Loading...
HomeMy WebLinkAbout04-22 Site Plan07/11/2022 STANTEC PROJECT NUMBER: 215616643 VICINITY MAP 1" = 1000' SITE N Know what's SITE SUMMARY PARCEL ID(s): EXISTING PARCEL ACREAGE: TOTAL SITE ACREAGE: DISTURBED AREA: DEVELOPED IMPERVIOUS AREA: OWNER: MAGISTERIAL DISTRICT: CURRENT ZONING: EXISTING LAND USE: PROPOSED LAND USE: REQUIRED PARKING: PROPOSED PARKING: PROPOSED BUILDING TOTAL AREA: PROPOSED BUILDING HEIGHT: F.A.R.: OPEN SPACE REQUIRED OPEN SPACE PROVIDED PREVIOUSLY APPROVED PLANS: RECEIVING STREAM: ULTIMATE RECEIVING STREAM: FLOOD ZONE: THIS PROPERTY APPEARS TO BE LOCATED IN FLOOD ZONE X, PER F.E.M.A. FLOOD INSURANCE RATE MAP 51069C0204E DATED 1/29/2021. THIS IS A BALANCED SITE, NO HAUL IN OR HAUL OFF MATERIAL IS REQ'D. THERE IS NOT A RETAINING WALL PROPOSED UNDER THIS PERMIT. UTILITY NOTES WATER:FREDERICK WATER SEWER:FREDERICK WATER GAS:WASHINGTON GAS ELECTRIC:SHENANDOAH VALLEY ELECTRIC COOPERATIVE (SVEC) STORMWATER: FREDERICK COUNTY 52-A-F 3.43 AC 1.39 AC 1.21 AC 0.70 AC MODWASH RE, LLC GAINESBORO B2 VACANT CARWASH 12 SPACES (1 VAN ACCESSIBLE ADA) 22 SPACES (1 VAN ACCESSIBLE ADA) 4,100 SF 17'-4" 0.07 15% - 0.21 AC 0.60 AC MDP #07-04 SHEET INDEX C001 COVER SHEET C002 GENERAL NOTES AND ABBREVIATIONS C100 EXISTING CONDITIONS AND DEMOLITION PLAN C200 SITE PLAN C201 PHOTOMETRIC PLAN C300 GRADING AND DRAINAGE PLAN C400 UTILITY PLAN C500 PROFILES C600-606 CONSTRUCTION DETAILS C700 EROSION AND SEDIMENT CONTROL PLANS - PHASE I C701 EROSION AND SEDIMENT CONTROL PLANS - PHASE II C702 EROSION AND SEDIMENT CONTROL NARRATIVE C703-C704 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS C800-C809 STORMWATER MANAGEMENT PLAN C900 ARCHITECTURAL ELEVATIONS L200 LANDSCAPE PLANTING PLAN NOTES: 1. THE ABOVE SCHEDULE IS FOR REFERENCE ONLY, IT IS NOT A CONTRACT SCHEDULE. THE CONTRACTOR MAY ALTER THIS SCHEDULE AS LONG AS EROSION CONTROL IS MAINTAINED AT ALL TIMES UNTIL PERMANENT VEGETATION IS ESTABLISHED. 2. DETAILED CONSTRUCTION SEQUENCES SEE SHEETS C701 TO C703. 3. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES. 4. TEMPORARY SEEDING OR MULCHING REQUIRED ON ALL EXPOSED AREAS WITHIN 14 DAYS OF DISTURBANCE. 5. MAINTAIN ALL SEDIMENT AND EROSION CONTROL FEATURES THROUGH THE LIFE OF THE PROJECT. 6. INSPECTIONS TO BE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCHES OR MORE OF PRECIPITATION. ABRAMS CREEK OPEQUON CREEK FREDERICK COUNTY PERMIT NUMBER: 04-22 APPROVED BY THE ZONING ADMINISTRATOR SIGNATURE:________________________________ DATE:_________ SITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATE. 07/11/2022 GENERAL NOTES: 1. OWNER: MODWASH RE, LLC 736 CHERRY STREET CHATTANOOGA, TN 37402 2. ENGINEER: STANTEC CONSULTING SERVICES INC. CONTACT: TONY GAYNORD, P.E. 11320 RANDOM HILLS ROAD, SUITE 600 FAIRFAX, VA 22030 TEL: (571) 298-8165 3. TOPOGRAPHIC AND ALL EXISTING CONDITIONS ARE FROM "ALTA/NSPS LAND TITLE SURVEY" BY POINT TO POINT LAND SURVEYORS DATED AUGUST 19, 2021. 4. WETLANDS, CRITICAL AREAS, OTHER INDICATED ENVIRONMENTALLY SENSITIVE AREAS AND UNDISTURBED BUFFERS SHALL NOT BE DISTURBED EXCEPT WHERE SPECIFICALLY INDICATED WITHIN THESE CONSTRUCTION DOCUMENTS AND/OR AS AUTHORIZED BY THE USACE AND VADEQ. 5. CONTRACTOR IS TO VERIFY ALL INFORMATION CONTAINED HEREIN PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OR OWNER OF ANY DISCREPANCY PRIOR TO CONSTRUCTION. 6. ALL CONSTRUCTION, METHODS, MATERIALS, AND WORKMANSHIP, NOT OTHERWISE INDICATED IN THESE PLANS, SHALL CONFORM TO OWNER AND COUNTY SPECIFICATIONS. WHERE CONFLICT OCCURS BETWEEN CONSTRUCTION PLANS, SPECIFICATIONS, AND/OR FIELD CONDITIONS, CONTRACTOR IS TO CONTACT ENGINEER OR OWNER FOR CLARIFICATION PRIOR TO CONSTRUCTION. 7. CONTRACTOR TO COORDINATE WITH OWNER AND ENSURE ALL APPLICABLE CONSTRUCTION AND LAND DISTURBANCE PERMITS HAVE BEEN OBTAINED PRIOR TO COMMENCING ANY WORK. SAFETY: 1. DURING THE CONSTRUCTION AND MAINTENANCE OF THE THIS PROJECT, ALL SAFETY REGULATIONS SHALL BE ENFORCED. THE CONTRACTOR OR HIS REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. 2. THE CONTRACTOR'S MAINTENANCE OF TRAFFIC CONTROL PLAN MUST BE SUBMITTED AND APPROVED BY THE VDOT AND APPLICABLE LOCAL AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION WITHIN STATE OR CITY RIGHT OF WAYS. 3. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION. 4. CONTRACTOR SHALL PROVIDE AND MAINTAIN HIS OWN SAFETY EQUIPMENT IN ACCORDANCE WITH HIS HEALTH AND SAFETY PROGRAM AND ALL OTHER APPLICABLE LEGAL AND HEALTH AND SAFETY REQUIREMENTS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING IT'S EMPLOYEES AND SUB CONTRACTORS WITH ADEQUATE INFORMATION AND TRAINING TO ENSURE THAT ALL EMPLOYEES AND SUB CONTRACTORS AND SUB CONTRACTOR'S EMPLOYEES COMPLY WITH ALL APPLICABLE REQUIREMENTS. CONTRACTOR SHALL REMAIN IN COMPLIANCE WITH ALL OCCUPATION SAFETY AND HEALTH REGULATIONS AS WELL AS THE ENVIRONMENTAL PROTECTION LAWS. THE FOLLOWING IS NOT TO BE PERCEIVED AS THE ENTIRE SAFETY PROGRAM BUT JUST BASIC REQUIREMENTS. 5. ALL EXCAVATIONS BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF LABOR'S OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION RULES AN REGULATIONS. PARTICULAR ATTENTION MUST BE PAID TO THE CONSTRUCTION STANDARDS FOR EXCAVATIONS, 29 CFR PART 1926, SUBPART P. 6. THE MINIMUM STANDARDS AS SET FORTH IN THE CURRENT EDITION OF "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) BE FOLLOWED IN THE DESIGN APPLICATION, INSTALLATION, MAINTENANCE AND REMOVAL OF ALL TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS NECESSARY TO PROTECT THE PUBLIC AND WORKMEN FROM HAZARDS WITHIN THE PROJECT LIMITS. 7. ALL TRAFFIC CONTROL MARKINGS AND DEVICES SHALL CONFORM TO THE PROVISIONS SET FORTH IN THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PREPARED BY THE US DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION. ALL VIRGINIA AMENDMENTS SHALL APPLY. 8. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY AND ENFORCE ALL APPLICABLE SAFETY REGULATION. THE ABOVE INFORMATION HAS BEEN PROVIDED FOR THE CONTRACTOR'S INFORMATION ONLY AND DOES NOT IMPLY THAT THE OWNER OR ENGINEER WILL INSPECT AND/OR ENFORCE SAFETY REGULATION. 9. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES. 10. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CLEARING AND DEMOLITION: 1. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SEEDED, MULCHED, SODDED OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY FOLLOWING CONSTRUCTION. 2. GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER OR THE OWNER'S ENGINEER TO BE USED FOR LANDSCAPING PURPOSES, UNLESS OTHERWISE DIRECTED BY THE OWNER OR THE OWNER'S ENGINEER. THE REMAINING EARTHWORK THAT RESULTS FROM CLEARING AND GRUBBING OR SITE EXCAVATION IS TO BE UTILIZED ON-SITE IF REQUIRED, PROVIDED THAT THE MATERIAL IS DEEMED SUITABLE FOR CONSTRUCTION BY THE OWNER'S SOILS TESTING COMPANY. EXCESS MATERIAL IS TO BE EITHER STOCKPILED ON THE SITE AS DIRECTED BY THE OWNER, OR REMOVED FROM THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING EXCESS EARTHWORK FROM THE SITE. 3. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIALS SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS OR AS DIRECTED BY THE OWNER. 4. SEE GEOTECHNICAL REPORT NOTES (THIS SHEET) FOR TOPSOIL DEPTHS. OFF STREET PARKING/LOADING: PAVING AND GRADING 1. ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MUCK, PEAR, BURIED DEBRIS) IS TO BE EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER, THE OWNER'S ENGINEER, OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO BE STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER OR THE OWNER'S ENGINEER. EXCAVATED AREAS TO BE BACKFILLED WITH APPROVED MATERIALS AND COMPACTED AS SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ANY PERMITS THAT ARE NECESSARY FOR REMOVING DELETERIOUS MATERIAL FROM THE SITE. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST COLLAPSE AND WILL PROVIDE BRACING SHEETING OR SHORING AS NECESSARY. DEWATERING METHODS SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE PIPE AND APPURTENANCES ARE BEING PLACED. 3. ALL NECESSARY FILL AND EMBANKMENT THAT IS PLACED DURING CONSTRUCTION SHALL CONSIST OF MATERIAL SPECIFIED BY THE OWNER'S SOIL TESTING COMPANY OR ENGINEER AND BE PLACED AND COMPACTED ACCORDING TO THESE PLANS OR THE REFERENCED SOILS REPORT. 4. PROPOSED SPOT ELEVATIONS REPRESENT FINISHED PAVEMENT OR GROUND SURFACE GRADE UNLESS OTHERWISE NOTED ON DRAWINGS. 5. UNLESS OTHERWISE NOTED, ALL GRADING, ROCKING AND PAVING TO CONFORM TO VDOT STANDARD SPECIFICATIONS, LATEST EDITION. 6. CLEAR AND GRUB WITHIN WORK LIMITS ALL SURFACE VEGETATION, TREES, STUMPS, BRUSH, ROOTS, ETC. DO NOT DAMAGE OR REMOVE TREES EXCEPT AS APPROVED BY THE APPROPRIATE MUNICIPAL AUTHORITY OR AS SHOWN ON THE DRAWINGS. PROTECT ALL ROOTS. 7. STRIP WORK LIMITS, REMOVING ALL ORGANIC MATTER WHICH CANNOT BE COMPACTED INTO A STABLE MASS. ALL TREES, BRUSH AND DEBRIS ASSOCIATED WITH CLEARING, STRIPPING OR GRADING SHALL BE REMOVED AND DISPOSED OF OFF-SITE BY THE CONTRACTOR. 8. IMMEDIATELY FOLLOWING FINE GRADING OPERATIONS, COMPACT SUBGRADE TO 95% OF THE MAXIMUM DRY DENSITY PER AASHTO T-180. 9. ALL FILLS WITHIN PUBLIC RIGHT-OF-WAYS AND EASEMENTS SHALL BE ENGINEERED. ADDITIONALLY, ANY FILLS OUTSIDE OF PUBLIC RIGHT-OF-WAYS WHICH ARE OVER 2 FEET IN DEPTH SHALL BE ENGINEERED. ENGINEERED FILLS SHALL BE CONSTRUCTED IN 6" LIFTS. EACH LIFT SHALL BE COMPACTED TO 95 % OF THE MAXIMUM DRY DENSITY PER AASHTO T-180 TEST METHOD (MODIFIED PROCTOR). 10. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, STRAIGHT GRADES SHALL BE RUN BETWEEN ALL FINISH GRADE ELEVATIONS AND/OR FINISH CONTOUR LINES SHOWN. FINISH PAVEMENT GRADES AT TRANSITION TO EXISTING PAVEMENT SHALL MATCH EXISTING PAVEMENT GRADES OR BE FEATHERED PAST JOINTS WITH EXISTING PAVEMENT AS REQUIRED TO PROVIDE A SMOOTH, FREE DRAINING SURFACE. 11. CRUSHED ROCK SHALL CONFORM TO THE REQUIREMENTS OF SECTION 02630 (BASE AGGREGATE) VDOT STANDARD SPECIFICATIONS. COMPACT TO 95% OF THE MAXIMUM DRY DENSITY PER AASHTO T-180 TEST METHOD (MODIFIED PROCTOR). A.C. PAVEMENT SHALL CONFORM TO SECTION 00745 (ASPHALT CONCRETE PAVEMENT) VDOT STANDARD SPECIFICATIONS FOR STANDARD DUTY MIX. A.C. PAVEMENT SHALL BE COMPACTED TO A MINIMUM OF 91% OF MAXIMUM DENSITY AS DETERMINED BY THE RICE STANDARD METHOD. 12. ALL EXISTING OR CONSTRUCTED MANHOLES, CLEANOUTS, MONUMENTS, GAS VALVES, WATER VALVES AND SIMILAR STRUCTURES SHALL BE ADJUSTED TO MATCH FINISH GRADE OF THE PAVEMENT, SIDEWALK, LANDSCAPED AREA WHEREIN THEY LIE. 13. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE METHODS. 14. ENGINEERED FILL MATERIAL SHALL NOT CONTAIN ROCKS OR HARD LUMPS GREATER THAN 3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE AND OTHER UNSUITABLE MATERIALS AND SHALL BE APPROVED BY GEOTECHNICAL ENGINEER. 15. IMPORTED SOILS FOR USE AS ENGINEERED FILL SHALL BE NON-EXCLUSIVE MATERIALS AND SHALL NOT CONTAIN ROCKS OR HARD LUMPS GREATER THAN 3 INCHES IN MAXIMUM DIMENSIONS AND SHALL BE FREE OF VEGETATION, ORGANIC MATTER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS. 16. AGGREGATE BASE MATERIAL SHALL MEET THE FOLLOWING GRADATION REQUIREMENTS: 17. ALL AREAS TO RECEIVE FILL, AND AREAS OF STRUCTURES AND PAVEMENTS, SHALL BE STRIPPED OF VEGETATION, ORGANIC MATER, DEBRIS, RUBBLE, AND OTHER UNSUITABLE MATERIALS. STRIPPED SOILS SHALL NOT BE USED IN ENGINEERED FILL, BUT MAY BE USED IN LANDSCAPE AREAS. ·ENGINEERED FILL MATERIAL SHALL BE COMPACTED TO AT LEAST THE FOLLOWING PERCENTAGES OF MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT, PER ASTM D698 (STANDARD PROCTOR) ·AGGREGATE BASE COURSE SHALL BE COMPACTED TO AT LEAST THE FOLLOWING PERCENTAGES OF MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT, PER AASHTO T180 (MODIFIED PROCTOR) ·NOTE: MOISTURE CONTENT OF ENGINEERED FILL MATERIAL MAY REQUIRE ADJUSTMENT DURING CONSTRUCTION TO PREVENT SOIL PUMPING. 18. ENGINEERED FILL SHALL BE PLACED IN LIFTS NO GREATER THAN 6 INCHES THICK (LOOSE). 19. THE TOP 6 INCHES OF SOIL EXPOSED AT THE BOTTOM OF THE EXCAVATIONS SHALL BE COMPACTED, SCARIFIED AND COMPACTED AS ENGINEERED FILL PRIOR TO PLACEMENT OF ADDITIONAL FILL. 20. IF SOFT OR LOOSE SOIL IS PRESENT AT THE BASE OF EXCAVATIONS, IT SHALL BE EXCAVATED AND/OR COMPACTED AS ENGINEERED FILL OR AS RECOMMENDED BY THE GEOTECHNICAL FIELD REPRESENTATIVE. 21. IF SUBGRADE SOILS EXHIBIT PUMPING DURING COMPACTION, THE AREA SHALL BE ALLOWED TO DRY UNTIL THE SOLIDS BECOME WORKABLE WITHOUT PUMPING. THE MOISTURE CONTENT OF THE SOILS SHALL BE ADJUSTED TO PREVENT PUMPING. 22. EXPOSURE TO THE ENVIRONMENT MAY REDUCE THE STRENGTH OF SOILS IN PAVED AREAS. IF THIS OCCURS, THE SOFTENED SOILS SHALL BE REMOVED AND REWORKED IMMEDIATELY PRIOR TO CONCRETE PLACEMENT. IF RAINFALL IS EXPECTED AT A TIME WHEN BEARING SOILS IN FOOTING AREAS ARE EXPOSED, A 2 TO 4 INCH THICK LAYER OF LEAN CONCRETE MAY BE PLACED IN SUCH AREA. 23. THE SITE SHALL BE GRADED TO TRANSPORT SURFACE RUNOFF AWAY FROM THE PAVED AREAS. WATER SHALL NOT BE ALLOWED TO ACCUMULATE (POND) ON PAVED AREAS. 24. BACKFILL AND FILL SHALL CONFORM TO THE GENERAL REQUIREMENTS FOR SOIL MATERIALS ABOVE AND SHALL BE CLASSIFIED AS GW, GP, GM, GC, SW, SP, SM, SC, ML, CL BY ASTM D2487 AND SHALL CONFORM TO THE FOLLOWING: 24.1. SHALL BE CAPABLE OF BEING COMPACTED TO THE SPECIFIED DEGREE OF COMPACTION WHEN THE MOISTURE CONTENT IS WITHIN 3 PERCENTAGE POINTS OF THE OPTIMUM PERCENT MOISTURE. 24.2. LIQUID LIMIT SHOULD NOT EXCEED 40 PERCENT WHEN TESTED IN ACCORDANCE WITH ASTM D4318. 24.3. PLASTICITY INDEX SHOULD NOT BE GREATER THAN 30 PERCENT WHEN TESTED IN ACCORDANCE WITH ASTM D4318. 24.4. NO MORE THAN 75 PERCENT BY WEIGHT SHALL BE FINER THAN NO. 200 SIEVE WHEN TESTED IN ACCORDANCE WITH ASTM D1140. 25. UNSUITABLE SOIL SHALL BE ANY SOIL MATERIALS DETERMINED BY THE INDEPENDENT GEOTECHNICAL LABORATORY AS NOT CONFORMING TO THE REQUIREMENTS DESCRIBED ABOVE FOR BACKFILL AND FILL. A MOISTURE CONTENT WHICH IS MORE THAN 3 PERCENTAGE POINTS FROM OPTIMUM SHALL NOT BE CONSIDERED UNSUITABLE IF SUCH MATERIALS WOULD OTHERWISE BE SUITABLE IF THE MOISTURE CONTENT WERE ADJUSTED. ADJUSTMENTS TO THE SOIL MOISTURE CONTENT BY DRYING, MIXING, ADDING WATER, OR OTHER MEANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 26. MEASUREMENT OF UNSUITABLE MATERIAL: THE VOLUME OF UNSUITABLE MATERIAL EXCAVATION SHALL BE DETERMINED BY A LICENSED SURVEYOR BY THE AVERAGE END AREA METHOD. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCALED PLAN WITH SUFFICIENT ELEVATION POINTS TO ACCURATELY DEFINE THE VOLUME OF UNSUITABLE MATERIAL EXCAVATED. THE EXTENT OF UNSUITABLE MATERIAL EXCAVATION SHALL BE DETERMINED BY THE INDEPENDENT GEOTECHNICAL LABORATORY. 27. ALL PAINTED ARROWS AND OTHER SYMBOLS TO BE PER MUTCD AND VDOT STANDARD SPECIFICATIONS. DRAINAGE: 1. ALL NEW STORM PIPES, BEDDING, TRENCHING, STORM BOXES, ETC. IN THE STATE RIGHTS-OF-WAY SHALL BE INSTALLED PER CURRENT VDOT SPECIFICATIONS, LOCATED ON THE INTERNET AT https://www.virginiadot.org/business/const/spec-default.asp STANDARD VDOT DETAIL DRAWINGS CAN BE LOCATED AT THE FOLLOWING WEBSITE, http://www.extranet.vdot.state.va.us/LocDes/Electronic%20Pubs/Standards/CSection100.pdf. 2. ALL REINFORCED CONCRETE PIPE SHALL, AT A MINIMUM, BE ASTM C76, CLASS III, UNLESS SPECIFIED OTHERWISE. 3. REINFORCED CONCRETE PIPE INSTALLED UNDER PAVEMENT AND/OR PARALLEL TO THE EDGE OF PAVEMENT IN PUBLIC RIGHS-OF-WAY SHALL HAVE O-RING JOINTS IN ACCORDANCE WITH ASTM C443 AND/OR AASHTO M315. THE JOINTS SHALL BE SECURELY WRAPPED WITH FILTER FABRIC 18" IN WIDTH. 4. SUBMERGED DRAINAGE SYSTEMS SHALL HAVE O-RING JOINTS IN ACCORDANCE WITH ASTM C C443 AND/OR AASHTO M315. THE JOINTS SHALL BE SECURELY WRAPPED WITH FILTER FABRIC 18" IN WIDTH. 5. WHERE TONGUE AND GROOVE STORM PIPE IS ALLOWED, REINFORCED CONCRETE PIPE SHALL BE PER ASTM C 76, CLASS III. JOINTS SHALL BE SEALED WITH RAMNECK OR EQUIVALENT PER AASHTO M198. THE JOINTS SHALL BE SECURELY WRAPPED WITH FILTER FABRIC 18" IN WIDTH. 6. ALL NEW STORM DRAINAGE LINES SHALL BE LAID UPGRADE AFTER CONFIRMATION OF EXISTING INVERT ELEVATION. 7. FREDERICK COUNTY MAINTAINS THE RIGHT TO ALLOW ALTERNATE PIPE INSTALLATIONS OR TYPE OF PIPE FOR ALL PROJECTS ON A CASE-BY-CASE BASIS FOR ANY PIPES TO BE INSTALLED IN AN EXISTING OR PROPOSED CITY ROAD RIGHT-OF-WAY AND-OR DRAINAGE EASEMENT. 8. PIPE LENGTHS SHOWN ARE APPROXIMATE AND CENTER TO CENTER ON DRAINAGE STRUCTURES OR TO END OF PIPE. CONTRACTOR SHALL VERIFY ALL QUANTITIES PRIOR TO SUBMITTAL OF BID. 9. ALL STORM DRAIN PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. CONTRACTOR TO NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS. 10. THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM MUD, DIRT, DEBRIS, ETC THE STORM DRAINAGE SYSTEM UNTIL FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR MAY BE REQUIRED TO RECLEAN PIPES AND INLETS FOR THESE PURPOSES. 11. FOR CONSTRUCTION OF THE DROP INLET WALLS EITHER BRICK MASONRY OR CLASS 3000 CONCRETE MAY BE USED. FOR CONCRETE THE WALLS ARE TO BE 6" THICK WITH A REINFORCING STEEL AREA OF 0.20 SQ. INCH PER FT. FOR BRICK THE WALLS ARE TO BE 8" THICK. 12. THE BOTTOM SLAB OF THE BOX SHALL BE A MINIMUM OF 6 IN. THICK CLASS 3000 CONCRETE WITH A REINFORCING STEEL AREA OF 0.20 SQ. INCH PER FT. WIRE MESH MAY BE USED IN LIEU OF STEEL BARS PROVIDED A MINIMUM OF 0.20 SQ. IN. PER FT. IS MET. 13. MORTAR SHALL BE TYPE S OR M. 14. IF DESIRED THESE ITEMS MAY BE PRECAST PRIOR TO INSTALLATION IN LIEU OF BEING CAST IN PLACE. THE USE OF PRECAST UNITS WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF OBTAINING SATISFACTORY INSTALLATIONS. SEE VDOT STANDARD DRAWINGS FOR PRECAST CONCRETE DRAINAGE BOX FOR ADDITIONAL DETAILS AND SPECIFICATIONS. 15. REINFORCING STEEL SHALL BE DEFORMED AND SHALL CONFORM TO AASHTO M 31, GRADE 60. WIRE MESH SHALL CONFORM TO AASHTO M 55 AND M 221. 16. IF STRUCTURE DEPTH EXCEEDS 4'-6", METAL STEPS ARE TO BE PLACED ON WALL. SEE STEP STANDARD DRAWING 719-16. 17. CASTING SHALL CONFORM TO AASHTO M 105, CLASS 35B AND THE ALTERNATE LOAD TEST OF AASHTO M 306. CASTINGS SHALL ALSO MEET THE LOADING REQUIREMENTS OF FEDERAL SPECIFICATION RR-F-621 (LATEST EDITION). A. STEEL GRATES AND FRAME MAY BE USED IN LIEU OF CAST IRON AS LONG AS THE LOADING AND HYDRAULIC REQUIREMENTS ARE MET, AND ARE ON VDOT LIST OF APPROVED SUPPLIERS. B. STEEL GRATES SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH AASHTO M 111. C. STEEL GRATES AND FRAMES SHALL BE DIMENSIONED TO BE INTERCHANGEABLE WITH EACH PIECE OF THE CAST IRON GRATE AND FRAME SHOWN. MUST HAVE A POSITIVE MEANS TO RETAIN THE GRATE IN THE FRAME. D. STRENGTH REQUIREMENTS OF STEEL GRATES AND FRAMES MUST MEET FEDERAL SPECIFICATION RR-F-621 (LATEST EDITION). 18. THE LONGEST DIMENSIONS OF THE OPENING IN THE IRON GRATE SHOULD BE ORIENTED IN THE DIRECTION OF FLOW IF PRACTICAL. 19. AS SHOWN BY THIS DRAWING THE FRAME IS SET LEVEL, BUT THE ENGINEER MAY SET SAME ON SLOPE AS REQUIRED BY LOCAL DRAINAGE CONDITIONS. 20. AFTER THE FRAME IS SET IN ITS FINAL POSITION, IT IS TO BE ENCASED WITH CONCRETE AS SHOWN BY DRAWING. 21. THE INSIDE OF THE OUTLET PIPE SHALL BE FLUSH WITH FLOOR OF BASIN, UNLESS OTHERWISE SHOWN ON PLANS (SUMP). 22. THE SOFFIT (INSIDE TOP OF PIPE) OF THE OUTLET PIPE SHOULD BE NO HIGHER THAN THE SOFFIT OF THE INLET PIPE, UNLESS OTHERWISE SHOWN ON PLANS. 23. SHOULD THE CONTRACTOR ENCOUNTER UNSUITABLE MATERIAL, THEN THE CONTRACTOR WILL ENGAGE AN INDEPENDENT GEOTECHNICAL ENGINEER TO VERIFY UNSUITABLE MATERIAL AND MAKE RECOMMENDATIONS ON THE REMOVAL AND THE PLACEMENT AND TYPE OF NEW BEDDING AND BACKFILL MATERIAL. THE RECOMMENDATIONS BY THE INDEPENDENT GEOTECHNICAL ENGINEER SHALL BE SUBMITTED TO THE OWNER AND CIVIL ENGINEER FOR CONCURRENCE PRIOR TO PROCEEDING WITH WORK. SHOP DRAWING SUBMITTAL: 1. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE OWNER'S ENGINEER; 2 SETS OF HARD COPIES AND 1 ELECTRONIC FOR REVIEW. 1.1. THE CONTRACTOR, OR THE CONTRACTORS SUPPLIER, MUST INCLUDE WITH THE SHOP DRAWING SUBMITTAL A REFERENCE TO THE GOVERNING MUNICIPALITIES STANDARDS SHOWING COMPLIANCE WITH SAID MUNICIPALITIES REQUIREMENTS. 1.1.1. THIS SHALL BE COMPLETED FOR EVERY SUBMITTAL TO ASSURE AN EXPEDITED REVIEW OF SHOP DRAWINGS. 2. SHOP DRAWINGS WILL BE REVIEWED AND RETURNED TO THE CONTRACTOR WITHIN 15 BUSINESS DAYS FROM CONFIRMED RECEIPT BY THE OWNER OR THE OWNERS ENGINEER. 3. SHOP DRAWINGS NOT RECEIVED IN THE PROPER FORMAT WILL BE RETURNED TO THE CONTRACTOR FOR REVISIONS PRIOR TO REVIEW. SIEVE SIZE (PER ASTM D422)PERCENT PASSING BY WEIGHT ENGINEERED FILL MATERIAL MINIMUM PERCENT COMPACTION MOISTURE CONTENT (RANGE) NATIVE SOIL 90%OPTIMUM TO OPTIMUM PLUS 3% ENGINEERED FILL UNDER STRUCTURES AND BEHIND RETAINING WALLS 95%OPTIMUM TO OPTIMUM PLUS 3% ENGINEERED FILL UNDER PAVEMENTS 95%OPTIMUM TO OPTIMUM PLUS 2% FILL IN LANDSCAPE AREAS 95%2 TO 5% ABOVE OPTIMUM ENGINEERED FILL MATERIAL MINIMUM PERCENT COMPACTION MOISTURE CONTENT (RANGE) AGGREGATE BASE MATERIAL OR IMPORTED GRANULAR SOIL IN BUILDING AND PAVEMENT AREAS 100%OPTIMUM PLUS OR MINUS 2% 1 INCH 3/4 No. 8 No. 200 100 90-100 35-55 0-8 ADA NOTE: 1. ALL PUBLIC RIGHT OF WAYS AND AMENITIES ARE TO BE ADA COMPLIANT. 2. RIGHT-OF-WAY WILL REMAIN ADA COMPLIANT DURING ALL SITE WORK AS WELL AS THE CONSTRUCTION STAGES OR AN ALTERNATIVE ACCESSIBLE ROUTE WILL BE PROVIDED. STANDARD NOTES: 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. ·WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICABLE. ·WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY CONSTRUCTED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 8. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 9. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 10. A COPY OF THE SWPPP, INSPECTION RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 11. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 12. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 13. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 15. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: ·WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; ·WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; ·FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND ·SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. GENERAL WATER NOTES: FREDERICK WATER TEL: (540) 868-1061 CONSTRUCTION NOTES 1. FREDERICK WATER’FS WATER AND SEWER STANDARDS AND SPECIFICATIONS ARE AVAILABLE AT WWW.FREDERICKWATER.COM 2. THE CONTRACTOR SHALL ADHERE TO FREDERICK WATER STANDARDS AND SPECIFICATIONS IN EFFECT AT THE TIME OF CONSTRUCTION. 3. THE CONTRACTOR SHALL COORDINATE WITH AND ARRANGE FOR INSPECTION BY FREDERICK WATER. 4. THE CONTRACTOR SHALL CONNECT A NEW SEWER LINE TO AN EXISTING MANHOLE BY CORE DRILLING THE MANHOLE. 5. A NEW WATER (OR FORCED SEWER) MAIN SHALL BE CONNECTED TO AN EXISTING MAIN BY A WET TAP. FREDERICK WATER SHALL FURNISH ALL NEEDED MATERIAL AND MAKE THE TAP. a. AN APPLICATION FOR WET TAP SHALL BE SUBMITTED AND THE INITIAL FEE PAID BEFORE THE TAP IS MADE. 6. EXACT LOCATIONS OF WATER AND SEWER SERVICES ON NEW LINES ARE TO BE COORDINATED WITH FREDERICK WATER’FS INSPECTOR. 7. FREDERICK WATER’FS MAINTENANCE DIVISION SHALL FURNISH AND INSTALL ALL WATER METERS THROUGH 2 INCH IN SIZE. IT IS THE CONTRACTOR’FS RESPONSIBILITY TO HAVE THE METER BOX ASSEMBLY INSTALLED CORRECTLY. BEFORE A PERMANENT METER IS INSTALLED: a. THE METER BOX, WITH ITS FRAME AND COVER, MUST BE PROPERLY ALIGNED WITH THE YOKE BAR. b. THE FRAME AND COVER SHALL BE SET TO FINAL GRADE. c. THE DISTANCE BETWEEN THE TOP OF THE COVER AND THE YOKE BAR SHALL BE BETWEEN 20 AND 23 INCHES. d. ALL COMPONENTS OF THE METER BOX ASSEMBLY SHALL BE IN PROPER WORKING ORDER. 8. FOR SERVICES THAT CONNECT TO EXISTING LINES: a. FREDERICK WATER SHALL FURNISH AND INSTALL: i. ALL ⅝”HX¾”H, ¾”H, 1”H, 1½”H AND 2”H WATER SERVICES ii. ALL SEWER SERVICES. b. THE OWNER/DEVELOPER SHALL: i. COORDINATE (OR HAVE THE CONTRACTOR COORDINATE) THE LOCATION OF THE SERVICE LATERAL WITH FREDERICK WATER’FS ENGINEERING ASSISTANT. ii. SUBMIT AN APPLICATION FOR SERVICE AND PAY THE REQUIRED FEES. 9. ALL WATER SERVICE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DOUBLE CHECK VALVE OR RPZ, AS REQUIRED). THE ASSEMBLY MUST MEET ASSE STANDARD NUMBER 1015 OR 1013. 10. ALL FIRE LINES MUST HAVE A BACKFLOW PREVENTION ASSEMBLY (DETECTOR DOUBLE CHECK VALVE OR RPZ, AS REQUIRED). THE ASSEMBLY SHALL MEET ASSE STANDARD NUMBER 1048 OR 1047. ANY PRIVATELY OWNED FIRE LINE, INTERIOR OR EXTERIOR, SHALL ALSO HAVE A FIRE SERVICE METER. THIS ASSEMBLY SHALL BE INSTALLED IMMEDIATELY BEFORE THE BACKFLOW PREVENTION UNIT. RADIO READ REMOTES ARE REQUIRED. 11. FREDERICK WATER SHALL REVIEW THE MECHANICAL PLAN(S) FOR DESIGN AND MATERIAL APPROVAL OF A BUILDING’FS: a. DOMESTIC WATER METER AND ITS BACKFLOW PREVENTION DEVICE, AND/OR ITS b. FIRE SERVICE LINE’FS WATER METER AND BACKFLOW PREVENTION DEVICE. 12. DEQ MUST ALSO APPROVE SEWER PUMP STATIONS. FREDERICK WATER REQUIRES A COPY OF DEQ’FS CERTIFICATE TO OPERATE AND A COPY OF THE STATION’FS DEQ APPROVED O&M MANUAL. THESE DOCUMENTS MUST BE RECEIVED BEFORE SUBSTANTIAL COMPLETION IS ISSUED AND WATER METERS RELEASED. SEWER CONSTRUCTION NOTES: FREDERICK WATER TEL: (540) 868-1061 WASTEWATER INSTALLATION SHALL BE IN ACCORDANCE WITH THE FREDERICK WATER "WATER AND SEWER STANDARDS AND SPECIFICATIONS". DEMANDS: WATER: 90 GPM PEAK INSTANTANEOUS FLOW SEWER: 6,300 GPD 07/11/2022 N 0 30'60' 1" = 30' LEGEND: LIMITS OF DISTURBANCE CURB AND GUTTER DEMOLITION PAVEMENT DEMOLITON BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETERREMAINING PARCEL AREA: 0.97 ACRES PROPOSED PARCEL AREA: 1.39 ACRES 32'1'14.7'R25'R25' 8 A 8 A B B B D E G G H I J J L M N O P Q 4 R 2 I S T T U L V H T F P K K R10' IR25'R20'R2'R45'R7.5'07/11/2022 N 0 20'40' 1" = 20' PROPOSED CURB DIRECTIONAL ARROW, PAINTED WHITE EXISTING EDGE OF PAVEMENT WHITE STOP LINE (WSL) (24" WIDE) TRAFFIC SIGN STANDARD DUTY CONCRETE PROPERTY LINE PARKING & PAVING LEGEND VACUUM SPACE STANDARD PARKING SPACE PARKING/PEDESTRIAN CONCRETE DUMPSTER PAD CONCRETE ASPHALT PATCH KEY NOTES A. NUMBER OF VACUUM SPACES B. 6" CONC. PAD FOR VACUUM EQUIPMENT C. VACUUM BOOM, SEE ARCH. PLANS FOR FOUNDATION DETAILS D. 7" CONCRETE PAVEMENT/DUMPSTER E. DUMPSTER ENCLOSURE, ARCH. PLANS. PLACE 6" CURB AROUND BACK, SIDES AND 3"x12" ROLL CURB (HUMP) ACROSS FRONT, DETAIL C605 F. 6' WIDE CROSSWALK G. 4" STRIPE LINE, WHITE H. 5' CONCRETE SIDEWALK I. DO NOT ENTER SIGN (R5-1-30) J. 4" CONCRETE ROLL CURB K. ESCAPE LANE L. DIRECTIONAL ARROW, WHITE M. ADA STD. HANDICAP SPACE AND SIGN N. 12" STRIPE, WHITE THERMOPLASTIC, CENTERED ON THE CONVEYOR O. 7' CONCRETE SIDEWALK, FLUSH WITH PAVEMENT P. TOPIARY Q. EMPLOYEE PARKING R. BUG PREPARATION PARKING S. FREE STANDING SIGN, MAX 12' TALL AND 50 SF T. FIXED BOLLARD U. LICENSE PLATE READER FOUNDATION V. ADA DETECTABLE WARNING W. RETAINING WALL(DESIGN BY OTHERS) X BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETER0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.5 0.8 1.1 1.3 1.7 1.9 1.6 1.1 0.7 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.5 1.7 1.3 1.0 0.8 0.8 1.0 1.5 2.5 2.8 2.8 2.8 2.8 3.6 2.4 1.5 0.9 0.6 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 1.4 2.4 2.5 2.6 2.8 2.9 3.4 2.2 1.5 1.2 1.2 1.5 2.2 3 . 2 3.3 2.5 2.5 2.4 2.6 2.2 1.5 1.0 0.6 0.4 0.3 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.7 1.2 2.0 3.2 2.8 2.5 2.5 2.7 3.0 2.4 1.7 1.4 1.4 1.9 2.6 3.0 2.8 2.7 2.8 2.6 2.1 1.6 1.2 0.9 0.6 0.4 0.3 0.1 0.1 0.1 0.0 0.1 0.1 0.4 0.7 1.2 1.8 2.3 2.4 2.5 2.9 3.0 2.8 2.3 1.8 1.5 1.6 2.9 5.2 4.0 2.7 2.5 2.5 2.2 1.7 1.4 1.2 0.9 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.3 0.4 0.7 1.0 1.3 1.6 2.0 2.4 2.8 3.3 4.9 4.2 2 . 2 1.6 1.7 3.9 10.0 6.9 3.1 2.2 1.9 1.7 1.5 1.2 1.0 0.7 0.5 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.3 0.4 0.6 0.8 1.1 1.3 1.6 1.9 2.3 3.8 9.7 7.5 2.8 1.6 1.7 3.1 7.6 8.5 3.5 1.9 1.4 1.2 1.0 0.8 0.7 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.2 0.3 0.5 0.7 0.9 1.1 1.2 1.4 1.6 3.0 6.8 8.4 3.7 1.7 1.5 2.5 6.8 9.1 4.0 1.7 1.0 0.8 0.6 0.5 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.7 5.9 9.7 4.3 1.8 1.3 1.9 4.8 10.4 5.4 1.8 0.9 0.6 0.4 0.4 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.2 0.2 0.3 0.4 0.4 3.9 9.8 6.1 2.0 1.2 1.5 3.4 7.8 6.1 2.1 0.9 0.5 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.0 0.0 3.0 7 . 6 6.5 2.5 1.2 1.2 2.6 7.8 8.6 2.9 1.0 0.5 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.0 0.0 7.0 9.5 3.2 1.3 1.0 1.9 5.2 8.8 3.8 1.2 0.5 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 4.5 8.6 4.5 1.5 0.9 1.4 4.2 9.3 4.9 1.6 0.7 0.4 0.3 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.0 0.0 0.0 3.7 9.2 5.5 1.9 1.0 1.1 3.0 8.4 7.4 2.3 0 . 8 0.4 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.4 0.2 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.0 0.0 0.0 2.4 7.6 8.0 2.5 1.0 1.0 2.1 6.2 7.4 2.9 1.1 0.6 0.4 0.4 0.5 0.5 0.6 0.7 0.7 0.6 0.6 0.5 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 5.8 7.7 3.3 1.2 0.9 1.7 5.4 10.3 4.3 1.4 0.7 0.5 0.6 0.6 0.8 0.9 0.9 0.9 0.8 0.8 0.7 0.2 0.2 0.1 0.1 0.0 0.0 0.0 4.4 10.3 4.7 1.5 0.9 1.3 3.5 8.2 5.6 1.8 0.9 0.7 0.7 0.8 1.0 1.1 1.2 1.2 1.1 1.0 0.8 0.7 0.3 0.2 0.1 0.1 0.1 0.0 0.0 2.9 7 . 2 5.8 1.9 0.8 1.0 2.7 8.1 6.8 2.3 1.0 0.8 0.8 0.9 1.2 1.5 1.7 1.6 1.4 1.3 1.0 0.8 0.3 0.2 0.1 0.1 0.1 0.0 0.0 1.9 6.6 6.2 1.8 0.8 0.8 1.8 5.8 8.9 2.9 1.0 0.8 0.9 1.1 1.4 1.6 1.5 1.5 1.4 1.5 1.3 0.9 0.3 0.2 0.1 0.1 0.0 0.0 0.0 2.5 3.0 2.0 0 . 9 0.6 1.1 3.2 5.0 2.2 1.0 0.9 1.0 1.3 1.5 1.5 1.5 1.4 1.5 1.6 1.3 1.0 0.7 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 2.1 7.1 4.2 1.2 0.7 0.8 1.3 1.5 1.3 1.0 1.0 1.1 1.4 1.6 1.5 1.5 1.4 1.5 1.5 1.3 1.0 0.7 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 2.7 6.3 3.9 1.7 1.1 0.9 1.0 1.5 2.1 1.8 1.2 1.2 1.3 1.5 1.5 1.5 1.5 1.5 1.4 1.1 0.9 0.7 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.9 1.5 2.7 3.2 3.2 2.1 1.3 1.0 1.1 2.6 7.4 5.2 2.0 1.2 1.2 1.3 1.4 1.5 1.7 1.5 1.2 0.9 0.7 0.6 0.5 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.3 0.7 1.3 2.5 3.0 3.1 3.3 3.4 2.3 1.5 1.1 1.3 3.0 8.6 7 . 8 2.9 1.4 1.1 1.1 1.1 1.2 1.3 1.2 1.0 0.8 0.6 0.5 0.4 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.4 0.9 1.8 3.1 2.8 2.8 2.5 2.5 2.4 1.9 1.4 1.1 1.1 2.2 6.9 10.5 4.1 1.5 1.0 0.9 0.9 0.9 0.9 0.9 0.8 0.6 0.5 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.3 0.6 1.1 1.9 2.9 2.6 2.3 2.5 2.5 2.0 1.5 1.2 1.0 1.0 1.6 4.4 10.1 5.4 1.6 0.9 0.7 0.7 0.7 0.7 0.6 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.2 0.4 0.6 1.0 1.5 2.0 2.1 2.3 2.5 2.1 1.7 1.4 1.2 0.9 0.8 1.1 2.5 5.3 3.2 1.2 0.7 0.6 0.5 0.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.2 0.4 0.6 0.8 1.1 1.3 1.5 1.7 1.8 1.7 1.4 1.2 0.9 0.8 0.6 0.7 1.0 1.3 1.1 0.7 0.3 0.3 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.2 0.3 0.5 0.7 0.9 1.1 1.3 1.3 1.3 1.2 1.0 0.8 0.6 0.5 0.5 0.5 0.5 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.7 0.9 0.9 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.6 0.5 0.5 0.4 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.2 0.3 0.3 0.3 0.4 0.4 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.00.00.10.10.10.10.10.10.10.20.20.20.30.30.30.50.70.70.80.70.60.70.50.50.50.40.4 0.3 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.4 0.5 0.5 0.6 0.6 0.5 0.5 0.4 0.4 0.3 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.3 0.4 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.4 0.4 0.4 0.3 07/11/2022 N 0 20'40' 1" = 20' KEY NOTES A. NUMBER OF VACUUM SPACES B. 6" CONC. PAD FOR VACUUM EQUIPMENT C. VACUUM BOOM, SEE ARCH. PLANS FOR FOUNDATION DETAILS D. 7" CONCRETE PAVEMENT/DUMPSTER E. DUMPSTER ENCLOSURE, ARCH. PLANS. PLACE 6" CURB AROUND BACK, SIDES AND 3"x12" ROLL CURB (HUMP) ACROSS FRONT F. 6' WIDE CROSSWALK G. 4" STRIPE LINE, WHITE H. 5' CONCRETE SIDEWALK I. DO NOT ENTER SIGN (R5-1-30) J. 4" CONCRETE ROLL CURB K. ESCAPE LANE L. DIRECTIONAL ARROW, WHITE M. ADA STD. HANDICAP SPACE AND SIGN N. 12" STRIPE, WHITE THERMOPLASTIC, CENTERED ON THE CONVEYOR O. 7' CONCRETE SIDEWALK, FLUSH WITH PAVEMENT P. TOPIARY Q. EMPLOYEE PARKING R. BUG PREPARATION PARKING S. SIGNAGE T. FIXED BOLLARD U. LICENSE PLATE READER FOUNDATION V. ADA DETECTABLE WARNING X LUMINAIRE DATA - DB LIGHTING CONSULTATION LABEL QTY SYMBOL [MANUFAC]DESCRIPTION LLF ARR. WATTS ARR. LUM. LUMENS MOUNTING HEIGHT L4 21 AUTOVAC 431-6000X 0.900 20 2650 10 SL4 1 COOPER PRV-C25-D-UNV-T4-BZ 0.900 96 13140 20 SL4s 2 COOPER PRV-C25-D-UNV-T4-BZ-HSS 0.900 96 11933 20 SL5 1 COOPER PRV-C25-D-UNV-T5-BZ 0.900 96 14045 20 CALCULATION VALUES - DB LIGHTING CONSULTATION LABEL CALCTYPE UNITS AVG MAX MIN AVG/MIN MAX/MIN ALL VALUES PROJECT AREA ILLUMINANCE FC 1.06 10.5 0.0 N.A.N.A. CURB CROOK WELLS MILL 0.33 0.8 0.0 N.A.N.A. CURB RETAIL BLVD 0.07 0.2 0.0 N.A.N.A. CURB WALMART 0.29 0.6 0.1 2.90 6.00 PROPERTY LINE NORTH 0.32 0.5 0.1 3.20 5.00 DRIVEWAY 1.31 2.9 0.7 1.87 4.14 PAY STATION 5.98 10.5 2.5 2.39 4.20 VACUUM 4.46 10.4 0.8 5.58 13.00 VACUUM EXIT 1.49 3.4 0.7 2.13 4.86 WASH ENTRANCE 1.42 3.1 0.5 2.84 6.20 WASH EXIT 2.22 3.6 0.7 3.17 5.14 ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC ILLUMINANCE FC NOTES: 1. THE CALCULATED RESULTS OF THIS LIGHTING SIMULATION REPRESENT A PREDICTION OF SYSTEM PERFORMANCE AND ARE NOT GUARANTEED. 2. ACTUAL MEASURED RESULTS MAY VARY FROM THE ANTICIPATED PERFORMANCE AND ARE SUBJECT TO MEANS AND CONDITIONS WHICH ARE BEYOND THE CONTROL OF 3. ILLUMINATION VALUES SHOWN (IN FOOT-CANDLES) ARE HORIZONTAL AT GRADE LEVEL BASED ON MOUNTING HEIGHT OF 20'-0" 4. CALCULATION POINTS ARE ON AN 8' X 8' SPACING 5. PER FIXTURE ISOLINES SHOWN REPRESENT 0.25 FC AND IS FOR REFERENCE ONLY DB LIGHTING CONSULTATION. 6. ALL LIGHTING WILL CONFORM TO THE §165-201.07 AND BE FULL DOWNCAST, SHIELDED, AND FULL CUTOFF. BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETER6'' SS4'' SS4'' SS4'' SSCO CO CO CO SS SS SS SS SS SS SS SS SS SS SS SS SS 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W12'' ST12'' ST12'' ST12'' ST12'' ST15'' ST 15'' ST 15'' ST I13A MH13B I13C I13D 12'' ST 12'' ST 12'' ST 20' WATER EASEMENT FFE: 844.0 18"X12" CL III RCP 12" HDPE 134 LF @ 1.80% 45° BEND INV.=839.00 10" PVC, CONNECT TO DOWNSPOUT 07/11/2022 N 0 20'40' 1" = 20' OLR OL R OLR O L R LEGEND: OVERLAND RELIEFOLR BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETER6'' SS4'' SS4'' SS4'' SSCO CO CO CO SS SS SS SS SS SS SS SS SS SS SS SS SS 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W12'' ST12'' ST12'' ST12'' ST12'' ST15'' ST 15'' ST 15'' ST 12'' ST 12'' ST 12'' ST 20' WATER EASEMENT 6X2 MJ TAPPED PLUG IN TEE 2" CORP STOP 6" POLY TUBING 6" CL52 DIP AND 6" MJ LONG SOLID SLEEVE 4" SANITARY SEWER SERVICE @ MIN. 1.0% EX. 8" SEWER A N C B G K J I L Q CLEAN OUT INV.=837.34 APPROXIMATELOCATION OFEX. 12" WATER EX. 12" WATER 30'6" SANITARY SEWER SERVICE @ MIN. 1.0% SEE SHEET C602 FOR RECLAIM TANK DETAILS. TOP OF TANKS = 841.0 APPROXIMATE LOCATION OF EXISTINGSANITARY SEWER SERVICE(CONTRACTOR TO FIELD LOCATE) CUTAND REMOVE EXISTING SEWER LATERALAND PLUG WYE PER FREDERICKWATER'S INSPECTORS REQUIREMENTS CONTRACTOR TO ADD CONCRETE CRADLE BETWEEN EX. WATER AND PROPOSED STORM. SEE DETAIL SHEET C-601. 07/11/2022 N 0 20'40' 1" = 20' KEYNOTES A. PROPOSED 2" PVC WATERLINE TO BUILDING B. 6" PVC SEWER STUB INV. = 839.30 C. 4" PVC SEWER STUB D. 2" PVC SEWER STUB E. 3" PVC SEWER STUB F. 6" PVC SEWER STUB INV. = 839.25 INV. IN TO TANK 3 = 839.08 G. 4" PVC SEWER STUB INV. = 840.0 H. COORDINATE NATURAL GAS WITH UTILITY COMPANY AND BUILDING REQUIREMENTS. I. RECLAIM TANK 1 (SEE SHEET C602 FOR DETAILS) J. RECLAIM TANK 2 (SEE SHEET C602 FOR DETAILS) 4" OVERFLOW INV. TO SANITARY SEWER = 838.5 K. RECLAIM TANK 3 L. 750 GAL OIL / WATER SEPARATOR (SEE SHEET C602 FOR DETAILS) M. 2" DOMESTIC METER WITH 2" RPZ BACKFLOW PREVENTER(PRIVATE) (SEE SHEET C601) N. 2" X 12" WET TAP O. NOT USED P. 2" PVC CONDUIT FOR BUG PREP Q. PULL BOX FOR CONDUIT R. COORDINATE SIGN POWER WITH SITE ELECTRICAL PLANS S. CUT-IN MAHNOLE TO EXISTING 8" SEWER MAIN 6" SEWER LATERAL INV. = 833.61 (PER PLAN) X NOTE: 1. ALL SANITARY SEWER CROSSINGS TO BE A MINIMUM OF 18" SEPARATION. 2. CONTRACTOR SHALL ADJUST FREDERICK WATER FACILITIES TO GRADE PER FREDERICK WATER INSPECTOR'S REQUIREMENTS 825 830 835 840 845 850 825 830 835 840 845 850 -0+25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+25 830 835 840 845 850 830 835 840 845 850 -0+25 0+00 0+50 1+00 STR I-13C (CURB INLET)TOP = 840.05INV IN = 836.60(STMH-27)INV OUT = 836.5067 LF @ 1.00% 12" HDPESTR MH-13B (MANHOLE)TOP = 839.63INV IN = 835.48(I-13D)INV IN = 835.83(I-13C)INV OUT = 835.0082 LF @ 1.00% 12" HDPESTR I-13A (DROP INLET W/GRATE)TOP = 838.68INV IN = 834.19(MH-13B)INV OUT = 831.77134 LF @ 0.50% 18"X12" CL III RCPSTR EX I-13 (EXISTING MANHOLE)TOP = 835.70INV IN = 831.10(I-13A)INV IN = 831.20(EX I-14)INV OUT = 831.10STR I-13D (CURB INLET)TOP = 842.03INV OUT = 838.1073 LF @ 3.61% 12" HDPESTR MH-13B (MANHOLE)TOP = 839.63INV IN = 835.48(I-13D)INV IN = 835.83(I-13C)INV OUT = 835.00PROPOSED GRADE EXISTING GRADE PROPOSED GRADE 8"07/11/2022 0 20'40' 1" = 20'04'8'1" =4'(VERTICAL)(HORIZONTAL) 07/11/2022 STOP BAR DETAIL N.T.S. NOTE: ADA SPACES TO HAVE HANDICAP BLUE STRIPING 9'-0"19'-0"EDGE OF ASPHALT PAVEMENT/FACE OF CURB 4" WHITE STRIPING (TYPICAL) (OR AS SHOWN ON SITE PLAN)(OR AS SHOWN ONSITE PLAN)PARKING STALL DETAIL N.T.S. 2" X 2" STEEL TUBE WITH WELDED TOP CAP RESERVED PARKING GENERAL NOTES: 1. BOLLARD NOT REQUIRED IF ACCESSIBLE SIGNAGE IS LOCATED IN GRASS AND OVER 3 FT BEYOND BACK OF CURB. 2. BOLLARD SHALL BE IDEAL SHIELD 18" STANDARD BOLLARD COVER, 1.90" OUTSIDE DIAMETER, 18" NOMINAL WALL THICKNESS, COLOR OSHA YELLOW WITH RED REFLECTIVE STRIPES, DOME TOP PLASTIC CAP. 3. REGULATORY SIGNAGE MUST ADHERE TO ALL REGULATIONS SET FORTH BY MUTCD. 4. CONTRACTOR SHALL COODINATE INSTALLATION OF BOLLARD COVER PRIOR TO SIGNAGE INSTALLATION. 5. FOR NON-VAN ACCESSIBLE PARKING SIGNAGE, ALIGN TOP OF THE SIGN WITH VAN ACCESSIBLE PARKING. VAN ACCESSIBLE ADA PARKING SIGN N.T.S. 4'-8" 4" 5'-6" 6'-0" AMERICANS WITH DISABILITIES ACT: 1.) DISABLE ACCESSIBLE ROUTES SHALL START AT HANDICAP PARKING AND GO INTO THE PRIMARY ENTRANCE OF ALL NEW OR RENOVATED BUILDING OR TENANT SPACES. IT IS ALSO REQUIRED THAT THE PARKING SPACE AND ITS ADJACENT AISLE BE RELATIVELY LEVEL, LESS THAN 2%. 2.) HANDICAP PARKING SPACES SHALL BE AT LEAST 8 FEET WIDE AND BE PROVIDED WITH AN ADJACENT ACCESS AISLE OF NO LESS THAN 8 FEET WIDE TO COMPLY WITH 4.6.2 OF THE ANSI 1986 STANDARD. ADDITIONALLY, HANDICAP PARKING SPACES SHALL BE DESIGNATED AS RESERVED FOR THE DISABLED BY A SIGN SHOWING THE SYMBOL OF ACCESSIBILITY. SUCH SIGNS SHALL BE 12 INCHES BY 18 INCHES REFLECTIVE BLUE METAL SIGN MOUNTED ON A 2 INCH X 2 INCH STEEL POST. SIGN TO BE MOUNTED 80 INCHES FROM THE BOTTOM OF THE SIGN TO THE TOP OF THE WALKING SURFACE. 3.) RAMPS SHALL BE PROVIDED WHEREVER AN ACCESSIBLE ROUTE CROSSES A CURB OR IS PART OF AN ACCESSIBLE ROUTE THAT HAS A SLOPE OF GREATER THAN 1:20. RAMPS SHALL HAVE A MINIMUM WIDTH OF 3 FT. EXCLUSIVE OF FLARED SIDES AND A MAXIMUM SLOPE OF 1:12. 4.) RAMPS RUNS HAVING A RISE OF MORE THAN SIX INCHES OR A HORIZONTAL RISE OF MORE THAN 6 FEET SHALL HAVE HANDRAILS ON THE ANSI 117-1-1986 STANDARD. PAINT SYMBOL ONTO PAVED SURFACE WITH (2) COATS OF WHITE PAINT AS PER DEPT. OF TRANSPORTATION SPEC. PAINT ASPHALT BACKGROUND SURFACE WITH (2) COATS OF HANDICAP BLUE. ADA PARKING SYMBOL N.T.S.18" MIN.NOT LESSTHAN 7'BACKGROUND: RED - REFLECTORIZED LEGEND AND BORDER: WHITE - REFLECTORIZED 2' 3000 PSI CONCRETE 3 LB/FT GREEN U-CHANNEL POST ROAD SIGN DETAILS N.T.S. COLOR SPEC: A) SHERWIN WILLIAMS INDUSTRIAL (SET FAST ACRYLIC WATERBORNE) COLOR = WHITE (TM226) PAVEMENT MARKINGS DIRECTIONAL ARROWS N.T.S. NOTE: ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH SCMUTCD PAVEMENT MARKING STRAIGHT ARROW N.T.S. 12"4'-8"5'-4"10'-0"20" 14"12"NOTES: 1. ALL SIGNAGE, STRIPING, AND INSTALLATION SHALL CONFORM TO SCDOT AND MUTCD STANDARDS AND SPECIFICATIONS. 2. SIGNS SHALL BE VERTICALLY MOUNTED AT RIGHT ANGLES TO THE DIRECTION OF, AND FACING, THE TRAFFIC THAT THEY ARE INTENDED TO SERVE. 3. POSTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SCDOT STANDARD DRAWINGS 654-105-01 TO -03 FOR BREAKAWAY POST DETAILS. 4. FOUNDATION AND MOUNTINGS SHALL BE SO CONSTRUCTED AS TO HOLD SIGNS IN PROPER AND PERMANENT POSITION, AND TO RESIST SWAYING IN THE WIND OR DISPLACEMENT BY VANDALISM. FOR STOP SIGNS: USE TYPE R1-1-30 30"X30" SIGN MOUNTED ON GALVANIZED U-CHANNEL POSTS. FOR DO NOT ENTER SIGNS: USE TYPE R5-1-30 30"X30" SIGN MOUNTED ON GALVANIZED U-CHANNEL POSTS. 5' LENGTH VARIES 3' 1'-6" NOTE: ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH SCMUTCD CROSS WALK STRIPING N.T.S. 6' LENGTH VARIES 8" 8" NOTE: STRIPING BARS TO BE 8" SOLID WHITE PAINT 52" TO TOP OF ADJACENT PAVING 6"6" YELLOW BOLLARD COVER. FIELD DRILL OPENING OF CHANNEL POST DIAMETER (SEE NOTE 1 & 2) 84" MIN. FROM BOTTOM OF SIGN TO TOP OF PAVEMENT 4" PRIMED PIPE BOLLARD, STRIKE CONCRETE FLUSH WITH TOP OF PIPE. (SEE NOTE 1) 12" DIA. x 36" DEEP CONCRETE FOOTING 6' NOTE: STRIPING BARS TO BE 8" SOLID WHITE PAINT 07/11/2022 NOTE: 1. CONTROL JOINT SHALL BE SAWED JOINTS (AT LEAST 1/4 OF THE PAVEMENT THICKNESS AND SPACED AT MAXIMUM OF 12' APART. 2. REFER TO GEOTECHNICAL ENGINEERING REPORT FROM TERRACON DATED AUGUST 2, 2021 FOR COMPLETE RIGID PAVEMENT DESIGN REQUIREMENTS. 3. 4,000 PSI NON-REINFORCED PORTLAND CEMENT CONCRETE SURFACE. PARKING / PEDESTRIAN CONCRETE PAVING DETAIL N.T.S. NOTE: 1. CONTROL JOINT SHALL BE SAWED JOINTS (AT LEAST 1/4 OF THE PAVEMENT THICKNESS AND SPACED AT MAXIMUM OF 12' APART. 2. REFER TO GEOTECHNICAL ENGINEERING REPORT FROM TERRACON DATED AUGUST 2, 2021 FOR COMPLETE RIGID PAVEMENT DESIGN REQUIREMENTS. 3. 4,000 PSI NON-REINFORCED PORTLAND CEMENT CONCRETE SURFACE. STANDARD/DUMPSTER PAD CONCRETE PAVING DETAIL N.T.S. STONE BASE PAVEMENT SECTION STONE BASE 4,000 PSI CONCRETE@ 28 DAYS CONCRETE APRON DETAIL N.T.S.TURNDOWN DETAIL N.T.S. 6' OC UNLESS SHOWN OTHERWISE ON PLAN ALL JOINTS AND EDGES SHALL BE TOOLED TO HAVE A 14" RADIUS 38" TOOLED JOINT SEALANT BROOM FINISH 12" 4" 18" R 34" 12" TOOLED JOINTS: PREMOLDED JOINT FILLER COMPACTED SUBGRADECONCRETE WHERE PAVEMENTS ABUT ANY FIXED OBJECT SUCH AS WALLS, CURB, MANHOLES, ETC. AND AT INTERVALS NOT EXCEEDING 40 FEET EXPANSION JOINTS: TYPICAL CONCRETE SIDEWALK JOINT DETAIL N.T.S. NOTE: 1. ALL UNDERGROUND TANKS AND PIPING BY CONTRACTOR 2. PIPE LOCATIONS SHOULD BE USED FOR ANY TANK 3. ALL INTERNAL TANK PLUMBING TO BE 6" sch 40 PVC UNLESS NOTED OTHERWISE 4. ALL TANK BOTTOMS SHOULD BE LEVEL 5. THIS DRAWING IS TO SHOW TANK HOLDING CAPACITY AND PIPING RELATIONSHIPS ONLY. THEY ARE NOT INTENDED TO ADDRESS TANK STRUCTURE ENGINEERING. NOTE: 1. Pressure Test All Suction Lines Upon Installation @ 10-15 PSI max. 2. Keep pressure on Suction Lines for the entire DURATION of construction. 3. Pressure should NOT drop more than 2 PSI. 4. Watch for problems when excavating driveways. 5. If reclaim tanks are located more than 60 feet away from reclaim unit, then increase suction line to 3" sch 80 PVC. 6. Placement of suction lines is critical 7. Do NOT put screens on the suction lines 8. ANY QUESTIONS CONTACT SONNY'S. PRESSURE TESTING PUMP SUCTION LINES 1/4" x 1/8" BRASS HEX NIPPLE Schrader Valve Stem Air Chuck 1/4" BRASS TEE 0-100 PSI Pressure Gauge - 1/4" MNPT 1/4" x 1/8" BRASS Bushing 1/8" MNPT x Schrader Valve Stem Compressed Air YES! PUMP TANK FLOORWALLGROUND LEVEL FLOW BELOW GROUND TANKS ALL suction lines require a continuous upward slope to the Equipment Room. NO! PUMP TANK FLOORWALLGROUND LEVEL FLOW AIR TRAP ALL suction lines must NEVER slope down and then back up again (Air Trap). BELOW GROUND TANKS NO! PUMP TANK FLOORWALLGROUND LEVEL FLOW ALL suction lines must NEVER slope up and then back down again (Air Trap). ANY QUESTIONS CONTACT SONNY'S BELOW GROUND TANKS AIR TRAP 12" ERS-100 Underground Stub-Ups & Pipe Connections in Equipment Room -by G.C. WALL 2" sch 80 PVC Underflow Discharge to TANK 1 4" sch 80 PVC to TANK 3 -2" sch 80 PVC AquaPrep Discharge -BOTTOM PIPE to 4" sch 80 PVC Pipe to Center Trench -2" Air Ozone return (optional) 2" sch 80 PVC Reclaim Water Outlet - TOP PIPE 2" Fresh Water Inlet 3" sch 80 PVC Filter Pump Suction Line from TANK 3 & 3" sch 80 PVC Optional Extra Suction Line from TANK 3 Two 1" PVC Conduits 48" 30" 5" 7" 6" 07/11/2022 NOT FOR CONSTRUCTION UNTIL APPROVED BELOW. NOT FOR CONSTRUCTION UNTIL APPROVED BELOW. TOP VIEW SIDE SECTION VIEW D E B C MODEL NUMBER LIQUID CAPACITY (GALLONS) DIM A DIM B DIM C DIM D DIM E MINIMUM WIDTH MINIMUM LENGTH DEPTH OF BURY TANK WEIGHT LBS. OIL / WATER SEPARATOR DETAIL (750 GAL) N.T.S. NOTE: 1. TANK SECTIONS SHALL BE BOLTED TOGETHER. 2. WATERTIGHT BOLT DOWN FRAME AND COVERS ARE REQUIRED. 3. PENETRATIONS SHALL HAVE BOOTS. 4. CONTRACTOR SHALL COORDINATE INSTALLATION AND INSPECTIONS WITH BOTH FREDERICK COUNTY INSPECTIONS DEPARTMENT AND FREDERICK WATER. 07/11/2022 1/4" TO 1/2" 1.5" DEEP T " SAW CUT JOINT AND JOINT SEALANT NOTE: EXECUTE SAW CUT NO LATER THAN 8 HOURS AFTER INITIAL CONCRETE PLACEMENT, BUT NOT SOONER THAN AS REQUIRED TO PREVENT SPALLING. SEE CONCRETE PAVEMENT SECTION DETAIL FOR MAXIMUM CONTROL JOINTSPACING BASED ON CONCRETE PAVEMENT THICKNESS. HINGED CONSTRUCTION JOINT - (TYPE E) DETAIL - CONTROL JOINT PREMOLDED JOINT MATERIAL NOTE: ISOLATION JOINT AREAS SHALL BE 34" WIDE AND FULL DEPTH, FOR THE ENTIRE LENGTH OF THE JOINT. FULL DEPTH 34" EXPANSION JOINT MATERIAL SHALL BE INSERTED AND LEFT RECESSED 1 12" BELOW THE CONCRETE APRON SURFACE. SILICON JOINT SEALANT (DOW CORNING 888 OR APPROVED EQUAL) SHALL BE USED TO SEAL THE NEW JOINT-LEAVE 12" RECESS PER MANUFACTURER'S RECOMMENDATION. 1/4" R. TOOLED EDGE JOINT SEALANT, COLD APPLIED PER ASTM D 5893 SILICONE SEALANT. DOW CORNING PRODUCT 888 SILICONE JOINT SEALANT OR EQUAL. ISOLATION JOINT @ STRUCTURE CONCRETE PAVEMENT JOINT DETAILS N.T.S. CONCRETE PAVEMENT SECTION AT VACUUM BOOMS CONCRETE PAVEMENT SECTION AT VACUUM BOOMS 2'-6" 12" 5'-6" 2" BRICK OR GRAVEL SETTING BASE WITH CONCRETE 4" SCHEDULE 80 PAVEMENT REFERENCE ELEVATION CUTOUT & PATCH 2'x2' PAVEMENT PIPE FILLED SAWCUT TYPICAL CAPCONCRETE FIXED BOLLARD N.T.S. 07/11/2022 07/11/2022 CONCRETE FOOTING, SEE STRUCTURAL DRAWINGS EXPANSION JOINT GRADE OR PAD, REFER TO CIVIL DRAWINGS 6" REINFORCED CONCRETE SLAB. SEE STRUCTURAL DRAWINGS 14'-0"A-403 1 A-403 2 8 YD. DUMPSTER PER LOCAL WASTE DISPOSAL SERVICE CONCRETE APRON AT DUMPSTER, REFER TO CIVIL DRAWINGS 12'-0"4'-6"4'-612"EQ.EQ. 6" DIA. STANDARD WEIGHT GALV. SCHEDULE 40 PIPE, CONC. FILLED. 6" CONCRETE SLAB SEE STRUCTURAL DRAWINGS 1'-6" FINISH-FLOOR ELEV=+0'-0"EQ.EQ.EQ.4'-6"6" BOLLARD, REFER TO STRUCTURAL SHEET S1.2.1'-0"EQ.1'-0"1 A-402 DUMPSTER ENCLOSURE ENLARGED PLAN DETAIL SCALE: 1/2"=1'-0" 4 A-402 DUMPSTER ENCLOSURE SECTION DETAIL SCALE: 1/2"=1'-0" POST FOOTING 4 A-402 6 A-402 PAINT EXPOSED EDGE OF WOOD POST P-4 FT-1 FC-1 FC-1 EDGE OF CONCRETE PAD FT-1 METAL COLLAR TO FIT OVER 6" DIA. POST, REFER TO STRUCTURAL DRAWINGS 6" DIA. STANDARD WEIGHT GALV. SCHEDULE 40 PIPE, CONC. FILLED. PT WOOD POST. (TYP @ (10) LOCATIONS, SEE STRUCTURAL DRAWINGS PAINT EXPOSED EDGE OF WOOD POST P-4 FT-1 METAL COLLAR TO FIT OVER 6" DIA. POST, REFER TO STRUCTURAL DRAWINGS FT-1 2" x 2" GALV. HSS GATE FRAME 4" STAINLESS STEEL PULL 18" x 1/2" DIA. CANE BOLTS AT EACH DOOR. 7 A-402 DUMPSTER ENCLOSURE ENLARGED PLAN DETAIL SCALE: 1/2"=1'-0" 6 A-402 DUMPSTER ENCLOSURE SECTION DETAIL SCALE: 1/2"=1'-0" FT-1 2" x 2" GALV. HSS GATE FRAME 4" STAINLESS STEEL PULL 18" x 1/2" DIA. CANE BOLTS AT EACH DOOR. A-4033 A-403 4 2" x 2" GALV. HSS GATE FRAME FT-1 112"13'-012"CLR.CASTERS. TYP. PAINT WOOD POSTS AND METAL BOLLARDS "P-4", TYP. PAINT ALL HARDIE TRIM BOARDS ON INSIDE OF ENCLOSURE, TYP. 7'-6" MIN.8"8"8" PT WOOD POST. (TYP @ (10) LOCATIONS, SEE STRUCTURAL DRAWINGS GATE DOOR TO OPEN TO EDGE OF CONC. PAD AS SHOWN. EDGE OF CONCRETE PAD EXTERIOR FINISH SCHEDULE MARK CATEGORY MANUF.DESCRIPTION EF-2 EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) FC-1 HARDIE BOARD JAMES HARDIE™ OR APPROVED EQUAL HARDIEPANEL VERTICAL SMOOTH SIDING OR APPROVED ALTERNATE, COLOR TO MATCH: PPG 1025-1 "COMMERCIAL WHITE" SEMI-GLOSS FINISH FT-1 TRIM BOARDS JAMES HARDIE™ OR APPROVED EQUAL HARDIETRIM® BOARDS 3/4 x 5-1/2" SMOOTH x VARYING LENGTHS OR APPROVED ALTERNATE, COLOR TO MATCH: PPG 1244-4 "BOUDOIR BLUE" SEMI-GLOSS FINISH PPG 1243-5 "BLUE DART" SEMI-GLOSS FINISH PPG 1243-7 RAINBOW BRIGHT" SEMI-GLOSS FINISH M-1 METAL PAC-CLAD M-2 METAL PAC-CLAD M-3 METAL PAC-CLAD P-1 PAINT PPG P-2 PAINT PB-1 8" SMOOTH FACE SCORED CMU T.B.D. SF-1 STOREFRONT YKK ALUMINUM STOREFRONT SYSTEM w/ TEMPERED CLEAR GLAZING, COLOR: CLEAR ANODIZED ALUMINUM EF-1 EXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) SENERGY (OR EQUAL) CHANNELED ADHESIVE CI DESIGN, FINE FINISH, COLOR TO MATCH: PPG 1025-1 "COMMERCIAL WHITE" METAL COPING, COLOR: "BONE-WHITE" AWNING COLOR: TO MATCH P-4 "BLUE DART" SEMI-GLOSS FINISH CHANNELED ADHESIVE CI DESIGN, FINE FINISH, COLOR TO MATCH: PPG, 1243-5 "BLUE DART" PPG 1025-1 "COMMERCIAL WHITE" SEMI-GLOSS FINISH 8" SMOOTH FACE SCORED CMU w/ ARGOS "TYPE-N GRAY" MORTAR, TOOLED JOINTS. PAINT COLOR PPG 1025-1 "COMMERCIAL WHITE" SEMI-GLOSS FINISH P-4 PAINT PPG PPG 1243-5 "BLUE DART" SEMI-GLOSS FINISH SENERGY (OR EQUAL) PPG PPG 1025-1 "COMMERCIAL WHITE" SEMI-GLOSS FINISH 07/11/2022 IP IP IP SF SF SFSFSF SAF SF SAF SAFSFSF SFSF0.06 ACRES TO 181 LF OF SILT FENCE SF IP 1.17 ACRES TO SEDIMENT TRAP (SEE SHEET C703 FOR CALCULATIONS AND DIMENSIONS) 07/11/2022 N 0 30'60' 1" = 30' BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETER12'' SS12'' SS12'' SS15'' ST 15'' ST STR I-13A DA=0.31 AC STR I-13D DA=0.19 AC STR I-13C DA=0.11 AC I13A MH13B I13C I13D 23 24 25 22 21 12'' SS 12'' SS STR I-13E DA=0.17 AC STR I-13F DA=0.04 AC 20' WATER EASEMENT IP IP IP SF SF SFSFSFSF SAF SF SF SF SAF SAFSF SFSFIP IP IP 0.30 ACRES TO 62 LF OF SILT FENCE 0.05 ACRES TO 239 LF OF SILT FENCE IP IP IP 07/11/2022 N 0 30'60' 1" = 30' 07/11/2022 07/11/2022 CE SF SAF ST DD SFSFSF 07/11/2022 IP IP CIP PS TS 07/11/2022 STORMWATER MANAGEMENT & OUTFALL NARRATIVE CHANNEL AND FLOOD PROTECTION REQUIREMENTS FOR THE PROPOSED DEVELOPMENT WILL BE MET BY THE EXISTING DETENTION POND APPROVED WITH THE WALMART SUPERCENTER # 3344 SP# 26-04. THE DEVELOPMENT OF THE SITE WAS ANTICIPATED WITH WALMART SUPERCENTER #3344 SP# 26-04 AS SHOWN ON SHEET C802. THE EXISTING STORM SYSTEM THAT THE PROPOSED STORM SYSTEM WILL CONNECT TO ALSO SHOWS ADEQUATE CAPACITY AND NON EROSIVE VELOCITIES AS SHOWN ON SHEET C500. THE DOWNSTREAM POND WAS DESIGNED TO ACCOMMODATE A DEVELOPMENT WITH A CN OF 93, AND THE PROPOSED DEVELOPMENT HAS A CN OF 90. IT IS THE OPINION OF THE SUBMITTING ENGINEER, STANTEC, THAT THE EXISTING DETENTION POND HAS ADEQUATE CAPACITY TO CONTROL RUNOFF GENERATED FROM THE DEVELOPMENT OF THE SUBJECT SITE AND THE THAT AN ADEQUATE OUTFALL EXISTS FOR THE PROPOSED DEVELOPMENT. THE TOTAL PHOSPHOROUS LOAD REDUCTION REQUIRED IS 1.31 LBS/YR AS SHOWN ON THE VRRM SUMMARY ON THIS SHEET. THE EXISTING DETENTION POND WILL REMOVE 0.90 LBS/YR AND THE REMAINING 0.41 LB/YR OF PHOSPHORUS BE ADDRESSED USING OFFSITE NUTRIENT CREDITS. THE EXISTING DETENTION POND PHOSPHORUS REMOVAL WAS ANTICIPATED WITH THE APPROVED SITE PLAN SP#26-04 AS SHOWN ON SHEETS C801 AND C802. TO BE ADDRESS WITH OFFSITE NUTRIENT CREDITS NUTRIENT CREDIT LETTER OF AVAILABILITY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 FOR INFORMATION ONLY 07/11/2022 07/11/2022 BOILER AREAFOR NORTHERNSITES ONLYGAS METERELECT.DISCONNECTELECT. CTCABINETMETER4PA 1AR 1QR 1AR 1LS 1LS 3QR 2ZS 07/11/2022 N 0 20'40' 1" = 20' in undisturbed soil 1/3 of earth ball 2"x 4"x 30" guy stake (3 required) 2" mulch material 3" dia. x 4' cedar stake(s) 3" galv. turnbuckle (2 strands twisted) #12 galv. wire branches are cut to balance tree, make cuts flush with a lateral branch. 12"12" PLANTING DETAIL/DECIDUOUS TREES NOT TO SCALE Note: Stake trees under 4" caliber. Guy trees over 4" caliber. Prune trees just after digging to reduce crown +/- 30%. Do not cut main leader. If side Reinforced rubber hose Approved tree wrap Mounded earth saucer Planting mixture Remove burlap from top Setting bed (compacted) Stakes 18" below tree pit 1. Plant Identification All plants shall be properly marked for identification. 2. List of Plant Material The Contractor will verify the plant quantities prior to bidding and any discrepancies shall be brought to the attention of the Landscape Architect. The Contractor shall furnish and plant all plants required to complete the work shown on the drawings. Substitution shall not be made without the written approval of the Landscape Architect. This contract will be based on the bidder having verified prior to bidding, the availability of the required plant material as specified on the Plant Materials List. 3. Plant Quality All shrubs shall be dense, heavy to the ground, and well grown, showing evidence of having been sheared regularly, and shall be sound, free of plant disease or insect eggs and shall have a healthy normal root system. Plants shall be freshly dug and not heeled-in stock from cold storage. All plants shall be nursery grown (except as noted below). Plants shall not be pruned prior to delivery. The shape of the plant shall in general conform to its natural growth proportions unless otherwise specified. Trees shall conform to the branching, caliber, and height specification the American Nursery & Landscape Association, and shall have a well-shaped, heavy branch structure for the species. Evergreen trees are to have an internode no greater than 18" and shall be uniformly well shaped. All plant sizes shall average at least the middle of the range given in the plant list. 4. Soil Mix Solid mix will be 2/3 existing soil, 1/3 leafmold or equal organic material, thoroughly mix and homogenized. 5. Excavation Holes for all plants shall be 18" larger in diameter than size of ball or container and shall have vertical sides. Hedges shall be planted in a trench 12" wider; beds for mass planting shall be entirely rototilled to a depth of 8" and shall be 18" beyond the average outside edge of plant balls. 6. Planting Backfilling shall be done with soil mix, reasonably free of stones, subsoil, clay lumps, stumps, roots, weeds, Bermuda grass, litter, toxic substances, or any other material which may be harmful to plant growth, or hinder grading, planting, or maintenance operations. Should any unforeseen or unsuitable planting conditions arise, such a faulty soil drainage or chemical residues, they should be called to the attention of the Landscape Architect and Owner for adjustment before planting. The plant shall be set plumb and straight, and shall be staked at the time of planting. Backfill shall be well worked about the roots and settled by watering. Plants will be planted higher than surrounding grade. Shrubs will be 1" higher and trees will be 3" higher. 7. Maintenance The Contractor shall be responsible during the contract and up to the time of acceptance, for keeping the planting and work incidental thereto in good conditions, by replanting, plant replacement, watering, weeding, cultivating, pruning and spraying, restocking and cleaning up and by performing all other necessary operations of care for promotion of good plant growth so that all work is in satisfactory condition at time of acceptance, at no additional cost to the Owner. The Contractor will be responsible for the removal of tree guying prior to release from the guarantee period. 8. Fertilizer Fertilizer shall be a slow release type contained in polyethylene perforated bags with micropore holes for controlled feeding such as Easy Grow as manufactured by Specialty Fertilizer Inc., Box 355, Suffern, New York, 10901 or approved equal. The bags shall contain 1 ounce of soluble fertilizer analysis 16-18-18 per units to last for three years and shall be applied during planting as recommended by the manufacturer. If fertilizer packets are not used the Contractor shall apply granular fertilizer to the soil mix with 10-6-4 analysis at the following rates: Tree Pits, 2-3 lbs. per caliper inch; Shrub Beds, 3-5 lbs. per 100 square foot; Ground Cover, 2-3 lbs. per 100 square foot. 9. Guarantee and Replacement All materials shall be unconditionally guaranteed for one year. The Contractor is not responsible for losses or damages caused by mechanical injury or vandalism. The owner, developer, and/or builder who is responsible for planting required landscaping shall be responsible for maintaining it in a state of good health for one year after planting. After one year, from the date occupancy is approved, the individual property owner and/or homeowner's association shall become responsible for maintenance. As long as the intent of this section is met, the Zoning Administrator may waive the requirement for landscaping on individual building lots when a hazard or nuisance exists. Guarantee shall cover both labor and materials. Earth saucers and stakes and guys shall be removed and trees and shrubs mulched to 3" maximum depth with shredded bark just prior to expiration of the one-year guarantee. The Owner shall be notified in writing when this work is to occur. 10. Plant Spacing Plant spacing is generally to scale on plan. No plants except viney ground covers or espaliered material shall be closer than 30" to building, walks or curbs. 11. Schedule and Approvals The Landscape Contractor shall submit a written schedule of operations and written requests for approvals in accordance with specifications, the contract documents or which these are a part or as otherwise agreed upon with the Owner. PLANTING NOTES PLANTING LIST ZONING STANDARDS per Frederick County, VA Zoning Ordinance -One (1) tree per 2,000 s.f. of impervious areaProposed impervious area=30,285 s.f. (30,285/2,000= 16 trees required) -One (1) tree per 10 parking spaces2 trees required Total Trees Required: 18Total Trees Provided: 18 KEY QTY BOTANICAL NAME/COMMON NAME SIZE COMMENTS Deciduous Trees-Shade AR 06 Acer rubrum/ Acer rubrum 2 1/2-3 inch caliper Ball and burlapLS 02 Liquidambar styriciflua 'Rotundiloba'2 1/2-3 inch caliper Ball and burlapQR 04 Quercus rubra/ Northern Red Oak 2 1/1-3 inch caliper Ball and burlapPA 04 Platanus x acerifloia/ Plane Tree 2 1/2-3 inch caliper Ball and burlapZS 02 Zelkova serrata/ Zelkova 2 1/2-3 inch caliper Ball and burlap