit.
C. Duty to Halt or to Reduce Activity
1. It shall not be a defense for a permittee in an
enforcement action that it would have been necessary to
halt or reduce the permitted activity in order to
maintain compliance with the conditions of this permit.
2. The permittee shall take all reasonable steps to
minimize, correct or prevent any discharge in violation
of this permit which has a reasonable likelihood of
adversely affecting human health or the environment.
D. Compliance with State and Federal Law
Nothing in this permit shall be construed to preclude the
institution of any legal action under or relieve the
permittee from any responsibilities, liabilities, or other
penalties established pursuant to any other State law or
regulation or under the authority preserved by Section 510 of
the Clean Water Act.
E. Property Rights
The issuance of this permit does not convey any property
rights in either real or personal property, or any exclusive
privileges, nor does it authorize any injury to private
F.
G.
VWP Permit No. 92-6017
Part III
Page 2 of 4
property or any invasion of personal property rights, nor any
infringement of Federal, State or Local Laws or regulations.
Severability
The provisions of this permit are severable.
Right of Entry
The permittee shall allow authorized State and Federal
representatives, upon the presentation of credentials;
1. To enter the permittee's premises on which the
establishment, outfalls and impacts are to be located or
in which any records are required to be kept under the
terms and conditions of this permit;
2. To have access to and to inspect at reasonable times any
records required to be kept under the terms and
conditions of this permit;
3. To inspect at reasonable times any monitoring equipment
or monitoring method required in this permit. For the
purpose of this section, the time for inspection shall be
deemed reasonable during regular business hours. Nothing
contained herein shall make an inspection time
unreasonable during an emergency.
H. Transferability of Permits
This permit may be transferred to another person by a
permittee if:
1. The current owner notifies the Board 30 days prior to the
proposed transfer of the title to the facility or
property;
2. The notice to the Board of the proposed transfer includes
a written agreement between the existing and proposed new
owner containing a specific date of transfer of the
permit responsibility, coverage and liability between
them; and
3. The Board does not within the 30 day time period notify
the existing owner of its intent to modify or revoke and
reissue the permit. Such a transferred permit shall, as
of the date of the transfer, be as fully effective as if
it had been issued directly to the new permittee.
0
VWP Permit No. 92-6017
Part III
Page 3 of 4
I. Permit Modification
The applicant shall notify the Board of any modification of
this project and shall demonstrate in a written statement to
the Board that said modification will not violate any
conditions of this permit. If such demonstration cannot be
made, the applicant shall apply to the Board for a
modification of this permit. This permit may be modified
when any of the following developments occur:
1. When additions or alterations have been made to the
affected facility or activity which require the
application of permit conditions that differ from those
of the existing permit or are absent from it.
2. When new information becomes available about the
operation or discharge covered by the permit which was
not available at permit issuance and would have justified
the application of different permit conditions at the
time of permit issuance.
3. When a change is made in the promulgated standards or
regulations on which the permit was based.
4. When changes occur which are subject to "reopener
clauses" in the permit.
5. When the permittee begins or expects to begin to cause
the discharge of any toxic pollutant not reported in the
application.
J. Permit Termination
This permit, after proper hearing, is subject to revocation
for failure to comply with the conditions herein. It is
issued in accordance with the plans for the project and
certifies that the applicant and project contractor shall not
violate Water Quality Standards to accomplish the project.
Any violation of Water Quality Standards will be subject to
abatement and control under State Water Control Law. A
permit can be terminated on any of the following grounds:
1. Noncompliance by the permittee with any condition of the
permit;
2. The permittee's failure in the application or during the
permit issuance process to disclose fully all relevant
facts or the permittee's misrepresentation of any
relevant facts at any time;
VWP Permit No. 92-6017
Part III
Page 4 of 4
3. The permittee's violation of a special or judicial order;
4. A determination that the permitted activity endangers
human health or the environment and can be regulated to
acceptable levels by permit modification or termination;
5. A change in any condition that requires either a
temporary or permanent reduction or elimination of any
discharge of dredged and fill material controlled by the
permit.
K. Civil and Criminal Liability
Nothing in this permit shall be construed to relieve the
permittee from civil and criminal penalties for
noncompliance.
L. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the
institution of legal action or relieve the permittee from any
responsibilities, liabilities, or penalties to which the
permittee is or may be subject under Section 311 of the Clean
Water Act or Sections 62.1-44.34(1) through 62.1-44.34(7) of
the law.
M. Unauthorized Discharge of Pollutants
Except in compliance with this permit, it shall be unlawful
for -the permittee to:
1. Discharge into state waters sewage, industrial wastes,
other wastes, or any noxious or deleterious substances,
or,
2. Otherwise alter the physical, chemical, or biological
properties of such state surface waters and make them
detrimental to the public health, or to animal or aquatic
life, or to the uses of such waters for domestic or
industrial consumption, or for recreation, or for other
uses.