TECHNICAL MEMORANDUM
Greystone Properties, LLC Rezoning
Median Acceleration/Storage Lane Analysis
Date: December 4, 2020 Project #: 24079
To: Brad Riggleman, P.E.
From: Andrew Butsick, P.E.; John Callow
Kittelson & Associates, Inc. (Kittelson) developed this memorandum to document the evaluation of a
median protected acceleration/storage lane at the proposed access point to the Greystone development
on Cedar Creek Grade in Frederick County, Virginia. Attachment A illustrates the proposed lane
configuration at the site driveway to be constructed prior to the first occupied dwelling unit within the
Greystone development. The intersection was previously evaluated as a traditional two-way stop-
controlled intersection as part of the November 2019 traffic impact analysis (TIA), which assumed a site
build-out year of 2027.
The forecast year 2027 site driveway volumes (post-build out) for the weekday a.m. and weekday p.m.
peak hours in the November 2019 TIA were applied to the new proposed lane configuration shown in
Attachment A. Table 1 compares the forecast year 2027 post-build out operations under the traditional
two-way stop-control intersection (TWSC) and TWSC with the added median acceleration/storage lane.
Table 1. 2027 Total Traffic Conditions – Two-Way Stop-Control w/ and w/o Median Acceleration Lane
Intersection Information AM Peak Hour PM Peak Hour
Intersection
(#)
Traffic Control Approach Lane
Group
Existing/
Proposed
turn-lane
lengths
LOS
Back
of
Queue
(feet)
Delay
(sec) LOS
Back
of
Queue
(feet)
Delay
(sec)
Route 622 (Cedar Creek
Grade)/Site Driveway
(#4)
Two-way
Stop-Controlled
EB EBL 200’ A 0 8.0 B 5 11.2
EBT - - 0 0.0 - 0 0.0
EB Approach - - 0.1 - - 0.7
WB WBT - - 0 0.0 - 0 0.0
WBR 150’ - 0 0.0 - 0 0.0
WB Approach - - 0.0 - - 0.0
SB SBL - D 43 32.0 F 65 93.6
SBR - B 5 10.4 C 8 19.3
SB Approach C - 24.4 F - 67.8
Two-Way
Stop-Control
w/Median Acceleration
Lane
EB EBL 200’ - 0 0.0 - 0 0.0
EBT - - 0 0.0 - 0 0.0
EB Approach - - 0.0 - - 0.0
WB WBT - - 0 0.0 - 0 0.0
WBR 150’ - 0 0.0 - 0 0.0
WB Approach - - 0.0 - - 0.0
SB SBL - B 10 11.2 C 18 22.5
SBR - B 5 10.4 C 8 19.3
SB Approach B - 10.9 C - 21.4
Greystone Properties, LLC Rezoning Project #: 24079
December 4, 2020 Page 2
Kittelson & Associates, Inc. Reston, Virginia
Attachment B contains the Synchro operational worksheets for the intersection with the median
acceleration lane. As shown, the addition of a median acceleration/storage lane for southbound left-
turning vehicles exiting the site is anticipated to reduce delays from 93.6 seconds (LOS F) to 22.5 seconds
(LOS C) during the weekday p.m. peak hour. This reduction in delay results from the ability of southbound
left-turning vehicles to complete a two-stage turn, rather than need to find a gap in both eastbound and
westbound traffic on Cedar Creek Grade at the same time.
As the Highway Capacity Manual, 6th Edition methodologies used to evaluate the median acceleration
lane in Synchro do not forecast any delays for the eastbound left-turn movements (due to the required
link layout in Synchro to accurately model the median acceleration lane), the operations of the site
driveway with the median acceleration lane were also evaluated using SimTraffic software in accordance
with VDOT TOSAM parameters. Table 2 illustrates the forecast delays and 95th percentile queues output
from the SimTraffic analysis. Attachment C contains the SimTraffic operational worksheets.
Table 2. 2027 Total Traffic Conditions – SimTraffic Analysis
Intersection Information AM Peak Hour PM Peak Hour
Intersection
(#)
Traffic Control Approach Lane
Group
Existing/
Proposed
turn-lane
lengths
Delay
(sec)
Back
of
Queue
(feet)
Delay
(sec)
Back
of
Queue
(feet)
Route 622 (Cedar Creek
Grade)/Site Driveway
(#4)
Two-Way
Stop-Control
w/Median Acceleration
Lane
EB EBL 200’ 1.9 13 16.7 47
EBT - 0.0 0 0.0 0
WB WBT - 0.5 0 1.4 2
WBR 150’ 0.1 0 0.6 7
SB SBL - 7.0 45 37.0 65
SBR - 4.5 26 18.2 28
As shown, the eastbound left-turn movement is forecast to operate with a total delay per vehicle of 1.9
and 16.7 seconds during the weekday a.m. and weekday p.m. peak hours, respectively. All 95th percentile
queues are forecast to be contained within the proposed storage.
CONCLUSIONS
The proposed site driveway on Cedar Creek Grade is forecast to operate acceptably under year 2027
post-build out traffic conditions with the proposed median acceleration/storage lane.
Attachment A
Proposed Lane Configurations:
Cedar Creek Grade/Site Driveway
Attachment B
Year 2027 Post-Build Out Traffic Conditions:
Synchro Operational Worksheets for
Proposed Lane Configuration
HCM 6th TWSC Greystone Property
4: Cedar Creek Grade & Greystone Dwy Weekday AM Peak - Total Traffic - Median Acceleration Lane
Greystone Property Synchro 10 Report
Weekday AM Peak - Total Traffic - Median Acceleration Lane Page 1
Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR SBL SBR NWL NWR NEL NER
Lane Configurations
Traffic Vol, veh/h 0 0 0 0 309 26 77 0 0 0 14 0
Future Vol, veh/h 0 0 0 0 309 26 77 0 0 0 14 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Free Free
RT Channelized - - - - - None - - - - - -
Storage Length - - - - - 150 0 200 - - 0 -
Veh in Median Storage, # - 0 - - 0 - 0 - 22350 - 22350 -
Grade, % - 0 - - 0 - 0 - 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 10 0 0 2 2 2 0 2
Mvmt Flow 0 0 0 0 336 28 84 0 0 0 15 0
Major/Minor Major2 Minor2
Conflicting Flow All - - 0 336 336
Stage 1 - - - 336 -
Stage 2 - - - 0 -
Critical Hdwy - - - 6.4 6.2
Critical Hdwy Stg 1 - - - 5.4 -
Critical Hdwy Stg 2 - - - - -
Follow-up Hdwy - - - 3.5 3.3
Pot Cap-1 Maneuver 0 - - 663 711
Stage 1 0 - - 728 -
Stage 2 0 - - - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 663 711
Mov Cap-2 Maneuver - - - 663 -
Stage 1 - - - 728 -
Stage 2 - - - - -
Approach WB SB
HCM Control Delay, s 0 10.9
HCM LOS B
Minor Lane/Major Mvmt WBT WBR SBLn1 SBLn2
Capacity (veh/h) - - 663 711
HCM Lane V/C Ratio - - 0.126 0.064
HCM Control Delay (s) - - 11.2 10.4
HCM Lane LOS - - B B
HCM 95th %tile Q(veh) - - 0.4 0.2
HCM 6th TWSC Greystone Property
4: Cedar Creek Grade & Greystone Dwy Weekday PM Peak - Total Traffic - Median Acceleration Lane
Greystone Property Synchro 10 Report
Weekday PM Peak - Total Traffic - Median Acceleration Lane Page 1
Intersection
Int Delay, s/veh 1.3
Movement EBL EBT EBR WBL WBT WBR SBL SBR NWL NWR NEL NER
Lane Configurations
Traffic Vol, veh/h 0 0 0 0 966 76 45 0 0 0 41 0
Future Vol, veh/h 0 0 0 0 966 76 45 0 0 0 41 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Free Free
RT Channelized - - - - - None - - - - - -
Storage Length - - - - - 150 0 200 - - 0 -
Veh in Median Storage, # - 0 - - 0 - 0 - 22350 - 22350 -
Grade, % - 0 - - 0 - 0 - 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 0 0 2 2 2 0 2
Mvmt Flow 0 0 0 0 1050 83 49 0 0 0 45 0
Major/Minor Major2 Minor2
Conflicting Flow All - - 0 1050 1050
Stage 1 - - - 1050 -
Stage 2 - - - 0 -
Critical Hdwy - - - 6.4 6.2
Critical Hdwy Stg 1 - - - 5.4 -
Critical Hdwy Stg 2 - - - - -
Follow-up Hdwy - - - 3.5 3.3
Pot Cap-1 Maneuver 0 - - 254 278
Stage 1 0 - - 340 -
Stage 2 0 - - - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 254 278
Mov Cap-2 Maneuver - - - 254 -
Stage 1 - - - 340 -
Stage 2 - - - - -
Approach WB SB
HCM Control Delay, s 0 21.4
HCM LOS C
Minor Lane/Major Mvmt WBT WBR SBLn1 SBLn2
Capacity (veh/h) - - 254 278
HCM Lane V/C Ratio - - 0.193 0.094
HCM Control Delay (s) - - 22.5 19.3
HCM Lane LOS - - C C
HCM 95th %tile Q(veh) - - 0.7 0.3
Attachment C
Year 2027 Post-Build Out Traffic Conditions:
SimTraffic Operational Worksheets
SimTraffic Performance Report Greystone Property
Weekday AM Peak - Total Traffic - Median Acceleration LaneWeekday AM Peak - Total Traffic - Median Acceleration Lane
Greystone Property SimTraffic Report
Weekday AM Peak - Total Traffic - Median Acceleration Lane Page 1
4: Cedar Creek Grade & Greystone Dwy Performance by movement
Movement WBT WBR SBL SBR2 NEL All
Denied Del/Veh (s) 0.3 3.5 0.2 4.0 0.0 0.8
Total Del/Veh (s) 0.5 0.1 7.0 4.5 1.9 1.9
Queuing and Blocking Report Greystone Property
Weekday AM Peak - Total Traffic - Median Acceleration LaneWeekday AM Peak - Total Traffic - Median Acceleration Lane
Greystone Property SimTraffic Report
Weekday AM Peak - Total Traffic - Median Acceleration Lane Page 2
Intersection: 4: Cedar Creek Grade & Greystone Dwy
Movement SB SB NE
Directions Served L > L
Maximum Queue (ft) 54 32 24
Average Queue (ft) 25 12 2
95th Queue (ft) 45 26 13
Link Distance (ft) 440 98
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200
Storage Blk Time (%)
Queuing Penalty (veh)
SimTraffic Performance Report Greystone Property
Weekday PM Peak - Total Traffic - Median Acceleration LaneWeekday PM Peak - Total Traffic - Median Acceleration Lane
Greystone Property SimTraffic Report
Weekday PM Peak - Total Traffic - Median Acceleration Lane Page 1
4: Cedar Creek Grade & Greystone Dwy Performance by movement
Movement WBT WBR SBL SBR2 NEL All
Denied Del/Veh (s) 1.2 3.1 0.2 4.1 0.0 1.3
Total Del/Veh (s) 1.4 0.6 37.0 18.2 16.7 3.5
Queuing and Blocking Report Greystone Property
Weekday PM Peak - Total Traffic - Median Acceleration LaneWeekday PM Peak - Total Traffic - Median Acceleration Lane
Greystone Property SimTraffic Report
Weekday PM Peak - Total Traffic - Median Acceleration Lane Page 2
Intersection: 4: Cedar Creek Grade & Greystone Dwy
Movement WB WB SB SB NE
Directions Served T R L > L
Maximum Queue (ft) 2 10 79 44 58
Average Queue (ft) 0 1 26 9 19
95th Queue (ft) 2 7 65 28 47
Link Distance (ft) 582 440 98
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 150 200
Storage Blk Time (%)
Queuing Penalty (veh)