Loading...
HomeMy WebLinkAbout02-22 Design Plan1COVER SHEETN/A Gas:Shenandoah Gas Co. P.O. Box 2400 Winchester, VA 22604 (540) 869-1111 Phone:Verizon P.O. Box 17398 Baltimore, MD 21297 (301) 954-6282 Water/Sewer: Frederick Water P.O. Box 1877 Winchester, VA. 22604 (540) 868-1061 UTILITY NOTICE REQUIRED Contractors shall notify all public utility operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. Names and telephone numbers of the operators of underground utility lines appear below. These numbers shall also be used to serve in an emergency condition. CALL "MISS UTILITY" VIRGINIA UTILITY PROTECTION SERVICE (VUPS) AT 811 OR 1-800-552-7001, 48 HOURS PRIOR TO THE START OF WORK. EXCAVATORS MUST NOTIFY ALL PUBLIC UTILITY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATING OR BLASTING AND HAVE THOSE FACILITIES LOCATED BY THE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION. THE EXCAVATOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL COUNTY REQUIREMENTS, VIRGINIA CODE AND REGULATIONS. VICINITY MAP SCALE: 1" = 1000' OWNER SNOWDEN II LLC 3201 JERMANTOWN ROAD, SUITE 150 FAIRFAX, VA 22030 571-581-4791 DEVELOPER SNOWDEN II LLC 3201 JERMANTOWN ROAD, SUITE 150 FAIRFAX, VA 22030 571-581-4791 Power:Rappahannock Electric Coop 137 Kelly Court Front Royal, VA 22630 1-800-552-3904 STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 22-02 15 2760B Plan Revisions Rev No Date Comment 01 4/13/2022 AGENCY COMMENTS 02 4/18/2022 FC GIS ROAD NAME COMMENTS 03 5/10/2022 VDOT AND FC PLANNING COMMENTS 04 6/07/2022 VDOT COMMENTS 05 06/27/2022 FC PLANNING COMMENTS 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVSTEPHENSON VILLAGE II MASTER DEVELOPMENT PLAN STONEWALL MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA FREDERICK COUNTY ADMINISTRATOR APPROVALS DATE FREDERICK COUNTY PLANNING DIRECTOR DATE MASTER DEVELOPMENT PLAN NUMBER 02-22 15 2003 GDP 01 04/13/2022 Sheet List Table Sheet #Sheet Title Rev. No. Rev. Date 1 Cover Sheet 2 General Notes and Legend 3 Overall Boundary Map 4 Proffered GDP and Project Development Plan 5 Overall Environmental Sheet 6 Development Aggregate Tabulation Sheet 7 Road Classification & Required Landscaping Plan 8 Land Use Plan and Sheet Index 9 Land Use Plan 10 Land Use Plan 11 Land Use Plan 12 Land Use Plan 13 Land Use Plan 14 Proffer Compliance Sheet 05 06/27/2022 01 04/13/2022 01 04/13/2022 05 06/27/2022 01 04/13/2022 01 04/13/2022 04 06/07/2022 03 05/10/2022 03 05/10/2022 03 05/10/2022 03 05/10/2022 03 05/10/2022 03 05/10/2022 01 04/13/2022 FIRE MARSHAL'S NOTE GENERAL NOTES VDOT GENERAL NOTES PROJECT NOTES LEGEND N/A 2GENERAL NOTES AND LEGENDSTEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15 Fire lane markings and signage: Any "No Parking" signs and yellow painted curb locations will be installed by field inspection at the direction of the Fire Marshal's Office. FREDERICK WATER PROJECT INFORMATION WATER AND SANITARY SEWER USAGE WATER DEMAND 308,270 GPD SANITARY SEWER DISCHARGE 308,270 GPD Calculation of demand/discharge WATER DEMAND *Residential: 235 gpd per connection *Commercial: 75 gpd per 1,000 sf *Industrial: 25 gpd @ 10 persons per acre SEWER DISCHARGE Sewer discharge equals water demand 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 1. Greenway Engineering, Inc. (GE) issued this plan set based on project criteria dictated by the client and municipal codes. This plan set is not considered complete or appropriate for construction until ALL necessary agencies have given approval AND this plan set is signed and sealed by a licensed professional. Any work, planning, scheduling, material purchases and/or construction prior to approvals and licensed/professional sealing will be performed at the risk of the personnel authorizing work. GE shall be held harmless from and costs, time delay and/or material changes incurred on work started before this plan set receives approvals and seals. 2. Methods and materials used in the construction of the improvements herein shall conform to current County Construction Standards and Specifications and/or current VDOT Standards and Specifications. 3. The Engineer shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures nor for safety precautions and programs in connection with work shown on these plans. The Engineer is not responsible for the contractor's schedules or failure to carry out the work. The Engineer is not responsible for acts of omissions of the contractor, subcontractor, or their agents or employees, or any other person performing portions of the work. 4. The Contractor, Owner or Developer shall be responsible for securing any third party inspection/testing service to insure construction compliance with these plans and specifications. It is Greenway Engineering's recommendation that a third party inspection/testing service be employed to ensure that project is completed and materials installed meet the details and specifications in these plans. 5. The location of existing utilities shown in these plans are taken from existing records. It shall be the contractors responsibility to verify the exact horizontal and vertical location of all existing utilities as needed prior to construction. The contractor shall be responsible for the digging of all test holes that may be required, whether recommended or not by these plans, to determine the exact location and elevation of existing utilities. If any conflicts arising from this existing utility verification or if during the course of construction, any object of an unusual nature is encountered, the contractor shall cease work in that area and immediately notify Greenway Engineering at (540) 662-4185 and/or the proper authority. Greenway Engineering or any engineer associated with these plans shall not be responsible or liable for any construction cost that may be associated with the installation or reinstallation any utility or other improvements if not notified of any discrepancies between actual field conditions and the approved plan. 6. The approval of these plans in no way relieve the developer, the contractor, or their agents of any legal responsibility which may be required by the code of Virginia or any other ordinance enacted by the County nor does it guarantee the issuance of any required permit by the County, VDOT or any other Agency. 7. An approved set of plans and all applicable permits must be available at the construction site at all times during construction. A representative of the developer must be available at all times. 8. Prior to the initiation of any land disturbing activities the Developer, the Contractor or the Responsible Land Disturber shall obtain a Land Disturbance Permit from the County Engineer's office. The Contractor, Developer or his agent shall be responsible for obtaining a Virginia Stormwater Management Program (VSMP) Permit and shall be responsible for the registration of the construction site as required by law. They shall also be responsible for obtaining and maintaining on site a Stormwater Pollution Prevention Plan (SWPPP). The approval of these plans in no way relieves the developer or his agent of the responsibilities contained in the Virginia Erosion and Sediment Control Handbook. 9. The Developer or his agent shall be responsible for obtaining any required permits from the Virginia Department of Environmental Quality (DEQ) or the United States Army Corp of Engineers for any plan wetland disturbance as shown on these plans. They shall also be responsible the identification and delineation of any wetlands that may be present on the construction site. 10. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public streets, and it is the contractors responsibility to clean streets, allay dust, and to take whatever measures are necessary to insure that public streets are maintained in a clean, mud and dust free condition at all times. 11. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Transportation (VDOT) and Frederick County prior to any construction activities within existing State right-of-way. 12. The developer will be responsible for any damage to the existing streets and utilities which occurs as a result of his construction project within or contiguous to the existing right-of-way. 13. Warning signs, markers, barricades or flagmen should be in accordance with the State and Federal Manual on Uniform Traffic Control Devices (MUTCD). 14. The exact location of all guard rails and paved ditches will be determined by VDOT personnel. "A joint inspection will be held with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation (VDOT) to determine if and where guard rail and/or paved ditches will be needed. The developer will be responsible for providing guardrail and paved ditches as determined by this joint inspection." Refer to Virginia Department of Transportation (VDOT) Guard Rail and Paved Ditch Specifications. 15. All unsuitable material shall be removed from the construction limits of the site plan before placing embankment. 16. All pavement sections shown on these approved plans are based on a minimum CBR value of 6 and are for preliminary design only. Final pavement design shall be based upon actual field tested CBR values. The Contractor or Developer shall be responsible for field tests per VDOT standards to obtain actual CBR values for final design. Final pavement designs will be approved by VDOT and/or the Owner/Developer, which ever applicable, prior to installation. 17. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6" diameter and conform to VDOT standard SB-1. 18. When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to the County Public Works Department prior to issuance of grading and/or site development permits. 19. Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary sewer lines. Information should also be obtained from the appropriate authority concerning permits, cut sheets, and connections to existing lines. 20. The Developer and/or Contractor shall be responsible to supply all utility companies with copies of the approved plans and advise them that all grading shall conform to the approved plans, and further that the utility companies shall be responsible for horning these plans and the finished grades in the installation of their utility lines. 21. All utilities to be located underground. 22. Contractors shall notify operators who maintain underground utility lines in the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. 23. The developer will be responsible for the relocation of any utilities which is required as a result of his project. The relocation should be done prior to construction. 24. All parking lot/street light and dry utility design shall be performed and provided separately by others. All dry utility and or lighting information shown hereon is as specified by others and is included for informational purposes only, as directed by the Owner, Developer and/or public agency requirements. Greenway Engineering has not performed the lighting and/or dry utility design and does not warrant and is not responsible for the degree and/or adequacy of illumination on this project or the adequacy of the dry utility to service the site. 25. All sanitary sewers, water mains and appurtenances shall be constructed in accordance with the current standards and specifications of the Frederick County Sanitation Authority. 26. All stormwater piping and structures shown on these plans are only accurate to the inlet or manhole locations as shown hereon. Detail design of stormwater structures were not provided to Greenway Engineering. Actual pipe alignments will be based upon developed structural shop drawings as provided by the manufacturer. Contractor shall make adjustments to pipe alignments base on provided shop drawings. Greenway Engineering will not be held responsible or liable for any discrepancies or changes caused by the structural design. Contractor may submit shop drawings to Greenway Engineering for review and approval at contractor's expense. Shop drawings will be reviewed for compliance with design plans. The Owner or Developer will be responsible for any redesign as a result of structural shop drawing design. 27. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per standard proctor AASHTO-T99, ASTM-D698, or VTM-1 as applicable. Density shall be certified by a registered professional engineer and results submitted to Frederick County prior to pavement construction. If a geotechnical report has been prepared, it should supersede the requirements in this note. 28. Refer to Geotechnical Engineer for methods, materials and details for construction of all earthwork activities. 29. Any retaining wall 2 ft. or greater in height shall require the issuance of a separate building permit. 30. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than one litter receptacle shall be provided at the construction site. 31. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected in accordance with state law. In the event gravesites are discovered during construction, the owner and engineer must be notified immediately. 32. Individual sign permits will be required from the Zoning Office for all free standing and/or facade signs prior to erecting the sign and may require a separate building permit.. V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation(VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations, and any otherapplicable state, federal or local regulations. In case of a discrepancy or conflict between the Standards or Specifications andRegulations, the most stringent shall govern. V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA),and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with thecurrent edition of VDOT’s Work Area Protection Manual. A transportation management plan needs to be submitted for approvaland land use permit issued prior to any execution of work within the VDOT right of way. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, junctionboxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the developer tolocate and identify utility facilities or items that may be in conflict with the proposed construction activity. VDOT approval ofthese plans does not indemnify the developer from this responsibility. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemednecessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility of the developer. V6. If required by the local VDOT Land Development Office, a pre-construction conference shall be arranged and held by theengineer and/or developer with the attendance of the contractor (s), various County agencies, utility companies and VDOT priorto initiation of work. V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undeterminedlength of time. VDOT requires and shall receive 48 hours advance notice prior to any required or requested inspection. V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that impacts a VDOTmaintained Interstate or Primary roadway to provide notification of the installation and removal of the work zone. V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance withSection 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by thisproject shall be maintained through construction. V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches coverand when possible shall be installed under roadway drainage facilities at conflict points.V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during thecourse of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that vicinityuntil an adequate design can be determined by the engineer and approved by VDOT. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior toplacement of fill. A VDOT representative shall be present to insure the soil sample(s) obtained for CBR’s is representative ofthe location. When soil samples are submitted to private laboratories for testing, the samples shall be clearly identified andlabeled as belonging to a project to be accepted by VDOT and that testing shall be performed in accordance with all applicableVDOT standards and procedures. V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in accordance withthe lift thicknesses, density and moisture requirements as specified in the current VDOT Road and Bridge Specifications.Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified by VDOT. V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans asstorm sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one pipe installation for each size ofeach material type will be inspected or ten percent of the total amount for each size and material type summarized. All pipeinstallations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for inspection purposes.Additional testing may be required as directed by the Area Land Use Engineer or their representative. V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum designstandards and is the responsibility of the developer. V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by thedeveloper in accordance with the Manual On Uniform Traffic Control Devices. V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start ofconstruction. Copies of all invoices for materials utilized within any dedicated street right-of-way must be provided to the localVDOT Land Development Office prior to acceptance of the work. Unit and total prices may be obscured. V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will bedetermined using the density control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications andVTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOTdaily, unless specified otherwise. In addition to checking stone depths, a VDOT representative shall be notified and given theopportunity to be present during the construction and testing of the density control strip. V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications.Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A certified compactiontechnician shall perform these tests. Certified copies of test reports shall be submitted to VDOT daily, unless specifie otherwise.A VDOT representative shall be notified and given the opportunity to be present during the construction and testing of thecontrol strip. V22. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored belowthe bottom of the excavation to determine the type and condition of the foundation. The contractor shall report findings offoundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOTRoad and Bridge Standard PB-1. Where soft, yielding, or otherwise unsuitable foundation is encountered, the foundation designand/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT’sinstallation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. V24. Approval of these plans shall expire five (5) years from the date of the approval letter. V25. VDOT Standard CG-12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. V26. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposedfoundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of borehole logsand report findings of foundation exploration to the engineer and VDOT for approval prior to constructing box. Foundationdesigns shall comply with VDOT Road and Bridge Standard PB-1. Contrary to the Standard, where rock is encountered andcast-in-place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, yielding, or otherwise unsuitablefoundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineerand approved by VDOT. Rev. No. Date 01 04/13/2022 PROPOSED SANITARY LATERAL CLEANOUT CENTERLINE EXISTING SPOT ELEVATION STORM DRAIN STRUCTURE IDENTIFIER SANITARY MANHOLE IDENTIFIER PROPOSED SPOT ELEVATION EXISTING CURB AND GUTTER PROPOSED EDGE OF PAVEMENT EXISTING EDGE OF PAVEMENT EXISTING INDEX CONTOUR EXISTING INTERMEDIATE CONTOUR PROPOSED CONTOUR PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED TELEPHONE LINE EXISTING TELEPHONE LINE TRANSITION TO REVERSE CURB PROPOSED CURB AND GUTTER PROPOSED ELECTRIC SERVICE EXISTING ELECTRIC SERVICE PROPOSED SANITARY SEWER EXISTING SANITARY SEWER PROPOSED GAS LINE EXISTING GAS LINE FENCELINE FLOW LINE PROPOSED WATERLINE W/ TEE PROPERTY LINE EXISTING TELEPHONE PEDESTAL EXISTING WATERLINE W/ TEE EXISTING UTILITY POLE/GUIDE WIRE SIGNS PROPOSED REDUCER EXISTING FIRE HYDRANT/VALVE/METER INDICATES THE NUMBER OF TYPICAL PARKING SPACES PARKING INDICATOR HANDICAP PARKING PROPOSED BUILDING ENTRANCE VEHICLES PER DAY COUNT PROPOSED FIRE HYDRANT/VALVE/METER LIGHT POLE EXISTING EASEMENT LINE PROPOSED EASEMENT LINE EXISTING TREE LINE PARCEL IDENTIFICATION NO. : SITE LOCATION : 44-A-31A FREDERICK COUNTY CURRENT ZONING : CURRENT USE : PROPOSED USE : R4, RESIDENTIAL PLANNED UNDEVELOPED RESIDENTIAL PLANNED COMMUNITY TOTAL SITE AREA : COMMUNITY DISTRICT PROJECT INFORMATION 386.24 ACRES FREDERICK WATER CONSTRUCTION NOTES 1. Frederick Water’s Water and Sewer Standards and Specifications are available at www.frederickwater.com 2. The contractor shall adhere to Frederick Water standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by Frederick Water. 4. The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. Frederick Water shall furnish all needed material and make the tap. a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made. 6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water’s inspector. 7. Frederick Water’s maintenance division shall furnish and install all water meters through 2 inch in size. It is the contractor’s responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed:a. The meter box, with its frame and cover, must be properly aligned with the yoke bar.b. The frame and cover shall be set to final grade.c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches.d. All components of the meter box assembly shall be in proper working order. 8. For services that connect to existing lines: a. Frederick Water shall furnish and install: i. all ⅝”x¾”, ¾”, 1”, 1½” and 2” water servicesii. all sewer services. b. The owner/developer shall:i. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water’s engineering assistant.ii. submit an Application for Service and pay the required fees. 9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 10. All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any privately owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. 11. Frederick Water shall review the mechanical plan(s) for design and material approval of a building’s: a. domestic water meter and its backflow prevention device, and/or its b. Fire service line’s water meter and backflow prevention device. 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEQ’s Certificate to Operate and a copy of the station’s DEQ approved O&M manual. These documents must be received before substantial completion is issued and water meters released. January 2019 The development of different housing types is permitted to occur simultaneously throughout the various Land Bays within Snowden Bridge. In order for development to occur, a Master Development Plan and Subdivision Design Plan must be approved for the applicable Land Bay by Frederick County, all required improvements must be bonded and all streets serving land uses must be developed to standards acceptable to the County. LAND BAY DEVELOPMENT NARRATIVEREZONING TIA BY PHR&A - 02/07/2003 PREVIOUS REZONING :#06-03 3OVERALL BOUNDARY MAP1" = 300'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 01 04/13/2022 ADJOINING PROPERTY OWNERS SNOWDEN BRIDGE II MASTER DEVELOPMENT PLAN AREA SEE NOTES ADDRESSING ABOVE CHART IN PROFFER 3. USES, DENSITY & MIX OF HOUSING TYPES A. (2) (1-4) MIN. MAX. 20 Ac. ±NA NA 24 Ac. ±NA NA 475 Ac. ± Convenience Commercial/Daycare 7 Ac.±NA NA SFD (Housing Unit Type 1,2,4,5 & RP District SFD )30 53 Townhouse (Housing Unit Type 6 & RP District Townhouses)10 30 MULTIFAMILY:7 30 (Condominiums, Elderly Housing, Housing Unit Type 3-Cottage House & RP District Duplex, Multiplex, Atrium & Garden Apartment) 126 Ac.± 30 53 SFD (Housing Unit Type 1,2, & 5) Multifamily (Condominiums, Elderly Housing, Housing Unit Type 3-Cottage House) 26 Ac. ±NA (Retail, Office & Public Service Satellite Facility) LAND USE ACREAGE % RANGE OF HOUSING UNIT TYPES JORDAN SPRING ELEMENTARY SCHOOL COMMUNITY PARK MIXED RESIDENTIAL: ACTIVE ADULT: COMMERCIAL CENTER NA LAND BAY BREAKDOWN LAND BAY V IV III II I LAND BAY BREAKDOWN NARRATIVE THE ACTUAL ACREAGE IDENTIFIED FOR EACH LAND BAY IS BASED ON THE BUBBLE DIAGRAM CALCULATED ON THE PROFFERED GENERALIZED DEVELOPMENT PLAN AND MAY FLUCTUATE WITHIN 5% OF THE TOTAL ACREAGE BASED ON FINAL SURVEY WORK. THE TABLE ON THIS SHEET REPRESENTS THE RANGES FOR THE REFERENCED HOUSING TYPES AS PROPOSED. THE FINAL MIX WILL NOT EXCEED THE 2,465 UNIT CAP, EXCLUSIVE OF THE AFFORDABLE HOUSING FOR THE ELDERLY (PROFFER SEC. 11) AND WILL BE COMPRISED OF HOUSE TYPE COMBINATIONS REPRESENTING A MIXTURE IDENTIFIED IN THE TABLE. THE MINIMUM AND MAXIMUM PERCENTAGES ESTABLISHED APPLY TO THE GENERAL CATEGORIES OF SINGLE FAMILY, TOWNHOUSES, MULTIFAMILY AND ACTIVE ADULT UNITS AND ARE NOT INTENDED TO PERTAIN TO ANY ONE HOUSING TYPE IN THOSE CATEGORIES. THE HOUSING UNIT TYPE MAXIMUM PERCENTAGE FOR THE GENERAL CATEGORIES OF SINGLE FAMILY, TOWNHOUSE, MULTIFAMILY AND ACTIVE ADULT WILL NOT EXCEED THE PERCENTAGES IDENTIFIED IN THE TABLE AND WILL NOT EXCEED THE TOTAL UNIT CAP OF 2,465, EXCLUSIVE OF THE AFFORDABLE HOUSING FOR THE ELDERLY (PROFFER SEC. 11) BASED ON ANY COMBINATION. THE TOTAL COMMERCIAL AREA WILL BE A MINIMUM OF 4% OF THE GROSS SITE AREA OR 33 ACRES AND WILL BE LOCATED WITHIN LAND BAYS III AND V. THE HIATT RUN CORRIDOR AND THE WETLANDS INTERMITTENT RAVINE CHANNEL ARE APPROXIMATELY 125 ACRES. THE REMAINING 113.5 ACRES OF REQUIRED OPEN SPACE WILL BE PROVIDED WITHIN LAND BAYS I, II, III AND IV. THE APPLICANT RESERVES THE RIGHT TO CONVERT MORE OF LAND BAY III TO ACTIVE ADULT OR AFFORDABLE HOUSING FOR THE ELDERLY. IN NO CASE SHALL THE PERCENTAGE OF ACTIVE ADULT OR AFFORDABLE HOUSING FOR THE ELDERLY EXCEED 53% OF THE TOTAL UNIT CAP OF 2,465, EXCLUSIVE OF THE AFFORDABLE HOUSING FOR THE ELDERLY (PROFFER SEC. 11). CONSTRUCTION OF SNOWDEN BRIDGE BOULEVARD ENCOMPASSED IN FURTHER DETAIL IN THE TERMS OF A PERFORMANCE AGREEMENT AND ACCOMPANYING MONETARY GUARANTY. REZONING PROFFER "EXHIBIT E" MINIMUM DESIGN STANDARDS Housing Unit Type Housing Name Minimum Lot Width Average Lot Area (Sq. Ft.) Minimum Lot Area (Sq. Ft.) Minimum Living Area (Sq. Ft.) Min. Front Yard Setback From R/W or Private Street to Dwelling Min. Rear Yard Setback to Dwelling Min. Setback to Dwelling from Common Driveway Min. Setback Dist. Between Dwelling Units Min. Side Yard Setback on Interior Lot Line Side / Combined Total Side Yard Setback / Corner Lot (or End Unit Townhouse) Side Yard Min. Setback to Garage from Street / Alley Min. Setback from Garage to Interior Lot Line Side Yard / Corner Lot (or End Unit Townhouse) Side Yard Deck Min. Setback to Interior Lot Line Side Yard / Corner Lot (or End Unit Townhouse) Side Yard Deck Min. Setback Rear Yard / Rear Yard Abutting Open Space Front Porches, Stoops, and Steps May Extend into Front Yard Setback Detached Accessary Building Max. Height Maximum Building Height Off Street Parking Spaces 1 Carriage 40'NA 4,000 1,400 15'25'NA 10'5'/10'/10'NA/20'3'/10'5'/10'15'/NA 6'20'35'2 2 Non-Alley Carriage 47'NA 4,700 1,400 15'25'NA 10'5'/15'/10'20'/NA 3'/10'5'/10'3'/3'6'20'35'2 3 Cottage 34'NA 3,264 1,400 15'20'NA 10' on Non Attached Side 0'/5'/10'NA/20'0'/NA 5'/10'5'/NA 6'NA 35'2 4 Court Yard NA 3,300 NA 2,000 10'NA 3'10'3'/NA/NA (10' from Dwelling to Perimeter Property Line) NA/NA (19' from Common Driveway) 3'/NA NA/NA (5' from Interior Lot Line) NA/NA (6' from Perimeter Property Line) 6'NA 35'2 5 Modified Single Family 38'NA 3,750 NA 20'15'NA 10' (0' for the Attached Option) 5'/10'/10' (0' for Zero Lot Line Side with a Combined Total of 10') 20'/15'5'/10' (0' Zero Lot Line or Attached Side) 5'/10' (0' Zero Lot Line or Attached Side)10'/3'12'20'35'2 6 Modified Townhouse 16'1,300 1,200 NA 20' (10' for Non Garage or Rear Loaded Garage Units) 20'NA 0' (25' from Non Attached Side Wall of End Unit to Any Other Home) 0'/0'/10'20'/5'0'/10'0'/10'5'/5' 12' for a 20' Setback, 5' for a 10' Setback 20'35'2 6 Modified Townhouse 18'1,500 1,400 NA 20' (10' for Non Garage or Rear Loaded Garage Units)20'NA 0' (25' from Non Attached Side Wall of End Unit to Any Other Home) 0'/0'/10'20'/5'0'/10'0'/10'5'/5' 12' for a 20' Setback, 5' for a 10' Setback 20'35' 2.25 6 Modified Townhouse 20' or >1,700 1,600 NA 20' (10' for Non Garage or Rear Loaded Garage Units) 20'NA 0' (25' from Non Attached Side Wall of End Unit to Any Other Home) 0'/0'/10'20'/5'0'/10'0'/10'5'/5' 12' for a 20' Setback, 5' for a 10' Setback 20'35' 2.50 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22PROFFERED GDP AND PROJECT DEVELOPMENT PLANSTEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA4 N/A JAN. 21, 2022 CMM/ZJ 22-02 15 2760B Rev. No. Date 05 06/27/2022 HIATT R U N C O R RI D O R HIATT RUN CORRID O R EX. SWM FACILITY FOR NEIGHBORING PROPERTY 100 YR FLOOD PLAIN DB 977 PG 1335 75' TREE SAVE AREA LEGEND JD STREAMS JD WETLAND RIPARIAN BUFFER EXISTING PROPERTY LINE NOTES 1.Topography, Site boundary and site design information provided by Greenway Engineering was used as a base for this exhibit. The contour interval (C.I.) is 2 feet. 2. The boundaries of jurisdictional wetlands and other Waters of the United States (WOTUS) within the Snowden 2 project area were delineated and surveyed by Virginia Waters and Wetlands, Inc. (VWW) in September and October 2020. The U.S. Army Corps of Engineers (COE) verified the delineation with a Preliminary jurisdictional determination (PJD) dated July 28, 2021 (NAO-2021-00803-arl). 3. Limits of impacts to jurisdictional wetlands and other WOTUS shown hereon are based upon current development plans and renderings for submission of the joint permit application. Buildings and other ancillary improvement types, layouts, and proposed uses may vary somewhat without affecting said permits as long as the nature and scope of impacts to jurisdictional wetlands and other WOTUS are not changed. 4. Total site drainage area TOTAL = ± 8.47 SQUARE MILES (DRAINAGE AREA PER USGS STREAM STATS)151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIARev. No. Date 01 04/13/2022 JAN. 21, 2022 CMM/ZJ 2760B 22-02 1" = 250' 5 15OVERALL ENVIRONMENTAL SHEETCONSERVATION EASEMENT DENOTES STEEP SLOPES >35% *ALL WETLAND DISTURBANCES ARE CURRENTLY PERMITTED BY THE U.S. ARMY CORP OF ENGINEERS AND THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY. Environmental Features Aggregate Table Environmental Feature Type Existing Area Disturbed Area Percentage Disturbed Floodplain 14.90 AC 1.14 AC 7.7% Lakes & Ponds 0.0 AC. 0.0 AC 0.0% Wetlands*0.76 AC 0.01 AC 1.3% Natural Detention 0.0 AC 0.0 AC 0.0% Sinkhole 0.0 AC 0.0 AC 0.0% Steep Slope (>35%)20.13 AC 4.53 AC 22.5% 100 YEAR FLOODPLAIN NOTES: HOUSING TYPES 1-6, RP DISTRICT HOUSING, PROFFERED ELDERLY HOUSING, AND CONDOMINIUMS MAY BE USED IN LAND BAY III. LAND BAY IV MAY USE HOUSING TYPES 1-3, 5, PROFFERED ELDERLY HOUSING, AND CONDOMINIUMS. RP HOUSE TYPE "E" - "SFD ZERO LOT" LINE SHALL REQUIRE A 10' MAINTENANCE EASEMENT ON THE LOT ADJACENT TO THE ZERO LOT LINE. THE OPPOSITE SIDE YARD SHALL BE MAINTAINED CLEAR OF ANY OBSTRUCTIONS OTHER THAN A 3' EAVE ENCROACHMENT, SWIMMING POOLS, NORMAL LANDSCAPING, REMOVABLE PATIO COVERS (EXTENDING NO MORE THAN 5'), GARDEN WALLS OR FENCES. NO ENCROACHMENTS OTHER THAN A FENCE SHALL BE PLACED IN THE REQUIRED MAINTENANCE EASEMENT AREA. ZERO LOT LINE SHALL NOT BE ADJACENT TO A ROAD RIGHT-OF-WAY. . RP HOUSE TYPE "F" - "SF SMALL LOT" SHALL PROVIDE A MINIMUM OF 20 ON LOT LANDSCAPE PLANTINGS. A 25% MINIMUM SHALL BE TREES (MIN 2" CAL.) WITH REMAINDER BEING SHRUBS (MIM. 3). DETACHED STRUCTURES SHALL NOT EXCEED 150 SF. (See Proffer Modification #1) NOTE: Other Unit Types Include: Townhouse, Multifamily, Active Adult Dwellings & RP District Housing TABLE #3 NON-RESIDENTIAL USE TABULATION BY AREA OVERALL PROJECT Land Bay Commericial Use (33.0 Ac. Required) School Site (20.0 Ac. Required) Public Park (24.0 Ac. Required) Land Bay I Land Bay II Land Bay III 10.52 Ac. Totals 36.63 Ac 20.0 24.0 TABLE #5 RECREATIONAL UNIT TABULATION TOTAL REQUIRED PER SEC. 165-402.08: (2,465/30) = 82.2 RECREATIONAL UNITS OVERALL PROJECT Land Bay Residential Dwelling Units Recreational Units Required Recreational Units Provided Land Bay III 1,233 41.1 103.9 Land Bay III Total 1,725 57.5 109.9 Land Bay IV 740 24.7 71 Totals 180.9 1 Unit = Value of 1 Tot Lot per FCZO Sec. 165-402.08B(1). Final recreational values to be determined at Subdivision Design Plan phase. (See Proffer Modification #4) 2,465 82.2 TABLE #4 OPEN SPACE TABULATIONS OVERALL PROJECT Land Bay Total Required (238.4 Acres) Land Bay I (20.0 Ac Required)20.0 Ac Land Bay II (24.0 Ac Required)24.0 Ac Snowden Bridge I 138.7 Ac 74.9 Ac Land Bay IV 83.2 Ac Totals 356.8 Ac or 52.6% of Gross Project Area TABLE #2 RESIDENTIAL USE TABULATION BY AREA OVERALL PROJECT Housing Type Proposed Use Area Percent of Total Res. Area (523.0) Permitted Percentage Range of Total Area Land Bay III Single Family 310.9 Ac 59.4% All Other 68.8 Ac 13.1% Land Bay IV Active Adult 71.9 Ac 13.8% Totals Single Family 310.9 Ac 59.4% 40% (237.6 Ac.) Min. All Other 140.7 Ac 26.9% 60% (356.4 Ac) Max. AMENITY RECREATIONAL CREDITS ACTIVE ADULT RECREATION CENTER 1 - RECREATION CENTER 71 PEDESTRIAN TRAILS 6 20.0 24.0 TOTAL (STEPHENSON VILLAGE II)77 LAND BAY III LAND BAY IV AREA LOTS 59.71 AC. R/W, PRIVATE ROADS AND ALLEYS 19.36 AC. OPEN SPACE 74.90 AC. COMMERCIAL 8.97 AC. TABLE #7 STEPHENSON VILLAGE II - LAND BAY AGGREGATE TABLE 71.91 AC. 29.32 AC. 83.20 AC. 0 AC SNOWDEN BRIDGE BLVD 13.3 AC. 0 AC. 0 AC. 0 AC. RP HouseType RP HouseName Minimum Lot Width at SB/RW Minimum Lot Area (SF) Min. Front Yard Setback From RoadRW Min. Front Yard SBFrom Parking orDriveway Min. Rear Yard Setback Min. Side Yard Setback Detached /Attached Min.on-site BuildingSpacing Side/Rear Min. Unroofed Deck or Stoop Setback from RW /Side Yard/Rear Yard Min. Unroofed Deck or Stoop Setback from Private or Public Road /Side Yard/Rear Yard /Rear from Open Space Maximum Building Height MaximumAccessory Building Height Minimum Off-street Parking Per Unit B SFD Traditional 80'15,000 35'- 25' 10'-25' / 5' / 15'-35'20'2 C SFD Urban 70' / 40'12,000 35'- 25' 10'-25' / 5' / 15'-35'20'2 D SFD Cluster 60' / 30'8,000 25'- 20' 8'-15' / 5' / 10'-35'20'2 E SFD Zero Lot Line -6,000 25'- 25' 0'25' / 25' 15' / 20' / 15'-35'20'2 F SFD/SFA Small Lot -3,750 25' / 15' w/alleyaccess - 15'5' / 10'20' (SFA)-15' (10' w/alley)/ 5' / 10' / 5'35'20'2 G Multiplex 3 Unit/4 Unit -3,000 per unit 9,000 / 12,000 35' 20' 25' fromperimeter boundary 15' fromperimeter boundary -25' / 10' / 15'15' from Parking or Drivewaay 35'20'2 RP ZONING DISTRICT DIMENSIONAL REQUIREMENTS 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 STONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIADEVELOPMENT AGGREGATE TABULATION SHEET6 N/A JAN. 21, 2022 CMM/ZJ 2760B 22-02 15STEPHENSON VILLAGE IILand Bay IV Land Bay V 26.11 Ac. Stephenson Village II TOTAL AREA 158.86 AC. 186.95 AC 13.3 AC. LAND BAY V 0 AC. 0 AC. 16.00 AC. 26.11 AC 26.11 AC 492 16.4 6 Snowden Bridge I Stephenson Village II Hyatt Run Trail 4,016 L.F. TABLE #6 STEPHENSON VILLAGE II RECREATIONAL UNIT TABULATION Land Bay III 213.6 AcTotal Rev. No. Date 01 04/13/2022 VALUE PER CREDIT TOTAL VALUE $2,485,000 $2,695,000 $35,000 $210,000 $35,000 $35,000 83.2 Ac Land Bay V 16.0 Ac 7ROAD CLASSIFICATION & REQUIRED LANDSCAPING PLANAS SHOWNSTEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 04 06/07/2022 CLASS III / GS SSAR TYPICAL ROAD SECTION 55' RW (50' MIN) LIMITS OF BITUMINOUS SURFACE LIMITS OF SUBBASE BITUMINOUS CONCRETE SIDEWALK 1' 3:1 SLOP E 1' STANDARD MIN. 5' 1/4":1'1/2":1' 3.5' MIN. 2' 9.5' (MIN) 1/4":1' SUBBASE 2,001-4,000 AADT 1' 9.5' STANDARD CG-6 BASE COURSE LC 1/4":1' 36' (26' MIN) 2' 1/2":1' MIN. 3.5' STANDARD SIDEWALK 3:1 SLOP E GRASS BUFFER 5' MIN. 1/4":1' 1' NTS 104' RW (MIN.) MAJOR COLLECTOR ROAD TYPICAL ROAD SECTION BITUMINOUS SURFACE LIMITS OF SUBBASE BITUMINOUS 3:1 SLOP E SIDEWALK STANDARD MIN. 5' 1/4":1' 1' 5' MIN. 1/2":1' 2' 1/4":1' SUBBASE 11'11' STANDARD CG-6 NTS BASE COURSE LC 1/4":1' 1' 2' MIN. 5' 1/2":1' 31' STANDARD 3:1 SLOP E 5' MIN. 1/4":1' GRASS BUFFER 31' LIMITS OF BITUMINOUS SURFACE LIMITS OF CONCRETE 20' MIN. 1'1' MIN.MIN.STANDARD CG-2 MEDIAN 1/2":1'1/2":1' R/W12.5'REG EG 2' SHOULDER 2' SHOULDER STD.CG-6 ONE WAY "NO PARKING"12.5'RPRIVATE ROADTYPICAL ALLEY ENTRANCE NTSCLASS VPUBLIC OR24' MIN. SIGN R/W "NO PARKING" SIGN CL 1/4":1'1/4":1' BITUMINOUS CONCRETE LIMITS OF BITUMINOUS SURFACE LIMITS OF SUBBASE 12' 16' INGRESS/EGRESS EASEMENT TYPICAL ALLEY SECTION NTSCLASS V R/W R/WR/W R/W 2'2' 1/2":1' R/W R/W 1'1' 1/2":1' 2:1 MA XMAX2:10-2,000 AADT CLASS III CLASS II/ GS SSAR TYPICAL ROAD SECTION BITUMINOUS CONCRETE LIMITS OF SUBBASE LIMITS OF BITUMINOUS SURFACE 50' RW (43' MIN) 3:1 SLOP E STANDARD SIDEWALK 1/4":1' R/W 1' 1/2":1' 2' SUBBASE 1/4":1' 9.5' (MIN) NTS 9.5' (MIN) STANDARD CG-6 BASE COURSE CL 1/4":1' 1' 2' 1/2":1' 29' (24' MIN) 3:1 SLOP E SIDEWALK STANDARD BUFFER GRASS 1/4":1' 1' R/W EPTYPICAL COURTYARD CLUSTER COMMON DRIVEWAYS NTS 1/4":1' CONCRETE CL 1/4":1' COMMON AREA R/W 20' R/WMOD. CG-9DENTRANCEBASE COURSESUBBASE BASE COURSE MAJOR COLLECTOR ROAD REQUIRED LANDSCAPING NTS 5 10 PLANT UNITSSYMBOLPLANT TYPE EVERGREEN TREE SHADE TREE ORNAMENTAL TREE 5 2SHRUB 40' TYP. NOTE: TREES AND SHRUBS SHALL BE PLANTED IN CLUSTERS AT AN EQUIVALENT RATE OF TEN PLANT UNITS PER 40 LINEAR FEET OF COLLECTOR STREET ROADWAY FRONTAGE R/W R/W R/WR/W LC CL GRASS BUFFER SIDEWALK/TRAIL RAISED LANDSCAPED MEDIAN GRASS BUFFER 40' TYP. PLANTING SCHEDULE = TOTAL PLANT UNITS PER 40' CLASS IV / GS 7 PUBLIC STREET PUBLIC STREET PUBLIC STREET SIDEWALK BASE COURSE TYPICAL PRIVATE ACCESS DRIVEWAYS (PAD) NTS 1/4":1' LC 1/4":1' P/L 18' PAVEMENT 20' EASEMENT P/L 4'4' LANEBICYLEBICYLELANE SIDEWALK VARAIABLE RW MAJOR COLLECTOR ROAD **TYPICAL BIFURCATION SECTION** BITUMINOUS SURFACE LIMITS OF SUBBASE BITUMINOUS 3:1 SL O P E SIDEWALK TRAIL/ MIN. 5' 1/4":1' 1' 8' 1/4":1' SUBBASE VARIABLE VARIABLE PAVED SHOULDER NTS BASE COURSE LC 1/4":1' 1' 29' 5' MIN. DITCH 29' LIMITS OF BITUMINOUS SURFACE LIMITS OF CONCRETE VARIABLE 1'1' MIN.MIN. STANDARD CG-2 MEDIAN R/WR/W CLASS IV / GS 7 PUBLIC STREET 4' 4' LANEBICYLE BICYLELANE 4:12: 1 SHLDR 6' PAVED SHOULDER DITCH 4:1 2:18' SHLDR 6' PEDESTRIAN SIDEWALK TRAIL/ PEDESTRIAN 3:1 SL O P E ** ROADEFFICIENCYBUFFER** ROADEFFICIENCYBUFFER** NOTE: ROAD EFFICIENCY BUFFER MAY BE REDUCED TO A MINIMUM OF 25' PER MODIFICATION #7 OF PROFFER STATEMENT. ALL SCREENING AND LANDSCAPING SHALL MEET MINIMUM ZONING ORDINANCE REQUIREMENTS. 25' MINIMUM 25' MINIMUM **BETWEEN OLD CHARLES TOWN ROAD AND THE NORTHERN ENTRANCE INTO STEPHENSON VILLAGE MIN. 3.5'5' MIN.MIN. 5'3.5' MIN. 1' MIN. MIN.MIN. MIN. 40' RW (30' MIN) STANDARD SIDEWALK ** SIDEWALK STANDARD 2'2' LC STANDARD VDOT CURB 5' (W/O SW)5' (W/O SW) 1/4":1'3:1 SLOP E LIMITS OF BITUMINOUS SURFACE 24' (20' MIN.) 3:1 SLOP E 1/4":1'1/4":1' 1'1' LIMITS OF SUBBASE BITUMINOUS CONCRETE BASE COURSESUBBASE GRASS BUFFER 1/2":1' TYPICAL ROAD SECTION PRIVATE STREETCLASS INTS TYPICAL CUL-DE-SAC WITHOUT RAISED LANDSCAPE ISLANDNTS 28' MIN CG-6STD. 45' R 90'10' STD.CG-6 55' R FC EP 10' R/W R/WR/W MIN. 5' MIN. 1/2":1'1/4":1' 5' MIN.MIN. 10' (MIN W/SW)10' (MIN W/SW) 1'1' R/W R/W ** ROADEFFICIENCYBUFFERTYPICAL PLANTING DETAIL NOTE: A MINIMUM 6' HIGH SCREEN WILL BE PROVIDED UTILIZATING ANY COMBINATION OF EITHER A SHRUB HEDGE, FENCE, WALL, MOUND OR BERM. 28' MIN.10'10' 28' MIN STD.CG-6 55' R 65' R R/W EPFC WITH RAISED LANDSCAPE ISLAND TYPICAL CUL-DE-SAC NTS STD.CG-3 3 0 'R25'REP EP5' MIN. S/W28' MIN. -ROAD NAMES CLASSIFIED AS CLASS I OR II MAY BE DEVELOPED AS PUBLIC OR PRIVATE STREETS WHICH WILL BE DETERMINED DURING SUBDIVISION DESIGN PLAN PROCESS. -THE PROPOSED SUBDIVISION STREETS PER THIS MDP REVISION WILL BE DESIGNED PER THE VDOT ROAD DESIGN MANUAL, APPENDIX B (1) AND SHALL MEET THE VDOT SECONDARY STREET ACCEPTANCE REQUIREMENTS (SSAR). MOUNTABLEAPRON STD.CG-2 LOCAL STREETS HAVING ONE POINT OF ACCESS AND AN ADT GREATER THAN 400 VPD MUST BE CONSTRUCTED AS A CLASS III ROADWAY. LOCAL STREETS HAVING ONE POINT OF ACCESS AND AN ADT GREATER THAN 400 VPD MUST BE CONSTRUCTED AS A CLASS III ROADWAY. ** ALL STREETS CLASSIFIED AS COLLECTOR TO BE DESIGNED PER VDOT ROAD DESIGN MANUAL APPENDIX A(1), ALL OTHER PUBLIC STREETS TO BE DESIGNED PER VDOT ROAD DESIGN MANUAL APPENDIX B(1). *** SIDEWALK TO BE PROVIDED ALONG A MINIMUM OF ONE SIDE OF PRIVATE STREETS *MINIMUM WIDTH WOULD BE ALLOWED WITH REDUCED ON STREET PARKING AND WILL BE DETERMINED DURING SUBDIVISION DESIGN PLAN REVIEW PROCESS. * * * * *MINIMUM WIDTH WOULD BE ALLOWED WITH REDUCED ON STREET PARKING AND WILL BE DETERMINED DURING SUBDIVISION DESIGN PLAN REVIEW PROCESS. 104' RW (MIN.) MAJOR COLLECTOR ROAD ALTERNATIVE TYPICAL ROAD SECTION BITUMINOUS SURFACE LIMITS OF SUBBASE BITUMINOUS 3:1 SLOP E MIN. 10' 1/4":1' 1' 8' MIN. 1/2":1' 2' 1/4":1' SUBBASE 19'11' STANDARD CG-6 NTS BASE COURSE LC 1/4":1' 1' 2' MIN. 5' 1/2":1' 27' STANDARD 3:1 SLOP E 5' MIN. 1/4":1' GRASS BUFFER 27' LIMITS OF BITUMINOUS SURFACE LIMITS OF CONCRETE 20' MIN. 1'1' MIN.MIN.STANDARD CG-2 MEDIAN 1/2":1'1/2":1' R/WR/W CLASS IV / GS 7 PUBLIC STREET SIDEWALK NOTES: PREVIOUSLY APPROVED ASPHALT BIKE TRAIL SSS S S S S S S SSS S SSS S S S SSSSNOWDEN BRIDGE BLVD . SNOWDEN BRI D G E B L V D. SNOWDEN BRIDGE BLVD. STE V E D O R W A YHALYARD BEND DRIVEZIN N I A L A N E HEIRLOOM WAY PENGUIN CREST DR IVE GRANITE RIDGE D R I V EFETLOCK DRIVEPENGUIN CREST DRIVE GRANITE RIDGE DRIVE MONALISA DR IVE SWANSONG PLACE B A T I K W A Y TEMPEST DRIVELOTUS BLOOM WAYMONSOON WAYHURRICANE WAY PENGUIN CREST DRIVE DAFFODIL DRIV E BLANKENSHIP LANECARRICK BEND WAY COACHMAN LAN E MO N A L I S A D R I V EMO N T R E A L W A Y F ESCU E WAYCORIANDER DRIVESCOTCH BO N N E T D RI V E FUNNE L R O D L A N E RUBY ROYCE DRIVESUNFLOWER WAYOLEANDER COURT CARDIGAN DR IVECARDIGAN DR.CINNAMON HILL WAY CORONET COU R TFORMATT WAYSAFFRON CREST DRIVESCO T C H B O N N E T D R I V E GELDING WAYFLAXEN MANE WAYPLAID HILL D R I V E OLEANDER COURTCASTAWAY PLACE WAGTAIL LANE GRANITE RIDGE DRIVECARNATION WAYOLEANDER COURTGRANITE R IDGE DR IVE LAWFORD WAYWEBSTER COURTKEYSTONE LANEMAGPIE LANEROOSTER TAIL DRI V E BAMBOO SHOOT LANESAPPHIRE S T R E E TALABASTER LA NE HEYFORD DRIVEGALAXY PLACE EDELWEISS WAY ORIGAMI WAY HOURGLASS L A N E STATESMAN DRIVE GOSHEN PLACE 1" = 250'151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 OVERALL SNOWDEN BRIDGE PROJECT AGGREGATE TABLE ITEM OVERALL PROJECT AREA THRESHOLD SNOWDEN BRIDGE I STEPHENSON VILLAGE II OVERALL PROPERTY TOTALS RESIDENTAL 2,465 MAX. UNITS 1233 UNITS 1232 UNITS 2465 UNITS (100%) SFD 30% MIN - 53% MAX (739 - 1306) Units 676 UNITS 221 UNITS 897 UNITS (36%) TH 10% MIN - 30% MAX (246 - 739) Units 433 UNITS 223 UNITS 656 UNITS (27%) MF 7% MIN - 30% MAX (172 - 739) Units 124 UNITS 48 UNITS 172 UNITS (7%) ACTIVE ADULT 30% MIN - 53% MAX (739 - 1306) Units 740 UNITS 740 UNITS (30%) RECREATIONAL 2465/30 = 82.2 UNITS 1233/30 = 41.1 UNITS PROP. 103.9 REC. UNITS 1232/30 = 41.1 UNITS PROP. 85 REC. UNITS 82.2 REC. UNITS OPEN SPACE 239.6 ACRES 182.7 ACRES 174.1 ACRES 340.22 ACRES 8LAND USE PLAN AND SHEET INDEXSTEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15 DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM 6' TRAIL STONE DUST or WOOD CHIP PRIVATE PEDESTRIAN TRAIL DETAIL NTS PRIVATE PEDESTRIAN TRAIL SYSTEM IS TO BE MAINTAINED PRIVATELY BY THE SNOWDEN BRIDGE HOME OWNERS ASSOCIATION. THE SELECTION OF TRAIL MATERIAL IS AT THE DISCRETION OF THE APPLICANT PROVIDED THEY ARE NOT PART OF THE RECREATIONAL CREDITS REFLECTED ON SHEET 6 AND NOT WITHIN THE PUBLIC ROW. THE APPLICANT MAY BE PERMITTED TO CONSTRUCT THE PRIVATE PEDESTRIAN TRAIL SYSTEM USING ASPHALT, CONCRETE, WOOD CHIPS, OR STONE DUST. (PROFFER 9C) NOTE: THE PROPOSED SUBDIVISION STREETS IN LANDBAY III PER THIS MDP WILL BE DESIGNED PER THE VDOT ROAD DESIGN MANUAL, APPENDIX B (1) AND SHALL MEET THE VDOT SECONDARY STREET ACCEPTANCE REQUIREMENTS (SSAR). STREETS IN LANDBAY IV WILL BE PRIVATE. PRIVATE STREETS WILL HAVE CROSS-SECTIONAL DIMENSIONS OF PAVEMENT THICKNESS AND COMPACTION BASE THICKNESS THAT MEETS OR EXCEEDS VDOT STANDARDS. 6' TRAIL ASPHALT OR CONCRETE 20' LINEAR PARK TRAIL EASEMENT LINEAR PARK TRAIL DETAIL NTS DENOTES SNOWDEN BRIDGE II PROJECT AREA DENOTES LINEAR PARK TRAIL SYSTEM HATCHED AREA DENOTES PROVIDED OPEN SPACE LINEAR PARK TRAIL SYSTEM TO HAVE 20' WIDE EASEMENT DEDICATED TO FREDERICK COUNTY PARKS AND REC PER PROFFER 9D. TRAIL TO BE ASPHALT OR CONCRETE AND QUALIFIES FOR RECREATIONAL CREDITS. NOTE: SSSSXX X X X X X X X X X X X S SSSSSSS S SSSSSSSSSSS S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SSSSSSSSS SSS SSNOWDEN BRIDG E B L V D. DB 977 PG 1335 75' TREE SAVE AREA GOSHEN PLACEORIGAM I WAYHOURGLASS LAN E STATESMAN DRIVEHEYFORD DRIVE A L A B A S T E R L A N E SAPPHIRE STREETBAMBOO SHOOT LANE ROOSTER TA IL DRIVEEDELWEISS WAY HEYFORD DRIVE GALAXY PLACE 9LAND USE PLAN1" = 100'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 HATCHED AREA DENOTES PROVIDED OPEN SPACE DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM NOTES: ·ALL PRIVATE ACCESS DRIVES (PAD) GREATER THAN 150' IN LENGTH SHALL PROVIDE ADEQUATE TURNAROUND PROVISIONS FOR FIRE AND RESCUE APPARATUS AND SHALL MEET MINIMUM INTERNATIONAL FIRE CODE REQUIREMENTS. ·UTILITY ROUTINGS ARE APPROXIMATE AND WILL BE REFINED WITH FINAL DESIGN PLANS. ·PAVEMENT AREAS NOT REFLECTED GEOMETRICALLY, SHADED ROAD AREAS REPRESENT EXPECTED ROW ONLY. DENOTES LINEAR PARK TRAIL SYSTEM VDOT NOTES: ·UTILITY ROUTINGS UNDER PAVED PORTION OF VDOT ROW MAY BE PROPOSED FOR VDOT CONSIDERATION ON A CASE BY CASE BASIS WITH FINAL DESIGN. S S S S S SSSSSSSSSSSSSS S S S S S SSSSSSSSSSSSSS S S SSSSSSNOWDEN BRIDG E B L V D. EX GRAVITY SEWER EASEMENT 100 YR FLOOD PLAIN BATIK COURTHIATT RUN CORR IDOR 10LAND USE PLAN1" = 100'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 HATCHED AREA DENOTES PROVIDED OPEN SPACE DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM DENOTES LINEAR PARK TRAIL SYSTEM NOTES: ·ALL PRIVATE ACCESS DRIVES (PAD) GREATER THAN 150' IN LENGTH SHALL PROVIDE ADEQUATE TURNAROUND PROVISIONS FOR FIRE AND RESCUE APPARATUS AND SHALL MEET MINIMUM INTERNATIONAL FIRE CODE REQUIREMENTS. ·UTILITY ROUTINGS ARE APPROXIMATE AND WILL BE REFINED WITH FINAL DESIGN PLANS. ·PAVEMENT AREAS NOT REFLECTED GEOMETRICALLY, SHADED ROAD AREAS REPRESENT EXPECTED ROW ONLY. VDOT NOTES: ·UTILITY ROUTINGS UNDER PAVED PORTION OF VDOT ROW MAY BE PROPOSED FOR VDOT CONSIDERATION ON A CASE BY CASE BASIS WITH FINAL DESIGN. SSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSS SSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S SSSSS S S SSS S SSSSSNOWDEN BRIDGE BLVD.PLAID HILL DRIVEFLAXEN MANE WAY GELDING WAY SCOTCH BONNET DR.SAFFRON CREST DRIVE FORMATT WAYCORONET COURTSWANSONG PLACEEX 6" GAS TRANSMISSION LINE EX 6" GAS TRANSMISSION LINE FETLOCK DRIVE HEIRLOOM WAYPENGUIN CREST DRIVEOLEANDER COURT O L E A N D E R C O U R T CASTAWAY PLACEWAGTAIL LANEGRANITE RIDGE DRIVECARNATION WAY GRANITE RIDG E D RI V E LAWFORD WAYWEBSTER COURTKEYSTONE LANE MAGPIE LANE OLEANDER COUR T 11LAND USE PLAN1" = 100'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 HATCHED AREA DENOTES PROVIDED OPEN SPACE DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM DENOTES LINEAR PARK TRAIL SYSTEM NOTES: ·ALL PRIVATE ACCESS DRIVES (PAD) GREATER THAN 150' IN LENGTH SHALL PROVIDE ADEQUATE TURNAROUND PROVISIONS FOR FIRE AND RESCUE APPARATUS AND SHALL MEET MINIMUM INTERNATIONAL FIRE CODE REQUIREMENTS. ·UTILITY ROUTINGS ARE APPROXIMATE AND WILL BE REFINED WITH FINAL DESIGN PLANS. ·PAVEMENT AREAS NOT REFLECTED GEOMETRICALLY, SHADED ROAD AREAS REPRESENT EXPECTED ROW ONLY. VDOT NOTES: ·UTILITY ROUTINGS UNDER PAVED PORTION OF VDOT ROW MAY BE PROPOSED FOR VDOT CONSIDERATION ON A CASE BY CASE BASIS WITH FINAL DESIGN. SSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S SS SSSSSS S SSSS SS S S SSS SS S SSSSSSSSSSSSSSSSSSSSS S S S S S S S S SSS S SSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S SSSSSSNOWDEN BR IDGE BLVD . FORMATT WAYCORONET COURT CINNAMON HILL WAY CARDIGAN DRIVE FUNNEL ROD LANESCOTCH BONN ET DR IV E CO R I A N D E R D R I V EFESCUE WAY MONTREAL WAYCARDIGAN DR.ZINNIA LANEPENGUIN CRES T D R I V EGRANITE RIDGE DRIVETEM P E S T D R I V EPENGUIN CREST DRIVEDAFFODIL DR IVE CARRICK BEND W A Y COACHMAN LANE RUBY RO Y C E D R I V E SUNFLOWER WAY OLEANDER COURTGRANITE RIDGE DRIVEBLA N K E N S H I P L A N E 12LAND USE PLAN1" = 100'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 HATCHED AREA DENOTES PROVIDED OPEN SPACE DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM DENOTES LINEAR PARK TRAIL SYSTEM NOTES: ·ALL PRIVATE ACCESS DRIVES (PAD) GREATER THAN 150' IN LENGTH SHALL PROVIDE ADEQUATE TURNAROUND PROVISIONS FOR FIRE AND RESCUE APPARATUS AND SHALL MEET MINIMUM INTERNATIONAL FIRE CODE REQUIREMENTS. ·UTILITY ROUTINGS ARE APPROXIMATE AND WILL BE REFINED WITH FINAL DESIGN PLANS. ·PAVEMENT AREAS NOT REFLECTED GEOMETRICALLY, SHADED ROAD AREAS REPRESENT EXPECTED ROW ONLY. VDOT NOTES: ·UTILITY ROUTINGS UNDER PAVED PORTION OF VDOT ROW MAY BE PROPOSED FOR VDOT CONSIDERATION ON A CASE BY CASE BASIS WITH FINAL DESIGN. S S SS S S S SSSSSSSSSSSSSS S S S S S S SSSS S SSSSSSSSSSSSSSSSSSSSS SS S S EX GRAVITY SEWER EASEMENT 100 YR FLOOD PLAIN HALY A R D B E N D D R I V E STEVEDOR WAYZINNIA LANEGRANITE RIDGE DRIVE TEM P E S T D R I V E MONSOON WAY HURRICANE WA Y BLA N K E N S H I P L A N EMONALISA DRIVEHIATT RUN CORR IDOR BLA N K E N S H I P L A N E MONALISA DRI V E 13LAND USE PLAN1" = 100'STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22 Rev. No. Date 03 05/10/2022 NOTES: ·ALL PRIVATE ACCESS DRIVES (PAD) GREATER THAN 150' IN LENGTH SHALL PROVIDE ADEQUATE TURNAROUND PROVISIONS FOR FIRE AND RESCUE APPARATUS AND SHALL MEET MINIMUM INTERNATIONAL FIRE CODE REQUIREMENTS. ·UTILITY ROUTINGS ARE APPROXIMATE AND WILL BE REFINED WITH FINAL DESIGN PLANS. ·PAVEMENT AREAS NOT REFLECTED GEOMETRICALLY, SHADED ROAD AREAS REPRESENT EXPECTED ROW ONLY. VDOT NOTES: ·UTILITY ROUTINGS UNDER PAVED PORTION OF VDOT ROW MAY BE PROPOSED FOR VDOT CONSIDERATION ON A CASE BY CASE BASIS WITH FINAL DESIGN. HATCHED AREA DENOTES PROVIDED OPEN SPACE DENOTES PRIVATE PEDESTRIAN TRAIL SYSTEM DENOTES LINEAR PARK TRAIL SYSTEM 14PROFFER COMPLIANCE SHEETN/A STEPHENSON VILLAGE IISTONEWALL MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIAJAN. 21, 2022 CMM/ZJ 2760B 22-02 15151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVMDP NUMBER: #02-22