HomeMy WebLinkAbout11-22 CommentsNo further road names required. Address will be issued upon the submission of a building permit. 4-22-22 4/28/22No 4/28/2022 Ethan R. Homesley 4/28/2022 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 May 17, 2022 Mr. William A. Shelton, PE ZMM Architects Engineers 200 Country Club Drive SW Plaza One, Building E Blacksburg, Virginia 24060 RE: Revised Site Plan Comments – Timber Ridge School – CTEC Building Frederick County, Virginia Dear Mr. Shelton: Upon review of the revised site plan dated April 20, 2022, we recommend approval of the subject plan (0.63 acres disturbed). Sincerely, Joseph W. Johnson, P.E. Joe C. Wilder Civil Engineer Director of Public Works JCW/kco cc: Planning and Development file See email dated March 23, 2022 from Lloyd Ingram w/ VDOT to Mr. Bill Shelton.3 DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 22 March 2022 Mr. Shelton, A VDOT review conducted for the Timber Ridge School – CTEC Building Site Plan with a submittal date of 02 Mar 2022. Based on the review of the Drawings, all of construction work will be off of VDOT right of way. VDOT will require a Temporary Construction permit, issued from the Edinburg office for access from New Hope road. The Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings. We offer the following general comments: • Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. • Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. • A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. • Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. • A Land Use Permit shall be obtained before any work is performed on the State’s right- of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need further information, please do not hesitate to contact me. Regards, Lloyd A. Ingram, Transportation Engineer Virginia Department of Transportation Edinburg Residency ~ Land Development 14031 Old Valley Pike Edinburg, Virginia 22824