Loading...
HomeMy WebLinkAbout45-22 Geology ReportCC: ENCL:Field Report # 1 9/25/2020 OvEx/Subgrade/P Ronald Drew Thomas, C.P.G. Principal Geologist Joshua W. Holloman, C.P.G. Senior Project Geologist LETTER OF TRANSMITTAL E.R. Neff Excavating PO Box 1027 ATTN:John Neff September 26, 2020 30346 Location: Permits: ECS Job # RE: Stephenson, VA 22656 HH Omps Trucking Pad Ezra Lane Field Reports X As requestedFor your use XXWe are enclosing: Stephens City, VA 22655 5406673750 Winchester, VA 22602 5406673730 ECS Mid-Atlantic, LLC 166 Windy Hill Lane Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings, and specifications for the activities, performed on this report date. 4. Incomplete or non-conforming work will be reported for future resolution. 5. The results of samples and/or specimens obtained or prepared for supersequent laboratory testing will be presented in separate reports/documents. 1000.1 Transmittal Page 1/6 * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the excavation of unsuitable fill soils in the building pad area, including organic and soft soils. Please see the attachments. Areas with topsoil, large rock, wet and saturated soils, or soft and yielding existing fill areas were over- excavated to natural ground. Once this excavation was complete, the exposed areas were checked and found to be free of organic materials, large free boulders, and debris. The building pad area was proof-rolled using a fully loaded dump truck. The area appeared to be firm and stable with no visible signs of pumping or rutting observed, except as noted. One area at the low side of a rock ledge was observed to have a suspect depression next to the rock ledge. This area was excavated and additional 2 feet to verify the depression was not a sinkhole throat. Upon excavation , it appeared that the depression was related to previous excavation work and removal of a large boulder, and was not considered a sinkhole feature. Chargeable Items Arrival Departure 1:30P 2:30P Time ofTrip Charges*Tolls/Parking* OvEx/Subgrade/PRRemarks 0.00Re Obs Time 1.00Total 0.00Travel Time* 0.00Lab Time On-Site Time 1.00 Contractor E.R. Neff Excavating Client E.R. Neff Excavating Stephenson, VALocation Weather 76 °/ SunnyProject 30346 1 Project No. HH Omps Trucking Pad Report No. Day & Date Friday 9/25/2020 FIELD REPORT ECS Mid-Atlantic, LLC 166 Windy Hill Lane Winchester, VA 22602 (540) 667-3750 [Phone] (540) 667-3730 [Fax] By Kenneth Wilson Tewalt 1800 1880582Transmittal Page 2/6 Attachments 20200925_130925_HDR Figure 1 20200925_130930_HDR Figure 2 Transmittal Page 3/6 Attachments 20200925_130932 Figure 3 20200925_132221_HDR Figure 4 Transmittal Page 4/6 Attachments 20200925_133119 Figure 5 20200925_133158 Figure 6 Transmittal Page 5/6 Attachments 20200925_133439_HDR Figure 7 Transmittal Page 6/6