HomeMy WebLinkAbout16-20 CommentsNo additional road name required at this time. If plans for the substation change substantively,
please resubmit for further review.
5/13/2020No
Helen White, GIS Technician
107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
August 27, 2020
Mr. Tyler Hays
GAI Consultants, Inc.
120 Eastshore Drive
Suite 100
Glen Allen, Virginia 20191
RE: 2nd Revised Site Plan Comments – Millbrook Substation
Dear Mr. Hays:
Upon review of the revised site plan July 31, 2020, we recommend approval of the
subject plan.
Sincerely,
Joseph W. Johnson, P.E. Joe C. Wilder
Civil Engineer Director of Public Works
JCW/kco
cc: Planning and Development
file
1
From:rhonda.funkhouser@vdot.virginia.gov
Sent:Wednesday, May 06, 2020 9:12 AM
To:Tyler Hays
Cc:Lloyd Ingram; John Bishop; Candice Perkins
Subject:Millbrook Substation - VDOT Comments to Site Plan
Attachments:comment sheet.pdf
EXTERNAL E-MAIL MESSAGE
DEPARTMENT OF TRANSPORTATION
Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
Mr. Hayes,
A VDOT review has been conducted for the Millbrook Substation site plan with an issue date of March 31,
2020. Based on the review of the drawings, the site plan is acceptable by our office. Please ensure all
applicable agencies have the most recent set of approved drawings.
We offer the following general comments:
· Our review and comments are general in nature. Should details be overlooked during plan review or
conditions in the field exist such that additional measures are warranted, such measures shall be
completed to the satisfaction of the department.
· Materials used and methods of construction shall adhere to the current observed VDOT Road and
Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land
Use Permit Special Provisions.
· Any construction related changes to the approved plan must come through the design engineer to
VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
· A Land Use Permit shall be obtained before any work is performed on the State’s right‐of‐way. The
permit is issued by this office and may require application fees, the salary & expenses of a State
assigned inspector, and surety bond coverage.
If you have any questions or need further information, please do not hesitate to contact me.
Regards,
Lloyd A. Ingram | Land Development Engineer
Virginia Department of Transportation
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA 22824
voice: 540/984-5611
2
fax: 540/984-5607
e-mail: Lloyd.Ingram@vdot.virginia.gov