Loading...
HomeMy WebLinkAbout15-20 Site PlanConstruction Notes: Virginia Department of Transportation ABBREVIATIONS Staunton District ASSY. ASSEMBLY 1. All work and materials shall conform to the current standards of Frederick County, Virginia, the regulations of the Americans with FLOOR Rev. January 19, 2013 Disabilities Act, where applicable, the Virginia Department of Transportation, and all applicable codes. B.F. BASEMENT O FREDERICK COUNTY, VIRGINIA BC BOTTOM OF CURB BML BUILDING MOUNTED LIGHT 2. Erosion and sediment control shall conform to the standards and specifications of the Commonwealth of Virginia, where applicable. VDOT General Notes CG-2/CG-3 VDOT CURB V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of Transportation (VDOT) Road and CG-6/CG-7 VDOT CURB & GUTTER 3. It sholl be the responsibility of the Contractor to notify "Miss Utility' at 811 at least five 5 working days, but not more than ten 10 Bridge Specifications and Standards, the Virginia Erosion and Sediment Control Regulations. and an other applicable state, federal or local regulations. In CIP CAST IN PLACE CONCRETE P Y Y Y O 9 Y O 9 P 9 9 Y PP 9 CL CLASS days prior to commencement of any land disturbing activity. case of a discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall govern. CMF CONCRETE MONUMENT FOUND 4. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational CPP CORRUGATED POLYETHYLENE PIPE of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain Safety & Health (VOSH) Rules and Regulations. _ CMP CORRUGATED METAL PIPE CMPA CORRUGATED METAL PIPE ARCH dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary. shall be in accordance with the current edition of VDOT's DI CLEAN OUT Work Area Protection Manual. A trans ortotion management plan needs to be submitted for approval and land use permit issued prior to an execution DIA. DIAMETER 5. All existing utilities have been shown based upon the best available information. However, there may be existing utilities which are not . g PP p y ED DOWNSPOUT shown and should di located. Therefore, it will be the responsibility ie the Contractor to verify the location of all existing utilities prior w of work within the VDOT right ib way. EOG EDGE OF PAVEMENT construction. Any discrepancies between these plans and the actual field conditions shall be reported immediately to the Engineer, the owner, V4 The developer shall be responsible for relocating. at his expense, any and all utilities, including traffic signal poles. junction boxes, controllers, etc., EOG EDGE OF GRAVEL and the appropriate utility company. owned by VDOT or private / public utility companies. It is the sole responsibility of the developer to locate and identify utility facilities or items that EX. FASTING 4 IX. EXISTING may be in conflict with the proposed construction activity. VDOT approval of these plans does not indemnify the developer from this responsibility. F.F. FIRST FLOOR 6. All proposed utilities shall be installed underground. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any F.F.E. FINISHED FLOOR ELEVATION additional expense incurred as a result of an field revision shall be the responsibility p FOG FIRE DEPARTMENT CONNECTION 7. It shall be the responsibility of the Contractor pr obtain all permits necessary for construction prior to the commencement of work. An P y p y of the developer. approved set of construction documents shall be present on the site at all times. V6. If required by the local VDOT Land Development Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with Ga�S. GAUGE NE SIGN the attendance of the contractor (s), various County agencies, utility companies and VDOT prior to initiation of work. VICINITY MAP GM GAS METER 8. Topographic and boundary information was derived from a field survey performed by Painter -Lewis, P.L.C. The field survey has been V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any undetermined length of time. VDOT requires t I \ \ f / / I \ i GV GAS VALVE or GATE VALVE based on U.S.C. and G.S. datum and a contour interval of one (1) toot has been established for this project. Contact Painter -Lewis, P.LC. and shall receive 48 hours advance notice prior to any required or requested inspection. uy-LTJ' HCR HANDICAP RAMP at 540-662-5792 to establish vertical control for project construction. HB HOSE BIB V8. The contractor shall notify the Traffic Operations Center at 0540) 332-9500 for any traffic control pion that impacts a VDOT maintained interstate or iyi HP HIGH POINT 9. No geotechnical report has been prepared for this project. Primary roadway to provide notification of the installation and removal of the work zone. INV 10. All radii designations indicate fore of curb, edge of pavement, or edge of stone pavement, where applicable. V9. The contractor shall be responsible for maintaining a CVDOT permitted temporary construction entrance(s) in accordance with Section 3.02 of the Virginia IPF IRON PIPE FOUND Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. IPS IRON PIPE SET ---� ^ LP LOW POINT 11. The Contractor shall coordinate the relocation of and the connection to the existing utilities with the appropriate utility company, where V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of construction. LT. LIGHT applicable. Vii. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches cover andwhenpossible sholl be MLP METAL LIGHT POLE 12. The Contractor shall provide all AS BUILT documents and plans to the regulatory agency requiring such. installed under roadway drainage facilities of conflict points. MP METAL POST V12. Any unusual subsurface conditions (e.g.. unsuitable soils, springs, sinkholes, voids. coves, etc.) encountered during the course of construction shall be MH MANHOLE 13. Stakeout Note: If requested b VDOT, the approximate location of proposed entrances from State -maintained road will be slaked. immediate) brought to the attention of the engineer and VDOT. Work shall cease in that vicinity until on adequate design can be determined b the NDC NOSE DOWN CURB q y p p y g 9' Y 9 Y N.T.S. NOT SCALE engineer and approved by VDOT. OHE OVERHEAD ELECTRIC 14. A smoothing grade shall be maintained from the centerline of the existing road to the flow line, to preclude the forming of false gutters V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to placement and fill. Where CBR OHT OVERHEAD TELEPHONE and/or the ponding of any water on the roadway. testingis required, a VDOT representative shall be resent to insure the sample obtoined is representative of the location. When soil samples are IA PL PROPERTY LINE q p p p p P i� pp POWER POLE _: o a project to be accepted b VDOT and PROPOSED 15. The approval of these plans shall in no way relieve the owner of complying with other applicable local, State and Federal requirements. submitted to private laboratories for testing, the samples shall be clearly identified and labeled as belonging t p � p y PR. All applicable state and federal permits shall be obtained prior to disturbances within and jurisdictional waters and wetlands. that testing shall be performed in accordance with all applicable VDOT standards and procedures.aue.es PVMT PAVEMENT V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in six (6) inch lifts to 95% of theoretical ��' RCP REINFORCED CONCRETE PIPE R.D. ROOF DRAIN maximum density as determined by AASHTO T-99 Method A, within plus or minus 2% of optimum moisture for the full width of any dedicated street �'� e performed independent agency n a:REDUCER ITARY Erosion and Sediment ContML right-of-way. At the direction of VDOT, density tests sholl be by a qualified inddt nin with VDOT Road and Bridge 1. All Erosion and Sediment Control measures shall be installed prior to any land disturbing activities. All work shall be done in accordance with the current edition of the of Commonwealth of Virginia Erosion and Sediment Control Handbook. Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. SEW. SEWER . STANDARD V15. VDOT Standard CD and UD under drains shall be installed where indicated on these plans and/or as specified by VDOT. T.B.D. D. TOBE DEMOLISHED 2. All work shall be confined to the designated Limits of Construction. V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified on the plans as storm sewer pipe and a - T.B.R. TO BE REMOVED select number of pipe culverts. For pipe culverts, o minimum of one pipe installation for each size of each material type will be inspected or ten T.B.P. TO BE PRESERVED or PROTECTED 3. The Contractor shall be responsible for the installation and maintenance of all Erosion and Sediment Control measures. All Measures shall II TC TOP OF CURB be inspected daily and after each significant rainfall by the site superintendent or his representative. Any damaged structures shall be percent of the total amount for each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe shall be TEL TELEPHONE repaired or replaced be the end of that work day, considered as culvert pipe for inspection purposes. Additional testing may be required as directed by the Area Land Use Engineer or their representative. • TRB TELEPHONE RISER BOX V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum design standards and is the NRB TELEVISION RISER BOX 4. Upon completion of construction, all permanent erosion and sediment control measures shall be installed. After stabilization, the temporary responsibility of the developer. UG or NP. TYPICAL Erosion Control devices shall be removed, as approved by the Local Inspection Authority. Al vegetative cover shall be checked regularly and �: ;rr UGE UNDERGROUND ELECTRIC any damaged areas shall be repaired, fertilized, replanted, and mulched, as needed. V18. Prior to VDOT by acceptance of any streets, all required street signage and/orOn pavement markings shall vi installed by the developer or, at VDOT's zN[v°'` f UGG UNDERGROUND GAS discretion, by VDOT on an account receivable basis following the Manual On Uniform Traffic Control Devices. i UG CAN UNDERGROUND CABLE T.V. 5. The Contractor shall provide adequate means of cleaning trucks and other construction equipment prior to entering the public R art o UGT UNDERGROUND TELEPHONE If V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of construction. Copies of all invoices pLTH Op necessary, a trash rack shall be used as part of the Construction Entrance to help in the control of potential mud generated as part of thefor materials utilized within any dedicated street right-of-way must be provided to the local VDOT Land Development Office prior to acceptance of the XFMR ELECTRIC TRANSFORMER ment of this site. If it is determined that this is not sufficient, then h rack binstalled, needed. It is the en a wasracsae nsae, as neee. WL WATERLINE development P work. Unit and total prices may be obscured. SITE LOCATION MAP WM WATER METER responsibility of the Contractor to maintain clean streets and to allay dust at all times. V20. Aggregate base and subbase materials shall be placed on subgrode by means of a mechanical spreader. Density will be determined using the density WPP WOOD POWER POLE K' Pov'na and Concrete: control strip in accordance with Section 304 of the VDOT Road and Bridge Specifications and VTM-10. A certified compaction technician shall perform GENERAL NOTES. WTP WOOD TELEPHONE POLE JOHN C. LEWIS Y 1. The proposed public roads, main drive aisles, and parking areas shall receive the minimum pavement sections, as detailed on the plans. these tests. Certified copies of lest reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking stone depths, a VDOT5WN WV WATER VALVE All points of connection with the existingpavement sections shall be graded as required to provide a smooth transition between the pavement M# N -00. RADIUS IN FEET �Iil 1 21 p 9 q P representative shall be notified and given the opportunity to be present during the construction and testing of the density control strip. �•00.00 PROPOSED SPOT ELEVATIONsections. TM 64-A-29 & TM 64-A-30 �V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge Specifications. Density shall be determined # # x(00.00) EXISTING SPOT ELEVATION (((///���1// 2. All concrete shall be VDOT classification A-3. All work shall be done in accordance with standard practices. using the density control strip as specified in Section 315 and VTM-76. A certified compaction technician shall perform these tests. Certified copies of Wake and Manor Land Trust Painter -Lewis, PLC O HATCHING INDICATES REVERSED PITCH .tE C1 10 test reports shall be submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the opportunity to be present 300 Graig Drive 817 Cedar Creek Grade, Suite 120 IN THE GUTTER PAN: PITCH TO BE �SlONAL Excavation and Gradin: during the construction and testing of the control strip. Stephens City, VA 22655 Winchester, Virginia 22601 1/2" PER FOOT. TRANSITION THE GUTTER 1. Test pits shall be excavated to determine the depths and locations of all of the existing utilities. If conflicts exist, then the existing V22. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall be explored below the bottom of the Contact: Rex Wakeman Contact: John C. Lewis, P.E.,L.L.A. OVER A 10' LENGTH (TYP). utilities shall be lowered or moved to promote the construction of the proposed development. Tel: 540-869-3644 Tel: 540-662-5792 excavation to determine the type and condition of the foundation. The contractor shall report findings of foundation exploration to the engineer and LIST OF DRAWINGS: 2. All deleterious materials, demolished debris, and cleared and grubbed materials shall be removed and properly disposed of off-site. VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Rood and Bridge Standard PB -1. Where soft, yielding, or otherwise EXISTING PARCEL DTA: unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved SHEET 1/15: COVER SHEET 3. All topsoil or vegetative cover shall be excavated to its full depth and stockpiled on-site, if applicable, in the areas as directed by the by VDOT. TM#64-A-29: Zoned 62, Business General, 4.86 acres SHEET 2/15: PROFFER STATEMENT Owner's representative for future finish grading. V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with VDOT's installation criteria. Final TM#64-A-30: Zoned 82, Business General, 2.22 acres PHASING PLAN 4. All borrow fill material, if necessary, shall be obtained by the Contractor and approved by a Certified Geo -Technical Engineer. All fill approval of the guardrail layout to be given by VDOT after grading is mostly complete. Existing Use: Vacant SHEET 3/15: EXISTING CONDITIONS material shall be placed in lifts of 8" or less and shall be compacted to 95% of ASTM D-698 Maximum Dry Density, or as directed by the V24. Approval of these plans shall expire three (3) years from the date of the approval letter. Proposed Parcel 1: 0.653 acres PHASE 1 E&S PLAN Geo -Technical Engineer. V25. VDOT Standard CG -12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. Proposed Parcel 2: 5.896 acres V26. The foundations for all box culverts shall be investigated b means of exploratory borings advanced below proposed foundation elevation to determine Right of Way: 0.531 acres SHEET 4/15: EROSION AND SEDIMENT CONTROL NOTES 5. No blasting shall be permitted within 25 feet of existing utilities or structures without permission of the Owner. 9 Y i rY 9 P P g y' SOILS MAP the type and condition of the foundation. The contractor shall submit copies of borehole Togs and report findings of foundation exploration to the Proposed Use: Self Storage/outdoor storage WATER QUALITY NARRATIVE 6. All landscaped islands, slopes, and lawn areas shall receive a minimum of 4" topsoil obtained off-site or from the topsoil stockpile on engineer and VDOT for approval prior to constructing box. Foundation designs shall comply with VOOT Road and Bridge Standard PB -1. Contrary to the Proposed Buildings: 9 one story building site. The topsoil shall be graded and raked, prior to application of permanent vegetative cover. Standard, where rock is encountered and cast -in-place box is proposed, the thickness of bedding shall six (6) inches. Where soft, yielding, Building 1 will have 54 units. Building 2 will have 56 units. The number of otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineerr SHEET 5/15: PHASE 2 E&S PLAN and Units in the remaining buildings i5 t0 be determined. EROSION AND SEDIMENT CONTROL DETAILS 7. All disturbed lawn areas shall be stabilized b the establishment of permanent turf grass installed in accordance with generally accepted SHEET 6/15: SITE LAYOUT PLAN practices. y g 9 y P approved by VDOT. Building Restriction Lines: Front Yard Primary Street Setback: Required- 50' Provided -250' SHEET 7/15: GRADING PLAN 8. Fill slopes steeper than 3:1 will require a slope stability analysis and maintenance plan. Front Yard Minor Street Setback: Required -35' Provided -36' SHEET 8/15: WATERLINE PROFILE Rear Yard Setback: Required -0' SHEET 9/15: FREDERICK WATER GENERAL NOTES AND DETAILS Side Yard Setback: Required -0' SHEET 10/15: STORM SEWER PROFILES Maximum Building Height: Allowed- 35' Provided -12' SHEET 11/15: STORM SEWER HYDRAULIC CALCULATIONS Sign Setback: Required -10' Provided -10'+ SHEET 12/15: SITE ENTRANCE PROFILE FAR: 55,500 sf/256,830 sf=0.216 CONSTRUCTION DETAILS SHEET 13/15: LANDSCAPE PLAN Buffers and Screening: B2 against MH1=B type buffer req'd SHEET 14/15: LIFE SAFETY PLAN 82 against RA(Resid.)=B type buffer req'd SIGNS AND STRIPING PLAN B2 against RA(vocant)=no buffer required SHEET 15/15: STORMWATER MANAGEMENT -QUANTITY Parking Requirements: Parking Restriction Lines: Street Setback: Required -10' Provided- 12' Yard Setback: Required -5' Provided- 26' Parking Spaces Required: 3 for the office 1 per employee 1/40,000 SF loading Office: 3 spaces required Employees: 1 employee = 1 spaces required Parking Spaces Provided: 4 including 1 ADA space TRAFFIC IMPACT: ZONING NOTES: Loading Spaces Required: 55,500/40,000 = 1 space required SITE PLAN SP#15-20 UTILITY AND REGULATORY CONTACTS: Loading Spaces Provided: 1 Frederick County Road Classification for Route 522, Front Roal Pike: Minor Arterial Road 1. Signs will Conform to Section 165.201.06 of the Frederick County Zoning Ordinance and will required a separate permit. Building and Impervious Area Coverage: CROSSROADS COMMERCE CENTER 2018 Existing Traffic Data -Route 522 WATER AND SEWER SERVICE NATURAL GAS AADT=I6,ODa trips Frederick Water Washington Gas Parcel Greenspace Required: 15% or 3e,524 6q. ft. SELF STORAGE 315 Tasker Road 350 Hillandale Lane 2. The maximum height for the monument sign is 12'. The maximum size Parcel Greenspace Provided: 38.8% or 99,692 sq. ft. Data Source: ITE Manual, Ninth Edition Stephens City, VA 22655 Winchester, VA 22602 for the monument sign is 50 square feet. Proposed Impervious Areas: Roof= 55,500 sq. ft. Trips based on Grass Square Feet: 540-868-7923 SHAWNEE MAGISTERIAL DISTRICT Land Use 151: Mini540-868-1061 Parking Areas= 101.638 $a. ft. Total Ira ervious Area= 157,138 s Gross square Feet=56,050 3. The self storage facility will be in conformance with Frederick County P q. ft. -61.2% BUILDING INSPECTIONS ELECTRIC SERVICE Zoning Ordinance ,s5-204.18. FREDERICK COUNTY, VIRGINIA Weekday: 56.05x2.5=140 trips (50% entering, 50% exiting) Frederick County Inspections Department Shenandoah Valley Electric Trash Removal: The owner will contract with a licensed, private trash hauler fo AM Peak Hour: 56.05x0.28=16 trips (48% entering, 52% exiting) 107 North Kent Street - Cooperative the regular removal of trash. PM Peak Hour: 56.05x0.29=16 trips (53% entering. 47% exiting) Winchester, VA 22601 3463 Valley Pike Saturday: 56.05x2.33=130 trips (50% entering, 509 exiting) 540-665-5650 Winchester, VA 22602 Lighting: All lighting will conform to the requirements of the Frederick County EROSION AND SEDIMENT CONTROL 540-450-0111 Zoning Ordinance Section- 165-201.07. Building mounted lights only are ZONING ADMINISTRATOR DATE Frederick County Department of Public Works TELEPHONE SERVICE proposed. FREDERICK COUNTY, VIRGINIA 107 North Kent Street Verizon Winchester, VA 22601 404 Hillandale Lane RESPONSIBLE LAND DISTURBER Environmental Features: SITE PLAN EXPIRES FIVE (5) YEARS FROM DATE OF APPROVAL 540-665-5643 Winchester, VA 22602 Wetlands - No wetlands have been identified on the site. PUBLIC ROAD IMPROVEMENTS 540-665-3156 NAME: Flood plains - FIRM Map No. FIRM 510069CO218D shows that the parcel is within Zone X. This zone is characterized by areas outside the 0.2% annual Frederick Water Information Virginia Department of Transportation PAINTER-LEWIS, P.L.C. 2275 Northwestern Pike CERTIFICATION #: chance floodplain. WATER AND SEWER DEMAND CALCULATIONS Winchester, VA 22603 817 Cedar Creek Grade, Suite 120 540-535-1818 THE RESPONSIBLE LAND DISTURBER Ig DATE: Storm Water Management: Daily Employees: 1 persons Water quantity impacts have will be offset by the installation of stormwater Average Demand per person: 30 gpd management facilities on the site. The stormwater management facilities were Telephone (540) 662-5792 PARTY RESPONSIBLE FOR CONSTRUCTION THE & Winchester, Virginia 22601 designed Subdivision Design Plan #19-07 prior to the implementation of water Facsimile (540) 662-5793 Total Demand: 30 gpd MAINTENANCE OF ALL THE LAND DISTURBING quality requirements. Email: office®palnterlewls.com ACTIVITIES AS SET FORTH IN THESE PLANS. JOB NO.: 1711030 SHEET: CON Previous Approval Numbers: REZ #10-05, MDP #09-06, Subdivision Design ENGINEERS March 25, 2020 /4 Plan #19-07 Latest Revision Date: June 12, 2020 Action AMENDMENT PLANNING COMMISSION: July 6, 2005 - Recommended Approval BOARD OF SUPERVISORS: August 1.0, 2005 U APPROVED ❑ DENIED AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING 410-05 OF WAKELAND PROPERTIES WHEREAS, Rezoning 910-05 of Wakeland Properties, was submitted to rezone 7.26 acres from RA (Rural Areas) District to B2 (General Business) District for commercial use. These properties are located east and adjacent to Front Royal Pike (Route 522), approximately 350 feet south of the Papermill Road intersection, in the Shawnee Magisterial District, and are identified by Property Identification Numbers (PINS) 64-A-29 and 64-A-30. WHEREAS, the Planning Commission held a public hearing on this rezoning on July 6, 2005; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on August 10, 2005; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to change 726 acres from RA (Rural Areas) District to B2 (General Business) District, as described by the application and plat submitted, subject to the attached conditions voluntarily proffered inwriting by the applicant and the property owner. ` PDR<, 132-05 Patton, Harris, Rust & Associates, pe 117 E. Picodily Sl. Winchester, Virginia 22601 OFFICE (540) 667-2139 FAX: (540) 665-0493 ro Proffer Statement Wakeland Properties Proffer Statement Wakeland Properties Proffer Statement WakelandProperues PROPOSED PROFFER STATEMENT 2. Site Development REZONING: RZ. # 10.05 2.1 Site entrances shall be limited to one (1) as shown on the Generalized Dcvclopmem Respectfully submitted, Rural Areas (RA) to Business General (82) Plan (GDP), the exact design and location of which shall be determined upon final engineering thereof pursuant to the specifications and approval of the Virginia WAKE MANOR TRUST PROPERTY: 716 ones */-S Department of Transportation (VDO'1). (See 1 on GDP) Tax Map Pareek 64-A-29 & 30 (the "Propert}r) BY h 2.2 A 20' landscaped corridor buffer shall be provided along die Front Royal Pike \ 0 RECORD OWNER Wakeland Manor Land Trust (Route 522) frontage of the site, which will include mixed ornamental plantings Date: consistent with good sight line characteristics for highway entrances. Said buffer APPLICANT; Wakeland Manor Land Trust shall be installed prior to issuance of the first certificate of occupancy for the site, and shall be provided in addition to the buffering and/or landscaping regturements STATE OF VIRGINIA, AT LARGE PROJECT NAME: Wakeland Properties - Front Royal Pike of the Frederik County Zoning Ordnance otherwise applicable to the are. One (1) FREDERICK COUNTY, To -wit: freestanding sign shall be permitted within the buffer area at the project cnttance. th ORIGINAL DATE No other structures or impervious surfaces shall be permitted within the condornsnm The foregoing ivent was acknowledged before me this J CtdayoQL"-- -, tN OF PROFFERS: June 10, 2005 buffer, except those required for utifiries and site access. (See 2 on GDP) 2005, by rdv W a ftlq Q O REVISLONDATE(S): N/A 3, Transportation My The undersigned hereby proffers that the use and development of the subject property Public fission expires %�(�� {'t ,\, 7iOf GGA ("Properry"), as described above, shall be in strict conformance with rhe following conditions, which l.1 The Applicant shall place the amount of $land F in an escrow (Route[ for Notary public C��C1 r� 't 1,1_aJ_Nnt7A shall supersede all other proffers that mayhave been made prior hereto. In the event that the above and/or izat err of the intersection andcst of luster Drive and Front Royal Pike (Route 522) referenced B2 conditional rezoning is not granted as applied for by the applicant ("Applicant") andllor future design and cosi( (6)on of re -aligned rezoPapning pp Road. Such funds these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are shall ed escrowed within six ( a months of rezoning approval, and shall be contingent upon final rezoning of the Property with "final rezoning" defined m that rezoning which released to the County within 90 days of a written request bythe County. is in effect on the day following the last day upon which the Frederick County Board of County 3,2 The Applicant shall install tum lane improvements on Front Royal Pike (Route 522) ' Supervisors (the "Board") decision granting the rezoning may be contested in the appropriate court, to ensure safe and efficient site access. The exact location and design of such If the Board's decision is contested, and the Applicant elects not to submit development plans until improvements shall be determined upon final engineering thereof, and shall be in ~ such contest is resolved, the term rezoning shall include the day following entry of a final cote accordance with Virginia Departrnem of Transportation (VDOT) specifications. This ordinance shall be in effect on the date of adoption. Z order affirming the decision of The Board which has not been appealed, or,. if appealed, the day M Z following which the decision has been affirmed on appeal. 3.3 The Applicant shall identify and reserve locations for mter-parcel pedestrian and Passed this I Oth day of August, 2005 by the following recorded vote: � Q vehicular access during the master development plan (MDP) and/or site ltl J The beadings of the proffers set forth below have been prepared for convenience or development plan (SDP) process. Q a reference only and shall not control or affect the meaning or be taken as an interpretation of arty Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye provision of the proffers. The term "Applicant" as referenced herein shall include within its 4. Monetary Coatdbudon to Offset I matt of Dev lopment N meaning all future owners and successors m interest. When used in these proffers, the "Generalized Z Development Plan," shall refer to the pian entitled "Generalized Development Plan, Wakeland 4,1 The Applicant shall contribute the amount of two thousand dollars ($2,000.00) to Gina A. Forrester NaY Gary Dove Aye LLI� N Propenes" dated June 10, 2005 (the "GDP"), and shall include the following: Frederick Countyfor fire and rescue purposes. Said contribution shall be made at LL- Q LL - the time of issuance of the fust commercial building permit for the sice. Lynda J. Tyler Aye Bill M. Ewing Aye LL - L LL _ L nd U e�- 1.1 The development of the site with B2lan d uses shall not exceed 80,000 square feet of 4.2 The Applicant shall contribute the amount of of two thousand dollars ($2,000.00) to Gene Fisher AYe CE gross floor area, excluding the floor area of mini-warehouse/self-storage facilities, Frederick County for Sheriff's Office purposes. Said contribution shall be made at CL which shall be permitted on the site without restriction to floor area except as the time of issuance of the first commercial building permit for the site. otherwise governed by the Frederick County Zoning Ordinance. A COPT' ATTEST SIGNATURES APPEAR ON TAE FOLLOWING PAGES John 4. pay, Jr. W Fredenek County Administrator 1-- V Z Q remiss v.,22d] rvlmns LL1 (r Z'n Pagel of? QQ `\J LII J •Q M O W Z OV)NO ULLQU V) LL a En OLd W W Z LLI O 200 CE (f) U J o N ,y M7J50• L p/1.B! w 0 m On E Oo W NO W = — —------- LU ss 1r— L-4 I , / a s a I --- I BUILDING 6 / `<` BUILDING 9 1 i / t�j o m o PHASE 3 / OUTDOOR W o •o ----- PHASEI - '� H W Z w I i STORPGE/PHASE 4 m BUILDING - 7 3 \ L in' it II n -- n 11 ...... BUILDING 4 � c9 r Z N II 11 t/ J w PHASE 2 D w BUILDING 2 • 0 Z IO Z � Uw — PHASE BUILDING 3 r r BUILDING 1 �NLTH ; ' 0}+ J C. LEWIS 9 Ic. No. 021621 -moi- OA SSIONAL 8� tO --� SURVEY: C.I.: 60 0 60 180 P -L NA p (IU DRAWN BY: JOB NO. C 11 iP-L 1711030 SCOle Irl Feet SCALE: DATE: I� PHASING P LAN AS SHOWN 3/25/20 11 SHEET: 2/15 t� 4� o Iti GENERALIZED DEVELOPMENT PLAN sa O O 4 FREREhYCK GOUNn; 49/7C/N[4 I x; I I k y$y III &®L!F - �'. . 'fl�� '•L"i �K j a t".'-,� �y Patton, Harris, Rust & Associates, pe 117 E. Picodily Sl. Winchester, Virginia 22601 OFFICE (540) 667-2139 FAX: (540) 665-0493 ro Proffer Statement Wakeland Properties Proffer Statement Wakeland Properties Proffer Statement WakelandProperues PROPOSED PROFFER STATEMENT 2. Site Development REZONING: RZ. # 10.05 2.1 Site entrances shall be limited to one (1) as shown on the Generalized Dcvclopmem Respectfully submitted, Rural Areas (RA) to Business General (82) Plan (GDP), the exact design and location of which shall be determined upon final engineering thereof pursuant to the specifications and approval of the Virginia WAKE MANOR TRUST PROPERTY: 716 ones */-S Department of Transportation (VDO'1). (See 1 on GDP) Tax Map Pareek 64-A-29 & 30 (the "Propert}r) BY h 2.2 A 20' landscaped corridor buffer shall be provided along die Front Royal Pike \ 0 RECORD OWNER Wakeland Manor Land Trust (Route 522) frontage of the site, which will include mixed ornamental plantings Date: consistent with good sight line characteristics for highway entrances. Said buffer APPLICANT; Wakeland Manor Land Trust shall be installed prior to issuance of the first certificate of occupancy for the site, and shall be provided in addition to the buffering and/or landscaping regturements STATE OF VIRGINIA, AT LARGE PROJECT NAME: Wakeland Properties - Front Royal Pike of the Frederik County Zoning Ordnance otherwise applicable to the are. One (1) FREDERICK COUNTY, To -wit: freestanding sign shall be permitted within the buffer area at the project cnttance. th ORIGINAL DATE No other structures or impervious surfaces shall be permitted within the condornsnm The foregoing ivent was acknowledged before me this J CtdayoQL"-- -, tN OF PROFFERS: June 10, 2005 buffer, except those required for utifiries and site access. (See 2 on GDP) 2005, by rdv W a ftlq Q O REVISLONDATE(S): N/A 3, Transportation My The undersigned hereby proffers that the use and development of the subject property Public fission expires %�(�� {'t ,\, 7iOf GGA ("Properry"), as described above, shall be in strict conformance with rhe following conditions, which l.1 The Applicant shall place the amount of $land F in an escrow (Route[ for Notary public C��C1 r� 't 1,1_aJ_Nnt7A shall supersede all other proffers that mayhave been made prior hereto. In the event that the above and/or izat err of the intersection andcst of luster Drive and Front Royal Pike (Route 522) referenced B2 conditional rezoning is not granted as applied for by the applicant ("Applicant") andllor future design and cosi( (6)on of re -aligned rezoPapning pp Road. Such funds these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are shall ed escrowed within six ( a months of rezoning approval, and shall be contingent upon final rezoning of the Property with "final rezoning" defined m that rezoning which released to the County within 90 days of a written request bythe County. is in effect on the day following the last day upon which the Frederick County Board of County 3,2 The Applicant shall install tum lane improvements on Front Royal Pike (Route 522) ' Supervisors (the "Board") decision granting the rezoning may be contested in the appropriate court, to ensure safe and efficient site access. The exact location and design of such If the Board's decision is contested, and the Applicant elects not to submit development plans until improvements shall be determined upon final engineering thereof, and shall be in ~ such contest is resolved, the term rezoning shall include the day following entry of a final cote accordance with Virginia Departrnem of Transportation (VDOT) specifications. This ordinance shall be in effect on the date of adoption. Z order affirming the decision of The Board which has not been appealed, or,. if appealed, the day M Z following which the decision has been affirmed on appeal. 3.3 The Applicant shall identify and reserve locations for mter-parcel pedestrian and Passed this I Oth day of August, 2005 by the following recorded vote: � Q vehicular access during the master development plan (MDP) and/or site ltl J The beadings of the proffers set forth below have been prepared for convenience or development plan (SDP) process. Q a reference only and shall not control or affect the meaning or be taken as an interpretation of arty Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye provision of the proffers. The term "Applicant" as referenced herein shall include within its 4. Monetary Coatdbudon to Offset I matt of Dev lopment N meaning all future owners and successors m interest. When used in these proffers, the "Generalized Z Development Plan," shall refer to the pian entitled "Generalized Development Plan, Wakeland 4,1 The Applicant shall contribute the amount of two thousand dollars ($2,000.00) to Gina A. Forrester NaY Gary Dove Aye LLI� N Propenes" dated June 10, 2005 (the "GDP"), and shall include the following: Frederick Countyfor fire and rescue purposes. Said contribution shall be made at LL- Q LL - the time of issuance of the fust commercial building permit for the sice. Lynda J. Tyler Aye Bill M. Ewing Aye LL - L LL _ L nd U e�- 1.1 The development of the site with B2lan d uses shall not exceed 80,000 square feet of 4.2 The Applicant shall contribute the amount of of two thousand dollars ($2,000.00) to Gene Fisher AYe CE gross floor area, excluding the floor area of mini-warehouse/self-storage facilities, Frederick County for Sheriff's Office purposes. Said contribution shall be made at CL which shall be permitted on the site without restriction to floor area except as the time of issuance of the first commercial building permit for the site. otherwise governed by the Frederick County Zoning Ordinance. A COPT' ATTEST SIGNATURES APPEAR ON TAE FOLLOWING PAGES John 4. pay, Jr. W Fredenek County Administrator 1-- V Z Q remiss v.,22d] rvlmns LL1 (r Z'n Pagel of? QQ `\J LII J •Q M O W Z OV)NO ULLQU V) LL a En OLd W W Z LLI O 200 CE (f) U J o N ,y M7J50• L p/1.B! w 0 m On E Oo W NO W = — —------- LU ss 1r— L-4 I , / a s a I --- I BUILDING 6 / `<` BUILDING 9 1 i / t�j o m o PHASE 3 / OUTDOOR W o •o ----- PHASEI - '� H W Z w I i STORPGE/PHASE 4 m BUILDING - 7 3 \ L in' it II n -- n 11 ...... BUILDING 4 � c9 r Z N II 11 t/ J w PHASE 2 D w BUILDING 2 • 0 Z IO Z � Uw — PHASE BUILDING 3 r r BUILDING 1 �NLTH ; ' 0}+ J C. LEWIS 9 Ic. No. 021621 -moi- OA SSIONAL 8� tO --� SURVEY: C.I.: 60 0 60 180 P -L NA p (IU DRAWN BY: JOB NO. C 11 iP-L 1711030 SCOle Irl Feet SCALE: DATE: I� PHASING P LAN AS SHOWN 3/25/20 11 SHEET: 2/15 o GENERALIZED DEVELOPMENT PLAN O O 4 FREREhYCK GOUNn; 49/7C/N[4 Patton, Harris, Rust & Associates, pe 117 E. Picodily Sl. Winchester, Virginia 22601 OFFICE (540) 667-2139 FAX: (540) 665-0493 ro Proffer Statement Wakeland Properties Proffer Statement Wakeland Properties Proffer Statement WakelandProperues PROPOSED PROFFER STATEMENT 2. Site Development REZONING: RZ. # 10.05 2.1 Site entrances shall be limited to one (1) as shown on the Generalized Dcvclopmem Respectfully submitted, Rural Areas (RA) to Business General (82) Plan (GDP), the exact design and location of which shall be determined upon final engineering thereof pursuant to the specifications and approval of the Virginia WAKE MANOR TRUST PROPERTY: 716 ones */-S Department of Transportation (VDO'1). (See 1 on GDP) Tax Map Pareek 64-A-29 & 30 (the "Propert}r) BY h 2.2 A 20' landscaped corridor buffer shall be provided along die Front Royal Pike \ 0 RECORD OWNER Wakeland Manor Land Trust (Route 522) frontage of the site, which will include mixed ornamental plantings Date: consistent with good sight line characteristics for highway entrances. Said buffer APPLICANT; Wakeland Manor Land Trust shall be installed prior to issuance of the first certificate of occupancy for the site, and shall be provided in addition to the buffering and/or landscaping regturements STATE OF VIRGINIA, AT LARGE PROJECT NAME: Wakeland Properties - Front Royal Pike of the Frederik County Zoning Ordnance otherwise applicable to the are. One (1) FREDERICK COUNTY, To -wit: freestanding sign shall be permitted within the buffer area at the project cnttance. th ORIGINAL DATE No other structures or impervious surfaces shall be permitted within the condornsnm The foregoing ivent was acknowledged before me this J CtdayoQL"-- -, tN OF PROFFERS: June 10, 2005 buffer, except those required for utifiries and site access. (See 2 on GDP) 2005, by rdv W a ftlq Q O REVISLONDATE(S): N/A 3, Transportation My The undersigned hereby proffers that the use and development of the subject property Public fission expires %�(�� {'t ,\, 7iOf GGA ("Properry"), as described above, shall be in strict conformance with rhe following conditions, which l.1 The Applicant shall place the amount of $land F in an escrow (Route[ for Notary public C��C1 r� 't 1,1_aJ_Nnt7A shall supersede all other proffers that mayhave been made prior hereto. In the event that the above and/or izat err of the intersection andcst of luster Drive and Front Royal Pike (Route 522) referenced B2 conditional rezoning is not granted as applied for by the applicant ("Applicant") andllor future design and cosi( (6)on of re -aligned rezoPapning pp Road. Such funds these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are shall ed escrowed within six ( a months of rezoning approval, and shall be contingent upon final rezoning of the Property with "final rezoning" defined m that rezoning which released to the County within 90 days of a written request bythe County. is in effect on the day following the last day upon which the Frederick County Board of County 3,2 The Applicant shall install tum lane improvements on Front Royal Pike (Route 522) ' Supervisors (the "Board") decision granting the rezoning may be contested in the appropriate court, to ensure safe and efficient site access. The exact location and design of such If the Board's decision is contested, and the Applicant elects not to submit development plans until improvements shall be determined upon final engineering thereof, and shall be in ~ such contest is resolved, the term rezoning shall include the day following entry of a final cote accordance with Virginia Departrnem of Transportation (VDOT) specifications. This ordinance shall be in effect on the date of adoption. Z order affirming the decision of The Board which has not been appealed, or,. if appealed, the day M Z following which the decision has been affirmed on appeal. 3.3 The Applicant shall identify and reserve locations for mter-parcel pedestrian and Passed this I Oth day of August, 2005 by the following recorded vote: � Q vehicular access during the master development plan (MDP) and/or site ltl J The beadings of the proffers set forth below have been prepared for convenience or development plan (SDP) process. Q a reference only and shall not control or affect the meaning or be taken as an interpretation of arty Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye provision of the proffers. The term "Applicant" as referenced herein shall include within its 4. Monetary Coatdbudon to Offset I matt of Dev lopment N meaning all future owners and successors m interest. When used in these proffers, the "Generalized Z Development Plan," shall refer to the pian entitled "Generalized Development Plan, Wakeland 4,1 The Applicant shall contribute the amount of two thousand dollars ($2,000.00) to Gina A. Forrester NaY Gary Dove Aye LLI� N Propenes" dated June 10, 2005 (the "GDP"), and shall include the following: Frederick Countyfor fire and rescue purposes. Said contribution shall be made at LL- Q LL - the time of issuance of the fust commercial building permit for the sice. Lynda J. Tyler Aye Bill M. Ewing Aye LL - L LL _ L nd U e�- 1.1 The development of the site with B2lan d uses shall not exceed 80,000 square feet of 4.2 The Applicant shall contribute the amount of of two thousand dollars ($2,000.00) to Gene Fisher AYe CE gross floor area, excluding the floor area of mini-warehouse/self-storage facilities, Frederick County for Sheriff's Office purposes. Said contribution shall be made at CL which shall be permitted on the site without restriction to floor area except as the time of issuance of the first commercial building permit for the site. otherwise governed by the Frederick County Zoning Ordinance. A COPT' ATTEST SIGNATURES APPEAR ON TAE FOLLOWING PAGES John 4. pay, Jr. W Fredenek County Administrator 1-- V Z Q remiss v.,22d] rvlmns LL1 (r Z'n Pagel of? QQ `\J LII J •Q M O W Z OV)NO ULLQU V) LL a En OLd W W Z LLI O 200 CE (f) U J o N ,y M7J50• L p/1.B! w 0 m On E Oo W NO W = — —------- LU ss 1r— L-4 I , / a s a I --- I BUILDING 6 / `<` BUILDING 9 1 i / t�j o m o PHASE 3 / OUTDOOR W o •o ----- PHASEI - '� H W Z w I i STORPGE/PHASE 4 m BUILDING - 7 3 \ L in' it II n -- n 11 ...... BUILDING 4 � c9 r Z N II 11 t/ J w PHASE 2 D w BUILDING 2 • 0 Z IO Z � Uw — PHASE BUILDING 3 r r BUILDING 1 �NLTH ; ' 0}+ J C. LEWIS 9 Ic. No. 021621 -moi- OA SSIONAL 8� tO --� SURVEY: C.I.: 60 0 60 180 P -L NA p (IU DRAWN BY: JOB NO. C 11 iP-L 1711030 SCOle Irl Feet SCALE: DATE: I� PHASING P LAN AS SHOWN 3/25/20 11 SHEET: 2/15 Ex I'�,d LBl' J II 1� I Ex. IARV fx. 4' SAN CJITEI 4' Cleon Out,_ y/ Ex. IConn Ex. 4- SAN. 610 \\SE ^ � f}�ie i ~ (top # dewfed) _ N 84'0530" E 200 I � I / -_ # / / / / / I 1 / / / / I I 1 1 1 I 1 1 1 I 1 I I / 1 �I 1 1 1 WS1 A COURT ANO ASS0aA 7E0 IMPR04EMENTS IS CORREN7CY UNDER CLNSMUCPQV TO STA17ON 2+50. 7NIS Ma ECT AS APPROIED UNDER SU8DIK5/0N DESIGN PLAN 179 07. (!cp i Ex &Wtay NN Top= 731.74' 8' PLC /n= 72348' 8' PK' 0,f- 72330' i-- I i 11 11 1 - 930Oo * M,.- 717.37 2. \/\ \\\��- �/ S ASH --------- A4 / / '' i i / / 1, \. \I / / / \ / / Iiy SASSAFRAS I be Voc&ad \ •� / 1 II I `\ \\\ � \\ \\\ // � \ \`` I / S' / % / I / .. / /; I6" SASSAFRAS _IO" MAPLE �i 0� I \\ \\ \\ /% I /'\\\ \\/ I M ' / / / ,//3 • iC CHERRY CEDAR 1 I N. I sehER uuN EOR uIEfUL \ \ / /' _ / - Is' CEDAR VERIFY KIN`ro aFTmE-em \\ i / / /' \\ \\ \ r.L nJ A 0014 nyYrRowwaLY 174'1 I / / /�' \\ \\ / i y( \\\ / l / Ji• �Iz' ccDaa T\ W M. a. INSIRF.VI MM \ I TOPSOIL \ \\\ % // /� 1,2 CHERRY STOCKPILE CEDAR b CEDAR \\\\ �\\�/ TS 2��//Ii /,,/ �a-CEDAR LOCUST `IV' CEDAR '�q. _✓' r _�a' ceonR I�\ — • _ _ -- _ r / / IT \ \ \\_—_--IS" CEDAR W 14 LOCUST 'By�y537" LIMITS OF DISTURBANCE E%. W SEWER MN AND MH AND EASEMENT TO BE AP PORED AQ/OR fK Spnibry MN REMOVED PER FREDERICK WATER Tap= 731.61' INSPECTORS SPECIHCARONS. 6' PVC QHI 72 6' PVC uf= ]25.225.2 8' V / x \ � I 25 d Vtd3x Poet) Ce 40 0 40 120 Scale in Feet AREA TO SEDIMENT BASIN=4.5 ACRES EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE P -1 - II I lr DRAWN BY: z tnn'15'RCP Mv.)7133�4.j(C 1711030 SCALE: ENTRANCE m n Apron a� O � ^\ SILT FENCE Q 1 I DI D K X Tu. C Apron` O � � O C / -_ # / / / / / I 1 / / / / I I 1 1 1 I 1 1 1 I 1 I I / 1 �I 1 1 1 WS1 A COURT ANO ASS0aA 7E0 IMPR04EMENTS IS CORREN7CY UNDER CLNSMUCPQV TO STA17ON 2+50. 7NIS Ma ECT AS APPROIED UNDER SU8DIK5/0N DESIGN PLAN 179 07. (!cp i Ex &Wtay NN Top= 731.74' 8' PLC /n= 72348' 8' PK' 0,f- 72330' i-- I i 11 11 1 - 930Oo * M,.- 717.37 2. \/\ \\\��- �/ S ASH --------- A4 / / '' i i / / 1, \. \I / / / \ / / Iiy SASSAFRAS I be Voc&ad \ •� / 1 II I `\ \\\ � \\ \\\ // � \ \`` I / S' / % / I / .. / /; I6" SASSAFRAS _IO" MAPLE �i 0� I \\ \\ \\ /% I /'\\\ \\/ I M ' / / / ,//3 • iC CHERRY CEDAR 1 I N. I sehER uuN EOR uIEfUL \ \ / /' _ / - Is' CEDAR VERIFY KIN`ro aFTmE-em \\ i / / /' \\ \\ \ r.L nJ A 0014 nyYrRowwaLY 174'1 I / / /�' \\ \\ / i y( \\\ / l / Ji• �Iz' ccDaa T\ W M. a. INSIRF.VI MM \ I TOPSOIL \ \\\ % // /� 1,2 CHERRY STOCKPILE CEDAR b CEDAR \\\\ �\\�/ TS 2��//Ii /,,/ �a-CEDAR LOCUST `IV' CEDAR '�q. _✓' r _�a' ceonR I�\ — • _ _ -- _ r / / IT \ \ \\_—_--IS" CEDAR W 14 LOCUST 'By�y537" LIMITS OF DISTURBANCE E%. W SEWER MN AND MH AND EASEMENT TO BE AP PORED AQ/OR fK Spnibry MN REMOVED PER FREDERICK WATER Tap= 731.61' INSPECTORS SPECIHCARONS. 6' PVC QHI 72 6' PVC uf= ]25.225.2 8' V / x \ � I 25 d Vtd3x Poet) Ce 40 0 40 120 Scale in Feet AREA TO SEDIMENT BASIN=4.5 ACRES EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE P -1 - � DRAWN BY: ZL�'\Z � tnn'15'RCP Mv.)7133�4.j(C 1711030 SCALE: ENTRANCE AS SHOWN • \� rT L_ �i Vii_ _� / -_ # / / / / / I 1 / / / / I I 1 1 1 I 1 1 1 I 1 I I / 1 �I 1 1 1 WS1 A COURT ANO ASS0aA 7E0 IMPR04EMENTS IS CORREN7CY UNDER CLNSMUCPQV TO STA17ON 2+50. 7NIS Ma ECT AS APPROIED UNDER SU8DIK5/0N DESIGN PLAN 179 07. (!cp i Ex &Wtay NN Top= 731.74' 8' PLC /n= 72348' 8' PK' 0,f- 72330' i-- I i 11 11 1 - 930Oo * M,.- 717.37 2. \/\ \\\��- �/ S ASH --------- A4 / / '' i i / / 1, \. \I / / / \ / / Iiy SASSAFRAS I be Voc&ad \ •� / 1 II I `\ \\\ � \\ \\\ // � \ \`` I / S' / % / I / .. / /; I6" SASSAFRAS _IO" MAPLE �i 0� I \\ \\ \\ /% I /'\\\ \\/ I M ' / / / ,//3 • iC CHERRY CEDAR 1 I N. I sehER uuN EOR uIEfUL \ \ / /' _ / - Is' CEDAR VERIFY KIN`ro aFTmE-em \\ i / / /' \\ \\ \ r.L nJ A 0014 nyYrRowwaLY 174'1 I / / /�' \\ \\ / i y( \\\ / l / Ji• �Iz' ccDaa T\ W M. a. INSIRF.VI MM \ I TOPSOIL \ \\\ % // /� 1,2 CHERRY STOCKPILE CEDAR b CEDAR \\\\ �\\�/ TS 2��//Ii /,,/ �a-CEDAR LOCUST `IV' CEDAR '�q. _✓' r _�a' ceonR I�\ — • _ _ -- _ r / / IT \ \ \\_—_--IS" CEDAR W 14 LOCUST 'By�y537" LIMITS OF DISTURBANCE E%. W SEWER MN AND MH AND EASEMENT TO BE AP PORED AQ/OR fK Spnibry MN REMOVED PER FREDERICK WATER Tap= 731.61' INSPECTORS SPECIHCARONS. 6' PVC QHI 72 6' PVC uf= ]25.225.2 8' V / x \ � I 25 d Vtd3x Poet) Ce 40 0 40 120 Scale in Feet AREA TO SEDIMENT BASIN=4.5 ACRES EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE P -1 - DRAWN BY: CONSTRUCTION (`E 1711030 SCALE: ENTRANCE AS SHOWN 3/25/20 3.05 SILT FENCE SF )—N K X TEMPORARY SEDIMENT SEDIMENT BASIN O 3.18 OUTLET PROTECTION O 3.31 TEMPORARY SEEDING U so 2 I ^1� af W U Q w Z U N g �> W J W of Of g p W Z 0 N (n 0 UIl< VIw�U W af W Z W 0 N U J o aR-0DOwo 3 5 a2 --.0 c W 0 o a a .2 LV U ~ 0 0 WN L - ` p U N U O z U Z L2 W Z 3 n a� a �N z J LJ w o? 021621 -C'10NAL -'" SURVEY: P -1 - DRAWN BY: JOB N0. P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 3/15 reject Description 9VAC25-840-40. MINIMUM STANDARDS 1 -19 - his project is located on Route 522 just south of its intersection with Papermill Road. The owner proposes to construct a self storage facility A VESCP must be consistent with the following criteria, techniques and methods: long with associated site improvements. Proposed improvements are planned to begin during the summer of 2020. While the storage facilities ill be constructed in phases, the entire site will be graded and stabilized during the first phase. 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final Kisting Site Conditions grade but will remain dormant for longer than 140 days. Permanent stabilization shall be applied to areas that are to be left he project site will be located on a 5.9 acre parcel which will be consolidated from two existing parcels in Frederick County, Virginia. dormant for more than one year. Cold Plain 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping he parcel contains no floodplain, measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. oils he USGS Soils map shows the predominant soil types on the site is 1B, Berks channery silt loam, 96 Clearbrook channery silt loam, and 3. A permanent vegetative cover shall be established on denuded areos not otherwise permanently stabilized. Permanent 1C Weikert-Berks channery silt loam. These soils are generally fairly shallow (22"-43"), weathered from shale and sandstone, and generally vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will ell_Arn;nnA inhibit erosion. Adjacent Areas 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be The adjacent property to the west is the Route 522 road right of way. The adjacent property to the north is vacant. The adjacent property constructed as a first step in any land -disturbing activity and shall be made functional before upsloper land disturbance takes to the south and east is zoned for residential use. place. Off-site Areas 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. There will be no off-site disturbance except as allowed by temporary construction easements. 41C Weik - erks channery siltlooms 8 to 15 Percent slopes. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by Critical Areas the trap or basin. No critical areas where slopes are greater than 3:1 are present on site. PARCEL 0.65 0.00 a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall The disturbed area is approximately 6.2 acres, including the areas of improvement in the pp y g p public rights of way and off-site. only control drainage areas less than three acres. 2.29 b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per 3.02 A 12'w by 701 temporary stone construction entrance will be constructed and shall be maintained in a condition which will acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a prevent tracking or flow of mud onto the public rights-of-way. This may require periodic top dressing with additional stone or the washing and 25 -year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. All materials spilled, or those conditions expected to exist while the sediment basin is utilized. dropped, washed, or tracked from vehicles onto roadways or into storm drains must be removed immediately. The use of water trucks to 7. Cut and fill slopes shall be designed and in that remove materials dropped, washed, or tracked onto roadways will not be permitted under any circumstances. constructed a manner will minimize erosion. Slopes that are found to be 3 eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the 3.05 Silt fence will be installed in selected locations downstream from the construction areas as o first measure of construction. Silt fence problem is corrected. will be installed around the downstream side of any topsoil stockpiles. Silt fences shall be inspected after each rainfall and at least daily 8, Concentrated runoff shall not flow down cut or fill slopes during prolonged rainfall. Any required repairs shall be made immediately. Damaged, decomposed or otherwise ineffective silt fence shall be unless contained within an adequate temporary or permanent replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half channel, flume or slope drain structure. the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with 9. Whenever the existing grade and stabilized. water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot 3.14 A temporary sediment basin will constructed p ry be con t acted on the site to control sediment generated from the earthwork operation. The basin berms will be enter the conveyance system without first being filtered or otherwise treated to remove sediment. constructed with on-site materials and will be seeded with the permanent seeding mix immediately after installation. This facility will be inspected after each 10. All rain storm and repairs made as necessary. This basin will be converted to a stormwater detention facility after site stabilization. storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot o- enter the conveyance system without first being filtered or otherwise treated to remove sediment. 3.31 Temporary seeding in accordance with the E & S Std & Spec 3.31 will be applied to the topsoil stock pile and all areas which will not 11, Before newly constructed be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily stormwater conveyance channels or pipes are made operational, adequate outlet protection and any seeded and mulched. All temporary be in the required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. seeding areas will mulched accordance with schedule included herein. U C) Temporary Seeding 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for Sept 1 - Feb 15: the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. Annual Ryegrass 50 Ib/ac 98 85 Winter Rye 50 Ib/ac 98 85 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary May 1 - Aug 31: vehicular stream crossing constructed of nonerodible material shall be provided. German Millet 50 Ib/ac 98 85 or 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. Feb 16 - Apr 30: Annual ryegrass 75 Ib/ac 98 85 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. Mulch: 1. ton/ac small grain straw Fertilizer: 1 1000 Ib/ac 10-10-70 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: 9 Y PHASE 2 EROSION ANDS AC SEDIMENT CONTROL MEASURES a. No more than 500 linear a feet of trench may be opened at one time. Y P 3.05 Silt fence will be installed in selected locations downstream from the construction areas as a first measure of construction. Silt fence b. Excavated material shall be placed on the uphill side of trenches. will be installed around the downstream side of any topsoil stockpiles. Silt fences shall be inspected after each rainfall and at least daily d t from rom ewaterin o c. 9 operations shall be filtered or passed through an approved sediment trapping device, or both, and during prolonged rainfall. Any required repairs shall be made immediately. Damaged, decomposed or otherwise ineffective silt fence shall be discharged in a manner that does not adversely affect flowing streams or off-site property. replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with IS. Restabilization shall be accomplished in accordance with these regulations. the existing grade and stabilized. f. Applicable safety regulations shall be complied with. 3.07 Inlet protection will be constructed at all inlets immediately offer installation. Inlets shall be inspected after each rainfall and at least Where construction 17. n traction vehicle access routes intersect paved or public roads, provisions shell be made to minimize the transport daily during prolonged rainfall. Any required repairs shall be made immediately. Damaged or otherwise ineffective devices shall be replaced. of seY e hi t by v calor tracking onto the paved surface. Where sediment is transported onto o paved or public rood surface, Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height surface shall the roadbe cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling of the barrier, or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 3.18 Outlet protection in the form of rip rap will be applied at culvert outlets in accordance with the details. Rip rap will be permanent. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after 3.30 Replacement of topsoil will generally occur throughout the work site where vegetation is to be reestablished. Topsoil will be uniformly the temporary measures are no longer needed, unless otherwise authorized by the VESCP. Trapped sediment and the disturbed spread and rolled to a minimum depth of 4". Topsoil sholl not be while in a frozen or wet condition. soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and placed sedimentation. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction is Summer 2020 through spring 2021. 19. Properties and waterways downstream from development sites shall be protected from sediment de osition, erosion n damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency equency storm of 24-hour 3.35 All seeded areas will be mulched in accordance with the schedule included herein. duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity Permanent Stabilization requirements for natural or man-made channels: The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or with a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or protected sediment trapping measures. The contractor is responsible for the temporary protection and permanent stabilization of all soil stockpiles on man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe site as well as soil intentionally transported from the project site. No soil testing is required. The contractor shall establish vegetation on all system, downstream stability analyses of the outfall of the pipe or pipe system shall be performed. areas not otherwise stabilized according the following specification: b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred Seedbed Preparation: times greater than the contributing drainage area of the project in question; or a. Scarify top 1" to 2" of soil after final grades have been achieved. (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop b. Add 3 tons per acre pulverized agricultural limestone(1401b/1000sf).ng a channel banks nor cause erosion of channel bed or banks. SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) (b) All previously constructed man-made channels shall be analyzed by the use of a ten-year storm to verify that Tall fescue 120 Ib/ac 97 85 stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause Red clover 8 I95 65 erosion of channel bed or banks; and Ladino clover 8 Ib/a lo/o c 95 65 (c) Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwater will be contained within the pipe or system. Nurse Grass -(season dependent) c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the Sept 1 - Feb 15: applicant shall: Annual Ryegrass 12 Ib/ac 98 85 (1) Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not Winter Rye 12 Ib/ac 98 85 cause erosion to the channel bed or banks; or May 1 -Aug 31: (2) Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; German Millet 12 Ib/ac 98 85 (3) Develop a site design that will not cause the pre -development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre -development peak runoff rate from a ten-year storm Febor Fe16 -Apr 30: to increase when runoff outfole into a man-made channel; or Annual ryegrass 12 Ib/ac 98 85 (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the Mulch: 1.5 ton/ac small straw VESCP authority to prevent downstream erosion. grain Fertilizer: 1000 Ib/ac 10-10-10 d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development of the subject project. 1. The VESCP Authority must be notified one week prior to the preconstruction conference, one week prior to the commencement of land f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a disturbing activity, and one week prior to the final inspection. plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. 2. Work on the project (grading, excavation, construction) shall not commence until the appropriate erosion and sediment controls are in place g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipations shall be the as specified on the plan and as approved by the VESCP Authority. placed at outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. 3. The approved site plan must be kept on the work site and shown on request. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. 4. Prior to commencing land disturbing activities in areas other than indicated on these plan (including, but not limited to, off-site borrow j• In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or or waste areas), the contractor shall submit a supplementary erosion and sediment control plan to the VESCP Authority for review and approval. industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate 5. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as development condition shall be used in all engineering calculations. determined by the VESCP Authority. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. 6. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site I. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity development until final stabilization is achieved. and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 7. All vegetative stabilization shall be uniform, mature enough to survive, and adequate to inhibit erosion. hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) EH65E 1 SEQUENCE OF CONSTRUCTION reduce the allowable peak flow rate resulting from the 1.5, 2, and 10 -year, 24-hour storms to a level that is less than or 1. Install construction entrance. equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the 2. Install silt fence along downstream perimeter of work areas. forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a forested 3. Install sediment basin generally to the lines of the proposed detention facility. Apply temporary seeding. good condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity 4. Strip, stockpile and stabilize topsoil in location shown on the Site Erosion and Sediment Control Plan. Apply temporary seeding. and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to 5. Perform rough grading over site. Insure that runoff from the disturbed areas is directed to the sediment basin. 62.1-44.15:54 or 62.1-44.15:65 of the Act. m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of 62.1-44-15:52A of the PHASE 2 SEQUENCEOF CONSTRUCTION Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act 1. Install drainage structures. (62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land disturbing activities are in 2. Install inlet and outlet controls. accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulations. 3. Complete exterior site improvements. n. Compliance with the water quality standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program 4. Stabilize work area with pavement or permanent seeding where necessary. (VSMP) Regulations shall be deemed to satisfy the requirements of subdivision 19 of this subsection. 5. Install landscape plants. 6. Remove the sediment basin outlet control elbow and convert to the permanent stormwater detention facility. Remove other temporary controls nff<r nil u,n,6 ^,.,n 6....e ked.. ..b I,Nn...w ID NAME Forst -defenc mpnt.Wee viwd corer 18 Berks chonnery silt loam, 3 to 8 percent slopes, HSG: B, K=0.20 9B Clearbrook channer sill loom, 2 to 7 percent slopes, HSG: C/D, K=0.24 41C Weik - erks channery siltlooms 8 to 15 Percent slopes. HSG: B K=SQ,17 ROW 0.53 0.50 0.03 SOILS MAP 5\ PAI 2 MFA -256.056 5.896 PARCEL 1 AREA=28.453 0.653 ACRES IMPERNOUS AIEA-157.)3E SF 3.607 �AC �23.22B F f plGNi Of wAY PR A®15 SF 0.54 IyRFS papEO`20U5 M� TOTAL PROJECT AREA=308,537 7.08 ACRES BMP LAND COVER EXHIBIT IMPERVIOUS AREAS fids aaes (Total ompeM1y area) Forst -defenc mpnt.Wee viwd corer TOTAL POST DEV CDA: 7.67 L26 ores AREA ID AREA IMPERVIOUS TURF ACRES ACRES ACRES ROW 0.53 0.50 0.03 PARCEL 0.65 0.00 0.65 PARCEL2 5.90 3.61 2.29 7.08 4.11 2.98 OFFSITE 0.588 C6n f0 V N 100 0 100 Scale in Feet WATER QUALITY NARRATIVE The site plan will meet Part IIC of the stormwater regulations. As shown on these exh bits, the site will require 5.257 lbs/year of phosphorus reductions. This reduction will be met by the purchase of nutrient credits. ICE -BASED WATER QUAIIIY COMPUTATIONS D oro WeetI- STEP 1- Determine the appliable sea (A) and Me peat -developed impetuous co er (Ian) Applicable area (A) = fids aaes (Total ompeM1y area) Forst -defenc mpnt.Wee viwd corer 5• yruMres- L26 ores lorWet = 2.35 arms Rwdways= am xmes other 3/25/20 Walkways= 0.00 acne¢ Too lmpernAm, COYR= 3.61 meres Ined = (total rent development Imcen'iws core' / A) x too = 55.1 a_ STEP 2 -Determine the average land as ermndition (Ewatershed) or the exisenB Impervious cover(IniRimi BeEldr, Im. down deni Twittered) If Use laality has deRrminM land dove coMhlers W, lW hAdual watersheds wii IN Junsdimon We the .."Wad Spent, value determined Dy the Idem, as 1__. ahaw'm'se the CMsapeake bay default value: (.ruses is 16% eemen�, lexsrad oermme esga,sesm,sr we, re Me dwa u,same sre dpeseM. STEP 3 - Determine the appropriate development situation TM site infonreter determin N In Step 1 and Step 2 provide emugM1 nformanon to d@ermine Me approleien, develcpnvst situation under whkn Me W hommence mcena will apply sWmion 1: I._ I.,pg„, 55,1 g 16 X Sltuaeon 2i Inew s I„,regn, SEA > IS 6lwtion 3: I,,,,,y 1 1 - DO > 16 Situation 5: I_ is servN by an a.... ems. If the propsed dmeiopme rt meets the ceteris for Me development situation 1, than the law denalty development is wnsldered to be Me IMP and no pennant remora is required. The calculation procedure her Situation 1 sumo bare. worksheat z- Situation 2 STEP 4- Determine Me relative pre -development peals taM Iwtl (L.-) -'sa.ne,. [0.05'(0.009 x t",ei x A x 238 Lwe.rusr1= 2.69716a/veer amine Me relative pasoaevelopmem p dli load (L.) (0.051(0.0095 I_)) x A x 228 Lam= SAM le/year ermine Me astatine pollutant removal repuirement UUu da= L -L__I RR= 5.25716i I) Determine We gmrM saturant removal el6cw Sur the 9[e'. EFF= (RR l tay)x 100 EFF= 64.07% 2) Sal. BMPS fmmtable 5-:S and kare on our amp 1= eV Ipy,= % Rwe,= acres BMP3= % Ismer= % A.,= acres 3)Man intoe pelletal, knd assuming Me amended Enos: L"y- [0.05+(0.009 x lu..>)1 x A x 228 ween: Lury-MaMp pwTM lopment total phosphom, load entering propsed BMP Ism - poYdcrelopmett percent impa nous ewer m EMP damage area (whole numcers) A= drainey, area of pmpmed BMP (saes) Len,= Baas ret/vear Law= u.aaa lbaVeer 4) Cakulare Me polutant Wri aecby Me prepoutl Bli EFF_ x4w Lwow .n e,= 0.000 IIN/year Lu."wm„s.= 0.000 lbvVAAr 5) Gkulate 0e WWI poM1dant load renwved my the BMP's: Liesi= 0.000 Ws/vear 6) Verify mmp'ianm: Le,pyy.,i > RR L 5.257 v O I- > Z W :2V) Of af (nZQZ 0 J f- } ZU(n- J_ �UO ZZWU _0 0 U W Q LJ W Z U Q W Z U � � J p � Q W > UC9¢as 0 N O UL�¢U N W M Y U Q N W � W Z W N Q� U V C.I.: FREDCO 5• DRAWN BY: J 0 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 4/15 a �o��o C6n f0 V N n n a N w No 3 �a Z � W a a a J E w .2 M 1 0 w U o- O i W N� a0 U C) N V ai O w Z 3 Q� CL LEWIS 021621 SURVEY: C.I.: FREDCO 5• DRAWN BY: JOB NO. P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 4/15 IEx.•SAN --�- �4 111 �• 111". / STRUCTURE ID Q10 D 1 LG I Wd SILT FENCE d50 1A 4 18 10 12 12" 0.5' 2A 1 10 1 18 10 12 112 3.35 0.5' 9 1 3.5 1 15' 10' 1 12' 1 12• 0.5' CULVERT OUTLET PROTECTION DETAIL NOT TO SCALE N 6• 113.6 pwW 6• PIC b 72330' n/ -'--rg�= Ij 977:73 UMITS aF DISTURBANCE 50 0 50 150 la•s1en�_��-__ - �- SB933 = Scale in Feet WSMA CCYMT AW A$$MATEO AAAA kNrs/s CARROYRY iAI a]VSTh 1/00V W SOU13H IF,W IMY FRSECF AS APPRI) DWAXR A9Nw96V OE51al PLW p91 EROSION & SEDIMENT CONTROL KEY F TEMPORARY STONE CONSTRUCTION ENTRANCE OE �� VEL MIN.) GRAVEL 3.05 SILT FENCE //- BACKFILL �WI)H SEDIM NR g TP INLET PROTECTION NIrylM11N iRILMW ER LUNDITINRUIiIU.N (TI, c 0.5' OIPHFiER) O 3.30 TOPSOILING U U� U) J 3.32 PERMANENT SEEDING STORAGE VOLUME 'JJ - 3.35 MULCHING ' U e r, OF N1. THIS METHOD OF INLET PROTECTION IS APPUCABLE Zi VOLUME REO'D. WERE HEAVY CONCENTRATED RAR FLOWS E EXPECTED, BUT NOT I P O w ce &E WHERE PONDING MOUND THE STRUCTURE MIGHT CAUSE c Q w D a9 wptet NI-.ro•/n E I 2. SHAUL BEVDOT 033, , # 7M, c (n Q 603 c.y. c.f.) OR /5 COHSE AGGREGATE. 0 Q U y . pr9xmc (n w : vL.I 19,315 J. � Q (n L Z 0 pipe(16,281 A 1 90 II i 1 1e of m Ih9 O r1 Of V) 0.5U U / -'--rg�= Ij 977:73 UMITS aF DISTURBANCE 50 0 50 150 la•s1en�_��-__ - �- SB933 = Scale in Feet WSMA CCYMT AW A$$MATEO AAAA kNrs/s CARROYRY iAI a]VSTh 1/00V W SOU13H IF,W IMY FRSECF AS APPRI) DWAXR A9Nw96V OE51al PLW p91 EROSION & SEDIMENT CONTROL KEY F TEMPORARY STONE CONSTRUCTION ENTRANCE OE �� VEL MIN.) GRAVEL 3.05 SILT FENCE //- BACKFILL �WI)H SEDIM NR g Ui51GN OF ENLLET PNI FRM R RWNU PIPE FLOAIW 1._ INLET PROTECTION NIrylM11N iRILMW ER LUNDITINRUIiIU.N (TI, c 0.5' OIPHFiER) O 3.30 TOPSOILING U U� U) J 3.32 PERMANENT SEEDING STORAGE VOLUME 'JJ - 3.35 MULCHING ' U e r, OF N1. THIS METHOD OF INLET PROTECTION IS APPUCABLE << VOLUME REO'D. WERE HEAVY CONCENTRATED RAR FLOWS E EXPECTED, BUT NOT I P O w ce &E WHERE PONDING MOUND THE STRUCTURE MIGHT CAUSE c Q w D a9 wptet NI-.ro•/n E I 2. SHAUL BEVDOT 033, , # 7M, c (n Q 603 c.y. c.f.) OR /5 COHSE AGGREGATE. 0 Q U y . pr9xmc (n w : vL.I 19,315 J. NOT TO SCALE VA EROSION AND SEDIMENT CONTROL HANDBOOK 1992 Q (n L Z 0 pipe(16,281 0 LIJ 90 II i 1 1e of m Ih9 O r1 Of V) 0.5U U J N MV a 5 V o r I\ =N NIf) N N U Vi 4 N N 3 NEEDED WITH WIRE SUPPORT 1i') 4 i a z C STEEL OR WOf a `f n WOOD POST J y > '0 U -LOW �- D V F ly N o W W E 4= v.N o 'o 3 F w Z N o E o � I- w Z w II 110 r -II Ij FT MAX. SPACING WITH -III,- I ITI - I I RE SUPPORT FENCE f - a I ill 11 II III ), N ,.gym a I II91 i Ill i' ,,.ti s a I 1 I I_ � a s @ m sa loo zao It7/mc. sao lana AmStrap. W ATTACH 90 BEND TO W-8"0 Inn YEAR WSF=7P6 a9 HOPE 0 0.00% SLOPE INVERT IN 716.80 INVERT O1 TOP OF ELBOW=7181 ADD 3' OF 8"0 PIPE RISER TOP OF RISER=721.0± DRILL 4 COLUMNS AND 5 ROWS OF 1"0 HOLES IN RISER 0 6" CC AS SHOWN(20 HOLES) 10 YEAR WSE=721.77 Tap OF RICFR=791 NO 9 YFAR AFI .11 DRY STORAGE -19.315 CUBIC FEET WET STOROBE=12,265 CUBIC FEET REMOVE 90' BEND AND S OF 8"0 PIPE RISER AFTER SITE IS STABILIZED. ADD END SECTION TO THE 8' LENGTH OF 8"0 CULVERT QMIMFMT TRAP Pel PIN ATII 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE OE �� VEL MIN.) GRAVEL 3.05 SILT FENCE //- BACKFILL �WI)H SEDIM NR g 3.07 INLET PROTECTION IP O 3.30 TOPSOILING U U� U) J 3.32 PERMANENT SEEDING STORAGE VOLUME 'JJ - 3.35 MULCHING ' U e r, OF N1. THIS METHOD OF INLET PROTECTION IS APPUCABLE << VOLUME REO'D. WERE HEAVY CONCENTRATED RAR FLOWS E EXPECTED, BUT NOT I P O w ce &E WHERE PONDING MOUND THE STRUCTURE MIGHT CAUSE c Q w EXCESSIVE INCONVENIENCE OR DAMAGE TO AWACE14T STRUCTURESUNPROTECTEDAREAS. cL ST 1 DI -1 TOP=725.00 8" INV. IN FROM DETENTION -718.60 18' INV. OUT=71860 rTOP OF BERM=726.50 SEE FINAL GRADING PLAN / DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% 2 X OR GREATER EXISTING PAVED III `�'9'O' '8 '%_, 1_ ROADWAY -III-III-III-I _I I-� I-�-"'- IMI ' I 1I - F LTM FABRIC SECTION A - A NOTE: _ SPILLWAY USE DRAGS, STRAW BALES SEDIMENT BARRIER OR ER APPROVED 1"'•""' (STRAW BALE TYPE SHOWN) TO HANNEUZE RUNDF AS EQUIRED. SUPPLY WATER TO WASH - WHEELS IF NECESSARY. QAt 2 OR0 . a Of I ,FIQM < F. p50VA4E GLLCAUNIONI p(.W)(&A IN/1W)DA IL) -5.4 CFS BACK OF SIDEWALK r /"� CATCH BASIN BACK OF CURB 111 A15-1 2X4 WOOD SND CONCRETE BLOCK ao : ,... A •no- ,.: 04:5„ . 4 �' b e V db� O WIRE SCREEN OR FILTER FABRIC CONCRETE BLOCK *FAER NG HEIGHT J C CONCRETE BLOCK U II- Z CURB INLET I O ZU WIRE L L FILTERJ I L� CATCH BASINOD SND Z LIJ CURB INLET d � NOTES: SEDIMENT BARRIER w o Q 1. USE BLOCK AND GRAVEL TYPE SEDIMENT BARRIER WHEN CURB INLEF IS LOCATED IN (\( (n Q CNTLY SLOPING STREET SEGMENT, WHERE WATER CAN POND AND ALLOW SEDIMENT TO SEPARATE FROM RUNOFF. LLI 0 2. BARRIER SHALL ALLOW FOR OVERFLOW FROM SEVERE STORM EVENT, Q Q 3. INSPECT BARRIERS AND REMOVE SEDIMENT AFTER EACH STORM EVENT. SEDIMENT AND GRAVEL MUST BE REMOVED FROM THE CL Z TRAVELED WAY IMMEDIATELY. w O O r !Y 18" MIN. - o/ TOTAL �� VEL MIN.) GRAVEL UJ WET //- BACKFILL �WI)H SEDIM NR g DRY _.., - ��(-) Lij Z WIDEN U U� U) STORAGE STORAGE OEPiH Of J STORAGE VOLUME DROP MR MESH INLET 'rt Q LaJ > STORAGE VOLUME ' U e r, OF N1. THIS METHOD OF INLET PROTECTION IS APPUCABLE << VOLUME REO'D. WERE HEAVY CONCENTRATED RAR FLOWS E EXPECTED, BUT NOT I P O w ce &E WHERE PONDING MOUND THE STRUCTURE MIGHT CAUSE c Q w EXCESSIVE INCONVENIENCE OR DAMAGE TO AWACE14T STRUCTURESUNPROTECTEDAREAS. cL OUTLET 2. SHAUL BEVDOT 033, , # 7M, c (n Q 603 c.y. c.f.) OR /5 COHSE AGGREGATE. 0 Q U 12.265 c.f. GRAVEL AND WIRE MESH DROP INLET SEDIMENT BARRIER (n w : vL.I 19,315 J. NOT TO SCALE VA EROSION AND SEDIMENT CONTROL HANDBOOK 1992 Q (n L Z 0 pipe(16,281 0 LIJ of m O r1 Of V) U U J N a o r I\ =N NIf) N N U Vi EXTRA STRENGTH FILTER FABRIC N N 3 NEEDED WITH WIRE SUPPORT 1i') 4 i a z C STEEL OR WOf a `f n WOOD POST J y > '0 U -LOW �- D V F ly N o W W E 4= v.N o 'o f� F w Z N o E .IN � I- w Z w II 110 r -II Ij FT MAX. SPACING WITH -III,- I ITI - I I RE SUPPORT FENCE a STEEL OR WIRE & FILTER FABRIC Z FLOW 36'Q HIGH MAX SDE OFNPO$TATFAC RELY ill? Z sv11}Auloti7t tF40d RUNOFF G py RUNOFF Z �{Se^ a6 W �A'o - �- /RFf`.TILIMMFNI1FI11 OW 0_ A I A 2"-3" COURSE AGGREGATE (ifI (Ym MIN. 6" THICK O 40'-18"0 HDPE O 0.00% SLOPE 3 �°o��y''$�g �ojO^,^✓M.9",.`^,} Oo INSTALL PREFABRICATED ND d a~'Oopt3Pd�'t�t'o°S6fa�'Bo'IMM•+uM°o§l' aavo Se SECTION 0 OUTLET END INVERT IN=717.80 V, INVERT OUT=716.00 Z DIVERSION RIDGE w 70' MIN. NSTSNOTES: B -OUTLET STRUCTURE DETAIL/SWM OUTFALL CONTROL DETAIL PLAN -TSS L 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS- OF-WAY, THIS MAY REQUIRE TOP DRESSING, TRAP ID TOTAL TOTAL WET WET WET DRY DRY DRY H/Ho TOP OF WIDEN DRAINAGE STORAGE STORAGE OEPiH STORAGE AREA STORAGE VOLUME STORAGE DEPTH STORAGE MEA STORAGE VOLUME MBMKME OF AREA VOLUME REO'D. WIDTH OUTLET SB1 4.5ac 603 c.y. c.f.) 200 it 8,530 St. 12.265 c.f. 2.00 ft. 18.810 81 19,315 J. HA 12 ft, pipe(16,281 REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY. WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. 3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP TEMPORARY SEDIMENT BASIN/CULVERT OUTLET DETAIL OR SEDIMENT BASIN. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT III , V I II n T -III- -III-III I P12 " MIN.' IILII �-IIII•iI=I I 171IIII•• TH 0 12" MIN.4zTRENCH WITHGRAVEL ED BACKFILL T'J N C. LEWIS 'c. No. 021621 STANDARD DETAIL ALTERNATE DETAIL �a TRENCH WITH NATIVE BACKFILL TRENCH WITH GRAVEL 4 a NOTE: 4. SET POSTS AND EXCAVATE A 4"X4" SIONAL aGti 1. INSPECT AND REPAIR FENCE AFTER EACH TRENCH UPSLOPE ANLONG THE LINE D` STORM EVENT AND REMOVE SEDIMENT WHEN OF POSTS' SURVEY: C.I.: NECESSARY. 5. STAPLE WIRE FENCING TO THE POSTS. P -L 1• 2. REMOVED SEDIMENT SHALL BE DEPOSITEDIRE ILR FABRIC TO THE WIRE TO AN AREA THAT WILL NOT CONTRIBUTE C&AX WEIR IT INTO THE TRENCH. SEDIMENT OFF -SRM AND CAN BE PERMANENTLY DRAWN BY: JOB NO. 7 BACKFILL AND COMPACT THE EXCAVATED STABILIZED. SOIL. P -L 1711030 3. SILT FENCE SHALL BE PLACED ON SLOPE SCALE: DATE: CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE DETAIL WITH WIRE SUPPORT AS SHOWN 3/25/20 NOT TO SCALE ADDAPTED FROM: 1992 VA E&S CONTROL HANDBOOK 3.05 SHEET: 5/15 40 0 40 120 Scale in Feet I Ex. 4' SAN. LAR RESERVED FOR INIETMARCEL is RESERVED FOR IMERPAfL LEhit SS n,�a II 11 h 1j u xp / mN fx. Da IARV h Off\ n Ex. 4' SAN. LA iFFA 12 \ ry 1 Ex 4' Of. Out• 1 (top is Nerofed) � r Ex Mr«a1t1l N B4.0530�r'' __;_ve IEx. B' NL G" Q) \� I y � I I LR,R 5x � 0 @ I BAIL(1TR) 4 I u 20.42' 8 m 121.42' CURVE ARC LENGTH r ]] C NY (3 IUNIT 3, C o it 40.00' '.500 SF N 5836'26" E 31.23' C2 79.21' 392.07' 113431" ti "I 63 I1' c9fin (Under Cost) -g-AA_// _ 11 ,r RCP m'= n334S R\P Wt5 COIIIRATOR imN AWOST FREDERICK WATER FMALITIES SO GRADE PER FREDERICK WATER INSPECTOR'$ REQUIREMi REVISED FREDERICK, WATER EASEMENT ACC dent Ex 4' Gear Out EOP y (tap demoted) $ uNR 2sil mces "LA0 S.SF I IIIIgB UNIT 25 ff \ sIXggt st ga My SEWER uANM SEE ROAD PW1S BY PHRAA Sit /19-W (INCREASE SIZE OF CUL -OE -SAC ro 98'e) cc-Iz RN,P(1YPh moor cc I I x5'8 S. WALr- 25'R \ E.A. submi MAl lap= 731.74' B• PIC !n= 723.48' 8' PVC Out= 72330' /V 04 2330" E 92561 FFrt]zisFo F_"] s U. 51 S CPP O 5.L% STORMWATER MANAGEMENT PRNAIE SEWER _�--- � WIIHIN�F EW/i� mNq g ({x]26.60 ,500 s I g s,.50o I'0 1,5W sF 0 SF s'R aMLOw) �- BOLLW� ARE � I rbl REpUWEp AT HYpp,VRS D' rW� ACCEn7etE 8 RDNE ro amcE I .10 3 UN31 T FF.TTT9.60 rc , FF -]w.60 I.SW sF F1S'e]1,.60 t.500 SF au5' 1,5W SF HR saLL TR. 11aMS's REP 60.75%-.. _- / PE x00 PYP �- 1 rJ ]� - - EyFF ! i - S Ia.1� FLWBIE CORRUCoMED 5/PIA= =Mi der Const. le' St.- _ ag LADING GATE 1B' CPP wt' 2259' II �� - KEYPAD CONTROLS EXTr k ENTRY PER OWNER SPEC9'MEnON PRGNDE "Col E0gi AS REOUIREO N95RO COURTAND )REA71 AR -D IAIPRpI'EAFEN7$ IS 70fir M RY UNDER WS PROJECT TO STAnC4N 2+50. TNIS AVER T 80 APPROVED ud 09 SUBOIW570N OESICiV PLAN /I9-Ol. LINE BEARING I y � I I LR,R 5x 13.95' FF.]T&g0 I BAIL(1TR) ,.SpO SF I 83'20'34" W 20.42' 8 PRNAM 121.42' CURVE ARC LENGTH �IAIFSEWER FAL I IUNIT 3, C1 E"]x9.60 40.00' '.500 SF /V 04 2330" E 92561 FFrt]zisFo F_"] s U. 51 S CPP O 5.L% STORMWATER MANAGEMENT PRNAIE SEWER _�--- � WIIHIN�F EW/i� mNq g ({x]26.60 ,500 s I g s,.50o I'0 1,5W sF 0 SF s'R aMLOw) �- BOLLW� ARE � I rbl REpUWEp AT HYpp,VRS D' rW� ACCEn7etE 8 RDNE ro amcE I .10 3 UN31 T FF.TTT9.60 rc , FF -]w.60 I.SW sF F1S'e]1,.60 t.500 SF au5' 1,5W SF HR saLL TR. 11aMS's REP 60.75%-.. _- / PE x00 PYP �- 1 rJ ]� - - EyFF ! i - S Ia.1� FLWBIE CORRUCoMED 5/PIA= =Mi der Const. le' St.- _ ag LADING GATE 1B' CPP wt' 2259' II �� - KEYPAD CONTROLS EXTr k ENTRY PER OWNER SPEC9'MEnON PRGNDE "Col E0gi AS REOUIREO N95RO COURTAND )REA71 AR -D IAIPRpI'EAFEN7$ IS 70fir M RY UNDER WS PROJECT TO STAnC4N 2+50. TNIS AVER T 80 APPROVED ud 09 SUBOIW570N OESICiV PLAN /I9-Ol. LINE BEARING DISTANCE TO Li N 05'28'35" W 13.95' L2 IN 83'20'34" E 49.07' L3 IS 83'20'34" W 20.42' L4 IN 05'28'35" W 121.42' CURVE ARC LENGTH RADIUS DELTA ANGLE CHORD BEARING CHORD LENGTH C1 32.08' 40.00' 45'57'13" N 5836'26" E 31.23' C2 79.21' 392.07' 113431" N 75'4747" E 79.07' 63 106.59' 458.00' 13'20'03" N 76'40'33" E 106.35' C4 200.88' 58.00' 198'26'17" N 15'52'34" W 114.50' C5 63.48' 58.00' 62'42'44" S 33'32'56" W 60.36' C6 28.33' 20.00' 81'09'00" S-42-415'04" W 26.02' C7 90.42' lE18.0(y10'00'03" 15" INV OUT -721.25 S 78'20'33" W 90.30' C8 38.34' 332.07' 6'36'57" IS 76'38'59" W 38.32' C9 39.02' 40.00' 55'53'53" IN 72'05'36" W 37.49' IMn s FEa]T&60 ,.500 5F """ 5 7;7 ,2] 60 SCO SG Cpp O 0.50' FH Am" 1 Fs.6o ,500 .7z65F 7, 76_4 dul �CIWNLINKOPMOE FARiIC / oIN / „NIT 2625 FF=]60 uwT v z o0o sF / UNrc ?5 Ware z6 2 OCn 4 / ,tor 4 FF.lz9.60F q,FFnx].fio es 00 z,OoO sODo sF Ad � . u / /'4 / I / FF ` UNn x5 / UNIT 22 "]25.W / UNrc 2, FF4T8.60 ,• 9�• FF 560 ,.500 ] / all, 30 3 11!7_9%f / 500 5E . if n / /STR 1 �/ / ; OUTFALL CONTROL CONTROL STRUCTURE SEALED STUB FOR FUTURE USE / TOP -725.00 15" INV OUT=724.50 TO 6 tih / 8" ORIFICE IN:716.80 18" INV OUT -716.80 TO 1A STR 8 :]26.80 FF�.]n.6o 5.sF / / STR 1A DI -3C L=10' TOP=727.00 500 sF Aro // END SECTION 15" INV OUT -723.00 TO 9 18' INV OUT=716.00 FROM 1 STR 9 / ES -1 / STR 2 / 15" INV OUT=719.00 FROM 8 - - - - / 18' INV IN=717.80 FROM 10 STR 10 24" I L=12' TOP -725.70 24" NV OUT=7.80 FROM 3 15" TOP -724.50 24" INV OUT=717.55 TO POND 75' INV IN=720.20 FROM 11 15" INV IN -720 20 FROM 13 - - - - .�- - - STR 2A 18" INV OUT -720.00 TO 2 - - -� END SECTION 1. AoawuWeeing"remse(whadv RGWhemM6r a. Matiem MMw#mN=."''=. a. failreeteed.mmemelenrl anem n. 0101 24" INV OUT=717.40 STR 11 W It... Ybl,age -- Meumlrm DI -1 TOP -724.50 TWF1 25011 120 STR 3 DI -1 TOP -727.20 15" INV IN=720.80 FROM 12 ,wOAk rvA H.IXtfIdW3red$. Yi60n 15" INV OUT=720.70 TO 10 ur SMF Internet slow Ion. ord" Idea em Moat) 18" INV IN -718.95 FROM 4 a61RT SO (W10 (nld weather ha1MU1 - - �- - �- 24" INV OUT=718.70 TO 2 STR 12 H161m Aboi OS Dual bad Red" DI -1 TOP=724.50 MOtiff '-e' CIlANONK FENCE moll oPAauE FABRIC STR 4 MH -1 TOP=732.20 15" INV OUT=721.25 721.25 TO 11 OF DISTURBANCE 18' INV IN -721.30 FROM 5 STR 13 ROWRM FARM wired ready fn IS 140) m PSOU remote Wtln er(mlu Yw ryweknotrndu@d; 3i°f min. IT mounting height, 2 00 amd lumens. 18" INV OUT=721.20 TO 3 DI -1 TOP=724.50 WIWNI' awNnngrmlpernuneµ"".^ 15" INV OUT -721.25 TO 10 STR 5 SnAT DI -3C L=12' TOP=728.53 rola 15" INV IN=723.69 L17.N, JV1A L/GHT/NG' cCe' Asn FEATURES & SPECIFICATIONS INRKOE D USE - For bolding- and wanmoumed appuaance, CONSTRUalON - Audi dd,.n, roo,lem Reunion housing. Did cast domRame has imwh her um brant tempered YASS lens. Da ssemme is fully sealed On a dosed OR slUearm gagAel. Finch 6a0dim finisM1 a hdmM dark clove ODBi) pN)nhr powder finial, wUM1 other anaM1itMmal cNmsavadaw" DPIIl3-NydMmmedrefienwtmsupeAOmnBomdryandconnd.VMiallampodmlatbnlaimmoyed Well Mounted LUminaite Iampouryutansid, .111,emos ( p00le.bil Arthur, TWF1 ashy do n eBmm(rom ballast and Mare M1om supply wires So6N cfo p paJNve htdiy WR opnb. INSTALLATION Un'rrtmlmwntlng plkw@lmegralmwncy bdn Mmpmn lAefixNre lorrasy me Perron nNallafim - UST),I named ndbrim I'ded to OownmimNlbnonly NOM(en fiei¢e0p- - moleIp65erged.11Rwanagnanebelowartl'uteri 10 ambienkm. SlWand lOWare Hebei to 25"< FLUORESCE NG 160iT-I0iAi WAAU EmemenryopUom lallwanagOlarellshd NIST ambient WARRAXSY lyra Iimirodwa a ty (ompl t a amIle slpatedat +>� ,Myo _d sLO sfx P, -. .r 'p_ dLps3u6 SProd¢uom XO1F Actual p A e mq differ as a resultstring user environmentndapplirnion With16140.6) � j Swdfi Ionssubjectl dRm, wltmAI notice. Height: 10 1/16 (25,61 DPA!, ORIh:46/A 11411 H •WeWM1t.141Usp0.9kg1 Aid-roknnaemdingemimeml �... W _ 1_ �. O un6rdMvuiMhumd, blR evi9Ar ar mM,prtd In Bumph ew. �. iPXIIXY mer M w 18' INV OUT -723.49 TO 4 STR 6 DI -3C L=12' TOP=728.53 15" INV IN=724.22 FROM 7 15" INV OUT=724.02 TO 5 TWF1 Compact fluorescent, Wall Mounted Units TWF12l26TRT TEST No:.1.78189 ----- dovend. _'cummWNxgmadvol ou"'Am ress,.lmi - •-- - - •• -. wegne:rrvrl3tlnl MyUU LYI Il. bm@aIeMIAM1llT hou'doolMdmicat 1. AoawuWeeing"remse(whadv RGWhemM6r a. Matiem MMw#mN=."''=. a. failreeteed.mmemelenrl anem n. 0101 1 Sam. W It... Ybl,age ealhn Meumlrm Op[iom TWF1 25011 120 Iblankl EIHrvrm VF (blanO Surfaamwnl Bhiooed installed'nfiv ,wOAk rvA H.IXtfIdW3red$. Yi60n 117 5. shNed,epArg'ely ur SMF Internet slow Ion. ord" Idea em Moat) z a61RT SO (W10 (nld weather ha1MU1 BBW Sudacemoumee E( E.. .braua" ore^ a H161m Aboi OS Dual bad Red" ROW Emergency canny add (321 min. Womq hmwalmeP'a" MOtiff 0 1 2 3]a 5 is swU<Mng' E(rvNt FmemmrybMl"Ywck(pYmin.awminglempnaeweV.•'6n.,' 32W InPInW6e 1-10 N1ThT Femicandli, 181um, based on 111 Irmem4s, ROWRM FARM wired ready fn IS 140) m PSOU remote Wtln er(mlu Yw ryweknotrndu@d; 3i°f min. IT mounting height, 2 00 amd lumens. OIRT Luminare EAdenry. 575% WIWNI' awNnngrmlpernuneµ"".^ mzm I SnAT rola ---- -- ORfiena(mntinuMl qM,R' Lempa OC11 Emmm rRydruilll.wnl3SWum uctirdi SbionedsenaraleH' (blank) DMkbmmElenumd 21011hurable Fnuhs LPI Lampimluded 1DC11 finergenrydrzuillbvon (Iwn3$WnmplOdWed("• WB wim's"d DSST Sandstoncrum red on)(Is W6 boom, IRP Less lamp X2012 Ememenry domed 12 IA 12OW lamp Nduded)•" V6 Vandilguard CHAT Natural aluminum, textured OBIYD Black 10[1011 Imn...... uNcon, H. IOW lam, muludedls OWNS WhitntexNred ONMO Nmuralalomin. U Plimimomonewl Neon type^ OBLB Black.humnM OV1NX0 MR, CSA (SAumbfiet CRT Nom 506 mouser. mattes WISTXO leetNeddankbronae AOM NOM unt'Ifxd 01" only) DBIBXD TexNrzd Mark DNAiXD iMmednmumMluminum )MUD IMUMwfiiM 18' INV OUT -723.49 TO 4 STR 6 DI -3C L=12' TOP=728.53 15" INV IN=724.22 FROM 7 15" INV OUT=724.02 TO 5 TWF1 Compact fluorescent, Wall Mounted Units TWF12l26TRT TEST No:.1.78189 II" dovend. _'cummWNxgmadvol ou"'Am ress,.lmi A MgnyNe,finAAxhenMey",n,[upY Il. bm@aIeMIAM1llT hou'doolMdmicat 1. AoawuWeeing"remse(whadv RGWhemM6r a. Matiem MMw#mN=."''=. a. failreeteed.mmemelenrl anem n. 0101 1 t rslm welM WuaNrwnnz•If8n z161ALtnnmma YOmlonry xe Wdon. f: "Peveslewn.iff,.NVmmmvrmin la HDRe. OOMwMe^prnhnr.a'd. rwwmhume N. PkNmuvd mpmlmgpyNveWK a mon heA.nnn nAl,lmm ole. Ia x aiA rem a P:3. SPM. In of n. Fuohn•revurmse nWeavebelNkgrpn Allxrw ani bt WbkmNWr 11 sereyy AMhMeMIiYMdll tn61Rt Y3a@l,nbYa}W eMFNo [rse l¢damb,N[e, IB Mebf fpnlMd.35ALmpMI"o, I"ree"a"rice" ,wOAk rvA H.IXtfIdW3red$. t] I1. for..ngamverannic'.Ronbnp mommemlgm ery 3= 5. Perimeters ...... terry Pro,MIAtiff, Whepmoae. z w 18' INV OUT -723.49 TO 4 STR 6 DI -3C L=12' TOP=728.53 15" INV IN=724.22 FROM 7 15" INV OUT=724.02 TO 5 TWF1 Compact fluorescent, Wall Mounted Units TWF12l26TRT TEST No:.1.78189 TWF12/32TRT TEST NO: LTL18188 Fc ISOILLUMINANCE PLOT 1-111mk3 13011rmsNANCE.LOT F-marem) 1711030 z. z AS SHOWN c ch T x °i i oc 8 51 O 0.50 5 F 3= TH z w ior a 0 1 2 3]a 5 is 0 I 2 S 6 5 6 26W lime-tubelari 32W InPInW6e 1-10 Femicandli, 181um, based on F.diver he vmmc bromed,on IT morivao, n gbT em lamed lumens. IT mounting height, 2 00 amd lumens. Luminare EAdenry. 575% Luminaires Envier, 660% BUILDING MOUNTED LIGHT SPECIFICATION SEE SITE PLAN FOR LIGHT LOCATIONS m Calculation Summary Units Avg 1 Max i Min Fc 0.90 2.50 0.0 Ex. hev= w F- m Al O Z CL F_ O g W I- N Cr Ld U Q W Cr Z Q Q Cr W J W Cr Cr I- :2 p W Z 0 U W Q U V)W�U W V) W Ld Cr Cr Z 0 O 2� Cr N U U J NAd a � C, 0 n n U 3 w No C LU�� o ��amr a J Y' 0-® N- I V U~ O= O V `LU II- w E UZ w F-L�L Z 3 r Q� a U N Z J W W Z OU W 021621 SURVEY: P -L DRAWN BY: JOB NO. P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 6/16 CONTRACTOR SHLLL ADJUST F ERICK WA,EA FACIMES TO ,F� ORAOE PER MVXRICK WATER M'0- ivBf I \ INSPECTOR'S REWIREMEMM N 84' Jv / Rrns6o FREOERLA^( Ex. SealfwY MH x. Fan m I I 1 'Iip Tw mRAis wA]sR c,SiAtENT Tap= 731.74' '� f / I I 1 1 I r 8' PVC M= 72348' I \ coR uE uKSro ~•� B' PVC 0u1= 72530' RECDVE %PESUi--'1_ Ex 4' SAN CitgRAL Tc _ r .-Ae- "y O 2/boF•I 1 I I 61d. fr'I� iswt_ / s demoted) \> - h / 1 1 \ \ Y / 1 L9 1, V"A F': 1 /�c� 15'P VP O 5th. I 1 % UNR 34 I/ // / // 1`� z.s•i spar[ V'/ / / 7 / / / I rt naso / 3T A ]2]69. // 1 11 Ex. 4' SAN L)I IERA- Ex. 4' peon Oafc \ UNR W I PPoNA / \ _ J ym (top !s NevafeC) FF=]3o.e1 EM I 7390 q� Do \ 11 N. SF' f IAIFRAL 11 \ \ 1 t Conc. I . BERN E, 200.01 _ �- YP\eTwtod) Ap/ap /� I"u' BEflM N 84--05 90 - - -� I I R:\i\31a.so ( II - _ _ �� _ - .'• / T-1 o.]9 I I ER i - WNNECT TO a B. 1_ 01 \ \ - I II 3\ SEWMY x %taXIW ET 100-4'W. I I I I O 2.0; M SLOPE / 1 \ \ ` / / etgl ,5 909 Si \ F 126.60 6Nrt]�IN . 29. t1 111 I : / t / 1 I I ` \ I ]io.6o \\ +F•we 4 /' _' / I II c I I 1 11 REo 1\MTEHroRIMS \ i \\ / aw CL 731.43 FFA _ 73.10 ' UNrti e6o N -7V l 15" RCP M d 23.x- q0/•-\150 w O a 5�`.diyis�r UNR t] UNIT 18 fF.]2].80 "moo 4 ,590 Y UNR 21 iF.]zi.6o UNR ie FF�Re.fA t.5o9 � I 1 _ UN2] �726.E0 2.900 4 um is ) FF+T26u .60 I.SW 4 1.509 SF / UNITBE 2 . / \ T I1NR 1iF_712 ) 1$Q0 sre XP WMi / 1!1 s� :e`'�4 I \ O HP PWAT _ _-� I \ Opi1X11C5E R \ \ \\ 730.33 it \ I I R. z�c < / � _ _ \�N_ - may" � - - •-- - / ---- // TC ER 83*36 37"-W 877.75 LIMITS OF DISTURBANCE WSh A COURT AND ASSOCIATED IMPROWUENTS IS CURRENTLY UNDER CONSTRUCTION TO STARON 2+50. THIS PROXCT AS APPROI•ED UNDER SURWWSON DESCN PLAN {I9-07. c / A / PVYT ♦// / / w / / / STR 1 STR 7 OUTFALL CONTROL STRUCTURE SEALED STUB FOR FUTURE USE TOP=725.00 15" INV 01 TO 6 8" ORIFICE IN=716.80 / 18" INV OUT=716.80 TO 1A STR 8 STR 1A - DI -3C L=10' TOP=727.00 END SECTION 15" INV 01 TO 9 18" INV OUT=716.00 FROM 1 STR 9 STR 2 ES -1 DI -3C L-12' TOP -725.70 15" INV OUT=719.00 FROM 8 18" INV IN -717.80 FROM 10 STR 10 24" INV IN -717,80 FROM 3 DI -1 TOP -724.50 24" INV OUT=717.55 TO POND 15" INV IN -720.20 FROM 11 STR 15" INV IN -720.20 FROM 13 TO 2 END SECTION 18" INV OUT=720.00 24" INV 01 STR 11 3 0I-1 TOP -724.50 STR STRTOP-727.20 15" INV IN -720.80 FROM 12 DI-IIN 718.95 FROM 4 18" INV 1s" INV 01 TO 10 24" INV OUT=718.70 TO 2 STR 12 DI -1 TOP=724.50 STR 4 MH -1 TOP=732.20 15" INV OUT=721.25 TO 11 18" INV IN=721.30 FROM 5 STR 13 18" INV 01 TO 3 DI -1 TOP=724.50 STR 5 15" INV OUT=721.25 TO 10 0I -3C L=12' TOP=728.53 15" INV IN=723.69 18" INV OUT=723.49 TO 4 STR 6 DI -3C L=12' TOP=728.53 15" INV IN=724.22 FROM 7 15" INV OUT -724.02 TO 5 0 V O / XP r___ RRR i W M Z U UNR 25 l2],EO 2000 4 z.000 BE 0 > UNR t] UNIT 18 fF.]2].80 "moo 4 ,590 Y UNR 21 iF.]zi.6o UNR ie FF�Re.fA t.5o9 � I 1 _ UN2] �726.E0 2.900 4 um is ) FF+T26u .60 I.SW 4 1.509 SF / UNITBE 2 . / \ T I1NR 1iF_712 ) 1$Q0 sre XP WMi / 1!1 s� :e`'�4 I \ O HP PWAT _ _-� I \ Opi1X11C5E R \ \ \\ 730.33 it \ I I R. z�c < / � _ _ \�N_ - may" � - - •-- - / ---- // TC ER 83*36 37"-W 877.75 LIMITS OF DISTURBANCE WSh A COURT AND ASSOCIATED IMPROWUENTS IS CURRENTLY UNDER CONSTRUCTION TO STARON 2+50. THIS PROXCT AS APPROI•ED UNDER SURWWSON DESCN PLAN {I9-07. c / A / PVYT ♦// / / w / / / STR 1 STR 7 OUTFALL CONTROL STRUCTURE SEALED STUB FOR FUTURE USE TOP=725.00 15" INV 01 TO 6 8" ORIFICE IN=716.80 / 18" INV OUT=716.80 TO 1A STR 8 STR 1A - DI -3C L=10' TOP=727.00 END SECTION 15" INV 01 TO 9 18" INV OUT=716.00 FROM 1 STR 9 STR 2 ES -1 DI -3C L-12' TOP -725.70 15" INV OUT=719.00 FROM 8 18" INV IN -717.80 FROM 10 STR 10 24" INV IN -717,80 FROM 3 DI -1 TOP -724.50 24" INV OUT=717.55 TO POND 15" INV IN -720.20 FROM 11 STR 15" INV IN -720.20 FROM 13 TO 2 END SECTION 18" INV OUT=720.00 24" INV 01 STR 11 3 0I-1 TOP -724.50 STR STRTOP-727.20 15" INV IN -720.80 FROM 12 DI-IIN 718.95 FROM 4 18" INV 1s" INV 01 TO 10 24" INV OUT=718.70 TO 2 STR 12 DI -1 TOP=724.50 STR 4 MH -1 TOP=732.20 15" INV OUT=721.25 TO 11 18" INV IN=721.30 FROM 5 STR 13 18" INV 01 TO 3 DI -1 TOP=724.50 STR 5 15" INV OUT=721.25 TO 10 0I -3C L=12' TOP=728.53 15" INV IN=723.69 18" INV OUT=723.49 TO 4 STR 6 DI -3C L=12' TOP=728.53 15" INV IN=724.22 FROM 7 15" INV OUT -724.02 TO 5 0 V O o VV��x J C. LEWIS a . ND. 021621 A CEV o��s 40 0 40 120 SIONAI, SURVEY: p_L 1. Scale In Feet DRAWN BY: JOB NO.: P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 7/15 W I- r___ U_ Q W M Z U N 0 > a W J Ld Q Cr W O O U) O ULL_QU (n I' l W W W Z O 2� ckf U J o a 0 Nrn N N `n h ` 3 wm 5 oa ° °y RE Z C W 4 J C a CE c W c U ~c 2 o Y W N O Q= 11 •E. rU O O w Z U 3 t` Q� a z J� " Z ow o VV��x J C. LEWIS a . ND. 021621 A CEV o��s 40 0 40 120 SIONAI, SURVEY: p_L 1. Scale In Feet DRAWN BY: JOB NO.: P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 7/15 iEx 4' SAN LkjFRAL a 1 \2 \ •-fa'o ce�0 260%1 I ' 1 1 oar. a'euvted)I 0 � 1 II Z', w 2 31 ,^� I I / I 15.j OpPO5.d16 I 2 2 I 2.000 Sf ' �'�• i / i/ I n m! II IUFR2 FrtW >t SI r _ i jL. E _ _ -- • l / I j i i / ` - l J I 20 urvRiz].¢ I ( / Ff.126.60 1,500 SF I ARV I h �-\ \ r $I--srx9mE_ /7 tu6t fF> Ex 4" SAN. LA ER Z I I / I 1 1 !I II Ex 4' peon Out— / \ \y �A` \ Mt 33 (top is e/ewted) fx. ` Or . -V&"\d'( out j� Cq�-�' "I I / � � N ��j `•= _2�� _ — •��� is . IweedJ \� � ' � i ueutl,,\\s,RR__t � \ rtu-)yye96° \\ ' _ --- -- -- — / - - / 3 0 9 t] fFm]x]so 15 / ' / = \ \ / , UNR]18.60 / 1.500 SF d'�f1 III I sF rRnniE sLwER \ �'--$� i \ � / FF' III III IA i �s. �60� -,21 5005 / 13 I a I II I 1 KWIRo6 AfiE / _ urvrt , t '.wo .6o FEWIREQ kT HNWNIS `� / �_� �� /� fF>•]9 t.WO Sf ':•/ f �\� ` ✓ / �\ I 11 \\ -` 1 Uw(3 s' / nrci FA°° ` UN+ tsoo 1 � \0 / 20%15 /--- zl �_— 7- 5 s �' tri .. I _ �--�_- / r 87775' 40 0 40 120 722.59' II— n 731.11 ;0 C Scale in Feet — WS7EMA COURT AND ASSOOA 7E0 1' \ INPROIENENTS IS CURRENTLY UNDER CONSMUC7/001 TO STARON 2+52 THIS PROJECT AS APPROIQD UNDER SUBOM90N \ DLSGN PLAN /19-07. � �� Ilii '. PROPOSED WATERLINE PROFILE P -L W DRAWN BY: JOB NO. SCALES: (H) 1 "=50' U_ Q SCALE: W XZ 3/25/20 U F- CD > a� W —Jof W } � x I— :2O W Z O (n N O U w Q U (nW�Y U w O W W Z (n Q af N W Qf 735 U U J o a N o I I w cNo cNo O Q 3 735 o az w � W CD S_ 00 0 0 J Y>` -'N® v0 w� I, U c d 0 ww-N o Q = a yi LW r _ O w U Lci Q �3 a I- 1 0 ILL 730 725 7 30 PR. - - I II I - - 725 48" MIN. CLEAR ---- - - - - EX. WATE 720 E _ - - - _ 18" MIN. -- LEAR -- - 720 1. LINE _ EX. "0 WATERLI E APPROXI MAIN ABAN 0 BE NED -P�4=SAN ,-- ..L -SLE WITHIN FIN _ ESMT. - GASLINE wFUL PR. 685'-8"0 DIP WATER CL 52 LINER JOINT OF IP WATER MNIN RED AT EN- WATER"- -LATERAL - -- . �R. l8" -5 --/�/ 701 - -S—HAL­LBE--CENT1 w S1NG-� W AIN --- 3 - — —_ _ - - - Z m I �' U w XIS_ I- - H Z m 2 m w w Z m _ Z iN in Xt0 m o o a to +�ao - - PROPOSED GRADE 0 PIPE to CENTERLINE WISTERIA COURT AND ASSOCIATED IMPROVEMENTS IS CURRENTLY UNDER CONSTRUCTION TO STATION 2+50. THE N WATERLINE IS BEING INSTALL TO ABOUT N STATION 1+90 ON THE ORIGINAL PLANS. THIS PROJECT AS APPROVED UNDER SUBDIVISION DESIGN PLAN #19-07. Ki M M r N O O N O O O+ to to n t0 N (p to {p APPROXIMATE EXISTING GRADEa 0 PIPE of N CENTERLINE Ci o M M w of N N ai N o m N o ro N N to N rn Mi N o ui N N vi N v N o n N o r` N a to N 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 W J_ I.L O Of W z J Of W Q w 11 Of P -L W DRAWN BY: JOB NO. 1-- U_ Q SCALE: W XZ 3/25/20 U F- CD > a� W —Jof W } � x I— :2O W Z O (n N O U w Q U (nW�Y U w O W W Z (n Q af N W Qf U U J o a N o w cNo cNo O Q 3 o az w � W CD S_ 00 0 0 J Y>` -'N® v0 w� I, U c d 0 ww-N o Q = a yi LW r o U N U Z O w U Lci Q �3 a U m Z x J w z N CD Z Z 0 w U No. 021621 �UKVtT: P -L DRAWN BY: JOB NO. P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 8/15 STANDARD ,wed lad1lo all 2a D. CONCRETECRADLE rel . CONCRETE ENCASEMENT TRENCH 6 BEDDING A. codas pad IT ad. type adj..N. va a bo[ location stall --\ vase box — .d.sor alone MAR 1S SSN W" 13 dolid block dean aw — eakon hardened t0 nBin — BN ex 10 eo tl block Notevaha a,all W spurges, type Water Forced Sewer 16", 18", 20" and 24" GATE VALVE -5- APR oe All pipe anal tittings shall be SDR 35/26. GRAVITY SEWER LATERAL FOR MAIN WITH COVER 15 FT OR LESS -22- FEB W pipe Fred vit J�Fdi a. ledwbhtl pantfinishedgrade concis BOLLARD DETAIL NOTE: Weep holes shall not be subject to bang submerged If installation is in an ares having a high gmundwawtable, the Authorito engineer shell be contacted f r hydrant raxebon. hall 4- El too W wmlell them — t'., a, (PJ xFIP)erd W parade Plug on B tel Piaa meterbot —2° —sitlI , I WVI/ it C. I.: NA :. i�\iu;til\�\i\p� ., Y ^` �>•\\-\�!��y�-\\p�� ��o o.\�a\\may .�\� ■�`. AS SHOWN 3/25/20 SHEET: F O N� M01 0 _' x\1 n n a a 3 CD Ij pv W SSN W" 13 dolid block dean aw — eakon hardened t0 nBin — BN ex 10 eo tl block Notevaha a,all W spurges, type Water Forced Sewer 16", 18", 20" and 24" GATE VALVE -5- APR oe All pipe anal tittings shall be SDR 35/26. GRAVITY SEWER LATERAL FOR MAIN WITH COVER 15 FT OR LESS -22- FEB W pipe Fred vit J�Fdi a. ledwbhtl pantfinishedgrade concis BOLLARD DETAIL NOTE: Weep holes shall not be subject to bang submerged If installation is in an ares having a high gmundwawtable, the Authorito engineer shell be contacted f r hydrant raxebon. hall 4- El too W wmlell them — t'., a, (PJ xFIP)erd W parade Plug on B tel Piaa meterbot —2° —sitlI , I WVI/ it FREDERICK WATER CONSTRUCTION NOTES 1. The Frederick Water Water and Sewer Standards and Specifications are available at www.frederickwater.com. 2. The contractor shall adhere to Frederick Water's standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by Frederick Water. 4. The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. Frederick Water shall furnish all needed material and make the tap. a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made. 6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water's inspector. 7. Frederick Water's maintenance division shall furnish and install all water meters though 2 inch in size. It is the contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed: a. The meter box, with its frame and cover, must be properly aligned with the yoke bar. b. The frame and cover shall be set to final grade. c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches. d. All components of the meter box assembly shall be in proper working order. B. For services that connect to existing lines: a. Frederick Water shall furnish and install: 1. all %"x-'4". Y'4 1". %" and 2" water services. 2. all sewer services. b. The owner/developer shall: 1. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water's engineering assistant. 2. submit an Application for Service and pay the required fees. 9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 10. All fire lines must have backflow prevention assembly (detector double check valve of RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any privately owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. 11. Frederick Water shall review the mechanical plon(s) for design and material approval of a building's: a. domestic water meter and its backflow prevention device, and/or its In. fire service line's backflow prevention device. 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEC's Certificate to Operate and a copy of the station's DEQ approved 0&M manual. These documents must be received before substantial completion is issued and water meters released. N1 �I �I J Q Of W N Z JUj_ U Q W 1,-- Z Q Y N U_ W ii-- WO C) Z W w Of Qf H U_ Q W XZ Qf Q/ W J Q W X X Z O LLI OU)O U W Q (nU W�Y U W O W W of Z ((% Q LLI W O 1711 W (n U C. I.: NA :. i�\iu;til\�\i\p� ., Y ^` ii p'O� i`,. 1711030 SCALE: ■ AS SHOWN 3/25/20 SHEET: F O N� M01 0 _' x\1 n n a a 3 CD Ij pv W J Y > W 1 W N w ry/ W U 1 IrrL WWr a= o y: O U 0 O ��w Z LW) 3 Ilk r a00 a Z� zIn J W Z� Z CD 0Z \ \ • i N I e FREDERICK WATER CONSTRUCTION NOTES 1. The Frederick Water Water and Sewer Standards and Specifications are available at www.frederickwater.com. 2. The contractor shall adhere to Frederick Water's standards and specifications in effect at the time of construction. 3. The contractor shall coordinate with and arrange for inspection by Frederick Water. 4. The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. Frederick Water shall furnish all needed material and make the tap. a. An Application for Wet Tap shall be submitted and the initial fee paid before the tap is made. 6. Exact locations of water and sewer services on new lines are to be coordinated with Frederick Water's inspector. 7. Frederick Water's maintenance division shall furnish and install all water meters though 2 inch in size. It is the contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meter is installed: a. The meter box, with its frame and cover, must be properly aligned with the yoke bar. b. The frame and cover shall be set to final grade. c. The distance between the top of the cover and the yoke bar shall be between 20 and 23 inches. d. All components of the meter box assembly shall be in proper working order. B. For services that connect to existing lines: a. Frederick Water shall furnish and install: 1. all %"x-'4". Y'4 1". %" and 2" water services. 2. all sewer services. b. The owner/developer shall: 1. coordinate (or have the contractor coordinate) the location of the service lateral with Frederick Water's engineering assistant. 2. submit an Application for Service and pay the required fees. 9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. 10. All fire lines must have backflow prevention assembly (detector double check valve of RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any privately owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. 11. Frederick Water shall review the mechanical plon(s) for design and material approval of a building's: a. domestic water meter and its backflow prevention device, and/or its In. fire service line's backflow prevention device. 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEC's Certificate to Operate and a copy of the station's DEQ approved 0&M manual. These documents must be received before substantial completion is issued and water meters released. N1 �I �I J Q Of W N Z JUj_ U Q W 1,-- Z Q Y N U_ W ii-- WO C) Z W w Of Qf H U_ Q W XZ Qf Q/ W J Q W X X Z O LLI OU)O U W Q (nU W�Y U W O W W of Z ((% Q LLI W O 1711 W (n U 4021�1�) JCNa.62 SURVEY: C. I.: NA J 0 JOB NO.: is 1711030 SCALE: GATE: AS SHOWN 3/25/20 SHEET: F O N� M01 0 n n a a 3 CD Z to0 �O :: � W J Y > W a n v N W N w ry/ W U N 0 01 O IrrL WWr a= o y: O U 0 O ��w Z LW) 3 r a00 a Z� zIn J W Z� Z CD 0Z 4021�1�) JCNa.62 SURVEY: C. I.: NA NA DRAWN BY: JOB NO.: P—L 1711030 SCALE: GATE: AS SHOWN 3/25/20 SHEET: 9/15 SCALE, tin = 50 ft H, 1117 = 5ft V I SCALE- lin = 50 ft H, lin = 5ft V 77AC nn 7ARZ nn 7AC nn 74500 T,IV V 740.00 735.00 730.00 725,00 720.00 715 00 yAR PB' NO PROJECTION OF PIPE ABOVE GROUND LINE DHSA, 30.3c EXPANSION 740.00 E%Pµ510N JOINT }•-10" FOR DETAILS OF INLET JOINT 6 COVER BACK OF SIDEWALK 740100 735.00 pgp[p BAa c GUTTER 735.00 -EXISTING GRADE 2••BPRs C LI=yI Begs B a 80R 2 - - SUBBASE 730,00 --- HARDWARE 730.00 RGPDSED GRADE II -I SEE NOTE 8 725.00 1 725100 HGL � dPOCK • r � 720.00 9TEP5'SE S 720.00 71500 UTTER CR K CONiftOL JOINT CRACK CONTROL JOINT 71500 0•. PLAN SECTION A -A 6'MIN. DEDDIrvc 1'M ra 10'MAX. A r KEYED CCNSL.OINTW L-VMI00,E - MA%. RO WARPED { 3�-0" {B' 2'-6" 8" 3^0" r. -B p•-77 GUTTER A GLITTER X �y iµ5 MIN. 1/10 D - MIx vw D x D x SELLING Ip D x D x HELD C -" - MATERIK MgiENA, % 0 X &Yb F Bµ5 E �B r ` Y'��® m Bµ5 E t3^ gNAETER FOUNDATION SOFT, YIELDING, OR ( WEEP HOLE FRONT ELEVATION E--I���/// B 1-e' 6.. BARS B BARS F N (GUTTER REMOVED) II/„ 3-0 6Y 5XA BENTPLPTE SECTION B -B v w LOP OF FILL TYPE A NOSE DETAIL SHILL BE USED WITH CG -3 6 CG -7 STANDARDS. a / RA L2/j %2/"%Y" TYPE B HOSE DETAIL SXµL BE USED WITH CG -2 4 CC -6 Sbl0µD5. TYPE A TYPE B /" CAL 12f:0 X A- STUD SHEAR CONNECTOR WELDED GALVANIZED PLATE FOR TYPE A TO BE BENT ON AN ANGLE OF 68.30' TO ANGLE PON AT 2'C -C. CONNECTORS µD IS TO BE ANCHORED WITH /t' % C' STUD SHEAR NOSE DETAILS VXU0. WELDED TO BENT PLATE AT 2'C -C. 2.. APPR PAVEMENT DI -3A M -dB L DI -}C -, WARPED PAVEMENT FLOW iLOW P O Iqy) -II I I I TAI DE L WHEN E USED FOR USE ON cRroEs ADJACENT TO CURB FOR USE IN SAGS WITHOUT GUTTER BOTH SIDES i0 BE SYMMETRICAL - LNE \VDOT d GROUND - svECRlwrroN LINE STANDARD CURB DROP INLET a REFERE"cE ROAD AND BRuEE STANDARDS 12" - 30" PIPE: MAXIMUM DEPTH (H) • 8' VRGWA DEPARTMENT OF TRANSPORTATION I z33 302 SHEET 1 of 2 RERAXN4 DATE 08/10 W0.09 / PER MIN. f/ID 0 1 OF„ MIN. 6". BEDDING a BEDDING VATER11 EARTH �C��� FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION ��'�� BEDDING MATERIIL IN ACCORDANCE WITH ®,z SECTION 302 OF i„E ROAD µD BRIpGE EMBARKMENT NOTES SPECIFICATIONS. N fl NOTES ON PIPE BEDDING, FOR LEEK F SEE INSTALL OF CULVERTS CLASS I BACK ILL MATERIAL IN 4000ROANCE EARENE ® WITH OF THE ROAD M•0 BRIDGE SEWS RS GENERAL NOTES SPECIFICATIONS302 ONOSHEETM107.00. WITH OFT THE BRIDGE PLASTIC PIPE CLASS I BACKFILL SECON302 ROAD AND MATERIAL CRUSHED GLASS CONFORMING TO THE I IN O N ACCORDANCE Wrt„ SECTION 302 OF THE ROAD SPECIFICATIONS SIZE EIZE 5 FOR CRUSHER RUN AND BRIDGE SPECIFKATIONS, AGGREGATE 25 µD 26 MAY BE USED INg PL CEE USED IN PLACE OF CLASS 2 BACNF.LL. FORN REGULAR BOC KOFLLTXE MATERIAL ACALL CORDANCE PIP„ OAD DBR OGE SPECffLATIONS. `V/QQT INSTALL. OF PIPE CULVERTS AND STORM SEWERS SPEOTICAT1N NEE ERENE ROAD ND BRIDGE ST N0AR05 CIRC, PIPE BEDDING AND BACKFILL - METHOD "A" 3o2 w I�ni WWW 6„EET, of A DA REM15,oN TE 07/12 VIRLWIA DEPARTMENT OF TRANSPORTATION 303 IOT.O1 -1 9 IA 6• _ __ _ u __ _ yAR PB' NO PROJECTION OF PIPE ABOVE GROUND LINE DHSA, 30.3c EXPANSION 740.00 E%Pµ510N JOINT }•-10" FOR DETAILS OF INLET JOINT 6 COVER BACK OF SIDEWALK 740100 735.00 pgp[p BAa c GUTTER 735.00 -EXISTING GRADE 2••BPRs C LI=yI Begs B a 80R 2 - - SUBBASE 730,00 --- HARDWARE 730.00 RGPDSED GRADE II -I SEE NOTE 8 725.00 1 725100 HGL � dPOCK • r � 720.00 9TEP5'SE S 720.00 71500 UTTER CR K CONiftOL JOINT CRACK CONTROL JOINT 71500 740.00 735100 730.00 (ISTING GRADE OPOSED GRADE 725.00 L 720.00 715,00 0+00 0+50 1+00 0+00 0+50 1+00 STR 9-STR 8 STR 10-STR 13 PB' NO PROJECTION OF PIPE ABOVE GROUND LINE DHSA, 30.3c EXPANSION KEYED E%Pµ510N JOINT }•-10" FOR DETAILS OF INLET JOINT 6 COVER BACK OF SIDEWALK CONST, B 0 GUTTER JOINT GUTTER STRAMPEES SEE STANDARD IC2 pgp[p BAa c GUTTER B/Rs c A.. .. 2., n RA 2••BPRs C LI=yI Begs B a 80R 2 - - SUBBASE µSF IF+I z --- HARDWARE g w SEEP HOLE I II -I SEE NOTE 8 r H T 1 R , D EARTH � dPOCK • r � m o -1 µ F Bµ A 9TEP5'SE S II 1, ITAR$ D FACE OF CURB NOTE B 8" UTTER CR K CONiftOL JOINT CRACK CONTROL JOINT r N N 0•. PLAN SECTION A -A 6'MIN. DEDDIrvc 1'M ra 10'MAX. A r KEYED CCNSL.OINTW L-VMI00,E - MA%. RO WARPED { 3�-0" {B' 2'-6" 8" 3^0" r. -B p•-77 GUTTER A GLITTER X �y iµ5 MIN. 1/10 D - MIx vw D x D x SELLING Ip D x D x HELD C -" - MATERIK MgiENA, % 0 X &Yb F Bµ5 E �B r ` Y'��® m Bµ5 E t3^ gNAETER FOUNDATION SOFT, YIELDING, OR ( WEEP HOLE FRONT ELEVATION E--I���/// B 1-e' 6.. BARS B BARS F N (GUTTER REMOVED) II/„ 3-0 6Y 5XA BENTPLPTE SECTION B -B v w LOP OF FILL TYPE A NOSE DETAIL SHILL BE USED WITH CG -3 6 CG -7 STANDARDS. a / RA L2/j %2/"%Y" TYPE B HOSE DETAIL SXµL BE USED WITH CG -2 4 CC -6 Sbl0µD5. TYPE A TYPE B /" CAL 12f:0 X A- STUD SHEAR CONNECTOR WELDED GALVANIZED PLATE FOR TYPE A TO BE BENT ON AN ANGLE OF 68.30' TO ANGLE PON AT 2'C -C. CONNECTORS µD IS TO BE ANCHORED WITH /t' % C' STUD SHEAR NOSE DETAILS VXU0. WELDED TO BENT PLATE AT 2'C -C. 2.. APPR PAVEMENT DI -3A M -dB L DI -}C -, WARPED PAVEMENT FLOW iLOW P O Iqy) -II I I I TAI DE L WHEN E USED FOR USE ON cRroEs ADJACENT TO CURB FOR USE IN SAGS WITHOUT GUTTER BOTH SIDES i0 BE SYMMETRICAL - LNE \VDOT d GROUND - svECRlwrroN LINE STANDARD CURB DROP INLET 740.00 735100 730.00 (ISTING GRADE OPOSED GRADE 725.00 L 720.00 715,00 0+00 0+50 1+00 0+00 0+50 1+00 STR 9-STR 8 STR 10-STR 13 w W H U_ Q w z U U) Cliff 5 Q 0 W J W of Q a M0�0 O 117 N O U W Q U 0LLI U N W O W W Cif z a � V) O = LL. W N U M J II J r SCALE, tin = 50 ft H, lin = 5ft V TO TO v SCALE- lin = 50 ft H, III = 5ft V 7aS nn _ 7d4 nn 7n.� nn a 740.00 735.00 730.00 725.00 720.00 715.00 71n nn PB' NO PROJECTION OF PIPE ABOVE GROUND LINE DHSA, 30.3c EXPANSION KEYED E%Pµ510N JOINT }•-10" FOR DETAILS OF INLET JOINT 6 COVER BACK OF SIDEWALK CONST, B 0 GUTTER JOINT GUTTER STRAMPEES SEE STANDARD IC2 pgp[p BAa c GUTTER B/Rs c A.. .. 2., n RA 2••BPRs C LI=yI Begs B a 80R 2 - - SUBBASE µSF IF+I z --- HARDWARE g w SEEP HOLE I II -I SEE NOTE 8 r H T 1 R , D EARTH � dPOCK • r � m o -1 µ F Bµ A 9TEP5'SE S II 1, ITAR$ D FACE OF CURB NOTE B 8" UTTER CR K CONiftOL JOINT CRACK CONTROL JOINT r N N 0•. PLAN SECTION A -A 6'MIN. DEDDIrvc 1'M ra 10'MAX. A r KEYED CCNSL.OINTW L-VMI00,E - MA%. RO WARPED { 3�-0" {B' 2'-6" 8" 3^0" r. -B p•-77 GUTTER A GLITTER X �y iµ5 MIN. 1/10 D - MIx vw D x D x SELLING Ip D x D x HELD C -" - MATERIK MgiENA, % 0 X &Yb F Bµ5 E �B r ` Y'��® m Bµ5 E t3^ gNAETER FOUNDATION SOFT, YIELDING, OR ( WEEP HOLE FRONT ELEVATION E--I���/// B 1-e' 6.. BARS B BARS F PIPE PROJECTION ABOVE GROUND LINE (GUTTER REMOVED) II/„ 3-0 6Y 5XA BENTPLPTE SECTION B -B v w LOP OF FILL TYPE A NOSE DETAIL SHILL BE USED WITH CG -3 6 CG -7 STANDARDS. a / RA L2/j %2/"%Y" TYPE B HOSE DETAIL SXµL BE USED WITH CG -2 4 CC -6 Sbl0µD5. TYPE A TYPE B /" CAL 12f:0 X A- STUD SHEAR CONNECTOR WELDED GALVANIZED PLATE FOR TYPE A TO BE BENT ON AN ANGLE OF 68.30' TO ANGLE PON AT 2'C -C. CONNECTORS µD IS TO BE ANCHORED WITH /t' % C' STUD SHEAR NOSE DETAILS VXU0. WELDED TO BENT PLATE AT 2'C -C. 2.. APPR PAVEMENT DI -3A M -dB L DI -}C -, WARPED PAVEMENT FLOW iLOW P O Iqy) III, o I I I TAI DE L WHEN E USED FOR USE ON cRroEs ADJACENT TO CURB FOR USE IN SAGS WITHOUT GUTTER BOTH SIDES i0 BE SYMMETRICAL - LNE \VDOT d GROUND - svECRlwrroN LINE STANDARD CURB DROP INLET a REFERE"cE ROAD AND BRuEE STANDARDS 12" - 30" PIPE: MAXIMUM DEPTH (H) • 8' VRGWA DEPARTMENT OF TRANSPORTATION I z33 302 SHEET 1 of 2 RERAXN4 DATE 08/10 W0.09 w W H U_ Q w z U U) Cliff 5 Q 0 W J W of Q a M0�0 O 117 N O U W Q U 0LLI U N W O W W Cif z a � V) O = LL. W N U M J II J r SCALE, tin = 50 ft H, lin = 5ft V TO TO v SCALE- lin = 50 ft H, III = 5ft V 7aS nn _ 7d4 nn 7n.� nn a 740.00 735.00 730.00 725.00 720.00 715.00 71n nn PB' NO PROJECTION OF PIPE ABOVE GROUND LINE TOP OF FLL TOP0 F FILL TOP OF FILL = GROIMJ LINE 730.00 730.00 725.00 - -: J �- GftOLWO LIKE-_ GROUND LINE 715.00 Imo= SIIJT- J -II J II -I rL II• r H T EARTH OR D EARTH � dPOCK • r � o IkIYKLDWL � r N N � E o DEDDIrvc - m d _ MATERIAL LII -I -III IL -.In q MIN .d MIN. 1/10 D - MIx vw D x D x SELLING Ip D x D x HELD C -" - MATERIK MgiENA, % 0 X PER I'OF H Y'��® Mix. R-. MAX. 24" FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION OTHERWISE UNSUITABLE MATERIAL PIPE PROJECTION ABOVE GROUND LINE IN. I5 A D MIN 15 A L MIN, 1,1 L MIN. I D MN ISD MIN 15 , D v w LOP OF FILL 0 o �iOP OF FILL W TOP OF RLL VXU0. J 87 III, o -_ Zcwi3FE � PIF M n - d GROUND : GROUND O� - N - LNE o - NE L d GROUND - LINE a 0D e 'EARr„ 11'L. r /�-. �NLCK I OR MIN.10 D UGIYIELDNG /' / /LL MN. 170 0 D % BEDDING x MATEWAL / PER MIN. f/ID 0 1 OF„ MIN. 6". BEDDING a BEDDING VATER11 EARTH MAX. 24" MATERIAL FOUNDATION SOFT, YIELDING, OR NORMAL EARTH FOUNDATION ROCK FOUNDATION OTHERWISE UNSUITABLE MATERIAL BEDDING MATERIIL IN ACCORDANCE WITH ®,z SECTION 302 OF i„E ROAD µD BRIpGE EMBARKMENT NOTES SPECIFICATIONS. N fl NOTES ON PIPE BEDDING, FOR LEEK F SEE INSTALL OF CULVERTS CLASS I BACK ILL MATERIAL IN 4000ROANCE EARENE ® WITH OF THE ROAD M•0 BRIDGE SEWS RS GENERAL NOTES SPECIFICATIONS302 ONOSHEETM107.00. WITH OFT THE BRIDGE PLASTIC PIPE CLASS I BACKFILL SECON302 ROAD AND MATERIAL CRUSHED GLASS CONFORMING TO THE I IN O N ACCORDANCE Wrt„ SECTION 302 OF THE ROAD SPECIFICATIONS SIZE EIZE 5 FOR CRUSHER RUN AND BRIDGE SPECIFKATIONS, AGGREGATE 25 µD 26 MAY BE USED INg PL CEE USED IN PLACE OF CLASS 2 BACNF.LL. FORN REGULAR BOC KOFLLTXE MATERIAL ACALL CORDANCE PIP„ OAD DBR OGE SPECffLATIONS. `V/QQT INSTALL. OF PIPE CULVERTS AND STORM SEWERS SPEOTICAT1N NEE ERENE ROAD ND BRIDGE ST N0AR05 CIRC, PIPE BEDDING AND BACKFILL - METHOD "A" 3o2 w I�ni WWW 6„EET, of A DA REM15,oN TE 07/12 VIRLWIA DEPARTMENT OF TRANSPORTATION 303 IOT.O1 w W H U_ Q w z U U) Cliff 5 Q 0 W J W of Q a M0�0 O 117 N O U W Q U 0LLI U N W O W W Cif z a � V) O = LL. W N U M J II J r SCALE, tin = 50 ft H, lin = 5ft V TO TO v SCALE- lin = 50 ft H, III = 5ft V 7aS nn _ 7d4 nn 7n.� nn a 740.00 735.00 730.00 725.00 720.00 715.00 71n nn H- 740.00 735.00 N 730.00 730.00 725.00 725.00 J 720.00 715.00 715.00 7117 nn 7117 nn w W H U_ Q w z U U) Cliff 5 Q 0 W J W of Q a M0�0 O 117 N O U W Q U 0LLI U N W O W W Cif z a � V) O = LL. W N U M J II J r SCALE, tin = 50 ft H, lin = 5ft V TO TO v SCALE- lin = 50 ft H, III = 5ft V 7aS nn _ 7d4 nn 7n.� nn a 740.00 735.00 730.00 725.00 720.00 715.00 71n nn YJ.UU 1,7s% P 740100 740.00 735.00 735,00 730.00 730.00 725.00 725.00 ---------- 720.00 715.00 715.00 7117 nn 7117 nn LL H o N r M E rn o0 �/� OCT n N r N N 740.00 V/ w b m d WU 0 0IIf 0 J Y'��® CF 735.00 v w c 0 o W VXU0. J 87 III, o -_ Zcwi3FE � PIF M n h -- - _. __ O� - N sCW 730.00 a 0D a i NIP e �N -O NO h q ,� dW > 725.00 `'IN F .n y w I�ni WWW -1 9 IA 6• _ __ _ u __ _ _ _ 3 Clti YGR *N. ___ ... WWIJ C) 720100 p�u NLTH OF V)(UNN _ Pe '.MONN- III Indio � O J LEWIS > 715.00 h n („nnED "'o M ®_ 11_�W 00011= 1.��1� 0 OZ 9INNAL PWWW 71000 SURVEY: E » W N N w G YJ.UU 1,7s% P 740100 740.00 735.00 735,00 730.00 730.00 725.00 725.00 720.00 720.00 715.00 715.00 7117 nn 7117 nn YJ.UU 1,7s% P N V LL H o N r M E rn o0 �/� OCT n N r N N 740.00 V/ w b m d WU 0 0IIf 0 J Y'��® CF 735.00 v w c 0 o W VXU0. J 87 III, o -_ Zcwi3FE � PIF M n h -- - _. __ O� - N sCW 730.00 a 0D a i NIP e �N -O NO h q ,� dW > 725.00 `'IN F .n y w I�ni WWW -1 9 IA 6• _ __ _ u __ _ _ _ 3 Clti YGR *N. ___ ... WWIJ C) 720100 p�u NLTH OF V)(UNN _ Pe '.MONN- III Indio � O J LEWIS > 715.00 h n („nnED "'o No m - 0 OZ 9INNAL PWWW 71000 SURVEY: E » W N N w G N -EXISTING GRADE PROPOSED GRAD _'PRH-1✓L 10 YEAR HGL IH MIN. CLEAR IOLf 0 BE ABANDONED .._. __ -H➢PE _ PR..H' M _ @ O.Z6._ - 4Lf - 15' @ 07 CLASS IIS -- -- - - ISP MIN.- LEAR __ _ I CLASS III RCP -RC ' - - - -- ADS I1 1 A➢S -N12 HDPE CP _- - _ 139Lf - 24' @ 0.61%. -- -ADS-Ml HDPE CPP - - --- 30 F-24' @0.50• Ay8 N12 HDPE CP -- - _-- - - -- - - YJ.UU 1,7s% P O LL H o N r M E rn o0 �/� OCT n N r N N 740.00 V/ w b m d WU 0 0IIf 0 J Y'��® CF 735.00 v w c 0 o W 87 III, o Zcwi3FE 730.00 a 0D a �N z 725.00 w z Z Z C) 720100 NLTH OF Pe � O J LEWIS > 715.00 c. No. 021621 "'o 0 9INNAL 71000 SURVEY: 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 P -L NA DRAWN BY: JOB Ni STR 2A-STR 12 STR 2A-STR 7 P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 10/15 CLASS A3 M.ES l i:e•K..e. .:. CONLFETE SECTION C -C ENTRANCE vOWNE CRPDE CNINCE 'D" DESIRABLE MA%MIIM HIGH CG 11 NONE ENTRANCEiE 3% MEDIUM CROSSESPA COMERCIK 1 53% 1 B% THE CROSS SLOPE SHALL BE 2X FOR I 56X I A WIDTH OF 5 FEET. TRUNOATEO GOES A �'T GENERAL NOTES W I FASTREET APPROACH SAE SURFACING FOR DETAILS (RMUS TO BE AS o C AS MANLIE ROADWAY (SEE NOTE 31 1. WHEN USED IN CONJVNCTNiN WITH STANDARD CG -3 SHOWN ON PLANS' STND. RAJA TO BE AS OR CC -7, THE CURB FACE ON THIS STANDARD IS TO — — — — — — — SHOWN ON PLANS) BE ADJUSTED TO MATCH THE MOUNTABLE CURB CHANNEL BACK OF CURB ACCESSIBLE CC2 OR CG-6CONFIGURATION. / N T 1 a8 i 2. SEE STANDARD CG -12 FOR CURB RAMP DESIGN TO BE B O SIDEWALK USED WITH THIS STANDARD. SIDSEWAIK _ w _ NOTE 5) r OPTIONAL UNPAVED SPACE 3. MAINLINE PAVEMENT SHALL BE CONSTRUCTED TO THE WFLOW LINE R/W ENE (EXCEPT ANY WBGRADE STABILIZATION — — — ------� REO UWED FOR MAI PAVEMENT WHICH CAR BE EXPANSION EXPA E%PAVSION OMITTED IN THE ENTRANCE.) JOINTJOINT 4. RADIAL CURB OR CONSNALON CURB AND CUTTER _ SHALL NOT BE CONSTRUCTED BEYOND THE R/W LINE NOTE: WIDTH "R" 2'-0" OR AS Itis MAINLINE ROADWAY EXCEPT FOR REPLACEMENT PURPOSES. SHOWN ON TYPICAL SECTION. A PLAN VIEW ENTRANCE NOTES 5. WHEN THE ENTRANCE RAGA CANNOT ACCOMMODATE THE TURNING REWIREMENTS OF ANTICIPATED HEAVY TRUCK MAWLINE ROADWAY SLOPE TRAFFIC. THE DEPTH FOR SIDEWKK & CURB RAMPS WITHIN TE LIMITS OF THE RAOISHOULO BE 10' PARABOLIC CURVE (ENTRANCE ONLY' INCREASED TO T'. (SEE CG -131 EDGE OF PAVEENT OR OPTIONA- FLOW LINE 9%u GRAQE CXANGE ® -- �'— 0 8. KALA$ IRE TO MANDATE WHEN CONSTRUCTION OF A FLOW LINE IS REQUIRED TO PROVIDE POSITIVE DRAINAGE ACROSS REE b THE ENTRANCE. MA'NLIE ROADWAY —NOTE MAX. O T, THE DESIRABLE AWMAXMAUM ENTRANCE GRACE CHANGES _ GRADE CHANGE ® — D' ME LISTED IN THE ALLOWABLE ENTRANCE GRADE D TABLE. THESE VALLES ME NOT APPLICABLE TO STREET CONNECTIONS. 5W1. 20'NII FOR INTERSECTION NOTES COMMERCIAL ENTRANCE B. WHEN CG -1115 USED FOR STREET COMNECTIONS THE ION MUST BE DEBITED W ACCORDANCE WITH M CONSTRUCT GRADE CHANGES WITH A PARABOLIC CURVE. AASHTOCONNEC AASNTO POLITY AD iE APPLICABLE REQUIREMENTS OF NTTIS. STOPPING OAD AD REWIE SECTION A - A NESVALUE ENVI SENT DISTANCE 9. OPTIONAL FLOWLINE MAY REQUIRE WARPING OF A PORTION OF GUTTER TTI PROVIDE POSITIVE DRAINAGE ACROSS THE INTERSECTION. B ALLOWABLE ENTRANCE GRADE CHANGES CLASS A3 M.ES l i:e•K..e. .:. CONLFETE SECTION C -C NOTE: ALLOWABLE ENTRANCE GRADE TABLE IS NOT APPLICABLE TO STREET CORRECTIONS SPECIFICATION METHOD OF TREATMENT MOOT REFERENCE FRIEE.N M AJD BRIDGE STANDARDS spz (CONNECTION FOR STREET INTERSECTIONS AND COMMERCIAL ENTRANCES) DATE SHEET 1 DE I VIRGINIA DEPARTMENT OF TRANSPORTATKN 0]/15 203.Oa To 502 J w -a :6SI�F 1. THIS ITEM MAY BE PRECAST OR CAST N PLACE. 2. CONCRETE TO BE CLASS AS IF CAST N RACE, {000 PBI IF PRECAST. 3. COMBINATION CURB 4 GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) SHALL BI: PNO FOR AS RADIA_ COMBINATION CURB M GUTTER. 4. FOR USE WITH STABILIZED OPEN -GRADED DRAINAGE LAYER. THE BOTTOM OF THE CURB • BETTER OF SUBBASEBEOiWSESES AND TTo THE DDEPTTHE SLOPE THE PAVEMENT. 5. IS ALLOWABLE 011 ROADWAY�CLASSIFIWE �CATIOON MN DESIGN SPEED AS SHOWN N APPENDIX A OF R THE ROAD DESIGN MAVOAL N WE BECTON ON GS URBAN STADRIMS. D_ m D D D "' D"• D" 0"• D BE CONCRETE OF THE CONTRACTOR IS COMBINATION 6" CURB AND GUTTER VIRGINIA DEPARTMENT OF TRANSPORTATION }LRMP ENTRANCE vOWNE CRPDE CNINCE 'D" DESIRABLE MA%MIIM HIGH MORE TXPN 15DO VPD O% 1 3% MEDIUM 1 5004500 VPD 1 53% 1 B% LOW I LESS THAN 50D VPD I 56X I 8X NOTE: ALLOWABLE ENTRANCE GRADE TABLE IS NOT APPLICABLE TO STREET CORRECTIONS SPECIFICATION METHOD OF TREATMENT MOOT REFERENCE FRIEE.N M AJD BRIDGE STANDARDS spz (CONNECTION FOR STREET INTERSECTIONS AND COMMERCIAL ENTRANCES) DATE SHEET 1 DE I VIRGINIA DEPARTMENT OF TRANSPORTATKN 0]/15 203.Oa To 502 J w -a :6SI�F 1. THIS ITEM MAY BE PRECAST OR CAST N PLACE. 2. CONCRETE TO BE CLASS AS IF CAST N RACE, {000 PBI IF PRECAST. 3. COMBINATION CURB 4 GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) SHALL BI: PNO FOR AS RADIA_ COMBINATION CURB M GUTTER. 4. FOR USE WITH STABILIZED OPEN -GRADED DRAINAGE LAYER. THE BOTTOM OF THE CURB • BETTER OF SUBBASEBEOiWSESES AND TTo THE DDEPTTHE SLOPE THE PAVEMENT. 5. IS ALLOWABLE 011 ROADWAY�CLASSIFIWE �CATIOON MN DESIGN SPEED AS SHOWN N APPENDIX A OF R THE ROAD DESIGN MAVOAL N WE BECTON ON GS URBAN STADRIMS. D_ m D D D "' D"• D" 0"• D BE CONCRETE OF THE CONTRACTOR IS COMBINATION 6" CURB AND GUTTER VIRGINIA DEPARTMENT OF TRANSPORTATION }LRMP ROADWAY GRACE W PERCENT MINIMUM RAMP LENGTH IN FEET 4" CURB 6" LUflB El 4 6 RESERVED 5 ■ -j 5 B (SEE IM -EI A (SEE TABLE' 9 a TRUNOATEO GOES 2 5 SEE SHEET 101 5 FOR DETAILS 6 U MIN —4 STND. U- N-i0D $HPPE MATCH F OF ROA' W/•Y LVRB CHANNEL BACK OF CURB ACCESSIBLE 20'1 a8 i ,swY mW roy. mK I SECTION A -A 1 SECTION B -B NOTES:. FOR GENERAL. NOTES ON THE DETECTABLE WARNING SURFACE, SEE SHEET IOF 5. THE REQUIRED LENGTH OF A PARALLEL RAMP IS_MTEO To 15 PEET.REGMDLESS OF THE SLOTC TYPE B PARALLEL APPLICATION ROADWAY GRACE W PERCENT MINIMUM RAMP LENGTH IN FEET 4" CURB 6" LUflB 0 4 6 RESERVED 5 ■ 3 5 B fi 9 a 8 2 5 III11 6 U ( ROM AND BRIDGE STANDARDS -- CET 3 O 5 1 REVISION DATE 203.03 01/15 CROSSWALK TYPICAL PLACEMENT AT INTERSECTION WITHIN CROSSWALK A NOV AND BRIDGE STANDARDS V610N oATE I SHEET 1 OF 1 'Tjcn�ws1.. o� WITHOUT BUFFER STRIP CROSSWALK V R. OSI w/>,NE MALA Pin \\\\ \\ ALL. CPOSSiK `.FP'R w""�tt'o5 MK + -� PE P WITH. BUFFER STRIP CPSW`" ""` caos6WAK W.l" CG -12 DETECTABLE WARNING SURFACE TYPE B (PARALLEL) APPLICATION VIRGINIA DEPARTMENT OF TRANSPOPTAEUR DIAGONAL PLACEMENT SITE ENTRANCE PROFILE 30.00 SU -30 feet Width 8.00 Track 8.00 Lock to Lock Time 6.0 Steering Angle 131,8 B' "-L-2,-0,,. CG -6R COMBINATION 6" CURB & GUTTER REVERSED NOT TO SCALE GRADE AUTOTURN-SU-30 VEHICLE 2" SM -2A 8" 21-B COMPACTED SUBGRADE — ASPHALT PAVEMENT DETAIL NOT TO SCALE APPLY TO ALL TRAVEL AREAS AROUND BUILDINGS. 8" 21-8 COMPACTED SUBGRADE -- STONE PAVEMENT DETAIL NOT TO SCALE APPLY TO ALL OUTDOOR STORAGE AREAS DETECTABLE EARLY WARNING MARKER' TAPE (nP) COMPACTED BACKFILL M 00 DETECTABLI WARNING T SELECT d4" SELECT MATERIAL E 40 Pvc(nP) y4" SELECT MATERIAL RESERVED --1 ■ DATE: AS SHOWN PARKING FARMED ( STND. U- VAN CHANNEL ACCESSIBLE POST ,swY mW roy. mK I 1 ■� HC ACCEIGNIBLE SIGN TROP. GROUND I lli ROOM 1 11 •• SITE ENTRANCE PROFILE 30.00 SU -30 feet Width 8.00 Track 8.00 Lock to Lock Time 6.0 Steering Angle 131,8 B' "-L-2,-0,,. CG -6R COMBINATION 6" CURB & GUTTER REVERSED NOT TO SCALE GRADE AUTOTURN-SU-30 VEHICLE 2" SM -2A 8" 21-B COMPACTED SUBGRADE — ASPHALT PAVEMENT DETAIL NOT TO SCALE APPLY TO ALL TRAVEL AREAS AROUND BUILDINGS. 8" 21-8 COMPACTED SUBGRADE -- STONE PAVEMENT DETAIL NOT TO SCALE APPLY TO ALL OUTDOOR STORAGE AREAS DETECTABLE EARLY WARNING MARKER' TAPE (nP) COMPACTED BACKFILL M 00 DETECTABLI WARNING T SELECT d4" SELECT MATERIAL SCH 40 Pvc(nP) y4" SELECT MATERIAL RESERVED 1711030 TYPICAL UNDERGROUND COUNDUIT DETAIL NOT TO SCALE MODIFY AS REQUIRED FOR POWER AND COMMUNICATIONS 1.5' SM -2A 5" BM -2 12" 21-T - COMPACTED SUBGRADE SUP U PAVEMENT SECTION DETAIL FOR R—O—Ws NOT TO SCALE END & CORNER r CHAIN LINK POST / rc. LINE POST) I N TRUSS ROD - BLACK FENCE SCREEN BY TRUTECH FABRIC OR EQUAL o Do I 10'-0" MAX SPACING— FENCE PACING FENCE SECTION ELEVATION NOT TO SCALE NOTES: 1. PROVIDE AUTOMATIC GATE AT ENTRANCE PER OWNER SPECIFICATIONS. 2. PROVIDE PERIMETER EGRESS GATES AS CALLED FOR ON THE SITE PLAN. RI -1 J -CHANNEL POST GROUND STOP R1-1 24"X24" OR STOP SIGN 30"X30" NOT TO SCALE 2" x 18" STND 12" X 4" STND. P -L RESERVED DRAWN BY: JOB NO. RESERVED 1711030 SCALE: DATE: AS SHOWN PARKING FARMED ( STND. U- VAN CHANNEL ACCESSIBLE POST ,swY mW roy. mK I HC ACCEIGNIBLE SIGN TROP. GROUND HANDICAP SIGN NOT TO SCALE A4"0/1"0 160 'PE K COPPER ALTER LINE WATERLINE INSTALLATION DETAIL NOT TO SCALE FIRE LANE SIGN NOT TO SCALE SIGN L POST END OF STALL - STRIPE OR CURBING WHITE PAVEMENT MARKING, 4" WIDTH, LENGTH AS SHOWN ON PLANS. WHITE SYMBOL PER ADA ON SOLID BLUE BACKGROUND WHITE PAVEMENT MARKING, 4" WIDTH, 2' CC; 45' ANGLE OR 5 - NOTE: ALL CONSTRUCTION SHALL CONFORM TO ADA ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES. PAINT: NO-REFLECTORIZED, ACRYLIC LATEX TYPE 442XX TRAFFIC MARKING PAINT BY DEVOE, LOUISVILLE. KY OR EQUAL SIGNS MAY BE PLACED ON BUILDINGS WITH OR OTHERWISE LOCATED WITH CONSENT FROM BUILDING INSPECTOR. PLEASE REFER TO THE SITE PIAN, FOR THE PROPOSED LAYOUT AND ORIENTATION OF THE ACCESSIBLE PARKING AREA. PARKING LOT STRIPING DETAIL NOT TO SCALE w 1= W 0 J J LL -Q w n M No. 021621 SURVEY: Cl: P -L NA DRAWN BY: JOB NO. P -L 1711030 SCALE: DATE: AS SHOWN 7/25/20 SHEET: 40 0 40 120 I Scale in Feet (1a)a/ - 13, II----_---�- 1r1t� _ L_ r x. II T u (I1 STA. M, II II 10)CL A II II (7)PA f'+ - 00 4F. BU - I� (1)PA II ° - /TAI (10)P7 I€ PARCEL 1 / A 1 U Il (10)BM V /G -- V�(12)JS NOTE: CONTRACTOR TO REGRADE, SOD OR HYDROSEED AND STRAW MULCH ALL AREAS DISTURBED AS A RESULT OF THEIR WORK. (2) UPRIGHT STAKES TO BE USED ON TREES UP TO 12' HGT. LARGER TREES TO BE GUYED. TREE WRAP MAIN TRUNK RUBBER HOSE 2"x2" HARDWOOD GUY STAKE 2 PER TREE 12 GAUGE GALVANIZED WIRE -DOUBLE STRAND TWISTED - 4" MULCH 3- SAUCER AROUND TREE EXISTING SOIL MIX COMPACTED MOUND TO PREVENT TREE FROM SETTUNG - 6" MIN. h UPRIGHT STAKES EXTENDED TO - FIRM BEARING REMOVE TOP 1/3 OF ALL BURLAP ROPE FROM ROOT BALL. TREE PLANTING SECTION >,N, UNIT 3. I W-730.8080 .50° S L �a- G II rim -G E��w,.i eWF IIS I� 3 NOTE: PLANT SPACING VAI PRUNE ALL BROKE WEAK BRANCHES. ALL SHRUB BEDS EXCAVATED OF ALL TO REQUIRED DEPI W/ REQUIRED SOIL MULCH TO BE 3" COMPLETELY REMO STRINGS. RIBBONS, TAGS FROM PLANT REMOVE TOP 1/3 BURLAP FABRIC AF ROOT BALL. SCARIFY ROOTS Or BOUND PLANTS. COMPACT SOIL TO 85% AT OPTIMUM MOISTURE CONTENT SHRUB PLANTING BED 2.&1 SLOPE 1261 q 724 ^ ! 1 nl I..IT ]D GG=]17 T+0 }1 SLOPE 11 61GPE� 1500 $F I 3:1 SLOPE ' TAe at . g " "500 IV - FF=72860 -. " _---.-- � f0 1?00 SG z) 1.59D UNI a fF t1 FF" 26.60 ,.So9 sF UNIT 1 � UNIT 6 FF=]29 60 L FFe130.60 1 500 $F PARCEL 2 a< q PL[ �. NNI1 6� ac UNIT -023 UNn 2 FF969 I FT:TY.1.60 1.300 SF R 10 (6)CL PARCEL 2 PLANT UST I I UNIT 5 11NR < �FSW SF FF=RB 6D L5p0 SF b r a a z -� m/ uNrt za 1 2.00°5.80 / (10)FIDO 099 56fIV °�M1 116 1R6 / (5)cM / ti / gM11 r / X10 uMl z5 r F / "la CEDAR 5wo 5V r UNIT 21 F�1266D (3)CL \� ASH UNIT 20 FFaT9.ba t SODIf/ n n "]26.80 1,509 Bf 1.599 Sr � ^ / l(4)2-3" CAL S0.55AGNA5 X10" sAssnFRnS 6 r r (3)FI I \'10" MAPLE �P 1a'c11eRR: 126.6° 1.600 / / 12" CEDAR UNrt ,1 S FF�121.80 1.596 fiD 1,500 SF / Iv CEDAR - 2" CEDAR r r \\ fi SASSAFRAS r / 12` CHERRY (5)n / \ -d.' CEDAR / 6CEDAR / CEDAR UN ,4 LOCUST LOCUST FRRY r �� lnAR ^ <el (5)CL _ _ J, •' OF CAS (4)SN _ AR= _ 1 .-ST 1 G 7 - - (6)PA V - � - (e)FI Ow LANDSCAPE REQUIREMENTS FOR PARCEL 1: (a)FI Parcel Greenspace Required: 15% or 4,268 sq. ft. vR Parcel Greenspace Provided: 100% or 28,453 sq. ft. (S)JV (6)PA Parking Lot Landscaping: (no parking proposed) LANDSCAPE PLAN Proffer Landscaping: Provided Low Profile shrubs on 36" berm along Route 522 right of way. Zoning District Buffers/Screening: B2 against RA residential: Category B Buffer 25' inactive/25' active with Landscape Screen and 6' high berm Length of Buffer=200' KEY QTY. BOTANICAL NAME COMMON NAME SIZE Z _10 y o y � O Downy Serviceberry 2" Cal. See Plans Deciduous Tree AR 18 Acer rubrum Red Maple 2" Caliper See plans C BM 0 II 15. NOTE: CONTRACTOR TO REGRADE, SOD OR HYDROSEED AND STRAW MULCH ALL AREAS DISTURBED AS A RESULT OF THEIR WORK. (2) UPRIGHT STAKES TO BE USED ON TREES UP TO 12' HGT. LARGER TREES TO BE GUYED. TREE WRAP MAIN TRUNK RUBBER HOSE 2"x2" HARDWOOD GUY STAKE 2 PER TREE 12 GAUGE GALVANIZED WIRE -DOUBLE STRAND TWISTED - 4" MULCH 3- SAUCER AROUND TREE EXISTING SOIL MIX COMPACTED MOUND TO PREVENT TREE FROM SETTUNG - 6" MIN. h UPRIGHT STAKES EXTENDED TO - FIRM BEARING REMOVE TOP 1/3 OF ALL BURLAP ROPE FROM ROOT BALL. TREE PLANTING SECTION >,N, UNIT 3. I W-730.8080 .50° S L �a- G II rim -G E��w,.i eWF IIS I� 3 NOTE: PLANT SPACING VAI PRUNE ALL BROKE WEAK BRANCHES. ALL SHRUB BEDS EXCAVATED OF ALL TO REQUIRED DEPI W/ REQUIRED SOIL MULCH TO BE 3" COMPLETELY REMO STRINGS. RIBBONS, TAGS FROM PLANT REMOVE TOP 1/3 BURLAP FABRIC AF ROOT BALL. SCARIFY ROOTS Or BOUND PLANTS. COMPACT SOIL TO 85% AT OPTIMUM MOISTURE CONTENT SHRUB PLANTING BED 2.&1 SLOPE 1261 q 724 ^ ! 1 nl I..IT ]D GG=]17 T+0 }1 SLOPE 11 61GPE� 1500 $F I 3:1 SLOPE ' TAe at . g " "500 IV - FF=72860 -. " _---.-- � f0 1?00 SG z) 1.59D UNI a fF t1 FF" 26.60 ,.So9 sF UNIT 1 � UNIT 6 FF=]29 60 L FFe130.60 1 500 $F PARCEL 2 a< q PL[ �. NNI1 6� ac UNIT -023 UNn 2 FF969 I FT:TY.1.60 1.300 SF R 10 (6)CL PARCEL 2 PLANT UST I I UNIT 5 11NR < �FSW SF FF=RB 6D L5p0 SF b r a a z -� m/ uNrt za 1 2.00°5.80 / (10)FIDO 099 56fIV °�M1 116 1R6 / (5)cM / ti / gM11 r / X10 uMl z5 r F / "la CEDAR 5wo 5V r UNIT 21 F�1266D (3)CL \� ASH UNIT 20 FFaT9.ba t SODIf/ n n "]26.80 1,509 Bf 1.599 Sr � ^ / l(4)2-3" CAL S0.55AGNA5 X10" sAssnFRnS 6 r r (3)FI I \'10" MAPLE �P 1a'c11eRR: 126.6° 1.600 / / 12" CEDAR UNrt ,1 S FF�121.80 1.596 fiD 1,500 SF / Iv CEDAR - 2" CEDAR r r \\ fi SASSAFRAS r / 12` CHERRY (5)n / \ -d.' CEDAR / 6CEDAR / CEDAR UN ,4 LOCUST LOCUST FRRY r �� lnAR ^ <el (5)CL _ _ J, •' OF CAS (4)SN _ AR= _ 1 .-ST 1 G 7 - - (6)PA V - � - (e)FI Ow LANDSCAPE REQUIREMENTS FOR PARCEL 1: (a)FI Parcel Greenspace Required: 15% or 4,268 sq. ft. vR Parcel Greenspace Provided: 100% or 28,453 sq. ft. (S)JV (6)PA Parking Lot Landscaping: (no parking proposed) LANDSCAPE PLAN Proffer Landscaping: Provided Low Profile shrubs on 36" berm along Route 522 right of way. Zoning District Buffers/Screening: B2 against RA residential: Category B Buffer 25' inactive/25' active with Landscape Screen and 6' high berm Length of Buffer=200' KEY QTY. BOTANICAL NAME COMMON NAME SIZE SPACING REMARKS AA 10 Amelanchier arborea Downy Serviceberry 2" Cal. See Plans Deciduous Tree AR 18 Acer rubrum Red Maple 2" Caliper See plans Deciduous Tree 2 rk BM 10 Berberis x mentorensis Mentor Barberry 3 gal. 4' o.c. shrub BN 22 Betula nigra River Birch 2" Cal. See Plans Deciduous Tree (11) 3"-12" cal. Locust, (6) 21 Chionanthus vir inicus Fringetree 4' height see plans Deciduous Tree CL 43 Cupressocyporis x leylandi Leyland Cypress 4' het ht 8' O.C. Evergreen Tree FI 50 Forsythia x intermedio Border Forsythia 3 al. cont. 4' o.c. shrub Sizes specified in the Plant List are minimum sizes against which the plants will be judged. Failure to meet 10 Juni erus chinensis 'Iowa' Iowa Juniper 48" height 4' o.c. Rt 522 berm shrub 6. Groups of shrubs shall be placed in a continuous mulched bed with smooth, continuous edges as shown on the Juni erus chinensis 'Mountbatten' Mountbatten Juniper 48' height 4' o.c. headlight screen 12 Juni erus chinensis 'Sar entii' Sar ent Juniper 3 at. cont. 4' o.c. Rt 522 berm shrub 7 Juni erus vir iniono Burkii Burk Eastern Redcedor 4' hei ht Evergreen Tree TA 16 Tilia americana American Linden 2" cal. Interior Shade Tree PS 15 Pinus strobus Eastern White Pine 4' height Use shredded hardwood bark mulch in all planting beds. Evercireen Tree PA 32 Prunus americana American Plum 2" Col. 11. Deciduous Tree VR 26 Viburnum rhytidophyllum Leatherleaf Viburnum 36" height See Plans shrub WF 30 Weigela florido 'Alexandra' Wine and Roses Weigela 3 gal. cont. See Plans shrub to installation. 13. Plant all materials in their appropriate season. The Contractor shall guarantee all plant materials and workmanship Plants Required=200'/10=20x3=60 plants total (20 shrubs, 20 deciduous trees, 20 evergreen trees) Provided: 60 plants total (20 shrubs, 20 deciduous trees, 20 evergreen trees) LANDSCAPE REQUIREMENTS FOR PARCEL 2: Parcel Greenspace Required: 15% or 38,528 sq. ft. Parcel Greenspace Provided: 38.8% or 99,718 sq. ft. Parking Lot Landscaping: Perimeter Areas: (1) Tree per 2,000 sq. ft. of Impervious Area Required Trees: 1,260 sq. ft./2,000=0.63=> 1 tree Provided Trees: 1 tree Required Headlight Screening: 3' high screen along Rights -of -ways and adjacent properties. Interior Areas: (1) Tree Per 10 Parking Spaces Trees Required: 3 spaces/10= 0.3=> 1 trees Trees Provided: 1 trees 5% Interior Greenspace Required: 1,260 sq. ft. x .05= 63 sq. ft. Provided Interior Greenspace: 12% or 150 sq. ft. Impervious Area Tree Requirement: 1 tree per 10,000 sf of impervious area. 157,138/10,000= 16 trees Zoning District Buffers/Screening: North Property Line: B2 against (vacant) RAC no buffer required per approved Master Development Plan me Z CL w IL Q U V) 0 Z 9 a- w � U Q U Z �U a �Of > W J Q :2 U W 0 (n 0 U LL. < V) LLI U N W Of W Z O 3E � [If V) U U J o w N Li H0 mm o U N N I I 3 N N w Q LU J w " v Li. U Fw- N O .-T WQ I d ry no a c Z U3 _2 L2 W _ r Q � a 00 z J w CnCn z Uw pVu ," C. I EWIS r No. 021621 SURVEY: C.I.: P -L 1, DRAWN BY: JOB NO. Zoning District Buffers/Screening: 1711030 SCALE: DATE: South and East Property Lines: B2 against RA residential: Category 8 Buffer LANDSCAPE INSTALLATION: 25' inactive/25' active with Landscape Screen and opaque fence Length of Buffer= 1087' 1. Confirm the locations of any utilities above or below ground prior to commencing work. Contact the Landscape Plants Required= 1087'/10=108.7x3=323 plants total Architect in the event that utilities or any other structure conflicts with the layout shown on the plan. (108 shrubs, 108 deciduous trees, 107 evergreen trees) 2. Verify the quantities shown on the plant list with totals indicated on the plan. Contact the Landscape Architect in the event that discrepancies exist. Supply unit prices to the Owner at time of bidding. Credit for the existing plants along the eastern buffer: (6) 2"-3" cal. Sassafras, (11) 3"-12" cal. Locust, (6) 3. All materials are subject to approval by the Owner or Owners representative. Provide the Owner with a tag from 10'-18" cal. Cherry, (5) 4"-8" cal. Ash, and (1) 10" cal. Maple will reduce the required number of deciduous trees each plant species and a list of the plant suppliers. Where any requirements are omitted from the Plant List, use by 29; (32) 3"-12" cal. Cedars will reduce the required number of evergreen trees by 32. plants which meet the normal requirements for the variety according to the American Association of Nurserymen. 4. Plants shall be sound, healthy, vigorous, well branched, free of disease, insect eggs and larvae, and shall have EXISTING PLANTS IN THE EASTER BUFFER WILL BE MAINTAINED IN GOOD CONDITION AS REQUIRED TO MEET THE INTENT adequate root systems. OF THE ORDINANCE. 5. Sizes specified in the Plant List are minimum sizes against which the plants will be judged. Failure to meet minimum size on any plant will result in rejection of that plant. Plants Provided: 262 plants total (108 shrubs, 79 deciduous trees, 75 evergreen trees) 6. Groups of shrubs shall be placed in a continuous mulched bed with smooth, continuous edges as shown on the plan. All mulched beds shall be curvilinear in shape fallowing the contour of the plant mass. Apply a minimum of 4 inches of mulch uniformly over beds. Trees located within four feet of any shrub bed shall share the some bed. Grade finished planting beds so as not to impede surface drainage. 7. Locate trees a minimum of 3 feet from walls or walks, if possible. B. Stake and guy all trees according with standard practice and/or the suppliers recommendations. At a minimum, all deciduous trees shall be double -guyed with 72" hardwood stakes driven firmly into the ground. Secure tree to stakes with #9 galvanized wire guys with rubber hose connections. Stakes shall be 2" x 2" x 72". 9. Use shredded hardwood bark mulch in all planting beds. 10. Remove all tags, twine and containers from installed plants. Roll back burlap one third on all B&B plants. 11. All plant substitutions are permitted with consent from the Landscape Architect and the Frederick Co. Planning Department. 12. Prepare the soil in all bedding areas by mixing into the top six inches of soil one cubic yard of manure, peat and 10-6-4 granular fertilizer per 100 square feet of area. Remove any turf, weeds or other vegetation completely prior to installation. 13. Plant all materials in their appropriate season. The Contractor shall guarantee all plant materials and workmanship for a period of one year from time of installation. 14. All existing plant materials shall remain unless otherwise noted on these plans. 15. All plantings must conform to sec. 165-203.01 of the Frederick County Zoning Ordinance. 16. No trees or shrubs shall be placed on Frederick Water easements. me Z CL w IL Q U V) 0 Z 9 a- w � U Q U Z �U a �Of > W J Q :2 U W 0 (n 0 U LL. < V) LLI U N W Of W Z O 3E � [If V) U U J o w N Li H0 mm o U N N I I 3 N N w Q LU J w " v Li. U Fw- N O .-T WQ I d ry no a c Z U3 _2 L2 W _ r Q � a 00 z J w CnCn z Uw pVu ," C. I EWIS r No. 021621 SURVEY: C.I.: P -L 1, DRAWN BY: JOB NO. P -L 1711030 SCALE: DATE: AS SHOWN 3/25/20 SHEET: 13/1 ® Ex MV -��- X. wv (a) _ I' .II Ocn ; X n N STOP SIGN 4" WHITE PVMT MARKING TYP w"' XN z o za Z w W LLJ i OY �gz� a LL � a 0 N U ULQC) [N Ll W WLLJ U Z LLJ ® Ex MV -��- X. wv (a) _ I' .II Ocn ; X n N STOP SIGN 4" WHITE PVMT MARKING TYP w"' XN 3NV1 o za 3.113 LLJ i W a ONIN11Vd X ON 3NV1 3.113 ON1NaVd ON z w'' ao ZW �Z N a�> W a J X W Z N 0 N U ULQC) [N z w'' OY ZW �Z N a�> W a J 3NV1 3.113 ONIN11Vd ON ..B IX.ZI FL38 1lX„ZL r� 3NVI3NVI 31113 31113ONIN11Vd ONIN.1Vd ON ON 40 0 40 120 Scale in Feet z zCL g� �Z CL Ir L� N 1w Q Z 0 Of W I.— U_ Q W U Z N � a�> W w�cl� J :2U W Z N 0 N U ULQC) V) Ll W WLLJ U Z LLJ o Q =� � U N U J a LU J LW r Z Q CL I Op 2 II e F satw_ar'a aoaa'__'�"" Romp P i 9 {{ppNTRyea11NG 1q.57'�"- II 1 1 1t I II III II 1 I II 1 1 II AC 80 0 80 MANiiiii Scale in Feet ON SnE CON OB RING AREA=5.93 FC COMMERCIAL If �/ ���.��OFF SRE CONTRIBi AREA -0.72 AC -'�"-- MOBILE HOME PARK POST DEVELOPMENT WATER QUANTITY NARRATIVE The site is located near a local high point. Under existing conditions, 5.51 acres including 0.72 acres from the adjacent mobile home park flow to the Swale at the northern boundary. Under post development conditions, the installation of a storm sewer system and with the grading of the site, 7.67 acres flow to the Swale at the northern boundary. The detention pond will limit the peak discharge rates from the design storm events to acceptable rates as shown below. PREDEV 2 -YEAR 10 YEAR 100 YEAR 5.11 CFS 10.97 CFS 23.12 CFS POSTDEV 2.64 CFS 3.31 CFS 5.19 CFS PROPOSED CONDITIONS -DRAINAGE AREA EXHIBIT IIEALAAA 21KWi:IV'Ill7[01III n ",IIIA;; This site is the subject of existing Frederick County approvals including Rezoning #10-05, Master Development Plan #09-06, and Subdivision Design Plan #19-07. A stormwater management plan was submitted and approved along with the Subdivision Design Plan on March 19, 2008. Construction of the entrance as depicted on the Subdivision Design Plan was begun in 2019. This site plan is in substantial conformance with the approved Subdivision Design Plan. No water quality controls are proposed. The property owner is responsible for the maintenance of the stormwater management facility. The property owner will conduct inspections of the facility at least once per year and after each measurable rainfall event of 1" within 24 hours. Crossroads Commerce Center SWM POND NOAA24-hi 2 -Year Rainfall=2.80" Prepared by {enter your company name here) Printed 4/1/2020 HydmCAM 10.00-25 sin 08684 @ 2019 HydroCAD software Solutions LLC Summary for Subcatchment IS: PREDEV Runoff = 5.11 cis @ 12.24 firs, Volume= 17,593 4, Depth, 0.88" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24.01 hrs, dt= 0.03 hrs NOAA 24 -hr B 2 -Year Rainfall=2.80" Area (ac) CN Description 0.720 90 1/8 acre lots 65% imp, HSG C 4.790 74 >75% Grass cover. Good, HSG C 5.510 76 Weighted Average 5.042 91 .51 % Pervious Area 0.468 8.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fVh) (fVsec) (ds) 11.5 100 0.0160 0.15 Sheet Flow, SEGMENT AS Grass: Short n=0.150 P2=2.80" 2.7 441 0.0330 2.72 Shallow Concentrated Ftow, SEGMENT BC GrassedWaterway 15.0 ftm15a ftm 14.2 541 Total Prepared by (enter your company name here) Printed 4/1/2020 H WreCAD@ 10.00-25 sin 08684 @ 2019 HydroCAD Software solutions LLC Summary for Subcatchment IS: PREDEV Runoff = 10.97 cis@ 12.23 hrs, Volume= 36,2004, Depth> 1.81" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24.01 hrs, dt= 0.03 hrs NOAA24-hrB 10 -Year Rainfall=4.10" acre 5.042 91.51 % Pervious Area 0.468 8,49%Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (fluff) (IVsec) (4s) 11.5 100 00160 0.15 Sheet Flow, SEGMENT AS Grass: Short n-0150 P2= 2.80" 2.7 441 0.0330 2.72 Shallow Concentrated Flow, SEGI Grassed Waterway Kv= 15.0 fps 14.2 541 Total Prepared by (enter your company name here) Printed 4/12020 Hyd.CAO@ 10.00-25 sin 08684 @ 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: PREDEV Runoff = 23.12 cfs @ 12.22 hrs, Volume= 76,109 cf. Deplh> 3.81" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24.01 hrs, dl= 0.03 hrs NOAA 24 -hr B 100 -Year Rainfall=6.50" acre 5.042 91.51% Pervious Area 0.468 8.49% Impervious Area Description ,a rvv v.o,ov u. m anear new, xramcn Tao Grass: Short n= 0.150 P2= 2.80" 2.7 441 0.0330 2.72 Shallow Concentrated Flow, SEGMENT BC Grassed Waterway Kv= 15.0 fps 14.2 541 Total 25 ns n AEDIN ros.o4 J� \ aP urwfraxeo Bwxau9 5LJ Prepared by (enter your company name here) Printed 4/1/2020 HydroCAD®10.00-25 sin 08684 @ 2019 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: POSTDEV Runoff = 14.14 cfs @ 12.27 hrs, Volume= 53,911 cf, Depth> 2.06" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24.01 hrs, dt= 0.03 hrs NOAA 24 -hr B 2 -Year Rainfall=2.80" 0.720 90 118 acre lots, 65% imp, HSG C 0.570 87 1/4 acre lots, 38% imp, HSG D 5.930 94 Urban commercial, 85% imp, HSG C 7.220 93 Weighted Average 1.495 20.70% Pervious Area 5.725 79.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (fl/sec) (ds) 13.8 100 0.0100 0.12 Sheet Flow, SEGMENT AS 5.725 79.30% Impervious Area Grass: Short n=0.150 P2=2.80" 18.8 100 Total Crossroads Commerce Center SWM POND NCAA 24-hrB 10 -Year Rainfall=4.10" Prepared by {enter your company name here} Printed 4/1/2020 HvdroCAD®10.00-25 sin 08684 @ 2019 HW oCAD Software Solutions LLC Summary for Subcatchment 2S: POSTDEV Runoff = 22.20 cfs @ 12.27 firs, Volume= 86,693 cf, Depth> 3.31" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24.01 hrs, dt= 0.03 hrs NOAA 24 -hr B 10 -Year Rainfall=4.10" 0.720 90 1/8 acre lots, 65% imp, HSG C 0.570 87 1/4 acre lots, 38% imp. HSG D 1.495 20.70% Pervious Area 5.725 79.30% Impervious Area To Length Slope Velocity Capacity Description Imir) (feet) (1110) (f/sec) (cfs) 13.8 100 0.0100 0.12 Sheet Flow, SEGMENT AS Grass: Short n=0.150 P2=2.80" 5.0 Direct Eni 18.8 100 Total Prepared by {enter your company name here} Printed 4/1/2020 HvdroCAD@ 10.00-25 s/n 08684 @ 2019 HydroCAD SofWare Solutions LLC Summary for Subcatchment 2S: POSTDEV Runoff = 36.87 cfs @ 12.27 has Volume= 148,375 cf Depth> 5.66" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 1.00-24,01 hrs, dt= 0.03 him NOAH 24hr B 100 -Year Rainfa11=6.50" Crossroads Commerce Center SWM POND NOAH 24 -hr B 2 -Year Rainfal1=2.80" Prepared by {enter your company name here} Printed 4/12020 HvdrOCAD@ 10.00.25 sin 08684 @ 2019 HydroCAD Software Solutions LLC Summary for Pond 3P: SWM POND [44] Hint: Outlet device #3 is below defined storage Inflow Area 314,503 sf, 79.30% Impervious, Inflow Depth> 2.06" for 2 -Year event Inflow = 14.14 cfs @ 12.27 firs, Volume= 53,911 of Outflow = 2.57 cfs @ 12.97 hrs, Volume= 53,824 cf, Atten= 82%, Lag= 41.5 min Primary = 2.57 cfs @ 12.97 hrs, Volume= 53,824 cf Routing by Stor-Ind method, Time Span= 1.00-24.01 firs, dt= 0.03 hrs Peak Elev= 720.15'@ 12.97 hrs Surf.Area= 9,817 sf Storage= 22,793 d Plug -Flow detention time= 85.5 min calculated for 53,824 cf (100% of inflow) Center -of -Mass det. time= 84.5 min ( 886.8 - 802.3 ) Volume Invert Avail.Storage Storage Descnption #1 717.00' 101,880 cf Custom Stage Data (Prismatic) Listed below (Recalc) - Elevation Surf.Area Ino.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 71/.00 1,100 0 0 718.00 7,450 4,275 4,275 719.00 8,530 7,990 12,265 720.00 9,645 9,088 21,353 721.00 10,810 10,228 31,580 722.00 12,020 11,415 42,995 723.00 13,290 12,655 55,650 724.00 14,600 13,945 69,595 725.00 15,970 15,285 84,880 726.00 18,030 17,000 101,880 #1 Primary 716.50' 18.0" Round Culvert L=40.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 716.50'1716.00' S=0.01257' Cc= 0.900 n=0.011 Concrete pipe, straight & clean, Flow Area= 1.77 sf #2 Device 1 725.00' 1.0" x 4.0" Horb, OrificefGrate X 4.00 columns X 14 rows C= 0.600 Limited to weir flow at low heads #3 Device 1 716.80' 8.0" Round Culvert L= 12.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet/ Outlet Invert= 716.80'/716.60- S=0.01677' Cc= 0.900 n= 0.010, Flow Area= 0.35 sf maty OutFlow Max=2.57 cfs @ 12.97 hrs HW=720.15' (Free Discharge) Culvert (Passes 2.57 Ors of 12.78 cis potential flow) 2=0r'dicaZwe ( Controls 0.00 cls) 3: Culvert (Inlet Controls 2.57 cfs @ 7.38 fps) Crossroads Commerce Center SWM POND NOAA 24 -hi 10 -Year -Rain Prepared by fenter Your companv name here} Printed Summary for Pond 3P: SWM POND (44] Hint: Outlet device #3 is below defined storage Inflow Area 314,503 sf, 79.30% Impervious, Inflow Depth> 3.31" for 10 -Year event Inflow = 22.20 ds @ 12.27 hrs, Volume= 86,693 cf Outflow = 3.19 ds @ 13.10 hrs, Volume= 86,550 cf, Atlen= 86%, Lag= 50.0 n Primary = 3.19 cis @ 13.10 hrs, Volume= 86,550 cf Routing by Stor-Ind method, Time Span= 1.00-24.01 hrs, dt= 0.03 hrs Peak Elev= 721.77' @ 13.10 hrs Surf.Area=11.747 sf Storage= 40,319 cf Plug -Flow detention time= 124.7 min calculated for 86,550 cf (100% of inflow) Center -of -Mass det. lime= 123.7 min (914.6-791,0 ) Device Routing Invert Outlet Devices #1 Primary 716.50' 18.0" Round Culvert L= 40.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet] Outlet Invert= 716.50'/716.00' S=0.01257' Cc= 0.900 n=0.011 Concrete pipe, straight&clean, Flow Area=1.77sf #2 Device 1 725.00' 1.0" x 4.0" Horiz. ONOce/Grate X 4.00 columns X 14 rows C= 0.600 Limited to weir flow at low heads #3 Device/ 716.80' 8.0" Round Culvert L= 12.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet/Outlet Invert- 716.80'/716.60' S=0.0167'! Cc=0.900 n=0.010, Flaw Area= 0.35 sf PrimaryOutFlow Max=3.19 ds @ 13.10 hrs HW=721.77' (Free Discharge) t1=Culvert (Passes 3.19 cfs of 15.97 cfs potential flow) �2=Orifice/Grate ( Controls 0.00 cfs) 3=Culvert (Inlet Controls 3.19 ds @ 9.15 fps) Crossroads Commerce Center SWM POND NOAA 24-hr8 100 -Year Rainfall= W. Prepared by {enter your company name here} Printetl 4/1/2020 Of Q LILI H ::) Q � I IYW 0 N W Q Z Q Of Z U Q W Z U � � Q%