Loading...
HomeMy WebLinkAbout005-91 Century Graphics - Stonewall District - Backfile (2)CENTURY GRAPHICS CORPORATION BUILDING EXPANSION STONEWALL INDUSTRIAL PARK EROSION AND SEDIMENT CONTROL PLAN STORMWATER MANAGEMENT PLAN Prepared By G. W. Clifford & Associates, Inc. 200 N. Cameron Street P. O. Box 2104 Winchester, VA 22601 703-667-2139 JANUARY 1991 I G. W. CLIFFORD & ASSOCIATES, INC. MEMORANDUM To: Review Agencies ' From: Ron Mislowsky, P.E. Re: Erosion and Sediment Control Study Stormwater Management Plan ' Century Graphics Expansion Date: 3 January 1991 ' Project Description - 200 North Cameron Street P.O. Box 2104 Winchester, Virginia 22601 703-667-2139 Fax: 703-665-0493 ' The purpose of this project is the construction of a new 65,146 square foot addition to the existing building. The site is located in Stonewall Magisterial District, Frederick County, Virginia on the easterly side of Virginia Secondary ' Route 862. In addition to the building expansion, a new employee parking lot and access roadways will be provided. An area of approximately 4.1 acres will be disturbed during construction. ' Existing Site Conditions - ' The proposed site is an area of maintained lawn area covered with grass. There are no trees or shrubs within the proposed construction area. The site slopes ' from east to west to an existing defined swale with existing slopes ranging from approximately 1% to 2%. A pre development C factor of .2 was used for existing open spaces and .9 for buildings and pavement. ' Soils - The site is in the Frederick-Poplimento-Oaklet Soil Association. The ' area is characterized by gently sloping to steep, well drained soils that have a fine textured subsoil, formed in material weathered from limestone. ' For purposes of design runoff conditions, antecedent moisture condition H (normal consideration for the mid -Atlantic region) is assumed. Soils are of the I Oaklet (32B) Series. These soils have a moderate rate of water transmission, therefore SCS Soil group "C" is adopted. A copy of the soils map is enclosed. k I ' Stormwater Management - There is a possibility that the owners may expand further, adding an ' additional 40,000 sq. ft. of floor area. All detention calculations reflect the development of this added floor space. The rational method was used to determine peak flows to storm structures and these values were used to size all storm piping. The design meets ' VDOT standards. All piping will carry the ten year storm. The rational method, and hydrographs based on the time of concentration equaling storm duration were used to estimate the peak run-off of a 2-year, 10-year, and 100-year and the Type ' II storm distribution, for the areas flowing to the Detention Pond, after development. The site has been evaluated on a 2 and 10 year/pre and post development basis. The goal of this study is to meet or exceed the control ' requirements of pre two -post two. The post -development two year discharge at the northwest corner of the property will not exceed the predevelopment two year ' storm runoff to the same point. The site lies in the Stonewall Industrial Park. A stormwater ' management plan for the park was completed in 1985. This plan used the rational method to determine runoff rates and a post development C factor of .52 for the developed park. The time of concentration for the drainage area, of which this ' site is part, is 13 minutes. The approved stormwater management plan allows a post development discharge from the site of 20.63 cfs for the two year storm, and 28.08 cfs for the ten. ' Part of the site is existing developed. Theweighted C factor is .38. As ' the time of concentration is specified by the stormwater management plan, it remains at 13 minutes. The existing runoff from the site is 15.0 cfs during the two year storm, and 20.4 cfs for the ten. These values are below that specified by the ' stormwater management plan. In order that this expansion not effect the Red Bud Run watershed, a detention pond is proposed. The pond will act to keep the net two and ten year flows from the site below the existing runoff rates. A dry pond has been designed. ' A ten inch pipe will control the release rate from the pond. During the 100 year storm the depth of water is eighteen inches. The inflow hydrographs, and routing calculations are attached. An analysis of the flows which exist, the allowed ' flows per the stormwater management plan, and the estimated post development JAN1go 'Q r ResNaV ED r 1 1� co c��. � MPANIES flows are also provided. The post development two year net flow from the site is ' 14.05 cfs, the ten year flow is 18.61 cfs. If the future 40,000+ sq. ft. expansion requires regrading of the detention ' pond area, maintaining the cross section area of the detention pond contours will ensure the validity of the flow and retention estimates presented here. ' All flow from the site is directed to an existing storm conveyance channel with flows to the west to Red Bud Run. As the predicted post development flows ' do not exceed what currently exists, this channel will be adequate. Sediment and Erosion Control - ' In order to ensure the quality of runoff does not decrease during construction, we have provided for silt fencing, straw bale barriers and a ' construction entrance to minimize erosion. Unless otherwise indicated, all vegetation and structural erosion and sediment control practices will be constructed ' and maintained according to the most current minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. The erosion control measures are specified on the plans. The design at the detention ' basin outfall provides for some sediment storage during construction. The detention pond will need to be maintained to ensure its continued ' effectiveness. The basin is to be seeded at 40 pounds per acre with a mixture of 57% Kentucky, 31 % Tall Fescue, and 12% Redtop. Maintain the basin by mowing when the grass height exceeds 6 inches. Inspect outlet periodically. Remove sediment ' and debris as required to ensure proper operation and appearance of the basin. Inspection of the basin should be conducted after each major storm. At minimum, ' inspection of the basin should be performed annually. Particular attention shall be placed on the grass planted on the basin side slopes to ensure the elimination of erosion. The stormwater plan outlined within this report meets all of the requirements of the Frederick Planning Commission Regulations. The intent of the ' plan is to reduce and where possible eliminate the effects of this development on the surrounding area. Revised 1.1 1 /7/91 1 Maintenance - All soil erosion control structures shall be checked weekly by the contractor during this construction period and after construction is completed until grass cover is established. Sediment retained by these structures shall be ' continuously removed and placed in an area of the site specified. Damage to soil erosion control structures shall immediately be repaired when identified by the contractor. The contractor shall cooperate with all agents of the County, the rEngineer and others who may identify needed facilities or work in order to protect the environment within the subject of this report. ICalculations - I Attached. ICentury Graphics I Soils Map J F F P FREDERICK COUNTY VIRGINIA SHEET NL 4r 74 1 tt ilk -If 440fZ/` -op ,y� ICentury Graphics tPeak Flow Analysis Two and Ten Year ' Storm Events tRevised 2/12/91 Revised 2/13/91 ' Revised 2/19/91 Existing Runoff From Site: Allowable Runoff From Site: Impervious Area- Acres C CA Per Stormwater Management Plan for the Bldg 1.10 0.90 0.99 Stonewall Industrial Park, Dated December 1985 Paved 1.70 0.90 1.53 Prepared by G.W. Clifford & Assoc Pen Space - Site Area-11.02 Ac ' Grass 8.22 0.20 1.64 C Factor= 0.52 T(c)= 13.00 Min T(c)min= 13.00 Total CA= 4.16 i(2)in/hr= 3.60 i(2)= 3.60 in/hr t(IO)in/hr= 4.90 Weighted C= 0.38 i(10)= 4.90 in/hr 1 Q(2)existing= 14.99 cfs Q(2)allowed= 20.63 cfs ' 2 Q(10)existing= 20.40 cfs Q(10)allowed= 28.08 cfs ' Proposed Runoff From Site: Drainage Area Acres C CA tA Railway 0.69 0.35 0.24 To Detention Drainage Area Detention to Pond= 6.69 ' B Bldg Grass 0.33 0.9 0.24 0.20 0.30 0.05 To Detention CA to Detention Pond= 3.49 Weighted C to pond= 0.52 C Pavmt 0.50 0.90 0.45 To Detention ' Bldg 1.51 0.90 1.35 (Future Additions Not Shown) Grass 0.73 0.20 0.15 ' D Bldg 0.59 0.90 0.53 To Detention Drainage Area Direct Offsite= 4.70 E Grass 2.10 0.20 0.42 To Detention CA Direct Offsite= 3.22 ' F Bldg 1.1 0.9 0.99 Direct Offsite Weighted C Offsite= .69 Pavmt 2.16 0.9 1.94 Grass 1.44 0.2 0.29 T(c)min= 13.00 Q(2)to Pond= 12.57 cfs Q(2) Offsite= 11.59 cfs i(2)in/hr= 3.60 Q(10)to Pond= 17.11 cfs Q(10) Offsite= 15.79 cfs i(10)in/hr= 4.90 Q(100)to Pond= 24.80 cfs Q(100) Offsite= 22.88 cfs ' i(100)in/hr= 7.10 ' Allowable = Existing Flow From Pond minus offsite Q(2)= 3.40 ' Q(10)= 4.61 Actual Peak Flow From Det Pond Total Post development Flow From Site ' From Det Pond Routing = offsite plus pond Q(2)= 2.10 cfs Q(2)= 13.69 cfs Less than 1 above, O.K. Q(10)= 2.34 cfs Q(10)= 18.13 cfs Less than 2 above, O.K. ' Q(100)= 2.72 cfs Q(100)= 25.60 ■ 1 ICentury Graphics I Culvert Sizing Data I I Revised 2/12/91 Revised 2/13/91 Revised 2/19/91 DRAINAGE AREAS DA Acres C T(c) i(10) Q(10)cfs A 0.69 0.35 5 6.8 1.64 B C 0.57 2.74 0.35 0.71 5 15 6.8 4.9 1.36 9.53 D1 0.06 0.90 5 6.8 0.37 D2 0.12 0.90 5 6.8 0.73 n(RCP)= 0.013 tD3 0.12 0.90 5 6.8 0.73 n(CMP)= 0.023 D4 0.12 0.90 5 6.8 0.73 n(PVC)= 0.02 D5 0.12 0.90 5 6.8 0.73 0.06 0.90 5 6.8 0.37 'D6 E 2.10 0;20 15 4.9 2.06 F 4.70 0.69 15 4.9 15.79 lulvert Inv.In Inv.Out L(ft) D(in.) S(%) Q(des)cfs q(10)cfs v(10)fps From: Type Cap.Chk (Ex) 706.50 706.00 50.0 15 1.00 6.47 1.64 5.28 Str 1 RCP o.k.Ex.Cul.(NIC) 705.65 705.25 80.0 15 0.50 4.58 3.00 3.73 Str 2 RCP o.k. '2 Bl 708.00 707.50 10.0 6 5.00 0.82 0.45 4.16 DS PVC o.k. B2 708.00 707.50 10.0 6 5.00 0.82 0.45 4.16 DS PVC o.k. 'B3 Dl 708.00 709.00 706.50 706.00 80.0 6 157.0 8 1.88 1.91 0.50 0.45 1.09 0.37 2.55 3.11 DS DS PVC PVC o.k. o.k. D2 711.00 706.00 157.0 8 3.18 1.41 0.73 4.01 DS PVC o.k. D3 711.00 706.00 157.0 8 3.18 1.41 0.73 4.01 DS PVC o.k. D4 711.00 706.00 157.0 8 3.18 1.41 0.73 4.01 DS PVC o.k. D5 711.00 706.00 157.0 8 3.18 1.41 0.73 4.01 DS PVC o.k. D6 709.00 706.00 157.0 8 1.91 1.09 0.37 3.11 DS PVC o.k. Str FROM: Q(10)cfs INV. TYPE Sx Hw/d T(ft) Hw Elv 1 A 1.64 706.50 ES-1 0.0070 0.60 107.14 707.3 ' 2 B 1.36 705.65 ES-1 0.0054 0.80 185.19 706.7 DS B1 0.45 708.00 Corr. PVC Drainspout DS B2 0.45 708.00 Corr. PVC Drainspout IDS B3 0.45 708.00 Corr. PVC Drainspout DS Dl 0.37 709.00 Corr. PVC Drainspout DS D2 0.73 711.00 Corr. PVC Drainspout D3 0.73 711.00 Corr. PVC Drainspout 'DS DS D4 0.73 711.00 Corr. PVC Drainspout DS D5 0.73 711.00 Corr. PVC Drainspout IDS D6 0.37 709.00 Corr. PVC Drainspout Century Graphics Detention Pond Data H I **1* ***�********�*****�**����*********��***�*��****�����**�***�**������.-� * ROUT VERSION 5.3b ** PROJECT: Century Graphics Det PA �*************'w*4.��� '- '' - �1ypes: ' �:weir; - �:pipe; 3:Riser) 0� 1: Type 2: Flpv�+�"" /++` ,, L _--'_--_. Length (ft) Coefficient Elevation (ft) Diameter (in� Orifice Elevation (ft) Orifice Diameter in, Orifice Elevation (ft) Orifice Diameter (In) Orifice Elevation (ft) Orifice Diameter (in) Invert Elevation (f�) Diameter (i-.) Orifice Diameter (in� Length (ft) Manning's n Slope (ft/ft) Entrance Loss Coefficie face: 20: Initial Elevation (ft) Pond Character isti�s: � 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: Structu.re 1 2� pipe (�.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0O .J.O0 7C3.7� 30.00 0.013 O.008 mt 0.6 703.75 Sect�o'. ��evation � 703.75 2 704.00 3 705.00 4 706.00 Structure 2 1� We�r 7�5.25 20.0� 3.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.;00 -- ----- 0.0C 2500.0� 26000.00 42000.00 ~ 1 1 ' Century Graphics ' Detention Pond Two, Ten and ' 100 Year Storm ' Routing 1 trol: RW = Riser act4ng as a weir RO = Riser acting as an ori�ice Pl = Hori�cntal pipe in inlet contr�� PO = Hcrizontal pipe in outIet �.me lnflow Pipe Weir Total E]ev Stcragc (cfs> (cfs) (cfs> (cfs) (�t> ft) N� ---------------------------------'------------------------- (cu 0'00 1.0 0.96 2'89 PI 0.0 0.36 704.1� �86.3� 7.0 6.73 0.6 PI 0.O 0.58 704.22 1,�64.06 8.0 7.70 0.7 PI1,777.73 9.0 8.66 0.8 PI 0.0 0'81 7o4'33 2,240.68 949- ..3� N�16.0 11.35 10.78 1.6 1.7 PI Pl 0.0 0'0 1.58 � 69 704.u3 5,86�./7 4-4 26 N�17.0 10.20 1.8 PI 0.0 1^78 704^7» 69-4^72 18.0 9.62 1.9 PI 0.0 1.87 704.72 7 45u C2 9.0 9.05 1.9 PI 0.0 1'?5 7�475 7'902'9� .99 Pi P1 5CL �D � 1E0 YEAR STORM ROUTINa Control: RW = Riser acting as a weir N� RO = Riser acting as an orifice PI = Horizontal pipe in inlet control PO = Horizontal pipe in outlet control N� Time Inflow Pipe Weir Total Elev (min) (cfs) (cfs) (cfs) (cfs) (ft) 0.00 0.0 0.0 0.00 703.75' 11 11 11 11 11 11 11 11 ,^ v.v v.vD /oo.uo 2.0 2.62 0.1 PI 0.0 0.11 703.92 3.0 3.93 0.2 PI 0.0 0.21 704.00 4.0 5.24 0.3 PI 0.0 0.31 704.07 5'0 6.55 0.4 PI 0.0 0.44 704.15 6'0 7.86 0.6 PI 0.0 0.5E 704.22 7'0 9.16 0.7 PI 0.0 0.72 704.29 8'0 10.47 0.9 PI 0.0 0.86 704.35 9'0 11.78 1.0 PI 0.0 1.01 704.41 10.0 13.09 1.2 PI 0.0 1.17 704.48 11.0 14.40 1.3 PI 0.0 1.33 704.54 12.0 15.71 1.5 PI 0.0 1.49 704.60 13.0 17.02 1.7 PI 0.0 1.66 704.65 14.0 16.24 1.8 PI 0.0 1.82 704.71 15.0 15.45 2.0 PI 0.0 1.97 704.76 16.0 14.67 2.1 PI 0.0 2.07 704'80 17.0 13.88 2.1 PI 0.0 2.12 704.83 18.0 13.10 2.2 PI 0.0 2.16 704.87 19.0 12.32 2.2 PI 0.0 2.20 704.90 20.() 11.53 2.2 PY 0.0 2.23 704.92 21.0 10.75 2.2 PI 0.0 2.25 704'94 22.0 9.96 2.3 PI 0'0 2'27 704.95 23.0 9.1E 2.3 PI 0.0 2.28 704.96 24.0 8.40 2.3 PI 0.0 2.29 704.97 25.0 7.61 2.3 PI 0.0 2.30 704.01 26.0 6.83 2.3 PI 0.0 2.31 704.99 27.0 6.04 2.3 FT 0.0 2.32 704.90 28.0 5.26 2.3 P! 0.0 2.73 705.00 29.0 4.48 2.Z Pl 0.0 2.33 705.nC 30.0 3.69 2.3 Ql 3.w 2.31 705.9 31,0 2.9i 2.3 PI 0.0 2.34 705.01 32.0 2.12 2.1 PI 0.0 2.34 705.01 33.0 1.34 2.3 Pl 0.0 � 2.34 705.00 Storage (cu ft) 0.00 36.78 129.80 306.38 560.56 928.26 1,368.17 1,866.54 2,432.66 3,066.77 3,768.92 4,539.()3 5,176.96 6,282.62 7,l91.17 8,039.57 8,829.92 9,567.87 10,254.58 10,890.69 11,476.72 11,802.16 12,379.3,-�) 12,367.S9 12,607'72 12,818.6-7: 13,000 5� 11,1t3.22 |1,27A.7� 13,371.03 i3,476.0-/ 13.47n.�G it, 492.!C 13`423.83 11 —1 0 4J U "A 4J H L :J, U1 ill fTj ro . H rq 13-' CY, El CL - 7 r .,I .,q 4-) 4-1 r6 ro U 41 -P r6 T c c 0 0 L N In M L L -:-q 0 0 Cr x 3: 'r 11 if 11 11 30-0 Lr, cr- CL CL Li L 4-1 CJ ,J C. r-, 03 i <1 vt f .,. •J) 4 Lf 1 r Lr.1 ro tt tzt r. 0 4-1 C, 4 0 r, co 'D r". K.i tzr OD o- Lr,., 0, 0 U.; � tt P, i": r.4 IN N' .1 -1:, J Zi w "0 fu r-, 0- U3 4- W-- L in -H 4- cu u :3 — 3 — 0 Ln .---1 4- 4- U C .-4 LO -1 ., D Lf) t') .q T, 1'-"' C, r- ct --1 03 !---) a] I,- 't I --. U), . !..i ...i t... I - I I f f"! ".:; -J) -4) <1 r- CO 0, 0 V C-4 ".' t.*'.i :zt 6 b 0) 03 01 01 10 0 ,- ("A CA ( I '.. 4• 4•• 4• 4 L, U71 L.i IF! UO CJ D U) U") LO F r, -1. <1 0.1 r- .:t C*.4 C-4 Ki 01 r'-- LO i r', --i -4:1 :1 V'J Lf) r- 0'. r,.- 0"- . i C-i LO IT; 4'1 t-, . . . . . . . . . . . . . . . . . C. C. 0 0 0 0 "D Q- -j- CL Q- 0- L Cl- CL i:L CL LL t"L ilk 0- fi- CL LL Cl- u- 11. 'IL OL U- J- r-, 01 -4 C'-j (-4 t"j ct ',I' Tj Lf") Vi A) <1 j'; '-I': "'A r,- 0'. -4 fej if 'I) 'J) '40 ('-4 CN N N CA V! N C-4 (N N N IN N N, "'.41 t 111-j IN N (1-4 (1-4 0 --, 01 (), 01 01 M 00 W r, -43 t', 01 LFJ C 4 0) Lrj --i P` It j —' 03 tt 0, rl- -40 Lo 't t.".1 C-4 -q C, 0, 0) fl, -,0 Lf) fl) 04 -4 01 M N U-j tzt K) 0 CY: 1 It t"i N C' 0' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -A Ln r" 01 -A t."I 10 r.- M .-,, N 1�t t-*j CA -q -4) Lf) nt !) IN --I . '�l 04 N N CA C-4 F4 - -1 -4 -1 -q ,-4 --q --1 -4 -f -, 1-4 -' - - i fil c I . . . . . . . . . . . . . . I . . ... . . . 't , -It i, , . G -H I --D --4 (%-q' et LO•ri tN (TJ 0' t-".f '�t Tj fJ N 0) 0 -1 C.-I E I N CA (A C-J L� FEB z1 MR D U SITE PLAN CHECKLIST The application is not complete if the following are not present <MlIql 1. 1 set of comment sheets from the following agencies along with any marked copies of the plan: VDOT City of Winchester zIzotalI -OK- 2/2-5/9I -LK- 3/5-hi pY- l/ Co. San. Auth. Inspections Fire Marshall Engineer Co. Health Dept. Parks & Rec. Airport Authority OftA / 2. 1 copy of the SITE PLAN Application ,Z1 3. 5 copies of the plan on a single sheet �IJA— 4. 1 reproducible copy of the plan (if required) N A 5. a 35mm. slide of the plan (if required) TRACKING DATE Application Received Review/Invoice received from Engineer O,c� :/p00. v 8D• Fee Paid (amount $ /�v�� ) G,o— WA Site Plan heard by Planning Commission (if required) Final Site Plan submitted with review agency, Planning Commission, and staff comments addressed. RECEIPT NsE 0229"3 AMOUNT DUE AMOUNT OUNT PAID BALANCE LANCE DUE PAID BY CASH CHECK ❑ OTHER OF PLANNING AND DEVELOPMENT �,. UH I SQUARE WINCHEbTER, VIRCINIA 2^_501 RECEIVED FROM ADDRESS - -le -k- � THE SUM 0P/y��1 �L�1yyL'L �%YT Xf%L!/'!!r/� 1 DOLLARS • /y ' it 1.-' . t FOR Co (h 1L. 6u BY i 5A!y=) 6-Cl COUNTY of FREDERICK Department of Planning and Development 703 / 665-5651 FAX 703/678-0682 March 25, 1991 Howard Shockey & Sons, Inc. ATTN: Mr. Terry Stone Box 2530 Winchester, Virginia 22601 Dear Terry: The Frederick County Planning Department administratively approved Site Plan #005-91 of Century Graphics on March 20, 1991. This plan calls for the construction of a 391900 square foot addition for printing and storage, a fire lane to provide fire and rescue access to the new addition, two new fire hydrants, additional concrete and asphalt for loading and maneuvering, a stormwater detention pond, and all appropriate erosion and sediment control measures. Enclosed is a copy of the approved site plan for your records. If I may answer any questions regarding this letter, please contact me. Sincerely, Q. i Evan A. Wyatt Planner II EAW/dds cc: Mr. Charles W. Orndoff, Sr., Stonewall District Supervisor Mr. Gerard Eberts 9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601 COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. Ql/��Lle4 % Date Received Date Reviewed 4 �/ Applicant Name Address �/�O. Z2,, 2J�3o Project Name Phone No.3- Type or Application J`,7E /�•�� Current Zoning /4/ ist Due Fire Co. /� 1st Due Rescue Co. /3 Election District Sic.iEsit��t RECOiMENDATIONS Automatic Sprinkler System A Residential Sprinkler System Automatic Fire Alarm System X— Other Emergency Vehicle Access; Adequate X Inadequate Not Identified Fire Lanes Required; Yes X No Comments: Roadway/Aisleway Widths; Adequate .11C Inadequate Special Hazards Neted; Yes _ Comments: Not Ident:ric?d No V • • Hydrant Locations; Adequate X Inadequate Siamese Connection Location; Approved Not Approved Not Identified Not Identified Additional Comments: •.(0 7- G, / Ts/r" s�Uif/- k.-'E_hT `-,r ,, 36 e-W 71-1F c-,y 74-2-- -�' f/.ct O/Lfe X C'e�/jinit;vTs O,�/ �fE �,CLeiG:c.-iL-- ,PC�Ji%C Review 1-1 � Douglas A. Kiracofe Fire Marshal ^ ^ UNTY OF FREDERICK, VlRGI���� ��m� FIRE MARSHAL'S OFFICE � LAND DEVELOPMENT COMMENTS Control No. 011491044 Date Received 011491 Date Reviewed 011791 Applicant Name Howard Shockey & Sons, Inc. Address P. O. Box 2530 Winchester, Virginia 22601 Project Name Century Graphics Addition Phone No. 703-667-7700 Type of Application 1st Due Fire Co. 13 Election District Site Plan Stonewall Current Zoning ist Due Rescue Go. 13 M-1 RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm System X Other Fire pump to satisfy NFPA 231 F Standard for storage of rol1 paper. Emerqencv Vehicle Access« Adequate Inadequate Not Identified Fire Lanes Required; Yes X No Comments: Posted fire lanes are required at all hydrants and siamese connections. Signs reading "No Parking - Fire Lane" required at all designated fire lanes. Roadway/Aisleway Widths; Adequate X Inadequate Not Identified Special Hazards Noted; Yes No X Comments: -Continued- Vydrant Locations; Adequate 11 quate X Not Idei ied Siamese Connection Location; 4pproved Not Approved Not Identified X. Additional Comments: 1) This buildino will have to comply with B.O.C.A. 6ection 504.0 Unlimited areas' The height limitation of 30' for a 2C Wilding is increased by 20` due to automatic sprinkler system througho --' B.O.C.A. Section 503.1. Building shall conform to B.O.C.A. Article 8 in regards to egress requirements and travel distances. 2) "Project South" wall will be required to be 3 hour rated per B.O.C.A. table 504.2 (also includes existing building) & all openings in this wall must have the openings protected with fire assemblies having a 3 hour rating. 3> Additional risers will be required for sprinkler protection. The siamese connections must come off of existing F.D.C. via manifolds. 4) Hydrant on front of structure at parking area is located behind parking | � making it inaccessible. Relocate onto traffic island. 5> Hydrant on | southwest corner of structure is inaccessible - It is located 70' from curb, must be within 3' of curb. 6) Access to all fire protection items and � construction site must be maintained at all times during construction. 7> Building will be required to have full fire alarm system which is activated � by sprinkler system, heard throughout the building. � Review Time 4.0 hrs Z, . � Douglas A. Kiracofe ~ Fire Marshal M M D D Y Y X x C LC:i l_-1dI 5'1/ 18 12 101 DEPARTMENT OF FIRE AN*ESCUE COUNTY OF FREDERICK P.O. Box 601 Winchester, VA 22601 703.665.6350 DATE ARRIVAL DEPARTURE INSPECTORS NAME I TYPE OF INSPECTION 1 LJ krCMNhppd Y M M D D,� H H M M H H M M LAST FIRST /Y 2L�rwir*leruss 3" alum, System 4I f overhead door STREET NUMBER STREET NAME SUIT APT SRA I I I 1 I�rIFtiIT Il+l f K/1 _ IL ✓� IN'/ ! 1 1 1 1 1 1 1 1 1 I l 1 1 1 I IG I/ L-2 SL—J new ouidirg 6" Ixrrrvng permr 7LJ I>wu+g OCCUPANT TELEPHONE 1 I I I I I I -I I I I-t I 1 1 I Bum obw 9Li No to" plan review MANAGER, REPRESENTATIVE! BUSINESS TELEPHONE It l_J ust instatlaeon 12LJ km leak 13" ust removal 14u usl liquid spill BUILDING OWNERS LAST NAME pWNERS ADDRESS TELEPHONE f IXED PROPERTY I I I I �C—'�-%%�CU/� � ��J NUMBER OF STORIES / is" annivai ir+speckon 1611 complaint 17" vraal on CONSTRUCTION TYPE t u hie resistive 3 u protected r10n-COmf)uSnDle s u� LJ ordinary 7 protected wood home 9 LJ notCtassfied 2 LJ Heavy Umber a LJ unprotected non<onibusnble d ordinary 6 � unprotectordinary 6 I_J unprdleoted wood 0 " undebnrwied to" fire Wane rupection 191 1 fire lane approvd FIRE PREVENTION PERMIT a RE -INSPECTION DATE MAXIMUM OCCUPANCY LOAD pL, re-rMpexbon Y Y M M D D Y Y u U u l —" l�l — u L_J I u I IL-1 21 uJ Other INSPECTION GUIDELINE -CORRECTIONS REQUIRED - The Following Conditions Need Corrections: BUILDING EXIT AND EGRESS C 61 Unapproved or Oefecbire Gas Connection C I Space Under Stairs Used tar Storage Purposes 031 Inadequate Means of Egress C 52 Damaged or Deteriorated Vent Pipe on Gas Burwg A ,pare G 2 Broken Ceilings and 'or WabS — Exposed Lath on Ceilings andAir WVaas 032 Second Means of Egress Not Reader Aecessoe 63 Vent Hoods. Vent Fans ands Duct Systems Need Ckanag jUnnatural OperungS) ❑ 33 Aisles andar Passageways Obstucted C 64 ComoA*m %N Stied Near Hot Water Heaver 0 3 Detective ander Unapproved Incinerator and or Spark Arrest r Screen 034 Panic Hardware (Anti -Panic Latches and BOBS) Required on Exit Doors C A Cardboard Ceilings andgr *at 035 Discharge From Exits. Outside Build% Etc ORDINARY HAZARDS 0 5 Fire Door Not Serviceable 036 Exnway Blocued am Obstructed ❑ 65 Poor Housekeeprq Condroora C 6 Foe Door Blocked or Wedged Open 037 Exit Door Locked and or Barricaded C 66 Improper Storage C 7 OA Soaked Wood Floors C 38 Ent Not Property Designated or Marked C 67 Storage of Flea pis, Ceanrg Compounds. waxes, Ptkshes. Etc C 8 Antic Areas Open to the Outside. Screen to Prevent Entry by Birds C 39 Exit Lights Provided But Not Operative C 68 Storage of Excelsior. Straw. Sawdust. Burlap. Etc 0 9 Doors Requiring Sell -Closing Devices Not So Equipped ❑ a0 ieuminaag Directional Signs to Exits Required C 69 Metal Drip Paris Repaired. But Not Provided ❑ 10 RorkOktive—Shoud Be Rated 041 Exit Door Swinging Agarnt Lfle of End Waft C 70 Excessive Grease on Stove 0 1 t. Open and Exposed Foundation Berieath Buda g C 42 Stairways Not Property Enclosed andbr Equipped wed Non -Stallard Doors ❑ 71 Cockloft Cover OB 012 Post Max Occuoaricy Load C 43 Stairways Not Property Illuminated ❑ 72. Unapproved Wash Conuirlers 044 Emergency White Lights ELECTRICAL G 13 Illegal and9r Boot -Leg Winrg FIRE PROTECTION 045 Fire Exhngurshers Required, But Not Providednnecessary SPECIAL HAZARDS G 13 U andiat Disorderly Accumulation at Boxes, Carbrs. Etc. 0 t A Inadequate Service andar Irsarth lent Circuits C 15 Insufficient Receptacles 046 Fire Exaqusliers Need RI cnrgngAlnspection CoeaMe—Mantaln Or" Arrangement G 75 Smokng le l location. "NO Needed ❑ 16 Detective Detenaated a Spliced WWWrrg ❑ a7 Unapproved Type Fire Extinguishers 048 Fire Exorigusliers Not Property Mounted A•-ti0' 75 Flammable LovedHatakr are Gases Berg g ImproSmoking" tf Used Used andAx Shed 017 Detective ands Broken Fixtures 018 Detective and or Broken Switches andbr Sockets 049 Fire Eirbnguishers Not Fkwey Vance C Wriads on in Location C 76. Storage of Vompresn n asConds LkWO ❑ 71 o Compressed GuCy1r ders wdttord Roper Anchorage (Ravin a ❑ 19 Cncurt Breakers By -Passed a Blocked Open ❑ 50 Stmdpite Hose DeteriorM/Not Racked Chwsl G 20 Oversize Fuses andar Circuit Breakers Set bo High g C 51 Fire Protection System ❑ 52 Defective Stando pe Nooks 078 Oxygen Cylinders Berg Stored andiar Used In Greasy a 01y Loabors ❑ 21 Pennies Behind Rugpe Fuses 022 Metal Strip of Fuze odder Cut Back ❑ 53 Standpipe System Disconnected ❑ 79 Oxygen Cylinders Being Stated Neu Acetylene or Fuel Gas Cylinders 0 80 0" Materials Berg Stared With Acids, Sulphur, Etc ❑ 23 Fuses Jumped a Bridged 024 Open Junction Box ano)or Fuse Box ❑ SA Sprinkler Heads, Cut Offs a Siamese Blocked ❑ 55 Inadequate Sprinkler Head Clearance (18Inches Requredl 082 Trish Room Door No Equipped With Self-CCkisrig Device C 25 Fuse Panel Obstructed and/or Muaessdk 30' 056 Spnnkler Valves Not Property dentlW ❑ 83 Open Flame Heabrg in Hazardous Loabon 026 Motors and or Fans Orly or Dust Covered HEATING AND COOKING ❑ 8/ Vacant at Time at Inspection 027 Unapproved Extmsan CordwDrop Cads 0 57 Deective Heating Um —Furnace, Gas BI>iler, Stove, Hater. Eh ❑ 85 Locked at Time of Inspection ❑ 28 Excessive Use 0 Multiple Outlet Plugs ❑ 58 Delecbve Cooking Urrl—Range. Hot Plat, Etc C 86 See Supplement Sheet ❑ 29 Lamps. Fixtures, Egteprnent Etc., Not Property Enclosed (Hazardous 059 fins Men Blocked andbr ObstrucLMANot Protected Locations Only) 060 Furnace, Boller. Heating. Cooking andb Smokeppe and Vent Pipe 87 IN THE OPINION OF THE INSPECTOR, THERE WERE NO KQARDOl1S .030 Dead and Unused W V% Staid Be Flernoved Clearances, From Combustible Maenak Not Strdrd CONDITIONS IN THIS AREA AT THE TIME OF THIS thISPECTION COMMENTS L,�ofi Ge C jo. The conditions reported on this form rtaAect the prerrtia s as observed by our inspector, at the wrke of ktaQeclion. Any emn or « irrisslon rregysrdhq G to safety or conditions regerdinp We prwxt lfor► we uMntentional and deemed the fault of the county. C/ OF INSPECTOR IF RECEIVED BY FORM ES-74 COUNTY OF FREDERICK, VIONIA • DEPARTMENT OF INSPECTIONS g Caller 1LL..Tt-tdNRs Time Called 3'OOawt Date Called lzgl91 1 Phone No. G78 - 0431 Time Requested Date Requested '3 F2(01� Received By VA") WY� Date of Inspection 9 / Z l9 PERMIT HOLDER NAME CF_WU&V G oZAPFF I CS I JOMQ ,F�J FIT. NO. 3� Lot No. SEC. No. SUBDIVISION_. STREET NAME LENOt fi� be J E DIRECTIONS 11 Q ::M 01-. "I : TUP_tJ Uh' BUILDING NO. Uhl TO 'S-Mi,J0,JA<,L_ I ND/US-M, 4 -- PLUMBING NO. P"v2 TAKE �r LEFT- f LEN01►Z ELECTRICAL NO. Z-L— BL.1126. 00 L.EF I MECHANICAL NO. SIGN NO. DISTRICT r7t<► 10e56000-C PERMIT FOR: Tr, Pu:�, Type of Inspection Residential Commercial Footers Setbacks: FR Slab Draintile Water Service Sewer Rough Electric Rough Plumbing Groundworks Other: Rough Mechanical Gas Piping/Test BK L. Gas Fire -up Framing Final Final Building Final Plumbing Time In: 10 3Q &``1 Temperature k 7, F Cut in No. Time Out: 10:4Anti Weather SUt'J►Jy Results: Approved V Rejected Comments: ALL- cumma► r- a" 8121IQ I i,QSPEC.TioiJ t-� &cEo C* -ge F R Final Electrical Final Mechanical Site Plan Fire Marshall Special/Complaint Signature (�A) 6 . cJDate- /q COUNTY OF FREDERICK, VANIA DEPARTMENT OF INSPECTIG.�S � 1 Caller -iJbNhLU / K� �,wl_LL Time Called 1 AM) Date Called 7_019 Phone No. (o78 - 04-Yl Time Requested Z , OCR rM Date Requested r; Z 1 �9 Received By LVA"3 6)wrf Date of Inspection 8 j Z I'9 PERMIT HOLDER NAME CENTUE? j GIZAP41e.S RT. NO. Lot No. SEC. No. SUBDIVISI STREET NAME �-Et401K-17>21'lc DIRECTIONS Tn f n L% BUILDING NO. is L '+n PLUMBING NO. _ PAKt. , "'} e .lam O5 1,-44 ELECTRICAL NO. Type of Inspection Residential Footers Setbacks: FR Slab Draintile Water Service Sewer Rough Electric Rough Plumbing Rough Mechanical Groundworks Gas Piping/Test Other MECHANICAL NO. SIGN NO. �- DISTRICT+-� ��Q►,? �A�1JE58aRQ� Commercial BK L Gas Fire -up Framing Final Final Building Final Plumbing o_ Time In: _ ITT Temperature 8Q ►' Cut in No. Time Out: �ZT Weather JdEYZC�T-_ Results;, Approved &a T--t emA-rcy C- Q• dejected R Final Electrical Final Mechanical Site Plan Fire Marshall Special/Complaint Comments: -') F:Qvlo F- Drz,vt PL4 EMGi� ktaw l cs_ta Aj LXTEQJ o Q J ' L_Om3t ►J L LiA ��� IJa.� Aoomuo Ei= uj&cam � ,►. .�t-�c T+x) Ajp A-�-io.+OL.T � 1 AN€eAi � Ct tT�C'EY� At_t_ (-x P oEiD I _f1 Term kch' , -TO 6C SL-EotQ STfi(jlll7_L_� Signature �1 >a A.)_' Date iqw S COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703 / 667-0370 March 14, 1991 Howard Shockey &.Sons, Inc. Attn: Terry Stone Box 2530 Winchester, VA 22601 RE: Site Plan Review For Century Graphics Printing Plarft Addition Dear Terry: This letter regards my preliminary review of the above mentioned project. The overall concept and design of this plan is fine; however, there are some minor details that need to be addressed prior to. final site plan approval. I offer the following comments: 1) The use of the three (3) parcels owned by Paul D. Mildowney needs to be specified. 2) If there are any signs, outdoor lighting fixtures or outdoor trash receptacles located on site, they need to be shown. 3) The proposed parking will be a benefit to the site; however, I suggest that you trade off a parking space closer to the office for the proposed handicapped space. The proposed handicapped space is a nice idea, but is not practical due to the lack of linear sidewalks to this area. 4) Are there any drainage easements on or adjacent to this site? In particular, along Route 862 and the NW boundary of this site. 5) There is an engineer's seal regarding drainage, grading and E & S control from G.W. Clifford & Associates. Should the Shockey Company include their seal? As I stated before, the plan is drawn very well which makes the review process easier on me - thank you! All other review agencies have approved this plan; therefore, once these revisions are addressed, I will recommend final site plan approval. Once this is obtained, you may proceed with all grading and other site improvements. If you want to start site grading prior to final site approval, a land disturbance permit is required from this office. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 Page -2- T. Stone Ltr. March 14, 1991 Please revise this site plan to reflect my comments and (4) copies to this office for final approval. If I may questions regarding this letter, please do not hesitate me. Sincerely, Evan A. Wyatt Planner II EAW submit four answer any to contact • COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/667-0370 March 14, 1991 Howard Shockey &.Sons, Inc. Attn: Terry Stone Box 2530 Winchester, VA 22601 RE: Site Plan Review For Century Graphics Printing Plant Addition Dear Terry: This letter regards my preliminary review of the above mentioned project. The overall concept and design of this plan is fine; however, there are some minor details that need to be addressed prior to final site plan approval. I offer the following comments: 1) The use of the three (3) parcels owned by Paul D. Mildowney needs to be specified. 2) If there are any signs, outdoor lighting fixtures or outdoor trash receptacles located on site, they need to be shown. 3) The proposed parking will be a benefit to the site; however, I suggest that you trade off a parking space closer to the office for the proposed handicapped space. The proposed handicapped space is a nice idea, but is not practical due to the lack of linear sidewalks to this area. 4) Are there any drainage easements on or adjacent to this site? In particular, along Route 862 and the NW boundary of this site. 5) There is an engineer's seal regarding drainage, grading and E & S control from G.W. Clifford & Associates. Should the Shockey Company include their seal? As I stated before, the plan is drawn very well which makes the review process easier on me - thank you! All other review agencies have approved this. plan; therefore, once these revisions are addressed, I will recommend final site plan approval. Once this is obtained, you may proceed with all grading and other site improvements. If you want to start site grading prior to final site approval, a land disturbance permit is required from this office. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 • Page -2- T. Stone Ltr. March 14, 1991 Please revise this site plan to reflect my comments and submit four (4) copies to this office for final approval. If I may answer any questions regarding this letter, please do not hesitate to contact me. Sincerely, Evan A. Wyatt Planner II EAW u APPLICANT'S CHECKLIST Your site plan should include the following: Administrative Information Y N ✓ _ 1. Name of proposed development 2. Name and address of owner 3. Name and address of developer 4. Name, address, and phone number of designer 5. Certificate of surveyor, engineer, or architect 6. Date plan prepared and date of revisions WA 7. A listing of all conditions placed on the site as a result of a conditional use permit or conditional / zoning approval ✓_ _ 8. A space labeled "approved by the Zoning Administrator" for the approval signature and date of approval General Site Information Y N 9. Location map (scale 1:2000) — 10. Magisterial District of site 11. Scale of site plan (not to exceed 1:50) 12. North Arrow _ 13. Zoning of site 14. Use and zoning of adjoining properties Lots/Uses/Buildings & Structures Y N _ 15. Surveyed boundaries for all lots and parcels _ 16. Acreage of all lots included in the plan _ 17. The location and dimensions of all required setbacks 18. and yard areas Location — of all buildings, structures, and uses 19. The proposed use of each building, structure, and area _ 20. The location and type of all dwelling units 21. Ground floor area and total floor area of all buildings with FAR calculations for commercial and 22. industrial zoning districts The height of all buildings and structures _ 23. The location and dimension of all signs F Lots/Uses/Buildings & Structures (con't) Y N _ _✓ 24. Location of outdoor lighting fixtures 25. Location and nature of outdoor storage areas -Lip 26. Location and area of common open space .IA 27. Location and description of all recreation facilities 28. Location of sidewalks and pedestrian ways 29. Location of outdoor trash receptacles Roads Y N _ 30. Name and number of existing and planned streets on / — and adjoining the site �L 31. Location of existing and planned streets on and adjoining the site 32. Dimensions, boundaries, width, pavement, and — construction of planned roads 33. Location and dimensions of all proposed entrances from public right-of-ways Utilities Y N 34. Location of all utilities, including sewer and water lines with the size of lines, mains, and laterals 35. Location and width of all ea s nts, including a easements access, utility andToVl�r _ 36. Location and nature e lanes, fire hydrants, and all other facilities necessary to meet the Fire Code requirements Parking Y N 37. Calculations describing the required number of / parking and loading spaces ✓ _ 38. Location and dimensions of all parking and loading spaces, driveways, parking aisles, curbing, and other features to be used 39. Location and dimension of all handicapped spaces E:3 (• �0 Natural Features Y N ✓ 40. Existing and finished contour lines �{ 41. Location of steep slopes, woodlands, floodplains, wetlands, sinkholes, and other environmental features 0 242. Location of streams and drainage ways Landscaping Y N 43. Landscaping plan describing location and types of plants to be used �A 44. Location of required buffers and screening with cross sections or profiles Erosion and Sediment Control Y / N _ 45. A stormwater management plan with run off calculations and location and description of facilities to be used 46. Soil erosion and sedimentation control plan with location, types, and examples of provisions to be used 9 r la G Q j COUNTY of FREDERICI Department of Planning and Developmen �g19? ,� 703 665-56 ot-REQUEST FOR SITE PLAN COMMENTS h�6�� �`�•� 03 667-03 � o a Virginia Department of Transportatio 2? EU Cj 1 �r J P.O. Boa 278, Edinburg, Virginia 22824- 27$�H :',� pAN1Ea (703) 984-4133 The local office of the Transportation Department is loca at 1550 Commerce Street, if you prefer to hand deliver this review form. Applicant's name, address and phone number: Howard Shockey & Sons, Inc. P.O. Box 2530, Winchester, Virginia 22601 (703) 667-7700 Name of development and/or description of the request: Century Graphics Addition For your review Location: Lenoir Drive, Stonewall Industrial Park Frederick County, Virginia Transportation Department Comments: No objection to revised site plan. Present entrance is adequate for proposed improvements. However, should business ever expand in the future the entrance may need to be upgraded. VDOT Signature and Date: AL4A----_ ?dlyfl (NOTICE TO VDOT - PLEASE RET' N THIS FORM TO THE AP IC .) 0 NOTICE TO APPLICANT D It iE ur responsibility to complete this form as accurately as FEB 2s' in order to assist the agency with their review. Also, plea ttach THREE copies of your plans and/or .pplication form. 9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601 0 40 C -i:Piini n � COUNTY of FREDERICf Department of' Plannim! and Developmen 703 665-561 REQUEST FOR SITE PLAN COMMENTS FAX 703 667-03 Frederick County Sanitation Authority P.O. Boa 618, Winchester, Virginia 22601 (703) 665-5690 The Frederick County Sanitation Authority is located on the second floor of the Old Frederick County Courthouse in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: TF/4Ry 5?o,c/E Howard Shockey & Sons, Inc. P.O. Box 2530, Winchester Virginia 22601 (703) 667-7700 �A Name of development and/or description of the request: Century Graphics Addit !� For your review Location: Lenoir Drive, Stonewall Industrial Park Frederick County, Virginia Sanitation Authority Comments: S' / TE�1 S — C 0,'9R FC7- oL Rf 5.40--y /T — Sanit. Signature & Date: (NOTICE TO SANITATION — NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach TWO copies of your plans and/or application orm. f �C COUNTY of FREDERI& Department ol' Planning and Developmen 703 665-56` FAX N11 //7-M REQUEST FOR SITE PLAN COMMENTS Frederick County Sanitation Authority P.O. Boa 618, Winchester, Virginia 22601 (703) 665-5690 The Frederick County Sanitation Authority is located on the second floor of the Old Frederick County Courthouse in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: lFR Ri 5?o11/E' Howard Shockey & Sons, Inc. P.O. Box 2530, Winchester, Virginia 22601 (703) 667-7700 Name of development and/or description of the request: Century Graphics Addition For your review Location: • Lenoir Drive, Stonewall Industrial Park Frederick County, Virginia _ � S Authority Comments S / TE�i S - C 0,-9A FC'To4 RESUo.�i /T . ---;=%— 0zN R / — 000,0 o I/E .< <3orto, FZ Sanit. Signature & Date: /y 9 (NOTICE TO SANITATION EASE RETURN THIS FORM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach TWO copies of your plans and/or application orm. COUNTY of FREDERICI 1 Department oC Planning and De�elopmen 703 665-565 REQUEST FOR SITE PLAN COMMENTS FAX 703 667-037 Frederick County Inspections Department P.O. Boa 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Inspections Department is located at 9 Court Square in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: Howard Shockey & Sons, Inc. P.O. Box 2530, Winchester, Virginia 22601 (703) 667-7700 Name of development and/or description of the request: Century Graphics Addition For your review Location: Lenoir Drive, Stonewall Industrial Park Frederick County, Virginia Inspections Department Comments: Building shall comply with Vol. #1 Virginia Uniform Statewide Building Code, and Section 305. Use Group F (Factory and Industrial) of the BOCA National Building Code/1987. (Final Pending Completion of Industrial Parks water storage tank.) Inspect. Signature & Date: .`e, (NOTICE TO INSPECTIONS - PLEASE RETURN THIS FOM TO APPLICANT.) NOTICE TO APPLICANT It is your responsibility to complete this form as accurately as possible in order to assist ':he agency with their review. Also, please attachra copy of your plans and/or application form. 9 Court Square - P.O. Box 601.. - %Vinchester, Virpk'lnla - 22601 COUNTY of FREDERIC I Department of Planning and De%elopmer. 703 665-56` REQUEST FOR SITE PLAN COMMENTS F..\X 703 667-037 Frederick County Inspections Department P.O. Bog 601, Winchester, Virginia 22601 (703) 665-5651 The Frederick County Inspections Department is located at 9 Court Square in Winchester, if you prefer to hand deliver this review form. Applicant's name, address and phone number: Howard Shockey & Sons, Inc. P, 0, Box 2530, Winchester, VA 22601 (70 ) 667-7700 Name of development and/or description of the request: Century Graphics Addition For your review �6ff8910//f� Location: Lenoir Drive, Stonewall Industrial Perk `ti JN%1991 s Frederick County, Virginia FtEGF pIANNING Inspections Department Comments: %Z 0 use r,rn,,/7 `.Z-- .) A i / C `_ e1C.c��rp N c� �� / <9 �• /s1 �f d LC� i- c�Q ; �l /'Jt r c / r� ,L- J� � c � � � / bcL. o (� /�jkwd- .c. r fcS3.o.a S S,/rCC, j� /lf ecIceey�CXetf m , / /.r Inspect. Signature & Date: �� A- I,�0, ,, �L 1-16 - RI �LS (/N7(O�TICCE TO INSPECTIONS - PLEASE RETURN THIS,/FORM TO APPLICANT.) Vrhl1 NOTICE TO APPLICANT F� Z �� iour responsibility to complete this form as accurately as ss in -rder to assist he agency with their review. Also, pleaoattach-a copy of your plans and/or application form. 9 Court Square - P.O. Box 601 - %%'inchester, Virginia - 212601 COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE -~LAND DEVELOPMENT COMMENTS�� Control No. 031991240 Date Received 031591 Date Reviewed 031991 Applicant Name Howard Shockey & Sons ____._. Address P. O. Box 2530 Winchester, Virginia 22601 Project Name Century Graphics Addition Phone No. 703-667-7700 Type of Application Site Plan Current Zoning M-1 ___ 1st Due Fire Co. 13 1st Due Rescue Co. 13 Election District stonewall Automatic Sprinkler System Automatic Fire Alarm System RECOMMENDATIONS X Residential Sprinkler System X Other Emergency Vehicle Access; Adequate X Inadequate Not Identified Fire Lanes Required; Yes X No '---- ---- Comments: Designated fire lanes required to all hydrants and siamese .����������������������......... ������������������������������������ Roadway/Aisleway Widths; Adequate X Inadequate Special Hazards Noted; Yes _ Comments: Not identified No X 0 Hydrant Locations; Adequate X Inadequate Not Identified Siamese Connection Location; Approved X Not Approved Not Identified ��� Additional Comments: All previous comments concerning fire dept. access during construction and compliance with applicable codes shall apply. Review Time .50 hr ����� yikz Douglas A. Kiracofe v Fire Marshal • COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. 021391139 Date Rec•e i ved 021391 Date Reviewed s 9i Applicant Name Howard ShockeX F� Sons, Inc - Address P. 0. Box 2S30 Winchester, VA - 22601 Project Name Century Graphics Addition Type of Application Current -Zoning /}%/ 1st Due Fire Co. 4 1st Due Rescue Co. /3 Election District �ia✓�u RECOti IMENDAT IONS Automatic Sprinkler System Automatic Fire Alarm System X Emergency Vehicle Access; Adequate X Inadequate Residential Sprinkler System Other Not Identified Fire Lanes Required; Yes x— No Comments: Roadwav/Aisiewav Widths; Adequate X Inadequate Not Identiried Special Hazards "Acted; Yes Comments: - CCnt I11�lecj - Hvdrant Locations; Adequate X Inadequate Not Identified Siamese Connection Location; Approved X Not Approved Not Identified Additional Comments: C'ss.O./Gt.� //i/✓c= .f�EF � /l7AZ�E To f%fE /��'oiE�:'iac/ .PFC�i�tr,�.�•�-� . .�iyifa i�,eF1�/GY��L�,I iO�CC�+ a!�/,C/,c/G lG.c�S�l/IT�U.�� /✓ �EGZ'/i.�F� �i /�� L / / /��E✓� �L �O/hi�ir�I/T.� .JL/.CS/�1�TTED O.c/ Review Time (/iaYRY �ifd.� Pr Douglas A. Kiracofe Fire Marshal �� �� C���TY OF FREDERICK° VlRGINI��� FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. 011491044 Date Received 011491 Date Reviewed 011791 _......... ____ Applicant Name Howard Shockey & Sons, Inc. .... .............. _..... ............ _.............. ....... ....... ........ ...... ...... ........... ....... ............... ............ ... ___ Address P. O. Box 2530 ............. ....... ............... ..... Winchester, Virginia 22601 ......... ............ . ........ �������...... �������������. Project Name Century Graphics Addition ------'-------'----------------------------'-------'------- Phone No. 703-667-7700 Type of Application Site Plan Current Zoning M-1 .... ............ ..... _ 1st Due Fire Co. 13 1st Due Rescue Co. 13 Election District Stonewall RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm System X Other Fire pump to satisfy NFPA 231 F ____________ Standard for storage of roll paper. Emerqency Vehicle Access; Adequate Inadequate Not Identified Fire Lanes Required; ___ Yes X ... .......... ....... No Comments: Posted fire lanes are required at all hydrants and siamese connections. ... Signs ........ ________________________________________.... reading "No Parking ........... ......... _....... ...... .................... ______............ - Fire Lane" required at all designated _..... ... ........... .......... _..... .................... fire lanes. .... _............ ......... ......... ... ...... ....... .... ... ....... _........... _............ ........................... .... ....... ........... ......... Roadway/Ais1eway Widths; Adequate X Inadequate Not Identified ���. Special Hazards Noted; Yes No X Comments: �/ ._ -Lon tinu( / � Hydrant Locations; Adequate Inadequate X Noti��-ntified Siamese Connection Location; Approved Not Approved Not Identified X Additional Comments: 1) This building will have to comply with B.O.C.A. Section 504.0 Unlimited areas. The height limitation of 30' for a 2C building is increased by 20' due to automatic sprinkler system throughout B.O.C.A. Section 503.1. Building shall conform to B.O.C.A. Article 8 in regards to egress requirements and travel distances. 2> "Project South" wall will be required to be 3 hour rated per B.O.C.A. table 504.2 (als(--i includes existing building) & all openings in this wall must have the openings protected with fire assemblies having a 3 hour rating. 3) Additional risers will be required for sprinkler protection. The siamese connections must come off of existing F.D.C. via manifolds. 4> Hydrant on front of structure at parking area is located behind parking making it inaccessible. Relocate onto traffic island. 5> Hydrant on southwest corner of structure is inaccessible - It is located 70' from curb, must be within 3` of curb. 6) Access to all fire protection items and construction site must be maintained at all times during construction. 7> Building will be required to have full fire alarm system which is activated by sprinkler system, heard throughout the building. Review Time 4.0 hrs ______ Douglas A. Kiracofe ` Fire Marshal COUNTY OF FREDERICK, VIRGINIA FIRE MARSHAL'S OFFICE LAND DEVELOPMENT COMMENTS Control No. Q//Z9/-0444 Date Received Date Reviewed Applicant Name to o' Address �A�r Project Name Phone No. Type or Application /`.,./ Current mooning 1st Due Fire Co. /3 1st Due Rescue Co. Election District RECOMMENDATIONS Automatic Sprinkler System X Residential Sprinkler System Automatic Fire Alarm System X Other Emergency Vehicle Access; Adequate X Inadequate Not Identi;ied Fire Lanes Required; Yes X No Comments: /os//%ea Roadway/Aisleway Widths; Adequate �_ Inadequate Not Identiried Special Hazards Noted; Yea No Comments: - _cn* I nIIeU - Hydrant Locations; Adequate X Inadequate Not Identified Siamese Connection Location; Approved Not Approved Not Identified Additional Comments: /UorE-• � ti�����r G(/ TNr s DUTi�- o , 3e e-W 7,,,e7- 7HE pt/ TllE `zac�r� 5ick� /S > QIiE�CiC GJ9�/ -`� �7is �yiyC 7llr �% �� � �� Ov -- �, /z/1%'/ Review Ti P Douglas A. Kiracofe Fire Marshal 0 • February 26, 1991 Evan Wyatt, Planner Frederick County Planning Department 9 Court Square, P.O. Box 601 Winchester, VA. 22601 Re: Century Graphics Corporation Building Printing Plant Addition 17555.123 Dear Evan, • • ENGINEERS ARCHITECTS SCIENT ISMS We have reviewed the second submittal of the above referenced plan and found the stormwater management design and the erosion and sedimentation control measures adequate and acceptable. The plan does not pose any significant difference from the first submittal except that the transport area has been stated as being a future development. We hereby recommend the approval of the plan as submitted. Sincerely, DO�TOHUE & ASSOCIATES NC. i Paul A. Bernard, P.E. Project Manager PAB/j la R/F/AH1 j: 1 ■ 11240 1%ples Mill Road, Suite 100, Fnirfar, Virginia 22030 ■ 703.385.3566 ■Fax 7 3.385.8319 l'ruur�(�vi ._. iron lrJ �,,y�ri 0 11240 Waples Mill Road ENGINEERS Suite 100 ARCHITECTS Fairfax, Virginia 22030 SCIENTISTS 703.385.3566 Evan Wyatt, Planner Frederick County Planning Department 9 Court Square, Box 601 Winchwster, VA 22601 Your Authorization: Signed Agreement Century Graphics - second submittal �LJ Date: Feb. 26, 1991 Please Reference: Project No. 17555. 123 Invoice No. 9101+2 Client No. 07534 Project Manager 1.5 hrs @33.25 49.88 Engineer 4.0 hrs @19.90 79.60 Admin Assist .5 hrs @14.50 7.25 Total Direct Total Indirect TOTAL DUE THIS INVOICE T4 136.73 205.10 $ 341.83 FEE • January 18, 1991 Evan Wyatt Planner Frederick County Planning Department 9 Court Square, P.O. Box 601 Winchester, VA 22601 Re: Century Graphics Corporation Building Printing Plant Addition 17555.123 Dear Evan, ENGINEERS ARCHITECTS SCIENTISTS We have reviewed the above referenced site plan and offer the following comments: 1. ACCESS ISSUES: The developer/owner anticipates no additional employees as a result of this addition. Using ITE methods, a building of this size generates a substantial flow of traffic. However, the fact that the development is within the Stonewall Industrial/Lenior City Industrial Parks, access to this lot is assumed consistent with the master development plan and the generated traffic should not create a major detrimental impact on the surrounding road system. 2. DRAINAGE AND STORMWATER MANAGEMENT: The drainage divide and storm water management design was provided and appear adequate. 3. EROSION AND SEDIMENTATION CONTROL: The erosion and sedimentation control measures and narrative have been provided and are acceptable. We can recommend the approval of this plan as submitted. Sincerely, i DONOHU & ASSO A S, INC. it v Paul A. Bernard, P.E. Project Manager @��� PAB/j la � , I; ,� A 2 L1 199, ■ 11240 Waples Mill Road, Suite 100, Faiijiu, Virginia 22030 ■ 703.385.3566 ■ Far • •� JL -, P -fi 0 0 5 -`► 1 CENTURY GRAPHICS CORPORATION BUILDING EXPANSION STONEWALL INDUSTRIAL PARK EROSION AND SEDIMENT CONTROL PLAN STORMWATER MANAGEMENT PLAN ^? 4 S- (7 -3 Prepared By G. W. Clifford & Associates, Inc. 200 N. Cameron Street P. O. Box 2104 Winchester, VA 22601 703-667-2139 JANUARY 1991 • G. W. CLIFFORD & ASSOCIATES, INC. 200 North Cameron Street P.O. Box 2104 Winchester, Virginia 22601 703-667-2139 Fax: 703-665-0493 MEMORANDUM To: Review Agencies From: Ron Mislowsky, P.E. Re: Erosion and Sediment Control Study Stormwater Management Plan Century Graphics Expansion Date: 3 January 1991 Project Description - The purpose of this project is the construction of a new 65,146 square foot addition to the existing building. The site is located in Stonewall Magisterial District, Frederick County, Virginia on the easterly side of Virginia Secondary Route 862. In addition to the building expansion, a new employee parking lot and access roadways will be provided. An area of approximately 4.1 acres will be disturbed during construction. Existing Site Conditions - The proposed site is an area of maintained lawn area covered with grass. There are no trees or shrubs within the proposed construction area. The site slopes from east to west to an existing defined swale with existing slopes ranging from approximately 1% to 2%. A pre development C factor of .2 was used for existing open spaces and .9 for buildings and pavement. Soils - The site is in the Frederick-Poplimento-Oaklet Soil Association. The area is characterized by gently sloping to steep, well drained soils that have a fine textured subsoil, formed in material weathered from limestone. For purposes of design runoff conditions, antecedent moisture condition II (normal consideration for the mid -Atlantic region) is assumed. Soils are of the Oaklet (3213) Series. These soils have a moderate rate of water transmission, therefore SCS Soil group "C" is adopted. A copy of the soils map is enclosed. �i;�� j� ;� f� � •�,� 5e • Stormwater Management - There is a possibility that the owners may expand further, adding an additional 40,000 sq. ft. of floor area. All detention calculations reflect the development of this added floor space. The rational method was used to determine peak flows to storm structures and these values were used to size all storm piping. The design meets VDOT standards. All piping will carry the ten year storm. The rational method, and hydrographs based on the time of concentration equaling storm duration were used to estimate the peak run-off of a 2-year, 10-year, and 100-year and the Type II storm distribution, for the areas flowing to the Detention Pond, after development. The site has been evaluated on a 2 and 10 year/pre and post development basis. The goal of this study is to meet or exceed the control requirements of pre two -post two. The post -development two year discharge at the northwest corner of the property will not exceed the predevelopment two year storm runoff to the same point. The site lies in the Stonewall Industrial Park. A stormwater management plan for the park was completed in 1985. This plan used the rational method to determine runoff rates and a post development C factor of .52 for the developed park. The time of concentration for the drainage area, of which this site is part, is 13 minutes. The approved stormwater management plan allows a post development discharge from the site of 20.63 cfs for the two year storm, and 28.08 cfs for the ten. Part of the site is developed. The existing weighted C factor is .38. As the time of concentration is specified by the stormwater management plan, it remains at 13 minutes. The existing runoff from the site is 15.0 cfs during the two year storm, and 20.4 cfs for the ten. These values are below that specified by the stormwater management plan. In order that this expansion not effect the Red Bud Run watershed, a detention pond is proposed. The pond will act to keep the net two and ten year flows from the site below the existing runoff rates. A dry pond has been designed. A ten inch pipe will control the release rate from the pond. During the 100 year storm the depth of water is eighteen inches. The inflow hydrographs, and routing calculations are attached. An analysis of the flows which exist, the allowed flows per the stormwater management plan, and the estimated post development flows are also provided. The post development two year net flow from the site is 14.05 cfs, the ten year flow is 18.61 cfs. If the future 40,000+ sq. ft. expansion requires regrading of the detention pond area, maintaining the cross section area of the detention pond contours will ensure the validity of the flow and retention estimates presented here. All flow from the site is directed to an existing storm conveyance channel with flows to the west to Red Bud Run. As the predicted post development flows do not exceed what currently exists, this channel will be adequate. Sediment and Erosion Control - In order to ensure the quality of runoff does not decrease during construction, we have provided for silt fencing, straw bale barriers and a construction entrance to minimize erosion. Unless otherwise indicated, all vegetation and structural erosion and sediment control practices will be constructed and maintained according to the most current minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. The erosion control measures are specified on the plans. The design at the detention basin outfall provides for some sediment storage during construction. The detention pond will need to be maintained to ensure its continued effectiveness. The basin is to be seeded at 40 pounds per acre with a mixture of 88% Kentucky, 31% Tall Fescue, and 12% Redtop. Maintain the basin by mowing when the grass height exceeds 6 inches. Inspect outlet periodically. Remove sediment and debris as required to ensure proper operation and appearance of the basin. Inspection of the basin should be conducted after each major storm. At minimum, inspection of the basin should be performed annually. Particular attention shall be placed on the grass planted on the basin side slopes to ensure the elimination of erosion. The stormwater plan outlined within this report meets all of the requirements of the Frederick Planning Commission Regulations. The intent of the plan is to reduce and where possible eliminate the effects of this development on the surrounding area. -n -.. n ' J Maintenance - All soil erosion control structures shall be checked weekly by the contractor during this construction period and after construction is completed until grass cover is established. Sediment retained by these structures shall be continuously removed and placed in an area of the site specified. Damage to soil erosion control structures shall immediately be repaired when identified by the contractor. The contractor shall cooperate with all agents of the County, the Engineer and others who may identify needed facilities or work in order to protect the environment within the subject of this report. Calculations - Attached. • • Century Graphics Soils Map Century Graphics Peak Flow Analysis Two and Ten Year Storm Events • • ._, �. �� i; j i �' _--.__._w. ,i � � 4 Existing Runoff From Site: • Allowable Runoff From S• Impervious Area- Acres C CA Per Stormwater Management Plan for the Bldg 1.10 0.90 0.99 Stonewall Industrial Park, Dated December 1985 Paved 1.70 0.90 1.53 Prepared By G.W. Clifford & Assoc Open Space - Site Area = 11.02 Ac Grass 8.22 0.20 1.64 C Factor = 0.52 T(c) = 13.00 Min T(c)min = 13.00 Total CA = 4.16 i(2)in/hr = 3.60 i(2) = 3.60 in/hr i(10)in/hr = 4.90 Weighted C = 0.38 i(10) = 4.90 in/hr <1> 0(2)existing = 14.99 cfs 0(2)allowed = 20.63 cfs Q.> Q(10)existing = 20.40 cfs 0(10)allowed = 28.08 cfs Proposed Runoff From Site: Drainage Area Acres C CA A Railway 0.69 0.35 0.24 To Detention B Bldg 0.33 0.9 0.30 To Detention Grass 0.24 0.20 0.05 C Pavmt 0.50 0.90 0.45 To Detention Bldg 0.92 0.90 0.83 (Future Addition, Not Shown) Grass 0.73 0.20 0.15 D Bldg 1.17 0.90 1.05 To Detention E Grass 2.10 0.20 0.42 To Detention F Pavmt 1.1 0.9 0.99 Direct Off site Bldg 2.3 0.9 2.07 Grass 1.3 0.2 0.26 T(c)min = 13.00 Q(2) to Pond = 12.54 cfs i(2)in/hr = 3.60 Q(10) to Pond = 17.07 cfs i(10)in/hr = 4.90 Q(100) to Pond = 24.73 cfs i(100)in/hr = 7.10 Allowable Flow From Pond = offsite minus existing 0(2) = 3.04 Q(10) = 4.14 Actual Peak Flow From Det Pond From Det Pond Routing Q(2) = 2.10 cfs 0(10) = 2.34 cfs Q(100) = 2.72 cfs Drainage Area to Detention Pond = 6.68 CA to Detention Pond = 3.48 Weighted C to pond = 0.52 Drainage Area Direct Offsite = 4.70 CA Direct Offsite = 3.32 Weighted C Offsite = 0.71 0(2) Offsite = 11.95 cfs 0(10) Offsite = 16.27 cfs 0(100) Offsite = 23.57 cfs Total Post development Flow From Site = offsite plus pond Q(2) = 14.05 cfs Less than <1> above, O.K. Q(10) = 18.61 cfs Less than <2> above, O.K. Q(100) = 26.29 • • Century Graphics Culvert Sizing Data • DRAINAGE AREAS DA Acres C T(c) i(10) Q(10)cfs A 0.69 0.35 5 6.8 1.64 B 0.57 0.35 5 6.8 1.36 C 2.15 0.78 15 4.9 8.22 D 1 0.12 0.90 5 6.8 0.73 D2 0.23 0.90 5 6.8 1.41 D3 0.23 0.90 5 6.8 1.41 D4 0.23 0.90 5 6.8 1.41 D5 0.23 0.90 5 6.8 1.41 D6 0.12 0.90 5 6.8 0.73 E 2.10 0.20 15 4.9 2.06 F 4.70 0.71 15 4.9 16.35 Culvert Inv. In Inv. Out L(ft) D(in.) 1(Ex) 706.50 706.00 50.0 15 2 705.65 705.25 80.0 15 131 708.00 707.50 10.0 6 B2 708.00 707.50 10.0 6 B3 708.00 706.50 80.0 6 D 1 709.00 706.00 65.0 6 D2 711.00 706.00 65.0 8 D3 711.00 706.00 65.0 8 D4 711.00 706.00 65.0 8 D5 711.00 706.00 65.0 8 D6 709.00 706.00 65.0 6 Str # FROM: Q(10)cfs 1 A 1.64 2 B 1.36 DS B1 0.45 DS B2 0.45 DS B3 0.45 DS D1 0.73 DS D2 1.41 DS D3 1.41 DS D4 1.41 DS D5 1.41 DS D6 0.73 n(RCP)= 0.013 n(CMP)= 0.023 n(PVC)= 0.02 S(%) Q(des)cfs q(10)cfs v(10)fps From 1.00 6.47 1.64 5.28 Str 1 0.50 4.58 3.00 3.73 Str 2 5.00 0.82 0.45 4.16 DS 5.00 0.82 0.45 4.16 DS 1.88 0.50 0.45 2.55 DS 4.62 0.78 0.73 4.00 DS 7.69 2.18 1.41 6.25 DS 7.69 2.18 1.41 6.25 DS 7.69 2.18 1.41 6.25 DS 7.69 2.18 1.41 6.25 DS 4.62 0.78 0.73 4.00 DS INV. TYPE Sx Hw/d T(ft) Hw EN 706.50 ES-1 0.0070 0.60 107.14 707.3 705.65 ES-1 0.0054 0.80 185.19 706.7 708.00 Corr. PVC Drainspout 708.00 Corr. PVC Drainspout 708.00 Corr. PVC Drainspout 709.00 Corr. PVC Drainspout 711.00 Corr. PVC Drainspout 711.00 Corr. PVC Drainspout 711.00 Corr. PVC Drainspout 711.00 Corr. PVC Drainspout 709.00 Corr. PVC Drainspout Type Cap.Chk RCP o.k. Existing Culvert (NIC) RCP o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. PVC o.k. • Century Graphics Detention Pond Data 0 0 • - T •• T T T T T T T T T T T ':' V �•. r T �R�knTUr kJVKcTF�ciK�Ik O*hT,a 5WW. T b*yyi,�.C*R.. T7V�ET.CTT��}},, . T Century el__ryGraphics amihis^, .y- r d a� 1�A.�:'r:�•.:a i� _ _-,-_'l•J;, Ti..-.1 .. � - �T•`. T T T T T T T T .ice. � .. y� .w � T �. �, 1. iT � .i n w �'1� T T � .1 .. .1• � •�.. _. .T. (Types. !:Weir; 2:Pipe; _.:raiser-) Weir: Kiser: ire: ` urface: 1: 4: S: c. 7: 8: 9: 10: 11: 12: 1_: :4: i5 : 16: 17: 18: 19: 20 : Type Elevation f'_, Length (rt) Coefficient Elevation, (ft) Diameter !_. Orifice Elevation ,ft. Orifice Diameter (in) Orifice Elevation ,ft; Orifice Diameter (in) Orifice Elevation (ft) Orifice Diameter (in` invert Elevation = t Inve ��.e�,�a..ion , Diameter (in) ) Orifice Diameter Ict=. in Length (ft Manning's Slope (ft/ft) Entrance Loss Coeffici_ Initial Elevation aft` Structure 1 ------------ 2: P i P - 0. 00 ". `-' 703. 7!' no _`.1.0:i _.00_ n, t 0.6 75 Str-t_._tt_tr-__ 7 1W'.._ .. - __ t5 - , -, ;' �: _7,_ . _ r;1 ��. r�.,� �. -- _-__ i; , �� I Century Graphics Detention Pond Two, Ten and 100 Year Storm Routing 0 0 A0 PAR SIGRA RCUTIN; ontral! RW - Riser acting as a wair RD - RisEr acting as &q vri"iae PI - Horizontal pipe in inist wortvz. PU = Horizontal pipe ;n mut]et cp,t : 'ime TnTlow Pipe Weir Total Elev stzraq::� Wini ;7fsj Wfs) QCfs; (cfs) �fu) ---------------------------------------------- im 0.96 FA -- -7 2.0 1.92 0.1 P Z 0.02 PAO �T A 23.A. 1 �2 0". 4.0 7.85 5.0 6.0 4.81 5.77 03 PI 0.4 PI 0.0 00 0.26 0.36 YJ4.07 704.1- 7-0 6.73 0.3 FO 0.6 Pf 0-0 OW 0.30 0.56 707 1- 7nd 72 8.0 7.70 0.7 PI CIG 0.69 M 9.0 8.66 0.8 PI n,r CAI 7-4 7. in !:.5G 1-5 PT 1.47 7 10-0 1.6 PI n 1.5s 704-0� I's 16.0 10.78 1.7 P! 0- LAT 7-A,6S 6,� 17.0 10.20 1.8 PI U.0 1,7S 7GC.70 I 00� ao 9.62 1.9 PI A,n 1.97 70Z.72 7'44tL Q- 19.0 9.05 1.9 Pf oz 1.75 7044 7.=�?,W' 8.07 2.0 z! QA 0 21.0 14.6 -vy 7 RL 1.1 FT 0,0 1XL n4.70 o �a.Q 2.1 2-L0 704. 0.0 0 RE A. 1 2.10 704.u� 7 25 7. 07 ��(G(s!�1n, EEN YEAR STORM ROUTIN3 Control: RW = Riser acting as =. weir RU = Riser acting as an orifice PI = Horizontal pipe in inlet con'•_roi PO = Horizontal pipe in outlet control Time Inflow Pipe Weir (min) ---------------------------------- (cfs) (cfs) (cfs) .0 0.00 0.0 0.0 1.0 1.31 0.0 P1 0.0 2. 4.0 5.24 0.3 F:1 0.0 5.0 6.55 0.4 F ! 0. v .0 7.86 06 .0 P1 . 7.0 9.16 0.7 PI 0.0 8.0 10.47 0.9 FI 0,0 9.0 11.78 1.0 P` 0.0 10.0 13.09 1.2 PI 0.0 11.0 14.40 1.3 r_ 0,0 12.0 15.71 1.5 f_ . 1=.0 17.02 1.. ! _.. 14.0 16.24 1.8 Pi O. 15.0 15.45 2.0 FI - 0.0 16.0 14.67 2.1 F'I 0.0 17.0 13.88 2.1 F'I ' .0 18.0 1.=.10 2.2 PI 0.0 19.0 12.32 2.2 PI 0.0 20.0 11.53 2.2 PI 0.0 21.0 10.75 2.2 PI 0,0 2=.0 9.16 2. "r - 24.0 E.40 2.3 F'- 0.0 25.0 7.11 2 P! 0.0 07.0 6.04 2.3 i - . _ 50.0 1.00 . _ 32.0 2.12 2.1 PI 0.0 Total Elev `storage (cfs) (ft) (,._u ft) .00 703.75 0.05 703.85 16, E: 0.11 70Z.97 129. J._ 0.21 704.00 '.t_ 6 . ZC 0.31 704.07 560.56 0.44 704.15 o--,o -, . • �, 0.5E � � 704.22 i'�. 1,36B.17 0.72 704.29 1,S66.54 0.86 o 704.35 2,472.66 1.01 704.41 3,066.77 1.17 704,49 76o 92 1.33 704.54 4.539.07 1.49 704. ..- ' ` r:r-. 1.66 704.60- 282 ,62 1.82 704.71 .i 9 i 1 1.97 704.7' B4O39.57 2.07 704.80 c S29.92 2.12 704.83 9 2.16 704.a7 10,254.59 2.20 704.90 10,S90.6o 2.20 704.92 i • l 7 - 2.27 7: .. ... 2,5Z 7 t ..- .. - .!_ . 2.71 -. -- ' _ .. - -. ai Ax Y _.. Z. . o.•'� r �� � �.,:,. •- « +•.! moo;"y_ L • ONE HUNDRED YEAR STORM ROUTIN-0 Control: RW = Riser acting as a w_=i;- RO = Riser acting as are orifice PI = Horizontal pipe in iriez control PO = Horizontal pipe in rutle` control _ma inflow Pipe Weir Total ' Clev stn ge (min) (cfs) Qfs) (cfs) (cfs) lft) CCU ft) 2.0 3.79 0.2 H ! 0.0 0.16 703.96 703.9 " 210.17B 3.0 5.69 0.3 P I 0.0 0.28 ' 704 . 05 7 4.0 7.59 0.4 Pi 0.0 2.41 704.13 B47.06. 5.0 9.49 0.6 P! 0.0 0.57 704.21 1.320.74 6.0 11.38 0.7 P! 0.0 0.74 704.30 1,949.82 7.0 13.28 0.9 c• I 0.0 0.92 704.3E 2,676.67 , -.:' 17.07 1.3 ,-I 0.0 1.70 04.5= 4 FIE • 1i.0 20.87 1.7 .. l 0.0 1.72 704.67 10.0 24.66 2.1 � ! I 0.0 9 704.81 -- - . 7r-i 14.0 23.53 P! 0.0 2.17 704.88 10.469.46 15.0 22.39 2.2 PI 0.0 2.25 704.93 11,730.34 16.0 _ P! 0.0 2.31 704.98 __ 1`.`.44 ,`' 17.0 20.12 2 ' u.07 18.0 1S.9R 2.4 F! 0.0 2.41 705 ,0261- - ,•, 20.0 16.71 2.5 C _ 0.0 ._ : _ _ 705.14 _r 21.0 15.57 2.5 .' _ 0.0 2.51 705.17 li - ' -_.... . _ . ._ i. - 14.44 44 13.33 2.6 .- i t . I _ 55 - - 5 1 _ .- - _. . _... . _ 14.3 - 2 . 1 2.6 2.6 - i . _ 6,3 3.0 2,07 _ 705.2C - - - . - ... _ _ 7,004.64 2 - - . 11.03 2.6 _.M5.22 __.. .. 2 50.Q .- 5.35 2.6 • _ � i SA l . - . __ L.63 _ ._ ..._ ._ 705.2b .... . _ -_ . .. ._ _.. 20,005.07 --•- 1.94 .G PI 0.1 2.71 705.26 20 <. ft .S5 0 0 0 0 77777777T� SITE PLAN APPLICATION DATE 2-12-91 APPLICATION # W5-q t Complete the following application: 1. Development Name: Century Graphics Corporation Addition 2. Location of Property: Lenoir Drive (by street name) Stonewall Industrial Park Winchester/Frederick County, Virginia 3. Property Owner: Century Graphics Corporation Address: 1013 McDermott Road Metairie, Louisanna 70001 Telephone: (504) 836-6000 .* G=EVARO 9ZC-P'T5 4. Applicant/Agent: Howard Shockey & Sons, Inc. Address: Box 2530 Winchester, Virginia 22601 Telephone: (703) 667-7700 5. Designer: Howard Shockey & Sons, Inc. Address: Box 2530 Winchester, Virginia 22601 Telephone: (703) 667-7700 Contact: Terry Stone (703-665-9554) X "�7,Wv 1, E I Is • 6. Is this an original or revised Site Plan? Original Revised X 7. Total area of parcel to be developed: 11.02 Acres 8. Property Information: a) Tax Map: 43 b) Parcel Number: 55-Q c) Tax ID # : 43000-A00-0000-0000-0055-0 d) Current Zoning: M-1 e) Present Use: Industrial f ) Proposed Use: Industrial g) Adjoining Property Zoning: M-1 (see Site Plan) h) Adjoining Property Use: Industrial (see Site Plan) i) Magisterial District: Stonewall I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Applicant's Signature: 11 I�p�6 dry FEB 2 19q� 0 X 0 �� 5 vt=i-. 005-` 1 1' January 18, 1991 Evan Wyatt Planner Frederick County Planning Department 9 Court Square, P.O. Box 601 Winchester, VA 22601 Re: Century Graphics Corporation Building Printing Plant Addition 17555.123 Dear Evan, ENGINEERS ARCHITECTS SCIENTISTS We have reviewed the above referenced site plan and offer the following comments: 1. ACCESS ISSUES: The developer/owner anticipates no additional employees as a result of this addition. Using ITE methods, a building of this size generates a substantial flow of traffic. However, the fact that the development is within the Stonewall Industrial/Lenior City Industrial Parks, access to this lot is assumed consistent with the master development plan and the generated traffic should not create a major detrimental impact on the surrounding road system. 2. DRAINAGE AND STORMWATER MANAGEMENT: The drainage divide and storm water management design was provided and appear adequate. 3. EROSION AND SEDIMENTATION CONTROL: The erosion and sedimentation control measures and narrative have been provided and are acceptable. We can recommend the approval of this plan as submitted. Sincerely, DONOHU & ASSO A S, INC. Paul A. Bernard, P.E. Project Manager PAB/j la M 11240 Waples Mill Road, Suite 100, Fairfax, Vicgiuia 22030 N 703.385.3566 N Fax 703.385.8319 rt> Printed nil n,' rec_rcled paper . • 11240 Waples Mill Road ENGINEERS Suite 100 ARCHITECTS Fairfax, Virginia 22030 SCIENTISTS 703.385.3566 Evan Wyatt, Planner Frederick County Planning Department 9 Court Square, Box 601 Winchwster, VA 22601 Your Authorization: Signed Agreement Century Graphics Corporation Building Printing Plant Addition • Date: Jan. 16, 1991 Please Reference: Project No. 17555. 123 Invoice No. 9100636 Client No. 07534 Project Manager 2.0 hrs @ 33.25 66.50 Engineer 4.0 hrs @ 19.90 79.60 Admin. Assist. .5 hrs @ 14.50 7.25 Total Direct 173.25 Total Indirect 259.88 TOTAL DUE THIS INVOICE $433.13 Copy To: Division 0 r ENGINEERS ARCHITECTS SCIENTISTS 11240 Waples Mill Road Suite 100 Fairfax, Virginia 22030 703.385.3566 Evan Wyatt, Planner Frederick County Planning Department 9 Court Square, Box 601 Winchwster, VA 22601 Your Authorization: Signed Agreement Century Graphics Corporation Building Printing Plant Addition Date: Jan. 16, 1991 Please Reference: Project No. 17555.123 Invoice No. 9100636 Client No. 07534 Project Manager 2.0 hrs @ 33.25 66.50 Engineer 4.0 hrs @ 19.90 79.60 Admin. Assist. .5 hrs @ 14.50 7.25 Total Direct 173.25 Total Indirect 259.88 TOTAL DUE THIS INVOICE $433.13