Loading...
HomeMy WebLinkAbout15-22 Comments 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 June 28, 2022 Mr. Tyler L. Bailey, PE, CM Delta Airport Consultants, Inc. 1750 East International Drive Suite 3 Raleigh, North Carolina 27623 RE: Site Plan Comments – Winchester Regional Airport – Terminal Phase 2 Dear Mr. Bailey: Upon review of the subject site plan dated May 04, 2022, we recommend approval of the subject plan. Sincerely, Joseph W. Johnson, P.E. Joe C. Wilder Civil Engineer Director of Public Works JCW/kco cc: Planning and Development file FREDERICK WATER SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice 315 Tasker Road, Stephens City, VA 22655 540.868.1429 fax Project ______________________________________________________________________________ Applicant ____________________________________________________________________________ REVIEW STATUS attention________________________________ review number ____________ correct & resubmit approved as noted number of items to be corrected _____________ approved DRAWINGS send me by_________________________________________: 1.print of sheets_____________________________________ 2. one CD or flash drive containing all sheets as a combined, multi-page document in PDF format. The pages shall be in landscape orientation.__________________________________ EASEMENTS Y N A copy of the recorded onsite FW easement(s) is/are required. A copy of the recorded offsite FW easement(s) is/are required. o The easement document shall contain a plat and both shall be signed by the Frederick Water. o The Frederick Water requires specific language in its deed of easement. o Visit our website www.frederickwater.com to obtain a copy of the form. o A copy of the recorded deed(s) of easement shall be received before service will be authorized. OTHER This project also requires DEQ - Valley Region Office approval. This project also requires VDH – Lexington Field Office approval. Date: _________________ ____________________________________________ Earl W. Wiley – Engineering Assistant FEB 22 Y N Y N Y N Y N Y N This project also requires VDH – Lexington Field Office – Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see website for form This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ’s Certificate to Construct, (2) a copy of DEQ’s Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These documents must be received before service will be authorized. (4) Work cannot commence that wo uld connect to FW facilities or require FW inspections until the contract is returned to this office.