Loading...
HomeMy WebLinkAbout16-20 CommentsNo additional road name required at this time. If plans for the substation change substantively, please resubmit for further review. 5/13/2020No Helen White, GIS Technician 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 August 27, 2020 Mr. Tyler Hays GAI Consultants, Inc. 120 Eastshore Drive Suite 100 Glen Allen, Virginia 20191 RE: 2nd Revised Site Plan Comments – Millbrook Substation Dear Mr. Hays: Upon review of the revised site plan July 31, 2020, we recommend approval of the subject plan. Sincerely, Joseph W. Johnson, P.E. Joe C. Wilder Civil Engineer Director of Public Works JCW/kco cc: Planning and Development file 1 From:rhonda.funkhouser@vdot.virginia.gov Sent:Wednesday, May 06, 2020 9:12 AM To:Tyler Hays Cc:Lloyd Ingram; John Bishop; Candice Perkins Subject:Millbrook Substation - VDOT Comments to Site Plan Attachments:comment sheet.pdf EXTERNAL E-MAIL MESSAGE  DEPARTMENT OF TRANSPORTATION Edinburg Land Development  14031 Old Valley Pike  Edinburg, VA 22824     Mr. Hayes,     A VDOT review has been conducted for the Millbrook Substation site plan with an issue date of March 31,  2020.  Based on the review of the drawings, the site plan is acceptable by our office.  Please ensure all  applicable agencies have the most recent set of approved drawings.       We offer the following general comments:     · Our review and comments are general in nature.  Should details be overlooked during plan review or  conditions in the field exist such that additional measures are warranted, such measures shall be  completed to the satisfaction of the department.     · Materials used and methods of construction shall adhere to the current observed VDOT Road and  Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land  Use Permit Special Provisions.       · Any construction related changes to the approved plan must come through the design engineer to  VDOT for approval.  Please allow a minimum of 5 business days for VDOT review.     · A Land Use Permit shall be obtained before any work is performed on the State’s right‐of‐way.  The  permit is issued by this office and may require application fees, the salary & expenses of a State  assigned inspector, and surety bond coverage.       If you have any questions or need further information, please do not hesitate to contact me.     Regards,  Lloyd A. Ingram | Land Development Engineer  Virginia Department of Transportation  Clarke, Frederick, Shenandoah & Warren Counties   14031 Old Valley Pike  Edinburg, VA 22824  voice: 540/984-5611  2 fax: 540/984-5607  e-mail: Lloyd.Ingram@vdot.virginia.gov