Loading...
HomeMy WebLinkAbout009-93 Blue Ridge Indus. (rev) - Shawnee District - BackfileRECEIPT N2 023708 AMOUNT DUE $ AMOUNT PAID _ 1 BALANCE DUE $ PAID BY CASH CHECK OTHER FREDERII✓h NNING AND DEVELOPh°Ei t P. O. BOX 601, 9 C� ✓RT SQUARE WINCHESTER, VIRGINIA 22601 uu�j [j nerc RECEIVED ADDRESS THE SUM OF FOR-� DAY -TIMERS RE -ORDER No. 3221 — Printed in USA * STAFF SITE PLAN CHECKLIST 'k This application is not complete if the following are not included: -VWsk 3 1. One set of comment sheets from the following agencies along with any marked copies of the plan; 1 U L VDOT City of Winchester ✓f Sanitation Authority Town of Stephens City Inspections Dept. Town of Middletown ✓ Fire Marshal Health Dept. County Engineer Parks & Recreation `f Airport Authority Soil & Water Conservation Dist. IA 2. One copy of the Site Plan application. 3. Five copies of the Site Plan. 4. One reproducible copy of the Site Plan (if required). 5. One 35mm. slide of the Site Plan (if required). TRACKING Date Application received. 99 All necessary agency comments received. 3 Fee Paid (amount $ Site Plan to Planning Commission via bi-monthly. Site Plan heard by Planning Commission (if required). t/ Revisions received (if required). ! C& 3 Date of approval. 3 Info added to ro[GZCC. L4 t3as e. COUNTY OF FREDERICK, VIRWIA • DEPARTMENT OF INSPECTIONS Caller LARR�! UUI3ECk� Time Called { PM ) Date Called 8 ` yc: Phone No. Q-7- 770o Time Requested 65A-P Date Requested A501rP Received By &A,3 A . Y#rr7 Date of Inspection 8 /', h+ PERMIT HOLDER NAME 5"Cl<Lly OMPA#J RT. NO. Lot No. SEC. No. SUBDIVISION STREET NAME 2-66 AKsor- 00,) _= DIRECTIONS MILL -WOOD RKE -M / V�Gnv�y BUILDING NO. �T 7Z�i 7UKrJ (� �rJ� PLUMBING NO. �Ki3GR l'_J�1,2T 5 rr� A►.l �( _� ELECTRICAL NO. P�%5T CzLA,Z_E 6 MECHANICAL NO. SIGN NO DISTRICT 1 5144WN PERMIT FOR: B1_IIr RIocr' INDuSrfLi (�,610E'ttouSC A001-noi Type of Inspection Residential Footers Slab Water Sewer Rough Plumbing Groundworks Other: Setbacks: FR Draintile Service Rough Electric Rough Mechanical Gas Piping/Test Commercial BK L R Gas Fire -up Final Electrical Framing Final Mechanical Final v� Site Plan Final Building Fire Marshall Final Plumbing Special/Complaint Time In: 10 * 3Z Temperature k 801,F Cut in No, Time Out: Weather SuPJ'J Y Results: Approved Comments: 5 Rejected V t a Signature �.1X��n a Date 81"/`a', SITE PLAN APPLICATION Complete the following application: DATE APPLICATION 1. Development kda5jT/�3 /i-x 2. Location of Property: lfli�l Idne InWds r,Ql park (by street name) 3. Property Owner: Address: I��•vx l�4f 7 7--l9e,5 7 Telephone: 70•5 - 39ov 4. Applicant/Agent: Address: Telephone: 5 . Designer: 4/. W. Address: o W Aie-hzslr/ Telephone: lCn i - Contact: 6. Is this an original or revised Site Plan? Original Revised -5- • 0 7. Total area of parcel to be developed: M,�" 33 (Ic,,a-S 8. Property Information: a) Property ID #: &V_ 4 go 9 b) Current Zoning: M_ c) Present Use: d) Proposed Use: e) Adjoining Property Zoning: M% f.)..Adj-oining -Property Use: Indoo, 'L_L b u`�/�I&I-;IR/.j,lY-e/ g) Magisterial District: '91V I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: �( lZ 1ci's --o ge 5 0 b)-M 40— COUNTY OF FREDERICK' VIRGINIA W � o FIRE AND RESCUE DEPARTMENT FARE RESCUE 9 N. Loudoun Street, 2nd Floor VIRGINIA Winchester, Virginia 22601 Thomas W. Owens Director ME-M0RANDUM TO: John Trenary, Building Official FROM: Douglas A. Itiiracofe, Fire Marshal SUBJECT: -Blue Ridge Industries DATE: Juiy 15, 199: Douglas A. Kiracofe Fire Marshal i have illspucl.ed Blue Ridge Industl'it s ' Addition for a Temporary Occupancy Permit.. I : ave found all fire protection systems to be complete ar.d in serv_ce at this time. The following i�-ems are and muss. be chec :ed prier to issuance of a Permanent. Certificate of Occupancy. i Post street address numbers C:': :uilding and at entrance from Victory Lane . 2. Columns where hose stati.;ns .are located have been painted red but must be labeled "Fire hose. " 3. Fire lane:_ on exterior must- 'L)e completed. 4. Spare sprinklers must be placed in sprinkler cabinet .at riser. A rest of the roil down fire door is scheduled this date. IL it passes, r_-he above four items w_1i be the only items I have outstanding on this project. DAK -ilc: cc: Evan Wvatt-, Planning Dept. Eddie keeier, Chief Co. 18 File DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682 BLU I RIDGE I4DUSTKIES, INC, P 1 winchester. Virginia 22604 (703) 662-39lxl Fax (703) hb_' 3010 �1r. I:anny ('. 1?'11.:1 Pl arirrcr 1 (,hurl t.,r• of F l^ederi c jk 1)c'1m tment of P I annonr.; anc:l Dovcl opemen I. 11.0. Box 601 Winchester, ``'i r•t~ i ni.`, -'2604 Dear Lanny: Etc t;Z.r c� i nt; Li,mhc�r ar t,r,rrnl t , ri:S we ri i m.-ussed curl I h" I,Iiom. • .At. i I 1 Shoppi rw Ar'uUrtcl for r-ont.rac tors. cluo Les rs c;oIII t.rac, t.or w i l t be acIcc:tcd immr.d i n I. i� r)nr'king lot. wl I I be j.)t9VE`(f wit11 a Illlnimulll „i pr'ill„` ;wd do tll,ie 41.•Fri its per site l)l.xr) wi I.hin 60 daps. 1 hank you once aga 1 ri . i COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 Fax 703 / 678-0682 April 9, 1993 Mr. Ron Mislowsky, P.E. G.W. Clifford and Associates 200 North Cameron Street Winchester, Va 22601 Dear Ron: This letter is to inform you that the Frederick County Department of Planning and Development administratively approved Site Plan #009-93, of Blue Ridge Industries, on April 9, 1993. This plan is a revision to Site Plan #017-91 and calls for the construction of a 47,000 square foot addition to the existing industrial site, 73 parking spaces and 4 handicapped spaces that are to be a minimum of bituminous prime and double seal, two loading bays, and approved calculations regarding increased runoff. Please call regarding any questions you have about this letter. Sincerely, Lanny Bise, II Planner I cc: Harrington Smith, Shawnee District Supervisor Gus Nusu, General Manager, Blue Ridge Industries LCB/gll 1) North LoU(loun Strcct P.O. Box 601 Winchester, VA 22601 Winchester, VA 22604 i COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 Fax 703 / 678-0682 March 31, 1993 Mr. Ron Mislowsky, P.E. G.W. Clifford and Associates 200 North Cameron Street Winchester, Va 22601 Dear Ron: This letter is in reference to my review of site plan 9009-93 of Blue Ridge Industries. The overall concept of this plan is fine; however, there are a few issues that need to be addressed. I offer the following comments: 1) Based on discussions with Plant Management, this department decided that 100 employees would be the maximum at the facility at any one time. Therefore, the parking requirement will be 75 spaces (75% of 100 spaces). 2) With a parking requirement of 75 spaces, the handicap space requirement is four. One additional is needed. 3) /Aased on careful consideration, your request to hold off laying down a prime and double seal surface until the adjoining road is improved is denied. A prime and double seal surface must be provided prior to the issuance of any occupancy permits. 4) I am still waiting on approval from Ed Strawsnyder, County Engineer. This site plan is scheduled to appear on the April 7, 1993 Planning Commission Bi-Monthly report. We should receive administrative approval authority at that meeting. I look forward to your resubmission. Please call with any questions. Sincerely, Lanny Bise, Planner I O North Loudoun Str-cct P.O. Box 601 Winchester, VA 22601 Winclicster, VA 22604 gilbert w. cli f f ord & associates, inc. 200 North Cameron Street • Winchester, Virginia 22601 703-667-2139 9 Fax: 703-665-0493 March 12, 1993 Mr. Lanny Bise Frederick County Planning Department P.O. Box 601 Winchester, Virginia 22601 Re: Blue Ridge Industries Dear Lanny, I want to thank you for your preliminary comments on the Blue Ridge Industries expansion plans. Items 1, 2 and 3 have been addressed on the plans enclosed here with the application. These plans have also been revised per the Review Agency comments. Concerning the number of employees, 1 believe Mr. Nusu meant 100 total employees. Blue Ridge Industries runs three shifts. The 40 employees existing and an additional 40 with the expansion is a conservative estimate of a one shift total. If during your review, you should have any comments, please do not hesitate to call. Regards, on Mislowsky, P.E. RAM/kf cc: Mr. Larry Dubyk • gilbert w. cli f ford & associates, inc. 200 North Cameron Street • Winchester, Virginia 22601 703-667-2139 • Fax: 703-665-0493 memorandum To: Lanny Bise, II From: Ron Mislowsky, P.E. Re: Blue Ridge Industries Site Plan Application Date: March 12, 1993 A couple of weeks ago, you called me and let me know that Inspections had somehow given their comment sheet directly to you. You indicated that the standard comment had been made and that you would hold on to it until you received the formal application. The remaining comment sheets are attached. :7 • Thomas W. Owens Director Mr. Ron Mislowsky G. W. Clifford & Assoc. 200 N. Cameron Street Winchester, VA 22601 Mr. Mislowsky, COUNTY OF FREDERICK, VIRGINIA FIRE AND RESCUE DEPARTMENT 9 N. Loudoun Street, 2nd Floor Winchester, Virginia 22601 February 25, 1993 Douglas A. Kiracofe Fire Marshal In reviewing the plan for Blue Ridge Industries, I have found several areas that are still not in compliance with Frederick County Chapter 10. 1. Chapter 10 Section 2-3-2.2 requires fire lanes to be 20' in width with the nearest edge 10' away from the structure. With only 26.01' to the property line there is insufficient room to meet the requirements for fire lanes. 2. In the TRC Meeting, I requested the Siamese connection be on the same side of the fire lane as the hydrant used to supply the Siamese. This was not changed on the submitted plan. 3. As plans progress for this project I want to be certain that the sprinkler system in the expansion will be tied into the existing fire dept. connection. Dual siamese connections on one building is an unsafe practice and should always be avoided. In closing, there are several items on this site that are inconsistent with nationally recognized standards regarding fire safety design. Additionally, issues with the Building Official and this office will have to be addressed before I can approve this site plan. Thank you. DAK:ilc cc: File S i j y Douglas A. Kiracofe Fire Marshal DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682 �� jNTY OF FREDERICK, VIRGIN��� � FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS ~ ^ ` Control No. 020993134 Date Received 020993 Date Reviewed 022593 Applicant Name � G. W. Clifford _______' _____-- & Assoc. Address 200 N' Cameron Street Winchester, VA 22601 Project Name Blue Ridoe Industries Phone No. 703-667-2139 Type of Application Site Plan Current Zoning M-1 1st Due Fire Co. 18 1st Due Rescue Co. 18 Election District Shawnee - RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm ------'- System -- X Other Emergency Vehicle Access; Adequate Inadequate X Fire Lanes Reouired: Yes X Comments: See attached Not Identified No Roadway/Aisleway Widths; Adequate Inadequate X Not Identified Special Hazards Noted; Yes X No Comments: While there are '--'-'--- four hydrants shown -'---'--- on the plan, they are all basically located on the west side of the project. This will require long hose lays for any fire occurring on the east side of the building. 0 Hydrant Locations; Adequate Inadequate X Siamese Connection Location; Approved X Not Approved Additional Comments: SEE ATTACHED. Review Time 2 hrs Not Identified Not Identified PLANS DISAPPROVED FIRE ~- �IVIARSHAL9 FRE[)ER/CK COUNTY Douglas A. Kiracofe Fire Marshal C� 0 REQUEST FOR SITE PLAN COMMENTS Frederick County Inspections Department Attn: Building Official P.O. Box 601 Winchester, Virginia 22601 (703) 665-5650 The Frederick County Inspections Department is located at 9 North Loudoun St., 2nd Floor of the Hammon Building in Winchester, if you prefer to hand deliver this review. Applicant's name, address and phone number: n 4 ---7 -. ! If Name of development and/or description of the request: 1 Location: 16G!&aI Inspection Department Comments • Building shall comply with the Virginia Uniform Statewide Building Code and Section 305, Use Group F-1 (Factory & Industrial) of the BOCA National Building Code/1990. Other codes that apply are title 28 Code of Federal Regulation, Part 36 Nondiscrimination on the Basis ot Disability by Public Ac5bmmdations and in Commercial Facilities. Need to show min. 3 H.C. parking spaces for ADA compliance (Note: Section 36.403 ADA Path ot Travelo e). Ques ion on ZADA Access between buildings with the floor elevation difference. (NOTE: Table 905.2 Fxterior wall fireresistance ratings) (Max. permitted with our wall and sprTMier is required). Code Administrator Signature & Date: t (NOTICE TO INSPECTIONS DEPT.*PLEASE RETURN THI NOTICE TO APPLICANT `'' It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your plans and/or application form. r -14- COUNTY of FREDERIJ Department of Planning and Developm 703,1665-5 REQUEST FOR SITE PLAN COMMENTS FAX 703/667-0 Frederick County Sanitation Authority P.O. Boa 618, Winchester, Virginia 22601 (703) 665-5690 The Frederick County Sanitation Authority is located on the second floor of the Old Frederick County Courthouse in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: gLyr 09-160 � /ilvJo srjrj*,4C(' .,A.. �o. 00ae moo ;pq-<f 61-s00400 uvi,60eo0 W9Y7K4, v0/ 0?j ! e Name of development and/or description of the request: �Or �/4OZ&& 0*406' "7 1A�S' S/odt OD4900 Y AtF V/si040 Location: _Vic y'�i�y 1w0fo " 14 Sanitation Authority Comments: WoeI A foo Apr! HMV,, v f, wwze ",A c'a40�� dA ------------------- F Sanit . Signature & Date: �''� r (NOTICE TO SANITATION A E RETURN TH �0 PLICANT. ) ACYTICE 1'0 APPLICANT It is your responsibility to cOmplete this for- .a4 accurately as possible in order to assist the agency wig,, their review. 7''so, please atC.cu�11 jTwO copies of your n1anG application form. Q Cniirt - P n Rnv rni ���inri., �., K 0 0 REQUEST P^- ^^ -TAN COMMENTS Winchester Regional Airport Attn: Executive Director Route 1, Box 208-A Winchester, Virginia 22601 (703) 662-2422 The Winchester Regional Airport is located on Route 645, off of Route 522 South, if you prefer to hand deliver this review form. Applicant's name, address and phone number: Name of development and/or description of the request: Location: Winchester Regional Airports Comments: See comments on back. Airport Signature and Date: Kenneth V. Wiega�d, Executive Director 02/23/93 (NOTICE TO AIRPORT. * PLEASE RETURN THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your plans and/or application form. -17- 9?- 0 Please consider the fol' .- of n- ^--n:ments when reviewing this Request for Master Development Plan: The Developer should be familiar with and be required to comply with the provisions of the Frederick County Airport Zoning District (AP-1) and Airport Support Area (ASA) described in the Frederick County Comprehensive Policy Plan. The developer should also be familiar with the provisions and requirements of the following codes: Title 15.1 Code of Virginia, Section 489 (Purpose of Zoning Ordinan<=es) and Section 491.02 (Airport Safety Zoning). Title 5.1-25.1 Code of Virginia (Permits Required for Erection of Certain structures.) As Winchester Regional Airport expands services and operations, noise associated with such expansion is very likely to increase. The Airport Support Area established by the Frederick County Comprehensive Policy Plan is designed to discourage residential development.in the vicinity of the airport to preclude citizen concerns for noise created by aircraft operating on, to and from Winchester Regional Airport. If the developer is planning residential development adjacent to the ASA or under a flight path used regularly by aircraft outside of the ASA as they arrive or_depart the Airport, he should be either required or encouraged to insulate all habitable structures for noise and be required to specifically address, in the property Covenants and Easements, existing airport related noise and the probability of increased noise as airport operations expand. Specific Comments: The proposed structure's site lies under the Airport's Transition Area which begins a distance of 500' from the Runway Centerline and extends away from the runway at a ratio of 7:1 to a height of approximately 877 feet (Mean Sea Level) or 150 feet above the airport elevation (727'). The proposed structure must not penetrate the Transition Area. �, `� COUNTY OF NREDERICK, VIRGINIA 1A _ -- P4 W _ � FIRE AND RESCUE DEPARTMENT �/� lJ�)/ 9 N. Louduun Street, 2nd Floor Winchester, Virginia ?2601 Thomas W. Owens Director February 25, 1993 Mr. Ron Mislowsky G. W. Clifford & Assoc. 200 N. Cameron Street Winchester, VA 22601 Mr. Mislowsky, Douglas A. Kiracofe Fire Marshal In reviewing the plan for Blue Ridge Industries, I have ut�t sevt :t:_ l areas that are st._ ll not in compliance with Frederick County Chapter 10. 1. Chapter 10 Section 2-3-2.2 requires fire lanes to be 20' in width with the nearest edge 10' away from the structure. With only 26.01' to the property line there is insufficient room to meet the requirements for fire lanes. 2. In the TRC Meeting, I requested the Siamese connection be on the same side of the fire lane as the hydrant used to supply the siamese. This was not changed on the submitted plan. 3. As plans progress for this project I want to be certain that the sprinkler system in the expansion will be tied into the existing fire dept. connection. Dual siamese connections on one building is an unsafe practice and should always be avoided. In closing, there are several items on this site that are inconsistent with nationally recognized standards regarding fire safety design. Additionally, issues with the Building Official and this office will have to be addressed before I can approve this site plan. Thank you. Si e y Douglas A. Kiracofe Fire Marshal DAK:jlc cc: File DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 678-0682 No. �.������������ Applicant Name G' �' C1ifforu & Assoc. ... ����������_������������................. ... .. ..... - ............................. ........ _......... Address 200 N' Cameron Street Winchester, VA ��-' Project Name Blue Ridge Industries Phone No. 703-667-2139 Type of Application Site Plan Current Zoning M-1 1st Due Fire Co. 18 1st Due Rescue Co. 18 Election District Shawnee _ ...... ... �...... ........ ������������������������������_ Automatic Sprinkler System X Hesidential Sprinklei stem Automatic Fire Alarm System X Other Emergency Vehicle Access; Adequate Inadequate X Fire Lanes Required; Yes X Comments: See attached. Roadwav/Aisleway Width, Not Identified No Adequate Inadequate X Not Identified ___ Special Hazards Noted; Yes X No Comments: While there are four hydrants shown on the plan, they are all basically located on the west side of the project. This will require long hose lays for any fire occurring on the east side of the building. Hydrant Locations; Adequate lnadequate X ............... Siamese Connection Location; Approved X Not Aooroved Additional Comments: SEE ATTAr-4Fn Review Time 2 hrs Douglas A. Kiracofe Not Identified Not Identified � ���o� PLANS ~~= DISAPPROVED FIRE =- MARSHAL, FREDER;CK COUNTY 0 0 COUNTY of FREDERICK Harvey E. Strawsnyder, Jr., P.E. Director of Engineering & 9 North Loudoun St., 2nd Floor 703/665-5643 March 11, 1993 Mr. Ron Mislowsky Gilbert W. Clifford and Associates, Inc. 200 North Cameron Street Winchester, Virginia 22601 RE: Blue Ridge Industries, Inc. Dear Ron: We have completed our review of the subject site plan and offer the following comments: 1) It is suggested that schedule 40 PVC be utilized in lieu of corrugated PVC for the downspout drain line. 2) Indicate that the existing 15 inch RCP shall be removed within the building.area. 3) Provide an easement immediately downstream of the 15 inch and 27 inch RCP outlets to accommodate the placement of the proposed rip -rap. This easement should take the form of an agreement between Blue Ridge Industries and the adjacent land owner considering the rip -rap encroaches on the adjacent property. 4) Provide cleanouts at appropriate locations along the six (6) inch drain line (i.e., where the line turns the corner of the building) . 5) Permanently incorporate drainage calculations on Sheet 3 of 3. 6) The proposed design reflects a modification to a previously approved site plan which did not include stormwater detention. Any future site development will require complete stormwater management assuming that the entire site is undeveloped. Fax: 703/678-0682 - P.O. Box 601 - Winchester, Virginia - 22604 j_ 0 0 Mr. Ron Mislowsky Page Two March 11, 1993 If you should have any questions regarding the above comments, please do not hesitate to contact us. HES:rls cc: Planning and Zoning file Sincerely, Harvey. . Strawsnyder, Jr., P.E. Director of Public Works APPLICANT'S CHECKLIST Your site plan should include the following: Administrative Information Y N - 1. Name of proposed development. 2. Name and address of owner. 3. Name and address of developer. 4. Name, address and phone number of designer. �✓ 5. Certificate of surveyor, engineer or architect. _ 6. Date plan prepared and date of revisions. _IVh_ 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval. 8., A space labeled "approved by the Zoning Administrator" for the approval signature and date of .approval. General Site Information Y N 9. Location map (scale 1:2000) 10. Magisterial District of site ✓ 11. Scale of site plan (not to exceed 1:50) ✓ 12. North Arrow 13. Zoning of site 14. Use and zoning of adjoining properties Lots/Uses/Buildings and Structures Y N - 15. Surveyed boundaries for all lots and parcels (-c" 16. Acreage of all lots included in the plan 17. The location and dimensions of all required / ✓ setbacks and yard areas 18. Location of all buildings, structures and uses 19. The proposed use of each building, structure and area 20. The location and type.of all dwelling units _V-1, 'T21. Ground floor area and total floor area of; all .-buildings _ with -:,FAR calculations for ' commercial;.- and industrial zoning .district x22.,.The height, of;iall buildings and structurestvq. N)A 423. The location and dimensions of all signs -7- Lots/Uses/Buildings and Structures (con't) Y N 24. Location of outdoor lighting fixtures 25. Location and nature of outdoor storage areas N� 26. Location and area of common open space 27. Location and description of all recreation facilities 28. Location of sidewalks and pedestrian ways 29. Location of outdoor trash receptacles Roads Y N N 30. Name and number of existing and planned streets on and adjoining the site Al 31. Location of existing and planned streets on and adjoining the site 32. Dimensions, boundaries width, pavement and construction of planned roads 33. Location and dimensions of all proposed entrances from public right-of-ways Utilities Y N Parking Y , N 34. Location of all utilities, including sewer and water lines with the size of lines, mains and laterals 35. Location and width of all easements, including access, utility and drainage easements 36. Location and nature of fire lanes, fire hydrants and all other facilities necessary to meet the Fire Code requirements 37. Calculations describing the required number of parking and loading spaces 38. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing and other features to be used 39. Location and dimension of all handicapped spaces • Natural Features Y N / 40. Existing and finished contour lines y/P 41. Location of steep slopes, woodlands, floodplains wetland, sinkholes and other environmental features i 42. Location of streams and drainage ways Landscaping Y N Nl1l 43. Landscaping plan describing location and types of plants to be used �A(� 44. Location of required buffers and screening with cross -sections -or --profiles. -- Erosion and Sediment Control Y N 45. A stormwater management plan with run off calculations and location and description of facilities to be used - 46. Soil erosion and sedimentation control plan with location, types and examples of provisions to be used . I uH CIRTY OF FREDERlCK, VIRGINI A*'' FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. 031293246 Date Received 031293 Date Reviewed 032293 ' Applicant Name G. W. Clifford & Assoc. Address 200 N. Cameron Street Wincnester, VA 22601 Project Name BluE Ridge Industries Phone No. 703-667-2139 Type of Application ist Due Fire Co. 18 Election District Site Plan (Rev) Current Zoning 1st Due Rescue Co. 18 Shawnee Automatic Sprinkler System Automatic Fire Alarm System RECOMMENDATIONS X Residential Sprinkler System X Other M-1 Emergency Vehicle Access5 Adequaze X Inadequate Not Identified ---- ---- ---- Fire Lanes Required; Yes X No Comments: Posted fire lanes required at all hydrants and along east and west sides of building as labeled. Roadway/Aisleway Widths; Adequate X Inadequate ---- Special Hazards Noted; Yes _ Comments: Not Identified U� �� �� �� �� � �� Hydrant Locations� Adequate X . Inadequate Not Identified Siamese Connection Location; *pproved X �ot Approved ` Not Identified Additional Comments: Approve� for construction. Review Time .5 hr COUNTY Fire Marshal e APPLICANT'S CHECKLIST Your site plan should include the following: Administrative Information Y N _✓ _ 1. Name of proposed development _ 2. Name and address of owner 3. Name and address of developer _ 4. Name, address, and phone number of designer _✓ _ 5. Certificate of surveyor, engineer, or architect _ 6. Date plan prepared and date of revisions 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval 8. A space labeled "approved by the Zoning Administrator" for the approval signature and date of approval General Site Information i7�Rj / ' SD ✓/ _ 9. Location map (scale 1:2000) 10. Magisterial District of site _ 11. Scale of site plan (not to exceed 1:50) 12. North Arrow _ _ 13. Zoning of site 14. Use and zoning of adjoining properties Lots/Uses/Buildings & Structures Y N 15. Surveyed boundaries for all lots and parcels F_,s 16. Acreage of all lots included in the plan a ` _ _ 17. The location and dimensions of all required setbacks _ and yard areas 18. Location of all buildings, structures, and uses _ 19. The proposed use of each building, structure, and area �1'ga 20. The location and type of all dwelling units _ 21. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts 22. The height of all buildings and structures go- -NJA 23. The location and dimension of all signs 7 n Lots/Uses/Buildings & Structures (con't) Y N 24. Location of outdoor lighting fixtures _ 25. Location and nature of outdoor storage areas 26. Location and area of common open space 27. Location and description of all recreation facilities �o- N1Q 28. Location of sidewalks and pedestrian ways 29. Location of outdoor trash receptacles Roads Y N f_ 30. Name and number of existing and planned streets on and adjoining the site � J,---Y= m ;' 31. Location of existing and planned streets on and adjoining the site 32. Dimensions, boundaries, width, pavement, and construction of planned roads 33. Location and dimensions of all proposed entrances from public right-of-ways Utilities Y N 1� � J__ W�, 'AN a" . e .. - C - 34. Location of all utilities, including sewer and water / lines with the size of lines, mains, and laterals 35. Location and width of all easements, including access, utility and drainage easements 36. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet the Fire Code requirements I,,, �I,, - r„ Parking Y N 37. Calculations describing the required number of parking and loading spaces 38. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing, and other features to be used _ 39. Location and dimension of all handicapped spaces n A. I. 0 • Natural Features Y N 40. Existing and finished contour lines 41. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features y� 42. Location of streams and drainage ways Landscaping Y N 43. Landscaping plan describing location and types of plants to be used Eja 44. Location of required buffers and screening with cross sections or profiles Erosion and Sediment Control Y N 45. A stormwater management plan with run off calculations and location and description of facilities to be used 46. Soil erosion and sedimentation control plan with location, types, and examples of provisions to be used I