Loading...
HomeMy WebLinkAbout011-92 Albin Ridge-Phase II - Gainesboro District - Backfile (2)RECEIPT NE 02v440 AMOUNT DUE $ $ 1) 5 o '0� BALANCE ' PAID BY I❑ CASH r� CHECK ❑� OTHER FREDER::,:. -C : 1--.. P.O. BOX 601, 9 COURT SQUARE WINCHESTER, VIRGINIA 22601 ILANN:NG AND DEVELOPMENT DAY TWERS RE -ORDER No 3221 — Primed in USA * STAFF SITE PLAN CHECKLIST * This application is not complete if the following are not included: One set of comment sheets from the following agencies along with any marked copies of the plan; —UK �Dl ✓ VDOT City of Winchester Sanitation Authority Inspections Dept. Fire Marshal — p K — (� % I �`� Z ✓ County Engineer Airport Authority 2. One copy of the Site Plan application. 3. Five copies of the Site Plan. 4. One reproducible copy of the Site Plan (if required). 5. One 35mm. slide of the Site Plan (if required). TRACKING Date 4111 q L Application received. All necessary agency comments received. to X Fee Paid (amount $ Site Plan to Planning Commission via bi-monthly. Town of Stephens City Town of Middletown Health Dept. Parks & Recreation Soil & Water Conservation Dist. Site Plan heard by Planning Commission (if required). Revisions received (if required). Date of approval. Info added to annual report diskette. SITE PLAN APPLICATION Complete the following application: DATE 6-11-92 APPLICATION # 011A9 . 1. Development Albin -Ridge Warehousing & Mini -storage Phase 2 2. Location of Property: Va. Route 679 - 1050' west of Rt. 522 (by street name) 3. Property Owner: Robert A. & Clara Lorene S. Carter Address: HC 36, Box 340-A Winchester, Virginia 22601 Telephone: 703-665-0133 4. Applicant/Agent: Ritchie Surveys Address: 5049 Amelia Avenue Stephens City, Virginia 22655 Telephone: 703- 869-5175 5. Designer: Ritchie Surveys Address: Telephone: Contact: Tim Painter 6. Is this an original or revised Site Plan? Original Revised X -5- 7. Total area of parcel to be developed: 1.5 Acres 8. Property Information: a) Property ID #: 42 A 176 B b) Current Zoning: B-3 c) Present Use: Mini -warehouse storage d) Proposed Use: _. additional warehouse units e) Adjoining Property Zoning: RA, B-3, M-2 f) Adjoining Property Use: Garage, residential, vacant g) Magisterial District: Gainesboro I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: J 0 4 Application for Land Disturbance Permit LAND DISTURBANCE PERMIT APPLICATION DATE OF APPLICATION: PERMIT NUMBER # PROPERTY OWNER: ADDRESS: 7/9/92 Robert A. Carter Rt. 2, Box 30A Winchester, VA 22601 TELEPHONE: 722-1100 DESIGN FIRM: ADDRESS: Ricketts Construction 36 Ricketts Drive Winchester, VA 22601 TELEPHONE: 662-4164 PLAN DESIGNER: Earl Wiley APPLICATION. NAME: Albin Ridge Storage DESCRIPTION OF USE: Mini Warehouse Storage MAGISTERIAL DISTRICT: Gainesboro PROPERTY IDENTIFICATION NUMBER: 42-A-176B TOTAL AREA OF PROPERTY: SXTXXXXMXX 5 acres ACREAGE OF AREA TO BE DISTURBED: 1 1/2 acres ZONING OF PROPERTY: B-3 USE CODE: STATUS OF APPLICATION: FEE: SITE PLAN REFERENCE: page 5 LAND DISTURBING PERMIT ISSUED TO: Albin Ridge Storage who has met all requirements of the Frederick County Erosion and Sedimentation Control Ordinance as certified by the Frederick County Department of Planning and Development. AGREEMENT This agreement, made this 9t11 19 92, by and between Robert A. Carter day of July I I party(s) of the first part, and the County of Frederick , Virginia, party of the second part. Whereas, in consideration of the approval by the party of the second part of this Virginia land disturbance plan and permit for the Albin Ridge Mini Storage of 1 1/2 (actual disturbed acres) and the party of the second part requiring the following work to be completed during the land disturbance construction and before final occupancy, the party(s) of the first part or his heirs/assigns agree to do the following work: 1. Provide for the adequate control of erosion and sedimentation by temporary and permanent control practices and measures which will be implemented during all phases of clearing, grading and construction and to provide for conformity with the Virginia Erosion and Sediment Control Law, Title 21, Chapter 1, Article 6.1 of the Code of Virginia and local code laws. 2. To provide Erosion and Sediment Control as per the Erosion and Sedimentation Control Plan. The party (s) of the first part does further agree that an agent of Frederick County shall be permitted entry to the site of the land disturbing activity to inspect the control measures shown in the approved plan. In testimony whereof, the party of the first part has hereunto caused its corporate names and seals to be hereunto affixed, for and in its behalf, by Robert A. Carter and caused this agreement to be acknowledged and delivered for and in its behalf. CORPORATION B Y : I5�'--,;7 In testimony whereof, the party of the second part has hereunto caused its body corporate names and seal to be hereunto affixed, for and in its behalf by Evan A. Wyatt, Planner II County of Frederick, Virginia BY: Q Frederick Coun Department of Planning and De elopment NOTE: Issuance of this permit does not constitute approval of a site plan. This permit is for land disturbance only. 0 -3- STATE OF VIRGINIA COUNTY OF FREDERICK I, Debi D. Swimley , a Notary Public in and for the State and County aforesaid, do hereby certify that this day personally appeared before me in my said County, (name) Robert A. Carter of (company) and Evan A. Wyatt, Planner II of the Frederick County Department and Development, whose names are signed to the foregoing agreement dated 7/9/92 did personally appear before me and acknowledged the same. Given under my hand this 9th day of July 1992 . Notary Public My Commission expires on September 30, 1992 1. ALCj,N -R1DC3C S-oPAC-E Pic :E -7 8'9 Z APPLICANT'S CHECKLIST Your site plan should include the following: Administrative Information Y N ✓ _ 1. Name of proposed development 2. Name and address of owner = 3. Name and address of developer 4. Name, address, and phone number of designer 5. Certificate of surveyor, engineer, or architect 6. Date plan prepared and date of revisions 1A 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional zoning approval A space labeled "approved by the Zoning Administrator" for the approval signature and date of approval General Site Information Y N _ 9. Location map (scale 1:2000) _ 10. Magisterial District of site _ 11. Scale of site plan (not to exceed 1:50) ,L _ 12. North Arrow v _ 13. Zoning of site _ 14. Use and zoning of adjoining properties Lots/Uses/Buildings & Structures Y N .� _ 15. Surveyed boundaries for all lots and parcels 7 _ 16. Acreage of all lots included in the plan 17. The location and dimensions of all required setbacks 18. and yard areas Location of all buildings, structures, and uses _ 19. The proposed use of each building, structure, and area )Li 20. The location and type of all dwelling units _ ✓ 21. Ground floor area and total floor area of all buildings with FAR calculations for commercial and industrial zoning districts ( 61,,� vE LA < I.0) � _ 22. The height of all buildings and structures 23. The location and dimension of all signs 7 Lots/Uses/Buildings & Structures (con't) Y N _ 41�- 24. Location of outdoor lighting fixtures rig/ 25. Location and nature of outdoor storage areas 26. Location and area of common open space _ 1�A 27. Location and description of all recreation facilities 7 _ 28. Location of sidewalks and pedestrian ways V�A 29. Location of outdoor trash receptacles Roads Y N 30. Name and number of existing and planned streets on and adjoining the site — 31. Location of existing and planned streets on and adjoining the site /A 32. Dimensions, boundaries, width, pavement, and construction of planned roads 33. Location and dimensions of all proposed entrances from public right-of-ways Utilities Y N ( Il i1 ---L ur�'� c n� c 34. ' I i Location of aI utilities, including sewer and water lines with the size of lines, mains, and laterals _ � 35. Location and width of all easements, including access, utility and drainage easements 4 1' _✓ _ 36. Location and nature of fire lanes, fire hydrants, and all other facilities necessary to meet the Fire Code requirements Parking Y N _ 37. Calculations describing the required number of parking and loading spaces — 38. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing, and 39. other features to be used .� _ Location and dimension of all handicapped spaces 9 0 0 Natural Features Y N _ 40. Existing and finished contour lines 4� 41. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features ►!4 42. Location of streams and drainage ways Landscaping Y N W—A 43. Landscaping plan describing location and types of plants to be used 44. Location of required buffers and screening with cross sections or profiles Erosion and Sediment Control U Y N 45. A stormwater management plan with run off calculations and location and description of ,r► / facilities to be used ,,( ✓_ _ 46. Soil erosion and sedimentation control plan with location, types, and examples of provisions to be used 9 COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/678-0682 July 28, 1992 Mr. Robert A. Carter Route 2 Box 30A Winchester, VA 22601 RE: Albin Ridge Mini Storage (Phase II) Site Plan. Dear Mr. Carter: The Frederick County Planning Department administratively approved Site Plan #011-92 of Albin Ridge Mini Storage (Phase II) on July 17, 1992. The approved site plan calls for the construction of four additional mini storage units totaling 14,600 square feet, and the addition of a van accessible handicapped parking space. Enclosed is a copy of the approved site plan for your records. As we discussed, your bond posted in the amount of $13,683.75 to cover costs associated with the asphalt surfacing of Phase I may be used in conjunction with the asphalt surfacing of Phase II. This bond will only be acceptable for Phase II when all improvements to Phase I have been completed and inspected by our department. Please contact this office to schedule an on -site inspection when these improvements are complete. Sincerely, Evan A. Wyatt Planner II EAW cc: Beverly J. Sherwood, Gainesboro District Supervisor Michael A. Didawick, Director of General Assessments Timothy G. Painter, Ritchie Surveys THE COURTHOUSE COMMONS 9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601 COMMONWEALTH of V1RQ1N1A DEPARTMENT OF TRANSPORTATION P. O. BOX 278 RAY D. PETHTEL EDINBURG, 22824 WILLIAM H. BUSHMAN COMMISSIONER RESIDENT ENGINEER June 2, 1992 TELE (703) 984-41 33 FAX (703) 984-9761 Mr. L. A. Ritchie, Jr. Ref: Albin Ridge Mini Storage C/O Ritchie Surveys Route 679 5049 Amelia Avenue Frederick County Stephens City, VA 22655 Dear Mr. Ritchie: As requested we have reviewed the above referenced site plan dated April 23, 1992. Overall the proposal appears satisfactory. However, we do have several comments relative to the proposed drainage design. They are as follows: 1. The area between the detention basin pipe and the 48" culvert under Route 522 needs to be regraded if necessary to transition the flow into our pipe. Also, standard EC-1 Type A riprap stone is to be added between the outfall of the basin to the inlet of the 48" pipe as noted. 2. Filter cloth should be used beneath the EC-1 stone on the detention basin spillway. 3. EC-1 riprap should only be used on the downstream half of the spillway to prevent seepage prior to the full overflow elevation. Please revise and resubmit four (4) copies for final approval. Should any changes be necessary please design them to meet or exceed the above recommendations. Should you have any questions please let me know. Sincerely, William H. Bushman Trans. Resident Engineer By: Robert B. Childress Hwy. Permits & Subd. Specialist Sr. RBC/rf Enclosures xc: Mr. R. W. Watkins Mr. H. E. Strawsnyder Mr. Robert A. Carter TRANSPORTATION FOR THE 21 ST CENTURY y COMMONWEALTH of V1RQ1N1A RAY D. PETHTEL COMMISSIONER Mr. L. A. Ritchie, Jr. C/O Ritchie Surveys 5049 Amelia Avenue Stephens City, VA 22655 Dear Mr. Ritchie: DEPARTMENT OF TRANSPORTATION P. O. BOX 278 EDINBURG,22824 June 12, 1992 WILLIAM H. BUSHMAN RESIDENT ENGINEER TELE(703)984-4133 FAX (703) 984-9761 Ref: Albin Ridge Mini -Storage Route 679 Frederick County We are in receipt of the referenced project's revised site plans dated June 5, 1992. All of our earlier recommendations appear to have been satisfactorily addressed. Please advise the owner of our approval and of the fact a land use permit will need to be obtained prior to any work being performed on the State's right-of-way. This permit is issued by this office and will require an inspection fee and surety bond coverage. Should you have any questions concerning the above or if we can of further assistance, please let us know. RBC/rf Attachment xc: Mr. R. W. Watkins Sincerely, William H. Bushman Trans. Resident Engineer By: Robert B. Childress Hwy. Permits & Subd. Specialist Sr. TRANSPORTATION FOR THE 21 ST CENTURY COMMONWEALTH of VIRCjlNIA DEPARTMENT OF TRANSPORTATION P 0. BOX 278 RAY D. PETHTEL EDINBURG, 22824 COMMISSIONER June 2, 1992 Mr. L. A. Ritchie, Jr. C/O Ritchie Surveys 5049 Amelia Avenue Stephens City, VA 22655 Dear Mr. Ritchie: WILLIAM H. BUSHMAN RESIDENT ENGINEER TELE(7031984-4133 FAX (703) 984-9761 Ref: Albin Ridge Mini Storage Route 679 Frederick County As requested we have reviewed the above referenced site plan dated April 23, 1992. Overall the proposal appears satisfactory. However, we do have several comments relative to the proposed drainage design. They are as follows: 1. The area between the detention basin pipe and the 48" culvert under Route 522 needs to be regraded if necessary to transition the flow into our pipe. Also, standard EC-1 Type A riprap stone is to be added between the outfall of the basin to the inlet of the 48" pipe as noted. 2. Filter cloth should be used beneath the EC-1 stone on the detention basin spillway. 3. EC-1 riprap should only be used on the downstream half of the spillway to prevent seepage prior to the full overflow elevation. Please revise and resubmit four (4) copies for final approval. Should any changes be necessary please design them to meet or exceed the above recommendations. Should you have any questions please let me know. Sincerely, William H. Bushman Trans. Resident Engineer By: Robert B. Childress RBC/rf Hwy. Permits & Subd. Specialist Sr. Enclosures xc: Mr. R. W. Watkins Mr. H. E. Strawsnyder Mr. Robert A. Carter COUNTY OF FREDERICK, VI&IA • DEPARTMENT OF INSPECTIONS Caller &G LA2Tt_-K Time Called (G=W A-M Date Called Phone No. (v%% - 1100 Time Requested AS" Date Requested ASa P Received By E_v++uJ kVyAir' Date of Inspection 26 PERMIT HOLDER NAME TZ -R nGL N - S ro?-A-GL RT. NO. EOM Lot No. SEC. No. SUBDIVISION STREET NAME I NDiarJ 4oL_L ) -'ntacr-3 DIRECTIONS 572-< fJ -7VK.5 r! L1 Gt�s� R - %�7`"�� BUILDING NO. pRpeezM/ A I Z_ NI L-LE 0" CL- PLUMBING NO. A b-IACL-21vT- :1'0 SCHOOL ELECTRICAL NO. MECHANICAL NO, SIGN NO DISTRICT C r4 i ►�E5c3ar�D PERMIT FOR: r i Nl 1 J&f_E "U5ti 0"11-7-S Tvoe of Inspection Residential Footers Slab Water Sewer Rough Plumbing Groundworks Other: Setbacks: FR Draintile Service Rough Electric Rough Mechanical Gas Piping/Test Commercial _ BK Gas Fire -up Framing Final Final Building Final Plumbing V� _L R Final Electrical Final Mechanical Site Plan LZ Fire Marshall Special/Complaint � u Time In: 3 . I S el Temperature Z 5 r= Cut in No. Time Out: 3 so Weather Su►.sri Results: Approved <) C RejectedAs A ��,ytv�x S .7TT�f3���-'E 1+�.�._ 1T12RD�D pp -�tR_l Comments: / _�'�r ,[Jb &Ru,, L17 C Po N \> T„Q Signature Date COUNTY OF FREDERICK, VI&IA • DEPARTMENT OF INSPECTIONS Caller �013eYT CN&j j:S� Time Called Date Called Z 3 h3 Phone No. t17 - IICO Time Requested AS1VP Date Requested J /q Received By EVA-n.) A . Vv/i Date of Inspection 1 PERMIT HOLDER NAME t-a4►J 11Q6E 10 - S'UlZ_AGQ-__ RT. NO. � Lot No. SEC. No. SUBDIVISION STREET NAME WD, Aryl DIRECTIONS ScZl" -TDEKI t'L1 t lZ� -, (S79 BUILDING NO. _ P(z0Pozni VZ M ►J L.EJ-- . PLUMBING NO. Ab_)&-c ► r—, `TD '2)ct+a1L gu5 JttoP . ELECTRICAL NO. MECHANICAL NO SIGN NO. DISTRICT CT AIFJCSr62C-� PERMIT FOR: M+'J� %JIh2C�irti= (Jti i Tvoe of Inspection Residential Footers Slab Water Sewer Rough Plumbing Groundworks Other: Setbacks: FR Draintile Service Rough Electric Rough Mechanical Gas Piping/Test Commercial ✓ _ BK L Gas Fire -up Framing Final Final Building Final Plumbing Time In: 1 , 0 1 r'*; Temperature :� 5� F Cut in No Time Out: I f s rti Weather 5000 R Final Electrical Final Mechanical Site Plan Fire Marshall Special/Complaint Results: Approved �JN +rs 4 1 . -� � Rejected Comments: G T y I"I Ou.+.,+l1dL.��.1 .BLit c-•�✓) � .J1.JQ.LI��..��nc11-•� C �1.J�-�-C �'}t�iu2 , ; .c 1.�32�J O,Lt ��.(/�aJL_� ot.JCJC ✓t.a-¢� (,t�.�A.� ;]t�ULs�� . Signature Date z- 1 5 `) REQUEST FOR SITE PLAN COMMENTS Frederick County Inspections Department Attn: Building Official P.O. Box 601 Winchester, Virginia 22601 (703) 665-5650 The Frederick County Inspections Department is located at 9 North If Loudoun St., 2nd Floor of the Hammon Building in Winchester, if you prefer to hand deliver this review. Applicant's name, address and phone number: Robert A. Carter and Clara Lorene S. Carter, Route 2, Box 30A, Winchester, Virginia 22601 (703) 722-1100 c Name of development and/or description of the request: Albin -Ridge Storage - Mini Storage BuilcJinbs Location: Route 522 North, Left on Route 679, then 0.1 Mile on Right. Inspection Department Comments: Building shall comply with the Virginia Uniform Statewide Building Code and Section 310- Use Group S Storage) of the BOCA National Building Code/1990. Other codes that apply'are title 28 Code of Federal Regulation, art ondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities. (One parking space in phase 3 s a e s ze an labeled van accessible in accordance to Section 4.6 of the ADA Regulations). Code Administrator Signature & Date: t�L' s (NOTICE TO INSPECTIONS DEPT. *PLEASi�—X URN T S FORM TO PLICANT. ) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach a copy of your plans and/or application form. -14- OOUNTY ���� OF FREDERlCK, VIRGImrn �FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS 01 No. 05059203e5 Date Received ApplIcan't Name Robert Clara Carter Address Route 2, Box tic t fro 4- Name Albin Ridge 'Storage one No. 703-722-110o 050592 Date Reviewed 051192 Current Zoning 1�st Due.Fire Co. 15 1st Due Rescue Co. 15 ' ��� r�1E s IL rict Gaineboro ��- RECOMMENDATIONS '--' - inkler System X Residential Sprinkler System bneir'gency-Vehicle Access; Inadequate -FA es Requit Other Not Identified X No Comments: Existing firE_� 1,Llne to dry 1-v,lldrant MU -St be maintained at -i-s-leway Widths; Adeq pe I* 4-Y r! *77277 Not Identified No X 4. ...................... .................. ........_..-._._...___- __ _...._.._.. _.__._....__ Hydrant Locations; AdQate X Inadequate Not Identified Siamese Connection Location; Approved Not Approved Not Identified K Additional Comments: 1) This is another phase of master- plan which this __.._.._...._--.--._..._._ ... -....... office has approved. 2) No burning of construction debris permitted __..._.__..__.........._.._.........._............ .... -._........ _................ _...._. onJ`ite.. w •tom ; xF a ._�..__._.--__....................... ........... .._._ __�_._..._.__._....._..._..__ . 41 Jil � j F. j,. •fir,,.' T � � •_•___ ._ ...�_ .�_._ f ' i _ _ __�......_....__........_.._.........___.....__....................._...._.__.......... i .. ............................................ _...----_...................... ... r,. .= me .25 hr. R . ) r D0691ao A. Kiracofe PLATS APPROVED FIRE NIIAR,3HAL, FREDEFICK COUNTY �io h�C410TY OF FREDERICK` VIRGINI U FIRE MARSHAL'S OFFICE pow..pow..--LT LAND DEVELOPMENT COMMENTS ��z_ "S_P. Control No. 0505920385 Date Received 050592 Date Reviewed 051192 Applicant Name Robert & Clara Carter Address Route 21 Box 30A Winchester, VA 22601 Project Name Albin Ridge Storage Phone No. 703-722-1100 Type of Application Site Plan Current Zoning 1st Due Fire Co' 15 1st Due Rescue Co. 15 Election District Gainesboro RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm System X Other Emergency Vehicle Access; Adequate X Inadequate Not Identified Fire Lanes Required; Yes X No Comments: Existing fire lane to dry hydrant must be maintained at all times. Roadway/Aisleway Widths; Adequate X Inadequate Not Identified ---` ---' Special Hazards Noted; Yes No X Comments: � UH Hydrant Locations; Adequate X Inadequate Not Identified Siamese Connection Location; Approved Not Approved Not Identified X Additional Comments: 1) This is another phase of master plan which this office has approved. 2) No burning of construction debris permitted on site. Review Time .25 hr. Douglas A. Kiracofe Fire Marshal 0 0 REQUEST FOR SITE PLAN COMMENTS Frederick County Engineering Department Attn: Dir3ctor of Engineering P.O. Box 601 Winches'.:er, Virginia 22601 703) 665-5643 The Frederick County Engineering Department is located at 9 North Loudoun St., 2nd Floor of the Hammon Building in Winchester, if you prefer to hand deliver this review. Applicant's name, address and phone number: Robert A. Carter and Clara Lorene S. Carter, Route 2, Box 30A Winchester, Virginia 22601 (703) 722-1100 Name of development and/or description of the request: Albin -Ride Storage - Mini Storage Buildings Location: Route 522 North, Left on Route 679, then 0.1 AZile on Right Engineers Comments: The Erosion and Sediment and stormwater management plan are approved as submitted. I recommend that the overflow weir be established at the level of the ?--year storm. Rip -rap should be placed above this level . Engineers Signature & Date': .CIJAVNIIAheU (NOTICE TO ENGINEERING DEPT.*PLEA$Ea RET RN THIS FOXM T APPLICANT. NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach two copies of your plans and/or application form. -13-