HomeMy WebLinkAbout12-23 ApplicationSITE PLAN APPLICATION
Office Use On ),-
Date Application Receii ed: Application #: 1 3
Fees Received: CL Receipt #: ( 3 Lo Initials: 1
Project Title: Graystone Lot 1A (Minor Site Plan Revision #5)
2. Project Description: The previously proposed pedestrian trail and picnic area have been relocated
and the proposed gas line has been moved to be parallel to the existing sanitary sewer.
3. Location of Property: South side of Snowden Bridge Boulevard 0.5 miles east of US Route 11
(Street address) 150 Norman Drive
4. Applicant/Designer:
Name: Greenway Engineering, Inc. Telephone: 540-662-4185
Primary Point of Contact: Trenton Caudill, P.E. email: tcaudill@greenwayeng.com
Address: 151 Windy Hill Lane, Winchester, VA 22602
5. Property Owner (if different than above):
Name: Graystone Corporation of Virginia Telephone. 540-667-7700
Address: P.O. Box 2530, Winchester, VA 22604
6. Property Information:
a. Property Identification Number:
b. Total acreage of the parcel to be developed:
c. Total disturbed area of the parcel:
d. Present Use:
C. Proposed Use:
f. Magisterial District(s)
8
44-A-26
63.11 Acres
22.04 Acres (Minor Site Plan Revision <10,000 sqft)
Vacant/Agricultural
Warehouse Building
Stonewall
7. Site Plan Type
a. is this an original or new site plan? Ycs F] No I V I
b. Is this a revised site plan? Yes 1 No LL
If yes provide all previous site plan numbers:
C. Is this a minor site plan? Yes I - l No
If yes provide all previous site plan numbers: #38-22
8. Zoning Information:
a. Current Zoning: M1
b. Was this property Rezoned? Yes No
C. If yes provide the rezoning number for this property: #09-09. #03-12
d. Are there any proffers for this property? Yes No
e. Has a MDP been approved for this property? Yes 77 No
f If yes provide the MDP number for this property: #01-15
9. Adjoining property zoning and use:
USE
North Snowden Bridge Blvd/Warehouses
East Vacant/Residential
South Vacant/Battlefield Visitor Center
West Vacant/Future Warehouse
ZONING
M1
R4/RA
RA
M1
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature: i�� �,,a
Name (Printed): Trenton Caudill
Date: 04/13/2023
9