Loading...
HomeMy WebLinkAbout11-21 CUP Concept Plan rev 1026211COVER SHEETAS SHOWN BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA VICINITY MAP SCALE: 1" 2000' CHARLES WILLIAM STAPLES - P.O. BOX 986 STEPHENS CITY, VA 22655 WINCHESTER WAREHOUSING, INC - P.O. BOX 2368 WINCHESTER, VA 22604 DEVELOPER TORCH CLEAN ENERGY 230 COURT SQUARE SUITE B102 CHARLOTTESVILLE, VA 22902 (703) 999-4280 BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021 EAW/JMM 5 4505T Plan Revisions Date Comment 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WVBARTONSVILLE ENERGY FACILITY II, LLC PHASE II EXPANSION AREA CONCEPT PLANPHASE II EXPANSION AREA CONCEPT PLAN BARTONSVILLE ENERGY FACILITY II, LLC BARTONSVILLE ENERGY FACILITY PHASE II EXPANSION AREA OWNERS Sheet List Table Sheet Number Revsion No Sheet Title 1 Cover Sheet 2 Project Area 3 PH-II Concept Development Plan 4 PH-1 Concept Development Plan 5 PH-1 Concept Development Plan APR MINI STORAGE, LLC - 127 MERCEDES COURT WINCHESTER, VA 22603 STEVEN D. BRIM, ET ALS - 254 W. QUEEN STREET STRASBURG, VA 22657 ELEANOR K. BRIM - 4125 32ND AVE SW SEATTLE, WA 98126 JUDITH B. CATES - 102 FOREST VALLEY ROAD WINCHESTER, VA 22602 WEST OAKS FARM MARKET LLC - 229 W OAKS LN WINCHESTER, VA 22602 LOUIS C. CARBAUGH, ET ALS - 5140 PASSAGE LANE STEPHENS CITY, VA 22655 R & T PACKING CORPORATION - 1835 VALLEY AVENUE WINCHESTER, VA 22601 CHARLES W. STAPLES - P.O. BOX 986 STEPHENS CITY, VA 22655 ROBERT R. STAPLES - 1708 TUNBRIDGE DRIVE RICHMOND, VA 23238 WRIGHT RENOVATIONS INC - 124 PAGE CT WHITE POST, VA 22663 BARTONSVILLE ENERGY FACILITY PHASE I CUP # 05-20 OWNERS PROJECT DESCRIPTION THE PHASE I PROJECT AREA RECEIVED APPROVAL THROUGH CUP #05-20 ON SEPTEMBER 23, 2020. THE PHASE II PROJECT EXPANSION AREA PROPOSAL INCLUDES 636.67 ACRES OF LAND (427± ACRES DISTURBED), AND PLACES PANELS ON THE STAPLES PROPERTY (PIN #74-A-20) WHICH WAS PREVIOUSLY INCLUDED AS AN INTERCONNECTION PARCEL ONLY WITH CUP #05-20. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX X X X X XXX XX XX XXX XX X X XXXX X X PR O P O S E D SU B S T A T I O N / S W I T C H I N G ST A T I O N CSX RAILROADSTRODEMCLEOD LNMARLBORO RD MARLBORO RDCARTERS LNVALLEY PIKEINTERSTATE 81FA M I L Y D R 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 1000' 2PROJECT AREABACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021 EAW/JMM ---- 5 4505TBARTONSVILLE ENERGY FACILITY II, LLCPHASE II EXPANSION AREA CONCEPT PLANGENERAL PROJECT NOTES BARTONSVILLE ENERGY FACILITY II: 40-60 MW SOLAR PROJECT TOTAL PROJECT PARCEL AREA: 636.67 ± AC. TOTAL PROJECT ARRAY AREA: 427 ± AC. MAGISTERIAL DISTRICT: BACK CREEK DISTRICT EXISTING LAND USE: AGRICULTURAL & RESIDENTIAL PHASE II PROJECT DEVELOPMENT NOTES 1.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTED PHOTOVOLTAIC MODULES AND CENTRAL INVERTERS 2.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 100' FROM EXTERNAL ROADS AND PROPERTY LINES AND 200' FROM ADJOINING PROPERTIES LOCATED WITHIN THE SOUTH FREDERICK AGRICULTURAL AND FORESTAL DISTRICT. 3.A MINIMUM 6' HIGH SECURITY FENCE WITH SECURITY SIGNAGE/24-HOUR CONTACT INFORMATION WILL BE INSTALLED AROUND PERIMETER OF SOLAR ARRAY DEVELOPMENT. 4.MINIMAL SAFETY AND SECURITY LIGHTING WILL BE INSTALLED WITH LOCATIONS AND SPECIFICATIONS PROVIDED ON SITE PLAN 5.CONSTRUCTION SEDIMENT PONDS AND PERMANENT STORMWATER MANAGEMENT FACILITIES WILL BE PROVIDED ON SITE PLAN 6.ACCESS TO THE BARTONSVILLE ENERGY FACILITY II, LLC PROJECT WILL BE PROVIDED VIA TWO ENTRANCES. THE STRODE MCLEOD LANE ENTRANCE ON MARLBORO ROAD WILL SERVE AS THE PRIMARY ACCESS AND AS THE CONSTRUCTION ENTRANCE TO THE PROJECT. THE STRODE MCLEOD LANE ENTRANCE ON FAMILY DRIVE WILL SERVE AS AN EMERGENCY ACCESS TO PROVIDE A SECOND MEANS OF EMERGENCY ACCESS TO THE PROJECT. BOTH ENTRANCES TO THE PROJECT ARE IDENTIFIED ON SHEET 3 OF THIS PLAN. 7.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH FOR THE LIFE OF THE PROJECT. EXISTING VEGETATION PRESERVATION AREAS IDENTIFIED ON SHEET 3 SHALL REMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT. Rev. No.Date B.E.F. PHASE II LEGEND PHASE II SUBJECT EXPANSION PROPERTIES GENERAL PROJECT NOTES BARTONSVILLE ENERGY FACILITY: 80-130MW SOLAR PROJECT 34.5kV GENERATION TIE LINE PROJECT SUBSTATION/SWITCHING STATION TOTAL PROJECT PARCEL AREA: 1160.19± AC. (MAXIMUM OF 690 ACRES FOR SOLAR ARRAYS) ACREAGE/ZONING: FREDERICK COUNTY 1010.30± AC./RA DISTRICT TOWN OF STEPHENS CITY 149.89± AC./R1 DISTRICT MAGISTERIAL DISTRICT: BACK CREEK DISTRICT & OPEQUON DISTRICT EXISTING LAND USE: AGRICULTURAL & RESIDENTIAL PHASE I PROJECT DEVELOPMENT NOTES 1.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTED PHOTOVOLTAIC MODULES AND CENTRAL INVERTERS 2.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 100' FROM EXTERNAL ROADS AND PROPERTY LINES 3.A 6' HIGH SECURITY FENCE WITH SECURITY SIGNAGE/24-HOUR CONTACT INFORMATION WILL BE INSTALLED AROUND PERIMETER OF SOLAR ARRAY DEVELOPMENT APPROXIMATELY 75-100' FROM EXTERNAL ROADS AND PROPERTY LINES 4.MINIMAL SAFETY AND SECURITY LIGHTING WILL BE INSTALLED WITH LOCATIONS AND SPECIFICATIONS PROVIDED ON SITE PLAN 5.CONSTRUCTION SEDIMENT PONDS AND PERMANENT STORMWATER MANAGEMENT FACILITIES WILL BE PROVIDED ON SITE PLAN 6.ACCESS TO BARTONSVILLE ENERGY FACILITY WILL BE PROVIDED VIA TWO ENTRANCES LOCATED ON SPRINGDALE ROAD (IDENTIFIED ON SHEET 4) AND ONE ENTRANCE LOCATED ON PASSAGE ROAD (IDENTIFIED ON SHEET 5). DELIVERY OF SOLAR ARRAY PANEL CONSTRUCTION MATERIALS WILL OCCUR AT THE SITE ACCESS ENTRANCE OFF OF PASSAGE ROAD IDENTIFIED AS DEER LANE ON SHEET 4 OF THE CONCEPT PLAN. SOLAR ARRAY PANEL MATERIALS DELIVERY LAYDOWN AREA WILL BE LIMITED TO TAX PARCEL 74-A-44A (CARBAUGH PROPERTY). 7.CARROLLTON ESTATES AND SPRINGDALE GLEN SUBDIVISION PARCELS (B, C, D) TO BE CONSOLIDATED/VACATED PRIOR TO DEVELOPMENT 8.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEALTH FOR THE LIFE OF THE PROJECT. EXISTING VEGETATION PRESERVATION AREAS IDENTIFIED ON SHEET 4 SHALL REMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT. PHASE II SOLAR ARRAY PROJECT AREA BARTONSVILLE ENERGY FACILITY PHASE I PROJECT AREA - CUP# 05-20 B.E.F. PHASE I LEGEND PHASE I SUBJECT PROPERTIES (CUP # 05-20) PHASE I SOLAR ARRAY PROJECT AREA BARTONSVILLE ENERGY FACILITY PHASE II PROJECT EXPANSION AREA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX X XX X X X X X XXXX X XXXXXXX XXX X X X XX XXX X XSTRODEMCLEOD LNRESERVED FORORCHARDPROPOSED SUBSTATION/ SWITCHING STATION MARL B O R O R D CSX RAILROADCSX RAILROADMARL B O R O R DCARTERS LNSOLAR ARRAY DEV. LIMITS SOLAR ARRAY DEV. L I M I T S SOLAR ARRAY DEV. LIM I T S EX VEG/ TREELINE EX VEG/ TREELI N E EX VEG/ TREELINEEX VEG/ TREELINE EX VEG/ TREELINE100'100'200'200'200'CONSTRUCTION ENTRANCE & ACCESS LANDSCAPE BUFFER "A" LANDSCAPE BUFFER "B" LANDSCAPE BUFFER "C" LANDSCAPE BUFFER "B" 100' RESERVED FOR ORCHARD RESERVED FOR ORCHARD RESERVED FOR CROPS RESERVED FOR PASTURE U N D E R G R O U N D IN T E R C O N N E C T I O N E S M T UNDER GROUND INTERCONNECTION ESMTTEMP. LAYDOWN AREA 200' LANDSCAPE BUFFER "B" LANDSCAPE BUFFER "B" LANDSCAPE BUFFER "B"151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV3PH-II CONCEPT DEVELOPMENT PLANBACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY, VIRGINIA10/26/2021 EAW/JMM ---- 5 4505TBARTONSVILLE ENERGY FACILITY II, LLCPHASE II EXPANSION AREA CONCEPT PLAN1" 400' Rev. No.Date PROPOSED ACCESS ROAD TYPICAL SECTION LEGEND PROJECT LANDSCAPE BUFFER AREA SOLAR ARRAY DEVELOPMENT LIMITS/SECURITY FENCE PROPOSED ACCESS ROADS PROPOSED SITE ENTRANCE EXISTING VEGETATION/TREELINE TYPICAL ROAD SECTION 2% MIN 20' MIN COMPACTED NATIVE SUBGRADE PER GEOTECHNICAL ENGINEER ALL WEATHER SURFACE/BASE PER GEOTECHNICAL ENGINEER NTS 14' MAX 26' TRACKER PANEL STOWED POSITION TRACKER PANEL FULL TILT POSITION 19' SOLAR ARRAY PANEL DETAIL SOLAR ARRAY CROSS SECTION NTS LANDSCAPE BUFFER "C" LANDSCAPE BUFFER "A" 100' LANDSCAPE BUFFER "A" not to scale DESCRIPTION : EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIES LANDSCAPE BUFFER "A" EX TREELINE PROPERTY BOUNDARY 100' 1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING; EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF DECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITE PLAN SOLAR ARRAY DEVELOPMENT LIMITS 15' OC LANDSCAPE BUFFER "B" not to scale DESCRIPTION : PROVIDE SINGLE ROW OF EVERGREEN FOR VIEWSHED ENHANCEMENTS LANDSCAPE BUFFER "B" PROPERTY BOUNDARY SOLAR ARRAY DEVELOPMENT LIMITS 15' OC LANDSCAPE BUFFER "B" LANDSCAPE BUFFER "C" not to scale DESCRIPTION : PROVIDE TRIPLE ROW OF EVERGREEN TREES TO SUPPLEMENT EXISTING TREELINE ALONG PROPERTY LINE LANDSCAPE BUFFER "C" PROPERTY BOUNDARY 200' SOLAR ARRAY DEVELOPMENT LIMITS EX TREELINE 15' OC 1. FIRST ROW OF EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2. SECOND AND THIRD ROW OF EVERGREEN TREES TO BE SAPLINGS. 3. SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN PHASE II EXPANSION AREA SUBJECT PROPERTIES PHASE II SOLAR ARRAY PROJECT AREA PHASE I SUBJECT PROPERTIES (CUP # 05-20) PHASE I SOLAR ARRAY PROJECT AREA X 1.EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN VARIABLE DISTANCE XXXXX X X X X XXXXXX X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X SOLAR ARRAY DEVELOPMENT LIMITSSOLAR ARRAY DEV. LMT.SOLAR ARRAY DEV. LIMITSSO L A R A R R A Y D E V . L I M I T SSOLAR ARRAY DEV. LIMITSXXXXXXXXXXXXXXXXXXXXXXXX200'200'SOLAR ARRAY DEV. LIMITSLANDSCAPE BUFFER "A" LANDSCAPE BUFFER "C" LANDSCAPE BUFFER "B"XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X XXXXX X X XXXXXXXX X X X X XXXXX X X X XX X RICE-ROBINSON HOUSE CARTER HALL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV1" 400' 4 9/23/2020 ZJ ---- 5 4505T MATCHLINE SHEET 5 PROPOSED ACCESS ROAD TYPICAL SECTION LEGEND PROJECT AREA PARCELS LANDSCAPE BUFFER AREA STREAMS X SOLAR ARRAY DEVELOPMENT LIMITS/SECURITY FENCE NWI WETLANDS PROPOSED ACCESS ROADS SOLAR ARRAY AREA (PH-1) PROPOSED SITE ENTRANCE EXISTING VEGETATION/TREELINE TYPICAL ROAD SECTION 2% MIN 20' MIN COMPACTED NATIVE SUBGRADE PER GEOTECHNICAL ENGINEER ALL WEATHER SURFACE/BASE PER GEOTECHNICAL ENGINEER NTS 14' MAX 26' TRACKER PANEL STOWED POSITION TRACKER PANEL FULL TILT POSITION 19' SOLAR ARRAY PANEL DETAIL SOLAR ARRAY CROSS SECTION NTS Rev. No.DateRev. No.Date LANDSCAPE BUFFER "A" 100' LANDSCAPE BUFFER "A" not to scale DESCRIPTION : EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIES LANDSCAPE BUFFER "A" EX TREELINE PROPERTY BOUNDARY 100' 1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING; EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF DECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITE PLAN SOLAR ARRAY DEVELOPMENT LIMITS 15' OC LANDSCAPE BUFFER "B" LANDSCAPE BUFFER "B" not to scale DESCRIPTION : PROVIDE DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE LANDSCAPE BUFFER "B" 100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS 15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN CONCEPT DEVELOPMENT PLANOPEQUON/ BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIALANDSCAPE BUFFER "C" not to scale DESCRIPTION : PROVIDE SINGLE ROW OF DECIDUOUS AND EVERGREEN SAPLINGS ALONG BOTH SIDES OF SPRINGDALE ROAD FOR FUTURE VIEWSHED ENHANCEMENTS LANDSCAPE BUFFER "C" 100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS 15' OC LANDSCAPE BUFFER "C" LANDSCAPE BUFFER "D" LANDSCAPE BUFFER "D" not to scale DESCRIPTION : PROVIDE THREE ROWS OF EVERGREEN TREES TO SUPPLEMENT EXISTING TREELINE ALONG PROPERTY LINE LANDSCAPE BUFFER "D" 100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS EX TREELINE 15' OC 1.EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN APPROVED CONCEPT PLAN CUP# 05-20 9/23/2020 BARTONSVILLE ENERGY FACILITYPHASE I PROJECT AREA CUP# 05-20 E EEEEBARTONSVILLE-MEADOWBROOK 138KV TRANSM IS S IO N LIN E SOLAR ARRAY DEV. LMT.SO L A R A R R A Y D E V . L I M I T S PROP 35' POWER LINE ESMNTPROP 35' POWER LINE ESMNTPROPOSED SUBSTATION/ SWITCHING STATION BARTONSVILLE-MEADOWBROOK 138KV TRANSMISSION LINE PROP. CONNECTION TO TRANSMISSION LINE XXXXXXXXX8 4 7 7 ' SOLAR ARRAY AND MATERIALS LAYDOWN AREA LANDSCAPE BUFFER "F" LANDSCAPE BUFFER "E" LANDSCAPE BUFFER "D" LANDSCAPE BUFFER "D" 27 5 . 0 ' EX VEG PRESERVATION AREA XXXXXXX X X X X X X X X X XXXXXXXXXXXXXXXXXXEX VEG PRESERVATION AREA EX VEG PRESERVATION AREA EX VEG PRESERVATION AREA CHERRY DALE (HISTORICAL PROPERTY) CARTER HALL 151 Windy Hill LaneWinchester, Virginia 22602Telephone: (540) 662-4185Fax: (540) 722-9528www.greenwayeng.comFND1971ENGINEERINGSHEET OF DESIGNED BY: FILE NO. SCALE: DATE:PROUDLY SERVING VIRGINIA & WEST VIRGINIAOFFICES IN: WINCHESTER, VA & MARTINSBURG, WV5CONCEPT DEVELOPMENT PLANOPEQUON/ BACK CREEK MAGISTERIAL DISTRICTFREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA9/23/2020 ZJ ---- 5 4505TBARTONSVILLE ENERGY FACILITYPHASE I PROJECT AREA CUP# 05-20MATCHLINE SHEET 4 MATCHLINE SHEET 3 NOTES ·BARTONSVILLE ENERGY FACILITY WILL INSTALL AN UNDERGROUND GENERATION-TIE LINE WITHIN AN EASEMENT ON TAX MAP PARCELS 74-A-20, 74-A-35A, AND 74-A-44. ·PROJECT SUBSTATION AND SWITCHING STATION WILL BE CONSTRUCTED ON TAX MAP PARCELS 74-A-20 & 74-A-21, ADJACENT TO CSX RAILROAD ·PROJECT WILL SUPPLY ELECTRICITY INTO THE BARTONSVILLE - MEADOWBROOK 138KV TRANSMISSION LINE 1" 400' SOLAR ARRAY PANEL DETAIL 14' MAX 26' TRACKER PANEL STOWED POSITION TRACKER PANEL FULL TILT POSITION 19' SOLAR ARRAY CROSS SECTION NTS LEGEND PROJECT AREA PARCELS LANDSCAPE BUFFER AREA STREAMS X SOLAR ARRAY DEVELOPMENT LIMITS/SECURITY FENCE NWI WETLANDS PROPOSED ACCESS ROADS 100 YR FLOODPLAIN SOLAR ARRAY AREA (PH-1) PROPOSED SITE ENTRANCE EXISTING VEGETATION/TREELINE INTERCONNECTION PARCELS Rev. No.Date INTERCONNECTION POWERLINE EASMENT DETAIL TYPICAL EASEMENT 35' 35' EASEMENT W/ PRIVATE ACCESS & UNDERGROUND GEN-TIE LINE PROPOSED ACCESS ROAD TYPICAL SECTION TYPICAL ROAD SECTION 2% MIN 20' MIN COMPACTED NATIVE SUBGRADE PER GEOTECHNICAL ENGINEER ALL WEATHER SURFACE/BASE PER GEOTECHNICAL ENGINEER NTS NTS LANDSCAPE BUFFER "E" LANDSCAPE BUFFER "E" not to scale DESCRIPTION : PROVIDE DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINES AND SUBSTATION BORDER LANDSCAPE BUFFER "E" 100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS 15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN LANDSCAPE BUFFER "F" LANDSCAPE BUFFER "F" not to scale DESCRIPTION : PROVIDE EARTH BERM AND DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE LANDSCAPE BUFFER "F" PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS 15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREEN TREES TO BE PROVIDED ON SITE PLAN 3.7' AVERAGE HEIGHT EARTH BERM TO BE CONSTRUCTED ALONG ENTIRE LENGTH OF ADJOINING PROPERTY LINE APPROVED CONCEPT PLAN CUP# 05-20 9/23/2020