Loading...
HomeMy WebLinkAbout01-21 PC Staff ReportCONDITIONAL USE PERMIT #01-21 Hollow Road Solar, LLC Staff Report for the Planning Commission Prepared: February 5, 2021 Staff Contact: M. Tyler Klein, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 02/17/21 Pending Board of Supervisors: 03/10/21 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) to enable construction of an 83-acre (disturbed area) 20-megawatt (MW) utility-scale solar power generating facility located on three (3) properties totaling approximately 326-acres +/-. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Timmons Group, dated August 28, 2020. 3. Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheet 4 of the Concept Plan, “Landscaping/Vegetative Screening Details” included with the CUP application, prepared by Timmons Group, dated August 28, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4. Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Decommissioning Plan, included with the CUP application, prepared by Blue Ridge Energy Holdings. 11 Page 2 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, shall not be used on the properties subject to this CUP. 6. Access to the site shall be limited to two (2) entrances, one entrance from Parishville Road (Route 610) and one entrance from Anchorage Lane in conformance with the Concept Plan, included with the CUP application, prepared by Timmons Group, dated August 28, 2020. Delivery of solar array panel construction materials and equipment shall occur only at the site access entrance off Parishville Road (Route 610) identified as “Primary Access Road” on Sheet 3 the Concept Plan. Use of the “50’ R/W Ingress & Egress” from Anchorage Lane shall only be used for passenger vehicle access during construction and post-construction maintenance. 7. Pile-driving of poles for solar arrays shall be limited to 7:00 a.m. to 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays. 8. A Phase 1 Archaeological and Architectural Survey will be completed as part of the permitting of this project and completed prior to site plan approval. This survey shall document the historic dwelling, barn and areas surrounding the farm complex barn (located on PIN # 27-A-11). This survey shall be submitted to the Frederick County Department of Planning and Development and the Department of Historic Resources (DHR). Phase II surveys shall be conducted if DHR determines the areas and resources under consideration are potentially significant. In the event the above resources are eligible for inclusion on the NRHP as a result of the Phase II study the structures and resources on the site shall be retained, stabilized and preserved and no disturbance shall occur within 100-feet (FT). 9. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 12 Page 3 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 LOCATION: The properties are generally located south of Parishville Road (Route 610) and generally south of the terminus (cul-du-sac) of Anchorage Lane in Gore. MAGISTERIAL DISTRICT: Gainesboro PROPERTY ID NUMBERS: 27-A-8, 27-A-11 and 27-A-12 Note: The property identified with PIN 27-A-8 will only be used for a subsurface interconnection easement and ingress/egress; no solar arrays (panels) or supporting equipment will be sited on PIN 27-A-8. PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) Land Use: Agricultural, Forestal and Vacant. ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural/Forestal/Residential South: RA (Rural Areas) Use: Agricultural/Forestal East: RA (Rural Areas) Use: Agricultural/Forestal/ Residential West: RA (Rural Areas) Use: Agricultural/Forestal/ Residential PROPOSED USE: This is a request for a Conditional Use Permit (CUP) to enable construction of an 83-acre (disturbed area) 20-megawatt (MW) utility-scale solar power generating facility located on three (3) properties totaling approximately 326-acres +/-. REVIEW EVALUATIONS: Virginia Department of Transportation: The application for a Conditional Use Permit for this property appears to have little measurable impact on Route 610, Parishville Road, the VDOT facility providing access to the property. The proposed primary entrance lacks the proper amount of required sight distance for a “Low Volume” Commercial Entrance. This entrance could be used during construction, provided a VDOT approved “Traffic Flagging” scenario, as described in the “Work Zone Safety Manual” was approved. The proposed secondary access point, of Anchorage Court, could be utilized as a “Low Volume” Commercial Entrance for maintenance and non-commercial traffic after the “Solar Project” construction was completed. An approved VDOT Land Use Permit would be required for work at both locations. 13 Page 4 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 VDOT would support the Solar Project if the entrance situations were resolved. Should the use expand in the future, the entrance will need to be reviewed, to determine if additional improvements may be required. See comment letter dated January 22, 2021. Frederick County Fire Marshal: Plans approved by Fire Marshal, Frederick County. See comment letter dated December 15, 2020. Frederick County Inspections: Conditional Use Permit for installation of solar arrays shall be designed per the 2015 Virginia Building Code, U-Utility Use Group. Solar panel installation not associated with publicly regulated utilities require permits. Plans submitted for permits may require the design to be sealed by a Registered Design Professional licensed in the State of Virginia. Arrays shall be designed for the applicable loads as required in Chapter 16 VBC. Please note the requirements in Chapter 17 of VBC for special inspection requirements on the type of structure (soil, concrete etc.). See comment letter dated December 14, 2020. Frederick County Public Works: A detailed site plan including erosion and sediment plans and stormwater plans will need to be submitted prior to construction. The plans shall comply with Chapter 143 of Frederick County Code. See comment letter dated December 21, 2020. Winchester-Frederick County Health Department: The proposed project will not require an approved water supply or sewage disposal. See comment letter dated December 18, 2020. Historic Resources Advisory Board (HRAB): The Frederick County Historic Resources Advisory Board (HRAB) considered this Conditional Use Permit application during their meeting on October 20, 2020. The project is adjacent to Sunrise (DHR #034-0486) which is listed on both the State and National Register of Historic Places. The site also has extensive frontage on Hollow Road which is listed as eligible for the State and Natural Register. The HRAB noted that there is a historic farm complex located on the site that had not 14 Page 5 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 been identified by the applicant; the site consists of a vacant dwelling and barn which were pictured in the Environmental Report. The HRAB stated that most likely this is a significant historic structure given the location and photographs included in the Environmental Report, and this structure has much architectural integrity (pattern of the house, central chimney, collection of structures, 18th century house) and most likely important to the early history of this area. The HRAB noted that this structure needs to be surveyed and preserved, and, not demolished as proposed. The HRAB recommended the following conditions: • A Phase II Survey needs to be conducted for the house/barn and surrounding site area. The survey needs to document the collection of historic structures on and around this development. • All proposed disturbance areas need to be moved away from the house and barn. • The structures on the site need to be retained, stabilized and preserved (mothballed). See comment letter dated November 19, 2020. Planning and Zoning: Utility-scale solar power generating facilities are a permitted use in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The Board of Supervisors added “utility-scale solar power generating facilities” to the Zoning Ordinance on January 8, 2020, including additional regulations for specific uses. These additional regulations further specify for utility-scale solar power generating facilities to prepare an engineered site plan and enter into a written agreement with Frederick County for facility decommissioning. The application proposes use of three (3) properties totaling approximately 326-acres +/- of RA (Rural Areas) Zoning District property, primarily used for agriculture, to generate up to 20 megawatts (MW) or photovoltaic (solar) electricity. Approximately 83-acres of the subject parcels will be utilized (disturbed) for the installation of rows of ground-mounted photovoltaic modules, commonly known as solar panels, other necessary equipment for facility operations, a transmission substation, access paths, fencing and landscaping. The solar panels will be interconnected, and the power generated by each solar panel will be combined, converted, and the voltage increased to allow delivery of the power to the adjacent Gore substation. The proximity of the project to the Gore substation and existing transmission line was a significant factor in the selection of these properties for the development of the facility. Additionally, the project as proposed does not include any batteries for the purposes of mass storage of electricity that will eventually be transferred into the grid. Small batteries will be utilized as backup for solar tracker motors, substation, and associated equipment. The Zoning Ordinance requirements for “Public Utilities” including “utility-scale solar power 15 Page 6 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 generating facilities” (§165-204.26) specifies the Zoning Administrator has the authority to determine appropriate setbacks for lots. Setbacks for the solar arrays (panels) will conform to the setback requirements contained in the Zoning Ordinance for principle uses in the RA (Rural Areas) Zoning District (§165-401.07): 60-feet (FT) front setbacks from right-of-way streets and roads, and side/rear setbacks of 50-FT from adjoining parcels 6-acres or less, 100-FT from adjoining parcels of more than 6-acres, and 200-FT from Agricultural and Forestal Districts (more than 6-acres) and orchards (regardless of size). After consultation with Staff during the pre-development of the application, the Applicant has proposed setbacks for the solar arrays (panels) for this project in conformance with the above setbacks prescribed by the Zoning Administrator. In protecting the viewshed and mitigate the visual impact to neighboring properties in the vicinity of the property the Applicant has proposed buffering and screening around the perimeter of the property, in addition to maintaining existing mature woodlands, to shield view of the facility from adjacent roadways, residences, and other agriculture uses. Access to the site shall be limited to two (2) entrances, one (1) entrance from Parishville Road (Route 610) and one (1) entrance from Anchorage Lane. The Applicant has agreed to further limit delivery of solar array panel construction materials and equipment to enter/depart the property only from Parishville Road (Route 61) (identified as “Primary Access Road” on Sheet 3 the Concept Plan prepared by Timmons Group dated August 28, 2020). Use of the “50’ R/W Ingress & Egress” from Anchorage Lane (as noted on Sheet 3, Concept Plan) will be used only for passenger vehicle access and post-construction maintenance to mitigate impact to residential properties sharing Anchorage Lane. Staff notes, the”50 R/W Ingress/Egress” easement (0.3460- acres +/-), was made part of PIN #27-A-11 through a boundary line adjustment recorded in 2004 (Instrument # 040006636, attached to staff report), providing the owner of said PIN direct access to Anchorage Lane from the subject property. Finally, a draft Decommissioning Plan included with the application materials, satisfies requirements contained in §165-204.26 of the Zoning Ordinance, ensuring that in the event the facility is no longer in operation, the land will be returned to the pre-development condition with all solar infrastructure and related facilities removed, ensuring future viability of the land to resume agricultural operations. Further, proposed condition of approval #4 ensures that Frederick County would maintain a bond that is updated every five (5) years keeping it up to date. The 2035 Comprehensive Plan envisions this area of the County to remain primarily rural in nature and for agricultural land to be preserved for future generations. The project is generally compatible with the Comprehensive Plan, with the rural character of the area, and with the adjoining agricultural and residential uses. The preservation of the underlying land maintains the ability for agricultural uses in the future. The proposed use is highly passive with limited noise, odor, glare, lighting, and traffic during operations. 16 Page 7 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 In addition to requirements contained in the Zoning Ordinance, the Applicant will pursue a “Permit-by-Rule” (PBR) application through the Virginia Department of Environmental Quality (DEQ). The PBR is a state-level administrative review and approval process for the siting of solar energy facilities in the Commonwealth, including environmental and cultural review and study. One component of the state required PBR review is local jurisdiction “approval” of solar project siting; this CUP application, if approved by the Frederick County Board of Supervisors, would satisfy that requirement enabling completion of a PBR process for this project. STAFF CONCLUSIONS FOR THE 02/17/21 PLANNING COMMISSION MEETING: This is a request for a Conditional Use Permit (CUP) to enable construction of an 83-acre (disturbed area) 20-megawatt (MW) utility-scale solar power generating facility located on properties totaling approximately 326-acres +/-. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Timmons Group, dated August 28, 2020. 3. Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheet 4 of the Concept Plan, “Landscaping/Vegetative Screening Details” included with the CUP application, prepared by Timmons Group, dated August 28, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4. Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Decommissioning Plan, included with the CUP application, prepared by Blue Ridge Energy Holdings. 17 Page 8 CUP #01-21 – Hollow Road Solar, LLC February 5, 2021 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, shall not be used on the properties subject to this CUP. 6. Access to the site shall be limited to two (2) entrances, one entrance from Parishville Road (Route 610) and one entrance from Anchorage Lane in conformance with the Concept Plan, included with the CUP application, prepared by Timmons Group, dated August 28, 2020. Delivery of solar array panel construction materials and equipment shall occur only at the site access entrance off Parishville Road (Route 610) identified as “Primary Access Road” on Sheet 3 the Concept Plan. Use of the “50’ R/W Ingress & Egress” from Anchorage Lane shall only be used for passenger vehicle access during construction and post- construction maintenance. 7. Pile-driving of poles for solar arrays shall be limited to 7:00 a.m. to 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays. 8. A Phase 1 Archaeological and Architectural Survey will be completed as part of the permitting of this project and completed prior to site plan approval. This survey shall document the historic dwelling, barn and areas surrounding the farm complex barn (located on PIN # 27-A-11). This survey shall be submitted to the Frederick County Department of Planning and Development and the Department of Historic Resources (DHR). Phase II surveys shall be conducted if DHR determines the areas and resources under consideration are potentially significant. In the event the above resources are eligible for inclusion on the NRHP as a result of the Phase II study the structures and resources on the site shall be retained, stabilized and preserved and no disturbance shall occur within 100-feet (FT). 9. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 18