Loading...
HomeMy WebLinkAbout57-22 Site PlanSITE U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS0000.dwg PLOTTED: 12/9/2022 10:06 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----LOCATION MAP Scale: 1" = 2000'NORTHCALL 1-800-552-7001 CALL BEFORE YOU DIG ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA SECTION 56-265.17 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC. TICKET NUMBER(S): PREPARED BY:PENNONI ASSOCIATES INC. 117 East Piccadilly Street Winchester, VA 22601 T 540.667.2139 F 540.665.0493 PREPARED FOR:LAMACCHIA GROUP 157 NORTH MILWAUKEE STREET MILWAUKEE, WISCONSIN 53202 414-223-4400 FNB BANK TAX MAP: 75-A-104JSITE PLAN SITE PLAN #57-22 SHAWNEE MAGISTERIAL DISTRICT - VIRGINIA ORIG SUBMISSION DATE: SEPTEMBER 29, 2022 REVISED SUBMISSION DATE: DECEMBER 09, 2022 RESPONSIBLE LAND DISTURBER THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. NAME:_____________________________________________________ CERTIFICATION #:___________________________________________ DATE: _____________________________________________________ APPROVED BY FREDERICK COUNTY ZONING ADMINISTRATOR "SITE PLAN VALID FOR FIVE YEARS FROM APPROVAL DATE" ________________________________________________________________________________ APPROVED BY DATE SITE DEVELOPER I HEREBY CERTIFY THAT THE PROPERTY CONTAINED IN THIS SUBDIVISION IS WITH FREE CONSENT AND IN ACCORDANCE WITH THE DESIRES OF THE UNDERSIGNED OWNERS, PROPRIETORS OR TRUSTEES, IF ANY. LAMACCHIA GROUP 157 NORTH MILWAUKEE STREET MILWAUKEE, WISCONSIN 53202 414-223-4400 LOCAL UTILITIES RAPPAHANNOCK ELECTRIC CO-OP 137 KELLEY COURT FRONT ROYAL, VIRGINIA 22630 (540) 662-2037 VERIZON 404 HILLANDALE LANE WINCHESTER, VIRGINIA 22602 (540) 665-3156 COMCAST COMMUNICATIONS 195 RAINVILLE ROAD WINCHESTER, VIRGINIA 22602 (540) 504-0942 WASHINGTON GAS 350 HILLANDALE LN. WINCHESTER, VIRGINIA 22602 (540) 868-7913 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VIRGINIA 22655 (540) 868-1061 REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF1 29CS0000COVER SHEETJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 Sheet List Table Sheet Number Sheet Title 1 Cover Sheet 2 Notes & Legend 3 Proffers 4 Proffers 5 Transportation Notes and Calculations 6 Existing Conditions 7 Erosion & Sediment Control Narrative 8 Erosion & Sediment Control Plan - Phase I 9 Erosion & Sediment Control Plan - Phase II 10 Erosion & Sediment Control Details 11 Erosion & Sediment Control Details 12 Site Plan 13 Grading Plan 14 Site Details 15 Utility Plan 16 Sanitary Sewer and Waterline Profiles 17 Sanitary Sewer and Water Details 18 Sanitary Sewer and Water Details 19 Pre-Development Drainage Map 20 Post-Development Drainage Map 21 Storm Sewer Profiles 22 Storm Sewer Details 23 SWMF A Plan & Computations 24 Stormwater Management Computations 25 Stormwater Management Computations 26 Landscape Plan, Notes & Details 27 Life Safety Plan 28 Photometric Plan 29 Utility Conduit Plan U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS0001.dwg PLOTTED: 12/9/2022 10:06 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT REV. JUNE 19, 2013 VDOT GENERAL NOTES V1. ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN. V2. ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS. V3. WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY, SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT'S WORK AREA PROTECTION MANUAL. A TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY. V4 THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY. V5. DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. V6. IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S), VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK. V7. THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION. V8. THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE INSTALLATION AND REMOVAL OF THE WORK ZONE. V9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH CONSTRUCTION. V10. CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION. V11. ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES AT CONFLICT POINTS. V12. ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V13. ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE SOIL SAMPLE(S) OBTAINED FOR CBR'S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES. V14. ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. V15. VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V16. A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR REPRESENTATIVE. V17. THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER. V18. PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. V19. THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED. V20. AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY CONTROL STRIP. V21. ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE CONTROL STRIP. V22. IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V23. VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN ACCORDANCE WITH VDOT'S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY VDOT AFTER GRADING IS MOSTLY COMPLETE. V24. APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER. V25. VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V26. THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. GENERAL CONSTRUCTION NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT AND PERFORM ALL WORK INCLUDING RESTORATION FOR THE COMPLETED FACILITY READY FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLE STANDARDS AND CONSTRUCTION SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF HEALTH, VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY, FREDERICK COUNTY SANITATION AUTHORITY, THE CONTRACT DOCUMENTS AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE SPECIFICATIONS DATED JANUARY 2002; VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE STANDARDS DATED FEBRUARY 1, 2001; AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION WORK AREA PROTECTION MANUAL DATED JANUARY 1, 1996. 2. THE ENGINEER HAS ATTEMPTED TO LOCATE EXISTING SUBSURFACE UTILITIES; HOWEVER, SUCH MAY EXIST THAT ARE NOT SHOWN. THE CONTRACTOR SHALL EXERCISE CARE IN THIS WORK SO AS TO AVOID DAMAGE TO ANY UTILITIES. ANY DAMAGE SHALL BE THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL NOTIFY ALL COMPANIES 72 HOURS PRIOR TO CONSTRUCTION. CALL "MISS UTILITY" 1-800-257-7777. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT. ALL DIMENSIONS, ELEVATIONS, AND LOCATIONS SHALL BE VERIFIED IN THE FIELD BY EACH CONTRACTOR PRIOR TO BEGINNING THE WORK. 4. ANY UNUSUAL SUBSURFACE CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. 5. ALL GRADING FOR IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA. ANY WORK PERFORMED OFFSITE IS THE CONTRACTOR'S RESPONSIBILITY. 6. CONTRACTOR SHALL OBTAIN, AT HIS EXPENSE, PERMITS FROM FREDERICK COUNTY FOR LAND DISTURBANCE AND VIRGINIA DEPARTMENT OF TRANSPORTATION FOR WORK WITHIN VIRGINIA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND SHALL FAITHFULLY ADHERE TO THE PERMIT CONDITIONS IMPOSED. 7. TEMPORARY AND PERMANENT EROSION CONTROL STRUCTURES AND METHODS TO BE IN ACCORDANCE WITH THE VIRGINIA EROSION CONTROL GUIDELINES AND LOCAL ORDINANCES AND TO BE UTILIZED DURING THE CONSTRUCTION PERIOD. 8. ALL EROSION CONTROL STRUCTURES SHOWN OR AS REQUIRED DURING CONSTRUCTION SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD IN WHICH AREAS ARE DENUDED. AREAS SHOWN TO BE SURFACED ARE TO HAVE STONE BASE INSTALLED AT THE EARLIEST POSSIBLE DATE AFTER ESTABLISHING GRADE. NO AREA IS TO REMAIN DENUDED FOR MORE THAN SEVEN CALENDAR DAYS WHEN CONSTRUCTION IS NOT IN PROGRESS. 9. ALL UNPAVED AREAS OF THE SITE WHICH ARE DISTURBED BY THIS CONSTRUCTION SHALL BE PROVIDED WITH FOUR INCH TOPSOIL, FERTILIZED, SEEDED, COMPACTED AND MULCHED. SEED BED TO BE WATERED AND CARED FOR AS NECESSARY TO PROVIDE A GOOD LAWN QUALITY GRASS COVER. AREAS NOT GRADED SHALL BE DISCED, LEVELED AND SEEDED TO ACHIEVE LAWN CONDITIONS. 10. SANITARY GRAVITY SEWER, FORCE AND WATER MAINS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND SHALL ADDITIONALLY MEET ALL REQUIREMENTS OF THE FREDERICK WATER STANDARDS AND SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE WITH THIS AGENCY AND ARRANGE FOR INSPECTION BY THE AUTHORITY. 11. CONTRACTOR SHALL CLEAN UP AND RESTORE DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF PIPE-LAYING IN THE AFFECTED AREA. 12. THE CENTERLINE OF ALL NEW SANITARY GRAVITY SEWER, FORCE AND WATER SHALL BE MAINS STAKED BY CONTRACTOR AT ALL 100 FOOT STATIONS AND AT ALL BENDS. THE CONTRACTOR SHALL NOT PROCEED WITH CONSTRUCTION UNTIL THE ALIGNMENT HAS BEEN APPROVED BY THE OWNER. 13. DISINFECTION OF SANITARY GRAVITY SEWER AND FORCE MAIN ARE NOT REQUIRED. 13. ALL FIRE HYDRANTS SHALL CONFORM TO THE FREDERICK COUNTY SANITATION SPECIFICATIONS PART III PARAGRAPH 5. 14. CONTRACTOR SHALL RESTORE ALL EXISTING RESIDENTIAL DRIVEWAYS AND BUSINESS ENTRANCES TO THEIR ORIGINAL STATE, IF DAMAGED DURING CONSTRUCTION. 15. ALL UTILITIES WILL BE LOCATED UNDERGROUND. TRAFFIC CONTROL NOTES: 1. THE CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL RESIDENCES AND BUSINESSES FOR THE DURATION OF THE CONTRACT. 2. TRAFFIC SHALL BE MAINTAINED IN TWO DIRECTIONS ON ALL PUBLIC AND PRIVATE STREETS FOR THE DURATION OF THE CONTRACT. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL SIGNS, BARRIERS, FLAGMEN AND OTHER CONTROLS. 3. ALL TRAFFIC CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE MUTCD AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION WORK AREA PROTECTION MANUAL 4. THE CONTRACTOR SHALL CLOSE ALL OPEN TRENCHES IN PAVED AREAS AT THE END OF EACH WORK DAY WHEN POSSIBLE. IN AREAS WHERE THE TRENCH CANNOT BE CLOSED AT THE END OF THE WORK DAY DUE TO SEQUENCING OF WORK OR OTHER CONSTRAINTS, THE TRENCH MAY BE PROTECTED BY PROVIDING STEEL PLATING AND WARNING SIGNS. PLATING OF OPEN TRENCHES WILL NOT BE PERMITTED IN AREAS IN RISK OF COLLAPSING DUE TO UNSTABLE SOIL CONDITIONS. ALL STEEL PLATING OF TRENCHES SHALL BE APPROVED BY THE VIRGINIA DEPARTMENT OF TRANSPORTATION. 5. TRENCHES IN PAVED AREAS MAY BE TEMPORARILY MAINTAINED IN THE FOLLOWING MANNER UNTIL FINAL PAVEMENT RESTORATION IS COMPLETE: 5.1. RESIDENTIAL AREAS METHOD: STONE BACKFILL FLUSH WITH PAVEMENT SURFACE TIME LIMIT: 5 CALENDER DAYS METHOD: BITUMINOUS COLD PATCH, 2 INCH MINIMUM THICKNESS TIME LIMIT: 30 CALENDER DAYS BUSINESS 5.2. COMMERCIAL AND INDUSTRIAL AREAS METHOD: BITUMINOUS COLD PATCH, 2 INCH MINIMUM THICKNESS TIME LIMIT: 14 CALENDER DAYS ALL TEMPORARY PAVEMENT REPAIRS SHALL BE REGULARLY INSPECTED BY THE CONTRACTOR AND MAINTAINED IN A SAFE MANNER. TEMPORARY PAVEMENT REPAIRS SHALL BE SMOOTH AND REGULAR WITHOUT CREATING HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC. 6. PAVEMENT REMOVAL SHALL BE ACCOMPLISHED BY CREATING A STRAIGHT LINE SAW CUT OF A MINIMUM OF TWO INCHES IN DEPTH AT THE LIMITS OF THE REMOVAL. CONCRETE SURFACES MAY BE REMOVED TO THE NEAREST JOINT IN LIEU OF SAW CUTTING IF A CLEAN STRAIGHT EDGE CAN BE CREATED PRIOR TO REPAIR INSTALLATION. LOCATOR MARKERS LOCATOR MARKERS (BURIED TRANSPONDERS) SHALL BE PLACED DIRECTLY OVER THE PIPE. MARKERS SHALL BE PLACED AT: 1. 50-FEET INTERVALS 2. EACH BEND 3. THE END OF EACH JOINT THAT IS DEFLECTED 4. ANY ADDITIONAL LOCATION THE AUTHORITY'S ENGINEER SHALL DIRECT. EROSION & SEDIMENT CONTROL NOTES: 1. PRIOR TO INITIATING ANY LAND DISTURBING ACTIVITY, IT WILL BE NECESSARY TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING WITH PUBLIC WORKS STAFF TO DISCUSS THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. NO PRE-CONSTRUCTION MEETINGS WILL BE SCHEDULED PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT FOR THE SUBJECT PROJECT. THE LAND DISTURBANCE PERMIT WILL BE ISSUED BY THE FREDERICK COUNTY DEPARTMENT OF PUBLIC WORKS. 2. CONTRACTOR TO CONTACT THE PUBLIC WORKS DEPARTMENT TO SCHEDULE THE REQUIRED EROSION AND SEDIMENT CONTROL MEASURES INSPECTIONS AS INDICATED BY THE PROGRAM ADMINISTRATOR. IF THE EROSION AND SEDIMENT CONTROL MEASURERS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE APPROVED PLAN, THE DEPARTMENT OF PUBLIC WORKS WILL GRANT APPROVAL TO INITIATE LAND DISTURBING ACTIVITIES. 3. PRIOR TO RELEASE OF BUILDING PERMITS, THE FOLLOWING ITEMS SHALL BE COMPLETED: A) SUBDIVISION SHALL BE STABILIZED IN ACCORDANCE WITH THE APPROVED PLAN (I.E., ROAD SURFACE, STORMWATER CONVEYANCE SYSTEM, CURB AND GUTTER, SIDEWALKS, CHANNEL LININGS, VEGETATIVE COVER, STC.) B) SUBMITTAL OF CERTIFIED AS-BUILT OF THR SUBDIVISION WHICH CONTAINS THE FOLLOWING ITEMS: STORMWATER CONVEYANCE SYSTEM, CURB AND GUTTER, DRAINAGE CHANNELS AND DITCHES, STORMWATER POND. A LETTER FROM THE ENGINEER-OF-RECORD SHALL BE INCLUDED WITH THE AS-BUILT WHICH STATES THAT THE SUBDIVISION HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLAN. C) INDIVIDUAL SUBDIVISION LOT GRADING PLANS SHALL BE SUBMITTED BY THE BUILDER AT THE TIME OF THE BUILDING PERMIT APPLICATION FOR EACH LOT PROPOSED FOR CONSTRUCTION. 4. TEMPORARY AND PERMANENT EROSION CONTROL STRUCTURES AND METHODS TO BE IN ACCORDANCE WITH THE VIRGINIA EROSION CONTROL GUIDELINES AND LOCAL ORDINANCES AND TO BE UTILIZED DURING THE CONSTRUCTION PERIOD. 5. ALL EROSION CONTROL STRUCTURES SHOWN OR AS REQUIRED DURING CONSTRUCTION SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD IN WHICH AREAS ARE DENUDED. AREAS SHOWN TO BE SURFACED ARE TO HAVE STONE BASE INSTALLED AT THE EARLIEST POSSIBLE DATE AFTER ESTABLISHING GRADE. NO AREA IS TO REMAIN DENUDED FOR MORE THAN 7 CALENDAR DAYS WHEN CONSTRUCTION IS NOT IN PROGRESS. 6. CONTRACTOR TO CLEAN UP AND RESTORE DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF PIPE-LAYING IN THE AFFECTED AREA. 7. ALL UNPAVED AREAS OF THE SITE WHICH ARE DISTURBED BY THIS CONSTRUCTION SHALL BE PROVIDED WITH 4" TOPSOIL, FERTILIZED, SEEDED, COMPACTED AND MULCHED. SEED BED TO BE WATERED AND CARED FOR AS NECESSARY TO PROVIDE A GOOD LAWN QUALITY GRASS COVER. AREAS NOT GRADED SHALL BE DISCED, LEVELED AND SEEDED TO ACHIEVE LAWN CONDITIONS. TEST HOLE ......................... PARKING SPACES NUMBER ............. BUILDING WALL ..................... DOOR LOCATION ..................... LIMITS OF GRADING ................. BENCHMARK ......................... 77 PROPOSED CG-6R TREE LINE ......................... TREE .............................. SANITARY STRUCTURE LABEL .......... WATER METER ....................... SPOT SHOT ......................... SIGN .............................. FIRE HYDRANT ...................... STREET LIGHT ...................... UTILITY POLE ...................... WATER VALVE ....................... TRAFFIC SIGNAL POLE ............... FENCE LINE ........................ UNDERGROUND TELEPHONE ............. OVERHEAD TELEPHONE ................ UNDERGROUND ELECTRIC .............. OVERHEAD ELECTRIC ................. STORM STRUCTURE LABEL ............. WATERMAIN ......................... SANITARY SEWER .................... STORM SEWER ....................... EDGE OF PAVEMENT .................. CURB AND GUTTER ................... CONTOURS .......................... STREET CENTERLINE ................. PROPERTY LINE ..................... 24 LEGEND TRANS.CG-6 EXISTING 24 PAVEMENT BORING ..................... PAVEMENT CORES ..................... FORCE MAIN .............. PW PWPROCESS WATER .............. GAS LINE ........................ FIBER OPTIC ........................ FIRE LINE ........................ PW PW FIRE RISER ...................... POST INDICATOR VALVE ...................... WV STORM SEWER MANHOLE ................ SAN. SEWER MANHOLE ................ REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM PROPERTY SUMMARY ADDRESS 0 WARRIOR DRIVE. STEPHENS CITY, VA. TAX MAP 75-A-104J PARCEL OWNER TASKER WARRIOR PROPERTIES, LLC PARCEL AREA 1.3417 AC EXISTING ZONING B2 CURRENT USE UNIMPROVED PROPOSED USE BANK WITH DRIVE-THRU DISTURBED AREA 1.75 AC DEVELOPED AREA 1.34 AC IMPERVIOUS AREA 0.54 AC (ON-SITE) 0.22 AC (ACCESS ESMT) 0.76 AC (TOTAL) FLOODPLAIN FEMA FLOOD MAP #51069C035OE EFF. 1/29/2021 ZONE X AREA OF MINIMAL FLOOD HAZARD WOODLANDS 0.24 AC EXISTING 0.24 AC (100%) TO BE DISTURBED 0.00 AC TO REMAIN O.S. / LANDSCAPED AREA REQUIRED PROVIDED 0.20 AC (15%)0.61 AC (45.3%) BUILDING HEIGHT REQUIRED PROVIDED <35'20' FLOOR AREA RATIO ALLOWED PROVIDED 1.0 0.04 GND FL 2,392 SF TTL FL 2,392 SF/58,443 SF (SITE AREA) SETBACKS REQUIRED PROVIDED FRONT 35'132.79' FRONT (ARTERIAL RD) 50'81. 50' SIDE 0'123.07' REAR 0'40.5' PARKING CALCULATIONS REQUIRED PROVIDED (1 SPACE /400 SF FLOOR AREA ) 2,392 SF / 400 = 6 SPACES PARKING SPACES 6 14 H.C. SPACES 1(1 VAN ACC.) 1 (1 VAN ACC.) TOTAL PARKING 6 14 LOADING SPACES REQUIRED PROVIDED 1 1 WATER & SAN. SEWER USAGE 50 GPD SF SQUARE FEET SEC SECTION RTE ROUTE ROW RIGHT-OF-WAY FT FEET POLYVINYL CHLORIDE REINFORCED CONCRETE PIPE VIRGINIA DEPARTMENT OF TRANSPORTATION WELDED WIRE MESH POINT OF VERTICAL INTERSECTION W/ FIRE HYDRANTF.H. WV WATER VALVE BEST MANAGEMENT PRACTICE BEGIN VERTICAL CURVE STATION BEGIN VERTICAL CURVE ELEVATION END VERTICAL CURVE STATION END VERTICAL CURVE ELEVATION DROP INLET DIAMETER DUCTILE IRON PIPE EROSION CONTROL ELEVATION END SECTION FINISHED FLOOR ELEVATION ELEV F.F.E. EVCS EX EVCE ES EXISTING DIP EA EC DIA DI EACH BENCHMARK CLEANOUT CONCRETECONC CL CO BVCS BVCE CLASS BLDG B.M. BMP BUILDING STR VERT WWM TYP VDOT RCP SHT STM PVC PVI STRUCTURE TYPICAL VERTICAL WITH SHEET STEAM HORIZ MECH MIN MSE INV MAX G.V. HORIZONTAL INVERT MAXIMUM MECHANICAL MINIMUM MECHANICALLY STABILIZED EARTH GATE VALVE AREA DRAINAD TRENCH DRAINTD LIMITS OF DISTURBANCELOD APPX. APPROXIMATELY OVERHEAD ELECTRICOHE UNDERGROUND ELECTRICUGE UGT UNDERGROUND TELEPHONE TELCO TELECOMMUNICATIONS WWF WELDED WIRE FABRIC CAST IRONCI STAINLESS STEELSS TREE PROTECTIONTP NORTH BOUND LANENBL SOUTH BOUND LANESBL BW BOTTOM OF WALL TOP OF WALLTW ON CENTER EACH WAY ON CENTEROC OCEW PROP PROPOSED DIAMETERØ MANHOLEMH FOR FUEL OIL RETURN FOS FUEL OIL SUPPLY CWR CWS CHILLED WATER SUPPLY CHILLED WATER RETURN MECHANICAL, ELECTRICAL, PLUMBINGMEP ABBREVIATIONS MLP METAL LIGHT POLE MSP METAL SIGN POLE F.H. ASSY FIRE HYDRANT ASSEMBLY HANDICAP PARKINGHCP BUILDING RESTRICTION LINEBRL APPROVED PERMIT DRAWINGS CIVIL SH. OF2 29CS0001NOTES & LEGENDJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 FREDERICK COUNTY INSPECTIONS DEPARTMENT NOTES: PROVIDED WITH APPROVAL SHEET DATED 10/11/2022 FNB BANK Building shall comply with the 2018 Virginia Uniform Statewide Building Code. Other codes that apply are ICC/ ANSI A117.1-2009 Accessible and Usable Buildings and Facilities, International Fire Code 2018, Virginia Energy Code 2018, Virginia Mechanical Code 2018, and the NEC. All required exits shall meet ANSI Al17.l-09. Exits shall terminate at a public way. A detailed fire exiting plan shall be provided with the building plans to identify the location and travel distance to the accessible exits. New exits may need to meet ANSI A117.1-09. An accessible route shall be provided to the facility and to the main entrance. Handicap parking shall comply with ANSI A117.1-09. Van accessible parking shall have a minimum of 11' width with 5' unloading area or a minimum of 8' unloading area with an 8' width. Maximum 2% slope required for parking and unloading. Maximum threshold at door shall not exceed 1 2”. Walkways shall not exceed 5% slope. Slopes exceeding 5% shall be designed as ramps. Accessible parking and unloading area shall haste a striped area leading to entrance when traveling over vehicular. Engineer Design require on all foundations and or slabs with greater than 8" fill or 24” clean sand/gravel. Fill shall be designed and compacted as designed by a Registered Design Professional. Please note the requirements in Chapter 17 of VCC for special inspection requirements on the type of structure (Soils, concrete etc.) U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS0002.dwg PLOTTED: 12/9/2022 10:06 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF3 29CS0002PROFFERS JULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS0003.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF4 29CS0003PROFFERS JULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS0004.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF5 29CS0004TRANSPORTATION NOTESAND CALCULATIONSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 CS1000 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS1000.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ---- APPROVED PERMIT DRAWINGS CIVIL SH. OF6 29 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS2000.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF7 29CS2000EROSION & SEDIMENTCONTROL NARRATIVEJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 Erosion and Sediment Control Narrative Project Description The "FNB Bank" project site is generally located in Frederick County, Virginia within the Shawnee Magisterial District. This site is specifically located along the West side of Warrior Drive approximately 1,000' south of the Tasker Road Intersection. A Self-Storage Facility is currently under construction, adjacent to and west of the project site. This project proposes construction of a Bank, with all associated appurtenances. A small Catch Basin is proposed for management of Stormwater Quantity. Existing Site Conditions The site is currently Unimproved. Slopes range from less than 0.50% to approximately 25%. See the "Existing Conditions Plan" (CS1000) & the Pre-Development Drainage Map (CS6000). Adjacent Property The project is bound, on the west, by a Self-Storage, which is currently under construction, A Shared Access Road is being constructed under coverage of the Self-Storage Facility Plans. Unimproved Commercial Land binds the site to the south and north of the Shared Access. Warrior Drive binds the site on the east. Off-Site Areas There is a linear utility strip proposed as part of this project, in order to bring necessary utility services to the site. Also small Off-Site areas will be needed to construct an entrance return and tie-out grading. Waterline "B" is proposed off-site. Stockpile Areas: The stockpiles will have to be kept out of the proposed grading area and to stay clear of all construction activity. Stockpiles will be stabilized with temporary vegetation and protected with silt fence to prevent soil loss and sediment transport from the stockpiles. Soils . All Soils within the delineated Drainage Areas are classified as "HSG D". See this sheet for an Overall Soils Map, HSG Group Classifications and a Map Unit Legend. (SL - USDA Web Soils Survey). The Physical propoerties of each soil type are summarized also. A Complete NRCS Soils Report is included with the FNB Bank "SWM Narrative". Geology The Martinsburg Formation underlies the project site. See this sheet for more specific Geologic Data. Critical areas A portion of the existing wetlands is to remain on-site. Care shall be taken during construction not to disturb this area. The "Ponded Water" existing on site must be drained before clearing and grubbing the site. See the Phase I E&S Plans. Erosion and sediment control measures Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. Structural Measures Structural control measures shown on the plans intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before up-slope land disturbance takes place. Every effort shall be made to prevent silt from running off the site during construction. Phase I: A Construction Entrance (3.02) shall be installed at the location shown on the Phase I plan to prevent mud and debris from being tracked onto roadways. Install Silt Fence (3.05) as shown on the plans to intercept and detain small amounts of runoff from disturbed areas during construction in order to prevent sediment from leaving the site. Culvert Inlet Protection (3.08) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. The Stone Option is required at the Dual 48" Culverts. Diversion Dike (3.09) as shown on plans to divert clean runoff away from work areas and contain onsite runoff to erosion and sediment control practices. Install temporary sediment traps (3.13) as a Phase 1 control measures prior to clearing the site; they shall detain runoff long enough to allow the majority of sediment to "settle out" prior to leaving the site. Rock Check Dams (3.20) shall be used to stabilize drainage swales. Roughen surface of slopes 3:1 or greater maximum 2:1 slope. (3.29) in preparation for temporary or permanent seeding. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and all other disturbed areas to stabilize disturbed areas. Phase II: All controls installed in Phase I should remain until the site is stabilized. Storm Drain Inlet Protection (3.07) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. Outlet Protection (3.18) shall be placed on the outlets of all storm sewer pipes and culverts to reduce erosion, undercutting and velocities. Riprap (3.19) shall be placed at the flume outlets to protect the soil from erosive forces and reduce velocities.of concentrated flows. Filter Cloth shall be installed as part of the the Bank Stabilization per Plate 3.19-1. Rock Check Dams (3.20) shall be used to stabilize drainage swales. Permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Soil Stabilization Blankets and Matting (3.36) shall be installed on disturbed slopes steeper than 3:1). Vegetative Measures Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months. Soil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary vegetation immediately after grading. All earth berms, dams, dikes, diversions and Sediment Trap embankments are to be machine-compacted, immediately seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover within five (5) days after grading. Management Strategies Construction shall be sequenced such that grading operations will begin and end as quickly as possible. The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. Maintenance of these measures throughout the project are critical to the effectiveness of the program. After areas above controls have been stabilized, the controls shall be cleaned up and removed at the direction of the Frederick County inspector. All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. Erosion and Sediment Control Narrative Management Strategies (Continiued) Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the check dams shall be removed. Concentrated runoff shall not flow down cut or fill slopes unless contained within a temporary or permanent channel, flume, or slope drain structure. Whenever water seeps from a slope face, drainage or other protection shall be provided. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soils areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment Control Handbook (VESCH). Any changes made to this plan must be resubmitted for approval without exception. Maintenance All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24 hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Gravel outlets shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Permanent Stabilization All areas disturbed by construction shall be stabilized with permanent seeding immediately following final grading. Seeding shall be done according to standard and specification no. 3.32 of the VESCH. Permanent stabilization is defined as 90% uniform coverage on the entire site, ability to inhibit erosion and mature enough to survive, including 2-3 inch cuttings. Phases of Land Disturbance Activities 1. Mandatory pre-construction conference shall be scheduled as required by regulations. 2. Clearing and grubbing for sediment control devices only. 3. Installation of all Phase I erosion & sediment control devices. 4. Obtain county inspector approval. 5. Clear site. 6. Restoration and stabilization of disturbed areas. 7. Remove all erosion & sediment control measures with the approval of the inspector. SWM Facility Long Term Maintenance and Repair Plan Mowing: All grasses should be mowed at least twice each year. Grasses such as tall fescue should be mowed in early summer after emergence of the heads on cool season grasses. They should be mowed again in the early fall to prevent seeds of annual weeds from maturing. Mowing of legumes such as sericea lespedeza and crown vetch can be permitted to grow on the dam or in any part of the emergency spillway. Liming and fertilizing: the soil should be sampled according to recommended procedures at least once every 4 years. The sample should be tested at a qualified soil testing laboratory. Lime and fertilizer should be applied in accordance with recommendations based on the tests. Replanting and over seeding: if vegetation covers less than 40% of the soil surface, lime, fertilize and seed in accordance with current recommendations for new seeding. If vegetation covers more than 40% but less than 70% of the soil surface, lime fertilize and over seed in accordance with current recommendations. Removing trash and debris: trash, litter and vegetation (other than grass) will be removed as needed (but no less than two times per year) to prevent obstruction to the flow of water, to prevent movement of trash and litter to downstream properties, to maintain the integrity of the structure, to provide an attractive appearance and to minimize water pollution. Removing sediment: soil materials (including clay, silt, sand and gravel) will be removed before the detention pool loses 10% of the designed storage capacity. Sediment disposal: sediment disposal should be in accordance with current procedures for disposal of sediment. Where required by the appropriate authorities, the sediment will be tested for appropriate pollutants at the owner's expense before it is removed from the pond. Repairs: repair slides, slumps and eroded areas promptly and in a workmanlike manner trash racks, pipes, headwalls, etc. Will be maintained, repaired and/or replaced as needed to maintain the integrity of the structure. Exposed metal surfaces will be painted to minimize damage due to rust. Maintenance inspections: the owner will be responsible for inspecting each stormwater management structure after each significant rainfall. Once each year a representative of will jointly inspect each stormwater management structure. Appropriate action will be taken to ensure appropriate maintenance. All maintenance costs will be borne by the owner. Where structures are to be maintained by more than one party, allocation of costs will be in accordance with terms set forth in the maintenance agreement. Keys to locked access points shall be available to personnel upon request. Maintenance records: the landowner, or someone designated by the landowner, shall inspect the detention pond within 24 hours after each rainfall event of one inch or more of rain. The owner or the designee shall keep written records of these inspections. The records shall also include maintenance and repairs performed. Copies of these records shall be provided to the county upon request. The water quality features shall not be modified in any way without prior approval by Frederick County. ·Topsoil shall be spread at a minimum depth of 4". ·Pulverized agricultural limestone shall be incorporated into soil at a rate of 92 lbs. Per 1000 s.f. (2 tons per acre). ·Fertilize with 10-20-10 at a rate of 12 lbs. Per 1000 s.f. (500 lbs. Per acre). Seed mix shall consist of 90% Kentucky 31 tall fescue and 10% Kentucky bluegrass applied at the rate of 200 lbs. Per acre. Minimum Construction Standards An erosion and sediment control program adopted with this plan must be consistent with the VESCH for 9VAC25-840-40 minimum standards: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 100-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with this chapter. f. Applicable safety requirements shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks; or (2) Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. l. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act. m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act. n. Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19. FNB BANK Site Specific Geologic Data Martinsburg and Oranda Formations: (Shown as Green Areas on Map Below) Description: Martinsburg Formation (Geiger and Keith, 1891). Three lithologic packages are recognized in the Martinsburg (in ascending order): black shale and limestone; sandstone and shale; and sandstone (Rader and Biggs, 1976). The lower unit consists of 200 to 250 feet of black calcareous shale, black aphanic, argillaceous limestone; and thin, light-brown K-bentonites. The bulk of the formation, more than 2800 feet, is composed of olive-green to gray, fine- to medium-grained, lithic sandstone and greenish-gray shale and siltstone. These lithologies occur in base-truncated Bouma cycles. Graded bedding, flute casts, and load casts are common. The upper unit, about 170 feet thick, is brownish-gray, medium- to coarse-grained, quartz sandstone. The lower two-thirds of this sandstone contains near-shore, marine fossils. Oranda Formation (Cooper and Cooper, 1946). Limestone and siltstone. Limestone, medium- to dark-gray, fine-grained, very argillaceous. Siltstone, black to dark-gray; both lithologies silicified where in contact with a K-bentonite. Five K-bentonites identified in the type section (Rader and Read, 1989). Lithologic constituents ·Major Sedimentary » Clastic » Mudstone» Shale ·Minor Sedimentary » Clastic » Sandstone ·Minor Sedimentary » Clastic » Siltstone ·Incidental Sedimentary » Carbonate » Limestone Soils Descriptions 1B—Berks channery silt loam, 3 to 8 percent slopes Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class: Well drained Runoff class: Medium Calcium carbonate, maximum content: 1 percent Depth to water table: More than 80 inches Available water capacity: Very low (about 2.9 inches) 9B—Clearbrook channery silt loam, 2 to 7 percent slopes Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Drainage class: Somewhat poorly drained Runoff class: Very High Depth to water table: About 3 to 12 inches Available water capacity: Very low (about 2.7 inches) Soils Descriptions 41C—Weikert-Berks channery silt loams, 8 to 15 percent slopes Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Well drained Runoff class: High Depth to water table: More than 80 inches Available water capacity: Very low (about 1.1 inches) 41D—Weikert-Berks channery silt loams, 15 to 25 percent slopes Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Well drained Runoff class: Medium Depth to water table: More than 80 inches Available water capacity: Very low (about 1.2 inches) OUTDOOR RV, BOAT AND TRAILER STORAGE (1.87 AC) 210.00'RIDGEFuture C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Surface Topography NoteThese Gray Scaled, Solid Line type,Contours and the adjacent spotelevations are shown per the "SecureStore Self-Storage" Site Plan, which iscurrently under construction.(SP #13-21). S S Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 12 WF 11 WF 10 WF 9 WF 8 WF 7WF 6 WF 5 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT PIN 75-A-104KTASKER WARRIORPROPERTIES, LLC INST. 160004426ZONED: B2 USE: VACANT Ex. Dual 142' - 48"RCP @1.01% Ex. Concrete Inlet(Mitered to Slope) Inv. In = 721.76 Ex Sign Ex Drainage Esmt. INST. 020006555 Ex. San. MHRim = 724.32Inv. Out = 716.82(Terminal MH) Ex. 225.51' - 8" PVC @ 0.50% Ex. San. MHRim = 725.70Inv. In = 715.70Inv. Out = 715.50 Ex. Grate InletTop = 724.29 Inv. Out = 720.99 Ex. Grate InletTop = 724.40 Inv. Out = 720.10 60.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 725 723 724 726 727 727 728728 726 726726726727727 727728728729729 725 724 726 726 727 727727728 729 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 72772 8 7 2 5 72 5 72 3 7 2 3 72 4 72472 6 72672 7 7 2 7 728 72 8 725724 726727 72572 5725725 725725 7267267277277 2 77257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727728725 7247267277 2 8 728728729729727 728 728 725 725 722 7 2 2 723723 72 4 724 726 726 727 727 725724 726 727Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) PONDED WATER(See Notes, Sh. 8) Ex. Inlet Inv. Out = 723.50 Ex.Curb (Under Const.) Ex. EG (Road UnderConstruction) HEAVY VEGETATION HEAVYVEGETATION HEAVYVEGETATION SF SF CE SF SF TS SF LOD LOD LOD LOD LOD LOD PS PS TS TS LOD CIP ST1 To SILT TRAP DA = 1.08 Ac. Install Diversion Dike to Convey Sediment-Laden Runoff to the Sediment Trap. Ensure Positive Drainage Along All Dikes. See Note, This Sheet 725725 721 722 723 724724 726726 727727 725 723 724 DD PONDED WATER NOTES 1. Ponded water shall be properly drained per VESCH standards. 2. All unsuitable material shall be removed. 3.Engineered soil fills shall be placed in accordance with the approved standards. 4. Certified engineering reports will need to be submitted to the Building Inspections Department during the building process to ensure foundations are stable. CULVERT INLET PROTECTION - CIP NOTE 1. See VESCH Std. Detail 3.08-1, Sh. 10. The Stone Option is Required for at the Ex. Dual 48" Culvert. Silt Fence Option is inadequate. NUTRIENT CREDIT PURCHASE NOTE 1. At the time of land disturbance and stormwater permit coverage, a receipt of purchase of nutrient credits shall be provided to the Frederick County Public Works Department.U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS2100.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF8 29CS2100EROSION & SEDIMENTCONTROL PLAN - PHASE IJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EEREROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.31 TEMPORARY SEEDING TS TS 3.05 SILT FENCE SF LIMITS OF DISTURBANCE LOD 3.08 CULVERT INLET PROTECTION CIP 3.32 PERMANENT SEEDING PS PS 3.39 DUST CONTROL DC DC 3.13 TEMPORARY SEDIMENT TRAP ST ST-1 3.09 TEMPORARY DIVERSION DIKE DD DD 210.00'RIDGEFuture C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Surface Topography NoteThese Gray Scaled, Solid Line type,Contours and the adjacent spotelevations are shown per the "SecureStore Self-Storage" Site Plan, which iscurrently under construction.(SP #13-21). S S Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 11 WF 10 WF 9 WF 8 WF 7WF 6 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT PIN 75-A-104KTASKER WARRIORPROPERTIES, LLC INST. 160004426ZONED: B2 USE: VACANT Ex. Dual 142' - 48"RCP @1.01% Ex. Concrete Inlet(Mitered to Slope) Inv. In = 721.76 Ex Sign Ex Drainage Esmt. INST. 020006555 Ex. Grate InletTop = 724.29 Inv. Out = 720.99 Ex. Grate InletTop = 724.40 Inv. Out = 720.10 2 - Ex. WV's (Field Located) 60.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 725 723 724 726 727 727 728728 726 726726726727727 727728728729729 725 724 726 726 727 727727728 729 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 72772 8 7 2 5 72 5 72 3 7 2 3 72 4 72472 6 72672 7 7 2 7 728 72 8 725724 726727 72572 5725725 725725 7267267277277 2 77257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727728725 7247267277 2 8 728728729729727 728 728 725 725 722 7 2 2 723723 72 4 724 726 726 727 727 725724 726 727Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) PONDED WATER(See Notes, Sh. 8) Ex. Inlet Inv. Out = 723.50 Ex.Curb (Under Const.) Ex. EG (Road UnderConstruction) HEAVY VEGETATION HEAVYVEGETATION HEAVYVEGETATION CG-12A5' SWLKPr. Pedestrian Crosswalk Pr. Stop Bar Pr. Lane Stripe (Typ.) CG-12A5' SWLK5' SWLK25'R25'R 50'R 5'R3' R 20'RPr. 7' Wide Grass Strip 7'33 32 31 1211 72672772 7 7277287297297267 2 7 728 726727727 727 727727 728 727728727728 728 728 727728 729 727727728728725 723 724 726 727 725 723 724 726 727728727728728728 725 723723 724724 726 727 727727 728 728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 728728728728 72 6 727727725 724 726 727 7 2 6 727727727728728TB = 726.75' 26 08 LP 26 89 EP 27 45 HP 29 49 HP 28 21 EP 26 92 EP 26 14 EP 26 37 HP 26 18 EP2671 FC 27 62 FC 27 91 FC 28 50 EP 29 21 EP 27 80 EP 28 01 EP 27 73 LP 27 64 FC 28 10 HP 27 79 EP 27 37 EP 27 12 EP 26 28 HP 27 64 FC 27 30 FC 26 55 EP 26 57 FC 27 28 FC 27 07 FC 27 13 EP 27 01 EP 27 57 EP 28 10 HP 27 77 EP 28 60 TC 28 60 TC 28 14 TC2835 28 35 25 48 EP 25 41 EP 26 41 25 80 27 30 FC 27 87 BP 27 46 EP 26 69 EP 27 21 EP 25 98 EP 26 23 EP 1.5% 2.0% 1.0%1.0%0.8%1.0% 2.2%2.0%2.3%3.0% 1.0%3.0% 3.6% 2.0% 3.6% 2.6%2.0%2.8%1.0 % 1.5% 2.9% 2.0%2.9%1.0%28 10 FC 28 10 FC 28 10 FC 28 14 TC 26 17 LP 26 65 HP 26 20 LP 26 45 EP 26 37 EP 27 24 26 30 27 10 27 46 INV 2.0%1.6%2.2%2.4%26 42 HP 1.5% 28 10 EP 28 10 EP 28 10 EP 26 00 TOP 25 85 TOP 2.0% 27 11 FC 27 32 FC 2.0%27 29 EP 27 33 EP2729 EP2755 EP2923 EP 1.2% 27 29 FC2738 FC 27 29 FC2729 FC 28 31 TC 28 10 FC 1. 3 % 28 31 TC 28 41 TC 28 12 TC 28 48 28 58 28 23 28 19 28 13 28 47 27 68 28 37 27 58 27 95 HP 28 40 2.2%2.6% 23 25 INV 23 25 INV 22 08 INV 22 45 INV 2.0%1.0%1.0%1.1% 25 95 INV 25 90 INV 26 48 INV TB = 726.75'IP PS PS LOD LOD LOD LOD LOD LOD PS LOD PS B/M B/M B/M B/M To Str. 33 DA = 0.20 Ac. To Str. 32 DA = 0.17 Ac. To Str. 12 DA = 0.28 Ac.Un-DetainedSheet Flow Un-DetainedSheet Flow Un-DetainedSheet Flow CIP CD Cl A1 Dry Rip-Rap Channel Bottom Width = 2' & Depth = 1.5' Cl A1 Dry Rip-Rap Channel Bottom Width = 2' & Depth = 1.5' RR RR OP OP 3.19 RIPRAP RR U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS2200.dwg PLOTTED: 12/9/2022 10:07 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF9 29CS2200EROSION & SEDIMENTCONTROL PLAN - PHASE IIJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.07 STORM DRAIN INLET PROTECTION IP 3.18 OUTLET PROTECTION OP 3.20 ROCK CHECK DAMS CD SOIL STABILIZATION BLANKETS AND MATTING B/M3.36 3.31 TEMPORARY SEEDING TS TS 3.05 SILT FENCE SF 3.32 PERMANENT SEEDING PS PS LIMITS OF DISTURBANCE LOD EROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.08 CULVERT INLET PROTECTION CIP U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS2500.dwg PLOTTED: 12/9/2022 10:08 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM CIVIL SH. OF10 29CS2500EROSION & SEDIMENTCONTROL DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 REQUIRED U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS2501.dwg PLOTTED: 12/9/2022 10:23 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM CIVIL SH. OF11 29CS2501EROSION & SEDIMENTCONTROL DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 APPROVED PERMIT DRAWINGS OUTDOOR RV, BOAT AND TRAILER STORAGE (1.87 AC) Future C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 12 WF 11 WF 10 WF 9 WF 8 WF 7WF 6 WF 5 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT EX. MULTI-TENANTSIGN ESM'TINST. 210017949PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT C1C2 PIN 75-A-104KTASKER WARRIORPROPERTIES, LLC INST. 160004426ZONED: B2 USE: VACANT Variable Width Private Access,Drainage, Grading & Utility Esmt. Ex Sign Ex. 20' FW Esmt.INST. 220007415 Ex. 20' FW Esmt. INST. 210017949 Ex Drainage Esmt. INST. 020006555 Ex. Variable WidthPrivate Access, Drainage,Grading & Utility Esmt. INST. 210017949Ex. 20' FW Esmt.INST. 210017949Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) Vacate Portion ofEx. 20' FW Esmt.INST. 210017949 N 48°46'27" W 245.46'N 38°03'15" E 167.71' S 8 4 ° 2 4 ' 5 7 " E 1 1 9 . 8 1 'S 48°08'05" E 90.22'S 41°13'35" W 247.14' 3 5 ' B R L 50' BRL35' BRL 50' PRIVA T E ACCESS D R .Pr. 20' FW Esmt.15' Pr. 20' FW Esmt. 4 10 Stop Sign 20' (Typ) 24' CG-6 CG-6CG-12ACG-220' (Typ)26' EP12' FCCG-6 CG-2 CG-630' FC5' 36.5' 9' FC9' 30' CG-11 30' CG -119' (Typ)12' 12'CG-2 9' (Typ) Stop Sign 5' Stop Sign Trash Can Corral (See Notes, Sh. 12) Main Entrance Employee Entrance 20'3' R 3'R10 ' R 50'R30' R 10'R10'R5' R 3'RCG-6RCG-6CG-624'14.67'1.00'42.33'16.50'4.67' 3.50'20.83'19.50' 4.00'3.00'32.50'14.67'3.42'6.00'4.42'22.33'10.5' SWM Esmt. Pr. Bank Building Floor Area = 2,392 ft2 Height = 18' FF = 728.35 CG-12A5' SWLKSWMF "A" Pr. Pedestrian Crosswalk Pr. Stop Bar Pr. Lane Stripe (Typ.)50.5'CG-12A5' SWLK5' SWLK15' R.E.C. Esmt.15' R.E.C. Esmt.10' Gas Esmt.15' R.E.C. Esmt.10' GasEsmt.10' GasEsmt.8'8'90°'(Typ)Conc Drive-Thru Pad See Arch.Plans for Drive-up Information 15.5'123.07'132.75'81.5'(2) Do Not Enter Signs (See Detail, Sh. 14) Pr. HC Sign (See Detail, Sh. 14) CG-6 CG-6 Conc. Flume (Typ.) (See Detail, Sh. 14) Pr. Freestanding Bank Sign (See Notes, Sh. 12)CG-6RCG-6R Bldg. Canopy (Typ.) Bollard Protection (Typ.) Raised Island (0.5 vf)CG-6RCG-625'R25'R 50'R 5'RCG-63' R 20'R12'45' x 12' Loading Space19.5' Pr. 7' Wide Grass Strip 7'Pr. Multi-Tenant Sign (See Notes, Sh. 12) Conc. Flume (Typ.) (See Detail, Sh. 14)27'Mod. CurbPr. Signage Notes 1. One Freestanding Bank Sign is proposed at the cul-de-sac entrance. ·Pr. Height = 4.5' ·Pr. Surface Area = 20.25 ft2 (4.5' x 4.5') ·Pre-Cast Base ·Internally Lit 2. One Multi-Tenant Sign is proposed at the Private Access Drive Entrance along Warrior Drive. ·Max Height = 25' ·Max. Surface Area = 150 ft2 3. The Multi-Tenant Sign was previously approved with the Secure Store Site Plan SP# 13-21 with the size specified as 15' max. ht. and 100 sf. max. area. However, the height and area allowed per code for a minor arterial road are 25' and 150 sf respectively. 4. Signs are proposed in accordance with §165-201.06. Pr. Trashh Corral Notes 1. Trash Can Corral will house two 96-gallon trash cans. 2. Fence to be made of 4x4 posts, with Opaque 1" X 6" Horizontal rails with hinged lockable swing gates. 3. Fence Height to be 6' - 0".U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS4001.dwg PLOTTED: 12/9/2022 10:24 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----CIVIL SH. OF12 29 00 20'40' GRAPHIC SCALE 1"=20'NORTHAPPROVED PERMIT DRAWINGS CS4001SITE PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKREVISIONS:OFFICE: 262-786-6776-STEPHENS CITY, VA- - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED  12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERCIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 08/26/2022 LMGRO22001 RAM EJG RAM (STANDARD DUTY) ASPHALT PAVEMENT NTS 1 1 2" SURFACE COURSE (SM 12.5A) 2" IM 19.0 COMPACTED SUBGRADE 6" DENSE GRADED STONE (21B) CONCRETE SIDEWALK & TRASH CORRAL PAD NTS 5" CONCRETE 4" DENSE GRADED STONE (21B) COMPACTED SUBGRADE (HEAVY DUTY) CONCRETE PAD AT DRIVE-THRU & LOADING SPACE NTS 6" - 4,000 PSI CONCRETE 8" DENSE GRADED STONE (21B) COMPACTED SUBGRADE 6" X 6" 10/10 WELDED WIRE MESH PROVIDE TOOLED JOINTS. SPACING OF CONTROL JOINTS SHALL NOT EXCEED SIDEWALK WIDTH. PROVIDE LIGHT BROOM FINISH WITH TOOLED JOINTS. RIDGEBIORETENTION POND #2 (PER SP #13-21) HP 722.38 TC 721.02 BC 720.52 LP TC 722.48 BC 721.98 720.05 LP TC 725.04 BC 724.54 724.07 LP TC 724.20 BC 723.70 728.52 TC 727.97 PVMT 728.12 TC 727.73 TC 727.46 PVMT 724.34 HP727.97 PVMT Future C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Surface Topography NoteThese Gray Scaled, Solid Line type,Contours and the adjacent spotelevations are shown per the "SecureStore Self-Storage" Site Plan, which iscurrently under construction.(SP #13-21). S S Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 11 WF 10 WF 9 WF 8 WF 7WF 6 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLC INST. 160004426 ZONED: B2USE: VACANT PIN 75-A-104K TASKER WARRIORPROPERTIES, LLC INST. 160004426 USE: VACANT Ex. Dual 142' - 48"RCP @1.01% Ex. Concrete Inlet(Mitered to Slope) Inv. In = 721.76 Ex Sign Ex Drainage Esmt. INST. 020006555 Ex. San. MHRim = 724.32Inv. Out = 716.82(Terminal MH) Ex. 225.51' - 8" PVC @ 0.50% Ex. San. MHRim = 725.70Inv. In = 715.70Inv. Out = 715.50 Ex. Grate InletTop = 724.29 Inv. Out = 720.99 Ex. Grate InletTop = 724.40 Inv. Out = 720.10 60.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 725 723 724 726 727 727 728728 726 726726726727727 727728728729729 725 724 726 726 727 727727728 729 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 72772 8 7 2 5 72 5 72 3 7 2 3 72 4 72472 6 72672 7 7 2 7 728 72 8 725724 726727 72572 5725725 725725 7267267277277277257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727728725 7247267277 2 8 728728729729727 728 728 725 725 722 7 2 2 723723 72 4 724 726 726 727 727 725724 726 727Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) PONDED WATER(See Notes, Sh. 8) Ex. Inlet Inv. Out = 723.50 Ex.Curb (Under Const.) Ex. EG (Road UnderConstruction) HEAVY VEGETATION HEAVYVEGETATION WM EX. 8" W/LCG-6 CG-6CG-12ACG-2 CG-6 CG-2 CG-6 CG-2CG-6RCG-6CG-6Overflow Roof Drain (Typ.) Primary Roof Drain (Typ.) SWMF "A" Outfall Weir Structure See Details, Sh. 23 CG-6 CG-6 Grass Channel Trapez. 4'(W) Bottom Conc. Flume (Typ.) (See Detail, Sh. 14)CG-6RCG-6R CG-6RCG-6 Grass Channel Trapez. 2'(W) Bottom CG-633 32 31 1211 1 5 " HDPE4" HDPE4" HDPE8" HDPE4" HDPE 15" HDPE 8" HDP E 15 " H D P E Conc. Flume (Typ.) (See Detail, Sh. 14)Mod. Curb72672772 7 7277287297297267 2 7 728 726727727 727 727727 728 727728727728 728 728 727728 729 727727728728725 723 724 726 727 725 723 724 726 727728727728728728 725 723723 724724 726 727 727727 728 728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 728728728728 72 6 727727725 724 726 727 7 2 6 727727727728728TB = 726.75' 26 08 LP 26 89 EP 27 45 HP 29 49 HP 28 21 EP 26 92 EP 26 14 EP 26 37 HP 26 18 EP2671 FC 27 62 FC 27 91 FC 28 50 EP 29 21 EP 27 80 EP 28 01 EP 27 73 LP 27 64 FC 28 10 HP 27 79 EP 27 37 EP 27 12 EP 26 28 HP 27 64 FC 27 30 FC 26 55 EP 26 57 FC 27 28 FC 27 07 FC 27 13 EP 27 01 EP 27 57 EP 28 10 HP 27 77 EP 28 60 TC 28 60 TC 28 14 TC2835 28 35 25 48 EP 25 41 EP 26 41 25 80 27 30 FC 27 87 BP 27 46 EP 26 69 EP 27 21 EP 25 98 EP 26 23 EP 1.5% 2.0% 1.0%1.0%0.8%1.0% 2.2%2.0%2.3%3.0% 1.0%3.0% 3.6% 2.0% 3.6% 2.6%2.0%2.8%1.0 % 1.5% 2.9% 2.0%2.9%1.0%28 10 FC 28 10 FC 28 10 FC 28 14 TC 26 17 LP 26 65 HP 26 20 LP 26 45 EP 26 37 EP 27 24 26 30 27 10 27 46 INV 2.0%1.6%2.2%2.4%26 42 HP 1.5% 28 10 EP 28 10 EP 28 10 EP 26 00 TOP 25 85 TOP 2.0% 27 11 FC 27 32 FC 2.0%27 29 EP 27 33 EP2729 EP2755 EP2923 EP 1.2% 27 29 FC2738 FC 27 29 FC2729 FC 28 31 TC 28 10 FC 1. 3 % 28 31 TC 28 41 TC 28 12 TC 28 48 28 58 28 23 28 19 28 13 28 47 27 68 28 37 27 58 27 95 HP 28 40 2.2%2.6% 23 25 INV 23 25 INV 22 08 INV 22 45 INV 2.0%1.0%1.0%1.1% 25 95 INV 25 90 INV 26 48 INV TB = 726.75'Frederick Water Note The Contractor shall adjust Frederick Water Facilities to Final Surface Grades Per Frederick Water's Inspector's Requirements.U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS4101.dwg PLOTTED: 12/9/2022 10:24 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20'NORTH REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF13 29CS4101GRADING PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS4500.dwg PLOTTED: 12/9/2022 10:24 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF14 29CS4500SITE DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 CONCRETE FLUME DETAIL NOT TO SCALE 30" x 30" R5-1 NOT TO SCALE DO NOT ENTER SIGN - DETAILHANDICAP SIGN DETAIL NOT TO SCALE NOT TO SCALE STOP SIGN - DETAIL S S Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 12 WF 11 WF 10 WF 9 WF 8 WF 7WF 6 WF 5 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT EX. MULTI-TENANTSIGN ESM'TINST. 210017949PIN 75-A-104E TASKER WARRIORPROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT PIN 75-A-104KTASKER WARRIORPROPERTIES, LLC INST. 160004426ZONED: B2 USE: VACANT Variable Width Private Access,Drainage, Grading & Utility Esmt. Ex. Dual 142' - 48"RCP @1.01% Ex Sign Ex. 20' FW Esmt.INST. 220007415 Ex. 20' FW Esmt. INST. 210017949 Ex Drainage Esmt. INST. 020006555 Ex. San. MHRim = 724.32Inv. Out = 716.82(Terminal MH) Ex. 225.51' - 8" PVC @ 0.50% Ex. San. MHRim = 725.70Inv. In = 715.70Inv. Out = 715.50 Ex. Variable WidthPrivate Access, Drainage,Grading & Utility Esmt. INST. 210017949 2 - Ex. WV's (Field Located)Ex. 20' FW Esmt.INST. 21001794960.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 725 723 724 726 727 727 728728 726 726726726727727 727728728729729 725 724 726 726 727 727727728 72 9 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 727 72 8 7 2 5 725 72 3 7 2 3 72 4 72472 6 72672 7 7 2 7 728 72 8 725724 726727 72572 5725725 725725 7267267277277277257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727728725 7247267277 2 8 728728729729727 728 728 725 725 722 7 2 2 723723 72 4 724 726 726 727 727 725724 726 727Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) WF 13 50' PRIVA T E ACCESS D R. OUTDOOR RV, BOAT AND TRAILER STORAGE (1.87 AC) 2.00% SLOPE ON PAD 210.00'45.00'PR. CANOPY (PER SP #13-21) 21.00' Future C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G".72672772 7 7277287297297267 2 7 728 726727727 727 727727 728 727728727728 728 728 727728 729 727727728728725 723 724 726 727 725 723 724 726 727728727728728728 725 723723 724724 726 727 727727 728 728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 728728728728 72 6 727727725 724 726 727 7 2 6 727727727728728TB = 726.75'TB = 726.75'Pr. Electric Transformer SWM Esmt. Pr. 4" San. C/O (Typ.) Overflow Roof Drain (Typ.) Primary Roof Drain (Typ.) Dry Utility Conduits See Typical Trench Section, Sh. 29 SWMF "A" Pr. Elec. Meter Dry Utility Conduits See Typical Trench Section, Sh. 29 Utility Conduit Junction Pr. Utility Conduit Junction Pr. Gas Meter15' R.E.C. Esmt.15' R.E.C. Esmt.10' Gas Esmt.15' R.E.C. Esmt.10' GasEsmt.10' GasEsmt.Pr. Gas MainGas Serv. Tap Gas Service Line Pr. Gas MainEnd Pr. Gas Main BEGIN PR. 4" SANITARY LATERAL Connection by Contractor Using Cut-In Tee & 2 - Ford Stainless Steel Repair Clamps 33 32 31 1211 1 5 " HDPE4" HDPE4" HDPE8" HDPE4" HDPE 15" HDPE 8" HDP E 15 " H D P E Pr. 4" Sanitary Lateral WM Pr. 20' FW Esmt.PR. W/L CONNECTION Extend Ex. 8" W/L to Pr. 1 - 8" X 8" Tee & 3 - 8" GV's PR. 8" W/L - A 11 4" WaterService 15' Pr. 20' FW Esmt. Radial Install (R=500') 1" Water Meter provided by FW BEGIN PR. W/L "A" 1 - Full Joint 8" CL 52 DIP & 1 - 8" End Cap w/ 1 - Flushing Assembly EX. 8" W/LEND PR. W/L "A" 1 - 8" GV, 1 - Full Joint 8" CL 52 DIP & 1 - 8" End Cap w/ 1 - Flushing Assembly 1 - 8" - 45° Horz. Bend PR. 8" W/L - BEND PR. W/L "B" 1 - 8" GV, 1 - Full Joint 8" CL 52 DIP & 1 - 8" End Cap w/ 1 - Flushing Assembly 12 + 9 3 9+76 10+00 11+00 12+00 Pr. Domestic Water Tap BEGIN PR. W/L "B" 1 - 8" Tee w/ 3 - 8" GV's 25' Pre-Blast Pr. 25' Pre-Blast Area 25' Pre-Blast Radial Install (R=200') Radial Install (R=200')U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS5001.dwg PLOTTED: 12/9/2022 10:24 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20' NORTH REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF15 29CS5001UTILITY PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER WATERLINE B PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 705 710 715 720 725 730 735 740 745 705 710 715 720 725 730 735 740 745 11+87.32 = EX. SSWR XINGINV = 716.76 (8" PVC)10+15 = GAS LINE XINGINV=721.18 ( BY OTHERS)9+50 10+00728.1727.111+00 727.1727.6612+00724.613+00 EX. GRADE FIN. GRADE10+00 = 8" X 8" TEE W/ 3 - 8" G.V.'S10+98.14 = DOMESTIC WATER TAP1" WATER METER PROVIDED BY FW8" DIP CL52 W / L " B " 18" CLEAR 10+31.64 = UTIL CONDUIT TRENCH XING18" MIN CLEAR18" MIN CLEAR 48" MIN COVER 11+90.57 = 1 - 8" G.V.WARRIOR DR. R/W LINEFULL 20' JOINT CL52 DIP 12+10.57 = 1 - 8" END CAPW/ 1 - FLUSH ASSMY25' WATERLINE A PROFILE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 705 710 715 720 725 730 735 740 745 705 710 715 720 725 730 735 740 745 12+60.34 = GAS LINE XINGINV=720.17 (BY OTHERS)8" DIP CL52 W/L "A" EX. GRADE FIN. GRADE 9+50 10+00728.1726.7728.4911+00726.5727.19726.3726.8512+00725.6726.613+00 13+5012+39.13 = 1 - 45° HORZ. BEND11+34.86 = EXTEND EX. 8" W/L TOPR. 8" X 8" TEE W/ 3 - 8" G.V.'S12+93.01 = 1 - 8" END CAPW/ 1 - FLUSH ASSMY48" MIN COVER10+00 = 8" X 8" TEE W/ 3 - 8" G.V.'S12+43.88 = UTIL CONDUIT TRENCH XING18" MIN CLEAR 18" MIN CLEAR12+73.01 = 1 - 8" G.V.9+76.50 = 1 - 8" END CAPW/ 1 - FLUSH ASSMYFULL 20' JOINT CL52 DIP FULL 20' JOINT CL52 DIP SANITARY LATERAL HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 710 715 720 725 730 735 740 710 715 720 725 730 735 740 9+50 10+00725.1726.90727.8711+00728.0712+00 EX. GRADE EX SSWR MAIN STA. 10+008" PVC INV=716.6837.42' - 4" SDR-35 @ 2.00%80.94' - 4" SDR-35/26 @ 9.48%RIM 728.10CO1 CLEANOUTINV 724.50RIM 728.29CO2 CLEANOUTINV 725.25PR BLDG 728.35 FFE FIN. GRADE STA:10+00.00 INV @ MAIN:716.83 STA:11+23.36 INV:725.35 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS5100.dwg PLOTTED: 12/9/2022 10:25 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 50'100' GRAPHIC SCALE 1"=50' REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF16 29CS5100SANITARY SEWER ANDWATERLINE PROFILESJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS5500.dwg PLOTTED: 12/9/2022 10:26 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF17 29CS5500SANITARY SEWER ANDWATER DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS5501.dwg PLOTTED: 12/9/2022 10:26 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF18 29CS5501SANITARY SEWER ANDWATER DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 Warrior Dr.Tasker Rd .Spanish Oak Rd.Warrior Dr.Chardonnay Dr.Spanish O a k R d. S a r v i s C t . Lyn n D r .Shumard Ct.Cabernet C t . Sonoma Ct. Albi n D r .Albin Dr.Corriedale Ct.R o m n e y P l . Su f f o l k C i r c l eVillage LaneMontgomery CircleSadi Ct. Button Bus h A v e .Slippery Elm Dr.Coopworth Ct.Ba y b e r r y C t . Lynn Dr.Chardonnay Dr.Cross Keys Pl.Tasker Rd .Tasker Rd.720 730 730730 74 0 74 0 740712714716718722724 726 728 728728 732 732732 734 73473473673673673873873874 2 74 2 744 744 730730730730730730 730730730 730 724724724724 72 6 726726 726 726 728728728728 728 728728 728 728 728732732732 732 732 73 2 732732 734 73 4 734734 734 734 734734 736736 736 73 6 736736 7 3 6 736 738 738 738 738 720730740 740 7227247267287327347367367 3 8 738 730 74 0 73 2 734 73 6 738738 73 8 720730740 7 1 4 71 67187227247 2 6 7287287287327347 3 673874 2 740 7407 3 6 736738738 73 8 742 742744 744 746 746 748748 740740 740 740 740 750 736736738 738 742744744 744 746 748 752 754 754 756 756 750750 760 748748752 754 756 758 740750 7387 4 2742742 744 746746 746 7487487 4 875275 2 752752752 754 756 756 740740 740 740 740 7 4 0750 750 750750750750 734 734 736 736 736 736738738 7387387 4 2 742 742 742744 744 74 4746 746 746 748 748 752752752 7 5 2752752 752 75 2752 7 5 2 7 5 2 752 75 0 750742744 744 746 746748748740 732734 736 738 740 732732 73473 4 73473673673 6 738 742 7 3 0 740 740 7 2 6 72 8 732 73 47367 3 8 73 0 730730 730726 72672672672 8 72873273 2 734734 740 750 736 738 742 744744744 746 746746748748 748 752 754 754754 756 7407507367 3 6 738 73 8 73 8 742 744 7467467467487 5 27547 5 4756756758758 720718722722 722724724 724 726 730726728 73 0 73072 8 72872 8 7287 3 2 7327 3 4736738 730 730 7 4 0 740 740740 732732 732 732 734 734 736 73 6 73873 8 738 738 738 73 8 738 7 3 8 742 742742742744 744 746 73 073 0 7 4 0 73 2 73 2 7347 3 4 73673 8 StudyPoint 1 Ex. TrapezoidalConc. Channel Ex. TrapezoidalRipRap Channel Ex. Head Wall Inlet Riser StructureDiameter = 4' ØHeight ≈ 4 vfOrifice ≈ 27" Circ.Outfall ≈ 30" RCP 18" ADSStorm Outfall Ex. SWMBasin 2 Ex. SWMBasin 3 Ex. Storm Outfall36" ADS w/ Alum. ES Riser StructureDiameter = 4' ØHeight ≈ 3.5 vfOrifice 1 ≈ 20"Orifice 2 ≈ 12" @22" Above BottomOutfall ≈ 18" RCP DA 1-On On-Site To Ex. Wetland Channel Water Surf. Area = 0.05 Ac. Forested Area = 0.20 Ac. Brush Area = 0.87 Ac.Total Area = 1.12 Ac. DA 1 UD - On-Site To Ex. Bio-Retention Impervious Area = 0.22 Ac.Total Area = 0.22 Ac. Wetland ChannelUpper ReachLength = 465'Bottom ≈ 4'Depth ≈ 2.5 vf Wetland ChannelLower ReachLength = 488'Bottom ≈ 8'Depth ≈ 4.24' vf Ex. SWMBasin 1 DA 2 Tc Calculation (LAG Method) Tc = 21.0 Mins. Avg. Ground Slope = 4.20% Hydraulic Length = 1,968 lf CNW = 87 DA 2.1 - Off-Site Upland To Ex. SWM Basin 2 Turf Area = 1.15 Ac. Forested Area = 2.75 Ac. Farmstead Area = 4.00 Ac. 1 3 Ac. Residential = 9.34 Ac. 1 8 Ac. Residential = 12.18 Ac.Total Area = 29.42 Ac. DA 3 Tc Calculation (LAG Method) Tc = 12.6 Mins. Avg. Ground Slope = 4.22% Hydraulic Length = 1,040 lf CNW = 87 DA 4 Tc (Assigned Min.) Tc = 5.0 Mins. DA 3.1 - Off-Site Upland To Ex. SWM Basin 3 Forested Area = 1.51 Ac. 1 3 Ac. Residential = 3.10 Ac. 1 8 Ac. Residential = 3.81 Ac.Total Area = 8.42 Ac. DA 1.1 - Off-Site Upland To Ex. SWM Basin 1 Forested Area = 0.17 Ac. Commercial = 1.23 Ac.Total Area = 1.40 Ac. DA 1-Off Tc (Estimated Value) Tc = 10.0 Mins. DA 1-On Tc (Assigned Min.) Tc = 5.0 Mins. DA 1-Off-Site To Wetland Channel-Upper Reach Turf Area = 0.31 Ac. Forested Area = 2.84 Ac. 1 8 Ac. Residential = 1.03 Ac.Total Area = 4.18 Ac. DA 1-Off-Site To Wetland Channel Lower Reach Water Surf. Area = 0.03 Ac. R/W Area = 1.28 Ac. Turf Area = 0.60 Ac. Forested Area = 1.60 Ac. Brush Area = 0.81 Ac. 1 8 Ac. Residential = 0.06 Ac.Total Area = 4.38 Ac. Ground Cover Hatch Key Forested Ground Cover Good Condition (HSG D) CN=77 Turf Ground Cover Good Condition (HSG D) CN=80 Impervious Ground Cover CN=98 18 Acre Residential Lots(HSG D) CN=92 1 3 Acre Residential Lots(HSG D) CN=86 Farmstead (HSG D) CN=86 Brush Ground Cover Good Condition (HSG D) CN=73 Road R/W (50% Impervious) (HSG D) CN=93 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6000.dwg PLOTTED: 12/9/2022 10:28 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 100'200' GRAPHIC SCALE 1"=100'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF19 29CS6000PRE-DEVELOPMENTDRAINAGE MAPJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER Warrior Dr.Tasker Rd .Spanish Oak Rd.Warrior Dr.Chardonnay Dr.Spanish O a k R d. S a r v i s C t . Lyn n D r .Shumard Ct.Cabernet C t . Sonoma Ct. Albi n D r .Albin Dr.Corriedale Ct.R o m n e y P l . Su f f o l k C i r c l eVillage LaneBridgewater Dr.Sadi Ct. Button Bus h A v e .Slippery Elm Dr.Coopworth Ct.Ba y b e r r y C t . Lynn Dr.Chardonnay Dr.Cross Keys Pl.Tasker Rd .Tasker Rd.720 730 730730 74 0 74 0 740712714716718722724 726 728 728728 732 732732 734 73473473673673673873873874 2 74 2 744 744 730730730730730730 730730730 730 724724724724 72 6 726726 726 726 728728728728 728 728728 728 728 728732732732 732 732 7 3 2 732732 734 73 4 734734 734 734 734734 736736 736 73 6 736736 7 3 6 736 738 738 738 738 720730740 740 7227247267287327347367367 3 8 738 730 74 0 73 2 734 73 6 738738 73 8 720730740 7 1 4 71 67187227247 2 6 7287287287327347 3 673874 2 740 74073873 8 742 742744 744 746 746 748748 740740 740 740 740 750 736736738 738 742744744 744 746 748 752 754 756 756 750750 760 748748752 754 756 758 740750 7387 4 2742742 744746746 746 7487487 4 875275 2 752752 740740 740 740 740 7 4 0750 750 750750 750750 734 734 736 736 736 736738738 7387387 4 2 742 742 742744 744 74 4746 746 746 748 748 752752752 7 5 2752752 752 75 2752 7 5 2 7 5 2 752 75 0 750742744 744 746 746748748740 732734 736 738 740 732 73273473 4 73473673673 6 738 742 7 3 0 740 740 7 2 6 72 8 732 7 3 47367 3 8 73 0 730730 730726 72672672672 8 72873273 2 734734 740 750 736 738 742 744744744 746 746746748748 748 752 754 754 756 7407507367 3 6 738 73 8 73 8 742 744 7467467467487 5 2 7 5 4756 720718722722 722724724 724 726 730726728 73 0 73072 8 72872 8 7287 3 2 7327 3 4736738 7 4 0 74074073873 8 738 73 8 742 742742742744 744 746 73 073 0 7 4 0 73 2 73 2 7347 3 4 73673 8 72672772 7 7277287297297267 2 7 728 726727727727727727728 727728727728 728 728 727728729 727727728728725723724726 727 725723724726727728727728728728 725723723724724726727 727727728 728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 728728728728 72 6 727727725724726727 7 2 6 727727727728728DA U2 Tc Calculation (LAG Method) Tc = 21.0 Mins. Avg. Ground Slope = 4.20% Hydraulic Length = 1,968 lf CNW = 87 StudyPoint 1 Ex. TrapezoidalConc. Channel Ex. TrapezoidalRipRap Channel Ex. Head Wall Inlet Riser StructureDiameter = 4' ØHeight ≈ 4 vfOrifice ≈ 27" Circ.Outfall ≈ 30" RCP 18" ADSStorm Outfall DA U2 - Off-Site Upland To Ex. SWM Basin 2 Turf Area = 1.15 Ac. Forested Area = 2.75 Ac. Farmstead Area = 4.00 Ac. 1 3 Ac. Residential = 9.34 Ac. 1 8 Ac. Residential = 12.18 Ac.Total Area = 29.42 Ac. Ex. SWMBasin 2 Ex. SWMBasin 3 DA U3 Tc Calculation (LAG Method) Tc = 12.6 Mins. Avg. Ground Slope = 4.22% Hydraulic Length = 1,040 lf CNW = 87 DA U1 Tc (Assigned Min.) Tc = 5.0 Mins. Ex. Storm Outfall36" ADS w/ Alum. ESDA U3 - Off-Site Upland To Ex. SWM Basin 3 Forested Area = 1.51 Ac. 1 3 Ac. Residential = 3.10 Ac. 1 8 Ac. Residential = 3.81 Ac.Total Area = 8.42 Ac. DA U1 - Off-Site Upland To Ex. SWM Basin 1 Forested Area = 0.17 Ac. Commercial = 1.23 Ac.Total Area = 1.40 Ac. Riser StructureDiameter = 4' ØHeight ≈ 3.5 vfOrifice 1 ≈ 20"Orifice 2 ≈ 12" @22" Above BottomOutfall ≈ 18" RCP DA U1.0 Tc (Estimated Value) Tc = 10.0 Mins. DA 1.1 Tc (Assigned Min.) Tc = 5.0 Mins. Wetland ChannelUpper ReachLength = 465'Bottom ≈ 8'Depth ≈ 2.5 vf Wetland ChannelLower ReachLength = 488'Bottom ≈ 16'Depth ≈ 6 vf DA U1.0 - Off-Site Upland To Wetland Channel-Upper Reach Turf Area = 0.31 Ac. Forested Area = 2.84 Ac. 1 8 Ac. Residential = 1.03 Ac.Total Area = 4.18 Ac. DA 1.0 - Off-Site To Channel Lower Reach Water Surf. Area = 0.03 Ac. R/W Area = 1.28 Ac. Turf Area = 0.60 Ac. Forested Area = 1.60 Ac. Brush Area = 0.81 Ac. 18 Ac. Residential = 0.06 Ac.Total Area = 4.38 Ac. Ex. SWMBasin 1 DA 1.1 - On-Site To Channel Lower Reach Turf Area = 0.12 Ac.Total Area = 0.12 Ac. DA To Ex. Bio-Retention Impervious Area = 0.22 Ac. Turf Area = 0.14 Ac.Total Area = 0.36 Ac. DA 1.0 Tc (Estimated Value) Tc = 10.0 Mins. DA 1 - On-Site To Pr. SWM Facility A Turf Area = 0.20 Ac. Impervious Area = 0.42 Ac.Total Area = 0.62 Ac. DA 1B - On-Site To Trap. Channel Turf Area = 0.18 Ac. Impervious Area = 0.10 Ac.Total Area = 0.28 Ac. Ground Cover Hatch Key Forested Ground Cover Good Condition (HSG D) CN=77 Turf Ground Cover Good Condition (HSG D) CN=80 Impervious Ground Cover CN=98 18 Acre Residential Lots(HSG D) CN=92 1 3 Acre Residential Lots(HSG D) CN=86 Farmstead (HSG D) CN=86 Brush Ground Cover Good Condition (HSG D) CN=73 Road R/W (50% Impervious) (HSG D) CN=93 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6001.dwg PLOTTED: 12/9/2022 10:28 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 100'200' GRAPHIC SCALE 1"=100'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF20 29CS6001POST-DEVELOPMENTDRAINAGE MAPJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER STORM SEWER STRUCTURES 31- 33 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 710 715 720 725 730 735 740 745 710 715 720 725 730 735 740 745 EX. GRADE PR. GRADE 9+50727.6727.55727.4727.4410+00727.0726.96726.7726.7410+50726.7726.68726.8726.8011+00727.0726.98726.9726.8911+50 12+00TOP = 725.8510+50.22 = DI-1INV IN = 723.43 (STR 33)INV OUT = 723.4350' - 15" HDPE @ 0.36% 32 10+00 = ES-1 (15")INV OUT = 723.25 (32)31 38' - 15" HDPE @ 0.40%TOP = 726.0010+88.16 = DI-1INV OUT = 723.5833 STORM 11 - 12 2+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 710 715 720 725 730 735 740 745 710 715 720 725 730 735 740 745 9+50 722.4722.4410+00723.3723.29725.2725.2410+50727.1727.14727.9727.8811+00727.5727.5410+00 = ES-1 (15")INV OUT = 722.08 (12)15" HDPE @ 1.41%TOP = 723.8910+26.16 = ES-1 (15")INV OUT = 722.45EX. GRADE 5' SWLK PR. GRADE 11 12 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6100.dwg PLOTTED: 12/9/2022 10:29 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 50'100' GRAPHIC SCALE 1"=50' REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF21 29CS6100STORM SEWER PROFILESJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EER U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6500.dwg PLOTTED: 12/9/2022 10:29 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF22 29CS6500STORM SEWERDETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 RIDGEFuture C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Surface Topography NoteThese Gray Scaled, Solid Line type,Contours and the adjacent spotelevations are shown per the "SecureStore Self-Storage" Site Plan, which iscurrently under construction.(SP #13-21). S Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 9 WF 8 WF 7 PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT Ex. Dual 142' - 48"RCP @1.01% Ex. Concrete Inlet(Mitered to Slope) Inv. In = 721.76 Ex Sign Ex Drainage Esmt. INST. 020006555 Ex. 225.51' - 8" PVC @ 0.50% Ex. Grate InletTop = 724.29 Inv. Out = 720.99 Ex. Grate InletTop = 724.40 Inv. Out = 720.10 2 - Ex. WV's (Field Located) 60.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 726 726727727 727728728729729 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 72772 8 7 2 5 72 5 72 3 7 2 3 72 4 724726 72672 7 7 2 7 728 72 8 725724 726727 72572 5725725 725725 7267267277277277257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727725 724726727728 728 725 722 7237 2 4 726 727 725724 726 727Ex. Inlet Inv. Out = 723.50 Ex.Curb (Under Const.) Ex. EG (Road UnderConstruction) HEAVY VEGETATION HEAVY VEGETATION Overflow Roof Drain (Typ.) Primary Roof Drain (Typ.) CG-12A5' SWLKSWMF "A" Pr. Pedestrian Crosswalk Pr. Stop Bar Pr. Lane Stripe (Typ.) CG-12A5' SWLK5' SWLK Outfall Weir Structure See Details, Sh. 23 Grass Channel Trapez. 4'(W) Bottom Conc. Flume (Typ.) (See Detail, Sh. 14)25'R25'R 50'R 5'RGrass Channel Trapez. 2'(W) Bottom 3' R 20'RPr. 7' Wide Grass Strip 7'33 32 31 1211 1 5 " HDPE4" HDPE8" HDPE4" HDPE 15" HDPE 8" HDP E 15 " H D P E Conc. Flume (Typ.) (See Detail, Sh. 14)72672772 7 7277287267 2 7 728 726727727 727 727727 728 727728727728 727 725 723 724 726 727728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 72 6 727727725 724 726 727 7 2 6 727727727728728TB = 726.75' 26 08 LP 26 89 EP 27 45 HP 28 21 EP 26 92 EP 26 14 EP 26 37 HP 26 18 EP2671 FC 27 62 FC 27 80 EP 27 64 FC 27 79 EP 27 37 EP 27 12 EP 26 28 HP 27 64 FC 27 30 FC 26 55 EP 26 57 FC 27 28 FC 27 07 FC 01 EP 28 14 TC2835 28 35 25 48 EP 25 41 EP 26 41 25 80 27 30 FC 26 69 EP 27 21 EP 25 98 EP 26 23 EP 2.0% 1.0%2.0%3.6% 2.0% 3.6% 2.6%2.0%1.5% 2.9% 2.0%2.9% 28 14 TC 26 17 LP 26 65 HP 26 20 LP 26 45 EP 26 37 EP 27 24 26 30 27 10 27 46 INV 2.0%1.6%2.2%2.4%26 42 HP 1.5% 26 00 TOP 25 85 TOP 2.0% 27 11 FC 27 32 FC 2.0%27 29 EP 27 33 EP2729 EP2755 EP 27 29 FC2738 FC 27 29 FC2729 FC 1. 3 % 31 TC 28 12 TC 28 23 28 19 28 13 47 27 68 37 27 58 27 95 HP 28 40 2.2%2.6% 23 25 INV 23 25 INV 22 08 INV 22 45 INV 2.0%1.0%1.0%1.1% 25 95 INV 25 90 INV 26 48 INV 100 Yr. WSE = 725.45' 10 Yr. WSE = 724.77' 10 Yr. WSE = 724.27' 100 Yr. WSE = 725.45'TB = 726.75'EX. 8" W/L12 + 9 3 11+00 12+00 SWMF A - Outfall Weir Detail Not to Scale Rectangular Weir Invert = 725.00' Top of Berm & Weir Wall = 726.75' Earthen Berm Rectangular Weir Width =4.00 lf Height = 1.75vf 6' Total Wall HeightCircular Orifice Ø = 3.5" 3.5" Ø Orifice Invert = 723.25' Pr. Grade 10' Wide Weir Wall 3.5' Above Grade Weir WallBottom of Weir Wall = 720.75'2.5' Below Grade Weir WallPr. Concrete Weir Wall 10 Yr. WSE = 724.77' 100 Yr. WSE = 725.44'U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6600.dwg PLOTTED: 12/9/2022 10:29 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF23 29CS6600SWMF A PLAN &COMPUTATIONSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERSWMF "A" PLAN VIEW Study Point 1 Study Point 1 Summary In General This Study Point discharges to a Man-Made Stormwater Conveyance System, being a dual 48" Culvert. This Culvert crosses Warrior Drive before discharging to a large trapezoidal Channel. This channel flows to a 48" Culvert, which then conveys runoff across Tasker Road. A large Upland Watershed flows to Study Point 1. It was necessary to obtain topography in order to delineate the Upland Drainage Patterns. Off-site topography was obtained from available GIS Data and should be considered approximate. Review of aerial photography aided identification of Drainage Facilities in the Upland Drainage Areas. A field visit was conducted to verify locations and approximate dimensions necessary to create a Drainage Model. SWMF A is proposed at the Northern extent of the project site. This Facility is a small "Catch Basin" serving to detain the necessary runoff volumes for controlled release, required to satisfy the Energy Balance Equation and reduce the 2 & 10 Yr. 24 Hr. Storm Events. A Concrete Weir is proposed to control release from the Catch Basin. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b . The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection & Limits of Analysis for Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.1. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.C.3.a. The Post-Development Peak Flow (Q10) is contained within the Downstream Conveyance System.U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6700.dwg PLOTTED: 12/9/2022 10:40 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF24 29CS6700STORMWATERMANAGEMENTCOMPUTATIONS JULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS6701.dwg PLOTTED: 12/9/2022 10:40 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----REVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF25 29CS6701STORMWATERMANAGEMENTCOMPUTATIONS JULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022 Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 11 WF 10 WF 9 WF 8 WF 7WF 6 PIN 75-A-104ISECURE STORE V, LLC INST. 210020896 ZONED: B2 USE: VACANT EX. MULTI-TENANTSIGN ESM'TINST. 210017949Variable Width Private Access,Drainage, Grading & Utility Esmt. Ex. Dual 142' - 48"RCP @1.01% Ex Sign Ex. 20' FW Esmt.INST. 220007415 Ex Drainage Esmt. INST. 020006555 Ex. Variable WidthPrivate Access, Drainage,Grading & Utility Esmt. INST. 210017949Ex. 20' FW Esmt.INST. 21001794960.42' - 15"CMP @ 1.34% 725 725 726 726 727 727 725 723 724 726 727 727 728728 726 726726726727727 727728728729729 725 724 726 726 727 727727728 729 725 725724 724726726 7 2 7 72 7 72 8 7 2 5 7 2 6 72772 8 7 2 5 7267 2 772 8 725724 726727 72572 5725725 725725 7267267277277 2 77257247267 2 5 7 2 5 7 2 6 725 723 724 726 725725 72 4 7 2 5 7 2 4 72 6727728725 7247267277 2 8 728728729729727 728 728 725 725 722 7 2 2 723723 72 4 724 726 726 727 727 725724 726 727Ex. Wetland On-Site Area =0.04 Ac. (1,750 sf) Vacate Portion ofEx. 20' FW Esmt.INST. 210017949 3 5 ' B R L 50' BRL35' BRL 50' PRIVA T E ACCESS D R . HEAVY VEGETATION HEAVYVEGETATION 4 10 SWM Esmt. SWMF "A"15' R.E.C. Esmt.15' R.E.C. Esmt.10' GasEsmt.10' GasEsmt.25'R25'R 50'R 5'R3' R 20'R210.00'RIDGEFuture C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan. ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". WM Pr. 20' FW Esmt.15' Pr. 20' FW Esmt.EX. 8" W/L72672772 7 7277287297297267 2 7 728 726727727 727 727727 728 727728727728 728 728 727728 729 727727728728725 723 724 726 727 725 723 724 726 727728727728728728 725 723723 724724 726 727 727727 728 728 725 725726 726727727727727727 728 728 725 725725725723723724 724724724726 726726726727 728728728728 72 6 727727725 724 726 727 7 2 6 727727727728728TB = 726.75'TB = 726.75'BM-24 OV-5 QA-1 QA-2 QA-1 QA-1 QA-1 ZS-6 BM-14 PROVIDE LANDSCAPE STONE IN PLANTING BED JP-6 JP-8 JS-13 JS-9 U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS7000.dwg PLOTTED: 12/9/2022 10:40 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----CIVIL SH. OF26 29 00 20'40' GRAPHIC SCALE 1"=20'NORTHAPPROVED PERMIT DRAWINGS CS7000LANDSCAPE PLAN,NOTES & DETAILSJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKREVISIONS:OFFICE: 262-786-6776-STEPHENS CITY, VA- - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED  12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERCIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 08/26/2022 LMGRO22001 RAM EJG RAM GENERAL CONDITIONS: SCOPE OF WORK THE LANDSCAPE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT TO COMPLETE ALL LANDSCAPE WORK AS SHOWN ON THE PLANS AND SPECIFICATIONS. NOTE: IF THE CONTRACTOR BIDS ACCORDING TO THE PLANT LIST, HE/SHE SHOULD THOROUGHLY CHECK THE PLANT LIST QUANTITIES WITH THE SYMBOLS DRAWN ON THE PLAN, TOP BE SURE THERE ARE NO DISCREPANCIES. IF THERE IS A DISCREPANCY BETWEEN THE DRAWING AND THE LIST ON THE PLANS, THE DRAWING TAKES PRECEDENCE. STANDARDS A. ALL PLANT MATERIAL WILL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA). B. PLANT MATERIAL MUST BE SELECTED FROM NURSERIES THAT HAVE BEEN INSPECTED AND CERTIFIED BY STATE PLANT INSPECTORS. C. COLLECTED MATERIAL MAY BE USED ONLY WHEN APPROVED BY OWNER'S REPRESENTATIVE. D. NOMENCLATURE WILL BE IN ACCORDANCE WITH HORTUS III BY L.H. BAILEY. SUBSTITUTIONS: PRE-BID IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO MAKE EVERY REASONABLE EFFORT TO FIND THE MATERIAL SPECIFIED BY THE ARCHITECT. THE LANDSCAPE CONTRACTOR MAY OFFER SUBSTITUTIONS TO THE LANDSCAPE ARCHITECT FOR HIS/HER CONSIDERATION. THE LANDSCAPE CONTRACTOR WILL NOTIFY THE LANDSCAPE ARCHITECT IF THERE ARE KNOWN DISEASES OR INSECT RESISTANT SPECIES THAT CAN BE SUBSTITUTED FOR A SELECTED PEST-PRONE PLANT. THE CONTRACTOR SHALL SUBMIT A BASE BID AS PER PLAN PLUS PRICE CLARIFICATIONS FOR ALL RECOMMENDED SUBSTITUTIONS. SUBSTITUTIONS: POST-BID IT IS THE INTENT TO ELIMINATE POST-BID SUBSTITUTIONS. HOWEVER, IN THE EVENT THAT THE CONTRACT MATERIAL HAS BECOME UNAVAILABLE, AN APPROPRIATE SUBSTITUTION MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE. UTILITIES AND UNDERGROUND FEATURES THE LANDSCAPE CONTRACT SHALL NOTIFY UTILITY COMPANIES AND/OR THE GENERAL CONTRACTOR IN ADVANCE OF CONSTRUCTION TO LOCATE UTILITIES. A. IF THERE IS A CONFLICT WITH THE UTILITIES AND THE PLANTING, THE LANDSCAPE ARCHITECT SHALL BE RESPONSIBLE FOR RELOCATING PLANTS PRIOR TO THE PLANTING PROCESS. ANY COST DUE TO RELOCATING AFTER PLANTING SHALL BE BORNE BY THE OWNER. DRAINAGE IF PLANTS ARE TO BE INSTALLED IN AREAS THAT SHOW OBVIOUS POOR DRAINAGE, AND THE PLANTS ARE INAPPROPRIATE FOR THAT CONDITION, THE LANDSCAPE CONTRACTOR SHALL BE RELOCATED, THE CONTRACT SHALL BE ADJUSTED TO ALLOW FOR DRAINAGE CORRECTION AT A NEGOTIATED COST, OR THE PLANT SELECTION MODIFIED BY THE LANDSCAPE ARCHITECT TO ACCOMMODATE THE POOR DRAINAGE SITUATION. WARRANTY A. THE STANDARD WARRANTY IS FOR A ONE (1) YEAR PERIOD, EXCLUDING BULBS, SOD AND ANNUALS, COMMENCING ON THE DATE OF INITIAL ACCEPTANCE. AL PLANTS SHALL BE ALIVE AND IN SATISFACTORY GROWTH AT THE END OF THE GUARANTEE PERIOD. B. BALLED AND BURLAPPED (B&B). 1. BALLED AND BURLAPPED PLANTS SHALL BE DUG WITH FIRM ROOT BALLS FREE OF NOXIOUS WEEDS. THERE SHOULD BE NO EXCESS SOIL ON TOP OF THE ROOT BALL OR AROUND THE TRUNK. 2. BALL SIZE SHALL BE IN ACCORDANCE WITH ANLA STANDARDS. 3. CALIPER AND HEIGHT MEASUREMENTS: IN SIZE GRADING B&B SINGLE-TRUNK TREES, CALIPER SHALL TAKE PRECEDENCE OVER HEIGHT. CALIPER OF THE TRUNK SHALL BE TAKEN 6" ABOVE THE GROUND LEVEL (UP TO INCLUDING 4" CALIPER SIZE) AND 12" ABOVE THE GROUND LEVEL OF LARGER TREES. FOR MULTIPLE-TRUNK TRESS, HEIGHT MEASUREMENT SHALL TAKE PRECEDENCE OVER CALIPER. C. CONTAINER-GROWN STOCK 1. THE SIZE OF CONTAINER-GROWN SHRUBS IS MEASURED BY HEIGHT AND WIDTH OF PLANT. CONTAINER-GROWN TREES ARE MEASURED BY THE SAME STANDARDS LISTED IN B.3 ABOVE. THE ROOT SYSTEM OF CONTAINER-GROWN PLANTS SHALL BE WELL-DEVELOPED AND WELL- DISTRIBUTED THROUGHOUT THE CONTAINER. 2. ALL CONTAINER-GROWN TREES AND SHRUBS THAT HAVE CIRCLING AND MATTED ROOTS SHALL BE TREATED IN THE FOLLOWING MANNER PRIOR TO PLANTING: USING A KNIFE OR SHARP BLADE, MAKE 4-5 CUTS, 1" DEEP, THE LENGTH OF THE ROOT BALL, TO CUT ALL CIRCLING ROOTS. SEE PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS IN THIS SECTION. 3. ALL CONTAINER-GROWN PLANTS SHOULD BE GROUPED AND WATERED DAILY UNTIL THEY ARE PLANTED IN THE LANDSCAPE, THE SOIL SHALL BE KEPT MOIST WITH THE EQUIVALENT OF ONE INCH OF RAINFALL PER WEEK. A. PRUNING SHALL BE DONE BEFORE PLANTING OR DURING THE PLANTING OPERATION. PRUNING DETAIL FOR TREES IN THIS SECTION. B. ALL PLANT MATERIAL IN TRANSIT SHALL BE COVERED TO KEEP MATERIAL FROM DRYING OUT. THE COVERING SHALL COMPLY WITH STATE AND LOCAL LAWS PERTAINING TO THE TRANSPORT OF MATERIALS. C. TREES SHALL BE PLACED IN AN UPRIGHT POSITION WITH THE ROOTBALL COVERED BY MULCH AND KEPT MOIST. TREES AND SHRUBS SHOULD NOT BE LEFT ON SITE UNPLANTED FOR MORE THAN 24 HOURS WITHOUT ADEQUATE WATER TO INSURE ROOTS SURVIVAL. INSPECTION A. PLANTS MAY BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR OWNER'S REPRESENTATIVE AT THE PLACE OF GROWTH OR HOLDING YARD FOR CONFORMITY TO SPECIFICATION REQUIREMENTS AS TO QUALITY, SIZE AND VARIETY. B. PLANTS DAMAGED IN HANDLING OR TRANSPORTATION CAN BE REJECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. C. STATE NURSERY INSPECTION CERTIFICATES SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT UPON REQUEST. PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS A. REMOVE THE PLANT EITHER BY CUTTING OR INVERTING THE CONTAINER. B. FOR UNTREATED PLASTIC CONTAINER GROWN PLANTS WITH CIRCLING ROOTS, USE A SHARP KNIFE TO MAKE 1" CUTS THE LENGTH OF THE ROOTBALL. C. PLANT SHRUB TO TREE A MINIMUM OF 1/8 OF THE HEIGHT OF THE ROOTBALL ABOVE EXISTING GRADE. D. APPLY A 2 TO 3" THICK LAYER OF APPROVED MULCH. KEEP MULCH 6" AWAY FROM THE TRUNK OF ALL TREES AND SHRUBS. E. PLANTS GROWN IN ROOT CONTAINMENT BAGS MUST HAVE THE BAGS REMOVED DURING THE PLANTING OPERATION. NO ADDITIONAL SLASHING OF THE ROOTBALL IS NECESSARY. MAINTENANCE OF LANDSCAPING NOTES: 1. ALL LANDSCAPED AREA SHALL BE MAINTAINED IN GOOD CONDITION BY OWNER. 2. REASONABLE PROVISIONS SHALL BE MADE FOR PROTECTION FROM VEHICLES, PEDESTRIANS, OR SHOPPING CARTS. 3. DEAD OR DYING VEGETATION SHALL BE REPLACED AT DIRECTION OF ADMINISTRATOR. 4. SHRUBS SHALL BE REPLACED AT A SIZE CONSISTENT WITH THAT OF EXPECTED FOR SPECIES AND TIME SINCE INSTALLATION. 5. TREES SHALL BE REPLACED AT A SIZE OF 0.5" CALIPER ABOVE 2" FOR EVERY YEAR SINCE INSTALLATION UP TO 5" CALIPER. 1. NO TREES OR SHRUBS SHALL BE PLACED ON FREDERICK WATER EASEMENTS. 2. ALL LANDSCAPING SHALL COMPLY WITH SECTION§165-203.01 LANDSCAPING REQUIREMENTS OF THE FREDERICK COUNTY ZONING ORDINANCE. 3. OWNER WILL ACCEPT FOR REVIEW, SUBSTITUTIONS FOR ALL LANDSCAPING PROVIDED THEY SATISFY APPLICABLE REGULATIONS. ADDITIONAL LANDSCAPING NOTES: LANDSCAPE CALCULATIONS: LANDSCAPED AREA/ OPEN SPACE CALCULATIONS TOTAL SITE AREA 58,444 SF LANDSCAPED AREA / OPEN SPACE REQUIRED 8,767 SF (15%) LANDSCAPED AREA / OPEN SPACE PROVIDED 26,480 SF (45.3%) PARKING LOT LANDSCAPING PERIMETER LANDSCAPING PARKING LOT IMPERVIOUS AREA 28,642 SF REQUIRED PROVIDED PERIMETER PARKING LOT SHADE TREES 15 (1 PER 2,000 SF) 15 3' HIGH HEADLIGHT SCREENING YES YES INTERIOR LANDSCAPING PARKING SPACES 14 REQUIRED PROVIDED PARKING LOT LANDSCAPED AREA 1,432 SF (5.00%) 4,139 SF (14.45%) INTERIOR PARKING LOT SHADE TREES 2 (1 PER 10 SPACES) 2 PARKING LOT PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES OV OSTRYA VIRGINIANA HOP HORNBEAM 1 1/4" CAL. MIN.AS SHOWN 5 QA QUERCUS ACUTISSIMA SAWTOOTH OAK 1 1/4" CAL. MIN.AS SHOWN 6 ZS ZELKOVA SERRATA ' GREEN VASE' GREEN VASE JAPANESE ZELKOVA 1 1/4" CAL. MIN.AS SHOWN 6 SHRUBS BM BUXUS MICROPHYLLA VAR. KOREANA 'WINTERGREEN' WINTERGREEN KOREAN BOXWOOD 3 GAL. CONT. MIN./ 36" HT. MIN.4' O.C.38 JP JUNIPERUS PROCUMBENS 'GREEN MOUND' GREEN MOUND JAPANESE GARDEN JUNIPER 3 GAL. CONT. MIN./ 36" HT. MIN.AS SHOWN 14 JS JUNIPERUS SQUAMATA 'BLUE STAR'BLUE STAR JUNIPER 3 GAL. CONT. MIN./ 36" HT. MIN.AS SHOWN 22 SHRUB PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL OR CONTAINER SIZE 2" OF MULCH CREATE A SAUCER SHAPE WITH MULCH TO HOLD WATER SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALLBASE FIRMLY TO PREVENT ROOT BALL FROM SHIFTING PRUNE ONLY DAMAGEDOR DEAD BRANCHES TREE PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL SET TRUNK PLUMB L DO NOT MULCH WITHIN 6" OF TRUNK 3" OF MULCH SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALLBASE FIRMLY WITH FOOT PRESSURE TO PREVENT ROOT BALL FROMSHIFTING SECURE GUYS WITH RUBBERHOSE TO TRUNK PRUNE ONLY DAMAGEDOR DEAD BRANCHES *(2) 2"x2" WOOD STAKES SET AT 180° (ALT: STEEL FENCE POSTS) C NOTES: 1.*STAKE ONLY TO PREVENT WIND TIP OR WHEN PLANTING ON STEEP SLOPES 2. REMOVE ALL TAGS AND ROPES FROM BRANCHES AND ROOT BALL. PITCH FROM C OF PLANTING AREA TYPICAL MULCH EDGING DETAIL4" MIN.MULCH LAYER TOPSOIL L PROVIDE EDGE WITH CLEAN, CRISP SEPARATION BETWEEN MULCHED BED AND ADJACENT SURFACECONDITIONS CUT EDGE MINIMUM 4" BELOW GRADE TO RECEIVEMULCH TURF, SIDEWALK, OR CURB 2" MIN. MULCH LAYER NOT TO SCALE Warrior Drive Minor Arterial 125' R/W (INST. 020006555) WF 11 WF 10 WF 9 WF 8 WF 7WF 6 PIN 75-A-104I SECURE STORE V, LLCINST. 210020896 ZONED: B2 USE: VACANT EX. MULTI-TENANTSIGN ESM'TINST. 210017949PIN 75-A-104ETASKER WARRIOR PROPERTIES, LLCINST. 160004426ZONED: B2 USE: VACANT C1C2 PIN 75-A-104K TASKER WARRIOR PROPERTIES, LLCINST. 160004426 ZONED: B2USE: VACANT Variable Width Private Access,Drainage, Grading & Utility Esmt. Ex. Dual 142' - 48"RCP @1.01% Ex Sign Ex. 20' FW Esmt.INST. 220007415 Ex. 20' FW Esmt. INST. 210017949 Ex Drainage Esmt. INST. 020006555 Ex. Variable Width Private Access, Drainage, Grading & Utility Esmt.INST. 210017949Ex. 20' FW Esmt.INST. 210017949Ex. Wetland On-Site Area = 0.04 Ac. (1,750 sf) Vacate Portion ofEx. 20' FW Esmt.INST. 210017949 N 48°46'27" W 245.46'N 38°03'15" E 167.71' S 8 4 ° 2 4 ' 5 7 " E 1 1 9 . 8 1 'S 48°08'05" E 90.22'S 41°13'35" W 247.14' 3 5 ' B R L 50' BRL35' BRL 50' PRIVA T E ACCESS D R . HEAVYVEGETATION HEAVY VEGETATION HEAVY VEGETATION 210.00'RIDGEFuture C&G (Per SP #13-21) Ex. C&G (Per SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21) ·Portions of the Curb already constructed at thetime of Field Survey are annotated as" Ex. Curb". ·Portions of Curb, not constructed at the time ofField Survey are shown per SP#13-21 andannotated as "Future C&G". Surface Topography NoteThese Gray Scaled, Solid Line type,Contours and the adjacent spotelevations are shown per the "SecureStore Self-Storage" Site Plan, which iscurrently under construction.(SP #13-21). WM Pr. 20' FW Esmt.15' Pr. 20' FW Esmt.EX. 8" W/L12 + 9 3 9+76 10+00 11+00 12+00 12+3610+0011+00 12+00 4 10 Stop Sign 24' CG-6 CG-6CG-12ACG-226' EP12' FCCG-6 CG-2 CG-630' FC5' 36.5' 9' FC9' 30' CG-11 30' CG -11 12' 12'CG-2 Stop Sign 5' Stop Sign Main Entrance Employee Entrance 20'CG-6RCG-6CG-624'10.5' SWM Esmt. Pr. Bank Building Floor Area = 2,392 ft2 Height = 18' FF = 728.35 Dry Utility Conduits See Typical Trench Section, Sh. 29 CG-12A5' SWLKSWMF "A" Pr. Elec. Meter Dry Utility Conduits See Typical Trench Section, Sh. 29 Pr. Pedestrian Crosswalk Pr. Stop Bar Pr. Lane Stripe (Typ.) Utility Conduit Junction Pr. Utility Conduit Junction 50.5'CG-12A5' SWLK5' SWLK Outfall Weir Structure See Details, Sh. 23 Pr. Gas Meter15' R.E.C. Esmt.15' R.E.C. Esmt.10' Gas Esmt.15' R.E.C. Esmt.10' GasEsmt.10' GasEsmt.Pr. Gas MainGas Serv. Tap Gas Service Line Pr. Gas MainEnd Pr. Gas Main 15.5'123.07'132.75'81.5'(2) Do Not Enter Signs (See Detail, Sh. 14) Pr. HC Sign (See Detail, Sh. 14) CG-6 CG-6 Grass Channel Trapez. 4'(W) Bottom Conc. Flume (Typ.) (See Detail, Sh. 14) Pr. Freestanding Bank Sign (See Notes, Sh. 12)CG-6RCG-6R Bldg. Canopy (Typ.) Bollard Protection (Typ.) Raised Island (0.5 vf)CG-6RCG-625'R25'R 50'R 5'RGrass Channel Trapez. 2'(W) Bottom CG-63' R 20'R19.5' Pr. 7' Wide Grass Strip 7'Pr. Multi-Tenant Sign (See Notes, Sh. 12) 33 32 31 1211 Conc. Flume (Typ.) (See Detail, Sh. 14)Mod. CurbU:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS8000.dwg PLOTTED: 12/9/2022 10:41 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----CIVIL SH. OF27 29 00 20'40' GRAPHIC SCALE 1"=20'NORTHAPPROVED PERMIT DRAWINGS CS8000LIFE SAFETY PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKREVISIONS:OFFICE: 262-786-6776-STEPHENS CITY, VA- - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED  12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERCIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 08/26/2022 LMGRO22001 RAM EJG RAM LIFE SAFETY NOTES 1. FIRE LANE SIGNS HAVE BEEN LIMITED TO REDUCE CROWDING IN DRIVEWAY CURB RETURN ISLANDS. 2. DISPLAY OF PAINTED CURBS HAVE BEEN EXAGGERATED FOR CLARITY. CURBS SHALL BE PAINTED AS SHOWN IN DETAILS ABOVE U:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS8100.dwg PLOTTED: 12/9/2022 10:41 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----CIVIL SH. OF28 29 APPROVED PERMIT DRAWINGS CS8100PHOTOMETRIC PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKREVISIONS:OFFICE: 262-786-6776-STEPHENS CITY, VA- - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED  12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERCIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 08/26/2022 LMGRO22001 RAM EJG RAM NTS CHAIN LINK FENCE (PER SP #13-21) DETENTION POND #2 (PER SP #13-21) BIORETENTION POND #2 (PER SP #13-21) BIORETENTION POND #3 (PER SP #13-21)15' R.E.C. Esmt.10' Gas Esmt.Gas Main Ex. Gas Main to Be Field Located. This Proposed Crossing is shown for Schematic Purpose Only. Indicating the General Vicinity of Gas "Tie-In" Location. Variable Width Private Access,Drainage, Grading & Utility Esmt. Ex. Variable WidthPrivate Access, Drainage, Grading & Utility Esmt. INST. 210017949Ex. 20' FW Esmt.INST. 210017949728 7 2 5 7 2 5 7 2 6725725 7 2 5 7 2 4 72 6727728 725724 726 72735' BRLRIDGEBIORETENTION POND #2 (PER SP #13-21) Private Access Drive Note ·The Shared Private Access Road is currentlyunder construction per the "Secure StoreSelf-Storage" Site Plan.(SP #13-21)72672772 7 727728729729727727 727 727727 728 727728 729 728 728728728 72 6 727727725 724 726 727 7 2 6 727727727728728Pr. 20' FW Esmt.PR. W/L CONNECTION Extend Ex. 8" W/L to Pr. 1 - 8" X 8" Tee & 3 - 8" GV's PR. 8" W/L - A 15' Pr. 20' FW Esmt. Radial Install (R=500') BEGIN PR. W/L "A" 1 - Full Joint 8" CL 52 DIP & 1 - 8" End Cap w/ 1 - Flushing Assembly END PR. W/L "A" 1 - 8" GV, 1 - Full Joint 8" CL 52 DIP & 1 - 8" End Cap w/ 1 - Flushing Assembly 1 - 8" - 45° Horz. Bend 12 + 9 3 9+76 10+00 11+00 12+00 10+00BEGIN PR. W/L "B" 1 - 8" Tee w/ 3 - 8" GV's 25' Pre-Blast Pr. 25' Pre-Blast Area Dry Utility Conduits See Typical Trench Section, Sh. 29 Dry Utility Conduits See Typical Trench Section, Sh. 29 Utility Conduit Junction Pr. Utility Conduit Junction 15' R.E.C. Esmt.15' R.E.C. Esmt.10' Gas Esmt.15' R.E.C. Esmt.10' GasEsmt.10' GasEsmt.Pr. Gas MainGas Serv. Tap Pr. Gas MainEnd Pr. Gas Main 25'R25'R Grass Channel Trapez. 2'(W) Bottom 33 15 " H D P E 5'-6" TRENCH (TYP.) UTILITY CONDUIT TRENCH SECTION VIEW - NTS PROPERTY LINE3' MIN.EXISTING GROUND R.E.C. 1-6" 15' UTILITY ESMT. DEDICATED TO R.E.C. BOTTOM OF TRENCH AND FIRST 6" OF BACKFILL SHALL BE FREE OF ROCKS AND SHARP OBJECTS ALL CONDUITS SHALL BE INSTALLED WITH 1/4" NYLON PULL CORD OR SIMILAR, AS APPROVED BY THE OPERATOR'S INSPECTOR. LOCATION AND WARNING TAPE SHALL BE OF TYPE AND INSTALLED AS DIRECTED BY THE UTILITY OPERATOR'S FIELD INSPECTOR. 6" CONDUITS (FROM JUNCTIONS) MAY BE CO-LOCATED WITHIN THE PRIMARY TRENCH WHERE APPROPRIATE. SPACING BETWEEN 6" AND 4" CONDUITS (REC) IS VARIABLE AS APPROVED BY THE REC FIELD INSPECTOR. 18"12"12"36" TO ⅊12" COMCAST 1-4"VERIZON 1-4" SPARE 1-4" 12"ESMT. LINEU:\Accounts\LMGRO\LMGRO22001 - Branch Bank West Side Warrior_Tasker Rd\DESIGN\_SHEETS\SP\CS9000.dwg PLOTTED: 12/9/2022 11:12 AM, BY: Eric Gottshall PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: ----00 20'40' GRAPHIC SCALE 1"=20'NORTHREVISIONS:OFFICE: 262-786-6776- - - - - - - - DATE DRAWN PROJECT DESIGNED CHECKED CIVIL ENGINEERING PREPARED BY PENNONI ASSOCIATES INC. 117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139 F 540.665.0493 12/09/2022 LMGRO22001 RAM EJG RAM APPROVED PERMIT DRAWINGS CIVIL SH. OF29 29CS9000UTILITY CONDUIT PLANJULY 26TH, 2022DATE:SHEET TITLE:22-354PROJECT NUMBER:FNB BANKSTEPHENS CITY, VA 12/09/2022PNo. 20674RONALD A. MISLOWSKY, JR. T MNOMAEW L OCGFOH R IV AINI RO FF SSIONA L E N G INE EERNORTHUtility Conduit Plan Utility Conduit Plan 00 20'40' GRAPHIC SCALE 1"=20'