Loading...
PC 04-21-21 Work Session Agenda5:30 Work Session Call to Order Discussion Item(s) Planning Commission Application Briefing for Rezoning #01-21 for One Logistics Park Winchester Submitted by Gordon, to rezone 277.16+/- acres from the R4 (Residential Planned Community) District to the B2 (General Business) and M1 (Light Industrial) Districts with proffers. The properties are located approximately one mile east of I-81 on the south side of Millwood Pike (Route 50), east of Prince Frederick Drive (Route 781) and Coverstone Drive (Route 1538) and west of Arbor Court and Pendleton Drive in the Shawnee Magisterial District and are identified by Property Identification Numbers 64-A-83, 64-A-83A, 64-A-84, 64-A-85, 64-A-86, and 64-A 87. In recognition of open meeting notification procedures, please be advised that the Board of Supervisors has been invited to attend the Work Session. Adjourn to Regular Meeting AGENDA PLANNING COMMISSION WEDNESDAY, APRIL 21, 2021 5:30 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC04-21-21ApplicationBriefingREZ01-21.pdf 1 Planning Commission Agenda Item Detail Meeting Date: April 21, 2021 Agenda Section: Discussion Item(s) Title: Planning Commission Application Briefing for Rezoning #01-21 for One Logistics Park Winchester Attachments: PC04-21-21ApplicationBriefingREZ01-21.pdf 2 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street • Winchester, Virginia 22601-5000 MEMORANDUM TO: Frederick County Planning Commission FROM: Candice E. Perkins, AICP, CZA, Assistant Director SUBJECT: April 21, 2021 Planning Commission Work Session-Application Briefing One Logistics Winchester Rezoning Application (RZ #01-21) DATE: April 13, 2021 Please find attached the Application Briefing Package for the One Logistics Winchester rezoning. The Planning Commission held a public hearing for this rezoning on March 17, 2021; the rezoning was postponed for 90 days. At that meeting, the Commission requested a work session to further discuss this application prior to its return date in June 2021. Enabled per the Planning Commission’s Bylaws and Roles and Responsibilities, the application briefing is an opportunity for the Planning Commission to discuss details of the application, any revised proffers provided or anticipated by the Applicant, and other aspects of the application that warrant detailed analysis or explanations. Please contact staff should you have any questions. Attachment: One Logistics Winchester Application Briefing Package 3 One Logistics Winchester – Application Briefing Work Session Application Briefing Package Contents: Staff Application Briefing Report: ❖ Application Overview ❖ Site History and Current Zoning ❖ 2035 Comprehensive Plan o Land Use o Transportation and Site Access ❖ Potential Transportation Impacts ❖ Staff Analysis – Transportation Proffers and Identified Concerns Maps: ❖ Location and Current Zoning Map ❖ Current Comprehensive Plan Map One Logistics Winchester Application content: ❖ Proposed Proffer Statement and Generalized Development Plan ❖ Transportation Impact Analysis ❖ Rezoning Application ❖ Impact Analysis Statement Review Agency Comments: ❖ VDOT Comments ❖ Applicant Response Memo Carpers Valley/Governors Hill Rezoning – current approved proffers and generalized development plan (2014 revision) 4 STAFF APPLICATION BRIEFING – ONE LOGISTICS PARK WINCHESTER- REZONING APPLICATION #01-21 Staff Contacts: Candice E. Perkins, AICP, CZA, Assistant Director John A. Bishop, AICP, Assistant Director - Transportation Prepared: April 13, 2021 This work session for an application briefing, scheduled for April 21, 2021, offers an opportunity for staff to provide the Planning Commission and Board of Supervisors with the details of a complex application. This briefing may be beneficial, as details of the application will be reviewed and clarified, and concerns expressed. Unresolved issues concerning this application are noted throughout this report. APPLICATION OVERVIEW: This is an application to rezone a total of 277.16+/- acres from the R4 (Residential Planned Community) District with proffers to the B2 (General Business) District and the M1 (Light Industrial) District with proffers. The site is located east of I-81 on the south side of Millwood Pike, east of Prince Frederick Drive and Coverstone Drive and west of Arbor Court and Pendleton Drive, in the Shawnee Magisterial District. The subject properties are part of the original Carpers Valley/Governors Hill Rezoning which was approved in 2005 (revised in 2009, 2013 and 2014). Rezoning #11-05 provided for 143 acres of commercial uses and 550 residential units on six parcels of land (Land Bay 1 – Residential, Land Bay 2 – Commercial). This application proposes to rezone the majority of the site to allow for industrial uses, with an area of commercial remaining at the intersection of Coverstone Drive and Millwood Pike (Route 50 East) and eliminates the residential units previously approved. The site is located within the limits of the Senseny/Eastern Frederick Urban Area Plan of the 2035 Comprehensive Plan. The Plan identifies these properties with a commercial/transition and residential land use designation; staff would note that these designations are consistent with the current zoning of the site. Staff has also outlined concerns with the transportation proffers proposed by the Applicant and whether they adequately address the impacts generated by the proposal. The following items warrant discussion during the Staff Application Briefing, and ultimately should be addressed to the satisfaction of the Planning Commission and Board of Supervisors: 1) It should be evaluated whether the transportation improvements proffered by the Applicant are adequate to address the impacts generated by this rezoning request. 2) Staff has identified several concerns with the layout and phasing of transportation proffers proposed by the Applicant. 3) The proposed M1 (Light Industrial) Zoning District is generally inconsistent with the land use depicted in the 2035 Comprehensive Plan. 4) VDOT comments remain unresolved. 5 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 2 Site History and Current Zoning: The subject properties were rezoned from the RA (Rural Areas) District to the R4 (Residential Planned Community) District in 2005 (revised in 2009, 2013 and 2014). A Master Development Plan was approved for the property, the Governors Hill project, in 2009. The proffers approved with Rezoning #03-14 are attached. Comprehensive Plan Land Use The site is located within the limits of the Senseny/Eastern Frederick Urban Area Plan of the 2035 Comprehensive Plan. The Plan identifies these properties with a commercial/transition and residential land use designation; these designations are consistent with the current zoning. Therefore, the requested M1 District is generally inconsistent with the Comprehensive Plan. The subject parcels are also located within the boundaries of the Airport Support Area that surrounds the Winchester Regional Airport. This area comprises a zone of influence for airport operations wherein new residential land use is discouraged due to the prevalence of aircraft noise and the consequent potential for use incompatibilities. The development of business and industrial land uses is supported within the Airport Support Area to minimize such use conflicts and ensure the feasibility of future airport expansion. The elimination of the residential zoning that currently exists on the site would further the goals of the Airport Support Area. Transportation and Site Access The planned road network included in the Senseny/Eastern Frederick Urban Area Plan identifies a major collector road system which provides for an east-west linkage (Coverstone Drive) which connects to Millwood Pike at Inverlee Drive. A portion of Coverstone Drive currently exits from Prince Frederick Drive to the property boundary of the Frederick County Public Safety Center. The planned phased connection from the existing terminus of Coverstone Drive to Millwood Pike at Inverlee Drive provides for an important linkage that serves both this development and surrounding land uses. This connection would offer an alternative route that would help relieve future congestion on Route 50 between Prince Frederick Drive and I-81. In addition, Coverstone Drive will connect with the future relocated Route 522 South, which once approved and constructed, would connect at Prince Frederick Drive. In combination with the Crossover Boulevard project, which is currently under construction from Airport Road into the City of Winchester, this important network connection would allow significant traffic flow from this development and surrounding land uses to access Route 522 and the City of Winchester without traveling through the Exit 313 interchange area. Potential Transportation Impacts: While the completion of Coverstone Drive will provide an important linkage in this area, it’s important to examine the anticipated traffic generation from this proposal and its projected impact on the greater network that will serve this development. The current transportation assumptions for the existing approved development anticipated a trip generation at buildout of 47,085 vehicles per day. The 6 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 3 proposed application being considered shows a reduction to 17,606 vehicles per day. While it is recognized that this proposal results in a significantly reduced overall trip generation, it should be recognized that this development would generate more tractor trailer trips and interstate-based trips. VDOT has expressed significant concern, as outlined in their comments, that the function of the Exit 313 interchange will be negatively impacted during the peak times that were studied. Given that the pending improvements to Exit 313 by VDOT include minimal capacity improvements, these interchange improvements will not alleviate the impacts from this development and the concerns that have been identified by VDOT. Staff Analysis - Transportation Proffers and Identified Concerns: The proposed transportation proffers associated with this rezoning application are as follows, Staff has identified concerns with the proffers that are shown in bold italic: Proffer Statement – Revised April 6, 2021: 2. TRANSPORTATION 2.1. The public roadways proposed on the Property shall be constructed in the locations depicted on the GDP. Minor modifications, as necessary upon final engineering, including but not limited to land bay ingress/egress and intersection alignments, must meet the intent of the proffers and receive Director of Planning and VDOT approval at site plan or road plan. 2.2. The Owners shall design, construct and dedicate Coverstone Drive as a half section of an urban four-lane divided collector road with turn lanes as warranted within an approximate 102' right-of-way. The road could be built as one complete operation or in phases, not limited to the order of the following phasing schedule: Staff Note: The updated language appears to allow a reordering of the phases of roadway development. Staff feels that it is important that the phasing schedule be maintained as previously proposed. Staff has no issues with advancement of the schedule but would be concerned about a reordering of the schedule. As established, the schedule prioritizes access to Route 50, and this should be maintained. PHASE 1: Phase 1 shall consist of the full four-lane divided urban collector road section, including a ten-foot shared-use asphalt trail, from Millwood Pike to the south boundary of Land Bay 3, as depicted on the GDP. Said roadway shall be bonded and constructed to a minimum base asphalt prior to issuance of a certificate of occupancy for any commercial building within Land Bay 3. Phase 1 improvements shall consist of all necessary improvements, including signalization if or when warranted by VDOT, to create a four way intersection, or alternative intersection, 7 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 4 subject to VDOT approval, at the existing intersection of Inverlee Way and Millwood Pike as shown on the GDP. Additionally, the Owner shall close the existing Millwood Pike crossover previously used for access to the golf course concurrent with Phase 1 improvements. PHASE 2: Phase 2 shall consist of construction of a two-lane urban half section of Coverstone Drive from the south boundary of Land Bay 3 to the Pendleton Drive intersection as depicted on the GDP, including a shared-use asphalt trail on the east side of this roadway. Said roadway improvements shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 5 through 8. This two-lane half section shall be subject to final engineering and VDOT approval and shall include the two ultimate northbound lanes used for two-way traffic, with a lane transition to the Phase 1 four lane section. PHASE 3: Phase 3 shall consist of construction of a two-lane urban half section of Coverstone Drive from the Pendleton Drive intersection to the existing Coverstone Drive connection at 1080 Coverstone Drive (TM 64-A-87A) as depicted on the GDP, including transition to the existing four-lane section and a shared-use asphalt trail to the south/east of the roadway. Said roadway improvements shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 1 or 2. This two-lane half section shall be subject to final engineering and VDOT approval and shall include the two ultimate eastbound lanes used for two-way traffic, with a lane transition to the existing four lane section. 2.3. If projected vehicle per day (VPD) traffic on Coverstone Drive exceeds 10,000 VPD total or if Heavy Vehicle traffic exceeds 800 Heavy Vehicle VPD on Coverstone Drive, south of Land Bay 3 the Owner shall expedite construction of Coverstone Drive as an ultimate full urban four lane section, from Millwood Pike to the existing eastern terminus of Coverstone Drive (1080 Coverstone Drive (TM 64-A-87A) (Phases 2 and 3 above). The term “Heavy Vehicle” shall be defined as per FHWA Classification Type 4 or higher (6 tires, or multi-axle vehicle). In order to ensure compliance with this Proffer 2.3, the owner shall provide a vehicle classification count to Frederick County, including Heavy Vehicle counts, not later than issuance of the certificate of occupancy for new construction on the Property that yields a minimum cumulative aggregate of 2,400,000 square feet of new construction on the Property. Additionally, the owner shall provide a vehicle classification count to Frederick County, including Heavy Vehicle counts, at the issuance of the final certificate of occupancy for new construction on the Property. Staff Note: 2.4 million square feet an advanced level of development for the overall proposed development to start doing traffic counts. Staff would suggest that the Applicant consider a traffic count prior to occupancy of any new use once the two-lane section has been completed. 2.4. The Owners shall design and construct the extension of existing Pendleton Drive to 8 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 5 Coverstone Drive, as shown on the GDP. The proposed extension will be a minimum two-lane urban local roadway with an approximate right of way width of 60' to provide access to employment uses within Phase B (Land Bays 5 through 8). The Pendleton Drive extension shall be constructed prior to issuance of the first occupancy permit within Phase B. 2.5. Access to Millwood Pike shall be limited to Coverstone Drive, as shown on the GDP, with the exception of the private driveway currently serving TM 64-A-83B. The Owner shall maintain an access easement for said driveway until such time as the property changes land use. If rezoned by others for non-residential uses, an interparcel access linkage shall be provided. No new commercial access to Millwood Pike is proposed and the existing driveway to 1600 Millwood Pike (TM 64-A-83B) will not be used for site access. 2.6. Off-site road improvements shall be designed to the latest VDOT standards, unless otherwise approved by VDOT in general conformance with the submitted impact study Off-site improvements shall be constructed as depicted on the aforementioned plans as follows: 2.6.1: Eastern improvements shall consist of improvements at the intersection of Millwood Pike/Inverlee Way/Coverstone Drive and shall be completed coincident with the Coverstone Drive construction described in 2.2, Phase 1, and shall consist of the following improvements: a) Eastbound Millwood Pike right turn lane to Coverstone Drive b) Westbound Millwood Pike dual left turns to Coverstone Drive, and c) Northbound Coverstone Drive dual lefts to Millwood Pike 2.6.2: Western improvements shall consist of improvements at the intersection of Prince Frederick Drive/Costello Drive and shall be completed with construction of Phases 1-3 in accordance with Proffer 2.2 and concurrent with new construction that yields a total aggregate new construction amount on the Property in excess of 1,491,600 sf and shall consist of the following improvements: a) Northbound Prince Frederick Drive left to Costello Drive and b) Installation of traffic signalization at the intersection of Prince Frederick Drive and Costello Drive, if deemed warranted by VDOT and subject to VDOT approval. If warranted, this installation will occur once Proffer 2.2 Coverstone Drive Phase 2 and Phase 3 improvements have been completed and accepted into the State highway system. If this traffic signalization is not warranted by VDOT at that time, the Owners will provide a cash contribution in the amount Two Hundred Thousand Dollars ($200,000) to Frederick County for regional roadway improvements off-site in the Millwood Pike corridor as determined by 9 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 6 the Board of Supervisors. This cash contribution shall be escalated per the Consumer Price Index (CPI-U) forward from the date of rezoning approval. Staff Note: As also noted by the County Attorney, additional clarity should be provided that would give a more specific implementation timetable instead of a range. 2.6.3: Northern improvements shall consist of improvements at the intersection of Millwood Pike and Prince Frederick Drive and shall consist of the following improvements: a) Construct additional lane on northbound Prince Frederick Drive to provide a dedicated left, left/through, and right turn lane, including modifications to the existing signal and geometric improvements of the crossover and shall be completed with the construction of Phases 1-3 in 2.2 and with site square footage in excess of 1,491,600 sf. 2.7. The Owner’s obligations to complete the off-site transportation improvements described in Proffers 2.2 and 2.6 shall be contingent upon the acquisition of the off-site right-of- way and necessary easements required for these improvements. The Owner shall make a good faith effort to obtain this off-site right-of-way and necessary easements by private means at fair market value. If the Owner is not able to acquire any of this required off- site right-of-way and necessary easement through private means, the Owners shall request use of eminent domain by the County. In the event that the County decides not to exercise its power of eminent domain so as to acquire the off-site right-of-way and necessary easements required for these improvements, the Owners shall instead provide alternative satisfaction of its proffered obligation to construct these off-site improvements by providing a cash contribution at that time to the County for the estimated construction costs of those off-site transportation improvements it is not able to construct for use by the County for regional roadway improvements off-site in the Millwood Pike corridor as determined by the Board of Supervisors. The construction cost estimate shall be subject to review and approval by the County. This cash contribution shall coincide with the thresholds that triggers the off-site road improvement as identified in Proffer 2.6. Staff Note: This proffer would request the Board of Supervisors to use eminent domain to acquire private land should the Applicant be unable to obtain the needed area or easements. If this does not occur, it could leave the County with an unacceptable traffic condition at the location identified for an off-site improvement and no realistic way to address it. Furthermore, this proffer does not address who would bear the cost of the acquisition and associated fees for any right-of-way needed; only the construction costs of the improvements are specified. The fair market 10 Planning Commission Work Session – Application Briefing Rezoning #01-21 One Logistics Park Winchester April 13, 2021 Page 7 value (FMV) of any right-of-way acquisition should be included in addition to construction costs. 2.8. Any future transportation analyses required for the Property shall utilize the Land Use Code per the latest version of the I.T.E. Trip Generation Manual for any non-residential use. Determination on alternative land uses shall be scoped with VDOT and approved in writing prior to submission of site plan. 2.9. In the event any proffered off-site road improvements are constructed by others, the Owners shall contribute to Frederick County an amount equivalent to the verified actual cost of these proffered improvement, as substantiated by paid invoices. Such contribution shall coincide with the non-residential use threshold that triggers the off- site road improvements as identified in Proffer 2.6. The warrant study justifying the improvements should accompany the request for reimbursement. Staff Note: This proffer appears unnecessary with the addition of proffer 2.7. AGENCY REVIEW COMMENTS: Virginia Dept. of Transportation: Please see attached letter from Pennoni dated February 12, 2021 addressed to Bradley S. Riggleman, P.E. County Attorney: Please see attached comments dated April 12, 2021. 11 WINCH ESTERREGIONAL AIRPORTSubdivisionAIRPORT BUSINESS CENTERSubdivision J I C LTD.Subdivision GOVERNORS HILLSubdivision PRINCEFREDERICK OFFICE PARTSubdivision RAVENPOINTESubdivision £¤50 64 A 83 64 A 86 64 A 84 64 A 83A 64 A 87 64 A 87 64 A 85 300ADMIRAL BYRD DR 300ADMIRALBYRD DR 300ADMIRALBYRD DR 511AIRPORT RD 222ADMIRALBYRD DR 200AVIATION DR 600AIRPORT RD640AIRPORT RD 211VICTORY RD 382ARBOR CT 250INDEPENDENCE DR 212INDEPENDENCE DR 491AIRPORT RD 380ARBOR CT 280VICTORY RD 140INDEPENDENCE DR 220ADMIRALBYRD DR 338ARBOR CT 287VICTORY RD287VICTORY RD 320VICTORY RD 368VICTORY RD 344VICTORY RD 180ADMIRALBYRD DR 321ARBOR CT 331VICTORY RD 390AIRPORT RD 296ARBOR CT 351VICTORY RD 411VICTORY RD 181PENDLETON DR 266ARBOR CT 220ARBOR CT 119ARBOR CT290AIRPORT RD 600PEGASUS CT 220ARBOR CT 182ARBOR CT311AIRPORT RD 295AIRPORT RD 402BUFFLICK RD 140ARBOR CT352BUFFLICK RD 431BUFFLICK RD 330BUFFLICK RD 361BUFFLICK RD391BUFFLICK RD399BUFFLICK RD 1830MILLWOODPIKE 301BUFFLICK RD317BUFFLICK RD325BUFFLICK RD 1828MILLWOODPIKE 1825MILLWOODPIKE 1815MILLWOODPIKE 1809MILLWOODPIKE 1080COVERSTONE DR 1773MILLWOOD PIKE 112SULPHURSPRING RD1753MILLWOODPIKE 231SULPHURSPRING RD 1600MILLWOODPIKE 143SULPHUR SPRING RD 185SULPHURSPRING RD 201PRINCEFREDERICK 1170GREENWOOD RD 1525MILLWOODPIKE 1441MILLWOOD PIKE 1517MILLWOODPIKE 177RYCO LN 179RYCO LN 1230MILLWOODPIKE 1288MILLWOOD PIKE1302MILLWOOD PIKE 100STANLEY DR1411MILLWOODPIKE 100DARBY DR105DARBY DR 147RYCO LN 151STANLEY DR 102WINSLOW CT 1160MILLWOODPIKE 202CUSTERAVE 209CUSTERAVE 119DARBY DR 107KINROSS DR 102DUNER CT 156DELCOPLAZA 1090MILLWOODPIKE 1237MILLWOOD PIKE 103STANLEYCIR 125DARBY DR123DARBY DR 108KINROSS DR 125KILLANEY CT 1080MILLWOODPIKE 1173MILLWOOD PIKE 1181MILLWOODPIKE 128ETNAM ST 104PEMBRIDGE DR 107STANLEYCIR105STANLEYCIR 131DARBY DR 119KINROSS DR 116KILLANEY CT 121KILLANEY CT 1105MILLWOOD PIKE 1135MILLWOOD PIKE 1039MILLWOOD PIKE 108PRINCETON DR 119ETNAM ST 122PEMBRIDGE DR 206FLANAGAN DR 111DONEGAL CT 143DARBY DR 130KINROSS DR 106KILLANEY CT 112CAHILLE DR 203TAGGART DR DELCOPLZW IN S L O WCTCLARENDONCT T A G G A R T D R INDEPENDENCEDR PRINCETONDR R EM E Y A V E STANLEY CIR SOMERSET ST PURDUEDRPEMBRI DGEDRE T N A M ST KI NROSS DRSULPHURSPRING RDSTANLEY DRDARBY DRCUSTER AVE RYCO LNPEGASUS CTKIL L A N E Y C TFLANAGAN DRBUFFLICK RDP E N D LET O N D R AIRPORT RD COSTELLO DR COVERSTONE DR VICTORY R DINVERLEE W AYPRINCEFREDERICK DRARBOR CTMILLWOOD PIKE ADMIRAL BYRD DRApplication Parcels Sewer and Water Service A rea B2 (General Business District) B3 (Industr ial Transition District) M1 (Light Industrial District) M2 (Industr ial General Distr ict) MH1 (Mobile Hom e Com m unity District) R4 (Residential Planned Com munity Distr ict) RP (Residential Per form ance District)µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: February 22, 2021 Winchester MILLWOOD PIKE AIRPORT RDFRONT ROYAL PIKEGREENWOOD RDVICTORY RDBUFFLICK RD DARBY DRCOSTELLO DR SULPHUR SPRING RD L O N G C R O F T R D CONSTITUTION DRCOVERSTONE DR £¤50 £¤522 0 1,000 2,000500 Feet R E Z # 0 1 - 2 1 : O n e L o g i s t i c s P a r k W i n c h e s t e rPINs: 6 4 - A - 8 3 , 6 4 - A - 8 3 A , 6 4 - A - 8 4 , 6 4 - A - 8 5 , 6 4 - A - 8 6 , 6 4 - A - 8 7Rezoning f r o m R 4 t o M 1 a n d B 2Zoning M a p REZ #01-21 §¨¦81 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21REZ #01-21 12 WINCH ESTERREGIONAL AIRPORTSubdivisionAIRPORT BUSINESS CENTERSubdivision J I C LTD.Subdivision GOVERNORS HILLSubdivision PRINCEFREDERICK OFFICE PARTSubdivision RAVENPOINTESubdivision £¤50 64 A 83 64 A 86 64 A 84 64 A 83A 64 A 87 64 A 87 64 A 85 300ADMIRAL BYRD DR 300ADMIRALBYRD DR 300ADMIRALBYRD DR 511AIRPORT RD 222ADMIRALBYRD DR 200AVIATION DR 600AIRPORT RD640AIRPORT RD 211VICTORY RD 382ARBOR CT 250INDEPENDENCE DR 212INDEPENDENCE DR 491AIRPORT RD 380ARBOR CT 280VICTORY RD 140INDEPENDENCE DR 220ADMIRALBYRD DR 338ARBOR CT 287VICTORY RD287VICTORY RD 320VICTORY RD 368VICTORY RD 344VICTORY RD 180ADMIRALBYRD DR 321ARBOR CT 331VICTORY RD 390AIRPORT RD 296ARBOR CT 351VICTORY RD 411VICTORY RD 181PENDLETON DR 266ARBOR CT 220ARBOR CT 119ARBOR CT290AIRPORT RD 600PEGASUS CT 220ARBOR CT 182ARBOR CT311AIRPORT RD 295AIRPORT RD 402BUFFLICK RD 140ARBOR CT352BUFFLICK RD 431BUFFLICK RD 330BUFFLICK RD 361BUFFLICK RD391BUFFLICK RD399BUFFLICK RD 1830MILLWOODPIKE 301BUFFLICK RD317BUFFLICK RD325BUFFLICK RD 1828MILLWOODPIKE 1825MILLWOODPIKE 1815MILLWOODPIKE 1809MILLWOODPIKE 1080COVERSTONE DR 1773MILLWOOD PIKE 112SULPHURSPRING RD1753MILLWOODPIKE 231SULPHURSPRING RD 1600MILLWOODPIKE 143SULPHUR SPRING RD 185SULPHURSPRING RD 201PRINCEFREDERICK 1170GREENWOOD RD 1525MILLWOODPIKE 1441MILLWOOD PIKE 1517MILLWOODPIKE 177RYCO LN 179RYCO LN 1230MILLWOODPIKE 1288MILLWOOD PIKE1302MILLWOOD PIKE 100STANLEY DR1411MILLWOODPIKE 100DARBY DR105DARBY DR 147RYCO LN 151STANLEY DR 102WINSLOW CT 1160MILLWOODPIKE 202CUSTERAVE 209CUSTERAVE 119DARBY DR 107KINROSS DR 102DUNER CT 156DELCOPLAZA 1090MILLWOODPIKE 1237MILLWOOD PIKE 103STANLEYCIR 125DARBY DR123DARBY DR 108KINROSS DR 125KILLANEY CT 1080MILLWOODPIKE 1173MILLWOOD PIKE 1181MILLWOODPIKE 128ETNAM ST 104PEMBRIDGE DR 107STANLEYCIR105STANLEYCIR 131DARBY DR 119KINROSS DR 116KILLANEY CT 121KILLANEY CT 1105MILLWOOD PIKE 1135MILLWOOD PIKE 1039MILLWOOD PIKE 108PRINCETON DR 119ETNAM ST 122PEMBRIDGE DR 206FLANAGAN DR 111DONEGAL CT 143DARBY DR 130KINROSS DR 106KILLANEY CT 112CAHILLE DR 203TAGGART DR DELCOPLZW IN S L O WCTCLARENDONCT T A G G A R T D R INDEPENDENCEDR PRINCETONDR R EM E Y A V E STANLEY CIR SOMERSET ST PURDUEDRPEMBRI DGEDRE T N A M ST KI NROSS DRSULPHURSPRING RDSTANLEY DRDARBY DRCUSTER AVE RYCO LNPEGASUS CTKIL L A N E Y C TFLANAGAN DRBUFFLICK RDP E N D LET O N D R AIRPORT RD COSTELLO DR COVERSTONE DR VICTORY R DINVERLEE W AYPRINCEFREDERICK DRARBOR CTMILLWOOD PIKE ADMIRAL BYRD DRApplication Parcels Sewer and Water Service A rea µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: February 22, 2021 Winchester MILLWOOD PIKE AIRPORT RDFRONT ROYAL PIKEGREENWOOD RDVICTORY RDBUFFLICK RD DARBY DRCOSTELLO DR SULPHUR SPRING RD L O N G C R O F T R D CONSTITUTION DRCOVERSTONE DR £¤50 £¤522 0 1,000 2,000500 Feet R E Z # 0 1 - 2 1 : O n e L o g i s t i c s P a r k W i n c h e s t e rPINs: 6 4 - A - 8 3 , 6 4 - A - 8 3 A , 6 4 - A - 8 4 , 6 4 - A - 8 5 , 6 4 - A - 8 6 , 6 4 - A - 8 7Rezoning f r o m R 4 t o M 1 a n d B 2Location M a p REZ #01-21 §¨¦81 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21REZ #01-21 13 WINCH ESTERREGIONAL AIRPORTSubdivisionAIRPORT BUSINESS CENTERSubdivision J I C LTD.Subdivision GOVERNORS HILLSubdivision PRINCEFREDERICK OFFICE PARTSubdivision RAVENPOINTESubdivision £¤50 64 A 83 64 A 86 64 A 84 64 A 83A 64 A 87 64 A 87 64 A 85 300ADMIRAL BYRD DR 300ADMIRALBYRD DR 300ADMIRALBYRD DR 511AIRPORT RD 222ADMIRALBYRD DR 200AVIATION DR 600AIRPORT RD640AIRPORT RD 211VICTORY RD 382ARBOR CT 250INDEPENDENCE DR 212INDEPENDENCE DR 491AIRPORT RD 380ARBOR CT 280VICTORY RD 140INDEPENDENCE DR 220ADMIRALBYRD DR 338ARBOR CT 287VICTORY RD287VICTORY RD 320VICTORY RD 368VICTORY RD 344VICTORY RD 180ADMIRALBYRD DR 321ARBOR CT 331VICTORY RD 390AIRPORT RD 296ARBOR CT 351VICTORY RD 411VICTORY RD 181PENDLETON DR 266ARBOR CT 220ARBOR CT 119ARBOR CT290AIRPORT RD 600PEGASUS CT 220ARBOR CT 182ARBOR CT311AIRPORT RD 295AIRPORT RD 402BUFFLICK RD 140ARBOR CT352BUFFLICK RD 431BUFFLICK RD 330BUFFLICK RD 361BUFFLICK RD391BUFFLICK RD399BUFFLICK RD 1830MILLWOODPIKE 301BUFFLICK RD317BUFFLICK RD325BUFFLICK RD 1828MILLWOODPIKE 1825MILLWOODPIKE 1815MILLWOODPIKE 1809MILLWOODPIKE 1080COVERSTONE DR 1773MILLWOOD PIKE 112SULPHURSPRING RD1753MILLWOODPIKE 231SULPHURSPRING RD 1600MILLWOODPIKE 143SULPHUR SPRING RD 185SULPHURSPRING RD 201PRINCEFREDERICK 1170GREENWOOD RD 1525MILLWOODPIKE 1441MILLWOOD PIKE 1517MILLWOODPIKE 177RYCO LN 179RYCO LN 1230MILLWOODPIKE 1288MILLWOOD PIKE1302MILLWOOD PIKE 100STANLEY DR1411MILLWOODPIKE 100DARBY DR105DARBY DR 147RYCO LN 151STANLEY DR 102WINSLOW CT 1160MILLWOODPIKE 202CUSTERAVE 209CUSTERAVE 119DARBY DR 107KINROSS DR 102DUNER CT 156DELCOPLAZA 1090MILLWOODPIKE 1237MILLWOOD PIKE 103STANLEYCIR 125DARBY DR123DARBY DR 108KINROSS DR 125KILLANEY CT 1080MILLWOODPIKE 1173MILLWOOD PIKE 1181MILLWOODPIKE 128ETNAM ST 104PEMBRIDGE DR 107STANLEYCIR105STANLEYCIR 131DARBY DR 119KINROSS DR 116KILLANEY CT 121KILLANEY CT 1105MILLWOOD PIKE 1135MILLWOOD PIKE 1039MILLWOOD PIKE 108PRINCETON DR 119ETNAM ST 122PEMBRIDGE DR 206FLANAGAN DR 111DONEGAL CT 143DARBY DR 130KINROSS DR 106KILLANEY CT 112CAHILLE DR 203TAGGART DR DELCOPLZW IN S L O WCTCLARENDONCT T A G G A R T D R INDEPENDENCEDR PRINCETONDR R EM E Y A V E STANLEY CIR SOMERSET ST PURDUEDRPEMBRI DGEDRE T N A M ST KI NROSS DRSULPHURSPRING RDSTANLEY DRDARBY DRCUSTER AVE RYCO LNPEGASUS CTKIL L A N E Y C TFLANAGAN DRBUFFLICK RDP E N D LET O N D R AIRPORT RD COSTELLO DR COVERSTONE DR VICTORY R DINVERLEE W AYPRINCEFREDERICK DRARBOR CTMILLWOOD PIKE ADMIRAL BYRD DRApplication Parcels Sewer and Water Service A rea Long R ange Land Use Urban Center Mixed-Use Industrial Institutional Park Airport S upport Area B2 / B3 Residential, 4 u/a High-Density Residential, 12-16 u/a µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: February 22, 2021 Winchester MILLWOOD PIKE AIRPORT RDFRONT ROYAL PIKEGREENWOOD RDVICTORY RDBUFFLICK RD DARBY DRCOSTELLO DR SULPHUR SPRING RD L O N G C R O F T R D CONSTITUTION DRCOVERSTONE DR £¤50 £¤522 0 1,000 2,000500 Feet R E Z # 0 1 - 2 1 : O n e L o g i s t i c s P a r k W i n c h e s t e rPINs: 6 4 - A - 8 3 , 6 4 - A - 8 3 A , 6 4 - A - 8 4 , 6 4 - A - 8 5 , 6 4 - A - 8 6 , 6 4 - A - 8 7Rezoning f r o m R 4 t o M 1 a n d B 2Long R a n g e L a n d U s e M a p REZ #01-21 §¨¦81 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21 REZ #01-21REZ #01-21 14 PROGRAMMING AND PLANNING CIVIL ENGINEERING LANDSCAPE ARCHITECTURE SURVEY AND MAPPING SECURITY CONSULTING www.gordon.us.com 4501 Daly Drive, Suite 200, Chantilly, VA 20151 — Phone: (703) 263-1900 April 6, 2021 Candice Perkins, AICP, CZA Assistant Director Frederick County Department of Planning & Development 107 North Kent Street Winchester, Virginia 22601 RE: One Logistics Park Winchester – GDP Rezoning Application: RZ# 01-21 Dear Candice, This letter is to provide you with a summary of the Rezoning Application materials based on Planning Commission Public Hearing dated 3/17/21 and our follow up coordination meeting from 3/29/21. Included for your review are clean and redlined versions of the proffers and GDP. The only changed on the GDP was to show the corrected Road Efficiency Buffer on Land Bay 3 and a new revision date. The proffers have been updated to reflect language revisions as discussed and during the meeting from March 30th. In addition to the text clarifications as outlined in the County staff report, the highlights of the proffer revisions are as follows: • Proffer 2.2 – Providing clarity on the phasing and construction sequence of Coverstone Drive. • Proffer 2.3 – Providing clarity of the terminus of Coverstone Dr. and reference to heavy vehicle trips. • Proffer 2.6.2 – Providing a cash contribution to the County if signalization is not warranted. • Proffer 2.7 – Providing clarity on contingencies regarding off-site improvements if acquisition for ROW and easements are not feasible. Please advise should have any questions or comments regarding the materials and feel free to contact me at 703-889-2350 or by email at cstephenson@gordon.us.com if you should have any further questions. Sincerely, WILLIAM H. GORDON ASSOCIATES, INC. Christopher Stephenson, PLA Planning Director G:\project\plann\3088\0103\PLANS\PDFS\Submissions\2021-04-06\2021-04-06-ONE LOGISTICS PARK -COVERLETTER.doc 15 Page 1 of 20 PROFFER STATEMENT REZONING: RZ #01-21 : R4 (Residential Planned Community District to M-1 (Light Industrial) and B-2 (General Business District) PROPERTY: 277.22 Acres Tax Map & Parcels 64-A-83, 83A, 84, 85, 86, and 87 (here-in after the "Property") RECORD OWNERS: Governor’s Hill, LLC; Hockman Investments, LLC; JGR Three, LLC; Ellen, LLC; LCR, LLC; MDC Three, LLC; Susan Sanders, LLC; Liberty Hill, LC; Thomas A. Dick; Timothy J. Dick; and Michael E. Dick APPLICANT: Wickshire Industrial, LLC a Virginia Limited Liability Company PROJECT NAME: One Logistics Park Winchester ORIGINAL DATE OF PROFFERS: September 3, 2020 December 7, 2020 January 12, 2021 February 9, 2021 April 6, 2021 The undersigned owners hereby proffer that the use and development of the subject property ("Property"), as described above, shall be in conformance with the following conditions, which shall supersede all other proffers that may have been made prior hereto. In the event that the above referenced rezoning is not granted as applied for by the Owners (“Owners”), these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with "Final Rezoning" defined as that rezoning that is in effect on the day upon which the Frederick County Board of County Supervisors (the "Board") grants the rezoning. The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The term "Owners" as referenced herein shall include within its meaning all future owners, assigns, and successors in interest. When used in these proffers, the "Generalized Development Plan" shall refer to the plan entitled "Generalized Development Plan - One Logistics Park Winchester" prepared by William H. Gordon Associates, Inc., (the "GDP") revised February 9 April 6, 2021 16 Page 2 of 20 1. LAND USE 1.1. The project shall be designed to establish interconnected commercial and light industrial Lland Bbays in conformance with the GDP, and as is specifically set forth in these proffers. Minor modifications as necessary upon final engineering, must meet the intent of the proffers and receive Director of Planning approval. 2. TRANSPORTATION 2.1. The public roadways proposed on the Property shall be constructed in the locations depicted on the GDP. Minor modifications, as necessary upon final engineering, including but not limited to Lland Bbay ingress/egress and intersection alignments, must meet the intent of the proffers and receive Director of Planning and VDOT approval at site plan or road plan. 2.2. The Owners shall design, and construct and dedicate Coverstone Drive as a half section of an urban four-lane divided collector road with turn lanes as warranted within an approximate 102' right-of-way. The road could be built as one complete operation or in phases, not limited to the order of the utilizing the following phasing schedule: PHASE 1: Phase 1 shall consist of the full four-lane divided urban collector road section, including a ten-foot shared-use asphalt trail, from Millwood Pike to the south boundary of for Land Bay 3, as depicted on the GDP. Said roadway shall be bonded and constructed to a minimum base asphalt prior to issuance of a certificate of occupancy for any commercial building within Land Bay 3. Phase 1 improvements shall consist of all necessary improvements, including signalization if or when warranted by VDOT, to create a four way intersection, or alternative intersection, subject to VDOT approval, at the existing intersection of Inverlee Way and Millwood Pike as shown on the GDP. Additionally, the Owner shall close the existing Millwood Pike crossover previously used for access to the golf course concurrent with Phase 1 improvements. PHASE 2: Phase 2 shall consist of construction of a two-lane urban half section of Coverstone Drive from the south boundary of Land Bay 3 to the Pendleton Drive intersection as depicted on the GDP, including a shared-use asphalt trail on to the east side of theis roadway. Said roadway improvements shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 5 through 8. This two-lane half section shall be subject to final engineering and VDOT approval and shall include the two ultimate northbound lanes used for two-way traffic, with a lane transition to the Phase 1 four lane section. PHASE 3: Phase 3 shall consist of construction of a two-lane urban half section of Coverstone Drive from the Pendleton Drive intersection to the existing Coverstone Drive connection at 1080 Coverstone Drive (TM 64-A-87A) 17 Page 3 of 20 as depicted on the GDP, including transition to the existing four-lane section and a shared-use asphalt trail to the south/east of the roadway. Said roadway improvements shall be completed prior to issuance of a certificate of occupancy for any use on Land Bays 1 or 2. . This two-lane half section shall be subject to final engineering and VDOT approval and shall include the two ultimate eastbound lanes used for two-way traffic, with a lane transition to the existing four lane section. 2.3. If projected vehicle per day (VPD) traffic on Coverstone Drive exceeds 10,000 VPD total or if Heavy Vehicle traffic exceeds 800 Heavy Vehicle VPD on Coverstone Drive, south of Land Bay 3 Tthe Owner shall expedite construction of Coverstone Drive as an ultimate full urban four- lane section, as provided in Proffer 2.2, from Millwood Pike to the existing eastern terminus of Coverstone Drive (1080 Coverstone Drive (TM 64-A-87A) (Phases 2 and 3 above). if projected vehicle per day (VPD) traffic on Coverstone Drive exceeds 10,000 VPD, south of Land Bay 3. The term “Heavy Vehicle” shall be defined as per FHWA Classification Type 4 or higher (6 tires, or multi-axle vehicle). In order to ensure compliance with this Proffer 2.3, the owner shall provide a vehicle classification count to Frederick County, including Heavy Vehicle counts, not later than issuance of the certificate of occupancy for new construction on the Property that yields a minimum cumulative aggregate of 2,400,000 square feet of new construction on the Property. Additionally, the owner shall provide a vehicle classification count to Frederick County, including Heavy Vehicle counts, at the issuance of the final certificate of occupancy for new construction on the Property. 2.4. The Owners shall design and construct the extension of existing Pendleton Drive to Coverstone Drive, as shown on the GDP. The proposed extension will be a minimum two- lane urban local roadway with an approximate maximum right of way width of 60' to provide access to employment uses within Phase B (Land Bays 5 through 8). The Pendleton Drive extension shall be constructed prior to issuance of the first occupancy permit within Phase B. 2.5. Access to Millwood Pike shall be limited to Coverstone Drive, as shown on the GDP, with the exception of the private driveway currently serving the residentially-zoned parcel identified as TM 64-A-83B. The Owner shall maintain an access easement for said driveway until such time as theis property changes land use. If rezoned by others for non- residential uses, an interparcel access linkage shall be provided. No new commercial access to Millwood Pike is proposed and the existing driveway to 1600 Millwood Pike (TM 64-A- 83B) will not be used for site access. 2.6. Off-site road improvements shall be designed to the latest VDOT standards, unless otherwise approved by VDOT in general conformance with the submitted impact study Off- site improvements shall be constructed as depicted on the aforementioned plans as follows: 2.6.1: Eastern improvements shall consist of improvements at the intersection of Millwood Pike/Inverlee Way/Coverstone Drive and shall be completed coincident with the Coverstone Drive construction described in 2.2, Phase 1, including: and shall consist of the following improvements: a) Eastbound Millwood Pike right turn lane to Coverstone Drive b) Westbound Millwood Pike dual left turns to Coverstone Drive, 18 Page 4 of 20 and c) Northbound Coverstone Drive dual lefts to Millwood Pike 2.6.2: Western improvements shall consist of improvements at the intersection of Prince Frederick Drive/Costello Drive and shall be completed with construction of Phases 1-3 in accordance with Proffer 2.2 and concurrent with new construction that yields a total aggregate new construction amount on the Property with site square footage in excess of 1,491,600 sf and shall consist of the following improvements including: a) Northbound Prince Frederick Drive left to Costello Drive and b) Installation of traffic sSignalization at the intersection of Prince Frederick Drive and Costello Drive,, if deemed warranted by VDOT and subject to VDOT approval., If warranted, this installation will occur once Proffer 2.2 Coverstone Drive Phase 2 and Phase 3 improvements have been completed and accepted into the State highway system. If this traffic signalization is not warranted by VDOT at that time, the Owners will provide a cash contribution in the amount Two Hundred Thousand Dollars ($200,000) to Frederick County for regional roadway improvements off-site in the Millwood Pike corridor as determined by the Board of Supervisors. This cash contribution shall be escalated per the Consumer Price Index (CPI-U) forward from the date of rezoning approval. 2.6.3: Northern improvements shall consist of improvements at the intersection of Millwood Pike and Prince Frederick Drive and shall consist of the following improvements: including: a) Construct additional lane on northbound Prince Frederick Drive to provide a dedicated left, left/through, and right turn lane, including modifications to the existing signal and geometric improvements of the crossover and shall be completed with the construction of Phases 1-3 in 2.2 and with site square footage in excess of 1,491,600 sf. 2.7. The Owner’s obligations to complete the off-site transportation improvements described in Proffers 2.2 and 2.6 and under the terms described in 2.2 and 2.6 shall also not vest until the County has obtained any off-site right of way needed for completion of the obligations shall be contingent upon the acquisition of the off-site right-of-way and necessary easements required for these improvements. The Owner shall make a good faith effort to obtain this off-site right-of-way and necessary easements by private means at fair market value. If the Owner is not able to acquire any of this required off-site right-of-way and necessary easement through private means, the Owners shall request use of eminent domain by the County. In the event that the County decides not to exercise its power of eminent domain so as to acquire the off-site right-of-way and necessary easements required for these improvements, the Owners shall instead provide alternative satisfaction of its proffered obligation to construct these off-site improvements by providing a cash contribution at that time to the County for the estimated construction costs of those off-site transportation improvements it is not able to construct for use by the County for regional roadway improvements off-site in the Millwood Pike corridor as determined by the Board of 19 Page 5 of 20 Supervisors. The construction cost estimate shall be subject to review and approval by the County. This cash contribution shall coincide with the thresholds that triggers the off-site road improvement as identified in Proffer 2.6 2.7. 2.8. Any future transportation analyses required for the Property shall utilize the Land Use Code per the latest version of the I.T.E. Trip Generation Manual for any non-residential use. Determination on alternative land uses shall be scoped with VDOT and approved in writing prior to submission of site plan. 2.9. In the event any proffered off-site road improvements are constructed by others, the Owners shall contribute to Frederick County an amount equivalent to the verified actual cost of these proffered improvement, as substantiated by paid invoices. Such contribution shall coincide with the non-residential use threshold that triggers the off-site road improvements as identified in Proffer 2.6. The warrant study justifying the improvements should accompany the request for reimbursement. 3. PEDESTRIAN TRAIL SYSTEM 3.1. The Owner shall design and build a 10’ public pedestrian-bicycle asphalt trail, to Virginia Department of Transportation (VDOT) standards, generally along the south/east side of Coverstone Drive. A crosswalk connection to the existing asphalt path to the west, outside of the dedicated right-of-way, will be provided. A Sidewalk shall be constructed to VDOT standards along the extension of Pendleton Drive. 4. FIRE AND RESCUE 4.1. Cash Ccontributions to support Frederick County fire and rescue services in the amount of One Hundred Dollars of ($100) for every per 1000 square feet of commercial and/or industrial building area shall be will be paid by the Owners to the County at time of issuances of certificates of occupancy for each building. 5. WATER AND SANITARY SEWER 5.1. The Owners shall be responsible for connecting the Property to public water and sanitary sewer. All water and sanitary sewer infrastructure shall be constructed in accordance with the requirements of the Frederick County Sanitation Authority. 5.2. Prior to the first water or sewer connection to the public system for occupancy in Phase A, the Owners, will conform with all appropriate Frederick Water regulations at time of site plan to address concerns regarding the inundation of three existing sanitary sewer manholes (#84, 84A, 85). The subject manholes are located south of Millwood Pike, adjacent to an existing pond within the project limits. The pond is located south of Millwood Pike, west of the proposed Coverstone entrance. 20 Page 6 of 20 6. CULTURAL RESOURCES INVESTIGATION AND PRESERVATION 6.1. The Owners shall conduct, or cause to be conducted, a Phase I Archaeological Investigation of the Property prior to the approval of the first final site plan for the Property, and shall complete Phase II and III investigations thereof as may be demonstrated to be necessary by the Phase I study. 7. ROAD EFFICIENCY BUFFER 7.1. The owner shall provide an addition 50’ to the Road Efficiency Buffer for the portion of the site within Phase A as depicted on the GDP. The total width of said buffer will be 150’ containing an inactive full screen buffer. SIGNATURES APPEAR ON THE FOLLOWING PAGES 21 FUTURE AIRPORT EXPANSION FUTURE AIRPORT EXPANSIONINVERLEE WAYWINCHESTER REGIONAL AIRPORT PROPOSED M1 - LIGHT INDUSTRIAL DISTRICT (±264.72 AC) PROPOSED B2 GENERAL BUSINESS DISTRICT (±12.5 AC) LIMITS OF APPLICATION (TYP.) R4 DISTRICT (NOT SUBJECT TO APPLICATION ) COVERSTONE DRIVE (102' ROW) PENDLETON DRIVE (60' ROW) 1 2 3 4 5 6 7 8 9 10 11 12 1314 15 16 17 19 20 21 22 23 24 25 26 28 29 30 31 18 27 75' INACTIVE LANDSCAPE BUFFER 25' ACTIVE LANDSCAPE BUFFER PHA S E A PHASE APHA S E B PHASE BTREE SAVE AREA (TYP.) TREE SAVE AREA (TYP.) TREE SAVE AREA (TYP.) 1 2 3 4 5 6 7 8 APPROX. LAND BAY LIMITS (TYP.) LAND BAY NUMBER (TYP.) FLOODPLAIN LIMITS (TYP.) EXISTING POND 10' SHARED USE TRAIL (TYP.) POTENTIAL LAND BAY ACCESS POINTS (TYP.) (SEE NOTE #2 THIS SHEET) PRIMARY ACCESS LAND BAY 3 SEE ADJOINING PROPERTIES TABLE (TYP.) APPROX. LOCATION EXISTING SANITARY MANHOLE (TYP.) 150' INACTIVE LANDSCAPE ROAD EFFICIENCY BUFFER (PER PROFFER 7.1) COVERSTONE DRIVE PHASE 1 PER PROFFER 2.2 COVERSTONE DRIVE PHASE 2 PER PROFFER 2.2 COVERSTONE DRIVE PHASE 3 PER PROFFER 2.2 TREE SAVE AREA (TYP.) PHASE A ±134.67 AC PHASE B ±142.55 AC LAND BAY NUMBER (TYP.) APPROX. LAND BAY LIMITS (TYP.) POTENTIAL LAND BAY ACCESS POINTS (TYP.) (SEE NOTE #2 THIS SHEET) 100' INACTIVE LANDSCAPE ROAD EFFICIENCY BUFFER (PER PROFFER 7.1) 100' INACTIVE LANDSCAPE ROAD EFFICIENCY BUFFER (PER PROFFER 7.1) JN 3088-0103 ONE LOGISTICS PARK WINCHESTER G:\PROJECT\PLANN\3088\0103\EXHIBITS\06 - REZONING APPLICATION EXHIBITS\3088-0201_L_GDP_PR_RZ_REV-3.DWG 04.06.2021 4501 Daly Drive Chantilly, VA 20151 Phone: 703-263-1900 www.gordon.us.com PROGRAMMING AND PLANNING CIVIL ENGINEERING LANDSCAPE ARCHITECTURE SURVEY AND MAPPING SECURITY CONSULTING GENERALIZED DEVELOPMENT PLAN ADJOINING PROPERTIES NOTES: 1.MINOR MODIFICATIONS AS NECESSARY UPON FINAL ENGINEERING, INCLUDING BUT NOT LIMITED TO LAND BAY INGRESS/EGRESS AND INTERSECTION ALIGNMENTS, MUST MEET THE INTENT OF THE PROFFERS, FREDERICK COUNTY AND VDOT APPROVAL. 2.THE LAND BAY ACCESS POINTS ARE SUBJECT TO FINAL APPROVAL / COORDINATION WITH VDOT AND ARE SHOWN ON THIS PLAN FOR GRAPHIC PURPOSES ONLY. 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 41 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 42 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 43 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 44 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 45 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 46 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 47 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 48 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 49 Page 12 To be completed by Planning Staff: Fee Amount Paid $ Zoning Amendment Number Anticipated PC Hearing Date Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Specific Contact Person at Firm: Address: Telephone: Email: Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 50 51 52 Page 14 6. Disclosure of real parties in interest. Virginia Code § 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. Please attach additional page(s) if necessary. 7. Checklist. Please check that the following items have been included with this application: □ Location Map □ Plat Depicting Metes/Bounds of Proposed Zoning □ Impact Analysis Statement □ Proffer Statement (if any) □ Agency Comments □ Fee □ Copies of Deed(s) to Property(ies) □ Tax Payment Verification □ Digital copies (pdf’s) of all submitted items 53 54 55 1 APPLICANT / CONTACT: WICKSHIRE INDUSTRIAL LLC C/O MR. EDWARD PODBOY 2318 RIVIERA DRIVE VIENNA, VA 22181 EMAIL: epodboy@wickshiregroup.com OWNERS: JGR THREE LLC ET ALS HOCKMAN INVESTMENTS LLC GOVERNOR’S HILL LLC ONE LOGISTICS PARK WINCHESTER SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA REVISED 02/09/2020 PREPARED BY: CONTACT: CHRIS STEPHENSON 4501 DALY DRIVE CHANTILLY, VA 20151 703-262-1900 IMPACT ANALYSIS STATEMENT 56 2 ONE LOGISTICS PARK INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 277.22 acre assemblage identified as Tax Map Parcels: 64-A-83, 64-A-83A, 64-A-84, 64-A-85, 64-A-86, & 64-A-87. The subject property is located on the south side of Millwood Pike (U.S. Route 50) and on the north side of the Winchester Regional Airport. The 277.22-acre assemblage is currently zoned R4, Residential (Planned Community District). This application proposes to rezone the 264.72 acre of the assemblage to M-1 (Light Industrial) and 12.5 acres to B-2 (General Business) Districts with up to 2,995,600 square feet of building area. This application seeks to change the current residential zoning designation to provide land uses that are light industrial and general business in nature which are more appropriate given the immediate existing / surrounding uses. To further support this effort, the property is also within the limits of the Airport Support Area where residential development is not desired. Successful entitlement will allow the property will be marketed / developed with any of the allowed and conditional uses as permitted by the respective zoning districts. Those types of uses supports the business development focus goals of the Comprehensive Plan while benefiting the community by offering viable economic development opportunities. BASE INFORMATION LOCATION: FRONTING ON THE SOUTHSIDE OF MILLWOOD PIKE (US ROUTE 50 EAST) AND THE NORTH SIDE OF WINCHESTER REGIONAL AIRPORT. MAGISTERIAL DISTRICT: SHAWNEE DISTRICT PROPERTY ID #’S: 64-A-83, 64-A-83A, 64-A-84, 64-A-85, 64-A-86 & 64-A-87 CURRENT ZONING: R4 (RESIDENTIAL PLANNED COMMUNITY DISTRICT) CURRENT USE: VACANT PROPOSED ZONING: M1 (LIGHT INDUSTRIAL DISTRICT) 264.72 AC B2 (GENERAL BUSINESS) 12.5 AC TOTAL PROPOSED SF: 2,995,600 SF TOTAL REZONING AREA: 277.22 AC 57 3 COMPREHENSIVE PLAN The One Logistics Park Winchester rezoning application is within the Senseny/Eastern Frederick Urban Area Plan per the 2035 Comprehensive Plan. Previous approvals on the properties have designated the west side of the project as intended to be General Business and Industrial Transition uses. The properties on the east side are currently intended to be high density residential (12-16 units/acre). The entire assemblage is within the Sewer and Water Area (SWSA) and approximately 115 acres are within the Urban Development Area (UDA). The application is also within the limits of the Airport Support Area. The 2035 Comprehensive Plan identifies the subject properties with a commercial/transition and residential land use designations. While the requested M1 (Light Industrial) District is generally inconsistent with the Comprehensive Plan, it should be noted that the proposed change of use is consistent with the land use plan that was in effect prior to the Governors Hill rezoning. This area is also within the limits of the Airport Support Area, where residential development is not desired for properties in this area This proposal supports the intended business development goals envisioned by the County for this area. It will increase the employment potential as encouraged by the 2035 Comprehensive Plan and provides more complimentary uses adjacent to the Winchester Regional Airport. It would also remove residential zoned land from the Airport Support Area where it is currently discouraged. Together these elements help support the future airport expansion and establishment of commercial and industrial land uses on the subject parcels. SUITABILITY OF THE SITE The subject parcels do have environmental features such as flood plain, wetlands, and steep slopes. These features are minimal when compared to the entirety of the 277-acre assemblage. Through well thought out site planning, and engineering practices, land disturbance will be limited in accordance with applicable regulatory standards. Flood Plains The 277.22-acre portion of the subject property does contain areas of flood plain (Sulphur Springs Run) as demonstrated on FEMA NFIP Map #51069C0219D, Effective Date September 2, 2009, as well as information from the Frederick County GIS Database. No proposed buildings will be located within the limits of the flood plain. A floodplain study or alteration will be processed with Frederick County and FEMA for improvements within the floodplain, as required. 58 4 Wetlands The National Wetlands Inventory Map identifies five wetland features on the site, all of which are man-made ponds. Any disturbance will be limited in accordance with applicable regulatory standards. More detailed environmental investigation will be completed prior to the site plan and construction process. Any wetland impacts that are required will be processed to comply with all County, State and Federal regulations. Soils and Steep Slopes Per the Soil Survey of Frederick County, Virginia, and the Frederick County GIS Database, the parcels subject to this application contain nine soil types within the limits of the application. The following soil types are present: • 1B Berks Channery Silt Loams 3-8% slope • 1C Berks Channery Silt Loams 8-15% slope • 3B Blairton Silt Loams 2-7% slope • 9B Clearbrook Channery Silt Loams 2-7% slope • 36 Pits, Quarries, and dumps • 41B Weikert-Berks Channery Silt Loams 3-8% slope • 41C Weikert-Berks Channery Silt Loams 8-15% slope • 41D Weikert-Berks Channery Silt Loams 15-25% slope • 41E Weikert-Berks Channery Silt Loams 25-35% slope The existing soils onsite are generally suitable for site construction provided the proper drainage, grading and sloping are maintained during and after construction. The existing soil characteristics and any implications for site development are manageable through the site engineering and construction processes. Steep slopes (areas of 50% slope or greater) exist along the frontage of the site and adjacent to four ravines that drain the site to Sulphur Spring Run. Some disturbance of these areas may be necessary to implement the project grading and stormwater management systems. Surrounding Properties NORTH • U.S Route 50 (6 lanes, median divided public road) • Existing residential (more than 500’ away) • Zoned: RP (Residential, Performance District) 59 5 SOUTH • Winchester Regional Airport • Future expansion / site access planned through subject area EAST • Existing light industrial / commercial uses • Zoned: M1 (Light Industrial District) WEST • Existing Army Corps of Engineers Facility • Zoned: B2 (General Business District) TRANSPORTATION The One Logistics Park Winchester project will be served by a transportation network designed and constructed to accommodate automobile and truck traffic safely and efficiently. The roadway network incorporates the general route location to extend Coverstone Drive as a collector road from Millwood Pike to the existing road adjacent to the Sheriffs east of Prince Frederick Drive. The external road system serving the site is comprised of Millwood Pike (Route 50/17 East), Prince Frederick Drive (Route 781), Coverstone Drive, and Pendleton Drive. Millwood Pike is a four-lane major arterial roadway, Coverstone Drive is proposed as a two-lane major collector and Prince Frederick Drive is a two-lane minor collector road. Pendleton Drive is a two-lane local roadway connecting to the east which provides alternative access to Arbor Court and Victory Road (Va. Rte. 728). The regional roadway network was planned as part of the Governors Hill approvals through 2013, which supported residential, office, and commercial activities with Coverstone Drive planned as a four-lane divided roadway, and off-site improvements at Millwood Pike intersections at Prince Frederick Drive and Sulphur Springs Road. The proposed land use plan significantly reduces the site traffic potential of the property by removing the residential use component and focusing on general industrial uses as recommended in the County Comprehensive Plan, with the general industrial uses, and ancillary commercial use in one land bay adjacent to the Millwood Pike/Coverstone Drive/Inverlee Way intersection, the anticipated site Daily trips at build-out are reduced from over 46,000 Vehicles per Day (VPD) under existing zoning with the Governors Hill uses to approximately 17,600 VPD, or a reduction of over 60 percent. With the significant trip reduction, the on-site public roadway network maintains the ultimate R-O-W for the four-lane extension of Coverstone Drive, but phases the construction to provide the link connection as a two-lane road with turn lanes and widening at Millwood Pike for a four lane section with a raised median. The applicant has maintained off-site turn lane improvements at Costello Drive/Prince Frederick Drive intersection as well as off-site road contributions and trip thresholds in the proffers. However, the 60 6 biggest change in the development with the employment uses is to establish the initial construction of Coverstone Drive as a through road to provide public street access. The transportation improvement program proffered with this application will improve existing off-site transportation shortfalls identified within the TIS prior to the inclusion of the proposed development impacts to the transportation network. The implementation of this program will occur in Phase A of the development, as specified by the Proffer Statement (see attached). The transportation proffers included with the application mitigate all impacts of the proposed rezoning, by providing the ultimate R-O-W for the public street network and building improvement to service the subject uses. A traffic impact study (TIS) is under preparation for this application using the current updated land use plan and extensive VDOT coordination on the technical scoping. Using trip generation figures from the latest edition of I.T.E. Trip Generation Manual, the TIS projects that the proposed development will reduce vehicle trips greater than 60% from the commercial uses assumed in the transportation studies from the RZ#10-08 rezoning approval. The TIS further includes additional study area roads and intersections from the Governors Hill rezoning study to reflect the regional improvement programmed by VDOT west of the site at the I-81 interchange. The study also provides the initial on-site traffic operations for Coverstone Drive at the proposed site entrances to verify turn lanes, which provide guidance for future site plan reviews. Based on the traffic forecasts, we anticipate the proposed Coverstone Drive two-lane section with turn lanes will adequately support the build-out of the property with the general industrial uses, as well as accommodate through traffic. The improvements also include the extension of a shared use path along Coverstone Drive with the site build-out to provide pedestrian linkages. The transportation network does include phasing for the local street, by connecting Pendleton Drive to Coverstone Drive extended. The local network supports additional access to the adjacent Airport and provide alternative access to the existing employment uses adjacent to Arbor Court. The Pendleton Drive connection will not be completed until Phase 2 activities, so as not to overload the existing roads. Additionally, the applicant is preparing the signal justification for the proposed US Route 50/17/Inverlee Way/Coverstone Drive intersection. The study for the location is provided consistent with the previously approved proffers for the intersection and the current VDOT guidance to assess alternative intersection configurations for new signal locations. Previous approved proffers required signalization when warranted. The analysis is accelerated to verify geometry. The significant reduction in proposed site trips, the proposed commitment with the updated proffers to provide the ultimate R-O-W, and construction of Coverstone Drive from US Route 50/17 (Millwood Pike) to the existing segment of Coverstone Drive east of Prince Frederick Drive (Va. Route 781) will support the subject site with employment uses. 61 7 SEWAGE CONVEYANCE & WATER SUPPLY The proposed change in zoning of the property is expected to result in a reduction to overall impact to the water demand and the sanitary sewer discharge. This is a result of the change in use from the higher demands of planned residential use to the proposed light industrial development. Sanitary sewer service will be provided by Frederick Water via an existing 8” sewer line that ties into the 12” sewer main located on the south side of Millwood Pike along the frontage of the site. This infrastructure will be expanded pursuant to Frederick Water requirements to serve the entire site and enable gravity flow to the existing main (where possible). A pump station or grinder pumps may be required to serve the buildings proposed on the east side of the property. Water is currently served by a 12” water main which currently extends through the central portion of the site. This water main will be rerouted, as necessary, with the final engineering associated with the site development. This infrastructure will be expanded pursuant to Frederick Water requirements. Sufficient water capacity exists to serve the domestic and fire protection demands of the project. The proposed land uses have a maximum sanitary estimated flow of about 390,000 GPD based on +/- 277 acres of light industrial land use. A preliminary computation is as follows: Estimated Flow = Area * Estimated employees/acre * Flow/employee Estimated Flow = 277.22 acres * 40 employees/acre (per section 3.2.A of Frederick Water Standards and Specifications) * 35 gallons/employee (Table 3 of the SCAT Regulations 9VAC25-790-490) Estimated Flow = 388,108 GPD ~ 390,000 GPD Actual water and sewerage flows will be determined at the time of final site engineering. SITE DRAINAGE The rezoning of the subject property will not result in significant changes to the existing site drainage patterns. The site generally drains north to Sulphur Spring Run via several pronounced drainage divides. It is anticipated that stormwater BMP’s and dry ponds will be implemented to meet local, state and federal stormwater development requirements. Stormwater design along with erosion control practice will mitigate adverse stormwater discharge impacts. Design of temporary and permanent facilities will be provided with final engineering and will comply with all County, State and Federal regulations. SOLID WASTE DISPOSAL The rezoning of the subject property from residential to proposed light industrial uses will not result in an increase of solid waste and therefore will not adversely affect the County’s disposal facilities. Solid waste from the project will be collected and deposited in the Frederick County landfill following via private carrier(s) contracted by the individual users. 62 8 HISTORICAL SITES AND STRUCTURES The Senseny/Eastern Frederick Land Use Plan does not identify the subject properties with any known historic sites or structures. The proposed rezoning will not create negative impacts associated with any historic resources and prior to approval of first site plan a Phase 1 Archaeological Investigation will be conducted. IMPACT ON COMMUNITY FACILITIES The rezoning of the subject properties to the M1 and B2 districts will have a positive impact on the community by generating economic diversity though the creation of employment opportunities. This application will expand the commercial tax base while allowing for the continuation of a lower residential tax rate. In addition, this project would lessen the demands/impacts on County and community facilities such as schools and parks that would have been typically generated if the properties were to be developed under the current zoning. Impacts to the transportation network will be mitigated by the proffered transportation improvements as specified in the pending proffers. Any visual or nuisance impacts on the surrounding property are being taken into consideration. The property will be developed in a manner that is logical, efficient and minimizes land disturbance to greatest extent possible. Helping with the mitigation efforts, is a commitment to providing an additional 50’ to the required full-distance buffer adjacent to Route 50. Tree save opportunities have been incorporated where possible. The combination of the additional buffer setback, landscape requirements and tree save together help to mitigate impacts on the Route 50 viewshed. 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104