Loading...
HomeMy WebLinkAbout005-92 Winchester Airport (safety zone-rd reloca) - Shawnee - BackfilePage is too large to OCR. Page is too large to OCR. UH C[UNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. 0519920421 Date Received 051892 Date Reviewed 051992 Applicant Name Greenway Engineering *ol clress zI+ 1:5axer Lane Winchester, VA 22601 Project Name Winchester Airport Hangar Phone No. 703-662-4185 Type of Application 1st Due Fire Co. 18 Election District Master Plan Current Zoning AP-1 1st Due Rescue Co. 18 Shawree RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm System X Other Emergency Vehicle Access; Adequate X Inadequate Not Identified Fire Lanes Required; Yes X No Comments: Fire lanes must be maintained at all hydrant locations. Roadway/Aisleway Widths; Adequate X Inadequate Not Identified Special Hazards Noted; Yes X No Comments: Addition will have to be separated from existing hangar via fire wall or entire structure will have to be sprinkle -red per B.O.C.A. Section 1002.7. UH Hydrant Locations; Adequate Inadequate Siamese Connection Location; Approved Not Approved Not Identified X Not Identified X Additional Comments: 1> Access for emergency vehicles must be maintained at all times during construction. 2) Burning of construction debris on site is prohibited. Review Time .25 hr. Douglas A. Kiracofe Fire Marshal PREDESIGN MEETING GRADE RUNWAY 32 EXTENDED SAFETY AREA (500' X 1000') RELOCATE VICTORY LANE WINCHESTER REGIONAL AIRPORT WINCHESTER, VIRGINIA AIP Project No. 3-51-005943-07 Delta Project No. VA 9211 January 10, 1992 Items for Discussion: 1. Scope of Project - grade rw 32 extended safety area (500' x 1000). obtain fill material from area north of runway. construct detention basin. - relocate Victory Lane (24' x 14001). - relocate water line, sewer force main, gas line, phone, and electric and leave sleeves under road for future utility service connections. Z E)) - rehab ODALs, new cable, conduit, and platforms conducive to maintenance. - clear and grub airport property (16 acres). - install fence along North Frederick Realty and along west side of Victory Lane (20001). - remove buildings. / - purchase approx. 2 acres for road relocation. - perform engineer ihng, surveys, fappraisals, etc. for above. - negotiate land acquisition and access with 2 property owners. - negotiate lease buyout with lessee. 2. Project Benefits - provide runway safety area sized and graded for approach category C aircraft. ���r�ftur� glide slopes - insure that no trees penetrate approach slopes. - provide stormwater management in accordance with Chesapeake Bay Act. t VA --S - move road out of runway safety area. - new ODALs and cable in conduit 3. Design Concerns - Is scope acceptable? C � t. 6 -> - Effect of detention basin on neighboring property and downstream pond. - VDOT requirements regarding site distance at tie in to SR 645. \ - VDOT requirements regarding design speed. - VDOT restrictions on road entrances. Can we provide a future road entrance for Airport? - Negotiations with Glaize to acquire property for road relocation. - Negotiations with Frederick Partners to provide road frontage along relocated road. - Negotiations with airport lessees for removal from site in time not to interfere with construction schedule. - Hope there are no major problems with asbestos or other sensitive materials during building demolition. - Construct haul route in order to leave runway open. 4. Phasing - project timing ..... bid in spring 1992. �C - 180 day construction period (June -Nov)? - Runway open at all times. - Victory Lane and SR 645 open at all times. 5. Operational Safety - active runway and taxiway areas will be well marked to keep all Contractor activities out of active safety areas. - Hauling and grading operations in close proximity to runway. - Will have to temporarily relocate threshold (limited time frame) while grading off end of runway and installing conduit. Distance of relocation approx. 3001. Taxiway will remain open and end of runway available for taxi. - Dust control important. - Contractor vehicles flagged and/or marked. - full-time, FAA experienced, resident inspection. 6. NAVAIDS - ODALs not available during much of construction period. - Contractor care required in working around NAVAIDS. 7. Environmental - drainage, erosion control, and stormwater detention subject to approval by Frederick County. - no appreciable change in runoff. - wetlands are present but have been determined to be considerably less than 2 acres so no EA or Corps of Engineer involvement required. 8. Civil Rights Requirements - FAA requirements will be adherred to regarding EEO, DBE, and Davis -Bacon Federal Wage Rates. 9. Engineer's Cost Estimate - Approximately $1.5 million total project. Lease buyout could add $100,000+ to this. Page is too large to OCR. Page is too large to OCR. Page is too large to OCR.