May 17, 2022
Mr. William A. Shelton, PE
ZMM Architects Engineers
200 Country Club Drive SW
Plaza One, Building E
Blacksburg, Virginia 24060
RE: Revised Site Plan Comments – Timber Ridge School – CTEC Building
Frederick County, Virginia
Dear Mr. Shelton:
Upon review of the revised site plan dated April 20, 2022, we recommend approval of the
subject plan (0.63 acres disturbed).
Sincerely,
Joseph W. Johnson, P.E. Joe C. Wilder
Civil Engineer Director of Public Works
JCW/kco
cc: Planning and Development
file
See email dated March 23, 2022 from Lloyd Ingram w/ VDOT to Mr. Bill Shelton.3
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
22 March 2022
Mr. Shelton,
A VDOT review conducted for the Timber Ridge School – CTEC Building Site Plan with a
submittal date of 02 Mar 2022. Based on the review of the Drawings, all of construction work
will be off of VDOT right of way. VDOT will require a Temporary Construction permit, issued
from the Edinburg office for access from New Hope road. The Site Plan is approved by our
office. Please ensure that all applicable agencies have the most recent set of approved
Drawings.
We offer the following general comments:
• Our review and comments are general in nature. Should details be overlooked during
plan review or conditions in the field exist such that additional measures are warranted,
such measures shall be completed to the satisfaction of the department.
• Materials used and methods of construction shall adhere to the current observed VDOT
Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic
Control Devices, and Land Use Permit Special Provisions.
• A preconstruction conference shall be held by the engineer and/or the developer with
the attendance of the contractor, various County agencies, utility companies, and VDOT
prior to initiation of work.
• All drainage is to be carried within the right-of-way in ditch lines or gutters along the
street to a pipe or drainage easement.
• Any construction related changes to the approved plan must come through the design
engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT
review.
• A Land Use Permit shall be obtained before any work is performed on the State’s right-
of-way. The permit is issued by this office and may require application fees, the salary &
expenses of a State assigned inspector, and surety bond coverage.
If you have any questions or need further information, please do not hesitate to contact me.
Regards,
Lloyd A. Ingram, Transportation Engineer