HomeMy WebLinkAbout01-21 Applicationt
SUBDIVISION APPLICATION
FREDERICK COUNTY, VIRGINIA
]]� - Office Use Only- f
Date: ""'1 Application #: C _ - MDP: %// no
If no, has the MDP requirement been waived by the Planning Director? des no
If the MDP has been waived, fill in the following public meeting dates for the final plats:
PC Meeting Date BOS Meeting Date
1. Applicant:
Telephone:
Name:
Greenway Engineering, Inc. 540-662-4185
Address: 151 Windy Hill Lane Winchester, VA 22602
Email Address: nadhikusumaCcDgreenwayeng.com
2. Property Owner (if different than above)
Name: Global Headquarters LLC Telephone: 540-869-1800
Address: PO Box 480
Stephens City, VA 22655-0480
3. Please list names of all owners, principals, and/or majority stockholders:
4. Contact person if other than above
Name: Niki Adhikusuma
Telephone: 540-662-4185
5. Name of Proposed Subdivision: Fairfax Downs
6. Number of Lots: 93 - Single (Detached)
7. Total Acreage:
81.43 ac '
s. Property Location: Route 277 Fairfax Pike, 1540' east of Rte 641
Double Church Road and 1355' west of South Warrior Drive
(Give State Route # and name, distance and direction from intersection)
0
9. Magisterial District: Opequon
10. Property Identification Number (P.I.N.): 86±r78,86 -A -79'86-A-80, & 86-A-81
(Parent Tract)
11. Property zoning and present use: Agriculture/ Vacant
12. Adjoining property zoning and use:
USE ZONING
18.
19.
North Office, and Vacant tit and 132
East HE High School
South RA and RA Church and Vacant/Agriculture
West RA and RA Vacant and Residential
Has a Master Development Plan been submitted for this project? x Yes
If yes, has the final MDP been approved by the Board of Supervisors?
What was the Master Development Plan title? Fairfax Downs Master Development Plan
Does the plat contain any changes from the approved MDP? Yes x No
If yes, specify what changes: N/A
No
Yes x No
Minimum Lot Size (smallest lot): 12,000 SF
Number and types of housing units in this development: 93 single Family Detached
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will be
complete prior to the submission o site plan.
Signature: v
Date: S — ZO 2
10