HomeMy WebLinkAbout10-21 PC Staff ReportCONDITIONAL USE PERMIT #10-21
David Hermens Wireless Telecommunication Tower
Staff Report for the Planning Commission
Prepared: October 8, 2021
Staff Contact: Mark Cheran, Zoning Administrator
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on
this request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 10/20/21 Pending
Board of Supervisors: 11/10/21 Pending
EXECUTIVE SUMMARY:
This is a request for a Conditional Use Permit to construct a 90-foot wireless telecommunication
tower. That was constructed without an approved CUP and therefore is a violation of the Zoning
Ordinance. The Applicant is seeking approval of this CUP to abate the zoning violation.
Should the Planning Commission find the use to be appropriate, Staff would suggest the
following conditions:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
4. Any expansion or modification of this use will require a new Conditional Use Permit.
Following this public hearing, it would be appropriate for the Planning Commission to offer
a recommendation concerning this application to the Board of Supervisors.
Page 2
CUP #10-21, David Hermens Wireless Telecommunication Tower
October 8, 2021
LOCATION: This property is located at 101 Greenway Court, Winchester, Virginia.
MAGISTERIAL DISTRICT: Back Creek
PROPERTY ID NUMBER: 60A-2A-A-16
PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas)
Land Use: Residential
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: Residential
South: RA (Rural Areas) Use: Vacant
East: RA (Rural Areas) Use: Vacant
West: RA (Rural Areas) Use: Residential
PROPOSED USE: This is a request for a Conditional Use Permit to enable the construction of
a 90-foot Wireless Telecommunications Tower.
REVIEW EVALUATIONS:
Frederick County Inspections: Conditional Use Permit for installation of a communication
tower shall be designed per the 2015 Virginia Building Code (VBC), U-Utility Use Group.
Tower installation requires permits. Plans submitted for permits may require the design to be
sealed by a Registered Design Professional licensed in the State of Virginia. Antennas, if
applicable, shall be designed for the applicable loads as required in Chap. 16 VBC.
Tower shall be located such that guy wires and other accessories shall not cross or encroach upon
any street or other public space, over above ground electric utility lines, or encroach upon any
privately owned property without written consent. Tower shall be equipped with climbing and
working facilities in compliance with TIA-222. Access to the tower sites shall be limited as
required by applicable OSHA, FCC and EPA regulations
.
Special Inspections may be required, please note the requirements in Chapter 17 of VBC for
special inspection requirements on the type of structure. (Soils, concrete etc..).
Frederick County Fire Marshall: Plans approved.
Winchester Regional Airport: No comment.
Page 3
CUP #10-21, David Hermens Wireless Telecommunication Tower
October 8, 2021
Planning and Zoning: Staff would note that this Conditional Use Permit (CUP) has been
applied to address and abate a zoning violation due to the construction of a 90’
telecommunication tower for wireless internet communication on the subject property without
first obtaining a CUP. Approval of a CUP by the Board of Supervisors is one avenue to abate
this violation.
This proposed 90-ft wireless telecommunication tower is located on property that is zoned
RA (Rural Areas) Zoning District and primarily used for residential purposes. The 2035
Comprehensive Plan of Frederick County (“Comprehensive Plan”) provides guidance when
considering any land use action. The Comprehensive Plan identifies this area of the County to
remain rural in nature and is not part of any current land use study. This proposed 90-foot
telecommunication tower is located on a 2.4+/- acre property that is zoned RA (Rural Areas)
Zoning District. The Comprehensive Plan identifies this area of the County to remain rural and is
not part of any current land use study.
The Frederick County Zoning Ordinance allows for the construction of telecommunication
facilities in the RA Zoning District with an approved CUP. The properties immediately adjacent
to this proposed CUP are also zoned RA and are utilized for residential uses.
STAFF CONCLUSIONS FOR THE 10/20/21 PLANNING COMMISSION MEETING:
Should the Planning Commission find this use appropriate, Staff would suggest the following
conditions be placed on the CUP:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
4. Any expansion or modification of this use will require a new Conditional Use Permit.
Following this public hearing, it would be appropriate for the Planning Commission to offer
a recommendation concerning this application to the Board of Supervisors.