Loading...
PC 05-05-21 Meeting Agenda1.Call to Order 2.Adoption of Agenda – Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting. 3.Committee Reports 4.Citizen Comments 5.Public Hearings 5.A.Draft Update of the 2021-2022 Frederick County Primary and Interstate Road Improvement Plans - (Mr. Bishop) Draft Update of the 2021-2022 Frederick County Primary and Interstate Road Improvement Plans – The Primary and Interstate Road Improvement Plans establish priorities for improvements to the Primary and Interstate road networks within Frederick County. Comments from the Transportation Committee will be forwarded to the Planning Commission and Board of Supervisors. Ultimately, the priorities adopted by the Board of Supervisors will be forwarded to the Commonwealth Transportation Board for consideration. The Virginia Department of Transportation and the Planning Commission of Frederick County, in accordance with Section 33.2-331 of the Code of Virginia, will conduct a joint public hearing in the Board Room of the Frederick County Government Center, 107 North Kent Street, Winchester, Virginia at 7:00 p.m. on Wednesday, May 5, 2021. The purpose of this public hearing is to receive public comment on the proposed Six Year Plan for Secondary Roads for Fiscal Year 2022. Copies of the proposed Plan and Budget may be reviewed at the Edinburg Office of the Virginia Department of Transportation, located at 14031 Old Valley Pike, Edinburg, Virginia or at the Frederick County offices located at 107 North Kent Street, Winchester, Virginia. All projects in the Secondary Road Improvement Plan that are eligible for federal funds will be included in the Statewide Transportation Improvement Program (STIP), which documents how Virginia will obligate federal transportation AGENDA PLANNING COMMISSION WEDNESDAY, MAY 5, 2021 7:00 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA 1 funds. Persons requiring special assistance to attend and participate in this hearing should contact the Virginia Department of Transportation at 1-800-367-7623. Persons wishing to speak at this public hearing should contact the Frederick County Planning Department at 540-665-5651. 6.Information/Discussion Items 6.A.Ordinance Amendment - Agricultural Supply Cooperatives in the RA Zoning District - (Mr. Cheran) Discussion on a proposed ordinance amendment to add “Agricultural Supply Cooperatives” as a conditional use in the RA (Rural Areas) Zoning District. 7.Other 8.Adjourn PC05-05-21InterstatePrimarySecondaryRoadPlan.pdf PC05-05-21OAAgricultralSupplyCooperative.pdf 2 Planning Commission Agenda Item Detail Meeting Date: May 5, 2021 Agenda Section: Public Hearings Title: Draft Update of the 2021-2022 Frederick County Primary and Interstate Road Improvement Plans - (Mr. Bishop) Attachments: PC05-05-21InterstatePrimarySecondaryRoadPlan.pdf 3 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 TO: Frederick County Planning Commission FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: Update of the Interstate, Primary, and Secondary Road Plans DATE: April 27, 2021 This is a public hearing item to consider the update of the 2021 – 2022 Interstate, Primary, and Secondary Road Improvement Plans. Summary of Changes: Updates to the priorities which are being recommended are for the reasons of consistency between the plans and for continuity and support of the Board’s SmartScale applications. Interstate Plan Updates are as follows: 1. There are no changes to the Interstate Plan at this time Primary Plan Updates are as follows: 1. Reorder the priorities of the phases of Route 37 to prioritize need over constructability. 2. Add the slip ramps from Lenoir Drive to Route 37. Secondary Plan Updates are as follows: 1. Update Major road improvements list to reflect current activities. 2. Update Advertisement years for projects on the scheduled list. No new projects were added to the scheduled list. The Transportation Committee reviewed this item on April 26, 2021 and has recommended approval to the Board of Supervisors. Staff is seeking a recommendation from the Planning Commission to the Board of Supervisors on the plans. Attachments JAB/pd MEMORANDUM 4 2021-2022 INTERSTATE ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/21 Frederick County Board of Supervisors: 5 6 ¬«7 ¬«277 ¬«37 §¨¦81 §¨¦81 §¨¦66 §¨¦81 £¤11 £¤50 £¤50 £¤522 £¤522 £¤11 £¤50 £¤522 £¤11 £¤522 £¤522 £¤50 £¤11 £¤522 Winchester Middletown StephensCity 0 2.5 51.25 Miles 2021 - 2022Interstate Ro adImprovement Plan Widening Priorities Priority 2Widen I-81 fromExit 307 to Exit 313 Priority 1Widen I-81 fromExit 313 to Exit 317 Widen Remainder of I-81 SouthPriority 4Widen Remainder of I-81 NorthPriority 3 Priority 5 !(Exit 307 Ramp Relocation Interchange ImprovementPriorities Priority 3Exit 310 Phase II of theInterchange Upgrade!( Priority 1Exit 313 Bridge Reconstruction,Safety Improvements, andCapacity Expansion!( Priority 4 !(Exit 307 Safety and CapacityImprovements to Existing Locationand Promote Future Realignment Priority 2 Exit 317 Interchange Upgradeand Redbud Rd Realignment toAccomodate InterchangeUpgrade !( 7 2021-2022 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/2021 Frederick County Board of Supervisors: 8 All upgrades to primary system roadways that are not limited access should include implementation of access management principles to improve safety and efficiency wherever possible. 1) Route 37 Bypass A. Route 37 – Phase 1 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between existing Route 11 North and Route 7. B. Route 37 - Phase 2 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the southern segment of the Route 37 Eastern Bypass from Interstate I-81 to Front Royal Pike (Route 522 South). C. Route 37 – Phase 3 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Existing Route 37 around Stonewall Industrial Park to Route 11 North. D. Route 37 - Phase 4 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Route 7 and Route 522. 2) Route 11 (North and South of Winchester) A) Establish an Urban Divided Six Lane System: From: Northern limits of the City of Winchester To: Intersection of Cedar Hill Road B) Establish an Urban Divided Four Lane System: From: Southern limits of the City of Winchester To: Renaissance Drive C) Establish an Urban Divided Four Lane System: From: Intersection of Cedar Hill Road To: West Virginia line 3) Route 37 Slip Ramps to Lenoir Drive Construct Ramps to allow traffic to enter and exit the southbound side of Route 37 from Lenoir Drive. 9 4) Route 277 (East of Stephens City) Upgrade of the overall corridor to a 4-lane divided system with improved access management and bicycle and pedestrian facilities. A) Establish an Urban Divided Four Lane System: From: Double Church Road To: Warrior Drive B) Establish an Urban Divided Four Lane System: From: Warrior Drive To: White Oak Road C) Establish an Urban Divided Four Lane System: From: White Oak Road To: Route 277 5) Route 7 – Establish a 6 Lane Cross Section: From: Exit 315 Interchange To: Future Route 37 Interchange 6) Route 50 East and West A) Establish a 6 Lane Cross Section: From: The Interchange at Exit 313 To: The Future Route 37 Interchange B) Establish a 6 Lane Cross Section: From: The Interchange with Route 37 To: Poorhouse Road 7) South Frederick County Parkway: From: Relocated Exit 307 To: Intersection with Route 277 approximately 1 mile west of the intersection of Route 277 and Route 522 This is a new planned roadway with limited access points serving a mixture of predominantly commercial and industrial development. There is a need to study this project in conjunction with the Exit 307 relocation and planning for Route 277 improvements noted in item 3. 10 Phasing of this project is not yet clearly defined; however general phasing would be from West to East with the clear first phase being from relocated Exit 307 to Warrior Drive. 8) Route 522 and Costello Drive Add additional left turn lane capacity on Route 522 southbound for turns onto Costello Drive. 9) Commuter Park and Ride Lots Establish a new park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Northern Shenandoah Valley Regional Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County’s Urban Development Area. For Park and Ride locations in Frederick County, the primary goal should be that they are situated in such a manner that they reduce traffic in Frederick County in addition to adjacent localities. 11 2A 2B 2C 1A 1B 1D 1C 3 5 4A 6A 6B 4B 4C 7 §¨¦81 §¨¦81 ¬«277 ¬«277 ¬«37 ¬«7 ¬«7 ¬«7 ¬«37 ¬«37 £¤50 £¤522 £¤11 £¤50 £¤522 £¤11 £¤522 £¤522 £¤11 £¤522 Winchester Stephens City 2021 - 2022Primary RoadImprovementPlan 0 1 20.5 Miles Route 37 Bypass Phases Priority 1A Priority 1B Priority 1C Priority 1D Route 11 North & South Priority 2A Priority 2B Priority 2C Lenoir Drive/Route 37 Slip Ramps Priority 3 Route 277 East of Stephens City Priority 4A Priority 4B Priority 4C Route 7 Priority 5 Route 50 Priority 6A Priority 6B South Frederick County Parkway Priority 7 Route 522 & Costello Dr !(Priority 8 Commuter - Park & Ride Lots !(Priority 9 2A 12 2021/22-2026/27 SECONDARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 4/26/21 Frederick County Planning Commission: 5/5/21 Frederick County Board of Supervisors: 13 14 ¬«277 ¬«37 ¬«7 ¬«7 ¬«7 ¬«37 §¨¦81 §¨¦81 £¤50 £¤522 £¤11 £¤50 £¤11 £¤522 £¤522 Winchester Stephens City Frederick CountyMajor RoadImprovement Projects2021/2022 thru 2026/2027 0 1 20.5 Milesµ 1 4 2 3 1. Redbud Rd Realignment 4. Renaissance Dr Phase II 3. Airport Rd Extension 2. East Tevis Street 15 16 §¨¦81 §¨¦81 §¨¦66 ¬«55 ¬«259 ¬«277 ¬«127 ¬«7 ¬«37 £¤50 £¤522 £¤522 £¤522 £¤11 £¤50 £¤50 £¤522 £¤11 £¤522 Winche ster Middletown Stephens City Frede rick CountyNon-Hardsurfaced RoadImprovement Projects2021/2022 thru 2026/2027 µ 0 4 82 Mi les 1. Laurel Grove Rd 2. Old Baltimore R d 3. Middle Fork Rd 4. Tim berlakes Ln 5. East Parkins Mill Rd 6. Fletcher Rd 7. Fishel Rd 8. Canterburg Rd 1 3 2 4 5 6 7 8 17 18 §¨¦81 §¨¦81 §¨¦66 ¬«55 ¬«259 ¬«277 ¬«127 ¬«7 ¬«37 £¤50 £¤522 £¤522 £¤522 £¤11 £¤50 £¤50 £¤522 £¤11 £¤522 Winche ster Middletown Stephens City SH AW NEE REDBUD STONEW ALL GAINESB ORO BACK CREEK OPEQUON Frederick CountyUnscheduledNon-Hardsurfaced RoadImprovement Projects2021/2022 thru 2026/2027 µ 0 4 82 Miles 1. Clark R d 2. Heishman Ln 3. Glaize Orchard Rd 4. South Timber Ridge Rd 5. Cougill Rd 6. Cattail R d 7. Hunting R idge R d 8. Huttle Rd 9. Ruebuck R d 10. Light Rd 11. McDonald R d 12. Grace C hurch Rd 13. Mount Olive R d 14. Gardners R d 15. Shockeysville Rd 16. Knob Rd 17. Mount Olive R d 7 4 15 10 3 6 14 9 12 16 17 13 11 2 1 5 8 19 Planning Commission Agenda Item Detail Meeting Date: May 5, 2021 Agenda Section: Information/Discussion Items Title: Ordinance Amendment - Agricultural Supply Cooperatives in the RA Zoning District - (Mr. Cheran) Attachments: PC05-05-21OAAgricultralSupplyCooperative.pdf 20 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: Mark R. Cheran, Zoning Administrator SUBJECT: Discussion - Ordinance Amendment – Agricultural Supply Cooperatives DATE: April 23, 2021 At the Board of Supervisors meeting on April 14, 2021, staff was directed to prepare an amendment to the Zoning Ordinance to add “Agricultural Supply Cooperatives” as a conditional use in the RA (Rural Areas) Zoning District. Staff has prepared a text amendment for three areas of the Zoning Ordinance. These include: 1) a new definition for Agricultural Supply Cooperatives, 2) supplemental use regulations pertaining to this use, and 3) the inclusion of Agricultural Supply Cooperatives as a conditional use in the RA District. The Development Review and Regulations (DRRC) discussed this item at their meeting on April 22, 2021. The DRRC agreed with the text amendment with minor modifications and forwarded it to the Planning Commission for discussion. The attached document shows the existing ordinance with the proposed changes supported by the DRRC (with bold italic for text added). This item is presented for discussion. Comments and suggestions from the Planning Commission will be forwarded to the Board of Supervisors. Attachments: 1. Revised ordinance with additions shown in bold underlined italics. MRC/pd 21 OA – Agricultural Supply Cooperatives Revised April 22, 2021 ARTICLE I General Provisions; Amendments; and Conditional Use Permits Part 101 General Provisions 165-101.02 Definitions and word usage. Agricultural Supply Cooperatives – Establishments primarily engaged in the retail or wholesale distribution of livestock and animal feed, fertilizers, agricultural chemicals, pesticides, seeds, and other agricultural products or services. ARTICLE II Supplementary Use Regulations; Parking; Buffers; and Regulations for Specific Uses Part 204 Additional Regulations for Specific Uses Agricultural Supply Cooperatives located in the RA Rural Areas Zoning District shall meet the following requirements: A. The sale of agricultural and garden machinery shall only be permitted as an accessory use. B. The repair of agricultural machinery or equipment shall be prohibited. C. Retail fuel sales shall be prohibited; sale of propane or off-road diesel fuel shall be permitted as a accessory use. D. A site plan shall be submitted to and approved by Frederick County prior to the establishment of the use. E. B2 General Business Zoning District standards apply, including but not limited to building height, building setbacks, parking setbacks, buffering, screening, and landscaping. ARTICLE IV Agricultural and Residential Districts Part 401 RA Rural Areas District 165-401.03 Conditional Uses. EE. Agricultural Supply Cooperatives 22