HomeMy WebLinkAbout02-21 Traffic Impact AnalysisTransportation Impact Analysis Greystone Properties, LLC Rezoning Frederick County, Virginia November 2019 Greystone Properties, LLC November 2019 Table of Contents Kittelson & Associates, Inc. ii TABLE OF CONTENTS Table of Contents ................................................................................................................................... ii Executive Summary ................................................................................................................................ 2 Introduction ....................................................................................................................................... 6 Existing Conditions ............................................................................................................................... 11 Transportation Impact Analysis ............................................................................................................ 18 Conclusions and Recommendations ..................................................................................................... 38 References ..................................................................................................................................... 41 APPENDICES Appendix A Scoping Letter Appendix B Traffic Counts Appendix C Level of Service Description Appendix D Existing Conditions Level of Service Worksheets Appendix F 2027 Background Traffic Conditions Level of Service Worksheets Appendix G 2027 Total Traffic Conditions Level of Service Worksheets Greystone Properties, LLC November 2019 Table of Contents Kittelson & Associates, Inc. iii LIST OF FIGURES Figure 1. Site Vicinity Map ......................................................................................................... 7 Figure 2. Conceptual Site Plan ................................................................................................... 8 Figure 3. Zoning Map ................................................................................................................. 9 Figure 4. Existing Lane Configurations and Traffic Control Devices ......................................... 12 Figure 5. Existing Traffic Conditions – Weekday AM & Weekday PM Peak Hours ................... 14 Figure 6. Existing Lane Group Levels of Service – Weekday AM & Weekday PM Peak Hours .. 15 Figure 7. Year 2027 Background Traffic Conditions – Weekday AM & Weekday PM Peak Hours .................................................................................................................................. 20 Figure 8. Year 2027 Background Lane Group Levels of Service – Weekday AM & Weekday PM Peak Hours ................................................................................................................ 21 Figure 9. Year 2027 Total Traffic Assumed Lane Configurations and Traffic Control Devices .. 24 Figure 10. Estimated Trip Distribution Pattern .......................................................................... 26 Figure 11. Net New Site-Generated Trips – Weekday AM & Weekday PM Peak Hours ............. 27 Figure 12. Year 2027 Total Traffic Conditions – Weekday AM & Weekday PM Peak Hours ...... 29 Figure 13. Year 2027 Total Traffic Lane Group Levels of Service – Weekday AM & Weekday PM Peak Hours ................................................................................................................ 30 Figure 14. VDOT Right-Turn Lane Warrants for Two-Lane Roads – Cedar Creek Grade/Site Driveway - Weekday AM & Weekday PM Peak Hours .............................................. 33 Figure 15. VDOT Left-Turn Lane Warrants– Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours .......................................................................................... 34 Figure 16. Access Management Evaluation ............................................................................... 36 Greystone Properties, LLC November 2019 Table of Contents Kittelson & Associates, Inc. iv LIST OF TABLES Table 1. Existing Transportation Facilities and Roadway Designations ................................... 11 Table 2. Existing Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection ........................................... 16 Table 3. Year 2027 Background Traffic Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection ....... 22 Table 4. Estimated Trip Generation ........................................................................................ 25 Table 5. 2027 Total Traffic Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection .............. 31 Table 6. Westbound Volumes – Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours ......................................................................................................... 32 Table 7. Left-Turning Volumes – Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours ......................................................................................................... 34 Executive Summary Greystone Properties, LLC November 2019 Executive Summary Kittelson & Associates, Inc. 2 EXECUTIVE SUMMARY A traffic operations analysis has been conducted to confirm that the transportation system can adequately support the proposed Greystone Properties development, in fulfillment of Frederick County and Virginia Department of Transportation’s (VDOT) requirements for traffic impact studies. The scope of the project analysis was developed in collaboration with County and VDOT staff. Specifically, this analysis includes: ▪ Year 2019 existing land use and transportation system conditions within the site vicinity; ▪ Forecast year 2027 background traffic conditions (without site development) during the weekday a.m. and weekday p.m. peak periods including in-process/approved developments and regional growth; ▪ Trip generation and distribution estimates for the proposed development; ▪ Forecast year 2027 total traffic conditions based on full build out of the development including queuing; ▪ Access management evaluation; and, ▪ Conclusions and recommendations. Based on the results of the transportation impact analysis, the transportation system can accommodate full build-out of the proposed development. The findings of this analysis and our recommendations are discussed below. Existing Conditions ▪ All study intersections study intersections are anticipated to operate at LOS C or better. 2027 Background Traffic Conditions ▪ Growth rates of one percent (linear) were applied to movements on public roadways to account for near-term regional traffic growth. ▪ No transportation improvements or in-process developments were identified for inclusion in the background 2027 analysis. ▪ All study intersections are forecast to continue to operate at LOS C or better under year 2027 background traffic conditions. Proposed Development ▪ Greystone Properties, LLC is proposing to develop 300 age-restricted single-family dwelling units north of Cedar Creek Grade between US 11 (Valley Avenue) and Route 37 (Winchester Bypass). o The site is currently zoned R4 and is approved for 200 single-family dwelling units, 120 age-restricted dwelling units, and 6 acres of commercial use. Owners of land Greystone Properties, LLC Rezoning November 2019 Executive Summary Kittelson & Associates, Inc. 3 parcels adjacent to the proposed development seek to rezone these properties back to agricultural usage. ▪ Access to the site upon build-out is proposed via a single full-movement driveway on Cedar Creek Grade. o A future site access point is proposed along the planned West Jubal Early Drive extension to the north of the site; however, the extension is not currently funded and will not be assumed in this study. ▪ The development is estimated to generate approximately 1,950 net new weekday daily trips, 159 weekday a.m. (40 in, 119 out), and 189 weekday p.m. (117 in, 69 out) peak hour trips when fully built out in year 2027. ▪ 2027 Total Traffic Conditions ▪ All study intersections are forecast to continue to operate at LOS D or better during all analysis periods with the exception of the site driveway. o During the weekday p.m. peak hour, the southbound left-turn movement is anticipated to operate below capacity at LOS F. The high delays forecast for this movement stem from the inability of south left-turning vehicles to find a gap in the heavy westbound through volumes. These delays are limited to traffic internal to the site, and no noticeable operational impacts are forecast for mainline traffic on Cedar Creek Grade. ▪ An evaluation of VDOT turn-lane warrants illustrated a westbound right-turn lane into the site forecast to warranted under year 2027 total traffic conditions. o A minimum 100-foot taper and 100-foot storage length are required given the urban nature of the surrounding area. The 100-foot storage (minimum) was determined due to the lack of anticipated queuing in the free-flow right-turn lane into the site. ▪ An evaluation of VDOT turn-lane warrants illustrated a eastbound left-turn lane into the site forecast to warranted under year 2027 total traffic conditions. o A 100-foot left-turn lane with a 100-foot taper are required based on both the projected weekday a.m. and weekday p.m. peak hour volumes at the site driveway. Access Management ▪ The proposed site driveway meets VDOT access management standards noted in the Road Design Manual. Greystone Properties, LLC Rezoning November 2019 Executive Summary Kittelson & Associates, Inc. 4 RECOMMENDATIONS Develop a westbound right-turn lane and an eastbound left-turn lane with 100-foot tapers and 100 feet of storage at the proposed site driveway. No other on- or off-site transportation improvements are triggered by the proposed Greystone Properties development. Introduction Greystone Properties, LLC Rezoning November 2019 Introduction Kittelson & Associates, Inc. 6 INTRODUCTION Kittelson and Associates, Inc. (Kittelson) prepared this report to document analysis methodologies and assumptions with regard to the proposed Greystone Properties development located north of Cedar Creek Grade between US 11 (Valley Avenue) and Route 37 (Winchester Bypass). The site, shown in Figure 1, proposes a single, full-movement access point on Cedar Creek Grade. Greystone Properties, LLC proposes to apply for a rezoning to allow the development of 300-age restricted single-family dwelling units. The site is currently approved for the development of 200 single-family dwelling units, 120 age-restricted dwelling units, and 6 acres of commercial use. The remaining land parcels not considered for this development are being considered for rezoning back to agricultural usage. Figure 2 shows a preliminary conceptual site plan. The general topography for the study site can best be described as level to rolling-hill type terrain. Figure 3 illustrates the current zoning map for Frederick County (Reference 1). The site on which the proposed development is located is currently zoned as R4. This analysis determines the transportation related impacts associated with the proposed development and was prepared in accordance with Frederick County and Virginia Department of Transportation (VDOT) requirements for traffic impact studies. The study intersections, time periods for analysis, and scope of this project were selected after County and VDOT staff were consulted. A scoping letter provided for this project is provided in Appendix A. A traffic operations analysis has been conducted to confirm that the transportation system can adequately support the proposed development. Specifically, this analysis includes: ▪ Year 2019 existing land use and transportation system conditions within the site vicinity; ▪ Forecast year 2027 background traffic conditions (without site development) during the weekday a.m. and weekday p.m. peak periods including in-process/approved developments and regional growth; ▪ Trip generation and distribution estimates for the proposed development; ▪ Forecast year 2027 total traffic conditions based on full build out of the development including queuing and turn lane analyses, ▪ Access management evaluation; and, ▪ Conclusions and recommendations. SITE - Study Intersections## MIDDLE RDC:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 01Site Vicinity Map Frederick County, VA 1 Greystone Properties, LLC Rezoning November 2019 Figure N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR FREDERICK COUNTY, VA 522 81 37 7 259 522 50 11 50 1181 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 - Future Study Intersections C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 02 Conceptual Site PlanProvided by Greenway EngineeringFrederick County, VA2Greystone Properties, LLC RezoningNovember 2019Figure SITEC:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 03 Frederick County Zoning MapObtained from Frederick County Online GIS DatabaseFrederick County, VA3Greystone Properties, LLC RezoningNovember 2019Figure Existing Conditions Greystone Properties, LLC Rezoning November 2019 Existing Conditions Kittelson & Associates, Inc. 11 EXISTING CONDITIONS The existing conditions analysis identifies the site conditions and current operational and geometric characteristics of the roadways within the study area. These conditions will be compared with future conditions later in this report. Kittelson staff visited and inventoried the proposed Greystone Properties development site and surrounding study area in June 2019. At that time, Kittelson collected information regarding site conditions, adjacent land uses, existing traffic operations, and transportation facilities in the study area. Transportation Facilities Table 1 summarizes the primary transportation facilities in the site vicinity. Figure 4 shows the existing lane configurations and traffic control devices at the study intersections. Table 1. Existing Transportation Facilities and Roadway Designations Roadway Classification1 Number of Lanes Speed Limit (mph) Median Side- walks Bicycle Lanes On- Street Parking Surface US 11 (Valley Avenue) Other Principal Arterial 4 35 No Yes Yes No Paved Route 622 (Cedar Creek Grade) Minor Arterial 2-42 35 No Yes3 No No Paved Route 37 NB Ramps Other Freeway or Expressway Ramp 1 N/A No No No No Paved Route 37 SB Ramps Other Freeway or Expressway Ramp 2 N/A No No No No Paved 1Classifications based on VDOT’s 2014 Functional Classification Map. 2Four lanes east of Stoneridge Road, two lanes west of Stoneridge Road 3Sidewalks present east of proposed site entrance only. Pedestrian and Bicycle Facilities Field observations taken in the site vicinity revealed low levels of pedestrian and bicycle activity along Cedar Creek Grade, particularly to the west of Stoneridge Road, where no sidewalks are present and land uses begin to transition to less dense, single-family plots. Moderate levels of pedestrian activity were observed along US 11, where numerous commercial businesses are present. Signalized pedestrian crossings are provided at the US 11/Cedar Creek Grade/Weems Lane intersection. On-street bike lanes are present along US 11. No protected bicycle infrastructure was observed on Cedar Creek Grade. Transit Facilities The City of Winchester operates the Trolley bus route along US 11 and Cedar Creek Grade. With hourly headways between 8:00 a.m. and 6:44 p.m. on Mondays, Wednesdays, and Fridays and 10:10 a.m. and 4:34 p.m. on Saturdays (no Sunday service), the route connects many of the residential communities in Winchester to the commercial land uses along South Pleasant Valley Road (Reference 2). A Trolley bus route stop is located approximately 650 feet east of the proposed site entrance of the Greystone Properties development at the Cedar Creek Grade/Harrison Street intersection. Currently, no bus shelter is present. SITE MIDDLE RDC:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 04Existing Lane Configurations and Traffic Control Devices Frederick County, VA 4 Greystone Properties, LLC Rezoning November 2019 Figure N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 - STOP SIGN - TRAFFIC SIGNAL 1 2 3 Greystone Properties, LLC Rezoning November 2019 Existing Conditions Kittelson & Associates, Inc. 13 Existing Traffic Volumes and Peak Hour Operations Turning-movement counts were obtained in May 2019 at all existing study intersections. The counts were conducted on a typical weekday morning (6:00 a.m. – 9:00 a.m.) and weekday evening (4:00 a.m. – 7:00 p.m.) during peak time periods when school was in session. Appendix B contains all turning movement count data sheets. Consistent with scoping requirements, operational analyses were performed at the following intersections: ▪ US 11 (Valley Avenue)/Route 622 (Cedar Creek Grade)/Weems Lane ▪ Cedar Creek Grade/Route 37 Northbound Ramps ▪ Cedar Creek Grade/Route 37 Southbound Ramps Current Levels of Service and Volume-to-Capacity Ratios All level of service (LOS) analyses described in this report was performed in accordance with the procedures stated in the 2010 Highway Capacity Manual (HCM - Reference 3) and report HCM 2010 outputs1. A description of level of service and the criteria by which they are determined is presented in Appendix C. This analysis is based on the system hourly peak during each of the study periods to evaluate of all intersection levels-of-service. The weekday a.m. and weekday p.m. peak hours were found to occur from 7:30 a.m. to 8:30 a.m. and 4:30 p.m. to 5:30 p.m., respectively. Traffic operations were evaluated using Synchro 10 in accordance with VDOT’s Traffic Operations and Safety Analysis Manual v1.0 (TOSAM – Reference 4). Figure 5 shows the overall intersection operational results of the existing traffic operations analysis for the weekday a.m. and weekday p.m. peak hours. Figure 6 shows the lane group LOS. Table 2 summarizes the Synchro 10 peak hour levels of service, 95th percentile back of queue, and delay for each lane group by intersection. Appendix D contains the existing conditions level of service worksheets. 1 The signal timing at the US 11/Cedar Creek Grade/Weems Lane intersection currently employs non-National Electrical Manufacturers Association (NEMA) phasing. As such, HCM 2000 outputs are reported for signalized intersections SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 05Existing Traffic Conditions Weekday AM and PM Peak Hours Frederick County, VA 5 Greystone Properties, LLC Rezoning November 2019 Figure CM = CRITICAL MOVEMENT (UNSIGNALIZED) LOS = CRITICAL MOVEMENT LEVEL OF SERVICE (SIGNALIZED)/CRITICAL MOVEMENT LEVEL OF SERVICE (UNSIGNALIZED) Del = INTERSECTION AVERAGE CONTROL DELAY (SIGNALIZED)/CRITICAL MOVEMENT CONTROL DELAY (UNSIGNALIZED) V/C = CRITICAL CRITICAL VOLUME-TO-CAPACITY RATIO WEEKDAY AM 1 WEEKDAY PM 2 3 291138109220LOS=C Del=16.4 V/C=0.34 CM=NB 142544 1123891003336996201 213 230 62 77 34 LOS=C Del=25.7 V/C=0.50440098246666969LOS=B Del=16.4 V/C=0.67 28754119987546245145 212 227 161 360 57 LOS=C Del=31.3 V/C=0.71363013016348199207LOS=B Del=17.1 V/C=0.72 48194358558LOS=B Del=12.7 V/C=0.19 CM=NB 78448 MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 06Existing Lane Group Levels of Service Weekday AM and PM Peak Hours Frederick County, VA 6 Greystone Properties, LLC Rezoning November 2019 Figure WEEKDAY AM 1 WEEKDAY PM 2 3 B B B B B B B C B B C A C D D D C C C C C C C B C C C C B C C C C C - STOP SIGN - TRAFFIC SIGNAL - LANE GROUP LOSX MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 Greystone Properties, LLC Rezoning November 2019 Existing Conditions Kittelson & Associates, Inc. 16 Table 2. Existing Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection Intersection Information AM Peak Hour PM Peak Hour Intersection (#) Traffic Control Approach Lane Group Existing turn-lane lengths LOS Back of Queue (feet) Delay (sec) LOS Back of Queue (feet) Delay (sec) Route 622 (Cedar Creek Grade)/Route 37 Southbound Ramps (#1) Signalized EB EBTR - B 135 14.8 B 74 10.7 EB Approach B - 14.8 B - 10.7 WB WBLT - B 72 13.4 B 199 18.7 WB Approach B - 13.4 B - 18.7 SB SBLT - B #276 19.8 C #274 20.3 SBR 650 B 25 10.2 B 37 13.4 SB Approach B - 18.1 B - 18.5 Overall LOS B - 16.4 B - 17.1 Route 622 (Cedar Creek Grade)/Route 37 Northbound Ramps (#2) Two-way Stop-Controlled EB EBLT - A 10 8.6 B 10 11.2 EB Approach - - 1.8 - - 1.7 WB WBTR - - 0 0.0 - 0 0.0 WB Approach - - 0.0 - - 0.0 NB NBLTR - C 38 16.4 B 18 12.7 NB Approach C - 16.4 B - 12.7 US 11 (Valley Avenue)/ Route 622(Cedar Creek Grade)/Weems Lane (#3) Signalized EB EBL - B 139 19.3 C 124 34.0 EBT - C 196 29.2 D 224 49.2 EBR 370 C 60 26.0 D 60 38.9 EB Approach C - 25.0 D - 41.5 WB WBL - C 50 26.0 C 136 33.1 WBTR - C 45 30.8 D 198 45.8 WB Approach C - 29.1 D - 42.2 NB NBL 340 B 77 17.6 C #284 21.3 NBT - C 154 25.5 C 223 24.3 NBR 235 C 0 22.0 C 35 21.2 NB Approach C - 23.5 C - 22.9 SB SBL 370 C 30 22.0 C 63 20.1 SBT - C 151 29.4 C 214 29.2 SBR 350 C 0 25.4 C 53 25.4 SB Approach C - 28.1 C - 27.2 Overall LOS C - 25.7 C - 31.3 #95th percentile volume exceeds capacity; queue may be longer. As shown in the figures and Table 2, study intersections are anticipated to operate at LOS C or better. Transportation Impact Analysis Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 18 TRANSPORTATION IMPACT ANALYSIS The transportation impact analysis identifies how the study area’s transportation system will operate through total build out of the project. The Greystone Properties development is anticipated to be constructed and built out by year 2027. Traffic impacts of the proposed Greystone Properties development during the typical weekday a.m. and weekday p.m. peak hours were examined as follows: • Year 2027 background traffic conditions were developed by applying a one percent linear annual growth rate to traffic on public roadways. • Year 2027 background weekday a.m. and weekday p.m. peak hour traffic conditions were analyzed at each of the study intersections. • Site-generated trips were estimated for the proposed site plan. • Site trip distribution patterns identified and confirmed through the scoping process were derived from existing traffic patterns and major trip origins and destinations in the study area. • Year 2027 total traffic conditions were analyzed at each of the study intersections and site- access driveways during the weekday a.m. and weekday p.m. peak hours. YEAR 2027 TRAFFIC CONDITIONS In the 2027 background analysis, traffic operations prior to full build-out of the proposed development are analyzed for the purposes of establishing a baseline against which to measure the specific impacts of the proposed development. Background growth in traffic volumes is attributed to regional growth in the area as well as any specific development within the study area. These two components of growth are discussed below. Regional Growth A one percent annual growth rate for traffic on public roadways was identified and confirmed through the scoping process to account for near-term regional traffic growth. This growth rate was grown linearly to forecast year 2027 background traffic volumes. In-Process Developments No in-process developments are anticipated within the study network by the year 2027. Planned Transportation Improvements No transportation improvements are anticipated within the study network by the year 2027. Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 19 2027 Background Traffic Conditions Figure 7 shows the overall intersection operational results of the year 2027 background traffic operations analysis for the weekday a.m. and weekday p.m. peak hours. Figure 8 shows the lane group LOS. Table 3 summarizes the peak hour levels of service, 95th percentile back of queue, and delay for each lane group by intersection. Appendix E contains the 2027 background traffic operational analysis worksheets. SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 07Year 2027 Background Traffic Conditions Weekday AM and PM Peak Hours Frederick County, VA 7 Greystone Properties, LLC Rezoning November 2019 Figure CM = CRITICAL MOVEMENT (UNSIGNALIZED) LOS = CRITICAL MOVEMENT LEVEL OF SERVICE (SIGNALIZED)/CRITICAL MOVEMENT LEVEL OF SERVICE (UNSIGNALIZED) Del = INTERSECTION AVERAGE CONTROL DELAY (SIGNALIZED)/CRITICAL MOVEMENT CONTROL DELAY (UNSIGNALIZED) V/C = CRITICAL CRITICAL VOLUME-TO-CAPACITY RATIO WEEKDAY AM 1 WEEKDAY PM 2 3 12142110836400104218 231 249 67 83 37 LOS=C Del=26.1 V/C=0.534760106266717575LOS=B Del=18.0 V/C=0.71 31158621594591265157 230 246 174 390 62 LOS=C Del=33.2 V/C=0.78393014117752215224LOS=B Del=19.2 V/C=0.77 311149118238LOS=C Del=16.6 V/C=0.35 CM=NB 154589 521102388602LOS=B Del=13.2 V/C=0.20 CM=NB 84485 MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 08Year 2027 Background Lane Group Levels of Service Weekday AM and PM Peak Hours Frederick County, VA 8 Greystone Properties, LLC Rezoning November 2019 Figure WEEKDAY AM WEEKDAY PM B B B C B C B C B B C A C D D D C C C C C C C B C C C C B C C C C C - STOP SIGN - TRAFFIC SIGNAL - LANE GROUP LOSX MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 1 2 3 Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 22 Table 3. Year 2027 Background Traffic Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection Intersection Information AM Peak Hour PM Peak Hour Intersection (#) Traffic Control Approach Lane Group Existing turn-lane lengths LOS Back of Queue (feet) Delay (sec) LOS Back of Queue (feet) Delay (sec) Route 622 (Cedar Creek Grade)/Route 37 Southbound Ramps (#1) Signalized EB EBTR - B 144 15.2 B 79 11.1 EB Approach B - 15.2 B - 11.1 WB WBLT - B 78 13.7 C 221 21.8 WB Approach B - 13.7 C - 21.8 SB SBLT - C #304 23.2 C #334 22.7 SBR 650 B 26 10.4 B 40 14.1 SB Approach C - 20.8 C - 20.4 Overall LOS B - 18.0 B - 19.2 Route 622 (Cedar Creek Grade)/Route 37 Northbound Ramps (#2) Two-way Stop-Controlled EB EBLT - A 13 8.6 B 13 11.6 EB Approach - - 1.8 - - 1.7 WB WBTR - - 0 0.0 - 0 0.0 WB Approach - - 0.0 - - 0.0 NB NBLTR - C 38 16.6 B 20 13.2 NB Approach C - 16.6 B - 13.2 US 11 (Valley Avenue)/ Route 622(Cedar Creek Grade)/Weems Lane (#3) Signalized EB EBL - B 150 19.4 C 134 34.8 EBT - C 212 29.6 D 243 50.0 EBR 370 C 62 26.0 D 67 38.4 EB Approach C - 25.1 D - 41.7 WB WBL - C 53 25.7 C 147 33.9 WBTR - C 47 30.7 D 215 46.7 WB Approach C - 28.9 D - 43.1 NB NBL 340 B 80 17.9 C #352 28.0 NBT - C 162 26.1 C 243 26.6 NBR 235 C 0 22.3 C 45 22.8 NB Approach C - 24.0 C - 26.3 SB SBL 370 C 30 22.4 C 66 20.6 SBT - C 157 30.3 C 233 31.6 SBR 350 C 0 25.8 C 55 26.8 SB Approach C - 28.9 C - 29.2 Overall LOS C - 26.1 C - 33.2 #95th percentile volume exceeds capacity; queue may be longer. As shown in the figures and Table 3, study intersections and critical movements are anticipated to continue to operate at LOS C or better. Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 23 PROPOSED DEVELOPMENT Greystone Properties, LLC is proposing to develop 300 age-restricted single-family dwelling units north of Cedar Creek Grade between US 11 (Valley Avenue) and Route 37 (Winchester Bypass). The site is currently zoned R4 and is approved for 200 single-family dwelling units, 120 age-restricted dwelling units, and 6 acres of commercial use. Access to the site upon build-out is proposed via a single full- movement driveway on Cedar Creek Grade. A future site access point is proposed along the planned West Jubal Early Drive extension to the north of the site; however, the extension is not currently funded and will not be assumed in this study. Figure 9 illustrates the assumed lane configurations and traffic control devices under year 2027 total traffic conditions. SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 09Year 2027 Total Traffic Assumed Lane Configurations and Traffic Control Devices Frederick County, VA 9 Greystone Properties, LLC Rezoning November 2019 Figure 1 2 4 3 MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 4 Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 25 Trip Generation Trip generation estimates for the proposed development were developed using rates specific to VDOT’s Staunton District developed by VDOT staff. Table 4 summarizes the trip generation estimates for the proposed development. Table 4. Estimated Trip Generation Land Use ITE Code Units Weekday Daily Peak Hour Adjacent Street Weekday AM Peak Hour Weekday PM Peak Hour Total In Out Total In Out Senior Adult Housing – Detached1 251 300 Dwelling Units 1,950 159 40 119 186 117 69 Total Trips 1,950 159 40 119 186 117 69 1Per VDOT staff direction, Weekday Daily, Weekday AM Peak Hour, and Weekday PM Peak Hour trip generation rates were obtained from VDOT Staunton trip generation methodology. As shown in Table 4, the development is estimated to generate approximately 1,950 net new weekday daily trips, 159 weekday a.m. (40 in, 119 out), and 189 weekday p.m. (117 in, 69 out) peak hour trips when fully built out in year 2027. Trip Distribution and Trip Assignment Trip distribution estimates for the proposed project were developed based on anticipated future travel patterns observed near the site and a major origin/destination patterns in the site vicinity. Figure 10 illustrates the estimated trip distribution pattern, which was confirmed through the scoping process. Figure 11 illustrates the assignment of net new trips to the surrounding roadway network during the weekday a.m. and weekday p.m. peak hours. SITETrip DistributionNM I D D L E R D VALLE Y A V ECEDAR CREEK GRADEW JUBALEARLY DR11628PAPE R M I L L R D WINCH E S T E R B Y P A S S 62262137MERRIMANS LN WEEMS LN644C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 10 Estimated Trip DistributionFrederick County, VA10Greystone Properties, LLC RezoningNovember 2019Figure SITE MIDDLE RDC:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 11Net New Site-Generated Trips Weekday AM and PM Peak Hours Frederick County, VA 11 Greystone Properties, LLC Rezoning November 2019 Figure N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 WEEKDAY AM 1 WEEKDAY PM 2 4 3 4 623 1 86 24 18 10824 24 30 8774214 26 181 13 1 2219 14 10 292314 14 17 23452441 76 Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 28 2027 TOTAL TRAFFIC CONDITIONS The year 2027 total traffic conditions analysis forecasts how the transportation system in the study area will operate after full build out of proposed development. Site-generated trips shown in Figure 11 were added to year 2027 background volumes shown in Figure 7 to arrive at the 2027 total traffic volumes shown in Figure 12. Figure 13 shows the lane group LOS for the weekday a.m. and weekday p.m. peak hours. Table 5 summarizes the Synchro 10 peak hour levels of service, 95th percentile back of queue, and delay for each lane group by intersection. Appendix F contains the year 2027 total traffic conditions operational worksheets. SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 12Year 2027 Total Traffic Conditions Weekday AM and PM Peak Hours Frederick County, VA 12 Greystone Properties, LLC Rezoning November 2019 Figure CM = CRITICAL MOVEMENT (UNSIGNALIZED) LOS = CRITICAL MOVEMENT LEVEL OF SERVICE (SIGNALIZED)/CRITICAL MOVEMENT LEVEL OF SERVICE (UNSIGNALIZED) Del = INTERSECTION AVERAGE CONTROL DELAY (SIGNALIZED)/CRITICAL MOVEMENT CONTROL DELAY (UNSIGNALIZED) V/C = CRITICAL CRITICAL VOLUME-TO-CAPACITY RATIO WEEKDAY AM 1 WEEKDAY PM 2 4 3 MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 4 13142110836400112241 254 279 67 91 37 LOS=C Del=26.4 V/C=0.574820106266719776LOS=B Del=18.5 V/C=0.72 774214 731 30926CM=SB LOS=D Del=32.0 V/C=0.39 1154595 142256 CM=NB LOS=C Del=17.1 V/C=0.37 34058621594591289171 243 263 174 413 62 LOS=C Del=34.9 V/C=0.83411014117852229225LOS=C Del=20.5 V/C=0.80 452441 585 96676CM=SB LOS=F Del=93.6 V/C=0.58 184504 401612 CM=NB LOS=B Del=14.0 V/C=0.2531157 52124 SITE C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 13Year 2027 Total Traffic Lane Group Level of Service Weekday AM and PM Peak Hours Frederick County, VA 13 Greystone Properties, LLC Rezoning November 2019 Figure CM = CRITICAL MOVEMENT (UNSIGNALIZED) LOS = CRITICAL MOVEMENT LEVEL OF SERVICE (SIGNALIZED)/CRITICAL MOVEMENT LEVEL OF SERVICE (UNSIGNALIZED) Del = INTERSECTION AVERAGE CONTROL DELAY (SIGNALIZED)/CRITICAL MOVEMENT CONTROL DELAY (UNSIGNALIZED) V/C = CRITICAL CRITICAL VOLUME-TO-CAPACITY RATIO WEEKDAY AM 1 WEEKDAY PM 2 4 3 MIDDLE RD N MERRIMANS LNVALLEY AVECEDAR C R E E K G R A D E W JUBAL EARLY DR 11 628 WEEMS LN PAPERMILL RDWINCHESTER BYPASS622 621 37 644 1 2 3 4 D D D D C C C C C C C B C C C C B C C C C C B B C ABB B C B C B C B F C A D B Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 31 Table 5. 2027 Total Traffic Conditions – Summary of Peak Hour Levels of Service, 95th Percentile Back of Queue, and Delay for Each Lane Group by Intersection Intersection Information AM Peak Hour PM Peak Hour Intersection (#) Traffic Control Approach Lane Group Existing/ Proposed turn-lane lengths LOS Back of Queue (feet) Delay (sec) LOS Back of Queue (feet) Delay (sec) Route 622 (Cedar Creek Grade)/Route 37 Southbound Ramps (#1) Signalized EB EBTR - B 144 15.2 B 79 11.0 EB Approach B - 15.2 B - 11.0 WB WBLT - B 91 14.6 C 232 22.8 WB Approach B - 14.6 C - 22.8 SB SBLT - C #310 24.1 C #371 25.4 SBR 650 B 26 10.4 B 42 14.5 SB Approach C - 21.6 C - 22.6 Overall LOS B - 18.5 C - 20.5 Route 622 (Cedar Creek Grade)/Route 37 Northbound Ramps (#2) Two-way Stop-Controlled EB EBLT - A 13 8.8 B 13 11.8 EB Approach - - 1.8 - - 1.7 WB WBTR - - 0 0.0 - 0 0.0 WB Approach - - 0.0 - - 0.0 NB NBLTR - C 43 17.1 B 25 14.0 NB Approach C - 17.1 B - 14.0 US 11 (Valley Avenue)/ Route 622(Cedar Creek Grade)/Weems Lane (#3) Signalized EB EBL - B 167 19.3 D #147 36.5 EBT - C #249 29.7 D 257 50.7 EBR 370 C 67 25.7 D 69 38.0 EB Approach C - 25.0 D - 42.2 WB WBL - C 53 25.7 C 147 34.4 WBTR - C 51 30.7 D 226 47.8 WB Approach C - 29.0 D - 44.2 NB NBL 340 B 85 18.4 C #426 32.7 NBT - C 162 26.7 C 243 27.1 NBR 235 C 0 22.7 C 45 23.1 NB Approach C - 24.4 C - 28.0 SB SBL 370 C 30 23.0 C 66 22.2 SBT - C 157 31.2 C 233 34.2 SBR 350 C 0 26.5 C 57 28.9 SB Approach C - 29.7 C - 31.5 Overall LOS C - 26.4 C - 34.9 Route 622 (Cedar Creek Grade)/Site Driveway (#4) Two-way Stop-Controlled EB EBL 100 A 0 8.0 B 5 11.2 EBT - - 0 0.0 - 0 0.0 EB Approach - - 0.1 - - 0.7 WB WBT - - 0 0.0 - 0 0.0 WBR 100 - 0 0.0 - 0 0.0 WB Approach - - 0.0 - - 0.0 SB SBL - D 43 32.0 F 65 93.6 SBR - B 5 10.4 C 8 19.3 SB Approach C - 24.4 F - 67.8 #95th percentile volume exceeds capacity; queue may be longer. As shown in the figures and Table 5, all study intersections are forecast to continue to operate at LOS D or better during all analysis periods with the exception of the site driveway. During the weekday p.m. peak hour, the southbound left-turn movement is anticipated to operate below capacity at LOS F. The high delays forecast for this movement stem from the inability of south left-turning vehicles to find a Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 32 gap in the heavy westbound through volumes. These delays are limited to traffic internal to the site, and no noticeable operational impacts are forecast for mainline traffic on Cedar Creek Grade. Turn-Lane Evaluation The subsequent sections evaluate the need for turn-lanes on Cedar Creek Grade into the proposed site based on forecast year 2027 total traffic volumes. Northbound Right-Turn Lane Per Appendix F of the VDOT Road Design Manual (RDM), right-turn lanes into a private entrance are required on a two-lane roadway if the warrants in Figure 3-26 are met. Table 6 illustrates the applicable volumes required for the right-turn lane warrant analysis, while Figure 14 illustrates the application of these volumes to Figure 3-26 of Appendix F of the VDOT RDM. As shown, a full-width right-turn lane and taper are projected to be warranted during the weekday p.m. peak hour under year 2027 total traffic volumes. Per Figure 3-1 of Appendix F of the VDOT RDM, a minimum 100-foot taper and 100- foot storage length are required given the urban nature of the surrounding area. The 100-foot storage (minimum) was determined due to the lack of anticipated queuing in the free-flow right-turn lane into the site. Table 6. Westbound Volumes – Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours Peak Hour Year 2027 Total Traffic Volumes PHV Right (vph) PHV Approach Total (vph) Weekday AM 26 335 Weekday PM 76 1,042 Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 33 Figure 14. VDOT Right-Turn Lane Warrants for Two-Lane Roads – Cedar Creek Grade/Site Driveway - Weekday AM & Weekday PM Peak Hours Field observations showed northbound right-turns into the adjacent commercial entrance on Noble Pond Way are able to complete their maneuver while northbound through movements bypass to the inside without encroaching into the opposing travel direction. As Noble Pond Way is currently 40-feet wide without pavement markings (local roadway), the development of a striped northbound right-turn taper will not be assumed. Southbound Left-Turn Lane Per Appendix F of the VDOT RDM, left-turn lanes into a private entrance are required on a two-lane roadway if the applicable warrants in Table 3-1 and/or Figures 3-5 through 3-22 are met. With a posted speed of 35 miles-per-hour (assumed design speed of 40 miles-per-hour) and left-turns into the site entrance accounting for approximately five percent of the southbound advancing volume, Figure 3-5 of the VDOT RDM is the most applicable warrant for the Cedar Creek Grade/Site Driveway intersection. Table 7 illustrates the applicable volumes required in the warrant analysis at the site entrance, while Figure 15 illustrates these volumes to Figure 3-5 of Appendix F of the VDOT RDM. As shown, a 100-foot left-turn lane with a 100-foot taper are required based on both the projected weekday a.m. and weekday p.m. peak hour volumes at the site driveway. Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 34 Table 7. Left-Turning Volumes – Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours Peak Hour Year 2027 Total Traffic Volumes Opposing Volume Advancing Volume Left-turns as a Percentage of Advancing Volume (L%) Weekday AM 335 745 2% Weekday PM 1,042 626 7% Figure 15. VDOT Left-Turn Lane Warrants– Cedar Creek Grade/Site Driveway – Weekday AM & Weekday PM Peak Hours ACCESS MANAGEMENT EVALUATION An evaluation of the proposed full-access movement on Cedar Creek Grade was performed with respect to VDOT’s Access Management policies (Reference 5). Figure 16 illustrates the proposed spacing of the full-movement driveway with respect to the adjacent roadways on Cedar Creek Grade. Spacing from Adjacent Full-Movement Access Entrances Per Table 2-2 in Appendix F of the VDOT RDM, the minimum spacing for a full-movement entrance on Cedar Creek Grade (posted 35 miles-per-hour) from an adjacent full-movement access is 470 feet. As shown in Figure 16, the proposed entrance is approximately 530 feet away from Stoneridge Road to Greystone Properties, LLC Rezoning November 2019 Transportation Impact Analysis Kittelson & Associates, Inc. 35 the east and approximately 550 feet from the private driveway to the single-family home to the west. Therefore, the proposed location of the full-movement site driveway meets minimum spacing standards from adjacent full-movement access entrances. Spacing from Adjacent Partial Access Entrances Per Table 2-2 in Appendix F of the VDOT RDM, the minimum spacing for a full-movement entrance on Cedar Creek Grade (posted 35 miles-per-hour) from an adjacent partial access is 250 feet. As shown in Figure 16, the proposed entrance is approximately 395 feet away from the private driveway to the single-family home to the east. Therefore, the proposed location of the full-movement site driveway meets minimum spacing standards from adjacent partial access entrances. SITENST O N E R I D G E R D C:\KAI Applications\Autodesk\TEMP\AcPublish_28128\24079_ReportFigs.dwg Nov 08, 2019 - 3:07pm - abutsick Layout Tab: 16 Access Management EvaluationFrederick County, VA16Greystone Properties, LLC RezoningNovember 2019Figure530' 5 5 0 '395'XX'PROPOSEDSITE DWY - PROPOSED SPACING FROM ADJACENT FULL-ACCESSXX' - PROPOSED SPACING FROM ADJACENT PARTIAL-ACCESS Conclusions and Recommendations Greystone Properties, LLC Rezoning November 2019 Conclusions and Recommendations Kittelson & Associates, Inc. 38 CONCLUSIONS AND RECOMMENDATIONS Based on the results of the transportation impact analysis, the transportation system can accommodate full build-out of the proposed development and assuming provision of the recommended mitigations. The findings of this analysis and our recommendations are discussed below. Existing Conditions ▪ All study intersections study intersections are anticipated to operate at LOS C or better. 2027 Background Traffic Conditions ▪ Growth rates of one percent (linear) were applied to movements on public roadways to account for near-term regional traffic growth. ▪ No transportation improvements or in-process developments were identified for inclusion in the background 2027 analysis. ▪ All study intersections are forecast to continue to operate at LOS C or better under year 2027 background traffic conditions. Proposed Development ▪ Greystone Properties, LLC is proposing to develop 300 age-restricted single-family dwelling units north of Cedar Creek Grade between US 11 (Valley Avenue) and Route 37 (Winchester Bypass). o The site is currently zoned R4 and is approved for 200 single-family dwelling units, 120 age-restricted dwelling units, and 6 acres of commercial use. Owners of the adjacent land parcels not considered for this development seek to rezone their property back to agricultural usage. ▪ Access to the site upon build-out is proposed via a single full-movement driveway on Cedar Creek Grade. o A future site access point is proposed along the planned West Jubal Early Drive extension to the north of the site; however, the extension is not currently funded and will not be assumed in this study. ▪ The development is estimated to generate approximately 1,950 net new weekday daily trips, 159 weekday a.m. (40 in, 119 out), and 189 weekday p.m. (117 in, 69 out) peak hour trips when fully built out in year 2027. ▪ Greystone Properties, LLC Rezoning November 2019 Conclusions and Recommendations Kittelson & Associates, Inc. 39 2027 Total Traffic Conditions ▪ All study intersections are forecast to continue to operate at LOS D or better during all analysis periods with the exception of the site driveway. o During the weekday p.m. peak hour, the southbound left-turn movement is anticipated to operate below capacity at LOS F. The high delays forecast for this movement stem from the inability of south left-turning vehicles to find a gap in the heavy westbound through volumes. These delays are limited to traffic internal to the site, and no noticeable operational impacts are forecast for mainline traffic on Cedar Creek Grade. ▪ An evaluation of VDOT turn-lane warrants illustrated a westbound right-turn lane into the site forecast to warranted under year 2027 total traffic conditions. o A minimum 100-foot taper and 100-foot storage length are required given the urban nature of the surrounding area. The 100-foot storage (minimum) was determined due to the lack of anticipated queuing in the free-flow right-turn lane into the site. ▪ An evaluation of VDOT turn-lane warrants illustrated a eastbound left-turn lane into the site forecast to warranted under year 2027 total traffic conditions. o A 100-foot left-turn lane with a 100-foot taper are required based on both the projected weekday a.m. and weekday p.m. peak hour volumes at the site driveway. Access Management ▪ The proposed site driveway meets VDOT access management standards noted in the Road Design Manual. RECOMMENDATIONS Develop a westbound right-turn lane and an eastbound left-turn lane with 100-foot tapers and 100 feet of storage at the proposed site driveway. No other on- or off-site transportation improvements are triggered by the proposed Greystone Properties development. References Greystone Properties, LLC Rezoning November 2019 References Kittelson & Associates, Inc. 41 REFERENCES 1. Frederick County. Frederick County Interactive Maps. Accessed August 20, 2019. https://www.fcva.us/departments/geographic-information-systems/interactive-maps 2. City of Winchester. Schedule/Bus Stop Locations. Accessed September 16, 2019. https://www.winchesterva.gov/public-transportation/schedule-bus-stop-locations 3. Transportation Research Board. Highway Capacity Manual. 2010. 4. Virginia Department of Transportation. Traffic Operations and Safety Analysis Manual. November 2015. 5. Virginia Department of Transportation. Road Design Manual. April 2016. Appendix A Scoping Letter It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. PRE-SCOPE OF WORK MEETING FORM Information on the Project Traffic Impact Analysis Base Assumptions The applicant is responsible for entering the relevant information and submitting the form to VDOT and the locality no less than three (3) business days prior to the meeting. If a form is not received by this deadline, the scope of work meeting may be postponed. Contact Information Consultant Name: Tele: E-mail: Andrew Butsick, PE & John Callow - Kittelson & Associates, Inc. (703) 885-8970 abutsick@kittelson.com Developer/Owner Name: Tele: E-mail: Greystone Properties, LLC (C/O Richie Wilkins) (540) 662-7215 rwilkins@wilkinsco.com Project Information Project Name: Greystone Properties, LLC Rezoning Locality/County: Frederick County Project Location: (Attach regional and site specific location map) See Figure 1 - attached Submission Type Comp Plan Rezoning Site Plan Subd Plat Project Description: (Including details on the land use, acreage, phasing, access location, etc. Attach additional sheet if necessary) Greystone Properties, LLC is proposing to develop 300 age-restricted single-family dwelling units north of Cedar Creek Grade between US 11 (Valley Avenue) and Route 37 (Winchester Bypass). The site is currently zoned R4 and is approved for 200 single-family dwelling units, 120 age-restricted dwelling units, and 6 acres of commerical use. Access to the site upon build-out is proposed via a single full- movement driveway on Cedar Creek Grade. A future site access point is proposed along the planned West Jubal Early Drive extension to the north of the site; however, the extension is not currently funded and will not be assumed in this study. A conceptual site plan is shown in Figure 2. Proposed Use(s): (Check all that apply; attach additional pages as necessary) Residential Commercial Mixed Use Other It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. Residential Uses(s) Number of Units: 300 ITE LU Code(s): 251 (see attached Trip Gen Table) Commercial Use(s) ITE LU Code(s): Square Ft or Other Variable: Other Use(s) ITE LU Code(s): Independent Variable(s): Total Peak Hour Trip Projection: Less than 100 100 – 499 500 – 999 1,000 or more Traffic Impact Analysis Assumptions Study Period Existing Year: 2019 Build-out Year: 2027 Design Year: N/A Study Area Boundaries (Attach map) North: West Jubal Early Drive South: Route 622 (Cedar Creek Grade) East: US 11 (Valley Avenue) West: Route 37 (Winchester Bypass) External Factors That Could Affect Project (Planned road improvements, other nearby developments) Extension of West Jubal Early Drive from the West Jubal Early Drive/Handley Avenue/Meadow Branch Avenue intersection to Route 621 (Merrimans Lane) Consistency With Comprehensive Plan (Land use, transportation plan) Yes Available Traffic Data (Historical, forecasts) 2017 AADT Volumes from VDOT US 11 (Valley Avenue) - 15,000 vpd (Jubal Early Drive to Weems Lane) US 11 (Valley Avenue) - 19,000 vpd (Weems Lane to Middle Road) Route 622 (Cedar Creek Grade) - 13,000 (SR 37 to WCL Winchester) Route 5200-138 (Cedar Creek Grade) - 13,000 (WCL Winchester to Valley Avenue) Trip Distribution (Attach sketch) Road Name: 60% to/from east on Cedar Creek Drive [20% north on US 11/20% east on Weems Lane/25% south on US 11] (See Figure 3) Road Name: 19% to/from south on Route 37 Road Name: 15% to/from north on Route 37 Road Name: 1% to/from west on Cedar Creek Grade Annual Vehicle Trip Growth Rate: 1% (linear) Peak Period for Study (check all that apply) AM PM SAT Peak Hour of the Generator 6-9 am 4-7 pm Study Intersections 1.Route 37 SB Ramps/Cedar Creek Grade 6. It is important for the applicant to provide sufficient information to county and VDOT staff so that questions regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting. and/or Road Segments (Attach additional sheets as necessary) 2.Route 37 NB Ramps/Cedar Creek Grade 7. 3.US 11/Cedar Creek Grade/Weems Lane 8. 4.Cedar Creek Grade/Proposed Driveway [future] 9. 5. 10. Trip Adjustment Factors Internal allowance: Yes No Reduction: % trips Pass-by allowance: Yes No Reduction: % trips Software Methodology Synchro HCS (v.2000/+) aaSIDRA CORSIM Other SimTraffic (if required) Traffic Signal Proposed or Affected (Analysis software to be used, progression speed, cycle length) Analysis Software: Synchro v10 Results: HCM Methodology Improvement(s) Assumed or to be Considered None Background Traffic Studies Considered None Plan Submission Master Development Plan (MDP) Generalized Development Plan (GDP) Preliminary/Sketch Plan Other Plan type (Final Site, Subd. Plan) Additional Issues to be Addressed Queuing analysis Actuation/Coordination Weaving analysis Merge analysis Bike/Ped Accommodations Intersection(s) TDM Measures Other NOTES on ASSUMPTIONS: All parameters of the study will be compliant with the provisions and analysis procedures established in VDOT's Traffic Operations and Safety Analysis Manual (TOSAM). SimTraffic software will be utilized in scenarios with oversaturated conditions. Greystone Properties, LLC RezoningITE Trip Gen 10th EdTotal In Out Total In OutSenior Adult Housing - Detached* 251 300 Dwelling Units 1,950 159 40 119 186 117 691,950 159 40 119 186 117 69*Per VDOT staff direction, Weekday Daily, Weekday AM Peak Hour, and Weekday PM Peak Hour trip generation rates were obtained from VDOT Staunton trip generation methodology.Peak Hour Adjacent StreetWeekday AM Peak Hour Weekday PM Peak HourTotal TripsLand UseITE CodeUnitsWeekday Daily Appendix B Traffic Counts Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Route 37 SB Ramps -- Cedar Creek Grade QC JOB #: QC JOB #: 14990201 CITY/STATE: CITY/STATE: Winchester, VA DATE: DATE: Tue, May 28 2019 538 0 98 0 440 165 0 0 136 246 0.90.9 67 312 66 69 686 0 0 0 135 0 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:30 AM -- 7:45 AMPeak 15-Min: 7:30 AM -- 7:45 AM 4.6 0 7.1 0 4.1 7.3 0 0 5.9 2 7.5 1.9 1.5 4.3 3.4 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Route 37 SB Ramps Route 37 SB Ramps (Northbound)(Northbound) Route 37 SB Ramps Route 37 SB Ramps (Southbound)(Southbound) Cedar Creek GradeCedar Creek Grade (Eastbound)(Eastbound) Cedar Creek GradeCedar Creek Grade (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 6:00 AM 0 0 0 0 40 0 3 0 0 19 8 0 4 2 0 0 76 6:15 AM 0 0 0 0 69 0 5 0 0 25 11 0 8 7 0 0 125 6:30 AM 0 0 0 0 73 0 3 0 0 34 6 0 14 7 0 0 137 6:45 AM 0 0 0 0 67 0 10 0 0 31 12 0 11 5 0 0 136 474 7:00 AM 0 0 0 0 70 0 9 0 0 55 16 0 24 7 0 0 181 579 7:15 AM 0 0 0 0 84 0 13 0 0 57 19 0 20 10 0 0 203 657 7:30 AM 0 0 0 0 120 0 17 0 0 79 20 0 19 19 0 0 274 794 7:45 AM 0 0 0 0 124 0 26 0 0 76 16 0 14 14 0 0 270 928 8:00 AM 0 0 0 0 103 0 28 0 0 44 17 0 16 16 0 0 224 971 8:15 AM 0 0 0 0 93 0 27 0 0 47 13 0 20 18 0 0 218 986 8:30 AM 0 0 0 0 98 0 23 0 0 46 10 0 18 18 0 0 213 925 8:45 AM 0 0 0 0 116 0 19 0 0 53 8 0 21 17 0 0 234 889 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 480 0 68 0 0 316 80 0 76 76 0 0 1096 Heavy Trucks 0 0 0 12 0 8 0 8 0 4 4 0 36 Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Route 37 SB Ramps -- Cedar Creek Grade QC JOB #: QC JOB #: 14990202 CITY/STATE: CITY/STATE: Winchester, VA DATE: DATE: Tue, May 28 2019 520 0 131 0 389 335 0 0 391 168 0.970.97 204 212 44 187 557 0 0 0 231 0 Peak-Hour: 4:15 PM -- 5:15 PMPeak-Hour: 4:15 PM -- 5:15 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 2.5 0 4.6 0 1.8 3 0 0 2 5.4 2 4.2 0 2.1 2.9 0 0 0 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Route 37 SB Ramps Route 37 SB Ramps (Northbound)(Northbound) Route 37 SB Ramps Route 37 SB Ramps (Southbound)(Southbound) Cedar Creek GradeCedar Creek Grade (Eastbound)(Eastbound) Cedar Creek GradeCedar Creek Grade (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 0 0 0 0 69 0 21 0 0 44 11 0 40 36 0 0 221 4:15 PM 0 0 0 0 107 0 36 0 0 45 6 0 41 52 0 0 287 4:30 PM 0 0 0 0 101 0 28 0 0 47 8 0 32 49 0 0 265 4:45 PM 0 0 0 0 94 0 29 0 0 42 10 0 46 60 0 0 281 1054 5:00 PM 0 0 0 0 87 0 38 0 0 34 20 0 68 43 0 0 290 1123 5:15 PM 0 0 0 0 81 0 35 0 0 40 10 0 53 50 0 0 269 1105 5:30 PM 0 0 0 0 81 1 31 0 0 35 9 0 33 39 0 0 229 1069 5:45 PM 0 0 0 0 68 0 22 0 0 27 14 0 30 34 0 0 195 983 6:00 PM 0 0 0 0 63 0 14 0 0 29 18 0 42 34 0 0 200 893 6:15 PM 0 0 0 0 65 0 20 0 0 22 10 0 27 37 0 0 181 805 6:30 PM 0 0 0 0 41 0 11 0 0 30 5 0 13 27 0 0 127 703 6:45 PM 0 0 0 0 55 0 21 0 0 27 3 0 25 39 0 0 170 678 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 0 0 0 0 348 0 152 0 0 136 80 0 272 172 0 0 1160 Heavy Trucks 0 0 0 0 0 8 0 0 0 4 4 0 16 Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Route 37 NB Ramps -- Cedar Creek Grade QC JOB #: QC JOB #: 14990203 CITY/STATE: CITY/STATE: Winchester, VA DATE: DATE: Tue, May 28 2019 0 385 0 0 0 129 160 224 326 534 0.860.86 102 694 0 0 666 27 1 132 0 160 Peak-Hour: 7:15 AM -- 8:15 AMPeak-Hour: 7:15 AM -- 8:15 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 0 6.5 0 0 0 7 4.4 7.6 7.4 3 6.9 3.3 0 0 3.2 7.4 100 3.8 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Route 37 NB Ramps Route 37 NB Ramps (Northbound)(Northbound) Route 37 NB Ramps Route 37 NB Ramps (Southbound)(Southbound) Cedar Creek GradeCedar Creek Grade (Eastbound)(Eastbound) Cedar Creek GradeCedar Creek Grade (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 6:00 AM 1 0 4 0 0 0 0 0 13 45 0 0 0 8 24 0 95 6:15 AM 5 0 16 0 0 0 0 0 19 74 0 0 0 7 38 0 159 6:30 AM 4 0 10 0 0 0 0 0 18 90 0 0 0 17 45 0 184 6:45 AM 2 0 19 0 0 0 0 0 25 71 0 0 0 15 47 0 179 617 7:00 AM 1 1 18 0 0 0 0 0 35 91 0 0 0 32 49 0 227 749 7:15 AM 2 0 20 0 0 0 0 0 41 106 0 0 0 28 48 0 245 835 7:30 AM 11 0 33 0 0 0 0 0 55 145 0 0 0 29 58 0 331 982 7:45 AM 10 0 53 0 0 0 0 0 39 163 0 0 0 21 57 0 343 1146 8:00 AM 4 1 26 0 0 0 0 0 25 120 0 0 0 24 61 0 261 1180 8:15 AM 4 0 26 0 0 0 0 0 23 109 0 0 0 35 44 0 241 1176 8:30 AM 7 0 28 0 0 0 0 0 22 131 0 0 0 26 47 0 261 1106 8:45 AM 8 0 27 0 0 0 0 0 26 144 0 0 0 35 47 0 287 1050 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 40 0 212 0 0 0 0 0 156 652 0 0 0 84 228 0 1372 Heavy Trucks 0 0 4 0 0 0 4 12 0 0 0 16 36 Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Route 37 NB Ramps -- Cedar Creek Grade QC JOB #: QC JOB #: 14990204 CITY/STATE: CITY/STATE: Winchester, VA DATE: DATE: Tue, May 28 2019 0 635 0 0 0 406 78 556 914 446 0.90.9 358 524 0 0 540 48 1 94 0 143 Peak-Hour: 4:30 PM -- 5:30 PMPeak-Hour: 4:30 PM -- 5:30 PM Peak 15-Min: 5:00 PM -- 5:15 PMPeak 15-Min: 5:00 PM -- 5:15 PM 0 1.6 0 0 0 1.7 6.4 0.9 1.1 1.3 1.4 2.1 0 0 1.7 4.2 0 3.2 0 3.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Route 37 NB Ramps Route 37 NB Ramps (Northbound)(Northbound) Route 37 NB Ramps Route 37 NB Ramps (Southbound)(Southbound) Cedar Creek GradeCedar Creek Grade (Eastbound)(Eastbound) Cedar Creek GradeCedar Creek Grade (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 14 0 26 0 0 0 0 0 28 95 0 0 0 62 98 0 323 4:15 PM 15 0 21 0 0 0 0 0 26 126 0 0 0 75 127 0 390 4:30 PM 18 1 19 0 0 0 0 0 24 124 0 0 0 69 104 0 359 4:45 PM 10 0 24 0 0 0 0 0 18 114 0 0 0 96 110 0 372 1444 5:00 PM 9 0 24 0 0 0 0 0 19 104 0 0 0 106 178 0 440 1561 5:15 PM 11 0 27 0 0 0 0 0 17 104 0 0 0 87 164 0 410 1581 5:30 PM 11 1 37 0 0 0 0 0 18 95 0 0 0 61 109 0 332 1554 5:45 PM 7 0 26 0 0 0 0 0 11 74 0 0 0 63 107 0 288 1470 6:00 PM 14 1 16 0 0 0 0 0 11 89 0 0 0 52 110 0 293 1323 6:15 PM 14 0 18 0 0 0 0 0 14 65 0 0 0 47 106 0 264 1177 6:30 PM 10 0 15 0 0 0 0 0 13 62 0 0 0 35 81 0 216 1061 6:45 PM 11 0 11 0 0 0 0 0 17 66 0 0 0 46 55 0 206 979 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 36 0 96 0 0 0 0 0 76 416 0 0 0 424 712 0 1760 Heavy Trucks 0 0 8 0 0 0 0 0 0 0 8 0 16 Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Valley Ave -- Cedar Creek Grade/Weems Ln QC JOB #: QC JOB #: 14990207 CITY/STATE: CITY/STATE: Winchester (city), VA DATE: DATE: Tue, May 28 2019 498 624 96 369 33 285 201 34 173 213 0.90.9 77 644 230 62 346 112 389 100 661 601 Peak-Hour: 7:30 AM -- 8:30 AMPeak-Hour: 7:30 AM -- 8:30 AM Peak 15-Min: 7:45 AM -- 8:00 AMPeak 15-Min: 7:45 AM -- 8:00 AM 5.6 5.8 11.5 4.3 3 9.8 5.5 8.8 10.4 2.8 13 4 3.9 8.1 2.9 6.3 5.7 3 4.5 5.3 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Valley Ave Valley Ave (Northbound)(Northbound) Valley Ave Valley Ave (Southbound)(Southbound) Cedar Creek Grade/Weems LnCedar Creek Grade/Weems Ln (Eastbound)(Eastbound) Cedar Creek Grade/Weems LnCedar Creek Grade/Weems Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 6:00 AM 11 23 7 0 3 17 9 0 11 14 17 0 3 7 1 0 123 6:15 AM 24 46 10 0 7 25 3 0 22 24 30 0 5 6 3 0 205 6:30 AM 20 47 11 0 1 29 12 0 41 37 41 0 7 11 7 0 264 6:45 AM 18 47 13 0 8 42 11 0 23 34 27 0 5 15 2 0 245 837 7:00 AM 15 59 14 0 4 48 26 0 38 31 38 0 11 20 2 0 306 1020 7:15 AM 27 86 25 0 10 67 22 0 31 44 34 0 7 13 7 0 373 1188 7:30 AM 27 83 19 0 5 98 20 0 45 51 60 0 13 24 5 0 450 1374 7:45 AM 26 113 22 0 6 106 29 0 57 61 71 0 16 15 8 0 530 1659 8:00 AM 33 104 25 0 13 94 27 0 62 44 51 0 16 12 11 0 492 1845 8:15 AM 26 89 34 0 9 71 20 0 37 57 48 0 17 26 10 0 444 1916 8:30 AM 25 82 33 0 6 63 29 0 40 37 43 0 23 28 9 0 418 1884 8:45 AM 26 101 32 0 8 81 27 0 40 62 71 0 18 27 12 0 505 1859 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 104 452 88 0 24 424 116 0 228 244 284 0 64 60 32 0 2120 Heavy Trucks 12 20 0 0 12 12 12 8 8 8 8 0 100 Pedestrians 4 0 0 0 4 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Valley Ave -- Cedar Creek Grade/Weems Ln QC JOB #: QC JOB #: 14990208 CITY/STATE: CITY/STATE: Winchester (city), VA DATE: DATE: Tue, May 28 2019 878 743 245 546 87 892 145 57 578 212 0.940.94 360 584 227 161 498 287 541 199 934 1027 Peak-Hour: 4:30 PM -- 5:30 PMPeak-Hour: 4:30 PM -- 5:30 PM Peak 15-Min: 5:15 PM -- 5:30 PMPeak 15-Min: 5:15 PM -- 5:30 PM 1.6 2.4 1.6 1.5 2.3 1.5 3.4 3.5 1.6 0.9 0.8 2.1 2.2 2.5 1.4 2.1 2 1.5 1.8 1.9 1 1 1 1 0 0 1 0 0 0 0 0 0 0 0 0 NA NA NA NA NA NA NA NA 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Valley Ave Valley Ave (Northbound)(Northbound) Valley Ave Valley Ave (Southbound)(Southbound) Cedar Creek Grade/Weems LnCedar Creek Grade/Weems Ln (Eastbound)(Eastbound) Cedar Creek Grade/Weems LnCedar Creek Grade/Weems Ln (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 62 138 46 0 13 100 33 0 28 48 36 0 28 71 19 0 622 4:15 PM 69 113 49 0 23 128 52 0 40 60 46 0 41 75 16 0 712 4:30 PM 66 138 43 0 23 130 48 0 34 52 65 0 43 67 13 0 722 4:45 PM 66 108 47 0 24 142 61 0 27 58 65 0 39 70 18 0 725 2781 5:00 PM 79 131 50 0 17 129 80 0 41 54 52 0 43 118 12 0 806 2965 5:15 PM 76 164 59 0 23 145 56 0 43 48 45 0 36 105 14 0 814 3067 5:30 PM 61 118 45 0 13 97 40 0 30 46 49 0 47 66 10 0 622 2967 5:45 PM 54 111 32 0 16 109 44 0 27 51 38 0 42 55 9 0 588 2830 6:00 PM 73 110 34 0 12 89 31 0 28 52 31 0 40 55 9 0 564 2588 6:15 PM 64 83 46 0 17 80 27 0 23 37 38 0 38 52 20 0 525 2299 6:30 PM 49 78 24 0 3 74 34 0 27 37 23 0 21 50 7 0 427 2104 6:45 PM 37 86 31 0 10 58 22 0 18 33 24 0 38 40 4 0 401 1917 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 304 656 236 0 92 580 224 0 172 192 180 0 144 420 56 0 3256 Heavy Trucks 4 12 4 4 12 4 0 0 0 4 4 4 52 Pedestrians 4 0 0 4 8 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Railroad Stopped Buses Comments: Report generated on 6/4/2019 1:33 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Appendix C Level of Service Description Greystone Properties, LLC Rezoning November 2019 Appendix C Kittelson & Associates, Inc. C1 APPENDIX C LEVEL-OF-SERVICE CONCEPT Level of service (LOS) is a concept developed to quantify the degree of comfort (including such elements as travel time, number of stops, total amount of stopped delay, and impediments caused by other vehicles) afforded to drivers as they travel through an intersection or roadway segment. Six grades are used to denote the various level of service from “A” to “F”.2 Signalized Intersections The six level-of-service grades are described qualitatively for signalized intersections in Table C1. Additionally, Table C2 identifies the relationship between level of service and average control delay per vehicle. Control delay is defined to include initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. Using this definition, Level of Service “D” is generally considered to represent the minimum acceptable design standard. Table C1 Level-of-Service Definitions (Signalized Intersections) Level of Service Average Delay per Vehicle A Very low average control delay, less than 10 seconds per vehicle. This occurs when progression is extremely favorable, and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. B Average control delay is greater than 10 seconds per vehicle and less than or equal to 20 seconds per vehicle. This generally occurs with good progression and/or short cycle lengths. More vehicles stop than for a level of service A, causing higher levels of average delay. C Average control delay is greater than 20 seconds per vehicle and less than or equal to 35 seconds per vehicle. These higher delays may result from fair progression and/or longer cycle lengths. Individual cycle failures may begin to appear at this level. The number of vehicles stopping is significant at this level, although many still pass through the intersection without stopping. D Average control delay is greater than 35 seconds per vehicle and less than or equal to 55 seconds per vehicle. The influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle length, or high volume/capacity ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. E Average control delay is greater than 55 seconds per vehicle and less than or equal to 80 seconds per vehicle. This is usually considered to be the limit of acceptable delay. These high delay values generally (but not always) indicate poor progression, long cycle lengths, and high volume/capacity ratios. Individual cycle failures are frequent occurrences. F Average control delay is in excess of 80 seconds per vehicle. This is considered to be unacceptable to most drivers. This condition often occurs with oversaturation. It may also occur at high volume/capacity ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also contribute to such high delay values. Most of the material in this Appendix is adapted from the Transportation Research Board, Highway Capacity Manual, (2000). 2 Most of the material in this Appendix is adapted from the Transportation Research Board, Highway Capacity Manual, (2010). Greystone Properties, LLC Rezoning November 2019 Appendix C Kittelson & Associates, Inc. C2 Table C2 Level-of-Service Criteria for Signalized Intersections Level of Service Average Control Delay per Vehicle (Seconds) A <10.0 B >10 and (20 C >20 and (35 D >35 and (55 E >55 and (80 F >80 Unsignalized Intersections Unsignalized intersections include two-way stop-controlled (TWSC) and all-way stop-controlled (AWSC) intersections. The 2010 Highway Capacity Manual (HCM) provides models for estimating control delay at both TWSC and AWSC intersections. A qualitative description of the various service levels associated with an unsignalized intersection is presented in Table C3. A quantitative definition of level of service for unsignalized intersections is presented in Table C4. Using this definition, Level of Service “E” is generally considered to represent the minimum acceptable design standard. Table C3 Level-of-Service Criteria for Unsignalized Intersections Level of Service Average Delay per Vehicle to Minor Street A • Nearly all drivers find freedom of operation. • Very seldom is there more than one vehicle in queue. B • Some drivers begin to consider the delay an inconvenience. • Occasionally there is more than one vehicle in queue. C • Many times there is more than one vehicle in queue. • Most drivers feel restricted, but not objectionably so. D • Often there is more than one vehicle in queue. • Drivers feel quite restricted. E • Represents a condition in which the demand is near or equal to the probable maximum number of vehicles that can be accommodated by the movement. • There is almost always more than one vehicle in queue. • Drivers find the delays approaching intolerable levels. F • Forced flow. • Represents an intersection failure condition that is caused by geometric and/or operational constraints external to the intersection. Greystone Properties, LLC Rezoning November 2019 Appendix C Kittelson & Associates, Inc. C3 Table C4 Level-of-Service Criteria for Unsignalized Intersections It should be noted that the level-of-service criteria for unsignalized intersections are somewhat different than the criteria used for signalized intersections. The primary reason for this difference is that drivers expect different levels of performance from different kinds of transportation facilities. The expectation is that a signalized intersection is designed to carry higher traffic volumes than an unsignalized intersection. Additionally, there are a number of driver behavior considerations that combine to make delays at signalized intersections less galling than at unsignalized intersections. For example, drivers at signalized intersections are able to relax during the red interval, while drivers on the minor street approaches to TWSC intersections must remain attentive to the task of identifying acceptable gaps and vehicle conflicts. Also, there is often much more variability in the amount of delay experienced by individual drivers at unsignalized intersections than signalized intersections. For these reasons, it is considered that the control delay threshold for any given level of service is less for an unsignalized intersection than for a signalized intersection. While overall intersection level of service is calculated for AWSC intersections, level of service is only calculated for the minor approaches and the major street left turn movements at TWSC intersections. No delay is assumed to the major street through movements. For TWSC intersections, the overall intersection level of service remains undefined: level of service is only calculated for each minor street lane. In the performance evaluation of TWSC intersections, it is important to consider other measures of effectiveness (MOEs) in addition to delay, such as v/c ratios for individual movements, average queue lengths, and 95th-percentile queue lengths. By focusing on a single MOE for the worst movement only, such as delay for the minor-street left turn, users may make inappropriate traffic control decisions. The potential for making such inappropriate decisions is likely to be particularly pronounced when the HCM level-of-service thresholds are adopted as legal standards, as is the case in many public agencies. Level of Service Average Control Delay per Vehicle (Seconds) A <10.0 B >10.0 and <15.0 C >15.0 and <25.0 D >25.0 and <35.0 E >35.0 and <50.0 F >50.0 Appendix D Existing Conditions Level of Service Worksheets Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - Existing Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 346 154 489 109 v/c Ratio 0.57 0.40 0.78 0.18 Control Delay 16.8 16.3 25.9 4.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 16.8 16.3 25.9 4.0 Queue Length 50th (ft) 72 33 115 0 Queue Length 95th (ft) 135 72 #276 25 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1572 1043 628 615 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.22 0.15 0.78 0.18 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - Existing Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 246 66 69 69 0 0 0 0 440 0 98 Future Volume (vph) 0 246 66 69 69 0 0 0 0 440 0 98 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.98 0.95 1.00 Satd. Flow (prot) 1810 1749 1736 1509 Flt Permitted 1.00 0.67 0.95 1.00 Satd. Flow (perm) 1810 1206 1736 1509 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 273 73 77 77 0 0 0 0 489 0 109 RTOR Reduction (vph) 0 20 0 0 0 0 0 0 0 0 0 70 Lane Group Flow (vph) 0 326 0 0 154 0 0 0 0 0 489 39 Heavy Vehicles (%) 0% 2% 2% 4% 8% 0% 0% 0% 0% 4% 0% 7% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 15.7 15.7 17.6 17.6 Effective Green, g (s) 15.7 15.7 17.6 17.6 Actuated g/C Ratio 0.32 0.32 0.36 0.36 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 584 389 628 546 v/s Ratio Prot c0.18 v/s Ratio Perm 0.13 0.28 0.03 v/c Ratio 0.56 0.40 0.78 0.07 Uniform Delay, d1 13.6 12.8 13.8 10.2 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.2 0.7 6.1 0.1 Delay (s) 14.8 13.4 19.8 10.2 Level of Service B B B B Approach Delay (s) 14.8 13.4 0.0 18.1 Approach LOS B B A B Intersection Summary HCM 2000 Control Delay 16.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.67 Actuated Cycle Length (s) 48.6 Sum of lost time (s) 15.3 Intersection Capacity Utilization 73.2% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday AM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - Existing Page 3 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 142 544 0 0 109 220 29 1 138 0 0 0 Future Vol, veh/h 142 544 0 0 109 220 29 1 138 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86 Heavy Vehicles, % 4 3 0 0 7 8 7 100 4 0 0 0 Mvmt Flow 165 633 0 0 127 256 34 1 160 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 383 0 - - - 0 1218 1346 633 Stage 1 - - - - - - 963 963 - Stage 2 - - - - - - 255 383 - Critical Hdwy 4.14 - - - - - 6.47 7.5 6.24 Critical Hdwy Stg 1 - - - - - - 5.47 6.5 - Critical Hdwy Stg 2 - - - - - - 5.47 6.5 - Follow-up Hdwy 2.236 - - - - - 3.563 4.9 3.336 Pot Cap-1 Maneuver 1165 - 0 0 - - 195 97 476 Stage 1 - - 0 0 - - 363 232 - Stage 2 - - 0 0 - - 776 472 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1165 - - - - - 152 0 476 Mov Cap-2 Maneuver - - - - - - 152 0 - Stage 1 - - - - - - 284 0 - Stage 2 - - - - - - 776 0 - Approach EB WB NB HCM Control Delay, s 1.8 0 16.4 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 476 1165 - - - HCM Lane V/C Ratio 0.34 0.142 - - - HCM Control Delay (s) 16.4 8.6 0 - - HCM Lane LOS C A A - - HCM 95th %tile Q(veh) 1.5 0.5 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - Existing Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 223 237 256 69 124 124 432 111 37 410 107 v/c Ratio 0.50 0.50 0.44 0.21 0.22 0.31 0.35 0.16 0.10 0.43 0.19 Control Delay 23.1 33.8 6.5 19.3 23.1 17.6 24.5 0.5 15.8 29.3 0.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.1 33.8 6.5 19.3 23.1 17.6 24.5 0.5 15.8 29.3 0.8 Queue Length 50th (ft) 86 118 0 24 22 41 103 0 12 102 0 Queue Length 95th (ft) 139 196 60 50 45 77 154 0 30 151 0 Internal Link Dist (ft) 875 740 538 478 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 449 478 586 365 629 412 1233 703 450 1025 575 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.50 0.50 0.44 0.19 0.20 0.30 0.35 0.16 0.08 0.40 0.19 Intersection Summary HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - Existing Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 201 213 230 62 77 34 112 389 100 33 369 96 Future Volume (vph) 201 213 230 62 77 34 112 389 100 33 369 96 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.95 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1703 1845 1532 1670 3081 1703 3406 1568 1752 3471 1442 Flt Permitted 0.49 1.00 1.00 0.61 1.00 0.39 1.00 1.00 0.50 1.00 1.00 Satd. Flow (perm) 870 1845 1532 1075 3081 703 3406 1568 923 3471 1442 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 223 237 256 69 86 38 124 432 111 37 410 107 RTOR Reduction (vph) 0 0 190 0 31 0 0 0 76 0 0 79 Lane Group Flow (vph) 223 237 66 69 93 0 124 432 35 37 410 28 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 6% 3% 4% 8% 13% 9% 6% 6% 3% 3% 4% 12% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 36.5 23.3 23.3 23.5 16.8 37.0 28.1 28.1 28.0 23.6 23.6 Effective Green, g (s) 36.5 23.3 23.3 23.5 16.8 37.0 28.1 28.1 28.0 23.6 23.6 Actuated g/C Ratio 0.41 0.26 0.26 0.26 0.19 0.41 0.31 0.31 0.31 0.26 0.26 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 475 477 396 324 575 387 1063 489 327 910 378 v/s Ratio Prot c0.07 c0.13 0.02 0.03 c0.03 0.01 c0.12 v/s Ratio Perm 0.12 0.04 0.04 0.10 c0.13 0.02 0.03 0.02 v/c Ratio 0.47 0.50 0.17 0.21 0.16 0.32 0.41 0.07 0.11 0.45 0.07 Uniform Delay, d1 18.6 28.4 25.8 25.6 30.7 17.1 24.4 21.8 21.8 27.8 25.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.7 0.8 0.2 0.3 0.1 0.5 1.2 0.3 0.2 1.6 0.4 Delay (s) 19.3 29.2 26.0 26.0 30.8 17.6 25.5 22.0 22.0 29.4 25.4 Level of Service B C C C C B C C C C C Approach Delay (s) 25.0 29.1 23.5 28.1 Approach LOS C C C C Intersection Summary HCM 2000 Control Delay 25.7 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.50 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 65.3% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - Existing Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 217 418 374 134 v/c Ratio 0.29 0.75 0.70 0.24 Control Delay 9.9 22.8 27.6 5.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 9.9 22.8 27.6 5.4 Queue Length 50th (ft) 39 113 99 0 Queue Length 95th (ft) 74 199 #274 37 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1422 1095 590 602 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.15 0.38 0.63 0.22 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - Existing Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 163 48 199 207 0 0 0 0 363 0 130 Future Volume (vph) 0 163 48 199 207 0 0 0 0 363 0 130 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.98 0.95 1.00 Satd. Flow (prot) 1773 1818 1770 1538 Flt Permitted 1.00 0.74 0.95 1.00 Satd. Flow (perm) 1773 1373 1770 1538 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow (vph) 0 168 49 205 213 0 0 0 0 374 0 134 RTOR Reduction (vph) 0 19 0 0 0 0 0 0 0 0 0 93 Lane Group Flow (vph) 0 198 0 0 418 0 0 0 0 0 374 41 Heavy Vehicles (%) 0% 5% 0% 2% 2% 0% 0% 0% 0% 2% 0% 5% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 22.0 22.0 16.3 16.3 Effective Green, g (s) 22.0 22.0 16.3 16.3 Actuated g/C Ratio 0.41 0.41 0.30 0.30 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 727 563 538 467 v/s Ratio Prot 0.11 v/s Ratio Perm c0.30 0.21 0.03 v/c Ratio 0.27 0.74 0.70 0.09 Uniform Delay, d1 10.5 13.4 16.5 13.3 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 5.3 3.9 0.1 Delay (s) 10.7 18.7 20.3 13.4 Level of Service B B C B Approach Delay (s) 10.7 18.7 0.0 18.5 Approach LOS B B A B Intersection Summary HCM 2000 Control Delay 17.1 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 53.6 Sum of lost time (s) 15.3 Intersection Capacity Utilization 73.8% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday PM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - Existing Page 3 Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 78 448 0 0 358 556 48 1 94 0 0 0 Future Vol, veh/h 78 448 0 0 358 556 48 1 94 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 6 1 0 0 1 1 4 100 3 0 0 0 Mvmt Flow 87 498 0 0 398 618 53 1 104 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 1016 0 - - - 0 1379 1688 498 Stage 1 - - - - - - 672 672 - Stage 2 - - - - - - 707 1016 - Critical Hdwy 4.16 - - - - - 6.44 7.5 6.23 Critical Hdwy Stg 1 - - - - - - 5.44 6.5 - Critical Hdwy Stg 2 - - - - - - 5.44 6.5 - Follow-up Hdwy 2.254 - - - - - 3.536 4.9 3.327 Pot Cap-1 Maneuver 667 - 0 0 - - 158 56 570 Stage 1 - - 0 0 - - 504 333 - Stage 2 - - 0 0 - - 485 217 - Platoon blocked, % - - - Mov Cap-1 Maneuver 667 - - - - - 130 0 570 Mov Cap-2 Maneuver - - - - - - 130 0 - Stage 1 - - - - - - 413 0 - Stage 2 - - - - - - 485 0 - Approach EB WB NB HCM Control Delay, s 1.7 0 12.7 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 570 667 - - - HCM Lane V/C Ratio 0.185 0.13 - - - HCM Control Delay (s) 12.7 11.2 0 - - HCM Lane LOS B B A - - HCM 95th %tile Q(veh) 0.7 0.4 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - Existing Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 154 226 241 171 444 305 576 212 93 581 261 v/c Ratio 0.55 0.70 0.51 0.55 0.70 0.71 0.39 0.27 0.22 0.47 0.36 Control Delay 33.4 54.2 8.4 33.0 47.2 30.5 25.6 3.0 15.9 29.9 4.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 33.4 54.2 8.4 33.0 47.2 30.5 25.6 3.0 15.9 29.9 4.6 Queue Length 50th (ft) 77 153 0 87 152 118 154 0 31 182 0 Queue Length 95th (ft) 124 224 60 136 198 #284 223 35 63 214 53 Internal Link Dist (ft) 875 704 493 593 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 290 401 528 320 756 428 1472 800 566 1324 755 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.53 0.56 0.46 0.53 0.59 0.71 0.39 0.27 0.16 0.44 0.35 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - Existing Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - Existing Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 145 212 227 161 360 57 287 541 199 87 546 245 Future Volume (vph) 145 212 227 161 360 57 287 541 199 87 546 245 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1752 1881 1561 1752 3486 1770 3539 1583 1770 3539 1583 Flt Permitted 0.33 1.00 1.00 0.39 1.00 0.30 1.00 1.00 0.43 1.00 1.00 Satd. Flow (perm) 606 1881 1561 722 3486 560 3539 1583 802 3539 1583 Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 154 226 241 171 383 61 305 576 212 93 581 261 RTOR Reduction (vph) 0 0 199 0 12 0 0 0 127 0 0 170 Lane Group Flow (vph) 154 226 42 171 432 0 305 576 85 93 581 91 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 3% 1% 2% 3% 1% 4% 2% 2% 2% 2% 2% 2% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 30.3 19.0 19.0 31.5 19.6 57.5 44.3 44.3 45.7 38.4 38.4 Effective Green, g (s) 30.3 19.0 19.0 31.5 19.6 57.5 44.3 44.3 45.7 38.4 38.4 Actuated g/C Ratio 0.28 0.17 0.17 0.29 0.18 0.52 0.40 0.40 0.42 0.35 0.35 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 284 324 269 318 621 437 1425 637 397 1235 552 v/s Ratio Prot 0.06 0.12 c0.06 c0.12 c0.08 0.02 0.16 v/s Ratio Perm 0.09 0.03 0.10 c0.28 0.16 0.05 0.08 0.06 v/c Ratio 0.54 0.70 0.15 0.54 0.70 0.70 0.40 0.13 0.23 0.47 0.17 Uniform Delay, d1 31.9 42.8 38.7 31.3 42.4 16.5 23.4 20.7 19.8 27.9 24.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.1 6.4 0.3 1.7 3.4 4.8 0.9 0.4 0.3 1.3 0.6 Delay (s) 34.0 49.2 38.9 33.1 45.8 21.3 24.3 21.2 20.1 29.2 25.4 Level of Service C D D C D C C C C C C Approach Delay (s) 41.5 42.2 22.9 27.2 Approach LOS D D C C Intersection Summary HCM 2000 Control Delay 31.3 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.71 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Appendix E 2027 Background Traffic Conditions Level of Service Worksheets Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Background Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 366 164 517 115 v/c Ratio 0.60 0.44 0.83 0.19 Control Delay 17.2 17.1 29.7 4.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 17.2 17.1 29.7 4.0 Queue Length 50th (ft) 77 36 124 0 Queue Length 95th (ft) 144 78 #304 26 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1562 992 624 616 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.23 0.17 0.83 0.19 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Background Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 266 71 75 75 0 0 0 0 476 0 106 Future Volume (vph) 0 266 71 75 75 0 0 0 0 476 0 106 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.98 0.95 1.00 Satd. Flow (prot) 1810 1749 1736 1509 Flt Permitted 1.00 0.64 0.95 1.00 Satd. Flow (perm) 1810 1153 1736 1509 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 289 77 82 82 0 0 0 0 517 0 115 RTOR Reduction (vph) 0 20 0 0 0 0 0 0 0 0 0 74 Lane Group Flow (vph) 0 346 0 0 164 0 0 0 0 0 517 41 Heavy Vehicles (%) 0% 2% 2% 4% 8% 0% 0% 0% 0% 4% 0% 7% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 16.0 16.0 17.6 17.6 Effective Green, g (s) 16.0 16.0 17.6 17.6 Actuated g/C Ratio 0.33 0.33 0.36 0.36 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 592 377 624 543 v/s Ratio Prot c0.19 v/s Ratio Perm 0.14 0.30 0.03 v/c Ratio 0.59 0.44 0.83 0.08 Uniform Delay, d1 13.7 12.9 14.3 10.3 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.5 0.8 8.9 0.1 Delay (s) 15.2 13.7 23.2 10.4 Level of Service B B C B Approach Delay (s) 15.2 13.7 0.0 20.8 Approach LOS B B A C Intersection Summary HCM 2000 Control Delay 18.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.71 Actuated Cycle Length (s) 48.9 Sum of lost time (s) 15.3 Intersection Capacity Utilization 76.5% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday AM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Background Page 3 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 154 589 0 0 118 238 31 1 149 0 0 0 Future Vol, veh/h 154 589 0 0 118 238 31 1 149 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 4 3 0 0 7 8 7 100 4 0 0 0 Mvmt Flow 167 640 0 0 128 259 34 1 162 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 387 0 - - - 0 1232 1361 640 Stage 1 - - - - - - 974 974 - Stage 2 - - - - - - 258 387 - Critical Hdwy 4.14 - - - - - 6.47 7.5 6.24 Critical Hdwy Stg 1 - - - - - - 5.47 6.5 - Critical Hdwy Stg 2 - - - - - - 5.47 6.5 - Follow-up Hdwy 2.236 - - - - - 3.563 4.9 3.336 Pot Cap-1 Maneuver 1161 - 0 0 - - 191 95 472 Stage 1 - - 0 0 - - 358 228 - Stage 2 - - 0 0 - - 774 470 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1161 - - - - - 148 0 472 Mov Cap-2 Maneuver - - - - - - 148 0 - Stage 1 - - - - - - 278 0 - Stage 2 - - - - - - 774 0 - Approach EB WB NB HCM Control Delay, s 1.8 0 16.6 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 472 1161 - - - HCM Lane V/C Ratio 0.345 0.144 - - - HCM Control Delay (s) 16.6 8.6 0 - - HCM Lane LOS C A A - - HCM 95th %tile Q(veh) 1.5 0.5 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Background Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 237 251 271 73 130 132 458 117 39 435 113 v/c Ratio 0.52 0.53 0.45 0.22 0.23 0.34 0.38 0.17 0.10 0.46 0.21 Control Delay 24.1 34.7 6.6 19.5 23.1 18.0 24.8 0.5 15.8 29.9 0.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 24.1 34.7 6.6 19.5 23.1 18.0 24.8 0.5 15.8 29.9 0.9 Queue Length 50th (ft) 91 126 0 25 23 44 112 0 12 110 0 Queue Length 95th (ft) 150 212 62 53 47 80 162 0 30 157 0 Internal Link Dist (ft) 875 769 569 535 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 452 478 598 364 631 397 1221 698 439 1013 571 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.52 0.53 0.45 0.20 0.21 0.33 0.38 0.17 0.09 0.43 0.20 Intersection Summary HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Background Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 218 231 249 67 83 37 121 421 108 36 400 104 Future Volume (vph) 218 231 249 67 83 37 121 421 108 36 400 104 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.95 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1703 1845 1532 1670 3081 1703 3406 1568 1752 3471 1442 Flt Permitted 0.49 1.00 1.00 0.60 1.00 0.37 1.00 1.00 0.49 1.00 1.00 Satd. Flow (perm) 872 1845 1532 1061 3081 655 3406 1568 900 3471 1442 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 237 251 271 73 90 40 132 458 117 39 435 113 RTOR Reduction (vph) 0 0 201 0 32 0 0 0 81 0 0 84 Lane Group Flow (vph) 237 251 70 73 98 0 132 458 36 39 435 29 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 6% 3% 4% 8% 13% 9% 6% 6% 3% 3% 4% 12% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 36.7 23.4 23.4 23.9 17.0 36.9 27.8 27.8 27.5 23.1 23.1 Effective Green, g (s) 36.7 23.4 23.4 23.9 17.0 36.9 27.8 27.8 27.5 23.1 23.1 Actuated g/C Ratio 0.41 0.26 0.26 0.27 0.19 0.41 0.31 0.31 0.31 0.26 0.26 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 478 479 398 328 581 374 1052 484 316 890 370 v/s Ratio Prot c0.07 c0.14 0.02 0.03 c0.04 0.01 c0.13 v/s Ratio Perm 0.13 0.05 0.04 0.11 c0.13 0.02 0.03 0.02 v/c Ratio 0.50 0.52 0.18 0.22 0.17 0.35 0.44 0.07 0.12 0.49 0.08 Uniform Delay, d1 18.6 28.5 25.8 25.4 30.6 17.3 24.8 22.0 22.2 28.4 25.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.8 1.0 0.2 0.3 0.1 0.6 1.3 0.3 0.2 1.9 0.4 Delay (s) 19.4 29.6 26.0 25.7 30.7 17.9 26.1 22.3 22.4 30.3 25.8 Level of Service B C C C C B C C C C C Approach Delay (s) 25.1 28.9 24.0 28.9 Approach LOS C C C C Intersection Summary HCM 2000 Control Delay 26.1 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.53 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 66.7% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - 2027 Background Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 236 453 405 145 v/c Ratio 0.31 0.80 0.74 0.25 Control Delay 10.0 25.5 31.2 5.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 10.0 25.5 31.2 5.6 Queue Length 50th (ft) 43 127 119 0 Queue Length 95th (ft) 79 221 #334 40 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1331 1011 552 579 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.18 0.45 0.73 0.25 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - 2027 Background Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 177 52 215 224 0 0 0 0 393 0 141 Future Volume (vph) 0 177 52 215 224 0 0 0 0 393 0 141 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.98 0.95 1.00 Satd. Flow (prot) 1773 1818 1770 1538 Flt Permitted 1.00 0.73 0.95 1.00 Satd. Flow (perm) 1773 1356 1770 1538 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow (vph) 0 182 54 222 231 0 0 0 0 405 0 145 RTOR Reduction (vph) 0 19 0 0 0 0 0 0 0 0 0 100 Lane Group Flow (vph) 0 217 0 0 453 0 0 0 0 0 405 45 Heavy Vehicles (%) 0% 5% 0% 2% 2% 0% 0% 0% 0% 2% 0% 5% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 24.1 24.1 17.8 17.8 Effective Green, g (s) 24.1 24.1 17.8 17.8 Actuated g/C Ratio 0.42 0.42 0.31 0.31 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 747 571 550 478 v/s Ratio Prot 0.12 v/s Ratio Perm c0.33 0.23 0.03 v/c Ratio 0.29 0.79 0.74 0.09 Uniform Delay, d1 10.9 14.4 17.6 14.0 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 7.5 5.1 0.1 Delay (s) 11.1 21.8 22.7 14.1 Level of Service B C C B Approach Delay (s) 11.1 21.8 0.0 20.4 Approach LOS B C A C Intersection Summary HCM 2000 Control Delay 19.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.77 Actuated Cycle Length (s) 57.2 Sum of lost time (s) 15.3 Intersection Capacity Utilization 77.3% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday PM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - 2027 Background Page 3 Intersection Int Delay, s/veh 1.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 84 485 0 0 388 602 52 1 102 0 0 0 Future Vol, veh/h 84 485 0 0 388 602 52 1 102 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 6 1 0 0 1 1 4 0 3 0 0 0 Mvmt Flow 91 527 0 0 422 654 57 1 111 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 1076 0 - - - 0 1458 1785 527 Stage 1 - - - - - - 709 709 - Stage 2 - - - - - - 749 1076 - Critical Hdwy 4.16 - - - - - 6.44 6.5 6.23 Critical Hdwy Stg 1 - - - - - - 5.44 5.5 - Critical Hdwy Stg 2 - - - - - - 5.44 5.5 - Follow-up Hdwy 2.254 - - - - - 3.536 4 3.327 Pot Cap-1 Maneuver 633 - 0 0 - - 141 82 549 Stage 1 - - 0 0 - - 484 440 - Stage 2 - - 0 0 - - 464 298 - Platoon blocked, % - - - Mov Cap-1 Maneuver 633 - - - - - 112 0 549 Mov Cap-2 Maneuver - - - - - - 112 0 - Stage 1 - - - - - - 386 0 - Stage 2 - - - - - - 464 0 - Approach EB WB NB HCM Control Delay, s 1.7 0 13.2 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 549 633 - - - HCM Lane V/C Ratio 0.204 0.144 - - - HCM Control Delay (s) 13.2 11.6 0 - - HCM Lane LOS B B A - - HCM 95th %tile Q(veh) 0.8 0.5 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - 2027 Background Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 167 245 262 185 481 331 623 229 100 629 282 v/c Ratio 0.60 0.72 0.53 0.60 0.74 0.82 0.46 0.30 0.26 0.54 0.39 Control Delay 35.2 55.0 8.7 34.6 48.1 40.6 28.1 4.0 16.8 31.8 4.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 35.2 55.0 8.7 34.6 48.1 40.6 28.1 4.0 16.8 31.8 4.7 Queue Length 50th (ft) 82 164 0 92 163 137 176 0 36 196 0 Queue Length 95th (ft) 134 243 67 147 215 #352 243 45 66 233 55 Internal Link Dist (ft) 875 689 473 563 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 285 401 539 315 756 406 1350 754 521 1286 755 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.59 0.61 0.49 0.59 0.64 0.82 0.46 0.30 0.19 0.49 0.37 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - 2027 Background Greystone Properties, LLC Rezoning Synchro 10 Report Weekday PM - 2027 Background Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 157 230 246 174 390 62 311 586 215 94 591 265 Future Volume (vph) 157 230 246 174 390 62 311 586 215 94 591 265 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1752 1881 1561 1752 3486 1770 3539 1583 1770 3539 1583 Flt Permitted 0.29 1.00 1.00 0.36 1.00 0.27 1.00 1.00 0.39 1.00 1.00 Satd. Flow (perm) 534 1881 1561 670 3486 494 3539 1583 718 3539 1583 Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 167 245 262 185 415 66 331 623 229 100 629 282 RTOR Reduction (vph) 0 0 215 0 12 0 0 0 142 0 0 188 Lane Group Flow (vph) 167 245 47 185 469 0 331 623 87 100 629 94 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 3% 1% 2% 3% 1% 4% 2% 2% 2% 2% 2% 2% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 31.4 19.8 19.8 32.2 20.2 56.2 42.0 42.0 45.2 36.5 36.5 Effective Green, g (s) 31.4 19.8 19.8 32.2 20.2 56.2 42.0 42.0 45.2 36.5 36.5 Actuated g/C Ratio 0.29 0.18 0.18 0.29 0.18 0.51 0.38 0.38 0.41 0.33 0.33 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 280 338 280 314 640 417 1351 604 378 1174 525 v/s Ratio Prot 0.06 0.13 c0.06 c0.13 c0.10 0.02 0.18 v/s Ratio Perm 0.11 0.03 0.11 c0.30 0.18 0.06 0.09 0.06 v/c Ratio 0.60 0.72 0.17 0.59 0.73 0.79 0.46 0.14 0.26 0.54 0.18 Uniform Delay, d1 31.4 42.5 38.1 31.1 42.4 18.0 25.5 22.2 20.3 29.9 26.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.4 7.5 0.3 2.8 4.3 10.0 1.1 0.5 0.4 1.8 0.7 Delay (s) 34.8 50.0 38.4 33.9 46.7 28.0 26.6 22.8 20.6 31.6 26.8 Level of Service C D D C D C C C C C C Approach Delay (s) 41.7 43.1 26.3 29.2 Approach LOS D D C C Intersection Summary HCM 2000 Control Delay 33.2 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.78 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 79.6% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Appendix F 2027 Total Traffic Conditions Level of Service Worksheets Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 366 188 524 115 v/c Ratio 0.60 0.52 0.84 0.19 Control Delay 17.2 19.2 30.7 4.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 17.2 19.2 30.7 4.0 Queue Length 50th (ft) 77 42 127 0 Queue Length 95th (ft) 144 91 #310 26 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1562 957 624 616 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.23 0.20 0.84 0.19 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 266 71 97 76 0 0 0 0 482 0 106 Future Volume (vph) 0 266 71 97 76 0 0 0 0 482 0 106 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.97 0.95 1.00 Satd. Flow (prot) 1810 1748 1736 1509 Flt Permitted 1.00 0.62 0.95 1.00 Satd. Flow (perm) 1810 1112 1736 1509 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 289 77 105 83 0 0 0 0 524 0 115 RTOR Reduction (vph) 0 20 0 0 0 0 0 0 0 0 0 74 Lane Group Flow (vph) 0 346 0 0 188 0 0 0 0 0 524 41 Heavy Vehicles (%) 0% 2% 2% 4% 8% 0% 0% 0% 0% 4% 0% 7% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 16.0 16.0 17.6 17.6 Effective Green, g (s) 16.0 16.0 17.6 17.6 Actuated g/C Ratio 0.33 0.33 0.36 0.36 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 592 363 624 543 v/s Ratio Prot c0.19 v/s Ratio Perm 0.17 0.30 0.03 v/c Ratio 0.59 0.52 0.84 0.08 Uniform Delay, d1 13.7 13.3 14.4 10.3 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.5 1.2 9.7 0.1 Delay (s) 15.2 14.6 24.1 10.4 Level of Service B B C B Approach Delay (s) 15.2 14.6 0.0 21.6 Approach LOS B B A C Intersection Summary HCM 2000 Control Delay 18.5 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72 Actuated Cycle Length (s) 48.9 Sum of lost time (s) 15.3 Intersection Capacity Utilization 76.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 3 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 154 595 0 0 142 256 31 1 157 0 0 0 Future Vol, veh/h 154 595 0 0 142 256 31 1 157 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 4 3 0 0 7 8 7 100 4 0 0 0 Mvmt Flow 167 647 0 0 154 278 34 1 171 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 432 0 - - - 0 1274 1413 647 Stage 1 - - - - - - 981 981 - Stage 2 - - - - - - 293 432 - Critical Hdwy 4.14 - - - - - 6.47 7.5 6.24 Critical Hdwy Stg 1 - - - - - - 5.47 6.5 - Critical Hdwy Stg 2 - - - - - - 5.47 6.5 - Follow-up Hdwy 2.236 - - - - - 3.563 4.9 3.336 Pot Cap-1 Maneuver 1117 - 0 0 - - 180 87 467 Stage 1 - - 0 0 - - 356 226 - Stage 2 - - 0 0 - - 746 445 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1117 - - - - - 138 0 467 Mov Cap-2 Maneuver - - - - - - 138 0 - Stage 1 - - - - - - 273 0 - Stage 2 - - - - - - 746 0 - Approach EB WB NB HCM Control Delay, s 1.8 0 17.1 HCM LOS C Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 467 1117 - - - HCM Lane V/C Ratio 0.368 0.15 - - - HCM Control Delay (s) 17.1 8.8 0 - - HCM Lane LOS C A A - - HCM 95th %tile Q(veh) 1.7 0.5 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 262 276 303 73 139 142 458 117 39 435 122 v/c Ratio 0.57 0.56 0.48 0.23 0.24 0.38 0.39 0.17 0.11 0.48 0.23 Control Delay 25.1 35.2 6.5 19.3 23.5 18.8 25.3 0.5 16.1 30.7 1.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 25.1 35.2 6.5 19.3 23.5 18.8 25.3 0.5 16.1 30.7 1.0 Queue Length 50th (ft) 101 138 0 25 25 49 113 0 13 113 0 Queue Length 95th (ft) 167 #249 67 53 51 85 162 0 30 157 0 Internal Link Dist (ft) 875 674 518 611 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 458 493 632 362 632 389 1201 690 430 996 564 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.57 0.56 0.48 0.20 0.22 0.37 0.38 0.17 0.09 0.44 0.22 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 241 254 279 67 91 37 131 421 108 36 400 112 Future Volume (vph) 241 254 279 67 91 37 131 421 108 36 400 112 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.96 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1703 1845 1532 1670 3088 1703 3406 1568 1752 3471 1442 Flt Permitted 0.47 1.00 1.00 0.59 1.00 0.36 1.00 1.00 0.49 1.00 1.00 Satd. Flow (perm) 844 1845 1532 1037 3088 639 3406 1568 900 3471 1442 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 262 276 303 73 99 40 142 458 117 39 435 122 RTOR Reduction (vph) 0 0 222 0 32 0 0 0 82 0 0 92 Lane Group Flow (vph) 262 276 81 73 107 0 142 458 35 39 435 30 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 6% 3% 4% 8% 13% 9% 6% 6% 3% 3% 4% 12% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 37.9 24.1 24.1 23.9 17.1 36.5 27.2 27.2 26.7 22.3 22.3 Effective Green, g (s) 37.9 24.1 24.1 23.9 17.1 36.5 27.2 27.2 26.7 22.3 22.3 Actuated g/C Ratio 0.42 0.27 0.27 0.27 0.19 0.41 0.30 0.30 0.30 0.25 0.25 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 487 494 410 323 586 369 1029 473 308 860 357 v/s Ratio Prot c0.08 c0.15 0.02 0.03 c0.04 0.01 c0.13 v/s Ratio Perm 0.14 0.05 0.04 0.12 c0.13 0.02 0.03 0.02 v/c Ratio 0.54 0.56 0.20 0.23 0.18 0.38 0.45 0.07 0.13 0.51 0.08 Uniform Delay, d1 18.2 28.4 25.5 25.4 30.6 17.7 25.3 22.4 22.8 29.1 26.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.1 1.4 0.2 0.4 0.2 0.7 1.4 0.3 0.2 2.1 0.5 Delay (s) 19.3 29.7 25.7 25.7 30.7 18.4 26.7 22.7 23.0 31.2 26.5 Level of Service B C C C C B C C C C C Approach Delay (s) 25.0 29.0 24.4 29.7 Approach LOS C C C C Intersection Summary HCM 2000 Control Delay 26.4 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 90.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 68.5% ICU Level of Service C Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 4: Cedar Creek Road & Greystone Weekday AM - 2027 Total Greystone Properties, LLC Rezoning Synchro 10 Report Weekday AM - 2027 Total Page 6 Intersection Int Delay, s/veh 2.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 14 731 309 26 77 42 Future Vol, veh/h 14 731 309 26 77 42 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 150 - - 150 0 200 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 3 10 0 0 0 Mvmt Flow 15 795 336 28 84 46 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 364 0 - 0 1161 336 Stage 1 - - - - 336 - Stage 2 - - - - 825 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 1206 - - - 218 711 Stage 1 - - - - 728 - Stage 2 - - - - 434 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1206 - - - 215 711 Mov Cap-2 Maneuver - - - - 215 - Stage 1 - - - - 719 - Stage 2 - - - - 434 - Approach EB WB SB HCM Control Delay, s 0.2 0 24.4 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity (veh/h) 1206 - - - 215 711 HCM Lane V/C Ratio 0.013 - - - 0.389 0.064 HCM Control Delay (s) 8 - - - 32 10.4 HCM Lane LOS A - - - D B HCM 95th %tile Q(veh) 0 - - - 1.7 0.2 Queues Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 1 Lane Group EBT WBT SBT SBR Lane Group Flow (vph) 238 468 424 145 v/c Ratio 0.31 0.81 0.79 0.25 Control Delay 9.7 26.3 34.8 5.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 9.7 26.3 34.8 5.8 Queue Length 50th (ft) 44 134 131 0 Queue Length 95th (ft) 79 232 #371 42 Internal Link Dist (ft) 1629 565 753 Turn Bay Length (ft) 650 Base Capacity (vph) 1304 981 540 570 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.18 0.48 0.79 0.25 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 1: Route 37 SB Ramps & Cedar Creek Grade Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 178 52 229 225 0 0 0 0 411 0 141 Future Volume (vph) 0 178 52 229 225 0 0 0 0 411 0 141 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.9 7.9 7.4 7.4 Lane Util. Factor 1.00 1.00 1.00 1.00 Frt 0.97 1.00 1.00 0.85 Flt Protected 1.00 0.98 0.95 1.00 Satd. Flow (prot) 1773 1817 1770 1538 Flt Permitted 1.00 0.72 0.95 1.00 Satd. Flow (perm) 1773 1344 1770 1538 Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Adj. Flow (vph) 0 184 54 236 232 0 0 0 0 424 0 145 RTOR Reduction (vph) 0 18 0 0 0 0 0 0 0 0 0 100 Lane Group Flow (vph) 0 220 0 0 468 0 0 0 0 0 424 45 Heavy Vehicles (%) 0% 5% 0% 2% 2% 0% 0% 0% 0% 2% 0% 5% Turn Type NA Perm NA Perm NA Perm Protected Phases 6 2 4 Permitted Phases 2 4 4 Actuated Green, G (s) 25.2 25.2 18.0 18.0 Effective Green, g (s) 25.2 25.2 18.0 18.0 Actuated g/C Ratio 0.43 0.43 0.31 0.31 Clearance Time (s) 7.9 7.9 7.4 7.4 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 763 578 544 473 v/s Ratio Prot 0.12 v/s Ratio Perm c0.35 0.24 0.03 v/c Ratio 0.29 0.81 0.78 0.09 Uniform Delay, d1 10.8 14.6 18.4 14.4 Progression Factor 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 8.2 7.0 0.1 Delay (s) 11.0 22.8 25.4 14.5 Level of Service B C C B Approach Delay (s) 11.0 22.8 0.0 22.6 Approach LOS B C A C Intersection Summary HCM 2000 Control Delay 20.5 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.80 Actuated Cycle Length (s) 58.5 Sum of lost time (s) 15.3 Intersection Capacity Utilization 79.1% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 2: Route 37 NB Ramps & Cedar Creek Grade Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 3 Intersection Int Delay, s/veh 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 84 504 0 0 401 612 52 1 124 0 0 0 Future Vol, veh/h 84 504 0 0 401 612 52 1 124 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Free Free Free RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 6 1 0 0 1 1 4 0 3 0 0 0 Mvmt Flow 91 548 0 0 436 665 57 1 135 0 0 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 1101 0 - - - 0 1499 1831 548 Stage 1 - - - - - - 730 730 - Stage 2 - - - - - - 769 1101 - Critical Hdwy 4.16 - - - - - 6.44 6.5 6.23 Critical Hdwy Stg 1 - - - - - - 5.44 5.5 - Critical Hdwy Stg 2 - - - - - - 5.44 5.5 - Follow-up Hdwy 2.254 - - - - - 3.536 4 3.327 Pot Cap-1 Maneuver 619 - 0 0 - - 133 77 534 Stage 1 - - 0 0 - - 473 431 - Stage 2 - - 0 0 - - 454 290 - Platoon blocked, % - - - Mov Cap-1 Maneuver 619 - - - - - 105 0 534 Mov Cap-2 Maneuver - - - - - - 105 0 - Stage 1 - - - - - - 373 0 - Stage 2 - - - - - - 454 0 - Approach EB WB NB HCM Control Delay, s 1.7 0 14 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBL EBT WBT WBR Capacity (veh/h) 534 619 - - - HCM Lane V/C Ratio 0.254 0.148 - - - HCM Control Delay (s) 14 11.8 0 - - HCM Lane LOS B B A - - HCM 95th %tile Q(veh) 1 0.5 - - - Queues Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 4 Lane Group EBL EBT EBR WBL WBT NBL NBT NBR SBL SBT SBR Lane Group Flow (vph) 182 259 280 185 505 362 623 229 100 629 307 v/c Ratio 0.66 0.74 0.54 0.60 0.77 0.88 0.47 0.31 0.27 0.58 0.44 Control Delay 37.9 55.4 8.6 34.6 49.3 49.3 28.6 4.0 17.2 33.9 4.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 37.9 55.4 8.6 34.6 49.3 49.3 28.6 4.0 17.2 33.9 4.9 Queue Length 50th (ft) 89 173 0 91 173 155 178 0 36 195 0 Queue Length 95th (ft) #147 257 69 147 226 #426 243 45 66 233 57 Internal Link Dist (ft) 875 695 546 589 Turn Bay Length (ft) 370 340 235 370 350 Base Capacity (vph) 282 401 553 311 756 410 1330 746 514 1286 771 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.65 0.65 0.51 0.59 0.67 0.88 0.47 0.31 0.19 0.49 0.40 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. HCM Signalized Intersection Capacity Analysis Greystone Properties, LLC Rezoning 3: Valley Ave & Cedar Creek Grade/Weems Ln Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 171 243 263 174 413 62 340 586 215 94 591 289 Future Volume (vph) 171 243 263 174 413 62 340 586 215 94 591 289 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1752 1881 1561 1752 3491 1770 3539 1583 1770 3539 1583 Flt Permitted 0.26 1.00 1.00 0.35 1.00 0.24 1.00 1.00 0.41 1.00 1.00 Satd. Flow (perm) 480 1881 1561 641 3491 447 3539 1583 756 3539 1583 Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 182 259 280 185 439 66 362 623 229 100 629 307 RTOR Reduction (vph) 0 0 228 0 11 0 0 0 143 0 0 212 Lane Group Flow (vph) 182 259 52 185 494 0 362 623 86 100 629 95 Confl. Peds. (#/hr) 2 2 Heavy Vehicles (%) 3% 1% 2% 3% 1% 4% 2% 2% 2% 2% 2% 2% Turn Type pm+pt NA Perm pm+pt NA custom NA custom pm+pt NA Perm Protected Phases 7 4 3 8 5 1 6 Permitted Phases 4 4 8 2 2 2 6 6 Actuated Green, G (s) 32.3 20.4 20.4 32.3 20.4 57.2 41.4 41.4 42.7 33.9 33.9 Effective Green, g (s) 32.3 20.4 20.4 32.3 20.4 57.2 41.4 41.4 42.7 33.9 33.9 Actuated g/C Ratio 0.29 0.19 0.19 0.29 0.19 0.52 0.38 0.38 0.39 0.31 0.31 Clearance Time (s) 7.0 6.5 6.5 7.0 6.5 7.0 7.0 7.0 7.0 7.0 7.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 278 348 289 308 647 428 1331 595 374 1090 487 v/s Ratio Prot c0.07 0.14 0.06 c0.14 c0.13 0.02 0.18 v/s Ratio Perm 0.12 0.03 0.11 c0.31 0.18 0.05 0.08 0.06 v/c Ratio 0.65 0.74 0.18 0.60 0.76 0.85 0.47 0.14 0.27 0.58 0.19 Uniform Delay, d1 31.1 42.3 37.7 31.1 42.5 18.5 26.0 22.6 21.8 32.0 28.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 5.5 8.4 0.3 3.3 5.3 14.2 1.2 0.5 0.4 2.2 0.9 Delay (s) 36.5 50.7 38.0 34.4 47.8 32.7 27.1 23.1 22.2 34.2 28.9 Level of Service D D D C D C C C C C C Approach Delay (s) 42.2 44.2 28.0 31.5 Approach LOS D D C C Intersection Summary HCM 2000 Control Delay 34.9 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.83 Actuated Cycle Length (s) 110.0 Sum of lost time (s) 27.5 Intersection Capacity Utilization 81.5% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group HCM 2010 TWSC Greystone Properties, LLC Rezoning 4: Cedar Creek Grade & Greystone Weekday PM - 2027 Total 09/27/2019 Synchro 10 Report Weekday PM - 2027 Total Page 6 Intersection Int Delay, s/veh 2.9 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 41 585 966 76 45 24 Future Vol, veh/h 41 585 966 76 45 24 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length 150 - - 150 0 200 Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 2 2 0 0 0 Mvmt Flow 45 636 1050 83 49 26 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1133 0 - 0 1776 1050 Stage 1 - - - - 1050 - Stage 2 - - - - 726 - Critical Hdwy 4.1 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.2 - - - 3.5 3.3 Pot Cap-1 Maneuver 624 - - - 92 278 Stage 1 - - - - 340 - Stage 2 - - - - 483 - Platoon blocked, % - - - Mov Cap-1 Maneuver 624 - - - 85 278 Mov Cap-2 Maneuver - - - - 85 - Stage 1 - - - - 316 - Stage 2 - - - - 483 - Approach EB WB SB HCM Control Delay, s 0.7 0 67.8 HCM LOS F Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2 Capacity (veh/h) 624 - - - 85 278 HCM Lane V/C Ratio 0.071 - - - 0.575 0.094 HCM Control Delay (s) 11.2 - - - 93.6 19.3 HCM Lane LOS B - - - F C HCM 95th %tile Q(veh) 0.2 - - - 2.6 0.3