HomeMy WebLinkAbout38-22 Comments
107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
August 15, 2022
Mr. Trenton Caudill, PE
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Revised Site Plan Comments – Graystone Industrial Park Lot 1A
Frederick County, Virginia
Dear Mr. Caudill:
Upon review of the revised site plan dated July 15, 2022, we recommend approval of the
subject plan. Please be advised that a draft SWM/BMP maintenance agreement and receipt of
nutrient credit purchase (2.80 lbs) will be required with the land disturbance application (22.04
acres disturbed).
Sincerely,
Joe C. Wilder
Director of Public Works
JCW/kco
cc: Planning and Development
file
New road name of Norman Dr selected and approved.No additional road names needed at this time.
Address will be assigned once building permit has been received.
6/22/2022
8/3/2022NO 8/3/2022
8/3/2022
FREDERICK WATER
SITE PLAN REVIEW COMMENTS
PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice
315 Tasker Road, Stephens City, VA 22655 540.868.1429 fax
Project ______________________________________________________________________________
Applicant ____________________________________________________________________________
REVIEW STATUS attention________________________________
review number ____________
correct & resubmit approved as noted number of items to be corrected _____________
approved
DRAWINGS
send me by_________________________________________:
print of sheets_____________________________________
EASEMENTS
Y N A copy of the recorded onsite FW easement(s) is/are required.
A copy of the recorded offsite FW easement(s) is/are required.
o The easement document shall contain a plat and both shall be signed by the Frederick Water.
o The Frederick Water requires specific language in its deed of easement.
o Visit our website www.frederickwater.com to obtain a copy of the form.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
This project also requires DEQ - Valley Region Office approval.
This project also requires VDH – Lexington Field Office approval.
Date: _________________ ____________________________________________
Earl W. Wiley – Engineering Assistant
Y N
Y N
Y N
Y N
Y N This project also requires VDH –Lexington Field Office – Project Summary Report.BY DATE FOR
DRAWINGS ABOVE,for form
This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ’s Certificate to Construct, (2) a
copy of DEQ’s Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These documents must be received before service will be authorized. (4) Work cannot
commence that wo uld connect to FW facilities or require FW inspections until the contract is returned
to this office.
_______________________________________________________
Earl W. Wiley – Engineerrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrininininiininiiiininiiininninininiiinininiiniiinininniiiiiiiiiiiiiig A
Graystone Lot 1A
Greenway
1
Trenton Caudill
6
ALL
ALL
✔
June 29, 2022
July 20, 2022
1
Trenton Caudill
From:Johnson, Joseph <josephw.johnson@vdot.virginia.gov>
Sent:Thursday, November 3, 2022 2:18 PM
To:Trenton Caudill
Cc:Rhonda Funkhouser; Timothy Rhodes; Tyler Klein
Subject:Graystone Lot 1A Site Plan
Follow Up Flag:Follow up
Flag Status:Flagged
Trenton,
A VDOT review has been conducted for the Graystone Lot 1A Site Plan, signature dated 10/20/2022. Upon
review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan
is approved by our office. Please ensure that all applicable agencies have the most recent set
of approved Drawings.
We offer the following general comments:
Our review and comments are general in nature. Should details be overlooked during plan review or
conditions in the field exist such that additional measures are warranted, such measures shall be
completed to the satisfaction of the department.
Materials used and methods of construction shall adhere to the current observed VDOT Road and
Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and
Land Use Permit Special Provisions.
A preconstruction conference shall be held by the engineer and/or the developer with the attendance of
the contractor, various County agencies, utility companies, and VDOT prior to initiation of work.
All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or
drainage easement.
Any construction related changes to the approved plan must come through the design engineer to
VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
A Land Use Permit shall be obtained before any work is performed on the State’s right-of-way. The
permit is issued by this office and may require application fees, the salary & expenses of a State
assigned inspector, and surety bond coverage.
If you have any questions or need further information, please do not hesitate to contact me.
Joseph W. Johnson, P.E.
2
Area Land Use Engineer - Clarke, Frederick, Shenandoah & Warren Counties
Edinburg Residency Office | Land Use
14031 Old Valley Pike | Edinburg, VA 22824
Phone #540.534.3223 | Fax #540.984.5607
Email: josephw.johnson@vdot.virginia.gov