HomeMy WebLinkAbout014-91 W.S. Frey Company, Inc. - Stonewall District - BackfileRECEIPT
I-i.;: UG�v:. U
AMOUNT DUE
$ of c�U
$ I r40) yU
BALANCE DUE
s
CASH
CHECK
1
OTHER
DATE j'
RECEIVED FROM____ -�M �Y: ✓1 I I fY
ADDRESS
THE SUM OIF _ ` DOLLARS S _
FORt 1s)i� - t'ti. �•_ iT� `-�I-�1�i j /�f1/1 of�
rno�c���-sc4
1
Ins I Alf W, 1l1 01rf 11 N, ^221 -- Pr1111ed iri USA
V . S. ray Co. -rW . --# 61+-91
=� STAFF SITE PLAN CHECKLIST =k
This application is not complete if the following are not included:
1. One set of comment sheets from the following agencies along with any marked
copies of the plan;
VDOT
Sanitation Authority
Inspections Dept.
Fire Marshal
County Engineer
Airport Authority
7• 1-0 l 2. One copy of the Site Plan application.
�1 hvee.
7 �1I 3. Y-i�e copies of the Site Plan.
4. One reproducible copy of the Site Plan (if required).
5. One 35mm. slide of the Site Plan (if required).
TRACKING
Date
-7• 1 • a Application received.
City of Winchester
Town of Stephens City
Town of Middletown
Health Dept.
Parks & Recreation
Soil & Water Conservation Dist.
All necessary agency comments received.
%• 1 •q I Fee Paid (amount $ I >200. °= ). Now Res. itI,000 + *20010cre
7 I7•41 Site Plan to Planning Commission via bi-monthly.
Site Plan heard by Planning Commission (if required).
Revisions received (if required).
Date of approval.
Info added to annual report diskette.
;4 Lt .tv
Situ
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703/678-0682
August 6, 1991
W. S. Frey Company, Inc.
Attn: Mr. Mark A. Georgiana
P. O. Box 65
Clear Brook, VA 22624
RE: Site Plan for Lime Kiln #2 Addition
Dear Mark:
The Frederick County Planning Department administratively approved
site plan #014-91 of the W. S. Frey Company on August 5, 1991.
This site plan calls for the construction of a new lime kiln
facility equipped with a burner building, a laboratory, storage
silos for materials, a belt conveyor system for the kiln and
screening stations, and sediment ponds to accept and control post
development runoff. Enclosed is a copy of the approved site plan
for your records.
If I may answer any questions regarding this letter, please contact
me.
Sincerely,
Evan A. Wyatt
Planner II
EAW
cc: Mr. Charles W. Orndoff, Stonewall District Supervisor
Mr. Michael A. Didawick, Director of Assessments
Mr. Mike Washer, Reimer and Fisher Engineering, Inc.
THE COURTHOUSE COMMONS
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
- SPo 014-91
NOTIFICATION FORM FROM LOCAL GOV&ING BODY
Please submit completed form to: Director, Region VII
Virginia Dept. of Air Pollution
Control
6225 Brandon Ave. - Suite 310
Springfield, Virginia 22150
This is in reference to the application by
(company Name)
W.S. Frey Co., Inc for a permit from the Department
of Air Pollution Control to construct (or modify) and operate a
Lime Kiln Installation at Clear Brook, VA
Type of Facility)
(Site)
located in Frederick County VA
(Municipality)
This is to inform you that the proposed location and
operation of this facility is consistent with all ordinances.
adopted by pursuant to Chapter 11
(Municipality)
(§ 15.1-427 et seq.) of Title 15.1 of the Code of Virginia.
Additionally, for informational purposes, please check the
a o riate statement below:
At this time, I am unaware of any controversy regarding
this permit application. If this should change at a
later date, I will notify your Department as soon as
possible.
OR
There in controversy regarding this application as
follows: (Please explain. Is it air -quality related?)
(Signed) Name:
Title: my Administrator
Municipality of. County of Frederick, Virginia
Date: March 5, 1992
filename: noticel.let
NOTIFICA'T`XON FROM LOCAL G-WERNiNG BODY
3`r Effective July 11 1990, Section 10.1-1321.1 of the Code of
Virginia specifies that:
"A. No a ppli ca tion for a permit fc -r a new or modified
stationary air pollution source she.11 be considered complete
unless the applicant has provided 1-he Director with
notification from the governing boc'y of the county, city, or
town in which the source is to be Located that the location
and operation of the source are consistent with all
ordinances adopted pursuant to Chaj-ter 11 (§ 25.2-427 et
seq. ) of Title 15.1.
"B. The governing body shall inform the applicant and the
Department of the sources compliarce or noncompliance not
more than 120 days from receipt by the chief executive
Officer, or his agent, of a request from the applicant."
In an effort to expedite the g your permit
p proce_ sin of
application, it is suggested that the attached form be submitted
to the appropriate officials of the county, city, or town in
which your facility is to be located. 'I he local officials may
use this form or submit the certificaticn in some other form.
Because the local governing body has 120 days in which to
respond, and because the Department care of complete the review of
the application until the certification is received, it is to
your advantage to request this certification at the earliest
Possible date.
Section 120-08-01 C.4 of the Regulations for the Control and
Abatement of Air Pollution states that prior to the decision of
the Department, certain permit applications shall be subject to
a public comment period of at least 30 days. In addition, a
public hearing shall be held in those instances at the end of the
public comment period. Applications that fall into this category
include: major sources, sources of hazardous pollutants, and
those that are opposed by an individual :)r that have generated
adverse co=,ent from a local official, governing -body, advisory
board, other governmental agencies, or iz the media.
i
filename: noticel.app
ON FORM FROM
Please submit completed form to: Director, Region VII
Virginia Dept. of Air Pollution
Control
6225 Brandon Ave. - Suite 310
Springfield, Virginia 22150
This is in reference to the application by
(Company Name)
W .S Fran rn Tnc- for a permit from the Department
of Air Pollution Control to construct (or modify) and operate a
Lime Storage Expansion
Type of Facility)
located in
at Clear Brook
(Site)
Frederick County VA
(Municipality)
This is to inform you that the proposed location and
operation of this facility is consistent with all ordinances
adopted by
pursuant to Chapter 11
(Municipality)
(§ 15.1-427 et seq.) of Title 15.1 of the Code of Virginia.
Additionally, for informational purposes, please check the
appropriate statement below:
At this time, I am unaware of any controversy regarding
this permit application. If this should change at a
later date, I will notify your Department as soon as
possible.
OR
There is controversy regarding this application as
follows: (Please explain. Is it air -quality related?)
(Signed) Name:
Title:
Counfy Administrator
Municipality of: County of Frederick, Virginia
Date: March 5, 1992
filename: noticel.let
0
NOTIFICAUON FROM LOCAL GOVERNING 13ODY
Effective July 11 1990, Section 10.1-1321.1 of the Code of
Virginia specifies that:
"A. No application for a permit fc-r a new or modified
stationary air pollution source she.11 be considered complete
unless the applicant has provided 1-he Director with
notification from the governing boc'y of the county, city, or
town in which the source is to be Located that the location
and operation of the source are coi sistent with all
ordinances adopted pursuant to Chapter 11 (§ 25.1-427 et
seq. ) of Title 15.1.
"B. The governing body shall inform the applicant and the
Department of the source's compliarce or noncompliance not
more than 120 days from receipt by the chief executive
Officer, or his agent, of a request from the applicant."
In an effort to expedite the processing of your permit
application, it is suggested that the attached form be submitted
to the appropriate officials of the courty, city, or town in
which your facility is to be located. the local officials may
use this form or submit the certificaticn in some other form.
Because the local governing body has 120 days in which to
respond, and because the Department cannot complete the review of
the application until the certification is received, it is to
your advantage to request this certification at the earliest
Possible date.
Section 120-08-01 C.4 of the Regulations for the Control and
Abatement of Air Pollution states that prior to the decision of
the Department, certain permit applications shall be subject to
a public comment period of at least 30 days. In addition, a
public hearing shall be held in those instances at the end of the
public comment period. Applications that fall into this category
include: major sources, sources of hazardous pollutants, and
those that are opposed by an individual Dr that have generated
adverse comment from a local official, governing --body, advisory
board, other governmental agencies, or i-i the media.
filename: noticel.app
•
�. (-,L . 5Q A-' 01-1 -9 1
NOTIFICATION FORM FROM LOCAL GOVERNING BODY
(This space for Regional
Office address)
,This is in reference
W . S Frey Company
Department of Air Pollution Control
6225 Brandon Avenue
Suite 310
Springfiekf, Virginia 22150
to the application by _
for a
of Air Pollution Control to construct
(Company Name)
permit from the Department
(or modify) and operate a
Lime Kiln Processing Plant at Clear Brook, VA
(Type of Facility) (Site)
located in Frederick County, VA
(Municipality)
This is to inform you that the proposed location and
operation of this facility is consistent with all ordinances
adopted b FRt=DER 1 c�
p Y pursuant to Chapter 11
(Municipality)
(§ 15.1-427 et seq.) of Title 15.1 of the Code of Virginia.
Additionally, for informational purposes, please check the
appropriate statement below:
At this time, I am unaware of any controversy regarding
this permit application. If this should change at a
later date, I will notify your Department as soon as
possible.
OR
There is controversy regarding this application as
follows: (Please explain. Is it air -quality related?)
(Signed) Name:
(Type or Print) Name:
Title; IL
Municipality of: FiZEDtRie..K Cauu-�IVA
Date: 9 19
0
NOTIFICATION FROM LOCAL GOVERNING BODY
Effective July 1, 1990;�Section.10:1-1321.1 of the Code of
Virginia specifies that:
"A. No application for a permit for a new or modified
stationary air pollution source shall be considered complete
unless the applicant has provided the Director with
notification from the governing body of the county, city, or
town in which the source is to be located that the location
and operation of the source are consistent with all
ordinances adopted pursuant to Chapter 11 (§ 15.1-427 et
seq.) of Title 15.1."
"B. The governing body shall inform the applicant and the
Department of the source's compliance or noncompliance not
more than 120 days from receipt by the chief executive
officer, or his agent, of a request from the applicant."
In an effort to expedite the processing of your permit
application, it is suggested that the attached form be submitted
to the appropriate officials of the county, city, or town in
which your facility.is to be located. The local officials may
use this form or submit the certification in some other form.
Because the local governing body has 120 days in which to
respond, and because the Department cannot complete the review of
the application until the certification is received, it is to
your advantage to request this certification at the earliest
possible date.
Section 120-08-01 C.4 of the Regulations for the Control and
Abatement of Air Pollution states that prior to the decision of
the Department, certain permit applications shall be subject to a
public comment period of at least 30 days. In addition, a public
hearing shall be held in those instances at the end of the public
comment period. Applications that fall into this category
include: major sources, sources of hazardous pollutants, and
those that are opposed by an individual or that have generated
adverse comment from a local official, governing body, advisory
board, other governmental agencies, or in the media.
0/ f
i COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
FAX 703/678-0682
July 1, 1991
W. S. Frey Company, Inc.
Attn: Mr. Mark Georgiana
P.O. Box 65
Clear Brook, VA 22624
RE: Site Plan Submittal.
Dear Mr. Georgiana:
As requested, this letter verifies the submittal of a site plan for
proposed improvements to the W. S. Frey site. This site plan was
submitted to our department on July 1, 1991 for consideration.
Please use this letter as proof of your site plan submittal to this
office. If I may answer any questions, do not hesitate to contact
me.
Sincerely,
Evan A. Wyatt
Planner II
EAW
THE COURTHOUSE COMMONS
9 N. Loudoun Street - P.O. Box 601 - Winchester, Virginia - 22601
•
DATE June 28, 1991
SITE PLAN APPLICATION
APPLICATION #
kale)u. - - 0- 1. SEA..
0
1. Development Name: W. S. Frey Company, Inc.
2. Location of Property: Route 672
(by street name)
Clear Brook, Va. 22624
3. Property Owner:
Address:
W. S. Frey Company, Inc.
P. 0. Box 1624
York, Pa. 17405
Telephone: 717-848-2369
4. Applicant/Agent: W. S. Frey Company, Inc.
Address: P. 0. Box 65
Clear Brook, Va. 22624
Telephone: 703-662-3855
5. Designer:
Address:
Telephone:
Contact:
Reimer and Fisher Engineering, Inc.
968 Postal Road
Allentown, Pa. 18103
215-266-2660
Mr. Mike Washer
5
r
'J{IL I991 �,
RECEIVED
pin
14' sa at
s
� �JIIL 1991 0
J
6. Is this an original or revised Site Plan? RECEIVED
Ori final X Revised $ PAD ��0
Ou 81.
7. Total area of parcel to be developed: 2.0 Acres
8. Property Information:
a) Tax Map: 34-000-A00-0000-0000-0011-0
b) Parcel Number: N/A
c) Tax ID #: 33-A-146
d) Current Zoning: EM
e) Present Use: Mining/Manufacturing
f) Proposed Use: Mining/Manufacturing
g)Adjoining Property Zoning: RA, M1, Residential
h) Adjoining Property Use: Agricultural, Light Industrial, Residential
i)Magisterial District: Stonewall
I have read the material included in this package and understand
what is required by the Frederick County Planning Department. I
also understand that all required material will be complete prior
to the submission of my site plan.
Applicant's Signature:
11
5 PREY CO, 14F
REYCO
QUALITY `�S
E 41MESTONE DROOV
W. S. FREY COMPANY,
INC.
MAIN OFFICE: P.O. BOX 1624, YORK, PENNA.-174M
AREA CODE 717 PHONE 848-2369
P. 0. Box 65
Clear Brook, Va. 22624
July 1, 1991
Frederick County Planning & Development
P. 0. Box 601
9 Court Square
Winchester, Va. 22601
Dear Mr. Wyatt,
Enclosed is the Site Plan Application Package for our
new lime kiln facility. If you have any questions during
your review, please don't hesitate to contact me at 703-662-3855.
Thank you,
Mark Georgiana
Plant Engineer
PLANT . . . CLEAR BROOK, VA. PHONE 703-662-3855
Local Government Ordinance Form
LGOF Page 1 of 2
SUBJECT: Local and Areawide Planning Requirements
TO:. Applicants For Virginia Pollutant Discharge Elimination
System (VPDES) Permits, Virginia Pollution Abatement (VPA)
Permits, Virginia Corrective Action Plan (CAP) Permits and
Virginia Water Protection (VWP) Permits.
Article 2, §62.1-44.15:3 of the State Water Control Law states:
"No application for a certificate to discharge sewage, industrial wastes and other
wastes into or adjacent to state waters shall be considered complete unless the
applicant has provided the Executive Director with notification from the governing body
of the county, city or town in which the discharge is to take place that the location
and operation of the discharging facility is consistent with all ordinances adopted
pursuant to Chapter 11 (515.1-427 et seq.) of Title 15.1. If the governing body of any
county, city, or town fails to respond within forty-five days following receipt of a
..ritten request by certified mail; return receipt requested by an applicant for
certification that the location and operation of the proposed discharging facility is
consistent with all ordinances adopted pursuant to Chapter 11 ($ 15.1-427 et seq.) of
Title 15.1, the location and operation of the proposed facility shall be deemed to
comply with the provisions of such ordinances for purposes of the this section.
In accordance with this section, new applications for VPA Permits,
VPDES Permits, CAP Permits and VWP Permits will not be considered
complete until the information below is submitted to the Department of
Environmental Quality, Water Division Regional Office (or DEQ
Headquarters Office of Water Resources Management for VWP Permits).
----------------------------------------------------------------------
To• Frederick County, VA
(County, City, or Town Administrator/Manager)
I an, in the process of completing a DEQ, Water Division application
form for a permit. In accordance with Chapter 11 (§15.1-427 et seq.)
of Title 15.1 of the Code of Virginia, I request that you sign one of
the three statements on the following page certifying that the project
described in the attached application is or is not consistent with
your local ordinances. Please note that the above referenced law
states that if this form was sent to you by certified mail; return
receipt requested and you do not return it within 45 days, I will
forward to DEQ a copy of my return receipt with my application and
they will process it as if the facility being permitted were
consistent with your local ordinances.
Return to: W.S. Frey Co. Inc.
(Applicant's Name and Address)
1 Quarry Road, P.O. Box 65
Clearbrook, VA 22624
PLEASE SEE THE REVERSE SIDE OF THIS FORM FOR CERTIFICATION
REQUIREMENTS.
1
w
Local Government Ordinance Form (cont.)
LGOF Page 2 of 2
i hereby certiiff ,
V 1 osed the (
that ro location ) p p and operation of the
facility is consistent with all ordinances adopted pursuant to
Chapter 11 (515.1-427 et seq.) of Title 15.1 of the Code of
Virginia.
OR
(2)that no local ordinances are in effect pursuant to
Chapter 11 (515.1-427 et seq.) of Title 15.1 of the Code of
Virginia.
OR
(3)that the proposed location and operation of the
facility is not consistent with all ordinances adopted
pursuant to Chapter 11 (§15.1-427 et seq.) of Title 15.1 of
th Code of Virginia.
S' natuTitle
ICLkYA)e - �)*f (.Lek
Print Name
Dat
10
f
• • I�J.S. F,
7/i2
APPLICANT'S CHECKLIST
Your site plan should include the following:
Administrative Information
Y N
1.
Name of proposed development
_
2.
Name and address of owner
_
3.
Name and address of developer
_
4.
Name, address, and phone number of designer
_
5.
Certificate of surveyor, engineer, or architect
6.
Date plan prepared and date of revisions
— r1/A
7.
A listing of all conditions placed on the site as a
result of a conditional use permit or conditional
zoning approval
8.
A space labeled "approved by the Zoning
Administrator" for the approval signature and date
of approval
General
Site
Information
Y N
_✓ _ 9. Location map (scale 1:2000)
— 10. Magisterial District of site
/ — 11. Scale of site plan (not to exceed 1:50)
12. North Arrow
— 13. Zoning of site
14. Use and zoning of adjoining properties
Lots/Uses/Buildings & Structures
Y N
15.
Surveyed boundaries for all lots and parcels
_ 16.
Acreage of all lots included in the plan
17.
The location and dimensions of all required setbacks
18.
and yard areas
Location
_
of all buildings, structures, and uses
_ 19.
The proposed use of each building, structure, and
area
—
_N LA 20.
The location and type of all dwelling units
—
LA 21.
Ground floor area and total floor area of all
buildings with FAR calculations for commercial and
industrial zoning districts
_ 22.
The height of all buildings and structures
4A 23.
The location and dimension of all signs
7
Lots/Uses/Buildings & Structures (con't)
Y N
_ N/A
24.
Location
of
outdoor lighting fixtures
L/A
25.
Location
and
nature of outdoor storage areas
— N/a
26.
Location
and
area of common open space
_ WA
27.
Location
and
description of all recreation facilities
_ y/a
28.
Location
of
sidewalks and pedestrian ways
29.
Location
of
outdoor trash receptacles
Roads
Y N
30. Name and number of existing and planned streets on
and adjoining the site (e.,., I:z°oo �)
31. Location of existing and planned streets on and
adjoining the site
N/a 32. Dimensions, boundaries, width, pavement, and
construction of planned roads
IVA 33. Location and dimensions of all proposed
entrances from public right-of-ways
Utilities
Y N
O/a
34.
Location of all utilities, including sewer and water
'O�- ✓
lines with the size of lines, mains, and laterals
_
35.
Location and width of all easements, including
access, utility drainage
and easements
oK-
_
36.
Location and nature of fire lanes, fire hydrants,
and all other facilities necessary to meet the Fire
Code requirements
Parking
Y
N
_
-4
37.
Calculations describing the required number of
parking and loading spaces
—
m1A
38.
Location and dimensions of all parking and loading
spaces, driveways, parking aisles, curbing, and
other features to be used
_
IA
39.
Location and dimension of all handicapped spaces
+' l
l •
Natural Features
Y N
_ 40. Existing and finished contour lines
_ NA 41. Location of steep slopes, woodlands, floodplains,
wetlands, sinkholes, and other environmental
features
42. Location of streams and drainage ways
Landscaping
Y N
43. Landscaping plan describing location and types of
plants to be used
44. Location of required buffers and screening with cross
sections or profiles
Erosion and Sediment Control
Y N
pK- 45. A stormwater management plan with run off
F7. . calculations and location and description of
YJ facilities to be used
✓ _ 46. Soil erosion and sedimentation control plan with
location, types, and examples of provisions to be
used
9
0
•
Q S P-�,Aj 1-1) ,
— MA-RK GEtsV ,u5wQ q to 6 Z - 3 8 S T (O / 7-6l `11
z) SLk�- 191��
117 1 18 1 11 zZ
4-
aTJ T!4j�
jjzjz- O-j rp - Gff-4-� IJ-A-_ tL--,o riot.,
S J �.�.
Frederick County Inspections'Departt-ment
P.O. Box 601, Winchester, Virginia 22601
(703) 665-5651
The Frederick County Inspections Department is located at 9 Court
Square in Winchester, if you prefer to hand deliver this review
form.
Applicant's name, address and phone number:
W. S. Frey Company, Inc. P. 0. Box 85 Clear Brook, Va. 22624
703-662-3855 Contact Mark Georgiana
Name of development and/or description of the request:
Construct new lime kiln facility and associated material handling
equipment
Location:
South of route 672 E Adjacent to the existing lime kiln facility
on current W. S. Frey property ,
Inspections Department Comments:
Building shall comply with the Virginia Uniform Statewide Building Code
and Section 306 Use Group H (High Hazard) of the BOCA National Building
Code 1990.
Inspect. Signature & Date:
(NOTICE TO INSPECTIONS - P
19 rw-.4, kWN N.: �N I
..
NOTICE TO APPLICAV�r
It is your responsibility to complete this form as accurately as
Fossible in _cder to assist '.he agency with their review. Also,- -
please attach a copy of your plans and/or application form..
9 Court Square - P.O. Box 601 %Winchester, Virvinia 22601
e
PLANS APPROVED
FIRE MARSHAL, FREDERICK COUN i`r
COUNTY OF FREDERICK, VIRGINIA
FIRE MARSHAL'S OFFICE
LAND DEVELOPMENT COMMENTS
Control No. Date Received Date Reviewed 9i
Applicant Name
Address
Project Name
Phone No. 73-
Type of Application /2.>.� Current Zoning
1st Due Fire Co. X3 1st Due Rescue Co. /3
Election District >�TGc�CIJAIt
eld-1
RECOiMMENDATIDNS
Automatic Sprinkler System Residential Sprinkler System
Automatic Fire Alarm System Other
Emergency Vehicle Access;
Adequate k Inadequate
Fire Lanes Required; Yes
Not Identified
No Al
Comments-
Roadway/Aisleway Widths;
Adequate X Inadequate Not Identified _
Special Hazards Noted; Yes -- No
Comments: 5ic���r c3=%� i��r' �ucL� py
- Continued -
•
Hydrant Locations;
Adequate Inadequate
Siamese Connection Location;
Approved Not Approved
Not Identified
Not Identified --,(
Additional Comments: x
G.t/ .qZL �i67C-� �IU�
Review Time -5`�
Douglas A. hiracofe
Fire Marshal
P_k.�p� (�14-91
0
COUNTY of FREDERICK
Harvey E. Strawsnyder, Jr., P.E.
Director of Engineering & General Services
703/665-5643
FAX: 703 / 678-0682
TO: Evan Wyatt, Planning Department
FROM: Harvey E. Strawsnyder, Jr., P.E., Director of
Engineering
SUBJECT: New Lime Kiln #2
W.S. Frey Co., Inc.
Clearbrook, Va.
DATE: July 5, 1991
I have completed my review of the proposed site plan for the
subject project and offer the following comments:
1) Drawings 102 and 104 reflect the existing and proposed
grades, respectively. Based on our review of these plans, it
appears that the major grading efforts will occur between the new
burner building and the lime storage silos and within the area
proposed for a new conveyor system. Generally, a detailed erosion
and sediment control plan would be required to minimize the impact
of these grading efforts. However, because this project is an ex-
pansion of an existing operation, it is possible that the existing
sediment ponds will be adequate to handle the potential runoff.
In that case, a detailed erosion and sediment control plan would
not be required. The designer or a representative from W.S. Frey
should provide us with data on the existing ponds (depth and area)
to verify their adequacy in controlling sediment laden runoff.
2) No stormwater calculations were provided with the design
drawings. The actual development will not substantially change the
runoff coefficient and corresponding runoff. However, it will be
necessary to verify that the channels or ditches proposed for the
southwest corner of the site are adequately designed to convey
stormwater flows. This design will be particularly critical con-
sidering the proposed grading is changing the hydrology and con-
centrating the flows in this location.
If the existing sediment ponds are determined to be adequate
for control of the post development runoff, a resubmittal will not
be required for approval. This reasoning also applies to the pro-
posed ditches. It is conceivable that a site visit may be in order
to evaluate the down gradient conditions.
9 North Loudoun St. - P.O. Box 601 - Winchester, Virginia - 22601