Loading...
HomeMy WebLinkAbout45-19 CommentsFrom:Tyler Klein To:Kirstin N. Twardon Subject:FW: Albin Citizen"s Convenience Center Site Plan Approval Date:Wednesday, May 27, 2020 11:29:02 AM Attachments:image001.png From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov> Sent: Thursday, February 06, 2020 3:06 PM To: Joseph Johnson <joseph.johnson@fcva.us> Cc: Matthew Smith <Matthew.Smith@vdot.virginia.gov>; Rhonda Funkhouser <Rhonda.Funkhouser@vdot.virginia.gov>; Tyler Klein <tklein@fcva.us>; Edwin Carter <edwin.carter@vdot.virginia.gov> Subject: Albin Citizen's Convenience Center Site Plan Approval DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Joe, A VDOT review has been conducted for the Albin Citizen’s Convenience Center Site Plan signature dated January 20, 2020. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings. We offer the following general comments: Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. A Land Use Permit shall be obtained before any work is performed on the State’s right-of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. Please submit one electronic copy of the plans as well as two additional hard copies of the plan to this office for inspection, permit and filing. If you have any questions or need further information, please do not hesitate to contact me. Sincerely, Timothy Rhodes VDOT~Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630