Loading...
HomeMy WebLinkAbout21-21 Comments 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 January 20, 2022 Mr. Tim Stowe, PE Stowe Engineering, PLC 103 Heath Court Winchester, Virginia 22602 RE: Revised Site Plan Comments – Winchester Regional Airport KOKV Hangars Frederick County, Virginia Dear Mr. Stowe: Upon review of the revised site plan dated September 3, 2021, we recommend approval of the subject plan. Please be advised that nutrient credit purchase (1.73 lbs) will be required with the land disturbance application. Sincerely, Joseph W. Johnson, P.E. Joe C. Wilder Civil Engineer Director of Public Works JCW/kco cc: Planning and Development file From:Timothy Rhodes To:Tim Stowe Cc:rhonda.funkhouser@vdot.virginia.gov; bradley.riggleman@vdot.virginia.gov; Gregory Hoffman; Tyler Klein; John Bishop Subject:Winchester Regional Airport KOKV Hangar- SE Side Site Plan Approval Date:Friday, January 14, 2022 9:42:34 AM Attachments:image001.png       DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824       Tim,   A VDOT review has been conducted for the Winchester Regional Airport KOKV Hangars- SE Side Site Plan, signature dated September 3, 2021, with a revision date of December 15, 2021. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings.   We offer the following general comments:   Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. A Land Use Permit shall be obtained before any work is performed on the State’s right-of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need further information, please do not hesitate to contact me.   Sincerely, Timothy Rhodes VDOT~Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630   FREDERICK WATER SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604-8377 540.868.1061 voice 315 Tasker Road, Stephens City, VA 22655 540.868.1429 fax Project ______________________________________________________________________________ Applicant ____________________________________________________________________________ REVIEW STATUS attention________________________________ review number ____________ correct & resubmit approved as noted number of items to be corrected _____________ approved DRAWINGS send me by_________________________________________: 1. print of sheets_____________________________________ 2. two CDs: each disc shall contain the following plan sheets________________________________ a)One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b)One CD shall be in DWG format; (1) in Model Space, (2) in state plane coordinate system NAD 83, (3) compatible with AutoCAD 2006. c)Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS Y N A copy of the recorded onsite FW easement(s) is/are required. A copy of the recorded offsite FW easement(s) is/are required. o The easement document shall contain a plat and both shall be signed by the Frederick Water. o The Frederick Water requires specific language in its deed of easement. o Visit our website www.frederickwater.com to obtain a copy of the form. o A copy of the recorded deed(s) of easement shall be received before service will be authorized. OTHER This project also requires DEQ - Valley Region Office approval. This project also requires VDH – Lexington Field Office approval. This project also requires VDH – Lexington Field Office – Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see VDH website for form This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ’s Certificate to Construct, (2) a copy of DEQ’s Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These documents must be received before service will be authorized. (4) Work cannot commence that would connect to FW facilities or require FW inspections until the contract is returned to this office. Date: _________________ ____________________________________________ Earl W. Wiley – Engineering Assistant APR 20 Y N Y N Y N Y N Y N KOKV Hangars SE Side Winchester Regional Airport Stowe Engineering 3 Mr. Timothy Stowe 0 One Set - All Sheets All Sheets 4 January 7, 2022 Reset January 28, 2022 From:Nicholas Sabo To:Tim Stowe Cc:David Foley Subject:Re: Site Plan #21-21 KOKV Hangars Date:Monday, December 20, 2021 1:02:58 PM Attachments:image001.png image002.jpg Tim,   The latest site plan submission for the project, “KOKV Hangars – SE Side” dated December 15, 2021 and received in our office December 16, 2021, satisfies all airport comments.  Please accept this email as approval.   Thank you, Nick   Nicholas Sabo, A.A.E. Executive Director Winchester Regional Airport Authority 491 Airport Road, Winchester, VA 22602 www.flyokv.com | 540-662-5786           VIRGINIA FREEDOM OF INFORMATION ACT NOTICE: This e-mail and any of its attachments may constitute a public record under the Virginia Freedom of Information Act. Accordingly, the sender and/or recipient listed above may be required to produce this e-mail and any of its attachments to any requester unless certain limited and very specific exemptions are applicable.