HomeMy WebLinkAbout03-22 PC Staff Report 1 REZONING 03-22 ONE LOGISTICS PARK L.P. REZONING APPLICATION #03-22 ONE LOGISTICS PARK L.P. Staff Report for the Board of Supervisors Prepared: June 7, 2022 Staff Contacts: John A. Bishop, AICP, Assistant Director Reviewed Action Planning Commission: 06/15/22 Pending Board of Supervisors: 07/13/22 Pending PROPOSAL: To rezone 3.16+/- acres from the R4 (Residential Planned Community) District with proffers to the M1 (Light Industrial) District with proffers. LOCATION: The property is located approximately one mile east of I-81 on the south side of Millwood Pike (Route 50), east of Prince Frederick Drive (Route 781) and Coverstone Drive (Route 1538) and west of Arbor Court and Pendleton Drive. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 06/15/2022 PLANNING COMMISSION MEETING; The subject property is part of the original Carpers Valley/Governors Hill Rezoning which was approved in 2005 (revised in 2009, 2013 and 2014). Rezoning #01-21 which rezoned the surrounding 277.16 acres to a mix of M1 (Light Industrial) and B2 (General Business) zoning with a total of 264.7 acres of M1 (Light Industrial) and 12.5 acres of B2 (General Business) . This action left the subject parcel surrounded entirely by M1 zoned property. The applicant has since purchased the subject property and is requesting that it be rezoned to M1 to match the surrounding property. The site is located within the limits of the Senseny/Eastern Frederick Urban Area Plan of the Comprehensive Plan. The Plan identifies this property with a commercial/transition and residential land use designation; these designations are consistent with the current zoning. Therefore, the requested M1 District is generally inconsistent with the Comprehensive Plan. It should be noted that the entire site was previously designated for commercial land uses by the Comprehensive Plan in effect at the time of the original rezoning approval; the plan was later updated to show the residential zoning approved in 2005. The subject parcels are also located within the boundaries of the Airport Support Area that surrounds the Winchester Regional Airport; the support area discourages new residential construction. The proposed elimination of residential use of the subject parcel would further support the goals of the Airport Support Area. The planned road network included in the Senseny/Eastern Frederick Urban Area Plan identifies a major collector road system which provides for an east-west linkage (Coverstone Drive) which connects to Millwood Pike at Inverlee Drive. A portion of Coverstone Drive currently exits from Prince Frederick Drive to the property boundary of the Frederick County Public Safety Center. The planned phased connection from the existing terminus of Coverstone Drive to Millwood Pike at Inverlee Drive provides for an important linkage that serves both this development and surrounding land uses. 29 2 REZONING 03-22 ONE LOGISTICS PARK L.P. Rezoning #01-21 has previously proffered to complete Coverstone Drive to Millwood Pike among a number of other transportation proffers. This application seeks to apply the proffers from Rezoning #01-21 verbatim and in their entirety to this parcel. This results in no additional developmental square footage or trip generation beyond what was previously approved in Rezoning #01-21. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. 30 3 REZONING 03-22 ONE LOGISTICS PARK L.P. This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by staff where relevant throughout this staff report. Reviewed Action Planning Commission: 06/15/22 Pending Board of Supervisors: 07/13/22 Pending PROPOSAL: To rezone 3.16+/- acres from the R4 (Residential Planned Community) District with proffers to the M1 (Light Industrial) District with proffers. LOCATION: The property is located approximately one mile east of I-81 on the south side of Millwood Pike (Route 50), east of Prince Frederick Drive (Route 781) and Coverstone Drive (Route 1538) and west of Arbor Court and Pendleton Drive. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBERS: 64-A-83B PROPERTY ZONING: R4 (Residential Planned Community) District PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: M1 (Light Industrial) Use Vacant South: M1 (Light Industrial) Use Vacant East: M1 (Light Industrial) Use Vacant West: M1 (Light Industrial) Use Vacant 31 4 REZONING 03-22 ONE LOGISTICS PARK L.P. REVIEW EVALUATIONS: Due to the fact that the applicant is applying the proffers of Rezoning #01-21 in their entirety to the subject parcel, resulting in no changes to transportation or other infrastructure or additional enabled square footage, staff has not required the applicant to seek additional agency comments. Planning & Zoning: 1) Site History The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle) identifies the subject parcels as being zoned R1 (Residential Limited) District. The parcels were re-mapped from R1 to A2 (Agricultural General) District pursuant to the County’s comprehensive downzoning initiative (Zoning Amendment Petition #011-80), which was adopted on October 8, 1980. The County’s agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted in the re- mapping of the subject property and all other A1 and A2 zoned land to the RA District. The subject properties were rezoned to the R4 (Residential Planned Community) District in 2005 (revised in 2009, 2013 and 2014). A Master Development Plan was approved for the property, the Governors Hill project, in 2009. 2) Comprehensive Plan The Comprehensive Plan is the guide for the future growth of Frederick County. The Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities, and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The Comprehensive Plan and the Senseny/Eastern Frederick Urban Area Plan provide guidance on the future development of this property. The site is located within the limits of the Sewer and Water Service Area (SWSA). The Plan identifies this property with a commercial/transition and residential land use designation which is consistent with the current zoning; therefore, the requested M1 (Light Industrial) District is generally inconsistent with the Comprehensive Plan. It should be noted that the entire site was previously designated for commercial land uses by the Comprehensive Plan in effect at the time of the original rezoning approval; the plan was later updated to show the residential zoning approved in 2005. The subject parcels are also located within the boundaries of the Airport Support Area that surrounds the Winchester Regional Airport. This area comprises a zone of influence for airport operations wherein new residential land use is discouraged due to the prevalence of aircraft noise and the consequent potential for use incompatibilities. The development of business and 32 5 REZONING 03-22 ONE LOGISTICS PARK L.P. industrial land uses is supported within the Airport Support Area to minimize such use conflicts and ensure the feasibility of future airport expansion. The elimination of the residential zoning that currently exists on the site would further the goals of the Airport Support Area. Transportation and Site Access The planned road network included in the Senseny/Eastern Frederick Urban Area Plan identifies a major collector road system which provides for an east-west linkage (Coverstone Drive) which connects to Millwood Pike (Route 50 East) at Inverlee Drive. A portion of Coverstone Drive currently exits from Prince Frederick Drive to the property boundary of the Frederick County Public Safety Center. The planned connection from the existing terminus of Coverstone Drive to Millwood Pike at Inverlee Drive provides for an important linkage that serves both this development and significant residential development north of Route 50. This connection would offer an alternative route that would help relieve future congestion on Route 50 between Prince Frederick Drive and I-81. In addition, Coverstone Drive will connect with the future relocated Route 522 South, which once approved and constructed, would connect at Prince Frederick Drive. In combination with the Crossover Boulevard project, which is currently under construction from Airport Road into the City of Winchester, this important network connection would allow significant traffic flow from this development and surrounding land uses to access Route 522 and the City of Winchester without traveling through the Exit 313 interchange area. 3) Potential Impacts: Due to the fact that this property proposes to adopt the proffers from Rezoning #01-21 for this parcel in their entirety and that those proffers limit development to specific square footage caps, there is no additional impact created by the rezoning of this parcel. 4) Proffers: The proposed proffers associated with this rezoning application are as follows. As noted previously, these proffers are identical to the proffers of Rezoning #01-21 for the surrounding properties. Proffer Statement: 1. LAND USE 1.1. The project shall be designed to establish interconnected commercial and light industrial Land Bays in conformance with the GDP, and as is specifically set forth in these proffers. Minor modifications as necessary upon final engineering, must meet the intent of the proffers and receive Director of Planning approval. 2. TRANSPORTATION 2.1. The public roadways proposed on the Property shall be constructed in the locations depicted on the GDP. Minor modifications, as necessary upon final engineering, including but not limited to land bay ingress/egress and intersection alignments, must meet the intent of the proffers and receive Director of Planning and VDOT approval at 33 6 REZONING 03-22 ONE LOGISTICS PARK L.P. site plan or road plan. 2.2. The Owners shall design, construct, and dedicate Coverstone Drive as an urban four-lane divided collector road with turn lanes as warranted within an approximate 102' right-of- way in accord with the phasing schedule referenced below. The Owners may at their option also build this road ahead of the requirements of the phasing schedule. PHASE 1: Phase 1 shall consist of the full urban four-lane divided collector road section, including a ten-foot shared-use asphalt trail, from Millwood Pike to the south boundary of Land Bay 3, as depicted on the GDP. This roadway shall be bonded and constructed to a minimum base asphalt prior to issuance of a certificate of occupancy for any building within Land Bays 3 or 4. Phase 1 improvements shall consist of all necessary improvements, including signalization if or when warranted by VDOT, to create a four-way intersection, or alternative intersection, subject to VDOT approval, at the existing intersection of Inverlee Way and Millwood Pike as shown on the GDP. Additionally, the Owner shall close the existing Millwood Pike crossover previously used for access to the golf course concurrent with Phase 1 improvements. PHASE 2: Phase 2 shall consist of construction of a two-lane urban half section of Coverstone Drive from the south boundary of Land Bay 3 to the Pendleton Drive intersection as depicted on the GDP, including a shared-use asphalt trail on the east side of this roadway. Phase 2 roadway improvements shall provide additional access to Land Bay 4 and shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 5 through 8. This two-lane Phase 2 half section shall be subject to final engineering and VDOT approval and shall include the two ultimate northbound lanes used for two-way traffic, with a lane transition to the Phase 1 four lane section. PHASE 3: Phase 3 shall consist of construction of a two-lane urban half section of Coverstone Drive from the Pendleton Drive intersection to the existing Coverstone Drive connection at 1080 Coverstone Drive (TM 64-A-87A) as depicted on the GDP, including transition to the existing four-lane section and a shared-use asphalt trail to the south/east of the roadway. Phase 3 roadway improvements shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 1 or 2 and or no later than issuance of the certificate of occupancy for new construction on the Property that exceeds 1,600,000 square feet. This two-lane Phase 3 half section shall be subject to final engineering and VDOT approval and shall include the two ultimate eastbound lanes used for two-way traffic, with a lane transition to the existing four lane section. PHASE 4: Phase 4 shall consist of construction of the remaining two-lanes of the full urban four-lane divided section of Coverstone Drive previously constructed in Phases 2 and 3 from the south boundary of Land Bay 3 to 34 7 REZONING 03-22 ONE LOGISTICS PARK L.P. the existing Coverstone Drive connection at 1080 Coverstone Drive (TM 64-A-87A) as depicted on the GDP. Phase 4 roadway improvements shall be completed prior to issuance of a certificate of occupancy for any new construction on the Property that exceeds 2,000,000 square feet. 2.3. Notwithstanding the foregoing Proffer 2.2 phasing schedule for the construction of Coverstone Drive, if vehicle per day (VPD) traffic counts on Coverstone Drive exceed 10,000 VPD total or if Heavy Vehicle traffic counts exceed 800 Heavy Vehicle VPD on Coverstone Drive, south of Land Bay 3, then the Owners shall complete the full construction of Coverstone Drive as an ultimate full urban four lane section from Millwood Pike to the existing eastern terminus of Coverstone Drive (1080 Coverstone Drive (TM 64-A-87A) prior to issuance of any further certificates of occupancy. The term “Heavy Vehicle” shall be defined as per FHWA Classification Type 4 or higher (6 tires, or multi-axle vehicle). In order to ensure compliance with this Proffer 2.3, the Owners shall provide a vehicle classification count to Frederick County, including Heavy Vehicle counts, not later six months after the issuance of the first certificate of occupancy for new construction on the Property in either Land Bays 1 and 2 or any new construction that yields a minimum cumulative aggregate of 1,600,000 square feet of new construction on the Property. 2.4. The Owners shall design and construct the extension of existing Pendleton Drive to Coverstone Drive, as shown on the GDP. The proposed extension will be a minimum two-lane urban local roadway with an approximate right of way width of 60' to provide access to employment uses within Phase B (Land Bays 5 through 8). The Pendleton Drive extension shall be constructed prior to issuance of the first occupancy permit within Phase B. 2.5. Access to Millwood Pike shall be limited to Coverstone Drive, as shown on the GDP, with the exception of the private driveway currently serving the residentially zoned parcel identified as TM 64-A-83B. The Owners shall maintain an access easement for this residential driveway until such time as this residentially zoned parcel is rezoned for non-residential uses. If this residentially zoned parcel is rezoned by others for non- residential uses, an interparcel access linkage shall be provided. No new commercial access to Millwood Pike is proposed and the existing driveway to 1600 Millwood Pike (TM 64-A-83B) will not be used for site access. 2.6. All off-site road improvements shall be designed to the latest VDOT standards, unless otherwise approved by VDOT in general conformance with the submitted impact study. Off-site improvements shall be constructed as depicted on the GDP as follows: 2.6.1. Eastern improvements shall consist of improvements at the intersection of Millwood Pike/Inverlee Way/Coverstone Drive and sh all be completed coincident with the Coverstone Drive construction described in Proffer 2.2, Phase 1, and shall consist of the following improvements: a) Eastbound Millwood Pike right turn lane to Coverstone Drive b) Westbound Millwood Pike dual left turns to Coverstone Drive, and c) Northbound Coverstone Drive dual lefts to Millwood Pike 35 8 REZONING 03-22 ONE LOGISTICS PARK L.P. 2.6.2 Western improvements shall consist of improvements at the intersection of Prince Frederick Drive/Costello Drive and shall be completed coincident with new construction that yields a total aggregate new construction amount on the Property in excess of 1,600,000 square feet and shall consist of the following improvements: a) Northbound Prince Frederick Drive left to Costello Drive; and b) Installation of traffic signalization at the intersection of Prince Frederick Drive and Costello Drive, if deemed warranted by VDOT and subject to VDOT approval. In furtherance of this commitment, a VDOT Traffic Signalization Agreement, attached as Exhibit 1 hereto shall be executed and submitted to VDOT prior to the first site plan approval. Pursuant to this VDOT Traffic Signalization Agreement, the Owners shall prepare and submit a traffic signalization warrant study to VDOT and Frederick County to determine whether minimum sufficient warrants exist for installation of traffic signalization at the intersection of Prince Frederick Drive and Costello Drive prior to issuance of the first certificate of occupancy for new construction that yields 1,600,000 square feet of new development on the Property. If warranted, this installation will occur once Proffer 2.2 Coverstone Drive Phase 2 and Phase 3 improvements have been completed. In the event that this traffic signalization warrant study shows that minimum sufficient warrants for installation of traffic signalization at the intersection of Prince Frederick Drive and Costello Drive are not present at that time, the Developer shall prepare and submit a second traffic signalization warrant study to VDOT and Frederick County to determine whether minimum sufficient warrants exist for installation of traffic signalization at the intersection of Prince Frederick Drive and Costello Drive prior to issuance of the first certificate of occupancy for new construction that yields 2,000,000 square feet in new development on the Property. In the event this traffic signalization is still not warranted by VDOT at that time, the Owners will provide a cash contribution in the amount Two Hundred Thousand Dollars ($200,000) to Frederick County for regional roadway improvements off-site in the Millwood Pike corridor as determined by the Board of Supervisors once the VDOT Signalization Agreement has expired and is nonrenewable. This cash contribution shall be escalated per the Consumer Price Index (CPI-U) forward from the date of rezoning approval. 2.6.3 Northern improvements shall consist of improvements at the intersection of Millwood Pike and Prince Frederick Drive and shall consist of the following improvements: Construction of an additional lane on northbound Prince Frederick Drive to provide a dedicated left, left/through, and right turn lane, including modifications to the existing signal and geometric improvements of 36 9 REZONING 03-22 ONE LOGISTICS PARK L.P. the crossover and shall be completed coincident with new construction that yields a total aggregate new construction amount on the Property in excess of 1,600,000 square feet. 2.7. The Owners’ obligations to complete the off-site transportation improvements described in Proffer 2.6 shall be contingent upon its acquisition of the off-site right-of-way and necessary easements required for these improvements. The Owners shall seek to acquire all off-site right-of-way and necessary easements by private means at fair market value. In the event the Owners are not able to acquire this needed off-site right-of-way and necessary easements required for these proffered improvements, the Owners shall instead provide alternative satisfaction of its proffered obligation to construct these off-site improvements by providing a cash contribution at that time to the County for the appraised right-of-way acquisition values of these off-site rights-of-way and the estimated construction costs of those off-site transportation improvements it is not able to construct for use by the County for regional roadway improvements off-site in the Millwood Pike corridor as determined by the Board of Supervisors. The construction cost estimate shall be subject to review and approval by the County. Thiscash contribution shall coincide with the thresholds that triggers the off-site road improvement as identified in Proffer 2.6. 2.8. Any future transportation analyses required for the Property shall utilize the Land Use Code per the latest version of the I.T.E. Trip Generation Manual for any non-residential use. Determination on alternative land uses shall be scoped with VDOT and approved in writing prior to submission of site plan. 3. PEDESTRIAN TRAIL SYSTEM 3.1. The Owners shall design and build a 10’ public pedestrian-bicycle asphalt trail, to Virginia Department of Transportation (VDOT) standards, generally along the south/east side of Coverstone Drive. A crosswalk connection to the existing asphalt path to the west, outside of the dedicated right-of-way, will be provided. A Sidewalk shall be constructed to VDOT standards along the extension of Pendleton Drive. 4. FIRE AND RESCUE 4.1. Cash contributions to support Frederick County fire and rescue services in the amount of One Hundred Dollars ($100) for every 1000 square feet of commercial and/or industrial building area shall be paid by the Owners to the County at time of issuances of certificates of occupancy for each building. 5. WATER AND SANITARY SEWER 5.1. The Owner shall be responsible for connecting the Property to public water and sanitary sewer. All water and sanitary sewer infrastructure shall be constructed in accordance with the requirements of the Frederick County Sanitation Authority. 5.2. Prior to the first water or sewer connection to the public system for occupancy in Phase A, the Owner, will conform with all appropriate Frederick Water regulations at time of 37 10 REZONING 03-22 ONE LOGISTICS PARK L.P. site plan to address concerns regarding the inundation of three existing sanitary sewer manholes (#84, 84A, 85). The subject manholes are located south of Millwood Pike, adjacent to an existing pond within the project limits. The pond is located south of Millwood Pike, west of the proposed Coverstone entrance. 6. CULTURAL RESOURCES INVESTIGATION AND PRESERVATION 6.1. The Owner shall conduct, or cause to be conducted, a Phase I Archaeological Investigation of the Property prior to the approval of the first final site plan for the Property and shall complete Phase II and III investigations thereof as may be demonstrated to be necessary by the Phase I study. 7. ROAD EFFICIENCY BUFFER 7.1. The Owners shall provide an additional 50’ to the Road Efficiency Buffer for the portion of the site within Phase A as depicted on the GDP. Following the required public hearing, a recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. 38