'� STAFF SITE PLAN CHECKLIST *
This application is not complete if the following are not included:
One set of comment sheets from the following agencies along with any marked
copies of the plan;
LI-1, VDOT t/ City of Winchester
1/ Sanitation Authority
Inspections Dept.
Fire Marshal
✓ County Engineer
Airport Authority
2. One copy of the Site Plan application.
3. Five copies of the Site Plan.
4. One reproducible copy of the Site Plan (if required).
5. One 35mm. slide of the Site Plan (if required).
Town of Stephens City
Town of Middletown
Health Dept.
Parks & Recreation
Soil & Water Conservation Dist.
TRACKING
Date
) -2 :/ ,)— Application received.
All necessary agency comments received.
y;�FeePaid (amount
Site Plan to Planning Commission via bi-monthly.
Site Plan heard by Planning Commission (if required).
Revisions received (if required).
Date of approval.
Info added to annual report diskette.
�l
9'J
FIL E UPY
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
January 25, 1992
The Potomac Edison Company
Attn: Ms. Rosalie Cornwell
10435 Downsville Pike
Hagerstown, Md. 21740-1766
Dear Ms Cornwell:
This letter is to confirm action taken by the Frederick Countv Board of Zoning Appeals at
their meeting of January 16, 1993.
The Board approved application #035-92 of The Potomac Edison Company, for a 50' front
and a 15' side variance for a new control building, a 37.95' and 43.88' front variance for a
12kV aluminum tower, a 45.95' and 40.95' front variance for an underground terminal rack
foundation and a 5' front yard variance for two new transformers. This property is located
at the intersection of '.north Kent Street and Route 738, in the Stonewall District, and is
identified as GPIN 540000A0000590.
Please feel free to call this office if you have any questions regarding your variance.
Sincerely,
Ronald A. Lilley
Planner II
RAL/slk
O North Loudoun Street P.O. Box 601
Winchester. VA 22601 Winchester, VA 226(9
7
AFILE COPY
January 25, 1993
Ms. Rosalie Cornwell
The Potomac Edison Company
10435 Downsville Pike
Hagerstown, MD 21740
Dear Rosalie:
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
This letter is to inform you that the Frederick County Department of Planning
administratively approved Site Plan #023-92 of The Potomac Edison Company for the
installation of a new control building, new transformers, and new 34.5KV bays, as well as
the removal of an existing building and bays. Prior to the approval of this site plan a
variance was applied for and granted at the January 19, 1993 Board of Zoning Appeals
meeting.
Please contact me regarding any questions you might have.
Sincerely,
Lanny C. Bise, II
Planner I
LCB/slk
1) North Loudoun Street P.O. Box 601
Winchester. VA 22601 Winchester, VA 226(9
Po'N9101 CP-C-
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
1.
Name of proposed development
_V/ _
2.
Name and address of owner
3.
Name and address of developer
4.
�e
Name, address, and phone number of designer �-t
5.
Certificate of surveyor, engineer, or architect
6.
Date plan prepared and date of revisions
I 2�21
7.
A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval � va • ,o —
8.
A space labeled "approved by the Zoning
_✓ _
Administrator" for the approval signature and date
of approval
General Site Information
Y N
_ 9. Location map (scale 1:2000)
10. Magisterial District of site
11. Scale of site plan (not to exceed 1:50)
12. North Arrow
13. Zoning of site
14. Use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Vhi
V _ 15.
_
16.
17.
18.
19.
20.
Nye
N
21.
_✓
22.
23.
Surveyed boundaries for all lots and parcels
Acreage of all lots included in the plan
The location and dimensions of all required setbacks
and yard areas
Location of all buildings, structures, and uses
The proposed use of each building, structure, and
area
The location and type of all dwelling units
Ground floor area and total floor area of all
buildings with FAR calculations for commercial and
industrial zoning districts
The height of all buildings and structures
The location and dimension of all signs
o �l Al
7
Lots/Uses/Buildings & Structures (con't)
Y
N
gip..
N
24.
Location
of
outdoor lighting fixtures
1/
25.
Location
and
nature of outdoor storage areas
N
26.
Location
and
area of common open space
yL0.
27.
Location
and
description of all recreation facilities
moo-
N�.S
28.
Location
of
sidewalks and pedestrian ways
q42-
q�k
29.
Location
of
outdoor trash receptacles
Roads
VM
U� �a 30. Name and number of existing and planned streets on
and adjoining the site
31. Location of existing and planned streets on and
adjoining the site
32. Dimensions, boundaries, width, pavement, and
construction of planned roads
_ 33. Location and dimensions of all proposed
entrances from public right-of-ways
Utilities
Y N
212 �W0. 34. Location of all utilities, including sewer and water
lines with the size of lines, mains, and laterals
35. Location and width of all easements, including
access, utility and drainage easements
Na 36. Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Parking
Y N
v�37. Calculations describing the required number of
parking and loading spaces
38. Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing, and
other features to be used
y NLo. 39. Location and dimension of all handicapped spaces
•
f
Natural Features
Y N
✓ _ 40. Existing and finished contour lines
ULQ, iao, 41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
LandscaDin
VHl
43. Landscaping plan describing location and types of
plants to be used
UA w-a- 44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
! Wj
45. A stormwater management plan with run off
calculations and location and description of
facilities to be used
46. Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
9
9 0
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
December 15, 1992
Ms. Rosalie Cornwell
The Potomac Edison Company
10435 Downsville Pike
Hagerstown, MD 21740
Re: Preliminary Review of Potomac Edison Site Plan
Dear Rosalie:
This letter is in reference to my preliminary review of the site plan for the Potomac Edison
substation located on North Kent Street, just inside the Frederick County boundary. The
overall concept of the plan is fine. However, I have some minor comments. I offer the
following:
1. The address and phone number of the designer should be indicated on the plan.
2. The certificate (seal) of your engineer should appear on the plan.
3. Location of outdoor lighting fixtures should be shown (if any are existing or
proposed).
4. If there are any sewer and water lines on the property, they should be indicated
showing the size of lines, mains and laterals.
5. Location and width of all easements including access, utility and drainage easements
should be shown (if applicable).
6. Location and nature of fire lanes, fire hydrants and all other facilities necessary to
meet the Fire Code requirements should be shown (may need to wait for Fire
Marshal's comments, he may indicate the site is adequate).
As I indicated earlier, these comments are minor in nature. If the comments aren't
applicable to your site, then disregard them. Keep in mind that once all agency review
comments have been received you may officially submit the site plan.
1) North L OLICInUn Strcct P.O. Box 601
%Winchester. VA 22601 Winchester, VA 2200.1
Page -2-
R. Cornwell Ltr.
December 15, 1992
At that point it will appear on the bi-monthly report to the Planning Commission and we
will await the decision of the Board of Zoning Appeals on your variance request.
Please contact me regarding any questions.
Sincerely,
Lanny C. Bise, II
Planner I
LCB/slk
SITE PLAN APPLICATION
Complete the following application:
DATE Nov. 23, 1992
APPLICATION # 023 - Tz
1.
Development
2.
Location of Property:
At the intersection of Virginia Rt. 783 and
(by street name)
North Kent Street on the West side of Rt. 783
and North of Kent Street.
3.
Property Owner.
The Potomac Edison Company
Address:
10435 Downsville Pike
Hagerstown, Maryland 21740-1766
Telephone:
301 - 790-6369
4.
Applicant/Agent:
Rosalie A. Cornwell
Address.
The Potomac Edison Company
10435 Downsville Pike
Hagerstown, Maryland 21740-1766
Telephone:
301 - 790-6369
5.
Designer:
The Potomac Edison Company
Address:
10435 Downsville Pike
Hagerstown, Maryland 21740-1766
Telephone:
301 - 790-6381
Contact:
Kimberly J. Shrader
6. Is this an original or revised Site Plan?
Original Revised
-5-
7. Total area of parcel to be developed:
8. Property Information:
a) Property ID #:
b) Current Zoning:
c) Present Use:
d) Proposed Use:
e) Adjoining Property Zoning:
f) Adjoining Property Use:
g) Magisterial District:
1.1 Acres
54 A 59
M 2
Electrical Substation
Same
M 2
Industrial business
Stonewall
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submis 'crn—o- my site plan.
signature:
Date: z2a.ar/���A-aALQ �41 ,J 99
•
Ll
41992
REQUEST FOR SITE PLAN COMMENTS
Frederick County Inspections Department
Attn: Building Official
P.O. Box 601
Winchester, Virginia 22601
(703) 665-5650
The Frederick County Inspections Department is located at 9 North
Loudoun St., 2nd Floor of the Hammon Building in Winchester, if you
prefer to hand deliver this review.
Applicant's name, _address and phone number: Rosalie A. Cornwell
The Potomac Edison Company
10435 Downsville Pike, Hagerstown, Maryland 21740-1766/Phone: (301) 790-6369
Name of development and/or description of the request:
Variances are requested as follows: A 50' front yard and 15' side yard for
a new control building; a 37.95' and 43.88' front yard for 12 kV aluminum
tower; a 45.95' and 40.95' front yard for underground terminal rack foundation
Location: and 5' front yard for 2 new transformers.
At the intersection of VA Rt. 783 and North Kent Street on the west side of
Route 783 and north of Kent Street.
Inspection Department Comments:
Building shall comply with the Virginia Uniform Statewide Building Code and Sec. 311,
Use Group U (utility and misc.) of the BOCA National Building Code/1990. Other permits
required shall be a demolition permit for the existing building.
Z--2ZA r�,,
Code Administrator Signature & Date:
(NOTICE TO INSPECTIONS DEPT.*PLEASE URN TH S FORM TO APP ANT.
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach a copy of your plans and/or application form.
-14-
EDlS: SC1 FTS89)ENIC'ti'
DEC 9 1992
REQUEST FOR SITE PLAN COMMENTS
❑O B ❑ ?AC ❑ 'JCS ❑ KDW
Virginia Department of Transportation uRBC UKSH C]KDC ❑RLF
Attn: Resident Engineer UCOPIES To.
P.O. Box 278
Edinburg, Virginia 22824-0278
(703) 984-4133
The local office of the Transportation Department is located at
1550 Commerce St. in Winchester if you prefer to hand deliver this
form.
Applicant's name, _address and phone number: Rosalie A. Cornwell
The Potomac -Edison Company
10435 Downsville Pike, Hagerstown, Maryland 21740-1766/Phone (301) 790-6369
Name of development and/or description of the request:
Variances are reauested as follows: A 50' front yard and 15' side yard
for a new control building; a 37.95' and 43.88' front yard for 12 kV aluminum
tower; a 45.95' and 40.95' front yard for underground terminal rack foundation
Location: and 5' front yard for 2 new transformers.
At the intersection of VA Rt. 783 and North Kent Street on the west side of
Route 783 and north of Kent Street.
Va. Dept. of Transportation Comments:
No eonment on proposed .unpnoveme to on Kent Street. Ij any won.k .is
peAjo4wed -on the Route 783 night-oj-way a land ube pexmi t w.i t be
nequviced.
VDOT Signature and Date: Ie /G L
(NOTICE TO RESIDENT ENGINEERkP EASE RETURN THIS FORM TO APPLI AN .)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach three conies of your plans and/or application form.
-10-
DEC 41992
REQUEST FOR SITE PLAN COMMENTS
Frederick County Engineering Department
Attn: Director of Engineering
P.O. Box 601
Winchester, Virginia 22601
(703) 665-5643
The Frederick County Engineering Department is located at 9 North
Loudoun St., 2nd Floor of the Hammon Building in Winchester, if you
prefer to hand deliver this review.
Applicant's name, --address and phone number:
The Potomac Edison Company
10435 Downsville Pike, Hagerstown, Maryland 21740-1766/Phone (301) 790-6369
Name of development and/or description of the request:
Variances are requested as follows: A 50' front yard and 15' side yard for
a new control building; a 37.95' and 43.88' front yard for 12 kV aluminum
tower; a 45.95 and 40.95' front yard for underground terminal rack foundation
Location: and 5' front yard for 2 new transformers.
At the intersection of VA Route 783 and North Kent Street on the west side of
Route 783 and north of Kent Street.
Engineers Comments:
Engineers Signature & Date* L . )��J�1 1"yt) I-L
(NOTICE TO ENGINEERING DEPT.*PLEA 4 RETURN THISWOM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach two copies of your plans and/or application form.
-13-
REQUEST FOR SITE PLAN COMMENTS
Frederick County Sanitation Authority
Attn: Engineer Director
P.O. Box 618
Winchester, Virginia 22601
(703) 665-5690
The Frederick County Sanitation Authority is located on the 2nd
floor of the old Frederick Co. Courthouse in Winchester, if you
prefer to hand deliver this review.
Applicant's name, -address and phone number:
The Potomac Edison Company
10435 Downsville Pike, Hagerstown, Maryland 21740-1766/Phone (301) 790-6369
Name of development and/or description of the request:
Variances are requested as follows: A 50' front yard and 15' side yard for
a new control building; a 37.95' and 43.88' front yard for 12 kV aluminum
tower; a 45.95 an ront yard or underground terminal rack oun ation
Location: and 5' front yard for 2 new transformers.
At the intersection of VA Route 783 and North Kent Street on the west side of
Route 783 and north of Kent Street.
Sanitation Authority Comments:
000�r Cox
Sanitation Authority Signature & Date:'„F4 00 999" = ",Ark',„
(NOTICE TO SANITATION AUTHORITY * RZI RN THIS FORM TO APPLICANT.)
NOTICE TO APPLICANT / 74z
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach two copies of your plans and/or application form.
-11-
•
REQUEST FOR SITE PLAN COMMENTS
CITY OF WINCHESTER
ATTN: Planning Director
15 North Cameron St.
Winchester, Virginia 22601
(703) 667-1815
The City of Winchester Planning Dept. is located in Rouss City Hall
at 15 North Cameron St. in Winchester, if you prefer to hand
deliver this form.
Applicant's name, address and phone number:
The Potomac Edison Company
10435 Downsville Pike, Hagerstown, Maryland 21740-1766/Phone (301) 790-6369
Name of development and/or description of the request:
Variances are requested as follows: A 50' front yard and 15' side yard for
a new control building; a 37.95' and 43.88' front yard for 12 kV alumunium
tower; a 45.95' and 40.95' front yard for underground terminal rack foundation
and 5' front yard for 2 new transformers.
Location:
At the intersection of VA Rt. 783 and North Kent Street on the west side of
Route 783 and north of Kent Street.
City of Winchester Comments:
Director Signature and Date:
(NOTICE TO DIRECTOR * PLEASf RETURN T IS ORM TO THE APPL C T.)
NOTICE TO APPLICANT �J
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Please
also attach a copy of your plans and/or application form.
-16-
Y OF F-A2± A: 1.'`
—FIRE MAFS+., z !0FlCE -^
LAND DEVELOPMENT :�MMENTS
Ccnhro1 No. 217920902 Date Received 121792 Date Reviewed 122292
pp1icant Name The Potomac Edison Ccmpany
Address 10425 Downsville Pike
Hagerstown, MD 21740-170-c':-
Project Name
Phone No. 301-790-636�
Type of Application Site Plan Current Zoning M-2
------
`st Due Fire Co. 13 1st Due Rescue Co. 13
E1ection District Stonewall
RECOMMENDAT: "-�HS
Automatic Sprinkler System Residential Sprinkler System
Automatic Fire Alarm System Other
Emergency
Adequate
Fire Lanes
Comments:
Vehicle Access;
X
Required;
Inadequate
Yes
Not Identified
No X
^`
Roadway/Aisleway
Adequate X
Special Hazards
Comments:
Widths;
Noted;
Inadequate
Yes
Not Identified
No �
-----------------------
---------------------'-------------------'—'--'--'-------------
0
Hydrant Locations;
Adequate Inadequate
Siamese Connection Location;
Approved Not Approved
Not Identified X
Not Identified X
Additional Comments: There are no significant hazards on this site that
would affect fire and rascue response.
� �������'
Plans approved.
Review Time .50 hr
6;4��5-2
Douglas A. ofe
Fire Marshal
f R
* PSUHM: MODULE <3-B> - SCS TR-55 TABULAR METHOD
*******************************************************************************
WATERSHED TITLE: NORTH WINCHESTER
2 YR. TYPE II STORM: PRECIPITATION = 3.5 in.
SUMMARY OF INPUT PARAMETERS
SUBAREA AREA CURVE IA/P RUNOFF TC ADJ. TC TT ADJ. TT
(acre) NUMBER (in) (hrs) (hrs) (hrs) (hrs)
-------------------------------------------------------------------------------
1 1.000 89 0.100 2.36 1.048 1.000 0.000 0.048
-------------------------------------------------------------------------------
COMPOSITE 1.000 89 2.36
INDIVIDUAL SUBAREA & COMPOSITE HYDROGRAPHS
SUBAREA TIME (hrs)
11.0 11.9 12.2 12.5 12.8 13.2 13.6 14.0 15.0 17.0 20.0 26.0
-------------------------------------------------------------------------------
1 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
-------------------------------------------------------------------------------
COMPOS. 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
THE PEAK FLOW IS 1.2 cfs - OCCURS AT 12.8 hrs
i
0 0
*******************************************************************
* TRAVEL TIME CALCULATIONS - SCS Segmental Approach, TR-55 (1986)
*******************************************************************
SUMMARY for NORTH WINCHESTER SUBSTATION
Segment 1: OVERLAND FLOW
L = 99 ft, S = .005 ft/ft, n = .011, P(2yr/24hr) = 3.5 in
Travel Time = 2 minutes
Segment 2: CONCENTRATED FLOW
L = 2500 ft, S = .0018 ft/ft, UNPAVED surface
Travel time = 60.9 minutes
TOTAL TRAVEL TIME = 62.9 min.
* PSUHM: MODULE <3-B> - SCS TR-55 TABULAR METHOD
*******************************************************************************
WATERSHED TITLE: NORTH WINCHESTER
2 YR. TYPE II STORM: PRECIPITATION = 3.5 in.
SUMMARY OF INPUT PARAMETERS
SUBAREA AREA CURVE IA/P RUNOFF TC ADJ. TC TT ADJ. TT
(acre) NUMBER (in) (hrs) (hrs) (hrs) (hrs)
-------------------------------------------------------------------------------
1 1.000 89 0.100 2.36 1.048 1.000 0.000 0.048
-------------------------------------------------------------------------------
COMPOSITE 1.000 89 2.36
INDIVIDUAL SUBAREA & COMPOSITE HYDROGRAPHS
SUBAREA TIME (hrs)
11.0 11.9 12.2 12.5 12.8 13.2 13.6 14.0 15.0 17.0 20.0 26.0
-------------------------------------------------------------------------------
1 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
-------------------------------------------------------------------------------
COMPOS. 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
THE PEAK FLOW IS 1.2 cfs - OCCURS AT 12.8 hrs
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
�
*******************************************************************
* TRAVEL TIME CALCULATIONS - SCS Segmental Approach, TR-55 (1986)
*******************************************************************
SUMMARY for NORTH WINCHESTER SUBSTATION
Segment 1: OVERLAND FLOW
L = 99 ft, S = .005 ft/ft, n = .011, P(2yr/24hr) = 3.5 in
Travel Time = 2 minutes
Segment 2: CONCENTRATED FLOW
L = 2500 ft, S = .0018 ft/ft, UNPAVED surface
Travel time = 60.9 minutes
TOTAL TRAVEL TIME = 62.9 min.
* PSUHM: MODULE <3-B> - SCS TR-55 TABULAR METHOD
*******************************************************************************
WATERSHED TITLE: NORTH WINCHESTER
2 YR. TYPE II STORM: PRECIPITATION = 3.5 in.
SUMMARY OF INPUT PARAMETERS
SUBAREA AREA CURVE IA/P RUNOFF TC ADJ. TC TT ADJ. TT
(acre) NUMBER (in) (hrs) (hrs) (hrs) (hrs)
-------------------------------------------------------------------------------
1 1.000 89 0.100 2.36 1.048 1.000 0.000 0.048
-------------------------------------------------------------------------------
COMPOSITE 1.000 89 2.36
INDIVIDUAL SUBAREA & COMPOSITE HYDROGRAPHS
SUBAREA TIME (hrs)
11.0 11.9 12.2 12.5 12.8 13.2 13.6 14.0 15.0 17.0 20.0 26.0
-------------------------------------------------------------------------------
1 0.0 . 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
-------------------------------------------------------------------------------
COMPOS. 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
THE PEAK FLOW IS 1.2 cfs - OCCURS AT 12.8 hrs
0
0
*******************************************************************
* TRAVEL TIME CALCULATIONS - SCS Segmental Approach, TR-55 (1986)
*******************************************************************
SUMMARY for NORTH WINCHESTER SUBSTATION
Segment 1: OVERLAND FLOW
L = 99 ft, S = .005 ft/ft, n = .011, P(2yr/24hr) = 3.5 in
Travel Time = 2 minutes
Segment 2: CONCENTRATED FLOW
L = 2500 ft, S = .0018 ft/ft, UNPAVED surface
Travel time = 60.9 minutes
TOTAL TRAVEL TIME = 62.9 min.
* PSUHM: MODULE <3-B> - SCS TR-55 TABULAR METHOD
*******************************************************************************
WATERSHED TITLE: NORTH WINCHESTER
2 YR. TYPE II STORM: PRECIPITATION = 3.5 in.
SUMMARY OF INPUT PARAMETERS
SUBAREA AREA CURVE IA/P RUNOFF TC ADJ. TC TT ADJ. TT
(acre) NUMBER (in) (hrs) (hrs) (hrs) (hrs)
-------------------------------------------------------------------------------
1 1.000 89 0.100 2.36 1.048 1.000 0.000 0.048
-------------------------------------------------------------------------------
COMPOSITE 1.000 89 2.36
INDIVIDUAL SUBAREA & COMPOSITE HYDROGRAPHS
SUBAREA TIME (hrs)
11.0 11.9 12.2 12.5 12.8 13.2 13.6 14.0 15.0 17.0 20.0 26.0
-------------------------------------------------------------------------------
1 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
-------------------------------------------------------------------------------
COMPOS. 0.0 0.1 0.2 0.7 1.2 1.0 0.5 0.3 0.2 0.1 0.1 0.0
THE PEAK FLOW IS 1.2 cfs - OCCURS AT 12.8 hrs
lJ ONS 1 ri C�"�� PC,2� i 1^ G rJ f c� G(c ,1oJ Go 1✓ ��'�c/ c/
*******************************************************************
* TRAVEL TIME CALCULATIONS - SCS Segmental Approach, TR-55 (1986)
*******************************************************************
SUMMARY for NORTH WINCHESTER SUBSTATION
Segment 1: OVERLAND FLOW
L = 99 ft, S = .005 ft/ft, n = .011, P(2yr/24hr) = 3.5 in
Travel Time = 2 minutes
Segment 2: CONCENTRATED FLOW
L = 2500 ft, S = .0018 ft/ft, UNPAVED surface
Travel time = 60.9 minutes
TOTAL TRAVEL TIME = 62.9 min.