PC 05-04-22 Meeting Agenda1.Call to Order
2.Adoption of Agenda – Pursuant to established procedures, the Planning Commission
should adopt the Agenda for the meeting.
3.Committee Reports
4.Citizen Comments
5.Public Hearings
5.A.Rezoning #02-22 of R&J Land Development, LLC - (Mr. Klein)
Submitted to rezone 1.444-acres from B3 (Industrial Transition) District to B2 (General
Business) District with proffers and 15.444-acres from B3 (Industrial Transition) District
to B3 (Industrial Transition) District with amended proffers. The properties are located
northwest corner at intersection of Martinsburg Pike (Route 11) and Jeffs Way, and are
identified by Property Identification Numbers 33-A-122A, 33-A-123, 33-A-123C, 33-A-
123D, and 33-A-123E in the Stonewall Magisterial District.
6.Other
6.A.Current Planning Applications
7.Adjourn
AGENDA
PLANNING COMMISSION
WEDNESDAY, MAY 4, 2022
7:00 PM
THE BOARD ROOM
FREDERICK COUNTY ADMINISTRATION BUILDING
WINCHESTER, VIRGINIA
PC05-04-22REZ02-22_Redacted.pdf
PC05-04-22REZ02-22TrafficImpactAnalysis.pdf
1
Planning Commission
Agenda Item Detail
Meeting Date: May 4, 2022
Agenda Section: Public Hearings
Title: Rezoning #02-22 of R&J Land Development, LLC - (Mr. Klein)
Attachments:
PC05-04-22REZ02-22_Redacted.pdf
PC05-04-22REZ02-22TrafficImpactAnalysis.pdf
2
REZONING APPLICATION #02-22
R&J LAND DEVELOPMENT
Staff Report for the Planning Commission
Prepared: April 22, 2022
Staff Contacts: M. Tyler Klein, AICP, Senior Planner
Reviewed Action
Planning Commission: 05/04/2022 Pending
Board of Supervisors: 05/25/2022 Pending
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 05/04/22 PLANNING
COMMISSION MEETING:
This is an application to rezone 1.444 acres from B3 (Industrial Transition) District to B2 (General
Business) District with proffers and 15.444 acres from B3 (Industrial Transition) District to B3 (Industrial
Transition) District with amended proffers. This rezoning application modifies approved land uses
associated with Rezoning Application (REZ) #01-06. The intended use of the proposed B2 zoned parcel is
a general merchandise store (Dollar General).
This site is located within the Sewer and Water Service Area (SWSA) and is located within the limits of
the Northeast Land Use Plan of the Comprehensive Plan. The Comprehensive Plan envisions this area of
the County as “business;” the proposed B2 (General Business) District is consistent with the future land
use plan.
Following a public hearing, a recommendation regarding this rezoning application to the Board
of Supervisors would be appropriate. The Applicant should be prepared to adequately address
all concerns raised by the Planning Commission.
3
Rezoning #02-22 R&J Land Development
April 22, 2022
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
PROPOSAL: To rezone 1.444-acres from B3 (Industrial Transition) District to B2 (General Business)
District with proffers and 15.444- acres from B3 (Industrial Transition) District to B3 (Industrial
Transition) District with amended proffers. This rezoning application modifies approved land uses
associated with Rezoning Application (REZ) #01-06.
LOCATION: The properties are located northwest corner at intersection of Martinsburg Pike (Route 11)
and Jeff’s Way.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBERS: 33-A-122A, 33-A-123, 33-A-123C, 33-A-123D and 33-A-123E
PROPERTY ZONING: B3 (Industrial Transition) District
PRESENT USE: Vacant/Undeveloped
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: Residential
South: RA (Rural Areas) Use: Residential
East: RA (Rural Areas) Use: Residential/Agricultural
West: Interstate 81 Use: Interstate
4
Rezoning #02-22 R&J Land Development
April 22, 2022
Page 3
REVIEW EVALUATIONS:
Planning & Zoning:
1) Site History
The original Frederick County zoning map (U.S.G.S. Inwood Quadrangle) identifies the subject
parcels as being zoned A-2 (Agricultural General). The County’s agricultural zoning districts
were subsequently combined to form the RA (Rural Areas) District upo n adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding
revision of the zoning map resulted in the re-mapping of the subject property and all other A-1
and A-2 zoned land to the RA District. Rezoning Application #01-06 (approved March 22,
2006) rezoned the subject properties to B3 (Industrial Transition) District.
2) Comprehensive Plan
The Comprehensive Plan is the guide for the future growth of Frederick County.
The Comprehensive Plan is an official public document that serves as the community's guide
for making decisions regarding development, preservation, public facilities and other key
components of community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence; the Plan is a composition of
policies used to plan for the future physical development of Frederick County. The Area Plans
and Appendix I of the Comprehensive Plan are the primary implementation tools and will be
instrumental to the future planning efforts of the County.
Comprehensive Plan Land Use Compatibility
The Northeast Frederick Land Use Plan of the Comprehensive Plan provides guidance on the
future development of the property. The Plan identifies these properties with a “business” land
use designation; the property is also within the limits of the Sewer and Water Service Area
(SWSA). The existing B3 (Industrial Transition) zoning is generally consistent with the goals
of the Comprehensive Plan.
The proposed B2 (General Business) zoning on 1.444-acres is also consistent with the goals of
the Plan. The intent of the B2 District is to provide large areas for a variety of business, office
and service uses. General business areas are located on arterial highways at major intersections
and at interchange areas. Businesses allowed involve frequent and direct access by the general
public but not heavy truck traffic on a constant basis other than that required for delivery of
retail goods. General business areas should have direct access to major thoroughfares and
should be properly separated from residential areas.
3) Access & Transportation
The site will have commercial access from Jeff’s Way, as required by approved REZ #01-06
proffers. The traffic study included with application shows that the proposed general
5
Rezoning #02-22 R&J Land Development
April 22, 2022
Page 4
merchandise store (Dollar General) does not negatively impact traffic operations at the
intersection of Route 11 and Jeff’s Way.
4) Potential Impacts & Proffers
The rezoning proposes only a change in the land use of 1.444-acres to the B2 (General
Business) District. All the other proffers, including site access, associated with the original REZ
#01-06 remain unchanged.
Virginia Dept. of Transportation: Please see attached letter from VDOT dated March 16, 2022
addressed from Bradley S. Riggleman, P.E.
Frederick Water: Please attached letter from Eric Lawrence, Executive Director, dated February 24,
2022.
Frederick County Fire Marshall: Plan approved.
Frederick County Public Works: We offer no additional comments at this time.
County of Frederick Attorney: Please see attached letter from Roderick B. Williams, County
Attorney dated April 1, 2022.
Following a public hearing, a recommendation regarding this rezoning application to the Board
of Supervisors would be appropriate. The Applicant should be prepared to adequately address
all concerns raised by the Planning Commission.
6
£¤11
§¨¦81
§¨¦81
§¨¦81
33 A 123D
33 A 122A
33 A 123C
33 A 123
33 A 123E
3468MARTINSBURGPIKE
3538MARTINSBURG PIKE
3588MARTINSBURGPIKE
3599MARTINSBURGPIKE
333JEREMIAH LN
3656MARTINSBURGPIKE
3683MARTINSBURGPIKE
281JEREMIAH LN
3703MARTINSBURGPIKE
3721MARTINSBURGPIKE 2060CEDARHILL RD
2020CEDARHILL RD
CEDAR HILL RD
WES LUKE DRJEFFS WAY
MARTINSBURGPIKEApplication
Parcels
Sewer and Water Service A rea µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: April 12, 2022
Clear BrookMARTINSBURG PIKEHOPEWELL RD
CEDAR HILL RD
B R U C E T O W N R DJEREMIAH LNWOODSIDE RDQUARRY LN§¨¦81
§¨¦81 £¤11
0 300 600150 Feet
REZ # 02 - 22: R and J Land Development, LLCPINs: 33 - A - 122A, 33 - A - 123, 33 - A - 123C, 33 - A - 123D, 33 - A - 123ERezoning from B3 to B2 and B3 to B3Location Map
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
7
£¤11
§¨¦81
§¨¦81
§¨¦81
33 A 123D
33 A 122A
33 A 123C
33 A 123
33 A 123E
3468MARTINSBURGPIKE
3538MARTINSBURG PIKE
3588MARTINSBURGPIKE
3599MARTINSBURGPIKE
333JEREMIAH LN
3656MARTINSBURGPIKE
3683MARTINSBURGPIKE
281JEREMIAH LN
3703MARTINSBURGPIKE
3721MARTINSBURGPIKE 2060CEDARHILL RD
2020CEDARHILL RD
CEDAR HILL RD
WES LUKE DRJEFFS WAY
MARTINSBURGPIKEApplication
Parcels
Sewer and Water Service A rea
B2 (General Business District)
B3 (Industr ial Transition District)
M1 (Light Industrial District)µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: April 12, 2022
Clear BrookMARTINSBURG PIKEHOPEWELL RD
CEDAR HILL RD
B R U C E T O W N R DJEREMIAH LNWOODSIDE RDQUARRY LN§¨¦81
§¨¦81 £¤11
0 300 600150 Feet
REZ # 02 - 22: R and J Land Development, LLCPINs: 33 - A - 122A, 33 - A - 123, 33 - A - 123C, 33 - A - 123D, 33 - A - 123ERezoning from B3 to B2 and B3 to B3Zoning Map
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
8
£¤11
§¨¦81
§¨¦81
§¨¦81
33 A 123D
33 A 122A
33 A 123C
33 A 123
33 A 123E
3468MARTINSBURGPIKE
3538MARTINSBURG PIKE
3588MARTINSBURGPIKE
3599MARTINSBURGPIKE
333JEREMIAH LN
3656MARTINSBURGPIKE
3683MARTINSBURGPIKE
281JEREMIAH LN
3703MARTINSBURGPIKE
3721MARTINSBURGPIKE 2060CEDARHILL RD
2020CEDARHILL RD
CEDAR HILL RD
WES LUKE DRJEFFS WAY
MARTINSBURGPIKEApplication
Parcels
Sewer and Water Service A rea
Long R ange Land Use
Business
Industrial
Rural Community Center µ
Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: April 12, 2022
Clear BrookMARTINSBURG PIKEHOPEWELL RD
CEDAR HILL RD
B R U C E T O W N R DJEREMIAH LNWOODSIDE RDQUARRY LN§¨¦81
§¨¦81 £¤11
0 300 600150 Feet
REZ # 02 - 22: R and J Land Development, LLCPINs: 33 - A - 122A, 33 - A - 123, 33 - A - 123C, 33 - A - 123D, 33 - A - 123ERezoning from B3 to B2 and B3 to B3Long Range Land Use Map
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
REZ #02-22
9
10
11
12
13
16
Owners of property adjoining the land will be notified of the Planning Commission and the
Board of Supervisors meetings. For the purpose of this application, adjoining property is any
property abutting the requested property on the side or rear or any property directly
across a public right-of-way, a private right-of-way, or a watercourse from the requested
property. The applicant is required to obtain the following information on each adjoining
property including the parcel identification number which may be obtained from the office of the
Commissioner of Revenue. The Commissioner of the Revenue is located on the 2nd floor of the
Frederick County Administrative Building, 107 North Kent Street.
Name and Property Identification Number Address
Name
Property #
Name
Property #
Name
Property #
Name
Property #
Name
Property #
Name
Property #
Name
Property #
Name
Property #
Name
Property #
ADJOINING PROPERTY OWNERS
14
15
16
17
18
19
20
21
22
Impact Analysis Statement
R&J Land Development Rezoning
Dollar General Store
Stonewall Magisterial District
Frederick County, VA
Parcel ID 33-A-123A
February 5, 2022
Rev March 28, 2022
Owner:
Prepared for:
R&J Land Development, LLC
1631 Redbud Road
Winchester, VA 22603
Prepared by:
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
23
1
IMPACT ANALYSIS STATEMENT
R&J Land Development – Dollar General Introduction
This project involves constructing 12,480 square foot variety store on 1.444 acres in Clear Brook,
Frederick County, VA. The project is west of Route 11, east of I-81, and south of Cedar Hill Rd
(Route 671). Access to the site will be from Jeff's Way. Figure 1 shows the location of the
project.
The parent parcel of which the proposed B2 area is a part, was rezoned to B-3 in 2006 with
rezoning RZ# 01-06. To create the proposed B-2 zoned area, the proffers for rezoning RZ# 01-06
are revised to maintain originally proffered conditions and account for proffers floor areas.
Figure 1 Project location map
The rezoning site is currently vacant and undeveloped. The site is bounded by Route 11 to the
east, undeveloped land, and I-81 to the west. To the north is more undeveloped land with
sparse residential units, and to the south is the Pine Knoll Construction office.
Proposed B2
Rezoning RZ# 01-06
24
2
Site Suitability
100 Year Flood Plains – The site is outside of the 100-year flood plain as can be seen in the FEMA
flood hazard mapping shown in Figure 2.
Figure 2 Floodplain Map
Wetlands – A desktop review of the US Fish and Wildlife Service's National Wetland Inventory
mapping shows there are no known wetlands on the site. See Figure 3
Project Location
25
3
Figure 3 National Wetland Inventory Map
Steep Slopes – Based on field observations and 5 ft contour mapping provided by the Frederick
County GIS, the site has been found to be generally flat, without any steep slopes.
Mature Woodlands – There are no areas of mature woodlands on the site.
Prime Agricultural Soils – Based on data from the USDA Web Soil Survey, all areas of the site
with soils type Oaklet Silt Loam, 32B, are prime farmland. See Figure 4.
Project Location
26
4
Figure 4 USDA Soils Map
Soil or Bedrock Conditions which would create Construction Difficulties or Hazards – A review of
the USDA Web Soil Survey indicates that the depth restrictive features are over 80 inches. Site
excavations are not expected to go that deep. Surrounding Properties
The proposed rezoning area is a portion of a larger parcel that is zoned B3. Residual B3 land will
surround the rezoned parcel on the west and south. Also, to the west is I-81. To the south, east
and north are rural lot residential properties that are zoned RA. Traffic
Stowe Engineering has prepared a Traffic Impact Study for the project. The study shows that the
proposed Dollar General store does not negatively impact traffic operations at the intersection
of Route 11 and Jeff’s Way. The intersection movements continue to operate at a Level of
Service of “A” or ”B” in the AM and PM peak hours through the Design Year 2029.
27
5
Sewage Conveyance and Treatment
Wastewater from the site will be collected and pumped through the existing Frederick Water
force mains on the site and gravity mains elsewhere. The wastewater will be treated at the
Opequon wastewater treatment plant, which has a capacity of 12.6 million gallons a day. Water Supply
Frederick Water will provide water service to the project. An existing 8" water main is in place at
the front of the site.
Frederick Water is constructing a new water plant a short distance away that will be rated at 8
million gallons a day. Drainage
Drainage from the site flows to the northeast to Turkey Run. Post-development drainage from
the site will be routed through stormwater management facilities to control the quantity and
quality of stormwater leaving the site.
Solid Waste Disposal Facilities
Collection of solid waste will occur through on-site dumpsters and private haulers. The Civil
Engineering Reference Manual, 4th edition, uses a solid waste generation rate of 5.4 cubic yards
per 1,000 square feet of floor area. Applying this rate, 12,480 sf store will generate 67 cubic
yards of solid waste per year. The solid waste will be transferred to the Frederick County Landfill
Facility by private licensed commercial carriers.
Historical Site and Structures
A review of the online Virginia Dept. of Historic Resources records did not show any historic
architectural or archeological sites in the proposed development area. One site was observed on
the adjacent property to the south of the site and another on the adjacent property to the north
of the site.
Site 034-0930. A review of the VA Department of Historic Resources records showed the existing
structure on the property to the north as being historic. The home was identified as the Edward
Joliffe house. The home was built in the 1850 Antebellum Period as a single-family dwelling.
Figure 7 shows the location of the home.
Site 034-0931. The VA Department of Historic Resources records also showed the existing
structure on the property to the south as being historic. The home was identified as the Dr.
28
6
Cochran house. The home was built in the 1905 as a single-family dwelling. Figure 7 shows the
location of the home.
A vegetative screening will be used to protect the viewshed of the site from the visual impacts
of the proposed development.
Figure 5 VA Department of Historic Resources Map Impact on Community Facilities
Educational Facilities – This project will not add children to the school system.
Emergency Services – Police protection will be provided by the Frederick County Sheriff
Department. The property is in the first response area for the Clear Brook Fire and Rescue
station. Therefore, response times from the station to the site are reasonable.
Parks and Recreation – This project will not add to the population of Frederick County and,
therefore, will not increase the demand for Parks and Recreational services.
Solid Waste – As previously stated, the site will generate 67 cubic yards of waste per year.
Waste will be collected in private bins and transported by private haulers to the Frederick
County land fill.
29
EDINBURG RESIDENCY
LAND USE MEMORANDUM
DATE: March 16, 2022
TO: Tim Stowe, P.E., Stowe Engineering
FROM: Bradley S. Riggleman, P.E., Area Land Use Engineer
RE: Rezoning Comments – R&J Land Development
_________________________________________________________________________________
Mr. Stowe,
This office received an application on February 15, 2022 for a proposed 1.444-acre rezoning for a
portion of TM 33 A 123 from B3 to B2 w/conditions for R&J Land Development. This property is
located at the corner of US Rt. 11 and Jeff’s Way, in northern Frederick County. A rezoning application
(signed 2/7/2022), impact analysis statement (dated 2/5/22), Traffic Impact Analysis (dated 2/9/22),
and proffer letter (dated 2/9/22) are the subject of this review. Comments are as follows:
Impact and Traffic Analysis
• The Impact and Traffic Analysis appear to be complete and acceptable from a transportation
perspective.
Rezoning Application
• The proposed change from B3 to B2 w/conditions should not have a significant impact the
roadway network. The proffer statement prohibits the use of quick-service restaurant with
drive-thru lanes and gas/fueling station, with or without a convenience store, which are high
traffic generators. Given these restrictive proffers, there would be minimum change to the
traffic generation potential compared to the existing zoning.
General Comments:
• Access to this site will need to be designed in accordance to the most current revisions of the
VDOT Road Design Manual, Road and Bridge Standards & Specifications, the Virginia Work
Area Protection Manual, and all other applicable manuals, regulations, and standards. Site
access will be evaluated during site plan review.
VDOT appreciates the opportunity to provide input on this potential rezoning. Please feel free to
contact me at 540-534-3223 if you have any questions or concerns.
Residency
Cc: John Bishop, Frederick County, Assistant Director, Transportation
Tyler Klein, Frederick County, Senior Planner
File
30
From:John Bishop
To:Tim Stowe
Subject:R&J Land Development Rezoning
Date:Thursday, March 24, 2022 12:41:52 PM
Tim,
Thank you for the opportunity to comment on the R&J land development rezoning package. At this time I do not
have anything to add to VDOT’s comment, which was submitted on March 16, 2022. Should conditions change
through the rezoning process or new information come too light, I reserve the right to update this comment.
thank you
John
John Bishop
Assistant Director-Transportation
Frederick County Planning and Development
31
32
315 Tasker Road PH (540) 868-1061 Eric R. Lawrence
Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director
www.FrederickWater.com
Water At Your Service
February 24, 2022
Tim Stowe
Stowe Engineering, PLC
103 Heath Court
Winchester, Virginia 22602
RE: Rezoning Application Comment
R&J Development, LLC - Dollar General Store
Tax Map Numbers: 33-A-123
1.444 acres
Dear Mr. Stowe:
Thank you for the opportunity to offer review comments on the R&J Land Development (Dollar
General Store) commercial rezoning application package, dated February 7, 2022, and received
at Frederick Water on February 18, 2022. Frederick Water offers comments limited to the
anticipated impact/effect upon Frederick Water’s public water and sanitary sewer system and
the demands thereon.
The project parcel is located within the sewer and water service area (SWSA), and therefore by
county policy, Frederick Water’s water and sewer services are available. The application’s
Impact Statement is silent on the projected quantities of water and sewer generation from the
proposed land use, but the zoning districts (existing B3 and proposed B3) suggest demands will
be similar to potential demands under the existing land use permitted by the underlying zoning.
It is noted that neither the potential square footage nor the water and sewer demand
projections are included in a proffer statement, so actual water and sewer demands could vary
significantly based upon ultimate land use.
Water service is available via existing 6- and 12-inch water mains located on properties south of
the site. The applicant will need to obtain easements. Adequate drinking water supply
presently exists.
33
Page 2
R&J Development LLC commercial rezoning application
Tim Stowe
February 24, 2022
A Frederick Water sanitary sewer forcemain exists on the property to the south, which serves
the existing building on Jeffs Way. The applicant will need to obtain easements. This forcemain
contributes to a forcemain that ultimately flows to the Opequon Water Reclamation Facility
(OWRF). Treatment capacity does presently exist at the OWRF.
Water and sanitary sewers are to be constructed in accordance with Frederick Water standards
and specifications. Easements will be required to accommodate infrastructure that is dedicated
to Frederick Water. Please be aware that Frederick Water is offering these review comments
without the benefit or knowledge of a proffered proposed use and water and sewer demands
for the site.
Please keep in mind that water supplies and sanitary sewer conveyance capacities change daily;
with each new customer connection bring additional demands and generated flows. Additional
upgrades to the sanitary sewer system may be necessary for the project to connect and
contribute to the system once the site’s sanitary sewer generations are known. This letter does
not guarantee system capacities to accommodate your development proposal.
Thank you for the opportunity to offer review comments.
Sincerely,
Eric R. Lawrence
Executive Director
34
35
36
37
COUNTY OF FREDERICK
Roderick B. Williams
County Attorney
540/722-8383
Fax 540/667-0370
E-mail rwillia@fcva.us
April 1, 2022
VIA EMAIL
Mr. Tim Stowe
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
Re: Rezoning Application – R&J Land Development/Dollar General Rezoning
Tax Parcel Numbers 33-A-122A, 33-A-123, 33-A-123C, 33-A-123D – 16.89±
Acres (the “Property”)
Proposed Proffer Statement (the “Proffer Statement”)
(Amendment to Proffer Statement for Rezoning #01-06)
Dear Tim:
You have submitted to Frederick County for review the Proffer Statement, for the
proposed rezoning of the Property, 16.89± acres in the Stonewall Magisterial District, from the
B3 (Industrial Transition) District with proffers to the B3 (Industrial Transition) District with
revised proffers (15.444± acres) and from the B3 (Industrial Transition) District with proffers to
the B2 (General Business) District with proffers (1.444± acres), by R&J Land Development,
LLC (the “Owner”). I have now reviewed the Proffer Statement and it is my opinion that the
Proffer Statement would be in a form to meet the requirements of the Frederick County Zoning
Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement,
subject to the following comments:
The approach of treating this as an overall amendment of the proffers from Rezoning
#01-06 is a good one. It does, however, constitute a new rezoning and, toward that end:
o References to “amended” in the heading and in the first paragraph should be deleted.
o Rezoning number references should be to whatever number is assigned to the current
matter and not to #01-06.
o The original date of the proffers can refer to the 2006 document, but should be to
March 2, 2006, the date of the actual proffers that the Board accepted. Any prior dates
38
Mr. Tim Stowe
April 1, 2022
Page 2
are of drafts that are, at this point, lost to history, not meaningful, and only end up
creating confusion.
o Any previously satisfied proffer obligations may be noted with a bracketed reference
after each: [Obligation has previously been satisfied]. I believe this may be the case
for Proffers A.1.b and A.1.e.
o Also, while we are perhaps engaging in some clean up exercises, I believe that the use
of the sub “i.” level in the text may be deleted as there are no sub “ii.” items (except
in Proffer A.3.a.), and the text for each may simply appear following the respective
current headings.
The acreage references in the heading and in the first paragraph have an extraneous dash
that may be deleted.
The parcel numbers are not correct; they should be 33-A-122A, 33-A-123, 33-A-123C,
and 33-A-123D.
For clarity, as an additional paragraph after the second paragraph should state to the
effect: References herein to the “the property” or “this property” are to the 16.89± acres
comprised of parcels 33-A-122A, 33-A-123, 33-A-123C, and 33-A-123D.
In Proffer A.1.a., there is an extraneous “3” in the last sentence.
In Proffer A.1.b., the words “frontage” and “road” have been reversed.
In Proffer A.1.c., “long” should be “along” in the first sentence.
In Proffer A.1.d., “prorate” should be “prorated” in the first sentence.
In Proffer A.5., there are two typographical errors: “Mop bile” and “20,0-00”.
In Proffer A.8.c., to improve clarity from the 2006 version, “will erect” might better read
“may erect” and “tenants” might better read “businesses operating on the property”.
I have not reviewed the substance of the proffers as to whether the proffers are suitable
and appropriate for this specific development, as my understanding is that review will be done by
staff and the Planning Commission.
County Attorney
cc: Department of Planning & Development
39
40
41
Prepared for:
R&J Land Development, LLC
1631 Redbud Road
Winchester, VA 22603
Prepared by:
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
Traffic Impact Study
Dollar General
Clear Brook, Frederick County, VA
February 9, 2022
2/9/22
42
Table of Contents
...................................................................................................................................................................... 0
February 5, 2022 ....................................................................................................................................... 0
Executive Summary ....................................................................................................................................... 3
Introduction and Background Information ................................................................................................... 1
Project Location and Description .............................................................................................................. 1
Non-existent transportation Improvements ............................................................................................ 2
TIA Scoping ................................................................................................................................................ 2
Study Area ................................................................................................................................................. 2
Existing Roadway Description ................................................................................................................... 3
Nearby Land Uses ..................................................................................................................................... 3
Comprehensive Plan ............................................................................................................................. 3
Zoning.................................................................................................................................................... 5
VDOT Functional Classification ................................................................................................................. 6
Multi-Modal Access .................................................................................................................................. 7
Future Transportation Improvements ...................................................................................................... 7
Analysis of Existing Conditions ...................................................................................................................... 8
Existing Traffic Operations ........................................................................................................................ 8
Intersection Level of Service Criteria ............................................................................................................ 8
Assessment of the Existing Conditions: .................................................................................................... 8
Analysis of Future Conditions Without Development (Background) .......................................................... 10
Traffic Growth ......................................................................................................................................... 10
Assessment of Traffic Operations without the Development ................................................................ 10
Site Trip Generation .................................................................................................................................... 12
Pass-By Trips ............................................................................................................................................... 12
Site Traffic Distribution and Assignment .................................................................................................... 12
Analysis of Future Conditions with the Development (Build-out) .............................................................. 14
Site Entrances ......................................................................................................................................... 14
Assessment of Traffic Operations with the Development ...................................................................... 15
Design Year Traffic Operations with Development and Mitigation ............................................................ 16
Traffic Growth ......................................................................................................................................... 16
43
Traffic Operations ................................................................................................................................... 16
Conclusions and Recommendations ........................................................................................................... 18
44
Executive Summary
This Traffic Impact Analysis evaluates the transportation impacts resulting from the development of a
1.44-acre site for a 12,480 SF Dollar General store in Frederick County, Virginia. The site is on the west
side of Route 11, approximately 0.4 miles north of Clear Brook, VA.
The property of which the proposed rezoning parcel is a part, was rezoned to B-3 in 2006 with rezoning
RZ# 01-06. That rezoning proffered to limit the combined floor area on the property to 128,000 SF, with
no more than 8,000 SF of that area used for a restaurant (SIC 581). Approximately 24,000 SF of floor
area is in place and operational on the site with a B3 use. The requested rezoning will convert 12,480 SF
of the remaining 103,520 SF to a B2 use, General Merchandise Store
The proposed development consists of a 12,480 SF variety store on 1.44 acres. A single site entrance will
connect to Jeff's Way. Traffic associated with the development will use Route 11 to travel north and
south.
This engineer believes that the transportation impacts of this rezoning are both manageable and
acceptable for this project setting with the implementation of these recommended improvements.
Additionally, with the modifications suggested in this TIA, the study intersections can accommodate
traffic from this site development.
45
Introduction and Background Information
Page | 1
Introduction and Background Information Project Location and Description
This project involves constructing 12,480 square foot variety store on 1.2 acres in Clear Brook, Frederick
County, VA. The project is west of Route 11, east of I-81, and south of Cedar Hill Rd (Route 671). Access
to the site will be from Jeff's Way. Figure 1 shows the location of the project.
Figure 1 Project Location Map
The property of which the proposed rezoning parcel is a part, was rezoned to B-3 in 2006 with rezoning
RZ# 01-06. That rezoning proffered to limit the combined floor area on the property t0 128,000 SF, with
no more than 8,000 SF of that area used for a restaurant (SIC 581). Approximately 24,000 SF of floor
Project Location
46
Introduction and Background Information
Page | 2
area is in place and operational on the site with a B3 use. The requested rezoning will convert 12,480 SF
of the remaining 103,520 SF to a B2 use, General Merchandise Store.
Non-existent transportation Improvements
A review of the VDOT Six-Year Improvement Plan and the Smart Scale Dashboard did not show any
active projects for this area.
TIA Scoping
A Traffic Study Pre-Scope of Work meeting was held with VDOT on December 14th, 2021. A VDOT
Chapter 527/870 traffic study is not required for the proposed land use application since the proposed
trips are not more than the 5,000 vpd volume threshold. A copy of the final scoping document is
included in Appendix A.
Study Area
The study area for this analysis includes the existing intersection of route 11 and Jeff's Way. Figure 2
shows the study area reference numbers of the intersection studied in this analysis.
Figure 2 Traffic data collection and study intersection locations
n
Map Source: Frederick County GIS
24 hr count
1
Exit 321
T.M. count
47
Introduction and Background Information
Page | 3
Existing Roadway Description
The public street network in the vicinity of the site is summarized below, with the existing characteristics
and road functional classifications (same for VDOT and County):
• US Route 11 (Martinsburg Pike) is a 2-lane highway from its intersection with Brucetown Road to
the north of Jeff's Way, at which point it transitions to two northbound lanes and one southbound
lane. A southbound right turn lane and a northbound left-turn lane are in place. The roadway has a
shoulder and ditch typical section through the study area. The VDOT average annual weekday
traffic volume (AAWDT) on this section of Route 11 was 7,500 in 2019. The posted speed limit
through this area is 45 mph.
• Jeff's Way (private street) is a two-lane road on the west side of Route 11. The pavement is 24 feet
wide with gravel shoulders. There was no observed posted speed limit. Nearby Land Uses
The site is bounded by Route 11 to the east, undeveloped land, and I-81 to the west. To the north is
more undeveloped land with sparse residential units, and to the south is more undeveloped land.
Comprehensive Plan
The 2035 Frederick County Comprehensive Plan envisions the land use for business, as shown in
Figure 3.
48
Introduction and Background Information
Page | 4
Figure 3 2035 Frederick County Comprehensive Plan Land Use
Project Location
49
Introduction and Background Information
Page | 5
Zoning
The current zoning on the site is B3, transitional business. See Figure 5.
Figure 4 Zoning Map
Project Location
50
Introduction and Background Information
Page | 6
VDOT Functional Classification
The VDOT Functional Plan for this portion of Frederick County is shown in Figure 5, which shows Route
11 (Martinsburg Pike) as a "Major Collector" in the vicinity of the study area.
The functional designation establishes the VDOT Access Management requirements for median
crossovers and traffic control.
Figure 5 Approved Roadway Functional Classification Map
Project Location
51
Introduction and Background Information
Page | 7
Multi-Modal Access
The existing roadway network does not include continuous pedestrian access. Bike lanes are not
included in the existing roadway typical sections. Future Transportation Improvements
As stated earlier in this section, A review of the VDOT Six-Year Improvement Plan and the Smart Scale
Dashboard did not show any active projects for this area.
52
Analysis of Existing Conditions
Page | 8
Analysis of Existing Conditions Existing Traffic Operations
Traffic counts were taken on Wednesday, January 12th, 2022, from 6:00 AM to 9:00 AM and from 3:00
PM to 6:00 PM to identify the peak traffic volume hours. The morning peak hour occurs from 7:00 AM to
8:00 AM, and the evening peak hour is from 4:45 PM to 5:45 PM. The traffic count data is included in
Appendix B.
The turning movement data for the AM and PM peak hours, with the intersection Level of Service (LOS)
by approach, are summarized in Figures 6 and 7. The approach LOS for the stop-controlled leg of the
unsignalized intersection is shown, and only conflicted movements are assigned a LOS. Capacity
calculations in HCM mode are from Synchro 11. The Synchro calculation worksheets are in Appendix C.
Intersection Level of Service Criteria
The Highway Capacity Manual methodologies for intersection and roadways Levels of Service (LOS) were
used to measure the performance of the study intersections. LOS measures vehicle operator delays with
the overall driving experience through a particular facility. Performance is quantified with designations
of LOS 'A' through 'F' based on the average control delay (given in seconds per vehicle) per lane group
and the overall intersection. These LOS designations describe the performance of the intersection from
the motorist's perspective, with LOS 'A' representing free-flowing conditions and LOS' F' representing
congested conditions. Delay is the additional travel time experienced by a driver, passenger, or
pedestrian. Control delay results when a traffic control device (such as a traffic signal) causes a lane
group to reduce speed or stop; it is measured compared to an uncontrolled condition.
A LOS "C" is preferred for rural conditions.
Assessment of the Existing Conditions:
• The unsignalized intersection of Jeff's Way and Route 11 has all conflicting movements
operating satisfactorily. The stop condition operates at a LOS of" B" in the AM peak hour and
LOS "A" in the PM peak hour. The northbound left-turn lane operates at LOS of "A" in the AM
and PM peak hours.
53
Analysis of Existing Conditions
Page | 9
Table 1 2022 Existing Level of Service, Delay, and Back of Queue (95%)
AM Peak Hour (PM Peak Hour)
1
Jeff’s Way Route 11 2 (0) 315 (241) 0 (0)
8 (5) 6,940 3 (3) 132(431) 1
Jeff’s Way Route 11 B (A) A (A) LOS Delay
(sec/veh)
Back of Queue
(ft)LOS Delay
(sec/veh)
Back of Queue
(ft)
NT ------
NL 450 A 8.0 0 A 7.8 0
NB LOS -A 0.4 -A 0.1 -
SR 175 ------
ST -------
SB LOS -------
EB/R/L -B 10.2 25 A 9.9 25
EB LOS -B 10.2 -A 9.9 -
Overall -0.4 --0.3 -
- EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T: Thru, R: Right
- Storage lengths include half the taper.
Lane/Approach#Intersection Traffic Control/
Mitigation
AM Peak Hour PM Peak Hour
Storage
Lengths (ft)
1 Jeff's Way &
Route 11
Unsignalized
Figure 5 Existing Traffic Volumes Figure 6 Existing Levels of
Service and Lane Configurations
54
Analysis of Background Conditions
Page | 10
Analysis of Future Conditions Without Development
(Background)
The 2023 traffic volumes represent the future traffic volumes in the study area. The traffic volumes have
increased because of land-use changes and regional growth without the proposed Dollar General store.
The parent parcel of land was rezoned in 2006 to B3 zoning. With that rezoning, PHR&A provided a
traffic study with an addendum dated 2/13/06, which provides the trip generation rates for the
proposed 16.9-acre development. A portion of the forecasted development is in place and operational
today. The remaining undeveloped land is included in the background traffic volumes and analysis. See
Table 2.
Table 2 Background trips for undeveloped R&J lands
The turning movement data for the AM and PM peak hours, with the intersection Level of Service (LOS)
by approach, are summarized in Figures 7 and 8. The LOS by lane group, approach, overall grade, and
back of queue values for each of the study intersections for the weekday AM and PM peak hours in
background conditions are shown in Table 2. For the unsignalized intersections, the approach LOS for
the stop-controlled leg is shown, and only conflicted movements are assigned a LOS. Capacity
calculations in HCM mode are from Synchro 11. The Synchro calculation worksheets are in Appendix C. Traffic Growth
Traffic volumes in the background scenario are increased at an annual rate of 1%. This growth rate is
considered conservative.
• The unsignalized intersection of Jeff's Way and Route 11 has all conflicting movements
operating satisfactorily. The stop condition operates at a LOS of" B" in the AM peak hour and
LOS "A" in the PM peak hour. The northbound left-turn lane operates at a LOS of "A" in the AM
and PM peak hours.
enter exit Total enter exit Total
GA Heavy Industrial (LU 120)1000 SQ FT 120 54 7 61 3 20 23 180
H-T Restaurant (LU 932)1000 SQ FT 8 48 44 92 53 34 87 1017
Total 102 51 153 56 54 110 1197
GA Heavy Industrial (LU 120)1000 SQ FT 24 11 1 12 1 4 5 36
H-T Restaurant (LU 932)1000 SQ FT 0 0 0 0 0 0 0 0
Total -11 -1 -12 -1 -4 -5 -36
Remaining Background Trips 91 50 141 55 50 105 1161
Units AmountLand Use Trips approved with Rezoning RZ#01-06Portion of Land Use completeAM PM ADT
55
Analysis of Background Conditions
Page | 11
Table 3 2023 No-Build Level of Service, Delay, and Back of Queue (95%)
AM Peak Hour (PM Peak Hour)
1
Jeff’s Way Route 11 11 (6) 318 (243) 5 (5)
53 (50) 7,970 85 (53) 133(435) 1
Jeff’s Way Route 11 B (A) A (A) LOS Delay
(sec/veh)
Back of Queue
(ft)LOS Delay
(sec/veh)
Back of Queue
(ft)
NT ------
NL 450 A 8.7 25 A 8.0 0
NB LOS -A 5.0 -A 0.8 -
SR 175 ------
ST -------
SB LOS -------
EB/R/L -B 11.8 25 B 11.6 25
EB LOS -B 11.8 -B 11.6 -
Overall -3.8 --2.3 -
1 Jeff's Way &
Route 11
Unsignalized
- EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T: Thru, R: Right
- Storage lengths include half the taper.
#Intersection Traffic Control/
Mitigation Lane/Approach
PM Peak Hour
Storage
Lengths (ft)
AM Peak Hour
Figure 7 No-Build Traffic
Volumes
Figure 8 No-Build Levels of
Service and Lane Configurations
56
Site Traffic Distribution and Assignment
Page | 12
Site Trip Generation
Trip generation for the site is based on the Institute of Transportation Engineers (ITE) Trip Generation
Manual, 11th Edition. The trip generation values for a Land Use 814, Variety Store are summarized in
Table 4.
Table 4 Site Trip Generation
Source: ITE Trip Generation Manual, 11th Edition
Pass-By Trips
Pass-by trip reductions consider site trips drawn from the existing traffic stream on an adjacent street,
recognizing that trips drawn to a site would otherwise already traverse the adjacent street regardless of
the site's existence. For this project, a northbound vehicle on Route 11 that patronizes the Dollar
General and continues north upon completing their store visit is considered a pass-by trip. The ITE Trip
Generation Handbook gives a pass-by rate of 34% for land use 814 Variety Store.
Site Traffic Distribution and Assignment
Trips generated by the development are distributed with 40% to the north and 60% to the south. Trip
distributions for the development generated trips, and the pass-by trips are shown in Figures 9, 10, and
11.
enter exit Total enter exit Total Enter Exit Total
Variety Store (814)1000 SQ FT 12 20 16 36 41 39 80 382 382 764
Pass-By Trips 6 6 12 14 13 27
Total 20 16 36 41 39 80 382 382 764
Units AmountLand Use AM PM ADT
57
Site Traffic Distribution and Assignment
Page | 13
Figure 9 Distribution of Development Trips
AM Peak Hour (PM Peak Hour)
1
Jeff’s Way Route 11 9 (12) 6 (10)
10 (15) 13 (17) 1
Jeff’s Way Route 11 3 (4) -3 (-4) 4 (6)
3 (4) 4 (6) -4 (-6) Figure 10 Development
Generated Traffic Volumes
Figure 11 Pass by Traffic
Volumes
58
Analysis of Future conditions with Mitigation
Page | 14
Analysis of Future Conditions with the Development (Build-
out)
The analysis of the 2023 Build-out condition represents the future traffic volumes in the study area with
the 12,480 SF store fully operational. The traffic volumes for this analysis were computed by adding the
new trips to the background traffic volumes and removing trips corresponding with 12,480 SF of heavy
industrial land use from the same. Site Entrances
The proposed development will have a single entrance connecting to Jeff's Way. See Figure 12 for the
proposed site layout.
Figure 12 Proposed Site Layout
59
Analysis of Future conditions with Mitigation
Page | 15
Assessment of Traffic Operations with the Development
The turning movement data for the AM and PM peak hours, with the intersection Level of Service (LOS)
by approach, are summarized in Figures 13 and 14. The LOS by lane group, approach, and overall grade
and back of queue values for each of the study intersections for the weekday AM and PM peak hours in
build-out conditions is shown in Table 4. For the unsignalized intersections, the approach LOS for the
stop-controlled leg is shown, and only conflicted movements are assigned a LOS. Capacity calculations in
HCM made are from Synchro 11. The Synchro calculation worksheets are in Appendix C
The effects of the development without mitigating measures are summarized below:
• The unsignalized intersection of Jeff's Way and Route 11 has all conflicting movements
operating satisfactorily. The stop condition operates at a LOS of" B" in the AM peak hour and
LOS "A" in the PM peak hour. The northbound left-turn lane operates at a LOS of "A" in the AM
and PM peak hours.
Table 5 Build-out Level of Service, Delay, and 95% Queue Length
1
Jeff’s Way Route 11 B (B) A (A) 1
Jeff’s Way Route 11 22 (21) 318 (243) 14 (21)
61 (65) 94 (71) 133(435) 8,305 LOS Delay
(sec/veh)
Back of Queue
(ft)LOS Delay
(sec/veh)
Back of Queue
(ft)
NT ------
NL 450 A 8.3 0 A 8.1 0
NB LOS -A 3.4 -A 1.1 -
SR 175 ------
ST -------
SB LOS -------
EB/R/L -B 11.9 25 B 13.8 50
EB LOS -B 11.9 -B 13.8 -
Overall -2.6 --3.4 -
1 Jeff's Way &
Route 11
Unsignalized
- EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T: Thru, R: Right
- Storage lengths include half the taper.
PM Peak Hour
Storage
Lengths (ft)
AM Peak Hour
#Intersection Traffic Control/
Mitigation Lane/Approach
Figure 13 Build-out Traffic
Volumes
Figure 14 Build-out Levels of
Service and Lane Configurations
60
Design Year Traffic Operations with Development and Mitigation
Page | 16
Design Year Traffic Operations with Development
The 2029 Design Year condition analysis represents the future traffic volumes in the study area, with the
development fully operational six years after its opening.
The turning movement data for the AM and PM peak hours, with the intersection Level of Service (LOS)
by approach, are summarized in Figures 15 and 16. The LOS by lane group, approach, and overall grade
and back of queue values for each of the study intersections for the weekday AM and PM peak hours in
design year conditions is shown in Table 5. For the unsignalized intersections, the approach LOS for the
stop-controlled leg is shown, and only conflicted movements are assigned a LOS. Capacity calculations in
HCM mode are from Synchro 11. The Synchro calculation worksheets are in Appendix C. Traffic Growth
Traffic volumes in the Design Year scenario have been increased at an annual rate of 1%. Traffic Operations
• The unsignalized intersection of Jeff's Way and Route 11 has all conflicting movements
operating satisfactorily. The stop condition operates at a LOS of" B" in the AM peak hour and
LOS "A" in the PM peak hour. The northbound left-turn lane operates at a LOS of "A" in the AM
and PM peak hours.
AM Peak Hour (PM Peak Hour)
1
Jeff’s Way Route 11 24 (22) 338 (258) 15 (22)
65 (69) 8,815 100 (75) 142(462) 1
Jeff’s Way Route 11 B (B) A (A) Figure 15 Design Year Traffic
Volumes
Figure 16 Design Year Levels of
Service and Lane Configurations
61
Design Year Traffic Operations with Development and Mitigation
Page | 17
Table 6 Design Year level of Service, Delay, and 95% Queue Length
LOS Delay
(sec/veh)
Back of Queue
(ft)LOS Delay
(sec/veh)
Back of Queue
(ft)
NT ------
NL 450 A 8.4 0 A 8.2 0
NB LOS -A 3.5 -A 1.1 -
SR 175 ------
ST -------
SB LOS -------
EB/R/L -B 12.3 25 B 14.7 50
EB LOS -B 12.3 -B 14.7 -
Overall -2.7 --3.6 -
1 Jeff's Way &
Route 11
Unsignalized
- EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T: Thru, R: Right
- Storage lengths include half the taper.
#Intersection Traffic Control/ Mitigation Lane/Approach
PM Peak Hour
Storage
Lengths (ft)
AM Peak Hour
62
Conclusions and Recommendations
Page | 18
Conclusions and Recommendations
This Traffic Impact Analysis has been prepared to evaluate the transportation impacts resulting from the
development of a 1.44-acre site for a 12,480 SF Dollar General store in Frederick County, Virginia. The
site is located on the west side of Route 11, approximately 0.4 miles north of Clear Brook, VA.
The property of which the proposed rezoning parcel is a part, was rezoned to B-3 in 2006 with rezoning
RZ# 01-06. That rezoning proffered to limit the combined floor area on the property t0 128,000 SF, with
no more than 8,000 SF of that area used for a restaurant (SIC 581). Approximately 24,000 SF of floor
area is in place and operational on the site with a B3 use. The requested rezoning will convert 12,480 SF
of the remaining 103,520 SF to a B2 use, General Merchandise Store
The proposed development consists of a 12,480 SF variety store on 1.44 acres. A single site entrance will
connect to Jeff's Way. Traffic associated with the development will use Route 11 to travel north and
south.
This engineer believes that the transportation impacts of this rezoning are both manageable and
acceptable for this project setting with the implementation of these recommended improvements.
Additionally, with the modifications suggested in this TIA, the study intersections can accommodate
traffic from this site development.
63
Appendix A
Pre-Scope of Work Meeting Form
64
SCOPING INFORMATION
Traffic Impact Analysis
for
R & J Development
Rezoning
November 30, 2021
Prepared by
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
rev. 12/16/21
65
R &
J
D
e
v
e
l
o
p
m
e
n
t
Area:
2
.
7
1
a
c
r
e
s
PROJECT LOCATIONR & J DevelopmentClear Brook, VA66
67
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
PRE-SCOPE OF WORK MEETING FORM
Information on the Project
Traffic Impact Analysis Base Assumptions
The applicant is responsible for entering the relevant information and submitting the form to VDOT and the
locality no less than three (3) business days prior to the meeting. If a form is not received by this deadline,
the scope of work meeting may be postponed.
Contact Information
Consultant Name:
Tele:
E-mail:
Stowe Engineering - Tim Stowe
540.686.7373
timstowe@stowecompanies.com
Developer/Owner Name:
Tele:
E-mail:
R&J Development
540.686.7373
timstowe@stowecompanies.com
Project Information
Project Name: Dollar General store Locality/County: Frederick Co
Project Location:
(Attach regional and site
specific location map) Martinsburg Pike (Rte 11) and Jeff's Way
Submission Type Comp Plan Rezoning Site Plan Subd Plat
Project Description:
(Including details on the land
use, acreage, phasing, access
location, etc. Attach additional
sheet if necessary)
construction of 12,000 sq ft variety store
Proposed Use(s):
(Check all that apply; attach
additional pages as necessary)
Residential Commercial Mixed Use Other
Residential Uses(s)
Number of Units:
ITE LU Code(s):
Commercial Use(s)
ITE LU Code(s): 814
Square Ft or Other Variable:
12,000 SF
Other Use(s)
ITE LU Code(s):
Independent Variable(s):
Total Peak Hour Trip
Projection: Less than 100 100 – 499 500 – 999 1,000 or more
68
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Traffic Impact Analysis Assumptions
Study Period Existing Year: 2021 Build-out Year: 2022 Design Year: 2027
Study Area Boundaries
(Attach map)
North: Cedar Hill Rd (Rte 671) South: W&W Railroad crossing
East: Route 11 West: Route 11
External Factors That
Could Affect Project
(Planned road improvements,
other nearby developments)
none
Consistency With
Comprehensive Plan
(Land use, transportation plan)
Yes
Available Traffic Data
(Historical, forecasts) VDOT published traffic data
Trip Distribution
(Attach sketch)
Road Name: see attachment Road Name:
Road Name: Road Name:
Annual Vehicle Trip
Growth Rate: 1.0%
Peak Period for Study
(check all that apply) AM PM SAT
Peak Hour of the Generator
Study Intersections
and/or Road Segments
(Attach additional sheets as
necessary)
1.Rte 11 and Jeff's Way (entrance) 6.
2. 7.
3. 8.
4. 9.
5. 10.
Trip Adjustment Factors Internal allowance: Yes No
Reduction: % trips
Pass-by allowance: Yes No
Reduction: per ITE% trips
Software Methodology Synchro HCS (v.2000/+) aaSIDRA CORSIM Other
Traffic Signal Proposed
or Affected
(Analysis software to be used,
progression speed, cycle length)
no adverse impacts expected due to the low volume of traffic being generated.
69
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Improvement(s)
Assumed or to be
Considered
none
Background Traffic
Studies Considered
none
Plan Submission Master Development Plan (MDP) Generalized Development Plan (GDP)
Preliminary/Sketch Plan Other Plan type (Final Site, Subd. Plan)
Additional Issues to be
Addressed
Queuing analysis Actuation/Coordination Weaving analysis
Merge analysis Bike/Ped Accommodations Intersection(s)
TDM Measures Other
NOTES on ASSUMPTIONS:
1. entrance for the Dollar General should be aligned wioth the Pine Knoll Construction entrance to the extent
possible.
2. Wheel tracking/truck turning movements should be considered.
3. Present evidence of downzoning/traffic reduction from B3 most intense use to this use
SIGNED: _________________________________ DATE: ______________
Applicant or Consultant
PRINT NAME: _____________________________
Applicant or Consultant
12/16/21
Tim Stowe
70
It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding
geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
71
R & J
D
e
v
e
l
o
p
m
e
n
t
Area:
2
.
7
1
a
c
r
e
s
AM & PM Peak
Hr Count
24 HR
classified
Count
TRAFFIC COUNT LOCATIONSR & J DevelopmentClear Brook, VA72
R &
J
D
e
v
e
l
o
p
m
e
n
t
Area:
2
.
7
1
a
c
r
e
s
40%
60%TRAFFIC DISTRIBUTIONR & J DevelopmentClear Brook, VA73
Appendix B
Traffic Count Data
74
File Name : 1253.0 R+J Rezoning AM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 1
Groups Printed- Cars - Med Trucks - Hvy Trucks
Route 11
From North
Private Drive
From East
Route 11
From South
Jeff's Way
From West
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
06:00 AM 0 46 0 46 0 0 0 0 0 22 0 22 1 0 0 1 69
06:15 AM 0 46 0 46 0 0 0 0 0 27 2 29 0 0 0 0 75
06:30 AM 0 69 0 69 0 0 0 0 0 22 2 24 2 0 0 2 95
06:45 AM 1 51 0 52 0 0 0 0 0 33 3 36 1 0 0 1 89
Total 1 212 0 213 0 0 0 0 0 104 7 111 4 0 0 4 328
07:00 AM 0 74 0 74 0 0 0 0 0 33 0 33 2 0 0 2 109
07:15 AM 1 76 0 77 0 0 0 0 0 40 1 41 1 0 0 1 119
07:30 AM 0 85 0 85 0 0 0 0 0 24 2 26 4 0 0 4 115
07:45 AM 1 80 0 81 0 0 0 0 0 35 0 35 1 0 0 1 117
Total 2 315 0 317 0 0 0 0 0 132 3 135 8 0 0 8 460
08:00 AM 0 46 0 46 0 0 0 0 0 31 3 34 0 0 0 0 80
08:15 AM 1 66 0 67 0 0 0 0 0 32 0 32 1 0 0 1 100
08:30 AM 0 60 0 60 0 0 0 0 0 37 1 38 0 0 0 0 98
08:45 AM 0 55 0 55 0 0 0 0 0 34 0 34 0 0 0 0 89
Total 1 227 0 228 0 0 0 0 0 134 4 138 1 0 0 1 367
Grand Total 4 754 0 758 0 0 0 0 0 370 14 384 13 0 0 13 1155
Apprch %0.5 99.5 0 0 0 0 0 96.4 3.6 100 0 0
Total %0.3 65.3 0 65.6 0 0 0 0 0 32 1.2 33.2 1.1 0 0 1.1
Cars 4 718 0 722 0 0 0 0 0 332 13 345 11 0 0 11 1078
% Cars 100 95.2 0 95.3 0 0 0 0 0 89.7 92.9 89.8 84.6 0 0 84.6 93.3
Med Trucks 0 24 0 24 0 0 0 0 0 25 1 26 1 0 0 1 51
% Med Trucks 0 3.2 0 3.2 0 0 0 0 0 6.8 7.1 6.8 7.7 0 0 7.7 4.4
Hvy Trucks 0 12 0 12 0 0 0 0 0 13 0 13 1 0 0 1 26
% Hvy Trucks 0 1.6 0 1.6 0 0 0 0 0 3.5 0 3.4 7.7 0 0 7.7 2.3
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
75
File Name : 1253.0 R+J Rezoning AM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 2
Route 11
From North
Private Drive
From East
Route 11
From South
Jeff's Way
From West
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:00 AM
07:00 AM 0 74 0 74 0 0 0 0 0 33 0 33 2 0 0 2 109
07:15 AM 1 76 0 77 0 0 0 0 0 40 1 41 1 0 0 1 119
07:30 AM 0 85 0 85 0 0 0 0 0 24 2 26 4 0 0 4 115
07:45 AM 1 80 0 81 0 0 0 0 0 35 0 35 1 0 0 1 117
Total Volume 2 315 0 317 0 0 0 0 0 132 3 135 8 0 0 8 460
% App. Total 0.6 99.4 0 0 0 0 0 97.8 2.2 100 0 0
PHF .500 .926 .000 .932 .000 .000 .000 .000 .000 .825 .375 .823 .500 .000 .000 .500 .966
Cars 2 306 0 308 0 0 0 0 0 118 3 121 8 0 0 8 437
% Cars 100 97.1 0 97.2 0 0 0 0 0 89.4 100 89.6 100 0 0 100 95.0
Med Trucks 0 5 0 5 0 0 0 0 0 5 0 5 0 0 0 0 10
% Med Trucks 0 1.6 0 1.6 0 0 0 0 0 3.8 0 3.7 0 0 0 0 2.2
Hvy Trucks 0 4 0 4 0 0 0 0 0 9 0 9 0 0 0 0 13
% Hvy Trucks 0 1.3 0 1.3 0 0 0 0 0 6.8 0 6.7 0 0 0 0 2.8
Route 11 Jeff's Way Private Drive Route 11
Right
2
0
0
2
Thru
306
5
4
315
Left
0
0
0
0
InOut Total
118 308 426
5 5 10
9 4 13
132 449 317 Right0 0 0 0 Thru0 0 0 0 Left0 0 0 0 OutTotalIn0 0 0 0 0 0 0 0 0 0 0 0 Left
3
0
0
3
Thru
118
5
9
132
Right
0
0
0
0
Out TotalIn
314 121 435
5 5 10
4 9 13
323 458 135 Left0 0 0 0 Thru0 0 0 0 Right8 0 0 8 TotalOutIn5 8 13 0 0 0 0 0 0 5 13 8 Peak Hour Begins at 07:00 AM
Cars
Med Trucks
Hvy Trucks
Peak Hour Data
North
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
76
File Name : 1253.0 R+J Rezoning AM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 3
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
77
File Name : 1253.0 R+J Rezoning PM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 1
Groups Printed- Cars - Med Trucks - Hvy Trucks
Route 11
From North
Private Drive
From East
Route 11
From South
Jeff's Way
From West
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
03:00 PM 0 42 0 42 0 0 0 0 0 66 0 66 1 0 0 1 109
03:15 PM 0 52 0 52 0 0 0 0 0 83 0 83 0 0 0 0 135
03:30 PM 0 63 0 63 0 0 0 0 0 85 1 86 0 0 0 0 149
03:45 PM 0 53 0 53 0 0 0 0 0 112 1 113 1 0 1 2 168
Total 0 210 0 210 0 0 0 0 0 346 2 348 2 0 1 3 561
04:00 PM 0 47 0 47 0 0 0 0 0 115 0 115 1 0 0 1 163
04:15 PM 0 57 0 57 0 0 0 0 0 99 1 100 0 0 0 0 157
04:30 PM 0 60 0 60 0 0 0 0 0 92 1 93 1 0 0 1 154
04:45 PM 0 47 0 47 0 0 0 0 0 122 2 124 1 0 0 1 172
Total 0 211 0 211 0 0 0 0 0 428 4 432 3 0 0 3 646
05:00 PM 0 73 0 73 0 0 0 0 0 111 0 111 4 0 0 4 188
05:15 PM 0 51 0 51 0 0 0 0 0 104 0 104 0 0 0 0 155
05:30 PM 0 70 0 70 0 0 0 0 0 94 1 95 0 0 0 0 165
05:45 PM 0 42 0 42 0 0 0 0 0 98 0 98 0 0 0 0 140
Total 0 236 0 236 0 0 0 0 0 407 1 408 4 0 0 4 648
Grand Total 0 657 0 657 0 0 0 0 0 1181 7 1188 9 0 1 10 1855
Apprch %0 100 0 0 0 0 0 99.4 0.6 90 0 10
Total %0 35.4 0 35.4 0 0 0 0 0 63.7 0.4 64 0.5 0 0.1 0.5
Cars 0 639 0 639 0 0 0 0 0 1147 4 1151 8 0 1 9 1799
% Cars 0 97.3 0 97.3 0 0 0 0 0 97.1 57.1 96.9 88.9 0 100 90 97
Med Trucks 0 10 0 10 0 0 0 0 0 21 2 23 1 0 0 1 34
% Med Trucks 0 1.5 0 1.5 0 0 0 0 0 1.8 28.6 1.9 11.1 0 0 10 1.8
Hvy Trucks 0 8 0 8 0 0 0 0 0 13 1 14 0 0 0 0 22
% Hvy Trucks 0 1.2 0 1.2 0 0 0 0 0 1.1 14.3 1.2 0 0 0 0 1.2
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
78
File Name : 1253.0 R+J Rezoning PM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 2
Route 11
From North
Private Drive
From East
Route 11
From South
Jeff's Way
From West
Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total
Peak Hour Analysis From 03:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 0 47 0 47 0 0 0 0 0 122 2 124 1 0 0 1 172
05:00 PM 0 73 0 73 0 0 0 0 0 111 0 111 4 0 0 4 188
05:15 PM 0 51 0 51 0 0 0 0 0 104 0 104 0 0 0 0 155
05:30 PM 0 70 0 70 0 0 0 0 0 94 1 95 0 0 0 0 165
Total Volume 0 241 0 241 0 0 0 0 0 431 3 434 5 0 0 5 680
% App. Total 0 100 0 0 0 0 0 99.3 0.7 100 0 0
PHF .000 .825 .000 .825 .000 .000 .000 .000 .000 .883 .375 .875 .313 .000 .000 .313 .904
Cars 0 235 0 235 0 0 0 0 0 420 1 421 4 0 0 4 660
% Cars 0 97.5 0 97.5 0 0 0 0 0 97.4 33.3 97.0 80.0 0 0 80.0 97.1
Med Trucks 0 2 0 2 0 0 0 0 0 7 1 8 1 0 0 1 11
% Med Trucks 0 0.8 0 0.8 0 0 0 0 0 1.6 33.3 1.8 20.0 0 0 20.0 1.6
Hvy Trucks 0 4 0 4 0 0 0 0 0 4 1 5 0 0 0 0 9
% Hvy Trucks 0 1.7 0 1.7 0 0 0 0 0 0.9 33.3 1.2 0 0 0 0 1.3
Route 11 Jeff's Way Private Drive Route 11
Right
0
0
0
0
Thru
235
2
4
241
Left
0
0
0
0
InOut Total
420 235 655
7 2 9
4 4 8
431 672 241 Right0 0 0 0 Thru0 0 0 0 Left0 0 0 0 OutTotalIn0 0 0 0 0 0 0 0 0 0 0 0 Left
1
1
1
3
Thru
420
7
4
431
Right
0
0
0
0
Out TotalIn
239 421 660
3 8 11
4 5 9
246 680 434 Left0 0 0 0 Thru0 0 0 0 Right4 1 0 5 TotalOutIn1 4 5 1 1 2 1 0 1 3 8 5 Peak Hour Begins at 04:45 PM
Cars
Med Trucks
Hvy Trucks
Peak Hour Data
North
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
79
File Name : 1253.0 R+J Rezoning PM Peak Hr at ent
Site Code : 00000000
Start Date : 1/12/2022
Page No : 3
Stowe Engineering, PLC
103 Heath Court
Winchester, VA 22602
80
Description: US 11 between Brucetown Rd & Jeffs Way Lattitude: 39.25954County: Frederick County, VA Longitude: -78.094842
Wednesday, 1/12/2022 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
Total 1 2294 857 21 36 22 5 22 48 1 0 0 0 0 2 3309
Percentages 0.03%69.33%25.90%0.63%1.09%0.66%0.15%0.66%1.45%0.03%0.00%0.00%0.00%0.00%0.06%100.00%
Thursday, 1/13/2022 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
Total 0 2352 958 27 37 32 2 25 39 4 0 0 0 0 0 3476
Percentages 0.00%67.66%27.56%0.78%1.06%0.92%0.06%0.72%1.12%0.12%0.00%0.00%0.00%0.00%0.00%100.00%
ADT=7110
Speed Limit=45.00 MPH
The Traffic Group, Inc.
(800) 583-8411www.trafficgroup.com
81
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990
A B C D E F G H I J K L M N O P Q
Description: US 11 between Brucetown Rd & Jeffs Way
Site ID:000000000220
Station Num:000000003000
County: Frederick County, Virginia
Start Date/Time:01-12-2022 00:00
End Date/Time:01-12-2022 23:59
Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
00:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5
00:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
01:15 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1
01:30 0 3 0 0 0 1 0 0 1 0 0 0 0 0 0 5
01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
02:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
02:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4
02:30 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3
02:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
03:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4
03:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4
03:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7
03:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
04:00 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5
04:15 0 8 2 0 0 0 0 0 3 0 0 0 0 0 0 13
04:30 0 11 8 0 0 0 0 0 0 0 0 0 0 0 0 19
04:45 0 9 8 0 0 0 0 0 0 0 0 0 0 0 0 17
05:00 0 18 7 0 1 1 0 0 0 0 0 0 0 0 0 27
05:15 0 23 10 0 0 0 0 0 0 0 0 0 0 0 0 33
05:30 0 34 10 1 0 0 0 0 0 0 0 0 0 0 0 45
05:45 0 19 6 0 0 1 0 0 0 0 0 0 0 0 0 26
06:00 0 33 14 0 0 0 0 0 2 0 0 0 0 0 0 49
06:15 0 32 13 1 0 1 0 0 0 0 0 0 0 0 0 47
06:30 0 41 22 1 3 1 0 1 1 0 0 0 0 0 0 70
06:45 0 32 15 1 1 1 0 0 2 0 0 0 0 0 0 52
07:00 0 49 26 0 1 0 0 1 0 0 0 0 0 0 0 77
07:15 0 50 18 2 2 0 0 0 1 0 0 0 0 0 0 73
07:30 0 65 25 0 1 0 0 0 0 0 0 0 0 0 0 91
07:45 0 65 15 0 0 0 0 1 1 0 0 0 0 0 0 82
08:00 0 30 13 0 1 2 0 0 0 0 0 0 0 0 0 46
08:15 0 38 24 2 0 0 0 1 1 0 0 0 0 0 0 66
08:30 0 44 14 0 1 1 0 0 0 0 0 0 0 0 0 60
08:45 0 39 12 1 1 0 0 0 1 0 0 0 0 0 0 54
09:00 1 37 13 0 2 1 0 0 1 0 0 0 0 0 0 55
09:15 0 24 17 0 1 1 0 2 1 0 0 0 0 0 0 46
09:30 0 29 13 0 0 0 0 0 0 0 0 0 0 0 0 42
09:45 0 37 12 1 1 1 1 1 2 0 0 0 0 0 0 56
10:00 0 30 16 0 2 1 0 1 0 0 0 0 0 0 0 50
10:15 0 28 12 0 1 0 1 2 1 0 0 0 0 0 0 45
10:30 0 32 15 2 0 0 3 0 0 0 0 0 0 0 0 52
10:45 0 23 14 0 2 0 0 2 2 1 0 0 0 0 0 44
11:00 0 32 8 1 0 0 0 2 0 0 0 0 0 0 0 43
11:15 0 23 21 0 0 0 0 0 1 0 0 0 0 0 1 46
11:30 0 35 17 0 0 0 0 0 0 0 0 0 0 0 0 52
11:45 0 26 15 0 0 1 0 0 0 0 0 0 0 0 0 42
12:00 0 21 12 0 0 0 0 0 0 0 0 0 0 0 0 33
12:15 0 37 20 1 2 0 0 0 0 0 0 0 0 0 0 60
12:30 0 43 15 0 0 1 0 1 0 0 0 0 0 0 0 60
12:45 0 41 11 0 2 0 0 1 2 0 0 0 0 0 0 57
13:00 0 38 20 0 0 0 0 1 1 0 0 0 0 0 0 60
13:15 0 33 10 0 1 0 0 0 1 0 0 0 0 0 0 45
13:30 0 43 14 1 0 2 0 0 1 0 0 0 0 0 1 62
13:45 0 28 16 3 1 0 0 0 0 0 0 0 0 0 0 48
14:00 0 34 19 0 0 1 0 0 0 0 0 0 0 0 0 54
14:15 0 35 12 0 0 0 0 0 1 0 0 0 0 0 0 48
14:30 0 42 19 0 0 1 0 0 1 0 0 0 0 0 0 63
14:45 0 41 10 0 0 0 0 0 0 0 0 0 0 0 0 51
15:00 0 32 10 1 1 0 0 0 1 0 0 0 0 0 0 45
15:15 0 38 11 1 0 0 0 0 1 0 0 0 0 0 0 51
15:30 0 40 23 0 1 0 0 0 0 0 0 0 0 0 0 64
15:45 0 35 16 1 2 0 0 0 0 0 0 0 0 0 0 54
16:00 0 39 12 0 0 0 0 0 0 0 0 0 0 0 0 51
16:15 0 42 11 0 0 1 0 0 1 0 0 0 0 0 0 55
16:30 0 48 13 0 0 0 0 1 0 0 0 0 0 0 0 62
16:45 0 36 12 0 0 1 0 0 1 0 0 0 0 0 0 50
17:00 0 61 12 0 0 0 0 1 1 0 0 0 0 0 0 75
17:15 0 39 14 0 0 0 0 0 0 0 0 0 0 0 0 53
17:30 0 53 16 0 0 0 0 1 0 0 0 0 0 0 0 70
17:45 0 27 11 0 0 0 0 1 1 0 0 0 0 0 0 40
18:00 0 43 6 0 1 0 0 0 0 0 0 0 0 0 0 50
18:15 0 43 12 0 1 0 0 0 0 0 0 0 0 0 0 56
18:30 0 36 6 0 1 0 0 0 1 0 0 0 0 0 0 44
18:45 0 28 7 0 0 1 0 0 1 0 0 0 0 0 0 37
19:00 0 20 0 0 1 0 0 0 0 0 0 0 0 0 0 21
19:15 0 12 5 0 0 0 0 0 1 0 0 0 0 0 0 18
19:30 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21
19:45 0 12 7 0 0 0 0 0 0 0 0 0 0 0 0 19
20:00 0 12 5 0 0 0 0 0 1 0 0 0 0 0 0 18
20:15 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10
82
919293949596979899100101102103104105106107
A B C D E F G H I J K L M N O P Q
20:30 0 11 5 0 0 0 0 0 1 0 0 0 0 0 0 17
20:45 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11
21:00 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13
21:15 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8
21:30 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15
21:45 0 11 2 0 0 0 0 0 3 0 0 0 0 0 0 16
22:00 0 5 3 0 0 0 0 0 1 0 0 0 0 0 0 9
22:15 0 5 2 0 0 0 0 0 1 0 0 0 0 0 0 8
22:30 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9
22:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8
23:00 0 2 0 0 1 0 0 0 1 0 0 0 0 0 0 4
23:15 0 3 0 0 0 0 0 0 1 0 0 0 0 0 0 4
23:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5
23:45 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 3
Total 1 2294 857 21 36 22 5 22 48 1 0 0 0 0 2 3309
Percentag 0.03%69.33%25.90%0.63%1.09%0.66%0.15%0.66%1.45%0.03%0.00%0.00%0.00%0.00%0.06%100.00%
83
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990
A B C D E F G H I J K L M N O P Q
Description: US 11 between Brucetown Rd & Jeffs Way
Site ID:000000000220
Station Num:000000003000
County: Frederick County, Virginia
Start Date/Time:01-13-2022 00:00
End Date/Time:01-13-2022 23:59
Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
00:00 0 1 1 0 0 0 0 0 1 0 0 0 0 0 0 3
00:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5
00:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
00:45 0 2 1 0 0 1 0 0 0 0 0 0 0 0 0 4
01:00 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 2
01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:30 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 3
01:45 0 4 0 0 0 0 0 0 2 0 0 0 0 0 0 6
02:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
02:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
02:30 0 4 0 0 0 1 0 1 0 0 0 0 0 0 0 6
02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
03:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
03:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6
03:45 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5
04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
04:15 0 6 2 0 0 0 0 0 2 0 0 0 0 0 0 10
04:30 0 10 6 0 0 0 0 0 0 0 0 0 0 0 0 16
04:45 0 14 5 1 0 0 0 0 1 0 0 0 0 0 0 21
05:00 0 17 10 0 0 0 0 0 0 0 0 0 0 0 0 27
05:15 0 20 10 0 0 0 0 0 0 0 0 0 0 0 0 30
05:30 0 27 14 1 0 0 0 1 1 0 0 0 0 0 0 44
05:45 0 27 18 1 0 0 0 0 0 0 0 0 0 0 0 46
06:00 0 33 13 0 0 0 0 1 1 0 0 0 0 0 0 48
06:15 0 39 17 1 1 1 0 0 1 1 0 0 0 0 0 61
06:30 0 42 25 1 2 0 0 1 1 0 0 0 0 0 0 72
06:45 0 37 20 0 2 0 0 1 2 0 0 0 0 0 0 62
07:00 0 49 15 0 1 0 0 1 1 0 0 0 0 0 0 67
07:15 0 70 16 0 0 0 1 1 0 0 0 0 0 0 0 88
07:30 0 55 17 1 1 1 0 0 2 0 0 0 0 0 0 77
07:45 0 53 18 0 0 1 0 0 0 0 0 0 0 0 0 72
08:00 0 45 13 0 0 1 1 2 1 0 0 0 0 0 0 63
08:15 0 40 20 1 0 1 0 0 0 0 0 0 0 0 0 62
08:30 0 42 21 1 0 1 0 1 1 1 0 0 0 0 0 68
08:45 0 33 19 0 0 2 0 1 0 0 0 0 0 0 0 55
09:00 0 30 12 0 1 2 0 1 0 0 0 0 0 0 0 46
09:15 0 40 18 0 2 3 0 1 2 0 0 0 0 0 0 66
09:30 0 35 12 0 0 1 0 0 0 0 0 0 0 0 0 48
09:45 0 37 24 0 2 0 0 0 0 0 0 0 0 0 0 63
10:00 0 38 22 1 0 1 0 3 0 0 0 0 0 0 0 65
10:15 0 39 16 0 2 1 0 0 0 0 0 0 0 0 0 58
10:30 0 24 24 1 2 2 0 0 0 0 0 0 0 0 0 53
10:45 0 35 14 1 1 1 0 1 0 0 0 0 0 0 0 53
11:00 0 33 14 0 2 1 0 0 1 0 0 0 0 0 0 51
11:15 0 30 5 0 0 1 0 0 1 0 0 0 0 0 0 37
11:30 0 35 12 2 2 0 0 2 0 1 0 0 0 0 0 54
11:45 0 37 22 2 2 0 0 0 1 0 0 0 0 0 0 64
12:00 0 41 18 0 1 0 0 0 0 0 0 0 0 0 0 60
12:15 0 30 22 2 0 0 0 0 0 0 0 0 0 0 0 54
12:30 0 33 13 0 1 1 0 0 0 0 0 0 0 0 0 48
12:45 0 35 16 2 0 0 0 0 0 0 0 0 0 0 0 53
13:00 0 25 8 0 1 1 0 0 1 0 0 0 0 0 0 36
13:15 0 33 20 0 1 0 0 0 1 0 0 0 0 0 0 55
13:30 0 33 12 0 2 3 0 1 1 0 0 0 0 0 0 52
13:45 0 41 16 1 1 1 0 0 0 0 0 0 0 0 0 60
14:00 0 37 17 1 2 1 0 1 0 0 0 0 0 0 0 59
14:15 0 27 16 0 0 0 0 0 1 0 0 0 0 0 0 44
14:30 0 45 10 0 1 0 0 0 0 0 0 0 0 0 0 56
14:45 0 30 20 0 0 1 0 1 1 0 0 0 0 0 0 53
15:00 0 37 13 1 0 0 0 0 1 0 0 0 0 0 0 52
15:15 0 31 15 0 0 0 0 0 0 0 0 0 0 0 0 46
15:30 0 42 17 0 0 0 0 0 0 0 0 0 0 0 0 59
15:45 0 45 19 2 2 1 0 0 0 1 0 0 0 0 0 70
16:00 0 51 18 0 0 0 0 0 0 0 0 0 0 0 0 69
16:15 0 44 17 0 0 0 0 0 0 0 0 0 0 0 0 61
16:30 0 43 18 0 0 0 0 1 1 0 0 0 0 0 0 63
16:45 0 40 14 0 0 0 0 0 0 0 0 0 0 0 0 54
17:00 0 59 25 0 1 0 0 0 0 0 0 0 0 0 0 85
17:15 0 50 19 0 0 0 0 0 0 0 0 0 0 0 0 69
17:30 0 42 17 1 0 0 0 1 1 0 0 0 0 0 0 62
17:45 0 45 10 1 0 0 0 0 0 0 0 0 0 0 0 56
18:00 0 43 15 0 0 0 0 0 0 0 0 0 0 0 0 58
18:15 0 31 11 0 0 0 0 0 0 0 0 0 0 0 0 42
18:30 0 29 6 0 0 0 0 0 1 0 0 0 0 0 0 36
18:45 0 23 9 0 0 0 0 0 0 0 0 0 0 0 0 32
19:00 0 15 5 0 0 0 0 0 0 0 0 0 0 0 0 20
19:15 0 18 5 0 0 0 0 0 0 0 0 0 0 0 0 23
19:30 0 12 3 0 0 0 0 0 1 0 0 0 0 0 0 16
19:45 0 19 3 0 1 0 0 0 0 0 0 0 0 0 0 23
20:00 0 15 1 0 0 0 0 0 0 0 0 0 0 0 0 16
20:15 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7
84
919293949596979899100101102103104105106107
A B C D E F G H I J K L M N O P Q
20:30 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13
20:45 0 7 7 0 0 0 0 0 0 0 0 0 0 0 0 14
21:00 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14
21:15 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13
21:30 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11
21:45 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5
22:00 0 7 6 0 0 0 0 0 0 0 0 0 0 0 0 13
22:15 0 2 1 0 0 0 0 0 3 0 0 0 0 0 0 6
22:30 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16
22:45 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5
23:00 0 4 0 0 0 0 0 1 0 0 0 0 0 0 0 5
23:15 0 7 1 0 0 0 0 0 1 0 0 0 0 0 0 9
23:30 0 3 0 0 0 0 0 0 1 0 0 0 0 0 0 4
23:45 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3
Total 0 2352 958 27 37 32 2 25 39 4 0 0 0 0 0 3476
Percentag 0.00%67.66%27.56%0.78%1.06%0.92%0.06%0.72%1.12%0.12%0.00%0.00%0.00%0.00%0.00%100.00%
85
Description: US 11 between Brucetown Rd & Jeffs Way Lattitude: 39.25954County: Frederick County, VA Longitude: -78.094842
Wednesday, 1/12/2022 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
Total 0 2465 990 27 47 29 1 17 59 2 0 0 0 0 0 3637
Percentages 0.00%67.78%27.22%0.74%1.29%0.80%0.03%0.47%1.62%0.05%0.00%0.00%0.00%0.00%0.00%100.00%
Thursday, 1/13/2022 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
Total 1 2585 1037 26 46 18 5 25 47 4 0 0 0 0 3 3797
Percentages 0.03%68.08%27.31%0.68%1.21%0.47%0.13%0.66%1.24%0.11%0.00%0.00%0.00%0.00%0.08%100.00%
ADT=7110
Speed Limit=45.00 MPH
The Traffic Group, Inc.
(800) 583-8411www.trafficgroup.com
86
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990
A B C D E F G H I J K L M N O P Q
Description: US 11 between Brucetown Rd & Jeffs Way
Site ID:000000000210
Station Num:000000001000
County: Frederick County, Virginia
Start Date/Time:01-12-2022 00:00
End Date/Time:01-12-2022 23:59
Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
00:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5
00:15 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7
00:30 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9
00:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:15 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 3
01:30 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 2
01:45 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 2
02:00 0 3 4 0 0 0 0 0 1 0 0 0 0 0 0 8
02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
02:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
02:45 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3
03:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
03:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
03:45 0 10 2 0 0 0 0 0 1 0 0 0 0 0 0 13
04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
04:15 0 3 0 0 0 0 0 0 1 0 0 0 0 0 0 4
04:30 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9
04:45 0 9 5 0 0 0 0 0 1 0 0 0 0 0 0 15
05:00 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7
05:15 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11
05:30 0 16 5 0 0 0 0 0 0 0 0 0 0 0 0 21
05:45 0 16 8 0 2 0 0 0 2 0 0 0 0 0 0 28
06:00 0 12 7 0 1 2 0 0 0 0 0 0 0 0 0 22
06:15 0 19 10 0 0 0 0 1 0 0 0 0 0 0 0 30
06:30 0 13 7 1 0 0 0 0 2 0 0 0 0 0 0 23
06:45 0 18 13 1 3 0 0 0 1 0 0 0 0 0 0 36
07:00 0 21 8 2 0 0 0 1 1 0 0 0 0 0 0 33
07:15 0 27 13 0 0 0 0 0 1 0 0 0 0 0 0 41
07:30 0 14 7 1 1 1 0 1 1 0 0 0 0 0 0 26
07:45 0 23 7 0 1 0 0 1 2 1 0 0 0 0 0 35
08:00 0 19 13 0 1 1 0 0 0 0 0 0 0 0 0 34
08:15 0 16 9 3 3 1 0 0 0 0 0 0 0 0 0 32
08:30 0 15 19 1 1 2 0 0 0 0 0 0 0 0 0 38
08:45 0 21 10 3 0 0 0 0 0 0 0 0 0 0 0 34
09:00 0 17 9 1 1 0 0 1 2 0 0 0 0 0 0 31
09:15 0 24 7 0 1 1 0 1 0 0 0 0 0 0 0 34
09:30 0 28 10 1 3 0 0 1 1 0 0 0 0 0 0 44
09:45 0 20 10 0 0 0 0 0 1 0 0 0 0 0 0 31
10:00 0 21 11 0 1 1 0 0 4 0 0 0 0 0 0 38
10:15 0 30 16 0 1 0 0 1 2 0 0 0 0 0 0 50
10:30 0 23 16 0 1 1 0 0 1 1 0 0 0 0 0 43
10:45 0 27 15 0 0 0 0 0 0 0 0 0 0 0 0 42
11:00 0 32 14 0 3 1 1 0 1 0 0 0 0 0 0 52
11:15 0 36 12 0 0 0 0 0 1 0 0 0 0 0 0 49
11:30 0 31 21 0 0 1 0 0 2 0 0 0 0 0 0 55
11:45 0 42 23 0 1 1 0 0 0 0 0 0 0 0 0 67
12:00 0 25 16 1 0 0 0 0 1 0 0 0 0 0 0 43
12:15 0 36 10 0 1 0 0 0 1 0 0 0 0 0 0 48
12:30 0 32 24 0 0 1 0 0 1 0 0 0 0 0 0 58
12:45 0 31 22 0 3 0 0 0 0 0 0 0 0 0 0 56
13:00 0 42 19 1 0 1 0 0 1 0 0 0 0 0 0 64
13:15 0 37 14 1 1 0 0 0 0 0 0 0 0 0 0 53
13:30 0 45 21 0 0 1 0 0 0 0 0 0 0 0 0 67
13:45 0 32 19 1 0 0 0 0 0 0 0 0 0 0 0 52
14:00 0 41 24 0 1 1 0 1 0 0 0 0 0 0 0 68
14:15 0 40 15 1 0 1 0 1 1 0 0 0 0 0 0 59
14:30 0 41 14 0 0 1 0 0 2 0 0 0 0 0 0 58
14:45 0 43 16 0 0 1 0 0 1 0 0 0 0 0 0 61
15:00 0 46 17 1 1 0 0 0 2 0 0 0 0 0 0 67
15:15 0 51 29 0 1 0 0 0 1 0 0 0 0 0 0 82
15:30 0 55 28 2 0 0 0 1 0 0 0 0 0 0 0 86
15:45 0 77 33 1 0 1 0 1 0 0 0 0 0 0 0 113
16:00 0 80 31 2 1 0 0 1 1 0 0 0 0 0 0 116
16:15 0 73 25 0 0 3 0 0 1 0 0 0 0 0 0 102
16:30 0 71 19 0 2 0 0 0 0 0 0 0 0 0 0 92
16:45 0 92 28 0 1 0 0 1 1 0 0 0 0 0 0 123
17:00 0 75 31 1 2 1 0 0 1 0 0 0 0 0 0 111
17:15 0 78 23 0 1 0 0 1 1 0 0 0 0 0 0 104
17:30 0 67 26 0 1 2 0 0 0 0 0 0 0 0 0 96
17:45 0 72 25 0 0 1 0 0 1 0 0 0 0 0 0 99
18:00 0 61 20 0 0 0 0 0 0 0 0 0 0 0 0 81
18:15 0 48 14 0 0 0 0 0 0 0 0 0 0 0 0 62
18:30 0 45 13 0 1 0 0 0 0 0 0 0 0 0 0 59
18:45 0 36 12 0 0 0 0 0 1 0 0 0 0 0 0 49
19:00 0 37 9 0 0 0 0 0 0 0 0 0 0 0 0 46
19:15 0 38 5 0 1 0 0 0 0 0 0 0 0 0 0 44
19:30 0 34 11 0 0 0 0 0 0 0 0 0 0 0 0 45
19:45 0 32 7 0 0 0 0 0 0 0 0 0 0 0 0 39
20:00 0 24 4 0 0 0 0 0 3 0 0 0 0 0 0 31
20:15 0 28 4 0 0 0 0 0 0 0 0 0 0 0 0 32
87
919293949596979899100101102103104105106107
A B C D E F G H I J K L M N O P Q
20:30 0 20 5 0 1 0 0 0 2 0 0 0 0 0 0 28
20:45 0 19 2 0 1 0 0 0 1 0 0 0 0 0 0 23
21:00 0 12 5 0 0 0 0 1 1 0 0 0 0 0 0 19
21:15 0 19 4 0 0 0 0 0 1 0 0 0 0 0 0 24
21:30 0 7 4 0 0 1 0 0 1 0 0 0 0 0 0 13
21:45 0 9 1 0 0 0 0 1 0 0 0 0 0 0 0 11
22:00 0 12 6 0 0 0 0 0 0 0 0 0 0 0 0 18
22:15 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12
22:30 0 7 3 0 2 0 0 0 0 0 0 0 0 0 0 12
22:45 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7
23:00 0 12 1 1 0 0 0 0 0 0 0 0 0 0 0 14
23:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
23:30 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5
23:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
Total 0 2465 990 27 47 29 1 17 59 2 0 0 0 0 0 3637
Percentag 0.00%67.78%27.22%0.74%1.29%0.80%0.03%0.47%1.62%0.05%0.00%0.00%0.00%0.00%0.00%100.00%
88
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990
A B C D E F G H I J K L M N O P Q
Description: US 11 between Brucetown Rd & Jeffs Way
Site ID:000000000210
Station Num:000000001000
County: Frederick County, Virginia
Start Date/Time:01-13-2022 00:00
End Date/Time:01-13-2022 23:59
Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Class 11 Class 12 Class 13 Class 14 Class 15 All Classes
00:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4
00:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3
00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
00:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:15 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 2
01:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3
01:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
02:00 0 4 3 0 0 0 0 0 1 0 0 0 0 0 0 8
02:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2
02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1
02:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
03:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3
03:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4
03:45 0 5 2 1 0 0 0 0 1 0 0 0 0 0 0 9
04:00 0 3 0 0 0 0 0 1 0 0 0 0 0 0 0 4
04:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2
04:30 0 4 3 0 0 0 0 0 2 0 0 0 0 0 0 9
04:45 0 12 3 0 0 0 0 0 0 0 0 0 0 0 0 15
05:00 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11
05:15 0 8 5 0 0 0 0 0 0 0 0 0 0 0 0 13
05:30 0 15 7 0 0 0 0 0 0 0 0 0 0 0 0 22
05:45 0 15 4 0 0 0 0 1 0 0 0 0 0 0 0 20
06:00 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14
06:15 0 18 6 2 2 0 0 1 1 0 0 0 0 0 0 30
06:30 0 16 11 0 2 0 1 0 1 0 0 0 0 0 0 31
06:45 0 22 13 0 3 0 1 1 2 0 0 0 0 0 0 42
07:00 0 20 8 0 0 0 0 0 0 0 0 0 0 0 0 28
07:15 0 17 11 0 0 0 0 2 1 0 0 0 0 0 1 32
07:30 0 23 15 0 0 1 0 1 0 0 0 0 0 0 1 41
07:45 0 27 10 0 1 0 0 0 2 1 0 0 0 0 0 41
08:00 0 14 14 0 1 2 1 0 1 0 0 0 0 0 0 33
08:15 0 22 9 2 0 0 1 0 0 0 0 0 0 0 0 34
08:30 0 20 16 0 0 1 0 1 1 0 0 0 0 0 0 39
08:45 0 26 15 3 2 1 0 1 1 0 0 0 0 0 0 49
09:00 0 24 11 1 1 0 0 0 0 0 0 0 0 0 0 37
09:15 0 20 15 0 1 0 0 0 0 0 0 0 0 0 0 36
09:30 0 26 12 3 0 0 0 2 1 0 0 0 0 0 0 44
09:45 0 30 15 0 2 1 0 0 0 0 0 0 0 0 0 48
10:00 0 21 21 0 2 1 0 0 1 0 0 0 0 0 0 46
10:15 0 19 15 1 1 0 0 1 1 0 0 0 0 0 0 38
10:30 0 26 14 0 1 1 1 1 1 0 0 0 0 0 0 45
10:45 0 32 11 0 2 0 0 1 1 0 0 0 0 0 0 47
11:00 0 37 10 0 2 0 0 1 0 1 0 0 0 0 0 51
11:15 0 46 16 1 3 0 0 0 1 0 0 0 0 0 0 67
11:30 0 40 23 0 1 1 0 0 1 0 0 0 0 0 0 66
11:45 0 46 10 0 0 1 0 2 0 0 0 0 0 0 0 59
12:00 0 35 15 0 0 0 0 0 1 1 0 0 0 0 0 52
12:15 0 37 18 1 0 0 0 0 1 0 0 0 0 0 0 57
12:30 0 44 17 0 1 0 0 1 0 0 0 0 0 0 0 63
12:45 0 28 30 0 0 0 0 0 0 0 0 0 0 0 0 58
13:00 0 40 14 0 1 0 0 1 1 0 0 0 0 0 0 57
13:15 0 41 17 0 2 1 0 0 0 0 0 0 0 0 0 61
13:30 0 42 18 0 3 0 0 1 1 0 0 0 0 0 0 65
13:45 0 45 17 2 1 0 0 0 2 0 0 0 0 0 0 67
14:00 0 43 28 0 0 1 0 1 0 0 0 0 0 0 0 73
14:15 0 43 27 2 0 1 0 0 2 0 0 0 0 0 0 75
14:30 1 54 16 0 0 0 0 0 1 0 0 0 0 0 0 72
14:45 0 52 24 0 0 0 0 0 1 0 0 0 0 0 0 77
15:00 0 44 17 1 1 0 0 1 0 1 0 0 0 0 0 65
15:15 0 43 22 0 2 0 0 0 1 0 0 0 0 0 0 68
15:30 0 57 36 2 1 1 0 0 1 0 0 0 0 0 0 98
15:45 0 98 25 2 0 1 0 0 1 0 0 0 0 0 0 127
16:00 0 77 32 0 2 0 0 0 1 0 0 0 0 0 0 112
16:15 0 62 26 0 0 1 0 0 0 0 0 0 0 0 0 89
16:30 0 85 27 0 1 0 0 0 0 0 0 0 0 0 0 113
16:45 0 82 39 0 2 0 0 0 2 0 0 0 0 0 0 125
17:00 0 76 25 0 0 0 0 1 0 0 0 0 0 0 0 102
17:15 0 80 21 2 0 0 0 0 0 0 0 0 0 0 0 103
17:30 0 76 23 0 0 1 0 0 0 0 0 0 0 0 0 100
17:45 0 66 22 0 0 0 0 0 3 0 0 0 0 0 0 91
18:00 0 56 22 0 0 0 0 0 0 0 0 0 0 0 0 78
18:15 0 49 19 0 0 0 0 0 0 0 0 0 0 0 0 68
18:30 0 42 13 0 0 0 0 0 0 0 0 0 0 0 0 55
18:45 0 37 13 0 0 0 0 0 0 0 0 0 0 0 1 51
19:00 0 31 9 0 0 0 0 0 1 0 0 0 0 0 0 41
19:15 0 34 9 0 0 0 0 0 0 0 0 0 0 0 0 43
19:30 0 37 11 0 0 0 0 0 0 0 0 0 0 0 0 48
19:45 0 30 3 0 0 0 0 0 0 0 0 0 0 0 0 33
20:00 0 26 5 0 0 1 0 0 1 0 0 0 0 0 0 33
20:15 0 28 4 0 0 0 0 0 0 0 0 0 0 0 0 32
89
919293949596979899100101102103104105106107
A B C D E F G H I J K L M N O P Q
20:30 0 14 8 0 1 0 0 0 1 0 0 0 0 0 0 24
20:45 0 21 8 0 1 0 0 1 2 0 0 0 0 0 0 33
21:00 0 18 2 0 0 0 0 0 0 0 0 0 0 0 0 20
21:15 0 16 2 0 0 0 0 0 0 0 0 0 0 0 0 18
21:30 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16
21:45 0 8 4 0 0 0 0 1 0 0 0 0 0 0 0 13
22:00 0 10 3 0 0 0 0 0 0 0 0 0 0 0 0 13
22:15 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15
22:30 0 14 0 0 0 0 0 0 1 0 0 0 0 0 0 15
22:45 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7
23:00 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9
23:15 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9
23:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3
23:45 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5
Total 1 2585 1037 26 46 18 5 25 47 4 0 0 0 0 3 3797
Percentag 0.03%68.08%27.31%0.68%1.21%0.47%0.13%0.66%1.24%0.11%0.00%0.00%0.00%0.00%0.08%100.00%
90
Appendix C
Synchro LOS and Queue Reports
91
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2022 Existing Conditions PM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 3 431 241 0
Future Vol, veh/h 0 5 3 431 241 0
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 31 92 88 82 92
Heavy Vehicles, % 0 02222
Mvmt Flow 0 16 3 490 294 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 790 294 294 0 - 0
Stage 1 294 -----
Stage 2 496 -----
Critical Hdwy 6.4 6.2 4.12 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.218 - - -
Pot Cap-1 Maneuver 362 750 1268 - - -
Stage 1 761 -----
Stage 2 616 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 361 750 1268 - - -
Mov Cap-2 Maneuver 361 -----
Stage 1 759 -----
Stage 2 616 -----
Approach EB NB SB
HCM Control Delay, s 9.9 0.1 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1268 - 750 - -
HCM Lane V/C Ratio 0.003 - 0.022 - -
HCM Control Delay (s) 7.8 - 9.9 - -
HCM Lane LOS A - A - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
92
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2022 Existing Conditions AM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 8 3 132 315 2
Future Vol, veh/h 0 8 3 132 315 2
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 50 38 82 93 50
Heavy Vehicles, % 0 0 0 12 3 0
Mvmt Flow 0 16 8 161 339 4
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 516 339 343 0 - 0
Stage 1 339 -----
Stage 2 177 -----
Critical Hdwy 6.4 6.2 4.1 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.2 - - -
Pot Cap-1 Maneuver 523 708 1227 - - -
Stage 1 726 -----
Stage 2 859 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 519 708 1227 - - -
Mov Cap-2 Maneuver 519 -----
Stage 1 721 -----
Stage 2 859 -----
Approach EB NB SB
HCM Control Delay, s 10.2 0.4 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1227 - 708 - -
HCM Lane V/C Ratio 0.006 - 0.023 - -
HCM Control Delay (s) 8 - 10.2 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
93
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2029 Design Year Conditions PM Peak Hour Synchro 11 Report
Stowe Eng Page 1
Intersection
Int Delay, s/veh 3.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 22 69 75 462 258 22
Future Vol, veh/h 22 69 75 462 258 22
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 31 92 88 82 92
Heavy Vehicles, % 0 02222
Mvmt Flow 24 223 82 525 315 24
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1004 315 339 0 - 0
Stage 1 315 -----
Stage 2 689 -----
Critical Hdwy 6.4 6.2 4.12 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.218 - - -
Pot Cap-1 Maneuver 270 730 1220 - - -
Stage 1 744 -----
Stage 2 502 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 252 730 1220 - - -
Mov Cap-2 Maneuver 252 -----
Stage 1 694 -----
Stage 2 502 -----
Approach EB NB SB
HCM Control Delay, s 14.7 1.1 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1220 - 617 - -
HCM Lane V/C Ratio 0.067 - 0.4 - -
HCM Control Delay (s) 8.2 - 14.7 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.2 - 1.9 - -
94
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2029 Design Year Conditions AM Peak Hour Synchro 11 Report
Stowe Eng Page 1
Intersection
Int Delay, s/veh 2.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 15 65 100 142 338 24
Future Vol, veh/h 15 65 100 142 338 24
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 12 3 0
Mvmt Flow 16 71 109 154 367 26
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 739 367 393 0 - 0
Stage 1 367 -----
Stage 2 372 -----
Critical Hdwy 6.4 6.2 4.1 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.2 - - -
Pot Cap-1 Maneuver 388 683 1177 - - -
Stage 1 705 -----
Stage 2 702 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 352 683 1177 - - -
Mov Cap-2 Maneuver 352 -----
Stage 1 639 -----
Stage 2 702 -----
Approach EB NB SB
HCM Control Delay, s 12.3 3.5 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1177 - 581 - -
HCM Lane V/C Ratio 0.092 - 0.15 - -
HCM Control Delay (s) 8.4 - 12.3 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.3 - 0.5 - -
95
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2023 Buildout Conditions PM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 3.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 65 71 435 243 21
Future Vol, veh/h 21 65 71 435 243 21
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 31 92 88 82 92
Heavy Vehicles, % 0 02222
Mvmt Flow 23 210 77 494 296 23
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 944 296 319 0 - 0
Stage 1 296 -----
Stage 2 648 -----
Critical Hdwy 6.4 6.2 4.12 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.218 - - -
Pot Cap-1 Maneuver 293 748 1241 - - -
Stage 1 759 -----
Stage 2 524 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 275 748 1241 - - -
Mov Cap-2 Maneuver 275 -----
Stage 1 712 -----
Stage 2 524 -----
Approach EB NB SB
HCM Control Delay, s 13.8 1.1 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1241 - 640 - -
HCM Lane V/C Ratio 0.062 - 0.363 - -
HCM Control Delay (s) 8.1 - 13.8 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.2 - 1.7 - -
96
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2023 Buildout Conditions AM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 61 94 133 318 22
Future Vol, veh/h 14 61 94 133 318 22
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 12 3 0
Mvmt Flow 15 66 102 145 346 24
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 695 346 370 0 - 0
Stage 1 346 -----
Stage 2 349 -----
Critical Hdwy 6.4 6.2 4.1 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.2 - - -
Pot Cap-1 Maneuver 411 702 1200 - - -
Stage 1 721 -----
Stage 2 719 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 376 702 1200 - - -
Mov Cap-2 Maneuver 376 -----
Stage 1 660 -----
Stage 2 719 -----
Approach EB NB SB
HCM Control Delay, s 11.9 3.4 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1200 - 604 - -
HCM Lane V/C Ratio 0.085 - 0.135 - -
HCM Control Delay (s) 8.3 - 11.9 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.3 - 0.5 - -
97
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2023 Background Conditions PM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 2.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 50 53 435 243 6
Future Vol, veh/h 5 50 53 435 243 6
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 31 92 88 82 92
Heavy Vehicles, % 0 02222
Mvmt Flow 5 161 58 494 296 7
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 906 296 303 0 - 0
Stage 1 296 -----
Stage 2 610 -----
Critical Hdwy 6.4 6.2 4.12 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.218 - - -
Pot Cap-1 Maneuver 309 748 1258 - - -
Stage 1 759 -----
Stage 2 546 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 295 748 1258 - - -
Mov Cap-2 Maneuver 295 -----
Stage 1 724 -----
Stage 2 546 -----
Approach EB NB SB
HCM Control Delay, s 11.6 0.8 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1258 - 712 - -
HCM Lane V/C Ratio 0.046 - 0.234 - -
HCM Control Delay (s) 8 - 11.6 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.1 - 0.9 - -
98
HCM 6th TWSC
1: Route 11 & Jeff's Way 02/04/2022
2023 Background Conditions AM Peak Hour Synchro 11 Report
Stowe Engineering Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 53 85 133 318 11
Future Vol, veh/h 5 53 85 133 318 11
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 450 - - 175
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - -2 2 -
Peak Hour Factor 92 50 38 82 93 50
Heavy Vehicles, % 0 0 0 12 3 0
Mvmt Flow 5 106 224 162 342 22
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 952 342 364 0 - 0
Stage 1 342 -----
Stage 2 610 -----
Critical Hdwy 6.4 6.2 4.1 - - -
Critical Hdwy Stg 1 5.4 -----
Critical Hdwy Stg 2 5.4 -----
Follow-up Hdwy 3.5 3.3 2.2 - - -
Pot Cap-1 Maneuver 290 705 1206 - - -
Stage 1 724 -----
Stage 2 546 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 236 705 1206 - - -
Mov Cap-2 Maneuver 236 -----
Stage 1 589 -----
Stage 2 546 -----
Approach EB NB SB
HCM Control Delay, s 11.8 5 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR
Capacity (veh/h) 1206 - 643 - -
HCM Lane V/C Ratio 0.185 - 0.173 - -
HCM Control Delay (s) 8.7 - 11.8 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0.7 - 0.6 - -
99
Appendix D
Generalized Development Plan
100
101
Planning Commission
Agenda Item Detail
Meeting Date: May 4, 2022
Agenda Section: Other
Title: Current Planning Applications
Attachments:
102