HomeMy WebLinkAbout48-22 Comments 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 August 12, 2022 Mr. Randy Kepler, PE Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22602 RE: Site Plan Comments – Red Bud Run Solar Project Frederick County, Virginia Dear Mr. Kepler: Upon review of the site plan dated July 18, 2022, we recommend approval of the subject plan. Please be advised that a draft SWM/BMP maintenance agreement and receipt of nutrient credit purchase (5.76 lbs) will be required with the land disturbance application (176 acres disturbed). Sincerely, Joe C. Wilder Director of Public Works JCW/kco cc: Planning and Development file From:Joe Wilder To:Daniel Murphy Cc:Tyler Klein; Karen Orndorff Subject:Re: "[External]"RE: "[External]"RE: Red Bud Run Solar Project - site plan review comments Date:Thursday, January 26, 2023 9:33:31 AM Attachments:image001.png image002.png Redbud Run Solar Decom_Plan 20220718r.pdf Mr. Murphy, We have reviewed the decommissioning estimate package for the subject project as prepared by Stantec Consulting Services, Inc. We recommend approval of this decommissioning estimate in the amount of $1,160,663.00. If you should have any other questions, please let me know. thank you, Joe C. Wilder Director of Public Works Frederick County, Virginia 107 N. Kent Street Winchester, Virginia 22601 email: jwilder@fcva.us phone: 540-722-8215 From: Daniel Murphy <dmurphy@greenwayeng.com> Sent: Wednesday, January 25, 2023 3:40 PM To: Joe Wilder <jwilder@fcva.us> Subject: '[External]'RE: '[External]'RE: Red Bud Run Solar Project - site plan review comments   Joe, I wanted to check in and see if you had a chance to look at approving the cost estimate per Tyler’s direction. We are waiting on this approval to obtain the final site plan approval. Thanks, Dan Murphy, CFM | Project Manager | Cell: 540.486.3708 From: Daniel Murphy Sent: Thursday, January 19, 2023 9:13 AM To: jwilder@fcva.us Subject: FW: '[External]'RE: Red Bud Run Solar Project - site plan review comments Joe, Please see the email below from Tyler Klein referencing the need to have public works approve the amount of the decommissioning cost estimate for the Redbud Run Solar project. Please review and let me know if you have any questions or comments. Thanks, Dan Murphy, CFM | Project Manager | Cell: 540.486.3708 From: Tyler Klein <tklein@fcva.us> Sent: Thursday, January 12, 2023 11:21 AM To: Daniel Murphy <dmurphy@greenwayeng.com> Cc: Amy Feltner <alight@fcva.us>; John Bishop <jbishop@fcva.us>; Mark Cheran <mcheran@fcva.us>; alessandra.trunzo@oridenpower.com Subject: RE: '[External]'RE: Red Bud Run Solar Project - site plan review comments Daniel – thank you for the resubmission – it appears all of the P&D comments have been addressed. For the decommissioning estimate provided, we need written confirmation from Public Works it is “acceptable.” In their comment letter/approval, I did not see that confirmation. For final Zoning Administrator approval, we need hard copies, a digital copy of the final site plan & digital copies all agency comments (including PW approval of the estimate). Please proceed with assembling the final requests. If there are any additional questions, please let me know. Best, Tyler From: Daniel Murphy <dmurphy@greenwayeng.com> Sent: Thursday, January 12, 2023 8:06 AM To: Tyler Klein <tklein@fcva.us> Cc: Amy Feltner <alight@fcva.us>; John Bishop <jbishop@fcva.us>; Mark Cheran <mcheran@fcva.us>; alessandra.trunzo@oridenpower.com Subject: '[External]'RE: Red Bud Run Solar Project - site plan review comments Tyler, We resubmitted the Redbud Run Solar plans to you yesterday afternoon. Attached is the approval letter from Frederick Water. We have resubmitted to VDOT and will forward the approval letter once obtained. Please let me know if you have any questions or additional comments. Thanks, Dan Murphy, CFM | Project Manager Winchester, VA I Ashburn, VA I Martinsburg, WV 151 Windy Hill Lane Winchester, VA 22602 Cell: 540.486.3708 Office: 540.662.4185 Fax: 540.722.9528 Web: www.GreenwayEng.com Email: dmurphy@greenwayeng.com Disclaimer: This email may contain confidential and privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and any file attachments from your computer. Thank you. From: Tyler Klein <tklein@fcva.us> Sent: Monday, October 24, 2022 9:22 AM To: Daniel Murphy <dmurphy@greenwayeng.com>; alessandra.trunzo@oridenpower.com Cc: Amy Feltner <alight@fcva.us>; John Bishop <jbishop@fcva.us>; Mark Cheran <mcheran@fcva.us> Subject: RE: Red Bud Run Solar Project - site plan review comments Daniel – good morning. Staff has reviewed the resubmission revised 10/20/2022; the following comments include those still outstanding from our 7/27/2022 letter and new comments from staff. Comment # 4: The Frederick County Zoning Ordinance does not contain a parking standard for “utilities.” Absent a standard, we reference to the Planners Advisory Service (PAS) – Parking Standards (2002) for a comparable example. The designer should include 1 parking space per vehicle anticipated for service of equipment at or nearby the proposed “Collection Equipment.” The spaces should meet the parking space size requirements contained in §165-202.01(D)(9). The designer may propose an alternative parking standard for review by the Zoning Administrator. The parking standard should be noted on Sheet 2 along with the number of spaces proposed; parking spaces should be clearly labeled on subsequent sheets (§165-802.03(B)(2)). The response from the applicant provided does not address the comment; the parking spaces need to be demarcated outside of the travel way (per §165-202.01(D)(2)). Comment #5: Label future Route 37 as “Future Route 37 Right-of-Way” on all applicable sheets (Sheets 3, 6, 15, 18, 22, 26A, 28). The response from the applicant provided does not address the comment. The ROW is shown but not labeled, as requested in the comment letter. New Comment #1: On Sheet 28, specify the total number of plants for each species type provided (§165-802.03(B)(5)). New Comment #2: A comment sheet/approval should be provided from Frederick Water given the proximity of the “20’ sanitary easement” Once you have addressed the above comments, resubmit one (1) hard copy plus a $500 fee check for a third submission (Frederick County Development Review Fee Schedules, rev. 12/11/2019). For final approval we will need five (5) complete hard copies, the final decommissioning cost estimate, and a digital copy of the plans plus digital copies of all review agency comment letters. Should you have any additional questions, please let me know. Thank you. M. Tyler Klein, AICP Senior Planner Department of Planning & Development Frederick County, Virginia 107 N. Kent Street Winchester, VA 22601 (540)722-8248 tklein@fcva.us From: Tyler Klein Sent: Wednesday, July 27, 2022 8:36 AM To: Daniel Murphy <dmurphy@greenwayeng.com>; alessandra.trunzo@oridenpower.com Cc: Mark Cheran <mcheran@fcva.us>; John Bishop <jbishop@fcva.us> Subject: Red Bud Run Solar Project - site plan review comments Good morning. Please find attached review comments for the above site plan; no hard copy will be provided. Should you have any questions or need to discuss further, please let me know. Thank you. M. Tyler Klein, AICP Senior Planner Department of Planning & Development Frederick County, Virginia 107 N. Kent Street Winchester, VA 22601 (540)722-8248 tklein@fcva.us FREDERICK WATER SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice 315 Tasker Road, Stephens City, VA 22655 540.868.1429 fax Project ______________________________________________________________________________ Applicant ____________________________________________________________________________ REVIEW STATUS attention________________________________ review number ____________ correct & resubmit approved as noted number of items to be corrected _____________ approved DRAWINGS send me by_________________________________________: 1.print of sheets_____________________________________ 2. one CD or flash drive containing all sheets as a combined, multi-page document in PDF format. The pages shall be in landscape orientation.__________________________________ EASEMENTS Y N A copy of the recorded onsite FW easement(s) is/are required. A copy of the recorded offsite FW easement(s) is/are required. o The easement document shall contain a plat and both shall be signed by the Frederick Water. o The Frederick Water requires specific language in its deed of easement. o Visit our website www.frederickwater.com to obtain a copy of the form. o A copy of the recorded deed(s) of easement shall be received before service will be authorized. OTHER This project also requires DEQ - Valley Region Office approval. This project also requires VDH – Lexington Field Office approval. Date: _________________ ____________________________________________ Earl W. Wiley – Engineering Assistant FEB 22 Y N Y N Y N Y N Y N This project also requires VDH – Lexington Field Office – Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see website for form This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ’s Certificate to Construct, (2) a copy of DEQ’s Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These documents must be received before service will be authorized. (4) Work cannot commence that wo uld connect to FW facilities or require FW inspections until the contract is returned to this office. Redbud Run Solar Project Greenway Engineering 2 Mr. Daniel Murphy 0 all all 4 January 11, 2023 Reset February 1, 2023 From:Timothy Rhodes To:Daniel Murphy Cc:Chris Mohn; Rhonda Funkhouser; Randy Kepler; Tyler Klein; John Bishop; Joseph Johnson; Gregory Hoffman Subject:Redbud Run Solar Project Site Plan Approval Date:Friday, February 3, 2023 2:23:32 PM Attachments:image001.png         DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824     Daniel,   A VDOT review has been conducted for the Redbud Run Solar Project Site Plan, signature dated January 9, 2023. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings.   We offer the following general comments:   Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. A Land Use Permit shall be obtained before any work is performed on the State’s right-of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. ·         Please provide an electronic copy of the plans via thumb drive or link. If you have any questions or need further information, please do not hesitate to contact me.   Sincerely, Timothy Rhodes VDOT~Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630   c. 7/28/2022 7/28/2022No 7/28/2022 Ethan R. Homesley Please see attached word Document. COUNTY OF FREDERICK Department of Geographic Information Systems (540) 665-5614 Fax: (540) 545-7086 May 25, 2023 Property ID: 55 A 136 and 55 A 137 JRW Properties and Rentals, Inc. 13 S. Loudoun St Winchester, Va 22601 To Whom it May Concern, This letter is to inform you of the new addresses associated with the Red Bud Run Solar Project. Along with this letter you will find three E-911 Structure Number Notification forms that correspond to each of the three new addresses. This form indicates the new address numbers that have been assigned by Frederick County GIS for your property. Please be aware that these addresses are used as a point of reference for 911 Emergency Services. To ensure emergency personnel can easily locate the property if needed, we ask that you please post the address numbers on each of the gates or posts near each entrance so that they are visible from Woods Mill Rd. A map will be provided with this letter showing which of the address numbers correspond to each entrance. Respectfully, Ethan Homesley Frederick County GIS Technician 107 North Kent Street, Winchester, Virginia 22601-5000