Loading...
HomeMy WebLinkAbout02-22 Comments revised 021622From:Timothy Rhodes To:Tyler Klein Cc:John Bishop; Chris Mohn; rhonda.funkhouser@vdot.virginia.gov; bradley.riggleman@vdot.virginia.gov Subject:"[External]"RE: Redbud Run Solar Project CUP: Glare Study Date:Wednesday, February 16, 2022 2:38:05 PM Attachments:image001.png Tyler,   We have completed our review of the Redbud Solar Glare Study.  Based on the information provided by Pennoni, it is understood there will be no negative glare impacts to the users of the roadways.  We are satisfied with the findings of this report and have no objections to the study.  The only outstanding item to address is the previous comment which follows:   The CUP and supplement identifies multiple entrance locations to serve the facility.  Some for construction and some to be permanent.  The supplement provided details on the sight distance for the proposed locations.  You have identified an existing private entrance as “Alternative 1.”  The sight distance profile and your supplement clearly show this entrance not meeting minimum sight distance requirements for safe access.  In accordance with VDOT Access Management Regulations (24VAC30-73) VDOT will not permit a commercial entrance without meeting minimum sight distance requirements.  This entrance needs to be removed from the proposal.  There are other locations proposed that meet minimum sight distance requirements and provide safe ingress/ egress for those coming to the facility as well as the motorist traveling on the roadway.   Please let me know if you have additional questions or concerns.   Thanks,   Timothy Rhodes VDOT~Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-534-3206   From: Chris Mohn <cmohn@greenwayeng.com>  Sent: Monday, January 31, 2022 12:54 PM To: Tim Rhodes <timothy.rhodes@vdot.virginia.gov>; Tyler Klein (tklein@fcva.us) <tklein@fcva.us> Cc: John Bishop <jbishop@fcva.us> Subject: Redbud Run Solar Project CUP: Glare Study Importance: High   Tim and Tyler,   Attached for your review please find the glare study and corresponding summary letter for the Redbud Run Solar Project CUP application.   Please advise if you would like to schedule a time to discuss the findings of the glare study or other transportation-related items associated with the application, and we will make plans accordingly.   Thanks! Chris   Christopher Mohn, AICP | Principal / Director of Planning Winchester, VA I Ashburn, VA I Martinsburg, WV   151 Windy Hill Lane Winchester, VA 22602   Phone: 540.662.4185 Cell: 540.333.2392 Fax: 540.722.9528 Web: www.GreenwayEng.com Email: cmohn@greenwayeng.com   Disclaimer: This email may contain confidential and privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and any file attachments from your computer. Thank you.