HomeMy WebLinkAbout11-21 CUP Concept Plan rev 1026211COVER SHEETAS SHOWN
BACK CREEK MAGISTERIAL DISTRICT
FREDERICK COUNTY, VIRGINIA
VICINITY MAP
SCALE: 1" 2000'
CHARLES WILLIAM STAPLES - P.O. BOX 986
STEPHENS CITY, VA 22655 WINCHESTER WAREHOUSING, INC - P.O. BOX 2368
WINCHESTER, VA 22604
DEVELOPER
TORCH CLEAN ENERGY
230 COURT SQUARE SUITE B102
CHARLOTTESVILLE, VA 22902
(703) 999-4280 BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021
EAW/JMM
5
4505T
Plan Revisions
Date Comment
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:
LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVBARTONSVILLE ENERGY FACILITY II, LLC PHASE II EXPANSION AREA CONCEPT PLANPHASE II EXPANSION AREA CONCEPT PLAN
BARTONSVILLE ENERGY FACILITY II, LLC
BARTONSVILLE ENERGY FACILITY PHASE II EXPANSION AREA OWNERS
Sheet List Table
Sheet Number Revsion
No Sheet Title
1 Cover Sheet
2 Project Area
3 PH-II Concept Development Plan
4 PH-1 Concept Development Plan
5 PH-1 Concept Development Plan
APR MINI STORAGE, LLC - 127 MERCEDES COURT
WINCHESTER, VA 22603
STEVEN D. BRIM, ET ALS - 254 W. QUEEN STREET
STRASBURG, VA 22657
ELEANOR K. BRIM - 4125 32ND AVE SW
SEATTLE, WA 98126
JUDITH B. CATES - 102 FOREST VALLEY ROAD
WINCHESTER, VA 22602
WEST OAKS FARM MARKET LLC - 229 W OAKS LN
WINCHESTER, VA 22602
LOUIS C. CARBAUGH, ET ALS - 5140 PASSAGE LANE
STEPHENS CITY, VA 22655
R & T PACKING CORPORATION - 1835 VALLEY AVENUE
WINCHESTER, VA 22601
CHARLES W. STAPLES - P.O. BOX 986
STEPHENS CITY, VA 22655
ROBERT R. STAPLES - 1708 TUNBRIDGE DRIVE
RICHMOND, VA 23238
WRIGHT RENOVATIONS INC - 124 PAGE CT
WHITE POST, VA 22663
BARTONSVILLE ENERGY FACILITY PHASE I CUP # 05-20 OWNERS
PROJECT DESCRIPTION
THE PHASE I PROJECT AREA RECEIVED APPROVAL
THROUGH CUP #05-20 ON SEPTEMBER 23, 2020. THE
PHASE II PROJECT EXPANSION AREA PROPOSAL
INCLUDES 636.67 ACRES OF LAND (427± ACRES
DISTURBED), AND PLACES PANELS ON THE STAPLES
PROPERTY (PIN #74-A-20) WHICH WAS PREVIOUSLY
INCLUDED AS AN INTERCONNECTION PARCEL ONLY
WITH CUP #05-20.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX
X
X
X
X XXX
XX XX XXX XX
X
X
XXXX
X
X
PR
O
P
O
S
E
D
SU
B
S
T
A
T
I
O
N
/
S
W
I
T
C
H
I
N
G
ST
A
T
I
O
N
CSX RAILROADSTRODEMCLEOD LNMARLBORO RD
MARLBORO RDCARTERS LNVALLEY PIKEINTERSTATE 81FA
M
I
L
Y
D
R 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 1000'
2PROJECT AREABACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021
EAW/JMM
----
5
4505TBARTONSVILLE ENERGY FACILITY II, LLCPHASE II EXPANSION AREA CONCEPT PLANGENERAL PROJECT NOTES
BARTONSVILLE ENERGY FACILITY II: 40-60 MW SOLAR PROJECT
TOTAL PROJECT PARCEL AREA: 636.67 ± AC.
TOTAL PROJECT ARRAY AREA: 427 ± AC.
MAGISTERIAL DISTRICT: BACK CREEK DISTRICT
EXISTING LAND USE: AGRICULTURAL & RESIDENTIAL
PHASE II PROJECT DEVELOPMENT NOTES
1.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTED PHOTOVOLTAIC MODULES AND CENTRAL INVERTERS
2.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 100' FROM EXTERNAL ROADS AND PROPERTY LINES AND 200' FROM ADJOINING
PROPERTIES LOCATED WITHIN THE SOUTH FREDERICK AGRICULTURAL AND FORESTAL DISTRICT.
3.A MINIMUM 6' HIGH SECURITY FENCE WITH SECURITY SIGNAGE/24-HOUR CONTACT INFORMATION WILL BE INSTALLED AROUND
PERIMETER OF SOLAR ARRAY DEVELOPMENT.
4.MINIMAL SAFETY AND SECURITY LIGHTING WILL BE INSTALLED WITH LOCATIONS AND SPECIFICATIONS PROVIDED ON SITE PLAN
5.CONSTRUCTION SEDIMENT PONDS AND PERMANENT STORMWATER MANAGEMENT FACILITIES WILL BE PROVIDED ON SITE PLAN
6.ACCESS TO THE BARTONSVILLE ENERGY FACILITY II, LLC PROJECT WILL BE PROVIDED VIA TWO ENTRANCES. THE STRODE MCLEOD
LANE ENTRANCE ON MARLBORO ROAD WILL SERVE AS THE PRIMARY ACCESS AND AS THE CONSTRUCTION ENTRANCE TO THE
PROJECT. THE STRODE MCLEOD LANE ENTRANCE ON FAMILY DRIVE WILL SERVE AS AN EMERGENCY ACCESS TO PROVIDE A SECOND
MEANS OF EMERGENCY ACCESS TO THE PROJECT. BOTH ENTRANCES TO THE PROJECT ARE IDENTIFIED ON SHEET 3 OF THIS PLAN.
7.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH FOR THE LIFE OF THE PROJECT. EXISTING VEGETATION
PRESERVATION AREAS IDENTIFIED ON SHEET 3 SHALL REMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT.
Rev. No.Date
B.E.F. PHASE II LEGEND
PHASE II SUBJECT EXPANSION PROPERTIES
GENERAL PROJECT NOTES
BARTONSVILLE ENERGY FACILITY: 80-130MW SOLAR PROJECT
34.5kV GENERATION TIE LINE
PROJECT SUBSTATION/SWITCHING STATION
TOTAL PROJECT PARCEL AREA: 1160.19± AC. (MAXIMUM OF 690 ACRES FOR SOLAR ARRAYS)
ACREAGE/ZONING: FREDERICK COUNTY 1010.30± AC./RA DISTRICT
TOWN OF STEPHENS CITY 149.89± AC./R1 DISTRICT
MAGISTERIAL DISTRICT: BACK CREEK DISTRICT & OPEQUON DISTRICT
EXISTING LAND USE: AGRICULTURAL & RESIDENTIAL
PHASE I PROJECT DEVELOPMENT NOTES
1.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTED PHOTOVOLTAIC MODULES AND CENTRAL INVERTERS
2.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 100' FROM EXTERNAL ROADS AND PROPERTY LINES
3.A 6' HIGH SECURITY FENCE WITH SECURITY SIGNAGE/24-HOUR CONTACT INFORMATION WILL BE INSTALLED AROUND PERIMETER
OF SOLAR ARRAY DEVELOPMENT APPROXIMATELY 75-100' FROM EXTERNAL ROADS AND PROPERTY LINES
4.MINIMAL SAFETY AND SECURITY LIGHTING WILL BE INSTALLED WITH LOCATIONS AND SPECIFICATIONS PROVIDED ON SITE PLAN
5.CONSTRUCTION SEDIMENT PONDS AND PERMANENT STORMWATER MANAGEMENT FACILITIES WILL BE PROVIDED ON SITE PLAN
6.ACCESS TO BARTONSVILLE ENERGY FACILITY WILL BE PROVIDED VIA TWO ENTRANCES LOCATED ON SPRINGDALE ROAD
(IDENTIFIED ON SHEET 4) AND ONE ENTRANCE LOCATED ON PASSAGE ROAD (IDENTIFIED ON SHEET 5). DELIVERY OF SOLAR
ARRAY PANEL CONSTRUCTION MATERIALS WILL OCCUR AT THE SITE ACCESS ENTRANCE OFF OF PASSAGE ROAD IDENTIFIED AS
DEER LANE ON SHEET 4 OF THE CONCEPT PLAN. SOLAR ARRAY PANEL MATERIALS DELIVERY LAYDOWN AREA WILL BE LIMITED TO
TAX PARCEL 74-A-44A (CARBAUGH PROPERTY).
7.CARROLLTON ESTATES AND SPRINGDALE GLEN SUBDIVISION PARCELS (B, C, D) TO BE CONSOLIDATED/VACATED PRIOR TO
DEVELOPMENT
8.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH FOR THE LIFE OF THE PROJECT. EXISTING
VEGETATION PRESERVATION AREAS IDENTIFIED ON SHEET 4 SHALL REMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT.
PHASE II SOLAR ARRAY PROJECT AREA
BARTONSVILLE ENERGY FACILITY PHASE I PROJECT AREA - CUP# 05-20
B.E.F. PHASE I LEGEND
PHASE I SUBJECT PROPERTIES (CUP # 05-20)
PHASE I SOLAR ARRAY PROJECT AREA
BARTONSVILLE ENERGY FACILITY PHASE II PROJECT EXPANSION AREA
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXX
X XX X X X X X XXXX X XXXXXXX XXX
X
X
X
XX
XXX X XSTRODEMCLEOD LNRESERVED FORORCHARDPROPOSED
SUBSTATION/
SWITCHING STATION
MARL
B
O
R
O
R
D
CSX RAILROADCSX RAILROADMARL
B
O
R
O
R
DCARTERS LNSOLAR ARRAY DEV. LIMITS
SOLAR ARRAY DEV.
L
I
M
I
T
S
SOLAR ARRAY DEV. LIM
I
T
S
EX VEG/ TREELINE
EX VEG/ TREELI
N
E EX VEG/ TREELINEEX VEG/ TREELINE EX VEG/ TREELINE100'100'200'200'200'CONSTRUCTION
ENTRANCE &
ACCESS
LANDSCAPE
BUFFER "A"
LANDSCAPE
BUFFER "B"
LANDSCAPE
BUFFER "C"
LANDSCAPE
BUFFER "B"
100'
RESERVED
FOR
ORCHARD
RESERVED
FOR
ORCHARD
RESERVED
FOR CROPS
RESERVED
FOR
PASTURE
U
N
D
E
R
G
R
O
U
N
D
IN
T
E
R
C
O
N
N
E
C
T
I
O
N
E
S
M
T
UNDER GROUND INTERCONNECTION ESMTTEMP.
LAYDOWN
AREA
200'
LANDSCAPE
BUFFER "B"
LANDSCAPE
BUFFER "B"
LANDSCAPE
BUFFER "B"151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV3PH-II CONCEPT DEVELOPMENT PLANBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021
EAW/JMM
----
5
4505TBARTONSVILLE ENERGY FACILITY II, LLCPHASE II EXPANSION AREA CONCEPT PLAN1" 400'
Rev. No.Date
PROPOSED ACCESS ROAD TYPICAL SECTION
LEGEND
PROJECT LANDSCAPE BUFFER AREA
SOLAR ARRAY DEVELOPMENT
LIMITS/SECURITY FENCE
PROPOSED ACCESS ROADS
PROPOSED SITE ENTRANCE
EXISTING VEGETATION/TREELINE
TYPICAL ROAD SECTION
2% MIN
20' MIN
COMPACTED NATIVE SUBGRADE PER
GEOTECHNICAL ENGINEER
ALL WEATHER
SURFACE/BASE PER
GEOTECHNICAL
ENGINEER
NTS
14' MAX
26'
TRACKER PANEL
STOWED POSITION
TRACKER PANEL
FULL TILT POSITION
19'
SOLAR ARRAY PANEL DETAIL
SOLAR ARRAY CROSS SECTION NTS
LANDSCAPE BUFFER "C"
LANDSCAPE BUFFER "A"
100'
LANDSCAPE BUFFER "A"
not to scale
DESCRIPTION :
EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIES
LANDSCAPE BUFFER "A"
EX TREELINE
PROPERTY BOUNDARY
100'
1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING;
EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF
DECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITE
PLAN
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
LANDSCAPE BUFFER "B"
not to scale
DESCRIPTION :
PROVIDE SINGLE ROW OF EVERGREEN FOR VIEWSHED ENHANCEMENTS
LANDSCAPE BUFFER "B"
PROPERTY BOUNDARY
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
LANDSCAPE BUFFER "B"
LANDSCAPE BUFFER "C"
not to scale
DESCRIPTION :
PROVIDE TRIPLE ROW OF EVERGREEN TREES TO SUPPLEMENT EXISTING TREELINE ALONG
PROPERTY LINE
LANDSCAPE BUFFER "C"
PROPERTY BOUNDARY
200'
SOLAR ARRAY DEVELOPMENT LIMITS
EX TREELINE
15' OC
1. FIRST ROW OF EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING
2. SECOND AND THIRD ROW OF EVERGREEN TREES TO BE SAPLINGS.
3. SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO
BE PROVIDED ON SITE PLAN
PHASE II EXPANSION AREA SUBJECT PROPERTIES
PHASE II SOLAR ARRAY PROJECT AREA
PHASE I SUBJECT PROPERTIES (CUP # 05-20)
PHASE I SOLAR ARRAY PROJECT AREA
X
1.EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF
EVERGREEN TREES TO BE PROVIDED ON SITE PLAN
VARIABLE
DISTANCE
XXXXX
X
X
X
X
XXXXXX
X
X
X
X
X
X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X SOLAR ARRAY DEVELOPMENT LIMITSSOLAR ARRAY DEV. LMT.SOLAR ARRAY DEV. LIMITSSO
L
A
R
A
R
R
A
Y
D
E
V
.
L
I
M
I
T
SSOLAR ARRAY DEV. LIMITSXXXXXXXXXXXXXXXXXXXXXXXX200'200'SOLAR ARRAY DEV. LIMITSLANDSCAPE
BUFFER "A"
LANDSCAPE
BUFFER "C"
LANDSCAPE
BUFFER "B"XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
XXXXX
X
X
XXXXXXXX
X
X
X
X
XXXXX
X
X
X
XX
X
RICE-ROBINSON
HOUSE
CARTER HALL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 400'
4
9/23/2020
ZJ
----
5
4505T
MATCHLINE SHEET 5
PROPOSED ACCESS ROAD TYPICAL SECTION
LEGEND
PROJECT AREA
PARCELS
LANDSCAPE BUFFER AREA
STREAMS
X SOLAR ARRAY DEVELOPMENT
LIMITS/SECURITY FENCE
NWI WETLANDS
PROPOSED ACCESS ROADS
SOLAR ARRAY AREA (PH-1)
PROPOSED SITE ENTRANCE
EXISTING VEGETATION/TREELINE
TYPICAL ROAD SECTION
2% MIN
20' MIN
COMPACTED NATIVE SUBGRADE PER
GEOTECHNICAL ENGINEER
ALL WEATHER
SURFACE/BASE PER
GEOTECHNICAL
ENGINEER
NTS
14' MAX
26'
TRACKER PANEL
STOWED POSITION
TRACKER PANEL
FULL TILT POSITION
19'
SOLAR ARRAY PANEL DETAIL
SOLAR ARRAY CROSS SECTION NTS
Rev. No.DateRev. No.Date
LANDSCAPE BUFFER "A"
100'
LANDSCAPE BUFFER "A"
not to scale
DESCRIPTION :
EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIES
LANDSCAPE BUFFER "A"
EX TREELINE
PROPERTY BOUNDARY
100'
1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING;
EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF
DECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITE
PLAN
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
LANDSCAPE BUFFER "B"
LANDSCAPE BUFFER "B"
not to scale
DESCRIPTION :
PROVIDE DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE
LANDSCAPE BUFFER "B"
100'
PROPERTY BOUNDARY
100'
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN
TREES TO BE PROVIDED ON SITE PLAN CONCEPT DEVELOPMENT PLANOPEQUON/ BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIALANDSCAPE BUFFER "C"
not to scale
DESCRIPTION :
PROVIDE SINGLE ROW OF DECIDUOUS AND EVERGREEN SAPLINGS ALONG BOTH SIDES OF
SPRINGDALE ROAD FOR FUTURE VIEWSHED ENHANCEMENTS
LANDSCAPE BUFFER "C"
100'
PROPERTY BOUNDARY
100'
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
LANDSCAPE BUFFER "C"
LANDSCAPE BUFFER "D"
LANDSCAPE BUFFER "D"
not to scale
DESCRIPTION :
PROVIDE THREE ROWS OF EVERGREEN TREES TO SUPPLEMENT EXISTING TREELINE ALONG
PROPERTY LINE
LANDSCAPE BUFFER "D"
100'
PROPERTY BOUNDARY
100'
SOLAR ARRAY DEVELOPMENT LIMITS
EX TREELINE
15' OC
1.EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF
EVERGREEN TREES TO BE PROVIDED ON SITE PLAN
APPROVED CONCEPT PLAN
CUP# 05-20 9/23/2020
BARTONSVILLE ENERGY FACILITYPHASE I PROJECT AREA CUP# 05-20
E
EEEEBARTONSVILLE-MEADOWBROOK 138KV TRANSM IS S IO N LIN E SOLAR ARRAY DEV. LMT.SO
L
A
R
A
R
R
A
Y
D
E
V
.
L
I
M
I
T
S
PROP 35' POWER LINE ESMNTPROP 35' POWER LINE ESMNTPROPOSED
SUBSTATION/
SWITCHING
STATION BARTONSVILLE-MEADOWBROOK 138KV TRANSMISSION LINE
PROP. CONNECTION TO
TRANSMISSION LINE XXXXXXXXX8
4
7
7
'
SOLAR ARRAY
AND MATERIALS
LAYDOWN AREA
LANDSCAPE
BUFFER "F"
LANDSCAPE
BUFFER "E"
LANDSCAPE
BUFFER "D"
LANDSCAPE
BUFFER "D"
27
5
.
0
'
EX VEG
PRESERVATION
AREA XXXXXXX
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXEX VEG
PRESERVATION
AREA
EX VEG
PRESERVATION
AREA
EX VEG
PRESERVATION
AREA
CHERRY DALE
(HISTORICAL PROPERTY)
CARTER HALL
151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF
DESIGNED BY:
FILE NO.
SCALE:
DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV5CONCEPT DEVELOPMENT PLANOPEQUON/ BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA9/23/2020
ZJ
----
5
4505TBARTONSVILLE ENERGY FACILITYPHASE I PROJECT AREA CUP# 05-20MATCHLINE SHEET 4 MATCHLINE SHEET 3
NOTES
·BARTONSVILLE ENERGY FACILITY WILL INSTALL AN UNDERGROUND
GENERATION-TIE LINE WITHIN AN EASEMENT ON TAX MAP PARCELS 74-A-20,
74-A-35A, AND 74-A-44.
·PROJECT SUBSTATION AND SWITCHING STATION WILL BE CONSTRUCTED ON TAX
MAP PARCELS 74-A-20 & 74-A-21, ADJACENT TO CSX RAILROAD
·PROJECT WILL SUPPLY ELECTRICITY INTO THE BARTONSVILLE - MEADOWBROOK
138KV TRANSMISSION LINE
1" 400'
SOLAR ARRAY PANEL DETAIL
14' MAX
26'
TRACKER PANEL
STOWED POSITION
TRACKER PANEL
FULL TILT POSITION
19'
SOLAR ARRAY CROSS SECTION NTS
LEGEND
PROJECT AREA
PARCELS
LANDSCAPE BUFFER AREA
STREAMS
X SOLAR ARRAY DEVELOPMENT
LIMITS/SECURITY FENCE
NWI WETLANDS
PROPOSED ACCESS ROADS
100 YR FLOODPLAIN
SOLAR ARRAY AREA (PH-1)
PROPOSED SITE ENTRANCE
EXISTING VEGETATION/TREELINE
INTERCONNECTION PARCELS
Rev. No.Date
INTERCONNECTION POWERLINE EASMENT DETAIL
TYPICAL EASEMENT
35'
35' EASEMENT W/
PRIVATE ACCESS &
UNDERGROUND
GEN-TIE LINE
PROPOSED ACCESS ROAD TYPICAL SECTION
TYPICAL ROAD SECTION
2% MIN
20' MIN
COMPACTED NATIVE SUBGRADE PER
GEOTECHNICAL ENGINEER
ALL WEATHER
SURFACE/BASE PER
GEOTECHNICAL
ENGINEER
NTS
NTS
LANDSCAPE BUFFER "E"
LANDSCAPE BUFFER "E"
not to scale
DESCRIPTION :
PROVIDE DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINES AND SUBSTATION
BORDER
LANDSCAPE BUFFER "E"
100'
PROPERTY BOUNDARY
100'
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN
TREES TO BE PROVIDED ON SITE PLAN
LANDSCAPE BUFFER "F"
LANDSCAPE BUFFER "F"
not to scale
DESCRIPTION :
PROVIDE EARTH BERM AND DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE
LANDSCAPE BUFFER "F"
PROPERTY BOUNDARY
100'
SOLAR ARRAY DEVELOPMENT LIMITS
15' OC
1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING
2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN
TREES TO BE PROVIDED ON SITE PLAN
3.7' AVERAGE HEIGHT EARTH BERM TO BE CONSTRUCTED ALONG ENTIRE
LENGTH OF ADJOINING PROPERTY LINE
APPROVED CONCEPT PLAN
CUP# 05-20 9/23/2020