HomeMy WebLinkAbout10-21 BOS Staff ReportCONDITIONAL USE PERMIT #10-21
David Hermens Wireless Telecommunication Tower
Staff Report for the Board of Supervisors
Prepared: January 27, 2022
Staff Contact: Mark Cheran, Zoning Administrator
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on
this request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 10/20/21 Recommended Denial
Board of Supervisors: 11/10/21 Tabled for 90 Days
Board of Supervisors: 02/09/22 Pending
EXECUTIVE SUMMARY:
This is a request for a Conditional Use Permit (CUP) to allow for a 90-foot wireless
telecommunication tower located at 101 Greenway Court, Winchester, in the Back Creek
Magisterial District. The subject tower was constructed without an approved CUP and therefore
is a violation of the Zoning Ordinance. The Applicant is seeking approval of this CUP to abate
the zoning violation. This application was postponed from the Board of Supervisors November
10, 2021 meeting to the February 9, 2022 meeting.
Should the Board of Supervisors find the use to be appropriate, Staff would suggest the
following conditions:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
4. Any expansion or modification of this use will require a new Conditional Use Permit.
Following this public hearing, a decision regarding this Conditional Use Permit application
by the Board of Supervisors would be appropriate. The Applicant should be prepared to
adequately address all concerns raised by the Board of Supervisors.
Page 2
CUP #10-21, David Hermens Wireless Telecommunication Tower
January 27, 2022
LOCATION: This property is located at 101 Greenway Court, Winchester, Virginia.
MAGISTERIAL DISTRICT: Back Creek
PROPERTY ID NUMBER: 60A-2A-A-16
PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas)
Land Use: Residential
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: Residential
South: RA (Rural Areas) Use: Vacant
East: RA (Rural Areas) Use: Vacant
West: RA (Rural Areas) Use: Residential
PROPOSED USE: This is a request for a Conditional Use Permit to allow for a 90-foot
wireless telecommunication tower.
REVIEW EVALUATIONS:
Frederick County Inspections: Conditional Use Permit for installation of a communication
tower shall be designed per the 2015 Virginia Building Code (VBC), U-Utility Use Group.
Tower installation requires permits. Plans submitted for permits may require the design to be
sealed by a Registered Design Professional licensed in the State of Virginia. Antennas, if
applicable, shall be designed for the applicable loads as required in Chap. 16 VBC.
Tower shall be located such that guy wires and other accessories shall not cross or encroach upon
any street or other public space, over above ground electric utility lines, or encroach upon any
privately owned property without written consent. Tower shall be equipped with climbing and
working facilities in compliance with TIA-222. Access to the tower sites shall be limited as
required by applicable OSHA, FCC and EPA regulations
Special Inspections may be required, please note the requirements in Chapter 17 of VBC for
special inspection requirements on the type of structure. (Soils, concrete etc..).
Frederick County Fire Marshal: Plans approved.
Winchester Regional Airport: No comment.
Page 3
CUP #10-21, David Hermens Wireless Telecommunication Tower
January 27, 2022
Planning and Zoning: The Frederick County Zoning Ordinance allows for the construction of
telecommunication facilities in the RA Zoning District only with an approved Conditional Use
Permit (CUP). The subject application has been applied for to address and abate a zoning
violation due to the construction of a 90’ telecommunication tower for wireless internet
communication without first obtaining a CUP. Approval of a CUP by the Board of Supervisors is
one avenue to abate this violation.
This tower is located on a 2.4+/- acre property that is zoned RA (Rural Areas) Zoning District
and primarily used for residential purposes. The Comprehensive Plan provides guidance when
considering any land use action. The Comprehensive Plan identifies this area of the County to
remain rural and is not part of any current land use study. The properties immediately adjacent
to this proposed CUP are also zoned RA and are utilized for residential uses.
PLANNING COMMISSION SUMMARY AND ACTION FROM THE 10/20/21
MEETING:
Staff provided an overview of the application and the proposed conditions. The Commission
inquired about the fall radius of the proposed tower and who constructed the tower. The
Applicant came forward to address questions, it was later noted that the tower was constructed
by Winchester Wireless. During the public hearing, no one came forward to speak. The
Commission noted concern that the tower was constructed without a permit and the number of
homes that this tower would serve. The Applicant stated that the tower was not intended to serve
other homes but noted the condition regarding collocating.
A motion made by Commissioner Jewell and seconded by Commissioner Oates to deny this
application.
Yes: Jewell, Brumback, Kozel, Manuel, Oates, Thomas, Triplett, Mohn, Kenney
No: Dawson, Morrison
(Note: Commissioner Molden was absent from the meeting.)
BOARD OF SUPERVISORS SUMMARY AND ACTION FROM THE 11/10/21
MEETING: This application was postponed from the Board of Supervisors November 10, 2021
meeting to the February 9, 2022 meeting.
Following this public hearing, a decision regarding this Conditional Use Permit application by
the Board of Supervisors would be appropriate. The Applicant should be prepared to
adequately address all concerns raised by the Board of Supervisors.