HomeMy WebLinkAbout003-91 Glaize & Bro. - Shawnee District - Backfile (2)-AECEIPT
N2 02288s
AMOUNT DUE
I j
AMOUNT PAID V�
BALANCE DUE
fi
PAID BY
CASH
HECK
OTHER
/ RECE
ADDF
THE
FOR
FF<l_i oiIi•i' __; PLWN;NG AND DEVELOPMENT
P.O. iJLX 6C1 • 9 COURT SQUARE
WINCHCITER, VIRGINIA 22601
vv
By
Dnr T�Kl[ R� RF ORDER No 3221 — Pooled in USA
0
SITE PLAN CHECKLIST
The application is not complete if the following are not present
1. 1 set of comment sheets from the following agencies along
with any marked copies of the plan:
►� A VDOT City of Winchester
W Co. San. Auth. Co. Health Dept.
Inspections Parks & Rec.
Fire Marshall Airport Authority
A Engineer
�I 2. 1 copy of the SITE PLAN Application
3. 5 copies of the plan on a single sheet
4. 1 reproducible copy of the plan (if required)
5. a 35mm. slide of the plan (if required)
TRACKING
DATE
Z Application Received
---�— Review/Invoice received from Engineer
.?� Fee Paid ( amount $
A Site Plan heard by Planning Commission (if required)
Final Site Plan submitted with review agency, Planning
Commission, and staff comments addressed.
4/Z-hf;
.
F-U01 Q
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
rAX: 540/ 665-6395
December 22, 2010
Subject: LETTER TO FILE — CAMPFIELD, LLC (PIN#64-A-80J)
Building Permit #1752-2010
On October 21, 2010, a meeting was held with Mark Cheran, Candice Perkins, Ron Mislowsky and JP Carr
to discuss a site plan submitted to the County for a new warehouse at the Probuild Site. At that
meeting, Staff agreed to allow the warehouse site plan to proceed by only addressing parcel 64-A-80M
with the submitted site plan. At that meeting, JP was informed that any future revisions to the ProBuild
parcel (64-A-80J) would require a new site plan and that site plan would need to address parking lot
upgrades. There were na_clisagreements during that meeting as to the future expectations for the
ProBuild site. Also discussed at that meeting was the removal of the lean-to that was attached to the
main building; staff was informed that the lean-to would not be rebuilt.
On December 1, 2010, a permit was applied for to demolish an existing garage area (referred to as lean-
to) on a structure located at 296 Arbor Court and construct a new attached shed roof building in its
place. The lean-to appears to have been constructed sometime between 1987 and 1988 without the
approval of a site plan and, therefore, was constructed in violation of the County Code. On December
15, 2010, staff received a call from JP Carr with Campfield, LLC who stated that the lean-to needed to be
demolished and rebuilt because it was unsafe. Staff informed Mr. Carr that Planning Staff would sign off
on this permit to alleviate the safety concern but would be unable to sign off on any further revisions on
the property without approval of a new site plan.
Please note that any new site plans submitted for parcel 64-A-80J and/or 64-A-80M will need to
address necessary upgrades and revisions to the site. Upgrades include, but are not limited to, the
gravel parking lot which appears to have been installed'sometime in the late 1980's. This parking lot
was not installed per the requirements of the County Code. Staff will not sign off on anv additional
building permits without the submission and approval of a site plan for the property that complies
with the Code of Frederick County.
Candice E. Perkins, AICP
Senior Planner
CEP/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
COUNTY of FREDERICK
i
Department of Planning and Development
703/665-5651
FAX 703/678-0682
April 3, 1991
Glaize & Brothers Component Division
ATTN: Mr. Scott Garber, Plant Manager
2749 Victory Lane
Winchester, Virginia 22601
Dear Mr. Garber:
The Frederick County Planning Department administratively approved
Site Plan #003-91 of Glaize & Brothers Component Division on April
2, 1991. This plan calls for the construction of three (3) storage
facilities for lumber, totaling 10,140 square feet in area. The
two (2) storage facilities located in the front yard setback
received a fifty (50) foot front variance on March 19, 1991.
Enclosed is a copy of the approved site plan for your records.
If I may answer any questions regarding this letter, please contact
me.
Sincerely,
&0- 1
'J
Evan A. Wyatt
Planner II
EAW/dds
cc: Mr. Harrington Smith, Jr., Shawnee District Supervisor
Mr. Lee A. Ebert
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
�JiCAPOF FREDERICK, ��,IRGINI
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. 0710920556 Date Received 062692 Date Reviewed 071092
Applicant Name Ricketts Const . Company
Address 36 Ricketts Drive
Winchester, VA 22601
Project Name Glaize & Brothers
Phone No. 703-662-416 4
Type of Application
1st Due Fire Co. 18
Election District
Site Flan
Shawnee
Current Zoning
1st Due Rescue Co. le
RECOMMENDATIONS
Automatic Sprinkler System X Residential Sprinkler System
Automatic Fire Alarm System X Other
Emergency Vehicle Access;
Adequate Y Inadequate Not Identified
Fire Lanes Required; Yes x No
Comments: Access to building perimeter must be maintained at all tidies.
Roadway!Aisleway Widths;
Adequate x Inadequate
Special Hazards Noted; Yes
Comments:
Not Identified
No x
�
UH
0 40
Hydrant Locations;
Adequate Inadequate Not Identified X
Siamese Connection Location;
Approved Not Approved Not Identified X
Additional Comments: 1> Access must be maintained during construction
for emergency vehicles. 2> Burning of construction debris on site is
prohibited.
Review Time .50 hr.
Douglas A. Viracofe
Fire Marshal
mv)",Uq L4 3(qi L IcsryyNrn—i
• i.�GoT GW,6r r' CPC (
COUNTY OF FREDERICK, VIRGINIA
FIRE AND RESCUE DEPARTMENT
21 Court Square, Winchester, Virginia 22601
"Thomas W. Owens
Director
M E M O R A N D U M
TO: Evan Wyatt - Planner
FROM: Douglas A. Kiracofe - Fire Marsha
SUBJECT: Glaize Truss Facility
DATE: April 3, 1991
Douglas A. Kiracofe
Fire Marshal
After speaking with Mr. Scott Garber about the type of
structure they are proposing, I feel I can approve the site plan
though this storage structure exceeds the limits of coverage
defined in Frederick County Chapter 10. There will be no
exterior walls to this building, a roof only, and probably the
storage arrangements will be better than no building being there.
I would request that as a safety to firefighters a 20' fire lane
be required around this building maintained clear and accessible
at all times, enforceable by the Fire Marshal Office or Frederick
County Sheriff's Dept.
Should you have further questions, please contact me at 665-
6350.
DAK:jla
cc: File
DIRECTOR - (703) 665-5618 FIRE MARSHAL - (703) 665-6350 FAX - (703) 667-0370
i
DATE
SITE PLAN APPLICATION
APPLICATION # &) -:3 - 9 /
Complete the following application:
1. Development Name: Glaize & Brother Component Division
2. Location of Property: 2749 Victory Lane
(by street name)
3. Property Owner:
Address:
Frederick -County, Virginia:
Glaize & Brother
X£ !"4"3`Xti'i'� E'E'TfKI:!PK�y�1 A7 y�Fr��► a.�E'�PXXG'3'T��,'3'i2-3 �P""%'�t9�1�
302 North Cameron Street, Winchester, VA 22601
Telephone: XX (703) 662-3451
4. Applicant/Agent: Mr. Scott Garber, Plant Manager
Address: 2749 Victory Lane
Winchester, Virginia 22601
Telephone: (703) 665-0078
5. Designer: Lee Ebert, Surveyor
Address: 35 West Boscawen Street
Winchester, Virginia 22601
Telephone: (703) 667-3233
Contact: Lee
61
6. Is this an original or revised Site Plan?
original Revised X
7. Total area of parcel to be developed: XRSY&X 15.5 Acres
8. Property Information:
a) Tax Map: 64
b) Parcel Number: 801
c ) Tax ID # : 64000A00000000000080J
d) Current Zoning: M-1
e) Present Use: MANUFACTURING
f) Proposed Use: STORAGE FACILITIES FOR LUMBER
g) Adjoining Property Zoning: M-1,RA,AP-1
h) Adjoining Property Use: LIGHT INDUSTRIAL, VACANT, AIRPORT
i) Magisterial District: SHAWNEE
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submission of my site plan.
Applicant's Signature: �C' � -, & . &- ,,—
I
' • •
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703/667-0370
February 5, 1991
Glaize & Brothers Component Division
Attn: Mr. Scott Garber, Plant Manager
2749 Victory Lane
Winchester, Virginia 22601
RE: Preliminary Review Of Site Plan #003 91
Dear Mr. Garber:
This letter regards my preliminary review of the proposed lumber
storage buildings to be located on parcel 64000-A00-0000-0000-
0080-J in the Shawnee Magisterial District. I offer the following
comments:
1) This project conforms with all zoning requirements with the
exception of the front yard setback requirements. M-1 Zoning
Districts require a seventy-five (75) feet setback for all
structures.
2) The comments made by the Fire Marshal need to be addressed.
In particular, the comment related to the proposed 26' x 190'
storage building. I will need a comment from the Fire Marshal
that states approval of this project.
3) It would be to your benefit to insure that the spacing of all
proposed buildings conforms to Use Group "S", Section 310 of
the BOCA National Building Code, 1987. Sometimes there is a
minimum spacing require between structures.
4) I realize that you have requested a variance to reduce the
front yard setback requirements. The Board of Zoning Appeals
will conduct their regular meeting on February 19, 1991 at
3:25 p.m. in the Old County Courthouse. If a variance to
reduce the setback requirements is not granted, the site plan
will have to be revised to reflect current setbacks in the M-
1 Zoning District.
5) We have included your project on the Planning Commission's
Bimonthly Report for their regular meeting of February 20,
1991. If you have received the variance, and the Planning
Commission does not request to have your site plan submitted
as a formal agenda item to be reviewed! I will recommend
approval of this site plan.
9 Court Square - P.O. Box 601 - Winchester, Virginia - 22601
1J
0
Please remember that the structural drawings for this project must
be reviewed by the Building Inspections Department before a
building permit will be issued. Any questions regarding structural
reviews should be addressed to Boyd Pitcock of the Building
Inspections Department.
I hope this preliminary review is beneficial to your project. If
I may answer any questions regarding this letter, or be of any
assistance, do not hesitate to contact me.
Sincerely,
Evan A. Waytt, Planner II
EAW
Enclosures
0 0
C
COUNTY of FREDERICI{
Department of' Planning and De\elopmen:
703 665-5651
REQUEST FOR SITE PLAN COMMENTS FAX 703 667-03;t
/Frederick County Inspections Department
P.O. Box 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Inspections Department is located at 9 Court
Square in Winchester, if you prefer to hand deliver this review
form.
_..Applicant's name, address and phone number:
Mr. Scott Garber, Plant Manager (703) 665-0078
2749 Victory Lane, Winchester, Virginia 22601
,_Name of development and/or description of the request:
Glaize & Brother Component Division
Three (3) lumber storage sheds.
Location:
Route
50
East
to
Route
728
(Victory Lane),
turn right
and
go 4/10
mile
and
turn
right
on
dirt
road..,Property
is located
at
end of road
Inspections Department Comments:
Z % / S, >" �Q ' �' -j �O 1^� t� / 'T C /' Ac iiJ
7 so
I!
Inspect. Signature & Date: ___,_ ,
(NOTICE TO INSPECTIONS - P PASSE RETURN THISIFORM TO APPLICANT.)
NOTICE TO APPLICANT
It is your responsibility to complete this form as accurately as
Possible in -rde to assist ',he agency with their review. Also,
of your plans and/or application form,
please attaci�� cop
9 Court Square - P.O. Box 60' - %\'inchester, Vir�ilnia 601
_
�
OF FREDERICK" VIRGI����
;
�- FIRE MARSHAL'S OFFICE ��
LAND DEVELOPMENT COMMENTS
- -�^p*r W-�-11
Control No, 020591099 Date Received 012391 Date Reviewed 020591
Applicant Name Scott Garber, Plant Mgr.
Address 2749 Victory Lane
Winchester, Virginia 22601
Project Name Glaize & Bros. Comoonent Div.
Phone No. 703-665-0078
Type of Application
1st Due Fire Co. 18
Election District
Site Plan Current Zoning
1st Due Rescue Co. 18/3
Shawnee
Automatic Sprinkler System
Automatic Fire Alarm System
Emergency Vehicle Acce
RECOMMENDATIONS
X Residential Sprinkler System
Other
Adequate X Inadequate ,W Not Identified
Fire Lanes Required; Yes X No
------- -----'
Comments: Fire lanes 20' in width are required between all stacks of
lumber storage and around buildings.
Roadway/Aisleway Widths;
Adequate X Inadequate Not Identified
�
Special Hazards Noted; Yes X No
Comments: The northern end of the largest building is going to be
approximately 800' away from the nearest hydrant. This will create severe
- .. . .... ...����������������
water supply problems should a fire occur in this structure, & does not
form with with Frederick County Chapter 10.
-Continued-
Hydvant Locations;
AdG'cC3U,-AttI X
• 0
1 1"i a d e O U cd t Eid l`J o t; 1 d E.i''i'1 t l iI i e?
Siamese Cii1"11'lt.CtiEi1"1 L..Gc6itic,fl;
ApF)v- oves'd IV(--�t Ar)pl-ove_e:E t'.lot Identified k
AdditiE-nal Commel'ltWi: Separation i:ii:�t�rlc�:=.� bratween I.3Liild.ings and between
La.:terior walls and lines appecar- great enat-tat1 thl -.at e.:terior walls
will reat..tire no fire v-atina.
Access to all sides of the =it1'UCti".treS Okt all ti.M1--5. iS 7.it7.'1e for
effective fire :-,t..tppre=sSic,n operations.
Re View Time .'5) l")rs.
u
Fire tIar'yhcll