Loading...
HomeMy WebLinkAbout55-22 Site Plan1COVER SHEET1" 1000' SENSENY PLACE SITE DEVELOPMENT PLAN RED BUD MAGISTERIAL DISTRICT FREDERICK COUNTY, VA SP# 55-22 UTILITY NOTICE REQUIRED Contractors shall notify all public utility operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. Names and telephone numbers of the operators of underground utility lines appear below. These numbers shall also be used to serve in an emergency condition. CALL "MISS UTILITY" VIRGINIA UTILITY PROTECTION SERVICE (VUPS) AT 811 OR 1-800-552-7001, 48 HOURS PRIOR TO THE START OF WORK. EXCAVATORS MUST NOTIFY ALL PUBLIC UTILITY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATING OR BLASTING AND HAVE THOSE FACILITIES LOCATED BY THE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION. THE EXCAVATOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL COUNTY REQUIREMENTS, VIRGINIA CODE AND REGULATIONS. VICINITY MAP SCALE: 1" 1000' OWNER TRUSTEE'S OF ST. PAUL'S ON THE HILL EPISCOPAL CHURCH 1527 SENSENY ROAD WINCHESTER, VA 22602 (540) 667-8110 DEVELOPER WESLEY HOUSING DEVELOPMENT CORPORATION 5515 CHEROKEE AVENUE SUITE 200 ALEXANDRIA, VA 22312 (571) 308-2102 SENSENY PLACERED BUD MAGISTERIAL DISTRICTFREDERICK COUNTY, VA04/20/2020 RLK/KAS DWG# 19-03 37 6387W Plan Revisions Rev No.Rev Date Comment 01 04-29-2020 CITY OF WINCHESTER PUBLIC SERVICES COMMENTS 02 05-12-2020 CITY OF WINCHESTER PUBLIC SERVICE COMMENTS 03 06-19-2020 FREDERICK COUNTY PUBLIC WORKS COMMENTS 04 07-13-2020 FREDERICK COUNTY PUBLIC WORKS COMMENTS 05 09-30-2020 VDOT & FREDERICK WATER COMMENTS 06 10-26-2020 VDOT COMMENTS 07 11-12-2020 FREDERICK WATER COMMENTS 08 11-30-2020 CITY OF WINCHESTER PUBLIC SERVICE COMMENTS 09 12-03-2020 VDOT COMMENTS 10 12-18-2020 VHDA COMMENTS 11 01-14-2021 BID SET - RELOCATED DUMPSTER PAD AND SITE LIGHTING 12 01-26-2021 RELOCATE JUNCTION BOX 13 02-16-2021 VHDA COMMENTS (HR DETAIL & LANDSCAPE BARRIER/GATE) 14 09-08-2022 FREDERICK COUNTY REVISION (UPDATE VHDA CHANGES) 15 10-17-2022 ADJUST SHARED BUFFER SCREEN FENCE, ADD SWM FENCE DATE APPROVAL =ONING ADMINISTRATOR SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF APPROVAL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVGas:Washington Gas P.O. Box 2400 Winchester, VA 22604 (540) 868-7923 Verizon P.O. Box 17398 Baltimore, MD 21297 (301) 954-6282 Water/Sewer:Frederick Water P.O. Box 1877 Winchester, VA. 22604 (540) 868-1061 Power:Rappahannock Electric Coop 137 Kelly Court Front Royal, VA 22630 1-800-552-3904 Communications:Comcast Comunications 195 Rainville Road Winchester, VA 22602 (540) 504-0942 Sheet Index Sheet Number Sheet Title Revsion No Revison Date 1 Cover Sheet 14 10-04-2021 2 General Notes and Legend 05 09-30-2020 3 Project Information and Proffers 4 Boundary and Existing Topo 05 09-30-2020 5 ALTA NSPS Land Title Survey (Painter-Lewis) 6 Demolition Plan 05 09-30-2020 7 E&S Phase I 05 09-30-2020 8 E&S Phases I & II For Entrance Road 05 09-30-2020 8A E&S Phase I & II Offiste Water & Sewer 05 09-30-2020 9 E&S Phase II 05 09-30-2020 10 E&S Narrative 03 06-19-2020 11 E&S Details 03 06-19-2020 12 E&S Details 03 06-19-2020 13 E&S Details 14 Site Plan 15 10-17-2022 15 Road Improvememt Plan 08 11-30-2020 16 Grading Plan 15 10-17-2022 17 Utility Plan 15 10-17-2022 17A Utility Plan - Offsite Water & Sewer 08 11-30-2020 18 Sight Distance 19 Pavement Marking Plan 10 12-18-2020 20 Life Safety Plan 21 BMP Map & VRRM Summary 22 SWM Divides Map 23 SWM Details 24 Sanitary Sewer Profiles 08 11-30-2020 24A Sanitary Sewer - Private Pump Station 06 01-05-2021 25 Storm Sewer Profiles 05 09-30-2020 26 Storm Sewer Profiles 06 10-26-2020 27 Waterline Profiles 07 11-12-2020 28 Storm Sewer Computations 06 10-26-2020 28A Storm Sewer HY8 Computations 05 09-30-2020 29 Retaining Wall Profile 05 09-30-2020 30 VDOT Details 09 12-03-2020 31 VDOT Details 09 12-03-2020 31A VDOT Details 05 09-30-2020 31B VDOT Details 13 02-05-2021 32 Site Details 10 12-18-2020 32A Site Details 05 09-30-2020 33 Winchester City Details 34 Frederick Water Details 07 11-12-2020 34A Frederick Water Details 07 11-12-2020 35 Landscape Plan 15 10-17-2022 36 Lighting Plan 14 09-08-2022 36a Lighting Plan - Details 14 09-08-2022 37 Auto-Turn Simulation 05 09-30-2020 15 10-17-2022 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING54-A-128 1527 Senseny Road 4.971 Acres Per ALTA Survey (5.19 Acres per Frederick County GIS) 5.62 Acres RP - Residential Performance District w/Proffers (RZ#02-18) Church Church & Senior Residential SP#18-20 Multifamily Residential Other - Church 35' 35'35' 50'50' 50'15' 175.7'106.0' 175.7'106.0' 332.4'560.9' 56.8'80.8' 60' (80' if Setbacks Increased per Code)Other - Church: 45' 60'45' 10' 5' 5' 10' 10' 10' Total Lot Area = 4.971 Acres = 222,156 SF Total Units = 63 Units Units/Acre = 12.67 < 20 Max 93 Spaces = 1 per 3 Church Seats (84 Seats x 1 3 = 28), 0.8 per 1 Bedroom Units (43 Units x 0.8 = 35) & 1.5 per 2 Bedroom Units (20 Units x 1.5 = 30) 94 Spaces (29 Church & 65 Residential) (See Parking Waiver Dated January 24, 2019 on Sheet 3. The original concept was for 71 units and the proposed residential building has been reduced to 63 units with parking adjusted accordingly.) 4 Spaces per Table 1106.1 VCC 8 Spaces (2 Church & 6 Residential) Required: 30%, 4.971 Acres x 0.30 = 1.49 Acres OR 64,961 SF Proposed: 51.72%, 2.571 Acres or 111,993 SF Required: 2.1 units at $32,500 = $68,250 Proposed:Trail, Community Room, Fitness Room & 3 Pieces of Equip. = $184,882 All lighting shall conform to section 165-201.07 of the Frederick County zoning ordinance All signs shall conform to 165-201.06 of the Frederick County zoning ordinance. A freestanding monument sign, not to exceed 15-FT in height and 100 square feet (SF) in sign area, is permitted. A separate sign permitted is required. 1.Construction may not begin until plans are approved and a pre-construction meeting has been held. 2.These plans are in conformance with Frederick County standards and ordinances, any deviation or change in these plans shall be approved by the Zoning Administrator prior to construction. 3.The Master Development Plan (MDP) requirement was waived by the Planning Director on December 11, 2019 as the applicant has chosen to process a site plan in lieu of an MDP (§165-801.03(A)(5)). PROPOSED SAN. LAT. CLEANOUT PROPOSED CENTERLINE E;ISTING SPOT ELEVATION STORM DRAIN STRUCTURE IDENTIFIER SANITARY MANHOLE IDENTIFIER PROPOSED SPOT ELEVATION E;ISTING CURB AND GUTTER PROPOSED EDGE OF PAVEMENT E;ISTING EDGE OF PAVEMENT PROPOSED STORM SEWER WITH INLET E;ISTING STORM SEWER WITH INLET PROPOSED TELEPHONE LINE E;ISTING TELEPHONE LINE TRANSITION TO REVERSE CURB PROPOSED CURB AND GUTTER PROPOSED ELECTRIC SERVICE E;ISTING ELECTRIC SERVICE PROPOSED SANITARY SEWER WITH MANHOLE E;ISTING SANITARY SEWER WITH MANHOLE PROPOSED GAS LINE E;ISTING GAS LINE FENCELINE FLOW LINE PROPOSED WATERLINE W/ TEE PROPERTY LINE E;ISTING TELEPHONE PEDESTAL E;ISTING WATERLINE W/ TEE E;ISTING UTILITY POLE/GUIDE WIRE SIGNS PROPOSED REDUCER E;ISTING FIRE HYDRANT/VALVE/METER INDICATES THE NUMBER OF TYP. PARKING SPACES PARKING INDICATOR HANDICAP PARKING PROPOSED BUILDING ENTRANCE VEHICLES PER DAY COUNT PROPOSED FIRE HYDRANT/VALVE/METER LIGHT POLE E;ISTING TREE LINE E;ISTING EASEMENT PROPOSED EASEMENT E;ISTING CENTERLINE E;ISTING INDE; CONTOUR E;ISTING INTERMEDIATE CONTOUR PROPOSED CONTOUR Parcel Identification No. Street Address: Project Site Area: Disturbed Area: Current Zoning: Current Use: Proposed Use: Previously Approved Plans: Required Setbacks: Public Street or Highway ROW Front: Rear: Side: Provided Setbacks: Public Street or Highway ROW Front: Rear: Side: Maximum Building Height: Proposed Building Height: Parking Setback: Front: Rear: Side: Sign Setback: Front: Rear: Side: Density: Parking Required: Parking Provided: ADA Parking Required: ADA Parking Provided: Open Space Calculations: Recreation Facilities: Outdoor Lighting: Signs: PROJECT INFORMATION LEGEND NOTES FIRE MARSHAL'S NOTE GENERAL PLAN AND CONSTRUCTION NOTES VDOT GENERAL NOTES Fire lane markings and signage: Any "No Parking" signs and yellow painted curb locations will be installed by field inspection at the direction of the Fire Marshal's Office. V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with the current edition of VDOT’s Work Area Protection Manual. A transportation management plan needs to be submitted for approval and land use permit issued prior to any execution of work within the VDOT right of way. V4. The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. If required by the local VDOT Land Development Office, a pre-construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor (s), various County agencies, utility companies and VDOT prior to initiation of work. V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection. V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that impacts a VDOT maintained Interstate or Primary roadway to provide notification of the installation and removal of the work zone. V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement of fill. A VDOT representative shall be present to insure the soil sample(s) obtained for CBR’s is representative of the location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in accordance with the lift thicknesses, density and moisture requirements as specified in the current VDOT Road and Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT. V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one pipe installation for each size of each material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for inspection purposes. Additional testing may be required as directed by the Area Land Use Engineer or their representative. V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design standards and is the responsibility of the developer. V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the developer in accordance with the Manual On Uniform Traffic Control Devices. V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the local VDOT Land Development Office prior to acceptance of the work. Unit and total prices may be obscured. V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of the control strip. V22. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT’s installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. V24. Approval of these plans shall expire five (5) years from the date of the approval letter. V25. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. V26. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered and cast-in-place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V27.The contractor/developer and subcontractors will be required to submit detailed Maintenance of Traffic plans for the work to be pursued throughout the life of the project for review and consideration of approval by the VDOT Engineer. Additional MOT plans may be required that combine or require revisions to the existing TTC's in the latest edition of the Virginia Work Area Protection Manual. The VDOT Engineer shall be afforded at least 14 days to review MOT submittals for consideration of approval. GENERAL 1.Greenway Engineering, Inc. (GE) has issued this plan set based on project criteria dictated by the client and municipal codes. This plan set is not considered complete or appropriate for construction until ALL necessary agencies have given approval AND this plan set is signed and sealed by a licensed professional. Any work, planning, scheduling, material purchases and/or construction prior to approvals and licensed/professional sealing will be performed at the risk of the personnel authorizing work. GE shall be held harmless from all costs, time delays and/or material changes incurred on any work that is preformed prior to this plan set being approved and sealed. 2.The approval of these plans in no way relieves the Developer, Contractor, Subcontractor, or any of their agents of any legal responsibility which may be required by the code of Virginia or any County enacted local ordinance, nor does it guarantee the issuance of any required permits by the City, County, State, VDOT or any other governing Agency. 3.An approved set of plans as well as all applicable permits and required documents must be available at the construction site at all times during construction. A representative of the Developer must be available at all times. 4.GE and/or the Engineer shall not not be responsible for or have control over or charge of construction means, methods, techniques, sequences or procedures, nor for safety precautions and programs in connection with any work shown on these plans. GE and/or the Engineer is not responsible for any Contractor's schedules or failure to carry out the work. GE and/or the Engineer is not responsible for acts of omissions by the Contractor, Subcontractor, or their agents, employees, or any other person performing portions of the work. 5.Methods and materials used in the construction of the improvements herein shall conform to current City and County Construction Standards and Specifications and/or current VDOT Standards and Specifications. Should a conflict between design specifications and these plans occur the most stringent requirement shall apply. 6.The Developer and/or Contractor shall be responsible for constructing the site in accordance with the approved plans and construction documents and the scope of work shall conform with grades, depths, dimensions, ect. shown hereon. 7.All known cemetery and/or gravesite locations have been identified on these plans. Any cemetery or gravesite shown on these plans shall be marked and protected in accordance with state law. The developer or contractor shall be responsible for marking, installing protecting and maintaining protection of any known sites during construction and in the event that any unknown gravesites is discovered during construction, the Owner and Engineer must be notified immediately and adequate protection from construction shall be installed immediately. PERMITS AND INSPECTIONS 1.The Developer or his agent shall be responsible for obtaining all required permits from the appropriate State and/or local agencies and to comply with their requirements and all applicable National, State and Local laws and shall be responsible for obtaining any required permits from the Virginia Department of Environmental Quality (DEQ) or the United States Army Corp of Engineers for any plan wetland disturbance as may be shown on these plans. They shall also be responsible the identification and delineation of any wetlands that may be present on the construction site. 2.Prior to the initiation of any land disturbing activities the Responsible Land Disturber, Developer, or the Contractor shall obtain a Land Disturbance Permit from the Frederick County Public Works Department and shall be responsible for filing a Virginia Stormwater Management Program (VSMP) registration statement for the construction site as required by law . They shall also be responsible for obtaining and maintaining on site a Stormwater Pollution Prevention Plan (SWPPP). The approval of these plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment Control Handbook. 3.Upon completion of all construction activities and permanent site stabilization, the Developer shall submit to Frederick County Public Works Department a DEQ Notice of Termination form, a copy of the sites construction inspection log book, an engineer certified red-lined as-built of the approved plans with computations for all permanent stormwater management facilities, water quality, and stormwater conveyance systems, a recorded copy of the required BMP Maintenance Agreement (if needed) , any VSMP Permit maintenance fees (if required), and a written request to Frederick County Planning for bond release. The Developer shall also schedule a Final on site inspection with Frederick County Public Works Department. 4.The Contractor, Owner or Developer must obtain a VDOT Land Use Permit (Entrance) from the Office of the Resident Engineer, Virginia Department of Transportation (VDOT) and provide to Frederick County prior to any construction activities within existing State right-of-way. 5.The Contractor, Owner or Developer shall be responsible for scheduling all required State and local inspections and for the securing of any third party inspection/testing service to insure construction compliance with these plans and specifications and shall keep and maintain a site inspection log book. It is Greenway Engineering's recommendation that a third party inspection/testing service be employed to ensure that project is compliant and that materials installed meet the details and specifications in these plans. 6.Any retaining wall 2 ft. or greater in height shall designed by a Structural Engineer require the issuance of a separate building permit. 7.Individual sign permits will be required from the Zoning Office for all free standing and/or facade signs prior to erecting the sign and may require a separate building permit. UTILITIES 1.The location of existing utilities shown in these plans are taken from existing available records and may not be representative of exact locations. It shall be the contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed prior to construction. The contractor shall be responsible for the digging of all test holes that may be required, whether recommended or not by these plans, to determine the exact location and elevation of existing utilities. If any conflicts arising from this existing utility verification or if during the course of construction, any object of an unusual nature is encountered, the contractor shall cease work in that area and immediately notify Greenway Engineering at (540) 662-4185 and/or the proper authority. Greenway Engineering or any engineer associated with these plans shall not be responsible or liable for any construction cost that may be associated with the installation or reinstallation any utility or other improvements if not notified of any discrepancies between actual field conditions and the approved plan. 2.The developer will be responsible for the relocation of any existing utilities which may be required as a result of his project. Any required relocation of existing utilities should be completed prior to construction. 3.The Developer and/or Contractor shall be responsible to supply all utility companies with copies of the approved plans and advise them that all grading shall conform to the approved plans, and further that the utility companies shall be responsible for honoring these plans and the finished grades in the installation of their utility lines. 4.All proposed utilities to be located underground. 5.The Developer and/or Contractor shall notify operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. 6.The developer shall be responsible for notifying City of Winchester and all other appropriate utility companies prior to construction of water and/or sanitary sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut sheets, and connections to existing lines. 7.All sanitary sewers, water mains and appurtenances shall be constructed in accordance with the current standards and specifications of City of Winchester. 8.When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to the City of Winchester Public Works Department prior to issuance of grading and/or site development permits. 9.The developer shall be responsible for any damage to the existing streets and/or utilities which may occur as a result of construction within or contiguous to an existing right-of-way or utility. 10.All stormwater piping and structures shown on these plans are only accurate to the inlet or manhole locations as shown hereon. Detail design of stormwater structures were not provided to Greenway Engineering. Actual pipe alignments will be based upon developed structural shop drawings as provided by the manufacturer. Contractor shall make adjustments to pipe alignments base on provided shop drawings. Greenway Engineering will not be held responsible or liable for any discrepancies or changes caused by the structural design. Contractor may submit shop drawings to Greenway Engineering for review and approval at contractor's expense. Shop drawings will be reviewed for compliance with design plans. The Owner or Developer will be responsible for any redesign as a result of structural shop drawing design. 11.All parking lot/street light and dry utility design shall be performed and provided separately by others. All dry utility, structural base design, electrical design, photometrics and or other lighting information shown hereon is as specified by others and is included for informational purposes only, as directed by the Owner, Developer and/or public agency requirements. Greenway Engineering has not performed any lighting and/or dry utility design and does not warrant and is not responsible for the degree and/or adequacy of illumination on this project or the adequacy of the dry utility to service the site. Any changes to the lighting design, once the plan is approved, shall be approved by the County prior to installation. SITEWORK 1.Refer to the Geotechnical Engineer Report for methods, materials and details for construction of all earthwork activities. 2.All vegetation, root material, topsoil, and any other unsuitable material shall be removed from the construction limits of the site before removal or placing of fill material. Earthwork clearing shall extend a minimum of 10' beyond all building and pavement limits with an additional 1 foot of clearance for each foot of fill required. 3.Controlled (Structural) fills shall be compacted to 95% of maximum dry density as determined by method "A" per standard proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable (Non-structural fills 85% to 90%). Structural fills shall extend a minimum of 5' beyond the limits of all foundation elements at bearing elevation. Density shall be certified by a registered professional engineer and results submitted to Frederick County prior to pavement construction. If a geotechnical report has been prepared, it should supersede the requirements in this note. No visual pumping, no rocks larger than 6-inches. Materials classified as OL, OH, MH or PT are not suitable for use as structural fill. All fill should be placed on stable subgrades. Fill should not be placed on surfaces that are muddy or frozen, or have not been approved by testing and/or proof-rolling. All fill material compacted by heavy compaction equipment should be placed in maximum 10-inch loose lifts. All fill material compacted by hand-operated tampers or light compaction equipment should be placed in maximum 4-inch loose lifts. Fill placed on sloping ground should be properly benched into residual soils such that a smooth interface will not be present. Fill material placed below and extending 10 feet beyond the foundations for the structure should be compacted to at least 98% of maximum dry density as determined by the Standard Proctor Test Method (ASTM-D698). 4.All fills greater than 2 feet shall require compaction testing. 5.All fills with slopes steeper than 3:1 or more than 10 feet in height shall require a Slope Stability Analysis. 6.All fill embankments being constructed against slopes of existing embankments or hillsides; or across existing embankments, hillsides, and depressions at a skew angle of 30 degrees or more or slopes are steeper than 4:1 shall be benched in a series of horizontal cuts beginning at the intersection with original ground and continuing at each vertical intersection with the previous cut. Material removed during benching shall be placed and compacted as embankment material. For existing slopes steeper than 4:1 but less than 1 12:1, the bench shall be a minimum of 6 feet wide. For existing slopes steeper than 1 12:1 but less than 12:1, the bench shall be a minimum of 4 feet wide. 7.All pavement sections shown on these approved plans are based on a minimum CBR value of 6 and are for preliminary design only. Final pavement design shall be based upon actual CBR values. The Contractor or Developer shall be responsible for field tests per VDOT standards to obtain actual CBR values for final design. Final pavement designs will be approved by VDOT and/or the Owner/Developer, which ever applicable, prior to installation. GE shall be held harmless from all costs, time delays and/or material changes incurred on any work that is preformed prior to final pavement design approval. 8.Concrete for pads and/or sidewalks shall be a minimum Class A3 or 3000 psi (with air) and shall be placed in accordance to ACI practices or as otherwise specified per structural design. All concrete areas requiring a separate permit shall be designed by a registered professional structural engineer. 9.The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take whatever measures are necessary to insure that public streets are maintained in a clean, mud and dust free condition at all times. 10.Warning signs, markers, barricades or flagmen should be in accordance with the State and Federal Manual on Uniform Traffic Control Devices (MUTCD). 11.The exact location of all guard rails and paved ditches will be determined by VDOT personnel. "A joint inspection will be held with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation (VDOT) to determine if and where guard rail and/or paved ditches will be needed. The developer will be responsible for providing guardrail and paved ditches as determined by this joint inspection." Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. 12.Any changes to the approved Landscape Plan shall be approved approved by the County prior to installation. 13.All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6" diameter and conform to VDOT standard SB-1. 14.Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than one litter receptacle shall be provided at the construction site. 15.All excavations shall be benched according to OSHA regulations to permit safe entry. PERMANENT STORMWATER MANAGEMENT EMBANKMENTS 1.Satisfactory fill materials for use in constructing permanent stormwater management facility embankments shall include materials classified in ASTM D-2487 as GC, GM, SC, SM, CL, or MI groups. Soils must contain a minimum of 20% plus No. 200 sieve and be "Well Graded" material, with no stones greater than 6 inches, mixed with the clay. A minimum of three samples shall be classified. 2.All fill areas shall be "Keyed In" and compacted in horizontal layers not to exceed a maximum loose lift of 8 inches thick. All fill shall be compacted with a sheepsfoot, rubber-tired or vibratory roller to a density of 100% of maximum dry density with a moisture content within +/- 2% of optimum per Standard Procter Test (ASTM D698) or the Modified Proctor Test (ASTM D1557) as director by the geotechnical engineer. Compaction test shall be performed at one test per 5,000 square feet on each layer. 3.Principal spillway must be installed concurrently with fill placement and not excavated into the embankment. All fills beside pipes or structures shall be placed in horizontal layers not to exceed 4 inches in depth and shall be compacted by hand tampers. Fill material shall completely fill all spaces under and beside pipes. Equipment should not be driven within 4 feet of any structure part during backfilling operation and shall never be driven over until compacted fill has been placed to a depth specified by the structural live load capacity of the structure or pipe. 4.Embankments shall be constructed with a relatively impervious core and cutoff trench. Core material shall be classified as GC, SC, or CL. The cutoff trench shall be excavated in impervious material a minimum of depth and width of 4 feet with side slopes no steeper than 1:1 and located at or upstream of the embankment centerline. The impervious core shall extend up to the 10-year water surface elevation (see engineering design). The surface of the embankment shall be covered with a minimum 6 inches of clean topsoil and stabilized with grass. 5.Stormwater management facility earthen embankments shall not be greater than 25' in height measured from the downstream toe of slope to the top of the embankment with embankment slopes no steeper than 2:1and a combined minimum upstream and downstream slope of 5:1. The minimum top width of the embankment shall be 8' for embankments 14' or less in height and shall be level. 6.Any groundwater seepage encountered during cutoff trench construction shall be drained by means of a foundation drain to the outside/ downstream toe of the embankment slope. Foundation drains shall be downstream and outside of the limits of the cutoff trench. The constructed foundation drain section shall be an excavated 2' x 2' trench backfilled with hand compacted #57 stone wrapped in geotextile fabric. 7.A geotechnical or construction inspector should be on site during embankment construction. 8.All embankment construction, compaction testing, and construction inspections shall be the responsibility of the site contractor. CONSTRUCTION STAKE-OUT/ ASBUILTS 1.All stake-out to be performed by GE. If the contractor does not utilize GE for stake-out then the contractor assumes all liability for accuracy of construction. 2.All cutsheet and grades are to be reviewed by Engineer of Record prior to issuance for construction. 3.Asbuilts of the SWM system is required to verify conformance with the approved plans. Please contact GE when installation is complete. 4.All stormwater collection, stormwater management and water quality features must be inspected by Engineer of Record during construction. As-built certification, required to terminate VSMP permit and bond release with the County upon the completion of the project, must be completed by GE. TOPOGRAPHY 1.Topography shown on this plan has been conducted per the VA Administrative code 18VAC10-20-382 and the minimum standards and procedures set forth in chapter 4 (§ 54.1-400 et seq.) of Title 54.1 of the Code of Virginia. This plan shows the design assumptions utilizing these accuracy standards. Inverts and other elevations shown hereon must be field verified by the contractor prior to construction. If a discrepancy is found, the contractor shall cease work in that area and immediately notify Greenway Engineering. Greenway Engineering shall be held harmless for any discrepancies or conflicts if not notified immediately. 2.Contractor shall confirm all existing tie-in points of this project prior to the start of construction. GE shall be notified of any discrepancies between actual field conditions and the approved plan prior to the start of construction. USECLASS * TRIP RATE TRIP GENERATION DATA UNITS/SEATS VPD * TAKEN FROM ITE TRIP GENERATION 9TH EDITION 252 Senior Adult Housing - Attached 63 3.44/unit 216.7 560 Church 84 1.85/seat 155.4 Total = 372.1 FREDERICK COUNTY INSPECTIONS DEPARTMENT NOTES 1. Proposed residential apartments and religious worship structure shall comply with the 2015 Virginia Uniform Statewide Building Code, 2015 Virginia Building Code (VBC); Section 305 Assembly Use Group, Sections 310, Residential Use Group. Other code that applies is ICC A117.1-09 Accessible and Usable Buildings and Facilities and the Virginia Energy Code 2015. 2. Demolition permit is required. An asbestos permit is required. If asbestos is found, an asbestos abatement permit will be required. Retaining walls require a permit and inspections. 3. Proposed structure shall comply with height and area as specified in Table 506 with applicable increases. Building is provided with a NFPA 13 sprinkler system as required. FDC located on the plans. 4. Location of the structure from adjacent property lines shall comply with T601/602 of the Virginia Building Code. 5. All required egress shall be handicap accessible. Handicap parking shall be provided per Section 1106.6 (Where multiple accessible entrances are provided; parking shall be dispersed). Signage shall comply with VBC 1106.8. 6.Special inspection requirements of Chapter 17 of VBC shall apply to this type of structure (soils, concrete, steel, etc.) FREDERICK WATER CONSTRUCTION NOTES 1. Frederick Water’s Water and Sewer Standards and Specifications are available at www.frederickwater.com 2. The contractor shall adhere to Frederick Water standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by Frederick Water. 4. The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. Frederick Water shall furnish all needed material and make the tap. a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made. 6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water’s inspector. 7. Frederick Water’s maintenance division shall furnish and install all water meters through 2 inch in size. It is the contractor’s responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed: a. The meter box, with its frame and cover, must be properly aligned with the yoke bar. b. The frame and cover shall be set to final grade. c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches. d. All components of the meter box assembly shall be in proper working order. 8. For services that connect to existing lines: a. Frederick Water shall furnish and install: i. all ⅝”x¾”, ¾”, 1”, 1½” and 2” water services ii. all sewer services. b. The owner/developer shall: i. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water’s engineering assistant. ii. submit an Application for Service and pay the required fees. 9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 10. All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any privately owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. 11. Frederick Water shall review the mechanical plan(s) for design and material approval of a building’s: a. domestic water meter and its backflow prevention device, and/or its b. Fire service line’s water meter and backflow prevention device. 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEQ’s Certificate to Operate and a copy of the station’s DEQ approved O&M manual. These documents must be received before substantial completion is issued and water meters released. January 2019 FREDERICK WATER PROJECT INFORMATION WATER AND SANITARY SEWER USAGE WATER DEMAND 19,732 GPD SANITARY SEWER DISCHARGE 19,732 GPD Calculation of demand/discharge WATER DEMAND *Residential: 235 gpd per connection *Commercial: 75 gpd per 1,000 sf *Industrial: 25 gpd @ 10 persons per acre SEWER DISCHARGE Sewer discharge equals water demand 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING N 32°06'42" E 918.87'S 26°58'44" E 339.07'S 35°50'07" W 685.31' EX 1 EX 2 EX 4 EX J EX L EX K EX 2A EX K1 EX K2 N 71°45'25" W 253.81 ' EX 3 EX K1A 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNOTES: 1.PROPERTY OWNER IS TO CONSERVE THE 50' MATURE WOODLAND FULL SCREEN FOR RESIDENTIAL SEPARATION BUFFER. THE PROPERTY OWNER IS NOT ALLOWED TO CLEAR THIS VEGETATION. 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING N 32°06'42" E 918.87'S 26°58'44" E 339.07'S 35°50'07" W 685.31' EX 1 EX 2 EX 4 EX J EX L EX K EX 2A EX K1 EX K2 N 71°45'25" W 253.81 ' EX 3 EX K1A DEMO EX. PVMNT (TYP) DEMO EX. UTILITY POLE (TYP) DEMO EX. LIGHT POLE (TYP) DEMO EX. LIGHT POLE (TYP) DEMO EX. GAS DEMO EX. SAN SEW DEMO EX. STRUCTURAL STEEL AND CONCRETE FOOTERS (TYP) DEMO EX. FIRE PIT DEMO EX. PVMNT (TYP) DEMO EX. STORM CULVERT (TYP) DEMO EX. ELECT (TYP) DEMO EX. ELECT (TYP) DEMO EX. ELECT (TYP) DEMO EX. 1 STORY BUILDING CAP EX. GAS LINE TO REMAIN IN PLACE DEMO EX. 2-STORY BUILDING DEMO EX. SAN SEW DEMO EX. SIGNS (TYP) DEMO EX. SIGN (TYP) DEMO EX. SIGN (TYP) RELOCATE EX. UTILITY POLE RELOCATE EX. MAILBOX EX. SAN SEW MH TO REMAIN DEMO EX. SIGNS (TYP) DEMO EX. GAS METER AND HVAC UNITS DEMO EX. SAN SEW DEMO EX. STORM DEMO EX. STM SEW DEMO EX. STM SEW EX. WATERLINE TO REMAIN. (CONNECTS TO ADJACENT PROPERTIES) RELOCATE IF NECESSARY RELOCATE IF NECESSARY 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNOTES : 1.DEMOLITION SCHEDULE SHALL BE SET BY THE CONTRACTOR. THIS SHEET IS TO DELINEATE, AT MINIMUM, ITEMS REQUIRING REMOVAL FOR CONSTRUCTION. 2.EXISTING UTILITIES TO BE RELOCATED AS NECESSARY FOR CONSTRUCTION OF PROPOSED SITE AND INFRASTRUCTURE. LEGEND STORM SEWER AND SANITARY SEWER PIPE DEMOLITION PAVEMENT AND BUILDING DEMOLITION GAS AND ELECTRIC DEMOLITION EX 1 EX 2 EX 4 EX J EX L EX K EX K1 EX K2 EX 3 EX K1A 22 23 TO CFS #3 DA=0.50 AC C=0.60 (SEE NOTE 5) TO CFS #4 DA=0.14 AC C=0.60 (SEE NOTE 5) TO CFS #5 DA=0.37 AC C=0.60 (SEE NOTE 5) TO CFS #6 DA=0.28 AC C=0.60 (SEE NOTE 5) TO CFS #7 DA=0.14 AC C=0.60 (SEE NOTE 5) TO SB DA=5.12 AC C=0.56 TO CFS #8 DA=0.34 AC C=0.60 TO CFS #2 DA=0.17 AC C=0.60 TO CFS #1 DA=0.37 AC C=0.60 12" COMPOST FILTER SOCK EX. WETLAND, STREAM AND RIPARIAN BUFFER ARE CRITICAL AREAS TO PROTECT EX. WETLAND, STREAM AND RIPARIAN BUFFER ARE CRITICAL AREAS TO PROTECT TO CFS #7A DA=0.09 AC C=0.60 (SEE NOTE 5) 82 20 GND 74 20 INV 72 00 INV 10 11 12 82 20 GND 82 20 GND8220 GND 90 00 INV "UPPER" DIVERSION DITCH "LOWER" DIVERSION DITCH 674672671680678680678678 676 675 676 694692690688686684682690 690 692 692 694 694 696 68668468868 0 68 2 68 2 68 4 68 8 TEMPORARY LINING NA GREEN DS150 OR APPROVED EQUAL TEMPORARY LINING NA GREEN C125BN OR APPROVED EQUAL SEDIMENT BASIN BAFFLE PROP. SANITARY SEWER. PROP. SANITARY SEWER. PROP. RETAINING WALL PROP. RETAINING WALL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING603001530 SCALE: 1" = 30' FOR PHASE I EROSION AND SEDIMENT CONTROL ONLY  NOTES: 1.SLOPES 3:1 AND GREATER SHALL BE PROTECTED WITH SOIL STABILIZATION BLANKETS (EC-2). 2.SUPER SILT FENCE AND ACF ENVIRONMENTAL SMART FENCE OR FILTREXX COMPOST FILTER SOCK MAY BE USED IN LIEU OF ONE ANOTHER WITH VARIANCE FROM FREDERICK COUNTY. 3.ALL COMPOST FILTER SOCKS ARE 8" SIZE UNLESS NOTED OTHERWISE. FILTER SOCKS SHALL BE PLACED ON LEVEL CONTOUR AND ENDS PLACED UPSLOPE TO PREVENT RUNOFF FROM BYPASING. 4.DRAINAGE DIVIDES (GRAY COLOR) FOR COMPOST FILTER SOCKS (CFS#3-#8) ARE INITIAL DIVIDES TO THE SOCKS DURING SITE CLEARING OPERATIONS AND SIZING OF THE SOCKS ARE BASED ON THESE AREAS. AS THE RETAINING WALL IS INSTALLED AND FILL OPERATIONS BEGIN THE DRAINAGE AREAS WILL BE REDUCED TO THE SOCKS AND MAJORITY OF THE DRAINAGE AREAS WILL BE DIVERTED TO THE SEDIMENT BASIN (DRAINAGE DIVIDE CYAN COLOR). EROSION/SEDIMENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION CE3.02 LCG LIMITS OF CLEARING & GRADING DRAINAGE DIVIDES PERMANENT SEEDING3.32 PS CRITICAL AREA - DISTURBANVCE IN CRITICAL AREAS TO BE KEPT TO A MINIMUM. ANY DISTURBED AREAS TO BE SEEDED, MULCHED AND TACKED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SF SILT FENCE3.05 STORM DRAIN INLET PROTECTION3.07 IP SMF SMART FENCE CFS COMPOST FILTER SOCK ROCK CHECK DAMSCD3.20 CIP CULVERT INLET PROTECTION3.08 DD TEMPORARY DIVERSION DIKE3.09 TSD TEMPORARY SLOPE DRAIN3.15 OP OUTLET PROTECTION3.18 DRAINAGE DIVIDE TO SEDIMENT BASIN MATCH LINE SHEET 8 696694692 690684690686688692 696 690692 694696698690690692692 694 696 690692 694 690 688 6 9 0 688EX1EX2EX4 EX2CN 71°45'25" W 253.81'EX3STAIRS (5R)5' S/W74.02'105.98'88.8'113114125476934A21208A82223LIGHT POLE(TYP)116TO 6 DA=12.26 AC. C=0.40 TO 4A DA=1.39 AC. C=0.35 TO 5 DA=0.40 AC. C=0.33 TO 2 DA=0.11 AC. C=0.85 TO 9 DA=0.11 AC. C=0.53 TO EX. 2 DA=1.68 AC. C=0.37 TO EX. 2C DA=1.41 AC. C=0.73 TO 21 DA=6.81 AC. C=0.44 TO 8A DA=0.03 AC. C=0.86 TO 8 DA=0.02 AC. C=0.88 TO 3 DA=0.18 AC. C=0.69 TO 4 DA=0.05 AC. C=0.30 TO 23 DA=0.64 AC. C=0.58 TO 116 DA=0.06 AC. C=0.90 TO EX. 2B DA=15.31 AC. C=0.38EX1EX2 EX4EX2CEX32223TO CFS #2 DA=0.17 AC C=0.60 12" COMPOST FILTER SOCK TO CFS #1 DA=0.37 AC C=0.60 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGFOR PHASE I & II EROSION AND SEDIMENT CONTROL ONLY  NOTES: 1.SLOPES 3:1 AND GREATER SHALL BE PROTECTED WITH SOIL STABILIZATION BLANKETS (EC-2). 2.SUPER SILT FENCE AND ACF ENVIRONMENTAL SMART FENCE OR FILTREXX COMPOST FILTER SOCK MAY BE USED IN LIEU OF ONE ANOTHER WITH VARIANCE FROM FREDERICK COUNTY. 603001530 SCALE: 1" = 30' 603001530 SCALE: 1" = 30' EROSION & SEDIMENT CONTROL PHASE I VIEW EROSION & SEDIMENT CONTROL PHASE II VIEW MATCH LINE SHEET 7 MATCH LINE SHEET 9 EROSION/SEDIMENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION CE3.02 LCG LIMITS OF CLEARING & GRADING DRAINAGE DIVIDES PERMANENT SEEDING3.32 PS CRITICAL AREA - DISTURBANVCE IN CRITICAL AREAS TO BE KEPT TO A MINIMUM. ANY DISTURBED AREAS TO BE SEEDED, MULCHED AND TACKED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SF SILT FENCE3.05 STORM DRAIN INLET PROTECTION3.07 IP SMF SMART FENCE CFS COMPOST FILTER SOCK ROCK CHECK DAMSCD3.20 CIP CULVERT INLET PROTECTION3.08 DD TEMPORARY DIVERSION DIKE3.09 TSD TEMPORARY SLOPE DRAIN3.15 OP OUTLET PROTECTION3.18 MATCH LINE SHEET 8AMATCH LINE SHEET 8A 696694692 696 690692 694696698698690692 694 696 690692 694 690 6 9 0 688EX4N 71°45'25" W 253.81'EX3FUTURE PRAYER LABYRINTH5' S/W74.02'39.01'105.98'88.8'112113114542066FUTURE CHURCHADDITIONFFE:696.50'34A21202223LIGHT POLE(TYP)SCREENING FENCESEE SHEET ##.116COMPOST FILTER SOCK DIVERSION TO 6 DA=12.26 AC. C=0.40 TO 4A DA=1.39 AC. C=0.35 TO 5 DA=0.40 AC. C=0.33 TO 9 DA=0.11 AC. C=0.53 TO 21 DA=6.81 AC. C=0.44 TO 3 DA=0.18 AC. C=0.69 TO 4 DA=0.05 AC. C=0.30 TO 23 DA=0.64 AC. C=0.58 TO 116 DA=0.06 AC. C=0.90 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGFOR PHASE I & II EROSION AND SEDIMENT CONTROL ONLY  NOTES: 1.SLOPES 3:1 AND GREATER SHALL BE PROTECTED WITH SOIL STABILIZATION BLANKETS (EC-2). 2.SUPER SILT FENCE AND ACF ENVIRONMENTAL SMART FENCE OR FILTREXX COMPOST FILTER SOCK MAY BE USED IN LIEU OF ONE ANOTHER WITH VARIANCE FROM FREDERICK COUNTY. 603001530 SCALE: 1" = 30' EROSION & SEDIMENT CONTROL PHASE I & II VIEW MATCH LINE SHEETS 7& 9 EROSION/SEDIMENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION CE3.02 LCG LIMITS OF CLEARING & GRADING DRAINAGE DIVIDES PERMANENT SEEDING3.32 PS CRITICAL AREA - DISTURBANVCE IN CRITICAL AREAS TO BE KEPT TO A MINIMUM. ANY DISTURBED AREAS TO BE SEEDED, MULCHED AND TACKED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SF SILT FENCE3.05 STORM DRAIN INLET PROTECTION3.07 IP SMF SMART FENCE CFS COMPOST FILTER SOCK ROCK CHECK DAMSCD3.20 CIP CULVERT INLET PROTECTION3.08 DD TEMPORARY DIVERSION DIKE3.09 TSD TEMPORARY SLOPE DRAIN3.15 OP OUTLET PROTECTION3.18 EX 1 EX 2 EX 4 EX J EX L EX K EX K1 EX K2 EX 3 EX K1A STAIRS (5R) FUTURE PRAYER LABYRINTH 5' S/W 5' S/W74.02 ' 39.01'34.02'39.2' 105.98'88.8'100 101 102 102A 103 103A 104 104B 106 106A 106B 109F 109D 109C 109A 111 111A 112 113 114 200 201202 203 202A 204 205 1 2 5 4 108 105 107 110A 104A 10 11 12 109E 206 DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLA S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POL L U T E DUCTIL E I R O N NYLO P L A S T DRAINS T O W A T E RW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 7 115 6 9 80.81'3 4A 21 20 8A 8 22 23 116 109 696694692690684 690 696696 69 6 69669469469 2 692 694 696 696 686 688 692 6 9 6 6 9 4 696696696 696 674673.6673.5672671680678686688690682684680678682.5686688690692694682684686688690692694688 686 690 692 694686688690684682.6682.5682680692690692 694 696 698 698 696 698 6 8 5 6 8 5 685 678 676 675 690 676 678 680 682 684 6 8 6 6 8 8 6 9 0 696 69469669469269469669 0 692694690688690688TO 6 DA=12.26 AC. C=0.40 TO 4A DA=1.39 AC. C=0.35 TO 5 DA=0.40 AC. C=0.33 TO 2 DA=0.11 AC. C=0.85 TO 108 DA=0.39 AC. C=0.70 TO 103A DA=1.88 AC. C=0.54 TO 101 DA=0.13 AC. C=0.59 TO 200 DA=0.22 AC. C=0.75 TO 103 DA=0.11 AC C=0.79 TO 102A DA=0.08 AC. C=0.75 TO 201 DA=0.22 AC. C=0.80 EX. WETLAND, STREAM AND RIPARIAN BUFFER ARE CRITICAL AREAS TO PROTECT EX. WETLAND, STREAM AND RIPARIAN BUFFER ARE CRITICAL AREAS TO PROTECT SEDIMENT BASIN BAFFLE TO 206 TO 111ATO 114 TO 205 TO 205 & 111A TO 111A TO 202A TO 202ATO 106 TO 106 TO 104BTO 106B TO 109F TO 102 DA=0.09 AC. C=0.76 TO 115 DA=0.51 AC. C=0.62 TO 8A DA=0.03 AC. C=0.86 TO 9 DA=0.11 AC. C=0.53 TO 3 DA=0.18 AC. C=0.69 TO 4 DA=0.05 AC. C=0.30 TO 21 DA=6.81 AC. C=0.44 TO 116 DA=0.06 AC. C=0.90 TO 8 DA=0.02 AC. C=0.88 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNOTES: 1.SLOPES 3:1 AND GREATER SHALL BE PROTECTED WITH SOIL STABILIZATION BLANKETS (EC-2). 2.SUPER SILT FENCE AND ACF ENVIRONMENTAL SMART FENCE OR FILTREXX COMPOST FILTER SOCK MAY BE USED IN LIEU OF ONE ANOTHER WITH VARIANCE FROM FREDERICK COUNTY. FOR PHASE II EROSION AND SEDIMENT CONTROL ONLY EROSION/SEDIMENT CONTROL LEGEND NO. KEY SYMBOL DESCRIPTION CE3.02 LCG LIMITS OF CLEARING & GRADING DRAINAGE DIVIDES PERMANENT SEEDING3.32 PS CRITICAL AREA - DISTURBANVCE IN CRITICAL AREAS TO BE KEPT TO A MINIMUM. ANY DISTURBED AREAS TO BE SEEDED, MULCHED AND TACKED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SF SILT FENCE3.05 STORM DRAIN INLET PROTECTION3.07 IP SMF SMART FENCE CFS COMPOST FILTER SOCK ROCK CHECK DAMSCD3.20 CIP CULVERT INLET PROTECTION3.08 DD TEMPORARY DIVERSION DIKE3.09 TSD TEMPORARY SLOPE DRAIN3.15 OP OUTLET PROTECTION3.18 MATCH LINE SHEET 8 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGMINIMUM CONSTRUCTION STANDARDS An erosion and sediment control program adopted with this plan must be consistent with the VSECH for 9VAC25-840-40 minimum standards: 1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2.During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. 5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 100-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14.All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15.The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches. c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with this chapter. f.Applicable safety requirements shall be complied with. 17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. 18.All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19.Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b.Adequacy of all channels and pipes shall be verified in the following manner: (1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2)(a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b)All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c)Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system. c.If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1)Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks; or (2)Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances; (3)Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or (4)Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d.The applicant shall provide evidence of permission to make the improvements. e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f.If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g.Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h.All on-site channels must be verified to be adequate. i.Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j.In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k.All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. l.Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act. m.For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act. n.Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19. EROSION AND SEDIMENT CONTROL NARRATIVE Description: The project proposes redevelopment of an existing church with a new church and senior housing apartment. This project will also include improvements to Senseny Road at the existing entrace of the site. The property is zoned RP and is located off of Senseny Road Route 657 in Frederick County, Virginia. A total of 5.62 will be disturbed for construction. Date of construction: Construction will begin following plan approval and will take approximately twelve (12) months to complete. Existing site conditions: The site is currently used as a place for worship for the community and consists of the existing church building, paved parking, some maintained grass areas and woods to the east. The site primary drains east to west to an intermittent stream that follows the west property line and flows south to north. All of the site areas drain to the intermittent stream which is a unnamed tributary to Abrams Creek. Typical slopes range between 2% and 40%. Adjacent areas: The site is bounded by Senseny Road Route 657 on the south. To the west is an existing school which is zoned RP. Located to the north are existing apartments zoned RP. A vacant parcel zoned B1, townhouses and apartments zoned RP are located to the east. Offsite areas: We are proposing road improvements to Senseny Road and some grading on lot TM 54-A-127C (vacant parcel) for a roadside ditch for Senseny Road. Parcels TM 54E-7-27 & 54E-7-29 will also have some grading and storm sewer adjustment for Senseny Road improvements. Soils: The existing soil conditions were obtained from the NRCS Soils Survey. Refer to the soils map this sheet. Critical areas: There is an intermittent steam and wetland located along the west property line. There is also a Riparian Buffer associated with the stream. These are the critical areas and extra care should be taken to preserve these areas and avoid release of sediment into the stream and wetlands. The stream and wetland can not be disturbed without an USACE permit. Erosion And Sediment Control Measures: Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. Structural Measures: Phase I: Install Temporary Construction Entrance with Wash Rack (3.02) as shown on the plan to minimize sediment carried onto roadway. Install perimeter E&S trapping controls silt fence (3.05), compost filter sock (super silt fence/smart fence) as shown on the plans to intercept and detain sediment from disturbed areas during construction in order to prevent sediment from leaving the site. Super silt fence, and smart fence may be used in lieu of compost filter sock. Install inlet protection (3.07) and culvert inlet protection (3.08) shall be located at culvert and inlet entrances as shown to prevent sediment from entering, accumulating in and being transferred by the culvert prior to permanent stabilization of the disturbed area. Install proposed sanitary sewer line. Install the outfall for the proposed SWM dry pond and modify the outfall to function as a sediment basin (3.14) as shown on the E&S details. The majority of the cut for this site will be from the area of the SWM pond and the SWM pond can function as a sediment basin during grading operations until the site is stabilized. Install temporary diversion dikes (3.09) and diversion (3.12) ditch as shown on the plans to divert runoff to the sediment basin. Immediately stabilize all berms and dikes. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Phase II: Phase I controls shall remain into Phase II for the duration of the project to the extent practical and/or until drainage area is stabilized. Install inlet protection (3.07) and culvert inlet protection (3.08) after proposed storm sewer structures are installed. Install rock check dams (3.20) as shown on the plans to reduce the velocity of concentrated stormwater flows and to trap sediment generated from adjacent areas or the ditch itself. Outlet protection (3.18) shall be installed on all outlets as shown on the plan sheets. Fill slope surface shall be left in a roughened condition to reduce erosion, see Plate 3.29-4. Contractor shall redirect the concentrated flow away from the fill slope by installing diversion dike and divert the runoff to sediment traps or sediment basins. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Vegetative Measures: Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than one year. Topsoil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary vegetation immediately after grading. All earth berms, diversions and sediment trap embankments are to be machine-compacted, seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover immediately after construction Erosion control mats shall be installed over steep (3:1) cut and fills slope which have been brought to final grade and seeded to protect from rill and gully erosion. Management Strategies: Construction shall be sequenced such that grading operations will begin and end as quickly as possible. The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. Maintenance of these measures throughout the project is critical to the effectiveness of the program. After areas above controls have been stabilized, the controls shall be cleaned up and removed. Electric power, telephone, storm, sanitary, water & gas supply trenches are to be compacted, seeded and mulched within five (5) days after backfilling. No more than 500 feet are to be open at any one time. All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the check dams shall be removed. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment Control Handbook. Stormwater Management: Increased runoff from this development will be controlled by the Project's stormwater management facilities. Maintenance Program: All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24-hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Inlet protection shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Erosion and sediment control program: Phase I 1.Hold pre-construction meeting on site with inspector. 2.Install construction entrance. 3.Clearing and grubbing for sediment control devices only (Perimeter E&S controls, diversion dikes, and silt fence). 4.Placement of sediment control devices. 5.Obtain inspector's approval prior to installation of the proposed sanitary sewer main. 6.Install gravity sewer line. Contractor to seed and stabilize areas disturbed within the riparian buffer immediately. 7.Install sediment basin and SWM outfall structure with modifications to function as a sediment basin. 8.Install diversion dikes and diversion ditches. 9.Clear and grub main area of site protected by installed E&S controls. 10.Obtain inspector's approval prior to beginning grading operations. Phase II 11.Begin earth moving activities and rough grade remainder of site. Install retaining wall with fill placement (rough grading). Place fill to allow runoff to drain towards the sediment basin to filter sediment laden runoff by working in a south to north direction. 12.Install storm drainage devices with sediment control measures (inlet protection). 13.Final grading. 14.Restoration and stabilization of disturbed areas. 15.Contractor to provide 100% vegetation in any area disturbed within the riparian buffer. 16.Remove erosion and sediment control measures with the approval of the inspector. Note: The Frederick County Public Works and Engineering Department retain the right to add and/or modify these erosion and sediment control measures during the construction process, within reason, to ensure adequate protection to the public and the environment. Seeding schedule (soil stabilization): 1.All permanent seeding shall be in accordance with section 3.31 & 3.32 of the VESCH. 2.Spread topsoil at a minimum depth of four (4) inches. 3.Incorporate pulverized agricultural limestone into the topsoil at a rate of 92 lbs. per 1,000 square feet (2 tons per acre). 4.Fertilize with 10-10-10 fertilizer at a rate of 23 lbs per 1,000 square feet (1,000 lbs per acre). 5.Seed all areas with a seed mix consisting of 67% Kentucky 31 Tall Fescue and 33% Red Top Clover. 6.Mulch all seeded areas with straw mulch applied at a rate of 3,500 lbs per acre anchored with cutback or emulsified asphalt applied at a rate of 200 gallons per acre. Dust control: 1.Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic. 2.All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and repeated as needed to control dust. VARIANCE REQUEST - SMARTFENCE & COMPOST FILTER SOCK: We are requesting the use of an alternative erosion and sediment control measures that is not listed in the Virginia Erosion and Sediment Control Handbook. 1.ACF Environmental - Smartfence: Smartfence is an perimeter erosion control device equivalent to super silt fence, see detail on sheet 11. 2.Filtrexx - Compost Filter Sock: Compost filter sock is equivalent to super silt fence, see detail on sheet 11. This will allow for less disturbance since it can be installed on the surface and requires no excavation. 3.ACF Environmental - CRAFS: CRAFS is a corrugated retention and filtration system for sediment control at areas of concentrated runoff with 95% sediment trapping efficiency, see detail on sheet 11. 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSEDIMENT BASIN CONVERSION TO SWM BASIN NOTES: 1.THE DETAIL ABOVE SHOWS THE PERMANENT RISER AND OUTFALL STRUCTURE IN COLOR GRAY AND TEMPORARY E&S MODIFICATIONS TO THE SEDIMENT BASIN ARE SHOWN IN BLACK. 2.INSTALL PRINCIPAL RISER , OUTLET PIPE, AND DAM EMBANKMENT AS SHOWN ON SWM POND DETAIL SHEETS. 3.E&S MEASURES TO REMAIN UNTIL UPSTREAM AREAS ARE PERMANENTLY STABILIZED. 4.DURING E&S PHASE, WHILE IN USE AS A SEDIMENT BASIN, THE PRINCIPAL RISER SHALL BE MODIFIED AS SHOWN ABOVE. TEMPORARILY BLOCK WEIR AND ORIFICE OPENINGS AND INSTALL TEMPORARY DEWATERING ORIFICE AND DEWATER DEVICE. 5.TO CONVERT FROM SEDIMENT BASIN TO SWM BASIN -DEWATER BASIN AS NECESSARY USING PUMPED WATER FILTER BAG. -REMOVE ALL ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE BASIN. -REGRADE BASIN BOTTOM TO MATCH PROPOSED GRADING SHOWN ON THE GRADING PLAN AND POND DETAIL SHEETS. -REMOVE TEMPORARY DEWATERING DEVICE AND GROUT DEWATERING ORIFICES CLOSED (UNLESS OPENING IS PROPOSED WITH SWM BASIN). -REMOVE TEMPORARY BLOCKING. -SEE SHEET 23 FOR SWM BASIN DETAILS. 30" RCP ASTM C-361 (RUBBER GASKETS W.T. JOINTS) 4' 2.6' **THE 100 YEAR WATER SURFACE ELEVATION (WSE) ASSUMES ALL OPENINGS BELOW THE TOP OF THE RISER ARE CLOGGED AND THE STARTING WSE IS AT THE TOP OF THE RISER. 3 : 1 12' WIDE PROP. GRADE 1 YR WS ELEV 677.60' 10 YR WS ELEV 678.99' 100 YR WS ELEV 680.01'** SWM BASIN PRINCIPAL RISER MODIFIED FOR SEDIMENT BASIN NTS TOP OF RISER ELEV =679.20 TOP OF BERM ELEV.=682.20 TYP.TRASH RACK BY PLASTIC SOLUTION OR APPROVED EQUAL 6.0" ORIFICE INV.=672.00 INV.=674.80 2' CLAY LINER WITH 6" TOPSOIL CAP TERMINATE LINER @ 10 YR WSE 4000 PSI CONCRETE PRECAST RCP BASE AND RISER STRUCTURE (VDOT) - SWM-1 SQUARE INSIDE 4' x 4' CONCRETE FILL FOR BUOYANCY NORMAL POOL WS ELEV 675.00' INV.=675.00 12" SCH 40 PVC WEIR ELEV = 677.80 2.0' W x 0.67' H VDOT EW-1 (SEE LOW FLOW ORIFICE DETAIL, THIS SHEET) ELEV = 672.20 BLOCK OPENING TEMP. PERFORATED POLYETHYLENE DRAINAGE PIPE (6") DEWATERING SYSTEM SEE DETAIL THIS SHEET INSTALL 4" DEWATERING ORIFICE = 676.50 BLOCK OPENING DRY STORAGE ELEV 679.20' (VOL=1,165.99 CU.YDS.) GRADE 671.0 AT BOTTOM OF SB WET STORAGE ELEV 669.50' (VOL=430.04 CU.YDS.) 100 YR WS ELEV 680.02' N 32°06'42" E 918.87'S 26°58'44" E 339.07'S 35°50'07" W 685.31' EX 1 EX 2 EX 4 EX J EX L EX K EX K1 EX K2 N 71°45'25" W 253.81 ' EX 3 EX K1A 10 10 11 4 5 5 5 5 4 5 10 8 12 STAIRS (5R) CG-6 CG - 6 R 5' S/W 5' S/W 5' S/W C G - 6 CG-6 CG-6 CG-6 CG-6 CG-6CG-6R EX. SAN. ESMT TO BE VACATED R=35'R= 5 0 'R=5'R=3 5 ' R=6 0 ' R = 3 5 ' R=5' R = 5 ' R=4.5'R=20'R=2 5'R=5'R = 2 0 ' R=5'R=5' R= 2 5 ' R= 5 'R=3'R=4.5'R=10'R= 5 'R=4.5'R=12' R = 5 'R= 3 8 'R=5'R=5'R=5'R= 5 'R= 1 2 ' R=5'R= 5 ' R=12'R=5'R= 5 'R= 5 'R= 5 'R= 5 ' R=5'R=5' R=5' R=12'R= 1 2 'CG-6R CG-6R CG-6R CG-6R CG-6RCG-6RCG-6RCG-6CG-6CG-6R CG-6R FUTURE PRAYER LABYRINTH 5' S/W 5' S/W5' S/W221.52'59.02'59.02'111.84'74.02 ' 39.01'34.02'39.2' 12 '5' S/W14'22 . 7 3 ' 5' S/W 105.98'56.75'332.3 8 '88.8'93.23'TRASH ROOM 100 101 102 102A 103 103A 104 104B 106 106A 106B 109F 109D 109C 109A 111 111A 112 113 114 200 201202 203 202A 204 205 1 2 5 4 108 105 107 110A 104A 10 11 12 109E 206 DUCTILE IRO N DO NOT POL L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IR O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTIL E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPL A S T DUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAY S NYLOPLAST DUCTIL E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPL A S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLL U T E DUCTILE I R O N NYLOP L A S T DRAINS TO W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 7 115 6 9 TEMP. GRADING ESM'T 5' S/W67.2'99.1'90.2'209 . 8 '42.5'CG-2 R=8' R=1 5 ' R = 4 7 ' R=35' R=20'80.81'175.68' R=20' 3 4A 21 20 8A 8 CG-6CG-6CG- 6 22 23 20'30' 20'40'9' TYP20'24'22'20'22'20' 23.5' 9' TYP 20'24'20'10'20'22'20'10'20'24'20'9' TYP 24' 73' 24'20' 9' TYP 9' TYP 11'9' TYP 11'9' TYP20.5'20.52'20.5'20.91'24'RETAINING WALL W/ HANDRAIL (STRUCTURAL DESIGN BY OTHERS) ACCESSIBLE SPACE TYP. SEE NOTE 6, MAX SLOPE 2% ALL DIRECTIONSACCESSIBLE SPACE TYP. SEE NOTE 6, MAX SLOPE 2% ALL DIRECTIONS CURB TRANSITION CG-6R TO CG-6 (TYP) CG-12B CG-12B 5' S/W DUMPSTER PAD FUTURE STORAGE PAD (10'x10') R=5' R=5' TEMPORARY GRADING ESM'T CONC. S/W (5'x5') CURB CUT (2' W) SCREENING FENCE SEE SHEET 35.SCREENING FENCE SEE SHEET 35. ROW DEDICATION PROP. SAW TOOTH CURB (TO PROVIDE OVERLAND RELIEF), 5- OPENINGS, SEE DETAIL SHEET 31 12' TRAIL INGRESS/ EGRESS ESM'T. CG-12B CG-12B PROP. 10' ASPHALT TRAIL EX. SAN. ESMT TO BE VACATED PRIVATE PUMP STATION (SEE DETAILS) PUMP STATION CONTROL PANEL (SEE DETAIL)STANDBY GENERATOR (SEE SHEET 24A) 116 CG-12B 109 CG-12B12'20' FITNESS ROOM COMMUNITY ROOM 9'9'18'20' 9'9' 20'25' 12' DUMPSTER APRON BOLLARDS (TYP.) NOSE DOWN CURB NOSE DOWN CURB CURB FLUSH W/EP FENCE W/DOUBLE GATE (DESIGN BY OTHERS) FENCE W/DOUBLE GATE (DESIGN BY OTHERS) BLACK CHAIN LINK FENCE GATES (DESIGN BY OTHERS) BLACK CHAIN LINK FENCE (TYP.) PROPOSED BUILDING 4 STORY SENIOR RESIDENTIAL (63 UD UNITS) 16,440 SF FUTURE BUILDING ADDITION CHURCH 4,050 SF 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGACCESSIBLE ROUTE -MAX. RUNNING SLOPE 5% -MAX. CROSS SLOPE 2% KEY CHURCH & ACCOMPANYING PARKING SPACES NOT IN VHDA CONTRACTMATCH LINE SHEET 15UNIVERSAL DESIGN GENERAL NOTES: 1.RESIDENTIAL BUILDING DEVELOPED WITH 43 ONE BEDROOM AND 20 TWO BEDROOM UNITS FOR A TOTAL OF 63 UNITS. 63 U.D. UNITS. U.D. UNIT PER U.D. REQUIREMENTS. 2.ACCESSIBLE ROUTE MAX RUNNING SLOPE 5% AND MAX CROSS SLOPE 2%. 3.ACCESSIBLE ROUTE DOES NOT TRAVEL BEHIND OR THROUGH PARKING SPACES. 4.ALL HANDICAP (HC) SPACES SIZED FOR VAN ACCESS. 5.ALL SIDEWALK 5' WIDTH UNLESS NOTED OTHERWISE. NO SIDEWALK LESS THAN 5' WIDTH. 6.PROPOSED 94 PARKING SPACES WITH 8 ACCESSIBLE SPACES SHOWN. 65 PARKING SPACES ARE AVAILABLE FOR PROJECT WHICH INCLUDES 6, ALL VAN ACCESSIBLE, HANDICAP PARKING SPACES. THE REMAINING 29 SPACES (2 HC SPACES) ARE PROVIDED FOR THE CHURCH AND NOT IN VHDA CONTRACT. 7.ALL CURB CUTS U.D. COMPLIANT. 8.MAIL BOXES FOR RESIDENTIAL UNITS LOCATED INTERNAL TO THE BUILDING. 9.GARBAGE COLLECTION FOR RESIDENTIAL UNITS LOCATED INTERNAL TO THE BUILDING. 10.HC SPACES TO BE PROVIDED WITH ACCESSIBLE ROUTES WITH U.D. COMPLIANT ACCESSIBLE RAMPS (8.33% MAX RUNNING SLOPE, 2.00% MAX CROSS SLOPE). 11.ONE SET OF EXTERIOR STAIRS IS NOT LOCATED WITHIN THE ACCESSIBLE ROUTES. NOTES 12.CONTRACTOR RESPONSIBLE FOR MAINTAINING ACCESS TO THE EXISTING MAILBOXES ALONG SENSENY ROAD DURING CONSTRUCTION AND RESETTING MAILBOXES IF IMPACTED BY ROAD IMPROVEMENTS. 13.PROPERTY OWNER IS TO CONSERVE THE 50' MATURE WOODLAND FULL SCREEN FOR RESIDENTIAL SEPARATION BUFFER. THE PROPERTY OWNER IS NOT ALLOWED TO CLEAR THIS VEGETATION. 14.A 10' WIDE TRAIL IS PROPOSED ACROSS THE PROPERTY FRONTAGE, A 545 SF FITNESS ROOM WITH 3 PIECES OF EQUIPMENT AND 1,082 SF COMMUNITY ROOM ARE PROPOSED INTERNAL TO THE BUILDING TO QUALIFY FOR RECREATION FACILITIES. TO SATISFY RECREATIONAL REQUIREMENTS THE FITNESS ROOM AND COMMUNITY ROOM SHALL REMAIN RECREATION SPACES UNLESS AN APPROVED ALTERNATIVE IS PROVIDED. EX1EX2EX4EX2CEX3STAIRS (5R)5' S/W113114125476934A21208A82223LIGHT POLE(TYP)11610+0011+001 0 + 0 0 10+1 0 . 7 8 10+75. 3 1 10+86. 3 9 11+00 11+22.20 11+86.40 10+00 11+00 10+00 11+00 12+0012+52.06PROP. ASPHALT PAVEMENT WIDENING TYP. (SEE WP-2 DETAIL SHEET 31) MEET & MATCH EX. PAVEMENT PROP. 1" SM-9.5A OVERLAY TYP 0+001+002+00 30'160' APPROACH TAPER 75' MIN.60'PROP. EG 200' TURN LANE TAPER 100' LT. TURN LANE 160' DEPARTURE TAPER 160' DEPARTURE TAPER 100' TURN LANE TAPER100' RT. TURN LANE PROP. EP PROP. EGPROP. EGPROP. EG PROP. EP R = 3 5 ' R=35'PROP. EG PROP. EG CG-6 R CG-6R=50'R=60'40' PROP. 20' STORM ESM'T 12'12'12'12'12'12'12'12'12'12'PROP. WP-2 TYP. PROP. WP-2 TYP. PROP. WP-2 TYP.8'PROP. GRAVEL SHOULDER TYP PROP. GRAVEL SHOULDER TYP 8'12'PROP. EG 5'PROP. GRAVEL SHOULDER TYP PROP. GRAVEL SHOULDER TYP8'8'8'TEMPORARY GRADING ESM'T. CURB TRANSITION CG-6 TO CG6R (TYP) REGRADED DITCH LINE TEMPORARY GRADING ESM'T. TEMPORARY GRADING ESM'T.60'60'PROP. CG-11 157'44'PROP. ROW 51'R=20'PROP. ROW CURB TRANSITION CG-6 TO CG6R (TYP) PROP. CG-12B PROP. 1' H. CURB OR RET. WALL PROP. 10' ASPHALT TRAIL PROP. 10' ASPHALT TRAIL12' TRAIL INGRESS/ EGRESS ESMT PROP. 20' STORM ESM'T PROP. 20' FREDERICK WATER ESM'T. 12'20' PROP. 20' STORM ESM'T PROP. 20' STORM ESM'T12'EX1EX2EX4EX2CEX3STAIRS (5R)5' S/W113114125476934A21208A8222311610+0011+001 0 + 0 0 10+1 0 . 7 8 10+75. 3 1 10+86. 3 9 11+00 11+22.20 11+86.40 10+00 11+00 10+00 11+00 12+00 8937EP8979PVT9382EP9486EP9615EP9644EP9585HP9552PVT9389PVC9491EP8929PVC8879PVC8875LP9597EP9595EP9590EP9590EP9605EP953095349583BP959405EPTW=690.00BW=689.508921EP8868EP8877EP8847EP8952EP9246EP9376EP9369EP9102EP8867EP9010EP%2.0%2.0%3.0X-SEC "2"X-SEC "38715INV8662GND8565INV3:12:12:13:13:112:18889PVT9557PVC9578PVT9415EP9574EP9592EP9587EP9570EP9536EP9344EP9191EP8926EP9067EP8955EP8911EP8987EP9585BP9626BP9583BP%2.0%2.0%2.09401EP9613SW9620SW9626SW9616SW9660SW9640SW9617SW9554SW9650BP9003SW8993SW8873SW9544SW9524SW9514SW9365LP9510GND9279BP9110LP9038EP8885SW8848SW8876SW8838SW8848SW8914SW8828SW8856SW8818SW8828SW%2.0%1.4%2.09642SW9499EP9565EP969632SW%1.09625SW96SW9637SW9635SW12:12:18730INV8920INV8921BP8913BP8931BP8901BP%2.0%2.0%2.08913BP%2.0%2.08862EP8862EP8858EP9040TOP9405GND9030INV9370INV8784SW696694692 690684690686688692 696 690692 694696698690690692692 694 696 690692 694 690 688 6 9 0 6889220GND9270GND0+001+002+00 TEMPORARY GRADING ESM'T. CURB TRANSITION CG-6 TO CG6R (TYP) REGRADED DITCH LINE TEMPORARY GRADING ESM'T. TEMPORARY GRADING ESM'T. CURB TRANSITION CG-6 TO CG6R (TYP) PROP. 1' H. CURB OR RET. WALL 12' TRAIL INGRESS/ EGRESS ESMT PROP. 20' FREDERICK WATER ESM'T. -0+50 0+00 0+50 1+00 1+50 2+00 2+50 670 675 680 685 690 695 670 675 680 685 690 695 700 -2.00%4.00% VC = 10.00 VC = 10.00 PROP. GRADE @ C/L COMPACT FILL TO A MINIMUM 95% DRY DENSITY, PER AASHTO T-99EXISTING GRADE @ C/L ELEV. @ PROP RD C/L 0+41.00 = PVC 0+46.00 = PVI (ELEV = 688.69)0+51.00 = PVT0+61.00 = PVC0+66.00 = PVI (ELEV = 689.49)0+71.00 = PVT688.76688.79 688.89689.51689.29689.79CREST = 2+07.03 ELEV = 695.85 APPROX. LOC. EX. GAS X-ING 0+00.00 = C/L SENSENY RD.689.610+29.00 = PVI (ELEV = 689.03)0+24.00 = PVI (ELEV = 689.13)6.11 % 2.08%1+38.00 = PVC1+58.00 = PVI (ELEV = 695.11)1+78.00 = PVTVC = 40.00 1.00%1+80.00 = PVC2+00.00 = PVI (ELEV = 695.98)2+20.00 = PVTVC = 40.00693.89694.91695.52695.57695.83695.78-2.00% SAG = 0+44.33 ELEV = 688.75 689.13 689.03 PROP. 30" STORM X-ING PROP. 12" WATERLINE X-ING APPROX. LOC. EX. WATERLINE X-ING 11' 12' 20' PAVEMENT DESIGN 2" - SM-12.5A 6.5" - BM-25.0 8" - 21B AGGREGATE NOT TO SCALE SENSENY ROAD- GS7 URBAN COLLECTOR SYSTEM (LEFT TURN TYP SECTION) -2.00%-2.00% 12' THRU 12' THRU BASE SUBBASE OVERLAY EXISTING TRAVELWAY 6'6' 12' LEFT TURN SHOULDER 8' 12:1 PAVEMENT DESIGN 1.5" - SM-12.5A 4.5" - BM-25.0 6" - 21B AGGREGATE NOTE: PAVEMENT DESIGN SHOWN IS PRELIMINARY, FINAL PAVEMENT DESIGN WILL BE BASED ON ACTUAL FIELD CBR TESTS. SITE ENTRANCE (TYP SECTION) 2' UD-4 UNDERDRAIN CG-6 18'18'2' 20' -2.00%-2.00% CG-6BASE SUBBASE NOT TO SCALE -2.00%-2.00% WP-2 (TYP) NOTE: PAVEMENT DESIGN SHOWN IS PRELIMINARY, FINAL PAVEMENT DESIGN WILL BE BASED ON ACTUAL FIELD CBR TESTS AND EXISTING PAVEMENT CORE DATA SUBMITTED FOR REVIEW AND APPROVED BY VDOT PRIOR TO CONSTRUCTION. SURFACE SURFACE1' VARI E S 2' UD-4 UNDERDRAIN CG-6 1'EX. ROWEX. ROW30'30' 14'PROP.ROW10' TRAIL -2.00% 10' VARIES NOTE: THIS TYPICAL SECTION IS NOT FOR CONSTRUCTION. IT DEMONSTRATES THAT THE PROPOSED ROW TAKES INTO ACCOUNT THE FUTURE U4D ROAD AS ANTICIPATED BY VDOT.NOT TO SCALE SENSENY ROAD- VDOT ANTICIPATED FUTURE U4D TYP. SECTION (NOT FOR CONSTRUCTION) -2.00%-2.00% UD-4 UNDERDRAIN CG-6 10' TRAIL INGRESS/EGRESS ESM'T -2.00%VARIES -2.00% 18' MEDIAN 9'9' 13' THRU12' THRU2'8'3'PROP.ROW44' 18' MEDIAN 9' 44' 3:1 SLOPE 5' -4.00%-2.00% 12' THRU PAVEMENT DESIGN 2" - SM-12.5A 6.5" - BM-25.0 8" - 21B AGGREGATE SENSENY ROAD - GS7 URBAN COLLECTOR SYSTEM (RIGHT TURN TYP SECTION) NOT TO SCALE -2.00%-2.00% 12' THRU BASE SUBBASE OVERLAY EXISTING TRAVELWAY 6'6' 12' PAINTED ISLAND SHOULDER 8' 12:1 -2.00%-2.00% WP-2 (TYP) 2' UD-4 UNDERDRAIN CG-6 12' RIGHT TURN 1' SURFACE VARI E SEX. ROWEX. ROWPROP. ROW10' TRAIL -2.00%VARIES 19'5' 51' 30'30' 2' 5' -2.00%-2.00% 3:1 S L O P E INGRESS/EGRESS ESM'T 11' INGRESS/EGRESS ESM'T 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSITE / UTILITY VIEW GRADING VIEW ENTRANCE ROAD PROFILE 1" OVERLAY KEY MILL & OVERLAY PER WP-2 DETAIL MATCH LINE SHEETS 14 & 17 MATCH LINE SHEET 16 NOTES: 1.SENSENY ROAD PAVEMENT SECTION TO MATCH EXISTING PAVEMENT SECTION. REFERENCE GEOTECHNICAL ENGINEERING REPORT SENSENY PLACE APARTMENTS BY ECS, PROJECT NUMBER 01:29733, DATE MARCH 18, 2020 FOR EXISTING PAVEMENT CORES ALONG EXISTING SENSENY ROAD. 2.THE NEAREST COMMERCIAL ENTRANCES ARE SENSENY ROAD SCHOOL 157' TO THE WEST AND TOT SPOT 715' TO THE EAST. 3.THE NEAREST VDOT ROADS ARE ROUTE 1265 CRESTLEIGH DR. 790' TO THE WEST AND ROUTE 1214 UNDERWOOD LANE 540' TO THE EAST. 4.THE FUNCTIONAL CLASSIFICATION FOR ROUTE 657 SENSENY ROAD IS MAJOR COLLECTOR. 5.LIMITS OF FULL DEPTH PAVEMENT WIDENING ALONG ROUTE 657 SHALL BE DETERMINED BY EXCAVATION IN THE PRESENCE OF A VDOT INSPECTOR AND MATCHING CORE SAMPLES REQUIRED PER WP-2 DETAIL. EX1EX2EX4EXJEXLEXKEXK1EXK2EX3EXK1ASTAIRS (5R)EX. SAN.ESMT TO BEVACATEDFUTURE PRAYER LABYRINTH5' S/W5' S/W100101102102A103103A104104B106106A106B109F109D109C109A111111A112113114200201202203202A2042051254108105107110A104A101112109E206DUCTILE IRO N DO NOT POLL U T E DRA I N S TO W A T ERW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE D R AINS T O WAT E RWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE I R O N DO NOT P OL L U TE D RA I N S T O W A T ER W AY S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTIL E I R O N DO NOT POLLUTE DRA I N S T O W A T E R W A Y S NYLOPL A S T DO NOT POLLUTE DUCTILE IRON NYLOPLAST DRAINS TO WAT E R WAYS NYLOPLA S T DUCTILE I R ON DO NOT P O L LU T E D R A IN S TO W AT E RW A Y S NYLOPLASTDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 71156934A21208A82223EX. SAN. ESMTTO BE VACATED11610910+0011+0010+0010+10.7810+75.3110+86.3911+0011+22.2011+86.4010+0011+0012+0013+0014+0015+00 16+00 16+09.7810+0011+0012+009650FF9650FF9650FF9590EP9590EP9560EP9560EP8937EP8979PVT9382EP9486EP9615EP9644EP9521EP9466EP9432EP9476EP9567EP9560EPTW=692.00BW=692.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-SEC "A"X-SEC "A"X-SEC "B"X-SEC "B"7420INVTW=690.00BW=689.50TW=695.09BW=688.00TW=694.60BW=687.08TW=694.60BW=685.50TW=694.60BW=685.43TW=694.60BW=684.11TW=694.60BW=681.75TW=694.88BW=678.86TW=693.79BW=679.76TW=693.00BW=678.38TW=693.14BW=685.43ACCESSIBLEROUTEACCESSIBLEROUTE8921EP8868EP8877EP8847EP8952EP9246EP9376EP9369EP9102EP8867EP9010EP%2.0%2.0%3.0 %3.0 %2.0%2.0 %2.0 %1.0 %4.0 %2.0 %1.0 %4.1 %1.0 %2.0%2.0%2.0%2.0%2.0%2.0 %2.0 %2.0 %2.0 %2.0 %2.0%1.0%1.0%2.0%2.0%1.3%2.0%1.5%1.5%2.39%2.39%1.0%1.0X-SEC "2"X-SEC "3"X-SEC "5"X-SEC "6"PROP. SAW TOOTHCURB (OVERLANDRELIEF), 5- OPENINGS,SEE DETAIL SHT. 31CURB TRANSITIONCG-6R TO CG-6 (TYP)CURB FLUSHWITH EPCURB FLUSHWITH EPCG-12BCG-12BCURBTRANSITION(TYP)CURBTRANSITION(TYP)CURB TRANSITIONCG-6R TO CG-6 (TYP)%2.0TEMPORARYGRADING ESM'T8715INV62GNDRETAINING WALL W/HANDRAIL(STRUCTURAL DESIGN BY OTHERS)TEMPORARYGRADING ESM'T9000INV8565INV7200INV100YRWSE=680.0110YRWSE=679.01100YRWSE=691.4210YRWSE=691.148540INV9187GND9169GND9270GND9320GND9300GNDCURB CUT(2' W)X-SEC "6"X-SEC "5"3:13:13:1 3:13:12:12:13:13:112:13:1 9625BP9584EP9540EP9539EP9592EP9572BP9517EP9469SW9555SW%2.49532EP9470EP9254EP 9206EP9195EP9205EP9489EP9546EP9549SW9529SW9571EP9522EP9598SW9598SW9553EP9608SW9625BP%2.0% 2. 09642GND9620GND%2.0 9629GND% 2.09496EP9470SW9535SW9476SW9540SW9485SW%2.09661GND9610SW9610SW9650FF9640SW9640SW9650FF9620SW9601SW9611SW9627GND9637GND9628SW9630SW9640SW9610SW9620SW9610SW9615SW9615SW9606SW9616SW9579EP9631TOP9372FL/OLR9280EP9178EP9487LPCURB TRANSITIONCG-6R TO CG-6 (TYP)9367GND9603EP9588EP9238BP9544EP9300EP9393GND9398FL/OLROVERLANDRELIEF 100YRWSE=694.178889PVT9557PVC9578PVT9415EP9574EP9592EP9587EP9570EP9536EP9344EP9191EP8926EP9067EP8955EP8911EP8987EP9585BP9626BP9583BP%2.0 %2.0%2.09401EP9613SW9620SW9626SW9616SW9660SW9640SW9617SW9554SW9650BP9003SW8993SW8873SW9544SW9524SW9514SW9603EP9549EP9530EP%2.0%4.0 9365LP9510GND9279BP9110LP9038EP8885SW8848SW8876SW8838SW8848SW8914SW8828SW8856SW8818SW8828SW%2.0%1.4%2.09642SW9499EP9565EP9639SW9632SW%1.09625SW9641SW9637SW9635SW12:12:18730INV8920INV8921BP8913BP8931BP8901BP%2.0%2.0 %2.08913BP3:1%2.0%2.08862EP8862EP8858EP9040TOP9405GND9030INV9370INV8784SW%2.0 9662GND9642GND9652GND9632GND9643GND%2.0 %2.0CONTRACTOR TOVERIFY COVEROVER EX. UTILITIESAND RELOCATE ASNECESSARY TOPROVIDED MIN.COVERTEMPORARYGRADING ESM'T9567SW9549SW9572SW9582SW9567GND9585GND9588GND9598GND92609320NOSE DOWN CURBCURB FLUSH W/EPNOSE DOWN CURB9300930092809349HP6966946926906846906 9 669669669 6 694694692692694696696686688692696694696696696696674673.6673.5672671680678686688690682684680678682.56866886906926946826846866886906926946886866906926 9 4 686688690684682.6682.56826806926906926946966986986966986856856856786766756906766786806826846866886906966946966946926946966906926946906886906889564SW9220GND9270GNDPROPOSED BUILDING4 STORY SENIOR RESIDENTIAL (63 UD UNITS)FFE: 696.50'FUTURE BUILDINGADDITION CHURCHFFE:696.50'151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N G NOTES:1.ACCESSIBLE ROUTE SHOWN IN RED. MAX. RUNNING SLOPE 5% AND MAX. CROSS SLOPE 2%.2.HANDICAP PARKING AND ACCESS AREAS ARE SHOWN AT SLOPES EQUAL TO OR LESS THAN 1.5%.3.SPOT SHOTS ARE EDGE OF PAVEMENT UNLESS OTHERWISE MARKED.4.TW = PROPOSED GROUND GRADE AT THE TOP OF WALL, HIGH SIDE OF RETAINING WALL.5.BW = PROPOSED GROUND GRADE AT THE BOTTOM OF WALL, LOW SIDE OF RETAINING WALL.6.ALL DOOR THRESHOLDS ARE GRADED WITH 0' DROP FROM INTERIOR TO EXTERIOR.7.PROPERTY OWNER IS TO CONSERVE THE 50' MATURE WOODLAND FULL SCREEN FOR RESIDENTIALSEPARATION BUFFER. THE PROPERTY OWNER IS NOT ALLOWED TO CLEAR THIS VEGETATION.8. CONTRACTOR TO CLOSELY COORDINATE ALL FINAL GRADE FEATURES BEFORE INSTALLINGUNDERGROUND VAULTS AND UNDERGROUND PIPING.MATCH LINE SHEET 15ACCESSIBLE ROUTE-MAX. RUNNING SLOPE 5%-MAX. CROSS SLOPE 2%KEYCHURCH & ACCOMPANYINGPARKING SPACESNOT IN VHDA CONTRACTNOT TO SCALEOVERLAND RELIEF WEIR FOR STORM STRUCTURE 103AD.A.CTcI100YRPEAK FLOWSTORM STR. 103A:1.88AC0.5415MIN5.835.92CFS(HYDROCAD 10.00-26 WAS USED TO PRODUCE WEIR COMPUTATIONS)2.0'SAW-TOOTH CURBOPENINGS (5)4.0'100YR WSE= 694.17FLOW LINEELEV.=693.72FLOW LINEELEV.=693.98CG-6 EX 1 EX 2 EX 4 EX J EX L EX K EX K1 EX K2 EX 3 EX K1A STAIRS (5R) EX. SAN. ESMT TO BE VACATED FUTURE PRAYER LABYRINTH 5' S/W 5' S/WTRASH ROOM 100 101 102 102A 103 103A 104 104B 106 106A 106B 109F 109D 109C 109A 111 111A 112 113 114 200 201202 203 202A 204 205 1 2 5 4 108 105 107 110A 104A 10 11 12 109E 206 DUCTILE I R O N DO NOT POL L U T E D R A IN S T O W A T E R W A Y S NYLOPLA S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IR O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IR O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT PO L L U T E DUCTI L E I R O N NYLO P L A S T DRAINS TO W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 7 115 6 9 3 4A 21 20 8A 8 22 23 LIGHT POLE (TYP) LIGHT POLE (TYP) LIGHT POLE (TYP) EX. SAN. ESMT TO BE VACATED 116 109 10+00 11+0010+0010+10.781 0 + 7 5 . 3 1 1 0 + 8 6 . 3 9 11+0011+22.2011+86.40FITNESS ROOM COMMUNITY ROOM10+0011+0012+00 13+00 14+00 15+0016+0016+09.7810+0011+00LIGHT POLE (TYP) LIGHT POLE (TYP) PROP. 8" SAN. SEW. PROP. SAN. MH PROP. 8" SAN. SEW. PROP. SAN. MH 12'12'PROP. CITY 20' SAN. SEW. ESM'T PROP. CITY 20' SAN. SEW. ESM'T PROP. CITY 20' SAN. SEW. ESM'T 10'6'4'PROP. CITY 20' SAN. SEW. ESM'T TEST PIT (TYP.)8" W /L -A PROP. STM. SEW. PROP. STM. SEW. PROP. FDC PROP. 2" WATER METER & 6" FIRE METER VAULT PROP. FH PROP. FH 8" FREDERICK WATER W/L-A PROP. FH SEDIMENT FOREBAY MICROPOOL EXTENDED DETENTION POND (SWM1) SWM ACCESS BENCH SWM ACCESS BENCH SWM RISER PROP. SPRINKLER ROOM 8" W/L-A 8" W/L-APROP. FW 20' W/L ESMT 1-45° BEND 1-22.5° BEND 1-6" G.V. 1-8" G.V. 8"X6" TEE 8"X6" CROSS PROP. FH 1-6" G.V. 1-6" G.V. 1-6" G.V. PROP. 6" DOM. WATER & FIRE SERVICE PROP. 2" WATER DOM. WATER SERVICE PROP. 6" CL 52 DIP RESTRAINED FIRE SERVICE (SEE NOTE 6) PROP. 1" WATER METER PROP. 1" DOMESTIC WATER SERVICE 1-22.5° BEND 1-45° BEND W/ FOSTER ADAPTER EXTEND & REPAIR/ REPLACE EX STM. SEW. DS1 DS2 DS3 DS4 DS5 DS6 DS7 DS8 DS9 DS10 DS11 DS12 DS13 DS14DS15 DS16 DS17 DS18 DS19 DS20 DS21DS26DS27 DS28 DS29DS30DS32 DS31 DS22 DS23 DS24 DS25 PROP. STM. SEW.PROP. 12' CL. I. RIP-RAP PROP. CL. I. RIP-RAP PROP. CL. I. RIP-RAP ARMOR 12' WIDE SPILLWAY W/ CL. I. RIP-RAP 4' AQUATIC BENCH 6' AQUATIC BENCH 10YR WSE = 678.99 PROPOSED BUILDING 4 STORY SENIOR RESIDENTIAL (63 UD UNITS) FUTURE BUILDING ADDITION CHURCH 100YR WSE = 680.01 PROP. 3"x2" REDUCER PROP. 3" WATER DOM. WATER SERVICE 8"X6" REDUCER 45° BEND 45° BEND 2-45° BEND PROP. CLEANOUTS (TYP.)4" SAN. LAT. 2-45° BEND 1-22.5° BEND 1-45° BEND LAT.8" SAN. 2" SAN. FORCE LAT. 1-45° BEND 2"X2" TEE 1-22.5° BEND W/ FOSTER ADAPTER PRIVATE PUMP STATION (SEE DETAILS) PUMP STATION CONTROL PANEL (SEE DETAIL)STANDBY GENERATOR12" W /L-B 12" FREDERICK WATER W/L-D 6" W/L - A 5' DIAMETER MH PRIVATEFW PROP. CITY OF WINCHESTER W/L PROP. 8" SAN. SEW. DROP C/O1-45° BEND 1-6" G.V. 1-45° BEND 1-45° BEND 2-45° BEND W/FOSTER ADAPTER FIRE LINE BACK FLOW PREVENTER 2" SEWER BALL VALVE. OWNERSHIP CHANGES FROM PRIVATE TO FW AT VALVE PROP. PUBLIC 2" FM PROP. 20' STM SEW ESM'T PROP. 20' STM SEW ESM'T PROP. 20' STM. ESM'T. 12"x8" TEE 2-12" GV 1-8" GV 8" FREDERICK WATER W/L-C RELOCATE CITY W/L 8"X8" TEE 3-8" GV CONTRACTOR TO VERIFY COVER OVER EX. UTILITIES AND RELOCATE AS NECESSARY TO PROVIDE MIN. COVER 8"X6" REDUCER 6" W/L-A WET TAP/ TEE THRU BALL VALVE BY FW 1-8" G.V. 18" SCH 80 SLEEVE WITH IN FW ESM'T. 6" SCH 80 SLEEVE WITH IN FW ESM'T END W/PROP. CAP & FLUSHING ASSEMBLY, SEE NOTE 9 PROP. 20' STM. ESM'T. PROP. JUNCTION BOX PROP. JUNCTION BOX PROP. JUNCTION BOX TRANSFORMER PROP. TRANSFORMER PROP. JUNCTION BOX PROP. NA GREEN SHOREMAX w/SC250 PROP. CL. I. RIP-RAP10'151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING603001530 SCALE: 1" = 30' NOTES: 1.ALL ROOF LEADERS, UNLESS OTHERWISE REFERENCED, SHALL BE 6" PVC SDR35. ROOF LEADER CONNECTION TO DOWNSPOUT SHALL BE PER ARCHITECT DETAIL. 2.POWER, COMMUNICATIONS AND GAS UTILITIES ARE SHOWN HERE FOR REFERENCE PURPOSES IN COORDINATION OF CONSTRUCTION. DESIGN OF THESE SYSTEMS ARE BY THE RESPECTIVE UTILITY COMPANY PROVIDING THESE SERVICES. IF ANY CONFLICTS BETWEEN THE CIVIL PLANS AND THE UTILITY COMPANY PLANS, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY TO DETERMINE THE BEST COURSE OF ACTION. 3.A 2" NEPTUNE T-10 WATER METER WITH 2" SERVICE LINE IS PROPOSED. INSTALL PER FREDERICK WATER DETAIL -9-, SEE SHEET 34, SIZING FOR THE WATER METER FOR THE RESIDENTIAL BUILDING BASED UPON A DOMESTIC WATER LOAD 658.4 WSFU, 152.5 GPM AND 3" SERVICE LINE ENTERING THE BUILDING. 4.A 1" NEPTUNE T-10 WATER METER IS PROPOSED FOR THE CHURCH BASED UPON 51 WSFU, SEE DETAIL -8-, SHEET 34. 5. = TEST PIT SYMBOL 6.RECORDS FOR THE EXISTING WATER LINE ALONG SENSENY ROAD IS THOUGHT TO BE 12" PER AVAILABLE RECORDS, BUT THE CONTRACTOR NEEDS TO TEST PIT THE EXISTING WATER LINE TO CONFIRM THE SIZE AND PRIOR TO ORDERING MATERIALS FOR CONNECTION. 7.DEVELOPER RESPONSIBLE FOR OBTAINING OFFSITE TEMPORARY GRADING EASEMENTS AND OR ANY USACE NWP, PRIOR TO START OF CONSTRUCTION IN THOSE AREAS. 8. CONTRACTOR TO CLOSELY COORDINATE ALL FINAL GRADE FEATURES BEFORE INSTALLING UNDERGROUND VAULTS AND UNDERGROUND PIPING. TOP OF VAULT TO BE FLUSH WITH FINAL GRADE. 9. W/L STUB INTENDED TO BE 1 JOINT OF PIPE 20' BUT POTENTIAL CONFLICT WITH EXISTING GAS LINE. A MINIMUM 10' STUB MAY BE ALLOWED TO AVOID CONFLICT AS SHOWN. FW INSPECTOR TO DETERMINE END OF W/L STUB AND FLUSHING ASSEMBLY LOCATION BASED UPON EXISTING FIELD CONDITIONS. 10. BALL VALVE TO BE LOCATED ON PROPERTY LINE. FW OWNERSHIP ENDS AT BALL VALVE.MATCH LINE SHEET 15MATCH L I N E S H E E T 17A S 35°50'07" W 685.31'EX4EXLN 71°45'25" W 253.81'EX3696694696696692696696696 696696690692 694696698698696698690692 694 696 690692 694 6 9 0 688TRASHROOM 104106106A106B109F109D109C109A111111A11211311420454108105107110A109EDUCTILE IRON DO NOT POLLUTE DRAINS TO W A T E R W A Y S NYLOPLAST DUCTILE I R O N DO NOT P O L L U T E D R A I NS TO W A T E R W A Y S NYLOPLAST DUCTILE IR O N DO NOT P O L L U T E D R A I N S T O WATERW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLU T E D R A I N S T O WATERW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRA I N S T O W A T E R W A Y S NYLOPLAST DUCTILE I R O N DO NOT PO L L U T E D R A I NS TO W A T E R W A Y S NYLOPL A S T DUCTILE IRON DO NOT POLLU T E D R A I N S T O WATERW A Y S NYLOPLAST 11564A21202223EX. SAN. ESMTTO BE VACATED11610910+0011+0010+75. 3 1 10+86. 3 9 11+00 11+22.20 11+86.40FITNESSROOMCOMMUNITYROOM11+00 12+0013+0014+0010+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+77.121-45° BEND CUT IN TEE 12"X16", LONG MJ SOLID SLEEVES, 1-12" G.V., 2-16" G.V.'S, AND JOINT RESTRAINTS ON EX W/L 12"X8" TEE 2-12" G.V. 1-8" G.V.1-12" END CAP W/ PROP. FLUSHING ASSEMBLY TEST PIT (TYP.) WET TAP/TEE THRU BALL VALVE BY FW PROP. STORM ESMT PROP. STORM ESMT 12" FREDERICK WATER W/L - D PROP. 8" WL PROP. 12" W/L PROP. 2" SAN. FORCE LAT. 12" W/L - C 8" W/L - A CONTRACTOR TO VERIFY COVEROVER EX. UTILITIES ANDRELOCATE AS NECESSARY TOPROVIDE MIN. COVERPROP. COUNTY 12" W/L W/L-D EX. SAN FM. APPROX. LOCATION PER AVAILABLE RECORDS. PROP. AIR RELEASE VALVE 1-45° BEND W/ FOSTER ADAPTER 1-22.5° BEND W/ FOSTER ADAPTER 2" SEWER BALL VALVE. OWNERSHIP CHANGES FROM PRIVATE TO FW AT VALVE 8"X8" TEE 3-8" GV 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING603001530 SCALE: 1" = 30'MATCH LINESHEET 17NOTES: 1.ALL ROOF LEADERS, UNLESS OTHERWISE REFERENCED, SHALL BE 6" PVC SDR35. ROOF LEADER CONNECTION TO DOWNSPOUT SHALL BE PER ARCHITECT DETAIL. 2.POWER, COMMUNICATIONS AND GAS UTILITIES ARE SHOWN HERE FOR REFERENCE PURPOSES IN COORDINATION OF CONSTRUCTION. DESIGN OF THESE SYSTEMS ARE BY THE RESPECTIVE UTILITY COMPANY PROVIDING THESE SERVICES. IF ANY CONFLICTS BETWEEN THE CIVIL PLANS AND THE UTILITY COMPANY PLANS, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY TO DETERMINE THE BEST COURSE OF ACTION. 3.A 2" NEPTUNE T-10 WATER METER WITH 2" SERVICE LINE IS PROPOSED. INSTALL PER FREDERICK WATER DETAIL -9-, SEE SHEET 34, SIZING FOR THE WATER METER FOR THE RESIDENTIAL BUILDING BASED UPON A DOMESTIC WATER LOAD 658.4 WSFU, 152.5 GPM AND 3" SERVICE LINE ENTERING THE BUILDING. 4.A 1" NEPTUNE T-10 WATER METER IS PROPOSED FOR THE CHURCH BASED UPON 51 WSFU, SEE DETAIL -8-, SHEET 34. 5. = TEST PIT SYMBOL 6.RECORDS FOR THE EXISTING WATER LINE ALONG SENSENY ROAD IS THOUGHT TO BE 12" PER AVAILABLE RECORDS, BUT THE CONTRACTOR NEEDS TO TEST PIT THE EXISTING WATER LINE TO CONFIRM THE SIZE AND PRIOR TO ORDERING MATERIALS FOR CONNECTION. 7.DEVELOPER RESPONSIBLE FOR OBTAINING OFFSITE TEMPORARY GRADING EASEMENTS AND OR ANY USACE NWP, PRIOR TO START OF CONSTRUCTION IN THOSE AREAS. 8. CONTRACTOR TO CLOSELY COORDINATE ALL FINAL GRADE FEATURES BEFORE INSTALLING UNDERGROUND VAULTS AND UNDERGROUND PIPING.MATCH LINE SHEET 15WATER MAIN CONNECTION NOTES: 1.TEST PIT THE EXISTING MAINS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS 2.INSTALL JOINT RESTRAINTS ON EXISTING WATER MAIN PER CURRENT FREDERICK WATER REQUIREMENTS PRIOR TO SHUT DOWN 3.PREPARE WORK AS FAR IN ADVANCE AS POSSIBLE TO MINIMIZE SHUT DOWN TIME 4.HAVE SUFFICIENT RESOURCES ON-SITE TO ACCOMPLISH TASKS PER FREDERICK WATER INSPECTOR'S REQUIREMENTS 5.PREPARE A WATER SHUT DOWN PLAN SATISFACTORY TO THE FREDERICK WATER INSPECTOR. FIREWATCH, NIGHT TIME WORK, ETC. MAY BE REQUIRED. 6.SCHEDULE SHUTDOWN WITH THE FREDERICK WATER INSPECTOR, FREDERICK COUNTY FIRE MARSHALL, AND ALL AFFECTED CUSTOMERS AT LEAST (7) DAYS IN ADVANCE, AND MAKE PREPARATIONS AS REQUIRED BY ALL PARTIES. STAIRS (5R)5' S/W2223LIGHT POLE(TYP)OBJECT RD C/L STATION = 13+90 LINE OF SIGHT STATION = 3+90.38 OBJECT RD C/L STATION = 6+10 LINE OF SIGHT STATION = 3+92.11 390' INTERSECTION SIGHT DISTANCE390' INTERSECTION SIGHT DISTANCE 14.5' 390'390' 4'4' 4+00 5+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 18+00 1+00 2+00 3+00 3+92.11 0+00 1+00 2+00 3+00 6+00 0+00 1+00 2+00 3+00 3+90.42 390' OBJECT RD C/L STATION = 13+78 LINE OF SIGHT STATION = 3+90.42 EYE RD C/L STATION = 10+00 LINE OF SIGHT STATION = 0 EYE RD C/L STATION = 9+88 LINE OF SIGHT STATION = 0 696694692 690684690686688692 696 690692 694696698698690690692692 694 696 690692 694 690 688 6 9 0 688 Horizontal Scale: 1"=50 Vertical Scale: 1"=5 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 0-50 680 685 690 695 700 ℄ PRIVATE DRIVEPROPOSED GRADE 390' SIGHT LINE 3.5' EYEHEIGHT3.5'OBJECTHEIGHTINTERSECTION SIGHT DISTANCE PROFILE LEFT TURN LANE (RIGHT) SCALE H: 1" = 50' V: 1"=5' Horizontal Scale: 1"=50 Vertical Scale: 1"=5685 690 695 700 705 ℄ PRIVATE DRIVEPROPOSED GRADE 3.5'OBJECTHEIGHT3.5' EYEHEIGHTINTERSECTION SIGHT DISTANCE PROFILE LEFT TURN LANE (LEFT) SCALE H: 1" = 50' V: 1"=5' 680 685 690 695 700 685 690 695 700 705 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 390' SIGHT LINE Horizontal Scale: 1"=50 Vertical Scale: 1"=5685 690 695 700 705 ℄ PRIVATE DRIVEPROPOSED GRADE 3.5'OBJECTHEIGHT3.5' EYEHEIGHTINTERSECTION SIGHT DISTANCE PROFILE RIGHT TURN LANE (LEFT) SCALE H: 1" = 50' V: 1"=5' 685 690 695 700 705 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 390' SIGHT LINE 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGPLAN VIEW 1" = 50' NOTES: 1.INTERSECTION SIGHT DISTANCE DETERMINED FROM TABLE 2-5 FROM APPENDIX F OF THE VDOT ROAD DESIGN MANUAL ISSUED JANUARY, 2005, REVISED JULY, 2017 UTILIZING THE LEGAL SPEED OF 35 MPH. THE REQUIRED INTERSECTION SIGHT DISTANCE IS 390 FT. 564.4 606.4 42 606.4 2223CONTRACTOR TO FIELD VERIFY ASBUILT CONDITIONS OF INTERSECTION PRIOR TO START OF CONSTRUCTION, ENGINEER SHALL BE NOTIFIED IMMEDIATELY IF ANY CONFLICTS ARISER1-1H E H C C D D F I I H H RELOCATE EXISTING SIGN M1-V2A ROAD WIDENING ROAD WIDENING C C TYPE B PARKING SPACE PAINT HC STRIPING PER DETAIL (TYP) HC STRIPING PER DETAIL (TYP) C L LIGHT DUTY PAVEMENT (TYP.) HEAVY DUTY PAVEMENT (TYP.) LIGHT DUTY PAVEMENT (TYP.) HEAVY DUTY PAVEMENT (TYP.) CONCRETE PAVEMENT (TYP.)151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGPAVEMENT MARKING LEGEND LANE LINES (BROKEN) - WHITE, TYPE B, CLASS I MARKINGS, 4" WIDE x 10' LONG, SPACED 30' EDGE LANE LINES (SOLID) - YELLOW, TYPE B, CLASS I MARKINGS, 4" WIDE LENGTH AS SHOWN ON PLAN. (OPTIONAL) CHANNELIZING LANE LINES (SOLID) - WHITE, TYPE B, CLASS I MARKINGS, 4" WIDE, LENGTH AS SHOWN ON PLAN EXTENDED LANE LINES (DOTTED) - COLOR AS SHOWN, TYPE B, CLASS I MARKINGS, 4" WIDE x 2' LONG, SPACED 6'. (OPTIONAL) 8" WIDTH TO BE USED FOR EMPHASIS AT ROUNDABOUT. (OPTIONAL) STOP BAR (SOLID) - WHITE, TYPE B, CLASS I MARKINGS, 24" WIDE CROSSWALK LINES - WHITE, TYPE B, CLASS I MARKINGS, 12" WIDE x 6' LONG, SPACED 18". SOLID WHITE TRANSVERSE LINES PLACED PARALLEL TO ONCOMING TRAFFIC. TYPE B, CLASS I WHITE PAVEMENT MARKING, 6" WIDE PARALLEL LINES SPACED 6 FEET APART. TYPE B, CLASS I PAINTED YELLOW DOUBLE LINE PAVEMENT MARKING, 4" WIDTH, SEPARATED BY A 7" SPACE, LENGTH AS SHOWN ON PLAN TYPE B YELLOW PAVEMENT MARKING, 24" WIDTH, LENGTH AS SHOWN, SPACED 12' AT 45° ANGLE. TRIANGLE YIELD STRIPE (OPTIONAL) TYPE 3 BARRICADES - RETROREFLECTIVE RAIL FACES WITH R11-2 "ROAD CLOSED" SIGN. TYPE B CLASS I WHITE PAVEMENT MARKING 24" WIDTH, LENGTH AS SHOWN, HASHES SPACED 12" ON CENTER AT 45° ANGLE. TYPE B, CLASS I WHITE PAVEMENT MARKING, ELONGATED TURN LANE ARROW. TYPE B, CLASS I WHITE PAVEMENT MARKING, ELONGATED TURN LANE ARROW. TYPE B, CLASS I WHITE PAVEMENT MARKING, ELONGATED LANE ARROW. A B C D E G F H I J K SIGNAGE AND PAVEMENT MARKING NOTES 1. ALL PROPOSED SIGNING AND PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF EACH OF THE FOLLOWING AND ANY REVISION THERETO: A. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. B. THE VIRGINIA SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. C. THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE SPECIFICATIONS. D. THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE STANDARDS. 2. ALL SIGNS SHALL BE CONSTRUCTED FROM ENCAPSULATED LENS SHEETING. 3. PROPOSED SIGN LOCATIONS ARE APPROXIMATE AND SHALL BE MODIFIED IN THE FIELD TO AVOID CONFLICT WITH UNDERGROUND UTILITIES OR OTHER OBSTRUCTIONS, AND TO COMPLY WITH STANDARDS REFERENCED IN NOTE #1. 4. FOR COLOR COMBINATIONS AND/OR LETTERING SIZE, REFER TO THE VIRGINIA SUPPLEMENT TO THE MUTCO. 5. ANY EXISTING PAVEMENT MARKINGS WHICH WILL CONFLICT WITH PROPOSED PAVEMENT MARKINGS SHALL BE COMPLETELY ERADICATED. 6. LIMITS SHOWN OF PROPOSED MARKINGS ARE APPROXIMATE AND SHALL BE MODIFIED IN THE FIELD TO INSURE THAT PROPOSED PAVEMENT MARKINGS CONTINUE UNTIL EXISTING PAVEMENT MARKINGS CAN BE MATCHED. 7. CURB SIGNS SHALL BE PLACED 2' FROM FACE OF CURB TO LEADING EDGE OF SIGN. 8. SIGN MOUNTING HEIGHT SHALL BE A MINIMUM OF 7' PER THE MUTCD. 9. PROPOSED POSTED SPEED LIMITS GREATER THAN 25 MPH REQUIRE AN ENGINEERING SPEED STUDY STAMPED BY A LICENSED PROFESSIONAL ENGINEER TO BE SUBMITTED TO VDOT FOR REVIEW AND APPROVAL PRIOR TO ERECTING SIGNS. 10. ALL SIGNS AND PAVEMENT MARKINGS SHALL BE REVIEWED IN THE FIELD WITH THE VDOT INSPECTOR 72 HOURS PRIOR TO INSTALLATION. 11. THERMO-PLASTIC MARKINGS SHALL BE USED. PARKING LOT - MAIN DRIVE AISLE NOT TO SCALE TYPICAL PAVEMENT SECTION #1 7.0" SUBBASE VDOT STD. 21B 2.0" SM-12.5A SURFACE COURSE VDOT VTM-1 METHOD) AT OPTIMUM MOISTURE CONTENT (COMPACTED TO 95% DENSITY COMPACTED SUBGRADE OF THE SUBGRADE MUST SUBMITTED FOR ACTUAL DETERMINATION OF REQUIRED PAVEMENT DESIGN BASED ON A SUBGRADE CBR DESIGN VALVE OF 7. SOIL TEST PAVEMENT SECTION THICKNESS PRIOR TO CONSTRUCTION. 4.0" BM-25 BASE COURSE NOTES: 1.SENSENY ROAD PAVEMENT SECTION TO MATCH EXISTING PAVEMENT SECTION. REFERENCE GEOTECHNICAL ENGINEERING REPORT SENSENY PLACE APARTMENTS BY ECS, PROJECT NUMBER 01:29733, DATE MARCH 18, 2020 FOR EXISTING PAVEMENT CORES ALONG EXISTING SENSENY ROAD. 2. PROPOSED PAVEMENT SECTION FOR THE SITE (PARKING AND DRIVE AISLES) IS FROM THE ECS GEOTECHNICAL REPORT NOTED ABOVE IN NOTE 1. L PARKING LOT - PARKING SPACES NOT TO SCALE TYPICAL PAVEMENT SECTION #2 6.0" SUBBASE VDOT STD. 21B 1.5" SM-12.5A SURFACE COURSE VDOT VTM-1 METHOD) AT OPTIMUM MOISTURE CONTENT (COMPACTED TO 95% DENSITY COMPACTED SUBGRADE OF THE SUBGRADE MUST SUBMITTED FOR ACTUAL DETERMINATION OF REQUIRED PAVEMENT DESIGN BASED ON A SUBGRADE CBR DESIGN VALVE OF 7. SOIL TEST PAVEMENT SECTION THICKNESS PRIOR TO CONSTRUCTION. 2.5" BM-25 BASE COURSE DRIVE AISLE FOR TRASH PICKUP NOT TO SCALE TYPICAL CONCRETE PAVEMENT SECTION #3 6" SUBBASE VDOT STD. 21B 6" 4,000 PSI REINFORCED CONCRETE VDOT VTM-1 METHOD) AT OPTIMUM MOISTURE CONTENT (COMPACTED TO 95% DENSITY COMPACTED SUBGRADE OF THE SUBGRADE MUST SUBMITTED FOR ACTUAL DETERMINATION OF REQUIRED PAVEMENT DESIGN BASED ON A SUBGRADE CBR DESIGN VALVE OF 7. SOIL TEST PAVEMENT SECTION THICKNESS PRIOR TO CONSTRUCTION. WITH 6x6W2.9/2.9 WWM PAVEMENT KEY #2 Pavement Section - Parking Spaces - Light Duty #1 Pavement Section - Drive Aisle - Heavy Duty #3 Pavement Section - Drive Aisle - Concrete Pavement N 32°06'42" E 918.87' S 35°50'07" W 685.31'N 71°45'25" W 253.81 ' DUCTILE I R O N DO NOT POLLU T E D R A I N S T O W A T E RW A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRO N DO NOT POLLUT E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE I R O N DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPL A S T DUCTILE IR O N DO NOT POLL U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IR O N DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPL A S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POL L U T E DUCTILE I R O N NYLOPLA S T DRAINS TO W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 22 23 10+00 11+0010+0010+10.781 0 + 7 5 . 3 1 1 0 + 8 6 . 3 9 11+0011+22.2011+86.4010+0011+0012+00 13+00 14+00 15+0016+0016+09.7810+0011+0012+00PROP. FDC PROP. FH PROP. FH PROP. FH PROP. SPRINKLER ROOM PROP. FH SIGN TYPE "C" SIGN TYPE "A" SIGN TYPE "C" SIGN TYPE "D" SIGN TYPE "D" SIGN TYPE "D" SIGN TYPE "C" SIGN TYPE "A" SIGN TYPE "D" MODIFIED SIGN TYPE "D" MODIFIED SIGN TYPE "D" SIGN TYPE "D" MODIFIED SIGN TYPE "D" MODIFIED SIGN TYPE "D" SIGN TYPE "C" SIGN TYPE "A" PROPOSED BUILDING 4 STORY SENIOR RESIDENTIAL (63 UD UNITS) FFE:696.50' RETAINING WALL W/ HANDRAIL LIFE SAFETY PLANSENSENY PLACERED BUD MAGISTERIAL DISTRICTFREDERICK COUNTY, VARev. No.Date -------- 1" = 40' 20 04/20/2020 RLK/KAS 19-09 37 6387W *THIS VIEW FOR FIRE LANE MARKINGS & SIGNAGE ONLY 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING EX 1 EX 2 EX 4 EX J EX L EX K EX K1 EX K2 EX 3 EX K1A STAIRS (5R) FUTURE PRAYER LABYRINTH 5' S/W 5' S/WDUCTILE IR O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E RW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLA S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POL L U T E DUCTIL E IR O N NYLO P L A S T DRAINS TO W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 22 23 LEVEL 1 DRY POND (EXTENDED DETENTION)151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGVRRM SITE ARE: APPLICABLE SITE AREA USED FOR WATER QUALITY CALCS. BMP LEGEND SITE BOUNDARY (PARCEL) NOTES: 1.THE PROPOSED PAVEMENT OVERLAY FOR EXISTING SENSENY ROAD WAS EXCLUDED FROM VRRM COMPUTATIONS. THE NEW TURN LANE AND GRADING DISTURBANCES WERE INCLUDED. DRAINAGE AREA LABLESA, B,C.. A DRAINAGE AREA TREATED BY LEVEL 1 DRY POND TC FLOW PATH EX 1 EX 2 EX 4 EX J EX L EX K EX 2C EX 2B EX K1 EX K2 EX K3 EX 3 EX K1A 1 DA = 49.10 AC CN = 84 4 DA = 1.68 AC CN = 77 6 DA = 0.90 AC CN = 88 STUDY POINT #1 2 DA = 1.39 AC CN = 86 3 DA = 1.64 AC CN = 83 5 DA = 1.85 AC CN = 82 TC FLOW PATH TC FLOW PATH TC FLOW PATH EX 1 EX 2 EX 4 EX 2C EX 2B EX 3 STAIRS (5R) FUTURE PRAYER LABYRINTH 5' S/W 5' S/W74.02 ' 39.01'34.02'39.2' 105.98'88.8'80.81'22 23 STUDY POINT #1 5 DA = 2.06 AC CN = 86 1 DA = 48.93 AC CN = 84 2 DA = 1.48 AC CN = 81 6 DA = 0.86 AC CN =89 TC FLOW PATH TC FLOW PATH TC FLOW PATH TC FLOW PATH 3 4 DA = 0.98 AC CN = 80 DA = 2.29 AC CN = 94 EX1 EX2 EX 4 EX2C EX 2B EX3 STAIRS (5R) FUTURE PRAYER LABYRINTH 5' S/W 5' S /W 74 .02 ' 39.01'34.02' 39.2' 105.98'88.8'80.81'22 23 113A 113B STUDY POINT #1 BW 695.50TW 698.00 695696694693695 696 696695 69 6 69669769 7 69 7 BW 695.55TW 698.05 BW 695.75TW 698.25 BW 695.52TW 698.00 BW 695.72TW 698.05 BW 695.92TW 698.25 9548GND 9614GND 9578GND 9622SW 9650FF 9607SW 9597SW 9675SW 9675SW 9690SW 9690SW 9620SW 9620SW 9575SW 9575SW 9670SW 9520SW 9530SW 9490SW 9495SW 9495SW 9480SW 9485SW 9525SW 9580GND 9615SW 9605SW 9595SW 9630SW 9627BP 9621SW 9611SW %1.8%1.8%1.8%2.0 9670SW 9640SW 9640SW9615SW9595SW 9595SW9580SW 9580SW 9530GND 9606SW9616SW 9512GND 9535SW 9510SW 9485SW 9500SW 9590SW 9590SW 9635SW 9635SW 9605SW 9595SW9620GND 9625GND 9625GND %2.0 %2.0%2.0%2.0 %2.0%2.0 %2.0 %2.0 %2.0 %2.0 %2.0 9720GND 9720GND %1.8 9730GND 9730GND 9620LP 9585LP %2.0 9606SW9601SW 9616SW 9450LP %2.0 PROP. STM. SEW. TC FLOW PATH TC FLOW PATH TC FLOW PATH TC FLOW PATH 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSITE BOUNDARY DRAINAGE AREA LABELS DRAINAGE DIVIDES ONSITE DRAINAGE AREAS TREATED BY SWM DEVICE SWM LEGEND 1-6 STORMWATER MANAGEMENT & BEST MANAGEMENT PRACTICES SUMMARY THE WATER QUALITY REQUIREMENTS WILL BE MET BY THE PROPOSED DRY POND AND PURCHASING OFFSITE NUTRIENT CREDITS. THE STORM WATER REQUIREMENTS (CHANNEL AND FLOOD PROTECTION) WERE MET BY THE PROPOSED DRY POND FOR STUDY POINT 1. OFFSITE DRAINAGE AREAS TO SWM DEVICE (UNCONTROLLED) PRE-DEVELOPMENT SWM DRAINAGE DIVIDE MAP 1" = 100' POST-DEVELOPMENT SWM DRAINAGE DIVIDE MAP 1" = 100' OFFSITE SWM DRAINAGE DIVIDE MAP 1" = 300' 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 655 660 665 670 675 680 685 690 655 660 665 670 675 680 685 690 12.0' TOP OF BERM ELEV.=682.20 48' - 30" RCP ASTM C-361 (RUBBER GASKETS W.T. JOINTS) @ 1.25%3:110+00=EW-1 (30")INV OUT = 674.2010+58= RISER STRUCTURE (4'x4')INV OUT = 674.80 (30")INV IN = 675.00 (12" REV. PIPE)10 TOP=678.0311 TOP=679.203:112.0'POND ACCESS BENCH (4% MAX.)3:1MICRO POOL WSE=675.00 (Tv=5,182 ft3)10+80.5=EW-1 (12")INV IN = 672.0012 TOP=673.001YR WSE=677.62 10YR WSE=679.01 100YR WSE=680.01** EX. GRADE PROP. GRADE PHREATIC- LINE 4:124.5'-12" SCH 40 PVC REVERSE PIPE @ -12.2% 4.0' CONTROLLED FILL - EMBANKMENT TO BE CONSTRUCTED WITH CLAY CORE 1:1 SIDE SLOPES CONCRETE CRADLE 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 9+50 10+00 10+50 11+00 11+50 12+00 12.0' FOREBAY WSE=684.10 (Tv=2,698 ft3)3:13:1 AQUATIC BENCH (TYP) FOREBAY SPILLWAY CLAY LINER (TYP) EXTEND TO ELEV 685.0 AT FOREBAY PROP. GRADE EX. GRADE EX. 8" SAN. SEW. XING4' AQUATIC BENCH 4% POND ACCESS BENCH (4% MAX.) 4% CL. 1 RIP-RAP CL. 1 RIP-RAP GRASS w/ NA GREEN SHOREMAX & SC250 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNOTES: 1.PROPOSED DRY EXTENDED DETENTION POND LEVEL 1 DESIGN FOR STORMWATER QUANTITY AND QUALITY. 2.REMAINING STORMWATER QUALITY CONTROL WILL BE PURCHASE OF OFFSITE STORMWATER CREDITS. 3.THE 100 YEAR WATER SURFACE ELEVATION (WSE) ASSUMES ALL OPENINGS BELOW THE TOP OF THE RISER ARE CLOGGED AND THE STARTING WSE IS THE TOP OF THE RISER. 4.ALL STORMWATER MANAGEMENT FACILITIES TO BE CERTIFIED BY A GEOTECHNICAL ENGINEER OR CONSTRUCTION INSPECTOR. 5.EMBANKMENT CONTROLLED FILL (SOIL MATERIALS) TO BE CERTIFIED BY A GEOTECHNICAL ENGINEER. 6.REFER TO GENERAL NOTES - PERMANENT SWM EMBANKMENT NOTES ON SHEET 2. 7.PHREATICLINE DOES NOT CROSS THE TOE OF THE EMBANKMENT THEREFORE NO DRAINAGE SYSTEM IS REQUIRED. 8.POND OUTFALL PIPE SHALL BE BEDDED WITH FINE GRAINED SOILS. FINE GRAINED SOILS SHALL HAVE STONE 1" OR LESS IN DIAMETER FOR A MINIMUM OF 2' AROUND PIPE IN AREAS OF BACKFILL. 9.CLAY CORE 4' MINIMUM WIDTH STARTING AT THE 10YR WSE AND 1:1 SIDE SLOPES. CLAY CORE ONLY NEED IN AREA DISTURBED WITH INSTALLATION OF THE PROPOSED POND OUTFALL PIPE, SINCE THE POND EMBANKMENT IS LOCATED WITHIN ALL CUT 30" RCP ASTM C-361 (RUBBER GASKETS W.T. JOINTS) 4' 2.6' **THE 100 YEAR WATER SURFACE ELEVATION (WSE) ASSUMES ALL OPENINGS BELOW THE TOP OF THE RISER ARE CLOGGED AND THE STARTING WSE IS AT THE TOP OF THE RISER. 3 : 1 12' WIDE PROP. GRADE 1 YR WS ELEV 677.62' 10 YR WS ELEV 679.01' 100 YR WS ELEV 680.01'** STORMWATER MANAGEMENT BASIN 2 PRINCIPAL RISER SECTION NTS TOP OF RISER ELEV =679.20 TOP OF BERM ELEV.=682.20 TYP.TRASH RACK BY PLASTIC SOLUTION OR APPROVED EQUAL 6.0" ORIFICE INV.=672.00 INV.=674.80 2' CLAY LINER WITH 6" TOPSOIL CAP TERMINATE LINER @ 10 YR WSE 4000 PSI CONCRETE PRECAST RCP BASE AND RISER STRUCTURE (VDOT) - SWM-1 SQUARE INSIDE 4' x 4' CONCRETE FILL FOR BUOYANCY NORMAL POOL WS ELEV 675.00' INV.=675.00 12" SCH 40 PVC WEIR ELEV = 677.80 2.0' W x 0.67' H VDOT EW-1 (SEE LOW FLOW ORIFICE DETAIL, THIS SHEET) ELEV = 672.20 STORMWATER MANAGEMENT BASIN 2 PRINCIPAL RISER PLAN VIEW NTS 2.0' W x 0.67' H WEIR PLASTIC SOLUTIONS TRASH RACK OR APPROVED EQUAL TOP TRASH RACK NOT SHOWN FOR CLARITY 30" PIPE 4000 PSI CONCRETE PRECAST RCP BASE AND RISER STRUCTURE (VDOT) - SWM-1 SQUARE INSIDE 4' x 4' 1 4" STEEL PLATE BOLTED TO EW-1 WITH 6.0" DIAMETER LOW FLOW ORIFICE (SEE LOW FLOW ORIFICE DETAIL THIS SHEET) VDOT EW-1 PLASTIC SOLUTIONS BMP TRASH RACK 12" PIPE 6" CONCRETE SLAB FOR ORIFICE GRATE 4'4'6.0" DIA. ORIFICE (LOW FLOW) 6.0" DIA. ORIFICE (LOW FLOW) 12" PIPE 1 4" STEEL PLATE BOLTED TO EW-1 VDOT EW-1 VDOT EW-1 1 4" STEEL PLATE BOLTED TO EW-1 LOW FLOW ORIFICE DETAIL NTS PLASTIC SOLUTIONS BMP TRASH RACK CONC. APRON (SLAB) 4' 2.6' STORMWATER MANAGEMENT BASIN 2 PRINCIPAL RISER FRONT VIEW NTS TOP OF RISER ELEV =679.20 TYP.TRASH RACK BY PLASTIC SOLUTION OR APPROVED EQUAL 4000 PSI CONCRETE PRECAST RCP BASE AND RISER STRUCTURE (VDOT) - SWM-1 SQUARE INSIDE 4' x 4' CONCRETE FILL FOR BUOYANCY 12" REVERSE PIPE INV.=675.00 WEIR ELEV = 677.80 2.0' W x 0.67' H ELEV = 672.20 2.0'0.67'SIDE TRASH RACK NOT SHOWN FOR CLARITY NOTES: 1.CONSTRUCTION TO COMPLY WITH RECOMMENDATIONS FROM GEOTECHNICAL REPORT. CLAY LINER NOTES: 1.A CLAY LINER SHOULD HAVE A MINIMUM THICKNESS OF 24 INCHES AND SHOULD COMPLY WITH THE SPECIFICATIONS PROVIDED IN TABLE 3.07-3. 2.A LAYER OF COMPACTED TOPSOIL (MINIMUM 6-12 INCHES THICK) SHOULD BE PLACED OVER THE LINER BEFORE SEEDING WITH AN APPROPRIATE SEED MIXTURE (REFER TO VESCH, 1992 EDITION). 3.A SYNTHETIC LINER WITH A MINIMUM THICKNESS OF 60 MIL. OR OTHER LINER TYPES MAY BE USED IF SUPPORTING DOCUMENTATION IS PROVIDED VERIFYING THE LINER MATERIAL'S PERFORMANCE. 4' WIDE AQUATIC BENCH ( FOR SAFETY PURPOSES)3:1 SIDE SLOPE3:1 SIDE SLOPEAQUATIC BENCH DETAIL NOT TO SCALE FOREBAYS & MICRO POOL 18"2.5% 12' FOREBAY SPILLWAY NOT TO SCALE 0.9' 2 : 1 2:1TOP OF BERM = 685.00 16' ELEV = 684.10 SANITARY SEWER EX STR "J" - EX STR "L" 660 665 670 675 680 685 690 695 700 660 665 670 675 680 685 690 695 700 EX. RIM = 694.13EX L 12+69.00 = EX MH (REPLACE MH)EX INV OUT = 686.80EX INV IN = 687.1112+18.00 = MHINV OUT = 685.50INV IN = 685.7551' - 8" SDR 26 @ 2.06% C RIM = 697.03A RIM = 677.60183' - 8 " SDR 2 6 @ 3. 0 1 % 35' - 8" SDR 26 @ 5.77%10+00.00 = MHINV OUT = 670.73INV IN = 670.98INV IN = 670.98EX. 50' - 8" CLAY @ 0.93%EX. RIM = 679.66EX J EX. RIM = 678.32EX K 09+50.44 = EX MHEX INV OUT = 670.15EX INV IN = 670.27PROP. RETAINING WALL EX. GRADE @ PIPE C/L PROP. GRADE @ PIPE C/L PROP 24"STORM XINGPROP 12"STORM XING9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+009+00 3' MIN.PROP 6"W/L XING10+35.00 = INSIDE DROP MHINV OUT = 673.00INV IN = 680.00 (8")B RIM = 696.25SANITARY SEWER STR "A" - EX STR "K2" 655 660 665 670 675 680 655 660 665 670 675 680 A RIM = 677.60132' - 8" SDR 26 @ 0.66%10+00.00 = MHINV OUT = 670.73INV IN = 670.98INV IN = 670.98EX. GRADE @ PIPE C/L PROP. RIP-RAP 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50EX. RIM = 674.51EX K1 EX. RIM = 676.15EX K2 13+00.66 = EX MHEX INV OUT = 672.82EX INV IN = 672.9311+32.14 = EX MH (REMOVE AND REPLACE MH)INV OUT = 671.85EX INV IN = 671.95EX. 127.0' - 8" CLAY @ 0.54% 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 675 680 685 690 695 700 675 680 685 690 695 700 4.0' MIN. 2" CTS HDPE DR11 SANITARY FORCE LATERAL 13+63.01= CONNECT TO13+55.71= 45° BEND13+51.49= 45° BEND10+00.00= 2" x 2" TEEPROP 8"EX. GRADEPROP. GRADE SANITARY SEWER FORCE LATERAL G PROP PUMP STATION1.5' MIN.PROP. 12" W/L XINGAPPROX. LOC.EX. 2" W/L XINGCONNECT TO EX SAN SEWERPROP 15" STORM XINGEX 8" GAS XING (APPROX.)1.5' MIN. 1.5' MIN. WET TAP/ TEE THRU BALL VALVE BY FREDERICK WATER TEST PITTEST PITCONTRACTOR TO VERIFY EXISTING UTILITY DEPTHS & TIE-IN LOCATIONS W/L XING9+50 10+00 10+50 11+00 11+50 665 670 675 680 685 690 695 700 705 665 670 675 680 685 690 695 700 705 57' - 8" SDR 35/26 @0.51%10+00.00= TIE TO PROP PUMP STATIONINV OUT=685.25INV IN=685.25INV OUT=685.70INV IN=689.36RIM=696.00PROP 18" STORM XING10+60.30= CLEANOUT(DROP)10+69.62= 45° BEND10+73.12= 45° BEND10+84.12= TIE TO BLDG SANINV OUT=689.6010+81.12= CLEANOUTSTA10+57.36 ELEV685.71 CROWN686.04 3' - 8" SDR @ 5.45% 24' - 8" SDR 35/26 @ 1.00%10+57.36= WYEINV OUT=685.54INV IN=685.54INV IN=685.71FFE=696.50'BLDG FACE1.5' MIN. EX. GRADE @ PIPE C/L PROP. GRADE @ PIPE C/L PROP 6" STORM XING 1.5' MIN. 9+50 10+00 10+50 11+00 11+50 12+00 12+50 665 670 675 680 685 690 695 700 705 665 670 675 680 685 690 695 700 705 194' - 4" S D R 3 5 / 2 6 @ 2.00%10+00.00= WYEINV OUT=685.54INV IN=685.71INV IN=685.5410+07.74 = 45° BEND10+21.71= CLEANOUT10+71.71= CLEANOUT11+19.69= CLEANOUT11+85.40= CLEANOUT11+94.23= TIE TO BLDG SANINV OUT=689.60STA10+00.00 ELEV685.54 CROWN686.21 PROP 15"STORM XING11+55.53= 22° BEND11+67.08= 45° BENDFFE=696.50'BLDG FACECONNECT TO PROP 8" SEWER STRUCTURE EX. GRADE @ PIPE C/L PROP. GRADE @ PIPE C/L 11+69.68= CLEANOUT1.5' MIN. 1.5' MIN. PROP 6" STORM XING SANITARY SEWER LATERAL - CHURCH F H G F E D 10+38.45= CLEANOUTSANITARY SEWER LATERAL - RESIDENTIAL BLDG I PROP 8" W/L XING10+70= PROP.2" BALL VALVEPRIVATEFW PROP 6" SCH 80 SLEEVE WITH IN FW ESM'T 18" STEEL SLEEVE WITH IN FW ESM'T EX. 41.5' - 8" CLAY @ 0.24%11+73.64 = EX MHEX INV OUT = 672.05EX INV IN = 672.14EX K1A EX. RIM = 674.60DO NOT POLLUTE DR A I N S T O W A T E R W A Y S DUCTILE IRONDO NOT POLLUTE D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT POLLUTE DUCTILE IRON NYLOPLAST DRAINS TO WATERWAYS NYLOPLASTDUCTILE IRONDO NOT POLLUT E D R A I N S T O W A T E R W A Y S 10+00 11+00 12+00 13+00PROP. 8" SAN. SEWEX J EX K EX L PROP. 20' CITY SAN. SEW. ESMN'T EX K1 EX 4 EX 3 DUCTILE IRON DO NOT POLLUTE D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUT E D R A I N S T O W A TE R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IR O N DO NOT PO L L UTE DRAINS T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRO N DO NOT POL L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT PO L L U T E DUCTIL E I R ON NYLOPLAST DRAINS TO WAT E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS PROP. 8" SAN. SEW LATERAL 45° BEND CLEANOUT INV. = 689.60 CLEANOUT PROP. 20' CITY SAN. SEW. ESMN'T CLEANOUT INV. = 689.60 45° BEND22° BEND 45° BEND PROP. 4" SAN. SEW LATERAL PROP. 2" SAN FORCE LAT.PROP. PUMP STATION 45° BEND 10+84.12 11+0011+94.23CLEANOUT WYE PROP. 2" SEW. BALL VALVE PRIVATEFW 10+00 11+00 12+00 13+00 13+51.49 6" SCH 80 SLEEVE WITH IN FW ESM'T 18" STEEL SLEEVE WITH IN FW ESM'T 1 0 + 0 0 DUCTILE IRON DUCTILE IRO N NYLOPLAS T DO NOT POLLU T E DUCTIL E I R O N NYLOPLAST DRAINS TO WATE R W A Y S EX K1 PROP. 20' CITY SAN. SEW. ESMN'T EX K2 11+00 12+00 13+0010+00 EX J EX K PROP. 8" SAN. SEW. EX K1A 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGPLAN VIEW 1" = 50' PLAN VIEW 1" = 50' PLAN VIEW 1" = 50' NOTES: 1.CONTRACTOR TO TEST PIT EXISTING UTILITIES AND RELOCATE AS NECESSARY. 2.ALL RESTRAINT JOINTS TO EXTEND 20' INTO CUT STANDBYGENERATORPUMP STATION CONTROL PANEL (SEE DETAIL) PUMP STATION WET WELL (SEE DETAIL) 45° BENDS 2" CTS HDPE DR11 FORCE MAIN 8" SANITARY LATERAL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGPS PLAN VIEW 1" = 10' concrete 4' min. 4' min.3' 10' 1' NOTES: 2' 1' to pump station 18" dia. hole underground power electric socket meter (see notes 1 thru 5) weather proof strobe light and vibrating horn (see notes 6 & 7) overhead light to be mounted on extention 2' above and 1' in front of enclosure. (see notes 8 & 9) 1. Enclosure construction: a. to meet NEMA 3R standards b. 4'-0" (W) x 4'-0" (H) x 1'-0" (D) c. 12 gage galvanized steel d. double doors with: 1) heavy duty hinges 2) heavy duty 3 point latching mechanism 3) heavy duty hasp (for padlock) e. drip shield f. back panel (of 12 gauge steel) to provide a minimum of 5/8" clearance 2. The following items are to be mounted in enclosure: b. automatic transfer switch c. circuit breaker panel d. 110 V outlet e. pump control panel 3. Controls to be in their own enclosures and mounted inside panel enclosure. 4. The pump control panel shall be accessible without cutting off power. 5. Inside 110 V outlet to be on separate circuit 6. Light and horn shall be Edwards model no. 50-R (light) and model no. 876-N5 (horn) or Engineer approved equal. 7. Alarm light and horn to have manual on/off switch inside control enclosure. 8. Overhead light to be on separate circuit and have on/off switch inside enclosure. 9. Overhead light to be 175 watt 120 V equivalent LED security light. GRINDER SEWER PUMP STATION ELECTRICAL CONTROLS ENCLOSURE conduit to generator min. a. main disconnect minimum dimensions 3 phase power monitor high water (wet well) pump #2 failure pump #1 failure OVERALL WIRING load side of meter to light(s) high water (wet well) 120 V sensor for alarm light and horn normally open dry contacts high water alarm contacts control panel to generator 110 V alarm light and horn (with manual on/off switch) alarm wiring (in separate conduit) 110 V receptacle (inside enclosure) circuit breaker panel main disconnect overcurrent protection ground per N.E.C. code automatic transfer switch TYPICAL WIRING DIAGRAMS SEWER PUMP STATION NOTE: Pump station controls shall provide low voltage, short circuit and overload protection on all phases. NOTE: The pump station alarm system shall monitor the main power supply, the auxiliary power supply, failure of each pump to discharge, high liquid level in the wetwell and have a test function. telephone line (1MB service) auto-dialer w/ alarm wiring (in separate conduit) surge suppressor 78 GPM @ 120' TDH PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE HGL COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 PROPOSED GRADEEXISTING GRADE HGL COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 24' CL 1 RIP RAP 72' - 15" H D P E @1.90% 26' - 8" PVC SDR35 @0.50% 24' - 6" PVC SDR35 @0.50% STR 102 - STR 102A STR 103 - STR 103A STR 1041 - STR 104B 75' - 18 " H D P E @3.6 1 % 27' - 24" HDPE @0.56% 61' - 15" HDPE @0.50%PROP 8"SAN. XINGPROP 8"W/L XINGSTR 100 - STR 114 62' - 24" HDPE @0.53% 55' - 24" HDPE @0.54% 62' - 24" HDPE @0.50% 17' - 24" HDPE @0.69% 50' - 24" HDPE @0.50% 30' - 18" HDPE @0.54% 59' - 18" HDPE @0.50% 72' - 15" HDPE @0.50%PROP 4"SAN. LAT.XINGPROP 4"SAN. LAT. XINGPROP 8"SAN. LAT. XING21' - 12" HDPE @0.57% 51' - 12" HDPE @0.51% 69' - 6" PVC SDR35 @0.51% 9+50 10+00 10+50 11+00 11+50 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 102 10+00.00=DI-3B (L=4')INV OUT=686.13INV IN=687.13INV IN=686.3810+72.00=DI-3B (L=4')INV OUT=688.509+50 10+00 10+50 11+00 11+50 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 103 10+00.00=DI-3BCC (L=6')INV OUT=686.67INV IN=687.67INV IN=686.9210+71.42=EW-1INV OUT=690.009+50 10+00 10+50 11+00 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 104 10+00.00=MH-1INV OUT=687.19INV IN=692.50INV IN=687.4410+25.67=NYP-12" W/ PED GRATEINV OUT=692.63INV IN=692.7310+49.46=NYP-12" W/ PED GRATEINV OUT=692.85INV IN=692.95 (2-6")TOP=696.00TOP=696.31TOP=696.00102A 103A 104A 104B TOP=693.74TOP=692.75TOP=695.209+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 100 101 102 103 104 105 106 107 108 109 111 112 113 114 10+00.00=ES-1INV OUT=685.4010+27.00=DI-3B (L=4')INV OUT=685.55INV IN=685.80INV IN=685.8010+89.00=DI-3B (L=4')INV OUT=686.13INV IN=686.38INV IN=687.1311+44.00=DI-3CC (L=6')INV OUT=686.67INV IN=686.92INV IN=687.4212+06.18=MH1INV OUT=687.23INV IN=687.48INV IN=692.5012+23.53=DI-1INV OUT=687.60INV IN=687.8012+73.42=DI-1INV OUT=688.05INV IN=688.55INV IN=692.8013+03.19=DI-3B (L=4')INV OUT=688.71INV IN=688.9613+62.31=DI-3C (L=6')INV OUT=689.26INV IN=689.5114+33.86=NYP-18" W/8" SOLID COVERINV OUT=689.87INV IN=690.10 (15")INV IN=692.42 (8")INV IN=692.97 (6")14+94.12=NYP-15" W/8" SOLID COVER & REDUCER INV OUT=690.40INV IN=693.11TOP=685.40TOP=692.40TOP=696.00TOP=695.65TOP=695.39TOP=694.58TOP=696.28TOP=696.32TOP=695.85TOP=696.34TOP=694.23INV IN=690.4015+15.11=NYP-12" W/ PED. GRATEINV OUT=690.52INV IN=690.5215+65.94=NYP-12" W/ 8" SOLID COVER & REDUCERINV OUT=690.78INV IN=691.7116+34.96=DUCTILE IRON CLEANOUTINV OUT=692.06TOP=693.74TOP=695.20TOP=695.11INV IN=689.51INV IN=690.78INV IN=692.06PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE HGLCOMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 PROPOSED GRADE EXISTING GRADE HGL COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 71' - 8" PVC SDR35 @0.50% 66' - 24" HDPE @0.50% 85' - 12" HDPE @0.50% 142' - 12" HDP E @ 1 . 3 1 % 17' - 12" HDPE @ 0.50% 121' - 12" HDPE @0.50% 102' - 12" HDPE @0.50% STR 106 - STR 106B STR 109 - STR 109F STR 101 - STR 205 43' - 6" PVC SDR35 @0.58% 11' - 6" PVC SDR35 @0.52% 8'- 6" PVC SDR35 @0.52% 8'- 6" PVC SDR35 @0.50% 36' - 6" PVC SDR35 @0.50%PROP 8" SAN. XINGPROP 8"SAN. LAT. XINGSTR 111 - 111A 17'-12" HDPE @0.50% 9+50 10+00 10+50 11+00 11+50 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 106 10+00.00=DI-1INV OUT=688.05INV IN=692.80INV IN=688.5510+42.99=NYP-12" W/ PED GRATEINV OUT=693.05INV IN=693.1510+54.45=NYP-8" W/ SOLID COVERINV OUT=693.21INV IN=693.21TOP=695.39TOP=696.05TOP=696.339+50 10+00 10+50 11+00 11+50 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 109 10+00.00=NYP-18" W/8" SOLID COVERINV OUT=689.85INV IN=692.42 (8" )INV IN=690.10 (15" )INV IN=692.59 (6" )10+70.86=NYP-12" W/ PED GRATEINV OUT=692.7810+78.61=NYP-12" W/ PED GRATE10+87.02=NYP-8" W/ SOLID COVERTOP=696.28TOP=696.23TOP=696.05TOP=696.339+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 101 200 201 202 203 204 205 10+00.00=DI-3B (L=4')INV OUT=685.55INV IN=685.80INV IN=685.8010+65.71=DI-3C (L=6')INV OUT=686.13INV IN=687.1311+50.93=DI-3B (L=4')INV OUT=687.55INV IN=687.8012+93.31=NYP-18" W/ PED GRATEINV OUT=689.67INV IN=689.77INV IN=691.2013+09.84=NYP-15" W/ PED GRATEINV OUT=689.85INV IN=689.9514+31.00=NYP-12" W/ PED GRATEINV OUT=690.56INV IN=690.6615+33.26=NYP-15" W/ PED GRATETOP=692.40TOP=691.47TOP=692.31TOP=694.45TOP=695.16TOP=695.22TOP=695.22106A 106B 109D 109E 109F INV IN=692.95INV OUT=692.99INV IN=693.09INV OUT=693.1315+69.04=NYP-12" W/ PED GRATEINV OUT=691.85TOP=694.50206 INV OUT=691.17INV IN=691.679+50 10+00 10+50 11+00 675 680 685 690 695 700 705 675 680 685 690 695 700 705 710 111 10+00.00= NYP-15" W/8" SOLID COVERINV OUT=690.40INV IN=693.1110+16.60=NYP-15" W/ PED GRATEINV OUT=693.20TOP=696.32TOP=696.20111A 710 INV IN=690.40INV IN=693.20151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGV: 1" = 5' H: 1" = 50' PROPOSED GRADE EXISTING GRADE HGL COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 HGL PROPOSED GRADE EXISTING GRADE EXISTING GRADE HGL PROPOSED GRADE HGL PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE 12' CL 1 RIP RAP HGL PROPOSED GRADE EXISTING GRADE 12' CL 1 RIP RAP COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 8' - 30" RCP III @1.25% APPROX. LOCATION EX. 8" GAS LINE XING. RELOCATE IF NECESSARY. 60' - 8 " PVC S D R 3 5 @3.3 9 % STR 202 - STR 202A 21' - 15" HDPE @0.50% 98' - 30" RC P I I I @ 1 . 7 3 % STR 108 - STR 115 STR 1- STR 6 44' - 15" RCP III @0.51% EX 2 - STR 9 90' - 1 5 " R C P I I I @3.3 3 % STR 4 - STR 4A 60' - 24" RCP III @2.50 % REPLACE E X C M P TO 46' - 24" RCP III @1.57% STR 7 - STR EX2 EX. 198' - 24" CMP @1.62%APPROX. LOC.EX F.O. XINGAPPROX.LOC. EX. 12"W/L XINGAPPROX. LOC. EX.8" GAS LINE XING48' - 30" RCP III @0.53% 49' - 30" RCP III @0.51% 31' - 30" RCP III @0.65% PROP. 12" W/L XING RELOCATE IF NECESSARY PROP. CONC. CRADLE 10YR WSE = 697.98 REPLACE E X C M P TO 46' - 24" RCP III @1.57% REMOVE & REPLACE EXISTING CULVERT EX 12" W / L 9+50 10+00 10+50 11+00 11+50 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 202 10+00.00=NYP-18" W/ PED GRATEINV OUT=689.67INV IN=691.20INV IN=689.7710+59.59=NYP-12" W/ PED GRATEINV OUT=693.22TOP=694.45TOP=696.18202A 9+00 9+50 10+00 10+50 11+00 675 680 685 690 695 700 705 710 675 680 685 690 695 700 705 710 108 115 10+00.00=DI-3C - 6'INV OUT=689.26INV IN=689.51INV IN=689.5110+21.00=DI-3B -10'INV OUT=689.61INV IN=689.61TOP=694.58TOP=694.709+50 10+00 10+50 11+00 11+50 12+00 12+50 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 10+00.00=ES-1 (30")INV OUT=681.1510+47.50=DI-3C - 6'INV OUT=681.40INV IN=681.5010+96.59=DI-3CC - 6'INV OUT=681.75INV IN=681.8511+27.39=DI-1INV OUT=682.05INV IN=682.85INV IN=684.1011+35.41=DI-3B - 4'INV OUT=682.95INV IN=683.9512+33.43=ES-1 (30")INV OUT=685.65INV IN=685.65TOP=682.56TOP=688.80TOP=689.00TOP=690.40TOP=690.45TOP=686.2254321 6 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 EX2 10+00.00=EX. DI-7INV OUT=683.62INV IN=683.94 (15"-2A)INV IN=684.35 (15"-2C)INV IN=683.92 (24"-2B)10+43.51= DI-7INV OUT=684.16PROP. TOP=688.00TOP=687.159+50 10+00 10+50 11+00 9 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 10+00.00=DI-1INV OUT=682.05INV IN=684.10INV IN=682.8510+90.00=DI-1INV OUT=687.10TOP=690.40TOP=691.109+50 10+00 10+50 11+00 4 4A 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 EX2 10+00.00=EW-1 (24")INV OUT=681.15INV IN=681.1510+60.00=DI-3B - 4'INV OUT=682.65INV IN=682.90INV IN=683.6511+05.82=EX. DI-7INV OUT=683.62INV IN=684.35 (15"-2C)INV IN=683.92 (24"-2B)INV IN=683.94 (15"-2A)TOP=688.97PROP. TOP=688.009+50 10+00 10+50 11+00 11+50 87 EX. TOP=686.73EX1 10+53.43=INV OUT=682.78INV IN=682.78TEST PITEX. TOP=686.73TEST PITAPPROX. LOC. EX. 2" W/L XINGTEST PITTEST PITAPPROX. LOC. EX. 2" SAN FM XINGPROP. 2"SAN FM XINGAPPROX. LOC. EX. F.O. XINGTEST PITPROP. 8"W/L XINGTEST PIT10+00.0010+00.0010+40.00INV. OUT = 690.30INV. IN = 693.70INV. OUT = 687.30INV. IN = 689.2010+44.008.5' CL 1 RIP RAP CULVERT 22-23CULVERT 20-21 7' CL 2 RIP RAP EXISTING GRADE EXISTING GRADE 44' - 18" RCP III @ 4.32%40' - 15" RCP III @ 8.50% 10YR WSE = 691.76 10YR WSE = 694.52 9+50 10+00 10+50 11+00 675 680 685 690 695 675 680 685 690 695 9+50 10+00 10+50 11+00 680 685 690 695 680 685 690 695 22 23 20 21 HGL PROPOSED GRADE EXISTING GRADE HGL PROPOSED GRADE EXISTING GRADE COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 20' - 15" RCP III @1.23% STR 8 - STR 8A STR 113 - STR 116 72' - 12" HDPE @0.51%PROP. 8"W/L XING18" MIN. 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 10+00.00=DI-3B - 4'INV OUT=682.65INV IN=683.65INV IN=682.9010+20.39=DI-3C - 6'INV OUT=683.90INV IN=683.90TOP=688.97TOP=688.929+50 10+00 10+50 11+00 8 8A 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 113 116 INV OUT=690.78INV IN=690.78INV IN=691.7110+72.13=DI-1INV OUT=691.15TOP=696.34TOP=693.659+50 10+00 10+50 11+0010+00.00=NYP-12" W/ 8" SOLID COVER & REDUCER151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGV: 1" = 5' H: 1" = 50' NOTES: 1.EXISTING STORM STRUCTURE (EX.#2) IS A MODIFIED DI-7 WITH AN EXISTING OPENING IN THE BACK TO ALLOW FOR SURFACE STORMWATER RUNOFF TO ENTER THE STRUCTURE AS DI-7 RIM ELEVATION IS HIGHER THAN THE EXISTING GRADE IN THE ADJACENT YARD. THE TOP OF EX#2 IS TO BE RAISED PER ROAD IMPROVEMENTS TO SENSENY ROAD AND THE OPENING IN THE BACK IS TO REMAIN TO ALLOW STORMWATER TO CONTINUE TO ENTER THE STRUCTURE. 2.CONTRACTOR TO TEST PIT EXISTING UTILITIES AND RELOCATE AS NECESSARY. 8" W/L DIP CL 52 PROPOSED GRADE EXISTING GRADE 5.0' EXISTING GRADE PROPOSED GRADE EXISTING GRADE 4.0' MIN. 4.0' MIN.TEST PIT17+72.12 = 45° BEND10+10.00 = 12"x8" TEE,2-12" G.V., 1-8" G.V.12" W/L DIP CL 52 10+00.00 = 12" END CAP &FLUSHING ASSEMBLY10+00.00 = 8"x12" TEE,2-12" G.V., 1-8" G.V.11+08.98 = 8"x8" TEE, 3-8" G.V.TEST PITPROP. 2"SAN. FORCE MAIN XING18" MIN.18" MIN. 18" MIN.PROP. RELOCATED12" W/L XING17+77.12 = 12"X16" TEE,1-12" G.V., 2- 16" G.V.15+90.00 = AIR RELEASE VALVE9+50 10+00 10+50 11+00 11+50 665 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 WATERLINE "C" (FREDERICK WATER) 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 APPROX. LOC. EX. 8"GAS LINE XINGPROP. 15"STM XINGWATERLINE "D" (FREDERICK WATER) EXISTING GRADE PROPOSED GRADE COMPACT FILL TO 95% MAXIMUM DRY DENSITY PER ASTM D 698 8" W/L DIP CL 52 11+36.30 = 45° BEND13+61.29 = 6" FIRE SERVICE & DOM. SERVICE 8"x6" TEE, 1-6" G.V.14+10.45 = 8"x6" CROSS, 2-6" G.V.,14+23.30 = 22.5° BEND14+50.22 = 45° BEND14+83.60 = 22.5° BEND4.0' MIN. WATERLINE "A" (FREDERICK WATER)PROP 8"SAN. XINGPROP 24"STM XING10+05.00 = 1-6" G.V., 8"x6" REDUCER10+00.00 = FH ASSEMBLY10+24.16 = 1" SERVICE LATERAL10+27.23 = 1-8" G.V.PROP 8"SAN. XING4.0' MIN. 18" MIN. 18" MIN.10+00.00 = 45° BENDTIE TO EX. W/LEXISTING GRADE PROPOSED GRADE 12" W/L DIP CL 52 3.0' MIN. 18" MIN.10+10.81 = 45° BEND10+75.31 = 45° BEND10+86.39 = 45° BEND18" MIN.11+86.42TIE PROP. W/L TO EX. W/LRESTRAINT JOINTS (TYP.) PROP. CONC. CRADLE APPROX. LOC. EX. 12" W/L 11+31.24 = 8"x8" TEE, 3-8" G.V.11+35.21 = 22.5° BEND2 FH ASSEMBLIES, 1-8" G.V.16+09.78 = FH ASSEMBLY16+04.78 = 8"X6" REDUCER, 1-6" G.V.W/ FOSTER ADAPTERW/ FOSTER ADAPTER6" WL DIP CL 52 6" WL DIP CL 52 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 670 675 680 685 690 695 700 705 670 675 680 685 690 695 700 705 PROP. 12"STORM XING9+50 10+00 10+50 11+00 11+50 670 675 680 685 690 695 700 665 670 675 680 685 690 695 700 WATERLINE "B" (CITY)PROP. 30"STM XINGPROP. 8"W/L XINGPROP. 2"SAN FM XING9+008+50 12+00 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGV: 1" = 5' H: 1" = 50' NOTES: 1.CONTRACTOR TO TEST PIT EXISTING UTILITIES AND RELOCATE AS NECESSARY. 2.ALL RESTRAINT JOINTS TO EXTEND 20' INTO CUT 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNTS 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNTS STAIRS (5R) 5' S/W 74.02 '34.02'39.2' 105.98' 102A 104B 106A 106B 109F 109D 109C 109A 111A 114 200 201202 203 202A 204 205 1 110A 10 109E 206 DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATER W A Y S NYLOPLAST DUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT P O L LU T E DUCT I L E I R O N NYLOP L A S T DRAINS T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS80.81'10+0016+0016+09.78X - S E C " A " X-SEC "3" X-SEC "5" CURB TRANSITION CG-6R TO CG-6 (TYP) CURB TRANSITION CG-6R TO CG-6 (TYP) RETAINING WALL W/HANDRAIL (STRUCTURAL DESIGN BY OTHERS) CURB CUT (2' W) X-SEC "5"3:13:11+002+00 1+0 0 692690 696694686 692 6 9 4 686688690682684676 678 680 682 68 4 6 8 6 6 8 8 6 9 0 696 N 32°06'42" E 918.87' EX J EX K EX K1 EX K1A 11+00 12+00 13+00 14+00 15+00PROPOSED BUILDING 4 STORY SENIOR RESIDENTIAL (63 UD UNITS) FFE:696.50' RETAINING WALL W/ HANDRAIL EX. SAN MAIN 10+00 TW=692.00 BW=692.00 TW=690.00 BW=689.50 TW=695.09 BW=688.00 TW=694.60 BW=685.50 TW=694.60 BW=684.11 TW=694.60 BW=681.75 TW=693.79 BW=679.76 TW=693.02 BW=678.38 TW=693.14 BW=685.43 TW=694.88 BW=678.86 TW=694.60 BW=685.43 TW=694.60 BW=687.08 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 680 685 690 695 700 705 675 680 685 690 695 700 705 PROPOSED GRADE AT HIGH SIDE OF WALL EXISTING GRADE AT LOW SIDE OF WALL PROP. PARALLEL STORM SEWER 10+00.00=BEGIN RETAINING WALL15+26.74=END RETAINING WALLSAN. SEW. XINGRETAINING WALL NOTES: 1.RETAINING WALL AND SYSTEM TO BE DESIGNED BY OTHERS. (UNDER SEPARATE BUILDING PERMIT) 2.HANDRAIL VDOT HR-1 OR APPROVED EQUIVALENT. (HANDRAIL NOT SHOWN FOR CLARITY) 3.RETAINING WALL PROFILE DEPICTS FINISHED GRADE AT HIGH SIDE AND LOW SIDE OF RETAINING WALL. WALL HEIGHT TO BE DETERMINED BY RETAINING WALL DESIGNER. PROPOSED RETAINING WALL (DESIGN BY OTHERS) PROPOSED RETAINING WALL (DESIGN BY OTHERS) PROPOSED RETAINING WALL (DESIGN BY OTHERS)BUILDING FF = 696.5FOUNDATION DRAIN BACKFILL BACKFILL BACKFILL TYPICAL SECTION 1 STATIONS 10+00 - 10+90 (10+53) NTS TYPICAL SECTION 2 STATIONS 10+90 - 13+11 (13+00) NTS TYPICAL SECTION 3 STATIONS 11+13 - 15+23.45 (13+78) NTS FOUNDATION DRAIN FOUNDATION DRAIN BUILDING FF = 696.5STORM STRUCTURE @ STA. 10+52.56 12" STORM SEWER 12" STORM SEWER 3.67' VARIES VARIES NOTES: 1.RETAINING WALL TYPICAL SECTION IS JUST TO SHOW PROXIMITY TO RETAINING WALL , HORIZONTAL AND VERTICAL SEPARATION BETWEEN STORM AND SANITARY. 2.RETAINING WALL SECTION IS NOT BASED ON ANY ACTUAL DESIGN OF A WALL. RETAINING WALL DESIGN WILL BE BY OTHERS.151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGVDOT ROAD DESIGN MANUAL, APPENDIX A(1) NOT TO SCALE GRASS CHANNEL SECTION #1 NOT TO SCALE GRASS CHANNEL SECTION #2 PEAK FLOW DEPTH VELOCITY 2 YR STORM EVENT:3.06 CFS --3.71 FPS 10 YR STORM EVENT:4.24 CFS 0.33'-- CHANNEL SLOPE 5.80% 3:1 3:1 2'0.4'2.2' NOT TO SCALE GRASS CHANNEL SECTION #3 PEAK FLOW DEPTH VELOCITY 2 YR STORM EVENT:0.04 CFS --0.83 FPS 10 YR STORM EVENT:0.05 CFS 0.02'-- CHANNEL SLOPE 5.80% 4:1 3:1 PROPOSED RETAINING WALL (DESIGN BY OTHERS) NOT TO SCALE GRASS CHANNEL SECTION #4 PROPOSED RETAINING WALL (DESIGN BY OTHERS) NOT TO SCALE GRASS CHANNEL SECTION #5 PEAK FLOW DEPTH VELOCITY 2 YR STORM EVENT:0.05 CFS --0.75 FPS 10 YR STORM EVENT:0.07 CFS 0.07'-- CHANNEL SLOPE 2.37% 13:1 22:1 NOT TO SCALE GRASS CHANNEL SECTION #6 PEAK FLOW DEPTH VELOCITY 2 YR STORM EVENT:14.60 CFS --4.49 FPS 10 YR STORM EVENT:23.90 CFS 0.33'-- CHANNEL SLOPE 7.27% 8:1 3:1 6'0.6'NA GREEN SC250 DITCH LINING (OR APPROVED EQUIVALENT) 5.7'2.2' NA GREEN S75BN DITCH LINING (OR APPROVED EQUIVALENT) CROSS SECTION #4 REMOVED 2.2' CROSS SECTION #1 REMOVED 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING2" LOCALIZED DEPRESSION MIN. SLOPE 4% 2. EXPANSION JOINT FILLER SHALL BE 1/2" BITUMINOUS TYPE PREFORMED EXPANSION JOINT FILLER, ASTM D-1751 1. UNLESS OTHERWISE NOTED, CONCRETE SHALL BE CLASS A3 NOTES: PROVIDE EROSION PROTECTION PER PLAN CONCRETE SCUPPER N.T.S. 2'6"TAPER CURB 9' MIN.18' OR 20'STRIPED AREA HANDICAPPED SYMBOLS FC EP 4.0' MIN. 7.0' MAX. 4" STEEL PIPE FILLED WITH CONCRETE DISPLAY CONDITIONS 24" 6"6" 9" RESERVED PARKING 12" 2'WHEEL STOP WITH EP SIGN (SEE DETAIL) HANDICAPPED PARKING N.T.S. 04/15 VER 1 NOTE: RAMP FOR HANDICAPPED MUST BE LOCATED AT SAME POINT ADJACENT TO THE STRIPED AISLE. LIGHT COLORED REFLECTIVE BACKGROUND MAT'L. DARK COLORED 2" LETTERS & 3/8" BORDER INTERNATIONAL SYMBOL OF ACCESSIBILITY UNLAWFUL PARKING IN THIS SPACE IS SUBJECT TO A FINE OF $50.00 TO $100.00 LIGHT COLORED 1" LETTERS DARK COLORED REFLECTIVE BACKGROUND MATERIAL SIGN SHALL BE LOCATED SUCH THAT IT WILL NOT BE OBSCURED BY VEHICLE PARKED IN SPACE. 9' VAN ACCESSIBLE SPACE 9' FOR REGULAR SPACE CONCRETE SIDEWALK N.T.S. -2% 4" 3000 PSI VDOT A3 CONCRETE 4" SUBBASE (21-A STONE) WIDTH VARIES SEE SITE PLAN COMPACTED SUBGRADE (COMPACTED TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT VDOT VTM-1 METHOD) * CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6% ±1.5. SLUMP TO BE 5" ±1" 6x6 WWM SAW-TOOTH CURB OPENINGS N.T.S. MODIFIED 2"R (TYP.) 4' TYP.2'2' 3" TYP. 2' GUTTER PAN CURB OPENING CURB OPENING FLOW LINE BACK OF CURB2.0%2.0%2'2' 2' GUTTER ON BACK OF CURB OVERLAND RELIEF WEIR EDGE OF PAVEMENT 2. FINISHED SIDE OF FENCE SHALL FACE ADJOINING PROPERTY, IF APPLICABLE. 1. PRESERVATIVE STAIN ON ALL WOOD. COLOR TO MATCH THAT OF BLDG. NOTES: 3.5" 1.25" 3.5"1 3/4"4"X4"X8' POSTS 2"X4"X4' BEAMS, TOE NAIL TO POST COMPACTED GRAVEL 4'-0" 1"X4"X4'-8" SLATS, 2-FINISH NAIL AT TOP AND BOTTOM 6"3"3'-0"6'-0"4"8"5'-8"8"NOT TO SCALE WOOD FENCE DETAIL OR APPROVED EQUAL, FOR BUFFER SCREENING (FENCE 6') WITH BOARD ON BOARD CONSTRUCTION 1'-0"6'-0" MIN 1'-6"MINMIN NTS COMPACTED SUBGRADE EXP. JOINT TYP. GATE HINGES PER MANUFACTURER'S SPEC DUMPSTER SLAB PRESSURE TREATED BOARD ON BOARD WOOD GATE OR APPROVED EQUAL 6"X 6"X 1/4" STEEL TUBE FILLED W/ CONCRETE & EMBEDDED INTO CONCRETE FOOTING TRAVEL WAY PAVEMENT 7" THICK POURED CONCRETE PAD W/ 6X6-10/10 W.W.M. ON COMPACTED 6" AGGREGATES BASE BELOW SLAB AND FOOTING TRASH ENCLOSURE DETAIL 6'-0"151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING1. The City's Water and Sewer Standards and Specifications are available at www.winchesterva.gov/engineering. 2. The contractor shall adhere to the standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by the City. 4. Exact locations of water and sewer services on new lines are to be coordinated with the City's inspector. 5. All waterlines are to be class 52 DIP. WINCHESTER PUBLIC SERVICES NOTES 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING WATER VAULT NOTES: 1. FREDERICK WATER TO PROVIDE DOMESTIC 2" NEPTUNE WATER METER. 2. FIRE METER TO BE 6" NEPTUNE HP PROTECTUS III FIRE SERVICE METER PER FW SPECIFICATIONS. 3. WATER LINES, FITTINGS AND GATE VALVES WITHIN THE VAULT TO BE FLANGED DIP CLASS 52 UNLESS OTHERWISE SPECIFIED. SIZE AS SHOWN. 4. INTERIOR METER VAULT DIMENSIONS ARE MINIMUM W= 8' BY L= 16'. INTERIOR BACKFLOW PREVENTION VAULT TO BE MINIMUM W= 6' BY L= 8'. 5. WATER METER AND BACKFLOW PREVENTION ASSEMBLIES TO BE PER FW SPECIFICATIONS. 5' minimum METER INTERFACE UNIT; BRACKET FURNISHED BY FW AND INSTALLED BY CONTRACTOR BACKFLOW PREVENTION ASSEMBLY6"TEE GATE VALVE6" BYPASS LINE 6" GATE VALVE 6" NEPTUNE HP PROTECTUS IIISADDLE AND CORPORATION STOP DOMESTIC METER TO BUILDING TO BUILDING S.S. PIPE STANDS (TYP.)6" STONE BASE NOTES: 1. All fittings and pipe in vault to be flanged D.I. Class 52. 2. Access door shall be Halliday Products H1R3636 or FW approved equal. 3. Water meter and backflow prevention assemblies to be per FW specifications. 4. Precast vaults shall have a minimum wall, top and floor thickness of 6". 5. Precast vaults shall be H20 rated. 6. 24" clearance required between vault walls and fittings. VAULT DIMENSIONS TO BE DETERMINED VAULT DIMENSIONS TO BE DETERMINED 6" STONE BASE ACCESS DOOR FIRE SERVICE AND DOMESTIC SERVICE VAULT DETAIL LINK-SEAL (TYP.) LINK-SEAL (TYP.) LINK-SEAL (TYP.) ALUMINUM ACCESS LADDER S.S. PIPE STANDS (TYP.) EBAA MEGAFLANGE 3' MIN. TO BUILDING DIP CLASS 52 2 FT MIN. 3' MIN. 3' MIN. DIP CLASS 52 4' MIN. FW PRIVATE 6" DIP CLASS 52 6" DIP CLASS 52 90° BEND 6"TEE 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLASTDUCTILE I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLA S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLASTDUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLASTDO NOT P O L L U T E DUCTILE I R O N NYLO P L A S T DRAINS T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS 3 Bn 4 Bn 4 Ar 1 Ar 3 Ar 10 Zs 7 Gt 19 Bg 92 Im 2 Gt 7 Gt 5 Ac 30 ToFence 6' Ht. (see sheet 32A) 2 Ac 4 Ms 1 Gt 1 Ar 1 Gt 2 Ms 1 Gt 2 Ms Fence 6' Ht. (Provide clearance from ground to allow runoff to flow under fence)No Fence in sanitary sewer easement BLACK CHAIN LINK FENCE GATE LANDSCAPE BARRIER (SHRUBS & TREES) LANDSCAPE BARRIER (SHRUBS & TREES) LANDSCAPE BARRIER (SHRUBS & TREES) 1 Gt 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGLANDSCAPING MAINTENANCE NOTES A. All landscaped area shall be maintained in good condition by owner. B. Reasonable provisions shall be made to protect landscaping from vehicles, pedestrians and shopping carts. C. Dead or dying vegetation shall be replaced at the direction of the site administrator. GENERAL CONDITIONS SCOPE OF WORK The landscape contractor shall provide all materials, labor and equipment to complete all landscape work as shown on the plans and specifications. NOTE: If contractor bids according to the Plant List, he/she should thoroughly check the plant list quantities with the symbols drawn on the plan, to be sure there are no discrepancies. If there is a discrepancy between the drawing and the list on the plans, the drawing takes precedence. STANDARDS All plant material will conform to the current issue of the American Standard for Nursery Stock published by the American Nursery & Landscape Association (ANLA). Plant material must be selected from nurseries that have been inspected and certified by state plant inspectors.Collected material may be used only when approved by owner's representative.Nomenclature will be in accordance with Hortus III by L.H. Bailey. SUBSTITUTIONS: PRE-BID It is the landscape contractor's responsibility to make every reasonable effort to find the plants specified by the landscape architect. The landscape contractor may offer substitutions to the landscape architect for his/her consideration.The landscape contractor will notify the landscape architect if there are known diseases or insect resistant species that can be substituted for a selected pest-prone plant. The contractor shall submit a base bid as per plan plus price clarifications for all recommended substitutions. SUBSTITUTIONS: POST-BID It is the intent to eliminate post-bid substitutions. However, in the event that the contract material has become unavailable, an appropriate substitution must be approved by the owner's representative and the Frederick County Planning Department UTILITIES AND UNDERGROUND FEATURES The landscape contractor shall notify utility companies and/or the general contractor in advance of construction to locate utilities. If there is a conflict with utilities and the planting, the landscape architect shall be responsible for relocating plants prior to the planting process. Any cost due to relocating after planting shall be borne by the owner. If plants are to be installed in areas that show obvious poor drainage, and the plants are inappropriate for that condition, the landscape contractor shall notify the landscape architect and owner. If they deem necessary, the plants shall be relocated, the contract shall be adjusted to allow for drainage correction at a negotiated cost, or the plant selection modified by the landscape architect to accommodate the poor drainage. No trees or shrubs shall be placed on Frederick Water easements. WARRANTY The standard warranty is for one (1) year period, excluding bulbs, sod and annuals, commencing on the date of initial acceptance. All plants shall be alive and in satisfactory growth at the end of the guarantee period. Any material that is 25% dead or more shall be considered dead and must be replaced at no charge. A tree shall be considered dead when the main leader has died back, or 25% of the crown is dead. Replacements shall be made during the next planting period. Replacements shall be of the same type, size and quality as original species unless otherwise negotiated. STANDARDS A. Plants will be in accordance with the current ANLA's Standards and conform in general to representative species. B. Balled and Burlapped (B&B) 1. Balled and burlapped plants shall be dug with firm root balls free of noxious weeds. There should be no excess soil on top of the rootball or around the trunk. 2. Ball sizes shall be in accordance with ANLA Standards. 3. Caliper and Height Measurement: In size grading B&B single trunk trees, caliper shall take precedence over height. Caliper of the trunk shall be taken 6" above ground level (up to and including 4" caliper size) and 12" above the ground level for larger trees. For multiple-trunk trees, height measurement shall take precedence over caliper. C. Container - Grown Stock 1. The size of container-grown shrubs is measured by height and width of the plant. Container-grown trees are measured by the same standars listed in B.3. above. The root system of container-grown plants shall be well developed and well distributed through out the container. 2. All container-grown trees and shrubs that have circling (girdling) and matted roots shall be treated in the following manner prior to planting: separate the roots by hand, untangling so circling roots will not damage future of the plant.See Planting procedures for all Container-Grown Trees & Shrubs in this section. 3. All container-grown plants should be grouped and watered daily until they are planted, the soil shall be kept moist with the equivalent of one-inch of rainfall per week. D. Pruning shall be done before planting or during the planting operation. E. All plant material in transit shall be covered to keep material from drying out. The covering shall comply with the state and local laws pertaining to the transport of materials. F. Trees shall be placed in an upright position with the rootball covered by mulch and kept moist. Trees and shrubs should not be left on site unplanted for more than 24-hours without adequate water to insure root survival. INSPECTION A. Plants may be subject to inspection and approval by the owner or owner's representative at the place of growth or holding yard for conformity to specification requirements as to quality, size and variety. B. Plants damaged in handling or transportation can be rejected by the owner or owner's representative. C. State nursery inspection certificates shall be furnished to the landscape architect upon request. PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS A. Remove the plant either by cutting or inverting the container. B. For untreated plastic container-grown pplants with circling roots, separate roots by hand and untangle roots the length of the rootball. C. Plant shrub or tree a minimum of 18 of the height of the rootball above existing grade. D. Apply a 2" to 3" thick layer of approved hardwood mulch. Keep mulch 6" away from the trunk of all trees and shrubs. E. Plants grown in root containment bags must have bags removed during the planting operation. No additional slashing of the rootball is necessary. SEEDING NOTES 1. Topsoil shall be spread at a depth of 4". 2. Before sodding or seeding and landscaping the contractor will till all compacted areas at least 6" in depth to loosen the compacted soils and add amendments 3. Pulverized agricultural limestone shall be incorporated into soil at a rate of 92 lbs. per 1000 s.f. (2 tons per ac.). 4. Fertilize with 10-10-10 at a rate of 23 lbs. per 1000 s.f. (1000 lbs. per ac.). 5 Seed mix shall consist of 67% Kentucky 31 Tall Fesue and 33% Sericea Lespedeza applied at the rate of 120 lbs. per ac. or similar drought tolerant mix. 6. Straw mulch shall be applied to all seeded areas at the rate of 3500 lbs. per acre and anchored with cutback, or emulsified asphalt applied at a rate of 200 gallons per ac.. 7. No slope in excess of 25% will be seeded (or sodded). 36" Ht92ImIlex x meserveae 'Mesdob'China Boy Holly Bg Buxus x 'Green Mountain'Green Mountain Boxwood 36" Ht.19 Red Maple Acer rubrum ABB BOTANIC NAME COMMON NAME QUANTITY SIZE Ar PROPOSED TREE PLANTINGS 9 PROPOSED SHRUB PLANTINGS 2" cal, B&B 30Emerald Green ArborvitaeThuja occidentalis 'Smaragd'To 2" cal, B&B 10Japanese ZelkovaZelkova serrata Zs 2" cal, B&B 7River BirchBetula nigraBn 2" cal, B&B DIG HOLE 2X-3X ROOT BALL WIDTH SCALE: NOT TO SCALE12"TREES <4" CAL. TREE PLANTING - VERTICAL STAKES FIRM BEARING SOIL WIND CONDITIONS-EXTENDED TO UPRIGHT STAKES-IN SEVERE TREE CHAIN OR TIE RUBBER HOSE OPTIONAL WITH TIE UPRIGHT STAKES EXTENDED TO FIRM BEARING SOIL PLACE STAKES PARALLEL TO WALKS AND BUILDINGS CORNER OF ROOT SYSTEM TO BE AT LINE OF ORIGINAL GRADE. FIRMLY COMPACTED SAUCER MIXTURE. SCARIFY PIT BOTTOM (MIN. 6"). NOTES: 1. MIN. ROOT SPREAD TO BE IN ACCORDANCE WITH "AMERICAN STANDARDS FOR NURSERY STOCK." 2. PRUNE ALL DAMAGED, DISEASED, OR WEAK LIMBS & ROOTS. 3. CLEARLY PRUNE ALL DAMAGED ROOT ENDS. 4. DO NOT ALLOW ROOTS TO DRY OUT DURING INSTALLATION PROCESS. 5. SOAK ROOTS IN WATER OVERNIGHT BEFORE PLANTING. TYPICAL PLANTING DETAIL - SHRUB 2 x BALL DIA. MIN SCARIFY PIT SIDES SCALE: NOT TO SCALE GENTLY COMPACTED TOPSOIL (USE TOPSOIL) THIS SHEET FOR LANDSCAPING ONLY CALCULATIONS: Total Site: 4.971 ac. or 216,536.8 sf Impervious Area = 1.83 or 79,617 sf Greenspace = 3.14 ac. or 136,920 sf.(63%) Interior Parking Lot Landscaping (165-202.01(D)(13)(b): 1 tree per 10 spaces 93 spaces proposed/ 10= 9 trees required, 9 trees provided Perimeter Landscaping (165-202.01-(D)(13)(a): x 70,410.99 impervious area (1.61 ac) 1 tree per 2,000 sf impervious area for first 100,000 sf = 40 trees required, 40 trees provided 1 tree per 5,000 sf impervious area thereafter = 0 trees required Street Tree Plantings: Street trees are not required but are being provided as part of the modified road efficiency buffer. TOTAL TREES REQUIRED: 49 TOTAL TREES PROVIDED: 49 Parking Perimeter Screening 110- Evergreen Shrubs NOTES: 1. Tree and shrub sizes shown on plan view are illustrative, sizes at planting are as shown in plant schedule. *2. The placement of trees shown on the plan may change at the time of install. The owner reserves the right to relocate trees, for aesthetic purposes, with prior approval from Frederick County Planning Department. *3. All plants shall conform with Frederick County's approved landscape list; substitutions must be approved in writing by the Frederick County Planning Department. 4. The owner has requested a Modified Road Efficiency Buffer per the exemption contained in Frederick County zoning ordinance §165-203.02(E)(5) as the topography changes +/- 6' from Senseny Road to the new parking area and buildings. Street trees are being provided along the property frontage with Senseny Road as part of this modification. 5. The owner has requested a Category Type B Buffer modification per the exemption contained in Frederick County zoning ordinance §165-203.02(C)(&) as an existing utility (sanitary sewer) conflicts (crosses) the buffer area near the existing adjacent townhomes. A 6' screening fence is being provided along the boundary adjacent to the townhomes except at the utility conflict. 8Flowering CrabappleMalus sp.Ms 2" cal, B&B Skyline Honey LocustGleditsia Triacanthos 'Skyline'Gt 2"-2.5" cal, B&B Shadblow Serviceberry MultitrunkAmelanchier CanadensisAc 2"-2.5" cal, B&B 20 7 PROPOSED BUILDING 4 STORY SENIOR RESIDENTIAL (63 UD UNITS) FFE:696.50' DUCTILE IRO N DO NOT P O L L U T E D R A I N S T O W A T E RW A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTIL E I R ON DO NOT PO L L U T E D R A I N S T O W A T E R W A Y S NYLOPL A S T DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTIL E I R O N DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT PO L L U T E D R A I N S T O W A T E R W A Y S NYLOPLASTDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERW A Y S NYLOPLAST DUCTILE I R O N DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAS TDUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DO NOT P O L L U T E DUCTILE I R O N NYLOP L A S T DRAINS T O W A T E R W A Y S NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS FUTURE CHURCH ADDITION FFE:696.50' 22 A @ 25' A @ 25' E @ 25' B @ 25' C @ 13' C @ 13' A @ 25' E @ 25' ZONED: RP USE: SCHOOL ZONED: RP USE: SINGLE FAM ZONED: RP USE: MULTI-FAM ZONED: RP USE: SINGLE FAM ATT ZONED: B1 USE: VACANT D @ 20' D @ 20' D @ 20' B @ 25' B @ 25'B @ 25' C @ 20'151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGNOTES: 1.READINGS SHOWN ARE BASED ON A TOTAL LLF OF AS SHOWN AT GRADE. DATA REFERENCES THE EXTRAPOLATED PERFORMANCE PROJECTIONS IN A 25c AMBIENT BASE ON 10,000 HRS OF LED TESTING (PER IESNA LM-80-08 AND PROJECTED PER IESNA TM-21-11). 2.PLEASE REFER TO THE "PLAN VIEW" FOR MOUNTING HEIGHTS AND ROTATION OF LIGHTS. 3. PRODUCT INFORMATION CAN BE OBTAINED AT WWW.ACUITYBRANDS.COM OR THROUGH YOUR LOCAL AGENCY. 4. REFER TO ARCHITECTURAL PLANS FOR PLACEMENT OF WALL PACK LIGHTS. 5. THIS ARCHITECTURAL LIGHTING SUBMITTAL IS PROVIDED ONLY FOR INFORMATIONAL PURPOSES AND TO THE HELP THE CUSTOMER OR END-USER (AS APPLICABLE) UNDERSTAND HOW VARIOUS SECTIONS OF LINEAR FIXTURES CONNECT TO EACH OTHER AND HOW THEY MOUNT TO THE CEILING. THIS LIGHTING SUBMITTAL IS STRICTLY BASED ON THE INFORMATION PROVIDED TO ACUITY BRANDS, AND IS PROVIDED WITHOUT WARRANTY AS TO ACCURACY, COMPLETENESS, RELIABILITY OR OTHERWISE. IF THE INFORMATION (INCLUDING BUT NOT LIMITED TO FLOOR-PLANS, REFLECTED CEILING PLANS, ELECTRICAL PLANS, AND SPECIFICATIONS) PROVIDED TO ACUITY BRANDS IS INCOMPLETE OR NOT CURRENT (I.E., NEWER VERSIONS EXIST), THE ACCURACY OF PROPOSED DESIGN MAY BE ADVERSELY AFFECTED. ONCE THIS LIGHTING SUBMITTAL IS RECEIVED BY THE CUSTOMER OR END-USER (AS APPLICABLE), IT IS THE OBLIGATION OF THE CUSTOMER OR END-USER (AS APPLICABLE) TO CONSULT WITH A PROFESSIONAL ENGINEERING ADVISOR TO DETERMINE WHETHER THE PROPOSED DESIGN MEETS THE APPLICABLE PROJECT REQUIREMENTS FOR LIGHTING SYSTEM PERFORMANCE, CODE COMPLIANCE, SAFETY, SUITABILITY, AND EFFECTIVENESS FOR USE IN A PARTICULAR APPLICATION. IN NO EVENT, WILL ACUITY BRANDS BE RESPONSIBLE FOR ANY LOSS RESULTING FROM ANY USE OF ANY INFORMATION CONTAINED IN THIS LIGHTING SUBMITTAL. 6. SITE LIGHTING PREPARED BY HOLOPHANE (Acutiy Design Services, Sydeny Schroeder) AND PLAN INFORMATION FROM DRAWING NO. 160718-1 A1. TYPICAL 25' LIGHT POLE DETAIL NOT TO SCALE CONCRETE LIGHT POLE BASE (DESIGN BY STRUCTURAL ENGINEER) FINISHED GRADE IS FLUSH WITH THE TOP OF THE BASE 25' MAX. POLE HEIGHT(PER FREDERICK COUNTY CODE)LIGHT POLE W/ CONCRETE BASE LIGHT FIXTURE 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERING 113A12+52.06PROP. EP PROP. EGPROP. EG PROP. EP113A12+52.06PROP. EP PROP. EGPROP. EG PROP. EP 113A12+52.06PROP. EP PROP. EGPROP. EG PROP. EP 113A12+52.06PROP. EP PROP. EGPROP. EG PROP. EP 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGVEHICLE CENTER LINE KEY VEHICLE TIRE PATH NOTES: 1.THE PASSENGER CAR (P) IS THE DESIGN VEHICLE THAT WILL ENTER AND EXIT THIS SITE WITH THE MOST FREQUENCY. THIS ENTRANCE IS DESIGNED FOR PASSENGER CARS. 2.OCCASIONALLY LARGER VEHICLES WILL ACCESS THE SITE AND A WB-40 IS SHOWN IN THE AUTOTURN SIMULATION THAT THE ENTRANCE WILL ACCOMMODATE THE LARGER VEHICLE. RIGHT TURN IN RIGHT TURN OUT LEFT TURN IN LEFT TURN OUT VEHICLE BODY ENVELOPE