Loading...
HomeMy WebLinkAbout28-21 Site PlanU:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS0000.dwg PLOTTED: 7/14/2022 3:04 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS0000 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-18 DLF SHEET APPROVED BY OF1 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS PREPARED FOR: OWNER/DEVELOPERDAVE HOLLIDAY CONSTRUCTION, INC. 420 WEST JUBAL EARLY DRIVE WINCHESTER, VIRGINIA 22601 (540) 667-2120 WINCHESTER LANDING AGE RESTRICTED RESIDENTIAL SUBDIVISION DESIGN & SITE PLAN SITE PLAN #28-21 RED BUD MAGISTERIAL DISTRICT - FREDERICK COUNTY, VIRGINIA ORIG SUBMISSION DATE: SEPTEMBER 17, 2021 REVISED SUBMISSION DATE: JULY 14, 2022 LOCATION MAP Scale: 1" = 2000' CALL 1-800-552-7001 CALL BEFORE YOU DIG ALWAYS CALL 811 BEFORE YOU DIG IN VIRGINIA SECTION 56-265.17 REQUIRES THREE WORKING DAYS NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR BLAST VIRGINIA UTILITY PROTECTION SERVICE, INC. TICKET NUMBER(S): PREPARED BY:PENNONI ASSOCIATES INC. 117 East Piccadilly Street Winchester, VA 22601 T 540.667.2139 F 540.665.0493 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601COVER SHEETWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 07-14-2022 DAVID L. FRANK Lic. No.1061 LOCAL UTILITIES RAPPAHANNOCK ELECTRIC CO-OP 137 KELLEY COURT FRONT ROYAL, VIRGINIA 22630 (540) 662-2037 VERIZON 404 HILLANDALE LANE WINCHESTER, VIRGINIA 22602 (540) 665-3156 COMCAST COMMUNICATIONS 195 RAINVILLE ROAD WINCHESTER, VIRGINIA 22602 (540) 504-0942 WASHINGTON GAS 350 HILLANDALE LN. WINCHESTER, VIRGINIA 22602 (540) 868-7913 FREDERICK WATER 315 TASKER ROAD STEPHENS CITY, VIRGINIA 22655 (540) 868-1061 RESPONSIBLE LAND DISTURBER THE RESPONSIBLE LAND DISTURBER IS THAT PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. NAME:_____________________________________________________ CERTIFICATION #:___________________________________________ DATE: _____________________________________________________ APPROVED BY FREDERICK COUNTY ZONING AND SUBDIVISION ADMINISTRATOR SITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATE ________________________________________________________________________________ APPROVED BY DATEPREVIOUS APPROVALS REZONING - (REZ) #04-21 09/22/2021 MDP WAIVER GRANTED UNDER §165-801.03 10/18/2021 SITE SHEET INDEX SHEET NO.SHEET TITLE 1 COVER SHEET 2 GENERAL NOTES & LEGENDS 3 SITE DEVELOPMENT SUMMARY & KEY PLAN 4 PROFFERS & WAIVERS 4A GENERAL DEVELOPMENT PLAN 5 EXISTING CONDITIONS 6 DEMOLITION PLAN 7 EROSION & SEDIMENT CONTROL NARRATIVE 8 EROSION & SEDIMENT CONTROL PLAN (PHASE-I) 9 EROSION & SEDIMENT CONTROL PLAN (PHASE-II) 10 SEDIMENT BASIN 1 PLAN & COMPUTATIONS 11 SEDIMENT BASIN 2 PLAN & COMPUTATIONS 12 EROSION & SEDIMENT CONTROL DETAILS (VESCH) 13 EROSION & SEDIMENT CONTROL DETAILS (VESCH) 14 SEDIMENT BASIN DETAILS (VESCH) 15 SEDIMENT TRAP COMPUTATIONS 16 MISCELLANEOUS E&S DETAILS 17 FARMINGTON BLVD. & GABRIEL CT. PROFILES 18 MAURY WAY, HARDY WAY & WERTLAND PL. PROFILES 19 SIGHT DISTANCE PROFILES 20 TYPICAL SECTIONS 21 VDOT STANDARD DETAILS 22 VDOT STANDARD DETAILS 23 VDOT STANDARD DETAILS 24 GEOMETRIC PLAN (OVERALL) 25 GEOMETRIC PLAN 26 GEOMETRIC PLAN 27 GEOMETRIC PLAN 28 GEOMETRIC PLAN 29 GRADING PLAN 30 GRADING PLAN 31 GRADING PLAN 32 GRADING PLAN 32A DETAILED GRADING PLAN (APARTMENTS) 33 SITE DETAILS 34 UTILITY PLAN 35 UTILITY PLAN 36 UTILITY PLAN 37 UTILITY PLAN 38 SANITARY SEWER PROFILES 39 SANITARY SEWER PROFILES 40 SANITARY SEWER PROFILES 41 SANITARY SEWER PROFILES 42 SANITARY SEWER COMPUTATIONS 43 WATERLINE PROFILES (A, B) 44 WATERLINE PROFILES (C, D, E) 45 WATERLINE PROFILES (F, G, H) & SERVICE VAULTS 46 FREDERICK WATER DETAILS 47 FREDERICK WATER DETAILS 48 PRE-DEVELOPMENT DRAINAGE MAP 49 POST-DEVELOPMENT DRAINAGE MAP 50 OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATION 51 OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATION 52 OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATION 53 WATER QUANTITY COMPLIANCE SUMMARY (STUDY POINTS 1-3) 54 WATER QUANTITY COMPLIANCE SUMMARY (STUDY POINTS 4-6) 55 WATER QUANTITY COMPLIANCE SUMMARY (STUDY POINTS 7-9) 56 WATER QUANTITY COMPLIANCE SUMMARY (SP 10) & SWM NARRATIVE 57 VIRGINIA RUNOFF REDUCTION COMPLIANCE SUMMARY 58 CATCH BASINS 1 & 2 PLAN 59 CATCH BASINS 3 & 4 PLAN 60 CATCH BASIN 5 PLAN 61 WET POND PLAN 62 WET POND COMPUTATIONS, NARRATIVES & DETAILS 63 BIO-RETENTION BASINS A & B PLAN 64 BIO-RETENTION BASINS C & D PLAN 65 BIO-RETENTION BASIN DETAILS & NARRATIVES 66 STORM SEWER PROFILES 67 STORM SEWER PROFILES 68 STORM SEWER PROFILES 69 STORM SEWER INLET & OUTLET COMPS 70 STORM SEWER DESIGN COMPS 71 HYDRAULIC GRADE LINE (HGL) COMPS 72 DITCH ANALYSES SUMMARY & COMPS 73 LANDSCAPE PLAN AND CALCULATIONS 74 LANDSCAPE BIO-RETENTION PLAN 75 LANDSCAPE NOTES AND DETAILS 76 LIFE SAFETY PLAN 77 LIGHTING PLAN SUBMISSION REVIEW TRACKING 09/17/2021 FREDERICK WATER (REVIEW) 10/08/2021 PLANNING, GIS, FIRE MARSHAL, INSPECTIONS (REVIEW) 10/22/2021 VDOT, PUBLIC WORKS (REVIEW) 11/19/2021 GIS (APPROVAL) 12/06/2021 VDOT (APPROVAL) 01/21/2022 FREDERICK WATER (REVIEW) 02/14/2022 FREDERICK WATER (REVIEW) 03/02/2022 FREDERICK WATER (APPROVAL) 04/15/2022 PLANNING, FIRE MARSHAL, INSP., PUBLIC WORKS, P&R (REVIEW) 05/10/2022 FIRE MARSHAL (APPROVAL) 06/01/2022 PUBLIC WORKS (APPROVAL) 07/14/2022 INSPECTIONS (APPROVAL) U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS0001.dwg PLOTTED: 7/14/2022 11:51 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS0001 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF2 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GENERAL NOTES & LEGENDSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTVIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT REV. JUNE 19, 2013 VDOT GENERAL NOTES V1. ALL WORK ON THIS PROJECT SHALL CONFORM TO THE CURRENT EDITIONS OF AND LATEST REVISIONS TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD AND BRIDGE SPECIFICATIONS AND STANDARDS, THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE STATE, FEDERAL OR LOCAL REGULATIONS. IN CASE OF A DISCREPANCY OR CONFLICT BETWEEN THE STANDARDS OR SPECIFICATIONS AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN. V2. ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIA OCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS. V3. WHEN WORKING WITHIN VDOT RIGHT-OF-WAY, ALL TRAFFIC CONTROL, WHETHER PERMANENT OR TEMPORARY, SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF VDOT'S WORK AREA PROTECTION MANUAL. A TRANSPORTATION MANAGEMENT PLAN NEEDS TO BE SUBMITTED FOR APPROVAL AND LAND USE PERMIT ISSUED PRIOR TO ANY EXECUTION OF WORK WITHIN THE VDOT RIGHT OF WAY. V4 THE DEVELOPER SHALL BE RESPONSIBLE FOR RELOCATING, AT HIS EXPENSE, ANY AND ALL UTILITIES, INCLUDING TRAFFIC SIGNAL POLES, JUNCTION BOXES, CONTROLLERS, ETC., OWNED BY VDOT OR PRIVATE / PUBLIC UTILITY COMPANIES. IT IS THE SOLE RESPONSIBILITY OF THE DEVELOPER TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTION ACTIVITY. VDOT APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE DEVELOPER FROM THIS RESPONSIBILITY. V5. DESIGN FEATURES RELATING TO FIELD CONSTRUCTION, REGULATIONS, AND CONTROL OR SAFETY OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED NECESSARY BY VDOT. ANY ADDITIONAL EXPENSE INCURRED AS A RESULT OF ANY FIELD REVISION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. V6. IF REQUIRED BY THE LOCAL VDOT LAND DEVELOPMENT OFFICE, A PRE-CONSTRUCTION CONFERENCE SHALL BE ARRANGED AND HELD BY THE ENGINEER AND/OR DEVELOPER WITH THE ATTENDANCE OF THE CONTRACTOR (S), VARIOUS COUNTY AGENCIES, UTILITY COMPANIES AND VDOT PRIOR TO INITIATION OF WORK. V7. THE CONTRACTOR SHALL NOTIFY THE LOCAL VDOT LAND DEVELOPMENT OFFICE WHEN WORK IS TO BEGIN OR CEASE FOR ANY UNDETERMINED LENGTH OF TIME. VDOT REQUIRES AND SHALL RECEIVE 48 HOURS ADVANCE NOTICE PRIOR TO ANY REQUIRED OR REQUESTED INSPECTION. V8. THE CONTRACTOR SHALL NOTIFY THE TRAFFIC OPERATIONS CENTER AT (540) 332-9500 FOR ANY TRAFFIC CONTROL PLAN THAT IMPACTS A VDOT MAINTAINED INTERSTATE OR PRIMARY ROADWAY TO PROVIDE NOTIFICATION OF THE INSTALLATION AND REMOVAL OF THE WORK ZONE. V9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A VDOT PERMITTED TEMPORARY CONSTRUCTION ENTRANCE(S) IN ACCORDANCE WITH SECTION 3.02 OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. FURTHERMORE, ACCESS TO OTHER PROPERTIES AFFECTED BY THIS PROJECT SHALL BE MAINTAINED THROUGH CONSTRUCTION. V10.CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION. V11. ALL WATER AND SEWER LINES WITHIN EXISTING OR PROPOSED VDOT RIGHT-OF-WAY SHALL HAVE A MINIMUM THIRTY-SIX (36) INCHES COVER AND WHEN POSSIBLE SHALL BE INSTALLED UNDER ROADWAY DRAINAGE FACILITIES AT CONFLICT POINTS. V12.ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND VDOT. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V13.ALL FILL AREAS, BORROW MATERIAL AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A VDOT REPRESENTATIVE PRIOR TO PLACEMENT OF FILL. A VDOT REPRESENTATIVE SHALL BE PRESENT TO INSURE THE SOIL SAMPLE(S) OBTAINED FOR CBR'S IS REPRESENTATIVE OF THE LOCATION. WHEN SOIL SAMPLES ARE SUBMITTED TO PRIVATE LABORATORIES FOR TESTING, THE SAMPLES SHALL BE CLEARLY IDENTIFIED AND LABELED AS BELONGING TO A PROJECT TO BE ACCEPTED BY VDOT AND THAT TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE VDOT STANDARDS AND PROCEDURES. V14.ALL ROADWAY FILL, BASE, SUBGRADE MATERIAL, AND BACKFILL IN UTILITY/STORM SEWER TRENCHES SHALL BE COMPACTED IN ACCORDANCE WITH THE LIFT THICKNESSES, DENSITY AND MOISTURE REQUIREMENTS AS SPECIFIED IN THE CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. V15.VDOT STANDARD CD AND UD UNDERDRAINS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V16. A POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION SHALL BE CONDUCTED BY THE CONTRACTOR ON ALL PIPES IDENTIFIED ON THE PLANS AS STORM SEWER PIPE AND A SELECT NUMBER OF PIPE CULVERTS. FOR PIPE CULVERTS, A MINIMUM OF ONE PIPE INSTALLATION FOR EACH SIZE OF EACH MATERIAL TYPE WILL BE INSPECTED OR TEN PERCENT OF THE TOTAL AMOUNT FOR EACH SIZE AND MATERIAL TYPE SUMMARIZED. ALL PIPE INSTALLATIONS ON THE PLANS NOT IDENTIFIED AS STORM SEWER PIPE SHALL BE CONSIDERED AS CULVERT PIPE FOR INSPECTION PURPOSES. ADDITIONAL TESTING MAY BE REQUIRED AS DIRECTED BY THE AREA LAND USE ENGINEER OR THEIR REPRESENTATIVE. V17.THE INSTALLATION OF ANY ENTRANCES AND MAILBOXES WITHIN ANY DEDICATED STREET RIGHT-OF-WAY SHALL MEET VDOT MINIMUM DESIGN STANDARDS AND IS THE RESPONSIBILITY OF THE DEVELOPER. V18.PRIOR TO VDOT ACCEPTANCE OF ANY STREETS, ALL REQUIRED STREET SIGNAGE AND/OR PAVEMENT MARKINGS SHALL BE INSTALLED BY THE DEVELOPER IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. V19.THE DEVELOPER SHALL PROVIDE THE VDOT LAND DEVELOPMENT OFFICE WITH A LIST OF ALL MATERIAL SOURCES PRIOR TO THE START OF CONSTRUCTION. COPIES OF ALL INVOICES FOR MATERIALS UTILIZED WITHIN ANY DEDICATED STREET RIGHT-OF-WAY MUST BE PROVIDED TO THE LOCAL VDOT LAND DEVELOPMENT OFFICE PRIOR TO ACCEPTANCE OF THE WORK. UNIT AND TOTAL PRICES MAY BE OBSCURED. V20.AGGREGATE BASE AND SUBBASE MATERIALS SHALL BE PLACED ON SUBGRADE BY MEANS OF A MECHANICAL SPREADER. DENSITY WILL BE DETERMINED USING THE DENSITY CONTROL STRIP IN ACCORDANCE WITH SECTION 304 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS AND VTM-10. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. IN ADDITION TO CHECKING STONE DEPTHS, A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE DENSITY CONTROL STRIP. V21.ASPHALT CONCRETE PAVEMENTS SHALL BE PLACED IN ACCORDANCE WITH SECTION 315 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. DENSITY SHALL BE DETERMINED USING THE DENSITY CONTROL STRIP AS SPECIFIED IN SECTION 315 AND VTM-76. A CERTIFIED COMPACTION TECHNICIAN SHALL PERFORM THESE TESTS. CERTIFIED COPIES OF TEST REPORTS SHALL BE SUBMITTED TO VDOT DAILY, UNLESS SPECIFIED OTHERWISE. A VDOT REPRESENTATIVE SHALL BE NOTIFIED AND GIVEN THE OPPORTUNITY TO BE PRESENT DURING THE CONSTRUCTION AND TESTING OF THE CONTROL STRIP. V22.IN ACCORDANCE WITH SECTION 302.03, THE FOUNDATIONS FOR PIPE CULVERTS THIRTY-SIX (36) INCHES AND LARGER SHALL BE EXPLORED BELOW THE BOTTOM OF THE EXCAVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO PLACING PIPE. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. V23.VDOT STANDARD GUARDRAIL SHALL BE INSTALLED WHERE WARRANTED AND/OR AS PROPOSED ON THESE PLANS IN ACCORDANCE WITH VDOT'S INSTALLATION CRITERIA. FINAL APPROVAL OF THE GUARDRAIL LAYOUT TO BE GIVEN BY VDOT AFTER GRADING IS MOSTLY COMPLETE. V24.APPROVAL OF THESE PLANS SHALL EXPIRE FIVE (5) YEARS FROM THE DATE OF THE APPROVAL LETTER. V25.VDOT STANDARD CG-12 CURB RAMPS SHALL BE INSTALLED WHERE INDICATED ON THESE PLANS AND/OR AS SPECIFIED BY VDOT. V26.THE FOUNDATIONS FOR ALL BOX CULVERTS SHALL BE INVESTIGATED BY MEANS OF EXPLORATORY BORINGS ADVANCED BELOW PROPOSED FOUNDATION ELEVATION TO DETERMINE THE TYPE AND CONDITION OF THE FOUNDATION. THE CONTRACTOR SHALL SUBMIT COPIES OF BOREHOLE LOGS AND REPORT FINDINGS OF FOUNDATION EXPLORATION TO THE ENGINEER AND VDOT FOR APPROVAL PRIOR TO CONSTRUCTING BOX. FOUNDATION DESIGNS SHALL COMPLY WITH VDOT ROAD AND BRIDGE STANDARD PB-1. CONTRARY TO THE STANDARD, WHERE ROCK IS ENCOUNTERED AND CAST-IN-PLACE BOX IS PROPOSED, THE THICKNESS OF BEDDING SHALL BE SIX (6) INCHES. WHERE SOFT, YIELDING, OR OTHERWISE UNSUITABLE FOUNDATION IS ENCOUNTERED, THE FOUNDATION DESIGN AND/OR NEED FOR FOUNDATION STABILIZATION SHALL BE DETERMINED BY THE ENGINEER AND APPROVED BY VDOT. GENERAL CONSTRUCTION NOTES: 1. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT AND PERFORM ALL WORK INCLUDING RESTORATION FOR THE COMPLETED FACILITY READY FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLE STANDARDS AND CONSTRUCTION SPECIFICATIONS OF THE VIRGINIA DEPARTMENT OF HEALTH, VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY, FREDERICK COUNTY SANITATION AUTHORITY, THE CONTRACT DOCUMENTS AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE SPECIFICATIONS DATED JANUARY 2002; VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE STANDARDS DATED FEBRUARY 1, 2001; AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION WORK AREA PROTECTION MANUAL DATED JANUARY 1, 1996. 2. THE ENGINEER HAS ATTEMPTED TO LOCATE EXISTING SUBSURFACE UTILITIES; HOWEVER, SUCH MAY EXIST THAT ARE NOT SHOWN. THE CONTRACTOR SHALL EXERCISE CARE IN THIS WORK SO AS TO AVOID DAMAGE TO ANY UTILITIES. ANY DAMAGE SHALL BE THE CONTRACTOR'S RESPONSIBILITY. THE CONTRACTOR SHALL NOTIFY ALL COMPANIES 72 HOURS PRIOR TO CONSTRUCTION. CALL "MISS UTILITY" 1-800-257-7777. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT. ALL DIMENSIONS, ELEVATIONS, AND LOCATIONS SHALL BE VERIFIED IN THE FIELD BY EACH CONTRACTOR PRIOR TO BEGINNING THE WORK. 4. ANY UNUSUAL SUBSURFACE CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. 5. ALL GRADING FOR IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA. ANY WORK PERFORMED OFFSITE IS THE CONTRACTOR'S RESPONSIBILITY. 6. CONTRACTOR SHALL OBTAIN, AT HIS EXPENSE, PERMITS FROM FREDERICK COUNTY FOR LAND DISTURBANCE AND VIRGINIA DEPARTMENT OF TRANSPORTATION FOR WORK WITHIN VIRGINIA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND SHALL FAITHFULLY ADHERE TO THE PERMIT CONDITIONS IMPOSED. 7. TEMPORARY AND PERMANENT EROSION CONTROL STRUCTURES AND METHODS TO BE IN ACCORDANCE WITH THE VIRGINIA EROSION CONTROL GUIDELINES AND LOCAL ORDINANCES AND TO BE UTILIZED DURING THE CONSTRUCTION PERIOD. 8. ALL EROSION CONTROL STRUCTURES SHOWN OR AS REQUIRED DURING CONSTRUCTION SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD IN WHICH AREAS ARE DENUDED. AREAS SHOWN TO BE SURFACED ARE TO HAVE STONE BASE INSTALLED AT THE EARLIEST POSSIBLE DATE AFTER ESTABLISHING GRADE. NO AREA IS TO REMAIN DENUDED FOR MORE THAN SEVEN CALENDAR DAYS WHEN CONSTRUCTION IS NOT IN PROGRESS. 9. ALL UNPAVED AREAS OF THE SITE WHICH ARE DISTURBED BY THIS CONSTRUCTION SHALL BE PROVIDED WITH FOUR INCH TOPSOIL, FERTILIZED, SEEDED, COMPACTED AND MULCHED. SEED BED TO BE WATERED AND CARED FOR AS NECESSARY TO PROVIDE A GOOD LAWN QUALITY GRASS COVER. AREAS NOT GRADED SHALL BE DISCED, LEVELED AND SEEDED TO ACHIEVE LAWN CONDITIONS. 10. SANITARY GRAVITY SEWER, FORCE AND WATER MAINS ARE TO BE CONSTRUCTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND SHALL ADDITIONALLY MEET ALL REQUIREMENTS OF THE FREDERICK WATER STANDARDS AND SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE WITH THIS AGENCY AND ARRANGE FOR INSPECTION BY THE AUTHORITY. 11. CONTRACTOR SHALL CLEAN UP AND RESTORE DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF PIPE-LAYING IN THE AFFECTED AREA. 12. THE CENTERLINE OF ALL NEW SANITARY GRAVITY SEWER, FORCE AND WATER SHALL BE MAINS STAKED BY CONTRACTOR AT ALL 100 FOOT STATIONS AND AT ALL BENDS. THE CONTRACTOR SHALL NOT PROCEED WITH CONSTRUCTION UNTIL THE ALIGNMENT HAS BEEN APPROVED BY THE OWNER. 13. DISINFECTION OF SANITARY GRAVITY SEWER AND FORCE MAIN ARE NOT REQUIRED. 13. ALL FIRE HYDRANTS SHALL CONFORM TO THE FREDERICK COUNTY SANITATION SPECIFICATIONS PART III PARAGRAPH 5. 14. CONTRACTOR SHALL RESTORE ALL EXISTING RESIDENTIAL DRIVEWAYS AND BUSINESS ENTRANCES TO THEIR ORIGINAL STATE, IF DAMAGED DURING CONSTRUCTION. 15. TRAFFIC CONTROL NOTES: 1. THE CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL RESIDENCES AND BUSINESSES FOR THE DURATION OF THE CONTRACT. 2. TRAFFIC SHALL BE MAINTAINED IN TWO DIRECTIONS ON ALL PUBLIC AND PRIVATE STREETS FOR THE DURATION OF THE CONTRACT. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL SIGNS, BARRIERS, FLAGMEN AND OTHER CONTROLS. 3. ALL TRAFFIC CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE MUTCD AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION WORK AREA PROTECTION MANUAL 4. THE CONTRACTOR SHALL CLOSE ALL OPEN TRENCHES IN PAVED AREAS AT THE END OF EACH WORK DAY WHEN POSSIBLE. IN AREAS WHERE THE TRENCH CANNOT BE CLOSED AT THE END OF THE WORK DAY DUE TO SEQUENCING OF WORK OR OTHER CONSTRAINTS, THE TRENCH MAY BE PROTECTED BY PROVIDING STEEL PLATING AND WARNING SIGNS. PLATING OF OPEN TRENCHES WILL NOT BE PERMITTED IN AREAS IN RISK OF COLLAPSING DUE TO UNSTABLE SOIL CONDITIONS. ALL STEEL PLATING OF TRENCHES SHALL BE APPROVED BY THE VIRGINIA DEPARTMENT OF TRANSPORTATION. 5. TRENCHES IN PAVED AREAS MAY BE TEMPORARILY MAINTAINED IN THE FOLLOWING MANNER UNTIL FINAL PAVEMENT RESTORATION IS COMPLETE: 5.1. RESIDENTIAL AREAS METHOD: STONE BACKFILL FLUSH WITH PAVEMENT SURFACE TIME LIMIT: 5 CALENDER DAYS METHOD: BITUMINOUS COLD PATCH, 2 INCH MINIMUM THICKNESS TIME LIMIT: 30 CALENDER DAYS BUSINESS 5.2. COMMERCIAL AND INDUSTRIAL AREAS METHOD: BITUMINOUS COLD PATCH, 2 INCH MINIMUM THICKNESS TIME LIMIT: 14 CALENDER DAYS ALL TEMPORARY PAVEMENT REPAIRS SHALL BE REGULARLY INSPECTED BY THE CONTRACTOR AND MAINTAINED IN A SAFE MANNER. TEMPORARY PAVEMENT REPAIRS SHALL BE SMOOTH AND REGULAR WITHOUT CREATING HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC. 6. PAVEMENT REMOVAL SHALL BE ACCOMPLISHED BY CREATING A STRAIGHT LINE SAW CUT OF A MINIMUM OF TWO INCHES IN DEPTH AT THE LIMITS OF THE REMOVAL. CONCRETE SURFACES MAY BE REMOVED TO THE NEAREST JOINT IN LIEU OF SAW CUTTING IF A CLEAN STRAIGHT EDGE CAN BE CREATED PRIOR TO REPAIR INSTALLATION. LOCATOR MARKERS LOCATOR MARKERS (BURIED TRANSPONDERS) SHALL BE PLACED DIRECTLY OVER THE PIPE. MARKERS SHALL BE PLACED AT: 1. 50-FEET INTERVALS 2. EACH BEND 3. THE END OF EACH JOINT THAT IS DEFLECTED 4. ANY ADDITIONAL LOCATION THE AUTHORITY'S ENGINEER SHALL DIRECT. EROSION & SEDIMENT CONTROL NOTES: 1. PRIOR TO INITIATING ANY LAND DISTURBING ACTIVITY, IT WILL BE NECESSARY TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING WITH PUBLIC WORKS STAFF TO DISCUSS THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. NO PRE-CONSTRUCTION MEETINGS WILL BE SCHEDULED PRIOR TO ISSUANCE OF THE LAND DISTURBANCE PERMIT FOR THE SUBJECT PROJECT. THE LAND DISTURBANCE PERMIT WILL BE ISSUED BY THE FREDERICK COUNTY DEPARTMENT OF PUBLIC WORKS. 2. CONTRACTOR TO CONTACT THE PUBLIC WORKS DEPARTMENT TO SCHEDULE THE REQUIRED EROSION AND SEDIMENT CONTROL MEASURES INSPECTIONS AS INDICATED BY THE PROGRAM ADMINISTRATOR. IF THE EROSION AND SEDIMENT CONTROL MEASURERS HAVE BEEN INSTALLED IN ACCORDANCE WITH THE APPROVED PLAN, THE DEPARTMENT OF PUBLIC WORKS WILL GRANT APPROVAL TO INITIATE LAND DISTURBING ACTIVITIES. 3. PRIOR TO RELEASE OF BUILDING PERMITS, THE FOLLOWING ITEMS SHALL BE COMPLETED: A) SUBDIVISION SHALL BE STABILIZED IN ACCORDANCE WITH THE APPROVED PLAN (I.E., ROAD SURFACE, STORMWATER CONVEYANCE SYSTEM, CURB AND GUTTER, SIDEWALKS, CHANNEL LININGS, VEGETATIVE COVER, STC.) B) SUBMITTAL OF CERTIFIED AS-BUILT OF THR SUBDIVISION WHICH CONTAINS THE FOLLOWING ITEMS: STORMWATER CONVEYANCE SYSTEM, CURB AND GUTTER, DRAINAGE CHANNELS AND DITCHES, STORMWATER POND. A LETTER FROM THE ENGINEER-OF-RECORD SHALL BE INCLUDED WITH THE AS-BUILT WHICH STATES THAT THE SUBDIVISION HAS BEEN CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLAN. C) INDIVIDUAL SUBDIVISION LOT GRADING PLANS SHALL BE SUBMITTED BY THE BUILDER AT THE TIME OF THE BUILDING PERMIT APPLICATION FOR EACH LOT PROPOSED FOR CONSTRUCTION. 4. TEMPORARY AND PERMANENT EROSION CONTROL STRUCTURES AND METHODS TO BE IN ACCORDANCE WITH THE VIRGINIA EROSION CONTROL GUIDELINES AND LOCAL ORDINANCES AND TO BE UTILIZED DURING THE CONSTRUCTION PERIOD. 5. ALL EROSION CONTROL STRUCTURES SHOWN OR AS REQUIRED DURING CONSTRUCTION SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD IN WHICH AREAS ARE DENUDED. AREAS SHOWN TO BE SURFACED ARE TO HAVE STONE BASE INSTALLED AT THE EARLIEST POSSIBLE DATE AFTER ESTABLISHING GRADE. NO AREA IS TO REMAIN DENUDED FOR MORE THAN 7 CALENDAR DAYS WHEN CONSTRUCTION IS NOT IN PROGRESS. 6. CONTRACTOR TO CLEAN UP AND RESTORE DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF PIPE-LAYING IN THE AFFECTED AREA. 7. ALL UNPAVED AREAS OF THE SITE WHICH ARE DISTURBED BY THIS CONSTRUCTION SHALL BE PROVIDED WITH 4" TOPSOIL, FERTILIZED, SEEDED, COMPACTED AND MULCHED. SEED BED TO BE WATERED AND CARED FOR AS NECESSARY TO PROVIDE A GOOD LAWN QUALITY GRASS COVER. AREAS NOT GRADED SHALL BE DISCED, LEVELED AND SEEDED TO ACHIEVE LAWN CONDITIONS. TEST HOLE ......................... PARKING SPACES NUMBER ............. BUILDING WALL ..................... DOOR LOCATION ..................... LIMITS OF GRADING ................. BENCHMARK ......................... 77 PROPOSED CG-6R TREE LINE ......................... TREE .............................. SANITARY STRUCTURE LABEL .......... WATER METER ....................... SPOT SHOT ......................... SIGN .............................. FIRE HYDRANT ...................... STREET LIGHT ...................... UTILITY POLE ...................... WATER VALVE ....................... TRAFFIC SIGNAL POLE ............... FENCE LINE ........................ UNDERGROUND TELEPHONE ............. OVERHEAD TELEPHONE ................ UNDERGROUND ELECTRIC .............. OVERHEAD ELECTRIC ................. STORM STRUCTURE LABEL ............. WATERMAIN ......................... SANITARY SEWER .................... STORM SEWER ....................... EDGE OF PAVEMENT .................. CURB AND GUTTER ................... CONTOURS .......................... STREET CENTERLINE ................. PROPERTY LINE ..................... 24 LEGEND TRANS.CG-6 EXISTING 24 PAVEMENT BORING ..................... PAVEMENT CORES ..................... FORCE MAIN .............. PW PWPROCESS WATER .............. GAS LINE ........................ FIBER OPTIC ........................ FIRE LINE ........................ PW PW FIRE RISER ...................... POST INDICATOR VALVE ...................... WV STORM SEWER MANHOLE ................ SAN. SEWER MANHOLE ................ TOWNHOUSE TOWNHOUSE 5' CONC. S/W PRIVATE ROAD 34.00'24.00'106.50'10.00' ASPH DW5.50' PED ESMT16.00' ASPH DW 5' CONC. S/W PUBLIC ROAD 25' BRL 8' BRL8' BRL20' BRL 42.00'64.00'64.00'42.00' 2,688 SF BUILDING ENVELOPE SINGLE FAMILY DETACHED CG-9B ROW CG-6 CG-9B CG-9BCG-658.00'48.00'48.00'11.00'11.00'11.67' 13.75'13.75'10.25' 20' BRL 25' BRL10' BRL (END UNIT)TYPICAL TOWNHOUSE LOT DETAIL NO SCALE TYPICAL SINGLE FAMILY DETACHED LOT DETAIL NO SCALE36'22'RM2RM2RM2RM2RM2RM2R M 2 RM 2 RM2RM2RM2RM2RM2 RM2 RM2RM2RM2CG-12A CG-12A CG-12A CG-12ACG-12ACG-12A CG-12A CG-12A CG-12A CG-12A CG-12A CG-12A CG-12A CG-12B CG-12B 20'x20' DUMPSTER PAD CG-12C CG-12C30 LF - GUARD RAIL - GR-2 10' LANDSCAPE ESMT50'ACCESS ESMT.6 ACRE PARKLAND AREA (PROFFER)CG-12B CG-12C CG-12C PR. MONUMENT SIGN LOCATION419 SF ENTRY MONUMENT ESMT.(REQUIRES SEPARATE PERMIT) PR. MONUMENT SIGN LOCATION388 SF ENTRY MONUMENT ESMT.(REQUIRES SEPARATE PERMIT) PR. MONUMENT SIGN LOCATION 144 SF ENTRY MONUMENT ESMT (REQUIRES SEPARATE PERMIT) . 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT10' LANDSCAPE ESMTCG-12C CG-12B MB CONC. S/W CONC. S/W L1 CONC. S/W WETLANDSCHANNEL243 LF 2.5' SIDEWALK ESMT.INST. NO. 040024106 NESCLIFFE CT.50' R/WFARMINGTON BLVD.50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD.60' R/W MB MB MB MB MB MBMB MLP MLP TRB TVRB TRB TRTRB GLM CONC. S/W CONC. S/WMBMBMBMB CONC. S/W TR DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT. 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 05002804220' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE SEWER ESMT.INST. NO. 010017843 TEABERRY DR.54' R/W VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. GASLINE (TYP.) EX. SIGNS EX. SHEDOVERHANG EX. SHED 22 23 24 24A 25 26 27 28 29 30 31 32 33 34 35 36 39 40 41 42 4344454647484950 10A 32 10 11 12 13 14 16 15 17 18 19 20 21 21A 37 38 20' FCSA SAN. E S M T . INST. NO. 0800 0 6 2 8 6 50' ACCESS ES M T . INST. NO. 0800 0 6 2 8 6 20' FCSA W/L E S M T . INST. NO. 0800 0 6 2 8 6 EX. STOP SIGN GARDEN PLAYSETDECK PATIO DECK DECK DECK PATIO PATIO PATIO PATIO POOL CONC. DRIVEWAY(TYPICAL) SHED CONC.RET. WALLSHED SHED CONCRETE PATIO TIGER LILY CT. POPPY LN. DECKPATIO DECK DECK DECK DECK SHED SHED PATIOAREA EX. DWELLING (TYP.)ARDEYTH LN.54' R/WEX. STOPSIGN U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS0002.dwg PLOTTED: 7/14/2022 11:51 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS0002 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF3 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SITE DEVELOPMENT SUMMARY & KEY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTLOT AREA (SF) AREA (AC) Lot 1 10,319 0.2370 Lot 2 8,350 0.1920 Lot 3 8,348 0.1920 Lot 4 8,346 0.1920 Lot 5 8,344 0.1920 Lot 6 8,343 0.1920 Lot 7 10,741 0.2470 Lot 8 10,740 0.2470 Lot 9 10,739 0.2470 Lot 10 10,874 0.2500 Lot 11 10,778 0.2470 Lot 12 9,920 0.2280 Lot 13 8,918 0.2050 Lot 14 8,000 0.1840 Lot 15 8,423 0.1930 Lot 16 8,425 0.1930 Lot 17 8,107 0.1860 Lot 18 8,615 0.1980 Lot 19 8,609 0.1980 Lot 20 8,427 0.1930 Lot 21 8,001 0.1840 Lot 22 8,000 0.1840 Lot 23 8,000 0.1840 Lot 24 8,000 0.1840 Lot 25 12,523 0.2870 Lot 26 8,816 0.2020 Lot 27 9,004 0.2070 Lot 28 10,176 0.2340 Lot 29 8,002 0.1840 Lot 30 8,003 0.1840 Lot 31 8,004 0.1840 Lot 32 8,005 0.1840 Lot 33 8,007 0.1840 Lot 34 8,008 0.1840 Lot 35 8,009 0.1840 Lot 36 8,010 0.1840 Lot 37 8,000 0.1840 Lot 38 8,000 0.1840 Lot 39 8,000 0.1840 Lot 40 8,053 0.1850 TOTAL SFD LOTS (40)351,986 8.0880 LOT AREA (SF) AREA (AC) OS Lot 1001 619,571 14.2200 OS Lot 1002 67,613 1.5520 OS Lot 1003 16,430 0.3770 TOTAL OPENSPACE 703,615 16.1490 TOTAL RESIDENTIAL LOTS 582,452 13 STREETS (PRIVATE ACCESS ESMT)54,342 1.2475 STREETS (PUBLIC)123,624 2.8380 TOTAL DEVELOPMENT 1,464,032 33.6295 PARENT TRACT 1,464,032 33.6100 LOT AREA (SF) AREA (AC) Lot 101 3,621 0.0830 Lot 102 2,556 0.0590 Lot 103 2,556 0.0590 Lot 104 2,556 0.0590 Lot 105 2,556 0.0590 Lot 106 2,556 0.0590 Lot 107 2,556 0.0590 Lot 108 3,621 0.0830 Lot 109 3,621 0.0830 Lot 111 2,556 0.0590 Lot 110 2,556 0.0590 Lot 112 2,556 0.0590 Lot 113 2,556 0.0590 Lot 114 2,556 0.0590 Lot 115 2,556 0.0590 Lot 116 3,621 0.0830 Lot 117 3,621 0.0830 Lot 118 2,556 0.0590 Lot 119 2,556 0.0590 Lot 120 2,556 0.0590 Lot 121 2,556 0.0590 Lot 122 2,556 0.0590 Lot 123 2,556 0.0590 Lot 124 3,621 0.0830 Lot 125 3,621 0.0830 Lot 126 2,556 0.0590 Lot 127 2,556 0.0590 Lot 128 2,556 0.0590 Lot 129 2,556 0.0590 Lot 130 2,556 0.0590 Lot 131 2,556 0.0590 Lot 132 3,621 0.0830 Lot 133 3,621 0.0830 Lot 134 2,556 0.0590 Lot 135 2,556 0.0590 Lot 136 2,556 0.0590 Lot 137 2,556 0.0590 Lot 138 2,556 0.0590 Lot 139 2,556 0.0590 Lot 140 3,621 0.0830 Lot 141 3,621 0.0830 Lot 142 2,556 0.0590 Lot 143 2,556 0.0590 Lot 144 2,556 0.0590 Lot 145 2,556 0.0590 Lot 146 2,556 0.0590 Lot 147 2,556 0.0590 Lot 148 3,621 0.0830 Lot 149 3,621 0.0830 Lot 150 2,556 0.0590 Lot 151 2,556 0.0590 Lot 152 2,556 0.0590 Lot 153 2,556 0.0590 Lot 154 2,556 0.0590 Lot 155 2,556 0.0590 Lot 156 3,621 0.0830 Lot 157 3,621 0.0830 Lot 158 2,556 0.0590 Lot 159 2,556 0.0590 Lot 160 2,556 0.0590 Lot 161 2,556 0.0590 Lot 162 2,556 0.0590 Lot 163 2,556 0.0590 Lot 164 3,621 0.0830 Lot 165 3,621 0.0830 Lot 166 2,556 0.0590 Lot 167 2,556 0.0590 Lot 168 2,556 0.0590 Lot 169 2,556 0.0590 Lot 170 3,621 0.0830 Lot 171 3,621 0.0830 Lot 172 2,556 0.0590 Lot 173 2,556 0.0590 Lot 174 2,556 0.0590 Lot 175 2,556 0.0590 Lot 176 3,621 0.0830 Lot 177 3,621 0.0830 Lot 178 2,556 0.0590 Lot 179 2,556 0.0590 Lot 180 2,556 0.0590 Lot 181 3,621 0.0830 TOTAL TH LOTS (80)230,466 5.3070 FEMA FLOOD MAP # 51069C0240E eff. 1/29/2021 ZONE "X" AREA OF MINIMAL FLOOD HAZARD SITE DEVELOPMENT NOTES 1. THE EXISTING CONDITIONS, FEATURES, PROPERTY INFORMATION AND TOPOGRAPHY ARE AS DEPICTED ON A SURVEY PREPARED BY MARSH & LEGGE LAND SURVEYORS, PLC. DATED; 11/18/2020. 2. THIS SURVEY AND PLAN ARE REFERENCED TO NAD83 VA NORTH ZONE COORDINATE SYSTEM AND NAVD88 DATUM, UNITS = US SURVEY FT. 3. THE PRESENCE OF WETLANDS HAS BEEN DETERMINED AND DELINEATED (JUNE 2020), BY VIRGINIA WATERS & WETLANDS. ANY WETLANDS IMPACT MAPS, SECTIONS, REPORTS AND / OR MITIGATION PLANS SHALL BE PREPARED AND SUBMITTED UNDER SEPARATE COVER BY THE ENVIRONMENTAL ENGINEER. 4. PREVIOUS APPROVAL PERTAINING TO THIS DEVELOPMENT PLAN: 4.1. REZONING (REZ) #04-21 4.2. MDP WAIVER GRANTED UNDER §165-801.03 10/18/2021 SITE DEVELOPMENT SUMMARY AGE- RESTRICTED RESIDENTIAL TAX IDENTIFICATION NUMBERS CURRENT ZONINGCURRENT USE PROPOSED USE FLOOD PLAIN SITE AREA TOTAL DISTURBED AREA OPEN SPACE /LANDSCAPED AREA OPEN SPACE REQUIRED 55-(A)-201BRP VACANT 33.6096 ACRES 33.1216 ACRES 10.0829 ACRES (30.00%) OPEN SPACE PROVIDED 16.1490 ACRES (48.05%) TOTAL DEVELOPED AREA 33.1216 ACRES PARKING (SFD &TOWNHOMES) SFD CLUSTER 80 (40 UNITS @ 2 PER UNIT) TOWNHOMES 203 (81 UNITS @ 2.5 PER UNIT) PARKING SPACES REQUIRED 80 (2 ON-LOT SP. PER UNIT) 203 (2 ON-LOT / UNIT + 41 PUBLIC) PARKING SPACES PROVIDED DENSITY DENSITY PERMITTED 170 UNITS TOTAL (PER PROFFERS)SINGLE FAMILY DETACHED (SFD)40 UNITS RECREATIONAL UNITS RECREATIONAL UNITS REQUIRED 4.30 (MFA: 48 +TH: 81 = 129 UNITS) RECREATIONAL UNITS PROVIDED MULTI USE TRAIL GAZEBO N HC PARKING NUMBER OF PUBLIC SPACES PROVIDED 30 HC SPACES REQUIRED 2 (1 VAN ACCESSIBLE) HC SPACES PROVIDED 2 (2 VAN ACCESSIBLE) ENVIRONMENTAL FEATURES FEATURE (AREAS IN ACRES)TOTAL AREA AREA DISTURBED % DISTURBED % IN O.S.AREA IN O.S. FLOODPLAINS 0 0 0%0%0 LAKES AND PONDS 0 0 0%0%0 NATURAL RETENTION AREAS 0 0 0%0%0 STEEP SLOPES ( )0.00 0.00 0%0%0 WETLANDS 0.15 0.15 100%0%0 WETLAND CHANNELS 243 LF 0 0%100%243 LF WOODLANDS 16.57 16.25 98.06%1.94%0.32 SINGLE FAMILY DETACHED CLUSTER SETBACK FROM R/W 25' SIDE SETBACK 8' REAR SETBACK 20' REQUIRED DIMENSIONAL REQUIREMENTS MIN. LOT AREA 8,000 SF TOWNHOUSES SETBACK FROM PUBLIC/PRIVATE STREET25' (WITH GARAGE) 15' (WITHOUT GARAGE) SETBACK FROM OFF-STREET PARKING LOT15' REAR SETBACK 20' REQUIRED MIN. LOT AREA 1,500 SF SIDE SETBACK 10' MIN. LOT WIDTH 18' (INTERIOR) 15' (END UNITS) MAX. BLDG. HEIGHT 40' (PRIMARY)20' (ACCESSORY) MIN. LOT WIDTH 60' (AT BLDG. SETBACK)30' (AT R/W) MAX. BLDG. HEIGHT 35' (PRIMARY) 20' (ACCESSORY) AGE-RESTRICTED MULTIFAMILY SETBACK FROM R/W 60' SETBACK FROM OFF-STREET PARKING LOT OR DRIVEWAY 5' REAR SETBACK (PERIMETER) REQUIRED SIDE SETBACK (PERIMETER)100' & 117' (100' +2' (PER FOOT) OF BLDG. HT. THAT EXCEEDS 40' WHEN ADJACENT TO SF RESIDENCES) MAX. BLDG. HEIGHT 40' (UP TO 60' WITH WAIVER) MAX SITE IMPERVIOUS RATIO 0.60 MAX # UNITS PER BUILDING 110 117' (100' +2' (PER FOOT) OF BLDG. HT. THAT EXCEEDS 40' WHEN ADJACENT TO SF RESIDENCES) BALCONIES AND DECKS MAY EXTEND 10' INTO BLDG. SETBACK BUILDING SPACING 20' (SIDE TO SIDE) 35' (SIDE TO BACK) 50' (BACK TO BACK) 98.15' +/- 9.34' +/- PROVIDED 120.20' +/- 48.26' (4 STORIES) 0.20 24 (48 TOTAL) 134.66' +/- 54.2' +/- PHASE SFD / TH 48,400 GPD APTS 19,200 GPD TOTAL 67,600 GPD USAGE PROJECT WATER AND SEWER USAGE NOTE: WATER USAGE WILL EQUAL SANITARY USAGE OF 400 GPD/UNIT BUFFERS RP (TOWNS) VS. RA (RESIDENTIAL)TYPE A RESIDENTIAL SEPARATION BUFFER 25' FULL SCREEN (10' ACTIVE, 15' INACTIVE) AND 50' LANDSCAPE SCREEN (20' ACTIVE, 30' INACTIVE) REQUIRED RP (MULTIFAMILY) VS. RA (RESIDENTIAL)TYPE C RESIDENTIAL SEPARATION BUFFER 100' FULL SCREEN (25' ACTIVE, 75' INACTIVE) RP (MULTIFAMILY) VS. RP (SFD)TYPE C RESIDENTIAL SEPARATION BUFFER 100' FULL SCREEN (25' ACTIVE, 75' INACTIVE) CS4001 CS4101 CS5001 CS4002 CS4102 CS5002 CS4003 CS4103 CS5003 CS4005 CS4105 CS5005 KEY PLAN NTS PARKING (MULTIFAMILY) AGE-RESTRICTED MULTI-FAMILY 72 (48 UNITS @ 1.5 PER UNIT) PARKING SPACES REQUIRED 78 PARKING SPACES PROVIDED HC PARKING NUMBER OF SPACES PROVIDED 78 HC SPACES REQUIRED 4 (1 VAN ACCESSIBLE) HC SPACES PROVIDED 4 (4 VAN ACCESSIBLE) DENSITY PROPOSED 169 UNITS TOTAL SINGLE FAMILY ATTACHED (SFA)/TOWNHOMES (TH)81 UNITSMULTI-FAMILY (MF)48 UNITS FRONT FROM R/W 15' SIDE 5' REAR 10' SETBACKS FOR UNROOFED DECKS, STOOPS, LANDINGS AND SIMILAR FEATURES FRONT FROM OFF-STREET PARKING 10' SIDE (END-UNIT)5' REAR 5' SETBACKS FOR UNROOFED DECKS, STOOPS, LANDINGS AND SIMILAR FEATURES FRONT FROM ROAD 15' $35,000 X 4.30 = $150,500 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS0003.dwg PLOTTED: 7/14/2022 11:51 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS0003 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF4 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601PROFFERS & WAIVERSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS0004.dwg PLOTTED: 7/14/2022 11:52 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS0004 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF4A 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GENERAL DEVELOPMENT PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTAPPROVED GDP SHOWN FOR REFERENCE PURPOSES NOT SHOWN TO SCALE 662664666668 660 670 6 6 26646 6 6 668672674 6506 6 0 6 7 0 6466466486526546566586626 6 4666668672674 650 650 660 6 6 0 648 652 652654 654 65 6 656 658 658662 662 664 66 4 650 65 2 666652 654666668 6 6 8 662 664664 6 6 2 660670658662664666668 66067066 2 664666668672 674 6 7 0664666 668 6706686726 7 0 6 7 2 67 4 676670670 662664666 666 668668672672 66 0 670654 656 65866266 4 66666 8 664 66 6 662 664 66 0 6 5 2 6 5 4 6 5 6 6 5 8 662662664 6 6 4664664 6 6 4 666660 656 658 662664664 660662 662664666 644 644644646646646648656 650660 642642642642644644646646648652654656658662664 646646 640 650 660 642 644 646 648 652654 656 658 662 664 666 650 660 6486526 5 465665 8666666668 650660 648652654656658 662 664 6 6 6 6706726726746746766766 7 6 6 7 6 670 668 668672Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 191 Ex. Lot 203 1 Ex. Lot 120 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 L1 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDS6,708 SF WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. 30" PE P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" PE P EX. 18" PEPEX. 18" PEP20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEP EX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) N 69°31'12" W 157.62' N 68°58'22" W 60.81' N 69°00'30" W 179.88' N 69°52'58" W 47.12'S 26°17'04"W 404.92'N 32°19'17"E 392.59'N 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34' N 64°38'51" W 376.73'S 43°18'34" W979.98'S 57°39'43" E 1313.09'N 35°18'07" E1166.98'EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 STEEP SLOPES (25%+) TYP.ZONED: RPZONED: B2ZONED: RA ZONED: RP ZONED: RAZONED: RPZONED: RA ZONED: RP 20' FCSA SA N . E S M T.INST. NO. 080 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 TIGER LILY CT. POPPY LN. Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) ORRICK COMMONSSUBDIVISION LOT 6ARDEYTH LN.54' R/WSTEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS1000.dwg PLOTTED: 7/14/2022 11:52 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS1000 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF5 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 1. THE AERIAL TOPOGRAPHIC MAPPING WAS PROVIDED BY PENNONI AND ASSOCIATES AND IS DATED JUNE 14, 2005 AND HAS BEEN ENHANCED AT EXISTING END OF ROAD INTERSECTIONS WITH A CURRENT FIELD RUN SURVEY COMPLETED DURING AUGUST AND SEPTEMBER, 2020. 2. ANY UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. 3. HORIZONTAL ORIENTATION IS BASED ON VA. NAD 83 NORTH ZONE STATE GRID; VERTICAL DATUM IS BASED ON NAVD 88 ELEVATIONS ESTABLISHED USING GPS METHODS. Marsh & Legge Land Surveyors, P.L.C. 560 NORTH LOUDOUN STREET ~ WINCHESTER, VIRGINIA 22601 PHONE (540) 667-0468 ~ FAX (540) 667-0469 ~ EMAIL office@marshandlegge.com www.marshandlegge.com TOPOGRAPHIC SURVEY OF THE LAND OF ORRICK CEMETERY COMPANY, INC. DEED BOOK 337 PAGE 179 RED BUD MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA ABBREVIATION DEFINITION DRAINAGE MANHOLE FIRE HYDRANT GAS LINE MARKER MAIL BOX METAL LIGHT POLE SANITARY MANHOLE TRANSFORMER TELEPHONE RISER BOX TELEVISION RISER BOX WATER METER WATER VALVE LEGEND U/G WATER LINE U/G ELECTRIC LINE U/G GAS MAIN FENCE DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EXISTING CONDITIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT MB CONC. S/W CONC. S/W Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 191 Ex. Lot 203 1 Ex. Lot 120 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 L1 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 CONC. S/W STEEPLECHASESUBDIVISIONINST. 050028042LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDS6,708 SF WETLANDSCHANNEL243 LF 2.5' SIDEWALK ESMT.INST. NO. 040024106 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER EX. SAN. SEWER SAN. LAT.FH 2 - WV's 3 - WV's MB MB MB MB MB MBMB MLP MLP TRB TVRB TRB TRTRB W/M WV GLM3 - WV's 2 - WV's TVRB TRB MLP CONC. S/W CONC. S/WMBMBMBMB TR TVRB CONC. S/W TR EX. 30" PE P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT. W/M W/M W/MEX. 24 " RCP EX. 15" PE P EX. 18" PEPEX. 18" PEPW/M FH W/MW/MW/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEP 20' WIDE SEWER ESMT.INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) N 69°31'12" W 157.62' N 68°58'22" W 60.81' N 69°00'30" W 179.88' N 69°52'58" W 47.12'S 26°17'04"W 404.92'N 32°19'17"E 392.59'N 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34' N 64°38'51" W 376.73'S 43°18'34" W979.98'S 57°39'43" E 1313.09'N 35°18'07" E1166.98'EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L EX. SIGNS T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 EX. SHEDOVERHANG EX. SHED 22 23 24 24A 25 26 27 28 29 30 31 32 33 34 35 36 39 40 41 42 4344454647484950 10A 32 10 11 12 13 14 16 15 17 18 19 20 21 21A 37 38 20' FCSA SA N . E S M T.INST. NO. 080 0 0 6 2 8 6 50' ACCESS E S M T . INST. NO. 08 0 0 0 6 2 8 6 20' FCSA W/L E S M T.INST. NO. 080 0 0 6 2 8 6 GARDEN PLAYSETDECK PATIO DECK DECK DECK PATIO PATIO PATIO PATIO POOL CONC. DRIVEWAY(TYPICAL) SHED CONC.RET. WALLSHED SHED CONCRETE PATIO TIGER LILY CT. POPPY LN. Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) EX. TEE W/3 - G.V.'S DECKPATIO DECK DECK DECK DECK SHED SHED PATIOAREA ORRICK COMMONSSUBDIVISION LOT 6 EX. DWELLING (TYP.)ARDEYTH LN.54' R/WEX. STOPSIGN STEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 662664666668 660 670 6 6 26646 6 6 668672674 6506 6 0 6 7 0 6466466486526546566586626 6 4666668672674 650 650 660 6 6 0 648 652 652654 654 65 6 656 658 658662 662 664 66 4 650 65 2 666652 654666668 6 6 8 662 664664 6 6 2 660670658662664666668 66067066 2 664666668672 674 6 7 0664666 668 6706686726 7 0 6 7 2 67 4 676670670 662664666 666 668668672672 66 0 670 654 656 65866266 4 66666 8 664 66 6 662 664 66 0 6 5 2 6 5 4 6 5 6 6 5 8 662662664 6 6 4664664 6 6 4 666660 656 658 662664664 660662 662664666 644 644644646646646648656 650660 642642642642644644646646648652654656658662664 646646 640650 660 642 644 646 648 652654 656 658 662 664 666 650 660 6486526 5 465665 8666666668 650660 648652654656658 662 664 6 6 6 6706726726746746766766 7 6 6 7 6 670 668 668672EXISTING WETLANDS TO BE DISTURBED / REMOVED. MITIGATION MEASURES / IMPACTS SHALL BE BE PREPARED AND CERTIFIED UNDER SEPARATE COVER. REMOVE BARRICADES. SAW-CUT MILL & PAVE APPROX 5' OF PAVEMENT FOR ROAD CONNECTION. SAW-CUT CURBS AND WALKS ACCORDINGLY TO MATCH NEW CONSTRUCTION TO EXISTING. REMOVE BARRICADES. SAW-CUT MILL & PAVE APPROX 5' OF PAVEMENT FOR ROAD CONNECTION. SAW-CUT CURBS AND WALKS ACCORDINGLY TO MATCH NEW CONSTRUCTION TO EXISTING. REMOVE ±130 LF OF BOARD FENCEING REMOVE / RELOCATE SHED, FIRE-PITS, AND TREE-HOUSE REMOVE LANDSCAPING / GARDEN REMOVE LANDSCAPING / GARDEN REMOVE FIRE PIT REMOVE GARDEN REMOVE FIRE PIT EX. WETLANDS SHALL BE PROTECTED WITH ORANGE CONSTRUCTION FENCE. THERE SHALL BE NO DISTURBANCE TO WETLANDS OR CHANNEL.U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS1500.dwg PLOTTED: 7/14/2022 11:52 AM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS1500 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF6 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR ANDOWNER MUST BE NOTIFIED OF ANY DISCREPANCIES BEFOREPROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601DEMOLITION PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTDEMOLITION NOTES: 1. WETLANDS IMPACTS AND MITIGATION MEASURES SHALL BE PROVIDED UNDER SEPARATE COVER. 2. THERE ARE SEVERAL "ENCROACHING" FEATURES RELATED TO ADJOINING RESIDENTIAL LOTS. THE CONTRACTOR SHALL NOT DISTURB THESE FEATURES WITHOUT THE DEVELOPER'S WRITTEN CONSENT. U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2000.dwg PLOTTED: 7/14/2022 1:39 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2000 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF7 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 Erosion and Sediment Control Narrative Project Description The "Winchester Landing" project site is generally located in Frederick County, Virginia within the Redbud Magisterial District. This site is specifically located north of Senseny Road (Route 657), east of Greenwood Road (Route 656) and the "Briarwood Estates" Subdivision, west of Channing Drive and the "Lynnehaven" Subdivision, and south of the "Steeplechase" Subdivision. This property is identified as property identification number 55-(A)-201B and is currently zoned RP. This project proposes Mass Grading of the site and various Stormwater Management Facilities. Facilities for management of Stormwater Quantity and Stormwater Quality are proposed to meet regulatory requirements. Existing Site Conditions The site is currently vacant. Slopes range from less than 0.50% to approximately 15%. The Western Portion of the site has "Brushy" ground cover. The "Brushy" ground cover is approximately 13.10 Acres or (39.00% of the total site). An Overhead Electric Transmission Cable traverses the project site from the south to north, or vise versa. There are two poles on-site and the facility is located within a 150' Wide Easement, which totals 3.79 Acres or (11.25% of the total site). The remaining 16.72 Acres or (49.75% of the total site) of on-site ground cover is "Wooded" and considered to be in good condition. Adjacent Property The project is bounded on the NW, NE, SE and SW by existing residential lots and SW by existing open area. Off-Site Areas There are no off-site areas associated with this project. Stockpile Areas: The stockpiles will have to be kept out of the proposed grading area and to stay clear of all construction activity. Stockpiles will be stabilized with temporary vegetation and protected with silt fence to prevent soil loss and sediment transport from the stockpiles. Soils See this sheet for an Overall Soils Map, HSG Group Classifications and a Map Unit Legend. (SL - USDA Web Soils Survey). The Physical propoerties of each soil type are summarized also. A Complete NRCS Soils Report is included with the Winchester Landing "SWM Data Package". Geology The Martinsburg Formation underlies the project site. See this sheet for more specific Geologic Data. Critical areas Two wetland areas exist at the project site. Both wetland features shall remain un-disturbed per this plan. Super silt fence is proposed to protect these critical areas. Erosion and sediment control measures Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. Structural Measures The Sediment Basin, Sediment Traps, sediment barriers and other measures shown on the plans intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. Every effort shall be made to prevent silt from running off the site during construction. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Phase I: A Construction Entrance (3.02) shall be installed at the location shown on the Phase I plan to prevent mud and debris from being tracked onto roadways. Install Silt Fence (3.05) and Super Silt Fence as shown on the plans to intercept and detain small amounts of runoff from disturbed areas during construction in order to prevent sediment from leaving the site. Install Diversion Dikes (3.09) as shown on plans to divert surface runoff away from work areas and contain onsite runoff to erosion and sediment control practices. Install Temporary Sediment Traps (3.13) as a Phase 1 control measures prior to clearing the site; they shall detain runoff long enough to allow the majority of sediment to "settle out" prior to leaving the site. Install temporary Sediment Basins #1 & #2 (3.14) as a Phase 1 control measure prior to clearing the site. It shall detain sediment-laden runoff from disturbed areas in "wet" and "dry" storage for the required 6 hour draw down time, allowing suspended sediments to "settle out" prior to leaving the site. The Temporary Sediment Basins shall be converted to Extended Detention Facilities at the discretion of the E&S Inspector, at such time as disturbed areas within the Contributing Drainage Area have achieved stabilization. Outlet Protection (3.18) shall be placed on the outlets of all storm sewer pipes and culverts to reduce erosion, undercutting and velocities. Block & gravel Curb Inlet Protection sediment filters (3.07-8) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. Culvert Inlet Protection (3.08) shall be installed as shown on the plans to prevent sediment from entering the existing storm system. Roughen surface of slopes 3:1 or greater maximum 2:1 slope. (3.29) in preparation for temporary or permanent seeding. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and all other disturbed areas to stabilize disturbed areas. Phase II: All controls installed in Phase I should remain until the site is stabilized. Permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Vegetative Measures Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months. Soil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary vegetation immediately after grading. All earth berms, dams, dikes, diversions and Sediment Trap embankments are to be machine-compacted, immediately seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover within five (5) days after grading. Management Strategies Construction shall be sequenced such that grading operations will begin and end as quickly as possible. The site superintendent shall be responsible for the installation and maintenance of all erosion and sediment control measures. Maintenance of these measures throughout the project are critical to the effectiveness of the program. After areas above controls have been stabilized, the controls shall be cleaned up and removed at the direction of the Frederick County inspector. All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. Erosion and Sediment Control Narrative Management Strategies (Continiued) Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the check dams shall be removed. Concentrated runoff shall not flow down cut or fill slopes unless contained within a temporary or permanent channel, flume, or slope drain structure. Whenever water seeps from a slope face, drainage or other protection shall be provided. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soils areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment Control Handbook (VESCH). Any changes made to this plan must be resubmitted for approval without exception. Maintenance All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24 hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Gravel outlets shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Permanent Stabilization All areas disturbed by construction shall be stabilized with permanent seeding immediately following final grading. Seeding shall be done according to standard and specification no. 3.32 of the VESCH. Permanent stabilization is defined as 90% uniform coverage on the entire site, ability to inhibit erosion and mature enough to survive, including 2-3 inch cuttings. Phases of Land Disturbance Activities 1. Mandatory pre-construction conference shall be scheduled as required by regulations. 2. Clearing and grubbing for sediment control devices only. 3. Installation of all Phase I erosion & sediment control devices. 4. Obtain county inspector approval. 5. Clear site. 6. Restoration and stabilization of disturbed areas. 7. Remove all erosion & sediment control measures with the approval of the inspector. Long Term Maintenance and Repair Plan Mowing: all grasses should be mowed at least twice each year. Grasses such as tall fescue should be mowed in early summer after emergence of the heads on cool season grasses. They should be mowed again in the early fall to prevent seeds of annual weeds from maturing. Mowing of legumes such as sericea lespedeza and crown vetch can be permitted to grow on the dam or in any part of the emergency spillway. Liming and fertilizing: the soil should be sampled according to recommended procedures at least once every 4 years. The sample should be tested at a qualified soil testing laboratory. Lime and fertilizer should be applied in accordance with recommendations based on the tests. Replanting and over seeding: if vegetation covers less than 40% of the soil surface, lime, fertilize and seed in accordance with current recommendations for new seeding. If vegetation covers more than 40% but less than 70% of the soil surface, lime fertilize and over seed in accordance with current recommendations. Removing trash and debris: trash, litter and vegetation (other than grass) will be removed as needed (but no less than two times per year) to prevent obstruction to the flow of water, to prevent movement of trash and litter to downstream properties, to maintain the integrity of the structure, to provide an attractive appearance and to minimize water pollution. Removing sediment: soil materials (including clay, silt, sand and gravel) will be removed before the detention pool loses 10% of the designed storage capacity. Sediment disposal: sediment disposal should be in accordance with current procedures for disposal of sediment. Where required by the appropriate authorities, the sediment will be tested for appropriate pollutants at the owner's expense before it is removed from the pond. Repairs: repair slides, slumps and eroded areas promptly and in a workmanlike manner trash racks, pipes, headwalls, etc. Will be maintained, repaired and/or replaced as needed to maintain the integrity of the structure. Exposed metal surfaces will be painted to minimize damage due to rust. Maintenance inspections: the owner will be responsible for inspecting each stormwater management structure after each significant rainfall. Once each year a representative of will jointly inspect each stormwater management structure. Appropriate action will be taken to ensure appropriate maintenance. All maintenance costs will be borne by the owner. Where structures are to be maintained by more than one party, allocation of costs will be in accordance with terms set forth in the maintenance agreement. Keys to locked access points shall be available to personnel upon request. Maintenance records: the landowner, or someone designated by the landowner, shall inspect the detention pond within 24 hours after each rainfall event of one inch or more of rain. The owner or the designee shall keep written records of these inspections. The records shall also include maintenance and repairs performed. Copies of these records shall be provided to the county upon request. The water quality features shall not be modified in any way without prior approval by Frederick County. ·Topsoil shall be spread at a minimum depth of 4". ·Pulverized agricultural limestone shall be incorporated into soil at a rate of 92 lbs. Per 1000 s.f. (2 tons per acre). ·Fertilize with 10-20-10 at a rate of 12 lbs. Per 1000 s.f. (500 lbs. Per acre). Seed mix shall consist of 90% kentucky 31 tall fescue and 10% kentucky bluegrass applied at the rate of 200 lbs. Per acre. Winchester Landing Site Specific Geologic Data Martinsburg and Oranda Formations: (Shown as Green Areas on Map Below) Description: Martinsburg Formation (Geiger and Keith, 1891). Three lithologic packages are recognized in the Martinsburg (in ascending order): black shale and limestone; sandstone and shale; and sandstone (Rader and Biggs, 1976). The lower unit consists of 200 to 250 feet of black calcareous shale, black aphanic, argillaceous limestone; and thin, light-brown K-bentonites. The bulk of the formation, more than 2800 feet, is composed of olive-green to gray, fine- to medium-grained, lithic sandstone and greenish-gray shale and siltstone. These lithologies occur in base-truncated Bouma cycles. Graded bedding, flute casts, and load casts are common. The upper unit, about 170 feet thick, is brownish-gray, medium- to coarse-grained, quartz sandstone. The lower two-thirds of this sandstone contains near-shore, marine fossils. Oranda Formation (Cooper and Cooper, 1946). Limestone and siltstone. Limestone, medium- to dark-gray, fine-grained, very argillaceous. Siltstone, black to dark-gray; both lithologies silicified where in contact with a K-bentonite. Five K-bentonites identified in the type section (Rader and Read, 1989). Lithologic constituents ·Major Sedimentary » Clastic » Mudstone» Shale ·Minor Sedimentary » Clastic » Sandstone ·Minor Sedimentary » Clastic » Siltstone ·Incidental Sedimentary » Carbonate » Limestone Minimum Construction Standards An erosion and sediment control program adopted with this plan must be consistent with the VESCH for 9VAC25-840-40 minimum standards: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 100-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with this chapter. f. Applicable safety requirements shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks; or (2) Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. l. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act. m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act. n. Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19. Soils Descriptions 1B—Berks channery silt loam, 3 to 8 percent slopes Depth to restrictive feature: 20 to 40 inches to lithic bedrock Drainage class: Well drained Runoff class: Medium Calcium carbonate, maximum content: 1 percent Depth to water table: More than 80 inches Available water capacity: Very low (about 2.9 inches) 9B—Clearbrook channery silt loam, 2 to 7 percent slopes Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Drainage class: Somewhat poorly drained Runoff class: Very High Depth to water table: About 3 to 12 inches Available water capacity: Very low (about 2.7 inches) Soils Descriptions 41C—Weikert-Berks channery silt loams, 8 to 15 percent slopes Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Well drained Runoff class: High Depth to water table: More than 80 inches Available water capacity: Very low (about 1.1 inches) 41D—Weikert-Berks channery silt loams, 15 to 25 percent slopes Depth to restrictive feature: 10 to 20 inches to lithic bedrock Drainage class: Well drained Runoff class: Medium Depth to water table: More than 80 inches Available water capacity: Very low (about 1.2 inches) DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EROSION & SEDIMENT CONTROL NARRATIVEWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 9B 41C 1B 9B 9B 9B 41C 662664666668 660 670 6 6 266466 6 668672674 6506 6 0 6 7 0 6466466486526546566586626 6 4666668672674 650 650 660 6 6 0 648 652 652654 654 65 6 656 658 658662 662 664 66 4 650 6 5 2 666652 654666668 6 6 8 662 664664 6 6 2 660670658662664666668 66067066 2 664666668672 674 670664666 668 6706686726 7 0 6 7 2 67 4 676670670 662664666 666 668668672672 66 0 67 0 654 656 65866266 4 66666 8 664 66 6 662 664 66 0 6 5 2 6 5 4 6 5 6 6 5 8 662662664 6 6 4664664 6 6 4 666660 656 658 662664664 660662 662664666 644 644644646646646648656 650660 642642642642644644646646648652654656658662664 646646 640650 660 642 644 646 648 652654 656 658 662 664 666 650 660 6486526 5 465665 8666666668 650660 648652654656658 662 664 6 6 6 6706726726746746766766 7 6 6 7 6 670 668 668672L1 WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" PE P EX. 18" PEPEX. 18" PEP20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEPEX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L 22 23 24 24A 25 26 27 28 29 30 31 32 33 34 35 36 39 40 41 42 4344454647484950 10A 32 10 11 12 13 14 16 15 17 18 19 20 21 21A 37 38 20' FCSA SA N. E S M T .INST. NO. 080 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 TIGER LILY CT. POPPY LN. EX. W/L (TYP.)ARDEYTH LN.54' R/W47 00Top 43 00Inv 42 50Inv 48 00Weir 43 00DL 47 50Inv CE LOD LOD SB#2 LOD ST#4 LOD Install Diversion Berm to Bypass Upland Drainage Around the Sediment Basin. Ensure Positive Drainage Along the Berm. SB#1 Flow Path (SB #1) Tc = 11.0 Mins. ST#3 ST#1 See Outlet Protection Table (Sheet 13) To Sediment Basin#1 DA = 10.40 Ac. See Sediment Basin #1 Comps & Details (Sheet 10) DD DD DD DD DD DD DD DD DD To Sediment Basin#2 DA = 4.66 Ac. Outlet Weir Outlet Weir LOD LOD LOD Flow Path (SB #2) Tc = 5.0 Mins. ST#2 ST#5 ST#6 ST#7 Enclose Ex. Utility Poles w/ Orange Safety Fence Enclose Ex. Utility Poles w/ Orange Safety Fence CD IPIP IP CD SAF SAF CD CD CD CD SF SSF SSF LOD See Sediment Basin 2 Comps & Details (Sheet 11) Outlet Weir Outlet Weir Outlet Weir Outlet Weir Outlet Weir Protect Ephemeral Channel w/ Orange Safety Fence SAF i8ersion i-e B;pass DA = 2.12 Ac. SF SF i8ersion i-e B;pass DA = 2.78 Ac. TS TS TS TS TS TS TSTS TS TS Potential Stockpile Area B/M B/M B/M B/M B/M B/M B/M B/M B/M B/M PS Place Orange SafetyFence at the R/W SAF Place OrangeSafety Fenceat the R/W SAF SF SF SF See Outlet Protection Table (Sheet 13) CDCD CD CD CD CD To Silt Trap #7 DA = 0.89 Ac. To Silt Trap #6 DA = 1.99 Ac. To Silt Trap #5 DA = 2.68 Ac. To Silt Trap #4 DA = 2.14 Ac. To Silt Trap #3 DA = 1.77 Ac. To Silt Trap #1 DA = 2.46 Ac. To Silt Trap #2 DA = 2.75 Ac. Potential Stockpile Area Ex. 243 lf Wetland Channel To Remain Undisturbed SedimentBasin 2 SedimentBasin 1 Install a Permanent Diversion Berm to Convey Drainage to the Sediment Basin & Future Wet Pond. Ensure Positive Drainage Along the Berm. DD U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2100.dwg PLOTTED: 7/14/2022 1:39 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2100 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF8 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EROSION & SEDIMENT CONTROL PLAN (PHASE-I)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTEROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.07 STORM DRAIN INLET PROTECTION IP DRAINAGE DIVIDES 3.32 PERMANENT SEEDING PS PS 3.13 TEMPORARY SEDIMENT TRAP ST ST-1 SUPER SILT FENCE SSF 3.09 TEMPORARY DIVERSION DIKE DD DD 3.14 TEMPORARY SEDIMENT BASIN SB SB LIMITS OF DISTURBANCE LOD 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS TS L1 WETLANDSCHANNEL243 LF NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. GASLINE (TYP.) TIGER LILY CT. POPPY LN.ARDEYTH LN.54' R/WLP 659.4314+63.33LP 661.9414+66.01662 662 664 666 650660 660 660 642642 644 64464664664 8 65265465 465465 4 654656 656 6566566566 5 6 658 658658662662 662 662662 66 2 66266 2 664 664666 666 668 668650 65066 0 648 648652 652654 654656 6566 5 8 6 5 8 662 664 664 660660 660 660 66 0 6 6 0 670 670 670 670 658658 662662662662662664664 66 4 6 6 4666 666668668668668 668668 672 672 674 67 4 676 6 7 667667 66766 7 6 67667 6676676 670 662 664 6 6 6 668 672 674 670672662 656660658662664664666668660662664666668660662 662 664 650 650 652 652 654 654 656 656 6506506526526546546566566606566566586626626626646 6 4 670 666668 662664666668670670 6 7 0 662662664664664 664666666666666 666666668668664666668664664666668 6 5 0 6 6 0 64 6 6 4 8 65 2 65 4 6 5 6 6 5 8 6 6 2 6626646 6 4 6666 6 6 668 668650646646646648652 660 654656658662664666 6606 5 4 656658664666668668650 650 650660646648652 652 652654 654654656658662664 662 664 66 0 66 2 664 666 666 66 8 670670668670 666668 672 670670670668 672672674670668668668 6 7 0 670 672 672670662664666668662664664 664 666 668668664666 6 6 8 668668670 66 8 666 668 668664666668 668 664666 666 666668 666 668 -2.0%15.4 15.3 15.2 15.1 14.1 14.2 13.1 13.6 5.1 1.8 1.9 1.5 1.6 1.3 1.4 2.3 2.2 2.1 3.2 3.3 13.3 11.1 10.1 10.2 6.5 6.2 6.36.4 14.3 18.1 11.4 11.5 11.6 11.3 4.2 4.1 4.34.4 4.5 4.6 17.2 13.7 13.2 13.5 12.1 12.2 17.1 15.5 21.5 21.1 13.4 6.1 CB1 CB2 CB3 CB4 10.3 21.2 1.2 EX9 21.4 21.3 10.4 10.5 19.2 19.1 23.322.2 22.1 23.1 23.2 U22 U21 Catch Basin 1 Catch Basin 2 BIO-RET A BIO-RET B Catch Basin 3 BIO-RET C BIO-RET D WETPOND Forebay 2 Catch Basin 5 Catch Basin 4 Forebay 1 To Str. 3.2 DA = 0.99 Ac. To Str. 1.8 DA = 0.04 Ac. To Str. 1.9 DA = 0.10 Ac. CNW = 87 To Str. 1.4 DA = 0.79 Ac. To Str. 1.3 DA = 0.86 Ac. To Str. 2.3 DA = 0.42 Ac. To Str. 2.2 DA = 0.13 Ac. To Str. 6.2 DA = 0.06 Ac. To Str. 6.4 DA = 0.36 Ac.To Str. 6.5 DA = 0.44Ac. To Str. 6.3 DA = 0.20 Ac. To Str. 3.3 DA = 0.56 Ac. To Str. 4.6 DA = 0.44 Ac. To Str. 4.3 DA = 0.45 Ac. To Str. 4.5 DA = 0.09 Ac. To Str. 4.2 DA = 0.23 Ac. To Str. 4.4 DA = 0.26 Ac. To Str. 5.1 DA = 0.48 Ac. To Str. 15.5 DA = 0.44 Ac. To Str. 15.4 DA = 0.62 Ac. To Str. 15.3 DA = 0.28 Ac. To Str. 17.2 DA = 0.21 Ac. To Str. 17.1 DA = 0.44 Ac. To Str. 13.4 DA = 0.36 Ac. To Str. 13.5 DA = 0.39 Ac. To Str. 14.2 DA = 0.48 Ac. To Str. 14.3 DA = 0.60 Ac. To Str. 12.1 DA = 0.38 Ac. To Str. 12.2 DA = 0.36 Ac.To Str. 11.5 DA = 0.36 Ac. To Str. 11.4 DA = 0.36 Ac. To Str. 13.7 DA = 0.45 Ac. To Str. 13.3 DA = 0.11 Ac. To Str. 11.6 DA = 0.11 Ac. To Str. 11.3 DA = 0.26 Ac. To Str. 13.2 DA = 0.50 Ac. To Str. 13.6 DA = 0.15 Ac. To Str. 1.6 DA = 0.40 Ac. To Str. 14.1 DA = 0.36 Ac. To Str. 18.1 DA = 0.48 Ac. To Ex. Str. 9 DA = 0.83 Ac. To Silt Fence DA = 0.19 Ac. To Silt Fence DA = 0.61 Ac. To Silt Fence DA = 0.29 Ac. To Silt Fence DA = 0.34 Ac. To Ex. Str. 6 DA = 0.61 Ac. To Ex. Str. 5.1 DA = 0.66 Ac. To Str. 21.4 DA = 0.05 Ac. To Str. 21.3 DA = 0.05 Ac. To Str. 21.5 DA = 0.43 Ac. To Bio-Ret D Total DA = 1.31 Ac. To Bio-Ret C Total DA = 0.68 Ac. To Str. 1.5 DA = 0.25 Ac. To Str. 19.2 DA = 0.15 Ac. To Str. 23.2 DA = 0.13 Ac. To Str. 22.2 DA = 0.22 Ac. PS PS PS PS PS PS PS PS PS PS PS IP OP IP IP IP OP OP IP IP IP IP IP IP IP IP IP IP OP OP OP OP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IPIP IP IPIP IP IP IP IP IP PS OP IP IP IP IP PS PS PS OP IP IP SF SF SF SF IP IP IP IP OP OP U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2200.dwg PLOTTED: 7/14/2022 1:41 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2200 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF9 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EROSION & SEDIMENT CONTROL PLAN (PHASE-II)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTEROSION AND SEDIMENT CONTROL LEGEND NO.TITLE KEY SYMBOL 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE CE 3.07 STORM DRAIN INLET PROTECTION IP DRAINAGE DIVIDES 3.32 PERMANENT SEEDING PS PS 3.13 TEMPORARY SEDIMENT TRAP ST ST-1 SUPER SILT FENCE SSF 3.09 TEMPORARY DIVERSION DIKE DD DD 3.14 TEMPORARY SEDIMENT BASIN SB SB LIMITS OF DISTURBANCE LOD 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS TS 650 660 652 654 656 658 662 650 6 5 2 654 650660 648652 654 656 658 662 CONC. S/W CONC. S/W 2.5' SIDEWALK ESMT.INST. NO. 040024106 FH 2 - WV's MB MB 15' WIDE W/L ESMT.INST. NO. 030007982 W/M EX. 24 " RCP EX. SHED(APPROX. LOC.) EX. W/L (TYP.) EX. GAS LINE (TYP.)S 43°18'34" W979.98'EX. SAN. SEW. (TYP.) EX. SHEDOVERHANG DECK 47 00 Top 43 00 Inv 42 50 Inv 48 00 Weir 43 00 DL 101 102 Install Diversion Berm to Bypass Upland Drainage Around the Sediment Basin. Ensure Positive Drainage Along the Berm. See Outlet Protection Table (Sheet 13) To Sediment Basin#1 DA = 10.40 Ac. See Sediment Basin #1 Comps & Details (Sheet 10) i8e4sion i-e B;2ass DA = 2.12 Ac. Place Orange SafetyFence at the R/W Potential 12' Wide Spillway @ 2.8% (Armour with N.A.G. C350 Permanent Erosion Matting) Principal Riser (See Details, Sh. 10) 68' - 24" RCP Cl. III @ 0.74% SedimentBasin 1 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2300.dwg PLOTTED: 7/14/2022 1:41 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2300 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF10 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 Sediment Basin #1 De-Watering Device Sizing Computations Area of Single Orifice with 8" Ø = 0.3491 sf [ A=3.1416 * r 2 ] Number of holes = 1 Total Area = 0.3491 sf Q(actual)= 0.6 * 0.3491 *(64.32* 1.250)1/2 Q(actual) = 1.8781 cfs Dry Storage Provided = 37,791 cf (From Stage Storage) Draw Down Time of: t = Dry Storage Provided / Q(actual) t = 5.59 hours (20,122 Seconds) An 8" Ø Dewatering Orifice obtains a 5.59 hour Draw Down Time.NORTHAPPROVED PERMIT DRAWINGS Earthen Embankments Notes Site Preparation Areas designated for borrow sites, embankment construction, and structural work should be cleared, grubbed and stripped of topsoil. All trees, vegetation, roots and other objectionable material should be removed. All cleared and grubbed material should be disposed of outside and below the limits of the embankment and reservoir, as directed by the owner or his representative. When specified, a sufficient quantity of topsoil should be stockpiled in a suitable location for use on the embankment and other designated areas. Earth Fill 1. Material - Fill material should be taken from an approved, designated borrow area. It should be free of roots, stumps, wood, rubbish, stones greater than 6 inches, and frozen or other objectionable materials. Fill material for the center of the embankment and the cutoff trench should conform to Unified Soil Classification GC, SC, or CL. Consideration may be given to the use of other materials in the embankment based on the recommendations of a geotechnical engineer supervises the design and construction. 2. Placement - Areas on which fill is to be placed should be scarified before its placement. Fill material should be placed in layers a maximum of 8 inches thick (before compaction), which should be continuous over the entire length of the fill. The most permeable borrow material should be placed in the downstream portions of the embankment. The principal spillway must be installed concurrently with fill placement and not excavated into the embankment. 3. Compaction - Fill material should be compacted with appropriate compaction equipment such as a sheepsfoot, rubber-tired or vibratory roller. The number of required passes by the compaction equipment over the fill material may vary with soil conditions. Fill material should contain sufficient moisture such that the required degree of compaction will be obtained with the equipment used. The minimum required density is 95% of maximum dry density with a moisture content within 2% of the optimum, unless otherwise specified by the engineer. Each layer of the fill should be compacted as necessary to obtain minimum density and the engineer should certify, at the time of construction, that each fill layer meets the minimum density requirement. All compaction is to be determined by either Standard Proctor Test (ASTM D698) or the Modified Proctor Test (ASTM D1557) as directed by the geotechnical engineer based on site and soil conditions and the size and type of structure being built. 4. Cutoff Trench - The cutoff trench should be excavated into impervious material along or parallel to the centerline of the embankment as shown on the plans. The equipment used for excavation should govern the bottom width of the trench, with the minimum width being 4 The depth should be at least 4 feet below existing grade or as shown on the plans. The side slopes of the trench should be 1H:1V or flatter. The backfill should be compacted with construction equipment, rollers, or hand tampers to assure maximum density and Minimum permeability. Compaction requirements shall be the same as those for the embankment. The trench shall be drained during the backfilling / compacting operations. 5. Top Soil - The surface layer of compacted fill should be scarified prior to placement of at least 6 inches of topsoil. The topsoil shall be stabilized with in accordance with the Virginia Erosion and Sediment Control Handbook, 1992 edition. Structure and Conduit Backfill Backfill that is beside pipes or structures should be of the same type and quality as specified for the adjoining fill material. The fill should be placed in horizontal layers not to exceed 4 inches in thickness and compacted by hand tampers or other manually directed compaction equipment. The material should completely fill all spaces under and beside the pipe. During the backfilling operation, equipment should not be driven closer than 4 feet, as measured horizontally, to any part of a structure. Also, equipment should NEVER be driven over any part of a structure or pipe, unless compacted fill has been placed to a depth specified by the structural live load capacity of the structure or pipe in order to adequately distribute the load. 00 30'60'Sediment Basin 1 Plan View Scale: 1" = 30' DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SEDIMENT BASIN 1 PLAN & COMPUTATIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 6506 6 0 6466466486526546566586626 6 4666 650 6 6 0 648652654 65 6658662 66 4 650 660 6486526 5 465665 8 PIN 65-A-22GEORGE T. DAMKO PIN 65-A-23RUSSELL W. MORELANDDB 344 PG 311 WETLANDSCHANNEL243 LF N 65°53'40" W 204.34' N 64°38'51" W 376.73' 47 50 Inv 10.1 10.2 To Sediment Basin#2 DA = 4.66 Ac. Flow Path (SB #2) Tc = 5.0 Mins. Protect Ephemeral Channel w/ Orange Safety Fence i8e4sion i-e B;2ass DA = 2.78 Ac. See Outlet Protection Table (Sheet 13)Top Berm = 657.33'58' - 124" RCP Cl. III @ 4.32% Ex. 243 lf Wetland Channel To Remain Undisturbed SedimentBasin 2 PRINCIPAL RISER ·5' Ø Riser Crest Elevation = 654.00' ·Passes the 100 Yr - 24 Hr Storm Event, While Providing at Least 2.0' Freeboard ·Plug or Cover All Weir & Orifices Openings Below the Principal Riser Crest until the Facility is Converted to the Ultimate Level I Wet Pond ConditionLimits of Wet Storage @ WSE = 650.00'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2310.dwg PLOTTED: 7/14/2022 1:41 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2310 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF11 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061NORTH 00 30'60' APPROVED PERMIT DRAWINGS Sediment Basin 2 Plan View Scale: 1" = 30' Sediment Basin #2 De-Watering Device Sizing Computations Area of Single Orifice with 4" Ø = 0.3491 sf [ A=3.1416 * r 2 ] Number of holes = 1 Total Area = 0.0873 sf Q(actual)= 0.6 * 0.0873 *(64.32* 1.250)1/2 Q(actual) = 0.4697 cfs Dry Storage Provided = 11,644 cf (From Stage Storage) Draw Down Time of: t = Dry Storage Provided / Q(actual) t = 6.89 hours (24,790 Seconds) An 4" Ø Dewatering Orifice obtains a 6.89 Hour Draw Down Time. DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SEDIMENT BASIN 2 PLAN & COMPUTATIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2500.dwg PLOTTED: 7/14/2022 1:42 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2500 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF12 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EROSION & SEDIMENT CONTROL DETAILS (VESCH)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2501.dwg PLOTTED: 7/14/2022 1:42 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2501 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF13 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601EROSION & SEDIMENT CONTROL DETAILS (VESCH)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTSee Sheet 69 for the "Outlet Protection Summary" U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2502.dwg PLOTTED: 7/14/2022 1:42 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2502 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF14 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SEDIMENT BASIN DETAILS (VESCH)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2503.dwg PLOTTED: 7/14/2022 1:42 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2503 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF15 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SEDIMENT TRAP COMPUTATIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS2504.dwg PLOTTED: 7/14/2022 1:42 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS2504 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF16 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 TYPICAL GABION BASKETS NOT TO SCALE ISOMETRIC VIEWNote: Gabion Basket lengths will vary, but Shall be Multiples (1,2,3, or 4) of the 3 foot Basket Width. BASKET HEIGHT VARIES 1', 1.5' OR 3' (SEE PLAN DETAILS FOR HEIGHT) INDIVIDU A L C E L L 3' LENGTH 3' B A S K E T W I D T H TOP/LID DIAPHRAGM GABION B A S K E T L E N G T H ( 3' , 6' , 9' O R 1 2' ) Trash Rack Openings ≈ 7" x 8" DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601MISCELLANEOUS E&S DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT FARMINGTON BLVD. 10+00 TO 24+00 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 630 640 650 660 670 680 630 640 650 660 670 680 9+50660.310+00661.2661.21663.0662.5811+00663.4664.50664.2666.2512+00663.9667.35665.0667.9213+00664.3668.46665.7668.7414+00665.8668.51666.4668.0115+00666.0667.52665.1667.0216+00662.8666.53659.8666.0317+00657.3665.54657.7665.0418+00658.0664.50657.9663.5919+00657.7662.27656.6660.5320+00655.5658.37652.8655.8521+00651.2653.28648.5650.7122+00646.3648.35644.1646.6723+00642.4645.68645.4645.3924+00645.40.12% -5.14 % -0.99% 2.01% 3.84% 1.08%STA 9+92.49ELEV 661.06STA 23+88.48ELEV 645.43PVI STA = 13+50.03 PVI ELEV = 669.00 A.D. = -2.07 K = 48.47 BVCS: 12+99.85BVCE: 668.46EVCS: 14+00.21EVCE: 668.50HIGH POINT ELEV = 668.74 HIGH POINT STA = 13+52.26 100' VC PVI STA = 19+00.03 PVI ELEV = 663.56 A.D. = -4.15 K = 59.86 BVCS: 17+75.82BVCE: 664.79EVCS: 20+24.25EVCE: 657.18248' VC PVI STA = 11+65.03 PVI ELEV = 667.00 A.D. = -2.76 K = 36.21 BVCS: 11+15.03BVCE: 665.08EVCS: 12+15.03EVCE: 667.54100' VC PVI STA = 22+55.85 PVI ELEV = 645.27 A.D. = +5.26 K = 36.00 BVCS: 21+61.15BVCE: 650.14EVCS: 23+50.56EVCE: 645.39LOW POINT ELEV = 645.39 LOW POINT STA = 23+46.16 189' VC PVI STA = 10+29.97 PVI ELEV = 661.81 A.D. = +1.83 K = 27.32 BVCS: 10+04.97BVCE: 661.31EVCS: 10+54.97EVCE: 662.7750' VC EXISTING EPSAW CUT AND MATCHEXISTING EPSAW CUT AND MATCHEXISTING POWER ESMT. FIN. GRADE EX. GRADE 25 MPH POSTED | 30 MPH DESIGN ADT=2,246BEGIN CONSTRUCTIONSTA 10+25.94END CONSTRUCTIONSTA 23+46.50CD-1CD-228" COVER 38" COVER 30" COVER 145" COVER 44" COVER 215" COVER GABRIEL CT. 10+00 TO 18+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 650 660 670 680 650 660 670 680 9+50 10+00664.8666.69666.3666.5911+00667.7667.17667.5667.7612+00667.9668.34668.5668.9313+00669.8669.51669.6670.0314+00670.2670.21669.5670.0215+00668.6669.48668.7668.8816+00668.8668.28667.6667.6917+00668.0667.58669.4667.9018+00669.9668.2118+50 1.17% -1.20% 0.63% -2.10%-2.09%STA 9+79.70ELEV 667.11STA 18+16.06ELEV 668.31PVI STA = 14+00 PVI ELEV = 670.68 A.D. = -2.36 K = 66.74 BVCS: 13+21.13BVCE: 669.76EVCS: 14+78.87EVCE: 669.73HIGH POINT ELEV = 670.21 HIGH POINT STA = 13+99.03 158' VC PVI STA = 10+20.72 PVI ELEV = 666.25 A.D. = +3.26 K = 15.34 BVCS: 9+95.72BVCE: 666.77EVCS: 10+45.72EVCE: 666.54LOW POINT ELEV = 666.44 LOW POINT STA = 10+27.82 50' VC PVI STA = 16+72.95 PVI ELEV = 667.41 A.D. = +1.83 K = 26.00 BVCS: 16+49.21BVCE: 667.69EVCS: 16+96.70EVCE: 667.56LOW POINT ELEV = 667.51 LOW POINT STA = 16+80.32 47' VC CD-1CD-1CD-225 MPH POSTED | 30 MPH DESIGN ADT=1,450 FIN. GRADE EX. GRADE CD-257" COVER43" COVER30" COVER CUL-DE-SAC UNWRAP 0+50 TO 4+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 650 660 670 680 650 660 670 680 0+00 1+00669.5667.67670.2668.132+00670.5668.43670.4668.503+00670.6668.33669.2667.944+00668.1667.384+50 0.94%-1.13%STA 0+57.94ELEV 667.27STA 4+10.19ELEV 667.27PVI STA = 2+49.97 PVI ELEV = 669.07 A.D. = -2.07 K = 108.59 BVCS: 1+37.78BVCE: 668.02EVCS: 3+62.17EVCE: 667.81HIGH POINT ELEV = 668.50 HIGH POINT STA = 2+39.84 224' VC FIN. GRADE (EDGE PVMT) EX. GRADE  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3050.dwg PLOTTED: 7/14/2022 12:54 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3050 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF17 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601FARMINGTON BLVD. & GABRIEL CT. PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT MAURY WAY 10+00 TO 15+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 660 670 680 645 650 660 670 680 9+50 10+00669.7669.97668.4668.8411+00666.4667.97667.1667.1212+00669.3666.27671.0665.4213+00671.3664.57670.6663.7214+00669.6662.87667.3662.0415+00664.8662.3515+50 -2.00% 2.00%2.00% -2.73% -1.70%STA 10+00ELEV 669.97STA 14+93.50ELEV 662.22STA 15+04.50ELEV 662.44BVCS: 10+16BVCE: 669.65EVCS: 10+66EVCE: 668.5450' VC BVCS: 14+43.05BVCE: 662.14EVCS: 14+93.05EVCE: 662.21LOW POINT ELEV = 661.94 LOW POINT STA = 14+66.01 50' VC PRIVATE ROAD / ACCESS ESMT. 25 MPH POSTED | 30 MPH DESIGN ADT=410 FIN. GRADE EX. GRADE CD-1CD-244" COVER48" COVERHARDY WAY 10+00 TO 15+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 660 670 680 645 650 660 670 680 9+50 10+00668.8668.44669.5667.4411+00669.4666.44669.6665.4412+00671.3664.44670.9663.4413+00669.0662.44665.6661.4414+00662.9660.44660.0659.5015+00658.7659.9115+50 -2.00% -2.00% 2.00%2.00%STA 10+00ELEV 668.44STA 14+93.50ELEV 659.78STA 15+04.50ELEV 660.00BVCS: 14+38.33BVCE: 659.68EVCS: 14+88.33EVCE: 659.68LOW POINT ELEV = 659.43 LOW POINT STA = 14+63.33 50' VC PRIVATE ROAD / ACCESS ESMT. 25 MPH POSTED | 30 MPH DESIGN ADT=400 FIN. GRADE EX. GRADE 33" COVER CD-235" COVERWERTLAND PL. 10+00 TO 15+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 660 670 680 645 650 660 670 680 9+50 10+00663.2663.15664.0663.9711+00664.1664.13665.0664.9712+00664.1664.11661.7661.7413+00659.0658.98657.3657.3014+00660.1660.05663.5663.4815+00664.3664.3415+50 -1.00%STA 10+00ELEV 663.75STA 15+19.42ELEV 658.56PRIVATE ROAD / ACCESS ESMT. 25 MPH POSTED | 30 MPH DESIGN ADT=170 FIN. GRADE EX. GRADE CD-1CD-163" COVER43" COVER U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3051.dwg PLOTTED: 7/14/2022 12:54 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3051 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF18 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601MAURY WAY, HARDY WAY & WERTLAND PL. PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT SIGHT DISTANCE ESMT. -2+07-2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+37 SIGHT DISTANCE ESMT. ORRICK CT. 55' ROW - 25 MPH MAURY WAY31' ACCESS ESMT.CG-11HARDY WAY31' ACCESS ESMTCG-11.RM2RM2RM2 CG-12A CG-12A CG-12ACG-12A CG-12ACG-12BLOT 131 2,556 SF LOT 132 3,621 SF LOT 134 2,556 SF LOT 133 3,621 SF LOT 163 2,556 SF LOT 164 3,621 SF LOT 102 2,556 SF LOT 101 3,621 SFCG- 1 2 C CG-12C LPLPLPLPGAZEBO / PAVILION4+07 UNWRAP 0+58 UNWRAP1+00 2+003+00PR. MONUMENT SIGN LOCATION144 SF ENTRY MONUMENT ESMT(REQUIRES SEPARATE PERMIT).LP 6 6 8 . 1 2 10 + 7 9 . 1 4 HP 671.47 19+83.70 668 668 67066866 8670670 670670672-2.0% HARDY WAY - SIGHT DISTANCE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 655 660 670 680 -2+50 -2+00670.0668.55669.1668.25-1+00667.7668.30668.1668.180+00668.8667.79669.0669.261+00669.0669.74669.5669.852+00670.3670.01669.4669.803+00669.0669.263+50 209' SDL (EFFECTIVE ) 337' SDL HEIGHT OF TARGET 3.5' HEIGHT OF TARGET 3.5' HEIGHT OF EYE 3.5' CUL-DE-SAC FIN. GRADE EX. GRADE GABRIEL CT - SIGHT DISTANCE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 655 660 670 680 -3+50 -3+00659.1659.9-2+00660.8662.5662.25-1+00663.7664.25664.8665.960+00665.5666.55665.2667.961+00664.2668.39664.4668.442+00665.4668.42666.3668.053+00666.0667.593+50 344' SDL 339' SDL HEIGHT OF TARGET 3.5' HEIGHT OF TARGET 3.5' HEIGHT OF EYE 3.5' EX. GRADE FIN. GRADE -3+34 -3+00 -2+50 -2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+39 14.5'FARMINGTON BLVD. 55' ROW - 25 MPH ORRICK CT.55' ROW - 25 MPHRM2RM2RM2RM2RM2 RM2CG-12ACG-12A LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 28 10,176 SF LP LP 419 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) Ex. Lot 14 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's TVRB TRB MLP CONC. S/W CONC. S/WMB TR W/M FH 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 EX. SAN. SEWER EX. W/L GARDENEX. STOPSIGN 662 55 662 29 663 09 660 44 OLR 662 71 6618165871 EP 659 14 EP 658 89 EP 658 13 EP 659 23 EP 659 76 EP 660 86 EP 662 2166334 662 94 HP 659 66 0 6 6 0 658658 6626 6 2 6 6 4 6 6 6 668 66866 8 668668664666 668MAURY WAY - SIGHT DISTANCE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 655 660 670 680 -3+50 -3+00667.8667.68668.5668.21-2+00668.9668.73668.9669.68-1+00669.5670.21670.1670.360+00668.8669.09668.5669.501+00668.6668.81667.7667.912+00666.9667.44666.9666.973+00666.0666.433+50 337' SDL 338' SDL HEIGHT OF TARGET 3.5' HEIGHT OF TARGET 3.5' HEIGHT OF EYE 3.5' EX. GRADE FIN. GRADE -3+36 -3+00 -2+50 -2+00 -1+50 -1+00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+37 SIGHT DISTANCE ESMT.SIGHT DISTANCE ESMT. ORRICK CT. 55' ROW - 25 MPH MAURY WAY31' ACCESS ESMT.CG-11HARDY WAY31' ACCESS ESMTCG-11.ORRICK CT. 55' ROW - 25 MPH RM2RM2RM2RM2CG-12A CG-12ACG-12ACG-12A CG-12A CG-12A LOT 2512,523 SFLOT 268,816 SFLOT 131 2,556 SF LOT 132 3,621 SF LOT 134 2,556 SF LOT 133 3,621 SF LOT 163 2,556 SF LOT 164 3,621 SF LOT 102 2,556 SF LOT 101 3,621 SFLPLP LPLPLOT 279,004 SF668 67066866 8670 666668670 670 668 -0+91 -0+50 0+00 0+50 1+00 1+18 -0+91 -0+50 0+00 0+50 1+00 1+18 WERTLAND PL. (PRIVATE ) 31' ACCESS ESMT. CG-12ACG-12A CG-12A CG-12ACG-12ATYPE "A" SEPARATION BUFFER50' - LANDSCAPE SCREENTYPE "A" SEPARATION BUFFER25' - FULL SCREENLOT 1672,556 SFLOT 1662,556 SFLOT 1653,621 SFLOT 1682,556 SFLOT 1692,556 SFLOT 1703,621 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1732,556 SFLOT 1722,556 SFLOT 1713,621 SFLOT 1742,556 SFLOT 1752,556 SFLOT 1763,621 SFLOT 1792,556 SFLOT 1782,556 SFLOT 1773,621 SFLOT 1802,556 SFLOT 1813,621 SFLPLPCG-12CCG-12B6 6 0 658660660662664662 66 2 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3100.dwg PLOTTED: 7/14/2022 12:55 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3100 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF19 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 50'100'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SIGHT DISTANCE PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT00 50'100' 00 50'100' PRIVATE ROAD INTERSECTION SIGHT DISTANCES 1. EFFECTIVE SIGHT DISTANCES SHOWN FOR REFERENCE. 2. NO PLANTINGS, FENCES, PEDESTALS, OR MAILBOXES SHALL BE PLACED IN SUCH A WAY TO REDUCE THE EFFECTIVE SIGHT DISTANCE. 00 50'100'NORTHNORT HNORTH NORT H 1 12 " SM 12.5A 3" BM-25 8" 21B COMPACTED SUBGRADE ROAD SECTION - A FARMINGTON BLVD. STA10+68 - 22+96 ORRICK CT. STA 10+00 - 17+00 55' R/W - 25 MPH POSTED / 30 MPH DESIGN (NTS) 55' RIGHT OF WAY EXTEND STONE BASE 1' BEYOND CG-6 EXTEND STONE BASE 1' BEYOND CG-6 2.08%2.08%2.00%2.00%B/C3' GRASS 5' SIDEWALK 1' BUFF 16' TRAVEL LANE 2.5' CG-6 2.00%2.00%2.00% 3' GRASS 5' SIDEWALK 1' BUFF 16' TRAVEL LANE 2.5' CG-6 B/CUD-4UD-4 TYPICAL RIGHT OF WAY & UTILITY LOCATIONS FARMINGTON BLVD. & GABRIEL CT. (NTS) 55' RIGHT OF WAY 3' GRASS 5' SIDEWALK 1' BUFF 2.00% 3' GRASS 5' SIDEWALK 1' BUFF 36 F/C B/CDRY UTILITY 2-PR 4" CONDUITS 1' 25' SETBACK GAS LINE 2' 10' WATERLINE 17' WATER ESMT. 5' 10'GAS ESMT.WATER ESMT.20' STREET TREE PLANTING LIMIT 25' SETBACK 2' 10' SANITARY SEWER 17' WATER ESMT. 5' 10'UTILITY ESMT.SEWER ESMT.20' STREET TREE PLANTING LIMIT 1 12 " SM 12.5A 3" BM-25 8" 21B COMPACTED SUBGRADE EXISTING ROAD SECTION - B FARMINGTON BLVD. STA10+20.25 60' R/W - 25 MPH POSTED / 30 MPH DESIGN AS SHOWN ON APPROVED STEEPLECHASE PLAN 2005 (NTS) 60' RIGHT OF WAY EXTEND STONE BASE 1' BEYOND CG-6 EXTEND STONE BASE 1' BEYOND CG-6 2.08%2.08%2.00%2.00%B/C4' GRASS 5' SIDEWALK 1' BUFF18' TRAVEL LANE 2.5' CG-6 2.00%2.00% 4' GRASS 5' SIDEWALK 1' BUFF18' TRAVEL LANE 2.5' CG-6 B/CUD-4UD-4 1 12 " SM 12.5A 3" BM-25 8" 21B COMPACTED SUBGRADE EXISTING ROAD SECTION - C FARMINGTON BLVD. STA 23+25.80 50' R/W - 25 MPH POSTED / 30 MPH DESIGN AS SHOWN ON APPROVED LYNNHAVEN SEC-1 PLAN 2003 (NTS) 50' RIGHT OF WAY EXTEND STONE BASE 1' BEYOND CG-6 EXTEND STONE BASE 1' BEYOND CG-6 2.08%2.08%2.00%2.00%2' GRASS4' SIDEWALK 0.5' BUFF16' TRAVEL LANE 2.5' CG-6 B/CUD-4UD-4 2.00%2.00%2' GRASS4' SIDEWALK 0.5' BUFF16' TRAVEL LANE 2.5' CG-6B/CNOTES 1. WATER AND SEWER NETWORKS WILL CROSS THROUGH THE TRAVELWAY AS NECESSARY TO ACHIEVE MINIMUM DEQ / VDH & FREDERICK WATER REQUIREMENTS. 2. STREET TREES SHALL NOT BE LOCATED WITHIN FREDERICK WATER EASEMENTS 1 12 " SM 12.5A 3" BM-25 8" 21B COMPACTED SUBGRADE PRIVATE ROAD SECTION - D MAURY WAY, HARDY WAY, WERTLAND PL. 31' ACCESS ESMT. - 25 MPH POSTED / 30 MPH DESIGN (NTS) 31' ACCESS EASEMENT EXTEND STONE BASE 1' BEYOND CG-6 2.08%2.08%2.00%2.00%2' GRASS5' SIDEWALK 0.5' BUFF11' TRAVEL LANE NO PARKING 2.5' CG-6 B/CUD-4 11' TRAVEL LANE NO PARKING 5.5' PEDESTRIAN ESMT.26' FACE OF CURB 2.00%2.00% 5.5' PEDESTRIAN ESMT.2' GRASS5' SIDEWALK 0.5' BUFF2.5' CG-6B/CCONCRETE SIDEWALK NTS 4" CONCRETE 4" DENSE GRADED STONE (21B) COMPACTED SUBGRADE (HEAVY DUTY) ASPHALT PAVEMENT NTS (HEAVY DUTY) CONCRETE DUMPSTER PAD NTS 1 1 2" SURFACE COURSE (SM 12.5A) 3" BASE COURSE (BM25) COMPACTED SUBGRADE 6" DENSE GRADED STONE (21B) 7" - 4,000 PSI CONCRETE 8" COMPACTED SAND COMPACTED SUBGRADE (STANDARD DUTY) ASPHALT PAVEMENT NTS 1 1 2" SURFACE COURSE (SM 12.5A) 2" IM 19.0 COMPACTED SUBGRADE 6" DENSE GRADED STONE (21B) 6" X 6" W2.9 W.W.F. PAVEMENT DESIGN NOTES: 1. THE PAVEMENT MATERIALS AND THICKNESS SHOWN ON THESE SECTIONS IS PRELIMINARY DESIGN BASED ON A CBR VALUE OF 6. 2. FINAL PAVEMENT DESIGN TO BE BASED ON FIELD OBTAINED CBR VALUES TAKEN IN THE PRESENCE OF A VDOT INSPECTOR. 3. VDOT IS TO REVIEW CBR's AND FINAL PAVEMENT DESIGN PRIOR TO APPROVAL FOR USE ON ALL INTENDED PUBLIC STREETS.. ASPHALT MULTI-USE TRAIL NTS 2" SURFACE COURSE (SM 12.5A) COMPACTED SUBGRADE 12" DENSE GRADED STONE (21B) (1) (1)SIDEWALK TRANSITIONS FROM TYPICAL 5-FOOT SECTION TO EXISTING 4-FOOT SIDWALK PER PLAN ENTITLED , "LYNNHAVEN SECTION-1 2003 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3200.dwg PLOTTED: 7/14/2022 12:56 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3200 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF20 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601TYPICAL SECTIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3500.dwg PLOTTED: 7/14/2022 12:56 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3500 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF21 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601VDOT STANDARD DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3501.dwg PLOTTED: 7/14/2022 12:56 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3501 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF22 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601VDOT STANDARD DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS3502.dwg PLOTTED: 7/14/2022 12:56 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS3502 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF23 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601VDOT STANDARD DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 130.00'TYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN TYPE "C" SEPAR A T I O N B U F F E R 100' - LANDSCA P E S C R E E N 7878LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SFLOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SFLOT 19 8,609 SFLOT 20 8,427 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SF FARMINGTON BLVD. 55' ROW - 25 MPH GABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.OPEN SPACE 2 1.5522 AC. OPEN SPACE 3 0.3772 AC.54.2'910AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 142.83' 142.83'73.44'73.44'AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07142.83' 142.83'73.44 '73.44' 12 11 12 11 1325' ACTIVE25' ACTIVE 25' ACTIVE27'R27 ' R 27'R27 ' R 27'R27 ' R 37' R 2 7 'R 5' R5'R5' R5'R5' R5'R3 6 ' R 8+44 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+0025+08 PC 19+07.39PT 20+80.13PC 20+86.44PT 23+21.579+8010+0011+0012+0013+0014+0015+0016+0017+0018+0018+16 15+04 10+00 11+00 12+00 13+00 14+00 15+00 15+04 10+00 11+00 12+00 13+00 14+00 15+00 10+0011+0012+0013+0014+0015+0015+06120.20'134.66 '98.15'131.21' 20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+0025' ACTIVE 50'ACCESS ESMT.OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF 27'R 6 ACRE PARKLAND AREA (PROFFER) TYPE "C" SEP A R A T I O N B U F F E R 200' - NO SCR E E N R E Q .1150' ACTIVE150' INACTIVEEx. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 191 Ex. Lot 203 1 Ex. Lot 120 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 L1 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. 30" PE P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" PE P EX. 18" PEPEX. 18" PEP20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEP EX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) N 69°31'12" W 157.62' N 68°58'22" W 60.81' N 69°00'30" W 179.88' N 69°52'58" W 47.12'S 26°17'04"W 404.92'N 32°19'17"E 392.59'N 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34' N 64°38'51" W 376.73'S 43°18'34" W979.98'S 57°39'43" E 1313.09'N 35°18'07" E1166.98'EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N . E S M T.INST. NO. 080 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 TIGER LILY CT. POPPY LN. Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) ORRICK COMMONSSUBDIVISION LOT 6ARDEYTH LN.54' R/WSTEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4000.dwg PLOTTED: 7/14/2022 1:07 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4000 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF24 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GEOMETRIC PLAN (OVERALL)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 193 Ex. Lot 192 Ex. Lot 120 Ex. Lot 14 Ex. Lot 15 Ex. Lot 16 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's TVRB TRB MLP CONC. S/W CONC. S/WMBMB TR TVRB TR EX. 15" P E P EX. 18" PEPEX. 18" PEPW/M FH W/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042S 57°39'43" E 1313.09' EX. SAN. SEWER EX. W/L GARDEN DECK PATIO DECKPATIO DECK SHED SHED PATIOAREA EX. STOPSIGN STEEPLECHASESUBDIVISIONINST. 050028042Ex. Lot 12Ex. Lot 11 RM2RM2RM2RM2RM2 RM2CG-12AC G - 1 2 A 8LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 113LOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFOPEN SPACE 2 1.5522 AC. ADT=1,123 ADT=1,450GABRIEL CT.55' ROW - 25 MPHFARMINGTON BLVD. 55' ROW - 25 MPH 37' R CG-9B (TYP)CG-6 CG-6 CG-6 CG-6 CG-6CG-68+44 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 9+8010+0011+0012+0010+005' CONC SWLK5' CONC SWLK5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 42' TRANSPVMT WIDTH 36' FC16'16'36' FC 16'16' 36' CG-9B (TYP) OPEN SPACE 1 15.4709 AC. LP LP 87 . 0 °EX. 60' ROWEX. 36' EPSAW CUT & MATCHPVMT, CURB, SWLKLOT 27 9,004 SF 5.5' PED ESMT.5' CONC SWLKPR. MONUMENT SIGN LOCATION 419 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMTNO PARK22'26'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4001.dwg PLOTTED: 7/14/2022 1:07 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4001 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF25 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS4002 MATCH CS4003  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GEOMETRIC PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4002MATCH CS4003 MB CONC. S/W CONC. S/W Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 Ex. Lot 204 Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195 Ex. Lot 194 Ex. Lot 193 Ex. Lot 203 LYNNEHAVENSEC. 2 / PH. 1AINST. 0400106672.5' SIDEWALK ESMT.INST. NO. 040024106 NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WFH 2 - WV's 3 - WV's MB MB MB MB MLP TRB TVRB W/M WV EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT. W/M W/M W/MEX. 24 " RCP 20' WIDE SEWER ESM T . INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. W/L (TYP.) EX. W/L (TYP.) EX. GAS LINE (TYP.)S 43°18'34" W979.98'EX. SAN. SEW. (TYP.) EX. SIGNS EX. SHEDOVERHANG Ex. Lot 26 Ex. Lot 27 DECK DECK DECKRM2RM2RM2RM2RM2RM2RM2RM2 8LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SF LOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SF LOT 19 8,609 SFLOT 20 8,427 SF OPEN SPACE 3 0.3772 AC. ADT=1,123 FARMING T O N B L V D. 55' ROW - 2 5 M P H CG-9B (TYP)CG-6 CG-6 CG-6 CG-6 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 25+08 PC 19+07.39PT 20+80.13PC 20+86.44PT 23+21.5710+005.5' PED ESMT. 5' CONC SWLK 5' CONC SWLK 34' TRANS SWLK & BUFF 16'16'30 LF - GUARD RAIL - GR-2 EXTEND 4' SWLK WITH ASPHALT TRANSITION TO 10' ASPHALT MULTI-USE TRAIL OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAILSAW CUT & MATCHPVMT, CURB, SWLKEX. 50' ROWEX. 32' EPOPEN SPACE 1 15.4709 AC.5' CONC SWLK5' CONC SWLKPR. MONUMENT SIGN LOCATION 388 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT 119'22'NO PARK22'10'20'CG-12C CG-12B 26' 5' CONC SWLK U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4002.dwg PLOTTED: 7/14/2022 1:09 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4002 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF26 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGSMATCH CS4001  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GEOMETRIC PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4003MATCH CS4001 20' WIDE DRAINAGE ESMT.15" PEP18" PEPN 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34'N 35°18'07" E1166.98'PLAYSETDECK PATIO DECK PATIO PATIO POOL SHED CONC.RET. WALLSHED CONCRETE RM2 RM2RM2CG-12ACG-12ACG-12ACG-12ACG- 1 2 A CG-12ACG-12ACG- 1 2 A CG-12ATYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN26' FC36' FC TO FC 31' PRIVATEACCESS ESMT26'7878LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SFGABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.26'27'R27 ' R 27'R27 ' R 27'R27 ' R ADT=410 ADT=400 AD T = 4 8 0GABRIEL CT.55' ROW - 25 MPH2 7 'R 5' R5'R5' R5'R5' R5'RR50' FC3 6 ' R CG-12C CG-12CCG-9B (TYP)CG-9B (TYP) CG-9B (TYP) CG-9B (TYP) CG-9B (TYP)CG-6CG-6CG-6CG-6CG-6CG-612+0013+0014+0015+0016+0017+0018+00 18+16 15+04 10+00 11+00 12+00 13+00 14+00 15+00 15+04 10+00 11+00 12+00 13+00 14+00 15+00 10+0011+0012+0013+0014+0015+0015+0631'CG-6 CG-6 CG-6 CG-6 26' 5.5' PED ESMT. 5.5' PED ESMT.CG-9B (TYP)10'18'10'18'10'18' 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK36' 10' ASPHALT MULTI-USE TRAIL LP LP LP LP LP GAZEBO / PAVILION 10' LANDSCAPE ESMT20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+00CG-11 ENTR.CG-11 ENTR.CG-11 ENTR.90 . 0 ° 90 . 0 ° 25' ACTIVE 10'10'10'OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF 5.5' PED ESMT.5.5' PED ESMT.26' FC TO FC31' PRIVATEACCESS ESMT5.5' PED ESMT.5.5' PED ESMT.26' FC TO FC31' PRIVATEACCESS ESMT5.5' PED ESMT.5.5' PED ESMT.26' FC31' PRIVATEACCESS ESMT5.5' PED ESMT.5.5' PED ESMT.27'R 5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK10' LANDSCAPE ESMT119'22'NO PARK22'10'20'CG-12C CG-12B 26' 5' CONC SWLK U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4003.dwg PLOTTED: 7/14/2022 1:09 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4003 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF27 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS4002MATCH CS4001  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GEOMETRIC PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4005 MATCH CS4005 MATCH CS4001 2 3 4 5 6 7 8 9 1 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PATTON SUBDIV I S I O N DB 218 PG 370N 69°31'12" W 157.62' N 68°58'22" W 60.81' N 69°00'30" W 179.88' N 69°52'58" W 47.12'S 26°17'04"W 404.92'N 32°19'17"E 392.59'N 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34' ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T. INST. NO. 08 0 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 PATIO SHED SHED CONCRETE ORRICK COMMONSSUBDIVISION LOT 6 RM2RM2CG-12A CG-12ACG-12B CG-12B 130.00'TYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN TYPE "C" SEPAR A T I O N B U F F E R 100' - LANDSCA P E S C R E E N LOT 40 8,053 SF 117' SETBACK 117' SETBACK26' FC 54.2'10'18'26'20'x20' DUMPSTER PAD 10'18'910117' SETBACK 60' SETBACK 100' SETBACK30' FCAGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 142.83' 142.83'73.44'73.44'AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07 142.83' 142.83'73.44'73.44 ' 12 11 12 11 1325' ACTIVE25' ACTIVE 25' ACTIVE 10'8'10' 10'8'10' AD T = 4 8 0GABRIEL CT.55' ROW - 25 MPH2 7 'R 5' R R50' FC3 6 ' R CG-12C CG-12CCG-618+00 18+16 15+0015+06FUTURE C O N N E C T O R (PRIVATE ) 5.5' PED ESMT.5' CONC SWLK10' ASPHALT MULTI-USE TRAIL LP LP LP 120.20'134.66 '98.15'131.21'26' FC10' LANDSCAPE ESMT20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN1+002+00 3+00CG-11 ENTR.25' ACTIVE 50'ACCESS ESMT.CG-6R (TYP) OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. 27'R 5' CONC SW L K 5' CONC SW L K CG-12BCG-12C CG-12C PR. MONUMENT SIGN LOCAT I O N 144 SF ENTRY MONUMENT E S M T (REQUIRES SEPARATE PERM I T ) . CG-6R (TYP)U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4005.dwg PLOTTED: 7/14/2022 1:10 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4005 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF28 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS4003  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GEOMETRIC PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4003 CO CO CO CO COCOCOCOCO60 50 Cap 60 00 Weir6050 Cap 59 00 61 00 TB 61 00 TB 60 00 Weir 61 00 TB 59 00 61 00 TB Top Berm = 664.50' 100 Yr. WSE = 663.28' Catch Basin 1 BIO-RET A Catch Basin 5 100 Yr. WSE = 663.35' 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 193 Ex. Lot 192 Ex. Lot 120 Ex. Lot 14 Ex. Lot 15 Ex. Lot 16 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's TVRB TRB MLP CONC. S/W CONC. S/WMBMB TR TVRB TR EX. 15" P E P EX. 18" PEPEX. 18" PEPW/M FH W/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042S 57°39'43" E 1313.09' EX. SAN. SEWER EX. W/L GARDEN DECK PATIO DECKPATIO DECK SHED SHED PATIOAREA EX. STOPSIGN STEEPLECHASESUBDIVISIONINST. 050028042Ex. Lot 12Ex. Lot 11 RM2RM2RM2RM2RM2 RM2CG-12AC G - 1 2 A 8LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 113LOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFOPEN SPACE 2 1.5522 AC. ADT=1,123 ADT=1,450GABRIEL CT.55' ROW - 25 MPHFARMINGTON BLVD. 55' ROW - 25 MPH CG-9B (TYP)8+44 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 9+8010+0011+0012+0010+005' CONC SWLK5' CONC SWLK5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK CG-9B (TYP) OPEN SPACE 1 15.4709 AC. LP LP LOT 27 9,004 SF 5.5' PED ESMT.5' CONC SWLKPR. MONUMENT SIGN LOCATION 419 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMTNO PARK22'STORM ESMT 20' STORM ESMT STORM DRAINAGE & MAINT. ESMTSTORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT 15"HDPE15" H D P E 15" HDPE 15" HDPE18" HDPE 15" HDPE 5.1 4.2 4.1 4.34.4 4.5 4.6 CB4HP 668.7413+52.26LP 666.44 10+27.82 FF=670.34FF=670.34 FF=671.96 GF=670.96 BF=663.36 FF=671.50 GF=670.50 BF=662.90 FF=671.26 GF=670.26 BF=662.66 FF=671.38 GF=670.38 BF=662.78 FF=671.38 GF=670.38 BF=662.78 FF=671.57 GF=670.57 BF=662.97 W/O W/O W/O W/O FF=671.77 GF=670.77 BF=663.17 FF=670.03 GF=669.03 BF=661.43 FF=670.88 GF=669.88 BF=662.28 FF=672.05 GF=671.05 BF=663.45 FF=672.88 GF=671.88 BF=664.28 FF=674.38 GF=673.38 BF=665.78 FF=668.69 GF=667.69 BF=660.09 FF=669.70 GF=668.70 BF=661.10 FF=670.50 GF=669.50 BF=661.90 FF=671.15 GF=670.15 BF=662.55 FF=671.69 GF=670.69 BF=663.09 FF=671.73 GF=670.73 BF=663.13 664 27 662 55 663 02 662 29 663 74 663 09 664 64 663 90 665 07 665 07 664 78 665 33 663 80 662 35 660 44 OLR 663 92 OLR 662 94 SP 661 80 SP 662 71 66181 66131 66153 665 35 666 35 664 13 664 25 664 35 HP66466 HP 658 71 EP 659 14 EP 658 89 EP65854 EP 657 85 EP 656 80 EP65669 EP 657 10 EP65688 EP 657 72 EP 658 13 EP 659 23 EP 659 76 EP 660 86 EP 664 81 662 80 Crest 663 57 664 07 664 26 HP 664 11 HP 666 26 HP 662 21 664 02 664 31 663 98 OLR 663 75 LP 664 28 660 00 LP 660 64 660 83 OLR 663 61 HP 663 34 659 6265902 659 69 662 94 HP 66198 662 7666155660966614966137 660 1365942 659 41 666 17 HP 665 06 665 31 666 88 667 03 665 25 664 95 665 82 664 65 665 89 665 17 HP 662 20 HP 66145 LP 661 89 LP 5.1%4.5%5.0%6.2%7.3%6.0% 8.6% 4.6% 2.2%5.8% 5.0% 5.1% 2.6%5.9% 2.7%5.5% 4.1%7.6% 6.7% 3.8%8.4%2.3%3.7%4.1%4.0%3.9%2.0%3.0%2.2%2.0%2.0%2.1%2.2%2.2%2.0%2.0%2.0%3.5%2.4%4.3%2.0%5.4%2.0%2.0%1.0%2.0%2.8%3.2% 666 45 TC 667 78 TC 666 47 TC 665 64 TC 663 28 TC 663 28 TC 664 60 BP 670 33 670 50 668 49 669 85 668 50 670 00 670 12 669 88 669 88 668 00 670 00 669 50 667 24 669 35 HP 667 96 666 65 666 94 669 35 HP 669 35 HP 666 76667376679666855 667 00 662 50 662 30 661 80 662 30 66180 662 11 662 11 662 11 661 61 662 11 661 61 670 00 669 29670076702767036 668 74 670 16 670 00 669 81 669 50 HP66935 HP 669 74 HP 667 48 HP 666 56 669 8866770 670 0966700 665 50 665 00 667 00 668 15 HP 667 25 665 25 666 00 667 72 667 95 668 40 668 65 665 82 665 00 BP 665 50 BP 666 50 BP 669 00 HP 666 00 667 00 669 75 HP 668 00 668 00 670 50 669 3567100 HP 669 10 667 00 666 50 BP 668 48 667 10 664 07 666 10 667 10 666 60 661 96 663 32 BP 667 10 666 26 666 60 666 64 667 13 HP 667 75 HP 667 10 667 10 668 55 HP 668 91 667 58 666 50 666 50 666 30 666 30 666 50 666 50 667 00 667 00 669 32 HP 669 74 668 25 670 28 668 83 669 74 HP 670 32 668 90 668 00 667 50 668 00 667 50 668 50 668 00 668 50 668 00 663 41 TC 668 36 667 76 667 17 67150 670 25 669 50 668 65 664 25 HP 662 34 668 6666893667846668366486 663 53 666 21 663 5366387664206645466487665546658866660 669 63 667 12667466677966813668466689666930 672 00 669 50 668 65 667 50 669 05 HP 666 60 BP 667 10 667 10 667 00 667 00 666 80 666 80 667 00 667 00 667 50 667 50 666 69 BP 666 35 BP 666 55 BP 666 56 BP 667 00 BP 668 00 BP 667 50 BP 667 50 BP 66185 BP 66161 BP 66161 BP 661 61 BP 661 61 66161 666 00 662 00 669 13 BP 669 03 668 77 663 03 HP 662 68 662 58 663 00 TC 663 56 TC 663 60 CL 663 25 CL 667 10 667 10 668 33 669 12 669 65 669 77 670 19 670 31 670 35 670 23 661 00 LP 661 5066150 6615066150 668 75 TC 668 75 TC 662 662 664 666 662662 664666 668 66866 0 6 6 0 658 658662662664 66 4 664666668 6 6 2 6 6 4 6666 6 6 668 668662 664 66 0 66 2 664 666 666 66 8 668662664666668662 664 664 664 666 668668664666 6 6 8 668668670 66 8 666 668 668663 92 663 82 TC66315 EP 663 68 TC 663 55 TC U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4101.dwg PLOTTED: 7/14/2022 12:11 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4101 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF29 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS4102 MATCH CS4103  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GRADING PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4102MATCH CS4103 NOTES: 1. ENGINEER DESIGN REQUIRED ON ALL FOUNDATIONS AND/OR SLABS WITH GREATER THAN 8” FILL OR 24” CLEAN SAND/GRAVEL. FILL SHALL BE DESIGNED AND COMPACTED BY A REGISTERED DESIGN PROFESSIONAL PLEASE PROVIDE EXISTING CONTOUR ELEVATIONS. RM2RM2RM2RM2RM2RM2RM2 RM28LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SF LOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SF LOT 19 8,609 SFLOT 20 8,427 SF OPEN SPACE 3 0.3772 AC. ADT=1,123 FARMING T O N B L V D. 55' ROW - 2 5 M P H CG-9B (TYP) 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 25+08 PC 19+07.39PT 20+80.13PC 20+86.44PT 23+21.5710+005.5' PED ESMT. 5' CONC SWLK 5' CONC SWLK 30 LF - GUARD RAIL - GR-2 EXTEND 4' SWLK WITH ASPHALT TRANSITION TO 10' ASPHALT MULTI-USE TRAIL OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAILOPEN SPACE 1 15.4709 AC.5' CONC SWLK5' CONC SWLKPR. MONUMENT SIGN LOCATION 388 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT 119'22'NO PARK22'10'20'CG-12C CG-12B 5' CONC SWLK CO CO CO CO CO CO 57 00 Weir 00 Weir 58 00 TB 56 00 56 00 58 00 TB 58 00 TB5800 TB 57 00 Weir 50 50 Weir 48 50 Inv 50 50 Weir 53 50 TB 53 50 TB 59 00 TOP 58 05 Inv 57 50 Cap 58 00 TB 57 50 Cap 51 50 Inv6150 TOP 100 Yr. WSE = 652.39' 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail Catch Basin 2 BIO-RET B Catch Basin 3 100 Yr. WSE = 645.51'Top Berm = 646.75'Catch Basin 4 LP 645.3923+46.16FF=664.98 GF=663.98 BF=656.38 FF=651.81 GF=650.81 BF=643.21 FF=655.05 GF=654.05 BF=646.45 FF=658.18 GF=657.18 BF=649.58 FF=660.89 GF=659.89 BF=652.29 FF=654.10 GF=653.10 BF=645.50 FF=656.86 GF=655.86 BF=648.26 FF=659.99 GF=658.99 BF=651.39 FF=663.79 GF=662.79 BF=655.19 FF=666.57 GF=665.57 BF=657.97 FF=668.09 GF=667.09 BF=659.49 FF=669.10 GF=668.10 BF=660.50 LOT FF=669.85 GF=668.85 BF=661.25 FF=665.03 FF=663.36 GF=662.36 BF=654.76 64591 OLR 646 62 HP 646 23 HP 661 03 OLR 4.1%6.6%6.0%5.2%4.9%4.9%2.1%8.2%7.7%7.4%7.6%7.6%8.0%8.3%8.0%3.0%2.0%2.0%2.0%1.9%2.0%2.1%4.5%3.8%0.5%6.4%3.4%3.3%2.0%3.1%3.4%2.0%3.1%2.0%2.8%2.0%2.0%2.0%2.0%1.0%645 76 TC 645 74 TC 645 40 TC 645 41 TC 662 79 663 64 659 98 659 98 663 4866369 659 48 659 48 650 43 650 31 650 31 650 31 643 09 INV 663 65 649 81 650 40 648 04 649 13 650 21 HP 655 88 652 72 653 64 653 67 653 55 651 05 650 55 651 55 652 05 653 45 HP 656 68 656 80 655 18 654 18 653 68 654 68 656 77 658 60 659 39 659 51 659 48 657 89 657 39 656 39 656 89 656 60 HP 659 32 HP 661 79 HP 661 95 661 86 658 36 661 98 658 36 657 39 657 39 660 91 663 64 TC 664 32 HP 665 72 665 13 664 37 663 04 660 70 657 05 653 45 650 63 648 08 668 50 668 35 668 46 665 52 667 72 667 60 667 69 664 93 666 71 666 59 666 68 664 00 667 85 667 85 667 10 667 10 666 59 666 09 666 59 666 09 665 07 664 57 664 00 663 50 662 29 661 79 659 79 659 25 652 60 652 10 655 36 654 36 653 86 654 86 658 49 657 99 657 99 658 49 665 19 665 07 665 16 662 42 652 72 652 06 652 55 649 68 655 48 655 36 655 45 652 51 652 45 HP 658 61 662 41 658 49 658 58 655 65 662 38 662 29 659 53 667 90 HP 666 37 HP 665 04 HP 662 71 HP 657 80 BP 655 16 HP 656 43 663 41 TC 662 21 660 22 657 75 654 91 651 46 648 0464804 646 62 650 81 TOP 648 00 TOP 654 90 TOP 662 45 TOP 652 60 658 04 HP 663 53 651 50 OLR 662 95 HP 646 15 OLR 650 10 HP 655 40 HP 64056 INV66835668356676066760 663 03 HP 662 68 662 58 663 00 TC 663 82 EP 663 56 TC 663 60 CL 663 25 CL 663 36 TC 664 03 663 53 650660 660 660 642642 644 644646646 64 8 65265465 4654 65 4 654656 656 6566566566 5 6 658 658658 662 662662 66 2 662 66 2 664 666 668 662 664 6 5 0 6 6 0 64 6 6 4 8 65 2 65 4 6 5 6 6 5 8 662664666650646646646648652 660 654656658662664 666 6606 5 4 656658664666668668650 650 650660646648652 652 652654 654654656658662664666 666668 666 668 663 99 HP 663 92 663 82 TC66315 EP 663 02 TC 662 35 EP 66134 EP 662 35 TC 66162 TC 663 32 EP 664 82 EC 664 77 EC 664 87 EC 664 92 EC 664 28 FC 664 16 EP 664 32 FC 663 74 EC 663 79 EC 663 89 EC 663 68 TC 663 55 TC 2.4%MB CONC. S/W CONC. S/W Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 Ex. Lot 204 Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195 Ex. Lot 194 Ex. Lot 193 Ex. Lot 203 LYNNEHAVENSEC. 2 / PH. 1AINST. 0400106672.5' SIDEWALK ESMT.INST. NO. 040024106 NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WFH 2 - WV's 3 - WV's MB MB MB MB MLP TRB TVRB W/M WV EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT. W/M W/M W/MEX. 24 " RCP 20' WIDE SEWER ESM T . INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. W/L (TYP.) EX. W/L (TYP.) EX. GAS LINE (TYP.)S 43°18'34" W979.98'EX. SAN. SEW. (TYP.) EX. SIGNS EX. SHEDOVERHANG Ex. Lot 26 Ex. Lot 27 DECK DECK DECK 20' STORM ESMT 20' STORM ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT30" X 19" HEHDPE 15" HDPE18" HDPE30" X 19" HERCP 15" HDPE 15" HDPE 15" HDPE 15" HDPE15"HDPE18" HDPE15" HDPE 15" HDPE 15" H D P E 15 " H D P E 24" EX S T R M 6" HDPE6" HDPE8" HDPE 1.8 1.9 1.5 1.6 1.3 1.4 2.3 2.2 2.1 3.2 3.3 6.5 6.2 6.36.4 6.1 CB1 CB2 CB3 CB4 1.2 EX9 19.2 STORM ESMT.U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4102.dwg PLOTTED: 7/14/2022 12:12 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4102 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF30 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GRADING PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4101MATCH CS4103MATCH CS4101NOTES: 1. ENGINEER DESIGN REQUIRED ON ALL FOUNDATIONS AND/OR SLABS WITH GREATER THAN 8” FILL OR 24” CLEAN SAND/GRAVEL. FILL SHALL BE DESIGNED AND COMPACTED BY A REGISTERED DESIGN PROFESSIONAL PLEASE PROVIDE EXISTING CONTOUR ELEVATIONS. 20' WIDE DRAINAGE ESMT.15" PEP18" PEPPLAYSETDECK PATIO DECK PATIO PATIO POOL SHED CONC.RET. WALLSHED CONCRETE RM2 RM2RM2CG-12ACG-12ACG-12ACG-12ACG- 1 2 A CG-12ACG-12ACG- 1 2 A CG-12ATYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN7878LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SFGABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.ADT=410 ADT=400 AD T = 4 8 0GABRIEL CT.55' ROW - 25 MPHCG-12C CG-12CCG-9B (TYP)CG-9B (TYP) CG-9B (TYP) CG-9B (TYP) CG-9B (TYP)12+0013+0014+0015+0016+0017+0018+00 18+16 15+04 10+00 11+00 12+00 13+00 14+00 15+00 15+04 10+00 11+00 12+00 13+00 14+00 15+00 10+0011+0012+0013+0014+0015+0015+06CG-9B (TYP)10'18'10'18'10'18' 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK10' ASPHALT MULTI-USE TRAIL LP LP LP LP LP GAZEBO / PAVILION 10' LANDSCAPE ESMT20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+0025' ACTIVE 10'10'10'OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF 5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK10' LANDSCAPE ESMT119'22'NO PARK22'10'20'CG-12C CG-12B 5' CONC SWLK HP 670.21 13+99.03 LP 667.51 16+80.32 LP 659.4314+63.33LP 661.9414+66.01LP 668.1210+79.14FF=664.24 GF=663.91 FF=664.91 GF=664.58 FF=664.91 GF=664.58 FF=665.58 GF=665.25 FF=665.58 GF=665.25 FF=666.25 GF=665.92 FF=666.92 GF=666.59 FF=666.92 GF=666.59 FF=670.34 GF=670.01 FF=669.67 GF=669.34 FF=669.17 GF=668.84 FF=668.50 GF=668.17 FF=667.83 GF=667.50 FF=668.50 GF=668.17 FF=669.17 GF=668.84 FF=670.34 GF=670.01 GF=670.96 BF=663.36 FF=672.88 GF=671.88 BF=664.28 FF=674.38 GF=673.38 BF=665.78 FF=674.88 GF=673.88 BF=666.28 FF=672.38 GF=671.38 BF=663.78 FF=671.88 GF=670.88 BF=663.28 FF=670.88 GF=669.88 BF=662.28 FF=671.88 GF=670.88 BF=663.28 FF=672.88 GF=671.88 BF=664.28 FF=674.38 GF=673.38 BF=665.78 FF=674.88 GF=673.88 BF=666.28 W/O FF=664.24 GF=663.91 FF=664.91 GF=664.58 FF=664.91 GF=664.58 FF=665.58 GF=665.25 FF=665.58 GF=665.25 FF=666.25 GF=665.92 FF=666.92 GF=666.59 FF=666.92 GF=666.59 FF=667.83 GF=667.50 FF=668.50 GF=668.17 FF=668.50 GF=668.17 FF=669.17 GF=668.84 FF=669.17 GF=668.84 FF=669.67 GF=669.34 FF=670.34 GF=670.01 FF=670.34 GF=670.01 FF=665.03 GF=664.70 FF=665.03 GF=664.70 FF=665.03 GF=664.70 FF=664.37 GF=664.04 FF=664.37 GF=664.04 FF=664.37 GF=664.04 FF=663.98 GF=663.65 FF=663.31 GF=662.98 FF=663.98 GF=663.65 FF=663.98 GF=663.65 FF=662.07 GF=661.74 FF=662.74 GF=662.41 FF=663.41 GF=663.08 FF=664.08 GF=663.75 FF=664.08 GF=663.75 FF=664.75 GF=664.42 FF=665.42 GF=665.09 FF=665.42 GF=665.09 FF=665.99 GF=665.66 FF=666.66 GF=666.33 FF=667.33 GF=667.00 FF=668.00 GF=667.67 FF=668.67 GF=668.34 FF=669.34 GF=669.01 FF=670.01 GF=669.68 FF=670.01 GF=669.68 FF=661.73 GF=661.40 FF=665.75 GF=665.42 FF=666.12 GF=665.79 FF=666.79 GF=666.46 FF=667.46 GF=667.13 FF=668.13 GF=667.80 FF=668.80 GF=668.47 FF=669.47 GF=669.14 FF=670.14 GF=669.81 FF=670.14 GF=669.81 FF=662.40 GF=662.07 FF=663.07 GF=662.74 FF=663.74 GF=663.41 FF=664.41 GF=664.08 FF=665.08 GF=664.75 FF=665.75 GF=665.42 W/O W/O PARTIAL W/O FF=662.71 GF=662.38 FF=662.71 GF=662.38 FF=662.34 GF=662.01 FF=662.34 GF=662.01 FF=661.67 GF=661.34 FF=661.67 GF=661.34 FF=661.67 GF=661.34 07 662 76 67138 667 89 665 56 662 42 660 01 660 50 665 33 663 80 663 92 OLR 660 06 SP 662 66 SP 659 62 662 01 668 06 667 87 667 79 HP 664 31 662 45 66198 662 21 663 03 66021 HP 662 20 HP 66145 LP 66189 LP 4.8%6.0%4.1%3.5%3.1%4.0%4.0%3.8%4.2%4.1%3.0%3.1%3.3%3.1%3.4%3.7%5.1% 3.8% 4.1% 4.6% 4.4% 5.8% 6.4% 6.1% 6.1% 6.3% 6.3% 6.5% 6.7% 3:1 2.0% 2.0%2.0% 2.0%2.0% 2.1% 2.7%5.5% 4.1%7.6% 6.7% 9.1% 8.8% 6.7% 6.4% 4.6% 3.5%2.5% 2.6%3.6% 2.0%8.4% 5.4% 6.1% 2.9%9.3% 2.4%10.0% 8.3% 8.7% 4.5%12.5% 12.5%5.3% 11.7%4.9%3.0%3.1%4.8%4.1%3.8%3.4%3.1%4.0%4.0%3.8%6.6%5.9%5.6%5.2%4.9%5.8%5.8%5.6%6.4%6.7%7.0%6.5%7.2%7.5%6.6%6.1%2.0%8.0%8.7%7.8%6.9%6.1%5.2%5.0%8.3%7.3%6.7%4.4%7.4%4.6%5.5%2.0%2.0%6.3%7.2%8.1%7.7%6.8%6.9%7.0%7.1%7.2%7.3%2.0%2.0%3:12.1% 2.0%2.0%2.0%3.8%2.0%6.6% 6.4% 6.1% 7.5% 8.0%2.0%2.1%2.0%2.0%2.0%1.0%1.0%1.0%1.0%1.0%3.1%1.9%2.0%2.3%2.0%2.0%2.0%2.0%669 35 669 10 TC 669 25 TC 670 20 TC 669 21 TC 660 77 EP 668 90 TC 667 70 TC 667 70 TC 668 00 TC 667 33 EP 662 06 TC 662 17 TC 662 02 TC66176 TC 662 06 TC 662 93 TC 662 87 TC 660 49 TC 659 73 TC 658 54 EP 663 53 66104 66162 TOP 663 536642066420664476648066540 664 71 666 21 665 8066595 662 486628966330663716641166452664936651066559 669 68 669 05 669 66 669 63 666 60 665 90 HP 664 60 BP 667 01 666 09 667 39 666 49 668 71 669 22 668 53 668 86 668 12 668 39 667 72 668 06 667 31 667 72 666 90 670 33 670 50 668 49 668 50 668 00 663 64 TC 663 40 664 23 664 19 664 08 663 80 663 86 663 75 662 17 663 30 663 06 662 82 662 58 662 34 66177 66166 661 42 66118 660 94 660 70 664 32 HP 663 66 663 07 HP 663 27 66150 660 84 660 67 663 27 662 00 66163 660 96 660 41 662 05 66143 HP 668 668 65 666 50 BP 667 00 669 75 HP 668 00 668 00 670 50 669 3567100 HP 669 10 665 11 BP 667 00 665 61 WO 673 00 669 80 670 05 672 00 HP 666 50 BP 665 61 WO 673 00 670 40 668 24 67100 668 60 669 10 669 97 670 00 67100 667 70 667 08 668 38 667 75 669 25 670 50 668 05 670 54 HP 668 75 668 09 664 60 666 71 670 00 HP 669 00 HP 669 00 HP 667 85 663 93 664 26 670 50 668 57 668 83 663 67 BP 663 72 670 00 HP 670 50 HP 665 11 WO 663 76 BP 665 11 WO 665 61 WO 665 61 WO 673 00 672 00 HP 672 50 HP 665 61 WO 667 80 669 37 668 71 669 22 668 53 663 53 662 48 663 79 662 89 664 13 663 30 664 46 663 71 664 80 664 12 665 40 664 52 665 80 664 93 665 95 665 10 666 21 66102 667 53 666 09 667 5366780 666 50 668 13 666 90 668 47 667 31 668 80 667 72 669 17 669 40 668 13 669 81 668 54 669 95 668 71 670 21 663 61 664 03 66104 664 45 663 03 664 30 662 83 663 90 662 35 663 30 66187 662 96 66139 662 56 660 91 66189 660 43 66129 659 95 664 51 HP 665 59 665 89 HP 669 27 670 02 HP 663 48 TOP 663 98 OLR 669 10 HP 662 20 659 68 660 92 BP 663 41 HP 669 30 665 28 669 04 667 27 668 89 667 07 668 49 666 59 667 82 666 11 667 15 665 63 666 48 665 15 665 81 664 67 665 28 664 19 667 80 667 82 659 68 662 73 663 61 667 84 667 69 659 32 TC 664 64 663 03 661 42 659 95 658 56 TC 660 72 HP 665 15 664 19 664 69 HP 668 91 667 27 665 68 664 67 666 35 665 15 667 02 665 63 667 69 666 11 668 36 666 59 668 76 667 07 66192 660 43 662 42 660 91 662 92 66139 663 43 66187 663 93 662 35 664 44 662 83 658 84 TC 658 82 TC65882 EC65862 EC 668 86 66102 665 04 668 28 HP 660 18 TC 662 63 TC 663 41 TC 665 61 WO 665 11 BP 664 61 BP 664 61 BP 664 50 BP 664 50 BP 667 25 BP 668 75 BP 669 77 BP 67150 673 50 673 50 673 00 67150 669 50 659 37 TOP 6613666203662706630366337664046643866528 669 30 664 20664726652366575666266667766729 663 53 664 17 6610266169663036637066437664716651566565665826664966716667836685066884 665 04 662 36 663 53 666 21 663 5366387664206645466487665546658866660 669 63 667 12667466677966813668466689666930 663 53 670 21 663 536635366386664546648766554665886675366753667876682066853668876695466988 666 21 664 20 670 56 669 17 HP 664 65 66128 HP 672 00 672 00 670 50 669 50 669 50 669 55 670 21 670 37 670 32 670 00 669 31 669 05 HP 667 50 BP 665 25 667 75 665 00 665 00 665 11 665 00 662 95 662 63 662 31 662 21 662 10 662 00 66134 66100 660 67 660 67 66171 66192 662 14 662 23 662 50 662 77 663 77 662 57 662 80 663 10 663 01 660 67 660 50 660 34 660 1766067 663 74 668 32 660 52661196625366320 663 87 664 2166515665326659966666667336680066816 66186 664 65 664 54 66147 660 02 66152 660 12 66113 659 78 66120 659 54 66107 659 30 658 60 665 28665956666266729667966686366897 66110 TC 660 94 TC 669 13 BP 669 03 668 77 663 03 HP 662 68 662 58 663 00 TC 663 82 EP 663 56 TC 663 60 CL 659 55 TC 660 49 TC 663 25 CL 663 36 TC 664 59 BP 660 59 TC 66137 TC 660 08 BP 664 03 663 53 662 87 663 37 663 37 662 98 663 37 663 09 663 37 663 20 663 59 663 31 663 81 663 42 660 84 BP 662 48 BP 660 61 EP 668 23 TC 670 22 TC 670 22 TC 3:1 6566 5 8660660 660 660 662662664 66 4 6 6 4 662 656660658662664664 666668660662664666668660662662 664 660656656658662662662 6646 6 4 670 666 668 662664666668670670 6 7 0 662662664664664 664666666666666 666666668668664666668664666668 662 664 66 0 66 2 664 666 670670668668 670 664666668 668 664 666 668 12 CL 52 668 08 EP 0. 7 %2.0%668 34 EP 667 90 EP 0. 8 %2.0% 668 39 EP 668 40 EP 668 82 EP 668 94 EP 668 50 EP 668 98 EP 667 98 EP 668 50 EP 668 24 EP 668 24 EP 668 53 RP 663 99 HP 663 92 663 82 TC66315 EP 663 02 TC 662 35 EP 66134 EP 662 35 TC 66162 TC 663 32 EP 664 82 EC 664 77 EC 664 87 EC 664 92 EC 664 28 FC 664 16 EP 664 32 FC 663 74 EC 663 79 EC 663 89 EC 663 68 TC 663 55 TC 2.4%COCOCOCOCOCOCOCOCOCO20' STORM ESMT 20' STORM ESMT 20' STORM ESMT 20' STORM ESMT 20' STORM ESMT20' STORM E S M T STORM DRAINAGE & MAINT. ESMT 20' STORM ESMT 20' STORM ESMT20 ' S T O R M E S M T 15" HDPE15" HDPE 15" HDPE15" HDPE15"HDPE15"HDPE15 " H D P E 15" RCP CL III15 " H D P E 15" RCP CL III 15" HDPE 15" HDPE15" HDPE15"HDPE18" HDPE 24" HDPE24" HDPE 24" HDPE18"HDPE18" HDPE15" HDPE15.4 15.3 15.2 15.1 14.1 14.2 13.1 13.6 13.3 11.1 14.3 11.4 11.5 11.6 11.3 17.2 13.7 13.2 13.5 12.1 12.2 17.1 15.5 13.4 CB3 19.2 19.115" HDPE STORM ESMT. 57 Weir 58 00 TB 56TB T o p B e r m = 6 5 6 . 0 0 ' Top Berm = 657.33' Top Berm = 657.33' 100 Yr. WSE = 655.07' Forebay 2 Forebay 1 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail 100 Yr. WSE = 653.16' 100 Yr. WSE= 655.23' Ditch A See Sheet 72 Ditch B See Sheet 72 Ditch C See Sheet 72 Ditch C See Sheet 72 Ditch D See Sheet 72 Ditch D See Sheet 72 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4103.dwg PLOTTED: 7/14/2022 12:14 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4103 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF31 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GRADING PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS4102MATCH CS4101 MATCH CS4105 MATCH CS4105 MATCH CS4101 NOTES: 1. ENGINEER DESIGN REQUIRED ON ALL FOUNDATIONS AND/OR SLABS WITH GREATER THAN 8” FILL OR 24” CLEAN SAND/GRAVEL. FILL SHALL BE DESIGNED AND COMPACTED BY A REGISTERED DESIGN PROFESSIONAL PLEASE PROVIDE EXISTING CONTOUR ELEVATIONS. RM2RM2CG-12A CG-12ACG-12B CG-12B LOT 40 8,053 SF 20'x20' DUMPSTER PAD AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07GABRIEL CT.55' ROW - 25 MPH2 7 'R 5' R R50' FC3 6 ' R CG-12C CG-12CCG-618+00 18+16 15+0015+065' CONC SWLK10' ASPHALT MULTI-USE TRAIL LP LP LP10' LANDSCAPE ESMT1+002+00 3+0050'ACCESS ESMT.CG-6R (TYP) OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. 27'R 5' CONC SW L K 5' CONC SW L K CG-12BCG-12C CG-12C CG-6R (TYP) PRIVATE SANITARY LATERAL SEE PLUMBING PLAN (BY OT H E R S )CO20' STORM E S M T STORM DRAINAGE & MAINT. ESMT 20 ' S T O R M E S M T STORM DRAINAGE & MAINT. ESMT S TO RM D R A IN AG E & M A I N T . E SM T STORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT15" HDPE15" RCP CL III15 " H D P E 15" HDPE 24" HDPE 24" HDPE 18" HDPE 15" HDP E15" HDPE 15.2 15.1 13.113.3 18.1 17.2 17.1 21.5 21.1 21.2 21.4 21.3 23.322.2 12" HDPE 22.1 12" H D P E 23.1 D 23.2 F.D.C.F.D.C.WMBFPWMBFPU22 U21 69 50 TB 68 50 Weir 69 50 TB6950 TB 68 00 69 00 Weir 69 00 Weir 70 00 TB 70 00 TB 69 00 Cap 69 50 Cap 69 50 Cap 69 50 Cap 68 50 Weir 68 50 Weir 62 60 Inv BIO-RET C BIO-RET D Ditch C See Sheet 72 Ditch C See Sheet 72 Ditch D See Sheet 72 2 3 4 5 6 7 8 9 1 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PATTON SUBDIV I S I O N DB 218 PG 370 ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T. INST. NO. 08 0 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 PATIO SHED SHED CONCRETE ORRICK COMMONSSUBDIVISION LOT 6 FF=672.38 GF=671.38 BF=663.7807 676 26 675 89 67138 672 90 667 89 674 70 20 676 82 16 673 09 67191 662 59 672 56 672 09 2.0% 6.7% 6.4% 3.5%2.5% 2.0% 1.4%670 07 HP 670 99 TC 669 35 TC 67168 TC 671 45 TC 672 60 TC 671 74 TC 670 00 TC 669 85 TC 668 88 TC 670 85 TC 669 19 TC 658 54 EP 660 67 660 96 668 24 67100 668 60 669 10 669 97 670 00 67100 668 38 669 25 670 668 05 670 54 HP 668 75 670 00 HP 658 56 TC 658 84 TC 658 82 TC65882 EC65862 EC 668 86 668 75 BP 669 77 BP 670 56 OLR 663 658 60 670 52 EP 671 94 TC 67160 EP 67151 HP 669 95 EP 668 23 TC 669 86 CL 67112 670 95 670 03 CL 669 74 CL 669 14 CL 668 67 CL 6 5 8 670 662664666668672 674 67 4 676 6 7 667667 66766 7 6 676 67 6676676 670 662 664 6 6 6 668 672 674 670672662 656660658662664666668670 670 666 668 672 670670670668 672672674670668668668 6 7 0 670 672 672670668 12 CL 67167 CL 670 62 TC 669 64 EP 671 61 TC 670 08 TC 0.2% 0.3% 670 51 EP 67143 EP 0.8% 1.3% 67150 EP 67127 EP 670 93 EP 669 66 EP 670 04 TC67028 HP 669 51 EP 669 03 EP 668 55 EP66881 EP 668 80 EP 668 52 EP 668 52 EP 668 08 EP 668 96 EP 2.0%1.0%2.8%0. 7 %2.0%2.0%1.0%0.9%670 26 669 02 EP 670 62 668 34 EP 667 90 EP 2.0%0.7%0.5%0. 8 % 1.4% 2.4 % 668 86 EP 668 00 669 80 EP 670 05 EP 670 29 EP 2.0%2.0%1.0%2.0% 668 39 EP 668 40 EP 668 82 EP 668 94 EP 668 50 EP 668 98 EP 667 98 EP 668 50 EP 668 24 EP 668 24 EP 669 79 EP 670 94 EP 67193 EP 0.9%2.0% 2.7% 670 68 CL 669 87 CL 670 07 CL0.2%670 25 EP 670 60 EP 670 64 EP 67119 EP 2.0% 671 41 EP 67114 EP 670 91 EP 669 88 EP 669 73 EP 668 74 EP 668 53 RP 1.0%0.2%-2.0%67131U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4105.dwg PLOTTED: 7/14/2022 12:16 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4105 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF32 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601GRADING PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT---- MATCH CS4103MATCH CS4103 NOTES: 1. ENGINEER DESIGN REQUIRED ON ALL FOUNDATIONS AND/OR SLABS WITH GREATER THAN 8” FILL OR 24” CLEAN SAND/GRAVEL. FILL SHALL BE DESIGNED AND COMPACTED BY A REGISTERED DESIGN PROFESSIONAL PLEASE PROVIDE EXISTING CONTOUR ELEVATIONS. CG-12ACG-12BCG-12BAGE RESTRICTEDAPARTMENTS NORTH4-STORY - 24 UNITHEIGHT = 48.26'10,490 SF GFA /41,960 SF TOTALFFE=672.69AGE RESTRICTEDAPARTMENTS SOUTH4-STORY - 24 UNITHEIGHT = 48.26'10,490 SF GFA/41,960 SF TOTALFFE=673.07LPCG-12BCG-6R (TYP)F.D.C.F.D.C.671 69 TC 670 6726726726 7 2 670 6 7 2 6 9 673 07 673 07 673 07 673 07 673 07 673 07 672 97 EC 672 97 EC 672 73 EC 672 73 EC -2.0%-4.9%-2.0% -0.7% 672 00 672 10 EP 672 08 EP 671 97 672 73 EC 672 75 EC 672 14 FC 672 14 TC 672 24 EC 672 24 EC67214 FC 672 14 TC 671 85 EC 672 77 EC 672 63 TC 672 63 TC 672 84 TC 672 94 EC 672 34 EP 672 69 TC 672 03 EP 672 35 TC 671 68 EP 672 67 TC 672 17 EP 672 34 TC 671 84 EP 672 16 TC67150 EP 671 72 TC 671 06 EP 671 02 EP 672 45 EC 670 62 EP 671 29 TC 672 06 TC67205 TC 672 38 TC 672 61 TC 67138 EP 671 39 EP 671 71 EP 671 94 EP 672 74 EC 672 81 EC 672 56 EC 672 65 EC 671 94 TC 671 28 EP 672 13 EP67204 -0.5% -2.0% -2.0%-2.0%-2.0%671 39 EC 671 00 EC 670 91 TC 670 96 EC 670 87 TC 670 94 EC 670 85 TC 670 92 EC 670 82 TC 670 37 FC 670 21 EP 670 35 FC 670 18 EP 670 86 TC 670 20 EP 67115 TC 670 48 EP 671 25 EC 672 4467257 672 52 673 02 673 02 671 35 EC 673 02 673 02 672 63 672 63 672 37 672 32 672 01 671 95 -2.0%-4.5% -2.0% -4.5% -2.0% 672 04 HP 672 04 672 24 672 21 672 38 672 42 672 64 672 64 672 69 672 69 -2.0% 672 14 672 64 672 64 672 69 672 69 -2.0%-4.5% 672 07 671 99 671 89 670 96 EC 670 95 TC 670 29 EP 672 69 672 69 672 69 672 69 672 69 672 69 67112 TC 672 69 672 69 671 22 EC 670 46 EP -2.0% 672 40 EC -2.0%672 30 TC 671 97 EP -2.0%-4.9%-2.0% 672 59 EC 672 59 EC 672 35 EC 672 35 EC 672 25 TC 672 25 TC 672 14 FC 672 63 TC 672 15 672 65 TC 672 18 EC 67156 EC 671 43 EC 67181 EC 672 08 TC 671 46 TC 671 33 TC 67171 TC 671 58 FC 671 46 FC 671 33 FC 671 21 FC -2.0% 670 96 670 84 671 28 EP 67116 EP 670 64 EC 670 40 EC 669 98 TC 669 49 FC 669 31 EP 669 43 TC 669 43 FC 669 26 EP 669 38 TC 669 38 FC 669 21 EP 669 90 TC 669 39 FC 669 22 EP 670 40 670 35 EC 670 12 TC 670 39 TC 669 46 EP 669 72 EP 670 54 TC 669 87 EP 670 65 TC 670 09 EP 671 53 EP67190 671 99 671 71 EP 671 66 67115 EP 671 40 670 76 EP 67138 670 72 EP 671 67 TC 671 00 EP 670 44 EP 67111 TC 671 21 EC 671 26 TC 670 59 EP 671 36 EC 671 77 EC 672 01 672 12 EC-2.0%673 07 673 07 673 07 673 07 672 05 -2.0%-2.0%-2.1% 672 672 67067080RIM6 7 0 7 5 RIM 672 672 6 7 2 672672 84 672 67 672 48 672 23 671 97 HP1.1%-3.9%0.2%-2.0%U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4105A.dwg PLOTTED: 7/14/2022 12:18 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4105A BYNO.DATEREVISIONSDHOLC20001 ---- CJM ---- DLF SHEET APPROVED BY OF32A 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 10'20'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTH APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601DETAILED GRADING PLAN (APARTMENTS)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS4500.dwg PLOTTED: 7/14/2022 1:19 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS4500 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF33 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SITE DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTHANDICAP SIGN DETAIL NOT TO SCALE NOT TO SCALE STOP SIGN - DETAIL STANDARD TRASH ENCLOSURE DETAIL9"8"6"3'-0"7"6"6"2"8"3'-0"6'-6"6"6" 16'-0" 14'-0" A 6" 6" 6" A Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 193 Ex. Lot 192 Ex. Lot 120 Ex. Lot 14 Ex. Lot 15 Ex. Lot 16 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's TVRB TRB MLP CONC. S/W CONC. S/WMBMB TR TVRB TR EX. 15" P E P EX. 18" PEPEX. 18" PEPW/M FH W/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042EX. SAN. SEWER EX. W/L GARDEN DECK PATIO DECKPATIO DECK SHED SHED PATIOAREA EX. STOPSIGN STEEPLECHASESUBDIVISIONINST. 050028042Ex. Lot 12Ex. Lot 11 CG-12AC G - 1 2 A LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 113LOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFOPEN SPACE 2 1.5522 AC.GABRIEL CT.55' ROW - 25 MPHFARMINGTON BLVD. 55' ROW - 25 MPH 5' CONC SWLK5' CONC SWLK5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK OPEN SPACE 1 15.4709 AC. LP LP LOT 27 9,004 SF 5.5' PED ESMT.5' CONC SWLKPR. MONUMENT SIGN LOCATION 419 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT6A 6 8" SDR-35/26 @ 3.66% S6A 5 8" SDR-35/26 @ 0.50% S6 8" SDR-35/26 @ 2.67% S5 4A 8" SDR-35/26 @ 0.50%8" SDR-35/26 @ 0.50%S6BCO CO CO CO COCOCOCOCOSTORM ESMT 20' STORM ESMT STORM DRAINAGE & MAINT. ESMTSTORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT WATERLINE "A" CONNECT TO EXISTING FH 0+00 1+00 2+00 3+00 4+00 5+00 6+000+001+002+001 - 8" TEE 3 -8" GV WATERLINE - BWATERLINE - A WATERLINE - A17'FREDERICK WATER ESMT.FREDERICK WATER ESMT.17'FREDERICK WATER ESMT.ARV U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5001.dwg PLOTTED: 7/14/2022 1:20 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5001 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF34 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS----MATCH CS5002 MATCH CS5003  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601UTILITY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS5003 MATCH CS5002 MB CONC. S/W CONC. S/W Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 Ex. Lot 204 Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195 Ex. Lot 194 Ex. Lot 193 Ex. Lot 203 LYNNEHAVENSEC. 2 / PH. 1AINST. 0400106672.5' SIDEWALK ESMT.INST. NO. 040024106 NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WFH 2 - WV's 3 - WV's MB MB MB MB MLP TRB TVRB W/M WV EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT. W/M W/M W/MEX. 24 " RCP 20' WIDE SEWER ESM T . INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. W/L (TYP.) EX. W/L (TYP.) EX. GAS LINE (TYP.)S 43°18'34" W979.98'EX. SAN. SEW. (TYP.) EX. SIGNS EX. SHEDOVERHANG Ex. Lot 26 Ex. Lot 27 DECK DECK DECK LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SF LOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SF LOT 19 8,609 SFLOT 20 8,427 SF OPEN SPACE 3 0.3772 AC. FARMING T O N B L V D. 55' ROW - 2 5 M P H 5.5' PED ESMT. 5' CONC SWLK 5' CONC SWLK 30 LF - GUARD RAIL - GR-2 EXTEND 4' SWLK WITH ASPHALT TRANSITION TO 10' ASPHALT MULTI-USE TRAIL OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAILOPEN SPACE 1 15.4709 AC.5' CONC SWLK5' CONC SWLKPR. MONUMENT SIGN LOCATION 388 SF ENTRY MONUMENT ESMT. (REQUIRES SEPARATE PERMIT) 10' LANDSCAPE ESMT 10' LANDSCAPE ESMT CG-12C CG-12B 5' CONC SWLK 3 8" SDR-35/26 @ 2.67% 2 8" SDR-35/26 @ 0.50% S3 1 8" SDR-35/2 6 @ 2. 9 9 % S2 EX 8" SDR-35/26 @ 0.50% S1 4 8" SDR-35/26 @ 0.50% S4 4A 8" SDR-35/26 @ 0.50%8" SDR-35/26 @ 0.50%S4ACO CO CO CO CO CO 20' STORM ESMT 20' STORM ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMTSTORM ESMT. WATERLINE "A" CONNECT TO EXISTING WATERLINE "G" CONNECT TO EXISTING 7+00 8+00 9+00 10+00 11+00 12+00 13+0013+21 0+001+002+000+001+001+98WATERLINE - A WATERLINE - AWATERLINE - G30'FREDERICK WATER ESMT.1 - 8" TEE 3 -8" GV 1 - 8" TEE 3 -8" GV FH U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5002.dwg PLOTTED: 7/14/2022 1:22 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5002 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF35 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGSMATCH CS5001  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601UTILITY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT MATCH CS5003MATCH CS5001 20' WIDE DRAINAGE ESMT.15" PEP18" PEPN 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34'N 35°18'07" E1166.98'PLAYSETDECK PATIO DECK PATIO PATIO POOL SHED CONC.RET. WALLSHED CONCRETE CG-12ACG-12ACG-12ACG-12ACG- 1 2 A CG-12ACG-12ACG- 1 2 A CG-12ATYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SFGABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.GABRIEL CT.55' ROW - 25 MPHCG-12C CG-12C5.5' PED ESMT. 5.5' PED ESMT. 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK 5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK10' ASPHALT MULTI-USE TRAIL LP LP LP LP LP GAZEBO / PAVILION 10' LANDSCAPE ESMT20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+0025' ACTIVE OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF 5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5.5' PED ESMT.5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK5' CONC SWLK10' LANDSCAPE ESMTCG-12C CG-12B 5' CONC SWLK 4D 4C 8" SDR-35/26 @ 1.04%S4D4B 8" SDR-35/26 @ 0.50%S4C4A 8" SDR-35/26 @ 0.50%S4B8" SDR-35/26 @ 0.50% S8 4B1 4C1 8" SDR-35/26 @ 2.09% S4C1 9 8" SDR-35/26 @ 0.50%S96B 8 8A 8" SDR-35/26 @ 1.00%S8 (1)8" SDR-35/26 @ 3.97% S4B1 6B1 8" SDR-35/26 @ 1.00%S6B1COCOCO COCOCOCOCOCOCOLATERAL 149 SHALL BE 4" CL 51 DIP FOR FW'S PORTION. DI HARCO WYE FITTING SHALL BE PLACED IN MAIN. MINIMUM 18" VERTICAL SEPARATION REQUIRED. LATERALS 156 AND 157 SHALL BE 4" CL 51 DIP FOR FW'S PORTION. DI HARCO WYE FITTING SHALL BE PLACED IN MAIN. MINIMUM 18" VERTICAL SEPARATION REQUIRED. LATERALS 124 AND 125 SHALL BE 4" CL 51 DIP FOR FW'S PORTION. DI HARCO WYE FITTING SHALL BE PLACED IN MAIN. MINIMUM 18" VERTICAL SEPARATION REQUIRED. 20' STORM ESMT 20' STORM ESMT 20' STORM ESMT 20' STORM ESMT 20' STORM ESMT20' STORM E S M T STORM DRAINAGE & MAINT. ESMT 20' STORM ESMT 20' STORM ESMT20 ' S T O R M E S M T STORM ESMT.FHFH FH FHWATERLINE - D WATERLINE - C2+003+004+005+006+007+008+000+00 1+00 2+00 3+00 4+00 5+00 5+44 0+00 1+00 2+00 3+00 4+00 5+00 5+44 2+003+004+005+006+007+007+464" FIRE & 2" DOM METER VAULT 1 - 8" X 6" TEE 2 - 8" GV 1 - 6" GV 0+000+ 0 0 WATERLINE - B18.00' 1 - 8" TEE 3 -8" GV 1 - 8" TEE 3 -8" GV WATERLINE - B1 - 8" TEE 3 -8" GV 1 - 8" TEE 3 -8" GV 8" WATERLINE STUB 1 - 8" GV 1-FLUSH ASSM.ARVU:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5003.dwg PLOTTED: 7/14/2022 1:23 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5003 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF36 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS5001 MATCH CS5005  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601UTILITY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTMATCH CS5005 MATCH CS5002MATCH CS5001 2 3 4 5 6 7 8 9 1 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PATTON SUBDIV I S I O N DB 218 PG 370N 69°31'12" W 157.62' N 68°58'22" W 60.81' N 69°00'30" W 179.88' N 69°52'58" W 47.12'S 26°17'04"W 404.92'N 32°19'17"E 392.59'N 65°45'33" W 79.64' N 64°49'53" W 138.60' N 65°53'40" W 204.34' ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T. INST. NO. 08 0 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 PATIO SHED SHED CONCRETE ORRICK COMMONSSUBDIVISION LOT 6 CG-12A CG-12ACG-12B CG-12B 130.00'TYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCRE E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN TYPE "C" SEPAR A T I O N B U F F E R 100' - LANDSCA P E S C R E E N LOT 40 8,053 SF 54.2'20'x20' DUMPSTER PAD AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07 25' ACTIVE25' ACTIVE 25' ACTIVE GABRIEL CT.55' ROW - 25 MPHCG-12C CG-12C5.5' PED ESMT.5' CONC SWLK10' ASPHALT MULTI-USE TRAIL LP LP LP 120.20'134.66 '98.15'131.21'10' LANDSCAPE ESMT20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN1+002+00 3+0025' ACTIVE 50'ACCESS ESMT.OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. 5' CONC SW L K 5' CONC SW L K CG-12BCG-12C CG-12C PR. MONUMENT SIGN LOCAT I O N 144 SF ENTRY MONUMENT E S M T (REQUIRES SEPARATE PERM I T ) . 4D 9 8" SDR-35/26 @ 0.50%11 10 8" SDR-35/26 @ 1.01% (PRIVATE)S11(PRI V A T E ) 8" S D R - 3 5 / 2 6 SS1 0 CO2 INV=665.4 4 CO1 INV=665.37 CO4 INV=662.72 CO3 INV=661.21 PRIVATE SANITARY LATERAL SEE PLUMBING PLAN (BY OT H E R S )CO32.8 7 ' 18" S D R - 2 1 ( S L E E V E )20.00'16" SDR-21(SLEEVE)20' STORM E S M T STORM DRAINAGE & MAINT. ESMT 20 ' S T O R M E S M T STORM DRAINAGE & MAINT. ESMT S TO RM D R A IN AG E & M A I N T . E SM T STORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT D 8" WATERLIN E S T U B 1 - 20' JOINT L E N G T H 8 " C L- 5 2 DI P 1 - FLUSH AS S M. 1 - GV 8+007+462" PRIVATE WATER SERV CO N N E C T I O N F.D.C.F.D.C.FHFH4" PRIVATE FIRE SERV CONN E C T I O N 1 - 8" TEE 3 - 8" GV 20 LF - 6" SCH-40 PVC SLEEVE 20'FH 4" CL-52 DIP FIRE SERV (PRIVATE) 4" FIRE & 2" DOM METER VAULT FH 1 - 8" X 6" TEE 2 - 8" GV 1 - 6" GV BEG. 2" PET DOM SERV (PRIVATE) END FREDERICK WATER OWNERSHIP BEG. PRIVATE OWNERSHIP 2" PRIVATE WAT E R S E R V C O N N E C T I O N 4" PRIVATE FIRE S E R V C O N N E C T I O N 1 - 8" X 6" TEE 2 - 8" GV 1 - 6" GV 6" X 4" REDUCE R 4" CL-52 DIP FIR E S E R V ( P R I V A T E ) 20 LF - 8" SCH-4 0 P V C S L E E V E 4" FIRE & 2" DOM METER VAULT BEG. 2" PET DO M S E R V ( P R I V A T E ) 20 LF - 6" SCH-4 0 P V C S L E E V E0+001+002+003+004+00 5+00 6+007+008+009+00 10+00 0+ 0 0 0+740+001+001+04WATERLINE - BWATERLINE - EWATERLINE - E WATERLINE - E 0+00 1+00 1+36 WATERLINE - H 8" WATERLINE STUB 1 - 8" GV 1-FLUSH ASSM.WMBFPWMBFPCONTRACTOR S H A L L S E T V A U L T S T O GRADE PER FRE D E R I C K W A T E R' S INSPECTORS' R E Q U I R E M E N T S CONTRACTOR SHALL SET VAULTS TO GRADE PER FREDERICK WATER'S INSPECTORS' REQUIREMENTS 6" x 4" REDUCER 4" CL-52 DIP FIRE SERV (PRIVATE) 20 LF - 8" SCH-40 PVC SLEEVE END FREDERICK W A T E R O W N E R S H I P BEG. PRIVATE O W N E R S H I P U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5005.dwg PLOTTED: 7/14/2022 1:24 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5005 BYNO.DATEREVISIONSDHOLC20001 1" = 30' CJM 2021-03-19 DLF SHEET APPROVED BY OF37 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS MATCH CS5003  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601UTILITY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT MATCH CS5003 SANITARY EX TO 6A 15+00 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 620 630 640 650 660 670 680 620 630 640 650 660 670 680 9+50 10+00645.7642.7645.3311+00643.8646.74646.5647.9512+00648.7650.08653.5652.2113+00656.6654.98659.3657.3714+00659.9660.48661.1662.8715+00661.1663.94661.1664.8616+00660.4665.61659.4666.1717+00660.0666.17663.3666.5618+00665.5666.93666.9667.5519+00666.8667.96666.4668.6220+00665.3669.22663.9669.1921+00664.0668.70663.6668.0222+00663.7667.37663.8666.1523+00 23+25RIM=665.396A - 48" MHINV OUT 659.00 (6)22+70.25RIM=668.106 - 48" MHINV IN 654.65 (6A)INV IN 654.65 (6B)INV OUT 654.45 (5)21+51.37RIM=667.855 - 48" MHINV IN 653.11 (6)INV OUT 652.91 (4)18+83.04RIM=666.134 - 48" MHINV IN 646.53 (5)INV IN 646.53 (4A)INV OUT 646.43 (3)16+44.02RIM=663.563 - 48" MHINV IN 645.66 (4)INV OUT 645.46 (2)14+90.02RIM=657.642 - 48" MHINV IN 644.78 (3)INV OUT 644.58 (1)13+53.18RIM=648.901 - 48" MHINV IN 639.09 (2)INV OUT 638.89 (EX)11+69.32RIM=646.27EX - 48" MHINV IN 638.17 (1)INV OUT 637.9710+25.03144.29' - 8" SDR-35/26 @ 0.50% S1 183.87' - 8" S D R- 3 5/ 2 6 @ 2. 9 9 % S2 136.84' - 8" SDR-35/26 @ 0.50% S3 154.00' - 8" SDR-35/26 @ 0.50% S4 239.02' - 8" S D R- 3 5/ 2 6 @ 2. 6 7 % S5 268.33' - 8" SDR-35/26 @ 0.50% S6 118.89 8" SDR-35/ 2 6 @ 3. 6 6 % S6A 354.39' - 8" SDR-35/26 @ 0.71%STRM XING STA. 10+50.3030" X 19" HEHDPE INV=640.90EX. GRADE 6' MIN COVER 18" MIN CLEAR 19" CLEAR FIN. GRADE 6' MIN COVER WATR XING STA. 11+53.508" DIP INV=641.08LAT-2 - 22+51.25 INV=659.32LAT-3 - 21+91.25 INV=657.13LAT-4 - 21+31.25 INV=655.37LAT-5 - 20+71.25 INV=655.07LAT-6 - 20+14.25 INV=654.78LAT-23 - 19+13.53 INV=657.45LAT-22 - 18+53.50 INV=656.31LAT-21 - 17+93.50 INV=654.71LAT-7 - 16+27.36 INV=647.36LAT-8 - 15+74.37 INV=647.10LAT-9 - 15+14.37 INV=646.80LAT-20 - 14+52.89 INV=649.61LAT-10 - 14+51.31 INV=646.22LAT-19 - 13+95 INV=649.35LAT-11 - 13+80.08 INV=645.87LAT-18 - 13+49.17 INV=648.66LAT-12 - 13+06.77 INV=644.23LAT-17 - 12+90.38 INV=646.81LAT-13 - 12+46.54 INV=642.48LAT-16 - 12+25.40 INV=644.85LAT-14 - 11+88.75 INV=640.70LAT-15 - 11+36.70 INV=641.19LAT-24 - 20+10.25 INV=657.93 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5100.dwg PLOTTED: 7/14/2022 1:27 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5100 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF38 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SANITARY SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT SANITARY 4 TO 4D HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 630 640 650 660 670 680 630 640 650 660 670 680 9+50 10+00659.6666.12656.6665.0711+00654.6664.68654.9662.8212+00658.2660.78661.0661.1313+00663.5662.66664.3662.9814+00664.3662.64665.7662.1415+00664.3661.64662.0661.1416+00659.2660.64657.8660.1417+00660.4659.64663.8659.1418+00 18+50 283.84' - 8" SDR-35/26 @ 0.50% S4A 141.00' - 8" SDR-35/26 @ 0.50% S4B 244.00' - 8" SDR-35/26 @ 0.50% S4C 117.13' - 8" SDR-35/26 @ 1.04 % S4DRIM=666.134 - 48" MHINV IN 646.53 (5)INV IN 646.53 (4A)INV OUT 646.43 (3)10+00RIM=662.374A - 48" MHINV IN 648.15 (4B)INV OUT 647.95 (4)12+83.84RIM=662.364B - 48" MHINV IN 649.05 (4C)INV IN 649.05 (4B1)INV OUT 648.85 (4A)14+24.84RIM=659.954C - 48" MHINV IN 650.47 (4D)INV IN 650.47 (4C1)INV OUT 650.27 (4B)16+68.84RIM=658.804D - 48" MHINV OUT 651.68 (4C)17+85.96FIN. GRADE EX. GRADE 7' COVER STRM XING STA. 14+75.5115" HDPE INV=655.45WATR XING STA. 14+34.848" DIP INV=657.57WATR XING STA. 16+78.848" DIP INV=655.05LAT-180 - 17+61.96 INV=653.24LAT-179 - 17+37.96 INV=652.99LAT-178 - 17+13.96 INV=652.74LAT-177 - 16+79.71 INV=652.39LAT-176 - 16+45.96 INV=651.96LAT-175 - 16+21.96 INV=651.84LAT-174 - 15+97.96 INV=651.72LAT-173 - 15+73.96 INV=651.60LAT-172 - 15+49.96 INV=651.48LAT-171 - 15+15.71 INV=651.31LAT-170 - 14+81.96 INV=651.14LAT-169 - 14+57.96 INV=651.02LAT-168 - 14+33.96 INV=650.90LAT-167 - 14+09.96 INV=650.58LAT-166 - 13+85.96 INV=650.46LAT-165 - 13+51.71 INV=650.2945" CLEAR SANITARY 4B TO 4B1 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 630 640 650 660 670 680 690 630 640 650 660 670 680 690 9+50 10+00665.3662.39667.0661.9411+00669.2662.78670.8663.6312+00670.9664.4813+00RIM=662.364B - 48" MHINV IN 649.05 (4C)INV IN 649.05 (4B1)INV OUT 648.85 (4A)10+00RIM=665.044B1 - 48" MHINV OUT 658.30 (4B)12+33.13233.13' - 8" S D R- 3 5/ 2 6 @ 3. 9 7 % S4B1RIM=662.364B - 48" MHINV IN 649.05 (4C)INV IN 649.05 (4B1)INV OUT 648.85 (4A)10+00STRM XING STA. 10+33.4915" HDPE INV=656.47FIN. GRADE EX. GRADE 6' MIN COVER LAT-124 - 12+28.13 INV=659.64LAT-123 - 11+88.88 INV=657.80LAT-110 - 11+90.88 INV=657.67LAT-122 - 11+64.88 INV=657.40LAT-111 - 11+66.88 INV=656.72LAT-121 - 11+40.88 INV=656.45LAT-112 - 11+42.88 INV=655.77LAT-120 - 11+16.88 INV=655.49LAT-113 - 11+18.88 INV=654.81LAT-114 - 10+94.88 INV=653.86LAT-119 - 10+92.88 INV=654.54LAT-118 - 10+68.88 INV=653.59LAT-115 - 10+70.88 INV=652.91LAT-117 - 10+44.88 INV=652.09LAT-116 - 10+46.88 INV=651.96 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5101.dwg PLOTTED: 7/14/2022 1:27 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5101 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF39 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SANITARY SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT SANITARY 4C TO 11 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 640 650 660 670 680 690 640 650 660 670 680 690 9+50 10+00658.8659.95660.1659.4111+00662.7660.35665.5661.3512+00668.9662.35670.9663.3513+00671.1664.35669.9665.3514+00669.8666.35669.0667.3515+00668.3668.09667.9668.3816+00668.7668.15669.7668.3717+00670.4668.77671.3670.2418+00672.4669.71673.5669.1619+00672.6669.66671.4670.1620+00671.2670.66671.5671.1721+00RIM=659.954C - 48" MHINV IN 650.47 (4D)INV IN 650.47 (4C1)INV OUT 650.27 (4B)10+00230.87' - 8" SDR-35/26 @ 0.50% S8 233.13' - 8" SDR - 3 5 / 2 6 @ 2 . 0 9 % S4C1 RIM=663.024C1 - 48" MHINV IN 655.54 (8)INV OUT 655.34 (4C)12+33.13271.94' - 8" SDR-35/26 @ 0.50% S9 100.15' - 8" S D R- 3 5/ 2 6 @ 3.50% SS10 RIM=669.0210 - 48" MHINV IN 662.16 (11)INV OUT 661.96 (9)18+36.09232.86' - 8" SDR-35/26 @ 1.01% S11 RIM=671.3611 - 48" MHINV IN 664.67 (CO1)INV OUT 664.50 (10)20+68.95RIM=667.678 - 48" MHINV IN 656.89 (9)INV IN 659.89 (8A)INV OUT 656.69 (4C1)14+64RIM=669.969 - 48" MHINV IN 658.45 (10)INV IN 658.42 (CO3)INV OUT 658.25 (8)17+35.94STRM XING STA. 10+34.9218" HDPE INV=654.93STRM XING STA. 12+4515" HDPE INV=659.12STRM XING STA. 15+77.8015" HDPE INV=663.31FIN. GRADE EX. GRADE 6' MIN COVER WATR XING STA. 14+748" DIP INV=662.24WATR XING STA. 18+00.938" DIP INV=664.0230" CLEAR 54" CLEAR 61" CLEAR LAT-40 - 16+51.16 INV=660.32LAT-39 - 15+91.88 INV=660.03LAT-38 - 15+51.02 INV=659.82LAT-37 - 14+93.88 INV=659.54LAT-149 - 10+44.88 INV=653.21LAT-148 - 10+46.88 INV=652.50LAT-147 - 10+70.88 INV=653.00LAT-150 - 10+68.88 INV=653.17LAT-146 - 10+94.88 INV=653.50LAT-151 - 10+92.88 INV=653.67LAT-152 - 11+16.88 INV=654.17LAT-145 - 11+18.88 INV=654.00LAT-153 - 11+40.88 INV=654.67LAT-144 - 11+42.88 INV=654.50LAT-154 - 11+64.88 INV=655.17LAT-143 - 11+66.88 INV=655.00LAT-155 - 11+88.88 INV=655.67LAT-142 - 11+90.88 INV=655.50LAT-156 - 12+29.12 INV=656.79LAT-157 - 12+56.88 INV=657.46LAT-140 - 12+58.88 INV=656.71LAT-139 - 12+82.88 INV=656.83LAT-158 - 12+80.88 INV=657.03LAT-138 - 13+06.88 INV=656.95LAT-159 - 13+04.88 INV=657.15LAT-133 - 14+36.13 INV=657.60LAT-164 - 14+34.13 INV=657.80LAT-134 - 14+02.88 INV=657.43LAT-163 - 14+00.88 INV=657.63LAT-135 - 13+78.88 INV=657.31LAT-162 - 13+76.88 INV=657.51LAT-136 - 13+54.88 INV=657.19LAT-161 - 13+52.88 INV=657.39LAT-137 - 13+30.88 INV=657.07LAT-160 - 13+28.88 INV=657.2733" CLEAR 22" CLEAR PRIVATE SANITARY MAIN 32.87' - 18" SDR-21 (SLEEVE) @ 3.50% SPAN FREDERICK WATER ESMT.  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5102.dwg PLOTTED: 7/14/2022 1:28 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5102 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF40 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SANITARY SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT SANITARY 6 TO 6B1 HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 640 650 660 670 680 690 640 650 660 670 680 690 9+50 10+00663.6668.10664.8667.3111+00666.4667.46666.8667.8912+00666.5668.32667.1668.9213+00668.4669.22668.2669.5914+00668.6668.94666.5668.0315+00667.1667.18668.7666.3316+00671.1665.4816+50RIM=668.106 - 48" MHINV IN 654.65 (6A)INV IN 654.65 (6B)INV OUT 654.45 (5)10+00RIM=669.016B - 48" MHINV IN 656.83 (6B1)INV OUT 656.63 (6)13+95.23395.23' - 8" SDR-35/26 @ 0.50% S6B 207.13' - 8" SDR-35/26 @ 1.00% S6B1 RIM=665.446B1 - 48" MHINV OUT 658.90 (6B)16+02.36STRM XING STA. 12+13.2318" HDPE INV=659.79FIN. GRADE EX. GRADE 6' MIN COVER WATR XING STA. 10+70.098" DIP INV=661.80LAT-126 - 15+78.36 INV=659.92LAT-107 - 15+76.36 INV=659.69LAT-127 - 15+54.36 INV=660.23LAT-106 - 15+52.36 INV=659.45LAT-128 - 15+30.36 INV=659.99LAT-105 - 15+28.36 INV=659.21LAT-129 - 15+06.36 INV=659.75LAT-104 - 15+04.36 INV=658.97LAT-130 - 14+82.36 INV=659.51LAT-103 - 14+80.36 INV=658.73LAT-131 - 14+58.36 INV=659.27LAT-101 - 14+23.11 INV=658.16LAT-32 - 13+46.84 INV=660.57LAT-31 - 12+86.80 INV=660.27LAT-30 - 12+26.78 INV=659.97LAT-26 - 11+64.76 INV=656.49LAT-29 - 11+66.76 INV=659.67LAT-25 - 11+04.75 INV=656.19LAT-28 - 11+06.75 INV=659.37LAT-108 - 15+98.36 INV=659.91LAT-102 - 14+56.36 INV=658.49LAT-132 - 14+25.11 INV=658.94LAT-27 - 12+24.78 INV=656.7932" CLEAR SANITARY 8 TO 8A HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 640 650 660 670 680 690 640 650 660 670 680 690 -0+50 0+00668.9667.67668.9668.831+00669.1668.78669.7669.732+00 2+25 150.29' - 8" SDR-35/26 @ 1.00% S8 (1)RIM=669.748A - 48" MHINV OUT 661.39 (8)1+50.63RIM=667.678 - 48" MHINV IN 656.89 (9)INV IN 659.89 (8A)INV OUT 656.69 (4C1)0+00.33FIN. GRADE EX. GRADE 6' MIN COVER LAT-35 - 0+90.60 INV=663.29LAT-36 - 0+30.49 INV=662.69LATERAL SOUTH BLDG (PRIVATE) HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 650 660 670 680 690 650 660 670 680 690 9+75 10+00671.4670.89673.1667.9911+00RIM=671.3611 - 48" MHINV IN 664.67 (CO1)INV OUT 664.50 (10)10+0067.30' - 6" SDR-35/26 @ 1.04% SCO1RIM 673.12CO1 CLEANOUTINV IN 665.37 (CO2)INV OUT 665.37 (11)10+67.30RIM=673.06CO2 - CLEANOUT 1INV OUT 665.44 (CO1)10+74.477.17' 6" SDR-35/26 @ 1.00% SCO2 FIN. GRADE EX. GRADE 6' MIN COVER LATERAL NORTH BLDG (PRIVATE) HORIZONTAL SCALE: 1" = 30' VERTICAL SCALE: 1" = 3' 650 660 670 680 690 650 660 670 680 690 9+50 10+00671.0669.96671.2671.1211+00671.3672.2811+5047.00' -6" SDR-35 /26@ 5.94%SCO3RIM=671.06CO3 - CLEANOUTINV IN 661.21 (CO4)INV OUT 661.21 (9)10+4763.07' - 6" SDR-35 /26 @ 2.40% SCO4 RIM=672.70CO4 - CLEANOUTINV OUT 662.72 (CO3)11+10.07RIM=669.969 - 48" MHINV IN 658.45 (10)INV IN 658.42 (CO3)INV OUT 658.25 (8)10+00FIN. GRADE EX. GRADE WATR XING STA. 10+648" DIP INV=664.3318" CLEAR 20.00' - 16" SDR-21 @ 2.40% SPAN FREDERICK WATER ESMT.  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5103.dwg PLOTTED: 7/14/2022 1:28 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5103 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF41 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SANITARY SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5104.dwg PLOTTED: 7/14/2022 1:30 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5104 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF42 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601SANITARY SEWER COMPUTATIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT WATERLINE - A HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 630 640 650 660 670 680 630 640 650 660 670 680 -0+50 0+00662.0663.1663.741+00664.0665.68665.2665.862+00665.5667.08664.8668.093+00664.2669.06665.0669.194+00665.3668.92664.7668.485+00663.5668.09662.1667.606+00660.0666.88657.2666.387+00655.7665.52655.6665.028+00655.2664.19654.7663.449+00653.9662.41652.8660.6610+00651.8658.54651.4656.0511+00649.6653.84647.7651.4812+00644.7649.35643.7647.4813+00644.7645.8013+50 FIN. GRADE EX. GRADE SSWR XING STA. 2+06.978" SDR-35 INV=655.00SSWR XING STA. 7+03.568" SDR-35 INV=646.89STRM XING STA. 8+65.7018" HDPE INV=657.58STRM XING STA. 13+05.7318" HDPE INV=641.48STRM XING STA. 1+30.6015" HDPE INV=660.75WATERLINE "A" - 8" C L - 5 2 D I P 48" MIN COVERFH ASSM. STA. 4+00.1019" CLEAR 45° BEND STA. 0+21.4145° BEND STA. 0+39.23TEE - STA. 1+29.83 = WATERLINE B STA. 0+00CONNECT TO EX. 8" WATER LINE STA. 0+00.10GV- STA. 1+20.99GV - STA. 1+33.3395% COMPACTED FILLTEE - STA. 7+12.85 = WATERLINE F STA. 0+00GV- STA. 7+09.85GV - STA. 7+15.8545° BEND STA. 12+93.9345° BEND STA. 13+01.27WATE R L I N E " A " - 8 " C L - 5 2 D I P 18" MIN CLEAR 18" MIN CLEAR CONNECT TO EX. WATER LINE STA. 13+21.17FIN. GRADE EX. GRADE EX. GRADEFH ASSM. STA. 7+37.74TEE - STA. 12+17.96GV - STA. 12+14.96GV - STA. 12+20.96LAT-24 - 3+51.74 INV=657.93LAT-23 - 4+48.46 INV=657.45LAT-22 - 5+08.48 INV=656.31LAT-21 - 5+68.48 INV=654.71LAT-20 - 9+16.50 INV=649.61LAT-19 - 9+74.43 INV=649.35LAT-18 - 10+32.53 INV=648.66LAT-17 - 10+91.37 INV=646.81LAT-16 - 11+56.39 INV=644.85LAT-15 - 12+25.95 INV=641.1929" CLEAR 23" CLEAR 31" CLEAR 38" CLEARAIR RELEASE VALVESTA. 3+79.57RESTRAINED JOINTS REQ'D MIN 20' ONTO ORIGINAL GROUND RESTRAINED JOINTS REQ'D MIN 20' ONTO ORIGINAL GROUND WATERLINE - B HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 660 670 680 645 650 660 670 680 -0+50 0+00664.9666.26666.0667.301+00666.6667.88667.1668.332+00668.0668.89668.8669.683+00669.2670.53669.5670.994+00669.3671.05668.7670.715+00668.0669.75668.2669.126+00667.9668.58667.0668.117+00668.7668.42669.6668.758+00670.6669.159+0045° BEND STA. 0+05.3745° BEND STA. 0+14.47TEE - STA. 0+00 = WATERLINE A STA. 1+29.83TEE - STA. 3+34.14 = WATERLINE C STA. 0+00FH ASSM. STA. 4+36.87TEE - STA. 5+78.14 = WATERLINE D STA. 0+00GV - STA. 0+03.50GV- STA. 3+31.14GV - STA. 3+37.14GV- STA. 5+75.14GV - STA. 5+81.1445° BEND STA. 8+06.98GV- STA. 8+45.44WATERLINE "B" - 8" CL-5 2 D I P 18" MIN CLEAR FIN. GRADE EX. GRADE 48" MIN COVER LAT-28 - 0+35.65 INV=659.37LAT-29 - 0+95.67 INV=659.67LAT-30 - 1+55.68 INV=659.97LAT-31 - 2+15.71 INV=660.27LAT-32 - 2+75.75 INV=660.57LAT-33 - 3+28.18 INV=660.75LAT-34 - 4+17.85 INV=663.89LAT-35 - 4+77.87 INV=663.29LAT-36 - 5+37.98 INV=662.69LAT-37 - 5+98.02 INV=659.54LAT-38 - 6+55.16 INV=659.82LAT-39 - 6+96.02 INV=660.03LAT-40 - 7+55.30 INV=660.3222" CLEAR 24" CLEAR 25" CLEAR 21" CLEARAIR RELEASE VALVESTA. 3+99.53TEE - STA. 8+48.94 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5200.dwg PLOTTED: 7/14/2022 1:30 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5200 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF43 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601WATERLINE PROFILES (A, B)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT WATERLINE - C HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 635 640 650 660 670 680 635 640 650 660 670 680 -0+50 0+00669.4670.75669.4669.701+00667.5668.45666.8667.602+00667.8666.75670.0665.903+00671.5665.05671.0664.204+00670.4663.35668.7662.515+00666.6661.846+00 WATERLINE "C" - 8 " C L - 5 2 D I P FIN. GRADE EX. GRADETEE - STA. 0+00= WATERLINE B STA. 3+34.11TEE - STA. 5+44 = WATERLINE F STA. 3+63.97FH ASSM. STA. 2+99GV - STA. 0+03GV - STA. 5+41STRM XING STA. 2+8915" HDPE INV=660.07STRM XING STA. 5+00.5115" HDPE INV=656.33SSWR XING STA. 5+348" SDR-35 INV=649.1025" CLEAR 18" MIN CLEAR LAT-132 - 0+99.87 INV=658.94LAT-131 - 1+33.12 INV=659.27LAT-130 - 1+57.12 INV=659.51LAT-129 - 1+81.12 INV=659.75LAT-128 - 2+05.12 INV=659.99LAT-127 - 2+29.12 INV=660.23LAT-126 - 2+53.12 INV=659.92LAT-125 - 2+77.12 INV=660.71LAT-124 - 3+05.87 INV=659.64LAT-123 - 3+45.12 INV=657.80LAT-122 - 3+69.12 INV=657.40LAT-121 - 3+93.12 INV=656.45LAT-120 - 4+17.12 INV=655.49LAT-119 - 4+41.12 INV=654.54LAT-118 - 4+65.12 INV=653.59LAT-117 - 4+89.12 INV=652.0921" CLEAR 21" CLEAR 15" CLEAR 18" CLEAR 18" CLEAR 48" MIN COVER LATERALS 124 AND 125 SHALL BE 4" CL 52 DIP FOR FW'S PORTION, DI HARCO WYE FITTING SHALL BE PLACED IN MAIN. MINIMUM 18" VERTICAL SEPARATION REQUIRED. WATERLINE - D HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 660 670 680 645 650 660 670 680 -0+50 0+00668.1668.99668.5668.071+00669.2667.03670.0666.032+00670.2665.03671.7664.033+00671.2663.03668.0662.034+00665.3661.03662.2660.035+00660.3659.336+00 FIN. GRADE EX. GRADE 48" MIN COVER SSWR XING STA. 5+348" SDR-35 INV=650.57SSWR XING STA. 0+708" SDR-35 INV=656.94STRM XING STA. 2+8915" HDPE INV=658.98STRM XING STA. 4+99.0818" HDPE INV=654.87FH ASSM. STA. 2+99GV - STA. 0+03GV - STA. 5+41TEE - STA. 0+00 = WATERLINE B STA. 5+78.08TEE - STA. 5+44 = WATERLINE F STA. 6+07.97WATERLINE "D" - 8 " C L - 5 2 D I P LAT-164 - 0+99.87 INV=657.80LAT-163 - 1+33.12 INV=657.63LAT-162 - 1+57.12 INV=657.51LAT-161 - 1+81.12 INV=657.39LAT-160 - 2+05.12 INV=657.27LAT-159 - 2+29.12 INV=657.15LAT-158 - 2+53.12 INV=657.03LAT-157 - 2+77.12 INV=657.46LAT-156 - 3+04.88 INV=656.79LAT-155 - 3+45.12 INV=655.67LAT-154 - 3+69.12 INV=655.17LAT-153 - 3+93.12 INV=654.67LAT-152 - 4+17.12 INV=654.17LAT-151 - 4+41.12 INV=653.67LAT-150 - 4+65.12 INV=653.17LAT-149 - 4+89.12INV=653.2134" CLEAR 18" CLEAR 46" CLEAR 19" CLEAR 26" CLEAR 31" CLEAR 22" CLEAR 21" CLEAR18" CLEAR LATERALS 149, 156 AND 157 SHALL BE 4" CL 52 DIP FOR FW'S PORTION, DI HARCO WYE FITTING SHALL BE PLACED IN MAIN. MINIMUM 18" VERTICAL SEPARATION REQUIRED. WATERLINE - E HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 650 660 670 680 650 660 670 680 -0+50 0+00671.7670.78672.5670.771+00671.1670.49670.7670.022+00669.7669.81668.8669.903+00667.8670.29666.7670.794+00665.6671.47665.7671.765+00665.8671.87669.1671.586+00671.2671.14672.2670.677+00671.6670.16672.3669.678+00673.4669.16673.4668.729+00672.2669.75671.6670.5910+00671.4671.08672.6670.9511+00 FIN. GRADE EX. GRADE 48" MIN COVER 31" CLEAR 45° BEND STA. 0+09.90TEE - STA. 0+00 = WATERLINE B STA. 1+29.83TEE - STA. 10+55.21 = WATERLINE E STA. 0+59.22GV - STA. 0+62.72GV - STA. 0+55.72GV - STA. 0+03.50TEE - STA. 0+59.22 = WATERLINE E STA. 10+55.21FH ASSM. STA. 2+40.77TEE - STA. 2+76.23 = WATERLINE H STA. 0+00GV - STA. 2+72.74GV - STA. 2+79.7345° BEND STA. 3+82.3245° BEND STA. 3+53.12TEE - STA. 4+37.32 = SOUTH VAULT STA 0+00GV - STA. 4+40.82GV - STA. 4+33.8245° BEND STA. 5+69.3845° BEND STA. 5+81.20FH ASSM. STA. 5+26.2011.25° BEND STA. 10+32.6022.5° BEND STA. 8+72.3245° BEND STA. 8+47.11FH ASSM. STA. 7+10.29FH ASSM. STA. 10+16.71GV - STA. 10+54.79SSWR XING STA. 8+92.768" SDR-35 INV=660.73SSWR XING STA. 9+85.576" SDR-35 INV=661.6225" CLEAR WATR XING STA. 10+33.796" SDR-40 INV=666.20WATR XING STA. 10+45.798" SDR-40 INV=666.2018" MIN CLEAR 18" MIN CLEAR WATR XING STA. 4+838" SDR-40 INV=666.70WATR XING STA. 4+48.826" SDR-40 INV=666.70WATERLINE "E" - 8" CL-52 DIP 24" CLEAR24" CLEAR STRM XING STA. 6+70.7912" HDPE INV=668.25STRM XING STA. 1+79.9712" HDPE INV=668.08 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5201.dwg PLOTTED: 7/14/2022 1:31 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5201 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF44 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601WATERLINE PROFILES (C, D, E)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT WATERLINE - F HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 640 650 660 670 640 650 660 670 -0+50 0+00655.6665.39654.0663.611+00656.0661.48659.1660.162+00661.8664.37663.5663.433+00664.0662.93664.9662.434+00664.8661.93662.8661.435+00660.2660.93657.8660.436+00658.2659.93661.3659.437+00664.0658.938+00 WATERLINE "F" - 8" CL-52 D I P 45° BEND STA. 0+11.53TEE - STA. 0+00 = WATERLINE A STA. 7+12.85GV - STA. 0+0311.25° BEND STA. 2+13.72TEE - STA. 3+63.97 = WATERLINE C STA. 5+44GV - STA. 3+60.97GV - STA. 3+66.97TEE - STA. 6+07.97 = WATERLINE D STA. 5+44FH ASSM. STA. 4+80.97GV - STA. 6+04.97GV - STA. 6+10.97STRM XING STA. 4+13.8115" HDPE INV=655.22FIN. GRADE EX. GRADE 48" MIN COVER 95% COMPACTED FILL FLUSHING ASSM STA. 7+22.97GV - STA. 7+18.92LAT-166 - 3+15.10 INV=650.46LAT-167 - 3+39.10 INV=650.58LAT-169 - 3+87.10 INV=651.02LAT-168 - 3+63.10 INV=650.90LAT-165 - 2+80.85 INV=650.29LAT-170 - 4+11.10 INV=651.14LAT-171 - 4+44.85 INV=651.31LAT-172 - 4+79.10 INV=651.48LAT-173 - 5+03.10 INV=651.60LAT-174 - 5+27.10 INV=651.72LAT-175 - 5+51.10 INV=651.84LAT-176 - 5+75.10 INV=651.96LAT-178 - 6+43.10 INV=652.74LAT-179 - 6+67.10 INV=652.99LAT-180 - 6+91.10 INV=653.24LAT-181 - 7+15.10 INV=652.94LAT-177 - 6+08.85 INV=652.3915" CLEAR 18" MIN CLEAR RESTRAINED JOINTS REQ'D MIN 20' ONTO ORIGINAL GROUND WATERLINE - G HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 625 630 640 650 660 625 630 640 650 660 -0+50 0+00654.2649.2651.891+00648.5649.55645.7647.112+00 2+50 FIN. GRADE EX. GRADE W A T E R L I N E " G " - 8" C L - 5 2 D I P CONNECT TO EX. 8" WATERMAIN STA. 0+00SSWR XING STA. 1+28.498" SDR-35 INV=638.81STRM XING STA. 0+75.4715" HDPE INV=644.3019" CLEAR 20" CLEAR 45° BEND STA. 1+00.7145° BEND STA. 0+48.76TEE - STA. 1+98.29 = WATERLINE A STA. 12+17.96GV - STA. 1+95.2948" MIN COVER SERVICE VAULT SOUTH HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 655 660 670 680 -0+50 0+00665.4671.70665.4671.561+00666.1672.062+00 4" CL-52 DIP FIRE SERV (PRIVATE) 8" SCH-40 PVC SLEEVETEE - STA. 0+00 = WATERLINE E STA. 4+42.23GV - STA. 0+03.5045° BEND STA. 0+20.5045° BEND STA. 0+24.04FIN. GRADE EX. GRADE 23" CLEAR PRIVATE SERV.FREDERICK WATER SERV.45° BEND STA. 0+68.056" X 4" RED & 45° BEND STA. 0+65.226" CL-52 DIP 95% COMPACTED FILL RESTRAINED JOINTS REQ'D MIN 20' ONTO ORIGINAL GROUND CONTRACTOR SHALL SET VAULTS TO GRADE PER FREDERICK WATER'S INSPECTORS' REQUIREMENTS SERVICE VAULT NORTH HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 690 655 660 670 680 690 -0+50 0+00671.7672.41+00 1+50TEE - STA. 0+00 = WATERLINE B STA. 8+52.09 & E STA. 0+0045° BEND STA. 0+07.78EX. GRADE 18" MIN. CLEAR6" GV - STA. 0+03.50FIN. GRADE PRIVATE SERV.FREDERICK WATER SERV.WATR XING STA. 0+58.608" DIP INV=664.004" CL-52 DIP FIRE SERV (PRIVATE) 8" SCH-40 PVC SLEEVE 6" CL-52 DIP CONTRACTOR SHALL SET VAULTS TO GRADE PER FREDERICK WATER'S INSPECTORS' REQUIREMENTS 6" X 4" RED - STA. 0+43.78WATERLINE - H HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 670 680 655 660 670 680 -0+50 0+00668.3670.07669.6671.071+00670.32+00TEE - STA. 0+00 = WATERLINE E STA. 2+73.15FLUSHING ASSM STA. 1+09.591 FULL JOINT LEN. 8" CL-52 DIPGV - STA. 0+03.50GV - STA. 1+03.44EX. GRADE 48" MIN COVER 18" MIN CLEAR FIN. GRADE WATERLINE "F" - 8" CL-52 DIP ⅊  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5202.dwg PLOTTED: 7/14/2022 1:31 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5202 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF45 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601WATERLINE PROFILES (F, G, H) & SERVICE VAULTSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5500.dwg PLOTTED: 7/14/2022 1:32 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5500 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF46 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601FREDERICK WATER DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT13. EXISTING FREDERICK WATER FACILITIES SHALL BE ADJUSTED TO GRADE BY CONTRACTOR PER FREDERICK WATER'S INSPECTORS REQUIREMENTS.  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS5501.dwg PLOTTED: 7/14/2022 1:32 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS5501 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF47 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601FREDERICK WATER DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 9B 41C 1B 41C 41C 41C 9B 9B 9B 9B 9B 9B 9B 41C 1B 1B 9B 9B 41C 41 Ground Cover Hatch Key Forested Ground Cover Good Condition (HSG B) Forested Ground Cover Good Condition (HSG D) Brush Ground Cover Good Condition (HSG D) Turf Ground Cover Good Condition (HSG B) Turf Ground Cover Good Condition (HSG D) Impervous Ground Cover 1 4 Acre Residential Lots(HSG D) 662 662 664 666 650660 660 660 642642 644 64464664664 8 65265465 465465 4 654656 656 6566566566 5 6 658 658658662662 662 66266266 2 66266 2 664 664666 666 668 668650 65066 0 648 648652 652654 654656 65665 8 6 5 8 662 664 664 660660 660 660 66 0 6 6 0 670 670 670 670 658658 662662662662662664664 66 4 6 6 4666 666668668668668 668668 672 672 674 67 4 676 6 7 667667 66766 7 6 67667 6676676 670 662 664 6 6 6 668 672 674 670672L1 WETLANDS6,708 SF NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W DRAINAGE ESMT.INST. NO. 040010667 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 TEABERRY DR. 54' R/W TIGER LILY CT. POPPY LN.ARDEYTH LN.54' R/W23 22 24 24.1 24.2 24.3 1 2 3 4 5 5.1 6 7 9 8 7 1716 66787 HP Flow Path Tc = 10.6 Mins. Ex. 243 lf Wetland Channel To Remain Undisturbed Ex. 6,720 sf Wetland Area To Remain Undisturbed B A C D B A C Shallow Flow 302 lf @ 1.64% B C C B A AB C D A B C A B C D 668 68 HP 67686 HP 669 02 669 10 HP 650.93 640 56 INV 664 25 669 64 675 57 66938 Flow Path Tc = 17.0 Mins. Shallow Flow 1,032 lf @ 1.86% Shallow Flow 232 lf @ 5.85% Sheet Flow 50 lf @ 0.90% Sheet Flow 50 lf @ 2.28% Sheet Flow 50 lf @ 1.98% Sheet Flow 50 lf @ 1.02% Sheet Flow 50 lf @ 4.86% Sheet Flow 50 lf @ 4.66% 661.80 Channel Flow 553 lf @ 2.32% Flow Path Tc = 11.7 Mins. Sheet Flow 50 lf @ 4.52% Shallow Flow 467 lf @ 2.61% Shallow Flow 443 lf @ 2.77% Flow Path Tc = 7.0 Mins. Flow Path Tc =5.8 Mins. Flow Path Tc = 7.3 Mins. 669 30 Shallow Flow 115 lf @ 4.98% A Shallow Flow 146 lf @ 6.12% Flow Path Tc = 6.6 Mins. Flow Path Tc = 6.2 Mins. 663 92 OLR66280 HP 660 86 SAG 660 44 OLR 66381 HP66398 OLR 66375 SAG 666 17 HP 662 94 HP65969 HP SP 8 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 0.38 Ac. (HSG D) Imperv. Area = 0.07 Ac.On-Site Areas (HSG D) Brush Area = 0.83 Ac.Total Area = 1.28 Ac. Off-Site to SP#5 SP 7 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 0.32 Ac. (HSG D) Imperv. Area = 0.07 Ac.On-Site Areas (HSG D) Brush Area = 0.36 Ac.Total Area = 0.75 Ac. SP 10 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 0.74 Ac. (HSG D) Impervious Area = 0.11 Ac.On-Site Areas (HSG D) Brush Area = 0.35 Ac. (HSG D) Forest Area = 0.01 Ac.Total Area = 1.21 Ac. SP 1 DA (PRE-DEV) On-Site Areas (HSG D) Turf Area = 0.39 Ac. (HSG D) Brush Area = 0.76 Ac. (HSG D) Forest Area = 1.02 Ac.Total Area = 2.17 Ac. SP 2 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 1.05 Ac. Impervious Area = 0.30 Ac.Total Off-Site DA = 1.35 Ac. On-Site Areas Water Surface Area = 0.02 Ac. (HSG B) Turf Area = 0.34 Ac. (HSG D) Turf Area = 2.13 Ac. (HSG D) Brush Area = 2.39 Ac. (HSG B) Forest Area = 2.55 Ac. (HSG D) Forest Area = 7.26 Ac.Total On-Site DA = 14.69 Ac.Total Area = 16.04 Ac. SP 6 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 0.18 Ac. (HSG D) Imperv. Area = 0.04 Ac.On-Site Areas (HSG D) Brush Area = 0.59 Ac.Total Area = 0.81 Ac. SP 5 DA (PRE-DEV) (2) Off-Site Areas (HSG D) Turf Area = 0.70 Ac. (HSG D) Imperv. Area = 0.31 Ac.On-Site Areas (HSG D) Brush Area = 3.67 Ac. (HSG D) Imperv. Area = 0.16 Ac.Total Area = 4.84 Ac. SP 3 DA (PRE-DEV) Off-Site Areas (HSG D) Turf Area = 0.59 Ac.Total Off-Site DA = 0.59 Ac. On-Site Areas (HSG D) Turf Area =1.06 Ac. (HSG D) Forest Area = 5.71 Ac.Total On-Site DA = 6.77 Ac.Total Area = 7.36 Ac. SP 4 DA (PRE-DEV) Off-Site Areas (HSG D) Commercial Area = 0.64 Ac.On-Site Areas (HSG D) Brush Area = 3.55 Ac.Total Area = 4.19 Ac. STUDY POINT 2 STUDYPOINT 10 STUDY POINT 3 STUDY POINT 4 STUDY POINT 1 STUDY POINT 6 (Ex. Storm Inlet 24.2) STUDY POINT 7 (Ex. Storm Inlet 24.1) STUDY POINT 5 (Ex. Storm Inlet 24.3) STUDY POINT 8 (Ex. Storm Inlet 7) 66131 660 00 SAG66083 OLR 66426 HP 666 26 HP 664 11 HP 662 83 HP 66294 HP 660 21 HP 645 91 OLR66464 HP 663 75 HP 67112 HP 678 04 HP 676 34 HP 675 74 HP 670 47 HP 672 92 HP 667 18 HP 670 21 HP 672 58 HP 666 11 HP66361 HP 646 62 HP 646 23 HP 670 17 HP 67010 HP 665 30 HP 663 90 HP 665 00 HP 668 35 HP 663 96 HP Flow Path Tc =6.8 Mins. EX EX EX EXEX EX EX EX EX EX EX EX EX EX EX EX EX EX EXSTUDY POINT 9A (Ex. Storm Inlet 6) STUDY POINT 9B (Ex. Storm Inlet 5.1) SP 9B DA (PRE-DEV) Off-Site Areas = 0.45 Ac.On-Site Areas = 0.34 Ac.Total Area = 0.78Ac. SP 9A DA (PRE-DEV) Off-Site Areas = 0.49 Ac. On-Site Areas = 0.15 Ac.Total Area = 0.64 Ac. 6 EX66153 663 75 66558 665 03 667 19 664 01 663 78 SAG 666 58 663 95 657 40 67160 665 32 644 65 677 43 673 09 662 59 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6000.dwg PLOTTED: 7/14/2022 2:13 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6000 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF48 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTPRE-DEVELOPMENT DRAINAGE MAPWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN  07-14-2022 DAVID L. FRANK Lic. No.1061 LP 659.4314+63.33662 662 664 666 650660 660 660 642642 644 64464664664 8 65265465 465465 4 654656 656 6566566566 5 6 658 658658662662 662 66266266 2 66266 2 664 664666 666 668 668650 65066 0 648 648652 652654 654656 6566 5 8 6 5 8 662 664 664 660660 660 660 66 0 6 6 0 670 670 670 670 658658 662662662662662664664 66 4 6 6 4666 666668668668668 668668 672 672 674 67 4 676 6 7 667667 66766 7 6 67667 6676676 670 662 664 6 6 6 668 672 674 670672662 656660658662664664666668660662664666668660662 662 664 650 650 652 652 654 654 656 656 6506506526526546546566566606566566586626626626646 6 4 670 666668 662664666668670670 6 7 0 662662664664664 664666666666666 666666668668664666668664664666668 6 5 0 6 6 0 64 6 6 4 8 6 5 2 65 4 6 5 6 6 5 8 6 6 2 6626646 6 4 6666 6 6 668 668650646646646648652 660 654656658662664666 6606 5 4 656658664666668668650 650 650660646648652 652 652654 654654656658662664 662 664 66 0 66 2 664 666 666 66 8 670670668670 666668 672 670670670668 672672674670668668668 6 7 0 670 672 672670662664666668662664664 664 666 668668664666 6 6 8 668668670 66 8 666 668 668664666668 668 664666 666 666668 666 668 -2.0%L1 WETLANDSCHANNEL243 LF NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W TIGER LILY CT. POPPY LN.ARDEYTH LN.54' R/W15.4 15.3 15.2 15.1 14.1 14.2 13.1 13.6 5.1 1.8 1.9 1.5 1.6 1.3 1.4 2.3 2.2 2.1 3.2 3.3 13.3 11.1 10.1 10.2 6.5 6.2 6.36.4 14.3 18.1 11.4 11.5 11.6 11.3 4.2 4.1 4.34.4 4.5 4.6 17.2 13.7 13.2 13.5 12.1 12.2 17.1 15.5 21.5 21.1 13.4 6.1 CB1 CB2 CB3 CB4 10.3 21.2 1.2 EX9 21.4 21.3 10.4 10.5 19.2 19.1 23.322.2 22.1 23.1 23.2 U22 U21 Ex. 243 lf Wetland Channel To Remain Undisturbed Catch Basin 1 Catch Basin 2 BIO-RET A BIO-RET B Catch Basin 3 BIO-RET C BIO-RET D WETPOND Forebay 2 Catch Basin 5 Catch Basin 4 Forebay 1 23 22 24 24.1 24.2 24.3 1 2 3 4 5 5.1 6 7 9 8 7 17 16 STUDY POINT 2 STUDYPOINT 10 STUDY POINT 3 STUDY POINT 4 STUDY POINT 1 Un-Detained to SP 3 (HSG D) On-Site Turf Area = 1.40 Ac. (HSG D) Off-Site Turf Area = 0.44 Ac.D.A. = 1.84 Ac.Total To Forebay 2 On-Site Turf Area = 3.38 Ac. Off-site Turf Area = 0.23 Ac. Impervious Area = 4.22 Ac.Forebay 2 D.A. = 7.83 Ac. Total To Forebay 1 (HSG D) On-Site Turf Area = 1.72 Ac. (HSG D) Off-site Turf Area = 0.02 Ac. (HSG D) Impervious Area = 1.46 Ac.Forebay 1 D.A. = 3.20 Ac. Total To Catch Basin 2 (HSG B) Turf Area = 0.81 Ac. (HSG D) Turf Area = 0.23 Ac. (HSG B & D) Impervious Area = 0.29 Ac.Total D.A. = 1.33 Ac. UN-Detained Storm 1.2 - 1.9[Discharge @ Storm 1.2] ON (HSG B CN=61) Turf Area = 0.37 Ac. ON (HSG D CN=80) Turf Area = 0.75 Ac. ON (HSG B&D CN=98) Impervious Area = 1.05 Ac. OFF (HSG D CN=80) Turf Area = 0.17 Ac. OFF(HSG D CN=98) Impervious Area = 0.10 Ac.Total D.A. = 2.44 Ac. SP 8 DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.38 Ac. (HSG D) Imperv. Area = 0.07 Ac.On-Site Areas (HSG D) Turf Area = 0.24 Ac. (HSG D) Imperv. Area = 0.11 Ac.Total Area = 0.80 Ac. Off-Site to SP 3 SP 7 DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.32 Ac. (HSG D) Imperv. Area = 0.07 Ac.On-Site Areas (HSG D) Turf Area = 0.20 Ac. (HSG D) Imperv. Area = 0.09 Ac.Total Area = 0.68 Ac. SP 10 DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.63 Ac. (HSG D) Impervious Area = 0.07 Ac.On-Site Areas (HSG D) Turf Area = 0.05 Ac.Total Area = 0.75 Ac. SP 1 DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.08 Ac. (HSG D) Impervious Area = 0.01 Ac.On-Site Areas (HSG D) Turf Area = 1.05 Ac. (HSG D) Impervious Area = 0.12 Ac.Total Area = 1.26 Ac. SP 6 DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.18 Ac. (HSG D) Imperv. Area = 0.04 Ac.On-Site Areas (HSG D) Turf Area = 0.14 Ac. (HSG D) Imperv. Area = 0.05 Ac.Total Area = 0.41 Ac. SP 5 DA (POST-DEV) (1) Off-Site Areas (HSG D) Turf Area = 0.68 Ac. (HSG D) Imperv. Area = 0.24 Ac.On-Site Areas (HSG D) Turf Area = 0.46 Ac. (HSG D) Imperv. Area = 0.15 Ac.Total Area = 1.53 Ac. To Catch Basin 5 Off-Site Areas (HSG D) Turf Area = 0.04 Ac. (HSG D) Impervious Area = 0.03 Ac.On-Site Areas (HSG D) Turf Area = 0.04 Ac. (HSG D) Impervious Area = 0.03 Ac.Total Area = 0.34 Ac. To Catch Basin 1 (HSG D) Turf Area = 0.95 Ac. (HSG D) Impervious Area = 0.12 Ac.Total Area = 1.07 Ac.To Storm 2.1 - 3.3 Total Area = 2.11 Ac. STUDY POINT 6 (Ex. Storm Inlet 24.2) STUDY POINT 7 (Ex. Storm Inlet 24.1) STUDY POINT 5 (Ex. Storm Inlet 24.3) STUDY POINT 8 (Ex. Storm Inlet 7) SP 9A DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.16 Ac. (HSG D) Impervious Area = 0.29 Ac.On-Site Areas (HSG D) Turf Area = 0.10 Ac. (HSG D) Impervious Area = 0.11 Ac.Total Area = 0.66 Ac. SP 9A DA (POST-DEV) Off-Site Areas (HSG D) Turf Area = 0.19 Ac. (HSG D) Impervious Area = 0.31 Ac.On-Site Areas (HSG D) Turf Area = 0.06 Ac. (HSG D) Impervious Area = 0.05 Ac.Total Area = 0.61 Ac. To Catch Basin 3 Off-Site Areas (HSG D) Turf Area = 0.26 Ac. (HSG D) Impervious Area = 0.05 Ac.On-Site Areas (HSG D) Turf Area = 2.67 Ac. (HSG D) Impervious Area = 0.08 Ac.Total Area = 3.06 Ac. To Wet Pond Direct Surface Runoff (HSG D) Turf Area = 0.75 Ac. (HSG D) Impervious Area = 0.06 Ac.Total Area = 0.81 Ac. To Ex. Storm 9 Direct Surface Runoff ON (HSG D) Turf Area = 0.08 Ac. OFF (HSG D) Turf Area = 0.62 Ac. OFF(HSG D) Impervious Area = 0.13 Ac.Total Area = 0.83 Ac. SP 4 DA (POST-DEV) Off-Site Areas (HSG D) Commercial Area = 0.64 Ac.On-Site Areas (HSG D) Impervious Area = 1.10 Ac. (HSG D) Turf Area = 1.92 Ac.Total Area = 3.66 Ac. Bio-Ret D Forebay Turf Area = 0.47 Ac. Impervious Area = 0.74 Ac.D.A. = 1.21 Ac. Bio-RetD Main Cell Turf Area = 0.10 Ac. Impervious Area = 0.00 Ac.D.A. = 0.10 Ac.Bio-Ret C Forebay Turf Area = 0.24 Ac. Impervious Area = 0.35 Ac.D.A. = 0.59 Ac. Bio-Ret C Main Cell Turf Area = 0.10 Ac.D.A. = 0.10 Ac. Bio-Ret A Main Cell (HSG D) Turf Area = 0.72 Ac. (HSG D) Impervious Area = 0.28 Ac.D.A. = 1.00 Ac. Bio-Ret A Forebay (HSG D) Turf Area = 1.47 Ac. (HSG D) Impervious Area = 1.50 Ac.D.A. = 2.97 Ac. Bio-Ret B Forebay Direct Surface Runoff Turf Area = 0.78 Ac. Impervious Area = 0.05 Ac.D.A. = 0.83 Ac. To Catch Basin 4 Direct Surface Runoff Turf Area = 0.47 Ac. Impervious Area = 0.02 Ac.D.A. = 0.49 Ac. Un-Detained To SP 4 Off-Site Areas (HSG D) Commercial Area = 0.64 Ac.On-Site Areas (HSG D) Turf Area = 0.91 Ac. (HSG D) Impervious Area = 0.01 Ac.Total Area = 1.56 Ac. STUDY POINT 9A (Ex. Storm Inlet 6) STUDY POINT 9B (Ex. Storm Inlet 5.1) EX EX EX EXEX EX EX EX EX EX EX EX EX EX EX EX EX EX EX EX Bio-Ret B Main Cell (HSG D) Turf Area = 0.38 Ac. (HSG D) Impervious Area = 0.07 Ac.D.A.= 0.45 Ac. Ground Cover Hatch Key Forested Ground Cover Good Condition (HSG B) Forested Ground Cover Good Condition (HSG D) Brush Ground Cover Good Condition (HSG D) Turf Ground Cover Good Condition (HSG B) Turf Ground Cover Good Condition (HSG D) Impervious Ground Cover 1 4 Acre Residential Lots(HSG D) Commercial Ground Cover (HSG D)U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6001.dwg PLOTTED: 7/14/2022 2:14 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6001 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF49 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHDAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTPOST-DEVELOPMENT DRAINAGE MAPWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN  07-14-2022 DAVID L. FRANK Lic. No.1061 00 80'160' Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 16 STEEPLECHASESUBDIVISIONINST. 05002804224" PEP 20' WIDE DRAINAGE ESMT. INST. NO. 050028042 15" PEP18" PEPN 35°18'07" E1166.98'PLAYSETDECK PATIO DECK PATIO PATIO CONC. DRIVEWAY(TYPICAL) SHED CONC.RET. WALLPATIO POPPY LN. EX. DWELLING (TYP.)ARDEYTH LN.54' R/WEx. Lot 17 15" HDPE15.5 23 24 24.1 24.2 24.3 PRE-DEV 10 Yr.WSE = 662.23' 9+65 10+00 10+35 OLR C OLR C OLR ABOLR E OLR E OLR D OL R D EX EX EX EXEX OLR ABPRE-DEV 10 Yr.WSE = 662.23' PRE-DEV 10 Yr.WSE = 662.23' 665 07 664 78 662 94 662 23 66195 663 44 667 63 669 02 662 76 662 42 660 01 660 50 665 33 663 80 663 92 OLR 659 62 662 01 662 47 665 28 668 63 669 40 668 06 667 87 666 35 664 13 662 78 664 54 668 91 67175 662 62 EP 662 27 EP 662 73 EP 66145 EP 665 80 EP 664 81 663 26 662 89 662 70 666 66 670 32 662 80 Crest 660 86 SAG 664 11 HP 666 26 HP 662 83 OLR 662 94 OLR 666 40 HP 668 91 670 47 HP 67190 HP 67158 664 31 662 45 66198 662 21 663 03 66021 HP 667 18 HP 662 20 HP 66145 LP 66189 LP 660660 660 660 670 662662664 66 4 6 6 4 666668668668 668 66 8 SECTION OLR E - OLR E HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 9+40 9+60662.2662.18661.9661.86661.5661.529+90661.5661.49661.4661.40661.9661.8710+20662.1662.14663.2663.22665.3665.2510+50665.6665.5810+60 Ex. Grade Ex. 24.2 Grate Top = 659.67 10+00 = OLRProp. Grade Ex. Grade POST-DEV 100 Yr.WSE = 661.40' PRE-DEV 10 Yr.WSE = 662.23' POST-DEV 10 Yr.WSE = 651.29' OLR = 661.35 SECTION OLR B - OLR B HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660Ex. Lot 19(⅊)Ex. Lot 18 (⅊)LP @ Rear Yards (≈90' East)10+00 = OLREx. Grade POST-DEV 100 Yr.WSE = 661.40' Post-Dev Freeboard 100YR = 1.54' Ex. 24.2 Grate Top = 659.67 PRE-DEV 10 Yr.WSE = 662.23' POST-DEV 10 Yr.WSE = 651.29' OLR = 662.94 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 16 STEEPLECHASESUBDIVISIONINST. 05002804224" PEP 20' WIDE DRAINAGE ESMT. INST. NO. 050028042 15" PEP18" PEPN 35°18'07" E1166.98'PLAYSETDECK PATIO DECK PATIO PATIO CONC. DRIVEWAY(TYPICAL) SHED CONC.RET. WALLPATIO POPPY LN. EX. DWELLING (TYP.)ARDEYTH LN.54' R/WEx. Lot 17 LOT 31 8,004 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF10' LANDSCAPE ESMT15" HDPE15.5 23 24 24.1 24.2 24.3 POST-DEV 10 Yr.WSE = 659.54' POST-DEV 10 Yr.WSE = 661.29' POST-DEV 10 Yr.WSE = 661.29' POST-DEV 100 Yr.WSE = 661.40' POST-DEV 100 Yr.WSE = 661.40' 9+65 10+00 10+35 OLR C OLR C OLR ABOLR E OLR E OLR D OL R D EX EX EX EXEX OLR ABPOST-DEV 100 Yr.WSE = 661.40' POST-DEV 100 Yr.WSE = 661.40' FF=672.88 GF=671.88 BF=664.28 FF=674.38 GF=673.38 BF=665.78 FF=674.88 GF=673.88 BF=666.28 FF=671.88 GF=670.88 BF=663.28 FF=672.88 GF=671.88 BF=664.28 FF=674.38 GF=673.38 BF=665.78 FF=674.88 GF=673.88 BF=666.28 W/O W/O W/O PARTIALW/O 665 07 664 78 662 94 662 23 66195 663 44 667 63 669 02 662 76 662 42 660 01 660 50 665 33 663 80 663 92 OLR 660 06 SP 662 66 SP 659 62 662 01 662 47 665 28 668 63 669 40 668 06 667 87 666 35 664 13 662 78 664 54 668 91 67175 662 62 EP 662 27 EP 662 73 EP 661 45 EP 665 80 EP 664 81 663 26 662 89 662 70 666 66 670 32 662 80 Crest 660 86 SAG 664 11 HP 666 26 HP 662 83 OLR 662 94 OLR 666 40 HP 668 91 670 47 HP 671 90 HP 67158 664 31 662 45 661 98 662 21 663 03 66021 HP 667 18 HP 662 20 HP 66145 LP 66189 LP 2.7%5.5% 4.1%7.6% 6.7% 9.1% 8.8% 4.6% 2.0%8.4% 5.4% 6.1% 2.9%9.3% 2.4%10.0% 8.3% 8.7% 4.5%12.5% 12.5%5.3% 11.7%4.9% 668 666 50 BP 667 669 75 HP 668 00 668 00 670 50 66967100 HP 669 665 11 BP 667 00 665 61 WO 673 00 669 80 670 05 672 00 HP 666 50 BP 665 61 WO 673 00 670 40 668 09 664 60 669 00 HP 667 85 663 93 664 26 670 50 668 57 668 83 663 67 BP 663 72 670 00 HP 670 50 HP 665 11 WO 663 76 BP 665 11 WO 665 61 WO 665 61 WO 673 00 672 00 HP 672 50 HP 665 61 WO 665 61 WO 665 11 BP 664 61 BP 664 61 BP 664 50 BP 664 50 BP 67150 673 50 673 50 673 00 67150 669 50 669 17 HP 672 00 672 00 670 50 669 50 669 55 670 21 670 37 670 32 670 00 669 31 665 25 665 00 665 00 665 11 665 00 670 660660 660 660 670 662662664 66 4 6 6 4 666668668668 668 66 8 6706 7 0 662662664664664 664666666666666 666668664666668664668 Ditch D See Sheet 72 SECTION OLR D - OLR D HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 Ex. Grade OLR = 662.20' POST-DEV 100 Yr.WSE = 661.40' 9+40 9+60 663.9663.91663.2663.249+90662.7662.69662.2662.20662.5662.5110+20664.2664.25665.6665.63666.8666.8110+50668.0667.9910+60 PRE-DEV 10 Yr.WSE = 662.23' Ex. 24.1 Grate Top = 659.12 POST-DEV 10 Yr.WSE = 659.54'10+00 = OLRPost-Dev Freeboard 100YR = 0.8' Prop. Grade SECTION OLR A - OLR A HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 9+40 9+60 9+90663.1663.10662.8662.83663.1663.1510+20 10+5010+60 Ex. Grade POST-DEV 10 Yr.WSE = 659.54' PRE-DEV 10 Yr.WSE = 662.23'Ex. Lot 18 (⅊)Ex. Lot 17 (⅊)POST-DEV 100 Yr.WSE = 661.40' LP @ Rear Yards (≈ 60' East) Ex. 24.1 Grate Top = 659.12 OLR = 662.83 10+00 = OLRSECTION OLR C - OLR C HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 9+40 9+60 664.8664.80664.4664.439+90664.1664.09663.9663.92664.0664.0110+20664.2664.16665.2665.1610+5010+60 LP @ Rear Yards (≈ 140' South)10+00 = OLREx. Grade OLR = 663.92' POST-DEV 100 Yr.WSE = 661.40' PRE-DEV 10 Yr.WSE = 662.23' Ex. 24.1 Grate Top = 659.12 POST-DEV 10 Yr.WSE = 659.54' Post-Dev Freeboard 100YR = 2.53' Ground Cover Hatch Key Pre-Development 10 Yr. WSE Post-Development 10 Yr. WSE Post-Development 100 Yr. WSE U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6002.dwg PLOTTED: 7/14/2022 2:16 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6002 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF50 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATIONWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTNORTH00 30'60'Off-Site Drainage & Over Land Relief Plan View Pre-Development Condition Evaluation Scale: 1" = 30' 00 30'60'Off-Site Drainage & Over Land Relief Plan View Post-Development Condition Evaluation Scale: 1" = 30' Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 14 OPEN SPACE Ex. Lot 13 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's CONC. S/W CONC. S/WMBMB TR EX. 15" P E P EX. 18" PEP W/M FH W/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 EX. SAN. SEWER EX. W/L GARDEN DECKPATIO DECK SHED SHED PATIOAREA EX. STOPSIGN Ex. Lot 12Ex. Lot 11 5 5.1 6 7 PRE-DEV 10 Yr.WSE = 657.68'OLR GOLR GOLR JOLR JPRE-DEV 10 Yr.WSE = 661.02' EX EX EX EX 664 27 662 55 663 02 662 29 663 74 663 09 35 660 44 OLR 662 71 66181 66153 664 25 664 35 HP66466 HP 658 71 EP 659 14 EP 658 89 EP65854 EP 657 85 EP 657 10 EP 657 72 EP 658 13 EP 659 23 EP 659 76 EP 660 86 EP 664 07 664 26 662 21 663 98 OLR 663 75 LP 664 28 660 00 LP 660 64 660 83 OLR 663 61 HP 663 34 659 6265902 659 69 662 94 HP 661 98 662 7666155660966614966137 660 1365942 659 41 666 17 HP 665 06 665 31 666 88 667 03 665 25 664 95 665 82 664 65 665 89 665 17 HP 662 662 664 666 66266 0 6 6 0 658 658662SECTION OLR J - ORL J HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 9+40 9+60 661.4661.36661.2661.159+90660.9660.91660.8660.83660.9660.9410+20661.2661.18661.7661.74662.4662.3910+5010+60 Ex. Grade OLR = 660.83 POST-DEV 100 Yr.WSE = 661.08'Face of Bldg. (Approx.)FFE's Unknown0.83' Sump SUMP = 660.00 LP @ Lot 13 (≈ 75' East) POST-DEV 10 Yr.WSE = 661.01' PRE-DEV 10 Yr.WSE = 661.03' Post-Dev 100YR = 0.33' Free Board 10+00 = OLREx. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 14 OPEN SPACE Ex. Lot 13 ARDEYTH LN.54' R/WFARMINGTON BLVD. 60' R/W EX. SAN. SEWER SAN. LAT.GLM3 - WV's 2 - WV's CONC. S/W CONC. S/WMBMB TR EX. 15" P E P EX. 18" PEPEX. 18" PEPW/M FH W/M 20' WIDE SEWER ESMT.INST. NO. 050028042 20' WIDE W/L ESMT.INST. NO. 050028042 EX. SAN. SEWER EX. W/L GARDEN DECKPATIO DECK SHED SHED PATIOAREA EX. STOPSIGN Ex. Lot 12Ex. Lot 11 CG-12AC G - 1 2 A LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 28 10,176 SF LOT 29 8,002 SF GABRIEL CT.55' ROW - 25 MPH5' CONC SWLK 5' CONC SWLK 10' LANDSCAPE ESMT 10' LANDSCAPE ESMTSTORM ESMT STORM DRAINAGE & MAINT. ESMT 15"HDPE15" H D P E 15" HDPE 15" HDPE4.34.4 4.5 4.6 5 5.1 6 7 POST-DEV 10 Yr.WSE = 657.66' POST-DEV 100 Yr.WSE = 657.73'OLR GOLR GOLR JOLR JPOST-DEV 10 Yr.WSE = 661.01' POST-DEV 100 Yr.WSE = 661.08' EX EX EX EX LP 666.44 10+27.82 FF=670.03 GF=669.03 BF=661.43 FF=670.88 GF=669.88 BF=662.28 FF=668.69 GF=667.69 BF=660.09 FF=669.70 GF=668.70 BF=661.10 FF=670.50 GF=669.50 BF=661.90 664 27 662 55 663 02 662 29 663 74 663 09 35 660 44 OLR 661 80 SP 662 71 66181 66153 664 25 664 35 HP66466 HP 658 71 EP 659 14 EP 658 89 EP65854 EP 657 85 EP 656 80 EP 657 10 EP65688 EP 657 72 EP 658 13 EP 659 23 EP 659 76 EP 660 86 EP 664 07 664 26 662 21 663 98 OLR 663 75 LP 664 28 660 00 LP 660 64 660 83 OLR 663 61 HP 663 34 659 6265902 659 69 662 94 HP 66198 662 7666155660966614966137 660 1365942 659 41 666 17 HP 665 06 665 31 666 88 667 03 665 25 664 95 665 82 664 65 665 89 665 17 HP 8.6% 4.6% 2.2%5.8% 3.8%8.4%2.3%3.7%2.0%3.0%2.0%2.1%2.2%2.2%2.0%2.0%2.0%3.5%666 45 TC66647 TC 665 64 TC 663 28 TC 663 28 TC 667 24 666 65 667 00 665 50 665 00 667 00 668 15 HP 667 25 665 25 665 82 665 00 BP 667 10 664 07 666 10 667 10 666 60 661 96 663 32 BP 667 10 666 26 666 60 666 64 667 13 HP 667 75 HP 667 10 667 10 668 668 91 667 58 666 50 666 50 668 65 664 25 HP 662 34 6676668366486 668 65 667 50 666 60 BP 667 10 667 10 667 00 667 00 666 69 BP 666 35 BP 667 10 667 10 668 33 669 12 662 662 664 666 66 0 6 6 0 658 6586626 6 2 6 6 4 6 6 6 668664666 6 6 8 Catch Basin 5 100 Yr. WSE = 663.35' See "Catch Basin 5 Weir Detail" (Sh. 60) Ground Cover Hatch Key Pre-Development 10 Yr. WSE Post-Development 10 Yr. WSE Post-Development 100 Yr. WSE SECTION OLR G - OLR G HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 657 660 663 666 657 660 9+40 663.1663.119+60662.3662.33661.4661.43660.8660.809+90660.6660.62660.4660.44660.6660.6410+20661.1661.07661.3661.26661.6661.5610+50661.7661.6810+60 OLR = 660.44POST-DEV 100 Yr.WSE = 657.73' LP @ Lot 14 (≈ 30' South) Grate Top = 657.42 POST-DEV 10 Yr.WSE = 657.66' PRE-DEV 10 Yr.WSE = 657.68'10+00 = OLRPost-Dev Freeboard 100YR = 2.71'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6003.dwg PLOTTED: 7/14/2022 2:18 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6003 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF51 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATIONWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTNORTHOff-Site Drainage & Over Land Relief Plan View Pre-Development Condition Evaluation Scale: 1" = 30' 00 30'60'Off-Site Drainage & Over Land Relief Plan View Post-Development Condition Evaluation Scale: 1" = 30' MB CONC. S/W CONC. S/W Ex. Lot 24 Ex. Lot 25 Ex. Lot 204 Ex. Lot 199Ex. Lot 198 Ex. Lot 203 2.5' SIDEWALK ESMT.INST. NO. 040024106LADYSLIPPER DR.54' R/WMB MB MB MLP TRB TVRB EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT.EX. 24 " RCP 20' WIDE SEWER ESM T . INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. GAS LINE (TYP.) EX. SAN. SEW. (TYP.) Ex. Lot 26 Ex. Lot 27 DECK DECK DECK 9 8 7 17 16 PRE-DEV 10 Yr.WSE = 643.71'OLR MOLR MEX EX EX EX EX 645 91 OLR 646 62 HP 646 23 HP 64056 INV 650642642 644 644646646 64 8 65265465 4654 65 4 6566566 5 6 SECTION OLR M - OLR M HORZ. SCALE: 1" = 30' VERT.SCALE: 1" = 3' 642 645 648 651 642 650 9+40 646.7646.709+60646.9646.86646.9646.90646.4646.409+90646.1646.10645.9645.91645.9645.9310+20645.6645.57645.1645.13645.3645.3010+50645.4645.3610+60 POST-DEV 100 Yr.WSE = 645.55' Ex. Grade PRE-DEV 10 Yr.WSE = 643.71' POST-DEV 10 Yr.WSE = 642.56' OLR @ EX. LOT 25 = 645.9110+00 = OLRFace of Bldg. (Approx.)FFE's UnknownOLR @ R/W = 645.50 MB CONC. S/W CONC. S/W Ex. Lot 24 Ex. Lot 25 Ex. Lot 204 Ex. Lot 199Ex. Lot 198 Ex. Lot 203 2.5' SIDEWALK ESMT.INST. NO. 040024106LADYSLIPPER DR.54' R/WMB MB MB MLP TRBTVRB EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.INST. NO. 03000798215' WIDE W/L ESMT.INST. NO. 030007982 10' WIDE GAS PIPELINE ESMT.EX. 24 " RCP 20' WIDE SEWER ES M T . INST. NO. 010017843 VARIABLE WIDTH W/L ESMT.INST. NO. 010017843CONC. S/WCONC. S/WEX. SHED(APPROX. LOC.) EX. SAN. SEWER EX. GAS LINE (TYP.) EX. SAN. SEW. (TYP.) Ex. Lot 26 Ex. Lot 27 DECK DECK DECK LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 15 8,423 SF LOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SF OPEN SPACE 3 0.3772 AC. FARMING T O N B L V D. 55' ROW - 2 5 M P H 30 LF - GUARD RAIL - GR-2 EXTEND 4' SWLK WITH ASPHALT TRANSITION TO 10' ASPHALT MULTI-USE TRAIL 20' STORM ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT9 8 7 17 16 POST-DEV 10 Yr.WSE = 642.56' POST-DEV 100 Yr.WSE = 645.55'OLR MOLR MEX EX EX EX EXLP 645.3923+46.16FF=651.81 GF=650.81 BF=643.21 FF=655.05 GF=654.05 BF=646.45 FF=658.18 GF=657.18 BF=649.58 FF=660.89 GF=659.89 BF=652.29 FF=654.10 GF=653.10 BF=645.50 FF=656.86 GF=655.86 BF=648.26 GF=658.99 BF=651.39 645 91 OLR 646 62 HP 646 23 HP 6.6%6.0%5.2%8.0%8.3%8.0%2.0%2.1%4.5%3.1%3.4%2.0%3.1%2.0%2.8%2.0%645 76 TC 645 74 TC 645 40 TC 645 41 TC 650 43 650 31 650 31 650 31 643 09 INV 663 65 649 81 650 40 648 04 649 13 650 21 HP 655 88 652 72 653 64 653 67 653 55 651 05 650 55 651 55 652 05 653 45 HP 656 68 656 80 655 18 654 18 653 68 654 68 656 77 659 39 89 39 656 89 656 60 HP 653 45 650 63 648 08 652 60 652 10 655 36 654 36 653 86 654 86 658 49 657 99 652 72 652 06 652 55 649 68 655 48 655 36 655 45 652 51 652 45 HP 658 49 658 58 655 65 655 16 HP 656 43 654 91 651 46 648 0464804 646 62 650 81 TOP 648 00 TOP 652 60 651 50 OLR 646 15 OLR 650 10 HP 655 40 HP 64056 INV 650642642 644 644646646 64 8 65265465 4654 65 4 6566566 5 6 6 5 0 64 6 6 4 8 6 5 2 65 4 6 5 6 650646646646648652 654656658 6 5 4 65665865064664865253 50 TB 100 Yr. WSE = 645.51'Top Berm = 646.75'Ground Cover Hatch Key Pre-Development 10 Yr. WSE Post-Development 10 Yr. WSE Post-Development 100 Yr. WSE U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6004.dwg PLOTTED: 7/14/2022 2:19 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6004 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF52 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 30'60'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 Off-Site Drainage & Over Land Relief Plan View Pre-Development Condition Evaluation Scale: 1" = 30' 00 30'60'Off-Site Drainage & Over Land Relief Plan View Post-Development Condition Evaluation Scale: 1" = 30' DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601OFF-SITE DRAINAGE & OVER LAND RELIEF EVALUATIONWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTNORTH U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6005.dwg PLOTTED: 7/14/2022 2:21 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6005 BYNO.DATEREVISIONSDHOLC20001 ---- CJM ---- DLF SHEET APPROVED BY OF53 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWATER QUANTITY COMPLIANCE SUMMARY(STUDY POINTS 1-3)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 Study Point 3 Study Point 2 Study Point 1 Natural Channel (Dense Grass / n=0.024)18:1 Slope20:1 Slope8' Wide Bottom Existing Channel Section SP1 - FP(NTS) Storm Event 2 Yr. Storm 10 Yr. Storm Peak Q 2.29 cfs 4.25 cfs Flow Depth 0.11' 0.15' Velocity 2.06 fps 2.61 fps Runoff Computations D10 = 0.15'This "Existing Channel Section" demonstrates compliance with Flood Protection 9VAC25-870-66.C.1 & the Limits of Analysis 9VAC25-870-66.C.3.d 4.5: 1 S l o p e 10:1 Slope Existing Channel Section SP3 - FP(NTS) Capacity ComputationBankfull Q10 = 31.38 DBankfull = 1.00'This "Existing Channel Section" demonstrates compliance with Flood Protection 9VAC25-870-66.C.1 & the Limits of Analysis 9VAC25-870-66.C.3.d Natural Channel (Dense Grass n=0.024) Study Point 1 Summary In General This Study Point discharges to a Natural Channel, being a Broad Swale. Drainage is detained at Catch Basin 1, then discharges through the weir to a Level Spreader at the Study Point. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.1. Downstream, the Broad Swale has Capacity to Convey the Post-Development Q10 Peak Discharge. Limits of Analysis for Flood Protection The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.C.3.d. Site Discharge is Sheet Flow from a Level Spreader. Downstream Conveyance has the required capacity to prevent flooding during the 10Yr - 24Hr Storm Event. Downstream Velocities are Non-Erosive during the 2Yr - 24Hr Storm Event. Downstream Areas are Stabilized. On-Site E&S Controls are required to remain until the Site is Stabilized.. Study Point 2 Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Lynnehaven Subdivision. This Study Point drains a significant portion of the proposed project. Three Catch Basins are situated within this Study Area, to Detain Runoff for Controlled release. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.2.b. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. Flood Protection & Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3. The Existing Headwall Inlet "Ex. 9", which begins the Downstream Conveyance is found to "Currently Experience Localized Flooding". See Sheet 52 - Off-Site Drainage & Over Land Relief Evaluation Study Point 3 Summary In General This Study Point discharges to a Natural Channel, being an Un-Named Tributary of Opequon Creek. This is Study Point drains another significant portion of the proposed project. One Wet Pond is situated within this Drainage Area, Detaining Runoff for Controlled release. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.3.a. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.2.b. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. Flood Protection & Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3. The Existing Channel, beginning the Downstream Conveyance is found to "Currently Experience Localized Flooding", as the Pre-Development Peak Flow (Q10) = 123.65 is found to overtop the Channel Bank. See this sheet for the "Existing Channel Section SP3 - FP" & Existing Channel Section (StreamSTATS) for Channel Capacity Computations. Channel Capacity was evaluated 2 ways with similar results. StreamSTATS was used to Delineate the Drainage Area. This Area was then used to Calculate the Pre-Development Peak Flow (Q10) using the "Regional Regression Equations for Estimating Peak Flows of Streams in Virginia", Reference USGS Scientific Investigations Report 2011-5144: Peak Flow Characteristics of Virginia Streams; Table 3"Existing Channel Section (StreamSTATS)(NTS) Capacity ComputationBankfull Q10 = 32.75 This "Existing Channel Section" demonstrates compliance with Flood Protection 9VAC25-870-66.C.1 & the Limits of Analysis 9VAC25-870-66.C.3. Natural Channel (Dense Grass n=0.024) 8' Wide BottomDBankfull=0.86' The "Bankfull Width & Depth" from the Regression Equation were Input for Channel Capacity Computation. The Post Developed Q10 is reduced, demonstrating compliance with Flood Protection 9VAC25-870-66.C.1 The Post Developed Q10 is reduced, demonstrating compliance with Flood Protection 9VAC25-870-66.C.1 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6006.dwg PLOTTED: 7/14/2022 2:21 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6006 BYNO.DATEREVISIONSDHOLC20001 ---- CJM ---- DLF SHEET APPROVED BY OF54 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWATER QUANTITY COMPLIANCE SUMMARY(STUDY POINTS 4-6)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 Storm Event 2 Yr. Storm 10 Yr. Storm Peak Q 4.04 cfs 10.68 cfs Flow Depth 0.45' 0.65' Velocity 4.20 fps 5.32 fps Runoff Computations Study Point 4 Summary In General This Study Point discharges to a Natural Channel. Concentrated Flow is Physically Spread to Sheet Flow by a Level Spreader at the Study Point. Other portions also discharge as Sheet Flow. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.3.a. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.1. Downstream, the Broad Swale has Capacity to Convey the Post-Development Q10 Peak Discharge. Limits of Analysis for Flood Protection The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.C.3.d. Site Discharge is Sheet Flow from a Level Spreader. Downstream Conveyance has the required capacity to prevent flooding during the 10Yr - 24Hr Storm Event. Downstream Velocities are Non-Erosive during the 2Yr - 24Hr Storm Event. Downstream Areas are Stabilized. On-Site E&S Controls are required to remain until the Site is Stabilized. Study Point 5 Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. Drainage to this Study Point during the Pre-Developed 10Yr - 24Hr Storm Event Floods this Area and Study Points 6 & 7. The Drainage Area to this Study Point has been reduced significantly, such that the Post-Developed 10Yr - 24Hr Storm Event No Longer Floods this Area. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.2.b. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. Flood Protection & Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3. The Existing Grate Inlet "Ex. 24.3", which begins the Downstream Conveyance is found to "Currently Experience Localized Flooding". See Sheet 50 - Off-Site Drainage & Over Land Relief Evaluation Study Point 6 Study Point 5 Study Point 4 4.5: 1 S l o p e 5:1 Slope Existing Channel Section SP4 - FP(NTS)D10 = 0.65'This "Existing Channel Section" demonstrates compliance with Flood Protection 9VAC25-870-66.C.1 & the Limits of Analysis 9VAC25-870-66.C.3.d Natural Channel (Dense Grass n=0.024) Study Point 6 Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. This Study Point experiences Flooding, during the Pre-Developed 10Yr - 24Hr Storm Event Floods along with Study Points 5 & 7. The Post-Developed 10Yr - 24Hr Storm Event No Longer Floods this Area. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.2.b. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. Flood Protection & Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3. The Existing Grate Inlet "Ex. 24.2", which begins the Downstream Conveyance is found to "Currently Experience Localized Flooding". See Sheet 50 - Off-Site Drainage & Over Land Relief Evaluation U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6007.dwg PLOTTED: 7/14/2022 2:21 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6007 BYNO.DATEREVISIONSDHOLC20001 ---- CJM ---- DLF SHEET APPROVED BY OF55 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWATER QUANTITY COMPLIANCE SUMMARY(STUDY POINTS 7-9)WINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 Study Point 7 Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. This Study Point experiences Flooding, during the Pre-Developed 10Yr - 24Hr Storm Event Floods along with Study Points 5 & 6. The Post-Developed 10Yr - 24Hr Storm Event No Longer Floods this Area. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.2.b. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. Flood Protection & Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3. The Existing Grate Inlet "Ex. 24.1", which begins the Downstream Conveyance is found to "Currently Experience Localized Flooding". See Sheet 50 - Off-Site Drainage & Over Land Relief Evaluation Study Point 9A & 9B Study Point 8 Study Point 7 Study Point 8 Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. This Study Point is at Existing Grate Inlet "Ex.7" in the Rear Yard of Existing Lot 14. See Sheet 51 - Off-Site Drainage & Over Land Relief Evaluation.. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.b. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.1. The Post-Development Q10 Peak Peak Flow is Conveyed Downstream through the Existing Storm Sewer System, having Adequate Capacity (Beginning at Ex. Structure 7 & Discharging at Ex Structure 1). See the "Storm Sewer Design Computations" on this Sheet. Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3.a. The Drainage From the Site to Existing Structure 1 is Less Than 1.0% of the Total CDA, to the same point. The Total CDA at Existing Structure 1 (Farmington Blvd Drainage Crossing) is Approximately 96 Acres, per a StreamSTATS Basin Delineation. The CDA to Study Point 8 is 0.80 Ac., or 0.83% of the Total CDA at the Limits of Analysis. Study Point 9A Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. This Study Point receives a small area of drainage from the proposed development. This drainage is collected within the Gutter Pan along Farmington Blvd. and Drains to a Curb Inlets, being Existing Structure 6. See the "Storm Sewer Design Computations" on this Sheet. Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.a. The Post-Development Q10 Peak Peak Flow is Conveyed Downstream through the Existing Storm Sewer at Non-Erosive Velocities. Accordingly, Post-Development Q2 Peak Peak Flow is Conveyed at Non-Erosive Velocities. Limits of Analysis for Channel Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.4.a. The Drainage From the Site to Existing Structure 1 is Less Than 1.0% of the Total CDA, to the same point. See the "Limits of Analysis for Flood Protection" below. Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.1. The Post-Development Q10 Peak Peak Flow is Conveyed Downstream through the Existing Storm Sewer System, having Adequate Capacity (Beginning at Ex. Structure 7 & Discharging at Ex Structure 1). See the "Storm Sewer Design Computations" on this Sheet. Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3.a. The Drainage From the Site to Existing Structure 1 is Less Than 1.0% of the Total CDA, to the same point. The Total CDA at Existing Structure 1 (Farmington Blvd Drainage Crossing) is Approximately 96 Acres, per a StreamSTATS Basin Delineation. The Contributing Drainage Area to Study Point 9A is 0.67Ac., or 0.70% of the Total Contributing Drainage Area at the Limits of Analysis. Study Point 9B Summary In General This Study Point discharges to a Man-Made Channel, being an Existing Storm Sewer System constructed as part of the Steeplechase Subdivision. This Study Point receives a small area of drainage from the proposed development. This drainage is collected within the Gutter Pan along Farmington Blvd. and Drains to a Curb Inlet, being Existing Structure 5.1. See the "Storm Sewer Design Computations" on this Sheet. Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.1.a. The Post-Development Q10 Peak Peak Flow is Conveyed Downstream through the Existing Storm Sewer at Non-Erosive Velocities. Accordingly, Post-Development Q2 Peak Peak Flow is Conveyed at Non-Erosive Velocities. Limits of Analysis for Channel Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.4.a. The Drainage From the Site to Existing Structure 1 is Less Than 1.0% of the Total CDA, to the same point. See the "Limits of Analysis for Flood Protection" below. Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.1. The Post-Development Q10 Peak Peak Flow is Conveyed Downstream through the Existing Storm Sewer System, having Adequate Capacity (Beginning at Ex. Structure 7 & Discharging at Ex Structure 1). See the "Storm Sewer Design Computations" on this Sheet. Limits of Analysis for Flood Protection The Limits of Analysis for Flood Protection is Satisfied by 9VAC25-870-66.C.3.a. The Drainage From the Site to Existing Structure 1 is Less Than 1.0% of the Total CDA, to the same point. The Total CDA at Existing Structure 1 (Farmington Blvd Drainage Crossing) is Approximately 96 Acres, per a StreamSTATS Basin Delineation. The Contributing Drainage Area to Study Point 9B is 0.66 Ac., or 0.69% of the Total Contributing Drainage Area at the Limits of Analysis. U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6008.dwg PLOTTED: 7/14/2022 2:22 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6008 BYNO.DATEREVISIONSDHOLC20001 ---- CJM DLF SHEET APPROVED BY OF56 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWATER QUANTITY COMPLIANCE SUMMARY (SP10) & SWM NARRATIVEWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 Winchester Landing Stormwater Management Narrative Overview The "Winchester Landing" project site is generally located in Frederick County, Virginia within the Redbud Magisterial District. This site is specifically located north of Senseny Road (Route 657), east of Greenwood Road (Route 656) and the "Briarwood Estates" Subdivision, west of Channing Drive and the "Lynnehaven" Subdivision, and south of the "Steeplechase" Subdivision. This property is identified as property identification number 55-(A)-201B and is currently zoned RP. This project proposes construction of Age-Restricted Community with Single Family Detached Lots, Townhouse Lots, Apartment Buildings, Public and Private Roads, associated utilities and various Stormwater Management Facilities. Facilities for management of Stormwater Quantity and Stormwater Quality are proposed to meet regulatory requirements. The site currently has no impervious land cover, excepting the Wetland Areas, one of which is to remain undisturbed, being outside of the Limits of Disturbance defined for this work. The Total Site Area is 33.61 acres, of which approximately 32.44 acres will be disturbed for construction. To meet Water Quality requirements, four (4) separate Level II Bio-Retention Facilities and a single Level I Wet Pond have been designed and proposed for construction. Pre-Development Conditions The site discharges surface runoff at ten (10) different locations. The drainage(s) flow to various Receiving Channels, which then convey stormwater further down gradient. Slopes range from less than 0.50% to approximately 15%. The Western Portion of the site has "Brushy" ground cover. The "Brushy" ground cover is approximately 13.10 Acres or (39.00% of the total site). An Overhead Electric Transmission Cable traverses the project site from the south to north, or vise versa. There are two poles on-site and the facility is located within a 150' Wide Easement, which totals 3.79 Acres or (11.25% of the total site). The remaining 16.72 Acres or (49.75% of the total site) of on-site ground cover is "Wooded" and considered to be in good condition. See the Pre-Development Drainage Map (Sheet 48). Post-Development Conditions The Post-Development Drainage Patterns are similar to the Pre-Development Drainage Patterns. The site still discharges surface runoff at ten (10) different locations. All Disturbed Areas will be stabilized and have Managed Turf or Impervious Ground Cover. See the Post-Development Drainage Map (Sheet 49). Water Quality Control (BMP) Water Quality Requirements for Phosphorus reduction are achieved on-site and by purchase of "Nutrient Credits. The total Phosphorous Reduction Required for this Development is To meet Water Quality requirements, four (4) separate Level II Bio-Retention Facilities and a single Level I Wet Pond have been designed and proposed for construction. These Facilities achieve a Combined Phosphorous Reduction of 18.37 lbs/yr. The Virginia Runoff Reduction Method for New Development Worksheet v3.0-2013 Draft Standards and Specifications was used to verify compliance of the water quality control requirements. The required phosphorus reduction for the site is 23.78 lbs/yr. The Proposed BMP Facilities, reduce the phosphorus load for this site by18.37 lbs/yr (77.25%). 5.41 lbs/yr (22.75%) of Nutrient Credits are necessary to be purchased, in order to meet the Total Required Phosphorous Reduction of 23.78 lbs/yr. Water Quantity Control (SWM) Water Quantity requirements for Channel Protection, Flood Protection and Limits of Analysis and flood protection are satisfied with five (5) small Catch Basins and a single Level I Wet Pond, in conjunction with Runoff Reduction through BMP design. Overall site design, in conjunction with proposed Stormwater Management Facilities allows for Post-Development Surface Runoff to be detained and released at a controlled rate. Channel Protection & Limits of Analysis for Channel Protection See the "MS-19 Compliance Summary" on Sheet ###################################### for a Summary of how Channel Protection & Limits of Analysis for Channel Protection are Satisfied at All Study Points. Sheets ## - ## offer detailed Analysis of each Study Point. Flood Protection & Limits of Analysis for Flood Protection See the "MS-19 Compliance Summary" on Sheet ###################################### for a Summary of how Channel Protection & Limits of Analysis for Channel Protection are Satisfied at All Study Points. Sheets ## - ## offer detailed Analysis of each Study Point. Summary The Water Quality Requirements are satisfied by achieving the required phosphorus load reduction through construction of On-Site BMP Facilities and the Purchase of Nutrient Credits. The storm water quantity requirements (channel and flood protection) are satisfied at all Study Points. The VA Runoff Reduction Method (VRRM) was used to verify BMP requirements were met. HydroFlow Hydrographs software was used to evaluate stormwater runoff. The design engineer shall be required to certify that the stormwater management facilities have been constructed in accordance with the approved plan. Study Point 10 Study Point 10 Summary In General This Study Point discharges to a Man-Made Channel, being a drainage channel constructed as part of the Steeplechase Subdivision. The Existing Channel, beginning Downstream Conveyance at the Rear of Existing Lot 13, does not have positive drainage. The area is a sump with Overland Relief near the adjacent property line at Ex. Lot 12. Catch Basin 5 is situated within this Drainage Area, Detaining Runoff for Controlled Release. Channel Protection & Limits of Analysis for Channel Protection Channel Protection is Satisfied by 9VAC25-870-66.B.3.a The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.B.4. The "Energy Balance Equation" is Satisfied at this Study Point. Flood Protection & Limits of Analysis for Flood Protection Flood Protection is Satisfied by 9VAC25-870-66.C.1. The Limits of Analysis for Channel Protection is Satisfied by 9VAC25-870-66.C.3.d. The Post-Development Peak Flow (Q10) is Less Than the Pre-Development Peak Flow (Q10) . The Existing Channel, beginning the Downstream Conveyance is found to "Currently Experience Localized Flooding", as Existing Lot 13 is currently in a Sump Condition. The Post-Development Q10.Peak Peak Flow is Less Than the Pre-Development Q10.Peak Flow. See Sheet 51 - Off-Site Drainage & Over Land Relief Evaluation ---- U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6009.dwg PLOTTED: 7/14/2022 2:22 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6009 BYNO.DATEREVISIONSDHOLC20001 ---- CJM ---- DLF SHEET APPROVED BY OF57 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTVIRGINIA RUNOFF REDUCTIONCOMPLIANCE SUMMARYWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 2.5' SIDEWALK ESMT.INST. NO. 040024106 FH 2 - WV's 3 - WV's WV EX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 15' WIDE SEWER ESMT.INST. NO. 030007982 15' WIDE W/L ESMT.15' WIDE W/L ESMT.W/M W/MEX. 24 " RCP VARIABLE WIDTH W/L ESMT.INST. NO. 010017843 EX. W/L (TYP.) EX. SAN. SEW. (TYP.) DECK LP 645.3923+46.16FF=654.10 GF=653.10 BF=645.50 FF=656.86 GF=655.86 BF=648.26 645 91 OLR 646 62 HP 8.3%8.0%2.1%4.5% 645 76 TC 645 74 TC 645 40 TC 645 41 TC 643 09 INV 648 0413 653 45 650 63 648 08 652 60 652 10 654 36 653 86 652 72 652 06 652 55 649 68 655 48 655 36 655 45 652 51 652 45 HP 646 62 650 81 TOP 648 00 TOP 652 60 651 50 OLR 650 10 HP 64056 INV642 642 644 644646 6 5 0 64 6 6 4 8 6 5 2 650646646646648652 654656 6 5 4 LOT 13 8,918 SF LOT 14 8,000 SF OPEN SPACE 3 0.3772 AC. ADT=1,123 21+00 22+00 23+00 24+00 PC 20+86.44PT 23+21.57EXTEND 4' SWLK WITH ASPHALT TRANSITION TO 10' ASPHALT MULTI-USE TRAIL 20' STORM ESMT STORM DRAINAGE & MAINT. ESMT 30" X 19" HEHDPE 30" X 19" HERCP 15" HDPE 15" HDPE 15" HDPE 15" H D P E 15 " H D P E 24" EX S T R M 1.8 1.9 1.3 1.4 6.2 6.3 6.1 1.2 EX9WATERLINE - G1 - 8" TEE 3 -8" GV 1 EX Catch Basin 2 100 Yr. WSE = 645.51'Top Berm = 646.75'See "Catch Basin 2 Weir Detail" (Sh. 58) PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 PATIOAREA FF=668.69 GF=667.69 BF=660.09 FF=669.70 GF=668.70 BF=661.10 FF=670.50 GF=669.50 BF=661.90 FF=671.15 GF=670.15 BF=662.55 FF=671.69 GF=670.69 BF=663.09 FF=671.73 GF=670.73 BF=663.13 664 27 6613166435 HP 28 665 31 665 66465 2.0%3.0%2.2%2.0%2.2%2.0%3.5%4.3%5.4%667 10 666 60 666 60 666 64 667 13 HP 667 75 666 50 666 50 666 30 666 30 666 50 666 50 667 00 667 00 664 25 HP 666 60 BP 667 10 667 10 667 00 667 00 666 80 666 80 667 00 667 00 667 50 667 50 666 69 BP 666 35 BP 666 55 BP 666 56 BP 667 00 BP 66100 LP 661 5066150 661 5066150662 662 664666 662 664 664 664 666 6 6 8 668668670 66 8 666 668 LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF 10' LANDSCAPE ESMT STORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT Top Berm = 664.50' See "Catch Basin 1 Weir Detail" (Sh. 58)100 Yr. WSE = 663.28' Catch Basin 1 100 Yr. WSE = 663.35' Level Spreader w/ Rigid Lip 10'(L) x 7'(W) x 0.5'(D) "See Detail" (Sh. 13) Catch Basin 1 - Outfall Weir Detail Not to Scale Bottom of Gabion Weir = 662.00' Top of Gabion Weir / Basket = 663.50' Top of Berm = 664.50' Earthen Berm Broad Crested Weir (100% Voids) Bottom Width = 11 lf, Top Width = 17 lf, Height = 1.00 vf Trapezoidal Weir Bottom Width = 2 lf Top Width = 11 lf Height = 1.5 vf Gabion Basket [12' (W) x 3' (H)] Buried 1.5' Min. (40% Voids) 1 - 12' Wide Basket 2' Wide Weir Bottom Effective Width @ (40% Voids) = 0.80' 17' Wide Clear Bottom of Gabion Basket = 660.50' 11' Wide Weir Top 6.5' Wide Weir @ Mid Depth (662.75') Effective Width @ (40% Voids) = 2.60'3' Tall Basket100 Yr. W.S.E. = 663.41'BasketBuried 1.5'3:1 Slope3:1 Slop e Notes: 1. Armor Catch Basin Spillway with N.A.G. C350 Permanent Erosion Matting or Approved Equal. 2. Gabion Stone Sizes Range from 4" - 8" (6" Average). 3. Install Non-Woven Geo-Textile Fabric at all Buried Edges of the Gabion Basket(s). 4. Fill Any Voids occuring between the Excavated Area and the Gabion Basket with No. 57 Stone. Geo-Textile Fabric (See Note 3) Fill Voids (See Note 4) Gabion Stones (See Note 2) Catch Basin 2 - Outfall Weir Detail Not to Scale Bottom of Gabion Weir = 644.00' Top of Gabion Weir / Basket = 645.75' Top of Berm = 646.75' Broad Crested Weir (100% Voids) Bottom Width = 13 lf, Top Width = 19 lf, Height = 1.00 vf Trapezoidal Weir Bottom Width = 4 lf Top Width = 13 lf Height = 1.5 vf Gabion Basket [12' (W) x 3' (H)] Buried 1.5' Min. (40% Voids) 15' Wide Basket (1 - 9' Wide & 1 - 6' Wide Basket) 19' Wide Clear Bottom of Gabion Basket = 642.50' 13' Wide Weir Top 3' Tall Basket100 Yr. W.S.E. = 646.17'BasketBuried 1.5'3:1 Slope 3:1 Slop e 4' Wide Weir Bottom Effective Width @ (40% Voids) = 1.60' 8.5' Wide Weir @ Mid Depth (645.50') Effective Width @ (40% Voids) = 3.40' Earthen Berm Notes: 1. Armor Catch Basin Spillway with N.A.G. C350 Permanent Erosion Matting or Approved Equal. 2. Gabion Stone Sizes Range from 4" - 8" (6" Average). 3. Install Non-Woven Geo-Textile Fabric at all Buried Edges of the Gabion Basket(s). 4. Fill Any Voids occuring between the Excavated Area and the Gabion Basket with No. 57 Stone. Fill Voids (See Note 4) Gabion Stones (See Note 2) Geo-Textile Fabric (See Note 3)U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6010.dwg PLOTTED: 7/14/2022 2:26 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6010 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF58 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTCATCH BASINS 1 & 2 PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 00 30'60'Catch Basin 1 Plan View Scale: 1" = 30'NORTHNORTH00 30'60'Catch Basin 2 Plan View Scale: 1" = 30' BF=656.38 6.4%3.3%659 98 659 98 659 48 659 48 650 651 55 655 18 654 653 68 654 68 657 89 657 39 656 39 656 89 658 36 658 36 657 39 657 39 660 660 656 658658 662650 650 652 652 652654 654654656658 8,615 SF LOT 19 8,609 SFLOT 20 8,427 SF OPEN SPACE 1 15.4709 AC.6" HDPE6" HDPE1.6 CB1 CB2 58 00 TB5800 TB 57 00 Weir 50 50 Weir 48 50 Inv 50 50 Weir 53 50 TB 53 50 TB 58 00 TB 57 50 Cap 51 50 Inv See "Catch Basin 3 Weir Detail" (Sh. 59) 100 Yr. WSE = 652.39' 71.78' - 6" HDPE Oufall @ 0.70% 1 - 6" Perforated Under Drain 1 - 6" Observation Well (See Detail Sh. 65) 64.80' - 6" Solid Wall Under Drain Pre-Treatment 5' Wide Grass Strip (Min.) 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting BIO-RET B Catch Basin 3 FF=671.38 GF=670.38 BF=662.78 W/O FF=664.98 GF=663.98 BF=656.38 661 03 OLR 2.0%662 11 661 61 662 11 661 61 669 2966981 667 48 HP 659 98 659 98 663 4866369 659 48 659 48 663 41 TC 661 61 BP 662 58 663 82 EP 663 56 TC 663 60 CL 660662664664 663 99 HP 663 92 663 82 TC66315 EP 663 02 TC 662 35 EP 662 35 TC66332 664 82 EC 664 77 EC 664 87 EC 664 92 EC 664 28 FC 664 16 EP 664 32 FC 663 79 663 89 EC 663 68 TC 663 55 TC 2.4%LOT 20 8,427 SF LOT 21 8,001 SF 10+00OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAIL5' CONC SWLKCG-12C CG-12B 20' STORM ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT 18" HDPE8" HDPE 2.1 CB3 CB4 30'FREDERICK WATER ESMT.4A 60 50 Cap 57 00 Weir 60 00 Weir 58 00 TB 61 00 TB 61 00 TB 56 00 56 00 58 00 TB 58 00 TB5800 TB 57 00 Weir 59 00 TOP 58 05 Inv 57 50 Cap 58 00 TB 57 50 Cap 61 50 TOP 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting 1 - 6" Perforated Under Drain 1 - 6" Observation Well (See Detail Sh. 65) Treatment Cell Storage Elevation = 660.00' 133.66' - 6" Solid Wall Under Drain Pre-Treatment Cell Storage Elevation = 657.00' See "Gabion Weir Detail" (Sh. 65) 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail 1 - 6" Perforated Under Drain Pre-Treatment 5' Wide Grass Strip (Min.) 98.72' - 6" Solid Wall Under Drain 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting Pre-Treatment 5' Wide Grass Strip (Min.) See Inflow Energy Dissapation Structure Detail, Sheet Catch Basin 4 Catch Basin 3 - Outfall Weir Detail Not to Scale Bottom of Gabion Weir = 650.50' Top of Gabion Weir / Basket = 651.50' Top of Berm = 653.50' Broad Crested Weir (100% Voids) Bottom Width = 13 lf, Top Width = 19 lf, Height = 1.00 vf Trapezoidal Weir Bottom Width = 4 lf Top Width = 13 lf Height = 1.5 vf Gabion Basket [12' (W) x 3' (H)] Buried 1.5' Min. (40% Voids) 15' Wide Basket (1 - 9' Wide & 1 - 6' Wide Basket) 19' Wide Clear Bottom of Gabion Basket = 649.00' 13' Wide Weir Top 3' Tall BasketBasketBuried 1.5'3:1 Slope 3:1 Slop e 1.6' Wide Weir Bottom Effective Width @ (40% Voids) = 0.40' 8.5' Wide Weir @ Mid Depth (664.75') Effective Width @ (40% Voids) = 3.40' Earthen Berm Notes: 1. Armor Catch Basin Spillway with N.A.G. C350 Permanent Erosion Matting or Approved Equal. 2. Gabion Stone Sizes Range from 4" - 8" (6" Average). 3. Install Non-Woven Geo-Textile Fabric at all Buried Edges of the Gabion Basket(s). 4. Fill Any Voids occuring between the Excavated Area and the Gabion Basket with No. 57 Stone. Fill Voids (See Note 4) Gabion Stones (See Note 2) Geo-Textile Fabric (See Note 3) 100 Yr. W.S.E. = 664.96'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6011.dwg PLOTTED: 7/14/2022 2:29 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6011 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF59 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTCATCH BASINS 3 & 4 PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 NORTHNORTH00 30'60'Catch Basin 4 Plan View Scale: 1" = 30' 00 30'60'Catch Basin 3 Plan View Scale: 1" = 30' PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE DECKPATIO SHED PATIOAREA FF=668.69 GF=667.69 BF=660.09 FF=669.70 GF=668.70 BF=661.10 FF=670.50 GF=669.50 BF=661.90 FF=671.15 GF=670.15 BF=662.55 FF=671.69 GF=670.69 BF=663.09 664 27 66131 66153 664 25 66435 HP66466 HP 663 98 OLR 663 75 LP 664 28 660 00 LP 663 61 HP 662 76 666 17 HP 66531 666 88 665 82 664 65 665 89 665 17 HP 2.0%3.0%2.2%2.0%2.2%2.2%2.0%3.5%4.3%5.4%666 10 667 10 666 60 663 32 BP 666 60 666 64 667 13 HP 667 75 HP 667 10 667 10 668 55 HP 666 50 666 50 666 30 666 30 666 50 666 50 669 32 664 25 HP 662 34 666 60 BP 667 10 667 10 667 00 667 00 666 80 666 80 667 00 667 00 666 69 BP 666 35 BP 666 55 BP 666 56 BP 667 10 667 10 668 33 669 12 669 65 669 77 670 19 670 31 66100 LP 661 5066150 661 5066150 662 662 664 666 662662 664 664 664 666 6686 6 8 668668LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF 10' LANDSCAPE ESMT STORM DRAINAGE & MAINT. ESMT Top Berm = 664.50' See "Catch Basin 1 Weir Detail" (Sh. 58)100 Yr. WSE = 663.28' Catch Basin 1 Catch Basin 5 100 Yr. WSE = 663.35' See "Catch Basin 5 Weir Detail" (Sh. 60) Level Spreader w/ Rigid Lip 10'(L) x 7'(W) x 0.5'(D) "See Detail" (Sh. 13) Catch Basin 5 - Outfall Weir Detail Not to Scale 10° V Notch Weir Invert = 662.00' Catch Basin Bottom = 662.00' Top of Weir Wall = 663.50' Top of Berm = 664.50' Earthen Berm 100 Yr. W.S.E. = 663.35' Rectangular Weir Width =1 lf Height = 0.7 vf 6' Wide Weir Wall Bottom of Weir Wall = 660.50'4' Tall Weir WallBuried 2.5'3:1 Slope3:1 Slop e V Notch Weir Θ = 10° Height = 0.80 vf 1.0'(W) x 0.7'(H) Rectangular Weir Invert = 662.80' Prop. Grade U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6012.dwg PLOTTED: 7/14/2022 2:31 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6012 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF60 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTCATCH BASIN 5 PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 NORTH00 30'60'Catch Basin 5 Plan View Scale: 1" = 30' WETLANDSCHANNEL243 LF FF=664.37 GF=664.04 FF=664.37 GF=664.04 FF=663.98 GF=663.65 FF=663.31 GF=662.98 FF=663.98 GF=663.65 FF=663.98 GF=663.65 FF=662.71 GF=662.38 FF=662.71 GF=662.38 FF=662.34 GF=662.01 FF=662.34 GF=662.01 FF=661.67 GF=661.34 FF=661.67 GF=661.34 FF=661.67 GF=661.34 5.8% 6.4% 6.1% 6.1% 6.3% 6.3% 6.5% 6.7% 3:1 2.0%2.0% 2.0%2.0%3:13:1 3:1 6.6% 6.4% 6.1% 7.5% 8.0% 663 86 663 75 662 17 662 58 662 34 66177 66166 66142 66118 660 94 660 70 663 66 663 07 HP 663 27 66150 660 84 660 67 663 27 662 00 66163 660 96 660 41 662 05 66143 HP 662 95 662 63 662 31 662 21 662 10 662 00 66134 66100 660 67 660 67 66171 66192 662 14 662 23 662 50 662 77 663 77 662 57 662 80 663 10 663 01 660 67 660 50 660 34 660 1766067 66147 660 02 66152 660 12 66113 659 78 66120 659 54 66107 659 30 658 60 TC 662 87 663 37 663 37 662 98 663 37 663 09 660 84 BP 662 48 BP 3:1 650 66 0 648 648652 654 656 6 5 8 662 664 656662 650 650 652 652 654 654 656 656 650650652652654654656656660656656658662662 CG-12ALOT 169 2,556 SF LOT 170 3,621 SF LOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SF OPEN SPACE 1 15.4709 AC. 5.5' PED ESMT.CG-9B (TYP)5' CONC SWLK5' CONC SWLK20' STORM ESMT STORM DRAINAGE & MAINT. ESMT D 13.1 11.1 10.1 10.2 11.3 13.2 10.3 10.4 10.5 48 70 50 00 Weir 48 50 47 00 47 50 InvTop Berm = 657.33'10' Wide Aquatic / Safety BenchEx. 243 lf Wetland Channel To Remain Undisturbed T o p B e r m = 6 5 6 . 0 0 ' Top Berm = 657.33' Top Berm = 657.33' Normal Pool Water Surface Elevation = 650.00' Water Surface Area = 12,260 ft2 Actual Storage Depth = 4.00 ft Provided Storage Volume = 27,043 ft3 Tv = Required Storage Volume = 25,103 ft3 PRINCIPAL RISER See Principal Riser Details for All Design Elevations 12" SCH. 40 PVC (Reverse Sloped) & VDOT Std. EW-1 See "Wet Pond Forebay 1 - Outfall Weir Detail" (Sh. 58) See "Wet Pond Forebay 2 - Outfall Weir Detail" (Sh. 58) Provide Positive Drainage across the Pond Bottom to Pond Drain InletLimits of Normal Pool @ WSE = 650.00'100 Yr. WSE = 655.07' WET POND Forebay 2 Forebay 1 100 Yr. WSE = 653.16' 100 Yr. WSE= 655.23' Provide "Wet Well" Being a Point of Access to Place Pumps & Drain Pond. VDOT Std. MH-1. Top = 657.33' Invert In = 646.00' 80' - 4" DIP @ 0.94% (Pond Drain to Wet Well) Ditch C See Sheet 72 3" Low Flow Orifice (Debris Cage Omitted for Clarity) Wet Pond- Principal Riser Plan Not to Scale 5' Ø Riser Structure per AASHTO M199 58' - 24" RCP CL. III @ 4.31% (See Note 5) Plastic Solutions Inc. Round Series Trash Rack, Part # = RS 60 (Not Shown, See Detail Sh. 16) Wet Pond - Principal Riser Elevation Not to Scale 3" Low Flow Orifice (Debris Cage Omitted for Clarity) 58' - 24" RCP CL. III @ 4.31% (See Note 5) Rectangular Weir [48" (W) x 6" (H)] Rectangular Weir [24" (W) x 2.4" (H)] Plastic Solutions Inc. Round Series Trash Rack, Part # = RS 60 (See Detail Sheet 16) 6" Minimum Wall Thickness 6" Minimum Wall Thickness Note: All References to Note Numbers in this Detail are shown on the "Wet Pond Principal Riser Section", on this Sheet. 9' Ø x 8" Thick Conc. Base (See Note 1) Rectangular Weir [30" (W) x 9.6" (H)] 25' - 12" SCH 40 PVC (Reverse Sloped) Fill Riser w/ 2.0' Concrete to the Flow Line Rectangular Weir [48" (W) x 6" (H)] Rectangular Weir [24" (W) x 2.4" (H)] Rectangular Weir [30" (W) x 9.6" (H)] 25' - 12" SCH 40 PVC (Reverse Sloped) Note: All References to Note Numbers in this Detail are shown on the "Wet Pond Principal Riser Section", on this Sheet. Wet Pond - Principal Riser Section Not to Scale Trash Rack (See Note 6) Earthen Berm (See Note 4) 9' Ø x 8" Thick Conc. Base (See Note 1)3:1 Side Slope3: 1 S i d e S l o p e 5' Ø Riser Structure per AASHTO M199 Ex. Grade Proposed Outlet Protection (See Table Sheet #12)3" Ø Low Flow Orifice & 12" PVC Invert = 650.00' Top of Embankment = 657.33' 10 Yr. W.S.E. = 653.50' 100 Yr. W.S.E. = 655.07' 1 Yr. W.S.E. = 652.57' 58' - 24" RCP CL. III @ 4.32% (See Note 5) 25 Yr. W.S.E. = 654.03' Debris Cage (See Note 2) Notes: 1.Concrete Base & Inside Concrete Fill Provide Anti- Floatation Anchoring. Embed the Principal Riser at least 6" into the Concrete Base. (See Plate 3.14-3, Sheet #14). 2.Plastic Solutions Inc. Stormrax Flush Mount Debris Cage or Approved Equal (See Detail, Sheet #14) 3. Connect the Concrete Slab Elevating the VDOT Std. EW-1, Using 1" Ø Steel Rod Dowel @ 6" O.C. 4. See "Earthen Embankments Note" on Sheet 7 for further guidance relative to construction of the Embankment, including the Cutoff Trench 5.Install the Riser Outfall Pipe per ASTM C-361 (Rubber Gaskets W.T. Joints) 6.Plastic Solutions Inc. Round Series Trash Rack, Part #RS 60 (Bolted to Structure W/ 2" SS Anchor Bolts) (See Detail, Sheet #14) Fill Riser w/ 2.0' Concrete to the Flow LineInv. = 650.00' Inv. = 647.50' 8' Embankment 25' - 1 2 " S C H 4 0 P V C (Reve r s e S l o p e d ) VDOT Std. EW-1 (Anchor EW-1 to Conc. Slab - See Note 3) Inv. = 647.00' Normal Pool W.S.E. = 650.00' Principal Riser Bottom = 648.00' 2 Yr. W.S.E. = 652.80' Principal Riser Crest = 654.00' Rectangular Weir = 653.50' [48" (W) x 6" (H)] Rectangular Weir = 652.70' [30" (W) x 9.6" (H)] Rectangular Weir = 652.50' [24" (W) x 2.4" (H)] STORM 10.1 TO 10.3 - WET POND OUTFALL STRUCTURE HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 635 640 645 650 655 660 665 670 675 635 640 650 660 670 9+50647.210+00648.7648.00650.9652.6811+00652.7647.00653.2650.0512+00654.2659.43RIM=654.0010.2 - 60" RISERINV IN 650.00 (10.3)INV OUT 650.00 (10.1)10+58FIN. GRADE EX. GRADERIM=648.9410.1 - ES-1 (15")INV IN 647.50 (10.2)10+0010+81.4910.3EW-1-12SEE "WET POND - PRINCIPAL RISER SECTION" FOR FURTHER DETAIL, SHEET 61 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6020.dwg PLOTTED: 7/14/2022 2:33 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6020 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF61 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWET POND PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061NORTH 00 30'60'Wet Pond Plan View Scale: 1" = 30' Wet Pond Forebay 1 - Outfall Weir Detail Not to Scale Bottom of Gabion Weir = 650.00' Top of Gabion Weir / Basket = 654.00' Top of Berm = 657.33' Broad Crested Weir (100% Voids) Bottom Width = 6 lf, Top Width = 26 lf, Height = 3.33 vf Gabion Basket [9' (W) x 6' (H)] Buried 2.0' (40% Voids) 9' Wide Basket 6' Wide Clear Bottom of Gabion Basket = 648.00' 3' Wide Weir 100 Yr. W.S.E. = 653.16'Basket Buried 2.0'3:1 Slope 3:1 Slop e 1' Wide Weir Bottom Effective Width @ (40% Voids) = 0.40' Earthen Berm Notes: 1. Armor Catch Basin Spillway with N.A.G. C350 Permanent Erosion Matting or Approved Equal. 2.Gabion Stone Sizes Range from 4" - 8" (6" Average). 3.Install Non-Woven Geo-Textile Fabric at all Buried Edges of the Gabion Basket(s). 4. Fill Any Voids occuring between the Excavated Area and the Gabion Basket with No. 57 Stone. Fill Voids (See Note 4) Gabion Stones (See Note 2) Geo-Textile Fabric (See Note 3) Bottom of Gabion Weir = 651.00' Wet Pond Forebay 2 - Outfall Weir Detail Not to Scale Bottom of Gabion Weir = 650.00' Top of Gabion Weir / Basket = 654.00' Top of Berm = 656.00' Broad Crested Weir (100% Voids) Bottom Width = 6 lf, Top Width = 18 lf, Height = 2.0 vf Gabion Basket [9' (W) x 6' (H)] Buried 2.0' (40% Voids) 9' Wide Basket 6' Wide Clear Bottom of Gabion Basket = 648.00' 3' Wide Weir 100 Yr. W.S.E. = 655.23'Basket Buried 2.0'3:1 Slope 3:1 Slop e 1' Wide Weir Bottom Effective Width @ (40% Voids) = 0.40' Earthen Berm Notes: 1.Armor Catch Basin Spillway with N.A.G. C350 Permanent Erosion Matting or Approved Equal. 2. Gabion Stone Sizes Range from 4" - 8" (6" Average). 3. Install Non-Woven Geo-Textile Fabric at all Buried Edges of the Gabion Basket(s). 4. Fill Any Voids occuring between the Excavated Area and the Gabion Basket with No. 57 Stone. Fill Voids (See Note 4) Gabion Stones (See Note 2) Geo-Textile Fabric (See Note 3) Bottom of Gabion Weir = 651.00'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6021.dwg PLOTTED: 7/14/2022 2:33 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6021 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF62 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTWET POND COMPUTATIONS,NARRATIVES & DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 VA DCR Stormwater Design Specification No. 14, Wet Pond, Ver. 2.0 January 1, 2013 SECTION 8: CONSTRUCTION 8.1 Construction Sequence The following is a typical construction sequence to properly install a wet pond. The steps may be modified to reflect different wet pond designs, site conditions, and the size, complexity and configuration of the proposed facility. Step 1: Use of Wet Pond as an E&S Control. A wet pond may serve as a sediment basin during project construction. If this is done, the volume should be based on the more stringent sizing rule (erosion and sediment control requirement vs. water quality treatment requirement). Installation of the permanent riser should be initiated during the construction phase, and design elevations should be set with final cleanout of the sediment basin and conversion to the post-construction wet pond in mind. The bottom elevation of the wet pond should be lower than the bottom elevation of the temporary sediment basin. Appropriate procedures should be implemented to prevent discharge of turbid waters when the basin is being converted into a wet pond. Step 2: Stabilize the Drainage Area. Wet ponds should only be constructed after the contributing drainage area to the pond is completely stabilized. If the proposed pond site will be used as a sediment trap or basin during the construction phase, the construction notes should clearly indicate that the facility will be de-watered, dredged and re-graded to design dimensions after the original site construction is complete. Step 3: Assemble Construction Materials on-site, make sure they meet design specifications, and prepare any staging areas. Step 4: Install E&S Controls prior to construction, including temporary de-watering devices and stormwater diversion practices. All areas surrounding the pond that are graded or denuded during construction must be planted with turf grass, native plantings, or other approved methods of soil stabilization. Step 5: Clear and Strip the project area to the desired sub-grade. Step 6: Excavate the Core Trench and Install the Spillway Pipe. Step 7: Install the Riser or Outflow Structure, and ensure the top invert of the overflow weir is constructed level at the design elevation. Step 8: Construct the Embankment and Any Internal Berms in 8- to 12-inch lifts, or as directed by geotechnical recommendations, and compact as required with appropriate equipment. Step 9: Excavate/Grade until the appropriate elevation and desired contours are achieved for the bottom and side slopes of the pond. Step 10: Construct the Emergency Spillway in cut or structurally stabilized soils. Step 11: Install Outlet Protection, including emergency and primary outlet apron protection. Step 12: Stabilize Exposed Soils with temporary seed mixtures appropriate for the pond buffer. All areas above the normal pool elevation should be permanently stabilized by hydroseeding or seeding over straw. Step 13: Plant the Pond Buffer Area, following the pond landscaping plan (Section 6.7). 8.2 Construction Inspection Multiple inspections are critical to ensure that stormwater ponds are properly constructed. ·Inspections are recommended during the following stages of construction: ·Pre-construction meeting ·Initial site preparation (including installation of E&S controls) ·Excavation/Grading (interim and final elevations) ·Installation of the embankment, the riser/primary spillway, and the outlet structure ·Implementation of the pond landscaping plan and vegetative stabilization ·Final inspection (develop a punchlist for facility acceptance) Upon final inspection and acceptance, the GPS coordinates for all wet ponds should be logged for entry into the VSMP Authority’s BMP maintenance tracking data base. A construction phase inspection checklist for Wet Ponds can be accessed at the end of this specification. VA DCR Stormwater Design Specification No. 14, Wet Pond, Ver. 2.0 January 1, 2013 SECTION 6: DESIGN CRITERIA 6.4 Required Geotechnical Testing Soil borings should be conducted within the footprint of the proposed embankment, in the vicinity of the proposed outlet structure, and in at least two locations within the proposed wet pond treatment area. Soil boring data is needed to (1) determine the physical characteristics of the excavated material to determine its adequacy as structural fill or other use, (2) determine the need and appropriate design depth of the embankment cut-off trench; (3) provide data for structural designs of the outlet works (e.g., bearing capacity and buoyancy), (4) determine the depth to groundwater and bedrock and (5) evaluate potential infiltration losses (and the potential need for a liner). Guidance on soil explorations in general can be found in Appendix 8-A of Stormwater Design Specification No. 8 (Infiltration). VA DEQ Stormwater Design Specification Introduction: Appendix A: Earthen Embankment SECTION A-7: Design Criteria A geotechnical engineering study should evaluate the stability of the proposed embankment and should consist of (1) a site investigation, (2) laboratory testing, and (3) an engineering analysis. 1. A field investigation should include the review of available soils information and a subsurface exploration. Test borings, test pits, or both, should be used to evaluate the foundations, abutments, borrow materials, reservoir area, embankment design and any other pertinent geological considerations. In areas underlain by Karst limestone, a subsurface profile using seismic or sonar technology should be considered to verify that subsurface anomalies do not exist. This type of subsurface investigation may also be recommended in areas known to have been previously mined for mineral extractions. 2. Laboratory testing should be completed to evaluate the various soils. At a minimum, an index property test should be completed to classify the soils following the Unified Soil Classification System. Shear strength, compressibility, and permeability testing may be required depending upon the size and complexity of the embankment and the nature of the site’s subsurface conditions. 3. A geotechnical engineer should do an engineering analysis and present his or her findings, recommendations and comments on items such as: foundation materials and preparation; design of interior drainage features and filters; and geotechnical design of conduits/structures through the embankment, including seepage and stability analyses. The engineer should also provide a summary describing the soil types and rock strata encountered and explaining the laboratory tests and their results. 18" Ø Nyloplast Drain Basin (See Detail, Sh. )36" Bio-RetentionSoil Media18" Sump6" Cleanout RiserBio-Retention Facility B - Schematic Cross Section Not to Scale12"Inv. = 663.00' 6" PerforatedUnderdrain 6" Perforated Underdrain (Invert = 662.00) 36" Soil Media Layer (Bottom = 652.75 3" Choker Stone Layer (Bottom = 652.50) 18" Stone Reservoir Layer (Bottom = 651.00) 36" Soil Media Layer (Top = 655.75) 3" Turf Layer (Top = 656.00) 37' - 6" Solid Wall Pipes(Underdrain fromBio-Retention Facilities) Inv. = 663.00' 155' - 6" Solid WallPipe @ 0.32% Geo-Textile Fabric Place Geo-Textile Fabric on top of the choker layer. Position the Filter Fabric to be centered about the Underdrain and extending 1ft. to 2 ft. beyond either side of the Underdrain. Inv. = 652.50' Top of Berm = 658.00 Finished Grade 6' Wide Weir = 657.00(Shown for Reference Elevation) 12" Storage Depth3" ThickConc. Apron Cap = 657.50 Cleanout Riser See Bio-Retention Cleanout Detail Geo-Textile Fabric Use a Non-Woven Geo-Textile Fabricwith a flow rate of > 110 gal./min/s.f.(e.g., Geotex 351 or Equivalent) 66 0 654 656 65866266 4 652 7+00 8+00 9+00 10+00 0+001+002+003+00WATERLINE - A 30'FREDERICK WATER ESMT.FF=664.98 GF=663.98 BF=656.38 FF=660.89 GF=659.89 BF=652.29 FF=665.03 GF=664.70 FF=665.03 GF=664.70 FF=665.03 GF=664.70 FF=663.36 GF=662.36 BF=654.76 661 03 OLR 4.1%4.9%4.9%3.8% 4.1% 4.6% 2.1%6.4%3.4%3.3%2.0%2.0%2.0%1.0%1.0%662 93 TC 662 87 TC 662 79 663 64 659 98 659 98 663 4866369 659 48 659 48 659 39 659 51 659 48 657 89 657 39 659 32 HP 661 79 HP 661 95 661 86 658 36 661 98 658 36 657 39 657 39 660 91 663 64 TC 663 40 664 23 664 19 664 08 663 30 663 06 664 32 HP 663 41 TC 662 21 660 22 66128 HP 663 00 TC 663 82 EP 663 56 TC 663 60 CL 663 25 CL 663 36 TC 664 03 663 53 663 59 663 31 663 81 663 42 660 656 658662 66 2 662 662 664 660652654656658662664 663 99 HP 663 82 TC66315 EP 663 02 TC 662 35 EP 66134 EP 662 35 TC 66162 TC 663 32 EP 664 82 EC 664 77 EC 664 87 EC 664 92 EC 664 28 FC 664 16 EP 664 32 FC 663 74 EC 663 79 EC 663 89 EC 663 68 TC 663 55 TC 2.4%57 00 Weir 58 00 TB 56 00 56 00 58 00 TB 58 00 TB5800 TB 57 00 Weir 59 00 TOP 58 05 Inv 57 50 Cap 58 00 TB 57 50 Cap 51 50 Inv6150 TOP 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting 133.66' - 6" Solid Wall Under Drain Pre-Treatment Cell Storage Elevation = 657.00' Treatment Cell Storage Elevation = 657.00' See "Gabion Weir Detail" (Sh. 65) 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail 1 - 6" Perforated Under Drain 1 - 6" Observation Well (See Detail Sh. 65) 64.80' - 6" Solid Wall Under Drain Pre-Treatment 5' Wide Grass Strip (Min.) 98.72' - 6" Solid Wall Under Drain 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting 1 - 6" Cleanout See Inflow Energy Dissapation Structure Detail, Sheet BIO-RET B Catch Basin 4 RM2CG-12A8LOT 18 8,615 SF LOT 19 8,609 SFLOT 20 8,427 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF10+0011+005.5' PED ESMT.10'18' 5' CONC SWLK OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAILOPEN SPACE 1 15.4709 AC.5' CONC SWLK5' CONC SWLK119'22'NO PARK22'10'20'CG-12C CG-12B 5' CONC SWLK 4A 8" SDR-35/26 @ 0.50%S4B8" SDR-35/26 @ 0.50%S4ACO CO CO 20' STORM ESMT20' STORM ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT18" HDPE8" HDPE 2.1 11.6 CB3 CB4 19.2 15" HDPE STORM ESMT. 66 0 67065866266 4 66666 8 660 656 658 662 664 FH 3+00 4+00 5+00 6+00 7+00 0+001+002+003+00WATERLINE - A FREDERICK WATER ESMT. 30'FREDERICK WATER ESMT.1 - 8" TEE 3 -8" GV ARV FF=664.24 GF=663.91 FF=664.91 GF=664.58 FF=664.91 GF=664.58 FF=665.58 GF=665.25 FF=665.58 GF=665.25 FF=666.25 GF=665.92 FF=666.92 GF=666.59 FF=666.92 GF=666.59 FF=669.17 GF=668.84 FF=668.50 GF=668.17 FF=667.83 GF=667.50 FF=668.50 GF=668.17 FF=669.17 GF=668.84 FF=671.38 GF=670.38 BF=662.78 FF=671.38 GF=670.38 BF=662.78 FF=671.57 GF=670.57 BF=662.97 W/O W/O W/O W/O FF=671.77 GF=670.77 BF=663.17 FF=665.03 GF=664.70 FF=665.03 GF=664.70 661 03 OLR 3.1%4.0%4.0%3.8%4.2%4.1%3.4%3.7%4.5%5.0%6.2%7.3%3.8% 4.1%2.0%2.0%2.1%2.0%2.0%2.0%1.0%1.0%2.0%2.8%3.2% 662 87 TC6635366353664206642066447664806654066621665806659566660 665 90 HP 664 60 BP 667 016673966839 72 668 06 31 667 72 50 668 00 670 00 669 50 666 94 669 35 HP 666 76667376679666855 667 00 662 50 662 30 661 80 662 30 661 80 662 11 662 11 662 11 661 61 662 11 66161 670 00 669 29670076702767036 668 74 670 16 670 00 669 81 669 50 HP66935 HP 669 74 HP 667 48 HP 666 56 663 64 TC 663 40 664 23 664 19 663 30 664 32 HP 00 667 50 668 00 667 50 668 50 668 00 668 50 668 00 662 63 TC 663 41 TC 668 36 667 76 667 17 663 53 666 21 663 536638766420664546648766554665886666066712667466677966813 668 00 BP 667 50 BP 667 50 BP 661 85 BP 661 61 BP 661 61 BP 661 61 BP 66161 661 61 666 00 662 00 663 03 HP 662 68 662 58 663 00 TC 663 82 EP 663 56 TC 663 60 CL 663 25 CL 663 36 TC 668 75 TC 666668664662 664 66 0 66 2 664 666 666 66 8 662664666668668 664 666 663 99 HP 663 92 663 82 TC66315 EP 663 32 EP 664 82 EC 664 77 EC 664 87 EC 664 92 EC 664 28 FC 664 16 EP 664 32 FC 663 74 EC 663 79 EC 663 89 EC 663 68 TC 663 55 TC 2.4%60 50 Cap 60 00 Weir6050 Cap 59 00 61 00 TB 61 00 TB 60 00 Weir 61 00 TB 59 00 58 05 Inv 61 00 TB 61 50 TOP 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting Pre-Treatment Cell Storage Elevation = 660.00' 1 - 6" Perforated Under Drain 1 - 6" Observation Well (See Detail Sh. 65) 1 - 6" Cleanout Treatment Cell Storage Elevation = 660.00' 133.66' - 6" Solid Wall Under Drain See "Gabion Weir Detail" (Sh. 65) 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail 98.72' - 6" Solid Wall Under Drain Pre-Treatment 5' Wide Grass Strip (Min.) BIO-RET A 100 Yr. WSE = 661.28'OLR = 661.05 @ Sag inMulti-Use Trail 8LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 166 2,556 SF LOT 165 3,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFFARMINGTON BLVD. 55' ROW - 25 MPH CG-6 10+005.5' PED ESMT.10'18' 5' CONC SWLK 5' CONC SWLK OPEN SPACE 1 15.4709 AC.10' ASPHALT MULTI-USE TRAIL5.5' PED ESMT.5' CONC SWLK5' CONC SWLK11NO PARK22'CG-12C CG-12B 5' CONC SWLK 4A 8" SDR-35/26 @ 0.50%S4B8" SDR-35/26 @ 0.50%S4A4B1 CO CO CO CO 6B1 20' STORM ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT 18" HDPE 15" HDPE3.3 11.6 4.1 CB4 Bio-Retention Facility A - Schematic Cross Section Not to Scale 3" ThickConc. Apron Top of Berm = 661.00 6" Perforated Underdrain (Invert = 655.00) 36" Soil Media Layer (Bottom = 655.75) 3" Choker Stone Layer (Bottom = 655.50) 18" Stone Reservoir Layer (Bottom = 654.00) 36" Soil Media Layer (Top = 658.75) 3" Turf Layer (Top = 659.00) Cap = 660.50Cleanout Riser See Bio-Retention Cleanout Detail Inv. = 655.00' Finished Grade 6' Wide Weir = 660.00(Shown for Reference Elevation) 12" Storage Depth Geo-Textile Fabric Use a Non-Woven Geo-Textile Fabric with a flow rate of > 110 gal./min/s.f.(e.g., Geotex 351 or Equivalent) Geo-Textile Fabric Place Geo-Textile Fabric on top of the chokerlayer. Position the Filter Fabric to be centered about the Underdrain and extending 1ft. to 2 ft. beyond either side of the Underdrain.36" Bio-RetentionSoil Media18" Sump6" Cleanout Riser6" PerforatedUnderdrain 12"U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6030.dwg PLOTTED: 7/14/2022 2:37 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6030 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF63 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 07-14-2022 DAVID L. FRANK Lic. No.1061NORTH 00 30'60'Bio-Retention Basin B Plan View Scale: 1" = 30' 00 30'60'Bio-Retention Basin #1 Plan View Scale: 1" = 30'NORTH2'2' Conrete Apron 3" Concrete Apron Vented Cap Cleanout Riser Apron Detail DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601BIO-RETENTION BASINS A & B PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT 36" Bio-RetentionSoil Media18" Sump6" Cleanout Riser12"Inv. = 664.00' 6" PerforatedUnderdrain 6" Perforated Underdrain (Invert = 664.00) 36" Soil Media Layer (Bottom = 664.75 3" Choker Stone Layer (Bottom = 664.50) 18" Stone Reservoir Layer (Bottom = 663.00) 36" Soil Media Layer (Top = 667.75) 3" Turf Layer (Top = 668.00) 6" Solid Wall Pipes(Underdrain fromBio-Retention Facilities) Inv. = 664.00' 6" Solid Wall Pipe@ 0.32% Geo-Textile Fabric Place Geo-Textile Fabric on top of the choker layer. Position the Filter Fabric to be centered about the Underdrain and extending 1ft. to 2 ft. beyond either side of the Underdrain. Top of Berm = 669.50 Finished Grade 6' Wide Weir = 668.50(Shown for Reference Elevation) 6" Storage Depth3" ThickConc. Apron Cap = 669.00 Cleanout Riser See Bio-Retention Cleanout Detail Geo-Textile Fabric Use a Non-Woven Geo-Textile Fabric with a flow rate of > 110 gal./min/s.f.(e.g., Geotex 351 or Equivalent) 18" Ø Nyloplast Drain Basin (See Detail, Sh. ) Bio-Retention Facility C - Schematic Cross Section Not to Scale CG-12B 20'x20' DUMPSTER PAD AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07CG-12BCG-12C CG-12C CG-6R (TYP) F.D.C.F.D.C.WMBFPHP 671.8214+97.66LP 669.86 17+76.79 67309 67191 66259 671 68 TC 671 45 TC 672 60 TC 671 74 TC 670 00 TC 669 85 TC 670 85 TC67052 EP 67194 TC 67160 EP 67151 HP 669 95 EP 669 86 CL 670 666668672 670 664 6 6 6 668 672 674 670672670 666 668 672 670670672670668668668 6 7 0 67267067167 CL 670 62 TC 669 64 EP 671 61 TC 670 08 TC 0.2% 0.3% 670 51 EP 671 43 EP 0.8% 1.3% 67150 EP 671 27 EP 670 93 EP 669 66 EP 670 04 TC67028 HP 669 51 EP 669 03 EP 2.0%1.0%2.8%2.0%1.0%0.9%2.0%0.7%0.5%668 00 669 80 EP 670 05 EP 670 29 EP 2.0%1.0%2.0% 669 79 EP 670 94 EP 671 93 EP 0.9%2.0% 2.7% 670 68 CL 669 87 CL 670 07 CL0.2%670 25 EP 670 60 EP 670 64 EP 67119 EP 2.0% 671 41 EP 67114 EP 670 91 EP 669 88 EP 669 73 EP 0.2%S TO RM DR A I N AG E & M A I N T . E SM T STORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT 15" HDP E15" HDPE 21.5 21.1 21.2 21.4 21.3 23.322.2 12" HDPE 22.1 12" H D P E 23.1 D 23.2 U22 U21 69 50 TB 68 50 Weir 69 50 TB6950 TB 68 00 69 00 Weir 69 00 Weir 70 00 TB 70 00 TB 69 00 Cap 69 50 Cap 69 50 Cap 69 50 Cap 68 50 Weir 68 50 Weir 62 60 Inv Treatment Cell Storage Elevation = 669.00' Pre-Treatment Cell Storage Elevation = 668.50' Treatment Cell Storage Elevation = 668.50' See "Gabion Weir Detail" (Sh. 65) Pre-Treatment Cell Storage Elevation = 669.00' See "Bio-Retention D Forebay - Outfall Weir Detail" (Sh. 64) Pre-Treatment 5' Wide Grass Strip (Min.) Pre-Treatment 5' Wide Grass Strip (Min.) 2 - 6" Perforated Under Drains & 2 - 6" Cleanouts 1 - 6" Observation Well (See Detail Sh. 65) 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting 1 - 6" Cleanout 1 - 6" Observation Well (See Detail Sh. 65) 6' Wide Weir Spillway Armour w/ N.A.G. C350 Permanent Erosion Matting BIO-RET C BIO-RET D 3' Wide Conc. Flume to Forebay 3' Wide Conc. Flume to Forebay 48" Ø Std. MH-1 Bio-Retention Facility D - Schematic Cross Section Not to Scale36" Bio-RetentionSoil Media18" Sump6" Cleanout Riser12"Inv. = 664.00' 6" PerforatedUnderdrain Top of Structure = 669.00 6" Perforated Underdrain (Invert = 664.00) 36" Soil Media Layer (Bottom = 664.75 3" Choker Stone Layer (Bottom = 664.50) 18" Stone Reservoir Layer (Bottom = 663.00) 36" Soil Media Layer (Top = 667.75) 3" Turf Layer (Top = 668.00) 37' - 6" Solid Wall Pipes(Underdrain fromBio-Retention Facilities) Inv. = 664.00' See StormSewer Profiles Geo-Textile Fabric Place Geo-Textile Fabric on top of the choker layer. Position the Filter Fabric to be centered about the Underdrain and extending 1ft. to 2 ft. beyond either side of the Underdrain. Top of Berm = 670.00 Finished Grade 6' Wide Weir = 669.00(Shown for Reference Elevation) 12" Storage Depth3" ThickConc. Apron Cap = 669.50 Cleanout Riser See Bio-Retention Cleanout Detail Geo-Textile Fabric Use a Non-Woven Geo-Textile Fabric with a flow rate of > 110 gal./min/s.f.(e.g., Geotex 351 or Equivalent) Bio-Retention D Forebay - Outfall Weir Detail Not to Scale Top of Weir Wall = 669.50' Top of Berm = 670.50' Earthen Berm Rectangular Weir Width =2.5 lf Height = 0.5 vf 6' Wide Weir Wall Bottom of Weir Wall = 660.50'4' Tall Weir WallBuried 2.5'3:1 Slope3:1 Slop e Rectangular Weir Width =0.5 lf Height = 1.0 vf 2.5'(W) x 0.5'(H) Rectangular Weir Invert = 669.00' Prop. Grade 0.5'(W) x 1.0'(H) Rectangular Weir Invert = 668.00'U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6031.dwg PLOTTED: 7/14/2022 2:39 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6031 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF64 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 07-14-2022 DAVID L. FRANK Lic. No.1061 00 30'60'NORTH2'2' Conrete Apron 3" Concrete Apron Vented Cap Cleanout Riser Apron Detail DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601BIO-RETENTION BASINS C & D PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTBio-Retention Basin C & Bio-Retention D Plan View Scale: 1" = 30' Bio-Retention Soil Media18" Sump6" Cleanout RiserBio-Retention Observation Well Detail Not to Scale PerforatedUnderdrain 12"Vented Cap Set 6" Above Water Storage Surface Elevation Connect Observation Well to Underdrain with a Vertical Tee Fitting Watertight PVC Cap on Upstream end of Underdrain 6" Cleanout RiserBio-Retention Cleanout Detail Not to Scale PerforatedUnderdrain 12"Vented Cap Set 6" Above Water Storage Surface Elevation Connect Cleanout Riser to Underdrain with a 45° Wye & Fitting or Equivalent Watertight PVC Cap on Upstream end of Underdrain Bio-Retention Soil Media18" SumpPlan View Section View Note: See Bioretention Bed Cross Section For Details Regarding Depth And Pipe Sizes.See Site Plan For Specific Elevations, Drainage Piping Inverts, And Storm Structure Sizing Pavement Sheet Flow from Impervious Surface Geo-Textile Fabric Use a Non-Woven Geo-Textile Fabricwith a flow rate of > 110 gal./min/s.f.(e.g., Geotex 351 or Equivalent) Choker Stone Layer Gravel Diaphram 3:1 Slopeto Berm WQv Level Filter Media PerforatedUnderdrain Grass Filter Strip SolidOutlet Pipeto Daylight Berm Overflow Weir Bio-Retention Facility Schematic Detail Gravel Diaphram Grass Filter Strip Perforated UnderdrainCollection System Berm Sump Top Mulch orTurf Layer Cleanout (Typ.) Geo-Textile Fabric Place Geo-Textile Fabric on top of the chokerlayer. Position the Filter Fabric to be centeredabout the Underdrain and extending 1ft. to 2 ft.beyond either side of the Underdrain. Gabion Weir Detail NTS 6' Weir Width 1.5' Front View 9' Length 3:1 Note: Gabion Stone Size4"-8" (Average 6") 1' 0.5' 7' Minimum Width of Forebay @Weir Approach 9' Length 3:1 6' Length 6' Length 9' Length Lower Gabion Basket(9' W x 1.5' H)Lower Gabion Basket(3' W x 1.5' H) Lower Gabion Basket(6' W x 1.5' H) Upper Gabion Basket(9' W x 1.0' H) Fill Voids with #57 Stone Between Edge of Excavation and Gabion Baskets Upper Gabion Basket(9' W x 1.0' H) Proposed Grade Non-WovenGeo-TextileFabric PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493DAVID L. FRANK Lic. No.1061 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6032.dwg PLOTTED: 7/14/2022 2:40 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6032 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF65 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKAPPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTBIO-RETENTION BASIN DETAILS & NARRATIVESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 Bio-Retention Basin Shall Be Constructed Only After The Site Work Is Complete And Stabilization Measures Have Been Implemented. Experience With Bio-Retention Basins And Soil Media Filters Has Demonstrated That Bio-Retention Filters Must Be Protected From All Sediment Loads. B.3.B Specifications For Bio-Retention 1. Material Specification The Allowable Materials To Be Used In Bio-Retention Area Are Detailed In Table 9.8, This Sheet. ALL BIO-RETENTION MEDIA IS TO BE SOURCED FROM A CERTIFIED VENDOR. 2. Planting Soil The Planting Soil Shall Be A Loamy Sand Or A Loam Sand Mix Which Is Generally Classified As A Loamy Sand On The Usda Texture Triangle. The Mixture Should Contain A Minimum Of 80-85% Course Sand By Volume, 8-12% Soil Fines, And 3-5% Organic Matter. The Soil Shall Be A Uniform Mix, Free Of Stones, Stumps, Roots, Or Other Similar Objects Larger Than One Inch. No Other Materials Or Substances Shall Be Mixed Or Dumped Within The Bio-Retention Area That May Be Harmful To Plant Growth, Or Prove A Hindrance To The Planting Or Maintenance Operations. The Planting Soil Shall Be Free Of Bermuda Grass, Mugwort, Nutsedge, Canada Thistle, Quackgrass, Johnson Grass, Or Other Noxious Weeds As Specified Under Comar 15.08.01.05. The Planting Soil Shall Be Tested And Shall Meet The Following Criteria: Ph Range 5.2 - 7.0 P-Index 10-30 Phosphorus 7-23 Mg/Kg Cation Exchange Capacity (Cec)Greater Than 10 Infiltration Rate 1-2 Inches Per Hour Void Ratio (Vv/Vt) (Min)0.25 All Bio-Retention Areas Shall Have A Minimum Of One Test. Each Test Shall Consist Of Both The Standard Soil Test For Ph, Phosphorus, And Potassium And Additional Tests Of Organic Matter, And Soluble Salts. A Textural Analysis Is Required From The Site Stockpiled Topsoil. If Topsoil Is Imported, Then A Textural Analysis Shall Be Performed For Each Location Where The Top Soil Was Excavated. Since Different Labs Calibrate Their Testing Equipment Differently, All Testing Results Shall Come From The Same Testing Facility. Should The Ph Fall Out Of The Acceptable Range, It May Be Modified (Higher) With Lime Or (Lower) With Iron Sulfate Plus Sulfur. 3. Compaction It Is Very Important To Minimize Compaction Of Both The Base Of The Bio-Retention Area And The Required Backfill. When Possible, Use Excavation Hoes To Remove The Original Soil. If Bio-Retention Areas Are Excavated Using A Loader, The Contractor Should Use Wide Track Or Marsh Track Equipment Or Light Equipment With Turf Type Tires. Use Of Equipment With Narrow Tracks Or Tires, Rubber Tires With Large Lugs, Or High Pressure Tires Will Cause Excessive Compaction Resulting In Reduced Infiltration Rates And Is Not Acceptable. Compaction Will Significantly Contribute To Design Failure. Compaction Can Be Alleviated At The Base Of The Bio-Retention Facility By Using A Primary Tilling Operation Such As A Chisel Plow, Ripper, Or Subsoiler. These Tilling Operations Are To Refracture The Soil Profile Through The 12 Inch Compaction Zone. Substitute Methods Must Be Approved By The Engineer. Rototillers Typically Do Not Till Deep Enough To Reduce The Effects Of The Compaction From Heavy Equipment. Rototill 2 To 3 Inches Of Sand Into The Base Of The Bio-Retention Before Backfilling The Required Sand Layer. Pump Any Ponded Water Before Preparing (Rototilling) Base. When Backfilling The Topsoil Over The Sand Layer, First Place 3 To 4 Inches Of Topsoil Over The Sand, Then Rototill The Sand/Topsoil To Create A Graduation Zone. Backfill The Remainder Of The Planting Soil To The Final Grade. When Backfilling The Bio-Retention Facility, Place Lifts 12" To 18" That Are Loosely Compacted. Do Not Use Heavy Equipment Within The Bio-Retention Basin. Heavy Equipment Can Be Used Around The Perimeter Of The Basin To Supply Soils And Sand. Grade Bio-Retention Materials With Light Equipment Such As A Compact Loader Or A Dozer/Loader With Marsh Tracks. 4. Plant Material Recommended Plant Material For Bio-Retention Areas Can Be Found In As Noted On This Sheet And In The Specifications.. 5. Plant Installation Mulch Should Be Placed To A Uniform Thickness Of 2" To 3". Shredded Hardwood Mulch Is The Only Accepted Mulch. Pine Mulch And Wood Chips Will Float And Move To The Perimeter Of The Bio-Retention Area During A Storm Event And Are Not Acceptable. Shredded Mulch Must Be Well Aged (6 To 12 Months) For Acceptance. Root Stock Of The Plant Material Shall Be Kept Moist During Transport And On-Site Storage. The Plant Root Ball Should Be Planted So 1/8th Of The Root Ball Is Above Final Grade Surface. The Diameter Of The Planting Pit Shall Be At Least Six Inches Larger Than The Diameter Of The Planting Ball. Set And Maintain The Plant Straight During The Entire Planting Process. Thoroughly Water Ground Bed Cover After Installation. Trees Shall Be Braced Using 2" By 2" Stakes Only As Necessary And For The First Growing Season Only. Stakes Are To Be Equally Spaced On The Outside Of The Tree Ball. Grasses And Legume Seed Should Be Drilled Into The Soil To A Depth Of At Least One Inch. Grass And Legume Plugs Shall Be Planted Following The Non-Grass Ground Cover Planting Specifications. The Topsoil Specifications Provide Enough Organic Material To Adequately Supply Nutrients From Natural Cycling. The Primary Function Of The Bio-Retention Structure Is To Improve Water Quality. Adding Fertilizers Defeats, Or At A Minimum, Impedes This Goal. Only Add Fertilizer If Wood Chips Or Mulch Are Used To Amend Soil. Rototill Urea Fertilizer At A Rate Of 2 Pounds Per 1000 Square Feet. 6.Underdrains Place The Appropriate Depth Of #57 Stone On The Bottom, Install The Perforated Underdrain Pipe, Pack #57 Stone To The Top Of The Pipe, Add 3" Of Choker Stone, Followed By A Geotech Filter Fabric For Filter Between Choker Stone And Planting Soil. The Main Collector Pipe For The Underdrain Systems Shall Be Constructed At A Minimum Slope Of 0.5%. Observation Wells And/Or Clean-Out Pipes Must Be Provided (One Minimum Per Every 1000 Square Feet Of Surface Area). 7.Miscellaneous - The Bio-Retention Facility May Not Be Constructed Until All Contributing Drainage Area Has Been Stabilized. - Landscape Contractor To Mix The Tree And Shrub Species Together For A More Naturalized Appearance. Specification #9, January, 2013 SECTION 8: CONSTRUCTION 8.1. Construction Sequence Construction Stage E&S Controls. Micro-bioretention and small-scale bioretention areas should be fully protected by silt fence or construction fencing, particularly if they will rely on infiltration (i.e., have no underdrains). Ideally, bioretention should remain outside the limit of disturbance during construction to prevent soil compaction by heavy equipment. Bioretention basin locations may be used as small sediment traps or basins during construction. However, these must be accompanied by notes and graphic details on the ESC plan specifying that (1) the maximum excavation depth at the construction stage must be at least 1 foot above the post-construction maximum excavation, (2) the facility must contain an underdrain, and (3) the plan must also show the proper procedures for converting the temporary sediment control practice to a permanent bioretention facility, including dewatering, cleanout and stabilization. 8.2 Bioretention Installation The following is a typical construction sequence to properly install a bioretention basin. The installation of a bioretention basin will include intermediate inspections at critical stages of construction with inspector sign-off that the particular elements of the bioretention are constructed according the approved plans and specifications. As an alternative, if allowed by the VSMP Authority, the contractor may rely on the engineer of record or other qualified individual to conduct the intermediate inspections and certifications of compliance. The construction sequence for micro-bioretention is more simplified. These steps may be modified to reflect different bioretention applications or expected site conditions: Step 1. Construction of the bioretention area may only begin after the entire contributing drainage area has been stabilized with vegetation. It may be necessary to block certain curb or other inlets while the bioretention area is being constructed. The proposed site should be checked for existing utilities prior to any excavation. Step 2. The designer and the installer should have a preconstruction meeting, checking the boundaries of the contributing drainage area and the actual inlet elevations to ensure they conform to original design. Since other contractors may be responsible for constructing portions of the site, it is quite common to find subtle differences in site grading, drainage and paving elevations that can produce hydraulically important differences for the proposed bioretention area. The designer should clearly communicate, in writing, any project changes determined during the preconstruction meeting to the installer and the plan review/inspection authority. Step 3. Temporary E&S controls are needed during construction of the bioretention area to divert stormwater away from the bioretention area until it is completed. Special protection measures such as erosion control fabrics may be needed to protect vulnerable side slopes from erosion during the construction process. Step 4. Any pre-treatment cells should be excavated first and then sealed to trap sediments. Step 5. Excavators or backhoes should work from the sides to excavate the bioretention area to its appropriate design depth and dimensions. Excavating equipment should have scoops with adequate reach so they do not have to sit inside the footprint of the bioretention area. Contractors should use a cell construction approach in larger bioretention basins, whereby the basin is split into 500 to 1,000 sq. ft. temporary cells with a 10-15 foot earth bridge in between, so that cells can be excavated from the side. Step 6. It may be necessary to rip the bottom soils to a depth of 6 to 12 inches to promote greater infiltration. Step 7. Place geotextile fabric on the sides of the bioretention area with a 6-inch overlap on the sides. If a stone storage layer will be used, place the appropriate depth of #57 stone on the bottom, install the perforated underdrain pipe, pack #57 stone to 3 inches above the underdrain pipe, and add approximately 3 inches of choker stone/pea gravel as a filter between the underdrain and the soil media layer. If no stone storage layer is used, start with 6 inches of #57 stone on the bottom, and proceed with the layering as described above. Step 8. Obtain soil media from a qualified vendor, and store it on an adjacent impervious area or plastic sheeting. After verifying that the media meets the specifications, apply the media in 12-inch lifts until the desired top elevation of the bioretention area is achieved. Wait a few days to check for settlement, and add additional media, as needed, to achieve the design elevation. Step 9. Prepare planting holes for any trees and shrubs, install the vegetation, and water accordingly. Install any temporary irrigation. Step 10. Place the surface cover in both cells (mulch, river stone or turf), depending on the design. If coir or jute matting will be used in lieu of mulch, the matting will need to be installed prior to planting (Step 9), and holes or slits will have to be cut in the matting to install the plants. Step 11. Install the plant materials as shown in the landscaping plan, and water them during weeks of no rain for the first two months. 8.3 Construction Inspection Inspections during and immediately after construction are needed to ensure that all the elements of bioretention basins are built in accordance with these specifications. Use a detailed inspection checklist that requires sign-offs by qualified individuals at critical stages of construction to ensure that the contractor's interpretation of the plan is consistent with the designer's intent. The following identifies the critical stages of construction where an intermediate inspection and sign-off by a qualified individual is recommended, since the items can't be verified after construction is completed. A construction inspection checklist that includes certifications of inspection at critical stages is provided at the end of this specification. The following represents items that are frequently overlooked during construction inspection but represent important elements for ensuring the success of the bioretention facility during the initial break-in period.  Verify the proper coverage and depth of mulch, vegetation, or soil matting has been achieved following construction, both on the filter bed and the side-slopes.  Inspect the pre-treatment forbays and filter strips to verify that they are properly installed, stabilized, and working effectively before opening the facility to runoff.  Check that outfall protection/energy dissipation measures at concentrated inflow and outflow points are stable. Upon final acceptance of the facility, log the practice's GPS coordinates and submit them for entry into the VSMP Authority's BMP maintenance tracking database. 9.1. Maintenance Agreements The Virginia Stormwater Management regulations (4 VAC 50-60) specify the circumstances under which a maintenance agreement must be executed between the owner and the VSMP authority, and sets forth inspection requirements, compliance procedures if maintenance is neglected, notification of the local program upon transfer of ownership, and right-of-entry for local program personnel.  All bioretention practices must include a long term maintenance agreements consistent with the provisions of the VSMP regulations, and must include the recommended maintenance tasks and a copy of an annual inspection checklist.  When micro-scale bioretention practices are applied on private residential lots, homeowners should be educated (ideally, provide handout materials) regarding their routine maintenance needs by being provided a simple document that explains their purpose and routine maintenance needs.  A deed restriction, drainage easement or other mechanism enforceable by the VSMP authority must be in place to help ensure that rain gardens and bioretention filters are maintained and not converted or disturbed, as well as to pass the knowledge along to any subsequent owners.  The mechanism should, if possible, grant authority for the VSMP authority to access the property for inspection or corrective action. Bio-Retention Construction Documentation Notes Photo Documentation of each stage of construction is recommended. Measuring Sticks should be used to document depth and thickness. Use photo documentation to record installation of; ·The Impermeable Liner fi Required ·The Underdrain System ·The Stone Reservoir Layer ·Choker Stone Layer ·Filter Fabric Placement ·The Bio-Retention Soil Media Layer ·The Hardwood Mulch Layer Upon final acceptance of the facility, log the practice's GPS coordinates and submit them for entry into the VSMP Authority's BMP maintenance tracking database. STORM 1.1 TO 1.6 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 625 630 635 640 645 650 655 660 665 625 630 640 650 660 8+50 9+00 645.710+00641.6640.85643.8645.3011+00646.7646.00647.9646.4012+00651.1647.40654.4653.6913+00RIM=646.001.5 - DI-1INV IN 642.50 (1.6)INV OUT 642.25 (1.4)11+17.94RIM=645.511.4 - DI-3B (6' RT)INV IN 641.30 (1.5)INV IN 641.63 (1.9)INV OUT 641.30 (1.3)10+61.55RIM=645.511.3 - DI-3B (6' LT)INV IN 640.95 (1.4)INV IN 641.29 (1.8)INV OUT 640.95 (1.2)10+21.55SSWR XING STA. 10+11.208" SDR-35 INV=638.30FIN. GRADE EX. GRADE WATR XING STA. 10+72.238" DIP INV=639.1618" MIN CLEAR 19" CLEAR 56.39' - 18" HDPE @ 1.68%40.00' - 30" x 19" HERCP @ 0.87% 21.55' - 30" X 19" HEHDPE @ 0.48% 93.32' - 15" HDPE @ 1 . 6 1 %RIM=647.451.6 - DI-1INV OUT 644.00 (1.5)12+11.25RIM=643.05EX9 - EW-1-21 OR 24INV OUT 640.56 ()9+65.4738' - 24" H D P E @ 3. 4 1 %RIM=642.961.2 - EW-1A (30X19)INV IN 640.85 (1.3)10+00STORM 1.3 TO 1.8 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 625 630 635 640 645 650 655 660 665 625 630 640 650 660 9+50643.6646.2010+00643.4645.51645.511+00RIM=645.441.8 - DI-3C (8')INV OUT 641.85 (1.3)10+24.61RIM=645.511.3 - DI-3B (6' LT)INV IN 640.95 (1.4)INV IN 641.29 (1.8)INV OUT 640.95 (1.2)10+00FIN. GRADE EX. GRADE 24.61' - 15" HD P E @ 2. 2 8 % STORM 1.4 TO 1.9 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 625 630 635 640 645 650 655 660 665 625 630 640 650 660 9+50643.2645.7610+00644.1645.51645.511+00RIM=645.511.4 - DI-3B (6' RT)INV IN 641.30 (1.5)INV IN 641.63 (1.9)INV OUT 641.30 (1.3)10+00RIM=645.441.9 - DI-3C (8')INV OUT 641.85 (1.4)10+24.60FIN. GRADE EX. GRADE 24.60' - 15" HDPE @ 0.89% STORM 2.1 TO 3.3 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50653.7656.0010+00653.0657.00652.1659.7111+00652.4662.81655.9662.9512+00659.8663.16659.6664.2313+00659.5664.89658.3665.3814+00656.8665.3614+50655.0664.64RIM=662.912.2 - DI-3B (8' RT)INV IN 658.00 (2.3)INV OUT 657.75 (2.1)11+50.83FIN. GRADE EX. GRADE2.1 - ES-1 (18")INV 656.00 (2.2)10+00WATR XING STA. 11+36.338" DIP INV=655.26RIM=665.593.2 - DI-3B (8' LT)INV IN 660.25 (3.3)INV OUT 660.25 (2.3)13+70.84RIM=665.593.3 - DI-3B (8' RT)INV OUT 660.80 (3.2)14+10.8440.00' - 15" HDPE @ 1. 3 7 %RIM=662.912.3 - DI-3B (8' LT)INV IN 658.50 (3.2)INV OUT 658.50 (2.2)11+90.84SSWR XING STA. 13+42.678" SDR-35 INV=646.6118" MIN CLEAR150.83' - 18" HDPE @ 1.16% 180.00' - 15" HDPE @ 0.97% 40.01' - 15" HDPE @ 1.25 % STORM 4.1 TO 4.6 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50663.6660.8810+00662.4659.00662.4664.1311+00663.8667.62664.4669.0812+00667.2668.01667.6667.3713+00666.9666.79665.9666.3414+00664.6666.26663.7664.9915+00663.7666.2915+50RIM=666.624.3 - DI-3B (6' RT)INV IN 660.45 (4.4)INV OUT 660.45 (4.2)13+37.77RIM=666.334.4 - DI-3B (6' LT)INV IN 660.65 (4.5)INV OUT 660.65 (4.3)13+80.23RIM=665.104.5 - DI-3B (6' LT)INV IN 660.90 (4.6)INV OUT 660.90 (4.4)14+33.14RIM=665.104.6 - DI-3B (6' RT)INV OUT 661.10 (4.5)14+73.1440.00' - 15" HDPE @ 0.52%52.91' - 15" HDPE @ 0.47%4.1 - ES-1 (18")INV 659.00 (4.2)10+00FIN. GRADE EX. GRADE SSWR XING STA. 11+91.578" SDR-35 INV=655.7241" CLEAR 42.46' - 15" HDPE @ 0.47%130.70' - 15" HDPE @ 0.46% 207.07' - 18" HDPE @ 0.41%RIM=667.874.2 - DI-3B (6' RT)INV IN 659.85 (4.3)INV IN 662.50 (5.1)INV OUT 659.85 (4.1)12+07.07STORM 4.2 TO 5.1 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50 10+00667.3667.87667.2668.0811+00RIM=667.874.2 - DI-3B (6' RT)INV IN 659.85 (4.3)INV IN 662.50 (5.1)INV OUT 659.85 (4.1)10+00RIM=667.875.1 - DI-3B (6' LT)INV OUT 662.80 (4.2)10+4040.00' - 15" HDPE @ 0.75% FIN. GRADEEX. GRADE STORM 6.1 TO 6.5 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 635 640 645 650 655 660 665 670 675 635 640 650 660 670 9+50643.0645.9310+00646.6644.83651.0648.6711+00655.1650.78657.4652.0012+00660.9654.01663.3655.7313+00665.3657.98666.8660.4314+00667.5662.4714+50RIM=648.006.2 - DI-1INV IN 644.50 (6.3)INV OUT 644.50 (6.1)10+45.88RIM=651.006.3 - DI-1INV IN 646.00 (6.4)INV OUT 646.00 (6.2)11+03.55RIM=654.906.4 - DI-1INV IN 650.00 (6.5)INV OUT 650.00 (6.3)12+29.20FIN. GRADE EX. GRADE WATR XING STA. 10+27.458" DIP INV=641.96RIM=662.456.5 - DI-1INV OUT 657.50 (6.4)13+97.876.1 - ES-1 (15")INV 644.00 (6.2)10+00125.65' - 15" H D P E @ 3. 1 8 % 125.65' - 15" H D P E @ 3. 1 8 % 125.65' - 15" H D P E @ 3. 1 8 % 45.88' - 15" HDPE @ 1.09% 57.67' - 15" H D P E @ 2. 6 0 %168.68' - 15" HDPE @ 4.45 % 18" MIN CLEAR  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6100.dwg PLOTTED: 7/14/2022 2:03 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6100 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5' CJM 2021-03-19 DLF SHEET APPROVED BY OF66 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601STORM SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT00 50'100' STORM 11.1 TO 11.6 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 640 645 650 655 660 665 670 675 680 640 650 660 670 680 9+50665.0652.3910+00664.4653.00663.9662.3511+00663.1662.79664.0661.6712+00666.6666.0662.1913+00666.2662.5813+50 FIN. GRADE EX. GRADE RIM=661.6211.6 - DI-1INV OUT 656.70 (11.5)12+58.45RIM=662.0911.4 - DI-3B (6' RT)INV IN 656.20 (12.1)INV IN 656.20 (11.5)INV OUT 656.20 (11.3)12+14.67RIM=662.0811.5 - DI-3B (6' LT)INV IN 656.60 (11.6)INV OUT 656.60 (11.4)12+44.64SSWR XING STA. 12+34.678" SDR-35 INV=650.38SSWR XING STA. 11+69.258" SDR-35 INV=649.30WATR XING STA. 12+24.678" DIP INV=653.80WATR XING STA. 11+55.698" DIP INV=652.9218" MIN CLEAR 21" CLEAR 13.81' - 15" HDPE @ 0.72% 29.98' - 15" HDPE @ 1.33% 72.54' - 15" HDPE @ 1 . 6 5 % STORM 11.4 TO 12.2 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50 10+00666.7662.09669.2662.7411+00670.4663.59671.2664.4412+00671.6665.29670.8665.6613+00RIM=666.6212.1 - DI-3B (6' RT)INV IN 660.00 (12.2)INV OUT 660.00 (11.4)12+11.51RIM=666.3312.2 - DI-3B (6' LT)INV OUT 660.20 (12.1)12+41.55RIM=662.0911.4 - DI-3B (6' RT)INV IN 656.20 (12.1)INV IN 656.20 (11.5)INV OUT 656.20 (11.3)10+00FIN. GRADE EX. GRADE WATR XING STA. 12+21.518" DIP INV=657.2321" CLEAR 30.04' - 15" HDPE @ 0.67% 211.51' - 15" HDPE @ 1 . 8 0 % STORM 13.1 TO 13.7 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 640 645 650 655 660 665 670 675 680 640 650 660 670 680 9+50656.210+00656.7654.58659.7660.0111+00663.1666.3658.1012+00665.0659.58661.6659.7413+00658.4659.89660.7660.6014+00 15+00RIM=658.8513.2 - DI-3B (6' LT)INV IN 653.75 (13.3)INV OUT 653.75 (13.1)11+03.34RIM=659.5713.4 - DI-3B (6' RT)INV IN 654.80 (14.1)INV IN 654.80 (13.5)INV OUT 654.80 (13.3)12+56.69RIM=659.5713.5 - DI-3B (6' LT)INV IN 655.00 (13.6)INV OUT 655.00 (13.4)12+86.69RIM=659.3713.7 - DI-1INV OUT 655.75 (13.6)13+89.65RIM=660.2113.6 - DI-3B (6' RT)INV IN 655.30 (13.7)INV OUT 655.30 (13.5)13+17.4713.1 - EW-1-21 OR 24INV 653.00 (13.2)10+00FIN. GRADE EX. GRADE SSWR XING STA. 12+76.698" SDR-35 INV=651.20WATR XING STA. 12+66.698" DIP INV=650.9816" CLEAR CONC. ARCH REQ. 33" CLEAR18" MIN CLEAR WATR XING STA. 11+13.578" DIP INV=651.4772.17' - 15" HDPE @ 0.62% 30.79' - 15" HDPE @ 0.97% 30.00' - 18" HDPE @ 0.66%104.31' - 24" HDPE @ 0.77% 103.34' - 24" HDPE @ 0.72% STORM 13.4 TO 14.3 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50 10+00661.0659.57663.2660.3011+00666.1661.30668.5662.3012+00672.0663.30670.1663.7013+00671.4664.32672.1663.7714+0013.4 - DI-3B (6' RT)INV 654.80 (14.1)INV 654.80 (13.5)10+00RIM=663.5014.1 - DI-3B (6' RT)INV IN 658.85 (14.2)INV OUT 658.85 (13.4)12+10.08RIM=663.5014.2 - DI-3B (6' LT)INV IN 659.25 (14.3)INV OUT 659.25 (14.1)12+40.08RIM=663.4814.3 - DI-1INV OUT 660.00 (14.2)13+42.08FIN. GRADE EX. GRADE SSWR XING STA. 12+30.088" SDR-35 INV=655.59WATR XING STA. 12+20.088" DIP INV=654.1516" MIN CLEAR 30" CLEAR WATR XING STA. 12+00.088" DIP INV=656.49102.00' - 15" HDPE @ 0.74% 30.00' - 15" HDPE @ 1.33% 210.08' - 18" HDP E @ 1 . 9 2 %  U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6101.dwg PLOTTED: 7/14/2022 2:03 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6101 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF67 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601STORM SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT00 50'100' STORM 15.1 TO 15.5 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 675 680 685 645 650 660 670 680 9+50675.1662.7010+00672.7665.46671.6668.2011+00670.2668.28668.6668.2712+00667.4667.38667.2667.6613+00668.5668.24169.31' - 15" HDPE @ 0.21%RIM=667.5515.3 - DI-3C (8')INV IN 663.35 (15.4)INV OUT 663.35 (15.2)11+86.61RIM=667.7515.2 - 48" MHINV IN 663.00 (15.3)INV IN 663.00 (17.1)INV IN 663.00 (18.1)INV OUT 663.00 (15.1)10+17.30FIN. GRADE EX. GRADE SSWR XING STA. 11+64.968" SDR-35 INV=657.4615.1 - ES-1 (15")INV 662.90 (15.2)10+0017.30' - 18" HDPE @ 0.58%40.02' - 15" RCP CL III @ 0.50%RIM=667.5515.4 - DI-3C (8')INV IN 663.55 (15.5)INV OUT 663.55 (15.3)12+26.6349.90' - 15" HDPE @ 0.50%RIM=667.9615.5 - DI-3B (8' RT)INV OUT 663.80 (15.4)12+76.53STORM 15.2 TO 17.2 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 695 655 660 670 680 690 9+50 10+00672.1667.75671.1668.0211+00671.7669.4311+50RIM=667.7515.2 - 48" MHINV IN 663.00 (15.3)INV IN 663.00 (17.1)INV IN 663.00 (18.1)INV OUT 663.00 (15.1)10+0039.50' - 15" HDPE @ 0.76%RIM=668.2617.1 - DI-3C (8')INV IN 663.30 (17.2)INV OUT 663.30 (15.2)10+39.5043.83' - 15" RCP CL III @ 0.91%RIM=669.3717.2 - DI-3B (6' LT)INV OUT 663.70 (17.1)10+83.34FIN. GRADE EX. GRADE STORM 15.2 TO 18.1 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 695 655 660 670 680 690 9+50 10+00672.1667.75672.7669.1211+00674.0669.27673.2668.7212+00RIM=668.9518.1 - DI-3B (6' LT)INV OUT 664.00 (15.2)11+21.97121.97' - 15" HDPE @ 0.82% FIN. GRADE EX. GRADERIM=667.7515.2 - 48" MHINV IN 663.00 (15.3)INV IN 663.00 (17.1)INV IN 663.00 (18.1)INV OUT 663.00 (15.1)10+00STORM 21.1 TO 21.5 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 650 655 660 665 670 675 680 685 690 650 660 670 680 690 9+50 10+00663.1664.58664.7667.5311+00666.0670.34667.6670.8012+00669.2670.64670.5671.2513+00671.3669.3113+50 114.86' - 15" HDPE @ 0.44%21.1 - ES-1 (15")INV 662.85 (21.2)10+00RIM=668.2521.5 - DI-1INV OUT 664.00 (21.4)12+90.63FIN. GRADE EX. GRADE WATR XING STA. 12+35.808" DIP INV=661.4731.32' - 15" HDPE @ 0.32%18" MIN CLEAR 110.45' - 15" HDPE @ 0.36%RIM=672.3621.3 - DI-3B (6' RT)INV IN 663.75 (21.4)INV OUT 663.75 (21.2)12+25.31RIM=671.5021.4 - DI-3B (6' LT)INV IN 663.90 (21.5)INV OUT 663.90 (21.3)12+59.3134.00' - 15" HDPE @ 0.44%RIM=670.9021.2 - 48" MHINV IN 663.35 (21.3)INV OUT 663.35 (21.1)11+14.86CATCH BASIN 3 OUTFALL - STORM CB1 TO CB2 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 635 640 645 650 655 660 635 640 650 660 9+50650.5650.5410+00653.3653.32655.1655.0511+00656.5656.4811+50657.6657.5771.78' - 6" HDPE @ 0.70% STORM CB3 TO CB4 2+50 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 645 650 655 660 665 670 645 650 660 670 9+50 10+00655.4655.45657.1657.0811+00657.3657.27658.7658.7412+00 146.85' - 8" HDPE @ 1. 4 0 % STORM 23.1 TO 23.3 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 655 660 670 680 690 10+00672.6669.86672.6670.3711+00671.0670.55669.4672.3712+00668.7672.00RIM=670.7523.3 - 30" DRAIN BASININV OUT 668.67 (23.2)11+87.8136.00' 12" HDPE @ 0.50%RIM=672.5023.2 - 30" JUNCTIONINV IN 668.49 (23.3)INV OUT 668.49 (23.1)11+51.81119.86' - 12" HDPE @ 0.41%RIM=669.4423.1 - ES-1 (15")INV IN 668.00 (23.2)10+31.95SSWR XING STA. 11+07.788" SDR-35 INV=663.7945" CLEAR WATR XING STA. 10+92.788" DIP INV=664.03STORM 22.1 TO 22.2 HORIZONTAL SCALE: 1" = 50' VERTICAL SCALE: 1" = 5' 655 660 665 670 675 680 685 690 655 660 670 680 690 10+00671.0668.00669.6669.9211+00668.9670.9711+50RIM=669.4422.1 - ES-1 (15")INV IN 668.00 (22.2)10+2582' - 12" HDPE @ 0.40%RIM=670.8022.2 - 30" DRAIN BASININV OUT 668.33 (22.1)11+06.63WATR XING STA. 10+46.128" DIP INV=664.03 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6102.dwg PLOTTED: 7/14/2022 2:04 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6102 BYNO.DATEREVISIONSDHOLC20001 HORZ. SCALE: 1" = 50' & VERT. SCALE: 1" = 5'CJM 2021-03-19 DLF SHEET APPROVED BY OF68 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS 07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601STORM SEWER PROFILESWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT00 50'100' U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6200.dwg PLOTTED: 7/14/2022 2:51 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6200 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF69 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTSTORM SEWER INLET & OUTLET COMPSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6201.dwg PLOTTED: 7/14/2022 2:51 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6201 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF70 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTSTORM SEWER DESIGN COMPSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6202.dwg PLOTTED: 7/14/2022 2:51 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6202 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF71 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTHYDRAULIC GRADE LINE (HGL) COMPSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS6203.dwg PLOTTED: 7/14/2022 2:52 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS6203 BYNO.DATEREVISIONSDHOLC20001 NONE CJM 2021-03-19 DLF SHEET APPROVED BY OF72 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVEWINCHESTER, VIRGINIA 22601PROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTDITCH ANALYSES SUMMARY & COMPSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLAN 07-14-2022 DAVID L. FRANK Lic. No.1061 LP 659.4314+63.33LP 661.9414+66.01662 662 664 666 650660 660 660 642642 644 64464664664 8 65265465 465465 4 654656 656 6566566566 5 6 658 658658662662 662 66266266 2 66266 2 664 664666 666 668 668650 65066 0 648 648652 652654 654656 6566 5 8 6 5 8 662 664 664 660660 660 660 66 0 6 6 0 670 670 670 670 658658 662662662662662664664 66 4 6 6 4666 6666686 6 8668668 668 66 8 672 672 674 67 4 676 6 7 667667 66766 7 6 67667 6676676 670 662 664 6 6 6 668 672 674 670672660660660650 650 650650660670 670670 6 7 0 6 5 0 6 6 0 650660 660650 650 65066066 0 670670670 6706706706706 7 0 670 670670 -2.0%Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 191 Ex. Lot 203 1 Ex. Lot 120 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 L1 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 4 OPEN SPACE Ex. Lot 13 LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WEX. 30" PE P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" PE P EX. 18" PEPEX. 18" PEP20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEPEX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T.INST. NO. 080 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 EX WATER ME T E R ( G I S ) TIGER LILY CT. Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) ORRICK COMMONSSUBDIVISION LOT 6ARDEYTH LN.54' R/WSTEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT STORM DRAINAGE & MAINT. ESMT S TO RM D R A I N A G E & M A I N T . E SM T STORM DRAINAGE& MAINT. ESMTSTORM DRAINAGE & MAINT. ESMT STORM DRAINAGE& MAINT. ESMTTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN TYPE "C" SEPAR A T I O N B U F F E R 100' - LANDSCA P E S C R E E N LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SFLOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SFLOT 19 8,609 SFLOT 20 8,427 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SF FARMINGTON BLVD. 55' ROW - 25 MPH GABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.OPEN SPACE 2 1.5522 AC. OPEN SPACE 3 0.3772 AC. AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TOT A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07 11 25' ACTIVE25' ACTIVE 25' ACTIVE20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+0025' ACTIVE 50'ACCESS ESMT.OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF TYPE "C" SEP A R A T I O N B U F F E R 200' - NO SCR E E N R E Q .50' ACTIVE150' INACTIVEAREA 1AREA 4 AREA 2 AREA 5 NOTE: FOR PROPOSED TOWNHOUSE PLANTINGS SEE DETAIL, SHEETS CS7100 AND CS7500 10' WIDE BUFFE R P L A N T I N G A R E A ( T Y P . )AREA 8AREA 7 AREA 6 AREA 3 25' VEG.BUFFERU:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS7000.dwg PLOTTED: 7/14/2022 2:07 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS7000 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF73 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601LANDSCAPE PLAN AND CALCULATIONSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTPROP. SHADE TREE PROP. EVG. TREE PROP. ORNAMENTAL TREE PROP. SHRUBS PROP. PLANT LABEL LANDSCAPE LEGEND PROP. BUFFER PLANTING AREA LANDSCAPE CALCULATIONS: RESIDENTIAL SEPARATION BUFFERS AREA 1 BUFFER TYPE TYPE C, FULL SCREEN BUFFER WIDTH 100 LF (25' ACTIVE, 75' INACTIVE) TOTAL BUFFER LENGTH 138 LF LENGTH OF BUFFER CONTAINING 50' DEPTH OF MATURE WOODLANDS 0 LF LENGTH OF BUFFER CONTAINING EASEMENTS 0 LF REMAINING BUFFER LENGTH TO BE PLANTED 138 LF REQUIRED PROVIDED PLANTS 41 (3 PER 10 LF) 41 (3 PER 10 LF) DECIDUOUS TREES (13 OF TOTAL)14 14 EVERGREEN TREES (13 OF TOTAL)14 14 SHRUBS (13 OF TOTAL)13 13 6' HIGH OPAQUE FENCE YES YES AREA 2 BUFFER TYPE TYPE C, FULL SCREEN BUFFER WIDTH 100 LF (25' ACTIVE, 75' INACTIVE) TOTAL BUFFER LENGTH 850 LF LENGTH OF BUFFER CONTAINING 50' DEPTH OF MATURE WOODLANDS 0 LF LENGTH OF BUFFER CONTAINING EASEMENTS 0 LF REMAINING BUFFER LENGTH TO BE PLANTED 850 LF REQUIRED PROVIDED PLANTS 255 (3 PER 10 LF) 255 (3 PER 10 LF) DECIDUOUS TREES (13 OF TOTAL)85 85 EVERGREEN TREES (13 OF TOTAL)85 85 SHRUBS (13 OF TOTAL)85 85 6' HIGH OPAQUE FENCE YES YES AREA 4 BUFFER TYPE TYPE A, LANDSCAPE SCREEN BUFFER WIDTH 50 LF (20' ACTIVE, 30' INACTIVE) TOTAL BUFFER LENGTH 249 LF LENGTH OF BUFFER CONTAINING 50' DEPTH OF MATURE WOODLANDS 0 LF LENGTH OF BUFFER CONTAINING EASEMENTS 0 LF REMAINING BUFFER LENGTH TO BE PLANTED 249 LF REQUIRED PROVIDED PLANTS 75 (3 PER 10 LF) 75 (3 PER 10 LF) DECIDUOUS TREES (13 OF TOTAL)25 25 EVERGREEN TREES (13 OF TOTAL)25 25 SHRUBS (13 OF TOTAL)25 25 6' HIGH OPAQUE FENCE NO NO AREA 5 BUFFER TYPE CATEGORY A, FULL SCREEN BUFFER WIDTH 50 LF (10' ACTIVE, 15' INACTIVE) TOTAL BUFFER LENGTH 119 LF LENGTH OF BUFFER CONTAINING 50' DEPTH OF MATURE WOODLANDS 0 LF LENGTH OF BUFFER CONTAINING EASEMENTS 0 LF REMAINING BUFFER LENGTH TO BE PLANTED 119 LF REQUIRED PROVIDED PLANTS 36 (3 PER 10 LF) 36 (3 PER 10 LF) DECIDUOUS TREES (13 OF TOTAL)12 12 EVERGREEN TREES (13 OF TOTAL)12 12 SHRUBS (13 OF TOTAL)12 12 6' HIGH OPAQUE FENCE YES YES STREET TREES FARMINGTON BOULEVARD LENGTH OF ROAD FRONTAGE 2,216 LF REQUIRED PROVIDED TREES 55 (1 PER 40 LF) 55 (1 PER 40 LF) GABRIEL COURT LENGTH OF ROAD FRONTAGE 1,651 LF REQUIRED PROVIDED TREES 41 (1 PER 40 LF) 41 (1 PER 40 LF) McCORMICK CIRCLE LENGTH OF ROAD FRONTAGE 2,087 LF REQUIRED PROVIDED TREES 52 (1 PER 40 LF) 52 (1 PER 40 LF) PARKING LOT LANDSCAPING PERIMETER LANDSCAPING PARKING LOT IMPERVIOUS AREA 28,807 SF REQUIRED PROVIDED PERIMETER PARKING LOT SHADE TREES 14 (1 PER 2000 SF)14 3' HIGH HEADLIGHT SCREENING YES (IN SOME AREAS) YES (IN SOME AREAS) INTERIOR LANDSCAPING TOTAL PARKING LOT AREA 31,841 SF PARKING SPACES 119 REQUIRED PROVIDED PARKING LOT LANDSCAPED AREA 1,287 SF (5.00%) 3,344 SF (12.99%) INTERIOR PARKING LOT SHADE TREES 12 (1 PER 10 SPACES) 12 TOWNHOUSE LANDSCAPING TOTAL TOWNHOUSES PROPOSED 81 REQUIRED PROVIDED ORNAMENTAL TREES 32 (2 PER 5 TOWNHOUSES) 32 SHRUBS 97 (6 PER 5 TOWNHOUSES) 97 PROP. LANDSCAPE ESMT PLANTING AREA LANDSCAPE EASEMENT SCREENING AREA 6 BUFFER WIDTH 10 LF TOTAL BUFFER LENGTH 485 REQUIRED PROVIDED EVERGREEN TREES 48 (1 PER 10 LF) 48 (1 PER 10 LF) AREA 7 BUFFER WIDTH 10 LF TOTAL BUFFER LENGTH 107 REQUIRED PROVIDED EVERGREEN TREES 11 (1 PER 10 LF) 11 (1 PER 10 LF) AREA 8 BUFFER WIDTH 10 LF TOTAL BUFFER LENGTH 792 REQUIRED PROVIDED EVERGREEN TREES 79 (1 PER 10 LF) 79 (1 PER 10 LF) AREA 3 BUFFER TYPE TYPE A, NO SCREEN BUFFER WIDTH 100 LF (25' ACTIVE, 75' INACTIVE) TOTAL BUFFER LENGTH 65 LF REQUIRED PROVIDED PLANTS 0 NO SCREEN 0 NO SCREEN 654 656 660 656 658662BIO-RET B Catch Basin 4 OPEN SPACE 1 15.4709 AC. 2.1 CB3 19.2 66266 4 666656 BIO-RET A 8,001 SF8,000 SF8,000 SF8,000 SF OPEN SPACE 1 15.4709 AC. CG-12C CG-12B 4.1 CB4 67223.1 670672100' SETBACK120.20' 5' CONC SW L K CG-12C 21.5 22.1 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS7100.dwg PLOTTED: 7/14/2022 2:09 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS7100 BYNO.DATEREVISIONSDHOLC20001 AS NOTED CJM 2021-03-19 DLF SHEET APPROVED BY OF74 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493 07-14-2022 DAVID L. FRANK Lic. No.1061NORTH Bio-Retention Basin B Plan View Scale: 1" = 30' Bio-Retention Basin A Plan View Scale: 1" = 30'NORTH DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601LANDSCAPE BIO-RETENTION PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTBIORETENTION A TOTAL AREA OF BIORETENTION 3,915 SF SHRUBS PROVIDED (30" HIGH, 10' O.C.)17 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)488 BIO-RETENTION CALCULATIONS: PLANTING TEMPLATE: PERENNIAL GARDEN WITH SHRUBS BIORETENTION B TOTAL AREA OF BIORETENTION 3,370 SF SHRUBS PROVIDED (30" HIGH, 10' O.C.)7 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)190 BIORETENTION PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY SHRUBS CS CORNUS SERICEA RED TWIG DOGWOOD 30" HT. MIN.AS SHOWN 12 IV ILEX VERTICILATA WINTERBERRY 30" HT. MIN.AS SHOWN 11 IH ITEA VIRGINICA 'HENRY'S GARNET' HENRY'S GARNET VIRGINIA SWEETSPIRE 30" HT. MIN AS SHOWN 13 HERBACEOUS/PERENNIALS CP CALTHA PALUSTRIS MARSH MARIGOLD 1 GAL. CONT.18" O.C.154 CE CAREX ELATA 'AUREA'BOWLES GOLDEN SEDGE 1 GAL. CONT.24" O.C. 148 CT CAREX STRICTA TUSSOCK SEDGE 1 GAL. CONT.18" O.C. 148 EP EUPATORIUM PURPUREA JOE PYE WEED 1 GAL. CONT.24" O.C. 161 IR IRIS VERSICOLOR BLUE FLAG IRIS 1 GAL. CONT.24" O.C.153 LC LOBELIA CARDINALIS CARDINAL FLOWER 1 GAL. CONT.24" O.C.169 BIORETENTION C TOTAL AREA OF BIORETENTION 896 SF SHRUBS PROVIDED (30" HIGH, 10' O.C.)6 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)97 BIORETENTION D TOTAL AREA OF BIORETENTION 1,786 SF SHRUBS PROVIDED (30" HIGH, 10' O.C.)6 HERBACEOUS/PERENNIALS PROVIDED (1 GAL. CONT. SPACING VARIES)158 Bio-Retention Basin C Plan View Scale: 1" = 20' Bio-Retention Basin D Plan View Scale: 1" = 20'NORTHNORTH TOWNHOUSE TOWNHOUSE ROAD S/WDRIVEWAY DRIVEWAY(2) PROP. SHRUBS 5' O.C.PROP. TREE NOTE: CONTRACTOR SHALL SELECT PLANTS FROM TOWNHOUSE LOT PLANT LIST (THIS SHEET) AND INSTALL PER THIS DETAIL. THERE SHALL BE AN EVEN DISTRIBUTION OF TOWNHOUSES WITH ORNAMENTAL TREES VS. TOWNHOUSES WITH SHRUBS.U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS7500.dwg PLOTTED: 7/14/2022 2:09 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS7500 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF75 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORKPENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493APPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601LANDSCAPE NOTES AND DETAILSWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICTGENERAL CONDITIONS: SCOPE OF WORK THE LANDSCAPE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT TO COMPLETE ALL LANDSCAPE WORK AS SHOWN ON THE PLANS AND SPECIFICATIONS. NOTE: IF THE CONTRACTOR BIDS ACCORDING TO THE PLANT LIST, HE/SHE SHOULD THOROUGHLY CHECK THE PLANT LIST QUANTITIES WITH THE SYMBOLS DRAWN ON THE PLAN, TOP BE SURE THERE ARE NO DISCREPANCIES. IF THERE IS A DISCREPANCY BETWEEN THE DRAWING AND THE LIST ON THE PLANS, THE DRAWING TAKES PRECEDENCE. STANDARDS A. ALL PLANT MATERIAL WILL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION (ANLA). B. PLANT MATERIAL MUST BE SELECTED FROM NURSERIES THAT HAVE BEEN INSPECTED AND CERTIFIED BY STATE PLANT INSPECTORS. C. COLLECTED MATERIAL MAY BE USED ONLY WHEN APPROVED BY OWNER'S REPRESENTATIVE. D. NOMENCLATURE WILL BE IN ACCORDANCE WITH HORTUS III BY L.H. BAILEY. SUBSTITUTIONS: PRE-BID IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO MAKE EVERY REASONABLE EFFORT TO FIND THE MATERIAL SPECIFIED BY THE ARCHITECT. THE LANDSCAPE CONTRACTOR MAY OFFER SUBSTITUTIONS TO THE LANDSCAPE ARCHITECT FOR HIS/HER CONSIDERATION. THE LANDSCAPE CONTRACTOR WILL NOTIFY THE LANDSCAPE ARCHITECT IF THERE ARE KNOWN DISEASES OR INSECT RESISTANT SPECIES THAT CAN BE SUBSTITUTED FOR A SELECTED PEST-PRONE PLANT. THE CONTRACTOR SHALL SUBMIT A BASE BID AS PER PLAN PLUS PRICE CLARIFICATIONS FOR ALL RECOMMENDED SUBSTITUTIONS. SUBSTITUTIONS: POST-BID IT IS THE INTENT TO ELIMINATE POST-BID SUBSTITUTIONS. HOWEVER, IN THE EVENT THAT THE CONTRACT MATERIAL HAS BECOME UNAVAILABLE, AN APPROPRIATE SUBSTITUTION MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE. UTILITIES AND UNDERGROUND FEATURES THE LANDSCAPE CONTRACT SHALL NOTIFY UTILITY COMPANIES AND/OR THE GENERAL CONTRACTOR IN ADVANCE OF CONSTRUCTION TO LOCATE UTILITIES. A. IF THERE IS A CONFLICT WITH THE UTILITIES AND THE PLANTING, THE LANDSCAPE ARCHITECT SHALL BE RESPONSIBLE FOR RELOCATING PLANTS PRIOR TO THE PLANTING PROCESS. ANY COST DUE TO RELOCATING AFTER PLANTING SHALL BE BORNE BY THE OWNER. DRAINAGE IF PLANTS ARE TO BE INSTALLED IN AREAS THAT SHOW OBVIOUS POOR DRAINAGE, AND THE PLANTS ARE INAPPROPRIATE FOR THAT CONDITION, THE LANDSCAPE CONTRACTOR SHALL BE RELOCATED, THE CONTRACT SHALL BE ADJUSTED TO ALLOW FOR DRAINAGE CORRECTION AT A NEGOTIATED COST, OR THE PLANT SELECTION MODIFIED BY THE LANDSCAPE ARCHITECT TO ACCOMMODATE THE POOR DRAINAGE SITUATION. WARRANTY A. THE STANDARD WARRANTY IS FOR A ONE (1) YEAR PERIOD, EXCLUDING BULBS, SOD AND ANNUALS, COMMENCING ON THE DATE OF INITIAL ACCEPTANCE. AL PLANTS SHALL BE ALIVE AND IN SATISFACTORY GROWTH AT THE END OF THE GUARANTEE PERIOD. B. BALLED AND BURLAPPED (B&B). 1. BALLED AND BURLAPPED PLANTS SHALL BE DUG WITH FIRM ROOT BALLS FREE OF NOXIOUS WEEDS. THERE SHOULD BE NO EXCESS SOIL ON TOP OF THE ROOT BALL OR AROUND THE TRUNK. 2. BALL SIZE SHALL BE IN ACCORDANCE WITH ANLA STANDARDS. 3. CALIPER AND HEIGHT MEASUREMENTS: IN SIZE GRADING B&B SINGLE-TRUNK TREES, CALIPER SHALL TAKE PRECEDENCE OVER HEIGHT. CALIPER OF THE TRUNK SHALL BE TAKEN 6" ABOVE THE GROUND LEVEL (UP TO INCLUDING 4" CALIPER SIZE) AND 12" ABOVE THE GROUND LEVEL OF LARGER TREES. FOR MULTIPLE-TRUNK TRESS, HEIGHT MEASUREMENT SHALL TAKE PRECEDENCE OVER CALIPER. C. CONTAINER-GROWN STOCK 1. THE SIZE OF CONTAINER-GROWN SHRUBS IS MEASURED BY HEIGHT AND WIDTH OF PLANT. CONTAINER-GROWN TREES ARE MEASURED BY THE SAME STANDARDS LISTED IN B.3 ABOVE. THE ROOT SYSTEM OF CONTAINER-GROWN PLANTS SHALL BE WELL-DEVELOPED AND WELL- DISTRIBUTED THROUGHOUT THE CONTAINER. 2. ALL CONTAINER-GROWN TREES AND SHRUBS THAT HAVE CIRCLING AND MATTED ROOTS SHALL BE TREATED IN THE FOLLOWING MANNER PRIOR TO PLANTING: USING A KNIFE OR SHARP BLADE, MAKE 4-5 CUTS, 1" DEEP, THE LENGTH OF THE ROOT BALL, TO CUT ALL CIRCLING ROOTS. SEE PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS IN THIS SECTION. 3. ALL CONTAINER-GROWN PLANTS SHOULD BE GROUPED AND WATERED DAILY UNTIL THEY ARE PLANTED IN THE LANDSCAPE, THE SOIL SHALL BE KEPT MOIST WITH THE EQUIVALENT OF ONE INCH OF RAINFALL PER WEEK. A. PRUNING SHALL BE DONE BEFORE PLANTING OR DURING THE PLANTING OPERATION. PRUNING DETAIL FOR TREES IN THIS SECTION. B. ALL PLANT MATERIAL IN TRANSIT SHALL BE COVERED TO KEEP MATERIAL FROM DRYING OUT. THE COVERING SHALL COMPLY WITH STATE AND LOCAL LAWS PERTAINING TO THE TRANSPORT OF MATERIALS. C. TREES SHALL BE PLACED IN AN UPRIGHT POSITION WITH THE ROOTBALL COVERED BY MULCH AND KEPT MOIST. TREES AND SHRUBS SHOULD NOT BE LEFT ON SITE UNPLANTED FOR MORE THAN 24 HOURS WITHOUT ADEQUATE WATER TO INSURE ROOTS SURVIVAL. INSPECTION A. PLANTS MAY BE SUBJECT TO INSPECTION AND APPROVAL BY THE OWNER OR OWNER'S REPRESENTATIVE AT THE PLACE OF GROWTH OR HOLDING YARD FOR CONFORMITY TO SPECIFICATION REQUIREMENTS AS TO QUALITY, SIZE AND VARIETY. B. PLANTS DAMAGED IN HANDLING OR TRANSPORTATION CAN BE REJECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. C. STATE NURSERY INSPECTION CERTIFICATES SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT UPON REQUEST. PLANTING PROCEDURES FOR ALL CONTAINER-GROWN TREES & SHRUBS A. REMOVE THE PLANT EITHER BY CUTTING OR INVERTING THE CONTAINER. B. FOR UNTREATED PLASTIC CONTAINER GROWN PLANTS WITH CIRCLING ROOTS, USE A SHARP KNIFE TO MAKE 1" CUTS THE LENGTH OF THE ROOTBALL. C. PLANT SHRUB TO TREE A MINIMUM OF 1/8 OF THE HEIGHT OF THE ROOTBALL ABOVE EXISTING GRADE. D. APPLY A 2 TO 3" THICK LAYER OF APPROVED MULCH. KEEP MULCH 6" AWAY FROM THE TRUNK OF ALL TREES AND SHRUBS. E. PLANTS GROWN IN ROOT CONTAINMENT BAGS MUST HAVE THE BAGS REMOVED DURING THE PLANTING OPERATION. NO ADDITIONAL SLASHING OF THE ROOTBALL IS NECESSARY. MAINTENANCE OF LANDSCAPING NOTES: 1. ALL LANDSCAPED AREA SHALL BE MAINTAINED IN GOOD CONDITION BY OWNER. 2. REASONABLE PROVISIONS SHALL BE MADE FOR PROTECTION FROM VEHICLES, PEDESTRIANS, OR SHOPPING CARTS. 3. DEAD OR DYING VEGETATION SHALL BE REPLACED AT DIRECTION OF ADMINISTRATOR. 4. SHRUBS SHALL BE REPLACED AT A SIZE CONSISTENT WITH THAT OF EXPECTED FOR SPECIES AND TIME SINCE INSTALLATION. 5. TREES SHALL BE REPLACED AT A SIZE OF 0.5" CALIPER ABOVE 2" FOR EVERY YEAR SINCE INSTALLATION UP TO 5" CALIPER. 1. NO TREES OR SHRUBS SHALL BE PLACED ON FREDERICK WATER EASEMENTS. 2. ALL LANDSCAPING SHALL COMPLY WITH SECTION§165-203.01 LANDSCAPING REQUIREMENTS OF THE FREDERICK COUNTY ZONING ORDINANCE. 3. OWNER WILL ACCEPT FOR REVIEW, SUBSTITUTIONS FOR ALL LANDSCAPING PROVIDED THEY SATISFY APPLICABLE REGULATIONS. SHRUB PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALLOR CONTAINER SIZE 2" OF MULCH CREATE A SAUCER SHAPE WITH MULCH TO HOLD WATER SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALLBASE FIRMLY TO PREVENT ROOT BALL FROM SHIFTING PRUNE ONLY DAMAGED OR DEAD BRANCHES TREE PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL SET TRUNK PLUMB L DO NOT MULCH WITHIN 6" OF TRUNK 3" OF MULCH SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIREBASKET FROM TOP 1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURETO PREVENT ROOT BALL FROM SHIFTING SECURE GUYS WITH RUBBER HOSE TO TRUNK PRUNE ONLY DAMAGED OR DEAD BRANCHES *(2) 2"x2" WOOD STAKES SET AT 180° (ALT: STEEL FENCE POSTS) C NOTES: 1.*STAKE ONLY TO PREVENT WIND TIP OR WHEN PLANTING ON STEEP SLOPES 2. REMOVE ALL TAGS AND ROPES FROM BRANCHES AND ROOT BALL. PITCH FROM C OF PLANTING AREA TYPICAL MULCH EDGING DETAIL4" MIN.MULCH LAYER TOPSOIL L PROVIDE EDGE WITH CLEAN, CRISP SEPARATIONBETWEEN MULCHED BED AND ADJACENT SURFACECONDITIONS CUT EDGE MINIMUM 4" BELOW GRADE TO RECEIVEMULCH TURF, SIDEWALK, OR CURB 2" MIN. MULCH LAYER NOT TO SCALE EVERGREEN TREE PLANTING NOT TO SCALE 3x DIAMETER OF ROOT BALL SET TRUNK PLUMB L DRIVE STAKES AT ANANGLE INSIDE OF SAUCER DO NOT MULCH WITHIN 6" OF TRUNK 3" OF MULCH CREATE A SAUCER SHAPEWITH MULCH TO HOLD WATER SLOPE SIDES OF PLANTING HOLE REMOVE BURLAP OR WIRE BASKET FROM TOP1/3 OF ROOT BALL TAMP SOIL AROUND ROOT BALLBASE FIRMLY WITH FOOT PRESSURE TO PREVENT ROOT BALL FROMSHIFTING PRUNE ONLY DAMAGED OR DEAD BRANCHES C LANDSCAPE BUFFER PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY AREA 1 QUANTITY AREA 2 QUANTITY AREA 3 QUANTITY AREA 4 QUANTITY AREA 5 QUANTITY TOTAL TREES AS ACER SACCHARUM SUGAR MAPLE 1 1/4" CAL. MIN.PER DETAIL 3 16 -5 2 26 AA AMELANCHIER ARBOREA DOWNY SERVICEBERRY 1 1/4" CAL. MIN.PER DETAIL 3 16 -5 3 27 BN BETULA NIGRA 'HERITAGE'HERITAGE RIVER BIRCH 1 1/4" CAL. MIN.PER DETAIL 3 17 -6 3 29 CC CERCIS CANADENSIS EASTERN REDBUD 1 1/4" CAL. MIN.PER DETAIL 2 17 -6 2 27 QA QUERCUS ACUTISSIMA SAWTOOTH OAK 1 1/4" CAL. MIN.PER DETAIL 3 17 -5 2 27 EVERGREEN TREES PA PICEA ABIES NORWAY SPRUCE 4' HT. MIN.PER DETAIL 5 28 -9 4 46 PS PINUS STROBUS EASTERN WHITE PINE 4' HT. MIN.PER DETAIL 5 27 -9 4 45 TS THUJA STANDISHII X PLICATA 'GREEN GIANT'GREEN GIANT ARBORVITAE 4' HT. MIN.PER DETAIL 4 28 -9 4 26 SHRUBS AG ABELIA X GRANDIFLORA GLOSSY ABELIA 18" HT. MIN.PER DETAIL 4 21 -6 3 34 IG ILEX GLABRA 'SHAMROCK'SHAMROCK INKBERRY 18" HT. MIN.PER DETAIL 3 21 -7 3 34 JV JUNIPERUS VIRGINIANA 'HETZII'HETZ JUNIPER 18" HT. MIN.PER DETAIL 3 21 -7 3 34 VR VIBURNUM RHYTIDOPHYLLUM LEATHERLEAF VIBURNUM 18" HT. MIN.PER DETAIL 3 21 -6 3 33 NOTE: PLANTS SHALL BE INSTALLED PER BUFFER DETAIL, THIS SHEET AND PLANT TYPES SHALL BE DISTRIBUTED EVENLY THROUGHOUT THE LENGTH OF BUFFER. STREET TREE PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES CB CARPINUS BETULUS EUROPEAN HORNBEAM 2 1/2" CAL. MIN. AS SHOWN 55 GT GLEDITSIA TRIACANTHOS INERMIS 'SHADEMASTER' SHADEMASTER THORNLESS HONEYLOCUST 2 1/2" CAL. MIN.AS SHOWN 23 MP MALUS X 'PRAIRIFIRE'PRAIRIFIRE CRABAPPLE 2 1/2" CAL. MIN.AS SHOWN 29 TC TILIA CORDATA 'GREENSPIRE'GREENSPIRE LITTLELEAF LINDEN 2 1/2" CAL. MIN.AS SHOWN 41 PARKING LOT PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES AR ACER RUBRUM 'OCTOBER GLORY' OCTOBER GLORY RED MAPLE 1 1/4" CAL. MIN.AS SHOWN 7 ZS ZELKOVA SERRATA ' GREEN VASE' GREEN VASE JAPANESE ZELKOVA 1 1/4" CAL. MIN.AS SHOWN 19 SHRUBS BM BUXUS MICROPHYLLA VAR. KOREANA 'WINTERGREEN' WINTERGREEN KOREAN BOXWOOD 3 GAL. CONT. MIN./ 36" HT. MIN.4' O.C.32 IM*ILEX X MESERVEAE 'BLUE PRINCE' AND 'BLUE PRINCESS' BLUE PRINCE AND BLUE PRINCESS HOLLY 3 GAL. CONT. MIN./ 36" HT. MIN.4' O.C.41 * NOTE: PLANTS SHALL BE INSTALLED AT A RATE OF 1 MALE PER 7 FEMALES. TOWHNOUSE LOT PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY TREES AP ACER PALMATUM JAPANESE MAPLE 1 1/4" CAL. MIN.PER DETAIL 11 CF CORNUS FLORIDA 'CHEROKEE CHIEF' CHEROKEE CHIEF DOGWOOD 1 1/4" CAL. MIN.PER DETAIL 11 PS PRUNUS SERRULATA 'KWANZAN'KWANZAN CHERRY 1 1/4" CAL. MIN.PER DETAIL 10 SHRUBS IC ILEX CRENATA 'COMPACTA'COMPACT JAPANESE HOLLY 18" HT. MIN PER DETAIL 24 ND NANDINA DOMESTICA 'GULFSTREAM' GULFSTREAM HEAVENLY BAMBOO 18" HT. MIN.PER DETAIL 24 PJ PIERIS JAPONICA 'MOUNTAIN FIRE'MOUNTAIN FIRE JAPANESE PIERIS 18" HT. MIN.PER DETAIL 24 VD VIBURNUM DENTATUM ARROWWOOD VIBURNUM 18" HT. MIN.PER DETAIL 25 ADDITIONAL LANDSCAPING NOTES: LANDSCAPE EASEMENT SCREENING PLANT LIST SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING QUANTITY AREA 6 QUANTITY AREA 7 QUANTITY AREA 8 QUANTITY TOTAL EVERGREEN TREES CJ CRYPTOMERIA JAPONICA JAPANESE CRYPTOMERIA 4' HT. MIN.PER DETAIL 12 3 20 35 IN ILEX NELLIE R STEVENS NELLIE R STEVENS HOLLY 4' HT. MIN.PER DETAIL 12 3 20 35 PS PINUS STROBUS EASTERN WHITE PINE 4' HT. MIN.PER DETAIL 12 3 19 34 TS THUJA STANDISHII X PLICATA 'GREEN GIANT'GREEN GIANT ARBORVITAE 4' HT. MIN.PER DETAIL 12 2 20 34 NOTE: PLANTS SHALL BE INSTALLED PER LANDSCAPE SCREEN DETAIL, THIS SHEET AND PLANT TYPES SHALL BE DISTRIBUTED EVENLY THROUGHOUT THE LENGTH OF THE LENGTH OF THE LANDSCAPE SCREEN. TYPE - A RESIDENTIAL SEPARATION BUFFERS NO SCALE TYPE - C RESIDENTIAL SEPARATION BUFFERS NO SCALE TYPICAL TOWNHOUSE PLANTING DETAIL NO SCALE LANDSCAPE EASEMENT SCREEN NO SCALE OR PERENNIAL PLANTING DETAILGROUNDCOVER, ORNAMENTAL GRASS PLAN VIEW "D" "D" "D" SCHEDULE VARIES SEE PLAN PLANTING SECTION FARMINGTON BLVD. 55' ROW - 25 MPH GABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TO T A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07 1150'ACCESS ESMT.6 ACRE PARKLAND AREA (PROFFER)0+001+001+98Ex. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 191 Ex. Lot 203 1 Ex. Lot 120 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 PIN 55J-1-9-204ABRIARWOOD ESTATES H.O.A.INST. 040013356 OPEN SPACE Ex. Lot 13 LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WEX. 30" P E P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" P E P EX. 18" PEPEX. 18" PEP20' WIDE DRAINAGE ESMT.INST. NO. 050028042 20' WIDE DRAINAGE ESMT.INST. NO. 050028042 15" PEP18" PEP EX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. SAN. SEWER EX. W/L T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T. INST. NO. 0 8 0 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) ORRICK COMMONSSUBDIVISION LOT 6ARDEYTH LN.54' R/WSTEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 C A C D A D DC C D D D C A A D C A D C A C D A C D A D D C NO PARKING / FIRE LANE MARKINGS FH LOCATION SIGN TYPE NO PARKING (BOTH SIDES) PARKING (BOTH SIDES) LEGEND X U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS8000.dwg PLOTTED: 7/14/2022 2:10 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS8000 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF76 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601LIFE SAFETY PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT TYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "C" SEPARATION BUFFER100' - LANDSCAPE SCREENTYPE "A" SEPARATION B U F F E R 50' - LANDSCAPE SCR E E N TYPE "A" SEPARATION B U F F E R 25' - FULL SCREEN TYPE "C" SEPAR A T I O N B U F F E R 100' - LANDSCA P E S C R E E N LOT 1 10,319 SF LOT 2 8,350 SF LOT 3 8,348 SF LOT 4 8,346 SF LOT 5 8,344 SF LOT 6 8,343 SF LOT 7 10,741 SF LOT 8 10,740 SF LOT 10 10,874 SF LOT 11 10,778 SF LOT 12 9,920 SF LOT 13 8,918 SF LOT 14 8,000 SF LOT 9 10,739 SF LOT 15 8,423 SFLOT 16 8,425 SF LOT 17 8,107 SF LOT 18 8,615 SFLOT 19 8,609 SFLOT 20 8,427 SF LOT 21 8,001 SF LOT 22 8,000 SF LOT 23 8,000 SF LOT 24 8,000 SF LOT 25 12,523 SF LOT 26 8,816 SF LOT 28 10,176 SF LOT 29 8,002 SF LOT 30 8,003 SF LOT 31 8,004 SF LOT 40 8,053 SF LOT 32 8,005 SF LOT 33 8,007 SF LOT 34 8,008 SF LOT 35 8,009 SF LOT 36 8,010 SF LOT 37 8,000 SF LOT 38 8,000 SF LOT 39 8,000 SF LOT 167 2,556 SF LOT 166 2,556 SF LOT 165 3,621 SF LOT 168 2,556 SF LOT 169 2,556 SF LOT 170 3,621 SF LOT 1302,556 SFLOT 1312,556 SFLOT 1323,621 SFLOT 1292,556 SFLOT 1282,556 SFLOT 1272,556 SFLOT 1262,556 SFLOT 1253,621 SFLOT 1352,556 SFLOT 1342,556 SFLOT 1333,621 SFLOT 1362,556 SFLOT 1372,556 SFLOT 1382,556 SFLOT 1392,556 SFLOT 1403,621 SFLOT 1622,556 SFLOT 1632,556 SFLOT 1643,621 SFLOT 1612,556 SFLOT 1602,556 SFLOT 1592,556 SFLOT 1582,556 SFLOT 1573,621 SFLOT 1112,556 SFLOT 1102,556 SFLOT 1093,621 SFLOT 1122,556 SFLOT 1132,556 SFLOT 1142,556 SFLOT 1152,556 SFLOT 1163,621 SFLOT 1222,556 SFLOT 1232,556 SFLOT 1243,621 SFLOT 1212,556 SFLOT 1202,556 SFLOT 1192,556 SFLOT 1182,556 SFLOT 1173,621 SFLOT 1432,556 SFLOT 1422,556 SFLOT 1413,621 SFLOT 1442,556 SFLOT 1452,556 SFLOT 1462,556 SFLOT 1472,556 SFLOT 1483,621 SFLOT 1542,556 SFLOT 1552,556 SFLOT 1563,621 SFLOT 1532,556 SFLOT 1522,556 SFLOT 1512,556 SFLOT 1502,556 SFLOT 1493,621 SFLOT 1032,556 SFLOT 1022,556 SFLOT 1013,621 SFLOT 1042,556 SFLOT 1052,556 SFLOT 1062,556 SFLOT 1072,556 SFLOT 1083,621 SFLOT 173 2,556 SF LOT 172 2,556 SF LOT 171 3,621 SF LOT 174 2,556 SF LOT 175 2,556 SF LOT 176 3,621 SF LOT 179 2,556 SF LOT 178 2,556 SF LOT 177 3,621 SF LOT 180 2,556 SF LOT 181 3,621 SF FARMINGTON BLVD. 55' ROW - 25 MPH GABRIEL CT.55' ROW - 25 MPHMAURY WAY (PRIVATE) 31' ACCESS ESMT. HARDY WAY (PRIVATE) 31' ACCESS ESMT.WERTLAND PL. (PRIVATE)31' ACCESS ESMT.OPEN SPACE 2 1.5522 AC. OPEN SPACE 3 0.3772 AC. AGE RESTRICTED APARTMENTS NORTH 4-STORY - 24 UNIT HEIGHT = 48.26' 10,490 SF GFA /41,960 SF TOT A L FFE=672.69 AGE RESTRICTE D APARTMENTS S O U T H 4-STORY - 24 UN I T HEIGHT = 48.26' 10,490 SF GFA/4 1 , 9 6 0 S F T O T A L FFE=673.07 11 25' ACTIVE25' ACTIVE 25' ACTIVE20' ACTIVE TYPE "A" SEPARATION B U F F E R 100' - NO SCREEN4+07 UNWRAP0+58 UNWRAP1+002+00 3+0025' ACTIVE 50'ACCESS ESMT.OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. OPEN SPACE 1 15.4709 AC. LOT 27 9,004 SF TYPE "C" SEP A R A T I O N B U F F E R 200' - NO SCR E E N R E Q .50' ACTIVE150' INACTIVEEx. Lot 119 Ex. Lot 117 Ex. Lot 118 Ex. Lot 13 Ex. Lot 12 Ex. Lot 11 OUTLOT A Ex. Lot 14 Ex. Lot 24 Ex. Lot 25 2 3 4 5 6 7 8 9 Ex. Lot 204Ex. Lot 199Ex. Lot 198Ex. Lot 197Ex. Lot 196Ex. Lot 195Ex. Lot 194 Ex. Lot 193 Ex. Lot 192 Ex. Lot 203 1 PIN 55-A-202CHARLES D. LLOYDINST. 100001953PIN 55-A-203CHARLES D. LLOYDDB 820 PG 345 PIN 65-A-21ROCKY J. RHODESINST. 060023931 PIN 65-A-22GEORGE T. DAMKODB 505 PG 845 PIN 65-A-23RUSSELL W.MORELANDDB 344 PG 311 Ex. Lot 14 Ex. Lot 15 Ex. Lot 18 Ex. Lot 19 Ex. Lot 20 Ex. Lot 21 Ex. Lot 22 Ex. Lot 23 Ex. Lot 24 Ex. Lot 16 L1 BRIARWOOD ESTATES H.O.A.INST. 040013356 4 OPEN SPACE Ex. Lot 13 LYNNEHAVEN - SEC. 1INST. 030007982 LYNNEHAVENSEC. 2 / PH. 1AINST. 040010667 PATTON SUBDI V I S I O N DB 218 PG 370 WETLANDSCHANNEL243 LF 24" PEP NESCLIFFE CT.50' R/WFARMINGTON BLVD. 50' R/WLADYSLIPPER DR.54' R/WARDEYTH LN.54' R/WEX. 30" PE P DRAINAGE ESMT.INST. NO. 040010667 EX. 24 " RCP EX. 15" PE P EX. 18" PEP 20' WIDE DRAINAGE ESMT.15" PEP18" PEP EX. SAN. SEWER EX. W/L(TYP.) EX. W/L (TYP.)EX. GASLINE (TYP.) EX. SAN.SEW. (TYP.) EX. SAN. SEWER EX. W/L T.M. 64-8-9TIRRENIA,LLCDB 838 PG 1360INST. NO. 15000586ZONE: B2USE: COMMERCIAL ORRICK COMMONSSUBDIVISION LOT 5 20' FCSA SA N. E S M T. INST. NO. 08 0 0 0 6 2 8 6 50' ACCESS E S M T .INST. NO. 080 0 0 6 2 8 6 20' FCSA W/L E S M T .INST. NO. 080 0 0 6 2 8 6 EX WATER ME T E R ( G I S ) Ex. Lot 26 Ex. Lot 27 EX. W/L (TYP.) ORRICK COMMONSSUBDIVISION LOT 6ARDEYTH LN.54' R/WSTEEPLECHASE SUBDIVISIONINST. 050028042 STEEPLECHASE SUBDIVISIONINST. 050028042 Ex. Lot 12Ex. Lot 11 Ex. Lot 17 U:\Accounts\DHOLC\DHOLC20001 - Holliday - Orrick\DESIGN\_SHEETS\SDP\CS8100.dwg PLOTTED: 7/14/2022 2:10 PM, BY: Christopher Mulholland PLOTSTYLE: Pennoni NCS.stb PROJECT STATUS: CONSTRUCTION PLANSCS8100 BYNO.DATEREVISIONSDHOLC20001 1" = 80' CJM 2021-03-19 DLF SHEET APPROVED BY OF77 79 DRAWN BY DRAWING SCALE DATE PROJECT ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY PENNONI ASSOCIATES FOR THE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO PENNONI ASSOCIATES; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM.ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTORAND OWNER MUST BE NOTIFIED OF ANYDISCREPANCIES BEFORE PROCEEDING WITH WORK00 80'160'PENNONI ASSOCIATES INC.117 East Piccadilly StreetWinchester, VA 22601T 540.667.2139F 540.665.0493NORTHAPPROVED PERMIT DRAWINGS  07-14-2022 DAVID L. FRANK Lic. No.1061 DAVE HOLLIDAY CONSTRUCTION, INC.420 WEST JUBAL EARLY DRIVE | WINCHESTER, VIRGINIA 22601LIGHTING PLANWINCHESTER LANDINGSUBDIVISION DESIGN & SITE PLANPROJECT ADDRESS 1 | PROJECT ADDRESS 2RED BUD MAGISTERIAL DISTRICT LIGHT POLE FOUNDATION DETAIL NOT TO SCALE 3'-0"6"4'-6"NOTE: 1'-8"