HomeMy WebLinkAbout014-92 Winchester Church of God - Gainesboro District - BackfileRECEIPT
N 02� �
AMOUNT DUE
sI
AMOUNT PAID
BALANCE DUE
PAID BY
CASH
CHECK
❑ OTHER
FREDERICK COUN, l ui-F " AND DEVELOPN;,-,;T
P.O. BGX 601, 9 COURT SQUARE
WINCHESTER, VIRGINIA 22601
RE(
ADI
THE
FOI
B�
DAY -TIMERS RE -ORDER 140. 3221 — Prood m USA
-OK- -11-7Iq?
-pl(- -714192-
* STAFF SITE PLAN CHECKLIST *
This application is not complete if the following are not included:
One set of comment sheets from the following agencies along with any marked
copies of the plan;
,�LfVDOT City of Winchester
Sanitation Authority
Inspections Dept.
Fire Marshal
County Engineer
Airport Authority
2. One copy of the Site Plan application.
3. Five copies of the Site Plan.
4. One reproducible copy of the Site Plan (if required).
5. One 35mm. slide of the Site Plan (if required).
TRACKING
Date
7 ,-9-sue Application received.
7 All necessary agency comments received.
7- ;'-'/- '�-Fee Paid (amount $ /&fib — ).
8 -19 -9 7--Site Plan to Planning Commission via bi-monthly.
Town of Stephens City
Town of Middletown
Health Dept.
Parks & Recreation
Soil & Water Conservation Dist.
N A Site Plan heard by Planning Commission (if required).
12(. 93 Revisions received (if required).
1 /Z? 93 Date of approval.
Info added to annual report diskette.
�IL�'11
S-t �� •tiS o�_
,J .^e- ( �-,urJ�o F--
0
0
COUNTY of FREDERICK
IDepartment of Planning and Development
703/665-5651
FAX 703 / 667-0370
January 29, 1993
Winchester Church of God
Attn: Pastor Darrell Waller
2312 Roosevelt Boulevard
Winchester, VA 22601
RE: Winchester Church of God Site Plan Approval
Dear Pastor Waller:
The Frederick County Planning Department administratively approved Site Plan #014-92 of
Winchester Church of God on January 27, 1993. The approved site plan calls for the
construction of a 33,900 square foot church, two (2) parking lots complete with 296 regular
parking spaces, eight (8) disabled parking spaces, S-5 surfacing, parking lot striping, and
concrete pedestrian walkways, two (2) overflow parking areas with double prime and seal
surfacing, a twenty-four (24) foot entrance drive complete with S-5 surfacing and a guard rail,
a stormwater detention basin, and all appropriate erosion and sediment control measures. Two
(2) copies of the approved site plan are enclosed for your records.
Please contact this office to schedule an inspection of this site once all improvements have been
completed. Please contact me if I may answer any questions regarding this letter.
Sincerely,
&Ia
Evan A. Wyatt
Planner II
EA W
cc: Beverly Sherwood, Gainesboro District Supervisor
Michael A. Didawick, Director of General Reassessments
Austin Spitler, Greenway Incorporated
0
•
DATE / — 0 — 94C
SITE PLAN APPLICATION
APPLICATION # O/- 9�
Complete the following application:
1. Development Name: �//IG
2. Location of Property: ( ,CoUT
(by street name)
AP��OX, / MiLE /I�O,eT� OG �i1/T�i��ECT/D�t%
,el-,
Doc i l� WAILED �Li-801�
3. Property Owner:
Address: �OUT� SX �%�✓�
.Gt/�vcHE2T�l� �yLl. 2Z�!
Telephone: 61�p-7 -C1W98
4. Applicant/Agent : X,E6 WA)
Address:
Telephone:
5. Designer:
Address:
Telephone:
Contact:
C4L)KCA OF GOD
Z312. R00Sc1JQT eL.vD
L."A N C,►+L-sue 1 v4 zz(.o
l�lr►�c,��T�,e, �� 2210�
- 4/8s
5
6. Is this an original or revised Site Plan?
Original _Aoo- Revised
7. Total area of parcel to be developed: /a. 902 AC.
8. Property Information:
a) Tax Map:
b) Parcel Nu
c) Tax ID # :
d) Current Zoning; i�7A '
e) Present Use: IWAA17—
f) Proposed Use:
g) Adjoining Property Zoning: %4 �d- O '2
h) Adjoining Property Use: YIGI�it!1" �' Co�ll� /�i�G'G �/off
i) Magisterial District: �?4/A146
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submission of my site plan.
Applicant's Signature:
6
COUNTY OF FREDERICK, VIR40IA •
DEPARTMENT OF INSPECTIONS �At�
Caller I ►JSNL ct� o,tJS Time Called 4' 1 5 P M Date Called 7 I' 9
Phone No. Time Requested A SA-P Date Requested �"5►� to __ __
i
Received By r /h� ~� Date of Inspection �
PERMIT HOLDER NAME
RT. NO. q2Z" Lot No. SEC. No. SUBDIVISION
STREET NAME 1JOCT14 G2eQL-721C.K Plw iL
DIRECTIONS 751T75 0--3 BUILDING NO.
SJST (�fRis�GC C01'i='r' PLUMBING NO.
ELECTRICAL NO.
PERMIT FOR:
DISTRICT
MECHANICAL NO.
SIGN NO.
Type of Inspection
Residential
-Gmmefelal
Footers
Setbacks: FR
BK
L R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final
Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: it) - 1 S A-+ Temperature d0°F Cut in No.
Time Out: IA; Weather Su N X))Y
Results: Approved ✓ Rejected
1-
j
Comments: %� j1 L � t ecL� 1 �� 5 , sy: �Lk y' r', , 1 . I
._
Signature (,.��_ �'�` Dated
COUNTY OF FREDERICK, VIR&A ,
DEPARTMENT OF INSPECTIONS
Caller L�1-4t C) F-tZ V i 1j Time Called 00 A-W4 Date Called
Phone No. Time Requested j ! 30 Date Requested 3
Received By 0YA-Q A . -Ywr Date of Inspection
PERMIT HOLDER NAME LRr = C o,,)smuc-m ov.
RT. NO. ZZ_ Lot No. SEC. No. SUBDIVISION
STREET NAME Npf'-il+r`R Kt-=--
DIRECTIONS :2Z. Q Ljir=l BUILDING NO.�'---
L�_, ,� ±�br ��.�►Jr�e V PLUMBING NO.
f"C'.
ELECTRICAL NO
MECHANICAL NO.
SIGN NO.
DISTRICT GA 1 r.JES-0
PERMIT FOR: 1►_Jc H-JRCN 0I• GOD
Type of Inspection
Residential
CHv2G H
wed-.
Footers
Setbacks: FR
BK L
R
Slab
Draintile
Gas Fire -up
Final Electrical
Water
Service
Framing
Final Mechanical
Sewer
Rough Electric
Final—
Site Plan
Rough Plumbing
Rough Mechanical
Final Building
Fire Marshall
Groundworks
IV Gas Piping/Test
Final Plumbing
Special/Complaint
Other:
Time In: i ,L� A,.-� Temperature z �u OJ i= Cut in No.
Time Out: I I Jc-6 AM Weather
Results: Approve4- Q iS" 1;�e _Ti me Q • 0 • Rejected
Comments:
b
vrR+JE Socw'?L.'.zc AL_
M
A14—
Signature l I)C.n i� • LJ�� v Date
0
V-1 . '�p -sr ol4-q'
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703/678-0682
January 19, 1993
Greenway, Inc.
Attn: Mr. Austin Spitler
1104 Baker Lane
Winchester, VA 22601
RE: Winchester Church of God Site Plan Review.
Dear Austin:
This letter regards our meeting this morning. The purpose of our meeting was to review
amendments to the above referenced site plan, and to discuss all requirements necessary for
final site plan approval.
My review was based on comments specified in the August 14, 1992 correspondence mailed
to your attention. All items specified in that letter have been adequately addressed with the
exception of the dimensions of the proposed sign along Route 522 North.
Please provide our department with four (4) copies of the final site plan indicating the sign
dimensions, as well as approval letters from the Virginia Department of Transportation, the
Frederick County Engineer, and the Winchester -Frederick County Health Department.
Once our department receives this information, I will recommend approval of this site plan.
Please contact me if I may answer any questions regarding this letter.
Sincerely,
Evan A. Wyatt
Planner II
EAW
cc: Pastor Darrell Waller, Winchester Church of God
1) North Loudoun Street P.O. Box 601
Winchcster. VA 22601 Winchester. VA 22604
r
COUNTY of FREDERICK
i
Department of Planning and Development
703/665-5651
FAX 703/678-0682
August 14, 1992
Greenway Engineering, Inc.
Attn: Mr. Austin Spitler
1104 Baker Lane
Winchester, VA 22601
RE: Winchester Church of God Site Plan Review.
Dear Austin:
I have completed my review of the above referenced site plan. Once the following items
are addressed, I will be able to recommend final site plan approval:
1) Provide address of owner/developer.
2) Include space labeled "Approved by Zoning Administrator".
3) Provide magisterial district.
4) Provide zoning of site to be developed.
5) Include use and zoning of all adjoining properties. (Our tax maps indicate that
Rodney L. & Ellen Cowley own property adjoining this parcel along a portion of the
north-eastern property line).
6) Include the location and dimension of required setbacks.
7) Indicate the proposed use of all buildings and areas.
8) Specify the height of all structures.
9) Are any signs proposed for this site? If so, specify their height and dimension.
10) Will there be any outdoor lighting fixtures? If so, indicate their location.
11) Will there be any outdoor trash receptacles? If so, include the pad and solid fence
for this area.
THE COURTHOUSE COMMONS
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
Spitler Letter
August 14, 1992
Page -2-
12) Please indicate any easements that will serve this site.
13) Provide parking calculations for this site. I can not determine at this point if
adequate parking has been provided.
14) Provide a key that provides designation of all surface materials proposed for this site.
15) The areas indicated as overflow parking must have a minimum of double prime and
seal surfacing and be striped.
16) If any landscaping is proposed for this site, please provide the location.
17) Include all appropriate erosion and sediment control measures for this development.
18) My file indicates that the Virginia Department of Transportation and the Frederick
County Engineer have not approved this plan to date. The comment provided by the
Health Department indicates that the area for the drainfield is approved, but other
issues need to be resolved prion to the issuance of a health permit. I will ask the
Health Department how they would prefer to address this issue regarding final site
plan approval.
This site plan is scheduled to appear on the Frederick County Planning Commission
bimonthly report on August 19, 1992. If the Planning Commission does not request formal
review of this plan, I will be able to recommend administrative approval once all of the
items specified in this letter are addressed. Please contact me if I may answer any questions
regarding this letter.
Sincerely,
Evan A. Wyatt
Planner II
EAW
cc: Mr. Garland DeHaven
•
SP 014 --qZ
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
_
1.
Name of proposed development
_
✓
Name and address of owner
l2
3
Name and address of developer
4.
Name, address, and phone number of designer
_
5.
Certificate of surveyor, engineer, or architect
6.
Date plan prepared and date of revisions
7.
A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval
A space labeled "approved by the Zoning
Administrator" for the approval signature and date
of approval
General
Site
Information
Y
N
_ 9. Location map (scale 1:2000)
0. Magisterial District of site
11. Scale of site plan (not to exceed 1:50)
12. North Arrow
13 Zoning of site
14 Use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Y N
15. Surveyed boundaries for all lots and parcels
Acreage of all lots included in the plan
7. The location and dimensions of all required setbacks
/ and yard areas
_ Location of all buildings, structures, and uses
A The proposed use of each building, structure, and
area
_ 20. The location and type of all dwelling units
_ 21. Ground floor area and total floor area of all
buildings With -FAR calculations for commercial and
8industrial zoning districts
22 The height of all buildings and structures
— _ The location and dimension of all signs
7
4P 0
Lots/Uses/Buildings & Structures (con't)
Y N/
7 Location of outdoor lighting fixtures
25. Location and nature of outdoor storage areas
1 26. Location and area of common open space
27. Location and description of all recreation facilities
28. Location of sidewalks and pedestrian ways
29 Location of outdoor trash receptacles
Roads
Y N
30. Name and number of existing and planned streets on
/ and adjoining the site
/ _ 31. Location of existing and planned streets on and
adjoining the site
32. Dimensions, boundaries, width, pavement, and
construction of planned roads
_ 33. Location and dimensions of all proposed
entrances from public right-of-ways
Utilities
Y N
34. Location of all utilities, including sewer and water
jlines with the size of lines, mains, and laterals
35 Location and width of all easements, including
— access, utility and drainage easements
36. Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Parking
Y N
Calculations describing the required number of
parking and loading spaces
-
38. Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing, and
other features to be used
_ 39. Location and dimension of all handicapped spaces
=.
lO
Natural Features
Y N
40. Existing and finished contour lines
7 41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
Landscaping
Y N
43 Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
1`�Rj
45. A stormwater management plan with run off
calculations and location and description of
facilities to be used
46� Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
0
COMMONWEALTH of VIRQI.NIA
RAY D. PETHTEL
COMMISSIONER
Mr. Austin Spitler
C/O Greenway, Inc.
1104 Baker Lane
Winchester, VA 22601
Dear Austin:
DEPARTMENT OF TRANSPORTATION
P. O. BOX 278
EDINBURG,22824
January 25, 1993
WILLIAM H. BUSHMAN
RESIDENT ENGINEER
TELE (703) 984-4133
FAX (703) 984-9761
Ref: Winchester Church of God
Route 522 North
Frederick County
We are in receipt of the above referenced project's revised site plans dated January 22, 1993.
It appears all of our earlier recommendations have been satisfactorily addressed. Please advise
the owner accordingly.
A land use permit will need to be applied for and issued to cover all proposed work on the
State's right-of-way. Said permit is issued by this office and will require a processing fee,
surety bond coverage and the salary and expenses of a State assigned Inspector. Our, turn
around time for a permit of this nature will be approximately thirty (30) days.
Enclosed you will find a copy of our Standard RW-203 Form Deed to cover the proposed
drainage easement adjacent to the Route 522 right-of-way. The deed will need to be completed
by the grantor and returned along with a certified plat of the easement for review by our
Right -of -Way Department. Satisfaction of this requirement will be needed prior to completion
Of the land use permit work.
Should you have any questions, please let me know.
Sincerely,
William H. Bushman
Trans. Resident Engineer
� �-, Z, -- -/ /, �. a, /, /Z, �
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior JAN i 6
1.9Q,�
RBC/rf
Enclosures
xc: Mr. Robert W. Watkins
0
0
COUNTY of FREDERI
Department of Planning and Developi
703 6h5
REQUEST FOR SITE PLAN C01414ENTS FA\ 703 o6
Virginia Department of Transportation
P.O. Box 278, Edi-nburg, Virginia 22824-0278
(703) 984=4133
The local office of the Transportation Department is located at
1550 Commerce Street, if you prefer to hand deliver this review
form.
6//5f9z
Applican Is name, address and phone number:
Name of development and/or description of the request:
WzYMq66725q CA(M)WY of 6042
Location:
Transportation Department Comments:
See attached letter from W. H. Bushman to Greenway, Inc. dated 01/25/93.
VDOT Signature and Date: /-/• //ZS
(NOTICE TO VDOT - PLEASE RETURN THIS FORM TO THE APPLICAN .) '
NOTICE To APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist the agency with their review. Also,
please attach TIME copies of your plans and/or ,pplication form.
Virsnnia
. ii?iara T'R:' 4
COMMONWEALTH Of VIRCjINIA
RAY D. PETHTEL
COMMISSIONER
Mr. Austin Spitler
C/O Greenway, Inc.
1104 Baker Lane
Winchester, VA 22601
Dear Austin:
DEPARTMENT OF TRANSPORTATION
P. 0. BOX 278
EDINBURG, 22824
January 15, 1993
WILLIAM H. BUSHMAN
RESIDENT ENGINEER
TELE(703)984-4133
FAX (703) 984-9761
Ref: Winchester Church of God
Route 522 North
Frederick County
Enclosed you will find the referenced project's revised site plan dated January 12, 1993.
Please revise the plans to reflect all recommendations in our earlier review letter to you (copy
attached) of July 28, 1992. Also, we ask a typical section of the proposed left turn lane along
Route 522 be incorporated into the plan. It should detail the same pavement design as shown
for the commercial entrance, a 12' width and a minimum 8' shoulder.
Once revised please resubmit four (4) copies for final approval. Should you have any questions,
please let me know.
RBC/rf
Enclosures
xc: Mr. R.
W. Watkins
Sincerely,
William H. Bushman
Trans. Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
JAN 2 1 �9q3
TRANSPORTATION FOR THE 21 ST CENTURY
. ,�� •r.>Ccri
COMMONWEALTH of VIRGINIA
RAY D. PETHTEL
COMMISSIONER
Rev. Darrell W. Waller
2313 Roosevelt Blvd.
Winchester, VA 22601
Dear Rev. Waller:
DEPARTMENT OF TRANSPORTATION
P. 0. BOX 278
EDINBURG• 22824
August 3, 1992
WILLIAM H. BUSHMAN
RESIDENT ENGINEER
TELE (703) 984-4133
FAX (703) 984-9761
Ref: Route 522 North (East Side)
at 0.28 Mi. N. of Route 679
Frederick County
This is to follow-up on our telephone conversation of July 31, 1992 concerning a proposed 80'
right-of-way on the northwest corner of the Winchester Church of God's property located at the
referenced location.
As I said, current VDOT sight distance requirements are met at this location to allow for the
construction of an entrance. However, whomever wishes to construct an entrance at this
location should be aware that all other land use policies and entrance requirements will have to
be met as well. The adjacent commercial entrance and median crossover could be a factor in
a future entrance design.
Should you have any questions concerning the above, please let me know.
RBC/rf
xc: Mr. R. W. Watkins
Mr. H. Bruce Edens
Sincerely,
William H. Bushman
Trans. Resident Eneineer
(��?rj�cd /6, eu�
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
15�L5�V
D
TRANSPORTATION FOR THE 21 ST CENTURY
RAY D. PETHTEL
COMMISSIONER
Mr. Austin Spitler
C/O Greenway, Inc.
1104 Baker Lane
Winchester, VA 22601
Dear Austin:
COMMONWEALTH of VIRCjI IA
DEPARTMENT OF TRANSPORTATION
P. O. BOX 278
EDINBURG,22824
July 28, 1992
WILLIAM H. BUSHMAN
RESIDENT ENGINEER
TELEI703I984-4133
FAX (703) 984-9761
Ref: Winchester Church of God
Route 522 North
Frederick County
As requested we have reviewed the above referenced site plan dated June 11, 1992. Our recommendations may
be found on the enclosed plans marked in red and as follows:
1. The northern entrance width of 40' appears adequate. However the southern entrance should be
widened to 50' in order to match the adjacent crossover width. A 200' left turn lane and 200'
taper will be required as shown. Also, the adjacent drainage structures and ditch lines will need
to be adjusted as necessary.
2. The proposed pavement design is to be revised as noted.
3. The curb & gutter type standard CG-6 is to be revised to standard CG-7 due to the speed limit.
The lengths of the entrance tapers are to be adjusted as noted.
4. In order to eliminate a portion of the proposed guardrail around the entrance access drive, we
suggest the area adjacent to the drive be filled. This could be accomplished by extending the
existing and proposed drainage culverts and the installation of a standard DI-7 drop inlet. A
drainage easement would be required as noted to accommodate this structure. This method would
certainly enhance the looks of the entrance and may be just as economical.
5. The existing sight distances, reference and speed limit is to be added to the plan as noted.
Please revise and resubmit four (4) copies for final approval. Should any changes be deemed necessary, please
design them to meet or exceed the above recommendations.
Should you have any questions please let me know.
RBC/rf
Enclosure
xc: Mr. J. B. Diamond
Mr. R. W. Watkins
Sincerely,
William H. Bushman
Trans. Resident Engineer
By: Robert B. Childress
Hwy. Permits & Subd. Spec. Senior
TRANSPORTATION FOR THE 21 ST CENTURY
0
0
COUNTY of FREDEK
I Ic
IDepartment of Planning, and De%elup
703 t,
REQUEST FOR SITE PLAN CO.'MIENTS FAX 103 `'"
Frederick County Inspections Department
P.O. Box 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Inspections Department is located at 9 Court
Square in Winchester, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
Name of development and/or description of the request:
.4 .
Irsli�vc�c�716W c,�r�RCr oC ,Pv
Location:
Inspections Depa-ct-ment Comments:
Building shall comply with the Virginia Uniform Statewide Building Code and
Section 302, Use Group (Assembly) of the BOCA National Building Code/1990.
Other codes that apply are title 28 Code of Federal Regulation, Part 36
Nondiscrimination on the Basis ot Disability by PuMic Accommodations and in
Con¢nercial Facilities. West parking lot handicap spaces shall have no greater
an a l:5U k2o) slope in all directions. (Section 4.6.3 ADA)
Inspect. Signature & Date:
( NOTICE TO INSPECTIONS -
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
possible in order to assist '.he agency with their review. Also,
please attacha copy of your plans and/or application form.
9 Court Square -
P.O. Box 601 - Winchester. Virginia - 22601
C-04TY OF FREDERICK, VIRGINI411.
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 0706920532 Date Received 061592 Date Reviewed 070692
Applicant Name Greenway Engineering
Address 1104 Baker Lane
Winchester, VA 22601
Project Name Winchester Church Of God
Phone No. 703-662-4185
Type of Application
1st Due Fire Co. 15
Election District
Site Plan
Gainesboro
Current Zoning
1st Due Rescue Co. 15
RECOMMENDATIONS
Automatic Sprinkler System X Residential Sprinkler System
Automatic Fire Alarm System X Other
Emergency Vehicle Access;
Adequate X Inadequate Not Identified
Fire Lanes Required; Yes X No
Comments: Posted fire lanes required at building entrance per
Frederick County Chapter 10.
Roadway/Aisleway Widths;
Adequate X Inadequate Not Identified
Special Hazards Noted; Yes X No
Comments: Lack of water supply for fire protection.
UH
0
Hydrant Locations;
Adequate Inadequate Not Identified X
Siamese Connection Location;
Approved Not Approved Not Identified X
Additional Comments: 1> Recommend storm water management pond be
installed in such a manner to hold water full time. Further request
installation of dry hydrant on S.W.M. Pond to utilize water for fire
protection. Access to hydrant would be necessary. 2) During
construction, access for emergency vehicles must be maintained at all
times. 3> Post temporary street signs identifying property. 4> Burning
of construction debris on site is prohibited.
Review Time .5 hr.
PLANS ������MA��SAAFRE[}E(/C-0OUNTY
Fire Marshal
i COUNTY of FREDERICK
Harvey E. Strawsnyder, Jr., P.E.
Director of Engineering & Inspections
9 North Loudoun St., 2nd Floor
703/665-5643
January 25, 1993
Mr. John E. Gast
Greenway, Inc.
1104 Baker Lane
Winchester, Virginia 22601
RE: Site Plan Approval
Winchester Church of God
Gainesboro Magisterial District
Frederick County, Virginia
Dear Mr. Gast:
The stormwater management and erosion and sediment control plans
included with your recent submittal are approved for the new
Winchester Church of God site development.
Please have your client's contractor contact this office so that
we can review the installation of the erosion and sediment control
measures.
Sincerely,
Ha �veyyStrawsnyder, Jr., P.E.
Director of Public Works
HES:rls
1
cc: Planning and Zoning
file
Fax: 703/678-0682 - P.O. Box 601 - Winchester, Virginia - 22604
FREDERICK COUNTY ENGINEER
9 NORTH LOUDOUN STREET, 2ND FLOOR
WINCHESTER, VIRGINIA 22601
(703) 665-5643
SITE PLAN
DATE: June 26, 1992
PROJECT: Winchester Church of God
Route 522 North
Gainesboro Magisterial District
Frederick County, Virginia
DESIGNER: Greenway, Inc. "
1104 Baker Lane
Winchester, Virginia 22601
COMMENTS
1. Adopt a runoff coefficient, "C" of 0.2 for pre -development
conditions in the undisturbed limestone areas. Resubmit
calculations for our review.
2. Provide a post -development map delineating relative
drainage areas similar to the map provided for the pre -
development.
3. Provide flared end sections for detention basin outlet
pipe.
4. Indicate typical pavement section for parking areas.
5. Provide erosion and sediment plan for our review. Also,
provide narrative describing soils, erosion and sediment
control measures and stormwater management plan.
Harvey E. rawsnyder, Jr.,P.
Director T. Engineering and
Inspections
Lord Fairf• Environmental Hearth District
800 Smithfield Avenue
P. O. Box 2056
Winchester, Virginia 22604
(703) 722-3480 FAX (703) 722-3479
Counties of- Clarke, Frederick, Page, Shenandoah, Warren, and City of Winchester
May 5, 1994
Evan Wyatt
Frederick County Planninq & Zoning
107 North Kent Street
Winchester, VA 22601
Re: Church of God, 522 North, Frederick County
Dear Mr. Wyatt:
The drainfield for the Church of God is designed to handle 1,620 gallons per day.
A holding tank has been designed to store the peak load on Sunday for the 850
seat sanctuary and accommodate a child care center with 60 children and 7
employees.
Food preparation is to be limited for the day care operation; only snacks and
prepackaged foods are to be provided. The sewage disposal system is designed
to allow for a small kitchen but not a cafeteria.
The Sewaqe _Handling and Disposal_ Regulations only address facilities with
showers. The facility plans to have a small gymnasium, which as long as no
showers are provided, the current sewage disposal system would be adequate.
If you need further clarification, please contact me at 722-3480.
Sincerely,
Steven Stiefel, VHS.
Environmental Health Manager
SS/rc
Lord Fairfax Environmental Health District
800 Smithfield Avenue
P. O. Box 2056
Winchester, Virginia 22601
'= U (703) 722-3480 FAX (703) 722-3479
Counties of Clarke, Frederick, Page, Shenandoah, Warren, and City of Winchester
CERTIFIED MAIL
Winchester Church of God
2312 Roosevelt Blvd.
Winchester, VA 22601
August 5, 1994
It has come to my attention that the new church on Rt. 522 North is including
a gymnasium and classrooms. The sewage disposal system permit which I issued
(SD92-210) on June 14, 1993, is only for achurch
sanctuary
in any of with
the p kitwh ich n.
There was no mention of classrooms or a gym
I received. The application which I received from your
Mr. Garland
Dehaven, made no mention of classrooms or a gym(copy enclosed).
None of the plans submitted by either Greenway Engineering or Gus Anderson
mentioned that there would be classrooms or a gy n
lcome to
come and look in my file to see what information I have. But no one ever
mentioned classrooms and a gym.
The addition of classrooms, if used during the week, and a gymnasium to the
Church will increase your daily water usage, and will necessitate an expansion
of your sewage disposal system. In order for the Health Department to correctly
size your drainfield, you must submit a new application with a full and accurate
description of proposed facilities.
You may wish to contact Mr. Anderson, your engineer, for advice in expanding
the sewage disposal system.
Also, the Health Department required that permanent water-saving
gbplumbing
fixtures be installed. Please be sure to include these in y g
plans, if they are not included already.
Please contact me with any questions you may have.
ENC: copy of application
CC: Frederick County Inspections
Frederick County Planning- Attn,
Greenway Engineering
Garland Dehaven
file
Sincerely,
Evan Wyatt
O
Greg Lloyd
Environmental Health Specialist
VeDHvIRGINIA
OF HEALT1HNT
t ngp( fine You and Yrwr Environmrnf
0 46
Lord Fairfax Environmental Health District
800 Smithfield Avenue
P. O. Box 2056
Winchester, Virginia 22601
(703) 722-3480 FAX (703) 722-3479
Counties of Clarke. Frederick, Page, Shenandoah, Warren, and City of Winchester
TO: Frederick County Planning And Zoning
9 Court Square
Winchester, Virginia 22601
FROM: Jim Webb, Environmental Health Specialist
Frederick County Environmental Health Dep tment
800 Smithfield Avenue
Winchester, Virginia 22601
SUBJECT: Winchester Church Of God
Septic Sewage Disposal System
Route 522 North
DATE: January 22, 1993
This office has approved the above site for a septic system to handle the
proposed capacity. The construction permit is pending final approval of
Engineered Plans. The Health Department has no objection to the church being
allowed to begin construction now.
JW/dm
PC: Frederick -Winchester Environmental Health Department Files
JAN 9 6
VIvIRGINIA
DEPARTMENT
OF HEALTH
Vmim loyx You &nd Yow fnvo"mmru
Lord Fairfax Environmental Health District
800 Smithfield Avenue
- P. O. Box 2056
Winchester, Virginia 22601
(703) 722-3480 FAX (703) 722-3479
Counties of Clarke, Frederick, Page, Shenandoah, Warren, and City of Winchester
.Tune 29, 1992
Mr. Garland DeHaven
Route 5, Box 688
Winchester, Virginia 22601
Re: Winchester Church Of God
Application Number SD-92-021.0
Location: Route 522 Across From
Omps Garage
Frederick County, Va.
Dear Mr. DeHaven,
The drainfield area proposed by your consultant on the above
noted property has been approved by this office. Permit issuance
is pending submittal and approval of engineered plans for septic
tanks, pump tanks, pumps, pump controls, and force mains to
accommodate the proposed sewage flow.
Please have your engineer contact me at 722-3481 for details.
Sincerely,
Doug Dailey,
Environmental Health Supervisor
Frederick County Health Department
DD/dw
PC: Frederick -Winchester Environmental Health Department Files.
VDHOFEVIRGINIA
EALTHNT
Vnihr ling You and Your fnOnrwnmt
12/23x92 16 : 13 1&700 2 3479 ENV:Health 0690
Lord Fairfax EnN ironmental Health District
800 Smithfield Avenue
P. O. Box 2056
--,-4 Winchester, Virginia 1.2601
"'o
0
— (703) 722-3480 FAX (703) 72203479
7,
Counties of- Clarke, Frederick, Page, She 'j,
FAX COVER PAGE
TO.
FROM:
'�WMBER OF PAGES TO FOLLOW:
; R G E:�'f L Y -,
FOR YOUR:(
COMMENTS
APPROVAL
SIGNATURE
(.')MMFN
IMMEDIATELY: A.S. A. P.
AS: DISCUSSED
REQUESTED
PLEASE: HANDLE
REVIEW
VINC,INIA
DIPARTMf
V"" DHoi 41AITM~
■
I
12/23/92
16 14 e70,!'L2 3479 ENb Health 0690
I COUNTY ot' FRED1_R
Department of Pianntn__ and De, r,or
_0,
1 E UEST FOR SITE PLAN COMMENTS
Frederick-winchester Health Department
P.O. Boa 2056, Winchester, Virginia 22601
�Qv (703) 667-974 7
The Frederick -Winchester Health Department is located at the
intersection of Smithfield Avenue and Brick Kiln Rcad, if you
prefer to hand deliver this review Corm.
CP/i5/9e
Applicant's name, address and phone number:
C.4vsTi&/TGEi2 _
Name of development and/or description of the request:
r---
Location:
--- --- — — - --
Health Department Co=nents:
.5" a#jak
Health Signature and Date: pt. "0' L�� '%�yz
(NOTICE TO HEIwTH DEPT. - PLEA TURN TIfIS FORM TO A2PLICA.NT.
NOTICE TO APPLICI,NT
It is your res7,cnsihility to complete this Corm as accurateiv a5
;:os�iblP in o.aer to assist the agency with tneir review. Also,
please attach a copy of your plans anaior application *orr.,.
� t
I' 23: c H 15 '$70* r Hea i t h 06'j
Lord Faiffax Environmental Health District
800 Smithfield Avenue
P. U. Box 2056
Winchester, Virginia 22601
(703) 722-3480 FAX (703) 722-3479
Counties of Clarke, Frederick, Pate, Shenandoah, Warrer; and City of Winchester
June 29, 1992
Mr. Garland DeHaven
Route 5, Box 688
Winchester, Virginia 22601.
Re: Winchester Church Of God
Application Number SD-92-0210
Location: Route 522 Across From
Omps Garage
Frederick County, Va.
Dear Mr. DeHaven,
The drainfield area proposed by your consultant on the above
noted property has been approved by this office. Permit issuance
is pending submittal and approval of engineered plans for septic
tankn, pump tanks, pumps, pump controls, and force mains to
accommodate the proposed sewage flow.
Please have your engineer contact me at 722-3481 for details.
Sincerely,
Doug Dailey,
! Environmental Health Supervisor
Frederick County Health Department
DD/dw
pc: Frederic: -Winchester Environmental Health Department Files.
VD�D anNE" ENT