HomeMy WebLinkAbout23-14 Site PlanPRIOR TO COMMENCING WORK
POLICE - FIRE - RESCUE
1-800-552-7001
CONTACT "MISS UTILITY" AT
SITE PLAN REVISION
OWNER / DEVELOPER
PROJECT: ALLIED RELOAD FACILITY
ENGINEER/SURVEYOR: URBAN, LTD.
133 S. Braddock St.
WINCHESTER, VA 22601
540-450-0211
ZONING: M-1
PIN #: 63((A))61A
PROPOSED USE: WAREHOUSING
CURRENT USE: WAREHOUSING
PLAN IS SUBJECT TO EASEMENTS AND RESTRICTIONS OF
RECORD.
NO TITLE REPORT FURNISHED.
BOUNDARY INFORMATION PROVIDED BY SURVEY BY
WOLFORD LAND SURVEYING, INSTRUMENT # 060017280
DATED AUGUST 1, 2006
TOPOGRAPHY BASED ON VIRGINIA STATE PLANE
HORIZONTAL NAD83 VERTICAL NAVD 88 BY URBAN, LTD
DATED FEBRUARY 9, 2007
TOTAL PROPERTY AREA = 21.2 Ac. (486,516 SF)
SITE CONDITIONS:
WOODLANDS - APPROXIMATELY 85%
STEEP SLOPES - APPROXIMATELY 1 ACRE
LAKES AND PONDS - SWM POND AT SOUTH OF SITE
WETLANDS - NONE
FLOODPLAINS - NONE
FREDERICK COUNTY, VIRGINIA
ALLIED RELOAD FACILITY
SHAWNEE MAGISTERIAL DISTRICT
VA. STATE GRID NORTHSITE
EMERGENCY
CALL 911
RESPONSIBLE LAND DISTURBER
DATE
SITE PLAN VALID FOR FIVE (5) YEARS FROM APPROVAL DATE
APPROVED BY THE FREDERICK COUNTY ZONING ADMINISTRATOR
WHITING ROAD, LLC
PH: (540) 665-9600
WINCHESTER, VA 22602
119 ARBOR COURT PLAN DATENo. 41423N/AN/AMAR. 2015COVER SHEETALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA1
19
SP-20167
SLIDE ACTION BOLT, 6"
MIN. LENGTH, HEAVY
DUTY STEEL W/ BLACK
FINISH
1"x6" VERTICAL BOARDS
GALV. STEEL DROP PINS
SET PLUMB IN METAL
SLEEVE, MIN 3" DEPTH
3"x3"x1/4" GALV.
RECTANGULAR STEEL
TUBE GATE FRAME,
PAINTED BLACK.
PROVIDE SHOP
DRAWINGS FOR OWNERS
APPROVAL.
HEAVY-DUTY HINGE,
BLACK FINISH, 3 PER
POST, EQ. SPACING
3"x3"x1/4" GALV. RECT.
STEEL TUBE GATE POST,
FILLED W/ CONC.
PAINTED BLACK.
OPAQUE GATE DETAIL2
18'-0"4"1'-1"5'-8"1'-3"8'-0"4"4"2"x6" CAPRAIL
1"x6" BOARDS
2"x4" RAIL (TYP.) SECURE TO
POST OR GATE POST
6"x6" POST
FINISH GRADE
3'-0"1'-0"8'-0"CONCRETE FOOTING
2" SAND BASE
1"x4" FASCIA BOARD
1"x4" FASCIA BOARD
NOTES:
1. ALL WOOD MEMBERS FOR GATES AND FENCE SHALL
BE PRESSURE-TREATED YELLOW PINE.
2. USE ONLY RING SHANK OR SCREW SHANK
GALVANIZED NAILS FOR CONNECTIONS.
OPAQUE FENCE DETAIL1
DESCRIPTIONDATE
PLAN STATUS
PROPOSEDEXISTING
WATERMAIN FITTINGS LEGEND
EASEMENT LEGEND
LEGEND
NOTE:
SOIL INFORMATION WAS TAKEN FROM A HISTORICAL REPLICA OF "SOIL SURVEY OF FREDERICK COUNTY, VIRGINIA"
MAJOR FIELDWORK FOR SOIL SURVEY WAS COMPLETED IN 1984.
Carbo silt loam, 2 to 7 percent slopes
Carbo - Oaklet silt loams, very rocky, 2 to 15 percent slopes
5B
6C
SYMBOL
MAP MAP UNIT NAME
C
C
HYDROLOGIC
SOIL GROUP
SOILS MAP
SCALE 1''=500'
Oaklet silt loam, 2 to 7 percent slopes32B
RAIL SIDETRACK CONSTRUCTION
ALL RAIL SIDETRACK CONSTRUCTION SHALL CONFORM TO THE
LATEST ISSUE OF: THE CSX TRANSPORATION STANDARD
GUIDELINES AND SPECIFICATIONS FOR THE DESIGN AND
CONSTRUCTION OF PRIVATE SIDETRACKS. OFFICE OF THE CHIEF
ENGINEER-DESIGN AND CONSTRUCTION, JACKSONVILLE, FLORIDA.
LANE ENTERPRISES
3905 HARTZDALE DRIVE, SUITE 514
CAMP HILL, PA 17011
(717) 764-8475 PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIINN/AN/AMAR. 2015STATUS AND DETAILSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA2
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIINN/AN/AMAR. 2015MISCELLANEOUS DETAILSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA3
19
SP-20167
1 6/27/2014ADDED SECOND FABRIC BUILDINGPLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=60'2'MAR. 2015PHASE 1 -OVERALL GRADING & SITE PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA4
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=60'2'MAR. 2015PHASE 2 - OVERALL GRADING & SITE PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA5
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=30'2'MAR. 2015PHASE 2 - GRADING & SITE PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA6
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=30'2'MAR. 2015PHASE 2 - GRADING & SITE PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA7
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=30'2'MAR. 2015PHASE 2 - GRADING & SITE PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA8
19
SP-20167
RAILROAD SPUR - 1 PLAN DATERG IN A
EERI
LTHOFMMONWEANENGCP R O FESSIOLic.No. 41423OALVIIN1"=50'(H), 1"=5"(V) 2'MAR. 2015RAIL SPUR PROFILEALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA9
19
SP-20167
RAILROAD SPUR - 2RAILROAD SPUR - 1 PLAN DATERG IN A
EERI
LTHOFMMONWEANENGCP R O FESSIOLic.No. 41423OALVIIN1"=50'(H), 1"=5"(V)2'MAR. 2015RAIL SPUR PROFILEALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA10
19
SP-20167
WATERLINE "A"WATERLINE "B"SANITARY SEWER PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=50'(H), 1"=5"(V)2'MAR. 2015WATER AND SANITARY SEWER PLAN AND PROFILEALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA11
19
SP-20167
CULVERT 8-9 CULVERT 6-7 PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=50' (H), 1"=5" (V)2'MAR. 2015CULVERT PROFILES AND COMPUTATIONSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA12
19
SP-20167
Pre-Development Pre-Development Karst Adjustment Karst Adjusted Onsite Total Pre-Development Post-Development W.S.E.L.
Offsite Flow Onsite Flow Factor
Pre-Development Flow Flow Pond Discharge Within Pond
(cfs)(cfs)(cfs)(cfs)(cfs)
2-YEAR 26.6 58.6 0.33 19.3 46 44.46 742.33'
10-YEAR 72.8 154.3 0.33 50.9 124 73.21 744.82'
100-YEAR 131.4 274.6 0.5 137.3 269 110.07 746.56'
FLOW SUMMARY
STAGE-DISCHARGE TABLE
POND EMBANKMENT CROSS SECTION
POND EMBANKMENT PROFILE PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=50'2'MAR. 2015SWM POND COMPUTATIONSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA13
19
SP-20167
MAXIMUM
POND STORAGE
7.116
14.329
20.448
(ac-ft)
STAGE-AREA-STORAGE TABLEPOST DEVELOPMENT 2-YEAR STORM HYDROGRAPH POST DEVELOPMENT 10-YEAR STORM HYDROGRAPH POST DEVELOPMENT 100-YEAR STORM HYDROGRAPH
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=40'2'MAR. 2015BMP COMPUTATIONSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA14
19
SP-20167VA. STATE GRID NORTH
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=50'2'MAR. 2015EROSION AND SEDIMENT CONTROL PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA15
19
SP-20167
TABLE 3.32-C
TABLE 3.35-A
TABLE 3.31-B PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIINN/A2'MAR. 2015EROSION AND SEDIMENT CONTROL DETAILSALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA16
19
SP-20167
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=60'2'MAR. 2015LANDSCAPING PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA17
19
SP-20167
INTERIOR LANDSCAPE AREA*
PLAN DATER G IN A
EERI
LTHOFMMONWEANENGCP R O FESSIONo. 41423OALVIIN1"=50'2'MAR. 2015FIRELANE SIGNAGE AND PAVEMENT PLANALLIED RELOAD FACILITYSITE PLANSHAWNEE MAGISTERIAL DISTRICTFREDERICK COUNTY, VA18
19
SP-20167
PLAN DATE
R
GI
NAEERIL T H OF
MMONW E A
N E N GCPROF
E
SSIO
No. 41423O
A L
VI
IN1"=20'2'MAR. 2015
PHOTOMETRICS PLAN
ALLIED RELOAD FACILITY
SITE PLAN
SHAWNEE MAGISTERIAL DISTRICT
FREDERICK COUNTY, VA1919SP-20167LIGHTING FIXTURE SCHEDULE EXTERIOR DOWNLIGHT