Loading...
HomeMy WebLinkAbout01-21 Applicationt SUBDIVISION APPLICATION FREDERICK COUNTY, VIRGINIA ]]� - Office Use Only- f Date: ""'1 Application #: C _ - MDP: %// no If no, has the MDP requirement been waived by the Planning Director? des no If the MDP has been waived, fill in the following public meeting dates for the final plats: PC Meeting Date BOS Meeting Date 1. Applicant: Telephone: Name: Greenway Engineering, Inc. 540-662-4185 Address: 151 Windy Hill Lane Winchester, VA 22602 Email Address: nadhikusumaCcDgreenwayeng.com 2. Property Owner (if different than above) Name: Global Headquarters LLC Telephone: 540-869-1800 Address: PO Box 480 Stephens City, VA 22655-0480 3. Please list names of all owners, principals, and/or majority stockholders: 4. Contact person if other than above Name: Niki Adhikusuma Telephone: 540-662-4185 5. Name of Proposed Subdivision: Fairfax Downs 6. Number of Lots: 93 - Single (Detached) 7. Total Acreage: 81.43 ac ' s. Property Location: Route 277 Fairfax Pike, 1540' east of Rte 641 Double Church Road and 1355' west of South Warrior Drive (Give State Route # and name, distance and direction from intersection) 0 9. Magisterial District: Opequon 10. Property Identification Number (P.I.N.): 86±r78,86 -A -79'86-A-80, & 86-A-81 (Parent Tract) 11. Property zoning and present use: Agriculture/ Vacant 12. Adjoining property zoning and use: USE ZONING 18. 19. North Office, and Vacant tit and 132 East HE High School South RA and RA Church and Vacant/Agriculture West RA and RA Vacant and Residential Has a Master Development Plan been submitted for this project? x Yes If yes, has the final MDP been approved by the Board of Supervisors? What was the Master Development Plan title? Fairfax Downs Master Development Plan Does the plat contain any changes from the approved MDP? Yes x No If yes, specify what changes: N/A No Yes x No Minimum Lot Size (smallest lot): 12,000 SF Number and types of housing units in this development: 93 single Family Detached I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission o site plan. Signature: v Date: S — ZO 2 10